7. In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.org.pk).
National Insurance Company Limited (National Insurance Company Limited (NICL)), Deputy Manager
3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
+92-343-771-1158
shahid.niazi@nicl.com.pk
The following specific data for the procurement of Non-Consultancy Services to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
Name of Procuring Agency: National Insurance Company Limited (National Insurance Company Limited (NICL))
The subject of procurement is: Operation and Maintenance of Lifts in NICL Building, Karachi (NICL/Procurement/2026/17) for the period of One Year
Expected commencement date: Monday, August 31, 2026
BDS Clause Number 2
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P53747
BDS Clause Number 3
JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil
BDS Clause Number 4
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Friday, July 17, 2026
BDS Clause Number 5
Any addendum, in case issued, shall be published on National Insurance Company Limited (National Insurance Company Limited (NICL)) website and on EPADS v2.0.
BDS Clause Number 6
List of documents required along with the bid: No
BDS Clause Number 7
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 8
Services and Their related documents:
See section Required Services and Scope of Work
BDS Clause Number 9
Price schedule will be provided according to the format defined and acquired.
see section price schedule.
BDS Clause Number 10
Specifications:
see section of specifications.
BDS Clause Number 11
The price shall be Fixed.
BDS Clause Number 12
Currency of the Bids shall be : PKR
BDS Clause Number 13
The Bids/Bid Validity period shall be: 90 Days
BDS Clause Number 14
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
The Bid Security shall be in the form of: Pay Order
BDS Clause Number 15
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents, for example the bid validity is 90 days so the bid security shall be valid for 90+28 = 118 days.
BDS Clause Number 16
Alternative Bids to the requirements of the bidding documents will not be permitted.
BDS Clause Number 17
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Tuesday, July 21, 2026 11:00 AM
BDS Clause Number 18
The Bids opening shall take place on EPADS v2.0.
Day : Tuesday
Date: Tuesday, July 21, 2026
Time : 11:30 AM
BDS Clause Number 19
Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria
BDS Clause Number 20
The Performance guarantee shall: 10.00%.
The Performance Guarantee shall be acceptable in the form of: Pay Order, Bank Guarantee
21.
51.1
Arbitrator shall be appointed by mutual consent of the both parties.
BDS Clause Number 22
Grievence against this procurement shall be submitted online on EPADS v2.0.
| Bidder's Type | Required Registration |
|---|---|
|
Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) |
NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| The firm must have a registered office in Karachi. Attach ownership documents/valid tenancy agreement with copy of last paid electricity bill for the stated address. | Yes |
| The firm must not be on Active Blacklisted Firms list on PPRA Website at the time of bid evaluation. | No |
| The firm must be an Active Taxpayer with respective tax authority. Attach Registration Certificate/Active Taxpayer check report for any date after publication of this tender. | Yes |
| The bidders must be registered with Pakistan Engineering Council (PEC) as C-3 with specialization Code ME-03 with minimum 5 year old registration. Attach all certificates of all years. | Yes |
| The firm should have provided Operation & maintenance contract and successfully completed the similar job of OTIS Lifts for at least (15) Fifteen clients in the past 5 years. Attach copies of the relevant completion certificate issued by authority. | Yes |
| The firm should have 50 million as total annual turnover in last 03 years. Please attach audited financial statements or income tax return or bank statement showing credit from corporate clients. | Yes |
Least Cost Based Selection (LCBS)
Positions Without Lots :
| Position | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Operation and Maintenance of Lifts in NICL Building, Karachi | Address: Bid Security Details: Format: Pay Order, Purpose of Transaction: Bid Security, Payee: National Insurance Company Limited, NTN: 0711319-6, Address: Manager Procurement Department, 5th Floor, Left Wing, NICL Building Abbasi Shaheed Road Karachi Schedule: 15 Days Quantity: 6/job |
6/job | 100000 PKR |
No
Positions Without Lots :
Position: Operation and Maintenance of Lifts in NICL Building, Karachi
Specifications / Requirements:
The primary purpose of the contract is to ensure smooth functioning of the 6 x lifts installed in NICL Building, Karachi. The NICL Building, Abbassi Shaheed Road, Karachi, is equipped with six (06) OTIS Lifts — five passenger Lifts and one service Lift. The main technical specifications for Passenger Lifts (No. 1 to 5 – OTIS) and Lift No. 6 (OTIS Service Lift) mentioned in Scope of Work. The scope of services required includes the inspection, maintenance, adjustment, cleaning, and servicing of six lifts installed in NICL Building Karachi as detailed in the main technical data. This also includes all related equipment and systems, such as machine room equipment and any other components specified in the main technical data mentioned in scope of work (Bidding document).The primary purpose of the contract is to ensure smooth functioning of the lifts installed in NICL Building, Karachi.
