The following specific data for the procurement of Consultancy Services to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: Procurement Dept, Inter State Gas Systems. (Inter State Gas Systems (ISGS))
The subject of procurement is: Hiring of Independent Technical Consultant for Monitoring of Refinery Upgrade Projects
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P139221
BDS Clause Number 2
ITB Number 1.2 & 9.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, December 7, 2026
Pre-Bid Meeting: Tuesday, November 17, 2026 02:00 PM
Venue: 8th floor, Petroleum House, G-5/2, Islamabad. {Note: Clarifications received on or before 12 November 2026 will be considered for discussion at the Pre-bid Meeting.}
Meeting Link: https://us06web.zoom.us/j/84670978281?pwd=o4xHUUq9PvHt3qJotK10NGZ0NSs2g3.1
BDS Clause Number 3
ITB Number 4.1
The language of the proposals is: English
BDS Clause Number 4
ITB Number 6.1
Participation of Sub-consultants, Key Experts and Non-Key Experts in more than one Proposal is permissible? No
BDS Clause Number 5
ITB Number 7.1
Proposals shall be valid until 180 Days
BDS Clause Number 6
ITB Number 9.1
List of documents required along with the bid:
BDS Clause Number 7
ITB Number 10.2
The Consultant’s Proposal must include the minimum Key Experts’ time-input of __________person-months.
For the evaluation and comparison of Proposals only: if a Proposal includes less than the required minimum time-input, the missing time-input (expressed in person-month) is calculated as follows:
The missing time-input is multiplied by the highest remuneration rate for a Key Expert in the Consultant’s Proposal and added to the total remuneration amount. Proposals that quoted higher than the required minimum of time-input will not be adjusted. ]
BDS Clause Number 8
ITB Number 10.5
The price shall be Fixed.
Price schedule will be provided according to the format defined and acquired. see section price schedule.
BDS Clause Number 9
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 10
ITB Number 7.6
Services and Their related documents:
See section Required Services and ToR
BDS Clause Number 11
ITB Number 8.1 & 8.2
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of : Inter State Gas Systems (Pvt) Ltd. (ISGS)
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft
BDS Clause Number 12
ITB Number 13.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 14.1
Proposal shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Thursday, December 10, 2026 03:00 PM
BDS Clause Number 14
ITB Number 15.1
The Bids opening shall take place on EPADS v2.0.
Day : Thursday
Date: Thursday, December 10, 2026
Time : 03:30 PM
BDS Clause Number 15
ITB Number 20
Selection technique adopted will be: Quality and Cost Based Selection (QCBS)
see Evaluation Criteria
BDS Clause Number 16
ITB Number 21.5
The Performance guarantee shall: 10.00%.
The Performance Guarantee shall be acceptable in the form of: Bank Guarantee
BDS Clause Number 17
ITB Number 24.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
|
None |
| Eligibility Criteria | Document |
|---|---|
| Form of Bid | Yes |
| National firms: valid SECP/PEC registration; International firms: valid incorporation in country of origin. | Yes |
| National firms: FBR registration and active taxpayer status. International firms: exempt if applying without local partner. | Yes |
| Experience of comparable or greater services. The bidder shall demonstrate that it has satisfactorily performed, on at least one project, services comparable to or greater than the Services described in the Terms of Reference | Yes |
| Minimum average annual turnover of US$ 5 million, or PKR equivalent, over the last three (3) years evidenced by the audited financial statements . In the case of a joint venture or consortium, the lead partner shall meet this requirement. | Yes |
Quality and Cost Based Selection (QCBS)
Weightage
| Technical Evaluation % | Financial Evaluation % |
|---|---|
| 75 | 25 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 75 | |
| General experience of the firm - 10 Marks | ||
| Years since establishment of the firm (Quantitative)(Doc Required) More than 15 years (5) 11 to 15 years (4) 5 to 10 years (2) | 5 | |
| Professional staff strength (Quantitative)(Doc Required) More than 15 (5) 10 to 15 (4) 5 to 9 (2) | 5 | |
| Relevant Experience of the Firm - 35 Marks | ||
| Technical verification, monitoring or assurance of refinery, petrochemical or process-industry capital projects (Qualitative)(Doc Required) 3 or more assignment (10) 2 assignment (8) at least 1 assignment (5) | 10 | |
| Refinery’s FEED or basic engineering review/preparation with assessment or validation of the capital cost estimate (Qualitative)(Doc Required) 3 or more FEED reviews/preparation (8) 2 FEED reviews/preparation (6) at least 1 FEED review/preparation (4) | 8 | |
| Financial Close and Final Investment Decision support, and Capex Schedule certification (Qualitative)(Doc Required) 3 or more projects taken to financial close or FID (6) 2 such projects (4) at least 1 such project (2) | 6 | |
