In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)), Deputy Director
Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory
+92-312-874-3878
engr.waqar.asghar@gmail.com
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)) The subject of procurement is:Â UPHOLSTERY , POLISHING AND REPAINTING OF FURNITURE AT EXECUTIVE BUILDING,ISLAMABAD Expected commencement date: Monday, November 30, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P153948Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Friday, October 23, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
 |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 120 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Call at Deposit  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Monday, October 26, 2026 11:30 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Monday Date:Â October 26, 2026 Time : 12:00 PM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 0%. The Performance Guarantee shall be acceptable in the form of:Â Nil |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Individual / Individual Consultant Sole Proprietorship Partnership Firm Company (Private Limited) | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| UPHOLSTERY , POLISHING AND REPAINTING OF FURNITURE AT EXECUTIVE BUILDING,ISLAMABAD | Address: Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory Schedule: 60 Days Quantity: 56674.19/Qty |
56674/Qty | 910378 PKR |
No
Jobs Without Lots :
Job: UPHOLSTERY , POLISHING AND REPAINTING OF FURNITURE AT EXECUTIVE BUILDING,ISLAMABAD
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|---|
| 1 | Non Schedule Items | Reupholstery of Bedroom/office chairs approved quality of sofa cloth with markeen cloth fully upholstred Including the cost of nails, doori, rubber, parachute thread, samad bond(Bonding Agents) and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 98 | 19195 | 1881110 |
| 2 | Non Schedule Items | Reupholstery of sofa seats(3 seater) approved quality of sofa cloth with markeen cloth fully upholstred Including the cost of nails, doori, rubber, parachute thread, samad bond(Bonding Agents) and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge | Nos | 16 | 92895 | 1486320 |
| 3 | Non Schedule Items | Reupholstery of sofa seats(2 seater) approved quality of sofa cloth with markeen cloth fully upholstred Including the cost of nails, doori, rubber, parachute thread, samad bond(Bonding Agents) and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge | Nos | 2 | 62205 | 124410 |
| 4 | Non Schedule Items | Reupholstery of sofa seats(single seater) approved quality of sofa cloth with markeen cloth fully upholstred Including the cost of nails, doori, rubber, parachute thread, samad bond(Bonding Agents) and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge | Nos | 17 | 30910 | 525470 |
| 5 | Non Schedule Items | Reupholstery of dewan(3 seater) approved quality of sofa cloth with markeen cloth fully upholstred Including the cost of nails, doori, rubber, parachute thread, samad bond(Bonding Agents) and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 1 | 50134 | 50134 |
| 6 | Non Schedule Items | Reupholstery of Ottoman seat(puffy) approved quality of sofa cloth with markeen cloth fully upholstred Including the cost of nails, doori, rubber, parachute thread, samad bond(Bonding Agents) and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 1 | 11715 | 11715 |
| 7 | Non Schedule Items | Reupholstery of Lawn chairs approved quality of parachute fabric with polyester upholstred Including the cost of nails, doori, parachute thread etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 4 | 13722 | 54888 |
| 8 | Non Schedule Items | Reupholstery of Dining Chairs approved quality of sofa cloth with markeen cloth fully upholstred Including the cost of nails, doori, rubber, parachute thread, samad bond(Bonding Agents) and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 16 | 7700 | 123200 |
| 9 | Non Schedule Items | Repairing of Office Chairs with approved quality of Molty faoam 3'' with refixing of existing fabric etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 6 | 6393 | 38358 |
