Framework Data Sheet (FDS
The following specific data for the Framework Agreement shall complement, supplement, or amend the provisions in the Instructions to Applicants/Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
FDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instructions to Applicants/Bidders
A. General
FDS Clause Number 1
ITB Number 1.1
Identification Number of the Framework Agreement: FFW9715
The Procuring Agency is: Sui Northern Gas Pipelines limited (Sui Northern Gas Pipelines Limited (SNGPL))
Framework Agreement Title: Pre-Qualification of Contractors for Hiring of Services for Boring/Installation of Deep well Ground beds
FDS Clause Number 2
ITB Number 2.1
The name of Procuring Agency is: Sui Northern Gas Pipelines limited (Sui Northern Gas Pipelines Limited (SNGPL))
The name of Framework Agreement is: Pre-Qualification of Contractors for Hiring of Services for Boring/Installation of Deep well Ground beds
FDS Clause Number 3
ITB Number 2.2
Participating / Authorized Procuring Agencies under this Framework Agreement:
FDS Clause Number 4
ITB Number 3.1
Framework Type: Open Framework Agreement
FDS Clause Number 5
ITB Number 4.1
Framework Duration: 36 Months
Commencement Date: Expired after the framework duration of 36 months from the award date.
Expiry Date:
Jobs Without Lots :
| Job |
Delivery Schedule |
Quantity |
| Category-A) Drilling of 8″dia bore-hole up to the depth of 200 ft to 400 ft and lowering of 10 No. Mixed Metal Oxide (MMO) anodes along with associated material items in each deep well bore, in accordance with / including the supplies and services |
Address: Ground Floor, LDA Plaza, 7-Egerton Road, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Schedule: Days 90
Quantity: 81090/ft
|
81090/ft |
| Category-B)Drilling of bore-hole 12" diameter drill bit / cutter up to the depth of 200 ft to 400 ft using portable trailer mounted drilling rigs, and lowering of 20 No. High Silicon Chromium Iron (HSCI) anodes along with associated material |
Address: Ground Floor, LDA Plaza, 7-Egerton Road, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Schedule: 90 Days
Quantity: 81090/ft
|
81090/ft |
FDS Clause Number 6
ITB Number 5.1
A list of debarred firms and individuals is available on PPRA website: https://ppra.gov.pk
B. Contents of the Framework Document
FDS Clause Number 7
ITB Number 7.1
For clarification, the Applicant shall seek clarifications through: EPADS v2.0
FDS Clause Number 8
ITB Number 7.1 & 8.2
Information related to the Framework Agreement shall be published on: EPADS v2.0
FDS Clause Number 9
ITB Number 7.2
Pre-Bid Meeting: Clarification Date: Wednesday, October 7, 2026
C. Preparation of Applications / Bids
FDS Clause Number 10
ITB Number 10.1
This Framework Agreement Document has been issued in the language: English
FDS Clause Number 11
ITB Number 11.1(d)
Additional documents to be submitted through EPADS v2.0:
- Registered name and address of firm/ company including telephone number, fax number (if any) and e-mail ID
- Certificates of registration/ incorporation of firm/ company.
- Partnership Deed in case of firm/AOP
- Memorandum & Articles of Association, in case of Company.
- Copies of Computerized National Identity Cards of owners/partners/directors
- Bank statement(s) for the last one year. a formal Bank certificate mentioning maintenance of minimum specified balance or credit line limit.
- Year-wise list of works/ contracts
- Documentary evidence(s) in the form of completion certificates / work orders / final payment certificates
- List of Essential Machines, Tools and Equipment.
- List of Personal Protection Equipment (PPE) i.e. Helmet, Safety Shoes, Gloves, etc
- List of total manpower mentioning their names
- Copies of CNIC of all staff
- CVs and Certificates in case of Engineer and Sub Engineer
- Copy of valid registration certificate of PEC
- Copy of valid Professional Tax Clearance Certificate (current financial year).
- Copy of relevant Provincial Revenue Authority certificate
- Undertaking for non-involvement in Litigation & Criminal activities
- Undertaking regarding blood relation with company employee(s) along with name, designation and place of Posting
- Copy of National Tax Number.
