In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.gov.pk).
Higher Education Commission (HEC) (Higher Education Commision (HEC)), Assistant Director
Central Procurement Cell, Sector H-9, Islamabad Capital Territory
+92-317-377-6141
zalashari@hec.gov.pk
The following specific data for the procurement of Consultancy Services to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: Higher Education Commission (HEC) (Higher Education Commision (HEC))
The subject of procurement is: Third-Party Evaluation of Outcomes, Impact and Effectiveness of the National Research Program for Universities (NRPU)
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P134053
BDS Clause Number 2
ITB Number 1.2 & 9.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Friday, November 27, 2026
Pre-Bid Meeting: Tuesday, November 24, 2026 11:00 AM
Venue: New Data Centre , IT Division, Sector H-9, HEC, Islamabad
Meeting Link: https://teams.microsoft.com/meet/455210951851678?p=PBmZMbLUC9U8j7eOwj
BDS Clause Number 3
ITB Number 4.1
The language of the proposals is: English
BDS Clause Number 4
ITB Number 6.1
Participation of Sub-consultants, Key Experts and Non-Key Experts in more than one Proposal is permissible? No
BDS Clause Number 5
ITB Number 7.1
Proposals shall be valid until 120 Days
BDS Clause Number 6
ITB Number 9.1
List of documents required along with the bid:
BDS Clause Number 7
ITB Number 10.2
The Consultant’s Proposal must include the minimum Key Experts’ time-input of __________person-months.
For the evaluation and comparison of Proposals only: if a Proposal includes less than the required minimum time-input, the missing time-input (expressed in person-month) is calculated as follows:
The missing time-input is multiplied by the highest remuneration rate for a Key Expert in the Consultant’s Proposal and added to the total remuneration amount. Proposals that quoted higher than the required minimum of time-input will not be adjusted. ]
BDS Clause Number 8
ITB Number 10.5
The price shall be Fixed.
Price schedule will be provided according to the format defined and acquired. see section price schedule.
BDS Clause Number 9
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 10
ITB Number 7.6
Services and Their related documents:
See section Required Services and ToR
BDS Clause Number 11
ITB Number 8.1 & 8.2
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of : Higher Education Commission (HEC)
The Bid Security shall be in the form of: Pay Order, Call at Deposit, Demand Draft
BDS Clause Number 12
ITB Number 13.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 14.1
Proposal shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
Central Procurement Cell, Sector H-9, Islamabad Capital Territory
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Monday, November 30, 2026 11:30 AM
BDS Clause Number 14
ITB Number 15.1
The Bids opening shall take place on EPADS v2.0.
Day : Monday
Date: Monday, November 30, 2026
Time : 12:00 PM
BDS Clause Number 15
ITB Number 20
Selection technique adopted will be: Quality and Cost Based Selection (QCBS)
see Evaluation Criteria
BDS Clause Number 16
ITB Number 21.5
The Performance guarantee shall: 10.00%.
