In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.gov.pk).
Pakistan Single Window (PSW), Procurement Department
Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
+92-331-310-1881
Procurement@psw.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: Pakistan Single Window (PSW)
The subject of procurement is: Provision of Repair & Maintenance Services for Air Conditioning Units at PSW Offices (Karachi).
Expected commencement date: Thursday, December 31, 2026
BDS Clause Number 2
ITB Number 2.1
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P87238
BDS Clause Number 3
ITB Number 4.6
JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil
BDS Clause Number 4
ITB Number 7.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Saturday, October 24, 2026
Pre-Bid Meeting: Thursday, October 15, 2026 11:00 AM
Venue: Online
Meeting Link: https://teams.microsoft.com/meet/429773221827945?p=tLqD8D92hC5OhVqFnO
BDS Clause Number 5
ITB Number 8.1
Any addendum, in case issued, shall be published on Pakistan Single Window (PSW) website and on EPADS v2.0.
BDS Clause Number 6
ITB Number9.1
List of documents required along with the bid: No
BDS Clause Number 7
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 8
ITB Number 7.6
Services and Their related documents:
See section Required Services and Scope of Work
BDS Clause Number 9
ITB Number 13.1 & 13.2
Price schedule will be provided according to the format defined and acquired.
see section price schedule.
BDS Clause Number 10
ITB Number 7.6.2
Specifications:
see section of specifications.
BDS Clause Number 11
ITB Number 13.5
The price shall be Fixed.
BDS Clause Number 12
ITB Number 15.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 16.1
The Bids/Bid Validity period shall be: 120 Days
BDS Clause Number 14
ITB Number 17.1
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of : Pakistan Single Window (PSW)
The Bid Security shall be in the form of: Pay Order
BDS Clause Number 15
ITB Number 17.3
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents, for example the bid validity is 180 days so the bid security shall be valid for 180+28 = 208 days.
BDS Clause Number 16
ITB Number 18.1
Alternative Bids to the requirements of the bidding documents will not be permitted.
BDS Clause Number 17
ITB Number 21.1
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Tuesday, October 27, 2026 11:00 AM
BDS Clause Number 18
ITB Number 26.1
The Bids opening shall take place on EPADS v2.0.
Day : Tuesday
Date: Tuesday, October 27, 2026
Time : 11:30 AM
BDS Clause Number 19
ITB Number 32.1
Selection technique adopted will be: Quality and Cost Based Selection (QCBS)
see Evaluation Criteria
BDS Clause Number 20
ITB Number 49.1
The Performance guarantee shall: 10.00%.
The Performance Guarantee shall be acceptable in the form of: Bank Guarantee
BDS Clause Number 21
ITB Number 51.1
Arbitrator shall be appointed by mutual consent of the both parties.
