Â
7. In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.org.pk).
Â
Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore), Pharmacist
Pharmacy Depatment SZH, University Road, New Muslim City, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
+92-300-424-8941
pharmacy@skzmdc.edu.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore) The subject of procurement is:Â Tender Notice for Private Medical Store/Pharmacy No-II SZHL Expected commencement date: Wednesday, July 1, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2025-26 Name and identification number of the Contract: P18308Â |
| 3. | 4.6 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
7.1 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, April 20, 2026 |
| 5. | 8.1 |
Any addendum, in case issued, shall be published on Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore) website and on EPADS v2.0. |
| 6. |
9.1 |
List of documents required along with the bid:
 |
| 7. | 11.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 7.6 |
|
| 9. | 13.1 & 13.2 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 7.6.2 |
 Specifications: see section of specifications. |
C. Preparation of Bids |
||
|
11. |
13.5 |
The price shall be Fixed. |
| 12. |
15.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 90 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.3 |
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents,  for example the bid validity is 180 days so the bid security shall be valid for  180+28 = 208 days. |
| 16. | 18.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Pharmacy Depatment SZH, University Road, New Muslim City, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Tuesday, April 28, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
26.1 |
The Bids opening shall take place on EPADS v2.0. Day : Tuesday Date:Â Tuesday, April 28, 2026 Time : 11:30 AM |
|
19. |
32.1 |
Selection technique adopted will be: Quality Based Selection (QBS) |
F. Award of Contract |
||
|
20. |
49.1 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Pay Order, Banker's Cheque, Demand Draft |
| 21. | 51.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
53.1 |
Grievence against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
|
Sole Proprietorship Company (Private Limited) |
NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) Punjab (PRA) |
| Eligibility Criteria | Document |
|---|---|
| 1. Minimum 10 branches /Out-Lets | Yes |
| 2. Valid Income Tax Registration | Yes |
| 3. Valid General Sales Tax Registration (Status with FBR) | Yes |
| 4. Punjab Sales Tax Registered | Yes |
| 5. Valid drug sale certificate at the time of bidding. However successful bidder will provide valid drug sale certificate for further required period. | Yes |
| 6. In full compliance of the Execution Schedule and delivery Period Mentioned In tender document (Undertaking of same On legal stamp paper | Yes |
| 7. Compliance to the services required Under clause 5, 6 & 7 of terms & Conditions | Yes |
| 8. Financial position / Bank Statement | Yes |
| 9. Photo copy of National Identity Card, Residential Office address along with Telephone Numbers. | Yes |
| 10. Professional tax payment certificate | Yes |
Quality Based Selection (QBS)
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 60 | |
| Technical Evaluation Criteria | ||
| Market Presence (Max Point-20) (Qualitative)(Doc Required)  More Than 20 branches /Outlet  (20)  15 to 20 branches/Outlet  (15)  10 to 15 branches/Outlet  (10) | 20 | |
| Minimum three Years of establishment. (Quantitative)(Doc Required) | 10 | |
| Financial Strength Experience (Max Point-20) (Qualitative)(Doc Required)  Worth of Project (verifiable through relevant Purchase Order/ Contract Last three years - 41-45 million  (20)  Worth of Project (verifiable through relevant Purchase Order/ Contract Last three years - 36-40 million  (15)  Worth of Project (verifiable through relevant Purchase Order/ Contract Last three years - 31-35 million  (10) | 20 | |
| Revenue (Max Point-20) (Qualitative)(Doc Required)  Average Annual revenue of last three years - 71-80 million & above  (20)  Average Annual revenue of last three years - 61-70 million  (15)  Average Annual revenue of last three years - 51-60 million  (10) | 20 | |
| Punjab Sales Tax Registered (Max Points 5) (Quantitative)(Doc Required) | 5 | |
| Professional tax payment certificate (Max Point 5) (Quantitative)(Doc Required) | 5 | |
| Human Resources Professionals (Max Points 20) (Qualitative)(Doc Required)  Qualified Pharmacist to be provided - D-Pharmacy & M-Pharmacy (Both)  (20)  Qualified Pharmacist to be provided - M-Pharmacy equal  (10)  Qualified Pharmacist to be provided - D-Pharmacy equal  (10) | 20 | |
Positions Without Lots :
| Position | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| 1 x Room (12x18), 216 Sq feet |
Address: Shaikh Zayed Hospital, University Road, New Muslim City, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). Schedule: 27 Days Quantity: 1 |
1 | 2700000 |
No
Positions Without Lots :
Position: 1 x Room (12x18), 216 Sq feet
Specifications / Requirements:
For the purpose of this rental agreement unless a contrary intention appears from the subject in the contract, the term, Medical Store/pharmacy mean, 1 x Room (12x18), 216 Sq feet adjacent to Social Welfare Office Opposite Hospital Canteen Shaikh Zayed Medical Complex, Lahore. The contract period will be 03 Years (Extendable) from the date of award with 10% annual increase. For the purpose of this agreement unless a contrary intention appears from the subject in the contract, the term, Medical Store/pharmacy mean, 1 x Room (12x18), 216 Sq feet adjacent to Social Welfare Office Opposite Hospital Canteen Shaikh Zayed Medical Complex, Lahore.
