In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.gov.pk).
Workers Welfare Fund, Balochistan (Workers Welfare Fund, Balochistan), Secretary
Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
+92-336-646-0666
workerwelfarefundbalochistan@gmail.com
The following specific data for the procurement of Consultancy Services to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: Workers Welfare Fund, Balochistan (Workers Welfare Fund, Balochistan)
The subject of procurement is: ESTABLISHMENT OF 200 LABOUR QUARTERS AT BAIKAR, NORTH DERA BUGTI
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P175995
BDS Clause Number 2
ITB Number 1.2 & 9.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Saturday, November 14, 2026
Pre-Bid Meeting: Monday, November 9, 2026 12:00 PM
Venue: Office of Workers Welfare Fund Balochistan near BINUQ, Samungali Road, Quetta
BDS Clause Number 3
ITB Number 4.1
The language of the proposals is: English
BDS Clause Number 4
ITB Number 6.1
Participation of Sub-consultants, Key Experts and Non-Key Experts in more than one Proposal is permissible? No
BDS Clause Number 5
ITB Number 7.1
Proposals shall be valid until 90 Days
BDS Clause Number 6
ITB Number 9.1
List of documents required along with the bid: No
BDS Clause Number 7
ITB Number 10.2
The Consultant’s Proposal must include the minimum Key Experts’ time-input of __________person-months.
For the evaluation and comparison of Proposals only: if a Proposal includes less than the required minimum time-input, the missing time-input (expressed in person-month) is calculated as follows:
The missing time-input is multiplied by the highest remuneration rate for a Key Expert in the Consultant’s Proposal and added to the total remuneration amount. Proposals that quoted higher than the required minimum of time-input will not be adjusted. ]
BDS Clause Number 8
ITB Number 10.5
The price shall be Fixed.
Price schedule will be provided according to the format defined and acquired. see section price schedule.
BDS Clause Number 9
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 10
ITB Number 7.6
Services and Their related documents:
See section Required Services and ToR
BDS Clause Number 11
ITB Number 8.1 & 8.2
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of : Workers Welfare Fund, Balochistan
The Bid Security shall be in the form of: Call at Deposit
BDS Clause Number 12
ITB Number 13.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 14.1
Proposal shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Tuesday, November 17, 2026 12:30 PM
BDS Clause Number 14
ITB Number 15.1
The Bids opening shall take place on EPADS v2.0.
Day : Tuesday
Date: Tuesday, November 17, 2026
Time : 01:00 PM
BDS Clause Number 15
ITB Number 20
Selection technique adopted will be: Quality and Cost Based Selection (QCBS)
see Evaluation Criteria
BDS Clause Number 16
ITB Number 21.5
The Performance guarantee shall: 0%.
The Performance Guarantee shall be acceptable in the form of: Nil
BDS Clause Number 17
ITB Number 24.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
|
NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) SECP PEC Registrar of Firms |
| Eligibility Criteria | Document |
|---|---|
| Valid Registration of the firm/Company with Pakistan Engineering Council. Must have 1201, 1203, 1231 Project Profile Codes and 510, 511, 516,518, 532, 533, 536, 537, 538, 542, 543, 544, 592 Project Services Codes | Yes |
| Valid PCATP Registration Category NO LIMIT | Yes |
| Valid legal entity of the firm e.g. Certificate of registration from Securities & Exchange Commission of Pakistan (SECP) or Registrar of Firms or any other Statutory Body. | Yes |
| Certificate of registration with Income Tax (BRA & Active Tax Payer List) | Yes |
| Must have average annual turnover of PKR 100.00 million or above during the last three (03) financial years. | Yes |
| Affidavit on non-judicial stamp paper that non-performance of a contract did not occur within the last ten years and no litigation is pending between the Consultant and any government department, body or agency. | Yes |