BDS Clause Number 22
ITB Number 53.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
| Bidder's Type | Required Registration |
|---|---|
|
Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) |
FBR (NTN) |
| Eligibility Criteria | Document |
|---|---|
| 1. Complete Company Profile. | Yes |
| 2. Bidder must be a registered business. Bidders to provide business registration documents (SECP incorporation certificate or certificate from registrar of firms or FBR business registration certificate, etc., as the case may be) | Yes |
| 3. The bidder must be Sales Tax registered and appearing as “Active” and “Operative” on the “Taxpayer Profile” at FBR’s website at the time of submission/evaluation of bids.Bidder to provide NTN & Sales tax registration certificates. | Yes |
| 4. Bidder must have delivered similar Services to at least five (05) clients in the last three (03) years. Documents/ Purchase order/ work orders or SLAs to be provided. | Yes |
| 5. Office Location in Karachi. Bidder to share complete details on letterhead, including address, contact name, number and designation of the Point of Contact at Karachi office and details of facilities and technical personnel at Karachi. | Yes |
| 6. Bidder must have a qualified technical team to carry out maintenance services for the mentioned AC units.Details of the team to be provided. | Yes |
| 7. The Bidder must have average annual turnover of minimum PKR 5 million in last three (03) years. Applicants to provide:Audited financial statements or tax returns of last three years. | Yes |
| 8. Escalation matrix with L1, L2, and L3 turnaround times and POCs details (names, emails, and contact numbers) to be provided. | Yes |
| 9. Signed Form of Bid with official stamp affixed on it as per the format given in additional Forms and Documents of the bid document. The Form of Bid submitted with the Technical Proposal shall not contain any prices, financial information, or details of the Financial Proposal | Yes |
| 10. Bid Securing Declaration form-9 must be submitted on bidder letterhead, in the required Annexure format | Yes |
| 11. The bidder shall submit a signed and stamped declaration on company letterhead confirming no contract non-performance, default termination, or procurement-related litigation during the last five (05) years. | Yes |
| 12. The Bidder must submit a duly signed Conflict of Interest Undertaking on its letterhead confirming that it has no actual, potential, or perceived conflict of interest with respect to this procurement or the related services. Confirmation to be provided on letterhead. | Yes |
| 13. The contents of the financial proposal must not be disclosed in the technical bid. In case the contents of the financial proposal are revealed prior to the opening of the financial bids, the bidder shall be disqualified. | No |
| 14. Any bidder with which PSW has an adverse or unsatisfactory documented experience in the past five (05) years shall be disqualified | No |
Quality and Cost Based Selection (QCBS)
Weightage
| Technical Evaluation % | Financial Evaluation % |
|---|---|
| 70 | 30 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 60 | |
| 1. Years in business of Repair & Maintenance Services for Air Conditioning Units | ||
| Bidders to provide copies of earliest relevant contracts/work orders/purchase Orders etc. The total number of years of relevant experience shall be calculated from such provided earliest assignment. Claims without supporting documents shall not be considered. (Quantitative)(Doc Required) above 10 years = 20 (20) from 7 to 10 years = 15 (15) from 5 to 7 years = 10 (10) | 20 | |
| 2. Public (Government) Sector and Corporate (Private) Sector clients (MNCs, development sector, big corporations) to which bidder has provided similar services in last three (03) years: | ||
| Documentary proof in shape of copies of contracts, work orders, completion certificates etc. be provided. No claim without said documentary proof shall be accepted (Quantitative)(Doc Required) Above 8= 20 (20) From 6 to 8 = 15 (15) From 3 to 6 = 10 (10) | 20 | |
| 3. Average annual turnover | ||
| Average annual turnover in the last three (03) years. (Quantitative)(Doc Required) Above 10 million = 20 (20) Between 08 million to 10 million = 15 (15) Between 05 million to 08 million = 10 (10) | 20 | |
| 4. Service Execution & Preventive Maintenance Methodology: | ||
