In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.org.pk).
Office of the Divisional Engineer E&M, PAA AIIAP Lahore (Pakistan Airports Authority), Divisional Engineer E&M
Allama Iqbal International Airport
+92-341-577-5777
imran.n@paa.gov.pk
The following specific data for the procurement of Consultancy Services to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
1
1.1
Name of Procuring Agency: Office of the Divisional Engineer E&M, PAA AIIAP Lahore (Pakistan Airports Authority)
The subject of procurement is: HIRING OF CONSULTANCY SERVICES FOR PLANNING DESIGN AND PROJECT EXECUTION SUPERVISION FOR REPLACEMENT OF FIREFIGHTING SYSTEM AT AIIAP LAHORE
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P103597
BDS Clause Number 2
ITB Number 1.2 & 9.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, September 14, 2026
Pre-Bid Meeting: Wednesday, September 9, 2026 11:00 AM
Venue: Office of the Additional Director E&M (PZ)
Allama Iqbal International Airport
BDS Clause Number 3
ITB Number 4.1
The language of the proposals is: English
BDS Clause Number 4
ITB Number 6.1
Participation of Sub-consultants, Key Experts and Non-Key Experts in more than one Proposal is permissible? No
BDS Clause Number 6
ITB Number 7.1
Proposals shall be valid until 180 Days
BDS Clause Number 7
ITB Number 9.1
List of documents required along with the bid: No
BDS Clause Number 8
ITB Number 10.2
The Consultant’s Proposal must include the minimum Key Experts’ time-input of __________person-months.
For the evaluation and comparison of Proposals only: if a Proposal includes less than the required minimum time-input, the missing time-input (expressed in person-month) is calculated as follows:
The missing time-input is multiplied by the highest remuneration rate for a Key Expert in the Consultant’s Proposal and added to the total remuneration amount. Proposals that quoted higher than the required minimum of time-input will not be adjusted. ]
BDS Clause Number 9
ITB Number 105
The price shall be Fixed.
Price schedule will be provided according to the format defined and acquired. see section price schedule.
BDS Clause Number 10
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 11
ITB Number 7.6
Services and Their related documents:
See section Required Services and ToR
BDS Clause Number 12
ITB Number 8.1 & 8.2
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Demand Draft
BDS Clause Number 13
ITB Number 13.1
Currency of the Bids shall be : PKR
BDS Clause Number 14
ITB Number 14.1
Proposal shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
Allama Iqbal International Airport
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Wednesday, September 23, 2026 11:00 AM
BDS Clause Number 15
ITB Number 15.1
The Bids opening shall take place on EPADS v2.0.
Day : Wednesday
Date: Wednesday, September 23, 2026
Time : 11:30 AM
BDS Clause Number 16
ITB Number 20
Selection technique adopted will be: Quality and Cost Based Selection (QCBS)
see Evaluation Criteria
BDS Clause Number 18
ITB Number 21.5
The Performance guarantee shall: 0%.