The Performance Guarantee shall be acceptable in the form of: Pay Order, Call at Deposit, Demand Draft
BDS Clause Number 17
ITB Number 24.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
|
FBR (NTN) FBR (GSTN) |
| Eligibility Criteria | Document |
|---|---|
| Must not have been blacklisted or debarred by any government, semi-government, autonomous or international organization in Pakistan. An undertaking confirming that the firm has not been blacklisted, and is not involved in litigation that may affect its performance. | Yes |
| Key Resource(s): Bidder must propose one named individual against each position, each a different person, with a signed CV and attested degree certificate. Relevant experience means professional experience in evaluation, impact assessment, research or data collection. 1. Team Leader - PhD, 10 yrs. 2. Evaluation Expert - PhD, 5 yrs. 3. Data/Statistical Expert - Master's, 5 yrs. 4. Field Survey Coordinator - Master's, 3 yrs. All four shall be listed on Form B (Key Personnel Summary). | Yes |
| Joint Venture (1 of 4) : Where the bidder is a joint venture, all of the following must apply: A joint venture agreement, or a letter of intent signed by all members, shall be submitted with the proposal, identifying the Lead Member and stating each member's share. All members shall be jointly and severally liable for performance of the contract. The joint venture shall comprise not more than three (03) members. A joint venture shall submit Form C (Joint Venture Declaration). | Yes |
| Joint Venture ( 2 of 4 ) : The Lead Member must have held at least one (01) contract for the evaluation of a research or commercialization project or programme, as sole consultant or leading partner of a joint venture. Contract value Rs. 5 million or above; completed on or after 1 July 2016, or started on or after that date and ongoing. Submit the contract or work order showing the Lead Member’s role, and a client certificate. Identify the contract at Part C.2 of Form C. | Yes |
| Joint Ventures (3 of 4) : The Team Leader shall be an employee of the Lead Member. | Yes |
| Joint Ventures (4 of 4 ): Each member shall separately satisfy the requirements of registration, tax status and non-blacklisting stated above. No firm may participate in more than one joint venture, nor both individually and as a member of a joint venture, for this assignment. Where a firm does so, all proposals in which it participates shall be declared non-responsive. | Yes |
| The participating bidders must be registered with SECP or Registrar of Firms. | Yes |
Quality and Cost Based Selection (QCBS)
Weightage
| Technical Evaluation % | Financial Evaluation % |
|---|---|
| 70 | 30 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Technical Evaluation Criteria : Consultant Profile (10 Marks) | ||
| A1.1 : Length of Incorporation as Company/firm or Registration/Licensing (Years)
- Provide the relevant documentary evidence (From date of registration from SECP or Registrar of Firms).
- Where the applicant is a joint venture, this criterion is assessed on the Lead Member only. (Quantitative)(Doc Required) 15 years or above (3) 10 years to below 15 (2) Below 10 years (1) | 3 | |
| A1.2 Regional Presence / Province wise. Number of provinces or territories with an established office. An established office means a registered business address. For this purpose, provinces and territories are Punjab, Sindh, Khyber Pakhtunkhwa, Balochistan, Islamabad Capital Territory, Azad Jammu & Kashmir, and Gilgit-Baltistan. Where the applicant is a joint venture, the offices of all members are counted collectively, each province or territory counted once. (Quantitative)(Doc Required) More than five (3) Four or Five (2) Two or three (1) | 3 | |
| A1.3 Average Annual Turnover, last three completed financial years. Documentary evidence required: audited financial statements for the last three completed financial years, duly audited by a Chartered Accountant firm, accompanied by a turnover certificate on company letterhead countersigned by the firm’s auditor stating the three-year average. Where the applicant is a joint venture, the average annual turnover of all members is aggregated, and each member shall submit the above evidence in its own name. (Quantitative)(Doc Required) Rs. 20 million or above (4) Rs. 10 million to below Rs. 20 million. (2) Below Rs. 10 million (1) | 4 | |
| Specific experience of the Consultant (as a firm) relevant to the Assignment : 40 Marks | ||
| A2.1 : Number of specific studies related to data collection or feasibility studies undertaken in the education sector.
Conditions:
1. Contract value Rs. 5 million or above.
2. Completed on or after 1st July 2016 or initiated on or after that date and currently ongoing.
3. Documentary evidence: contract or work order showing client, scope, value and dates. A certificate confirming completion or for ongoing assignments that it is in progress. An assignment without both is not counted.
4. Assignments shall be listed on Form A (Schedule of Assignments), indicating against each assignment the criterion under which it is nominated. Only assignments listed on Form A and supported by uploaded evidence will be counted.
5. No assignment may be counted under more than one of A2.1, A2.2 and A2.3.
6. Joint ventures: assignments of all members are counted collectively; the same assignment is counted once.
7. An assignment means a single contract or work order, whatever its duration or number of components. (Quantitative)(Doc Required) More than 10 (20) 6 to 10 (15) 3 to 5 (10) 1 to 2 (5) | 20 | |
| A2.2: Number of evaluation studies undertaken of research projects or programmes.
A research project or Programme means one whose objectives include the funding, conduct or support of research.
