In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)), Project Director
Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
+92-370-134-0190
xen.gc-1@pesco.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)) The subject of procurement is: Crossing of 11 kV Independent feeder over Swat River near Ayub Bridge for Supplying Power to PAF Base Kanju, Swat. Expected commencement date: Thursday, December 31, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P142404 |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 2 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, October 20, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
|
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 90 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Call at Deposit |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Friday, October 23, 2026 10:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Friday Date: October 23, 2026 Time : 10:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of: Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC KPK (KPRA) |
| Eligibility Criteria | Document |
|---|---|
| Eligible participation. The Bidder may participate as a single entity or a Joint Venture comprising a maximum of two members, including one Lead Member. All JV members shall be jointly and severally liable for performance of the Contract | Yes |
| PEC and tax registration. The Bidder shall hold valid PEC registration in Category C-6 or above with specialization codes CE-02, and EE-05; valid FBR/NTN registration and Active Taxpayer status; KPRA registration where applicable; and EPADS V-2.0 registration. Each JV member shall meet the applicable legal and registration requirements under the Bidding Documents. | Yes |
| Non blacklisting certificate. The Bidder shall submit a Non-Blacklisting Certificate on stamp paper, duly signed and stamped, declaring that the firm has not been blacklisted by any Government, semi-Government or public-sector organization. Each JV member shall submit its own certificate | Yes |
| Bid security. The Bidder shall provide bid security of PKR 439,495, equal to 3% of the estimated cost rounded upward, only in the form of a Call Deposit Receipt (CDR) issued in favour of the P D(GSC), PESCO. A scanned copy shall be uploaded with the electronic bid. The original CDR shall reach the office before the electronic bid-submission deadline. Failure to submit the original CDR within the deadline shall render the bid non-responsive. Bank Gu | Yes |
| Similar contract experience. The Bidder shall have satisfactorily completed at least two similar contracts during the last five years, each valued at not less than PKR 7,324,921, equivalent to 50% of the estimated cost rounded upward. The Bidder shall demonstrate experience in bored RCC pile foundations and the prescribed key activities for 132 kV or higher overhead transmission-line works, as detailed in the Qualification Criteria. | Yes |
| Financial capacity. The Bidder shall demonstrate Average Annual Construction Turnover of at least PKR 10,254,889 (70% of the estimated cost) and available financial resources or cash flow of at least PKR 4,394,953 (30% of the estimated cost), both rounded upward. Supporting evidence and JV assessment shall be as prescribed in the detailed Qualification Criteria | Yes |
| Joint Venture evidence. A JV shall submit the JV Agreement in the format prescribed in Annexure-D, along with the supporting documents required by the Bidding Documents. Each member and the JV collectively shall fulfil the applicable qualification requirements specified in the detailed Qualification Criteria | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 100 | |
| GENERAL CONSTRUCTION EXPERIENCE | ||
| The single bidder or each member of a two-member JV shall demonstrate at least five years of verified active construction experience in 132 kV or higher overhead line tower construction works during the five years preceding the bid-submission deadline. The single bidder shall provide at least two completed qualifying contracts. A two-member JV shall collectively provide at least two distinct completed qualifying contracts, including at least one from each member. Duplicate contracts shall be counted once only. Failure to meet any mandatory minimum requirement shall render the bid non-responsive. Award 20 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: Year wise experience statement, agreements or work orders and employer completion, separately identifying each JV member’s contracts (Quantitative)(Doc Required) | 20 | |
| SPECIFIC CONSTRUCTION EXPERIENCE | ||
| The single bidder or a two-member JV shall demonstrate completion or substantial completion of at least two similar contracts within the five years preceding the bid-submission deadline. Each contract shall have an executed value of at least PKR 7,324,921, equivalent to 50% of the estimated contract cost and include 132 kV or higher overhead line tower works involving pile or RCC foundations and tower erection relevant to the river-crossing scope. For a JV, qualifying contracts shall be assessed collectively, with at least one qualifying contract from each member. Each contract shall independently meet the prescribed value and scope requirements. Duplicate contracts shall be counted once only. Failure to meet any mandatory minimum requirement shall render the bid non-responsive. Award 20 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: Agreements or work orders; employer or engineer completion or substantial completion certificates; BOQs or certified payment records proving executed scope and value (Quantitative)(Doc Required) | 20 | |
| AVERAGE ANNUAL CONSTRUCTION TURNOVER. | ||
