In terms of Rule 48 of Public Procurement Rules, 2004, the Grievance Redressal Committee (GRC) has been notified for the subject procurement. The notification is available on the Procuring Agency's website and on PPRA's website.
Productivity Enhancement Through Installation of Solar Powered High Efficiency Irrigation System in ICT (Water Management Department-ICT)
Director
ICT Agriculture Complex Mauve Area G-11/4, Islamabad Capital Territory
+92-333-540-4351
watermanagementdepartmentict@gmail.com
The following specific data for the Framework Agreement shall complement, supplement, or amend the provisions in the Instructions to Applicants/Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
FDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instructions to Applicants/Bidders
FDS Clause Number 1
ITB Number 1.1
Identification Number of the Framework Agreement: FFW10269
The Procuring Agency is: Productivity Enhancement Through Installation of Solar Powered High Efficiency Irrigation System in ICT (Water Management Department-ICT)
Framework Agreement Title: PRODUCTIVITY ENHANCEMENT THROUGH INSTALLATION OF SOLAR POWERED HIGH EFFICIENCY IRRIGATION SYSTEM IN ISLAMABAD CAPITAL TERRITORY
FDS Clause Number 2
ITB Number 2.1
The name of Procuring Agency is: Productivity Enhancement Through Installation of Solar Powered High Efficiency Irrigation System in ICT (Water Management Department-ICT)
The name of Framework Agreement is: PRODUCTIVITY ENHANCEMENT THROUGH INSTALLATION OF SOLAR POWERED HIGH EFFICIENCY IRRIGATION SYSTEM IN ISLAMABAD CAPITAL TERRITORY
FDS Clause Number 3
ITB Number 2.2
Participating / Authorized Procuring Agencies under this Framework Agreement:
ITA Number 4.2
Maximum number of members in a Joint Venture (JV): 2
FDS Clause Number 4
ITB Number 3.1
Framework Type: Closed Framework Agreement
FDS Clause Number 5
ITB Number 4.1
Framework Duration: 12 Months Lot Title : Installation of Solar Pumping System 3.3 HP & 5.5 HP
Commencement Date: Expired after the framework duration of 12 months from the award date.
Expiry Date:
Item
UNSPSC
Delivery Schedule
Quantity Manufacturer / Dealer Authorization Warranty
SOLAR PHOTOVOLTAIC
Electric power system construction service
1 / Qty Any 5 Years
PUMP CONTROLLER/VARIABLE FREQUENCY DEVICE (VFD)
Electric power system construction service
1 / Qty Any 5 Years
SOLAR ARRAY PANEL STRUCTURE
Electric power system construction service
1 / Qty Any 5 Years
SOLAR ARRAY WIRING
Electric power system construction service
1 / Qty Any 5 Years
CONNECTORS AND POWER DISCONNECT
Electric power system construction service
1 / Qty Any 5 Years
FDS Clause Number 6
ITB Number 5.1
A list of debarred firms and individuals is available on PPRA website: https://ppra.gov.pk
FDS Clause Number 7
ITB Number 7.1
For clarification, the Applicant shall seek clarifications through: EPADS v2.0
FDS Clause Number 8
ITB Number 7.1 & 8.2
Information related to the Framework Agreement shall be published on: EPADS v2.0
FDS Clause Number 9
ITB Number 7.2
Pre-Bid Meeting: Clarification Date: Wednesday, October 14, 2026
FDS Clause Number 10
ITB Number 10.1
This Framework Agreement Document has been issued in the language: English
FDS Clause Number 11
ITB Number 11.1(d)
Additional documents to be submitted through {SYSTEMSHORTTITLE}:
No
FDS Clause Number 12
ITB Number 14.2
Source for determining exchange rates: Not Applicable
FDS Clause Number 18
ITB Number 16.1
Deadline for Bid Submission:
Day: Friday
Date: Friday, October 16, 2026
Time: 11:00 AM
FDS Clause Number 19
ITB Number 17.1
Opening of Bids shall be conducted through: EPADS v2.0
Day: Friday
Date: Friday, October 16, 2026
Time: 11:30 AM
Virtual participation link: https://vendors.epads.gov.pk/
FDS Clause Number 20
ITB Number 21.1
Margin of Domestic Preference: Not Applicable
FDS Clause Number 21
ITB Number 22.1
Framework Award Basis: Least Cost Based Selection (LCBS)
FDS Clause Number 22
ITB Number 23.1
Suppliers admitted to the Framework Agreement shall not be guaranteed any minimum quantity, value, or volume of business unless otherwise stated in the Framework Agreement.
