Standard Bidding Document

📑 Procurement Notice (NIT)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

REQUEST FOR BIDS

PROCUREMENT OF CIVIL WORKS

  1. The No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan) has reserved Funds for the procurement planned for FY 2026-27. The No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan) intends to apply part of the proceeds of this Fund to cover eligible payments under the contract for the "Establishment of Data Processing Labs" with the reference of "P160599".
  2. The No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan) invites sealed Bids from eligible Bidders for procurement of Works (Establishment of Data Processing Labs) described in the bidding documents on EPADS v2.0.
  3. Single Stage-Two Envelope will be used by adopting Least Cost Based Selection (LCBS) Technique for the subject procurement, in line with the Public Procurement Rules, 2004 and any Regulations, Regulatory Guides, Procurement Guidelines or Instructions issued by the Authority from time to time.
  4. All Bids must be accompanied by a Bid Security amount described in Bid Security Section in Bidding Document in the form of  Call at Deposit. Or all bids must be accompanied by bid securing declaration in the format specified in the Bidding documents
  5. E-Bidding documents, containing detailed terms & conditions, specifications and requirements etc. are available on e-Pak Acquisition and Disposal System (EPADS) at https://epads.gov.pk/opportunities/federal/procurements/160599 for all the interested bidders registered on EPADS v2.0. Bidders are required to get themselves registered on EPADS v2.0 to participate in Bidding process.
  6. The e-bids, prepared in accordance with the instructions in the e-Bidding documents, must be submitted through EPADS v2.0 on or before Friday, October 30, 2026 11:00 AM. E-bids will be opened by using EPADS v2.0 on the same day at Friday, October 30, 2026 11:30 AM. Manual submission of Bids shall not be entertained. Those vendor who have not yet registered on the new version of EPADS v2.0, may register themselves on https://vendors.epads.gov.pk/. A tutorial to explain the registeration process is available at https://www.youtube.com/watch?v=MNW6T38v7tc.

In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).

 

 

No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director
Survey of Pakistan, Murree Road Faizabad, Rawalpindi
+92-321-629-1301
cpcdatum@gmail.com

📑 Instructions to Bidders (ITB)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

A. INTRODUCTION

  1. Scope of Bid
    1. The Procuring agency/Employer (PA), as indicated in the Bid Data Sheet (BDS) invites Bids for the execution of Works as specified in the BDS and Section V- Works Requirements. The name, identification, and number of lots (contracts) of this National/ International Competitive Bidding process are specified in the BDS.
  2. Source of Funds
    1. Source of funds as referred in Clause 2 of Bid Data Sheet.
  3. Eligible Bidders
    1. A bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture or consortium. In the case of a joint venture or consortium, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture or consortium shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture or consortium during the Bidding process, and in case of award of contract, during the execution of contract. Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
      Any bid submitted by the joint venture, consortium or association shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
      (The limit on the number of members of JV or Consortium may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
    2. The invitation for bids is open to all prospective bidders subject to any provisions of incorporation or licensing by the respective national/ international incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidder keeping in view the requirement of that business.
    3. A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidders may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
      1. are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring agency/Employer to provide consulting services for the preparation of design or technical specifications of the works that are the subject of the bid; or
      2. have controlling shareholders in common; or
      3. receive or have received any direct or indirect subsidy from any of them; or
      4. have the same legal representative for purposes of this Bid; or
      5. have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the Procuring agency/Employer regarding this Bidding process; or
      6. Submit more than one bid in this bidding process.
    4. A Bidder may be ineligible if –
      1. he is declared bankrupt or, in the case of company or firm, insolvent;
      2. payments in favor of the bidder is suspended in accordance with the judgment of a court of law other than a judgment declaring bankruptcy and resulting (in accordance with the national laws) in the total or partial loss of the right to administer and dispose of its property;
      3. the bidder is convicted, by a final judgment of a Court of Law or relevant Professional Statuary Body, of any offence involving professional conduct;
      4. The bidder is debarred/ blacklisted by a national level Procuring agency/Employer and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration.
    5. As and when required, bidders shall provide to the Procuring agency/Employer evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
    6. Bidders shall submit proposal relating to the nature, conditions and modalities of sub-contracting wherever the sub-contracting of any elements of the contract is envisaged.
  4. Eligible Material and Equipment
    1. All the material and equipment to be mobilized under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such materials and equipment. For this purpose, ineligible countries are stated in the section-IV titled as “Eligible Countries”.

