In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.gov.pk).
SSGC-LPG Ltd. (SSGC-LPG Limited), Assistant Manager
SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
+92-322-821-3169
fahad.zia@ssgclpg.com
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: SSGC-LPG Ltd. (SSGC-LPG Limited)
The subject of procurement is: Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim Terminal
Expected commencement date: Thursday, December 31, 2026
BDS Clause Number 2
ITB Number 2.1
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P167781
BDS Clause Number 3
ITB Number 4.6
JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil
BDS Clause Number 4
ITB Number 7.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Friday, November 6, 2026
BDS Clause Number 5
ITB Number 8.1
Any addendum, in case issued, shall be published on SSGC-LPG Ltd. (SSGC-LPG Limited) website and on EPADS v2.0.
BDS Clause Number 6
ITB Number9.1
List of documents required along with the bid: No
BDS Clause Number 7
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 8
ITB Number 7.6
Services and Their related documents:
See section Required Services and Scope of Work
BDS Clause Number 9
ITB Number 13.1 & 13.2
Price schedule will be provided according to the format defined and acquired.
see section price schedule.
BDS Clause Number 10
ITB Number 7.6.2
Specifications:
see section of specifications.
BDS Clause Number 11
ITB Number 13.5
The price shall be Fixed.
BDS Clause Number 12
ITB Number 15.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 16.1
The Bids/Bid Validity period shall be: 120 Days
BDS Clause Number 14
ITB Number 17.1
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of : SSGC-LPG Ltd.
The Bid Security shall be in the form of: Pay Order
BDS Clause Number 15
ITB Number 17.3
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents, for example the bid validity is 180 days so the bid security shall be valid for 180+28 = 208 days.
BDS Clause Number 16
ITB Number 18.1
Alternative Bids to the requirements of the bidding documents will not be permitted.
BDS Clause Number 17
ITB Number 21.1
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Monday, November 9, 2026 03:30 PM
BDS Clause Number 18
ITB Number 26.1
The Bids opening shall take place on EPADS v2.0.
Day : Monday
Date: Monday, November 9, 2026
Time : 04:00 PM
BDS Clause Number 19
ITB Number 32.1
Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria
BDS Clause Number 20
ITB Number 49.1
The Performance guarantee shall: 0%.
The Performance Guarantee shall be acceptable in the form of: Nil
BDS Clause Number 21
ITB Number 51.1
Arbitrator shall be appointed by mutual consent of the both parties.
BDS Clause Number 22
ITB Number 53.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
|
NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
Least Cost Based Selection (LCBS)
Positions Without Lots :
| Position | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim Terminal | Address: SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province). Schedule: 8 (Eight) Weeks after issue/ acceptance of PO/WO. Quantity: 02/job |
2/job | 60000 PKR |
No
Positions Without Lots :
Position: Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim Terminal
Specifications / Requirements:
Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim TerminalSSGC LPG Limited (SLL) is located at Plot No NWZ/1/P-305 (A-4, LPG Area) North Western Industrial Zone, Port Qasim, Karachi. SLL is 100% owned subsidiary of Sui Southern Gas Company Limited, engaged in LPG marketing & distribution across the country. The Company owns and operates a dedicated open access LPG terminal with storage facility at PQ Terminal. There is a ship receiving jetty located about 3.5 km south of the terminal. The product is stored in above ground spherical tanks of 3x1500 MT & 2x1000 MT with a combined capacity of 6,500 MT.
Â
SLL intends to engage an experienced, competent, and qualified contractor for the fabrication, surface preparation, painting, removal of existing damaged monkey ladders, and installation of two (02) new monkey ladders at the Jetty Head of SLL Port Qasim LPG Terminal.
The new monkey ladders shall be fabricated strictly in accordance with the construction drawing attached with this document and all applicable engineering standards, safety regulations, and Port Qasim Authority (PQA) requirements. The bidder is required to seek necessary permissions from PQA prior to start the work, SLL will provide full support in this regard.
Â
            The Contractor shall undertake, but not be limited to, the following activities:
2.1 Site Visit and Verification
2.1.1 Conduct a detailed site survey prior to bid submission.
2.1.2 Verify all dimensions, fixing arrangements, structural interfaces, and access requirements at site.
Assess the condition of existing monkey ladders and supporting structures.
Â
2.2 Fabrication of New Monkey Ladders
2.2.1 Procure all required materials, consumables, welding electrodes, fasteners, and accessories necessary for fabrication.
2.2.2 Fabricate two (02) monkey ladders in accordance with the attached approved drawing and specifications. However, actual sizes to be verified from site.
