7. In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.org.pk).
Â
PESCO (Peshawar Electric Supply Company (PESCO)), Manager
Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
+92-370-134-0008
mm@pesco.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency:Â PESCO (Peshawar Electric Supply Company (PESCO))
The subject of procurement is:Â Procurement of Services For the Repair / Reclamation of 132/11 KV Power Transformers (2 x 20/26 MVA and 1 x 31.5/40 MVA)
Expected commencement date: Thursday, June 11, 2026
BDS Clause Number 2
ITB Number 2.1
Financial year for the operations of the Procuring Agency:Â 2025-26
Name and identification number of the Contract: P29282Â
BDS Clause Number 3
ITB Number 4.6
JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil
BDS Clause Number 4
ITB Number 7.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, May 12, 2026
BDS Clause Number 5
ITB Number 8.1
Any addendum, in case issued, shall be published on PESCO (Peshawar Electric Supply Company (PESCO)) website and on EPADS v2.0.
BDS Clause Number 6
ITB Number 9.1
List of documents required along with the bid:
BDS Clause Number 7
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 8
ITB Number 7.6
Services and Their related documents:
See section Required Services and Scope of Work
BDS Clause Number 9
ITB Number 13.1 & 13.2
Price schedule will be provided according to the format defined and acquired.
see section price schedule.
BDS Clause Number 10
ITB Number 7.6.2
 Specifications:
see section of specifications.
BDS Clause Number 11
ITB Number 13.5
The price shall be Fixed.
BDS Clause Number 12
ITB Number 15.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 16.1
The Bids/Bid Validity period shall be: 120 Days
BDS Clause Number 14
ITB Number 17.1
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
The Bid Security shall be in the form of: Call at Deposit, Bank Guarantee Â
BDS Clause Number 15
ITB Number 17.3
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents,  for example the bid validity is 180 days so the bid security shall be valid for  180+28 = 208 days.
BDS Clause Number 16
ITB Number 18.1
Alternative Bids to the requirements of the bidding documents will not be permitted.
BDS Clause Number 17
ITB Number 21.1
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Thursday, May 21, 2026 10:00 AM
BDS Clause Number 18
ITB Number 26.1
The Bids opening shall take place on EPADS v2.0.
Day : Thursday
Date:Â Thursday, May 21, 2026
Time : 10:30 AM
BDS Clause Number 19
ITB Number 32.1
Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria
BDS Clause Number 20
ITB Number 49.1
The Performance guarantee shall: 10.00%.
The Performance Guarantee shall be acceptable in the form of:Â Call at Deposit, Bank Guarantee
21.
51.1
Arbitrator shall be appointed by mutual consent of the both parties.
BDS Clause Number 22
ITB Number 53.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
| Bidder's Type | Required Registration |
|---|---|
|
Any |
FBR (NTN) FBR (GSTN) |
| Eligibility Criteria | Document |
|---|---|
| Documentary evidence demonstrating relevant experience in the manufacturing and/or repair of power transformers. The evidence must include work orders/ contracts and performance certificates issued by NTDC/WAPDA/PPMC/DISCOs/ or any government organization. | Yes |
| Submission of undertaking/ affidavit that the firm is NOT BLACKLISTED by any of Provincial or Federal Government Department, Agency, Organization or autonomous body anywhere in Pakistan at the time of bid submission. | Yes |
Least Cost Based Selection (LCBS)
Lot Title : Repair/ Reclamation of 132/11 KV, 20/26 MVA, Power Transformer Make Siemens (S.No. 10900016 lying at 132 kV GSS Tajazai)
Bid Security : 396498
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Manufacturing/ Repair of 01-No. HV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| New Copper Conductor (if required & Same Qty of the Old Copper will be Return to PESCO) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement/ Repair of 01-No. HV insulation including cylinders b/w windings, insulating angle rings & end rings with new one |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement/ Repair of 01-No. LV insulation including cylinders b/w windings, insulating angle rings & end rings with new one |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement/ Repair of 01-No. RV insulation including cylinders b/w windings, insulating angle rings & end rings with new one |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement of all Gaskets |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Painting of Body |
Address: Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province). Schedule: 27 DaysQuantity: 1 |
1 |
| Replacement of cabling |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Refurbishment of Insulating parts |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Cleaning, washing & removal of sludge articles, polluted oil from the Tank Body, upper & Lower Yoke cleaning, washing of radiators, fan motors, conservator tank & piping arrangements, New leads including all Minor works etc. |
Address: PESCO Specified Location Schedule: 90-120DaysQuantity: 1 |
1 |
| Handling, loading/uploading, diagnostic testing, un-tanking active parts, removing top cover & OLTC, removing core frame top yoke lamination, disassembling windings & insulating parts (cutting HV, LV, RV leads), and conducting PRJI & customer inspect |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| After drying/sizing of windings, assembled on the core limbs. Assembly of the Upper Yoke Clamps Fixing of the Top Cover Assembly of OLTC Manufacturing of New Leads & Its Assembly with OLTC Stage Inspection & Testing of Active Part assembly |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Vapor Phase Drying of the Active Parts Assembly |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Final assembly of active parts in the tank, vacuuming, oil filling/ filtering, and circulation. HV bushings, instruments, and accessories are assembled. Old T/F oil be filled and dehydrated. 10% Dehydration allowance be provided by PESCO |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| New Oil if provided by the Workshop |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| All type of Testing during and after Repairs as per NTDC/WAPDA Specifications |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Loading, unloading, assembly, and disassembly at the site & workshop (Before & after Repair); safe handling and transportation to the workshop; and return of the transformer to the PESCO-specified location after repairs. |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Repairing of Fan motor |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
