7. In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.org.pk).
LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT), CHIEF ENGINEER
22-A QUEENS ROAD LAHORE
+92-370-499-0342
ammm5@lesco.gov.pk
The following specific data for the procurement of Non-Consultancy Services to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
Name of Procuring Agency: LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT)
The subject of procurement is: TENDER NO 4388 (FOR PROCUREMENT OF SERVICES OF PRIMARY INTERNET CONNECTIVITY FOR REMOTE SITES AND MPLS L3 PRIAMARY CONNECTIVITY BETWEEN DATA CENTER AND DISASTER RECOVERY SITE)
Expected commencement date: Monday, August 31, 2026
BDS Clause Number 2
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P52025
BDS Clause Number 3
JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil
BDS Clause Number 4
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Sunday, June 28, 2026
BDS Clause Number 5
Any addendum, in case issued, shall be published on LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT) website and on EPADS v2.0.
BDS Clause Number 6
List of documents required along with the bid:
BDS Clause Number 7
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 8
Services and Their related documents:
See section Required Services and Scope of Work
BDS Clause Number 9
Price schedule will be provided according to the format defined and acquired.
see section price schedule.
BDS Clause Number 10
Specifications:
see section of specifications.
BDS Clause Number 11
The price shall be Fixed.
BDS Clause Number 12
Currency of the Bids shall be : PKR
BDS Clause Number 13
The Bids/Bid Validity period shall be: 120 Days
BDS Clause Number 14
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft
BDS Clause Number 15
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents, for example the bid validity is 90 days so the bid security shall be valid for 90+28 = 118 days.
BDS Clause Number 16
Alternative Bids to the requirements of the bidding documents will not be permitted.
BDS Clause Number 17
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
22-A QUEENS ROAD LAHORE
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Wednesday, July 8, 2026 10:30 AM
BDS Clause Number 18
The Bids opening shall take place on EPADS v2.0.
Day : Wednesday
Date: Wednesday, July 8, 2026
Time : 11:00 AM
BDS Clause Number 19
Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria
BDS Clause Number 20
The Performance guarantee shall: 5.00%.
The Performance Guarantee shall be acceptable in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft
21.
51.1
Arbitrator shall be appointed by mutual consent of the both parties.
BDS Clause Number 22
Grievence against this procurement shall be submitted online on EPADS v2.0.
| Bidder's Type | Required Registration |
|---|---|
|
Any |
FBR (NTN) FBR (GSTN) SECP |
| Eligibility Criteria | Document |
|---|---|
| Bidder (manufacturers/suppliers/stockiest/Service Provider) must be registered with FBR and are active tax payers | Yes |
| Bidder must be in Active Tax Payer list of FBR. | Yes |
| The bid security shall be, at the option of the bidder, in the form of Deposit at Call or Pay Order or Banker’s Cheque or a Bank Guarantee must be issued in the favor of CEO LESCO.The Bid Validity period shall be 120 days 28-days beyond the bid validity date after the date of tender opening | Yes |
| Bid Security shall be in favour of the Purchaser valid for a period of 28-days beyond the Bid Validity date.Bid guarantee shall be furnished on non-judicial stamp paper of value Rs.500/-. In case of any amendment in Bid Security, the bidder should also furnish the same on non-judicial stamp paper of value Rs. 500/-. | No |
| Bidder must be legally present and SECP registered in Pakistan for at least 3 years (Please attach copy of SECP registration certificate.) Local Warehouse/office presence in Pakistan preferably Islamabad/Lahore/Karachi/. | Yes |
| Long Haul License (Valid). Valid License must be attached as proof. | Yes |
| Clauses having "Required Documents" "Yes" are mandatory to attached relevant document other wise bidder will be not eligible | No |
Least Cost Based Selection (LCBS)
Lot Title : PROCUREMENT OF SERVICES OF PRIMARY INTERNET CONNECTIVITY FOR REMOTE SITES AND MPLS L3 PRIAMARY CONNECTIVITY BETWEEN DATA CENTER AND DISASTER RECOVERY SITE
Bid Security : 2216000 PKR
| Position | Delivery Schedule | Quantity |
|---|---|---|
| Primary Internet Connectivity Services (CIR) for remote sites Internet SD-WAN Sites (394 MBPS) | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 90/Nos |
90/Nos |
| Primary MPLS Connectivity Services (CIR) for remote sites with its aggregation (75 MBPS) | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 27/Nos |
27/Nos |
| Primary Internet Connectivity Services (CIR) for Data Center PR Site. IT Directorate 132 Ghazi grid Station Barki Road Lahore. (380 MBPS) | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 1/Nos |
1/Nos |
| Primary Internet Connectivity Services (CIR) for Data Center DR Site 22 Queens Road Lahore (305 MBPS) | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 1/Nos |
1/Nos |
| Primary MPLS Connectivity Services between Data Center & DR Site (LESCO Head Office) (250 MPBS) | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 1/Nos |
