In terms of Rule 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Â
Â
Engineering Development Board EDB (MoI&P), DM
EDB Complex Building 5-A Constitution Avenue Islamabad
+92-519-201726
aslam@edb.gov.pk
Sections of Prequalifica¬tion Documents
The following specific data for the Prequalification of Applicants shall complement, supplement, or amend the provisions in the Instructions to Applicants (ITA). Whenever there is a conflict, the provisions herein shall prevail over those in ITA.
PDS Clause No
ITA No
Amendments of, and Supplements to, Clauses in the Instructions to Applicants
PDS Clause No 1
ITA No 1.1
Identification Number of the Invitation for Prequalification: P41159
The Procuring Agency is: Engineering Development Board EDB (MoI&P)
List of Contracts:
See section items and Lots
PDS Clause No 2
ITA No 2.1
The name of Procuring Agency is: Engineering Development Board EDB (MoI&P)
The name of Project / Procurement is: EXPRESSION OF INTEREST (EOI) Pre-Qualification of all Electric Vehicle (EV) 3-Wheelers Original Equipment Manufacturers (OEMs) /Assemblers for PAVE Phase-II & Subsequent Phases.
PDS Clause No 3
ITA No 4.2
Maximum number of members in a Joint Venture (JV): Nil
PDS Clause No 4
ITA No 4.5
A list of debarred firms and individuals is available on PPRA website:https://ppra.gov.pk
PDS Clause No 5
ITA No 7.1
For clarification, the Applicant shall seek clarifications through: EPADS v2.0
PDS Clause No 6
ITA No 7.1 & 8.2
Information related to Prequalification shall be published on: EPADS v2.0
PDS Clause No 7
ITA No 7.2
Pre-Application Meeting: Clarification Date: Wednesday, June 3, 2026
Pre-Bid Meeting: Monday, June 1, 2026 11:00 AM
Venue: EDB Complex Building 5-A Constitution Avenue Islamabad
PDS Clause No 8
ITA No 10.1
This Prequalification Document has been issued in the language: English
PDS Clause No 9
ITA No 11.1(d)
Additional documents to be submitted through EPADS v2.0:
PDS Clause No 10
ITA No 14.2
Source for determining exchange rates: Not Applicable
PDS Clause No 11
ITA No 16.1
Deadline for Application Submission:
Day: Tuesday
Date: Tuesday, June 9, 2026
Time: 02:00 PM
PDS Clause No 12
ITA No 17.1
Opening of Applications shall be conducted through: EPADS v2.0
Day: Thursday
Date: Thursday, July 9, 2026
Time: 02:30 PM
Virtual participation link: https://vendors.epads.gov.pk/
PDS Clause No 13
ITA No 21.1
Margin of Domestic Preference: Not Applicable
(Applicable only if authorized in Procurement Plan)
PDS Clause No 14
ITA No 29.1
Prequalification-related complaints / grievances shall be submitted in writing through: EPADS v2.0
A complaint may challenge:
| Bidder's Type | Required Registration |
|---|---|
|
Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) |
FBR (NTN) FBR (GSTN) |
| Eligibility Criteria | Document |
|---|---|
| Company Profile, | Yes |
| NTN Certificate, | Yes |
| GST Certificate, | Yes |
| EDB License , | Yes |
| PSQCA License , | Yes |
| Product Brochures , | Yes |
| Compliance Sheet , | Yes |
| Experience Evidence , | Yes |
| Financial Reports , | Yes |
| Bank Statements , | Yes |
| Warranty Details , | Yes |
| After-Sales Setup, EV 3 Wheelers, Pictures, Models, Specifications. Any other documents as specified in Annex-A , | Yes |
| The bid Submission fee: Pay Order/Bank Draft/Demand Draft of Rs. 5,000 will be paid in favor of Drawing & Disbursement Officer (DDO), EDB and the same will uploaded on PPRA E-Pads as well as submitted in hard form at Drawing & Disbursement Officer (DDO), EDB, office before closing date and time. , | Yes |
Quality Based Selection (QBS)
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Technical Evaluation Criteria | ||
| Confirmation of Localization as per Annex-D (Quantitative)(Doc Required) | 20 | |
| Valid EDB and PSQCA (Quantitative)(Doc Required) | 5 | |
