7. In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA), Resident Engineer
o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
+92-333-580-6800
rekhankhwar.proc@gmail.com
1.1 The Procuring Agency (PA), as indicated in the Bids Data Sheet (BDS) invites Bids through EPADS v2.0 for the provision of Goods for as specified in the BDS and in Section V – Evaluation Criteria, Specifications & Schedule of Requirements. The name, identification, and number of items/deliverables are provided in the BDS. The successful Bidders will be expected to provide the goods within the specified period and timeline(s) as stated in the BDS.
2.1 Source of funds is referred in Clause-1 of Invitation for Bids.
3.1 A Bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture, consortium, or association. In the case of a joint venture, consortium, or association, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture, consortium, or association shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture, consortium, or association during the Bidding process, and in case of award of contract, during the execution of the contract.
3.2 Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
3.3 The appointment of Lead Member in the joint venture, consortium, or association shall be confirmed by submission of a valid Power of Attorney to the Procuring Agency.
3.4 Any bid submitted by the joint venture, consortium or association shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
(The limit on the number of members of JV or Consortium or Association may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
3.5 The invitation for Bids is open to all prospective suppliers, manufacturers, or authorized agents / dealers subject to any provisions of incorporation or licensing by the respective national incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidders keeping in view the requirement of that business.
3.6 A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidder may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
3.7 A Bidder may be ineligible if –
3.8 As and when required, bidders shall provide to the Procuring Agency evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
3.9 Bidders shall submit Bids relating to the nature, conditions and modalities of sub-contracting wherever the sub-contracting of any elements of the contract amounting to more than ten (10) percent of the Bid price is envisaged.
4.1 All goods and related services to be supplied under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such goods and services. For purpose of this Bid, ineligible countries are the countries declared ineligible by the Federal Government.
5.1 A bidder shall submit only one Bid, in the same bidding process, either individually as a Bidder or as a member in a joint venture or any similar arrangement.
5.2 The Bidder shall not engage a subcontractor for any portion of the contract if the value of such subcontracting exceeds thirty percent (30%) of the total contract amount.
6.1 Any cost incurred by the bidder relating to the preparation and submission of its Bid shall be borne by the bidder, and the Procuring Agency shall in no case be responsible or liable for those costs, regardless of the conduct or outcome of the bidding process.
7.1 The Goods required, Bidding procedures, and terms and conditions of the contract are prescribed in the Bidding Documents. In addition to the Invitation for Bids, the Bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 9.1 include:
Section I -Invitation to Bids
Section II Instructions to Bidders (ITB)
Section III Bid Data Sheet (BDS)
Section IV Evaluation Criteria, Specifications, Schedule of Requirements
Section V Bid Forms
Section VI General Conditions of Contract (GCC)
Section VII Special Conditions of Contract (SCC)
Section VIII Contract Forms
7.2 The Bidder is expected to examine all instructions, forms, terms and specifications in the Bidding documents. Failure to furnish all the information required in the Bidding documents through EPADS v2.0 will be at the Bidder’s risk and may result in the rejection of his Bids.
8.1 A prospective Bidder requiring any clarification of the Bidding documents may notify the Procuring Agency through EPADS v2.0.
8.2 The Procuring Agency will within three (3) working days after receiving the request for clarification, respond to any request for clarification through EPADS v2.0 provided that such request is received not later than three (03) days prior to the deadline for the submission of Bids as prescribed in ITB 22
8.3 Copies of the Procuring Agency's response will be forwarded to all identified Prospective Bidders through EPADS v2.0, including a description of the inquiry, but without identifying its source.
8.4 Should the Procuring Agency deem it necessary to amend the Bidding document as a result of a clarification, it shall do so following the procedure under ITB 9.
8.5 If indicated in the BDS, the Bidder’s designated representative is invited at the Bidder’s cost to attend a pre-Bid meeting at the place, date and time mentioned in the BDS. During this pre-Bid meeting, prospective Bidders may request clarification of the schedule of requirement, the Evaluation Criteria or any other aspects of the Bidding document.
8.6 Minutes of the pre-Bid meeting, if applicable, including the text of the questions asked by Bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS v2.0. Any modification to the Bidding documents that may become necessary as a result of the pre-Bid meeting shall be made by the Procuring Agency exclusively through the use of an Addendum pursuant to ITB 9. Non-attendance at the pre-Bid meeting will not be a cause for disqualification of a Bidder.
9.1 Before the deadline for submission of Bids, the Procuring Agency for any reason, whether at its own initiative or in response to a clarification requested by a prospective Bidder or Pre-Bid meeting may modify the Bidding documents by issuing addenda through EPADS v2.0.
9.2 The Procuring Agency shall promptly publish the addendum through EPADS v2.0.
9.3 Any addendum issued including the notice of any extension of the deadline shall also be communicated through EPADS v2.0 to all the bidders who have already submitted their bids. Such bidders shall have the right to withdraw their already submitted bid and re-submit the revised bid prior to the original or extended bid submission deadline.
9.4 To give prospective Bidders reasonable time in which to take an addendum/corrigendum into account in preparing their Bids, the Procuring Agency may, at its discretion, extend the deadline for the submission of Bids through EPADS v2.0:
Provided that the Procuring Agency shall extend the deadline for submission of Bids, if such an addendum is issued within last three (03) days of the Bids submission deadline.
10.1 The Bid prepared by the bidder, as well as all correspondence and documents relating to the Bids exchanged by the Bidder and the Procuring Agency shall be written in the English language unless otherwise specified in the BDS. Supporting documents and printed literature furnished by the Bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless otherwise specified in the BDS, in which case, for purposes of interpretation of the Bidder, the translation shall govern.
11.1 The Bid prepared by the Bidder shall constitute thedocuments required in the BDS.
Details of sample(s) where applicable and requested in the BDS.
1. Documentary evidence established in accordance with ITB that the Bidder is eligible and/or qualified for the subject bidding process;
2. Documentary evidence establish that the Bidder has been authorized by the manufacturer to deliver the goods into Pakistan, where required and where the supplier is not the manufacturer of those goods;
3. Documentary evidence establish that the goods and related services to be supplied by the Bidder are eligible goods and services, and conform to the Bidding Documents;
4. Bid security or Bid Securing Declaration furnished in accordance with ITB 18.
12.1 To establish the conformity of the bidder to the Bidding document, the Bidder shall furnish as part of its Bids the documentary evidence that Goods provided conform to the technical specifications and standards.
13.1 The Bidder shall furnish, as part of itsBid, all those documents establishing the Bidder’s eligibility to participate in the Bidding process and/or its qualification to perform the contract if its Bid is accepted.
14.1 The Bidder shall fill the Form of Bid furnished in the Bidding documents.The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
15.1 The Bids Prices quoted by the Bidder in the Form of Bid and in the Price Schedules shall conform to the requirements specified below or exclusively mentioned hereafter in the Bidding documents.
15.2 All items in the Schedule of Requirement must be listed and priced separately in the Price Schedule(s). If a Price Schedule shows items listed but not priced and neither explicitly denied, their prices shall be construed to be included in the prices of other items.
15.3 Items not listed in the Price Schedule shall be assumed not to be included in the Bid, and provided that the Bid is still substantially responsive in their absence or due to their nominal nature, the corresponding average price of the respective item(s) of the remaining substantially responsive Bidder(s) shall be construed to be the price of those missing item(s)
15.4 The Bid price to be quoted in the Form of Bid in accordance with ITB 14.1 shall be the total price of the Bid.
15.5 The Bidder shall indicate on the appropriate Price Schedule, the unit prices (where applicable) and total Bid price of the Goods it proposes to provide under the contract.
15.6 Prices quoted by the Bidder shall be fixed during the Bidder’s performance of the contract and not subject to variation on any account. A Bid submitted with an adjustable price will be treated as non-responsive and shall be rejected.
16.1 Prices shall be quoted in Pakistani Rupees unless otherwise specified in the BDS in accordance with Rule 30 (2) of the Public Procurement Rules, 2004.
17.1 Bids shall remain valid for the period specified in the BDS after the Bid submission deadline prescribed by the Procuring Agency. A Bid valid for a shorter period shall be rejected by the Procuring Agency as non-responsive. The period of Bid validity will be determined from the complementary Bid securing instrument, i.e. the expiry period of Bid Security or Bids Securing Declaration as the case may be.
17.2 The procuring agency shall ordinarily be under an obligation to process and evaluate the bid and to issue letter of award within the stipulated bid validity period.
17.3 Under exceptional circumstances, prior to the expiration of the initial Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids only once through EPADS v2.0, for the period not more than the period of initial bid validity. The Bid Security provided under ITB 18 shall also be suitably extended. A Bidder may refuse the request without forfeiting its Bid security or causing to be executed its Bid Securing Declaration. A Bidder agreeing to the request will not be required nor permitted to modify its Bid, but will be required to extend the validity of its Bid Security or Bid Securing Declaration for the period of the extension.
18.1 The Bidder shall furnish as part of its Bid, a Bid Security in accordance with Rule 25 of the Public Procurement Rules, 2004.
18.2 The original Bid Security shall be enclosed within the sealed envelope and to be submitted physically before closing time for submission of bids. Whereas, scanned copy of bid security shall be uploaded electronically through EPADS v2.0 before closing hours for submission of bids.
18.3 The Bidder who failed to submit the original Bids security before the submission deadline shall be disqualified straightaway.
18.4 The Bid Security or Bid Securing Declaration is required to protect the Procuring Agency against the risk of Bidder’s conduct which would warrant the security’s forfeiture, pursuant to ITB 18.7.
18.5 The Bid Security shall be denominated in the local currency, and it shall be a Bank Draft in the name of the Procuring Agency and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bids/Bid Validity is extended. In either case, the form must include the complete name of the Bidder.
18.6 The Bid Security shall be payable promptly upon written demand by the Procuring Agency in case any of the conditions listed in ITB 18 are invoked.
18.7 Unsuccessful Bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bids Validity prescribed by the Procuring Agency pursuant to ITB 17. The Procuring Agency shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
18.8 The successful Bidder’s Bids Security will be discharged upon the Bidder signing the contract, or furnishing the Performance Guarantee.
18.9 The Bid Security may be forfeited or the Bid Securing Declaration executed:
19.1 Before Bid submission deadline, any Bidder may withdraw, substitute, or modify its Bid after it has been submitted through EPADS v2.0. Bids requested to be withdrawn, shall be returned unopened to the Bidders through EPADS v2.0.