| The bidder shall submit a concise methodology covering preventive and corrective maintenance of the AC units, including inspection, cleaning, electrical and refrigerant-system checks, drainage, performance testing, fault diagnosis, troubleshooting, repairs, and restoration. The methodology shall also address breakdown and emergency requests, including response time, resource deployment, service workflow, and measures to minimize equipment downtime, in line with applicable industry best practices. (Qualitative)(Doc Required) | 20 | |
| 5. Proposed Technical Team | ||
| The bidder shall provide details of the proposed technical team for execution of the contract, including team composition, qualifications, relevant experience, technical expertise, certifications (if any), and experience in AC repair, maintenance, troubleshooting, and preventive maintenance. The bidder shall also provide CVs/profile of key technical personnel and evidence of relevant experience, where applicable. (Qualitative)(Doc Required) | 20 | |
No
Positions Without Lots :
Position: Annual Repair & Maintenance Services of Air Conditioning Units at PSW Offices (Karachi)
Specifications / Requirements:
| S. No | Item Description | UoM |
|---|---|---|
| 1 | Annual Maintenance Charges (includes two visits – one visit after every six months) For 01 Ton AC (For evaluation, annual maintenance charges will be calculated as per the number of AC units given in the Scope of Work) | Job |
| 2 | Annual Maintenance Charges (includes two visits – one visit after every six months) for 1.5 Ton AC (For evaluation, annual maintenance charges will be calculated as per the number of AC units given in the Scope of Work) | Job |
| 3 | Annual Maintenance Charges (includes two visits – one visit after every six months) for 2 Ton AC (For evaluation, annual maintenance charges will be calculated as per the number of AC units given in the Scope of Work) | Job |
| 4 | Annual Maintenance Charges (includes two visits – one visit after every six months) for 4-ton AC (For evaluation, annual maintenance charges will be calculated as per the number of AC units given in the Scope of Work) | Job |
| 5 | On-call visit and Diagnosis charges (without parts) | Job |
| 6 | Labor charges for replacement of capacitor 1 ton | Job |
| 7 | Labor charges for replacement of circuit board 1 ton | Job |
| 8 | Charges for the installation of AC 1 ton | Job |
| 9 | Charges for dismantling/un-installation of AC 1 ton | Job |
| 10 | Labor charges for replacement of compressor 1 ton | Job |
| 11 | Labor charges for condenser replacement 1 ton | Job |
| 12 | Labor charges for cooling coil replacement 1 ton | Job |
| 13 | Labor charges for replacement of AC 1/2 VALVE 1 ton | Job |
| 14 | Labor charges for replacement of AC 1/4 VALVE 1 ton | Job |
| 15 | Labor charges for replacement of Four-Way Valve AC 1 ton | Job |
| 16 | Labor charges for AC Gas R410 Charges 1 ton | Job |
| 17 | Labor charges for AC Gas R22 Charges 1 ton | Job |
| 18 | Labor charges for Circuit Board Repair (Minor) 1 ton | Job |
| 19 | Labor charges for Circuit Board Repair (Major) 1 ton | Job |
| 20 | Labor charges for AC Leakage Repair (per leakage) 1 ton | Job |
| 21 | Labor charges for replacement of AC U BAND 5/8 1 ton | Job |
| 22 | Labor charges for replacement of AC U BAND 3/8 1 ton | Job |
| 23 | Labor charges for Cooling Coil Repairing 1 ton | Job |
| 24 | Labor charges for replacement of capacitor 1.5 ton | Job |
| 25 | Labor charges for replacement of circuit board 1.5 ton | Job |
| 26 | Charges for the installation of AC 1.5 ton | Job |
| 27 | Charges for dismantling/un-installation of AC 1.5 ton | Job |
| 28 | Labor charges for replacement of compressor 1.5 ton | Job |
| 29 | Labor charges for condenser replacement 1.5 ton | Job |
| 30 | Labor charges for cooling coil replacement 1.5 ton | Job |
| 31 | Labor charges for replacement of AC 1/2 VALVE 1.5 ton | Job |
| 32 | Labor charges for replacement of AC 1/4 VALVE 1.5 ton | Job |
| 33 | Labor charges for replacement of Four-Way Valve AC 1.5 ton | Job |
| 34 | Labor charges for AC Gas R410 Charges 1.5 ton | Job |
| 35 | Labor charges for AC Gas R22 Charges 1.5 ton | Job |
| 36 | Labor charges for Circuit Board Repair (Minor) 1.5 ton | Job |
| 37 | Labor charges for Circuit Board Repair (Major) 1.5 ton | Job |
| 38 | Labor charges for AC Leakage Repair (per leakage) 1.5 ton | Job |
| 39 | Labor charges for replacement of AC U BAND 5/8 1.5 ton | Job |
