In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.gov.pk).
NUML University Main Campus, Islamabad (Technical Branch), Deputy Director Technical
NUML Main Campus Islamabad
+92-519-265-100
dir-tech@numl.edu.pk
The following specific data for the procurement of Consultancy Services to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: NUML University Main Campus, Islamabad (Technical Branch)
The subject of procurement is: Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P181671
BDS Clause Number 2
ITB Number 1.2 & 9.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Saturday, November 21, 2026
BDS Clause Number 3
ITB Number 4.1
The language of the proposals is: English
BDS Clause Number 4
ITB Number 6.1
Participation of Sub-consultants, Key Experts and Non-Key Experts in more than one Proposal is permissible? Yes
BDS Clause Number 5
ITB Number 7.1
Proposals shall be valid until 360 Days
BDS Clause Number 6
ITB Number 9.1
List of documents required along with the bid:
BDS Clause Number 7
ITB Number 10.2
The Consultant’s Proposal must include the minimum Key Experts’ time-input of __________person-months.
For the evaluation and comparison of Proposals only: if a Proposal includes less than the required minimum time-input, the missing time-input (expressed in person-month) is calculated as follows:
The missing time-input is multiplied by the highest remuneration rate for a Key Expert in the Consultant’s Proposal and added to the total remuneration amount. Proposals that quoted higher than the required minimum of time-input will not be adjusted. ]
BDS Clause Number 8
ITB Number 10.5
The price shall be Adjustable.
Price schedule will be provided according to the format defined and acquired. see section price schedule.
BDS Clause Number 9
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 10
ITB Number 7.6
Services and Their related documents:
See section Required Services and ToR
BDS Clause Number 11
ITB Number 8.1 & 8.2
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of : NUML University Main Campus, Islamabad
The Bid Security shall be in the form of:
BDS Clause Number 12
ITB Number 13.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 14.1
Proposal shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
NUML Main Campus Islamabad
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Tuesday, November 24, 2026 11:00 AM
BDS Clause Number 14
ITB Number 15.1
The Bids opening shall take place on EPADS v2.0.
Day : Tuesday
Date: Tuesday, November 24, 2026
Time : 11:30 AM
BDS Clause Number 15
ITB Number 20
Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria
BDS Clause Number 16
ITB Number 21.5
The Performance guarantee shall: 0%.
The Performance Guarantee shall be acceptable in the form of: Nil
BDS Clause Number 17
ITB Number 24.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
|
NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 60 | |
| Similar All Projects Completed Tender Committee may be verified Work Order Orders and Completion Certificates of the completed projects | ||
| If 8 Project Completed Rs 901 Mn and above 40 Points will be given 5 points for each project (Qualitative)(Doc Required) If 8 Project Completed Rs 901 Mn and above 40 Points will be given 5 points for each project (40) If 7 Project Completed Rs 501 Mn to 900 Mn 35 Points will be given 5 points for each project (35) If 6 Project Completed Rs 301 Mn to 500 Mn 30 Points will be given 5 points for each project (30) If 5 Project Completed Rs 201 Mn to 300 Mn 25 Points will be given 5 points for each project (25) If 4 Project Completed Rs 101 Mn to 200 Mn 20 Points will be given 5 points for each project (20) If 3 Project Completed Rs 51 Mn to 100 Mn 15 Points will be given 5 points for each project (15) If 2 Project Completed Rs 25 Mn to 50 Mn 10 Points will be given 5 points for each project (10) | 40 | |
| Similar All Projects Ongoing Tender Committee may be verified Work Order Orders of the Ongoing Projects | ||
| If 8 Project Ongoing Rs 901 Mn and above 40 Points will be given 5 points for each project (Qualitative)(Doc Required) If 8 Project Ongoing Rs 901 Mn and above 40 Points will be given 5 points for each project (40) If 7 Project Ongoing Rs 501 Mn to 900 Mn 35 Points will be given 5 points for each project (35) If 6 Project Ongoing Rs 301 Mn to 500 Mn 30 Points will be given 5 points for each project (30) If 5 Project Ongoing Rs 201 Mn to 300 Mn 25 Points will be given 5 points for each project (25) If 4 Project Ongoing Rs 101 Mn to 200 Mn 20 Points will be given 5 points for each project (20) If 3 Project Ongoing Rs 51 Mn to 100 Mn 15 Points will be given 5 points for each project (15) If 2 Project Ongoing Rs 25 Mn to 50 Mn 10 Points will be given 5 points for each project (10) | 40 | |
| List of Staff (PEC Engineers), (Structure, Architecture, Civil, Electrical, MEP), (having proof individual employed is working in your firm) | ||
