In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Deputy Director
Islamabad International Airport., Islamabad Capital Territory
+92-323-759-1045
shahzad.hassan@paa.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)) The subject of procurement is:Â Rehabilitation and Strengthening of Damaged Perimeter Fence at Airside IIAP Islamabad Expected commencement date: Wednesday, November 11, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P115375Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 1 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Friday, September 25, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 120 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Â Â |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Islamabad International Airport., Islamabad Capital Territory Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Wednesday, September 30, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Wednesday Date:Â September 30, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 5.00%. The Performance Guarantee shall be acceptable in the form of:Â Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Sole Proprietorship Partnership Firm Company (Private Limited) | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) SECP PEC Registrar of Firms |
| Eligibility Criteria | Document |
|---|---|
| Original Bid Security as mentioned in the bidding documents | Yes |
| Certificate of incorporation / memorandum & article of association or partnership deed / sole proprietor affidavit | Yes |
| JV agreement (if applicable) | Yes |
| Registration with SECP for private limited company | Yes |
| Affidavit of no litigation/blacklisting on non-judicial stamp paper (original) with a minimum value of Rs. 200/- to the effect that the firm has not been blacklisted by any Government, Semi Government or autonomous body. In case of JV each firm shall provide the affidavit. | Yes |
| Power of attorney on non judicial stamp paper of Rs. 500 | Yes |
| Valid PEC License having minimum C-5 category license in the relevant field of specialization i.e., CE-01, CE-10 | Yes |
| Valid professional tax certificate | Yes |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Rehabilitation and Strengthening of Damaged Perimeter Fence at Airside IIAP Islamabad | Address: Islamabad International Airport., Islamabad Capital Territory Schedule: 09 Months Quantity: 1/job |
1/job | 600000 PKR |
No
Jobs Without Lots :
Job: Rehabilitation and Strengthening of Damaged Perimeter Fence at Airside IIAP Islamabad
Specifications / Requirements:
| Sr. No | Ref No. | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|---|
| 1 | 123/63 | Dismantling all types of wire fencing or netting including winding the wires in rolls and rolling the netting and stacking serviceable material and disposing of unserviceÂable material as directed within three chains (91.5 m).. | P.Kg | 122 | Â | Â |
| 2 | A/R | Dismantling of existing already fixed Chain link fabric mesh to fencing posts including clamps, hooks and tension wire including winding the Chain link fabric mesh in rolls and rolling the netting and stacking serviceable material and disposing of unserviceÂable material as directed within three chains complete in all respect as per directions of the Engineer incharge. | P.Sft | 4080 | Â | Â |
| 3 | 123/01 | Dismantling lime or cement concrete in foundation or under floor basement, plinth and ground floor and disposing of surplus material as directed within three chains (91.5 m).. | 100.Cft | 9422 | Â | Â |
| 4 | 127/134 | Dismantling bitumen carpet of any description from existing road surface including its removal and disposal within three chains (91 m) lead as desired. | 100.Sft | 600 | Â | Â |
| 5 | 123/03 | Dismantling stone masonry in lime or cement mortar in foundation, plinth and ground floor including stacking salvaged material (serviceable) and disposing surplus stuff as directed within three chains (91.5 m) | 100.Cft | 1125 | Â | Â |
| 6 | 103/01 | Excavation for foundation trenches and drains in all kinds of soil (except gravelly and murum soil, wet silt, clay or mud conglomeration of gravel and boulders, soft, sandy or disintegrated sandy and hard rock) and back filling the excavated material in foundation, plinth or under floor including breaking clods, watering, consolidation by ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction, dressing and disposal of surplus excavated stuff as directed, lead upto one chain (30.5 R.m) and lift upto 5 feet (1.52 m). | 100.Cft | 30779 | Â | Â |