| Affidavit declaring “Neither the firms nor its Directors, Stakeholders, as a whole or as a part of the firm have been blacklisted/defaulted by any government agency/department/organization”. | Yes |
| Provision of a separate undertaking that the information supplied by the firm is correct. | Yes |
| The bidder shall provide an undertaking, duly signed and stamped by the authorized representative, confirming that consultant shall, as a first priority, prepare and submit the PC-II (Feasibility Study) of the project, including all necessary surveys, preliminary designs, cost estimates and supporting documents required for approval from the competent forum. All subsequent stages of consultancy services shall commence only after the approval of PC-II by the Client and the competent authority." | Yes |
| The Bidder must submit the physical copy of bid before tender opening at the office of workers welfare board, balochistan | Yes |
| Tender Fees of Rupees 5000 in the form of Pay order must be submitted in the favor of Secretary Workers Welfare Board Balochistan | Yes |
| Bidder Must Submit Original CDR in separate envelope before bid opening | Yes |
Quality and Cost Based Selection (QCBS)
Weightage
| Technical Evaluation % | Financial Evaluation % |
|---|---|
| 80 | 20 |
| Technical Marks | 1000 | |
|---|---|---|
| Passing Marks | 700 | |
| A. FIRM’S STATUS | ||
| 1.1 Establishment of the Firm (attach evidence) (Quantitative)(Doc Required) 15+ years (50) 10 to 14 years (30) 8 to 13 years (20) Less than 7 years (10) | 50 | |
| 1.2 ISO Certification 2015:9001 (Quantitative)(Doc Required) | 50 | |
| B. EXPERIENCE OF THE FIRM | ||
| Experience on projects of matching magnitude/complexity completed successfully during the last ten (10) years. i. Project costing more than 2,000/- Million 25 Marks ii. Project costing more than 1,500/- Million 15 Marks iii. Project costing more than 500/- Million 10 Marks (Qualitative)(Doc Required) | 50 | |
| a) General (Overall experience of firm in the industry) i. Project costing more than 2,000/- Million 20 Marks ii. Project costing more than 1,500/- Million 15 Marks iii. Project costing more than 1,000/- Million 5 Marks (Qualitative)(Doc Required) | 40 | |
| a) Projects in Hand Present Commitment (For Project costing more than 1,000/- Million) 10 (Qualitative)(Doc Required) | 10 | |
| C. APPROACH AND METHODOLOGY | ||
| Understanding of objectives (Quantitative)(Doc Required) | 50 | |
| Quality of Methodology a) Data Collection, Survey & Investigations 10 b) Design of Infrastructure Works 10 c) Procurement of Infrastructure Development Works 10 d) Construction Supervision of Infrastructure Development Works 10 (Qualitative)(Doc Required) | 40 | |
| Work Programme a) Activity Schedule 15 b) Team Organization 15 c) Staff Duty Matrix 15 d) Staffing Schedule 15 (Qualitative)(Doc Required) | 60 | |
| Prior Work Experience a) Work Experience with WWB 50 (Qualitative)(Doc Required) | 50 | |
| Physical Presence in Quetta (Quantitative)(Doc Required) | 100 | |
| D. STAFF TO BE DEPLOYED ON THE ASSIGNMENT Project Manager/Team Leader 50 a) Academic and General Qualifications Total 25 Marks (BSc/BE Civil Engineering = 15 Marks MSc Civil Engineering/Construction Management/Project Management = 7.5 Marks PMP | ||
| Project Manager/Team Leader 50 a) Academic and General Qualifications Total 25 Marks (BSc/BE Civil Engineering = 15 Marks MSc Civil Engineering/Construction Management/Project Management = 7.5 Marks PMP Certification = 2.5 Marks b) Professional Experience Total 25 Marks 20+ Years’ experience = 25 Marks 10 to 19 Years’ experience = 15 Marks Less than 10 Years’ experience = 0 Marks (Qualitative)(Doc Required) | 50 | |
| Town Planner 50 Academic and General Qualifications Total 25 Marks Bachelors in town Planning = 20 marks PCATP Registration = 5 marks Professional Experience Total 25 Marks 12+ Years’ experience = 25 marks, 8 to 12 Years’ experience = 15 marks Less than 8 Years’ experience = 0 marks (Qualitative)(Doc Required) | 50 | |
