In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Procurement and Contract Wing (Capital Development Aurhority (CDA)), Deputy Director
Chairman Office, CDA, G-7/4., Islamabad Capital Territory
+92-333-545-3375
Dd.iipcaii@cda.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Procurement and Contract Wing (Capital Development Aurhority (CDA)) The subject of procurement is:Â PROVIDING / INSTALLATION OF FIRE ALARM SYSTEM ALONG WITH FIRE SAFETY EQUIPMENT, UPGRADATION OF ELECTRICAL INFRASTRUCTURE AND OVERHAULING OF GENERATORS INSTALLED AT CAPITAL HOSPITAL SECTOR G-6/2, ISLAMABAD Expected commencement date: Wednesday, October 28, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P110362Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 3 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, September 14, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Procurement and Contract Wing (Capital Development Aurhority (CDA)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 120 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Call at Deposit  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Chairman Office, CDA, G-7/4., Islamabad Capital Territory Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Monday, September 21, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Monday Date:Â September 21, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Individual / Individual Consultant Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| i. Registered with PEC in Category C-5 or above (valid) having codes ME-02 & EE-04 | Yes |
| ii. Registered with PEC before ten years or beyond | Yes |
| iii. Not having been debarred/ blacklisted. The bidder must provide undertaking on stamp paper. | Yes |
| iv. There should not be pending litigation against the bidder. The bidder must provide undertaking on stamp paper. In case there is any pending litigation, the bidder must provide an undertaking on stamp paper that the pending litigation will be resolved. | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Firm's Work Experience (Completed Similar Works) | ||
| Rs. 70 Million and above
NOTE: Only similar works having an individual contract value of Rs. 10 Million or above shall be considered for scoring. The value of works shall be supported by documentary evidence such as work orders/contracts and completion certificates for completed works, and work orders/contracts with progress certificates for ongoing works. for completed works (Quantitative)(Doc Required) Rs. 70 Million and above (35) Rs. 50 Million to below Rs. 70 Million (25) Rs. 30 Million to below Rs. 50 Million (20) Rs. 20 Million to below Rs. 30 Million (10) Rs. 10 Million to below Rs. 20 Million (5) | 35 | |
| Firm's Work Experience (Ongoing Similar Works) | ||
| Rs. 70 Million and above
NOTE: Only similar works having an individual contract value of Rs. 10 Million or above shall be considered for scoring. The value of works shall be supported by documentary evidence such as work orders/contracts and completion certificates for completed works, and work orders/contracts with progress certificates for ongoing works. for completed works (Quantitative)(Doc Required) Rs. 70 Million and above (35) Rs. 50 Million to below Rs. 70 Million (25) Rs. 30 Million to below Rs. 50 Million (20) Rs. 20 Million to below Rs. 30 Million (10) Rs. 10 Million to below Rs. 20 Million (5) | 35 | |
| Financial Capabilities (Average Annual Turnover) | ||
| Rs. 150 Million and above
NOTE: Average annual turnover shall be calculated on the basis of audited financial statements or income tax returns for the last three (03) financial years. (Quantitative)(Doc Required) Rs. 150 Million and above (20) Rs. 100 Million to below Rs. 150 Million (18) Rs. 75 Million to below Rs. 100 Million (15) Rs. 50 Million to below Rs. 75 Million (10) Rs. 10 Million to below Rs.50 Million (5) | 20 | |
| Financial Capabilities (Available Credit Line / Bank Facility) | ||
| Rs. 40 Million and above