The Performance Guarantee shall be acceptable in the form of: Nil
BDS Clause Number 19
ITB Number 24.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
| Bidder's Type | Required Registration |
|---|---|
|
Individual / Individual Consultant Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) |
NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| • Valid Pakistan Engineering Council (PEC) Registration Certificate of the proposer or local JV partner(s) as consultant for following minimum: 1. Type of Ownership 022 OR 023 OR 024 2. Main Discipline 01 OR 02 3. Project Profile Code 1201 – (i) Public Building and Offices, (ii) Commercial Building and Offices OR (b) 1216 – Airports 4. Service Codes (all enlisted below codes are required) 0537 OR 0540, 0543, 0544 & 0547 (attach valid PEC certificate) | Yes |
| • In case of foreign firm not registered with PEC, Joint Venture (JV) with local PEC registered consultancy firm is mandatory in line with PEC bye laws (Project Specific Letter of intent or Joint Venture Agreement to be attached) | Yes |
| • Registration with the Federal Board of Revenue (FBR) as an active taxpayer. (Attach NTN, Active Tax payer verification OR For foreign firms participating in a JV, registration with the relevant authority in the jurisdiction of their incorporation / origin is required) | Yes |
| • Joint Venture agreement or a letter of intent to form such a JV, duly signed by all members (to be submitted only in the case of a Joint Venture). | No |
| • Power of Attorney (on non-judicial e-Stamp Paper valuing PKR 500) specifically authorizing the Authorized Representative to sign and submit the proposal on behalf of the consultant. In case of JV, the said power of Attorney shall be signed by Authorized Representative of each JV member. Moreover, the Power of Attorney for Authorized Representative of each JV member, to sign and submit the proposal on their behalf, shall also be appended therewith. | Yes |
| • Affidavit of ‘Non-Blacklisting’ (on non-judicial e-Stamp Paper valuing PKR 500) to the effect that the firm/JV Partner(s) never been blacklisted with any Government Department / Agency / Authority. | Yes |
Quality and Cost Based Selection (QCBS)
Weightage
| Technical Evaluation % | Financial Evaluation % |
|---|---|
| 70 | 30 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Technical Evaluation Criteria | ||
| Average Annual turnover for the last three financial years i.e. 2022-23, 2023-24, 2024-25 (FORMTECH-7shall be filled in this regard) (Qualitative)(Doc Required) [05 marks if average annual turnover of last three financial years is PKR 60 million or above.] [For average turnover of less than PKR 60 million, marks shall be awarded as per following formula: (A × 5 / 60), where ‘A’ is average annual turnover in Million] (5) | 5 | |
| Average Annual Working Capital for the last three financial years i.e. 2022-23, 2023-24, 2024-25(FORM TECH-7 shall be filled in this regard). (Qualitative)(Doc Required) [05 marks if average working capital of last three financial years is PKR 30 million or above] [For average working capital of less than PKR 30 million, marks shall be awarded as per following formula: (A × 5 / 30), where ‘A’ is average annual working capital in Million] (5) | 5 | |
| General Experience of all types of engineering consultancy services for Public, Commercial OR Airport Building during the last ten (10) years for projects having a minimum overall Completion Cost of PKR 600 million.
For the Applicant’s experience, either independent or as a member of JV, marks shall be awarded if the “Project Completion Certificate” or any other supporting document (clearly stating the date of completion and project cost) of the respective project is submitted with Form TECH-2B and TECH-2C. A particular project can only be claimed against one of the sub-criteria. (Qualitative)(Doc Required) Three (03) marks shall be awarded for each successfully completed project. Maximum 15 Marks shall be awarded if ≥ 5 successfully completed projects. [For completion event, below PKR 600 million during the last ten (10) years, marks shall be awarded as per following formula: (B × 5 / 600), where ‘B’ is the completion cost in Million]. Maximum 03 projects shall be considered in such event, each with minimum completion cost of PKR 400 million. [Attach completion certificates of the relevant projects] (15) | 15 | |
| Experience of consultancy services1 for fire fighting system at Public, Commercial OR Airport Building during the last ten (10) years for project(s) having minimum Fire-fighting Sub Head Completion Cost of PKR 200 million.
Note: For the Applicant’s experience, either independent or as a member of JV, marks shall be awarded if the “Project Completion Certificate” or any other supporting document (clearly stating the date of completion and project cost) of the respective project is submitted with Form TECH-2B and TECH-2C (Qualitative)(Doc Required) Five (05) marks shall be awarded for each successfully completed project subject to maximum of fifteen (15) marks. [For completion event, below PKR 200 million during the last ten (10) years, marks shall be awarded as per following formula: (B × 5 / 200), where ‘B’ is the completion cost in Million]. Maximum 03 projects shall be considered in such event, each with minimum completion cost of PKR 100 million. [Attach completion certificates of the relevant projects] (15) | 15 | |
| Project Methodology:
[Notes to Consultant: The Procuring Agency will assess whether the proposed methodology is clear, responds to the TORs, work plan is realistic and implementable; overall team composition is balanced and has an appropriate skills mix; and the work plan has right input of Experts.]