| Lead Architect 50 Academic and General Qualifications Total 25 Marks (Bachelor's Degree in Architecture (B.Arch.) = 15 marks Master's Degree in Architecture, or Project Management field = 7.5 Marks, Registered with PCATP And IAP = 2.5 Marks Professional Experience Total 25 Marks 25+ Years’ experience = 25 Marks 15 to 24 Years’ experience = 15 Marks Less than 15 Years’ experience = 0 Marks 10%, (Qualitative)(Doc Required) | 50 | |
| Senior Architect 40 Academic and General Qualifications Total 20 Marks (Bachelor's Degree in Architecture (B.Arch.) = 12 marks Master's Degree in Architecture, or Project Management field = 6 Marks, Registered with PCATP And IAP = 2 Marks Professional Experience Total 20 Marks 20+ Years’ experience = 20 Marks 10 to 19 Years’ experience = 10 Marks Less than 10 Years’ experience = 0 Marks (Qualitative)(Doc Required) | 40 | |
| Structural Engineer 30 Academic and General Qualifications Total 15 Marks (BS/BSc Civil Engineering. = 10 Marks, MSc Structural Engineering. = 5 Marks Professional Experience Total 15 Marks 10+ Years’ experience = 15 marks 5 to 9 Years’ experience = 7.5 marks Less than 5 Years’ experience = 0 marks (Qualitative)(Doc Required) | 30 | |
| Contracts Expert 60 Academic and General Qualifications Total 30 Marks (BE/BSc Civil Engineering = 20 Marks MSc in Engineering Management = 10 Professional Experience Total 30 Marks 15+ Years’ experience = 30 Marks 10 to 14 experience = 15 Marks Less than 10 Years’ experience = 0 Marks (Qualitative)(Doc Required) | 60 | |
| Resident Engineer 60 Academic and General Qualifications Total 30 Marks BE/BSc Civil Engineering = 30 Professional Experience Total 30 Marks 20+ Years’ experience = 30 Marks 15 to 20 Years’ experience = 15 Marks Less than 15 Years’ experience = 0 Marks (Qualitative)(Doc Required) | 60 | |
| Assistant Resident Engineer (Civil) 25 Academic and General Qualifications Total 12.5 Marks BE/BSc Civil Engineering = 12.5 Marks Professional Experience Total 12.5 Marks 15+ Years’ experience = 12.5 Marks 10 to 15 Years’ experience = 7.5 Marks Less than 10 Years’ experience = 0 Marks (Qualitative)(Doc Required) | 25 | |
| Assistant Resident Engineer (Electrical/Mechanical) 40 Academic and General Qualifications Total 20 Marks BE/BSc Electrical Engineering/Mechanical = 20 Marks Professional Experience Total 20 Marks 12+ Years’ experience = 20 Marks 8 to 12 Years’ experience =10 Marks Less than 8 Years’ experience = 0 Marks (Qualitative)(Doc Required) | 40 | |
| Material Engineer 40 Academic and General Qualifications Total 20 marks DAE Civil/B.Tech Civil = 20 Marks Professional Experience Total 20 Marks 20+ Years’ experience = 20 Marks 15 to 20 Years’ experience =10 Marks Less than 15 Years’ experience = 0 Marks (Qualitative)(Doc Required) | 40 | |
| Quantity Surveyor 30 Academic and General Qualifications Total 15 marks DAE Civil/B.Tech Civil = 15 Marks Professional Experience Total 15 Marks 20+ Years’ experience = 15 Marks 15 to 20 Years’ experience =7.5 Marks Less than 15 Years’ experience = 0 Mark (Qualitative)(Doc Required) | 30 | |
| Surveyor 25 Academic and General Qualifications Total 12.5 marks DAE Civil/B.Tech Civil = 12.5 Marks Professional Experience Related to the Assignment Total 12.5 Marks 20+ Years’ experience = 12.5 Marks 15 to 20 Years’ experience =7.5 Marks Less than 15 Years’ experience = 0 Mark (Qualitative)(Doc Required) | 25 | |
Lot Title : ESTABLISHMENT OF 200 LABOUR QUARTERS AT SHAHEED BENAZIR BHUTTO LABOUR COLONY, BAIKAR, DERA BUGTI FOR WORKERS’ WELFARE BOARD BALOCHISTAN
Bid Security : 900000 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Stage-1: Data Collection, Surveys and Investigations | Address: Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 27 DaysQuantity: 1/Qty |
1 |
| Stage 2: Conceptual Master Plan and Preliminary Design | Address: Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 27 DaysQuantity: 1/Qty |
1 |
| Stage 3: Detailed Architectural and Engineering Designs | Address: Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 27 DaysQuantity: 1/Qty |