| Verification of Refinery’s milestones, progress, invoices and payment claims governing release of funds (Qualitative)(Doc Required) 3 or more assignments (7) 2 assignments (5) at least 1 assignment (3) | 7 | |
| Brownfield refinery upgrade project (for clean-fuel) experience (Qualitative)(Doc Required) 3 or more brownfield upgrade projects (4) 2 brownfield upgrade projects (3) 1 brownfield upgrade project (1) | 4 | |
| Technical capability and resource adequacy - 5 Marks | ||
| Quality, HSE and information security certifications For example ISO 9001, ISO 14001 and ISO 27001. (Qualitative)(Doc Required) | 2 | |
| Cost estimating, planning and document control systems (Qualitative)(Doc Required) | 2 | |
| Presence in Pakistan (Qualitative)(Doc Required) | 1 | |
| Methodology, work plan and understanding of the Terms of Reference - 25 Marks | ||
| Understanding of the Policy, the Upgrade Agreement and the certification duties of the Consultant (Qualitative)(Doc Required) | 6 | |
| Verification methodology (Qualitative)(Doc Required) | 9 | |
| Work plan, staffing schedule, deployment and reporting arrangements (Qualitative)(Doc Required) | 6 | |
| Approach to avoiding duplication of work (Qualitative)(Doc Required) | 4 | |
| Key experts’ qualifications and experience - 25 Marks | ||
| Project Director / Team Leader (Qualitative)(Doc Required) | 5 | |
| Process / Refining Technology Lead (Qualitative)(Doc Required) | 5 | |
| Mechanical / Static and Rotating Equipment Lead (Qualitative)(Doc Required) | 5 | |
| Electrical, Instrumentation and Control Systems Lead (Qualitative)(Doc Required) | 5 | |
| Project Finance / Financial Close Specialist (Qualitative)(Doc Required) | 5 | |
Lot Title : Provision of consultancy services for monitoring of Attock Refinery Limited – Upgradation project
Bid Security : 16021600 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Inception Report and Claim-Verification Plan | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 15 Days after issuance of first work orderQuantity: 1/job |
1 |
| Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 Days after receipt of complete FEEDQuantity: 1/job |
1 |
| Financial Close and Capex Schedule Certification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: completeness confirmation within 3 days of receipt; certification within 7 days of receipt of a complete packageQuantity: 1/job |
1 |
| Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Initial register with the Inception Report or FEED Review Report, followed by updates with each claim and monthly reportQuantity: 1/job |
1 |
| Claim Verification Report and Technical Verification Certificate | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of a complete claim packageQuantity: 1/job |
1 |
| Consultant’s Monthly Project Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: 10th day of every monthQuantity: 1/job |
1 |
| Verification Report on the Refinery's Monthly Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 7 days after receipt of the refinery's monthly progress report.Quantity: 1/job |
1 |
| Commissioning and Performance Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of complete commissioning and performance-test records.Quantity: 1/job |
1 |
| Product Quality and Crude Assay Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Monthly from commissioning to start up]Quantity: 1/job |
1 |
| Final Technical Verification and Close-Out Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 days after the final claim, successful commissioning, completion of the relevant work order or such other date directed by ISGSQuantity: 1/job |
1 |
Lot Title : Provision of consultancy services for monitoring of National Refinery Limited – Upgradation project
Bid Security : 17500000 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Inception Report and Claim-Verification Plan | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 15 Days after issuance of first work orderQuantity: 1/job |
1 |
| Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 Days after receipt of complete FEEDQuantity: 1/job |
1 |
| Financial Close and Capex Schedule Certification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: completeness confirmation within 3 days of receipt; certification within 7 days of receipt of a complete packageQuantity: 1/job |
1 |
| Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Initial register with the Inception Report or FEED Review Report, followed by updates with each claim and monthly reportQuantity: 1/job |
1 |
| Claim Verification Report and Technical Verification Certificate | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of a complete claim packageQuantity: 1/job |
1 |
| Consultant’s Monthly Project Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: 10th day of every monthQuantity: 1/job |
1 |
| Verification Report on the Refinery's Monthly Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 7 days after receipt of the refinery's monthly progress report.Quantity: 1/job |