Marks shall be awarded based on the following criteria for exhibiting proper work methodology to be adopted for the provision of services (Qualitative)(Doc Required) [1] Understanding of Objectives (2 marks) Familiarization with the project objectives is of paramount importance considering the nature of the project. [2] Quality of Methodology with respect to Familiarization Reports (4 Marks) A site familiarization report will be an added advantage, as it is important in showing the Consultant’s interest for the project. The Consultant should also demonstrate its familiarization with relevant applicable Engineering Standards. [3] Work Programme and Proposal Presentation (4 Marks) (10) | 10 | |
| Key Personnel (Design Phase):
[Notes to Consultant: each position number corresponds to the same for the Key Experts in Form TECH-6 to be prepared by the Consultant. Marks shall be awarded on the basis of qualification and experience of the staff]
Note:
• In case of degrees availed / qualified in Pakistan, the same will be from an HEC recognized institution
• In the case of foreign experts, registration with the relevant authority in the country of practice shall be submitted in place of PEC / PCATP / HEC registration.
The number of points to be assigned to each of the above positions shall be determined considering the following two sub-criteria and relevant percentage weights:
Qualifications: 30%
Relevant Experience: 70%
Total weight: 100%
The evaluation of the consultant's professional team may be carried out through interviews with key team members, discussions with the consultant's past Procuring Agencies and project end-users, and inspections of past projects. (Qualitative)(Doc Required) 1. Project Team Leader Qualification: i. B.Sc./B.Eng. Mechanical / Project Management (5 marks) ii. PEC Professional Engineer/ registered with PEC ( 5 / 2 marks) iii Certified Fire Protection Specialist (CFPS) member (4 marks) iv National Fire Protection Association (NFPA) membership present / past (4/2 marks) Experience: 10 Years (Max. Marks 18) 2. Fire fighting system analyst/Designer Qualification: i. B.Sc./B.Eng. Mechanical Engineering ii. Registered with PEC Experience: 08 years (Max. Marks 06) 3. MEP Engineer Qualification: i. B.Sc./B.Eng. Mechanical / Electrical / Civil ii. Registered with PEC Experience: 05 Years (Max. Marks 04) 4. Contract Specialist Qualification: i. B.Sc./B.Eng. Mechanical/ Electrical / Civil ii. Registered with PEC Experience: 05 Years (Max. Marks 03) (31) | 31 | |
| Key Personnel (Supervision Phase):
[Notes to Consultant: each position number corresponds to the same for the Key Experts in Form TECH-6 to be prepared by the Consultant. Marks shall be awarded on the basis of qualification and experience of the staff]
Note:
• In case of degrees availed / qualified in Pakistan, the same will be from an HEC recognized institution
• In the case of foreign experts, registration with the relevant authority in the country of practice shall be submitted in place of PEC / PCATP / HEC registration.
The number of points to be assigned to each of the above positions shall be determined considering the following two sub-criteria and relevant percentage weights:
Qualifications: 30%
Relevant Experience: 70%
Total weight: 100%
The evaluation of the consultant's professional team may be carried out through interviews with key team members, discussions with the consultant's past Procuring Agencies and project end-users, and inspections of past projects. (Qualitative)(Doc Required) 1. Resident Engineer/Team Lead i. B.Sc./B.Eng. Mechanical / Project Management (03 marks) ii. Professional Engineer with PEC (02 marks) iii Demonstrated experience of NFPA compliant projects. (02 marks) Experience: 10 years (Max. Marks: 07) 2. Asstt. Resident Engineer (ARE) i. B.Sc./B.Eng. Mechanical Engineering ii. Registered with PEC Experience: 05 years (Max. Marks: 03) 3. Commissioning Engineer i. B.Sc./B.Eng. Mechanical / Mechatronics Engineering ii. Registered with PEC Experience: 05 years (Max. Marks: 03) 4. QA/QC Engineer i. B.Sc./B.Eng. Mechanical Engineering ii. Registered with PEC Experience: 05 years (Max. Marks: 03) 5. Site Supervisor i. B.Tech having DAE in Mechanical. Experience: 05 years (Max. Marks: 03) (19) | 19 | |