| Average Annual Construction Turnover (AATO) shall be calculated as the average annual construction turnover for the last three completed financial years. A single bidder shall demonstrate AATO of at least PKR 10,254,889, equivalent to 70% of the estimated contract cost. For a two-member JV, the combined AATO shall be at least PKR 10,254,889, with the Lead Partner contributing at least PKR 5,127,445 and the other member at least PKR 2,050,978. These individual minima represent 50% and 20% of the minimum required AATO, respectively, rounded upward to the next whole rupee. Both individual minima and the combined minimum shall be satisfied. Failure to meet any applicable minimum requirement shall render the bid non-responsive. Award 10 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: Audited financial statements for the last three completed years and Chartered Accountant certificate confirming year wise construction turnover and average, separately for each JV member (Quantitative)(Doc Required) | 10 | |
| NET WORTH. | ||
| Net worth shall mean total assets minus total liabilities, as reported in the audited financial statements for the latest completed financial year. The single bidder or each member of a two-member JV shall independently demonstrate non-negative net worth. Zero net worth shall meet this minimum requirement. A JV member’s negative net worth shall not be offset by another member’s positive net worth. Failure of the single bidder or either JV member to meet this minimum requirement shall render the bid non-responsive. Award 10 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: Latest completed financial year audited financial statements and auditor or Chartered Accountant certificate confirming assets, liabilities and net worth, separately for each JV member. (Quantitative)(Doc Required) | 10 | |
| FINANCIAL RESOURCES AND CASH FLOW | ||
| The single bidder shall demonstrate available financial resources of at least PKR 4,394,953, equivalent to 30% of the estimated contract cost rounded upward, net of existing contractual funding commitments. Eligible resources comprise available cash or bank balances and committed, unutilized credit facilities accessible for executing this contract. For a two-member JV, verified resources shall be combined after deducting each member’s contractual funding commitments. No separate minimum percentage applies to either member. The same funds or facilities shall not be counted twice. Turnover, net worth and fixed assets shall not, by themselves, establish available financial resources. Failure to meet this minimum shall render the bid non-responsive. Award 10 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: Current bank certificates or statements, bank confirmation of committed unutilized credit facilities and a schedule of existing contracts and funding commitments, separately for each JV member. (Quantitative)(Doc Required) | 10 | |
| KEY PERSONNEL | ||
| Provide seven named persons: one Project Manager or Overhead Line Engineer; one Civil Engineer for foundations and piling; one Electrical or Overhead Line Engineer; one Survey Engineer or Surveyor; one EHS Manager or environmental and social representative; and two supervisors collectively covering foundation works and tower erection. Submit assigned responsibilities and signed availability commitments. Each person shall fill one position only. For a JV, assess one combined team supplied by either or both members. All seven persons and the prescribed supporting documents shall be provided. Failure to meet this requirement shall render the bid non-responsive. No additional academic or years of experience requirement is introduced by this parameter. Award 10 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: Named personnel list, assigned responsibilities and signed availability commitments for the required deployment period. (Quantitative)(Doc Required) | 10 | |
| EQUIPMENT & MACHINARY | ||
| The single bidder or two member JV shall demonstrate firm availability of every equipment item in attached Annexure-C in the prescribed quantity and capacity, with applicable certification. Owned, leased, hired or other firm documented arrangements are acceptable. Evidence shall identify equipment, quantities, capacities and availability for the required deployment period. For a JV, assess equipment secured by either or both members collectively, without double counting. Failure to establish availability of every mandatory item shall render the bid non-responsive. Ownership shall receive no preference over an acceptable firm lease or hire arrangement. Award 10 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: Ownership records, signed lease or hire agreements or signed provider commitments, and applicable certificates. Attach the complete Annexure C before publishing (Quantitative)(Doc Required) | 10 | |
| MS PROJECT PROGRAMME AND WORK METHODOLOGY | ||
| The single bidder or two-member JV shall submit one project-specific, logic-linked MS Project programme, a readable PDF export and supporting methodology demonstrating completion within the contractual period. The submission shall cover riverbank access, material handling, foundation works and curing, tower assembly and erection, activity dependencies, critical path, milestones, personnel and equipment deployment, safety measures and required inspections. Failure to submit the required programme and methodology, or to meet these minimum requirements, shall render the bid non-responsive. Award 10 marks when all the above minimum requirements are met and established by the prescribed supporting documents; otherwise award zero marks and declare the bid non-responsive under this mandatory category. For a JV, apply the stated individual and collective requirements and award the category marks once only. Documents to request: MS Project programme file, readable PDF export, methodology and integrated resource deployment schedule (Quantitative)(Doc Required) | 10 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Crossing of 11 kV Independent feeder over Swat River near Ayub Bridge for Supplying Power to PAF Base Kanju, Swat. | Address: Kanju near Ayub Bridge Swat, KPK Schedule: 120 Days Quantity: 1/job |
1/job | 439495 PKR |
No
Jobs Without Lots :
Job: Crossing of 11 kV Independent feeder over Swat River near Ayub Bridge for Supplying Power to PAF Base Kanju, Swat.