| Technical Specifications Battery (05 Marks)  Type: Lithium Iron Phosphate (LiFePO₄)  Voltage: Minimum 60 V  Warranty: Minimum 3 years or 40,000 km (whichever occurs first)  State-of-Health: Shall not fall below 80 % during the warranty period; replacement required if below the threshold.  Labelling: Battery shall display UID Number, Type, Chemistry, Rating (Ah/Wh), Cycle Life, Temperature Range, Form Factor and Number of Cells.  Testing Certificates: (05 Marks)  Acceptable pack standards: UL 2271 / GB 38031-2020 /ISO 12405-1:2011 /ISO 6469-1.  Mandatory transport certification: UN/DOT 38.3 or IEC 62281.  For locally assembled packs: cell certification to GB 31484-2015 / GB 31485-  2015 / GB 31486-2015 / IEC 62660 / IEC 62133-2:2017.  A Country-of-Origin (CoO) certificate is required if above not available. Motor: (05 Marks)  Type: Permanent Magnet Synchronous Motor (PMSM) – brushless only.  Minimum top speed: 40 km/h.  Ingress Protection: IP-67 or above. Vehicle and Charger Performance: (05 Marks)  Speedometer: Maximum allowable error is ±2%.  Odometer: Maximum allowable error is ±2%.  Minimum range must be 170 km in a single charge with swappable option.  Battery charging time: Maximum 6 hours from 20% to 100%  Charger efficiency: The charger must have at least 80% efficiency, tested by charging a fully discharged battery from 0% to 100% at a laboratory nominated by EDB. If it meets the requirement, it will be certified; otherwise, it won't. Safety (Quantitative)(Doc Required) | 25 | |
| Warranty and Performance Guarantee Vehicle Warranty (excluding battery): Minimum 2 years or 40,000 km (whichever comes first), covering manufacturing defects only. (Quantitative)(Doc Required) | 10 | |
| General Manufacturing and Operational Criteria  Experience (04 Marks): Minimum one-year manufacturing of electric 3-wheelers.  Sales Track Record (04 Marks): ≥ 200 units sold with verifiable documentation  Production Facility (04 Marks): Must include assembly line, testing fixtures, battery safety zone, and motor test bench.  Supply Chain (04 Marks): Demonstrated vendor linkages for battery, motor, harness, and body components within Pakistan.  Stock Availability (04 Marks): Minimum 100 ready units or two months components inventory. (Quantitative)(Doc Required) | 20 | |
| After-Sales and Service Support ď‚§ OEMs shall maintain a minimum of three service centers in each operating region/province. (04 Marks) ď‚§ Technician Training: Staff must be EV-safety-certified. (04 Marks) ď‚§ Parts Availability: Written undertaking ensuring spare parts supply for five (5) years post-sale (04 Marks) (Quantitative)(Doc Required) | 12 | |
| Documentation and Certification Applicants shall submit certified copies of: ď‚§ Valid EDB Manufacturing Certificate; (01 Marks) ď‚§ Valid PSQCA License; (01 Marks) ď‚§ Company Registration & Tax Compliance Documents; (01 Marks) ď‚§ Audited Financial Statements (latest year); (01 Marks) ď‚§ Bank Guarantee Instrument(s); (01 Marks) and ď‚§ BOM and Vendor List showing local content share. (01 Marks) ď‚§ Firm commitment under an affidavit for local value addition as per Annex-D. (02 Marks) (Quantitative)(Doc Required) | 8 | |
Â
Submit your bid according to the bidding document (Attached)Â
Reference is invited to the advertisement published on May 24, 2026 by Engineering Development Board (EDB) regarding Expression of Interest (EOI) Pre-Qualification of all Electric Vehicle (EV) 3-Wheelers Original Equipment Manufacturers (OEMs) /Assemblers for PAVE Phase-II & Subsequent Phases.
It is hereby notified for information of all prospective bidders that the following information mentioned in the advertisement may be read as follows:
All other terms and conditions of the RFP shall remain unchanged.
as per the bidding DocumentÂ
as per the bidding DocumentÂ
as per the bidding DocumentÂ