The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: National Telecommunication Corporation (National Telecom Corporation (NTC))
The subject of procurement is: Shifting / Re-Routing of NTC OFC Due to Construction of Underpass at COD Chowk on Range Road Rawalpindi
Expected commencement date: Thursday, December 31, 2026
BDS Clause Number 2
ITB Number 2.1
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P171981
BDS Clause Number 3
ITB Number 4.6
JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil
BDS Clause Number 4
ITB Number 7.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Sunday, November 8, 2026
BDS Clause Number 5
ITB Number 8.1
Any addendum, in case issued, shall be published on National Telecommunication Corporation (National Telecom Corporation (NTC)) website and on EPADS v2.0.
BDS Clause Number 6
ITB Number9.1
List of documents required along with the bid: No
BDS Clause Number 7
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 8
ITB Number 7.6
Services and Their related documents:
See section Required Services and Scope of Work
BDS Clause Number 9
ITB Number 13.1 & 13.2
Price schedule will be provided according to the format defined and acquired.
see section price schedule.
BDS Clause Number 10
ITB Number 7.6.2
Specifications:
see section of specifications.
BDS Clause Number 11
ITB Number 13.5
The price shall be Fixed.
BDS Clause Number 12
ITB Number 15.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 16.1
The Bids/Bid Validity period shall be: 120 Days
BDS Clause Number 14
ITB Number 17.1
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of : Director National Telecommunication Corporation Rawalpindi
The Bid Security shall be in the form of: Call at Deposit
BDS Clause Number 15
ITB Number 17.3
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents, for example the bid validity is 180 days so the bid security shall be valid for 180+28 = 208 days.
BDS Clause Number 16
ITB Number 18.1
Alternative Bids to the requirements of the bidding documents will not be permitted.
BDS Clause Number 17
ITB Number 21.1
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
Sector I-12, Microwave Station, Near Social Security Hospital, IJP Road, Islamabad Capital Territory
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Wednesday, November 11, 2026 10:30 AM
BDS Clause Number 18
ITB Number 26.1
The Bids opening shall take place on EPADS v2.0.
Day : Wednesday
Date: Wednesday, November 11, 2026
Time : 11:00 AM
BDS Clause Number 19
ITB Number 32.1
Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria
BDS Clause Number 20
ITB Number 49.1
The Performance guarantee shall: 0%.
The Performance Guarantee shall be acceptable in the form of: Nil
BDS Clause Number 21
ITB Number 51.1
Arbitrator shall be appointed by mutual consent of the both parties.
BDS Clause Number 22
ITB Number 53.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
|
NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) Punjab (PRA) PEC AGPR (Gilgit-Baltistan Government) KPK (KPRA) |
Least Cost Based Selection (LCBS)
Lot Title : Shifting / Re-Routing of NTC OFC Due to Construction of Underpass at COD Chowk on Range Road Rawalpindi
Bid Security : 150000 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| 48 Fiber SM OFC (Duct) G.652 D Compliance | Address: On Site Schedule: 60 DaysQuantity: 900/m |
900/m |
| Joint Enclosure 48 Fiber | Address: On Site Schedule: 60 DaysQuantity: 2/Qty |
2/Qty |
| HDPE pipe 2 | Address: On Site Schedule: 60 DaysQuantity: 850/m |
850/m |
| Concrete H/Hole 4'*4'*4' | Address: On Site Schedule: 60 DaysQuantity: 5/Qty |
5/Qty |
| Warning tape with NTC Monogram | Address: On Site Schedule: 60 DaysQuantity: 740/m |
740/m |
| Marking Post | Address: On Site Schedule: 60 DaysQuantity: 4/Qty |
4/Qty |
| Marking and excavation in Kacha Trench 4' depth and 18 | Address: On Site Schedule: 60 DaysQuantity: 500/m |
500/m |
| Marking and excavation in Pacca Trench 4' depth and 18 | Address: On Site Schedule: 60 DaysQuantity: 240/m |
240/m |
| Re-instatement of Pacca | Address: On Site Schedule: 60 DaysQuantity: 240/m |
240/m |
| Bore | Address: On Site Schedule: 60 DaysQuantity: 110/m |
110/m |