1/Nos |
| Live IP Addresses for PR and for DR | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 92/Nos |
92/Nos |
| One-Time Cost for Deployment Per site 1st year | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 38/Sites |
38/Sites |
| One-Time Cost for Deployment Per site 2nd year | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 39/Sites |
39/Sites |
| One-Time Cost for Deployment Per site 3rd year | Address: IT Directorate 132 Ghazi grid Station Barki Road Lahore Schedule: 90 DaysQuantity: 40/Sites |
40/Sites |
No
Lot Title : PROCUREMENT OF SERVICES OF PRIMARY INTERNET CONNECTIVITY FOR REMOTE SITES AND MPLS L3 PRIAMARY CONNECTIVITY BETWEEN DATA CENTER AND DISASTER RECOVERY SITE
Position: Primary Internet Connectivity Services (CIR) for remote sites Internet SD-WAN Sites (394 MBPS)
Specifications / Requirements:
Primary Internet Connectivity Services (CIR) for remote sites Internet SD-WAN Sites (394 MBPS) Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: Primary MPLS Connectivity Services (CIR) for remote sites with its aggregation (75 MBPS)
Specifications / Requirements:
Primary MPLS Connectivity Services (CIR) for remote sites with its aggregation (75 MBPS) a. Separate 50 MPLS Bandwidth for Aggregation Site (Primary & Backup) without any additional cost IT Directorate 132 Ghazi grid Station Barki Road Lahore. b. Separate 50 MPLS Bandwidth for Aggregation Site (Primary & Backup) Without any additional Cost. 22 Queens Road Lahore Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: Primary Internet Connectivity Services (CIR) for Data Center PR Site. IT Directorate 132 Ghazi grid Station Barki Road Lahore. (380 MBPS)
Specifications / Requirements:
Primary Internet Connectivity Services (CIR) for Data Center PR Site. IT Directorate 132 Ghazi grid Station Barki Road Lahore. (380 MBPS) Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: Primary Internet Connectivity Services (CIR) for Data Center DR Site 22 Queens Road Lahore (305 MBPS)
Specifications / Requirements:
Primary Internet Connectivity Services (CIR) for Data Center DR Site 22 Queens Road Lahore (305 MBPS) Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: Primary MPLS Connectivity Services between Data Center & DR Site (LESCO Head Office) (250 MPBS)
Specifications / Requirements:
Primary MPLS Connectivity Services between Data Center & DR Site (LESCO Head Office) (250 MPBS) Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: Live IP Addresses for PR and for DR
Specifications / Requirements:
Live IP Addresses for PR and for DR Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: One-Time Cost for Deployment Per site 1st year
Specifications / Requirements:
One-Time Cost for Deployment Per site 1st year Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: One-Time Cost for Deployment Per site 2nd year
Specifications / Requirements:
One-Time Cost for Deployment Per site 2nd year Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.Position: One-Time Cost for Deployment Per site 3rd year
Specifications / Requirements:
One-Time Cost for Deployment Per site 3rd year Mandatory Requirement/Note It is mandatory for the bidder to provision redundant/backup links against all primary connectivity Services (Aggregation sites, IT Directorate 132 KV Grid Station and 22 Queens Road) at no additional cost Preferably any wired medium/Wireless. And any Wired medium/P2P Wireless as backup at remote sites at no additional cost The backup infrastructure must ensure seamless failover, high availability, and uninterrupted operations to support the organization’s Business Continuity requirements. Any financial cost associated with redundancy, alternate routing ,or failover infrastructure shall be borne by the bidder. 100% Delivery/installation shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified.The contractor / bidder shall be responsible for
a. Service Provider will be bound to deploy internet connectivity at Data Center (132Kva Ghazi Grid Station, Barki Road Lahore and Disaster Recovery site at 22-A Queen’s Road) services prior to deployment of services at remote sites.
b. Bidder will submit a detailed project plan, the same will be strictly followed during the execution.
c. Service Provider will be bound to deploy list of 40 priority sites within 90 days as mentioned in Annexure-A (List of priority Sites).
d. 160 Days from Notification of Awards for all remaining Sites shall be completed.
e. List of all site attached in Annexure-B (List of Remote Sites)
f. All public IP addresses must be allocated from IANA-designated ranges through the appropriate Regional Internet Registry (RIR).
g. The Bidder shall be responsible for coordinating with IANA/RIRs to request and register the required IP pools under the official LESCO account and email ID (it@lesco.gov.pk)
h. The Bidder shall configure BGP (Border Gateway Protocol) sessions with designated upstream providers, ensuring proper prefix advertisement, route filtering, and compliance with global routing standards.
i. The Bidder shall ensure proper documentation of all IP allocations, ASN information, and BGP configurations for compliance, and operational continuity.