| 7 | 105/14 | Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using crush graded boulders 1 inch (25 mm) and down gauge in foundation including levelling, compacting and curing etc.complete. | 100.Cft | 1015 | Â | Â |
| 8 | 114/1 + 136 | Providing and laying reinforced cement concrete using crush graded boulder 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch (20.69 N/mm2 ) at 28 days with a mix not leaner than 1:2:4 in column footing of required shape including form work and its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | 100 Cft | 3105 | Â | Â |
| 9 | 114/4+136 | Providing and laying reinforced cement concrete using crush graded boulder 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch (20.69 N/mm2) at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth . | 100 Cft | 410 | Â | Â |
| 10 | 114/17+136 | Providing and laying reinforced cement concrete using crush graded boulder 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch (20.69 N/mm2) at 28 days with a mix not leaner than 1:2:4 in straight retaining walls with out counter forts up to 10 feet (3 M) height including form work and its removal compacting and curing etc. complete but excluding the cost of reinforcement, | 100 Cft | 2500 | Â | Â |
| 11 | 114/08+136 | Providing and laying reinforced cement concrete using crush graded boulder 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs.. per sq inch (20.69N/mm2) at 28 days with a mix not leaner than 1:2:4 in plinth beams of required shape and design including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, tn foundation basement and plinth | 100 Cft | 536 | Â | Â |
| 12 | 114/166 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . | P.Kg | 23768 | Â | Â |
| 13 | 124/43 | Providing and fixing PVC pipe spouts of 4" (100 mm) dia and required length including fixing in cement mortar 1:4 etc. complete | P.Rft | 140 | Â | Â |
| 14 | A.R | Providing and Fixing of RCC fencing posts size 0'-5" x 0'-5" (130 x 130 mm) and 12'-6" height with chamfered edges i/c steel complete using Crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in as per drawing embeded in Cement concrete 1:2:4. including the cost of form work, curing and fixing straight in cement concrete foundation etc, complete as per approved design and direction of the Engineer Incharge. | Each | 57 | Â | Â |
| 15 | 102/5 | Levelling and dressing the ground by cutting and filling earth upto 6 inches (152 mm) in depth including consolidating and watering, complete as required. | 100 Sft | 4250 | Â | Â |
| 16 | 104/07 | Supplying earth from approved site within the area acquired including digging or cutting, loading, unloading and filling in foundation trenches, plinth or under floor etc. including breaking clods, dressing watering and consolidation by ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction complete within a lead of 5 Miles (up to 9.6 km ) and lift of 5 feet (1.52 m) as directed by the Engineer-in-charge. | 100 Cft | 64800 | Â | Â |
| 17 | 127/10 | Making earthen embankments with earth taken from approved borrow pits including cost of excavation, placing earth in layers not exceeding 9" (229 m) depth as per approved section including dressing top and sides of the bank within a lift of 5 ft. (1.52m) and lead upto 100ft. (30.5 m) in all kinds of soil (except gravelly, murum, wet silt, clay or mud and rock). | 100 Cft | 43200 | Â | Â |
| 18 | 127/18 | Compaction of earthen embankments to full depth and width below sub-grade level by approved mechanical means in layers not exceeding 9" (229 mm) in depth at optimum moisture content including watering, mixing by mechanical means complete (the sub-grade embankment of 3 Ft. (914 mm) or less in height shall be compacted to at least 95% modified A.A.S.H.O. max. dry density or their full depth and width, embankments over 3 ft. (914 mm) in depth shall have top 3 ft. (914 mm) compacted to not less than 95% modified A.A.S.H.O. maximum dry density to their full depth and width and portion below 3 ft. (914 mm) compacted not less than 85% modified A.A.S.H.O. max. dry density to their full depth and width) . | 100 Cft | 43200 | Â | Â |
| 19 | 127/94 | Providing and laying 1:4:8 cement concrete in any thickness using 2" (51 mm) and down gauge stone ballast of approved grade and quality over prepared sub-grade or sand cushion in roads, paths, creteways laid to required gradient and camber including cost of necessary form work and its removal compacting with vibrators including curing etc. complete . | 100 Cft | 2297 | Â | Â |