1 |
| Commissioning and Performance Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of complete commissioning and performance-test records.Quantity: 1/job |
1 |
| Product Quality and Crude Assay Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Monthly from commissioning to start up]Quantity: 1/job |
1 |
| Final Technical Verification and Close-Out Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 days after the final claim, successful commissioning, completion of the relevant work order or such other date directed by ISGSQuantity: 1/job |
1 |
Lot Title : Provision of consultancy services for monitoring of Pakistan Refinery Limited – Upgradation project
Bid Security : 20048000 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Inception Report and Claim-Verification Plan | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 15 Days after issuance of first work orderQuantity: 1/job |
1 |
| Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 Days after receipt of complete FEEDQuantity: 1/job |
1 |
| Financial Close and Capex Schedule Certification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: completeness confirmation within 3 days of receipt; certification within 7 days of receipt of a complete packageQuantity: 1/job |
1 |
| Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Initial register with the Inception Report or FEED Review Report, followed by updates with each claim and monthly reportQuantity: 1/job |
1 |
| Claim Verification Report and Technical Verification Certificate | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of a complete claim packageQuantity: 1/job |
1 |
| Consultant’s Monthly Project Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: 10th day of every monthQuantity: 1/job |
1 |
| Verification Report on the Refinery's Monthly Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 7 days after receipt of the refinery's monthly progress report.Quantity: 1/job |
1 |
| Commissioning and Performance Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of complete commissioning and performance-test records.Quantity: 1/job |
1 |
| Product Quality and Crude Assay Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Monthly from commissioning to start up]Quantity: 1/job |
1 |
| Final Technical Verification and Close-Out Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 days after the final claim, successful commissioning, completion of the relevant work order or such other date directed by ISGSQuantity: 1/job |
1 |
Lot Title : Provision of consultancy services for monitoring of Cnergyico PK Limited – Upgradation project
Bid Security : 18172000 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Inception Report and Claim-Verification Plan | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 15 Days after issuance of first work orderQuantity: 1/job |
1 |
| Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 Days after receipt of complete FEEDQuantity: 1/job |
1 |
| Financial Close and Capex Schedule Certification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: completeness confirmation within 3 days of receipt; certification within 7 days of receipt of a complete packageQuantity: 1/job |
1 |
| Project Cost and Milestone Register | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Initial register with the Inception Report or FEED Review Report, followed by updates with each claim and monthly reportQuantity: 1/job |
1 |
| Claim Verification Report and Technical Verification Certificate | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of a complete claim packageQuantity: 1/job |
1 |
| Consultant’s Monthly Project Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: 10th day of every monthQuantity: 1/job |
1 |
| Verification Report on the Refinery's Monthly Progress Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 7 days after receipt of the refinery's monthly progress report.Quantity: 1/job |
1 |
| Commissioning and Performance Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 10 days after receipt of complete commissioning and performance-test records.Quantity: 1/job |
1 |
| Product Quality and Crude Assay Verification Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Monthly from commissioning to start up]Quantity: 1/job |
1 |
| Final Technical Verification and Close-Out Report | Address: 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory Schedule: Within 30 days after the final claim, successful commissioning, completion of the relevant work order or such other date directed by ISGSQuantity: 1/job |
1 |
No
Lot Title : Provision of consultancy services for monitoring of Attock Refinery Limited – Upgradation project
Position: Inception Report and Claim-Verification Plan
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Financial Close and Capex Schedule Certification Report
Specifications / Requirements:
Linked Upgrade Project milestone: Final Investment Decision; Financial Close
Detailed Scope of Work is attached as Annexure...