Lot Title : CONSULTANCY SERVICES FOR PLANNING, DESIGNING AND PROJECT EXECUTION SUPERVISION FOR REPLACEMENT OF FIRE FIGHTING SYSTEM AT AIIAP LAHORE
Bid Security : 500000 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Phase-I | Address: Allama Iqbal International Airport Schedule: 06 MonthsQuantity: 1/Qty |
1 |
| Phase-II | Address: Allama Iqbal International Airport Schedule: From date of commencement till one month after issuance of DLCQuantity: 1/Qty |
1 |
No
Lot Title : CONSULTANCY SERVICES FOR PLANNING, DESIGNING AND PROJECT EXECUTION SUPERVISION FOR REPLACEMENT OF FIRE FIGHTING SYSTEM AT AIIAP LAHORE
Position: Phase-I
Specifications / Requirements:
As per RFP (Annexure)
Position: Phase-II
Specifications / Requirements:
As per RFP (Annexure)
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract>
Number of GC Clause 3.1
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 4.1
The language is English
Number of GC Clause 6.1 and 6.2
The addresses are:
The Procuring Agency is: Office of the Divisional Engineer E&M, PAA AIIAP Lahore (Pakistan Airports Authority), Divisional Engineer E&M Allama Iqbal International Airport
The Consultant Address:
The title of the subject procurement is:HIRING OF CONSULTANCY SERVICES FOR PLANNING DESIGN AND PROJECT EXECUTION SUPERVISION FOR REPLACEMENT OF FIREFIGHTING SYSTEM AT AIIAP LAHORE
Number of GC Clause 8.1
[Note: If the Consultant consists only of one entity, state “N/A”;Or
The Lead Member on behalf of the JV is ___________ ______________________________ [insert name of the member]
Number of GC Clause 9.1
The Authorized Representatives are:
The Authorized Representatives are:
For the Procuring Agency:
Office of the Divisional Engineer E&M, PAA AIIAP Lahore (Pakistan Airports Authority), Divisional Engineer E&M
Allama Iqbal International Airport
+92-341-577-5777
imran.n@paa.gov.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 11.1
[Note: If there are no effectiveness conditions, state “N/A”]OR
List here any conditions of effectiveness of the Contract]
The effectiveness conditions are the following: [insert “N/A” or list the conditions]
Termination of Contract for Failure to Become Effective:
The time period shall be _______________________ [insert time period, e.g.: four months].
Commencement of Services:
The number of days shall be_________________ [e.g.: ten].
Confirmation of Key Experts’ availability to start the Assignment shall be submitted to the Procuring Agency in writing as a written statement signed by each Key Expert.
Expiration of Contract:
The time period shall be ________________________ [insert time period, e.g.: twelve months].
Number of GC Clause 23.1
No additional provisions.
The following limitation of the Consultant’s Liability towards the Procuring Agency can be subject to the Contract’s negotiations:
Please refer Clause 23.1, 23.2 & 24.1 of SCC (RFP Annexure).
Number of GC Clause 24.1
The insurance coverage against the risks shall be as follows:
(a) Professional liability insurance, with a minimum coverage of ______________________ [insert amount and currency which should be not less than the total ceiling amount of the Contract];
Number of GC Clause 33. Removal of Experts or Sub-consultants
[Note to Procuring Agency: include the following for supervision of infrastructure contracts (such as Plant or Works) and for other consulting service where the social risks are substantial or high, otherwise delete.]
Price adjustment on the remuneration …………….. [insert “applies” or “ does not apply”]
[If the Contract is less than 18 months, price adjustment does not apply.