Conditions:
1. Contract value Rs. 5 million or above.
2. Completed on or after 1st July 2016 or initiated on or after that date and currently ongoing.
3. Evidence: (a) contract or work order showing client, scope, value and dates; and (b) a certificate confirming completion or, for an ongoing assignment, that it is in progress. An assignment without both documents is not counted.
Assignments shall be listed on Form A (Schedule of Assignments), indicating against each assignment the criterion under which it is nominated. Only assignments listed on Form A and supported by uploaded evidence will be counted.
4. No assignment may be counted under more than one of A2.1, A2.2 and A2.3.
5. Joint ventures: assignments of all members are counted collectively; the same assignment is counted once.
6. An assignment means a single contract or work order, whatever its duration or number of components. (Quantitative)(Doc Required) More than 5 (10) 4 to 5 (8) 3 (6) 2 (4) 1 (2) | 10 | |
| A 2.3: Number of evaluation studies undertaken of commercialization projects or programmes.
A commercialization project or Programme means one whose objectives include the translation of research or technology outputs into commercial, industrial or practical application, including technology transfer, patenting, licensing, prototyping, incubation, start-up formation or industry-academia collaboration.
1. Contract value Rs. 5 million or above.
2. Completed on or after 1st July 2016 or initiated on or after that date and currently ongoing.
3. Evidence: (a) contract or work order showing client, scope, value and dates; and (b) a certificate confirming completion or, for an ongoing assignment, that it is in progress. An assignment without both documents is not counted.
Assignments shall be listed on Form A (Schedule of Assignments), indicating against each assignment the criterion under which it is nominated. Only assignments listed on Form A and supported by uploaded evidence will be counted.
4. No assignment may be counted under more than one of A2.1, A2.2 and A2.3.
5. Joint ventures: assignments of all members are counted collectively; the same assignment is counted once.
6. An assignment means a single contract or work order, whatever its duration or number of components. (Quantitative)(Doc Required) More than 3 (10) 3 (8) 2 (6) 1 (4) | 10 | |
| Proposed Methodology and Work Plan in accordance with TORs – Max Marks – 35 | ||
| A3.1 : Technical Approach and Methodology: Sub-Criteria : Understanding of the assignment and the NRPU Programme Scored 0, 2 or 4 — see Annexure-C. (Qualitative)(Doc Required) | 4 | |
| A3.1 : Technical Approach and Methodology: Sub-Criteria : Proposed evaluation approach and basis of assessment. Scored 0, 3 or 6 — see Annexure-C. (Qualitative)(Doc Required) | 6 | |
| A 3.1 : Technical Approach and Methodology: Sub-Criteria : Sampling approach and coverage of the project portfolio Scored 0, 3 or 5 — see Annexure-C. (Qualitative)(Doc Required) | 5 | |
| A3.1 : Technical Approach and Methodology: Sub-Criteria : Approach to assessing research outputs. Scored 0, 3 or 5 — see Annexure-C. (Qualitative)(Doc Required) | 5 | |
| A3.2 : Work Plan and Timeline: Sub Criteria : Activity schedule aligned to the deliverables and timelines in the TOR. Scored 0, 3 or 6 — see Annexure-C. (Qualitative)(Doc Required) | 6 | |
| A3.2 : Work Plan and Timeline: Sub Criteria : Staffing input schedule by position Scored 0, 3 or 5 — see Annexure-C. (Qualitative)(Doc Required) | 5 | |
| A3.2 : Work Plan and Timeline: Quality assurance and internal review arrangements Scored 0, 2 or 4 — see Annexure-C. (Qualitative)(Doc Required) | 4 | |
| Proposed Key resource(s) for assignment: 15 | ||
| A4.1 Proposed Key Resource(s): Team Leader - leads the assignment and is responsible for the final report.
Marks are given for the number of assignments on which this person worked as team leader, project director or principal investigator, on an evaluation, impact assessment or third-party validation study.