FDS Clause Number 23
ITB Number 29.1
Framework-related complaints / grievances shall be submitted in writing through: EPADS v2.0
A complaint may challenge:
For Brief description see Annex-A.
Yes
Installation of Solar Pumping System 3.3 HP & 5.5 HP
| Position | Related Services |
|---|---|
| SOLAR PHOTOVOLTAIC | Commissioning and Installation |
| PUMP CONTROLLER/VARIABLE FREQUENCY DEVICE (VFD) | Commissioning and Installation |
| SOLAR ARRAY PANEL STRUCTURE | Commissioning and Installation |
| SOLAR ARRAY WIRING | Commissioning and Installation |
| CONNECTORS AND POWER DISCONNECT | Commissioning and Installation |
Lot Title : Installation of Solar Pumping System 3.3 HP & 5.5 HP
Position: SOLAR PHOTOVOLTAIC
Specifications / Requirements:
| Title | Description |
|---|---|
| Application | To absorb the sunlight as a source of energy to generate electricity. |
| Nominal Power (Watt) | ≥ 585 (N-Type) |
| Solar Cell | Bifacial, TOPCON, Mono/poly Perc |
| Module Efficiency (%) | ≥ 21 |
| Power Tolerance | Positive Tolerance Only |
| Operating Temperature | -40℃ to +85℃ |
| International Standards Compliance | IEC 61215, IEC 61730 |
| Identification | Barcode |
| Labeling and Import Data | Name of Manufacturer, Unique Model Number and Serial Number, Maximum Performance Pmax, Maximum Power Voltage Vmp, Maximum Power Current Imp, Open Circuit Voltage Voc, Short Circuit Current Isc, Month and Year of Manufacturing (the age of the module must not be more than one year at the time of installation). |
| Junction Box | PVC |
| Junction Box Standard | IP67 and Above |
| Performance Warranty | 25 Years i.e. Insurance backed warranty (Manufacturer warranty on letter head), global irrevocable and immediate insurance-backed with 3rd party policy rights of operation. Performance warranty will be linear. |
| Materials and Workmanship Warranty | Free: 12 Years or above |
| Power Output Warranty | Power output within 10 years Shall not fall below 90%. Power output within 25 years Shall not fall below 80%. |
| Degradation | Anti-Potential Induced Degradation (PID) |
| Origin | Imported |
| Temperature Co-efficient of Maximum Power (Pmax) | ≤ -0.43% / °C |
| Minimum Efficiency at 200W/m2 (25°C, AM 1.5) | Equal to or more than 95% of the module efficiency at STC. |
| Connector | MC4 Equivalent connectors. |
Position: PUMP CONTROLLER/VARIABLE FREQUENCY DEVICE (VFD)
Specifications / Requirements:
| Title | Description |
|---|---|
| Application | Converts D.C. voltage to A.C. voltage and regulates the functions of the pump |
| Standard Compliance | IP65 or above |
| Efficiency | ≥95 % |
| Type | Wall mounted |
| Free warranty period | 02 years from the date of certification including replacement and O&M service or more as provided by manufacturer. |
| Built-in functions | Variable Frequency Drive. Automatic Start and Stop with any input power (solar, Grid and Generator). Self-diagnostic and self-Protection. Multi-string input with failure. Dry run protection detection. MPPT (Maximum Power Point Tracking). |
| Controls | Digital controls with complete protective functions. Instantaneous output status display (Speed / Power /Amps) etc. Intelligent Power module (IPM) with LED displays or external display through smart phone for operating system. Data logging (Optional). Ground fault monitoring.AC short circuit protection. Under/Over Voltage & Over Current protection. Low Voltage Disconnect (LVD). Overcharge Protection. Reverse Current Blocking. |
| Temperature range | -10 to + 60 degree Celsius |
| Rated output voltage | A.C. and D.C. rated voltage (single/three phase)/rated voltage matching with the motor. |
| Origin | Imported |
Position: SOLAR ARRAY PANEL STRUCTURE
Specifications / Requirements:
| Title | Description |
|---|---|
| Application | Ground-mounted structure for 585 W solar PV modules |
| Structure Type | Fixed-tilt, ground-mounted |
| Main Structure | L2 & L3 galvanized steel sections |
| Steel Thickness | 14 Gauge minimum |
| Material | Mild Steel / GI structural steel |
| Wind Load | Designed for minimum 150 km/h wind speed |
| Fasteners | SS-304 minimum, corrosion-resistant |
| Bracing | Adequate diagonal, longitudinal & transverse bracing |
| Foundation | RCC foundation designed according to site/soil conditions |