| 10x Engineers (Structure, Architecture, Civil, Electrical, MEP) or more (10 Points) (Qualitative)(Doc Required) 10x Engineers (Structure, Architecture, Civil, Electrical, MEP) or more (10 Points) (10) 08x Engineers (Structure, Architecture, Civil, Electrical, MEP) (08 Points) (8) 06x Engineers (Structure, Architecture, Civil, Electrical, MEP) (06 Points) (6) 04x Engineers (Structure, Architecture, Civil, Electrical, MEP) (04 Points) (4) 02x Engineers (Structure, Architecture, Civil, Electrical, MEP) (02 Points) (2) | 10 | |
| Verified Bank Statements (Last 05 Years) in which mentioned that “Annual Credit Turnover” and “Annual Debit Turnover” | ||
| If Annual Debit / Credit Turnover Rs. 900 Mn and above point will be given (10) (Qualitative)(Doc Required) If Annual Debit / Credit Turnover Rs. 900 Mn and above point will be given (10) (10) If Annual Debit / Credit Turnover Between Rs. 501 to 900 Mn point will be given (08) (8) If Annual Debit / Credit Turnover between Rs. 301 to 500 Mn point will be given (06) (6) If Annual Debit / Credit Turnover between Rs. 201 to 300 Mn point will be given (04) (4) If Annual Debit / Credit Turnover between Rs. 50 to 200 Mn point will be given (02) (2) | 10 | |
Lot Title : Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Bid Security : 0 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects) | Address: NUML Main Campus Islamabad Schedule: 360 DaysQuantity: 1/job |
1 |
| Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects) | Address: NUML Main Campus Islamabad Schedule: 360 DaysQuantity: 1/job |
1 |
Lot Title : Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Bid Security : 0 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects) | Address: NUML Main Campus Islamabad Schedule: 360 DaysQuantity: 1/job |
1 |
| Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects) | Address: NUML Main Campus Islamabad Schedule: 360 DaysQuantity: 1/job |
1 |
No
Lot Title : Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Position: Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Specifications / Requirements:
a. NUML Lahore Campus (Newly Allocated Maraka Land)
Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
b. NUML Rawalpindi Campus (Newly Allocated Land in Capital Smart City) - Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
All Interested Consultant Firms / Companies prepare their “Technical Bids / Companies Profiles” for technical evaluation / shortlisting of their firms are required to submit the information / details duly supported with undermentioned following documents and details
a. PEC / PCATP P License in Category A-1
b. All Project Details (Completed/Ongoing) with Evidences (Work Order / Completion Certificates)
c. All Staff Details with Evidences (Degress/Employment Letter)
d. Annual Debit / Credit Turnover (last 5 Years)
e. All Technical Equipments Details firm owned
Position: Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Specifications / Requirements:
a. NUML Lahore Campus (Newly Allocated Maraka Land)
Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
b. NUML Rawalpindi Campus (Newly Allocated Land in Capital Smart City) - Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
All Interested Consultant Firms / Companies prepare their “Technical Bids / Companies Profiles” for technical evaluation / shortlisting of their firms are required to submit the information / details duly supported with undermentioned following documents and details
a. PEC / PCATP P License in Category A-1
b. All Project Details (Completed/Ongoing) with Evidences (Work Order / Completion Certificates)
c. All Staff Details with Evidences (Degress/Employment Letter)
d. Annual Debit / Credit Turnover (last 5 Years)
e. All Technical Equipments Details firm owned
Lot Title : Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Position: Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Specifications / Requirements:
a. NUML Lahore Campus (Newly Allocated Maraka Land)
Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
b. NUML Rawalpindi Campus (Newly Allocated Land in Capital Smart City) - Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
All Interested Consultant Firms / Companies prepare their “Technical Bids / Companies Profiles” for technical evaluation / shortlisting of their firms are required to submit the information / details duly supported with undermentioned following documents and details
a. PEC / PCATP P License in Category A-1
b. All Project Details (Completed/Ongoing) with Evidences (Work Order / Completion Certificates)
c. All Staff Details with Evidences (Degress/Employment Letter)
d. Annual Debit / Credit Turnover (last 5 Years)
e. All Technical Equipments Details firm owned
Position: Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Specifications / Requirements:
a. NUML Lahore Campus (Newly Allocated Maraka Land)
Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
b. NUML Rawalpindi Campus (Newly Allocated Land in Capital Smart City) - Complete Consultancy Services with Close / Detailed Supervision and Top Supervision (both services) from Planning to Execution till Completion of the Project.