20.1 The Bidder shall prepare and submit Bids with due diligence after carefully reading all the terms and condition before bid submission deadline through EPADS v2.0.
21.1 The Technical and Financial Bids if required to submitted, shall be submitted on EPADS v2.0.
22.1 Bids shall be received by the Procuring Agency through EPADS v2.0 before bid submission deadline.
22.2 The Procuring Agency may, under exceptional circumstances, extend the deadline for the submission of Bids, after recording reasons in writing and in an equal opportunity manner.
In such case, all rights and obligations of the Procuring Agency and the Bidders that were previously governed by the original deadline shall thereafter be subject to the revised deadline.
23.1 The Bid Evaluation Committee of the Procuring Agency shall open all Bids through the EPADS v2.0, on the date and time specified in the Bid Data Sheet (BDS).
23.2 The Bid Evaluation Committee shall generate minutes through EPADS v2.0 containing brief details of bid opening process. The record of the Bid opening shall include, as a minimum: the name of the Bidder, the Bid price if applicable, and the presence or absence of a Bid Security or Bid Securing Declaration.
23.3 The procuring agency shall live broadcast the opening of bids on national media or on their website or digital channels, if the volume of procurement exceeds five hundred million rupees in case of goods and services and one thousand million rupees in case of works.
23.4 In case the date of opening of bid has been declared as public holiday or the procuring agency fail to open bid due to any EPADS v2.0 related issues, the submission and opening of bids shall be shifted to the next working day on the same time.
23.5 In case of Single Stage One Envelope Procedure, the Bidders names, the Bid prices, the total amount of each Bid and, the presence or absence of Bid Security, Bid Securing Declaration and such other details as the Procuring Agency may consider appropriate, will be announced by the Bid Evaluation Committee.
24.1 To assist in the examination, evaluation and comparison of Bids of the Bidders, the Procuring Agency may, ask any Bidder for a clarification of its Bid including breakdown of prices.
24.2 The request for clarification and the response shall be sought through EPADS v2.0 before three days prior to the deadline for submission of bids. No change in the prices or substance of the Bids shall be sought, offered, or permitted.
24.3 The alteration or modification in the BIDS which in any way affect the following parameters will be considered as a change in the substance of a Bids:
24.4 From the time of Bids opening to the time of Contract award if any Bidder wishes to contact the Procuring Agency on any matter related to the Bids it should do so through EPADS v2.0.
25.1 Prior to the detailed evaluation of Bids, the Procuring Agency will determine whether each Bid:
25.2 The Procuring Agency's determination of a Bid's responsiveness will be based on the contents of the Bid itself.
25.3 A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding documents, without material deviation or reservation. A material deviation or reservation is one that: -
25.3 If a Bids is not substantially responsive, it will be rejected by the Procuring Agency and may not subsequently be evaluated for complete technical responsiveness.
26.1 The Procuring Agency shall examine the Bids to confirm that all terms and conditions specified in the GCC and the SCC have been accepted by the Bidder without any material deviation or reservation.
26.2 The Procuring Agency shall evaluate the technical aspects of the Bids submitted, to confirm that all requirements specified in Schedule of Requirements and Technical Specifications of the Bidding documents have been met without material deviation or reservation.
26.3 If after the examination of the terms and conditions and the technical evaluation, the Procuring Agency determines that the Bid is not substantially responsive in accordance with ITB 25.2, it shall reject the Bid.
27.1 Bids determined to be substantially responsive will be checked for any arithmetic errors. Errors will be corrected as follows: -
27.2 The amount stated in the Bid will, be adjusted by the Procuring Agency in accordance with the above procedure for the correction of errors and, with the concurrence of the Bidder, shall be considered as binding upon the Bidder. If the Bidder does not accept the corrected amount, its Bid will then be rejected, and the Bid Security may be forfeited or the Bids Securing Declaration may be executed.
28.1 To facilitate evaluation and comparison, the Procuring Agency will convert all Bids prices expressed in the amounts in various currencies in which the Bids prices are payable. For the purposes of comparison of bids quoted in different currencies, the price shall be converted into a single currency specified in the bidding documents. The rate of exchange shall be the selling rate prevailing on the date of opening of financial bids specified in the bidding documents, in accordance with weighted average customer exchange rates list issued by the State Bank of Pakistan on that day.
29.1 The Bids, quotations, or proposals shall be evaluated by the respective evaluation committees as per evaluation criteria described in the Bidding Documents in accordance with Rule 29 and 30 of the Public Procurement Rules, 2004.
1. Least Cost Based Selection (LCBS)
After meeting the requirements of eligibility, qualification and substantial responsiveness, the bid in compliance with all the mandatory (technical) specifications/requirements and/or requisite quality threshold (if any), and having lowest evaluated cost (or financial proposal) shall be considered Successful Bid.
2. Quality and Cost Based Selection (QCBS)
In such combination, there shall be some specific weightage of both the technical features and financial aspects of the proposal. The financial marks shall be awarded on the basis of inverse proportion calculations. The successful bid shall be declared, on the basis of combined evaluation.
3. Quality Based Selection (QBS)
Atter meeting the requirements of eligibility, qualification and substantial responsiveness the bid in compliance with all the mandatory (technical) specifications/requirements and attaining highest marks in the Technical Evaluation considering all other qualitative and/or quantitative parameters (or point rated criteria) for technical proposal(s) such as working methodology, implementation plan, resource allocation, additional functionalities, risk management approach, knowledge transfer techniques, post implementation methodology etc. shall be treated as highest ranked bid. Later on, the financial proposal of highest ranked bidder shall be opened, however, in case of failure to proceed further with such a bidder, the procuring agency may resort to second highest bidder and so on.
29.2 In case of tie of bids, the bidders shall be provided an opportunity to offer their best and final monetary offer through EPADS v2.0. However, in no case the rates shall be higher than the original financial bids.
30.1 The procuring agency shall evaluate and compare bids, allow for preference to domestic bidders, while competing with the international bidders in accordance with the policies of Federal Government.
The percentage of preference, to be accorded shall be clearly mentioned in the bidding documents under the bid evaluation criteria.
31.1 Selection technique will be adopted for determining the Successful Bid in accordance with the criteria referred in the BDS or prescribed in the separate section titled as Evaluation Criteria.
31.2 In case where the Procuring Agency adopts the Cost Based Evaluation Technique and, the Bid with the lowest evaluated price from amongst those which are eligible, compliant and substantially responsive shall be the Successful Bid.
31.3 The Procuring Agency may adopt the Quality & Cost Based Selection Technique due to the following two reasons:
1. Where the Procuring Agency knows about the main features, usage and output of the products; however not clear about the complete features, technical specifications and functionalities of the goods to be procured and requires the bidders to submit their proposals defining those features, specifications and functionalities; or
2. Where the Procuring Agency, in addition to the mandatory requirements and mandatory technical specifications, requires parameters specified in Evaluation Criteria to be evaluated while determining the quality of the goods.
31.4 In such cases, the Procuring Agency may allocate certain weightage to these factors as a part of Evaluation Criteria, and may determine the ranking of the bidders on the basis of combined evaluation in accordance with provisions of Rule 2(1)(h) of the Public Procurement Rules, 2004.
32.1Where the Bid price is considered to be abnormally low, the Procuring Agency shall perform price analysis either during determination of Successful Bids or as a part of the post-qualification process.
32.2 The Procuring Agency may reject an Abnormally low financial bids.
32.3 In order to identify the Abnormally Low Bids (ALB) following approaches can be considered to minimize the scope of subjectivity:
32.4 The Procuring Agency will determine to its satisfaction whether the Bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily.
32.5 The determination will take into account the Bidder’s financial, technical, and production capabilities. It will be based upon an examination of the documentary evidence of the Bidder’s qualifications submitted by the Bidder, as well as such other information as the Procuring Agency deems necessary and appropriate. Factors not included in these Bidding documents shall not be used in the evaluation of the Bidders’ qualifications.
32.6 Procuring Agency may seek “Certificate for Independent Price Determination” from the Bidder and the results of reference checks may be used in determining an award of contract.
Explanation: The Certificate shall be furnished by the Bidder. The Bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc.
32.7 An affirmative determination will be a prerequisite for award of the contract to the Bidder. A negative determination will result in rejection of the Bidder’s Bids, in which event the Procuring Agency will proceed to the next ranked Bidder to make a similar determination of that Bidder’s capabilities to perform satisfactorily.
33.1 The Procuring Agency will award the Contract to the Bidder whose Bids has been determined to be substantially responsive to the Bidding documents and who has been declared as Most Advantageous Bidder.
34.1 The procuring agency shall not engage in negotiations with respect to scope and price with the bidder except when the procuring agency conducts a procurement using direct or negotiated contracting or a request for proposals with evaluation based on quality alone.
34.2 The procuring agency may negotiate with the most advantageous bid with a view to streamline the work or task execution, at the time of contract finalization on methodology, work plan, staffing, finalizing payment arrangements, delivery arrangements, minor amendments to the special conditions of the contract.
35.1 The Procuring Agency reserves the right to reject all bids or proposals at any time prior to the issuance of the Letter of Award, without incurring any liability, in accordance with Rule 33 of the Public Procurement Rules, 2004.
36.1 The Procuring Agency reserves the right at the time of contract award to increase or decrease the quantity of Goods originally specified in these Bidding documents provided this does not exceed by 15%, without any change in unit price or other terms and conditions of the Bids and Bidding documents.
37.1 Prior to the award of contract, the procuring agency shall announce and publish the result of bid evaluation on EPADS v2.0 in accordance with Rule 35 of the Public Procurement Rules, 2004.
37.2 The Bidder whose Bids has been accepted will be notified of the award by the Procuring Agency prior to expiration of the Bids/Bid Validity period. The Letter of Award will state the sum that the Procuring Agency will pay the successful Bidder in consideration for the delivery of Goods as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price).
37.3 The Letter of award will constitute the formation of the Contract, subject to the Bidder furnishing the Performance Guarantee and signing of the contract.
38.1 Promptly after issuance of Letter of award, Procuring Agency shall send the successful Bidder the draft Contract, incorporating all terms and conditions as agreed by the parties to the contract.