Lot Title : Repair/ Reclamation of 132/11 KV, 20/26 MVA, Power Transformer Make PEL(S.No. 1140022 lying at 132/11 kV GSS Dalazak)
Bid Security : 396498
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Manufacturing/ Repair of 01-No. HV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| New Copper Conductor (if required & Same Qty of the Old Copper will be Return to PESCO) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement/ Repair of 01-No. HV insulation including cylinders b/w windings, insulating angle rings & end rings with new one |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement/ Repair of 01-No. LV insulation including cylinders b/w windings, insulating angle rings & end rings with new one |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement/ Repair of 01-No. RV insulation including cylinders b/w windings, insulating angle rings & end rings with new one |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement of all Gaskets |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Painting of Body |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement of cabling |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Refurbishment of Insulating parts |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Cleaning, washing & removal of sludge articles, polluted oil from the Tank Body, upper & Lower Yoke cleaning, washing of radiators, fan motors, conservator tank & piping arrangements, New leads including all Minor works etc. |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Handling, loading/uploading, diagnostic testing, un-tanking active parts, removing top cover & OLTC, removing core frame top yoke lamination, disassembling windings & insulating parts (cutting HV, LV, RV leads), and conducting PRJI & customer inspect |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| After drying/sizing of windings, assembled on the core limbs. Assembly of the Upper Yoke Clamps Fixing of the Top Cover Assembly of OLTC Manufacturing of New Leads & Its Assembly with OLTC Stage Inspection & Testing of Active Part assembly |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Vapor Phase Drying of the Active Parts Assembly |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Final assembly of active parts in the tank, vacuuming, oil filling/ filtering, and circulation. HV bushings, instruments, and accessories are assembled. Old T/F oil be filled and dehydrated. 10% Dehydration allowance be provided by PESCO |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| New Oil if provided by the Workshop |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| All type of Testing during and after Repairs as per NTDC/WAPDA Specifications |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Loading, unloading, assembly, and disassembly at the site & workshop (Before & after Repair); safe handling and transportation to the workshop; and return of the transformer to the PESCO-specified location after repairs. |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Repairing of Fan motor |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
Lot Title : Repair/ Reclamation of 132/11 KV, 31.5/40 MVA, Power Transformer Make PEL(S.No. 11300001 lying at 132/11 kV GSS Kohat)
Bid Security : 426204
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Manufacturing/ Repair of 01-No. HV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| New Copper Conductor (if required & Same Qty of the Old Copper will be Return to PESCO) |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement/ Repair of 01-No. HV insulation including cylinders b/w windings, insulating angle rings & end rings with new one |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement of all Gaskets |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Painting of Body |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Replacement of cabling |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Refurbishment of Insulating parts |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Cleaning, washing & removal of sludge articles, polluted oil from the Tank Body, upper & Lower Yoke cleaning, washing of radiators, fan motors, conservator tank & piping arrangements, |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Handling, loading/uploading, diagnostic testing, un-tanking active parts, removing top cover & OLTC, removing core frame top yoke lamination, disassembling windings & insulating parts (cutting HV, LV, RV leads), and conducting PRJI & customer inspect |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| After drying/sizing of windings, assembled on the core limbs. Assembly of the Upper Yoke Clamps Fixing of the Top Cover Assembly of OLTC Manufacturing of New Leads & Its Assembly with OLTC Stage Inspection & Testing of Active Part assembly |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Vapor Phase Drying of the Active Parts Assembly |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Final assembly of active parts in the tank, vacuuming, oil filling/ filtering, and circulation. HV bushings, instruments, and accessories are assembled. Old T/F oil be filled and dehydrated. 10% Dehydration allowance be provided by PESCO |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| New Oil if provided by the Workshop |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| All type of Testing during and after Repairs as per NTDC/WAPDA Specifications |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Loading, unloading, assembly, and disassembly at the site & workshop (Before & after Repair); safe handling and transportation to the workshop; and return of the transformer to the PESCO-specified location after repairs. |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