NOTE: The available credit line/bank facility shall be supported by a certificate issued by a scheduled bank (Quantitative)(Doc Required) Rs. 40 Million and above (10) Rs. 30 Million to below Rs. 40 Million (8) Rs. 20 Million to below Rs. 30 Million (6) Rs. 10 Million to below Rs. 20 Million (4) Rs. 05 Million to below Rs. 10 Million (2) | 10 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| PROVIDING / INSTALLATION OF FIRM ALARM SYSTEM ALONG WITH FIRE SAFETY EQUIPMENT, UPGRADATION OF ELECTRICAL INFRASTRUCTURE AND OVERHAULING OF GENERATORS INSTALLED ATCAPITAL HOSPITAL SECTOR G-6/2, ISLAMABAD | Address: Chairman Office, CDA, G-7/4., Islamabad Capital Territory Schedule: 90 Days Quantity: 43431/Qty |
43431/Qty | 2170610 PKR |
No
Jobs Without Lots :
Job: PROVIDING / INSTALLATION OF FIRM ALARM SYSTEM ALONG WITH FIRE SAFETY EQUIPMENT, UPGRADATION OF ELECTRICAL INFRASTRUCTURE AND OVERHAULING OF GENERATORS INSTALLED ATCAPITAL HOSPITAL SECTOR G-6/2, ISLAMABAD
Specifications / Requirements:
| Sr. No | Ref.No | Description | Unit | Qty | Rate | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Supply, installation and commissioning of wired/wireless Addressable Microprocessor based Fire Alarm Control Panel (FACP) capable of PC interface with window conforming to EN-54, consisting of specified loop circuits having 240 devices per loop, indicating circuits, built in power supply with back up batteries, alarm and trouble indication, silence alarm and reset system, general alarm and reset system, general alarm facility. Made of Eurotech Fire UK, Notifier USA, Simplex USA. complete in all respect as approved and directed by Engineer In charge. IV) FACP 4- loop panel Note:- The FACP shall be integrated with BMS (without any additional module). | Nos | 6 | 613233.45 | Rupees six hundred thirteen thousand two hundred thirty three Paisa Fourty Five only | 3679400.7 |
| 2 | 2 | Supply, installation and commissioning of Addressable Optical Smoke DetectoRupees EN-54, incorporating an LED indication located in labyrinth within housing the detector. Sensing unit, adjustable via software between 0- 90 seconds having built in short circuit isolatoRupees on both inputs. Make Honeywell/ Bosch/ Eaton (UK),or equivalent including the cost of all other accessories as required, approved and directed by the Engineer In charge. ii)-Dual Detector | Nos | 1280 | 12540.9 | Rupees twelve thousand five hundred fourty Paisa Ninety only | 16052352 |
| 3 | 3 | Supply, installation and commisioning of Addressable Heat DetectoRupees incorporating an LED indication located in labyrinth with in the housing of the detector. adjustable Sensing unit via software between 0-90 seconds. The detector shall have built in short circuit isolatoRupees on both inputs. made of Ademco/ Honeywell/ Bosch/ Eaton . i)-Fixed Heat Detector to Sense High Temperatures | Nos | 680 | 7558.3 | Rupees seven thousand five hundred fifty eight Paisa Thirty only | 5139644 |
| 4 | 4 | Supply, installation and commissioning of Addressable Type Indoor Loop Powered Electronic Sounder/Flasher/Bell EN-54 with minimum sound output 100dB at 1meter with frequencies of variety of sounds as required and shall be loop wired and loop signaled, built in short circuit isolator, configured via software. made of Honeywell/ Bosch/ Eaton (UK), or equivalent as approved and directed by the Engineer In charge. II)-With Flasher | Nos | 140 | 25972.5 | Rupees twenty five thousand nine hundred seventy two Paisa Fifty only | 3636150 |
| 5 | 5 | Supply, installation and commissioning with Addressable Break Glass unit, (Manual Call Point) with key type EN-54 having a built-in short circuit isolator and microprocessor to ensure a response time of max. 1second, having an indication LED flash after pressing the button to acknowledge the activation and a key operation facility for testing purposes. made of Honeywell/ Bosch/ Eaton (UK) or as approved and directed by the Engineer In charge. | Nos | 160 | 18588.9 | Rupees eighteen thousand five hundred eighty eight Paisa Ninety only | 2974224 |
| 6 | 6 | Supply and erection of PVC pipe for wiring including inspection boxes & pull boxes, hooks, and repairing surface, etc., complete with all specials :- b ) On Surface i/c clamps ii) 20 mm i/d | Mtr | 15500 | 232.2 | Rupees two hundred thirty two Paisa Two only | 3599100 |