- Undertaking for non-black listing
FDS Clause Number 12
ITB Number 14.2
Source for determining exchange rates: Not Applicable
D. Scope of Framework Agreement
FDS Clause Number 13
ITB Number 15.1
Items, Services and/or Works covered under the Framework Agreement:
See Section Items and Lots
FDS Clause Number 14
ITB Number 15.2
Estimated Framework Value: {ESTIMATEDVALUE}
FDS Clause Number 15
ITB Number 15.3
Maximum Framework Value (if applicable): {MAXIMUMFRAMEWORKVALUE}
FDS Clause Number 16
ITB Number 15.4
Call-Off / Secondary Procurement Method: {CALLOFFMETHOD}
FDS Clause Number 17
ITB Number 15.5
Maximum number of suppliers to be admitted to the Framework Agreement: {MAXSUPPLIERS}
E. Submission of Applications / Bids
FDS Clause Number 18
ITB Number 16.1
Deadline for Bid Submission:
Day: Monday
Date: Monday, October 19, 2026
Time: 11:00 AM
FDS Clause Number 19
ITB Number 17.1
Opening of Bids shall be conducted through: EPADS v2.0
Day: Monday
Date: Monday, October 19, 2026
Time: 11:30 AM
Virtual participation link: https://vendors.epads.gov.pk/
F. Evaluation and Award
FDS Clause Number 20
ITB Number 21.1
Margin of Domestic Preference: Not Applicable
FDS Clause Number 21
ITB Number 22.1
Framework Award Basis: Quality Based Selection (QBS)
FDS Clause Number 22
ITB Number 23.1
Suppliers admitted to the Framework Agreement shall not be guaranteed any minimum quantity, value, or volume of business unless otherwise stated in the Framework Agreement.
FDS Clause Number 23
ITB Number 29.1
Framework-related complaints / grievances shall be submitted in writing through: EPADS v2.0
A complaint may challenge:
- The terms of the Framework Agreement Documents
- The Procuring Agency’s evaluation decision
- The Procuring Agency’s Framework Award decision
Framework Items / Lots
Brief Description
- Boring job at all sites will be done by portable trailer mounted drilling rigs, however if due to site constraints it is not possible to use portable trailer mounted drilling rigs, other means of boring may be used at same rates after recommendation / approval of site engineer.
- Supply and installation of 1/2″ dia. hemp core galvanized steel wire rope for category A & 1/4″dia hemp core galvanized steel wire rope for category B to be used as support/load carrier during lowering of the anodes. (Length will depend on the particular bore depth).
- Supply and installation of Steel clamps for holding of Anodes & vent pipe with the wire rope in the deep well. (One clamp at the top and one at bottom of every anode). Cable ties of suitable & proper size will be used to clamp / tie anode cables and vent pipe with the wire rope.Â
- Supply and installation of 2″ dia. good quality uP.V.C pipe for category A & 1″ dia. good quality uP.V.C pipe for category B as per sample approved by the Company. Length of this pipe to be used at each site will depend on the bore depth at that particular site and it will include the length from bore to the junction box installation point. The perforated portion of the pipe may (or may not be depending upon site conditions as per decision of site Engineer) be wrapped with geo-textile cloth (filter cloth) to avoid blockage. Necessary arrangement will be required to be made to stick the cloth with the pipe in order to avoid slip during lowering / completion of job. This pipe will be perforated in the portion as per design / method advised by the site Incharge.
- Ditching/Backfilling for laying anodes cables from boring point to Junction Box installation site will be the responsibility of Contractor (Depth/width of trench will be decided by site engineer of SNGPL according to site conditions). Anodes cables from Bore to Junction Box should be covered with two PVC pipes (to be supplied by the contractor) of 4” dia. each and length equal to distance from boring point to Junction Box.
- The contractor shall obtain prior approval for type, design and specifications of the materials to be used (steel wire rope, steel clamps, uPVC pipe etc.) and will submit specimens / samples of all the approved materials before start of work.
- Fabrication of steel bucket as per sample approved by the company, to be used at the bottom for lowering of anodes to support anodes and wire ropes.
- The Contractor shall provide a 2” dia. MS pipe of 7 ft. length at each site which will be used for holding the steel wire rope at bore hole.
- Clean water required for boring work will be arranged by the contractor at his own cost. Sewerage water or any other contaminated water will not be allowed to be used for this purpose. All allied jobs required for boring such as ditching for temporary water pool etc. will be arranged by the Contractor, in cases like concrete surfaces where excavation for temporary pool is not feasible, the contractor will make arrangement for making temporary water pool that may be of mud. The mud used in this case will be arranged according to his requirement for boring machine at his own cost. He will also arrange shifting of the mud/debris from site and re-instating the site to its original state.