All Interested Consultant Firms / Companies prepare their “Technical Bids / Companies Profiles” for technical evaluation / shortlisting of their firms are required to submit the information / details duly supported with undermentioned following documents and details
a. PEC / PCATP P License in Category A-1
b. All Project Details (Completed/Ongoing) with Evidences (Work Order / Completion Certificates)
c. All Staff Details with Evidences (Degress/Employment Letter)
d. Annual Debit / Credit Turnover (last 5 Years)
e. All Technical Equipments Details firm owned
1.  Scope of Services
Engineering Consultancy Services for NUML Lahore Campus & Rawalpindi Campuses - Newly Allocated Site). The scope of services (include all consultancy services from Planning to Execution till Completion of the Projects (Building and Allied Services) with Close / Detailed Supervision and Top Supervision (both services) on project to project requirement basis and as directed by the client (NUML Main Campus, Islamabad).
2.  Services Range (It is mandatory for the Consulting Firm to provide all undermined services)
a.     Preparation & execution of PC-1 of the each project (mentioned in Sr#1 Scope of Services) as per client requirement including all major components as per engineer incharge instructions and as per prescribed format HEC & Planning Commission of Pakistan guidelines / pattern.
b.     Preparation of feasibility report of each project as per client requirement.
c.     Topography Survey of the designed project site including Soil testing & investigation and prepare reports accordingly.
d.     Preparation of required documents of each building project including designs, drawings for enlistment / registration and obtaining of NOC for construction of Building. Consultant is responsible to prepare the case and get approve from Concerned Govt Department / Building Control Authority / Concerned Housing Society as per their Rules & Regulations.
e.     Preparation of required documents of each building project including designs, drawings for enlistment / registration and obtaining of NOC for Sui Gas Connection, Electric Meter, Transformer Connection, Water Supply Connection. Consultant is responsible to prepare the case and get approve from Concerned Govt Department / Building Control Authority as per their Rules & Regulations.
f.      Preparation of Bench Mark, Detail Cross Section, Primary Layout, Detailed Designing, Line Plan, Architectural Drawings, Structural Drawings, Interior Design / Drawings, Exterior Design / Drawings, 3D Elevation Designs, Public Health Drawings, Elevator Drawings, Electrical related works Design / Drawings, Air conditioning and Centralize Heating & Cooling System Design / Drawings, IT Components Line Plan / Designs / Drawings i.e. (Security Cameras, Telephone, IT Conduiting) as per site requirement and as per client requirement. (All tendering and working / construction drawings are included). Preparation of 3D drawings aforementioned services if required.
g.     Preparation, of each project, complete technical sanction, engineer estimate, BOQs, tender documents, technical specifications, terms & conditions.
h.     Preparation of complete plan including tender documents / BOQs, line plan, drawings, designs for Interior and Exterior Decoration works, Additional Works of the buildings as per client requirement.
j.      After approval of design / drawings of the projects, provision of Hard Copies of BOQs, Tender Documents, Electrical Design / Drawings, Public Health Design / Drawings, Air Conditioning Design / Drawings, Architectural Design / Drawings, Interior & Exterior Design / Drawings, Exterior Design Drawings Elevations Design / Drawings, Structural Design / Drawings. Copies of required Tender documents including all above mentioned design / drawings can be increased / decreased as per client requirement.
k.     Prepare Presentations of the line plan, 3D design / drawings including accommodation services of the projects as per requirement of client.
l.      Submission of coloured design / drawings copies of the projects as per requirement of client.
m.    Provision of Soft Form of all required drawings / design / line plans in (Auto Cad & PDF).
n.     Issuance of Completion Certificate of the Projects.
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract>
Number of GC Clause 3.1
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 4.1
The language is English
Number of GC Clause 6.1 and 6.2
The addresses are:
The Procuring Agency is: NUML University Main Campus, Islamabad (Technical Branch), Deputy Director Technical NUML Main Campus Islamabad
The Consultant Address:
The title of the subject procurement is:Hiring of New Consultant for NUML Rawalpindi & Lahore Campuses (New Sites Development Projects)
Number of GC Clause 8.1
[Note: If the Consultant consists only of one entity, state “N/A”;Or
The Lead Member on behalf of the JV is ___________ ______________________________ [insert name of the member]
Number of GC Clause 9.1
The Authorized Representatives are:
For the Procuring Agency:
NUML University Main Campus, Islamabad (Technical Branch), Deputy Director Technical
NUML Main Campus Islamabad
+92-519-265-100
dir-tech@numl.edu.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 11.1
[Note: If there are no effectiveness conditions, state “N/A”]OR
List here any conditions of effectiveness of the Contract]
The effectiveness conditions are the following: [insert “N/A” or list the conditions]
Termination of Contract for Failure to Become Effective:
The time period shall be _______________________ [insert time period, e.g.: four months].