2.2.3 Ensure dimensional accuracy, structural integrity, and workmanship quality.
2.2.4 Carry out all cutting, fitting, welding, grinding, and finishing works required for complete fabrication.
Â
2.3 Surface Preparation and Painting
2.3.1 Perform surface preparation of fabricated ladders by mechanical cleaning, grinding, and removal of rust, scale, oil, and contaminants. The fabricated ladder assembly to be sandblasted, prior to applying paint.
2.3.2 Following sandblasting apply two coats of zinc rich epoxy primer paint (150 microns thickness),
2.3.3 Apply two coats of high build epoxy paint (150 microns thickness)
2.3.4 Apply two coats of Polyurethane paint (100 microns thickness).
2.3.5 Thus, maintain overall paint thickness above 400 microns.
2.3.6 Bidder to arrange calibrated paint thickness meter to determine paint thickness.
2.3.7 The surface to be completely dry before applying each paint coat.
Â
2.4 Removal of Existing Monkey Ladders
2.4.1 Carefully remove the two (02) damaged monkey ladders from the Jetty Head.
2.4.2 Carry out necessary cutting and welding works for safe dismantling.
2.4.3 Ensure no damage is caused to adjacent structures, piping, marine facilities, or equipment during removal.
2.4.4 Dispose of removed material at a location designated by SLL. The scrap material to be transported to the designated scrap yard at the SLL terminal. The bidder has to arrange suitable manual trolley for the said work.
Â
2.5 Installation of New Monkey Ladders
2.5.1 Transport fabricated ladders from the fabrication area to the Jetty Head.
2.5.2 Lift, position, align, and install the new monkey ladders at the designated locations.
2.5.3 Carry out all required welding, fixing, grinding, and finishing works.
2.5.4 Ensure proper vertical alignment, structural stability, and secure fixing of the ladders.
2.5.5 The Contractor shall supply and install eight (08) steel plates (12" × 12") on the existing RCC structure for securing the monkey ladders. Each plate shall be fixed using four (04) heavy-duty Rawl bolts, making a total of thirty-two (32) Rawl bolts.
Â
2.6 Testing and Inspection
2.6.1 Conduct visual inspection of all welds and structural connections.
2.6.2 Rectify any defects identified during inspection.
2.6.3 Facilitate inspection by SLL representatives and obtain acceptance of completed works.
Â
3. Work Location
3.1 Fabrication, surface preparation, and most painting activities shall be carried out at the designated fabrication area within SLL Terminal.
3.2 Removal of existing ladders, installation of new ladders, minor welding works, and final touch-up painting shall be performed at the Jetty Head.
3.3 All Hot Work Area to be completely covered all around by scaffolding pipes and thoroughly wrapped with fire blankets/ tarpuline, so that the work canopy can be safely isolated from the adjoining working area.
Â
Â
4. Operational Restrictions
4.1 No work shall be permitted at the Jetty Head while an LPG vessel is berthed alongside the Jetty.
4.2 The Contractor shall plan and execute the work schedule in coordination with SLL operations.
4.3 Any interruption due to vessel berthing or operational requirements shall not constitute grounds for additional claims unless otherwise approved by SLL.
Â
5. Defect Liability
The Contractor shall remain responsible for any defects arising from workmanship, fabrication, welding, installation, or painting deficiencies for a period of twelve (12) months from the date of work completion and acceptance by SLL.
Â
Â
5. HSE Requirements:
5.1All work on site will be done under SSGC-LPG Work Permit System.
5.2 Prior permission to be sought, from SLL Site Supervisor, before starting the hot work i.e. cutting, welding, grinding or drilling.
5.3 No hot work will be allowed while ship is berthed at SLL jetty.
5.4 Bidder has to arrange good quality hoisting and lifting tools and equipment, where required, to safely carry out lifting operations as per the contractual works.
5.5 The Bidder’s manpower to be equipped with proper PPE’s i.e., safety helmet, safety shoes, cover all, hand gloves, safety goggles, life jacket/ lifebuoy with rope & dust mask as may be required for the job. While insulated gloves, insulated tools, safety harness, welding screen, fire blankets etc. should also be provided as per specific job requirement.
5.6 The Bidder should inform SLL site engineer of any near miss, incident / accident during the project work.
5.7 Housekeeping of the work area under Bidder’s use is to be maintained all the time during the whole contract period on daily basis.
5.8 On project completion, all rubble / leftover material to be removed from jetty premises and shift to the designated scarp yard at the terminal, as final cleanup activity.
5.9 Life jackets shall be worn by all personnel working at the jetty where there is a risk of falling into water. The responsibility shall lie with the bidder.