- Shifting of the ground bed materials to each deep well boring site will be the responsibility of the contractor (Contractor/his authorized person will acknowledge the receipt of the material). For category A, these include deep well tubular anode kit (comprising 20 No. Anodes), carbonaceous backfill (approx. 6 metric tons) earthing set and junction box, and category B these include deep well MMO anode kit (comprising 10 No. Anodes), carbonaceous backfill (approx. 2 metric tons), earthing set and junction box at each site from concerned SNGPL store located at _________________________.
- Lowering of HSCI Anodes, tied with ½″ inch diameter galvanized steel wire rope with suitable arrangement ensuring that anodes and cable insulation are not damaged during the process and the top anode must be dipped in water.
- During lowering of uPVC pipe along with HSCI anodes for venting of gases, each length of pipe will be fitted with other length with proper arrangement and with proper adhesive material
- Injection of metallurgical hard coke / coke breeze into the bore in the form of slurry with suitable arrangement after lowering of anodes. After injection of carbonaceous backfill, the remaining bore depth will be backfilled with soil.
- Disposal and removal of mud, waste water and any other debris as a result of boring, restoration of site to its original state, backfilling of the bore after injection of carbonaceous backfill, backfilling of all other trenches at the site.
- Placing of safety signs / barricading tape at the site and necessary arrangements (including personal protective equipment’s) for safety of the contractor’s personnel, general public and public property during the job will be the responsibility of the contractor.
- Contractor will also arrange to make a 4 inch diameter bore up to the depth of water level at each deep well boring site which will be used for earthing of CP Station. The earthing material will be provided by the Company.The location of the earthing bore shall be decided by the SNGPL Site Engineer according to the prevailing site conditions
- The installation of Junction Box (to be provided by the company) for anodes cables and its grouting with 1½” x 1½”x ¼” MS angle iron of 5 feet length (should be Welded from top of the Junction box) with MS bar (both to be supplied by the contractor) welded at the bottom for support will be the responsibility of the contractor. Junction boxes will be installed at suitable level so as to prevent any ingress of dirt or water (Location of Junction Box will be decided by site engineer of SNGPL according to site condition and can be away from bore).Â
- Exact depth to be bored at each site will be informed to the contractor before start of work at that particular site.
- The contractor shall obtain prior approval for type and design of all the materials to be utilized before bringing them at site and / or using them for the subject job
General Terms and Conditions of the Contract:
Â
- The Company reserves the right to reject any or all of the quotations without assigning any reason.
- The contractor / bidder will upload one copy of our tender document after signing and affixing his stamp on each page as a token of understanding and acceptance of the terms and conditions of the tender document.
- Rates per Running Foot inclusive of all tax should be quoted separately for both categories (A&B) as mentioned in Scope of work. Rate quotation exclusive of taxes or missing will be considered as inclusive of all taxes. Rate of Each Category A&B will be evaluated separately.
- In case of same rates quoted by more than one bidder, SNGPL has rights to award the tender on the basis of previous performance of same kind of boring jobs in SNGPL.
- Contractor can claim upto max of 02 PPCs (Partial Payment Certificates) & payment will accordingly be made for 50% of total work done (as per requirement of respective region).
- All costs including local taxes, transportation, loading and unloading, mobilization and demobilization of equipment and material as mentioned above shall be borne by the contractor. Laborers required for handling of material and other miscellaneous jobs at the boring site will also be arranged and paid by the contractor.
- Envelope should be marked “CONFIDENTIAL” and should be clearly marked as “Quotation for boring & installation of deep well ground beds of CP stations in __________region and do not open before ___________, ______ hours”.
- All government taxes (GST, PRA, Income Tax etc.) whichever will be applicable on this work / contract shall be borne by the contractor. If any amendment in the rate of any of the above mentioned tax is notified by the government during the fiscal year 2026-27 till three (03) years , the contractor shall have to bear the increase in the cost. Therefore, the rate quoted by the bidder shall be considered to be inclusive of all applicable taxes.
- Any kind of discount offered by the bidder will not be considered and only firm’s rates will be acceptable.
- The bidders are required to upload one copy each of following documents along with their bid.
- Pakistan Engineering Council (PEC) certificate valid for current fiscal year.
- Valid Income Tax Certificate and latest Professional Tax Certificate.