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|---|
| 1 | Part-A: Schedule Items for Carriage (WCSR-2022) | |||||
| 2 | A-01 | Carriage of 3.0 cum or 5 metric tons of all material like earth, silt, sand, stone aggregate spawl, coal, lime, surkhi, steel girders, MS sheets, MS Bars etc. or 4.25 cum of timber or 3.75 metric tons all fuel wood by truck or any other means. (WCSR-2022) Page No. 1-1/1 Shifting of 22.402 tons of material from 1st to 6th km (quantity expressed in units of 5 Matric Ton/Km). | 5 Matric Ton/Km | 4.4804 | ||
| 3 | A-02 | Carriage of 3.0 cum or 5 metric tons of all material like earth, silt, sand, stone aggregate spawl, coal, lime, surkhi, steel girders, MS sheets, MS Bars etc. or 4.25 cum of timber or 3.75 metric tons all fuel wood by truck or any other means. (WCSR-2022) Page No. 1-1/1 Shifting of 22.402 tons of material from 7th to 212th km (quantity expressed in units of 5 Matric Ton/Km). | 5 Ton/Km | 922.9624 | ||
| 4 | A-03 | Carriage of 3.0 cum or 5 metric tons of all material like earth, silt, sand, stone aggregate spawl, coal, lime, surkhi, steel girders, MS sheets, MS Bars etc. or 4.25 cum of timber or 3.75 metric tons all fuel wood by truck or any other means. (WCSR-2022) Page No. 1-1/1 Shifting of 7.619 cubic metres of material from 1st to 6th km (quantity expressed in units of 3 Cum/Km). | 3 Cum/Km | 2.5396666666667 | ||
| 5 | A-04 | Carriage of 3.0 cum or 5 metric tons of all material like earth, silt, sand, stone aggregate spawl, coal, lime, surkhi, steel girders, MS sheets, MS Bars etc. or 4.25 cum of timber or 3.75 metric tons all fuel wood by truck or any other means. (WCSR-2022) Page No. 1-1/1 Shifting of 7.619 cubic metres of material from 7th to 206th km (quantity expressed in units of 3 Cum/Km) | 3 Cum/Km | 523.24 | ||
| 6 | Sub Total Bid for Part-A | |||||
| 7 | Part-B: Schedule Items for Pile foundations (WCSR-2022) | |||||
| 8 | B-01 | Supply and fabrication of intermediate-grade deformed reinforcement for RCC piles i/c cutting, bending, laying in position, welding and fastening i/c cost of binding wire: 40,000 psi (276 MPa) yield Page No. 5-3/7 (a) | Kg | 25219.114 | ||
| 9 | B-02 | Providing and casting in situ bored RCC piles in 1:1½:3 cement concrete of approved crushed stone and coarse sand i/c all costs of boring drilling with rotary, reverse rotary or any approved method, placing concrete with tremie excluding cost of supply and fabrication of steel bars reinforcement cage, which shall be paid separately i/c screening and washing of shingle; Page No. 5-2/4 (v) (vi), ED+0+2, (900 mm dia.) 2 Nos. | RMS | 184 | ||
| 10 | B-03 | Reinforced cement concrete work using coarse sand except the cost of steel reinforcement and its labour for bending and binding. This rate also includes all kinds of forms and moulds; shuttering, curing, rendering and finishing the exposed surface (i/c screening and washing of shingle) (a) in-situ in roof slabs, beams, columns, rafts, lintels and other structural members complete in all respects. Ratio (1:2:4) Page No. 5-1/3.5-2 (i) | Cum | 55.705 | ||
| 11 | Sub Total Bid for Part-B | |||||
| 12 | Part-C: Non-Schedule (NS) for Erection of Towers Item | |||||
| 13 | C-01 | Transportation of tower material from site camp store to site and erection of ED+0+2M type tower, including fixing anti-climbing devices, barbed wire and name plates; welding nuts/bolts up to tower top; painting welded points with anti-rust paint; and removal of obstructions necessary to achieve standard line clearance, complete in all respects. (N.S.) | No. | 2 | ||
| 14 | Sub Total Bid for Part-C | |||||
| 15 | Part-E: Non-Schedule (NS) for Stringing of Conductor Item | |||||
| 16 | D-01 | Shifting of stringing material from site store to site and stringing of six Lynx conductors, including installation of disc insulators, mid-span joints, SBDs, PG connectors and other allied hardware as per standard drawings/specifications, complete in all respects. (N.S.) | Km | 0.45 | ||
| 17 | D-02 | Stringing of earth wire, including installation of mid-span joints and clamps in accordance with the specifications, complete in all respects. (N.S.) | Km | 0.45 | ||