Position: Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Claim Verification Report and Technical Verification Certificate
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Consultant’s Monthly Project Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Verification Report on the Refinery's Monthly Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Commissioning and Performance Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Product Quality and Crude Assay Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Final Technical Verification and Close-Out Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Lot Title : Provision of consultancy services for monitoring of National Refinery Limited – Upgradation project
Position: Inception Report and Claim-Verification Plan
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Financial Close and Capex Schedule Certification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Claim Verification Report and Technical Verification Certificate
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Consultant’s Monthly Project Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Verification Report on the Refinery's Monthly Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Commissioning and Performance Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Product Quality and Crude Assay Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Final Technical Verification and Close-Out Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Lot Title : Provision of consultancy services for monitoring of Pakistan Refinery Limited – Upgradation project
Position: Inception Report and Claim-Verification Plan
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Financial Close and Capex Schedule Certification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Claim Verification Report and Technical Verification Certificate
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Consultant’s Monthly Project Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Verification Report on the Refinery's Monthly Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Commissioning and Performance Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Product Quality and Crude Assay Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Final Technical Verification and Close-Out Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Lot Title : Provision of consultancy services for monitoring of Cnergyico PK Limited – Upgradation project
Position: Inception Report and Claim-Verification Plan
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Feasibility and FEED Review Report, with the initial Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Financial Close and Capex Schedule Certification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Project Cost and Milestone Register
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Claim Verification Report and Technical Verification Certificate
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Consultant’s Monthly Project Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Verification Report on the Refinery's Monthly Progress Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Commissioning and Performance Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Product Quality and Crude Assay Verification Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
Position: Final Technical Verification and Close-Out Report
Specifications / Requirements:
Detailed Scope of Work is attached as Annexure...
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract>
Number of GC Clause 3.1
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 4.1
The language is English
Number of GC Clause 6.1 and 6.2
The addresses are:
The Procuring Agency is: Procurement Dept, Inter State Gas Systems. (Inter State Gas Systems (ISGS)), Deputy Chief Manager 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory
The Consultant Address:
The title of the subject procurement is:Hiring of Independent Technical Consultant for Monitoring of Refinery Upgrade Projects
Number of GC Clause 8.1
[Note: If the Consultant consists only of one entity, state “N/A”;Or
The Lead Member on behalf of the JV is ___________ ______________________________ [insert name of the member]
Number of GC Clause 9.1
The Authorized Representatives are:
For the Procuring Agency:
Procurement Dept, Inter State Gas Systems. (Inter State Gas Systems (ISGS)), Deputy Chief Manager
8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory
+92-345-858-6018
ishtiaq.ahmed@isgs.com.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 11.1
[Note: If there are no effectiveness conditions, state “N/A”]OR
List here any conditions of effectiveness of the Contract]
The effectiveness conditions are the following: [insert “N/A” or list the conditions]
Termination of Contract for Failure to Become Effective:
The time period shall be _______________________ [insert time period, e.g.: four months].
Commencement of Services:
The number of days shall be_________________ [e.g.: ten].
Confirmation of Key Experts’ availability to start the Assignment shall be submitted to the Procuring Agency in writing as a written statement signed by each Key Expert.
Expiration of Contract:
The time period shall be ________________________ [insert time period, e.g.: twelve months].
Number of GC Clause 23
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.20% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 23.1
No additional provisions.
The following limitation of the Consultant’s Liability towards the Procuring Agency can be subject to the Contract’s negotiations:
Number of GC Clause 24
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Inter State Gas Systems (Pvt) Ltd.
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Bank Guarantee
Number of GC Clause 24.1
The insurance coverage against the risks shall be as follows:
(a) Professional liability insurance, with a minimum coverage of ______________________ [insert amount and currency which should be not less than the total ceiling amount of the Contract];
Number of GC Clause 33. Removal of Experts or Sub-consultants
[Note to Procuring Agency: include the following for supervision of infrastructure contracts (such as Plant or Works) and for other consulting service where the social risks are substantial or high, otherwise delete.]