List the assignments at Part B.2 of Form B. Each one must also be shown in the person’s CV, uploaded here and signed by the person and the Bidder. (Quantitative)(Doc Required) More than 5 (6) 3 to 5 (4) 1 to 2 (2) | 6 | |
| A4.2 Proposed Key Resource(s): Evaluation Expert - designs the evaluation approach and analysis.
Marks are given for the number of assignments on which this person designed or led the evaluation approach, the analytical framework or the evaluation questions, on an evaluation, impact assessment or third-party validation study.
List the assignments at Part B.2 of Form B. Each one must also be shown in the person’s CV, uploaded here and signed by the person and the Bidder. (Quantitative)(Doc Required) More than 5 (4) 3 to 5 (3) 1 to 2 (1) | 4 | |
| A4.3 Proposed Key Resource(s): Data / Statistical Expert - responsible for sampling and quantitative analysis.
Marks are given for the number of assignments on which this person did the sample design, the statistical analysis, or the management and analysis of survey or administrative data.
List the assignments at Part B.2 of Form B. Each one must also be shown in the person’s CV, uploaded here and signed by the person and the Bidder. (Quantitative)(Doc Required) More than 4 (3) 3 to 4 (2) 1 to 2 (1) | 3 | |
| A4.4: Proposed Key Resource(s): Field Survey Coordinator - plans and supervises field data collection.
Marks are given for the number of assignments on which this person planned, coordinated or supervised field data collection, including training and supervising enumerators or field teams.
List the assignments at Part B.2 of Form B. Each one must also be shown in the person’s CV, uploaded here and signed by the person and the Bidder. (Quantitative)(Doc Required) More than 3 (2) 1 to 3 (1) | 2 | |
Positions Without Lots :
| Position | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Submission of report on Third-Party Evaluation of Outcomes, Impact and Effectiveness of the National Research Program for Universities (NRPU) |
Address: Central Procurement Cell, Sector H-9, Islamabad Capital Territory Schedule: 52 weeks Quantity: 1/Qty Quantity: 1 Qty |
1/Qty | 300000 PKR |
No
Positions Without Lots :
Position: Submission of report on Third-Party Evaluation of Outcomes, Impact and Effectiveness of the National Research Program for Universities (NRPU)
TORs (Terms of Reference):
A minimum of 25% sample size is required to evaluate the outcomes and impact of the NRPU funded projects. Sampling will be done on basis of geographical distribution, discipline-wise coverage, number of universities and completed vs ongoing projects.
1.1 Evaluation of Research Outcomes and Performance:
The evaluation will focus on assessing whether the NRPU-funded projects achieved their intended research goals and objectives. This includes:
1.2 Impact Assessment :
An essential part of the evaluation will be to assess the broader impact of the funded projects on society, policy, and national development. This includes:
1.3 Funding Utilization and Suitability:
The evaluation will assess the appropriateness and effectiveness of funding allocation across projects, and whether funds were utilized efficiently to achieve the project objectives. This will include:
1. Background:
The National Research Program for Universities (NRPU), funded by the Higher Education Commission (HEC), has been instrumental in promoting research and innovation across universities in Pakistan. Since its inception in 2003, a total of 4,695 projects have been funded with an estimated total budget of around PKR 20 billion. These projects span multiple disciplines, including basic and applied research, and have shown promising results in advancing knowledge and contributing to societal development. Of these, 3,648 projects have been successfully completed or closed, yielding valuable research outputs.
Given the scale and significance of the NRPU program, it is imperative to assess the effectiveness, efficiency, and impact of the funding to ensure that it is being utilized optimally and to understand the broader outcomes of the research projects. This evaluation will be essential in identifying areas for improvement in the funding and administrative processes.
In order to evaluate the project's achievements a 3rd party evaluation of outcomes and impact of projects awarded under NRPU will be conducted through Consulting Firms. The Consultant will engage the Principal Investigators & their Team involved in the project along with their partner industry through Meetings/Focus Group Discussions (FGDs)/Interviews and on site verification of outcomes. Based on findings, impacts and recommendations a comprehensive report will be developed.