5.10 Weather conditions and seawater tide level shall be continuously monitored, and work shall be suspended during unsafe conditions. The responsibility shall lie with the bidder.
5.11 Adequate fire extinguishers shall be available during all hot work activities. The responsibility shall lie with the bidder.
5.12 All the Hot Work i.e., welding, grinding and cutting should be done carefully and safely. At this location, all Hot Work Area to be completely covered all around by scaffolding pipes and thoroughly wrapped with fire blankets/ tarpaulin, so that the work canopy can be safely isolated from the adjoining working area.
5.13 A dedicated Fire Watchman shall be deployed during all hot work activities. The responsibility shall lie with the bidder.
5.14 All lifting operations shall be carried out under an approved lifting plan with a designated Lifting Supervisor and Signalman. The responsibility shall lie with the bidder.
5.15 Continuous gas monitoring shall be conducted in hazardous areas during hot work activities. The responsibility shall lie with the bidder.
Â
6. General Conditions:
6.1 The physical work on site to be completed in 8 (Eight) Weeks in all respects. Including.
6.2 The bidder is required to arrange all consumables like welding electrode, grinding/ cutting discs, emery cloth, paint brush/ roller etc.
6.3 The Bidder will be allowed to work on site from 9:00 am till 5:30 pm from Monday to Saturday. No work will be allowed on Sundays and gazette holidays, or beyond 5:30 pm without written approval by the Competent Authority.
6.4 Any additional work claim will not be entertained/ accepted unless it is dully approved in writing by the competent authority of SLL.
Â
Â
7. Contractor’s Responsibility:
7.1 The contractor is required to arrange supervision, manpower, equipment, tools and consumables to carry out the awarded job safely and efficiently.
7.2 The Contractor is required to arrange his own suitable transportation means to shift equipment, material, tools and manpower to the work site/ locations.
7.3 Electricity and water will be provided by SLL.
7.4 Contractor to arrange material, as indicated above in the scope of work and BOQ.
7.5 It will be contractor’ s responsibility/ scope to transport the material provided by SLL to the work site
7.6 Contractor is required to maintain good quality works; company representative can reject the poor works; the contractor has to make it good without any extra cost.
7.7 The bidder is required to arrange qualified scaffolders and scaffolding material to carry out the required job.
7.8 The contractor is required to engage qualified and competent Supervisor and other technical manpower to accomplish the awarded job. Company’s representative can interview few or all of the contractor’s staff to ensure their competencies for the required works.
7.9 Contractor to seal/sign whole tender document.
7.10 The Contractor to arrange transport, food and drinking water for his personnel at site. The bidder is required to arrange equipment like welding machine, grinding, drill machine and all other tools to carry out the required work. All welding works to be done with electric arc welding machine. All Structural welding to be done with electric arc welding by using 7018 electrodes.
7.11 It will be sole responsibility of the bidder to select, procure and fit the correct type and quantity of equipment/ material in full compliance with local laws, rules and regulations.Â
In case of conflict, SLL version shall be final.
Â
8. Completion Time: 8 (Eight) Weeks after issue/ acceptance of PO/WO.
9. Mode of Payment: 100% after successful completion of work in all respect.
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Definitions
The Procuring Agency is: SSGC-LPG Ltd. (SSGC-LPG Limited), Assistant Manager SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
Contractor is:
The title of the subject procurement is:Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim Terminal
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
SSGC-LPG Ltd. (SSGC-LPG Limited), Assistant Manager
SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
+92-322-821-3169
fahad.zia@ssgclpg.com
Contractor/ Bidder:
[Name, address and telephone number].
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
SSGC-LPG Ltd. (SSGC-LPG Limited), Assistant Manager
SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
+92-322-821-3169
fahad.zia@ssgclpg.com
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ………………….
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 16.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 0.10% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Nil
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P167781
To: SSGC-LPG Ltd. (SSGC-LPG Limited), Assistant Manager SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between SSGC-LPG Ltd. (SSGC-LPG Limited), Assistant Manager SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim Terminal (P167781) and has accepted a Bids by the Bidder for the provision of Services in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: SSGC-LPG Ltd. (SSGC-LPG Limited), Assistant Manager SSGC-LPG Building, Karachi Terminal, Opposite Saffari Park Main University Road, Gulshan e Iqbal karachi., Gulshan-e-Iqbal Sub-Division, Karachi East (District), Karachi (Division), Sindh (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Non-Consultancy Services(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Replacement of Two Number Broken Monkey Ladders SLL at Port Qasim Terminal