| 7 | 7 | Supply, Installation and commissioning of wiring with specified Fireresistant Shielded Cable (Fire Rating for 2 houRupees) of required size from respective DB to Fire Alarm FACP (Fire Alarm Control Panel) in prelaid conduit/duct. Make Pony / Belden/ Covian(Italy) or equivalent as approved and directed by the Engineer In charge. i)-2C,1.5mm2 | Mtr | 15500 | 441.8 | Rupees four hundred fourty one Paisa Eighty only | 6847900 |
| 8 | 8 | Providing and fixing of fire extinguisheRupees and fire blanket of following type and capacities complete in all respect as approved and directed by the Engineer Incharge. i)- Dry Chemical Powder capacity 6 Kg. | Nos | 950 | 13329.6 | Rupees thirteen thousand three hundred twenty nine Paisa Sixty only | 12663120 |
| 9 | 9 | Providing and installation of Fire Alarm Slave (Repeater) Panel, compatible with the main Fire Alarm Control Panel (FACP), complete with LCD/LED zone indication, audible/visual alarm indicatoRupees, and control switches for acknowledge, silence and reset functions. Panel shall be wall/surface mounted with backup battery and charger unit as per manufacturer's standard, conforming to relevant fire safety codes EN 54 . Includes all interconnecting cabling, conduits, termination, batteries backup and integration with the main fire alarm network for complete functional operation and as per directed by site engineer incharge. | No | 1 | 1221000 | Rupees one million two hundred twenty one thousand only | 1221000 |
| 10 | 10 | Providing/fixing of self-contained LED Emergency Exit Light with integral rechargeable battery backup (min. 3 houRupees as per EN 1838), pictogram signage, and automatic charging unit made of Europen Brand including all mounting accessories, wiring and testing for complete functional operation and as per direction of site engineer incharge. | Nos | 70 | 24700 | Rupees twenty four thousand seven hundred only | 1729000 |
| 11 | 11 | Providing/fixing of internally illuminated LED Exit pictogram signage, approximately size 320x270x110 mm,made of Europen brand, complete with mounting accessories and wiring for complete functional operation as approved and directed by site Engineer incharge. | Nos | 50 | 16500 | Rupees sixteen thousand five hundred only | 825000 |
| 12 | 12 | Supply and erection of PVC pipe for wiring including inspection boxes, & pull boxes, hooks, and repairing surface, etc., complete with all specials. b) On Surface i/c clamps ii) 20 mm i/d | Mtr | 900 | 232.55 | Rupees two hundred thirty two Paisa Fifty Five only | 209295 |
| 13 | 13 | Supply and erection of PVC pipe for wiring including inspection boxes, & pull boxes, hooks, and repairing surface, etc., complete with all specials. b) On Surface i/c clamps iii) 25 mm i/d | Mtr | 600 | 282.25 | Rupees two hundred eighty two Paisa Twenty Five only | 169350 |
| 14 | 14 | Supply and erection of PVC pipe for wiring including inspection boxes, & pull boxes, hooks, and repairing surface, etc., complete with all specials. b) On Surface i/c clamps vi) 50 mm i/d | Mtr | 100 | 565.6 | Rupees five hundred sixty five Paisa Sixty only | 56560 |
| 15 | 15 | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/ wooden casing an capping/G.I.wire/trenches (rate for cables only):- c) 450/750 volts, PVC insulated: ii) 1.5 mm sq (3/0.029") | Mtr | 2100 | 140.25 | Rupees one hundred fourty Paisa Twenty Five only | 294525 |
| 16 | 16 | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/ wooden casing an capping/G.I.wire/trenches (rate for cables only):- c) 450/750 volts, PVC insulated: iii) 2.5 mm sq (7/0.029") | Mtr | 1350 | 207 | Rupees two hundred seven only | 279450 |
| 17 | 17 | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/ wooden casing an capping/G.I.wire/trenches (rate for cables only):- c) 450/750 volts, PVC insulated: iv) 4 mm sq (7/0.036") | Mtr | 900 | 273.45 | Rupees two hundred seventy three Paisa Fourty Five only | 246105 |
| 18 | 18 | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/ wooden casing an capping/G.I.wire/trenches (rate for cables only):- c) 450/750 volts, PVC insulated: v) 6 mm sq (7/0.044") | Mtr | 720 | 378.45 | Rupees three hundred seventy eight Paisa Fourty Five only | 272484 |