| Anchor Bolts | Galvanized/SS anchor bolts of approved size |
| Earthing | Complete metallic structure to be properly bonded and earthed |
| Tilt & Orientation | Optimized for Islamabad solar conditions |
| Structural Design | Structural calculations and wind-load analysis mandatory |
| Drawings | GA, fabrication and foundation drawings to be submitted |
| Alignment | Structure shall be level, plumb, rigid and properly aligned |
| Design Life | Minimum 25 years |
| Structural Warranty | Minimum 10 years |
| Quality Certificates | Material and galvanization certificates required |
| Installation | Complete supply, fabrication, transportation and erection |
| Standards | Applicable IEC and relevant structural/building standards |
| Contractor Responsibility | Complete structure including all accessories, fittings and civil works |
Position: SOLAR ARRAY WIRING
Specifications / Requirements:
| Title | Description |
|---|---|
| Application | To carry current |
| Type | Single conductor type, 99.99% Copper, Cross-sectional area of 4 mm2 or higher, 1000 V/Class II (according to protection class II /1000V, single core cable, linned copper conductor, XLPE insulation, double EVA jacket (resistant to heat and cold, resistant to heat and cold, resistant to ozone, UV, oil and chemicals), Temperature range:-40 to 90 0C (temperature peak allowable:120 0C), Halogen free, DC cables shall be suitable for the environmental conditions at the Project site, including |
| Color Coding | Positive: Red or brown. Negative : Black or blue |
| Cable Losses | Ohmic losses less than 1% for DC cables and 0.5% for AC cables |
| Cable binders | Cable, cable binders, clamps and other fixing material must also be UV-resistant, made of polyethylene. |
| Standard | ISO 9001:2015 |
| Origin | Imported/ Local |
Position: CONNECTORS AND POWER DISCONNECT
Specifications / Requirements:
| Title | Description |
|---|---|
| Application | To connect and disconnect the power and to enclose them in proper housing |
| Ingress Protection | IP 54 or higher for breaker box |
| Voltage | Have voltage ratings greater than the maximum circuit voltage |
| Current | Have current ratings between 125% and 150% of the maximum design current for the circuit |
| Display | All power disconnect should include a clear visual indication of their state (ON/OFF or I/O) |
| Alternate Source switch over | There must be a switch over to power the pumping system with grid or generator on request of farmer |
| Origin | Imported/ Local |
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Bidder's Type | Required Registration |
|---|---|
|
Individual / Individual Consultant Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) |
FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| The firms (having capacity to deliver the complete package of services including survey, design, supply of equipment/ materials, installation & commissioning and post installation back up support during the warranty with the following strength/ eligible for qualification as SSC for fiscal year 2026-27:- | No |
| Fixed Price: The prices indicated in the Financial Bid are firm and fixed and not subject to any adjustment during contract performance. | No |
| Must have an office in the ICT and have/ willing to establish at least One (1) sub-offices/ dealerships/ after sales service centers in the Twin cities (Islamabad, Rawalpindi) | Yes |
| Must be in solar business for last three years; | Yes |
| v. Must have experience of completing similar assignments preferably installation of at least 10 solar powered water pumping systems during last three (03) years (Attach following documents to justify the experience claim): ï‚§ List of completed and on-going projects with location, components, size/scope, cost, period and share/ role (in case of joint venture) ï‚§ List of Clients ï‚§ Type of Solar systems installed Any additional document to support relevant experience | Yes |
| Must possess inventory of solar equipment as per standards & specifications approved by the Water Management Department ICT. The Bidder shall submit the Bill of Quantities (BOQ) strictly in the prescribed format provided in the tender documents. Any BOQ submitted in a format other than the prescribed format, or with any alteration/deviation therein, shall be liable to rejection and shall not be entertained for evaluation. | Yes |