- The Company reserves the right to cancel the award of contract at any stage if it is found that the performance or progress of the contractor is not satisfactory and the jobs are likely to be delayed or adversely affected. In such an event, the Company reserves the right to award the contract to any other contractor.
- The bidder must ensure to mention his name and designation on the bid offer. All the future correspondence (letters / invoices etc.) with the Company shall be accepted only if it is initiated and signed by the same signatory.
- The rates quoted by the contractor shall be for complete finished work and shall be comprehensive and complete in all respects including costs of all materials, their shifting and all other arrangements / jobs which are necessary for completion of the work.
- No advance payment shall be made.Â
- Payment of work against each site will be processed after completion of all physical work against that site. Payment will be processed as per company rules.
- The rates quoted will remain valid for the whole fiscal year and no escalation charges in respect of any kind of material or services shall be paid in any case due to increase of prices of any material in the market or due to increase in the rate of any applicable Tax.
- No amendment or modification in the scope of work / terms and conditions shall be made except those conveyed by the Company in writing.
- In case of a public holiday, bids will be opened on next working day on same time.
- The Contractor cannot outsource / sub-contract the boring work under any circumstances. The boring machine should be owned by the contractor. Non-compliance will result in cancellation of contract.
- The Contractor shall be bound to respond and depute his personnel and machinery etc. at the site within seven days of the intimation to him. Contractor will be bound to depute his teams / machinery at two or more sites simultaneously on the requirement of the Company in case if these sites are available to start work. In case of non-compliance, an amount equal to 10% of the total amount will be deducted as penalty from the bill of any site.
- The contractor will not shift / relocate his crew and equipment after completion of job at any SNGPL site until and unless advised by the Company. The Boring machine will remain at each site after boring and lowering of anodes for at least 24 hours.
- The boring and installation job at one site should be completed within one week of start of job up to the entire satisfaction of site Engineer / site in-charge and no unnecessary delay will be admissible. In case any unnecessary / unjustified delay is observed in job completion, an amount equal to 10% of the total bill will be deducted from the bill of that particular site as penalty.
- The contractor will be responsible for safe handling and safekeeping of the Company’s materials at site after handing over, i.e. anodes, cables, carbonaceous backfill etc. All costs incurred due to any damage or loss of these materials while in his custody will be borne by the contractor.
- The contractor will be required to continue work on next available Company site after completion of job on previous site. The contractor will not be allowed to unnecessarily stop / delay his work at site due to any reason.
- SNGPL reserves the right of inspection of work facilities / drilling rigs of the contractor before awarding contract. The Company reserves the right to cancel award of contract if any discrepancies are observed in the condition / status of the machinery or abilities / experience of the crew of the contractor.
- The bidders shall be required to submit a bid bond along with their bids / quotations for an amount of Rs. ___________/-(as per PPRA rules) in the form of Pay order / demand draft / CDR from a scheduled bank. Any bid received without bid bond will be rejected. The bid bonds will be returned to all un-successful bidders in due course of time after necessary processing, on the request of the bidder. Bid Bond is to be furnished/submitted at the stage of submission of the financial bid after issuance of the invitation to the prequalified applicants, as applicable.
- The successful bidder shall furnish a Performance Bond in the shape of Bank Guarantee / demand draft / pay order from any scheduled bank of Pakistan equal to ten percent (10%) of the contract sum favouring SNGPL along with the undertaking on non-judicial stamp paper of Rs. 100/- (sample format attached as Annexure-A). The Performance bond shall remain valid from the date of issuance of contract until three (03) months after the date of completion of the contract. The cost incurred on processing / preparation of Performance Bond shall be borne by the successful bidder in all respects.
- The tentative / estimated work (Boring and Installation of Deep Well Ground beds) is expected to be carried out at _____ Nos. Sites during the fiscal year. The amount of bid bond and performance bond shall be calculated on the basis of this tentative / estimated volume of work. However, the actual volume of work may exceed or may be less than this estimated volume of work subject to availability of material and site permissions. In such a case, the bidder / contractor shall have no right whatsoever to lodge any claim at any forum against the Company.
- The Performance bond shall be furnished in accordance with the conditions of the contract before execution of the contract.
- Failure or neglecting to deliver / provide Performance bond as specified above more than 1 month after letter of intent to contractor , shall be considered as abandoning of the contract by the bidder. In this case, the bid bond shall not be returned to the contractor and will be liable to be encashed / deposited in the Company’s account.