Commencement of Services:
The number of days shall be_________________ [e.g.: ten].
Confirmation of Key Experts’ availability to start the Assignment shall be submitted to the Procuring Agency in writing as a written statement signed by each Key Expert.
Expiration of Contract:
The time period shall be ________________________ [insert time period, e.g.: twelve months].
Number of GC Clause 23
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 23.1
No additional provisions.
The following limitation of the Consultant’s Liability towards the Procuring Agency can be subject to the Contract’s negotiations:
Number of GC Clause 24
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Nil
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 24.1
The insurance coverage against the risks shall be as follows:
(a) Professional liability insurance, with a minimum coverage of ______________________ [insert amount and currency which should be not less than the total ceiling amount of the Contract];
Number of GC Clause 33. Removal of Experts or Sub-consultants
[Note to Procuring Agency: include the following for supervision of infrastructure contracts (such as Plant or Works) and for other consulting service where the social risks are substantial or high, otherwise delete.]
Price adjustment on the remuneration : Nil [insert “applies” or “ does not apply”]
The currency of payment shall be the following: PKR
[The advance payment could be in either the foreign currency, or the local currency, or both; select the correct wording in the Clause here below. The advance bank payment guarantee should be in the same currency(ies)]
The following provisions shall apply to the advance payment and the advance bank payment guarantee:
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P181671
To: NUML University Main Campus, Islamabad (Technical Branch), Deputy Director Technical NUML Main Campus Islamabad
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
This CONTRACT (hereinafter called the “Contract”) is made the [number] day of the month of [month], [year], between, on the one hand, [name of Procuring Agency or Recipient] (hereinafter called the “Procuring Agency”) and, on the other hand, [name of Consultant] (hereinafter called the “Consultant”).
[If the Consultant consist of more than one entity, the above should be partially amended to read as follows: “…(hereinafter called the “Procuring Agency”) and, on the other hand, a Joint Venture consisting of the following entities, each member of which will be jointly and severally liable to the Procuring Agency for all the Consultant’s obligations under this Contract, namely, [name of member] and [name of member] (hereinafter called the “Consultant”).]
WHEREAS
NOW THEREFORE the parties hereto hereby agree as follows:
The following documents attached hereto shall be deemed to form an integral part of this Contract:
In the event of any inconsistency between the documents, the following order of precedence shall prevail: the Special Conditions of Contract; the General Conditions of Contract, including Attachment 1; Appendix A; Appendix B; Appendix C and Appendix D; and Appendix E. Any reference to this Contract shall include, where the context permits, a reference to its Appendices.
2. The mutual rights and obligations of the Procuring Agency and the Consultant shall be as set forth in the Contract, in particular:
(a) the Consultant shall carry out the Services in accordance with the provisions of the Contract; and
(b) the Procuring Agency shall make payments to the Consultant in accordance with the provisions of the Contract.
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be signed in their respective names as of the day and year first above written.
For and on behalf of [Name of Procuring Agency]
[Authorized Representative of the Procuring Agency – name, title and signature]
For and on behalf of [Name of Consultant or Name of a Joint Venture]
[Authorized Representative of the Consultant – name and signature]
[For a joint venture, either all members shall sign or only the lead member, in which case the power of attorney to sign on behalf of all members shall be attached.]
For and on behalf of each of the members of the Consultant [insert the name of the Joint Venture]
[Name of the lead member]
[Authorized Representative on behalf of a Joint Venture]
[add signature blocks for each member if all are signing]
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: NUML University Main Campus, Islamabad (Technical Branch), Deputy Director Technical NUML Main Campus Islamabad
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Similar All Projects Completed Tender Committee may be verified Work Order Orders and Completion Certificates of the completed projects
List of Staff (PEC Engineers), (Structure, Architecture, Civil, Electrical, MEP), (having proof individual employed is working in your firm)
Similar All Projects Completed and Ongoing Tender Committee may be verified Work Order Orders and Completion Certificates of the completed projects
Similar All Projects Ongoing Tender Committee may be verified Work Order Orders and Completion Certificates of the completed projects
Verified Bank Statements (Last 05 Years) in which mentioned that “Annual Credit Turnover” and “Annual Debit Turnover”
Verified Bank Statements (Last 05 Years) in which mentioned that “Annual Credit Turnover” and “Annual Debit Turnover”