| 10 | Non Schedule Items | Reupholstery of Double bed with approved quality of cloth upholstry Including the cost of nails, doori, rubber, parachute thread and best quality foam(Master molty Foam or equvalent) etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 1 | 28050 | 28050 |
| 11 | Non Schedule Items | Replacement of Conopy Fabric Guard of Honour area with approved quality of cloth , parachute thread etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 1 | 46750 | 46750 |
| 12 | Non Schedule Items | Repairing of parade area canopy with new green colour fabric(best quality) icnluding thread and golden colour silky frill etc. per instsruction, satisfaction of Engineer Incharge. | Nos | 1 | 28050 | 28050 |
| 13 | Non Schedule Items | Replacement of Travelling Chairs lose cover with approved quality of parashute cloth Including the cost of elastic, thread, carriage upto site etc. complete as per instsruction, satisfaction of Engineer Incharge. | Nos | 7 | 12237 | 85659 |
| 14 | Non Schedule Items | Replacement of Office Chairs Table Top with approved best quality of Leatheroid including the cost of nails, doori, rubber, parachute thread etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 3 | 6891 | 20673 |
| 15 | Non Schedule Items | Providing of Small Cushion (16'' x 16'') with approved quality of fabric and fine quality ball fiber polyster filling, carriage upto site etc. complete as per instsruction, satisfaction of Engineer Incharge. | Nos | 49 | 3019 | 147931 |
| 16 | Non Schedule Items | Repairing of Recliner Chair complete as per instsruction, satisfaction of Engineer Incharge. | Nos | 1 | 9298 | 9298 |
| 17 | Non Schedule Items | Repairing of Presentation Board and Replacement of Approved Wooden Beading complete as per instsruction, satisfaction of Engineer Incharge. | Nos | 1 | 22330 | 22330 |
| 18 | Non Schedule Items | Repairing of Office Chair with approved quality of Molty faoam 3'' with refixing of existing fabric etc. complete as per instsruction, satisfaction of engineer incharge. | Nos | 1 | 5555 | 5555 |
| 19 | Non Schedule Items | Repairing of revolving chairs with new base, new cylinder including base machine etc. complete as per instsruction, satisfaction of Engineer Incharge. | Nos | 4 | 17215 | 68860 |
| 20 | Non Schedule Items | Reupholstery & repairing of revolving chairs approved best quality of cloth with new base, new cylinder including base machine etc. complete as per instsruction, satisfaction of Engineer Incharge. | Nos | 1 | 35695 | 35695 |
| 21 | Non Schedule Items | Replacement of revolving chairs , new Hydraulic and Wheelset etc. complete as per instsruction, satisfaction of Engineer Incharge. | Nos | 4 | 10395 | 41580 |
| 22 | Non Schedule Items | Dry cleaning and shampoing of carpet with chemical water, removing stains, spots etc complete in all respect as per instruction, satisfaction of Engineer incharge. | Sqft | 34661 | 33 | 1143813 |
| 23 | Non Schedule Items | Dry cleaning and shampoing of Sofa seats with chemical water, removing stains, spots etc complete in all respect as per instruction, satisfaction of Engineer incharge | Nos | 120 | 2404 | 288480 |
| 24 | Non Schedule Items | Dry cleaning and shampoing of Office chairs with chemical water, removing stains, spots etc complete in all respect as per instruction, satisfaction of Engineer incharge. | Nos | 63 | 1518 | 95634 |
| 25 | Non Schedule Items | Dry cleaning and shampoing of Dining chairs with chemical water, removing stains, spots etc complete in all respect as per instruction, satisfaction of Engineer incharge. | Nos | 22 | 1392 | 30624 |
| 26 | Non Schedule Items | Washing and drycleaning of canopy including removing stains and spots as per instruction, satisfaction of Engineer incharge. | Nos | 3 | 21505 | 64515 |
| 27 | Non Schedule Items | Dry cleaning and shampoing of Quilted Bed with chemical water, removing stains, spots etc complete in all respect as per instruction, satisfaction of Engineer incharge | Nos | 2 | 2910 | 5820 |
| 28 | Non Schedule Items | Dry cleaning and shampoing of hand knotted Carpets with chemical water, removing stains, spots etc complete in all respect as per instruction, satisfaction of Engineer incharge. | Sqft | 502 | 380 | 190760 |
| 29 | Non Schedule Items | Dry cleaning and shampoing of Machine Made Carpets with chemical water, removing stains, spots etc complete in all respect as per instruction, satisfaction of Engineer incharge. | Sqft | 865 | 80 | 69200 |