38.2 Immediately after the Redressal of grievance by the GRC (if any), mandatory standstill period in accordance with Rule 35 of the Public Procurement Rules, 2004 and after fulfillment of all condition’s precedent of the Contract Form, the successful Bidder and the Procuring Agency shall sign the Contract.
39.1 Procuring Agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.
40.1 The Grievance Redressal Committee shall address the grievance, if any submitted by any party, including the bidder, in accordance with Rule 48 of the Public Procurement Rules, 2004 to be read with Redressal of Grievances Regulations, 2021.
40.2 In case if any party or the bidder is not satisfied with the decision of the GRC or if it fails to decide within ten days, the bidder or the party may file an appeal before the Appellate Committee of the Authority in accordance with Rule 48 of the Public Procurement Rules, 2004 to be read with Redressal of Grievances Regulations, 2021.
41.1 The Procuring Agency shall initiate blacklisting proceedings against any bidder, supplier, or contractor in accordance with the Mechanism for Blacklisting Regulations, 2024, read with Rule 19 of the Public Procurement Rules, 2004.
41.2 The blacklisted/debarred bidder may file the review petition before the Authority in accordance with Rule 19 of the Public Procurement Rules, 2004 to be read with Procedure of filing and disposal of Review Petitions Regulations, 2021.
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA) The subject of procurement is: PROCUREMENT OF MECHANICAL EQUIPMENTS ,T&P, SPARE PARTS & CONSUMEABLE ITEMS ON FCS BASIS Expected commencement date: Friday, March 27, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2025-26 Name and identification number of the Contract: P9545 |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil see section of eligibility criteria. |
B. Bidding Documents |
||
|
4. |
8.1 |
The Bidders may seek clarifications through EPADS v2.0 : Clarification Date: Saturday, February 28, 2026 |
C. Preparation of Bids |
||
| 5. |
10.1 |
The Language of all correspondences and documents related to the Bids shall be in: English List of documents required along with the bid: No |
| 6. | 11.1 |
|
| 7. | 12.1 |
Items / Lots Specifications: see section of items specifications. |
|
8. |
15.6 |
The price shall be Fixed. |
| 9. |
16.1 |
Currency of the Bids shall be : PKR |
| 10. |
17.1 |
The Bids/Bid Validity period shall be: 120 Days |
| 11. |
18.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
D. Submission of Bids |
||
|
12. |
20.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province). before bid submission deadline. Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Thursday, March 5, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
13. |
23.1 |
The Bids opening shall take place on EPADS v2.0. Day : Thursday Date: Thursday, March 5, 2026 Time : 11:30 AM |
|
14. |
31.1 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Review of Procurement Decisions |
||
|
15. |
41.1 |
Grievence against this procurement shall be submitted online on EPADS v2.0. Arbitrator shall be appointed by mutual consent of the both parties. |
| Bidder's Type | Required Registration |
|---|---|
|
Individual / Individual Consultant Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) |
FBR (NTN) FBR (GSTN) |
Eligibile bidder(s) with substantially responsive bid(s) offering Least Cost Based Selection (LCBS) shall be consider for the award of contract(s).
Least Cost Based Selection (LCBS)
Lot Title : Mechanical Equipment and T&P (A)
Bid Security : 75000
| Item | UNSPSC | Delivery Schedule | Quantity | Warranty |
|---|---|---|---|---|
| Water Jet High Pressure Washer | Pressure washer motor AC |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 01
|
1 | 365 Days |
| Paint Spray Electric Gun | Paint sprayers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 01
|
1 | 365 Days |
| Electric Drill Machine with Hammering Function | Core drills |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 01
|
1 | 365 Days |
| Electric Rotary Hammer Drill machine | Hammer drills |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Electric Die grinder | Bench grinder |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Electric Cut-off Machine | Machine guns |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Electric Arc Welding Machine | Braze welding machine |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Rechargeable Cordless LED Work Lamp | Arc lamp |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Rechargeable multifunction emergency flash light ( escape/rescue) | Flashlight |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Electric Cordless Impact Wrench 1/2” | Adjustable wrenches |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| G-Clamp/ C-Clamp | Arc lamp |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Striking /Slogging Ring Spanner: | Acetabular rings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Striking/Slogging Open-end Spanner | Tap spanner or basin wrench |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Spirit Level | Spirits or liquors |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| L-handle 1/2inch | Tool handles |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Bench vice 6 Inch | Bench vises |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Bench vice 8 Inch | Bench vises |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Bench vice 4 Inch | Bench vises |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Adjustable Wrench | Adjustable wrenches |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Adjustable Wrench | Adjustable wrenches |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Tools Tray | Cable tray |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Feeler Gauge/Gap gauge (Matric) | Feeler gauges |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Snap-off knife | Dough knife |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 4
|
4 | 365 Days |
| Sludge Hammer | Sledge hammer |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 01
|
1 | 365 Days |
| Stoning Hammer Steel handle | Striking hammers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Rubber Hammer | Hammers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Outside Micrometer screw gauge | Micrometers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Tool Bag | Tool bags |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Measuring Tap 5mx19mm | Measuring tapes |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 4
|
4 | 365 Days |
| Gas cutting Torch | Blow torch |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Vanier Caliper 200mm (8inch) | Calipers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Flexible Ratchet spanner (Combination) | Ring wrench or spanner |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Feeler Gauge/Gap gauge (Matric) | Feeler gauges |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Pressure Sprayer | Sprayers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Mechanical Screw driver set | Offset screw driver |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 4
|
4 | 365 Days |
| Welding safety helmet | Helmet parts or accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Air Spray gun for paint | Spray gun |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Combination Plier | Combination pliers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 5
|
5 | 365 Days |
| Long Nose-Plier | Longnose pliers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Hydraulic Bearing/Gear Puller | Hanger bearings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Hand Wood Saw | Tile hand saw |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Cold Chisel Flat shape | Cold chisels |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Allen Hex Key Set | Hex keys |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 4
|
4 | 365 Days |
| Oiler Can (Pump oiler) | Air pumps |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Telescopic ladder | Ladders |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Air Grease Gun/Lubricator | Grease guns |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Wheel-barrow | Grinding wheels |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Air Blow Gun | Anaesthetic gun |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Striking /Slogging Ring Spanner | Ring wrench or spanner |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Drill Press Vice | Drill press or radial drill |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Extension Cable Reel (Roll type) | Electrical box extension |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 01
|
1 | 365 Days |
| Hole-saw set Bi-metal Hole saw 12pcs set Size:12pcs hole saw: Φ 19mm, Φ 22mm, Φ 29mm, Φ 32mm, Φ 38mm, Φ 44mm, Φ 51mm, Φ 64mm, Φ 76mm, Φ 89mm, Φ 102mm, Φ 127mm 2pcs Arbors , 1PC Hex key wrench: Φ 2.5mm 1PC Driver plate, Packed in case | Hole saws |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| HSS Drill bit 25pc set | Drill bit accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Masonry drill bit set For hammering drill machine | Drill bit accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Lath machine Knurling tool | Automatic lathe or chucking machine |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Boring bar tool set | Boring tool |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| HSS center drill bit For Lathe machine Material: HSS Size: Φ2mm, Φ3mm, Φ4mm, Φ5mm, Angle 60° | Automatic lathe or chucking machine |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Tungsten Carbide brazed tip 06 pc set for Lath tool | Automatic lathe or chucking machine |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Tungsten Carbide brazed tipped cutter tools For metal lathe machine 10pc set, Size: 20x20x200mm (Including boring, turning, threading, chamfering, boring and parting tools etc) | Automatic lathe or chucking machine |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Pipe revolving bull nose center For lath machine | Automatic lathe or chucking machine |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Walkie-talkie Rechargeable 02pc set, | Wireless communication service |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Webbing round rope sling | Slings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Webbing round rope sling | Slings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Webbing round rope sling | Slings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Steel wire rope sling | Slings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| D-shackle | Hoisting and lifting equipment spare parts and accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30Days