| Pulling of OFC | Address: On Site Schedule: 60 DaysQuantity: 900/m |
900/m |
| Splicing | Address: On Site Schedule: 60 DaysQuantity: 96/Qty |
96/Qty |
No
Lot Title : Shifting / Re-Routing of NTC OFC Due to Construction of Underpass at COD Chowk on Range Road Rawalpindi
Position: 48 Fiber SM OFC (Duct) G.652 D Compliance
Specifications / Requirements:
48 Fiber SM OFC (Duct) G.652 D CompliancePosition: Joint Enclosure 48 Fiber
Specifications / Requirements:
Joint Enclosure 48 FiberPosition: HDPE pipe 2
Specifications / Requirements:
HDPE pipe 2" DiaPosition: Concrete H/Hole 4'*4'*4'
Specifications / Requirements:
Concrete H/Hole 4'*4'*4'Position: Warning tape with NTC Monogram
Specifications / Requirements:
Warning tape with NTC MonogramPosition: Marking Post
Specifications / Requirements:
Marking PostPosition: Marking and excavation in Kacha Trench 4' depth and 18
Specifications / Requirements:
Marking and excavation in Kacha Trench 4' depth and 18" width with laying of HDPE pipePosition: Marking and excavation in Pacca Trench 4' depth and 18
Specifications / Requirements:
Marking and excavation in Pakha Trench 4' depth and 18" width with laying of HDPE pipePosition: Re-instatement of Pacca
Specifications / Requirements:
Re-instatement of PaccaPosition: Bore
Specifications / Requirements:
BorePosition: Pulling of OFC
Specifications / Requirements:
Pulling of OFCPosition: Splicing
Specifications / Requirements:
SplicingTender is invited for the work of “Shifting / Re-Routing of NTC OFC Due to Construction of Underpass at COD Chowk on Range Road Rawalpindi
Followingdocumentsshallbe uploadedwiththeproposal:
a.Registration with Tax authorities / PEC (Relevant/Active Status)
b.Relevant Experience (Minimum 02xsimilar completed works in Pakistan)
c.Valid Tender security amounting to Rs.150,000/- (Must be submitted physically before tender opening)
d.Affidavit that firm is not blacklisted, product is not of Indian / Israel origin.
All goods, materials and store items including the spares (if any) shall have make and origin of any country fulfilling the specifications, except Israel and India. The bidder will provide the relevant documents to confirm the make and manufacture. (if any item during course of execution may not confirm about its make than bidder shall provide an affidavit in this regard).
The bidder shall bear all costs associated with the preparation and submission of its bid and the NTC will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the tendering process.
A prospective bidder requiring any clarification(s) regarding technical matter / Specs may notify to DE (OFC) Division NTC Rawalpindi (Tel: 051-9290512) in writing. The concerned NTC officer will respond to any request for clarification, which receives well before (approximate 05 working days or more) the deadline of the submission of bids. Copies of NTC response will be forwarded to all prospective bidders (if not already clarified in the tender or deemed necessary for the bidder).
At any time prior to the deadline for submission of bids, the NTC may, for any reason, whether at his own initiative or in response to a clarification requested by a prospective bidder, modify the tender documents by issuing amendment.
Any amendment thus issue through same media shall be part of the tender documents. To afford bidders reasonable time in which to take an amendment into account in preparing their bids, the NTC may extend the deadline for submission of bids (Ref #27 PPRA Rules 2004).
The bidder shall provide all the store / items mentioned BOQ of Made in Pakistan ‘or’ otherwise mentioned the country of origin (Country of Manufacturer) of the offered/ quoted equipment & all allied accessories. Equipments or any of its unit components quoted by bidders must not be manufactured in Israel or India. Furthermore, the Bidder/Principle must not have any linkage with Israel or India regarding ownership, sponsoring and financing in case any item may not confirms its country of origin, the bidder will provide the relevant documents to confirm the make and manufacture. (if any item during course of execution may not confirm about its make than bidder shall provide an affidavit in this regard).