J. Initial period of contract will be of 1 Year with provision of further 2 years extension on yearly basis upon mutual consent of stakeholders.
3 Resident Engineers with mutual consent in NOC for 24x7 operational support to resolve ISP issues for timely support.
The bidder must provide onsite support during business hours and online (remote) support 24/7 for all supplied items as per BOQ.
LESCO can increase or decrease the quantity of required equipment/services/additional site at the time of Signing of Contract and anytime at later stage with mutual consent of Service Order Form/Addendum
The Service Provider will install, configure, maintain, optimize and support the internet Connectivity services CIR for the duration of the contract.
The Internet connectivity is required at all locations, per site/aggregation bandwidth required mentioned at may increase or decrease as per requirements during any time execution of contract.
The provided Layer-3 network must allow the following:
Bidder is responsible for providing smooth connectivity services.
Service provider must ensure prevention of DDOS attack at its end
The internet connectivity deployed at Data Center and DR site must be configured. Dual Home/Ring technology for failover.
MPLS L3 connectivity between Data Center and DR site must also be configured in active-active mode.
Traceroute / Hop list for Data Center and DR site list must be unique for internet connectivity and MPLS L3 service otherwise link will not be acceptable.
1. Bidder should have multiple Tier-1 Uplink connectivity.
2. Bidder should have their own valid local loop license.
3. Bidder should have their own Long-Haul connectivity to serve the customer requirement.
4. Financial Statements for the Last (03) Years along with 500M annual turnover.
5. Bidder must be and IP transit provider with operating cable landing station(s) CLS having redundant connectivity to international cable system.
6. Bidder should have their own network infrastructure presence in major cities of Pakistan including Karachi, Lahore, Islamabad, etc.
7. Bidder must provide a list of their clients with 100 or more offices connected through MPLS VPNs.
8. Bidder must have at least 25 years’ experience of industry grade internet service implementation / provision.
9. Bidder has valid updated Professional Tax Certificate.
10. Connectivity purchase orders along with documentary proof.Any device/CPE installed at LESCO site will be the property of the LESCO till the project tenure.
Installation / Configuration
Installation / Configuration The service provider will perform all the installations related to provision and commissioning of internet connectivity at the Remote Offices, Data center and Disaster Recovery site. In case of wireless connectivity, any deployed ISM Pole/Tower/equipment will be Bidder Responsibility. However, ISP will remain responsible for maintenance and replacement of faulty components till expiry of contract. In case of ISM, service provider will preferably deploy tower/pole on ground and will engage remote, and IT Directorate nominated staff prior and during activity.
The maintenance of internet connectivity and MPLS L3 links (last mile only including CPE) and all the relevant equipment will be the responsibility of Service Provider. This includes the following:
a) Any licenses, No Objection Certificates from PTA, FAB or any other regulatory authority required during the implementation will be the responsibility of the vendor.
Performance Specifications / Service Level Agreement
Services
Incident Reporting and Ticket
/ Online Complaint / Ticket Management System
Availability Services
Bandwidth
Network
Service Provider shall render Network Availability of 95% for each
designated Purchaser Site
Penalties under SLA
Failure to Conform to Network Availability:
Where:
|
Example Calculation (Quarterly Basis) |
||
|
Parameter |
Value / Formula |
Result |
|
Monthly Service Charges |
— |
PKR 1,000,000 |
|
Quarterly Service Charges |
1,000,000 × 3 |
PKR 3,000,000 |
|
Committed Availability |
— |
95% |
|
Actual Availability |
— |
93.5% |
|
Total Hours in Quarter |
24 × 30 × 3 |
2,160 hours |
|
ActualAvailableHours |
2,160 × 93.5% |
2,021 hours |
|
Non-Available Hours |
2,160 − 2,021 |
139 hours |
|
Penalty |
(3,000,000 × 139) ÷ 2,160 |
PKR 193,056 |
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Definitions
The Procuring Agency is: LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT), CHIEF ENGINEER 22-A QUEENS ROAD LAHORE
The Supplier is:
The title of the subject procurement is:TENDER NO 4388 (FOR PROCUREMENT OF SERVICES OF PRIMARY INTERNET CONNECTIVITY FOR REMOTE SITES AND MPLS L3 PRIAMARY CONNECTIVITY BETWEEN DATA CENTER AND DISASTER RECOVERY SITE)
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT), CHIEF ENGINEER
22-A QUEENS ROAD LAHORE
+92-370-499-0342
ammm5@lesco.gov.pk
Contractor/ Bidder:
[Name, address and telephone number].
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT), CHIEF ENGINEER
22-A QUEENS ROAD LAHORE
+92-370-499-0342
ammm5@lesco.gov.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ………………….