Price adjustment on the remuneration : Nil [insert “applies” or “ does not apply”]
The currency of payment shall be the following: PKR
[The advance payment could be in either the foreign currency, or the local currency, or both; select the correct wording in the Clause here below. The advance bank payment guarantee should be in the same currency(ies)]
The following provisions shall apply to the advance payment and the advance bank payment guarantee:
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P139221
To: Procurement Dept, Inter State Gas Systems. (Inter State Gas Systems (ISGS)), Deputy Chief Manager 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
This CONTRACT (hereinafter called the “Contract”) is made the [number] day of the month of [month], [year], between, on the one hand, [name of Procuring Agency or Recipient] (hereinafter called the “Procuring Agency”) and, on the other hand, [name of Consultant] (hereinafter called the “Consultant”).
[If the Consultant consist of more than one entity, the above should be partially amended to read as follows: “…(hereinafter called the “Procuring Agency”) and, on the other hand, a Joint Venture consisting of the following entities, each member of which will be jointly and severally liable to the Procuring Agency for all the Consultant’s obligations under this Contract, namely, [name of member] and [name of member] (hereinafter called the “Consultant”).]
WHEREAS
NOW THEREFORE the parties hereto hereby agree as follows:
The following documents attached hereto shall be deemed to form an integral part of this Contract:
In the event of any inconsistency between the documents, the following order of precedence shall prevail: the Special Conditions of Contract; the General Conditions of Contract, including Attachment 1; Appendix A; Appendix B; Appendix C and Appendix D; and Appendix E. Any reference to this Contract shall include, where the context permits, a reference to its Appendices.
2. The mutual rights and obligations of the Procuring Agency and the Consultant shall be as set forth in the Contract, in particular:
(a) the Consultant shall carry out the Services in accordance with the provisions of the Contract; and
(b) the Procuring Agency shall make payments to the Consultant in accordance with the provisions of the Contract.
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be signed in their respective names as of the day and year first above written.
For and on behalf of [Name of Procuring Agency]
[Authorized Representative of the Procuring Agency – name, title and signature]
For and on behalf of [Name of Consultant or Name of a Joint Venture]
[Authorized Representative of the Consultant – name and signature]
[For a joint venture, either all members shall sign or only the lead member, in which case the power of attorney to sign on behalf of all members shall be attached.]
For and on behalf of each of the members of the Consultant [insert the name of the Joint Venture]
[Name of the lead member]
[Authorized Representative on behalf of a Joint Venture]
[add signature blocks for each member if all are signing]
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Procurement Dept, Inter State Gas Systems. (Inter State Gas Systems (ISGS)), Deputy Chief Manager 8th floor, Petroleum House, G-5/2, Islamabad., Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
If any disqualification condition stipulated in the Form of Bid applies to the Bidder, its Bid shall be disqualified.
The successful bidder shall be required to furnish, for contracts above PKR 50 million, the Declaration of Ultimate Beneficial Owners Information as per the attached format.
This SCC shall replace the above SCC.
Detailed technical evaluation criteria...Â
Bids for each refinery shall be evaluated separately, and a separate contract shall be awarded for each refinery. However, a successful bidder may be awarded contract for maximum of two refineries.
Detailed Scope of work/Terms of Reference (ToRs) are attached.
The total lump-sum amount, including the local and foreign components, if any, shall be quoted in PKR on the e-PADS portal for evaluation purposes. The fixed exchange rate specified in the Financial Forms shall be used for conversion of the foreign currency component into PKR. The bidder must understand the services to be provided by local man power/personnel shall only be quoted and paid in PKR as per applicable laws.
This performance guarantee format shall be used.Â
The Performance Guarantee shall be calculated separately for each refinery in accordance with the relevant Contract Agreement.
All experiences submitted will be evidenced by a completion certificate, or a client reference confirming satisfactory performance of the completed scope claimed, together with the contract or award letter along with contact details of the client for ISGS verification. Ongoing assignments count only for services the client confirms have been delivered. Assignments carried out during last 15 years shall be considered for evaluation.
Provide copies of financial statements for the last three (3) years pursuant to the Eligibility Criteria.