Any bidder may modify or withdraw his bid after bid submission provided that written notice of the modification or with-drawl is received by the concerned officer prior to the deadline for submission of bids.
No bid may be modified or withdrawn by a bidder after the deadline for submission of bids.
The bid is valid till required period
The bid prices are firm during its validity and inclusive of all taxes, duties & freight charges etc
Completion period offered is within specified limits
he bidder is eligible to tender and possesses the requisite experience
The bid is generally in order.
The bidder promptly responds to queries sought by NTC.
NOTE:“Anybidderfoundnon-compliantinanyofabovementionedconditionswillbe declared as non-responsive and will not be considered for further Evaluation proceedings. A bidder once declared “Non-responsive” shall not subsequently be made responsive by the NTC.”
For survey, prospective bidders may coordinate with DE (OFC) Division NTC Rawalpindi for coordination and assistance on sites (Concerned Site Address: Inside PTCL Complex 7th Road Satellite Town Rawalpindi. (Tel: 051-9290512)
Unless the delay in completion of work is caused by force majeure and the delay is on part of the Contractor, contractor shall pay to NTC as liquidated damages a sum equivalent to 0.5% of the actual work /completion cost for each week of delay and subject to a maximum of 10% value of the actual work delayed, as such the completed component is useable in all respect otherwise 10% of the total contract value shall be levied, and same will be recovered from the contractor at the time of PAC. In case of force majeure, the delivery period may be extended on receipt of request/intimation from contractor with evidence during the execution period. For the purpose of calculation of Liquidated Damages charges, 7 days of week would be considered, and goods delayed for more than 3 days will be considered as one week otherwise less than or equal or upto 3 days will not be penalized. The parties agree that the accumulated total liquidated damages for delay shall carry a maximum limit of upto 10% of the contract value.
The contractor will warrant that the Store / equipment supplied under the contract are new, un-used, and incorporates all recent improvements in design and materials and of good quality. The warranty shall remain valid for a period of 12 months starting from the date of issuance of PAC. NTC shall promptly notify the supplier in writing of any claims arising under this warranty and the supplier will repair / replace the defective items within reasonable time without any cost effect.
The contractor, for technical assistance at the highest level shall provide high-level support/technical assistance at sites on 24 x 7 basis, during the warranty period, free of cost.
The Contract will be construed under and governed by THE LAWS OF THE ISLAMIC REPUBLIC OF PAKISTAN.
NTC and the Contractor shall make every effort to resolve amicably by direct informal negotiation any disagreement or dispute arising between them under or in connection with the Contract.
Any dispute, disagreement or question arising out of or relating to or in consequence of this contract or relating to its execution or performance which cannot be settled amicably, shall be referred to arbitration to MD NTC. Only MD NTC will have sole authority in arbitration to decide. All the decisions will be made in view of Arbitration Act 1940.
Within 30 days of the said notice, one arbitrator shall be nominated in writing by NTC and one arbitrator shall be nominated in writing by the Contractor.
The arbitration shall initiate arbitration proceedings at Islamabad. In case the arbitration does not reach on conclusion, then case would be referred to the court of Law.
Each party shall bear the cost of its own arbitrator and the cost of the third arbitrator shall be borne equally by both parties.
The NTC may at any time terminate the contract by giving written notice to the bidder, without any compensation to bidder. If the bidder becomes bankrupt or otherwise insolvent, provided that such termination will not prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to action to the NTC.
Divisional Engineer OFC Division NTC Rawalpindi being project Manager (PM) would execute the work as per contract
Payment will be made after completion of work. The performance security (10% of work completion) will be released after successful completion of warranty/defect liability period and issuance of Final Acceptance Certificate (FAC) by Director NTC Rawalpindi.
Taxes will be deducted as per government rules at the time of payment.
Payments shall only be released if the contractor is found to be “Active Tax Payer” in Federal Board of Revenue (FBR) Pakistan database at the time of payment. Contractor will provide the e-return of each invoice after payment.