| Repairing of Fan motor |
Address: PESCO Specified Location Schedule: 90-120 DaysQuantity: 1 |
1 |
No
Lot Title : Repair/ Reclamation of 132/11 KV, 20/26 MVA, Power Transformer Make Siemens (S.No. 10900016 lying at 132 kV GSS Tajazai)
Position: Manufacturing/ Repair of 01-No. HV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: New Copper Conductor (if required & Same Qty of the Old Copper will be Return to PESCO)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement/ Repair of 01-No. HV insulation including cylinders b/w windings, insulating angle rings & end rings with new one
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement/ Repair of 01-No. LV insulation including cylinders b/w windings, insulating angle rings & end rings with new one
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement/ Repair of 01-No. RV insulation including cylinders b/w windings, insulating angle rings & end rings with new one
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement of all Gaskets
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Painting of Body
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement of cabling
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Refurbishment of Insulating parts
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Cleaning, washing & removal of sludge articles, polluted oil from the Tank Body, upper & Lower Yoke cleaning, washing of radiators, fan motors, conservator tank & piping arrangements, New leads including all Minor works etc.
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Handling, loading/uploading, diagnostic testing, un-tanking active parts, removing top cover & OLTC, removing core frame top yoke lamination, disassembling windings & insulating parts (cutting HV, LV, RV leads), and conducting PRJI & customer inspect
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: After drying/sizing of windings, assembled on the core limbs. Assembly of the Upper Yoke Clamps Fixing of the Top Cover Assembly of OLTC Manufacturing of New Leads & Its Assembly with OLTC Stage Inspection & Testing of Active Part assembly
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Vapor Phase Drying of the Active Parts Assembly
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Final assembly of active parts in the tank, vacuuming, oil filling/ filtering, and circulation. HV bushings, instruments, and accessories are assembled. Old T/F oil be filled and dehydrated. 10% Dehydration allowance be provided by PESCO
Specifications / Requirements:
As per relevant NTC SpecificationPosition: New Oil if provided by the Workshop
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: All type of Testing during and after Repairs as per NTDC/WAPDA Specifications
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Loading, unloading, assembly, and disassembly at the site & workshop (Before & after Repair); safe handling and transportation to the workshop; and return of the transformer to the PESCO-specified location after repairs.
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Repairing of Fan motor
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationLot Title : Repair/ Reclamation of 132/11 KV, 20/26 MVA, Power Transformer Make PEL(S.No. 1140022 lying at 132/11 kV GSS Dalazak)
Position: Manufacturing/ Repair of 01-No. HV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: New Copper Conductor (if required & Same Qty of the Old Copper will be Return to PESCO)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement/ Repair of 01-No. HV insulation including cylinders b/w windings, insulating angle rings & end rings with new one
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement/ Repair of 01-No. LV insulation including cylinders b/w windings, insulating angle rings & end rings with new one
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement/ Repair of 01-No. RV insulation including cylinders b/w windings, insulating angle rings & end rings with new one
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement of all Gaskets
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Painting of Body
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement of cabling
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Refurbishment of Insulating parts
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Cleaning, washing & removal of sludge articles, polluted oil from the Tank Body, upper & Lower Yoke cleaning, washing of radiators, fan motors, conservator tank & piping arrangements, New leads including all Minor works etc.
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Handling, loading/uploading, diagnostic testing, un-tanking active parts, removing top cover & OLTC, removing core frame top yoke lamination, disassembling windings & insulating parts (cutting HV, LV, RV leads), and conducting PRJI & customer inspect
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: After drying/sizing of windings, assembled on the core limbs. Assembly of the Upper Yoke Clamps Fixing of the Top Cover Assembly of OLTC Manufacturing of New Leads & Its Assembly with OLTC Stage Inspection & Testing of Active Part assembly
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Vapor Phase Drying of the Active Parts Assembly
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Final assembly of active parts in the tank, vacuuming, oil filling/ filtering, and circulation. HV bushings, instruments, and accessories are assembled. Old T/F oil be filled and dehydrated. 10% Dehydration allowance be provided by PESCO
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: New Oil if provided by the Workshop
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: All type of Testing during and after Repairs as per NTDC/WAPDA Specifications
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Loading, unloading, assembly, and disassembly at the site & workshop (Before & after Repair); safe handling and transportation to the workshop; and return of the transformer to the PESCO-specified location after repairs.