| 30 | Non Schedule Items | Washing and drycleaning of curtains with lining, panels, including removing stains and spots, including pressing and cartage from site as per instruction, satisfaction of Engineer incharge. | Panels | 454 | 1240 | 562960 |
| 31 | Non Schedule Items | Washing and drycleaning of Roman window blinds including removing stains and spots as per instruction, satisfaction of Engineer incharge. | Nos | 32 | 3289 | 105248 |
| 32 | Non Schedule Items | Washing and drycleaning of pelmet including removing stains and spots as per instruction, satisfaction of Engineer incharge. | Nos | 12 | 3416 | 40992 |
| 33 | Non Schedule Items | Refixing of old curtains with minor repair with hooks, bolts cartage upto site as per instruction, satisfaction of Engineer Incharge. | panels | 510 | 384 | 195840 |
| 34 | Non Schedule Items | Repairing and Refixing of Roman Blinds including doori, hooks, bolts cartage upto site as per instruction, satisfaction of Engineer Incharge. | Nos | 32 | 3377 | 108064 |
| 35 | Non Schedule Items | Repairing And Refixing of pelmet design including nails, glue rods cartage upto site as per instruction, satisfaction of Engineer Incharge. | Nos | 11 | 3020 | 33220 |
| 36 | Non Schedule Items | Lacquer polishing of sofa seats two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Seats | 12 | 7304 | 87648 |
| 37 | Non Schedule Items | Lacquer polishing of center table set (3 pieces) two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Set | 1 | 7304 | 7304 |
| 38 | Non Schedule Items | Lacquer polishing of side tables two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 2 | 3825 | 7650 |
| 39 | Non Schedule Items | Lacquer polishing of Ottoman(puffy) stool two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 1 | 4331 | 4331 |
| 40 | Non Schedule Items | Repainting round table set (3 piece) two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge | Nos | 1 | 8822 | 8822 |
| 41 | Non Schedule Items | Lacquer polishing of console two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 2 | 8140 | 16280 |
| 42 | Non Schedule Items | Lacquer polishing of iron stand two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 1 | 6380 | 6380 |
| 43 | Non Schedule Items | Lacquer polishing of net set two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Set | 1 | 5555 | 5555 |
| 44 | Non Schedule Items | Lacquer polishing of entrance table two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 1 | 6380 | 6380 |
| 45 | Non Schedule Items | Lacquer polishing of Dining Chairs two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 8 | 6380 | 51040 |
| 46 | Non Schedule Items | Lacquer polishing of Dining Table two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 1 | 21615 | 21615 |
| 47 | Non Schedule Items | Lacquer polishing of Bedroom Chairs two renewal coats of appproved make to woodwork including cleaning the old old surface & minor repair(if required) as per instruction, satisfaction on Engineer Incharge. | Nos | 6 | 8140 | 48840 |
| 48 | Non Schedule Items | Repainting sofa seats two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 24 | 8305 | 199320 |
| 49 | Non Schedule Items | Repainting Office Chairs two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 20 | 8360 | 167200 |
| 50 | Non Schedule Items | Repainting Centre table Base two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 12 | 3960 | 47520 |
| 51 | Non Schedule Items | Repainting Dining Chairs two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 8 | 7535 | 60280 |
| 52 | Non Schedule Items | Repainting Dining Table two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 19410 | 19410 |
| 53 | Non Schedule Items | Repainting Wardrobe two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 2 | 35200 | 70400 |
| 54 | Non Schedule Items | Repainting ottoman(puffy stool) two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 6545 | 6545 |
| 55 | Non Schedule Items | Repainting round table two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge | Nos | 1 | 10010 | 10010 |
| 56 | Non Schedule Items | Repainting Double bed with two Side tables two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge | Nos | 1 | 31680 | 31680 |