2. The bidder is required to deposit Rs.2,700,000/= (Rupees Twenty Seven Lac Only) of bid price in the shape of call deposit in the name of Executive Director Shaikh Zayed Hospital from any scheduled Bank at the time of submission of offer. No bid will be considered for acceptance without call deposit.
3. The contractor will furnish a Performance Guarantee @ 10% of total bidding amount / contract amount in the shape of Bank Draft / Pay Order in the name of Executive Director Shaikh Zayed Hospital Lahore. The contractor shall be bound to provide the Performance Guarantee within seven (7) days of receipt of award letter. This Performance Guarantee will be refundable after expiry of the contract. If successful bidder fails to meet the time limit for depositing Performance Guarantee, he will lose contract that, his bid shall stand cancelled and the CDR obtained as bid security shall be forfeited. Consequently, contract will be awarded to the next higher bidder, approved by the Hospital Authorities.
4. The contract period will be 03 Years (Extendable) from the date of award with 10% annual increase.
5. The contractor will provide all Medical supplies/ Medicines/ Surgical supplies and disposable items and shall keep for sale at Retail Price concluded by the Ministry of Health / DRAP Islamabad comparable with market prices.
6. Medicines in the medical store shall have sufficient shelf life. Medicines with less than 1 year expiry date will not be sold in the medical store.
7. All vaccines / Insulin's / Medicines which require refrigeration will be kept in refrigerators.
8. Executive Director Shaikh Zayed Medical Complex Lahore or any other officer detailed by Executive Director can check the Medicines / shelf life etc.
9. If during the period of this agreement, any competent authority or by the Government or BOG of Shaikh Zayed Medical Complex Lahore issue new directions/orders/decisions, Notifications regarding the said license agreement it will be modified or cancelled/ terminated accordingly.
10. The Medical Store / Pharmacy will be managed by a qualified Pharmacist and the Pharmacy / Medical Store will be organized, managed and run on modem scientific lines.
11. No hand written bill will be issued to customer only computerized bill will be issued.
12. The Medical Store/Pharmacy room will be used exclusively for the storage and sale of Medicines, Medical, Surgical supplies. No eatable / general supplies would be sold on the medical store.
13. The contractor / licensee will make available all the essential drugs as per list approved by the Ministry of Health; Pakistan as well other commonly used medicines, Surgical and related items.
14. The Medical Store will be run in accordance with the provision of drugs act and the other rules, regulations applicable laws there under.
15. Any dispute concerning this agreement including interpretation of any terms of this agreement shall be referred for the decision to Executive Director Shaikh Zayed Medical Complex Lahore, who shall be the sole arbitrator.
16. If the contractor /licensee or his employees, sub agents misuse the space or the area, this agreement will stand rescinded and penalty of Rs.100,000/- (Rupees One Lac Only) will be imposed for misuse of space. Â
17. The contractor shall be responsible to keep the Medical Store clean and tidy.
18. The contractor will be responsible to pay the electricity bill on commercial rates. However, Rs.100,000/ (Rupees One Lac only) per month shall be charged for electricity if meters goes out of order.