- The performance bond will be released three months after successful completion of all Boring jobs and contract on request of the contractor.
- Failure or neglecting to deliver / provide Performance bond within 14 days as specified above, shall be considered as abandoning of the contract by the bidder. In this case the bid bond shall not be returned to the contractor and will be liable to be encashed / deposited in the Company’s account.
- The Performance bond shall be furnished before execution of the contract, in accordance with the terms and conditions of the tender document.
- Boring sites are selected after feasibility surveys. So, contractor will have no right to reject any site selected for boring due to any reason.
- Any collapse during boring activity or any financial loss associated with collapse of bore will be contractor’s liability.
- Any loss due to collapse of soil at boring site due to poor workmanship even after completion of activities will be contractor’s liability and the cost incurred will be directly born by contractor or in case of delay same will be deducted from hold security/performance bond.
- Any loss to contractor’s personnel, machineries, equipment, company material handed over to contractor, as a result of riots, theft, natural disaster(Flood, rains, earth quake etc), and third party damage collapsing of bore will be borne by contractor and could not lodge his claim any damages from company at any forum.
- The contractor shall be required to comply with the Health, Safety and Environment (HSE) policy / regulations of the Company. The contractor will submit duly signed and stamped “Contractor’s HSE Statement” (attached as Annexure-B) along with his bid offer. The Contractor will be bound to comply with all the HSE regulations of the Company during work at the Company’s site, that are applicable on all the contractors working with the Company.
- The contractor shall be liable to pay compensation to his staff / labour in case of any major injury, disability and fatality category wise as under:
-
|
i) In case of Major Injury
     (Injury leading to Temporary disablement)
Â
|
Payment of ½ of the monthly wages till the recovery of temporary disablement or for a maximum period of one year, whichever is less.
Payment of 1/3 of the monthly wages till the recovery of chronic ill health / disease or for a maximum period of 5 year, whichever is less.
|
|
   i) In case of Disability (Permanent)
|
Rs. 500,000/-
|
|
iii) Fatality
|
Rs. 500,000/-
|
Â
- Failure to compliance against HSE initiative at operational sites will lead to blacklisting of a contractor through following disciplinary actions.
-
Â
Â
Â
Â
- 1st Violation      Warning letter
- 2nd Violation     Fine of Rs. 100,000/- (Rupees One Lac only)
- 3rd Violation      Fine of Rs. 500,000/- (Rupees Five Lacs only)
- 4th Violation      Suspension for a Period of 6 Months
- 5th Violation      Black Listing
-
As per requirement of ISO 14001:2015, necessary information regarding environmental aspects     of machinery / equipment / material utilizing in boring could be asked at any stage during the execution of Job from contractor.
Contractor will not withhold any part of salary, benefits, property or documents of his personnel in order to force such personnel to continue working and contractor will not engage in or support human trafficking.
The award of contract shall be applicable for the SNGPL pipeline network in the domain of SNGPL ______________Region.
Any clarification / information regarding this job / contract may be obtained from the office of the undersigned during office hours on any working day.
-
The technical execution of this work shall be governed by the secondary procurement procedures (Call-Offs) as outlined above. The draft template of the Secondary Call-Off Contract is attached under the final 'Tender Documents / Attachments' section of this portal for bidder reference. All future execution orders will refer to those terms."