| 19 | 19 | Providing and fixing M.S. iron box for housing main switches, made of 1.5 mm (1/16") thick M.S. sheet, with locking arrangement, including painting:- ii) 95x40x20 cm (38"x16"x8") | Nos | 6 | 10097.2 | Rupees ten thousand ninety seven Paisa Twenty only | 60583.2 |
| 20 | 20 | Suppling,Installation and comissioning of MCB (Miniature Circuit Breaker) of specified rating made of LEGRAND FRANCE/ GE U.S.A / SCHNEIDER GERMANY /SIEMEN GERMAN/TERASAKI JAPAN/ ABB SWITZERLAND in prelaid DBs and Panels i/c the cost of screwes,necessary wire complete in all respect as approved and directed by the Engineer Incharge. a) Single Pole (iii) 6-63 Amp (10 KA) | Nos | 120 | 1459.05 | Rupees one thousand four hundred fifty nine Paisa Five only | 175086 |
| 21 | 21 | Suppling,Installation and comissioning of MCB (Miniature Circuit Breaker) of specified rating made of LEGRAND FRANCE/ GE U.S.A / SCHNEIDER GERMANY /SIEMEN GERMAN/TERASAKI JAPAN/ ABB SWITZERLAND in prelaid DBs and Panels i/c the cost of screwes,necessary wire complete in all respect as approved and directed by the Engineer Incharge. b) Double Pole (iii) 6-63 Amp (10 KA) | Nos | 36 | 5621.55 | Rupees five thousand six hundred twenty one Paisa Fifty Five only | 202375.8 |
| 22 | 22 | Providing and fixing Pakistan Energy Label NEECA approved Copper winded Exaust Fan i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge. b) Plastic body (i) 10" dia | Nos | 48 | 5235.5 | Rupees five thousand two hundred thirty five Paisa Fifty only | 251304 |
| 23 | 23 | Providing and fixing Pakistan Energy Label NEECA approved Copper winded Exaust Fan i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge. b) Plastic body (ii) 12 " dia | Nos | 18 | 5685.5 | Rupees five thousand six hundred eighty five Paisa Fifty only | 102339 |
| 24 | 24 | Providing and fixing Pakistan Energy Label NEECA approved Copper winded Exaust Fan i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge. b) steel body (i) 12" dia | Nos | 10 | 5516.75 | Rupees five thousand five hundred sixteen Paisa Seventy Five only | 55167.5 |
| 25 | 25 | Providing and fixing Pakistan Energy Label NEECA approved Copper winded Exaust Fan i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge. b) steel body (ii) 18" sweep | Nos | 4 | 6641.75 | Rupees six thousand six hundred fourty one Paisa Seventy Five only | 26567 |
| 26 | 26 | Providing and fixing Copper winded ceiling fan made of Pak/Younas/G.F.Cor NEECA approved equivalent i /c the cost of necessary cable and hardware for connection as approved and directed by Engineer Incharge iii) 56" dia | Nos | 40 | 10180.2 | Rupees ten thousand one hundred eighty Paisa Twenty only | 407208 |
| 27 | 27 | Providing and fixing Pakistan Energy Label NEECA approved Copper winded wall bracket Fan i/c the cost of necessary cable and hardware for connection as approved and directed by Engineer Incharge. i) 18" Sweep dia | Nos | 150 | 6861.15 | Rupees six thousand eight hundred sixty one Paisa Fifteen only | 1029172.5 |
| 28 | 28 | P/F PVC double layer Switch kit Face plate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider, screws complete as approved and directed by the Engineer Incharge. (a)One way Gange Switch Small. (iv) Three pin Light Plug 10/13 Amp | Nos | 180 | 754.45 | Rupees seven hundred fifty four Paisa Fourty Five only | 135801 |
| 29 | 29 | P/F PVC double layer Switch kit Face plate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider, screws complete as approved and directed by the Engineer Incharge. (a)One way Gange Switch Small. (viii) Three Pin Power Plug 15-32 Amp | Nos | 80 | 924.55 | Rupees nine hundred twenty four Paisa Fifty Five only | 73964 |
| 30 | 30 | P/F PVC double layer Switch kit Face plate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider, screws complete as approved and directed by the Engineer Incharge. (a)One way Gange Switch Small. (vi) Fan Dimmer | Nos | 15 | 740.6 | Rupees seven thousand fourty Paisa Sixty only | 11109 |
| 31 | 31 | P/F PVC double layer Switch kit Face plate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider, screws complete as approved and directed by the Engineer Incharge. (b) One way Gange Switch (Large) (i) 04 Gange | Nos | 30 | 981.25 | Rupees nine hundred eighty one Paisa Twenty Five only | 29437.5 |