19. The contractor will be responsible for the safe custody of the Hospital property i.e Medical Store fixtures and furniture and will also be responsible for their maintenance at his own cost.
20. In case the contractor fails to deposit the installments of contract money on due date the security shall be forfeited and the contract shall be cancelled.
21. If the contractor does not pay the utility bills, shall be liable to pay penalty of Rs.1,000/= per day and after 30 days utilities like electricity / Gas etc shall be disconnected.
22. On expiry of the contract, all facilities i.e. electricity, Gas etc. shall be disconnected.
23. The contractor / licensee shall pay all rates, taxes and assessments whatsoever payable or hereafter to become payable to the Federal, Provincial Govt. L.M.0 or L.D.A in respect at the said Medical Store.
24. The contractor / licensee shall pay Income Tax in advance on the contract value according to prevailing income Tax rate as per Income Tax Ordinance 2001 (Individual and AOP).He shall provide copy of the paid bank Challan to the Hospital Administration and will be kept in Estate office for record.
25. The contractor / licensee shall also be responsible to make conservancy arrangements.
26. The contractor / licensee shall be directly responsible for all claims, which may be made by customers of any loss and damage etc.
27. The contractor / licensee shall not part with assign or transfer the privileges under this agreement or the room and land or any portion thereof.
28. The contractor / licensee shall be responsible for compliance with the provisions of the payment of wages act in force and the rules made in respect of the staff employees by him. He shall keep the Executive Director Shaikh Zayed Medical Complex, Lahore indemnified and harmless against all losses and claims arising directly or indirectly through any failure or omission or breech of any term or obligation of the said status under this agreement / applicable law.
29. The contractor / licensee shall be responsible to comply with the provisions of employment of children Act 1936 or any statutory modification thereof and the rules framed under the said act.
30. In the event of the earlier termination of this agreement all payment (s) made by the contractor / licensee to the Shaikh Zayed Medical Complex. Lahore Executive Director in terms of this agreement and the security deposit mentioned here before shall move no claim whatsoever against the Institute.
31. On the expiry of earlier termination of this agreement, the contractor / licensee shall forthwith remove his belongings and restore the said Medical Store in the original condition without any objection opposition of delay.
32. That this agreement or any terms or condition or provision / right / obligation hereunder shall be varied / altered or modified until / unless the same is endorsed on this agreement or by execution of a supplementary written agreement to be executed by both the parties for varying or altering or modifying this agreement.
33. In this agreement unless a different intention appears from subject of the context the terms Hospital's Administration shall include besides the Chairman, the Executive Director of the Hospital and other officers of the SZMC who may be duly authorized thereto.
34. That, without prejudice to the rights of the Institute. Executive Director reserve under the clauses mentioned above, the contractor / licensee shall pay a penalty which may extend to Rs 10,000/- for each complaint of charging more than the prescribed rates, or incivility to public or any other complaint. The decision of the Executive Director shall he final and binding on the contractor / licensee.
35. The cost of stamp paper on this agreement shall be borne by the contractor / licensee.
36. It is expressly agreed that either party shall be at liberty to terminate this agreement at any time by giving one month's prior notice in writing to the other party without assigning any reason. In case Notice is given by the licensee, the contractor / licensee shall be bound to carry out the work till final decision is communicated by the Executive Director Shaikh Zayed Medical Complex, Lahore. Then his security deposit shall be refunded.
37. The contract money will be deposited on due date every month in advance. In case the contractor fails to deposit the contract money on due date, he will levied an amount of Rs.1,000/- per day in lieu of fine.
Note. Verifiable documentary proof for all above requirements and criteria points are mandatory requirement and marks will be awarded on the basis of these verifiable proofs. Bidder must include check list for above requirements in their bid.
b)Â Â Â Â Â Â FINANCIAL BID
(i). Â Â Â Â Contract money of rent.