Quantity: 6
|
6 | 365 Days |
| D-shackle | Hoisting and lifting equipment spare parts and accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Chain block/Hoist | Hoisting and lifting equipment spare parts and accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Lever Chain Hoist (Come Along) Rating lifting weight:6 Ton, Lifting height:1.5 m Strands of load chain:2, Minimum distance between two hooks:600 mm Pulling force at full load:340 N Packed by wooden case | Hoisting and lifting equipment spare parts and accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Hydraulic bottle Jack | Jacks |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Eye Bolt | Hoisting and lifting equipment spare parts and accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 4
|
4 | 365 Days |
| Eye Bolt | Hoisting and lifting equipment spare parts and accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30Days
Quantity: 4
|
4 | 365 Days |
| Bourdon tube pressure gauge | Pressure gauge |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
Lot Title : Lot-II Mechanical Consumable items (B)
Bid Security : 84476
| Item | UNSPSC | Delivery Schedule | Quantity | Warranty |
|---|---|---|---|---|
| Anti-Rust Spray | Anti spatter spray |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 36
|
36 | 365 Days |
| Silicon Sealant 310ml tube | Aluminum bolted tube assemblies |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 50
|
50 | 365 Days |
| Teflon Tape | Teflon coating service |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30Days
Quantity: 50
|
50 | 365 Days |
| Emery Paper | Emery |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 75
|
75 | 365 Days |
| Metal cutting Abrasive Disc | Cutting disc |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 100
|
100 | 365 Days |
| Metal Grinding Abrasive Disc | Grinding machines |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30Days
Quantity: 50
|
50 | 365 Days |
| Metal Cutting Disc | Cutting disc |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 12
|
12 | 365 Days |
| Metal Cutting Disc | Cutting disc |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 12
|
12 | 365 Days |
| Buffer Disc/Flap Disc | Grinding machines |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 12
|
12 | 365 Days |
| Snap-off cutter blades set | Grinding machines |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 5
|
5 | 365 Days |
| Hack saw Blades double sided | Saw blades |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 24
|
24 | 365 Days |
| Wire Brush | Wire brushes |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 24
|
24 | 365 Days |
| Crimped brass-steel wire cup brush | Wire brushes |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Tungsten carbide double cut rotary burr set | Tungsten carbide |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Flexible Hose Pipe | Subsea flexible pipe or pipeline |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 30
|
30 | 365 Days |
| T-bolt hose clamp | T bolt |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Hose clamp | Hose or pipe clamps |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Samad bond glue | Glues |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Super glue | Glues |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 20
|
20 | 365 Days |
| G-wire | Insulated winding wire |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 15
|
15 | 365 Days |
| Welding gloves | Anti cut gloves |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Safety Goggles | Goggles |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Safety Face Shield | Personal safety alert |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 12
|
12 | 365 Days |
| Safety Gum Rubber long Boots | Safety boots |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Safety Gum Rubber long Boots | Safety boots |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Safety Gloves | Gloves or mittens |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 200
|
200 | 365 Days |
| Reflection vest | Yellow jacket allergenic extracts |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 12
|
12 | 365 Days |
| Umbrella | Umbrellas |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Rain-suit | Waterproof jacket or raincoat |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Tool vast Jacket | Workshop machine tools accessories |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 10
|
10 | 365 Days |
| Rechargeable Battery cell | Rechargeable batteries |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 24
|
24 | 365 Days |
| Pure PTFE Gland packing | Fluoropolymers PTFE |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 10
|
10 | 365 Days |
| Pure PTFE Gland packing | Fluoropolymers PTFE |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 10
|
10 | 365 Days |
| Refrigerant gas | Refrigerant |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 230
|
230 | 365 Days |
| Refrigeration compressor oil | Refrigerant compressors |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 20
|
20 | 365 Days |
| O ring Cord | Acrylonitrile butadiene NBR |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 30
|
30 | 365 Days |
| O ring Cord | Acrylonitrile butadiene NBR |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 30
|
30 | 365 Days |
| O ring Cord | Acrylonitrile butadiene NBR |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 30
|
30 | 365 Days |
| O ring Cord | Acrylonitrile butadiene NBR |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 30
|
30 | 365 Days |
| Rubber Coupling buffer rings | Acrylonitrile butadiene NBR |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 100
|
100 | 365 Days |
| Asbestos Gasket sheet | Asbestos sheet |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Rubber Gasket Sheet (NBR-80) | General gasket |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| PTFE/Teflon Gaskets hard sheet | General gasket |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| O-ring rubber Kit | Actuator kit |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Oil Seal | Oil seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Oil Seal | Oil seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Oil Seal | Oil seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Oil Seal | Oil seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Hydraulic Seal | Hydraulic setting tools |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Hydraulic seal | Hydraulic setting tools |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Hydraulic Seal | Hydraulic setting tools |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Hydraulic Seal | Hydraulic setting tools |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Hydraulic Seal | Hydraulic setting tools |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Water Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Water Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Water Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Water Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Water Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Water Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Oil Seal | Oil seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Mechanical Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Mechanical Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Mechanical Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Mechanical Seal | Mechanical seals |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 3
|
3 | 365 Days |
| Coupling Pads | Couplers |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 4
|
4 | 365 Days |
Lot Title : Lot-III Mechanical Spare Parts (C)
Bid Security : 70057
| Item | UNSPSC | Delivery Schedule | Quantity | Warranty |
|---|---|---|---|---|
| Hex bolt | Bolt nut |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 20
|
20 | 365 Days |
| Stud Double-end | Ball stud |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 20
|
20 | 365 Days |
| Coupling Bolt , | Blank bolt |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 60
|
60 | 365 Days |
| MS sheet | Sheet bags |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| MS sheet | Sheet bags |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 1
|
1 | 365 Days |
| Deep Groove Ball Bearing | Ball bearings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 100
|
100 | 365 Days |
| Deep Groove Ball Bearing | Ball bearings |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 60
|
60 | 365 Days |
| MS Round Bar | Round bar stock |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 15
|
15 | 365 Days |
| MS Round Bar | Round bar stock |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 16
|
16 | 365 Days |
| MS Hollow Round bar | Round bar stock |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 16
|
16 | 365 Days |
| MS Hollow Round bar | Round bar stock |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 16
|
16 | 365 Days |
| MS Hollow Round bar | Round bar stock |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 16
|
16 | 365 Days |
| MS Hollow Round bar | Round bar stock |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 16
|
16 | 365 Days |
| Bush | Electrical bushing |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Bush | Electrical bushing |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Hexagonal Bolt, | Bolt nut |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 60
|
60 | 365 Days |
| Hexagonal Bolt | Bolt nut |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 60
|
60 | 365 Days |
| Wear Ring | Brass bonded pipe assemblies |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 10
|
10 | 365 Days |
| Wear Ring | Brass bonded pipe assemblies |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 10
|
10 | 365 Days |
| Stud, Double Ended | Ball stud |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 20
|
20 | 365 Days |
| Ball Valve | Ball valves |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 10
|
10 | 365 Days |
| Ball Valve | Ball valves |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 6
|
6 | 365 Days |
| Gate Valve | Gate valves |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
| Gate Valve | Gate valves |
Address: o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Distt Shangla Khyber-Pakhtunkhwa, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Schedule: 30 Days
Quantity: 2
|
2 | 365 Days |
No
Lot Title : Mechanical Equipment and T&P (A)
Item: Water Jet High Pressure Washer
UNSPSC: Pressure washer motor AC
Specifications / Requirements:
160 bar, 2000W, 6L/min,220-240V~50/60Hz, include accessories ,2 Set water spray gun,2 Pcs 5m super flexible high pressure hose,1 Pcs water inlet screw 1 Pcs soap bottleItem: Paint Spray Electric Gun
UNSPSC: Paint sprayers
Specifications / Requirements:
Container capacity: 800ml, Max. Air Flow: 380ml/min , Nozzle size 2.5mm, Type: SPG-3508 ingcoItem: Electric Drill Machine with Hammering Function
UNSPSC: Core drills
Specifications / Requirements:
Input power: 1200W ,230V , chuck size 13mm , corded, include bit set 2mm to 13 mmItem: Electric Rotary Hammer Drill machine
UNSPSC: Hammer drills
Specifications / Requirements:
Input power:1500W Voltage:220-240V~50/60Hz No-load speed:850rpm, Impact rate: 4400 bpm, Impact energy:5.5J Max. Drilling capacity:Concrete:32mm,Steel:13mm, Wood:40mm, Include: bit set & BMC BoxItem: Electric Die grinder
UNSPSC: Bench grinder
Specifications / Requirements:
Input power: 400W, Voltage220-240V~50-60Hz No load speed:15000-26000rpm, Collet Size Φ 6mmItem: Electric Cut-off Machine
UNSPSC: Machine guns
Specifications / Requirements:
Input power: 2350W Voltage: 220V-240V~50-60Hz Blade size: Φ 355x25.4x3mm,No-load speed: 3800rpm Max cutting capacity: Φ 100mm in round pipe 100X100mm in square steel 120X100mm in rectangle Max.cutting steel bar: Φ 30mmItem: Electric Arc Welding Machine
UNSPSC: Braze welding machine
Specifications / Requirements:
IGBT inverter technology , Input voltage: 1~220-240V , Frequency: 50/60Hz , Output current: 15-200A , Duty cycle: 200A@60% , LED display No-load voltage: 79V , Max.output current: 200A Diameter of electrode: 1.6-4.0mm , Anti-stick/Hot start/Arc-force ,1 Pcs electrode holder with cable 1 Pcs earth clamp with cable , 1 Pcs wire brush 1 Pcs helmetItem: Rechargeable Cordless LED Work Lamp
UNSPSC: Arc lamp
Specifications / Requirements:
Lumens: Max:300±10% Low:75±10% LED power dissipation:3.5W with charging accessories Using Li-polymer rechargeable battery 3.6 VItem: Rechargeable multifunction emergency flash light ( escape/rescue)
UNSPSC: Flashlight
Specifications / Requirements:
material aluminum alloy , USB charger type C, built in battery 10000 mah, 1km visible range , telescopic zoom, emergency hammer/cutter& lamp, SOS mode, water proof, ABD-2210Item: Electric Cordless Impact Wrench 1/2”
UNSPSC: Adjustable wrenches
Specifications / Requirements:
Brushless motor Voltage:20V, 02Pc-4.0Ah Batteries , Square drive:1/2", No-load speed: 0-1600/0-2100/0- 2400rpm, Fastening torque:850Nm, Nut-Busting torque:1000Nm , Integrated LED work light Box case Include: 3 Pcs deep sockets( Φ22,Φ24,Φ27mm) 1 Pcs belt clip. with charging accessoriesItem: G-Clamp/ C-Clamp
UNSPSC: Arc lamp
Specifications / Requirements:
Size: 6InchItem: Striking /Slogging Ring Spanner:
UNSPSC: Acetabular rings
Specifications / Requirements:
Size: Φ 36mm, Forged, heavy dutyItem: Striking/Slogging Open-end Spanner
UNSPSC: Tap spanner or basin wrench
Specifications / Requirements:
Size Φ 36mm, Forged, heavy dutyItem: Spirit Level
UNSPSC: Spirits or liquors
Specifications / Requirements:
60 cm, Aluminum body, magnetizedItem: L-handle 1/2inch
UNSPSC: Tool handles
Specifications / Requirements:
Length: 15 inch , with Sockets Φ 10 to 32 mm, (CR.V material)Item: Bench vice 6 Inch
UNSPSC: Bench vises
Specifications / Requirements:
with anvil, material ductile cast iron, Max clamping force:1600KGItem: Bench vice 8 Inch
UNSPSC: Bench vises
Specifications / Requirements:
with anvil, material ductile cast iron, Max clamping force: 2500 KGItem: Bench vice 4 Inch
UNSPSC: Bench vises
Specifications / Requirements:
with anvil, material ductile cast iron, Max clamping force: 2500 KGItem: Adjustable Wrench
UNSPSC: Adjustable wrenches
Specifications / Requirements:
Size 10 Inch/250mm having Rubber handle GripItem: Adjustable Wrench
UNSPSC: Adjustable wrenches
Specifications / Requirements:
Size 12 Inch/300mm ,having Rubber handle GripItem: Tools Tray
UNSPSC: Cable tray
Specifications / Requirements:
SS,1ft x1.5 ftItem: Feeler Gauge/Gap gauge (Matric)
UNSPSC: Feeler gauges
Specifications / Requirements:
Blade material: Stainless steel , Blade Length: Approx. 08 inch , Width : 15mm No. of Blades: 17 (0.02m to 1 mm)Item: Snap-off knife
UNSPSC: Dough knife
Specifications / Requirements:
Adjustable Aluminum Alloy/ Steel body with blades setItem: Sludge Hammer
UNSPSC: Sledge hammer
Specifications / Requirements:
with Fiberglass handle 4000g, Length 900mmItem: Stoning Hammer Steel handle
UNSPSC: Striking hammers
Specifications / Requirements:
1000g (Drop forged)Item: Rubber Hammer
UNSPSC: Hammers
Specifications / Requirements:
with Fiberglass handle 450g Industrial standardItem: Outside Micrometer screw gauge
UNSPSC: Micrometers
Specifications / Requirements:
Range: Φ 0-200mm, Least Count : Φ 0.01mm , Material: Carbon steel with metric and inchItem: Tool Bag
UNSPSC: Tool bags
Specifications / Requirements:
16 Inch Length Max. load capacity: 20kg Reinforced plastic baseItem: Measuring Tap 5mx19mm
UNSPSC: Measuring tapes
Specifications / Requirements:
Self lock function, metallic strip with metric and inch marking , Double buttonItem: Gas cutting Torch
UNSPSC: Blow torch
Specifications / Requirements:
Hose Connection:G3/8"-G3/8" LH , Torch Length: 422mm (16.5"), Cutting Capacity: 300mm, Gas Cutting Nozzles: Acetylene, Propane, Gouging Nozzle, Material: Stainless Steel & Brass along with nozzle accessoriesItem: Vanier Caliper 200mm (8inch)
UNSPSC: Calipers
Specifications / Requirements:
Range: Φ 0-200mm, Least Count:0.05mm , Material: Carbon steel with metric and inchItem: Flexible Ratchet spanner (Combination)
UNSPSC: Ring wrench or spanner
Specifications / Requirements:
High quality Cr-Mo Ratchet Size: Φ 8-19mm Φ 8mm, Φ 10mm, Φ 12mm, Φ 13mm, Φ14mm, Φ 15mm, Φ 17 mm, Φ 19mm (12pc set )Item: Feeler Gauge/Gap gauge (Matric)
UNSPSC: Feeler gauges
Specifications / Requirements:
Blade material: Stainless steel , Blade Length: Approx. 12 inch , Width : 25mm No. of Blades: 25Item: Pressure Sprayer
UNSPSC: Sprayers
Specifications / Requirements:
Capacity: 1.5Liter , Aluminum pump lever Pressure:2.5BAR Adjustable nozzle with straight jet and mist sprayItem: Mechanical Screw driver set
UNSPSC: Offset screw driver
Specifications / Requirements:
Material: CR.V , Rod Length: 12inch , Φ 8mm thick with hammer proof compact handleItem: Welding safety helmet
UNSPSC: Helmet parts or accessories
Specifications / Requirements:
Auto Darkening, Viewing Area:90×35mm Cartridge Size: 110×90×9mm Dark State: Variable shade, 9 ~13Item: Air Spray gun for paint
UNSPSC: Spray gun
Specifications / Requirements:
500ml cup capacity, Air vol: 13-15CFM, Air Pressure: 4 Bar , with steel cupItem: Combination Plier
UNSPSC: Combination pliers
Specifications / Requirements:
Size: 8Inch (Cr.V)Item: Long Nose-Plier
UNSPSC: Longnose pliers
Specifications / Requirements:
Size: 8 Inch (Cr.V Industrial standard material)Item: Hydraulic Bearing/Gear Puller
UNSPSC: Hanger bearings
Specifications / Requirements:
Adjustable Universal 3Jaw , Material: Alloy steel Capacity: 15Ton , Spread length Size:12Inch/300 mm with handle and Box case complete setItem: Hand Wood Saw
UNSPSC: Tile hand saw
Specifications / Requirements:
Length: 400mm/ 16-Inch , TPI:07 ,0.9mm ThickItem: Cold Chisel Flat shape
UNSPSC: Cold chisels
Specifications / Requirements:
Material: Carbon steel with solid rubber handle Size: Φ 24mm x 300mmItem: Allen Hex Key Set
UNSPSC: Hex keys
Specifications / Requirements:
9pc set , Extra Long arm, Material: CR.V , Ball point end , Size: Φ 1.5mm to 10mmItem: Oiler Can (Pump oiler)
UNSPSC: Air pumps
Specifications / Requirements:
Material: Carbon steel & Alloy Fluid Capacity: 350ml ,Flexible metal spoutItem: Telescopic ladder
UNSPSC: Ladders
Specifications / Requirements:
Folding & extendable A-shape 10steps 16feet, Material: Aluminum Alloy ,Anti-slippery rubber feetItem: Air Grease Gun/Lubricator
UNSPSC: Grease guns
Specifications / Requirements:
(Pneumatically operated drum type) Capacity: 30L Drum, Working pressure: 6-8Bar, flow: 850g/min, Pressure ratio: 50:1, Inlet and outlet air regulator with a water filtering device, and a 5-meter grease hose,Item: Wheel-barrow
UNSPSC: Grinding wheels
Specifications / Requirements:
Load (kg):130, Water Capacity(L) :65 Wheel:16"X4.00-8 solid Wheel Size: 1400x550x550 mm. Tray with 0.8mm (16 Gauge) thickness and handleItem: Air Blow Gun
UNSPSC: Anaesthetic gun
Specifications / Requirements:
For hose pipe & Dusting, Nozzle length: 16x 80mmItem: Striking /Slogging Ring Spanner
UNSPSC: Ring wrench or spanner
Specifications / Requirements:
Size: Φ 120mm, Length: 18inch Drop-ForgedItem: Drill Press Vice
UNSPSC: Drill press or radial drill
Specifications / Requirements:
For Vertical Drill machine, Size: 6inch opening 360 Degree rotation function , Material: Cast iron with Stainless steel jaws , Heavy dutyItem: Extension Cable Reel (Roll type)
UNSPSC: Electrical box extension
Specifications / Requirements:
single phase Cable Length: 50 Meter , 7/29 full gauge Φ2.5mm2-2 Core & 3500 Watt Load, Metal bodyItem: Hole-saw set Bi-metal Hole saw 12pcs set Size:12pcs hole saw: Φ 19mm, Φ 22mm, Φ 29mm, Φ 32mm, Φ 38mm, Φ 44mm, Φ 51mm, Φ 64mm, Φ 76mm, Φ 89mm, Φ 102mm, Φ 127mm 2pcs Arbors , 1PC Hex key wrench: Φ 2.5mm 1PC Driver plate, Packed in case
UNSPSC: Hole saws
Specifications / Requirements:
Bi-metal Hole saw 12pcs set Size:12pcs hole saw: Φ 19mm, Φ 22mm, Φ 29mm, Φ 32mm, Φ 38mm, Φ 44mm, Φ 51mm, Φ 64mm, Φ 76mm, Φ 89mm, Φ 102mm, Φ 127mm 2pcs Arbors , 1PC Hex key wrench: Φ 2.5mm 1PC Driver plate, Packed in caseItem: HSS Drill bit 25pc set
UNSPSC: Drill bit accessories
Specifications / Requirements:
sizes Φ1-13mm(Metric) in metal box industrial typeItem: Masonry drill bit set For hammering drill machine
UNSPSC: Drill bit accessories
Specifications / Requirements:
Size: Φ6-16mmx180mm long bit setItem: Lath machine Knurling tool
UNSPSC: Automatic lathe or chucking machine
Specifications / Requirements:
With Diamond and straight knurl Wheel head 0.5/1/2mm Pitch and with holder kit (size20x20mm)Item: Boring bar tool set
UNSPSC: Boring tool
Specifications / Requirements:
S12M-SCLCR06 & S12M-SCLCL06 holders (For CNC/Metal lathe machine) with carbide insert bits (CCMT060204x4pc) Φ 8mm, Φ 10mm, Φ 12mm and Φ 16mm x250mm boring bar (Total 4pc set)Item: HSS center drill bit For Lathe machine Material: HSS Size: Φ2mm, Φ3mm, Φ4mm, Φ5mm, Angle 60°
UNSPSC: Automatic lathe or chucking machine
Specifications / Requirements:
Material: HSS Size: Φ2mm, Φ3mm, Φ4mm, Φ5mm, Angle 60°Item: Tungsten Carbide brazed tip 06 pc set for Lath tool
UNSPSC: Automatic lathe or chucking machine
Specifications / Requirements:
(Grade YG6/K20, shape A2, A4, C1,B, E)Item: Tungsten Carbide brazed tipped cutter tools For metal lathe machine 10pc set, Size: 20x20x200mm (Including boring, turning, threading, chamfering, boring and parting tools etc)
UNSPSC: Automatic lathe or chucking machine
Specifications / Requirements:
10pc set, Size: 20x20x200mm (Including boring, turning, threading, chamfering, boring and parting tools etc)Item: Pipe revolving bull nose center For lath machine
UNSPSC: Automatic lathe or chucking machine
Specifications / Requirements:
70 degree and Shank taper (Size: MT3 Φ 106mm Dia)Item: Walkie-talkie Rechargeable 02pc set,
UNSPSC: Wireless communication service
Specifications / Requirements:
Frequency Range: 450-470MHz , Storage Channel:16, Talk Range: 4KM Operating Temperature Range: -30 °C to + 60°C Battery Capacity: 2000mAh Li-ion Battery With Charging Accessories (Motorola MT-918 or Baofeng 888s equivalent)Item: Webbing round rope sling
UNSPSC: Slings
Specifications / Requirements:
Material: Nylon/Polyester round sling with two ply woven heavy sleeve Load Capacity: 03 Ton WLL, Length:16feetItem: Webbing round rope sling
UNSPSC: Slings
Specifications / Requirements:
Material: Nylon/Polyester round sling with two ply woven heavy sleeve Load Capacity: 05 Ton WLL, Length:16feetItem: Webbing round rope sling
UNSPSC: Slings
Specifications / Requirements:
Material: Nylon/Polyester round sling with two ply woven heavy sleeve Load Capacity: 15 Ton WLL, Length:30feetItem: Steel wire rope sling
UNSPSC: Slings
Specifications / Requirements:
Load capacity: 15 Ton WLL, Size:30feetItem: D-shackle
UNSPSC: Hoisting and lifting equipment spare parts and accessories
Specifications / Requirements:
Bow shape-Screw pin Size: Φ 3/4 -05 Ton WLLItem: D-shackle
UNSPSC: Hoisting and lifting equipment spare parts and accessories
Specifications / Requirements:
Bow shape-Screw pin Size:5/8- 03 Ton WLLItem: Chain block/Hoist
UNSPSC: Hoisting and lifting equipment spare parts and accessories
Specifications / Requirements:
Load Capacity: 10Ton double long chain Length: 6meter lift height ,Material: Galvanized Carbon Steel with Double-Pawl Brake, Auto Chain Leading & 360° Rotation HookItem: Lever Chain Hoist (Come Along) Rating lifting weight:6 Ton, Lifting height:1.5 m Strands of load chain:2, Minimum distance between two hooks:600 mm Pulling force at full load:340 N Packed by wooden case
UNSPSC: Hoisting and lifting equipment spare parts and accessories
Specifications / Requirements:
(Come Along) Rating lifting weight:6 Ton, Lifting height:1.5 m Strands of load chain:2, Minimum distance between two hooks:600 mm Pulling force at full load:340 N Packed by wooden caseItem: Hydraulic bottle Jack
UNSPSC: Jacks
Specifications / Requirements:
Load Lifting Capacity: 50Ton, With safety valve Min. height: 280mm Max. height:470mm Travel:200mmItem: Eye Bolt
UNSPSC: Hoisting and lifting equipment spare parts and accessories
Specifications / Requirements:
Size: M16x 2.0 mm thread Capacity 740kg Load lifting Material: Zinc plated ,SS 304Item: Eye Bolt
UNSPSC: Hoisting and lifting equipment spare parts and accessories
Specifications / Requirements:
Size: M12x 1.75 mm thread Capacity 340kg Load lifting Material: Zinc plated, SS304Item: Bourdon tube pressure gauge
UNSPSC: Pressure gauge
Specifications / Requirements:
range:0-250 bar, analog dial 3 inch, ss body , for hose pipe thread 19G (TPI)Lot Title : Lot-II Mechanical Consumable items (B)
Item: Anti-Rust Spray
UNSPSC: Anti spatter spray
Specifications / Requirements:
WD-40 440mlItem: Silicon Sealant 310ml tube
UNSPSC: Aluminum bolted tube assemblies
Specifications / Requirements:
GMSAItem: Teflon Tape
UNSPSC: Teflon coating service
Specifications / Requirements:
teflon tapeItem: Emery Paper
UNSPSC: Emery
Specifications / Requirements:
Sand paper size 1, size 2,size 3, (25 Nos of each)Item: Metal cutting Abrasive Disc
UNSPSC: Cutting disc
Specifications / Requirements:
size: Φ 4” ( Φ 105x3.2x16mm)Item: Metal Grinding Abrasive Disc
UNSPSC: Grinding machines
Specifications / Requirements:
size: Φ 4” ( Φ 110x6.4x16mm)Item: Metal Cutting Disc
UNSPSC: Cutting disc
Specifications / Requirements:
size: Φ 12” ( Φ 300x3.2x25.4mm)Item: Metal Cutting Disc
UNSPSC: Cutting disc
Specifications / Requirements:
size: Φ 14” ( Φ 355x3.2x25.4mm)Item: Buffer Disc/Flap Disc
UNSPSC: Grinding machines
Specifications / Requirements:
Size: Φ 4”( Φ 100mm-Grit A80) Material: Aluminum oxideItem: Snap-off cutter blades set
UNSPSC: Grinding machines
Specifications / Requirements:
size: 10pc-Box Size: 18x100x 0.5mmItem: Hack saw Blades double sided
UNSPSC: Saw blades
Specifications / Requirements:
For metal cutting size: 300mmx24mmItem: Wire Brush
UNSPSC: Wire brushes
Specifications / Requirements:
Plastic Handle (Size 9Inch/ 250mm) Crimped brass-steel wireItem: Crimped brass-steel wire cup brush
UNSPSC: Wire brushes
Specifications / Requirements:
for Angle grinder Size: Φ 4 InchItem: Tungsten carbide double cut rotary burr set
UNSPSC: Tungsten carbide
Specifications / Requirements:
for Die grinder Shank size Φ 5mm & head size Φ12 mm 5pc set for metal workItem: Flexible Hose Pipe
UNSPSC: Subsea flexible pipe or pipeline
Specifications / Requirements:
Garden water pipe, Size: Φ 3/4" Thickness:3.0mm Pure plastic transparent color seamlessItem: T-bolt hose clamp
UNSPSC: T bolt
Specifications / Requirements:
Material: stainless steel Sizes: Φ 2”,2.5”,3”and 4” ( 10 Nos each required)Item: Hose clamp
UNSPSC: Hose or pipe clamps
Specifications / Requirements:
Material: stainless steel, Size: Φ 1”, 1.5”, 2”, 2.5”, 3” and 4” (10 No. Each size required)Item: Samad bond glue
UNSPSC: Glues
Specifications / Requirements:
Size: 40gTubes (10pc pack/box)Item: Super glue
UNSPSC: Glues
Specifications / Requirements:
Size: 20ml GMSAItem: G-wire
UNSPSC: Insulated winding wire
Specifications / Requirements:
Size 2.5 mm /3.5 mmItem: Welding gloves
UNSPSC: Anti cut gloves
Specifications / Requirements:
Leather material, Size: 16 InchItem: Safety Goggles
UNSPSC: Goggles
Specifications / Requirements:
Industrial standard qualityItem: Safety Face Shield
UNSPSC: Personal safety alert
Specifications / Requirements:
Headgear with adjustable knobs (Industrial standard) size: 12-14 Inch high-qualityItem: Safety Gum Rubber long Boots
UNSPSC: Safety boots
Specifications / Requirements:
With metal toe and anti-slip , Size:42Item: Safety Gum Rubber long Boots
UNSPSC: Safety boots
Specifications / Requirements:
With metal toe and anti-slip, Size:43Item: Safety Gloves
UNSPSC: Gloves or mittens
Specifications / Requirements:
Nitrile coated Size: 9InchItem: Reflection vest
UNSPSC: Yellow jacket allergenic extracts
Specifications / Requirements:
Color: Neon Color/Yellow Conforms to EN471 class 2(safety class) Material:100% polyester, Visibility Strip size: 5cm, Size: L/XLItem: Umbrella
UNSPSC: Umbrellas
Specifications / Requirements:
Type: Portable , Strong Umbrella Pole Flexible Umbrella Ribs , Color: blue/black Ribs: 8 Ribs , Size of Open Umbrella: 55 inches/ 139.7 Cm Frame: Fiber RibsItem: Rain-suit
UNSPSC: Waterproof jacket or raincoat
Specifications / Requirements:
• Size: XL ,100% New PVC , Waterproof with breather holes, Two down pockets with flap • With a reflective strip at the backItem: Tool vast Jacket
UNSPSC: Workshop machine tools accessories
Specifications / Requirements:
Size: 42x60x3cm , Load capacity: 3kg • Adjustable shoulder straps and waist size , Air mesh material , Multiple-use compartments for all storage needs , With 7 pocketsItem: Rechargeable Battery cell
UNSPSC: Rechargeable batteries
Specifications / Requirements:
Material & Type: (Ni-MH) AA 1800mAh 3.7VoltItem: Pure PTFE Gland packing
UNSPSC: Fluoropolymers PTFE
Specifications / Requirements:
Lubricated with oil (Glandori) size: 12x12 mm (as per Sample)Item: Pure PTFE Gland packing
UNSPSC: Fluoropolymers PTFE
Specifications / Requirements:
Lubricated with oil (Glandori) Size Φ 14x14 mm (as per Sample)Item: Refrigerant gas
UNSPSC: Refrigerant
Specifications / Requirements:
Type R134A Brand: Us/HoneywellItem: Refrigeration compressor oil
UNSPSC: Refrigerant compressors
Specifications / Requirements:
Type: SL 100 Suniso compatible with R134aItem: O ring Cord
UNSPSC: Acrylonitrile butadiene NBR
Specifications / Requirements:
Size: Φ 8 mm diameter, Material: NBR-70Item: O ring Cord
UNSPSC: Acrylonitrile butadiene NBR
Specifications / Requirements:
Size: Φ 6 mm diameter, Material: NBR-70Item: O ring Cord
UNSPSC: Acrylonitrile butadiene NBR
Specifications / Requirements:
Size: Φ 5 mm diameter, Material: NBR-70Item: O ring Cord
UNSPSC: Acrylonitrile butadiene NBR
Specifications / Requirements:
Size: Φ 4 mm diameter, Material: NBR-70Item: Rubber Coupling buffer rings
UNSPSC: Acrylonitrile butadiene NBR
Specifications / Requirements:
Size: Φ18x35 mm , NBR, profile as per SampleItem: Asbestos Gasket sheet
UNSPSC: Asbestos sheet
Specifications / Requirements:
Thickness 1.5 mm , 4x4 ft, Medium: High Pressure air and oilItem: Rubber Gasket Sheet (NBR-80)
UNSPSC: General gasket
Specifications / Requirements:
Size: 4x4 feet, Thickness: 6, 5,4,3,2 & 1.5mmItem: PTFE/Teflon Gaskets hard sheet
UNSPSC: General gasket
Specifications / Requirements:
Material: PTFE/, Size 2x4 feet, Thickness 2mmItem: O-ring rubber Kit
UNSPSC: Actuator kit
Specifications / Requirements:
Sizes: Φ 30sizes 382pcs BoxItem: Oil Seal
UNSPSC: Oil seals
Specifications / Requirements:
Size: TC 85-115-12Item: Oil Seal
UNSPSC: Oil seals
Specifications / Requirements:
Size: TC 20-40-10Item: Oil Seal
UNSPSC: Oil seals
Specifications / Requirements:
Size: TC 30-50-10Item: Oil Seal
UNSPSC: Oil seals
Specifications / Requirements:
Size: TC 30-50-07Item: Hydraulic Seal
UNSPSC: Hydraulic setting tools
Specifications / Requirements:
Size: UN 20-32-6, PU materialItem: Hydraulic seal
UNSPSC: Hydraulic setting tools
Specifications / Requirements:
Size: IDU 32-40-10, PU materialItem: Hydraulic Seal
UNSPSC: Hydraulic setting tools
Specifications / Requirements:
Size: IDU 85-97-14, PU materialItem: Hydraulic Seal
UNSPSC: Hydraulic setting tools
Specifications / Requirements:
Size: IDU 80-92-14, PU materialItem: Hydraulic Seal
UNSPSC: Hydraulic setting tools
Specifications / Requirements:
Size: IDU 22-28-8, PU materialItem: Water Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: TC 45-70-12Item: Water Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: TC 50-72-12Item: Water Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: TC 50-72-10Item: Water Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: TC 45-72-8Item: Water Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: TC 50-70-10Item: Water Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: VS60-S V-ring, NBR-80Item: Oil Seal
UNSPSC: Oil seals
Specifications / Requirements:
Size: UN 110-125-12Item: Mechanical Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: TS-8-25Item: Mechanical Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
TS-08-25 (as per sample) Size: MGI-25(G60 STA) CA/CE/NBRItem: Mechanical Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
Size: TS-80Item: Mechanical Seal
UNSPSC: Mechanical seals
Specifications / Requirements:
TS-09 (as per sample) Size: 56 LTMSO TC-SC-C-SSItem: Coupling Pads
UNSPSC: Couplers
Specifications / Requirements:
ID 57mm, OD:110mm, Width 24mm, 6 no. of teeth, NBR-80Lot Title : Lot-III Mechanical Spare Parts (C)
Item: Hex bolt
UNSPSC: Bolt nut
Specifications / Requirements:
Half-thread, Size: M10x1.5x100mm , SS 304, Grade 8.8 (Forged)Item: Stud Double-end
UNSPSC: Ball stud
Specifications / Requirements:
M12x1.75x55 mm, SS 304, Grade 8.8 Material ,with nuts 19mm (s.s Hexagonal )Item: Coupling Bolt ,
UNSPSC: Blank bolt
Specifications / Requirements:
Size: Head Φ32mm, Bolt length: Φ110mm, Taper size D= Φ24mm d= Φ21mm, L=20mm Thread= Φ16mm thread length=23mm Thread (metric)=2mm with nut and spring washer. Half threaded , Material& dimension as per sampleItem: MS sheet
UNSPSC: Sheet bags
Specifications / Requirements:
, Size:4x4 feet , Thickness :12mmItem: MS sheet
UNSPSC: Sheet bags
Specifications / Requirements:
Size:2x2 feet , Thickness :18mmItem: Deep Groove Ball Bearing
UNSPSC: Ball bearings
Specifications / Requirements:
Size: 6307 zz , type : Double metal shielded ntnItem: Deep Groove Ball Bearing
UNSPSC: Ball bearings
Specifications / Requirements:
Size: 6309 zz , type: Double metal shielded ntnItem: MS Round Bar
UNSPSC: Round bar stock
Specifications / Requirements:
Size: Φ 52 mm, length 31 inchItem: MS Round Bar
UNSPSC: Round bar stock
Specifications / Requirements:
Size: Φ 42 mm, length: 25 inchItem: MS Hollow Round bar
UNSPSC: Round bar stock
Specifications / Requirements:
Size: OD: Φ 65 mm ID: Φ 48 mm, length 10 inch, seamlessItem: MS Hollow Round bar
UNSPSC: Round bar stock
Specifications / Requirements:
Size: OD: Φ 55 mm ID: Φ 38 mm, length 08 inch, seamlessItem: MS Hollow Round bar
UNSPSC: Round bar stock
Specifications / Requirements:
Size: OD: Φ 63 mm ID: Φ 43 mm, length 07 inch, seamlessItem: MS Hollow Round bar
UNSPSC: Round bar stock
Specifications / Requirements:
Size: OD: Φ 52 mm ID: Φ 33 mm, length: 06 inch, seamlessItem: Bush
UNSPSC: Electrical bushing
Specifications / Requirements:
Size: OD: Φ 95 mm ID: Φ 59 mm, length: 83mm, seamless gunmetal ( Non sand casted)Item: Bush
UNSPSC: Electrical bushing
Specifications / Requirements:
Size: OD: Φ 83 mm ID: Φ 48 mm, length: 58 mm, seamless gunmetal (Non sand casted)Item: Hexagonal Bolt,
UNSPSC: Bolt nut
Specifications / Requirements:
M16x2.0x95 mm, SS304 Half ThreadItem: Hexagonal Bolt
UNSPSC: Bolt nut
Specifications / Requirements:
M16x2.0x80 mm, SS304, Half ThreadItem: Wear Ring
UNSPSC: Brass bonded pipe assemblies
Specifications / Requirements:
OD:197mm, ID 172mm, width 20mm BrassItem: Wear Ring
UNSPSC: Brass bonded pipe assemblies
Specifications / Requirements:
OD:210mm, ID 192mm, width 24mmBrassItem: Stud, Double Ended
UNSPSC: Ball stud
Specifications / Requirements:
M16x2.0x55 mm, with 24mm Hexagonal nuts, SS 304Item: Ball Valve
UNSPSC: Ball valves
Specifications / Requirements:
Brass body, ½ inchItem: Ball Valve
UNSPSC: Ball valves
Specifications / Requirements:
, ½ NPT, 304 SS, PTFE Seat, 8 Mpa, end fittings as per sampleItem: Gate Valve
UNSPSC: Gate valves
Specifications / Requirements:
DN 15mm, PN16, Medium: turbine Oil, 121W XH, Ends having External ThreadsItem: Gate Valve
UNSPSC: Gate valves
Specifications / Requirements:
DN 20 mm, 160P, J13W, Medium: turbine Oil, Ends having internal Threads (as per Sample)For Individual Items
| # | Item Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
2.1 These General Conditions shall apply to the extent that they are not superseded by provisions of other parts of the Contract.
2.2 In interpreting these Conditions of Contract headings and marginal notes are used for convenience only and shall not affect their interpretations unless specifically stated; references to singular include the plural and vice versa; and masculine include the feminine. Words have their ordinary meaning under the language of the Contract unless specifically defined.
3.1 The contract shall be governed and interpreted in accordance with the laws of Pakistan, unless otherwise specified in SCC.
4.1 The Contract as well as all correspondence and documents relating to the Contract exchanged between the Bidder and the Procuring Agency, shall be written in the English language unless otherwise stated in the SCC. Supporting documents and printed literature that are part of the Contract may be in another language provided these are accompanied by an accurate translation of the relevant passages in English, in which case, for purposes of interpretation of the Contract, this translation shall govern.
5.1 Any notice, request, or consent made pursuant to this Contract shall be in writing and shall be deemed to have been made when delivered in person to an authorized representative of the Party to whom the communication is addressed, or when sent by registered mail, telex, telegram, or facsimile to such Party at the address specified in the SCC.
6. Delivery/Location
6.1 The Goods shall be delivered to such locations as the Procuring Agency may approve and as specified in SCC.
7. Authorized Representatives / Authority of Member in charge
7.1 Any action required or permitted to be taken, and any document required or permitted to be executed, under this Contract by the Procuring Agency or the Bidder may be taken or executed by the officials specified in the SCC.
8.1 This Contract shall come into effect on the date the Contract is signed by both parties and such other later date as may be stated in the SCC.
9.1 The Bidder shall confirm availability of Key Experts and begin carrying out the Services not later than the number of days after the Effective Date specified in the SCC.
10.1 Before commencement of the Services, the Bidder shall submit to the Procuring Agency for approval a Program showing the general methods, arrangements, order and timing for all activities. The Services shall be carried out in accordance with the approved Program as updated.
11.1 The Bidder shall start carrying out the Services Five (05) days after the date the Contract becomes effective, or at such other date as may be specified in the SCC.
11.2 Unless terminated earlier pursuant to Clause GCC 15 hereof, this Contract shall expire at the end of such time period after the Effective Date as specified in the SCC.
12.1 This Contract contains all covenants, stipulations and provisions agreed by the Parties. No agent or representative of either Party has authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein.
13.1 Any modification or variation of the terms and conditions of this Contract, including any modification or variation of the scope of the Services, may only be made by written agreement between the Parties. However, each Party shall give due consideration to any Bids for modification or variation made by the other Party.
13.2 In cases of any modifications or variations, the prior written consent of the Procuring Agency is required.
14.1 Definition
For the purposes of this Contract, “Force Majeure” means an event which is beyond the reasonable control of a Party and which makes a Party’s performance of its obligations under the Contract impossible or so impractical as to be considered impossible under the circumstances.
14.2 No Breach of Contract
The failure of a Party to fulfill any of its obligations under the contract shall not be considered to be a breach of, or default under, this Contract in so far as such inability arises from an event of Force Majeure, provided that the Party affected by such an event (a) has taken all reasonable precautions, due care and reasonable alternative measures in order to carry out the terms and conditions of this Contract, and (b) has informed the other Party as soon as possible about the occurrence of such an event.
14.3 Extension of Time
Any period within which a Party shall, pursuant to this Contract, complete any action or task, shall be extended for a period equal to the time during which such Party was unable to perform such action as a result of Force Majeure.
14.4 Payments
During the period of their inability to perform the Services as a result of an event of Force Majeure, the Bidder shall be entitled to continue to be paid under the terms of this Contract, as well as to be reimbursed for additional costs reasonably and necessarily incurred by them during such period for the purposes of the Services and in reactivating the Service after the end of such period.
15.1 By the Procuring Agency
The Procuring Agency may terminate this Contract in case of the occurrence of any of the events specified in paragraphs (a) through (e) of this Clause. In such an occurrence the Procuring Agency shall give at least thirty (30) calendar days’ written notice of termination to the Bidder in case of the events referred to in (a) through (d); at least sixty (60) calendar days’ written notice in case of the event referred to in (e);
15.2 By the Bidder
The Bidder may terminate this Contract, by not less than thirty (30) calendar days’ written notice to the Procuring Agency, in case of the occurrence of any of the events specified in paragraphs (a) through (d) of this Clause.
16.1 Standard of Performance
16.2 Law Applicable to Goods
The Bidder shall deliver the goods in accordance with the Contract and in accordance with the Law of Pakistan and shall take all practicable steps to ensure that any of its Experts and Sub-Bidders, comply with the Applicable Law.
17.1 Bidder Not to Benefit from Commissions and Discounts.
The remuneration of the Bidder shall constitute the Bidder’s sole remuneration in connection with this Contract or the Services, and the Bidder shall not accept for their own benefit any trade commission, discount, or similar payment in connection with activities pursuant to this Contract or to the Services or in the discharge of their obligations under the Contract, and the Bidder shall use their best efforts to ensure that the Personnel, any Subcontractors, and agents of either of them similarly shall not receive any such additional remuneration.
17.2 Bidder and Affiliates Not to be Otherwise Interested in Project
The Bidder agree that, during the term of this Contract and after its termination, the Bidder and its affiliates, as well as any Subcontractor and any of its affiliates, shall be disqualified from providing Goods for any project resulting from or closely related to the Services.