| 57 | Non Schedule Items | Repainting Bedroom Tables two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge | Nos | 1 | 8250 | 8250 |
| 58 | Non Schedule Items | Repainting Center Table Set two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Set | 1 | 8250 | 8250 |
| 59 | Non Schedule Items | Repainting shoe racks two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 21725 | 21725 |
| 60 | Non Schedule Items | Repainting wall hanging frame two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 3 | 3438 | 10314 |
| 61 | Non Schedule Items | Repainting coat hanger two coats with deco paint of approved make and shades including scrapping and sand papering the old surface & minor repair(if required) as per instruction, satisfaction of Engineer Incharge. | Nos | 2 | 3329 | 6658 |
| 62 | Non Schedule Items | Providing & Fixing of Roller blinds of approved shade,quality and design including the cost of all accessories etc as per instruction, satisfaction of Engineer incharge | Sqft | 1217 | 638 | 776446 |
| 63 | Non Schedule Items | Providing & Fixing verman blinds of approved shade,quality and design including the cost of all accessories etc as per instruction, satisfaction of Engineer incharge. | Sqft | 706 | 1320 | 931920 |
| 64 | Non Schedule Items | Providing & Fixing of imported Wall paper on walls including the cost of cutting, wastage and cartage upto site as per instruction,satisfaction of Engineer incharge. | Sqft | 5519 | 453 | 2500107 |
| 65 | Non Schedule Items | Providing & Fixing of Prestige Heat Resistant Frosted paper on Glass surfaces including the cost of cutting, wastage and cartage upto site as per instruction,satisfaction of Engineer incharge. | Sqft | 550 | 638 | 350900 |
| 66 | Non Schedule Items | Providing & Fixing of Frosted paper(Normal But Superb quality)as per instruction, satisfaction of Engineer incharge. | Sqft | 53 | 181 | 9593 |
| 67 | Non Schedule Items | Providing & Fixing Hard Wall panels of approved shade etc Complete as per instruction, satisfaction of Engineer incharge. | Sqft | 377 | 528 | 199056 |
| 68 | Non Schedule Items | Providing & Fixing PVC Wall panels(Economy class) of approved shade etc complete as per instruction, satisfaction of Engineer incharge. | Sqft | 410 | 242 | 99220 |
| 69 | Non Schedule Items | Providing & Fixing False celling(2*2) including chanels and bolts as per instruction, satisfaction of Engineer incharge. | Sqft | 504 | 286 | 144144 |
| 70 | Non Schedule Items | Providing & Fixing Roman Blinds(Fabric) of approved shade,quality and design including the cost of all accessories etc as per instruction, satisfaction of Engineer incharge. | Sqft | 413 | 1760 | 726880 |
| 71 | Non Schedule Items | Replacement of Curtains with Cloth and Markeen(lining) per meter approved shade quality and Design including the cost off bukram, thread, hooks, bolts with rings etc complete as per instruction, satisfaction of Engineer incharge. | panels | 152 | 16775 | 2549800 |
| 72 | Non Schedule Items | Replacement of blackout curtains per meter approved shade quality and Design including the cost off bukram, thread, hooks, bolts with rings etc complete as per instruction, satisfaction of Engineer incharge. | panels | 8 | 6358 | 50864 |
| 73 | Non Schedule Items | Replacement of Net curtains per meter approved shade quality and Design including the cost off bukram, thread, hooks, bolts with rings etc complete as per instruction, satisfaction of Engineer incharge. | panels | 64 | 11055 | 707520 |
| 74 | Non Schedule Items | Providing & Fixing curtains pelmet design including cloth, 1/2'' foam sheet, 25 mm lasani base, bottom 2.5'' x 1 '' wood etc making and fixing as per instruction, satisfaction of Engineer Incharge. | Rft | 240 | 4620 | 1108800 |
| 75 | Non Schedule Items | Providing & Fixing of imported laminated wooden floor (teak, Sheesham or oak wood texture desired by the management) of best quality of 12 mm with dense jumbolan of 2mm thick layer as under lay including the cost of cutting, nailing carriage etc complete as per instructions & satisfaction of Engineer Incharge. | Sqft | 3022 | 1320 | 3989040 |