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Repairing of Fan motor
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationLot Title : Repair/ Reclamation of 132/11 KV, 31.5/40 MVA, Power Transformer Make PEL(S.No. 11300001 lying at 132/11 kV GSS Kohat)
Position: Manufacturing/ Repair of 01-No. HV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Manufacturing/ Repair of 01-No. LV Winding with new insulation with same Copper conductor (Per Phase) including 05% New Copper Conductor (if required)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: New Copper Conductor (if required & Same Qty of the Old Copper will be Return to PESCO)
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement/ Repair of 01-No. HV insulation including cylinders b/w windings, insulating angle rings & end rings with new one
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement of all Gaskets
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Painting of Body
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Replacement of cabling
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Refurbishment of Insulating parts
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Cleaning, washing & removal of sludge articles, polluted oil from the Tank Body, upper & Lower Yoke cleaning, washing of radiators, fan motors, conservator tank & piping arrangements,
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Handling, loading/uploading, diagnostic testing, un-tanking active parts, removing top cover & OLTC, removing core frame top yoke lamination, disassembling windings & insulating parts (cutting HV, LV, RV leads), and conducting PRJI & customer inspect
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: After drying/sizing of windings, assembled on the core limbs. Assembly of the Upper Yoke Clamps Fixing of the Top Cover Assembly of OLTC Manufacturing of New Leads & Its Assembly with OLTC Stage Inspection & Testing of Active Part assembly
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Vapor Phase Drying of the Active Parts Assembly
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Final assembly of active parts in the tank, vacuuming, oil filling/ filtering, and circulation. HV bushings, instruments, and accessories are assembled. Old T/F oil be filled and dehydrated. 10% Dehydration allowance be provided by PESCO
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: New Oil if provided by the Workshop
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: All type of Testing during and after Repairs as per NTDC/WAPDA Specifications
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Loading, unloading, assembly, and disassembly at the site & workshop (Before & after Repair); safe handling and transportation to the workshop; and return of the transformer to the PESCO-specified location after repairs.
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationPosition: Repairing of Fan motor
Specifications / Requirements:
As per relevant NTDC/WAPDA SpecificationRepair/Reclamation of 132 kV Power Transformer
The Supplier/Service Provider shall be fully responsible for the repair/reclamation of the 132/11 kV power transformer in accordance with the requirements of PESCO and the applicable NTDC/WAPDA specifications. The scope of work shall include, but shall not be limited to, the following activities:
1. Site Handling, Dismantling and Transportation
The Supplier shall be responsible for all activities required at the PESCO site, including loading, unloading, dismantling, handling, shifting and safe transportation of the power transformer from the specified PESCO location to the Supplier’s/service provider’s workshop or premises. All tools, tackles, cranes, lifters, trailers, manpower, safety arrangements and transportation facilities required for this purpose shall be arranged by the Supplier at its own cost and risk.
The Supplier shall ensure that the transformer is handled carefully during dismantling, loading, transportation and unloading to avoid any further damage. Any damage occurring during handling, lifting, transportation or unloading shall be the sole responsibility of the Supplier.
2. Initial Inspection at Service Provider’s Premises
After receiving the transformer at its premises, the Supplier shall issue a formal inspection call to PESCO. A PESCO-nominated committee shall visit the Supplier’s premises and jointly inspect the transformer along with the Supplier’s representative.
The purpose of this joint inspection shall be to assess the actual condition of the transformer and ascertain the nature and extent of damage/loss. The inspection may include physical inspection, preliminary testing, internal inspection, assessment of damaged components and verification of required repair/reclamation works.
The Supplier shall provide all necessary facilities to the PESCO inspectors including boarding and lodging  during the inspection and testing process.
3. Submission of Revised Bill of Quantities
After joint inspection and assessment, the Supplier shall submit a revised Bill of Quantities based on the actual repair/reclamation requirement identified during inspection. The revised BOQ shall be prepared strictly in accordance with the rates already agreed and approved in the original work order and shall be duly signed by all the PESCO nominated committee memebers.
PESCO shall review the revised BOQ and, after approval, issue a revised work order to the Supplier. The Supplier shall not proceed with any additional work beyond the original scope unless the revised BOQ/work order is approved by PESCO.
4. Repair/Reclamation Work
After issuance of the revised work order, the Supplier shall carry out the repair/reclamation of the transformer in accordance with the approved BOQ, relevant NTDC/WAPDA specifications, applicable standards, good engineering practices and PESCO requirements.