1 |
| Stage 4: Documents and Estimates | Address: Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 27 DaysQuantity: 1/Qty |
1 |
| Stage 5: Tender Documents and Procurement Assistance | Address: Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 27 DaysQuantity: 1/Qty |
1 |
| Phase-II: Construction Supervision | Address: Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 27 DaysQuantity: 1/Qty |
1 |
No
Lot Title : ESTABLISHMENT OF 200 LABOUR QUARTERS AT SHAHEED BENAZIR BHUTTO LABOUR COLONY, BAIKAR, DERA BUGTI FOR WORKERS’ WELFARE BOARD BALOCHISTAN
Position: Stage-1: Data Collection, Surveys and Investigations
Specifications / Requirements:
A-3.2 Phase-I: Planning, Design and Tendering
A-3.2.1 Stage 1: Data Collection, Surveys and Investigations
The Consultant shall collect, review and evaluate the available project information and undertake the necessary surveys and investigations to establish reliable baseline information for planning and design.
The scope of services shall include:
(a) Review of Project Documents
Review the approved PC-I, project scope, proposed facilities, estimated costs, site information, available drawings and other relevant documents provided by the Client. Identify the project requirements, design parameters, constraints and information gaps requiring further investigation or clarification.
(b) Site Reconnaissance and Assessment
Undertake site visits to assess the existing physical conditions, topography, accessibility, surrounding development, natural drainage patterns, existing infrastructure, utility connections and other site-specific conditions affecting planning and design.
(c) Topographic Survey
Conduct a detailed topographic survey of the Project site, including:
The Client shall provide authenticated land ownership, boundary and revenue records. Legal boundary demarcation by the competent revenue authority shall remain the Client’s responsibility unless expressly included in the Consultant’s scope.
(d) Hydrological and Drainage Studies
Undertake hydrological and surface drainage assessments relevant to the Project site, including:
(e) Geotechnical Investigations
Undertake geotechnical investigations appropriate to the proposed buildings and infrastructure, including:
The extent and number of investigations shall be established considering the Project components, site conditions and applicable engineering standards.
(f) Existing Infrastructure and Utilities Assessment
Identify and assess the availability and capacity of existing access roads, water supply, electricity, sewerage, drainage and other utilities relevant to the Project. Obtain available technical information from the Client and concerned service providers and identify any additional infrastructure requirements.
(g) Inception and Data Collection Report
Prepare and submit an Inception and Data Collection Report incorporating the findings of the document review, site reconnaissance, surveys and investigations, identified constraints, preliminary design considerations and the proposed methodology and programme for subsequent stages.
Position: Stage 2: Conceptual Master Plan and Preliminary Design
Specifications / Requirements:
A-3.2.2 Stage 2: Conceptual Master Plan and Preliminary Design
The Consultant shall prepare a comprehensive conceptual master plan and preliminary architectural and engineering designs based on the approved PC-I, Client’s requirements and findings of Stage 1.
The scope of services shall include:
(a) Planning and Space Requirements
Review and establish the planning and functional requirements of all Project components, including residential labour quarters, masjid, community centre, shopping centre, infrastructure and external development works.
(b) Conceptual Master Planning
Prepare a conceptual master plan incorporating:
The master plan shall consider efficient land utilization, accessibility, safety, environmental conditions, construction economy and future operational requirements.