| 76 | Non Schedule Items | Providing & Fixing of imported laminated wooden floor (teak, Sheesham or oak wood texture desired by the management) of best quality of 8 mm with dense jumbolan of 2mm thick layer as under lay including the cost of cutting, nailing carriage etc complete as per instructions & satisfaction of Engineer Incharge. | Sqft | 2049 | 979 | 2005971 |
| 77 | Non Schedule Items | Providing & Fixing wooden skirting (teak, Sheesham or oak wood texture desired by the management) best quality as per site requirements including cutting, wastage, carriage etc complete in all respect as per the instructions & satisfaction of Engineer Incharge. | Rft | 1288 | 660 | 850080 |
| 78 | Non Schedule Items | Supply of new Sofa Seats(3 Seater)Chester style approved quality of furniture(Interwood wood or equivalent) fabric including cartage upto site complete in all respect as per instruction, satisfaction of engineneer incharge | Nos | 2 | 345656 | 691312 |
| 79 | Non Schedule Items | Supply of new Sofa Seats(Signle Seater)Chester style approved quality of furniture(Interwood wood or equivalent) fabric including cartage upto site complete in all respect as per instruction, satisfaction of engineneer incharge | Nos | 2 | 123188 | 246376 |
| 80 | Non Schedule Items | Supply of new Sofa Seats(3 Seater) approved quality of furniture(Interwood wood or equivalent) fabric including cartage upto site complete in all respect as per instruction, satisfaction of engineneer incharge | Nos | 2 | 294682 | 589364 |
| 81 | Non Schedule Items | Supply of new Sofa Seats(Signle Seater) approved quality of furniture(Interwood wood or equivalent) fabric including cartage upto site complete in all respect as per instruction, satisfaction of engineneer incharge | Nos | 2 | 93522 | 187044 |
| 82 | Non Schedule Items | Supply of new Folding Chairs for Masjid approved quality of furniture(Interwood wood or equivalent) including cartage upto site complete in all respect as per instruction, satisfaction of engineneer incharge. | Nos | 2 | 11220 | 22440 |
| 83 | Non Schedule Items | Supply of new Bags for Chauirs of Approved Quality Including cartage upto site as per instruction, satisfaction of Engineer Incharge | Nos | 2 | 9680 | 19360 |
| 84 | Non Schedule Items | Supply of Spring Mattress (Master molty foam, diamond foam or equivalent) (78" x 72" x 10") approved quality including cartage upto site as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 164466 | 164466 |
| 85 | Non Schedule Items | Supply of Spring mattress/Master molty foam, diamond foam or equivalent (78" x 72" x 8") approved quality including cartage upto site as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 142768 | 142768 |
| 86 | Non Schedule Items | Supply of Pillows with approved quality ball fiber including cartage upto site as per instruction, satisfaction of Engineer Incharge. | Nos | 2 | 2640 | 5280 |
| 87 | Non Schedule Items | Supply of mattress cover including cartage upto site as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 10340 | 10340 |
| 88 | Non Schedule Items | Providing & Fixing of Book shelve (8'-9" x 6'-6" x 9") made of HDF High class laminated sheet including cost of handle lock, hinges, channels etc complete in all respect, as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 163487 | 163487 |
| 89 | Non Schedule Items | Providing & Fixing of High pile synthetic carpet runner(altimate soft & light wieght) for Aeroplane including cost of Cutting, fitting, cartage upto site as per instruction,satisfiction of Engineer incharge.(Placed in aeroplane corridoor & in foot Pads area) | Sqft | 181 | 3278 | 593318 |
| 90 | Non Schedule Items | Providing & Fixing synthetic carpet (08 mm in hairey form) with Samadbond(Bonding Agents)(Bonding Agents) including cost of Cutting, fitting, cartage upto site as per instruction,satisfiction of Engineer incharge. | Sqft | 365 | 335 | 122275 |
| 91 | Non Schedule Items | Providing & Fixing synthetic carpet(05 mm In plan) with Samadbond(Bonding Agents) including cost of Cutting, fitting, cartage upto site as per instruction,satisfiction of Engineer incharge. | Sqft | 192 | 202 | 38784 |
| 92 | Non Schedule Items | Providing & Fixing of high pile synthetic carpet(action back plastic hard mished back) with Samadbond(Bonding Agents) including cost of Cutting, fitting, cartage upto site as per instruction,satisfiction of Engineer incharge. | Sqft | 71 | 594 | 42174 |