The Client will aid consultants in access to documents, counterparts’ information, field surveys, networking assistance, Meetings/Focus Group Discussions (FGDs)/Interviews and on site verification of outcomes and other required for the services.
2.Objectives:
Output Validation: Verify and document all research outputs, including national/international patents, peer-reviewed publications, and industrial prototypes developed during project implementation.
Commercialization Audit: Evaluate the commercialization ecosystem of funded projects, specifically measuring the economic contributions, licensing metrics, and revenue splits between PIs and universities.
Socio-Economic Impact Assessment: Determine the short- and long-term impact of research interventions on local communities, national development priorities, and evidence-based public policy.
Capacity Building Evaluation: Quantify the scale of direct and indirect employment generated under the program and evaluate the upgrade of institutional infrastructure such as university labs.
Collaboration Framework Analysis: Assess the effectiveness of current industry-academia linkages and the systemic assimilation of academic research into commercial market dynamics.
Financial Stewardship Review: Appraise the efficiency of funding utilization, mapping the alignment of expenditures against approved budget lines and identifying systemic operational constraints.
Strategic Recommendations: Document critical operational lessons learned to formulate actionable recommendations for improving HEC’s administrative, monitoring, and evaluation frameworks.
3.Scope of Work:
Project evaluation and validation is a pivotal component of any project; therefore, HEC intends to initiate 3rd party evaluation of outcomes and impact of projects awarded under its NRP project from qualified and reputed consultancy firm to measure the degree of effectiveness, outcome, impact, success and identify areas of improvement.
Therefore, in order to evaluate the success of the said project, the successful bidder will be required to perform activities including the following:
A minimum of 25% sample size is required to evaluate the outcomes and impact of the NRPU funded projects. Sampling will be done on basis of geographical distribution, discipline-wise coverage, number of universities and completed vs ongoing projects.
1. Evaluate the awarded NRPU Projects to universities/principal investigator (PI)
2.Evaluate the employee hired under complete project direct and indirect.
3.Evaluate/verify the National/ International patent filed and granted in collaboration with industry.
4.Evaluate/verify prototype and products developed during the implementation of project.
5.Evaluate/verify the licenses issued, and marketing of research conducted by universities/principal investigators (PI).
6.Evaluate the impact being created through the project after license agreements and highlight the contributions made in the economy after the license agreements.
7. Evaluate/verify the revenue generated for the HEI/project team in accordance with the license agreement.
8. Pick and publish the lessons learned from the project which could be applied for future and to other ongoing programs.
9. To assess the outcomes of project such as:
a.Collaboration mechanism developed between academia, Industry or any other (national or international)
b.Creation of opportunities with local and international investors in R&D
c.Self-sustainability of university by increased research income
d.Internal mechanism of universities in supporting and promoting research
e.Development/upgradation of existing labs of universities
f.University mechanism for the assimilation of research.
10. What were the constraints and limitations faced by the universities during the implementation of the project and how to remove these in future program.
11. Identify the short term and long-term impact of the project in coming years.
12. Recommendation to further improve the processes and increase impact.
3.1 Evaluation of Research Outcomes and Performance:
The evaluation will focus on assessing whether the NRPU-funded projects achieved their intended research goals and objectives. This includes:
i. Research Outputs: Assessing the quality and quantity of publications, patents, technologies, and other innovations emerging from the projects.
ii. Academic and Practical Relevance: Evaluating the relevance of research outcomes for addressing national and global challenges, and their contribution to the advancement of knowledge in diverse academic fields.
iii. Success Indicators: Assessing key performance metrics such as the number of collaborations, technology transfers, industry adoption, and policy influence generated by the research.
3.2 Impact Assessment: An essential part of the evaluation will be to assess the broader impact of the funded projects on society, policy, and national development. This includes:
i. Long-Term Impact: Analyzing the sustainability of research outcomes, including their influence on industry practices, public policy, and community development.
ii. Economic and Social Benefits: Evaluating how the projects have contributed to economic growth, entrepreneurship, job creation, and technological advancement.
iii. Sustainability: Assessing whether research outcomes have been maintained, scaled, or disseminated beyond the project lifecycle.