The scope of services required includes the inspection, maintenance, adjustment, cleaning, and servicing of six lifts installed in NICL
Building Karachi as detailed in the main technical data. This also includes all related equipment and systems, such as machine room
equipment and any other components specified in the main technical data mentioned in this document.
A brief description of services is mentioned below,
Service
1. To inspect, clean, lubricate and adjust the mechanism of the lifts at least once a month particularly cleaning of machine, motor
and control panel and greasing and oiling of bearings and guide rails.
2. To provide all cleaning material, lubricants and to drain out the gear box including replenishment of fresh oil.
3. To attend and rectify promptly any breakdown of the lifts.
4. To carry out all minor repairs without any extra charge.
5. To carry out major repair work at mutually accepted cost in addition to the price of this contract. Major works shall include
changing of suspension/ governor ropes, repair of gear box, winding of motors, etc. The contractor shall submit an estimate to the
procuring agency for approval before carrying out any major repairs which become necessary in due course but not due to any
negligence or fault of the contractor, his agents or employees of which the procuring agency shall be the sole judg The estimate
shall be submitted expeditiously so as not to disrupt the normal operation of Lifts. The contractor shall undertake the work on
approval of the estimate by the procuring agency
6. The contractor shall carry out the regular servicing and maintenance work in such a manner as to avoid interruption to regular
operation of Lifts, without any extra charge to procuring agency.
Staff
1. The contractor shall be required to deploy one (01) qualified and skilled Lift Technician at site on full time basis one (1) from
08:00 am to 6:00 pm on all working days including Saturday from 8:00 AM to 06:00 PM (However, in addition to the above, the
overall supervision and maintenance will be undertaken by contractor Service Engineers who shall conduct regular visits to the
site in order to ensure due fulfilment of the contract. For this purpose,the contractor shall maintain daily attendance register at
the site which will be countersigned by the procuring agency.
2. The contractor shall detail experienced and qualified staff for the service and maintenance that will work exclusively in the
building and shall not be diverted to the contractor's other installations. The staff must remain at the site of work during their
working hours and should have sufficient qualifications and experience in their respective trades.
3. The contractor shall depute additional staff as required from his central workshop for carrying out the work of servicing,
maintenance and minor repairs, particularly annual servicing, maintenance and overhauling and work of urgent nature, without
any extra charge to procuring agency.
4. The contractor shall arrange periodic site visits, at least once every month of his Service Engineer from his Head Office to check
the operation of the Lifts, Allied Equipment, and Systems and the servicing, maintenance, minor repairs and overhauling work
carried out by the contractor's staff. The contractor will submit the Inspection Report of his Service Engineer to the procuring
agency in first week of every month for the preceding month. The Report shall also highlight the overall performance of the
complete Lifts, Equipment and Systems and pinpoint any actions to be taken by the procuring agency.
5. Qualifications and Experience of Technical Staff Section in these bidding documents, list of staff, specify the minimum full-time
staff to be employed by the contractor at site without limitation. The contractor must employ sufficient staff to fulfill its obligations
under the contract.
6. The contractor must ensure regular attendance of the approved staff for the work and maintain an Attendance Register for the
staff and take signature from procuring agency every day.
7. Replacement staff shall be immediately arranged by the contractor if any staff cannot attend to his duties. The biodata of
replacement staff shall be immediately /submitted to the procuring agency for approval.
8. The procuring agency reserves the right to make deductions on pro-rata basis, of which the procuring agency shall be the sole
judge if the attendance of contractor's staff is irregular.
9. The contractor must ensure good behavior by his staff and the contractor's Technician at the site should liaise with and follow
the instructions of the procuring agency
10. For the purpose of identification and security, all workers of the contractor, who may be, from time to time, detailed to work
within the premises of the NICL Building, Karachi in connection with the rendering of the services shall be issued with proper
identity cards by the contractor at its own cost. The specimen of the card shall be approved by the procuring agency
11. While being present within the premises of the NICL Building, Karachi in connection with the rendering of services for and on
behalf of the contractor, all workers of the contractor shall always wear proper and clean uniform(approved by the procuring
agencyto be provided to them by the contractor).