| 40 | Labor charges for replacement of AC U BAND 3/8 1.5 ton | Job |
| 41 | Labor charges for Cooling Coil Repairing 1.5 ton | Job |
| 42 | Labor charges for replacement of capacitor 2 ton | Job |
| 43 | Labor charges for replacement of circuit board 2 ton | Job |
| 44 | Charges for the installation of AC 2 ton | Job |
| 45 | Charges for dismantling/un-installation of AC 2 ton | Job |
| 46 | Labor charges for replacement of compressor 2 ton | Job |
| 47 | Labor charges for condenser replacement 2 ton | Job |
| 48 | Labor charges for cooling coil replacement 2 ton | Job |
| 49 | Labor charges for replacement of AC 1/2 VALVE 2 ton | Job |
| 50 | Labor charges for replacement of AC 1/4 VALVE 2 ton | Job |
| 51 | Labor charges for replacement of Four-Way Valve AC 2 ton | Job |
| 52 | Labor charges for AC Gas R410 Charges 2 ton | Job |
| 53 | Labor charges for AC Gas R22 Charges 2 ton | Job |
| 54 | Labor charges for Circuit Board Repair (Minor) 2 ton | Job |
| 55 | Labor charges for Circuit Board Repair (Major) 2 ton | Job |
| 56 | Labor charges for AC Leakage Repair (per leakage) 2 ton | Job |
| 57 | Labor charges for replacement of AC U BAND 5/8 2 ton | Job |
| 58 | Labor charges for replacement of AC U BAND 3/8 2 ton | Job |
| 59 | Labor charges for Cooling Coil Repairing 2 ton | Job |
| 60 | Labor charges for replacement of capacitor 4 ton | Job |
| 61 | Labor charges for replacement of circuit board 4 ton | Job |
| 62 | Charges for the installation of AC 4 ton | Job |
| 63 | Charges for dismantling/un-installation of AC 4 ton | Job |
| 64 | Labor charges for replacement of compressor 4 ton | Job |
| 65 | Labor charges for condenser replacement 4 ton | Job |
| 66 | Labor charges for cooling coil replacement 4 ton | Job |
| 67 | Labor charges for replacement of AC 1/2 VALVE 4 ton | Job |
| 68 | Labor charges for replacement of AC 1/4 VALVE 4 ton | Job |
| 69 | Labor charges for replacement of Four-Way Valve AC 4 ton | Job |
| 70 | Labor charges for AC Gas R410 Charges 4 ton | Job |
| 71 | Labor charges for AC Gas R22 Charges 4 ton | Job |
| 72 | Labor charges for Circuit Board Repair (Minor) 4 ton | Job |
| 73 | Labor charges for Circuit Board Repair (Major) 4 ton | Job |
| 74 | Labor charges for AC Leakage Repair (per leakage) 4 ton | Job |
| 75 | Labor charges for replacement of AC U BAND 5/8 4 ton | Job |
| 76 | Labor charges for replacement of AC U BAND 3/8 4 ton | Job |
| 77 | Labor charges for Cooling Coil Repairing 4 ton | Job |
The annexure is attached, which details the services provided and the scope of work involved for the Annual Maintenance of ACs.
-
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Definitions
The Procuring Agency is: Pakistan Single Window (PSW), Procurement Department Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
Contractor is:
The title of the subject procurement is:Provision of Repair & Maintenance Services for Air Conditioning Units at PSW Offices (Karachi).
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Pakistan Single Window (PSW), Procurement Department
Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
+92-331-310-1881
Procurement@psw.gov.pk
Contractor/ Bidder:
[Name, address and telephone number].
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Pakistan Single Window (PSW), Procurement Department
Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
+92-331-310-1881
Procurement@psw.gov.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ………………….
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 16.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.05% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Pakistan Single WIndow
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P87238
To: Pakistan Single Window (PSW), Procurement Department Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Pakistan Single Window (PSW), Procurement Department Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Provision of Repair & Maintenance Services for Air Conditioning Units at PSW Offices (Karachi). (P87238) and has accepted a Bids by the Bidder for the provision of Services in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Pakistan Single Window (PSW), Procurement Department Ground Floor, NESPAK Building, Sector G-5/2, Islamabad, Pakistan
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Non-Consultancy Services(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}