3.3 Funding Utilization and Suitability:
The evaluation will assess the appropriateness and effectiveness of funding allocation across projects, and whether funds were utilized efficiently to achieve the project objectives. This will include:
i. Funding Allocation: Assessing whether the funds allocated were suitable for the project scope and aligned with the research objectives.
ii. Utilization: Evaluating how well the funds were spent on research activities, resources, equipment, and personnel.
iii. Budget Adherence: Reviewing whether projects adhered to their approved budgets and identifying reasons for any deviations.
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract>
Number of GC Clause 3.1
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 4.1
The language is English
Number of GC Clause 6.1 and 6.2
The addresses are:
The Procuring Agency is: Higher Education Commission (HEC) (Higher Education Commision (HEC)), Assistant Director Central Procurement Cell, Sector H-9, Islamabad Capital Territory
The Consultant Address:
The title of the subject procurement is:Third-Party Evaluation of Outcomes, Impact and Effectiveness of the National Research Program for Universities (NRPU)
Number of GC Clause 8.1
[Note: If the Consultant consists only of one entity, state “N/A”;Or
The Lead Member on behalf of the JV is ___________ ______________________________ [insert name of the member]
Number of GC Clause 9.1
The Authorized Representatives are:
For the Procuring Agency:
Higher Education Commission (HEC) (Higher Education Commision (HEC)), Assistant Director
Central Procurement Cell, Sector H-9, Islamabad Capital Territory
+92-317-377-6141
zalashari@hec.gov.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 11.1
[Note: If there are no effectiveness conditions, state “N/A”]OR
List here any conditions of effectiveness of the Contract]
The effectiveness conditions are the following: [insert “N/A” or list the conditions]
Termination of Contract for Failure to Become Effective:
The time period shall be _______________________ [insert time period, e.g.: four months].
Commencement of Services:
The number of days shall be_________________ [e.g.: ten].
Confirmation of Key Experts’ availability to start the Assignment shall be submitted to the Procuring Agency in writing as a written statement signed by each Key Expert.
Expiration of Contract:
The time period shall be ________________________ [insert time period, e.g.: twelve months].
Number of GC Clause 23
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 23.1
No additional provisions.
The following limitation of the Consultant’s Liability towards the Procuring Agency can be subject to the Contract’s negotiations:
Commencement and duration: The Consultant shall commence the services within fifteen (15) days of the effective date of the Contract, or as mutually agreed between the parties. The total time allocated for the assignment is fifty-two (52) weeks from the date of signing of the agreement.
Commencement and duration: The timeline, work plan and activities set out in the Consultant's accepted proposal shall be discussed at a kick-off meeting and, after incorporating any agreed amendment, shall form an integral part of the Contract as the "Schedule". Where no change is made, the schedule in the Request for Proposal shall be final.
Intellectual property and Confidentiality: All intellectual property in the studies, reports, datasets, survey instruments, recordings, software and documents produced as an exclusive and direct consequence of this Contract shall be the property of the Procuring Agency. The Consultant shall deliver all such material to the Procuring Agency on completion and shall retain no copy without prior written consent.
Intellectual Property and Confidentiality: The Consultant shall not disclose any proprietary or confidential information relating to this Contract or to the Procuring Agency's business or operations without prior written consent, during the Contract period or after its expiry. The Consultant is strictly prohibited from disclosing research data, university information, financial records and unpublished research accessed in the course of the assignment.
Performance security: The performance security shall be furnished within ten (10) working days of receipt of the notification of award. It shall be returned within two (02) months after maturity of the Contract and successful completion of the assignment, after the Consultant has remedied any issues notified in the final report.
Acceptance of deliverables: Each deliverable shall be reviewed by the Technical Committee constituted by the Procuring Agency. No deliverable shall be treated as accepted until cleared in writing by the Technical Committee. Payment shall follow acceptance.