Tools and Equipment
1. The contractor shall supply and maintain sufficient tools, equipment and instruments for the use of his staff that are required to
enable them to fulfill their obligations under the contract.
Monthly and Bi-Annual Reports
1. The contractor is to submit monthly maintenance, servicing report of work done in respect of all lifts. The report shall be based
on the work recorded in the maintenance register and shall be counter signed by the procuring agency.
2. The contractor shall also furnish 6 monthly reports on the condition of the parts of all lifts.
Operational Timings
1. The overhauling, maintenance, servicing and repairs of all Lifts, allied equipment and systems shall be carried out in a manner so that normal operation is not disrupted.
Spare Parts
1. The contractor shall ensure that the spare parts etc. are replaced only when it is considered essential. Maximum care shall be
exercised for economy and all efforts should be made to repair the old part for its reuse. New part should only be substituted
when the old part cannot be satisfactorily repaired.
2. The contractor may be asked to procure and store consumable and spares required for operation and maintenance of lifts as
and when necessary and approved by the procuring agency.
3. The contractor will submit a complete List of spare parts and materials required for the operation, routine and annual servicing,
maintenance and overhauling of Lifts.
4. The contractor shall give following minimum time Notice to the procuring agency for procurement of spare parts and materials:
i) 6 month’s time for imported spare parts & materials.
ii) 2 months time for locally available spare parts and materials.
Qualifications and Experience of Technical Staff
Lift Technician
Must have passed Matriculation Examination in Science with qualified lifts maintenance diploma/course and minimum 5 years’
experience in operation, trouble shooting and routine servicing and maintenance of OTIS or equivalent Lift equipment with
electronic controls.
Schedule of Manpower for Lift Maintenance
|
S.No |
Category of Staff |
Shift- A(Day Time) 8.00 AM to 6.00 PM (All working day Including Saturday) |
|
1 |
Lift Technician |
              01 |
Note
The deployment of number of staff in the shift well as the shift timings as mentioned above is indicative only and is subject to
change at any time in order to meet the operational requirement of the building.
Main Technical Data for Lift
The NICL Building, Abbassi Shaheed Road, Karachi, is equipped with six (06) OTIS Lifts — five passenger Lifts and one service Lift —
installed in 2010. The main technical specifications are summarized as under,
Passenger Lifts (No. 1 to 5 – OTIS)
|
Description |
Details |
|
Number of Lifts |
5 (Five) |
|
Capacity |
800 kg each |
|
Speed |
1.75 meters per second |
|
Drive System |
Variable Voltage, Variable Frequency (A.C. geared drive) |
|
No. of Starts |
240 starts per hour (average) |
|
Travel |
56,850 mm |
|
No. of Stops |
18 (Ground + 17 upper floors) |
|
Floor Designation |
Quadruplex Group Supervisory Control |
|
Control System |
Digital car position indicators |
|
Signals in Car |
Digital position and continuation indicators |
|
Signals at Floors |
Floor gongs and digital indicators |
|
Entrances per Floor |
1 (one) per car |
|
Car Dimensions (inside) |
Width: 1400 mm, Depth: 1420 mm, Height: 2300 mm |
|
Door Type |
Fully automatic OTIS center opening sliding doors |
|
Door Dimensions |
Width: 800 mm, Height: 2100 mm |
|
A.C. Power Supply |
3-Phase, 380V ±5% / -10%, 50 Hz |
|
Lighting Supply |
1-Phase, 230V, 50 Hz |
Lift No. 6 (OTIS Service Lift)
|
Description |
Details |
|
Number of Lifts |
1 (One) |
|
Capacity |
1000 kg |
|
Speed |
1.75 meters per second |
|
Drive System |
Variable Voltage, Variable Frequency (Step Controller A.C. geared drive) |
|
No. of Starts |
240 starts per hour (average) |
|
Travel |
56,850 mm |
|
Floor Designation |
Ground + 17 upper floors |
|
Control |
Step control |
|
Signals in Car |
Digital car position indicator (FUJI) |
|
Signals at Floors |
Digital floor indicators and gongs |
|
Entrances per Floor |
1 (one) |
|
Car Dimensions (inside) |
Width: 1400 mm, Depth: 1420 mm, Height: 2300 mm |
|
Door Type |
Fully automatic, Panasonic controller, center opening sliding doors |
|
Door Dimensions |
Width: 800 mm, Height: 2100 mm |
|
MachineRoom Location |
Directly above hoistway |
|
A.C. Power Supply |
3-Phase, 380V ±5%, 50 Hz |
|
Lighting Supply |
1-Phase, 230V, 50 Hz |
Contract Period
1. The contract period shall be for a period of 1 year (renewable up to a period of 2 years thereafter at maximum increase of 10%
per year subject to mutual consent of both parties)