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Definitions
The Procuring Agency is: National Telecommunication Corporation (National Telecom Corporation (NTC)), Assistant Engineer Sector I-12, Microwave Station, Near Social Security Hospital, IJP Road, Islamabad Capital Territory
Contractor is:
The title of the subject procurement is:Shifting / Re-Routing of NTC OFC Due to Construction of Underpass at COD Chowk on Range Road Rawalpindi
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
National Telecommunication Corporation (National Telecom Corporation (NTC)), Assistant Engineer
Sector I-12, Microwave Station, Near Social Security Hospital, IJP Road, Islamabad Capital Territory
+92-333-530-8552
bilal.ahmad@ntc.org.pk
Contractor/ Bidder:
[Name, address and telephone number].
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
National Telecommunication Corporation (National Telecom Corporation (NTC)), Assistant Engineer
Sector I-12, Microwave Station, Near Social Security Hospital, IJP Road, Islamabad Capital Territory
+92-333-530-8552
bilal.ahmad@ntc.org.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ………………….
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 16.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.50% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Nil
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
All goods, materials and store items including the spares (if any) shall have make and origin of any country fulfilling the specifications, except Israel and India. The bidder will provide the relevant documents to confirm the make and manufacture. (if any item during course of execution may not confirm about its make than bidder shall provide an affidavit in this regard).
The bidder shall bear all costs associated with the preparation and submission of its bid and the NTC will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the tendering process.
A prospective bidder requiring any clarification(s) regarding technical matter / Specs may notify to DE (OFC) Division NTC Rawalpindi (Tel: 051-9290512) in writing on EPAD. The concerned NTC officers will respond to any request for clarification, which receives well before (approximate 10working days or more) the deadline of the submission of bids. Copies of NTC response will be forwarded to all prospective bidders (if not already clarified in the tender or deemed necessary for the bidder).
At any time prior to the deadline for submission of bids, the NTC may, for any reason, whether at his own initiative or in response to a clarification requested by a prospective bidder, modify the tender documents by issuing amendment. 5.2 Any amendment thus issue through same media shall be part of the tender documents. To afford bidders reasonable time in which to take an amendment into account in preparing their bids, the NTC should extend the deadline for submission of bids Ref #27 PPRA2004
The bidder shall provide all the store / items mentioned BOQs of Made in Pakistan ‘or’ otherwise mentioned the country of origin (Country of Manufacturer) of the offered/ quoted equipment & all allied accessories. Equipments or any of its unit components quoted by bidders must not be manufactured in Israel or India.
The price quoted should be firm, final, and clearly typed without any ambiguity. The price should include all the government taxes including General Sales Tax and Service Tax at specified rates by Federal and provincial Governments (where applicable), duties, delivery and installation charges etc & shall clearly mention GST/PST otherwise the same shall be considered as incorporated in prices.
The bidder shall furnish a tender security / earnest money. The Bid Security shall be, at the option of the bidder, in the form of Call Deposit Receipt in favour of the Director NTC Rawalpindi valid for a period 120 days beyond the bid validity date. The tender securities / earnest money of the unsuccessful bidders will be returned upon award of contract to the successful bidder or on expiry of validity of tender as per requirement of bidder whichever is earlier
The tender security may be forfeited: If a bidder withdraws his bid during the period of bid validity. If the bidder does not accept the correction of his bid price. In the case of successful bidder, if he fails to furnish the required performance security or fail to sign the contract as per LOI. All correspondence regarding release / extension of bid security shall be made with Director NTC Rawalpindi.
NTC on its own initiatives or on the request of any prospective bidder shall extend the deadline for submission of bids prior to the deadline, which will be communicated to all prospective bidders well in time. In extension of deadline all the rights and obligation of NTC and bidder(s)/firm(s)/contractor(s) subject to the original deadline will now subject to the extended deadline.
Any bidder may modify or withdraw his bid after bid submission provided that written notice of the modification or with-drawl is received by the concerned officer prior to the deadline for submission of bids. No bid may be modified or withdrawn by a bidder after the deadline for submission of bids.
The bid is valid till required period The bid prices are firm during its validity and inclusive of all taxes, duties & freight charges etc Completion period offered is within specified limits The bidder is eligible to tender and possesses the requisite experience The bid is generally in order. The bidder promptly responds to queries sought by NTC.