(c) Preliminary Architectural Design
Prepare preliminary architectural designs for the proposed buildings, including:
(d) Preliminary Engineering Design
Develop preliminary engineering concepts covering:
(e) Evaluation and Finalization of Concept
Review the proposed conceptual arrangements with the Client, evaluate reasonable design alternatives where necessary and incorporate the Client’s comments.
Submit the conceptual master plan and preliminary designs for the Client’s review and approval before proceeding to detailed design.
Position: Stage 3: Detailed Architectural and Engineering Designs
Specifications / Requirements:
A-3.2.3 Stage 3: Detailed Architectural and Engineering Designs
Following approval of the conceptual master plan and preliminary designs, the Consultant shall undertake detailed architectural and engineering designs for all Project components.
The scope shall include the following disciplines:
(a) Detailed Architectural Design
Prepare complete architectural designs for residential labour quarters, masjid, community centre, shopping centre and other buildings identified in the approved PC-I, including:
(b) Structural Engineering Design
Undertake structural analysis and design of all proposed buildings and relevant civil structures, including:
Structural design shall consider the applicable seismic requirements, geotechnical recommendations, design loads and relevant codes and standards.
(c) Water Supply and Plumbing Design
Prepare detailed designs for:
(d) Sewerage and Sanitation Design
Prepare detailed designs for:
(e) Stormwater Drainage Design
Prepare detailed stormwater drainage designs based on the hydrological assessment, including surface grading, runoff collection, drainage channels, culverts, outfalls and other drainage structures as required.
(f) Electrical Engineering Design
Prepare detailed electrical designs for the proposed buildings and external development works, including:
(g) Mechanical and Building Services Design
Prepare relevant mechanical and building-services designs, including ventilation, exhaust systems, pumps, firefighting and other services required for the proposed facilities in accordance with the approved Project requirements.
(h) Roads and External Development Design
Prepare detailed engineering designs for:
(i) Design Coordination and Review
Coordinate all architectural and engineering disciplines to ensure consistency of dimensions, levels, structural arrangements, utility routes and construction details.
Review the designs for technical completeness, constructability, economy, safety and compliance with the approved scope and applicable standards.
Position: Stage 4: Documents and Estimates
Specifications / Requirements:
A-3.2.4 Stage 4: Documents and Estimates
The Consultant shall prepare the complete technical documentation and cost estimates required for approval, procurement and execution of the Project.
The scope of services shall include:
(a) Construction Drawings
Prepare coordinated and fully detailed architectural, structural, electrical, plumbing, mechanical and infrastructure drawings suitable for construction.
(b) Technical Specifications
Prepare comprehensive technical specifications for all major materials, equipment, construction activities, workmanship, testing and quality requirements.
(c) Bills of Quantities
Prepare itemized Bills of Quantities for the proposed buildings, infrastructure and external development works based on the approved detailed designs.
(d) Engineer’s Estimates
Prepare detailed Engineer’s Estimates using applicable government schedules of rates, prevailing market rates and appropriate rate analyses for non-scheduled items.
The estimates shall include relevant quantities, unit rates, cost summaries and supporting calculations.
(e) Project Cost Review
Review the estimated project cost against the approved PC-I provisions and identify any significant deviations, cost implications or necessary scope adjustments for consideration by the Client.
(f) PC-I Revision and Approval Documentation
Where required by the Client, prepare technical inputs, revised cost estimates and supporting documentation for updating or revising the PC-I and obtaining relevant project approvals.
(g) Final Design Documentation
Incorporate the Client’s comments and finalize the complete design documentation, specifications, quantities and estimates for subsequent procurement.
Position: Stage 5: Tender Documents and Procurement Assistance
Specifications / Requirements:
A-3.2.5 Stage 5: Tender Documents and Procurement Assistance
The Consultant shall prepare bidding documents and provide professional assistance to the Client during procurement of construction works.
The scope of services shall include:
(a) Procurement Planning
Review the proposed construction scope and advise the Client on appropriate work packages, contract arrangements, procurement methods and implementation considerations.