Eligibility & Qualification Criteria
| Bidder's Type |
Required Registration |
|
Sole Proprietorship
Partnership Firm
Company (Private Limited)
Company (Public Limited)
Company (Holding Company)
Company (Limited by Guarantee)
State Owned Enterprise (Private Limited)
State Owned Enterprise (Public Limited)
|
NADRA CITIZENSHIP (CNIC/NICOP)
FBR (NTN)
FBR (GSTN)
Punjab (PRA)
PEC
KPK (KPRA)
|
| Eligibility Criteria |
Document
|
| i) Registered name and address of firm/ company including telephone, e-mail ID. |
Yes |
| ii) Certificates of registration/ incorporation of firm/ company. |
Yes |
| iii) Partnership Deed in case of firm/AOP. |
Yes |
| iv) Memorandum of Association/ Article of Association, in case of Company. |
Yes |
| v) Copies of valid Computerized National Identity Cards of owners/partners/directors. |
Yes |
| vi) Bank statement(s) for the last one year or a formal Bank certificate mentioning maintenance of minimum specified balance or credit line limit. |
Yes |
| vii) Documentary evidence(s) in the form of completion certificates / work orders / final payment certificates for the last 01 to 15 years (as per your relevant work experience) |
Yes |
| viii) Copy of valid Professional Tax Clearance Certificate (current financial year). |
Yes |
| ix) Copy of National Tax Number, verifiable in ATL of FBR. |
Yes |
| x) Valid certificate of relevant Provincial revenue authority |
Yes |
| xi) Other Documents as per Appendix-D |
Yes |
| The bidder must be registered with relevant provincial revenue authority (e.g. PRA,SRB, BRA etc.) |
Yes |
Evaluation Criteria
Quality Based Selection (QBS)
| Technical Marks | 100 |
|---|
| Passing Marks | 56 |
|---|
| Organization |
Organization
(Please tick in relevant box and provide documents as certificate of incorporation of business, declaration of sole proprietorship, Articles & Memorandum of Association / partnership deed) (Quantitative)(Doc Required)
Limited Company/Firm
(10)
Partnership / AOP
(8)
Sole Proprietorship
(7)
| 10 |
| Financial Position |
Please provide bank statement(s) of firm/ company for last 12 months statement and certificate from concerned bank(s) mentioning average balance of account during last 12 months confirming financial soundness (Quantitative)(Doc Required)
Bank Turnover for last one year Rs. Above 5 Million
(25)
Bank Turnover for last one year Rs. 4,500,001 to 5,000,000
(22)
Bank Turnover for last one year Rs. 4,000,001 to 4,500,000
(18)
Bank Turnover for last one year Rs. 3,500,001 to 4,000,000
(16)
Bank Turnover for last one year Rs. 2,000,001 to 3,500,000
(14)
Bank Turnover for last one year Rs.1,000,001 to 2,000,000
(12)
Bank Turnover for last one year Rs.500,000 to Rs. 1,000,000
(10)
| 25 |
| Relevant Work Experience |
Please attach Year-wise list of works/contracts awarded since date of establishment of the firm for carrying out any similar nature of work like Boring/Drilling and Installation of Deep Well Ground beds, Cathodic Protection Services or any vertical Boring Services etc. Documentary evidence(s) in the form of jobs completion certificates / work orders & Final Payment Certificates etc. will be required (Qualitative)(Doc Required)
Having relevant work experience for 10 years or above with SNGPL
(15)
Having relevant work experience for 05 to 10 years with SNGPL
(12)
Having relevant work experience for less than 05 years with SNGPL
(8)
| 15 |
Please attach Year-wise list of works/contracts awarded since date of establishment of the firm for carrying out any similar nature of work like Boring/Drilling and Installation of Deep Well Ground beds, Cathodic Protection Services or any vertical Boring Services etc. Documentary evidence(s) in the form of jobs completion certificates / work orders & Final Payment Certificates etc. will be required (Qualitative)(Doc Required)
Having relevant work experience for 10 years or above other than SNGPL
(10)
Having relevant work experience for 05 to 10 years other than SNGPL
(8)
Having relevant work experience for less than 05 years other than SNGPL
(6)
| 10 |
| Machinery & Equipment (Attach list along with details) |
Machinery & Equipment (Attach list along with details) (Quantitative)(Doc Required)
Drilling Rigs (more than 01 No.)
(12)
Drilling Rigs (01 No.)
(6)
| 12 |
Machinery & Equipment (Attach list along with details) (Quantitative)(Doc Required)
Water Supply Well Drilling Machine (more than 01 No.)
(8)
Water Supply Well Drilling Machine (01 No.)
(4)
| 8 |
| Proper Tool Kit (Wrench, Drill Bits, Pliers, Screw Drivers, Hammer etc.) (Quantitative)(Doc Required) | 3 |
| Personal Protective Equipment: PPEs (Helmet, Safety Shoes, Gloves etc) (attach list of PPEs) (Quantitative)(Doc Required) | 2 |
| Manpower (Attach list along with details) |
Manpower (Attach list along with details) (Quantitative)(Doc Required)
Engineer (registered in PEC) (Attach CV and PEC registration certificate)
(7)
Sub Engineer (Attach CV and DAE certificate)
(5)
| 7 |
Manpower (Attach list along with details) (Quantitative)(Doc Required)
Skilled Drilling Rig Operator (more than 01 No.)
(8)
Skilled Drilling Rig Operator (01 No.)
(5)
| 8 |
Call-Off / Secondary Procurement Procedure