| 32 | 32 | P/F PVC double layer Switch kit Face plate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider, screws complete as approved and directed by the Engineer Incharge. (b) One way Gange Switch (Large) (iii) 06 Gange | Nos | 25 | 1405.85 | Rupees one thousand four hundred five Paisa Eighty Five only | 35146.25 |
| 33 | 33 | P/F PVC concealed Switch kit Box i/c the cost of screws complete as approved and directed by the Engineer Incharge (i) Small | Nos | 300 | 192.5 | Rupees one hundred ninety two Paisa Fifty only | 57750 |
| 34 | 34 | P/F PVC concealed Switch kit Box i/c the cost of screws complete as approved and directed by the Engineer Incharge (ii) Large | Nos | 250 | 221.45 | Rupees two hundred twenty one Paisa Fourty Five only | 55362.5 |
| 35 | 35 | Providing / fixing of LED strips light 4 feet, 36 watt 220/240 volts for wall or ceiling mounted (Premium), Supply and fixing. | Nos | 200 | 3900 | Rupees three thousand nine hundred only | 780000 |
| 36 | 36 | Providing and fixing of LED Bulb, 12-Watt operational voltage 220V,AC, 50Hz, approved quality as per instruction, i/c Lamp holder ES, threaded 20 mm dia, site satisfication and approved by engineer incharge | Nos | 150 | 650 | Rupees six hundred fifty only | 97500 |
| 37 | 37 | provinding / installation of new LED flood light fixtures 100 & 110 Watt 220/250 Volts (Make OSAKA, or Approved equivalent) complete in all respect made of die-cast aluminium having in built or eusiliary mounting arrangements for fixing on wall & poles and building as per satisfication & instruction of the Engineeer in charge . 1- Contractor will be responsable to provide 1 year free replacement warranty of light fixtures. | Nos | 30 | 26000 | Rupees twenty six thousand only | 780000 |
| 38 | 38 | provinding / installation of new LED flood light fixtures 150 Watt 220/250 Volts (Make OSAKA, or Approved equivalent) complete in all respect made of die-cast aluminium having in built or eusiliary mounting arrangements for fixing on wall & poles and building as per satisfication & instruction of the Engineeer in charge . 1- Contractor will be responsable to provide 1 year free replacement warranty of light fixtures. | Nos | 8 | 45000 | Rupees fifty five thousand only | 360000 |
| 39 | 39 | Mono Block Pumping Set (cast iron body) single Phase, electric Motor Efficiency IE-2, Insulation Class F, Enclosure characteristic IP-55, with copper winding, 5 HP, max suction 6 M, Head 10-24 Metre and discharge 25-70 Ltr/Min supply and fixing. 1.Contractor will be responsable to provide 1 year free replacement warranty of light fixture. | Nos | 4 | 65000 | Rupees sixty five thousand only | 260000 |
| 40 | 40 | Cassette type fan 2'x2' with copper winding & remote control including connections provision of cable best quality supply fixing. | Nos | 14 | 14000 | Rupees fourteen thousand only | 196000 |
| 41 | 41 | Supply of Ceiling light / panel LEd having body size 2'x2' 36watt operational 220V 50Hz Philips, Pak light, Sun light approved quality as per instruction of site Incharge. | Nos | 520 | 11500 | Rupees eleven thousand five hundred only | 5980000 |
| 42 | 42 | Servicing/Maintenace of 40 Kva Generator Old filteRupees and Provding /Fixing of complete Oil filter, fueil filter,Air Filter,and cleaning rediator and chage of Coolent approved type of Diesel Generator Set, complete testing and commissioning as per site requirement and approved by engineer incharge. | Job | 1 | 70000 | Rupees Seventy thousand only | 70000 |
| 43 | 43 | Servicing/Maintenace and Dismantling of 100 Kva Generator Old filteRupees and Provding /Fixing of complete Oil filter, fule filter,Air Filter,and cleaning rediator and chage of Coolent approved type of Diesel Generator Set, complete testing and commissioning as per site requirement and approved by engineer incharge. | Job | 2 | 130000 | Rupees one hundred thirty thousand only | 260000 |