(b) Preparation of Bidding Documents
Prepare complete bidding documents in accordance with the applicable procurement rules and approved procurement method, including:
(c) Prequalification Assistance
Where prequalification is required, prepare prequalification documents, establish technical qualification criteria and assist the Client in evaluation of applications and preparation of the prequalification evaluation report.
(d) Tender Clarifications and Pre-Bid Meetings
Assist the Client in conducting pre-bid meetings, responding to technical queries, preparing clarifications and issuing addenda where necessary.
(e) Bid Evaluation Assistance
Assist the Client in examination and evaluation of bids in accordance with the approved evaluation criteria and applicable procurement rules.
Prepare technical evaluation inputs, review arithmetic and commercial aspects within the assigned scope, and assist in preparation of bid evaluation reports and recommendations for award.
(f) Contract Finalization
Assist the Client in finalizing construction contract documents, incorporating approved clarifications and amendments, and preparing the final set of construction documents for execution.
The final decision regarding bidder qualification, bid acceptance and award of contract shall remain with the Client and its duly authorized procurement authorities.
Position: Phase-II: Construction Supervision
Specifications / Requirements:
A-3.3.1 Stage 1: Detailed Construction Supervision
The Consultant shall provide professional construction supervision services during execution of the Project to monitor and administer the construction works in accordance with the approved drawings, specifications, construction contracts and applicable standards.
The scope of services shall include:
(a) Mobilization and Construction Planning
(b) Construction Supervision and Inspection
(c) Quality Assurance and Quality Control
(d) Construction Programme and Progress Monitoring
(e) Measurement and Payment Certification
(f) Contract Administration
(g) Design Clarifications and Coordination
(h) Health, Safety and Environmental Monitoring
(i) Testing and Commissioning
(j) Completion and Handover
Â
APPENDIX -A
DESCRIPTION OF SERVICES/TERMS OF REFERENCE
Â
A-1Â Â Â Â Â Â Â Â Â Â Â INTRODUCTION
Workers Welfare Board Balochistan (hereinafter referred to as the "Client") intends to develop labour quarters at Shaheed Benazir Bhutto Labour Colony, Baiker, District North Dera Bugti, Balochistan, for mining and industrial workers and their families, in accordance with the approved Project PC-I.
The Project comprises residential labour quarters, a masjid, community centre, shopping centre and associated infrastructure and external development works, including internal roads, boundary walls and gates, water supply and storage facilities, sewerage and sanitation systems, septic tanks, electrical and plumbing installations, external paving, landscaping and horticulture, together with other facilities and works identified in the approved PC-I.
The Client intends to engage a qualified consulting firm (hereinafter referred to as the "Consultant") to undertake planning, architectural and engineering design, preparation of estimates and bidding documents, procurement assistance and construction supervision of the Project.
A-2Â Â Â Â Â Â Â Â Â Â Â PROJECT OBJECTIVES
The primary objective of the consultancy is to ensure the planning, design and implementation of the Project in a technically sound, economical, sustainable and coordinated manner, consistent with the approved PC-I, applicable engineering standards, statutory requirements and the Client’s functional requirements.
The specific objectives of the consultancy shall include:
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract>
Number of GC Clause 3.1
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 4.1
The language is English
Number of GC Clause 6.1 and 6.2
The addresses are:
The Procuring Agency is: Workers Welfare Fund, Balochistan (Workers Welfare Fund, Balochistan), Secretary Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
The Consultant Address:
The title of the subject procurement is:ESTABLISHMENT OF 200 LABOUR QUARTERS AT BAIKAR, NORTH DERA BUGTI
Number of GC Clause 8.1
[Note: If the Consultant consists only of one entity, state “N/A”;Or
The Lead Member on behalf of the JV is ___________ ______________________________ [insert name of the member]
Number of GC Clause 9.1
The Authorized Representatives are:
For the Procuring Agency:
Workers Welfare Fund, Balochistan (Workers Welfare Fund, Balochistan), Secretary
Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
+92-336-646-0666
workerwelfarefundbalochistan@gmail.com
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 11.1
[Note: If there are no effectiveness conditions, state “N/A”]OR
List here any conditions of effectiveness of the Contract]
The effectiveness conditions are the following: [insert “N/A” or list the conditions]
Termination of Contract for Failure to Become Effective:
The time period shall be _______________________ [insert time period, e.g.: four months].