39. The bidder must fulfill all the Pharmacy requirement, as per Drug Act 1976 DRAP rules during currency of contract.
40. If the contractor violates the terms of the said contract intentionally and in case of over charges from the customers and if hospital management receives complaints in writing against the contractor, Executive Director will probe the complaint thoroughly and if, the contractor found guilty Executive Director has the power to cancel the contract. Security deposited will not be refunded.
41. The contractor will be allowed to operate only one out-let in this hospital.
42. Estate Officer will be informed about deputed staff in Pharmacy by providing credentials photo copies of CNIC after signing the contract agreement of contract.
43. The contractor / licensee shall be liable to have this agreement registered with the office of the Sub Registrar concerned under the law and the cost / expenses of registration along with stamp duty should be borne by the contractor.   Â
44. The Executive Director reserves the right to reject any or all offers as per Rule-33 of PPRA Rules 2004 (amended).
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
|
Number of GC Clause |
Amendments of, and Supplements to, Clauses in the General Conditions of Contract |
|
 |
Definitions The Procuring Agency is: Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore), Pharmacist Pharmacy Depatment SZH, University Road, New Muslim City, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). The Supplier is: The title of the subject procurement is:Tender Notice for Private Medical Store/Pharmacy No-II SZHL |
|
GCC 2 |
Applicable/Governing Law: The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan |
|
GCC 3 |
Language: The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English. |
|
GCC 4 |
Notices: The addresses for the notices are: Procuring Agency: Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore), Pharmacist Contractor/ Bidder:  [Name, address and telephone number]. The Contractor/ Bidder’s Representative(s) [Name, address, telephone number and e-mail address]  |
|
GCC 6.1 |
The Authorized Representatives are:  For the Procuring Agency: Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore), Pharmacist For the Bidder: Name: ……………………… Designation: …………….. Address: ……………………………..  |
|
GCC 7 |
Effectiveness of the contract The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties |
|
GCC 8 |
Commencement of Contract: The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract. |
|
GCC 10.2 |
Expiration of Contract: The time period shall be …………………. |
|
GCC 14 |
Termination In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements. |
|
GCC 16 |
Conflict of Interest: The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17. |
|
GCC 20 |
Liquidated Damages If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 0.01%Â of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority. |
|
GCC 21 |
Performance Guarantee: The amount of performance guarantee shall be 10.00%Â of the contract price in acceptable form of Pay Order, Banker's Cheque, Demand Draft |
|
GCC 27 |
Currency of Payment: All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees. |
|
GCC 28 |
Payment terms: Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract. |
| Â | Â |
|
GCC 29 |
Identifying Defects: The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided. |
|
GCC 31 Â |
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder. Arbitrator’s fee: The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties. Appointing Authority for Arbitrator: By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties. Rules of procedure for arbitration proceedings: Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator. Place of Arbitration and Award: The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties. |
Date: [insert date (as day, month and year)]
Bid No.:P18308
To: Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore), Pharmacist Pharmacy Depatment SZH, University Road, New Muslim City, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Â
Â
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
Â
THIS AGREEMENT made the _____ day of __________ 20_____ between Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore), Pharmacist Pharmacy Depatment SZH, University Road, New Muslim City, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
Â
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Tender Notice for Private Medical Store/Pharmacy No-II SZHL (P18308) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
Â
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1.  In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2.  The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3.  In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4.  The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
Â
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Â
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Bidder: …………………………………………………
Â
Â
Â
Contract                          Number:  Contract                              Value:  Contract Title:
Dated:
Â
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Â
To:     Sheikh Zayed Hospital (Shaikh Zayed Postgraduate Medical Institute (SZPGMI), Lahore), Pharmacist Pharmacy Depatment SZH, University Road, New Muslim City, Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Â
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
Â
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
Â
AND WHEREAS we have agreed to give the Bidders guarantee:
Â
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarÂantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
Â
This guarantee is valid until the: [insert date]
Â
Â
Signature and seal of the Guarantors
Â
Â
_____________________________________________________________________
[name of bank or financial institution]
Â
Â
_____________________________________________________________________
[address]
Â
Â
_____________________________________________________________________
[date}
Bidding Document Complete
Minimum three Years of establishment.