In terms of Rule 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Engineering Development Board (EDB) (MoI&P), Project Manager PAVE
edb complex building 5-A constitution evenue Islamabad
+92-300-955-8256
ijazbacha@gmail.com
Sections of Prequalifica¬tion Documents
The following specific data for the Prequalification of Applicants shall complement, supplement, or amend the provisions in the Instructions to Applicants (ITA). Whenever there is a conflict, the provisions herein shall prevail over those in ITA.
PDS Clause No
ITA No
Amendments of, and Supplements to, Clauses in the Instructions to Applicants
PDS Clause No 1
ITA No 1.1
Identification Number of the Invitation for Prequalification: P115300
The Procuring Agency is: Engineering Development Board (EDB) (MoI&P)
List of Contracts:
See section items and Lots
PDS Clause No 2
ITA No 2.1
The name of Procuring Agency is: Engineering Development Board (EDB) (MoI&P)
The name of Project / Procurement is: EXPRESSION OF INTEREST (EOI) Pre-Qualification of all Electric Vehicle (EV) 2-Wheelers Original Equipment Manufacturers (OEMs)/Assemblers for PAVE Phase-II & Subsequent Phases. Electric Bikes (EV-2 Wheelers)
PDS Clause No 3
ITA No 4.2
Maximum number of members in a Joint Venture (JV): Nil
PDS Clause No 4
ITA No 4.5
A list of debarred firms and individuals is available on PPRA website:https://ppra.gov.pk
PDS Clause No 5
ITA No 7.1
For clarification, the Applicant shall seek clarifications through: EPADS v2.0
PDS Clause No 6
ITA No 7.1 & 8.2
Information related to Prequalification shall be published on: EPADS v2.0
PDS Clause No 7
ITA No 7.2
Pre-Application Meeting: Clarification Date: Saturday, September 19, 2026
PDS Clause No 8
ITA No 10.1
This Prequalification Document has been issued in the language: English
PDS Clause No 9
ITA No 11.1(d)
Additional documents to be submitted through EPADS v2.0:
PDS Clause No 10
ITA No 14.2
Source for determining exchange rates: Not Applicable
PDS Clause No 11
ITA No 16.1
Deadline for Application Submission:
Day: Thursday
Date: Thursday, September 24, 2026
Time: 11:00 AM
PDS Clause No 12
ITA No 17.1
Opening of Applications shall be conducted through: EPADS v2.0
Day: Thursday
Date: Thursday, September 24, 2026
Time: 11:30 AM
Virtual participation link: https://vendors.epads.gov.pk/
PDS Clause No 13
ITA No 21.1
Margin of Domestic Preference: Not Applicable
(Applicable only if authorized in Procurement Plan)
PDS Clause No 14
ITA No 29.1
Prequalification-related complaints / grievances shall be submitted in writing through: EPADS v2.0
A complaint may challenge:
| Bidder's Type | Required Registration |
|---|---|
|
Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) |
FBR (NTN) FBR (GSTN) |
| Eligibility Criteria | Document |
|---|---|
| Company Profile | Yes |
| NTN | Yes |
| GST | Yes |
| ATL Certificates | Yes |
| PSQCA License | Yes |
| EDB License | Yes |
| Product Brochures | Yes |
| Compliance Sheet | Yes |
| Experience Evidence | Yes |
| Financial reports / Bank Statements | Yes |
| Warranty Details | Yes |
| After-Sales Setup | Yes |
| EV 2-Wheeler, Pictures, Models, Specifications | Yes |
| Any other documents as specified in Bidding Document | Yes |
| The bid Submission fee: Pay Order/Bank Draft/Demand Draft of Rs. 5,000 will be paid in favor of Drawing & Disbursement Officer (DDO), EDB and the same will uploaded on PPRA E-Pads as well as submitted in hard form at Drawing & Disbursement Officer (DDO), EDB, office before closing date and time. | Yes |
Quality Based Selection (QBS)
Weightage (Without Financial Criteria)