Commencement of Services:
The number of days shall be_________________ [e.g.: ten].
Confirmation of Key Experts’ availability to start the Assignment shall be submitted to the Procuring Agency in writing as a written statement signed by each Key Expert.
Expiration of Contract:
The time period shall be ________________________ [insert time period, e.g.: twelve months].
Number of GC Clause 23
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 0.50% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 23.1
No additional provisions.
The following limitation of the Consultant’s Liability towards the Procuring Agency can be subject to the Contract’s negotiations:
Number of GC Clause 24
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Nil
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 24.1
The insurance coverage against the risks shall be as follows:
(a) Professional liability insurance, with a minimum coverage of ______________________ [insert amount and currency which should be not less than the total ceiling amount of the Contract];
Number of GC Clause 33. Removal of Experts or Sub-consultants
[Note to Procuring Agency: include the following for supervision of infrastructure contracts (such as Plant or Works) and for other consulting service where the social risks are substantial or high, otherwise delete.]
Price adjustment on the remuneration : Nil [insert “applies” or “ does not apply”]
The currency of payment shall be the following: PKR
[The advance payment could be in either the foreign currency, or the local currency, or both; select the correct wording in the Clause here below. The advance bank payment guarantee should be in the same currency(ies)]
The following provisions shall apply to the advance payment and the advance bank payment guarantee:
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P175995
To: Workers Welfare Fund, Balochistan (Workers Welfare Fund, Balochistan), Secretary Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
This CONTRACT (hereinafter called the “Contract”) is made the [number] day of the month of [month], [year], between, on the one hand, [name of Procuring Agency or Recipient] (hereinafter called the “Procuring Agency”) and, on the other hand, [name of Consultant] (hereinafter called the “Consultant”).
[If the Consultant consist of more than one entity, the above should be partially amended to read as follows: “…(hereinafter called the “Procuring Agency”) and, on the other hand, a Joint Venture consisting of the following entities, each member of which will be jointly and severally liable to the Procuring Agency for all the Consultant’s obligations under this Contract, namely, [name of member] and [name of member] (hereinafter called the “Consultant”).]
WHEREAS
NOW THEREFORE the parties hereto hereby agree as follows:
The following documents attached hereto shall be deemed to form an integral part of this Contract:
In the event of any inconsistency between the documents, the following order of precedence shall prevail: the Special Conditions of Contract; the General Conditions of Contract, including Attachment 1; Appendix A; Appendix B; Appendix C and Appendix D; and Appendix E. Any reference to this Contract shall include, where the context permits, a reference to its Appendices.
2. The mutual rights and obligations of the Procuring Agency and the Consultant shall be as set forth in the Contract, in particular:
(a) the Consultant shall carry out the Services in accordance with the provisions of the Contract; and
(b) the Procuring Agency shall make payments to the Consultant in accordance with the provisions of the Contract.
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be signed in their respective names as of the day and year first above written.
For and on behalf of [Name of Procuring Agency]
[Authorized Representative of the Procuring Agency – name, title and signature]
For and on behalf of [Name of Consultant or Name of a Joint Venture]
[Authorized Representative of the Consultant – name and signature]
[For a joint venture, either all members shall sign or only the lead member, in which case the power of attorney to sign on behalf of all members shall be attached.]
For and on behalf of each of the members of the Consultant [insert the name of the Joint Venture]
[Name of the lead member]
[Authorized Representative on behalf of a Joint Venture]
[add signature blocks for each member if all are signing]
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Workers Welfare Fund, Balochistan (Workers Welfare Fund, Balochistan), Secretary Neart BINUQ, Samugli Road, Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}