| Must have mix of professional staff at least 5 agricultural engineers (Provide list of staff and their CVs indicating qualifications, their registration with professional institutions & relevant experience supported by relevant documents. | Yes |
| Must attached acceptable document like financial statements, tax declaration / returns etc of last three years | Yes |
| Must be manufacturer or sole distributor or authorized dealer of specific make of solar systems meeting approved technical specifications of the water Management Department and must agree to supply compatible complete unit including PV panels and essential accessories (Attach valid sole distributor certificate, complete specifications of PV panels and required accessories along with origin certificate of equipment, brochure etc.); | Yes |
| The bidder/contractor shall maintain sufficient stock of all required materials and equipment in its warehouse to cater for at least 15 sites, in accordance with the approved specifications and standards of the Water Management Department. The available stock shall be subject to physical verification by the Department’s approved Technical Committee. The Technical Committee shall have the right to visit the bidder’s/contractor’s warehouse at any time, as required, for inspection and verific | Yes |
| Pakistan Engineering Council (PEC) Registration in C4 or above Category with relevant codes e.g. (EE04, EE06, EE11) | Yes |
| Must have an Alternative energy development Board (AEDB) registration C-3 or above category | Yes |
| Must provide affidavit confirming that (a) applicant firm / joint venture have never been blacklisted by any government department. (If ever blacklisted, then provide the case history, current status of the firm regarding this decision) (b) all the information provided by the applicant firm/ joint venture are correct (c) the firm will provide compatible solar equipment as per approved standards & specifications and (d) the firm will deploy staff as per project requirement/ directions of the Clie | Yes |
| The Client reserves the right to terminate or cancel the contract and, subject to the applicable procurement rules and contractual provisions, award the remaining work to the next highest-ranked/evaluated responsive bidder in the event that the Contractor fails to comply with the specified terms and conditions, technical requirements, approved standards, or fails to meet the stipulated deadlines within the prescribed time period. | Yes |
| DELIVERY, INSTALLATION AND COMMISSIONING: The Contractor shall complete delivery, installation, testing and commissioning of the complete solar pumping system at each designated farmer site within thirty (45) days from the date of issuance of the work order, unless otherwise specified in the Contract. | No |
| WARRANTY: All equipment and materials supplied under the Contract shall be covered by the manufacturer's warranty and the Contractor's warranty obligations specified in the Tender Document. Unless a longer period is specified for a particular item, the minimum warranty period shall be twelve (12) months from successful commissioning/acceptance. The bidder shall state the warranty period and terms for each major component. | No |
| Packaging and Marking Instructions: The contractor shall properly pack all the material and mark as well to ensure safe delivery at consignee’s place. Safe delivery at consignee’s place is the sole responsibility of the contractor. Only material duly inspected by the team shall be allowed for installation. | No |
| FAILURE TO PERFORM: The Procuring Agency may take contractual action, including termination, encashment of applicable security and/or other remedies available under the Contract and applicable rules, if the Contractor fails to deliver, install, test, commission or warrant the Goods/Works in accordance with the Tender Document. | No |
| Rejection of Bid: Bid(s) not conforming to the above terms and conditions shall be rejected being non-responsive. | No |
Least Cost Based Selection (LCBS)