| 20 | 127/79+80x4 | Providing and laying 6" (102 mm) thick not leaner than 1:2:4 cement concrete (minimum works cube crushing strength of 2250 Lbs. PSI (158 Kg. per Sq.cm. at 28 days) in road, paths, crete-ways etc. using graded screened bajri in panels of approved size laid to required gradient and camber over any sub-grade including cost of necessary form work and its removal, compacting with vibrators (immersion or screen or both) belting the surface with canvas belt, roughening the surface after laying concrete with brush and curing etc. complete. | 100 Sft | 4600 | Â | Â |
| 21 | 113/16+48 | Providing and laying uncoursed rubble masonry in cement mortar 1:4 in superstructure including scaffolding, curing etc. complete in ground floor. | 100 Cft | 1125 | Â | Â |
| 22 | 109/107+123 | Providing and laying in situ 1:2:4 cement concrete using crush graded boulder 3/4 inch (19 mm) and down gauge in architraves, coping and cornice etc. of required shape in superstructure including compacting, curing, cost of form work and its removal etc., complete in ground floor | 100 Cft | 83 | Â | Â |
| 23 | A/R | Fixing of already available at site Chain link fabric mesh fixing to fencing posts including clamps, hooks and strengthening the chain link fence with 9 SWG tension wire (03 Nos.) at top, middle and bottom complete in all respect as per drawing, design and directions of the Engineer incharge. | P.Sft | 2448 | Â | Â |
| 24 | A/R | Providing and fixing new Chain link fabric of 10 SWG & 2"x2" mesh size fixing to fencing posts including clamps, hooks and strengthening the chain link fence with 9 SWG tension wire (03 Nos.) at top, middle and bottom complete in all respect as per drawing, design and directions of the Engineer incharge. | P.Sft | 1632 | Â | Â |
| 25 | A/R | Fixing of already available at site galvanized iron barbed wire fencing to the posts of any description complete with hooks and binding wire etc-( if required) complete in all respect as per drawing, design and directions of the Engineer incharge. | P.Kg | 72 | Â | Â |
| 26 | 124/17 | Providing and fixing galvanized iron barbed wire fencing (with four points) to the posts of any description complete with hooks and binding wire etc- if required (cost of posts not included). | P.Kg | 49 | Â | Â |
| 27 | 119/32 | Providing and fixing iron grills with required section of flat iron as per approved design including welding all sides of the section at the junction, and fixing with sunk iron screws, painting two coats of red oxide paint etc. complete as required in any floor in masonry or concrete work. | P.Kg | 511 | Â | Â |
| 28 | 122/158 | Painting iron work with enamel paint of approved make and shade two coats over and including the cost of one coat of priming complete at any height in any floor. | 100 Sft | 71 | Â | Â |
| 29 | T | Total Estimated Price of scheme | as ment. | as ment. | Â | 28256644 |
| GRAND TOTAL: | Rs 28,256,644.00 |
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Deputy Director Islamabad International Airport., Islamabad Capital Territory
The Supplier is:
The title of the subject procurement is: Rehabilitation and Strengthening of Damaged Perimeter Fence at Airside IIAP Islamabad
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Deputy Director
Islamabad International Airport., Islamabad Capital Territory
+92-323-759-1045
shahzad.hassan@paa.gov.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Deputy Director
Islamabad International Airport., Islamabad Capital Territory
+92-323-759-1045
shahzad.hassan@paa.gov.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.05% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 5.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P115375
To: Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Deputy Director Islamabad International Airport., Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Deputy Director Islamabad International Airport., Islamabad Capital Territory
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Rehabilitation and Strengthening of Damaged Perimeter Fence at Airside IIAP Islamabad (P115375) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Islamabad International Airport - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Deputy Director Islamabad International Airport., Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
In case of any descripancy, PAA Contract document shall prevailÂ
Bank Gurantee is acceptable from the approved PAA BanksÂ