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Technical Evaluation Criteria (Note: Bidders must score at least 70 marks out of total 100 marks in the technical evaluation criteria.) | ||
| Confirmation of Localization as per Annex-D (Quantitative)(Doc Required) | 25 | |
| EDB and PSQCA Certifications (Quantitative)(Doc Required) | 5 | |
| Technical Specifications | ||
| Battery (05 marks) ï‚§ Type: Lithium Iron Phosphate (LiFePOâ‚„) ï‚§ Voltage: Minimum 48 V ï‚§ Warranty: Minimum 3 years or 40,000 km (whichever occurs first) ï‚§ State-of-Health: Shall not fall below 80 % during the warranty period; replacement required if below threshold. ï‚§ Labelling: Battery shall display UID Number, Type, Chemistry, Rating (Ah/Wh), Cycle Life, Temperature Range, Form Factor and Number of Cells (Quantitative)(Doc Required) | 5 | |
| ï‚§ Testing Certificates: (05 marks) ï‚§ Acceptable pack standards: UL 2271 / GB 38031-2020 /ISO 12405-1:2011 /ISO 6469-1. ï‚§ Mandatory transport certification: UN/DOT 38.3 or IEC 62281. ï‚§ For locally assembled packs: cell certification to GB 31484-2015 / GB 31485- ï‚§ 2015 / GB 31486-2015 / IEC 62660 / IEC 62133-2:2017. ï‚§ A Country-of-Origin (CoO) certificate required if above not available. (Quantitative)(Doc Required) | 5 | |
| Motor: (05 marks)  Type: Permanent Magnet Synchronous Motor (PMSM) – brushless only.  Minimum top speed: 45 km/h.  •Ingress Protection: IP-67 or above. (Quantitative)(Doc Required) | 5 | |
| Vehicle and Charger Performance: (05 marks)  Range: ≥ 60 km per full charge.  Charging Time: ≤ 6 hours (from 20 % to 100 %).  Charger Efficiency: ≥ 80 %  Speedometer and Odometer Accuracy: ± 2 %.  Data Logger: Mandatory GPS-enabled device with ≤ 5 m accuracy and 90-day history (Quantitative)(Doc Required) | 5 | |
| Safety and Environmental Compliance: (05 marks) ï‚§ Compliance with all applicable PSQCA, EDB and environmental regulations is mandatory. (Quantitative)(Doc Required) | 5 | |
| Warranty and Performance Guarantee | ||
| Vehicle Warranty (excluding battery): Minimum 2 years or 40,000 km (whichever comes first), covering manufacturing defects only. (Quantitative)(Doc Required) | 10 | |
| General Manufacturing and Operational Criteria | ||
| ï‚§ Experience (04 marks): Minimum one-year manufacturing of electric 2-wheelers. (Quantitative)(Doc Required) | 4 | |
|  Sales Track Record (03 marks): ≥ 200 units sold with verifiable documentation (Quantitative)(Doc Required) | 3 | |
| ï‚§ Product Pricing (10 marks): At least one model within the price cap of PKR 250,000 (Quantitative)(Doc Required) | 10 | |
| ï‚§ Production Facility (02 marks): Must include assembly line, testing fixtures, battery safety zone, and motor test bench. (Quantitative)(Doc Required) | 2 | |
| ï‚§ Supply Chain (02 marks): Demonstrated vendor linkages for battery, motor, harness, and body components within Pakistan. (Quantitative)(Doc Required) | 2 | |
| ï‚§ Stock Availability (04 marks): Minimum 500 ready units or two months component inventory. (Quantitative)(Doc Required) | 4 | |
| After-Sales and Service Support | ||
| ï‚§ OEMs shall maintain minimum three service centers in each operating region/province. (03 marks) (Quantitative)(Doc Required) | 3 | |
| ï‚§ Technician Training: Staff must be EV-safety-certified. (03 marks) (Quantitative)(Doc Required) | 3 | |
| ï‚§ Parts Availability: Written undertaking ensuring spare parts supply for five (5) years post-sale. (04 marks) (Quantitative)(Doc Required) | 4 | |
As Per the Bidding Document
As Per the Bidding Document
As Per the Bidding Document