Payment: No mobilization or advance payment shall be made to the Consultant. Payment shall be made in Pakistan Rupees, by cheque against invoice, on the following schedule, in each case following written clearance of the relevant deliverable by the Technical Committee: (i) Inception Report — 10% (ii) Information and data analysis report — 30% (iii) Draft evaluation report — 30% (iv) Final evaluation report — 30%
Payment: Government taxes shall be deducted at source. The Consultant shall provide NTN/FTN and any tax exemption certificate with its invoices.
Price: The Contract is not subject to price adjustment. However, any subsequent legislation enacted, change in the rate of any indirect tax, or levy of additional tax or duty during the currency of the Contract that impacts the contract price shall be accounted for equally by both parties. The quoted price is inclusive of all applicable taxes and all out-of-pocket expenses, including transportation, local travel, surveys and meetings with stakeholders.
Changes to the Terms of Reference : Where the Procuring Agency considers a change to the agreed Terms of Reference necessary, the change may be implemented through mutual consultation of both parties and shall be recorded in writing signed by both parties
Key personnel and sub-consultants: Key personnel named in the Consultant's proposal shall not be substituted without concrete reason, prior intimation to the Procuring Agency and its written approval. The Consultant shall submit at least three profiles of any proposed replacement, which the Procuring Agency may accept or reject at its sole discretion. Any replacement shall be of equivalent or better qualification and experience.
Key Personnel and Sub-Consultants: The Consultant shall remain liable for the acts and omissions of its sub-consultants and personnel.
Liquidated damages and defective services: Liquidated damages shall be charged at 0.01% of the value of the undelivered portion per day of delay, up to a maximum of ten percent (10%) of the contract value, in the event of delay in delivery of services beyond any mutually agreed extension, or poor delivery against agreed deliverables. Liquidated damages shall be deducted from sums payable to the Consultant.
Liquated Damages and Defective Services: Where the services do not comply with the Terms of Reference, the Procuring Agency shall give notice stating the delay or the nature of the non-compliance. The Consultant shall remedy the deficiency within seven (07) calendar days of such notice. Failing compliance, the Procuring Agency may take such remedial action as may be necessary at the Consultant's risk and expense, without prejudice to any other rights it may have under the Contract.
Termination: In addition to the grounds stated in the General Conditions, the Procuring Agency may terminate the Contract on discovery of misconduct by the Consultant, including bribery, falsification of receipts, sub-contracting without prior written agreement, failure to disclose personal relationships with employees of the Procuring Agency, or any other practice the Procuring Agency deems fraudulent.
Termination: On such termination no further payment shall be due in respect of delivered or undelivered services, and the Procuring Agency may inform other public or private organizations of the reasons for cancellation. Where a force majeure event continues for more than three (03) months (90 days), the Procuring Agency may terminate the Contract without incurring any liability or damages.
Dispute Resolution: Any dispute arising out of or relating to the Contract shall first be referred to a committee comprising the Director General (R&ID), HEC and a representative of the Consultant, which shall seek resolution through negotiation and mutual consent. Where the dispute is not resolved within thirty (30) days of such referral, either party may refer it to arbitration. The provisions of the Arbitration Act, 1940 shall apply and venue of arbitration shall be Islamabad.
Liability: The Consultant shall be liable for the consequences of errors or omissions on its part. Such liability shall not be less than the remuneration payable under this Contract, excluding out-of-pocket expenses, and shall not exceed twice that remuneration. The Consultant shall in addition be liable to repay amounts received where the services are provided only partially against the Terms of Reference, or where the Consultant terminates during the contract period.
Conflict of interest: The Consultant and its experts shall not be involved, directly or indirectly, with any Principal Investigator, university or industry partner connected with the projects under evaluation. The Consultant shall submit a Conflict-of-Interest Declaration confirming that neither the firm nor its experts participated in the implementation or management of the NRPU projects being evaluated. Failure to disclose may lead to disqualification or termination of the contract.
Integrity Pact: If the Consultant or any of its sub-consultants, agents or servants is found to have violated the Integrity Pact signed as part of this Contract, the Procuring Agency shall be entitled to recover from the Consultant an amount equivalent to ten times the sum of any commission, gratification, bribe, finder's fee or kickback given; to terminate the Contract; and to recover any loss or damage resulting from such termination or from any other corrupt business practice.