2. The contract may be terminated with a notice period of 30 days.
Commencement of Services
1. The contractor shall assume the services within 15 days from the date of signing of the contract by both parties
Penalty
1. If the contractor fails to deliver the services, or any part thereof, within the time stated in scope of services/works with each
phase, or fails to complete the whole of the services, or, if applicable, then the contractor shall pay to the procuring agency the
relevant sum stated herein below as liquidated damages for such default (which sum shall be the only moneys due from the Consultant for such default) for every day or part of a day which shall elapse between the relevant time for Delivery or Time for
Completion and the actual date of delivery at site or the date stated in a Taking–Over Certificate of the whole of the
services/works or the relevant Section, as the case may be, subject to the applicable limit stated herein below.
2. NICL may deduct the amount of such damage from any amount due or to become due to the consultant. The payment or
deduction of such damages shall not relieve the Consultant from his obligation to complete the required services, or from any
other of his obligations & liabilities under the contract.
3. The liquidated damages for each day of delay, at the end of consultant, will be charged at Rs.1000 per day and the maximum
amount shall not exceed 2% of the total contract value.
4. If the contractor fails to deliver the services, or any part thereof, within the time stated in scope of services/works with each
phase, or fails to complete the whole of the services, or, if applicable, then the contractor shall pay to the procuring agency the
relevant sum stated herein below as liquidated damages for such default (which sum shall be the only moneys due from the
Consultant for such default) for every day or part of a day which shall elapse between the relevant time for Delivery or Time for
Completion and the actual date of delivery at site or the date stated in a Taking–Over Certificate of the whole of the
services/works or the relevant Section, as the case may be, subject to the applicable limit stated herein below.
5. NICL may deduct the amount of such damage from any amount due or to become due to the consultant. The payment or
deduction of such damages shall not relieve the Consultant from his obligation to complete the required services, or from any
other of his obligations & liabilities under the contract.
6. The liquidated damages for each day of delay, at the end of consultant, will be charged at Rs.1000 per day and the maximum
amount shall not exceed 2% of the total contract value.
For any Query or further information, please contact POC,
Â
      NICL Building Abbasi Shaheed Road Karachi, Pakistan
Â
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Definitions
The Procuring Agency is: National Insurance Company Limited (National Insurance Company Limited (NICL)), Deputy Manager 3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
The Supplier is:
The title of the subject procurement is:Operation and Maintenance of Lifts in NICL Building, Karachi (NICL/Procurement/2026/17) for the period of One Year
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
National Insurance Company Limited (National Insurance Company Limited (NICL)), Deputy Manager
3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
+92-343-771-1158
shahid.niazi@nicl.com.pk
Contractor/ Bidder:
[Name, address and telephone number].
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
National Insurance Company Limited (National Insurance Company Limited (NICL)), Deputy Manager
3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
+92-343-771-1158
shahid.niazi@nicl.com.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ………………….
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Services till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing services due to a conflict of a nature described in Clause GCC C2.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 2.00% to 2.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause F
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause F
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Number of GC Clause F 5 & 6
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P53747
To: National Insurance Company Limited (National Insurance Company Limited (NICL)), Deputy Manager 3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between National Insurance Company Limited (National Insurance Company Limited (NICL)), Deputy Manager 3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Operation and Maintenance of Lifts in NICL Building, Karachi (NICL/Procurement/2026/17) for the period of One Year (P53747) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: National Insurance Company Limited (National Insurance Company Limited (NICL)), Deputy Manager 3rd Floor, 20-A, Cricket House, Shadman-II, Jail Road., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}