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Services till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing services due to a conflict of a nature described in Clause GCC C2.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 2.00% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 5.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause F
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause F
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
100% Delivery shall be completed within 90 days from the date of issue of purchase order. Delivery period shall be completed not later than the dates specified. The terms “Delivery Date” shall mean the date of 1st day of Inspection or 15th day of Inspection Call
whichever is earlier, shall be reckoned as date of delivery of Store to Consignee provided the goods accepted for supply have been delivered within 20-days of issue of Inspection Certificate subject to the condition that the supplier / manufacturer offers the material for Inspection at least 15-days prior to the due date and the offer is not rejected due to being a fake call or material not conforming to the specification
Inspection of the material will be carried out at your works by the authorized representatives of the office of Director General (IT) LESCO and Chief Engineer (TS) Design, if required by the purchaser / competent authority. Notice in writing shall have to be given to the office of Chief Engineer (MM) LESCO Ltd. 22-A Queen Road, Lahore by you when the store against the order is ready for inspection.
All reasonable facilities as provided in the specifications or followed by the Industry or Trade in General shall have to be afforded to the Inspecting Officer by you at your expense for carrying out inspection.
All expenses of LESCO Inspectors shall be borne by the Tenderer including Boarding/ Lodging, Daily Allowance etc. Stage inspection may be carried out, if necessary. Inspection Call shall be declared fake if the store against the inspection call is less as per the mentioned quantity.
All reasonable facilities followed by the industry or trade, in general, shall have to be accorded to the inspecting officers at your expense for carrying out the inspection.
The Inspecting Officer may reject a part or the whole of the consignment tendered for inspection, if after inspection, such portion thereof as he may decide, on his discretion, he is satisfied that the consignment is below the requirements of the particulars governing the supply given in the Purchase Order
The decision of the Inspecting Officer shall be binding on the supplier. If the stores are rejected as aforesaid, then without prejudice to the right of the Purchaser, the supplier may submit stores in replacement of those rejected but resubmission will not mean the extension of the delivery period.
On final rejection, the purchaser shall have the following rights: a. To purchase the rejected goods at the supplier’s cost and expense. b. To terminate the contract/PO and recover from the supplier the loss the Company, thereby incurs.
LESCO reserves the right to re-inspect, re-test and, where necessary, reject the Goods after their arrival at the final destination. This shall in no way be limited to or eased because of the Goods having previously been inspected, tested and passed by LESCO or its representative prior to the Goods’ shipment. The decision of LESCO based on the reports of re-inspection and/or re-testing shall be binding on the manufacturer/supplier
The payment will be made quarterly directly by the Chief Financial Officer LESCO Lahore within (30) days on the presentation of the following documents: - i. Invoice of the supplied material in triplicate including one time deployment cost. ii. Confirmation letter of acceptance of performance Bond/Security by the Chief Engineer (MM) LESCO. iii. Certificate to the effect that the billed amount has not been claimed or received earlier (Non- payment certificate).
iv. Professional Tax paid certificate by the firm. v. Timely Deployment Completion Certificate from the LESCO IT Directorate. vi. All Federal & Provincial Taxes will be applied as per prevailing laws. vii. Copy of General Sales Tax/Excise Duty Invoice.
viii. The manufacturer/supplier in its invoices shall also give an undertaking, in case of omission of any deductible amount; LESCO’s claim at any later stage (through pre-audit / post audit) shall be acceptable to them
ix. As per directions of FBR dated. 3.9.2015 conveyed vide C.E (Operation) PEPCO vide letter No. 1918-28 dated. 17.09.2015, the payment to the registered persons may be linked with the active taxpayer status of the suppliers as per FBR database. If any registered supplier is not in ATL his payment should be stopped till he files his mandatory returns and appears on ATL of FBR.
Number of GC Clause F 5 & 6
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P52025
To: LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT), CHIEF ENGINEER 22-A QUEENS ROAD LAHORE
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT), CHIEF ENGINEER 22-A QUEENS ROAD LAHORE
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., TENDER NO 4388 (FOR PROCUREMENT OF SERVICES OF PRIMARY INTERNET CONNECTIVITY FOR REMOTE SITES AND MPLS L3 PRIAMARY CONNECTIVITY BETWEEN DATA CENTER AND DISASTER RECOVERY SITE) (P52025) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT), CHIEF ENGINEER 22-A QUEENS ROAD LAHORE
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
ALL FORMS/ATTACHEMENT MUST BE READ CAREFULLY FILLED (WHERE REQUIRED) SIGNED AND STAMPED BY THE BIDDER AND UPLOAD WITH BIDDING DOCUMENT OTHERWISE BIDDER WILL BE DISQUALIFIED
WAN Projects Experience, Bidder must attach work order for all completed projects with each having at least 100 sites)
Documentary proof (copies of contracts or purchase orders or service orders). Minimum 2 Projects Must be completed.