Procuring Agency's obligations: The Procuring Agency shall aid the Consultant in obtaining access to documents, counterparts' information, field surveys, networking assistance, meetings, focus group discussions, interviews and on-site verification of outcomes, and such other support as is required for the performance of the services.
Extension of time for Client-caused delay: Where any review or approval by the Technical Committee exceeds the period stated in the Terms of Reference, the assignment period shall be extended day for day, without cost consequence to either party. Liquidated damages shall not apply to delay attributable to the Procuring Agency.
Number of GC Clause 24
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Director General (DG) Higher Education Commission (HEC)
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Call at Deposit, Demand Draft
Number of GC Clause 24.1
The insurance coverage against the risks shall be as follows:
(a) Professional liability insurance, with a minimum coverage of ______________________ [insert amount and currency which should be not less than the total ceiling amount of the Contract];
Number of GC Clause 33. Removal of Experts or Sub-consultants
[Note to Procuring Agency: include the following for supervision of infrastructure contracts (such as Plant or Works) and for other consulting service where the social risks are substantial or high, otherwise delete.]
Price adjustment on the remuneration : Nil [insert “applies” or “ does not apply”]
The currency of payment shall be the following: PKR
[The advance payment could be in either the foreign currency, or the local currency, or both; select the correct wording in the Clause here below. The advance bank payment guarantee should be in the same currency(ies)]
The following provisions shall apply to the advance payment and the advance bank payment guarantee:
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P134053
To: Higher Education Commission (HEC) (Higher Education Commision (HEC)), Assistant Director Central Procurement Cell, Sector H-9, Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
This CONTRACT (hereinafter called the “Contract”) is made the [number] day of the month of [month], [year], between, on the one hand, [name of Procuring Agency or Recipient] (hereinafter called the “Procuring Agency”) and, on the other hand, [name of Consultant] (hereinafter called the “Consultant”).
[If the Consultant consist of more than one entity, the above should be partially amended to read as follows: “…(hereinafter called the “Procuring Agency”) and, on the other hand, a Joint Venture consisting of the following entities, each member of which will be jointly and severally liable to the Procuring Agency for all the Consultant’s obligations under this Contract, namely, [name of member] and [name of member] (hereinafter called the “Consultant”).]
WHEREAS
NOW THEREFORE the parties hereto hereby agree as follows:
The following documents attached hereto shall be deemed to form an integral part of this Contract:
In the event of any inconsistency between the documents, the following order of precedence shall prevail: the Special Conditions of Contract; the General Conditions of Contract, including Attachment 1; Appendix A; Appendix B; Appendix C and Appendix D; and Appendix E. Any reference to this Contract shall include, where the context permits, a reference to its Appendices.
2. The mutual rights and obligations of the Procuring Agency and the Consultant shall be as set forth in the Contract, in particular:
(a) the Consultant shall carry out the Services in accordance with the provisions of the Contract; and
(b) the Procuring Agency shall make payments to the Consultant in accordance with the provisions of the Contract.
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be signed in their respective names as of the day and year first above written.
For and on behalf of [Name of Procuring Agency]
[Authorized Representative of the Procuring Agency – name, title and signature]
For and on behalf of [Name of Consultant or Name of a Joint Venture]
[Authorized Representative of the Consultant – name and signature]
[For a joint venture, either all members shall sign or only the lead member, in which case the power of attorney to sign on behalf of all members shall be attached.]
For and on behalf of each of the members of the Consultant [insert the name of the Joint Venture]
[Name of the lead member]
[Authorized Representative on behalf of a Joint Venture]
[add signature blocks for each member if all are signing]
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Higher Education Commission (HEC) (Higher Education Commision (HEC)), Assistant Director Central Procurement Cell, Sector H-9, Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Must have verifiable consultancy experience.
Have not been blacklisted or debarred by any government/semi-government/autonomous/international organizations in Pakistan.
Provide Bank statements of last three (3) years.