| 93 | Non Schedule Items | Providing & Fixing carpet underlay 12 mm with Samadbond(Bonding Agents) including cost of Cutting, fitting, cartage upto site as per instruction,satisfiction of Engineer incharge. | Sqft | 313.19 | 76 | 23802.44 |
| 94 | Non Schedule Items | Providing & Fixing High pile carpet (action back plastic flexible mished back) with Samadbond(Bonding Agents) including cost of Cutting, fitting, cartage upto site as per instruction,satisfiction of Engineer incharge. | Sqft | 382 | 1100 | 420200 |
| 95 | Non Schedule Items | Providing & Fixing Masjid Prayer rugs (Mussallah)(hard thrread back) with under layer with Samadbond(Bonding Agents) including the cost off cutting, fitting, and cartage on site etc complete. | Nos | 14 | 7700 | 107800 |
| 96 | Non Schedule Items | Providing & Fixing plastic Mat(non skitiing, non woven mished shaped) for swimming pool complete as per instruction,satisfiction of Engineer incharge. | Sqft | 182 | 878 | 159796 |
| 97 | Non Schedule Items | Providing & Fixing Door Mat(action back plastic flexible mished back) complete as per instruction,satisfaction of Engineer incharge. | Nos | 12 | 2420 | 29040 |
| 98 | Non Schedule Items | Providing & Fixing Floor Mat(non skitiing, non woven mished shaped) for swimming pool complete as per instruction,satisfaction of Engineer incharge. | Nos | 8 | 5060 | 40480 |
| 99 | Non Schedule Items | Providing and Fixing Carpet joint tape with stickey material with hot application methodology(iron pressed ) for existing carpet runner at Guard of Honour Area(Main porch) as per instruction,satisfaction of Engineer incharge. | Rft | 252 | 1100 | 277200 |
| 100 | Non Schedule Items | Repair of Carpet Runners for Guard of Honour Area(Main porch) as per instruction,satisfaction of Engineer incharge. | Nos | 1 | 82500 | 82500 |
| 101 | Non Schedule Items | Providing & Fixing Curtain Rods including bollts, drilling fixing arrangemnet etc complete. As per instruction,satisfaction of Engineer incharge. | Rft | 142 | 981 | 139302 |
| 102 | Non Schedule Items | Providing & Fixing of curtain railing with runners, bolts, brackets etc complete in all respect as per instruction, satisfaction of Engineer Incharge. | Rft | 272 | 783 | 212976 |
| 103 | Non Schedule Items | Providing & Fixing of Flexible curtain railing for Round windows with runners, bolts, brackets along with all hinging arrangements etc. complete in all respect as per instruction, satisfaction of Engineer Incharge. | Rft | 28 | 1428 | 39984 |
| 104 | Non Schedule Items | Providing & Fixing of Heavy Duty Curtain railing with runners, bolts, brackets etc complete in all respect as per instruction, satisfaction of Engineer Incharge. | Rft | 29 | 1804 | 52316 |
| 105 | Non Schedule Items | Providing & Fixing of curtain operating pulley set complete in all respect as per instruction, satisfaction of Engineer Incharge. | Nos | 1 | 10796 | 10796 |
| GRAND TOTAL: | Rs 30,345,934.44 |
As per BOQ
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)), Deputy Director Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory
The Supplier is:
The title of the subject procurement is: UPHOLSTERY , POLISHING AND REPAINTING OF FURNITURE AT EXECUTIVE BUILDING,ISLAMABAD
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)), Deputy Director
Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory
+92-312-874-3878
engr.waqar.asghar@gmail.com
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)), Deputy Director
Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory
+92-312-874-3878
engr.waqar.asghar@gmail.com
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.00% to 0.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P153948
To: Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)), Deputy Director Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)), Deputy Director Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., UPHOLSTERY , POLISHING AND REPAINTING OF FURNITURE AT EXECUTIVE BUILDING,ISLAMABAD (P153948) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Civil-Maintenace Division PMOH, Maintence of Public Buildings Directorate (Capital Development Aurhority (CDA)), Deputy Director Room # E-115, PM Secretariate, Sector G-5, Islamabad, Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}