17.3 Prohibition of Conflicting Activities
Neither the Bidder nor its Subcontractors nor the Personnel shall engage, either directly or indirectly, in any of the following activities:
18.1 Except with the prior written consent of the Procuring Agency, the Bidder and the Experts shall not at any time communicate to any person or entity any confidential information acquired in the course of the contract.
19.1 The Bidder(a) shall take out and maintain, and shall cause any Subcontractors to take out and maintain, at its (or the Subcontractors’, as the case may be) own cost but on terms and conditions approved by the Procuring Agency, insurance against the risks, loss or damage, and for the coverage, as shall be specified in the SCC; and (b) at the Procuring Agency’s request, shall provide evidence to the Procuring Agency showing that such insurance has been taken out and maintained and that the current premiums have been paid.
20.1 The Bidder shall obtain the Procuring Agency’s prior approval in writing before taking any of the following actions:
(a) appointing such members of the Personnel not provided by the Bidder;
(b) changing the Program of activities; and
(c) any other action that may be specified in the SCC.
21.1 The Bidder shall submit to the Procuring Agency the reports and documents in the numbers, and within the periods as prescribed by the Procuring Agency.
22.1 If the Supplier fails to deliver any or all of the Goods or to perform the Services within the period(s) specified in the Contract, the Procuring Agency shall, without prejudice to its other remedies under the Contract, deduct from the Contract Price, as liquidated damages, a sum equivalent to the percentage specified in SCC of the delivered price of the delayed Goods or unperformed Services for each week or part thereof of delay until actual delivery or performance, up to a maximum deduction of the performance security (or guarantee) specified in SCC. Once the said maximum is reached, the Procuring Agency may consider termination of the Contract pursuant to GCC Clause 15.
22.2 Correction for Over-payment
If the Intended Completion Date is extended after liquidated damages have been paid, the Procuring Agency shall correct any overpayment of liquidated damages by the Bidder by adjusting the next payment certificate. The Bidder shall be paid interest on the overpayment, calculated from the date of payment to the date of repayment, at the rates specified in SCC.
22.3 Lack of performance penalty
If the Bidder has not corrected a Defect within the time specified in the Procuring Agency’s notice, a penalty for Lack of performance will be paid by the Bidder. The amount to be paid will be calculated as a percentage of the cost of having the Defect corrected, assessed as specified in the SCC.
23.1 Within Seven (07) days from the issuance of acceptance letter from the Procuring Agency, the successful Bidder shall furnish the Performance Guarantee in shape of ------- at the discretion of the PA in the amount specified in SCC. In case the amount of Bids security is equal or greater than
23.2 The proceeds of the Performance Guarantee shall be payable to the Procuring agency as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract.
23.3 The Performance Guarantee shall be denominated in the currency of the Contract, or in a freely convertible currency acceptable to the Procuring agency and shall be in the acceptable form as specified in SCC.
23.4 The Performance Guarantee will be discharged by the Procuring agency and returned to the Supplier not later than thirty (30) days following the date of completion of the Supplier’s performance obligations under the Contract, including any warranty obligations, unless otherwise specified in SCC.
24.1 The Procuring Agency requires the Supplier to disclose any commissions or fees that may have been paid or are to be paid to agents or any other party with respect to the Bidding process or execution of the Contract. The information disclosed must include at least the name and address of the agent or other party, the amount and currency, and the purpose of the commission, gratuity or fee.
25.1 The Bidder shall conform to the sustainable procurement contractual provisions, if and as specified in the SCC.
26.1 The titles, agreed job descriptions, minimum qualifications, and estimated periods of engagement in the carrying out of the Services of the Bidder’s Key Personnel. The Key Personnel listed by title as well as by name are hereby approved by the Procuring Agency.
27.1 Except as the Procuring Agency may otherwise agree, no changes shall be made in the Key Personnel. If, for any reason beyond the reasonable control of the Bidder, it becomes necessary to replace any of the Key Personnel, the Bidder shall provide as a replacement a person of equivalent or better qualifications.
27.2 If the Procuring Agency finds that any of the Personnel have (i) committed serious misconduct or have been charged with having committed a criminal action, or (ii) have reasonable cause to be dissatisfied with the performance of any of the Personnel, then the Bidder shall, at the Procuring Agency’s written request specifying the grounds thereof, provide as a replacement a person with qualifications and experience acceptable to the Procuring Agency.
27.3 The Bidder shall have no claim for additional costs arising out of or incidental to any removal and/or replacement of Personnel.
28.1 The Procuring Agency shall use its best efforts to ensure that the Government shall provide the Bidder such assistance and exemptions as specified in the SCC.
29.1 If, after the date of this Contract, there is any change in the Applicable Law with respect to taxes and duties which increases or decreases the cost of the related Services rendered by the Bidder, then the remuneration and reimbursable expenses otherwise payable to the Bidder under this Contract shall be increased or decreased accordingly by agreement between the Parties, and corresponding adjustments shall be made to the amounts referred in the SCC.
30.1 The Procuring Agency shall make available to the Bidder and the Experts, for the purposes of the Services and free of any charge, the services, facilities and property described , at the times and in the manner specified in the SCC or terms of reference.
30.2 In case that such services, facilities and property shall not be made available to the Bidder, the Parties shall agree on (i) any time extension that it may be appropriate to grant to the Bidder for the performance of the Services, (ii) the manner in which the Bidder shall procure any such services, facilities and property from other sources, and (iii) the additional payments, if any, to be made to the Bidder as a result thereof.
31.1 The price payable shall be in Pakistani Rupees unless otherwise specified in the SCC. Prices charged by the Supplier for Goods delivered under the Contract shall not vary from the prices quoted by the Supplier in its Bid.
32.1 Payments will be made to the Bidder according to the payment schedule stated in the SCC and as per actual invoice submitted by the Bidder.
32.2 Unless otherwise stated in the SCC, the advance payment shall be made against the provision by the Bidder of a bank guarantee for the same amount, and shall be valid for the period stated in the SCC. Any other payment shall be made after the conditions listed in the SCC for such payment have been met, and the Bidder have submitted an invoice to the Procuring Agency specifying the amount due.
33.1 Any payment under this Contract shall be made in the currency(ies) specified in the SCC.
34.1 The principle and modalities of Inspection of the Goods by the Procuring Agency shall be as indicated in the SCC. The Procuring Agency shall check the Bidder’s performance and notify him of any Defects that are found. Such checking shall not affect the Bidder’s responsibilities. The Procuring Agency may instruct the Bidder to search for a Defect and to uncover and test any service that the Procuring Agency considers may have a Defect. Defect Liability Period is as defined in the SCC.
Lack of Performance Penalty
35.1 The Procuring Agency shall give notice to the Bidder of any Defects before the end of the Contract. The Defects liability period shall be extended for as long as Defects remain to be corrected.
35.2 Every time notice a Defect is given, the Bidder shall correct the notified Defect within the length of time specified by the Procuring Agency’s notice.
35.3 If the Bidder has not corrected a Defect within the time specified in the Procuring Agency’s notice, the Procuring Agency will assess the cost of having the Defect corrected, the Bidder will pay this amount, and a Penalty for Lack of Performance.
36.1 A Supplier shall be entirely responsible for all taxes, duties, fees, etc., incurred until delivery of the contracted Goods to the Procuring Agency.
37.1 The disputes between the parties to the contract may be settled in accordance with Public Procurement Rules, 2004.
37.2 The procuring agency shall refer the matter to the Chief Justice Islamabad High Court or Managing Director PPRA or the Secretary Ministry of Law & Justice for appointment of Arbitrator.
37.3 The fee for the Arbitrator shall be specified in Pak Rupees as determined by the appointing authority which shall be borne and shared equally by the contracting parties.
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
|
Number of GC Clause |
Amendments of, and Supplements to, Clauses in the General Conditions of Contract |
|
GCC 1 |
Definitions The Procuring Agency is: Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA), Resident Engineer o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province). The Supplier is: The title of the subject procurement is: PROCUREMENT OF MECHANICAL EQUIPMENTS ,T&P, SPARE PARTS & CONSUMEABLE ITEMS ON FCS BASIS |
|
GCC 3 |
Applicable/Governing Law: The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan |
|
GCC 4 |
Language: The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English. |
|
GCC 5 |
Notices: The addresses for the notices are: Procuring Agency: Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA), Resident Engineer Contractor/ Bidder: [Name, address and telephone number]. The Contractor/ Bidder’s Representative(s) [Name, address, telephone number and e-mail address]
|
|
GCC 7.1 |
The Authorized Representatives are:
For the Procuring Agency: Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA), Resident Engineer For the Bidder: Name: ……………………… Designation: …………….. Address: ……………………………..
|
|
GCC 8 |
Effectiveness of the contract |
|
GCC 9 |
Commencement of Contract: |
|
GCC 11.2 |
Expiration of Contract: |
|
GCC 15 |
Termination In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements. |
|
GCC 17 |
Conflict of Interest: The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17. |
|
GCC 22 |
Liquidated Damages If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.20% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority. |
|
GCC 23 |
Performance Guarantee: The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft |
|
GCC 32 |
Payment terms: Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract. |
|
GCC 33 |
Currency of Payment: All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees. |
|
GCC 34 |
Identifying Defects: The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided. Inspections & Tests RequirementsInspection of the material will be carried out at site in presence of our nominated inspection committee. The decision of the inspector shall be binding on contractor. Delivery & DocumentsCopies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount; Manufacturer’s or Supplier’s Valid Warranty Certificate; -Delivery Challan -Annex-C -Non- Payment Certificate |
|
GCC 37
|
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder. Rules of procedure for arbitration proceedings: Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator. Place of Arbitration and Award: The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties. |
Date: [insert date (as day, month and year)]
Bid No.:P9545
To: Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA), Resident Engineer o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA), Resident Engineer o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., PROCUREMENT OF MECHANICAL EQUIPMENTS ,T&P, SPARE PARTS & CONSUMEABLE ITEMS ON FCS BASIS (P9545) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Khan Khwar Hydel Power Station, Besham (General Manager Finance (Power) WAPDA), Resident Engineer o/o Resident Engineer, Khan Khwar Power Station, WAPDA, Besham, Shangla (District), Malakand Division (Division), Khyber Pakhtunkhwa (KP) (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}