| 18 | D-03 | Installation of Stockbridge dampers for RAIL conductors, including all required accessories, complete in all respects. (N.S.) | No | 12 | ||
| 19 | D-04 | Installation of Stockbridge dampers for earth wire, including all required accessories, complete in all respects. (N.S.) | No | 2 | ||
| 20 | Sub Total Bid for Part-D | |||||
| 21 | Total Bid Cost (A+B+C+D) | |||||
| 22 | TOTAL ESTIMATED CONTRACT COST — EXCLUDING KPRA SALES TAX (PKR) | 14649841 | ||||
| GRAND TOTAL: | Rs 14,649,841.00 |
The work comprises carriage of PESCO-supplied transmission-line materials from PESCO Warehouse, Jamrud, to the work site/store at Kanju; construction of RCC pile foundations for two ED+0+2 river-crossing towers; assembly and erection of towers, including installation of associated hardware and insulator assemblies; stringing, sagging and termination of ACSR Lynx/Osprey conductor and earth wire, as specified; earthing; and all allied civil and electrical works, inspections, testing and commissioning required to complete the river crossing in accordance with the approved drawings, specifications and BOQ.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)), Project Director Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
The Supplier is:
The title of the subject procurement is: Crossing of 11 kV Independent feeder over Swat River near Ayub Bridge for Supplying Power to PAF Base Kanju, Swat.
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)), Project Director
Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
+92-370-134-0190
xen.gc-1@pesco.com.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)), Project Director
Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
+92-370-134-0190
xen.gc-1@pesco.com.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Survey and foundations: Verification of alignment, tower locations, levels, foundation dimensions and founding conditions; inspection of pile boring, reinforcement, formwork, anchor bolts and embedded components before concreting.
Concrete and piling: Verification of approved concrete mix; slump and concrete strength tests; inspection of concrete placement, compaction and curing; and pile integrity or load tests where specified.
Tower erection: Inspection of tower members, assembly, verticality, bolt tightening, foundations and installation of insulators and hardware.
Stringing and clearances: Inspection of conductor and earth-wire condition, joints, fittings, sag, tension and required electrical and ground clearances, including river-crossing clearances.
Earthing and completion: Measurement of earthing resistance, verification of electrical continuity and completion checks before commissioning or energization.
Insurance Certificate;
The Contractor shall collect and transport PESCO-supplied materials from PESCO Warehouse, Jamrud, to the work site/store at Kanju, ensuring proper handling, safe storage and reconciliation of materials received, installed and returned. The works shall be completed within 120 days from the Commencement Date, in accordance with the approved drawings, specifications and BOQ.
The Contractor shall submit the work programme and methodology, material receipt and reconciliation statements, inspection requests, test reports, measurement records, as-built drawings and completion documents required under the Contract. Surplus materials shall be returned to the designated PESCO store, and the completed works shall be handed over after satisfactory inspection, testing and rectification of defects identified at completion.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P142404
To: Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)), Project Director Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)), Project Director Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Crossing of 11 kV Independent feeder over Swat River near Ayub Bridge for Supplying Power to PAF Base Kanju, Swat. (P142404) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Project Dorector GSC PESCO Peshawar (Peshawar Electric Supply Company (PESCO)), Project Director Project Director GSC PESCO Faqir Abad No.2, Zaryab Colony Peshawar, Peshawar City, Peshawar (District), Peshawar Division (Division), Khyber Pakhtunkhwa (KP) (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}