| 44 | 44 | Servicing/Maintenace and Dismantling of 250 Kva Generator Old filteRupees and Provding /Fixing of complete Oil filter, fule filter,Air Filter,and cleaning rediator and chage of Coolent approved type of Diesel Generator Set, complete testing and commissioning as per site requirement and approved by engineer incharge. | Job | 1 | 160000 | Rupees one hundred sixty thousand only | 160000 |
| 45 | 45 | Servicing/Maintenace and Dismantling of 500 Kva Generator Old filteRupees and Provding /Fixing of complete Oil filter, fule filter,Air Filter,and cleaning rediator and chage of Coolent approved type of Diesel Generator Set, complete testing and commissioning as per site requirement and approved by engineer incharge. | Job | 1 | 220000 | Rupees two hundred twenty thousand only | 220000 |
| 46 | 46 | Replacement of Engine Oil 15W40 (Caltex, Shell, PSO), best quality. | ltRupees | 175 | 1795 | Rupees one thousand seven hundred ninety five only | 314125 |
| 47 | 47 | P/Fixing of DC Battery 210 AH ( Volta, Exide, Osaka) for 500,250,100 Kva generator complete connections as required on site & approved by engineer incharge. | No | 5 | 48000 | Rupees fourty eight thousand only | 240000 |
| 48 | 48 | P/Fixing of DC Battery 120 AH (Volta, Exide, Osaka) for 40 Kva generator complete connections as required on site & approved by engineer incharge. | No | 1 | 33000 | Rupees Thirty three thousand only | 33000 |
| GRAND TOTAL: | Rs 72,353,657.95 |
PROVIDING / INSTALLATION OF FIREÂ ALARM SYSTEM ALONG WITH FIRE SAFETY EQUIPMENT, UPGRADATION OF ELECTRICAL INFRASTRUCTURE AND OVERHAULING OF GENERATORS INSTALLED AT CAPITAL HOSPITAL SECTOR G-6/2, ISLAMABAD
1. The scope of the work can be amended (increased or decreased) as per recommendation of the consultant.
2. The contractor shall be responsible for verification/ validation of the executed work by the consultant.Â
3. Defect Liability Period: The Defect Liability Period (DLP) shall be twelve (12) months, commencing from the date of successful commissioning of the system at site.
4. Warranty: The Contractor shall be responsible for the repair/replacement of all defective fire detection and firefighting equipment/components during the warranty period, which shall be a minimum of five (05) years from the date of commissioning.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Procurement and Contract Wing (Capital Development Aurhority (CDA)), Deputy Director Chairman Office, CDA, G-7/4., Islamabad Capital Territory
The Supplier is:
The title of the subject procurement is: PROVIDING / INSTALLATION OF FIRE ALARM SYSTEM ALONG WITH FIRE SAFETY EQUIPMENT, UPGRADATION OF ELECTRICAL INFRASTRUCTURE AND OVERHAULING OF GENERATORS INSTALLED AT CAPITAL HOSPITAL SECTOR G-6/2, ISLAMABAD
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Procurement and Contract Wing (Capital Development Aurhority (CDA)), Deputy Director
Chairman Office, CDA, G-7/4., Islamabad Capital Territory
+92-333-545-3375
Dd.iipcaii@cda.gov.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Procurement and Contract Wing (Capital Development Aurhority (CDA)), Deputy Director
Chairman Office, CDA, G-7/4., Islamabad Capital Territory
+92-333-545-3375
Dd.iipcaii@cda.gov.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Quantities will be increased or decreased as per consultant recommendations.
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P110362
To: Procurement and Contract Wing (Capital Development Aurhority (CDA)), Deputy Director Chairman Office, CDA, G-7/4., Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Procurement and Contract Wing (Capital Development Aurhority (CDA)), Deputy Director Chairman Office, CDA, G-7/4., Islamabad Capital Territory
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., PROVIDING / INSTALLATION OF FIRE ALARM SYSTEM ALONG WITH FIRE SAFETY EQUIPMENT, UPGRADATION OF ELECTRICAL INFRASTRUCTURE AND OVERHAULING OF GENERATORS INSTALLED AT CAPITAL HOSPITAL SECTOR G-6/2, ISLAMABAD (P110362) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Procurement and Contract Wing (Capital Development Aurhority (CDA)), Deputy Director Chairman Office, CDA, G-7/4., Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Water charges at the rate of 0.5% will be deducted from each bill.Â