The repair/reclamation work may include, where required, dismantling, inspection, repair or replacement of damaged parts, winding repair/replacement, core inspection, insulation treatment, oil filtration/replacement, bushing repair/replacement, gasket replacement, tank repair, painting, drying-out process, reassembly, testing and any other work necessary to restore the transformer to satisfactory operating condition.
All materials, spare parts and components used during the repair shall be new, genuine, standard quality and suitable for use in 132 kV power transformers. The Supplier shall be responsible for workmanship, quality control and performance of the repaired transformer.
If replacement of copper conductors is required, the Service provider will provide new copper conductors and return the same quantity of old copper conductors to PESCO.
5. Final Inspection and Testing
After completion of repair/reclamation work, the Supplier shall issue a final inspection call to PESCO. The PESCO-nominated committee shall inspect and test the repaired transformer at the Supplier’s premises.
The transformer shall be tested in accordance with NTDC/WAPDA specifications and applicable standards. The Supplier shall provide all testing facilities, instruments, manpower and arrangements required for inspection and testing. All test results shall be recorded and submitted to PESCO for verification.
After satisfactory inspection and testing, the PESCO-nominated committee shall issue an Inspection Certificate/Acceptance Certificate for the repaired transformer.
6. Return Transportation and Delivery
After issuance of the Inspection Certificate, the Supplier shall transport the repaired transformer back to the PESCO-specified location. The Supplier shall be responsible for all loading, unloading, handling, transportation, shifting and placement of the transformer at the designated PESCO site.
The Supplier shall ensure safe delivery of the transformer without damage. Any damage during return transportation, loading, unloading or handling shall be rectified by the Supplier at its own cost.
7. Taxes, Duties and Incidental Charges
The quoted price shall be inclusive of all applicable taxes, duties, levies, loading, unloading, dismantling, handling, transportation, labour, tools, equipment, testing, inspection support and all other incidental charges required for successful completion of the work.
No additional payment shall be admissible except where specifically approved by PESCO through a revised work order based on the joint inspection and agreed work-order rates.
8. Compliance and Responsibility
The Supplier shall be responsible for completing the entire work in accordance with the approved work order, revised BOQ, NTDC/WAPDA specifications, applicable safety standards and instructions issued by PESCO. The Supplier shall also ensure proper documentation, inspection coordination, safe handling and timely completion of the repair/reclamation work.
Failure to comply with specification requirements, poor workmanship, use of substandard material or unsatisfactory test results shall be the responsibility of the Supplier, and the Supplier shall rectify such defects at its own cost.
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Definitions
The Procuring Agency is: PESCO (Peshawar Electric Supply Company (PESCO)), Manager Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
The Supplier is:
The title of the subject procurement is:Procurement of Services For the Repair / Reclamation of 132/11 KV Power Transformers (2 x 20/26 MVA and 1 x 31.5/40 MVA)
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:Â
PESCO (Peshawar Electric Supply Company (PESCO)), Manager
Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
+92-370-134-0008
mm@pesco.com.pk
Contractor/ Bidder:Â
 [Name, address and telephone number].
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
PESCO (Peshawar Electric Supply Company (PESCO)), Manager
Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
+92-370-134-0008
mm@pesco.com.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ………………….
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.07% to 10.00%Â of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00%Â of the contract price in acceptable form of Call at Deposit, Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
The detailed delivery schedule and inspection procedures are provided in the Annexure.
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:Â
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P29282
To: PESCO (Peshawar Electric Supply Company (PESCO)), Manager Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Â
Â
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
Â
THIS AGREEMENT made the _____ day of __________ 20_____ between PESCO (Peshawar Electric Supply Company (PESCO)), Manager Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
Â
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Procurement of Services For the Repair / Reclamation of 132/11 KV Power Transformers (2 x 20/26 MVA and 1 x 31.5/40 MVA) (P29282) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
Â
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1.  In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2.  The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3.  In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4.  The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
Â
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Â
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Bidder: …………………………………………………
Â
Â
Â
Contract                          Number:  Contract                              Value:  Contract Title:
Dated:
Â
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Â
To:     PESCO (Peshawar Electric Supply Company (PESCO)), Manager Room # 310, PESCO Head Quarter, Shami Road., Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
Â
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
Â
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
Â
AND WHEREAS we have agreed to give the Bidders guarantee:
Â
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarÂantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
Â
This guarantee is valid until the: [insert date]
Â
Â
Signature and seal of the Guarantors
Â
Â
_____________________________________________________________________
[name of bank or financial institution]
Â
Â
_____________________________________________________________________
[address]
Â
Â
_____________________________________________________________________
[date}