If the Contract has duration of more than 18 months, a price adjustment provision on the remuneration for foreign and/or local inflation shall be included here. The adjustment should be made every 12 months after the date of the contract for remuneration in foreign currency and – except if there is very high inflation in the Procuring Agency’s country, in which case more frequent adjustments should be provided for – at the same intervals for remuneration in local currency. Remuneration in foreign currency should be adjusted by using the relevant index for salaries in the country of the respective foreign currency (which normally is the country of the Consultant) and remuneration in local currency by using the corresponding index for the Procuring Agency’s country. A sample provision is provided below for guidance:
Payments for remuneration made in [foreign and/or local] currency shall be adjusted as follows:
{or }
where
Rf is the adjusted remuneration;
Rfo is the remuneration payable on the basis of the remuneration rates (Appendix C) in foreign currency;
If is the official index for salaries in the country of the foreign currency for the first month for which the adjustment is supposed to have effect; and
Ifo is the official index for salaries in the country of the foreign currency for the month of the date of the Contract.
{or }
where
Rl is the adjusted remuneration;
Rlo is the remuneration payable on the basis of the remuneration rates (Appendix D) in local currency;
Il is the official index for salaries in the Procuring Agency’s country for the first month for which the adjustment is to have effect; and
Ilo is the official index for salaries in the Procuring Agency’s country for the month of the date of the Contract.
The currency of payment shall be the following: PKR
[The advance payment could be in either the foreign currency, or the local currency, or both; select the correct wording in the Clause here below. The advance bank payment guarantee should be in the same currency(ies)]
The following provisions shall apply to the advance payment and the advance bank payment guarantee:
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P103597
To: Office of the Divisional Engineer E&M, PAA AIIAP Lahore (Pakistan Airports Authority), Divisional Engineer E&M Allama Iqbal International Airport
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
This CONTRACT (hereinafter called the “Contract”) is made the [number] day of the month of [month], [year], between, on the one hand, [name of Procuring Agency or Recipient] (hereinafter called the “Procuring Agency”) and, on the other hand, [name of Consultant] (hereinafter called the “Consultant”).
[If the Consultant consist of more than one entity, the above should be partially amended to read as follows: “…(hereinafter called the “Procuring Agency”) and, on the other hand, a Joint Venture consisting of the following entities, each member of which will be jointly and severally liable to the Procuring Agency for all the Consultant’s obligations under this Contract, namely, [name of member] and [name of member] (hereinafter called the “Consultant”).]
WHEREAS
NOW THEREFORE the parties hereto hereby agree as follows:
The following documents attached hereto shall be deemed to form an integral part of this Contract:
In the event of any inconsistency between the documents, the following order of precedence shall prevail: the Special Conditions of Contract; the General Conditions of Contract, including Attachment 1; Appendix A; Appendix B; Appendix C and Appendix D; and Appendix E. Any reference to this Contract shall include, where the context permits, a reference to its Appendices.
2. The mutual rights and obligations of the Procuring Agency and the Consultant shall be as set forth in the Contract, in particular:
(a) the Consultant shall carry out the Services in accordance with the provisions of the Contract; and
(b) the Procuring Agency shall make payments to the Consultant in accordance with the provisions of the Contract.
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be signed in their respective names as of the day and year first above written.
For and on behalf of [Name of Procuring Agency]
[Authorized Representative of the Procuring Agency – name, title and signature]
For and on behalf of [Name of Consultant or Name of a Joint Venture]
[Authorized Representative of the Consultant – name and signature]
[For a joint venture, either all members shall sign or only the lead member, in which case the power of attorney to sign on behalf of all members shall be attached.]
For and on behalf of each of the members of the Consultant [insert the name of the Joint Venture]
[Name of the lead member]
[Authorized Representative on behalf of a Joint Venture]
[add signature blocks for each member if all are signing]
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Office of the Divisional Engineer E&M, PAA AIIAP Lahore (Pakistan Airports Authority), Divisional Engineer E&M Allama Iqbal International Airport
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Request for Proposals for Hiring of
"CONSULTANCY SERVICES FOR PLANNING, DESIGNING AND PROJECT EXECUTION SUPERVISION FOR REPLACEMENT OF FIRE FIGHTING SYSTEM AT AIIAP LAHORE"
Note: The appended ITC, PAA GCC (General Conditions of Contrcat & PAA SCC (Special Condition of contract) of the RFP alongwith forms and allied documents shall prevail for the subject firefighting consultancy.
Technical proposal forms
Financial Proposal Forms (to be submitted with the financial proposal).