The Performance Security shall be released after expiry of the Maintenance / Warranty period, subject to issuance of Final Acceptance Certificate (FAC), by Director NTC Rawalpindi. All the correspondence regarding release of performance guarantee shall be made with Director NTC Rawalpindi
The contractor shall complete the work in accordance with the contract BoQs, Specs, Plan and responsibility matrix within the agreed completion time. The contractor shall not subcontract the whole of the works. The contractor shall not subcontract any part of the works without the consent of the NTC. The contractor shall provide all necessary Contractor equipment’s, superintendence, labors and materials necessary for accomplishment and testing of the work as per contract.
Regarding liaison with other Govt. Deptts. / Entities etc. and acquiring NOC/Permission (involving smooth accomplishment of project), The contractor will provide the information /detail(s) of his labour within 03 x days on such requirement at his own cost. Any delay in provision of labour information will be considered on part of the contractor.
All types of transportation for delivery of Store / equipment at final destination will be the responsibility of the contractor. Contractor shall ensure proper / international packing of Store / equipment /cables to avoid deterioration of equipment / cable etc. Contactor shall also be responsible for transportation of NTC or any other Department which store will be utilized in the project.
Unless the delay in completion of work is caused by force majeure and the delay is on part of the Contractor, contractor shall pay to NTC as liquidated damages a sum equivalent to 0.5% of the actual work /completion cost for each week of delay and subject to a maximum of 10% value of the actual work delayed, as such the completed component is useable in all respect otherwise 10% of the total contract value shall be levied, and same will be recovered from the contractor at the time of PAC
In case of force majeure, the delivery period may be extended on receipt of request/intimation from contractor with evidence during the execution period. For the purpose of calculation of Liquidated Damages charges, 7 days of week would be considered, and goods delayed for more than 3 days will be considered as one week otherwise less than or equal or upto 3 days will not be penalized. The parties agree that the accumulated total liquidated damages for delay shall carry a maxlimit of upto 10%
The contractor will warrant that the Store / equipment supplied under the contract are new, unused, and incorporates all recent improvements in design and materials and of good quality. The warranty shall remain valid for a period of 12 months starting from the date of issuance of PAC. NTC shall promptly notify the supplier in writing of any claims arising under this warranty and the supplier will repair / replace the defective items within reasonable time without any cost effect.
Director NTC Rawalpindi will detail a team for final inspection. The team shall confirm the quantities and functioning of equipment and will mention discrepancies, if any. Director NTC Rawalpindi will issue the PAC on the basis of successful conduct of PAT/ Final inspection including verification of contract BoQ as per site requirement.
NTC reserves the rights to reject any item even after issuance of Provisional Acceptance Certificate if it does not conform to the specifications by reason of some defect, latent or otherwise of material which was not discoverable by a reasonable examination. The Provisional Acceptance Certificate (PAC) will be valid for warranty period of one year. Final Inspection of work will be carried out in accordance with NTC Policy.
100 % payment will be made to contractor after completion of work. The performance security (10% of work completion) will be released after successful completion of warranty/defect liability period and issuance of Final Acceptance Certificate (FAC) by Director NTC Rawalpindi. Taxes will be deducted as per government rules at the time of payment.
Divisional Engineer OFC Division NTC Rawalpindi being project Manager (PM) would execute the works as per contract.
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P171981
To: National Telecommunication Corporation (National Telecom Corporation (NTC)), Assistant Engineer Sector I-12, Microwave Station, Near Social Security Hospital, IJP Road, Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between National Telecommunication Corporation (National Telecom Corporation (NTC)), Assistant Engineer Sector I-12, Microwave Station, Near Social Security Hospital, IJP Road, Islamabad Capital Territory
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Shifting / Re-Routing of NTC OFC Due to Construction of Underpass at COD Chowk on Range Road Rawalpindi (P171981) and has accepted a Bids by the Bidder for the provision of Services in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: National Telecommunication Corporation (National Telecom Corporation (NTC)), Assistant Engineer Sector I-12, Microwave Station, Near Social Security Hospital, IJP Road, Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Non-Consultancy Services(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}