B. BIDDING DOCUMENTS

  1. Contents of Bidding Documents
    1. The scope of Works, bidding procedures, and terms and conditions of the contract are prescribed in the bidding documents.  In addition to the Invitation for Bids, the bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 7.1 include:
      Section I -Invitation for Bids 
      Section II Instructions to Bidders (ITBs)
      Section III Bid Data Sheet (BDS)
      Section IV Eligible Countries
      Section V Evaluation and Qualification Criteria
      Section VI Works Requirements Technical Specifications & Schedule of Requirements
      Section VII Standard Bidding Forms
      Section VIII General Conditions of Contract (GCC)
      Section IX Particular Conditions of Contract (PCC)
      Section X Contract Forms
    2. The bidder is expected to examine all instructions, forms, specifications, terms and conditions prescribed in the bidding documents. Failure to furnish all the information required in the bidding documents will be at the bidder’s risk and may result in the rejection of his bid. 
  2. Clarification of Bidding Document, Pre-bid Meeting
    1. A prospective bidder requiring any clarification of the bidding document may notify the Procuring agency/Employer through EPADS. 
    2. The Procuring agency/Employer shall respond to the request for clarification in accordance with Rule 31 of the Public Procurement Rules 2004.
    3. Should the Procuring Agency deem it necessary to amend the BIDDING document as a result of a clarification, it shall do so following the procedure under ITB 7.
    4. If indicated in the BDS, the bidder’s designated representative is invited at the bidder’s cost to attend a pre-bid meeting at the place, date and time mentioned in the BDS. During this pre-bid meeting, prospective bidders may request clarification of the schedule of requirement, the evaluation criteria or any other aspects of the bidding documents.
    5. Minutes of the pre-bid meeting, if applicable, including the text of the questions asked by bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS. Any modification to the bidding documents that may become necessary as a result of the pre-bid meeting shall be made by the Procuring agency/Employer exclusively through the use of an Addendum pursuant to ITB 7. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
    6. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works.  The costs of visiting the Site shall be at the bidder’s own expense.
    7. The bidder and any of its authorized personnel will be granted permission by the Procuring agency/Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the bidder and its personnel will release and indemnify the Procuring agency/Employer  from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
  3. Amendment of Bidding Documents
    1. The procuring agency may issue notification of any change, addition, modification or deletion in accordance with Rule 23 of the Public Procurement Rules 2004 i.e. Bidding Documents.
    2. To give prospective bidders reasonable time in which to take an addendum/corrigendum into account in preparing their bids, the Procuring agency/Employer may, at its discretion, extend the deadline for the submission of bids:
      Provided that the Procuring agency/Employer shall extend the deadline for submission of bid in pursuance of Rule 27 of the  Public Procurement Rules 2004, i.e. Extension of time for submission of bids, if such an addendum is issued within last three (03) days of the bid submission deadline.

C. PREPARATION OF BIDS

  1. Language of Bid
    1. The bid prepared by the bidder, as well as all correspondence and documents relating to the bid exchanged by the bidder and the Procuring agency/Employer shall be written in the English language unless specified in the BDS. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless specified in the BDS, in which case, for purposes of interpretation of the bidder, the translation shall govern.
  2. Documents Constituting the Bids   
    1. The Bids prepared by the Bidder shall constitute of all the documents required in the BDS.
  3. Documents Establishing Eligibility of Material, Equipment and Works, their Conformity to Bidding Documents
    1. The bid prepared by the bidder shall constitute the following components: -
      1. Documentary evidence established in accordance with ITB 10 that the material and equipment to be utilized by the Bidder for the executions of works are eligible material and equipment and conform to the Bidding Documents;
      2. Documentary evidence established in accordance with ITB 11 that the bidder has been authorized to carry out the Construction works;
      3. Documentary evidence established in accordance with ITB 11 that the bidder is eligible and/or qualified for the subject bidding process;
      4. Form of Bid and Bid Prices completed in accordance with ITB 12 and 13; 
      5. Completed schedules as required, including priced Bill of Quantities in accordance with ITB 13.
      6. Technical Proposal completed in all aspects in accordance with ITB-15. 
      7. Bid security or Bid Securing Declaration furnished in accordance with ITB 17;
      8. Any other document required in the BDS.
    2. In addition to the requirements, bids submitted by a JV shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful bid shall be signed by all members and submitted with the bid, together with a copy of the proposed Agreement.
    3. The bidder shall furnish, as part of its bid, all those documents establishing the eligibility in conformity to the terms and conditions specified in the bidding documents for all material, equipment and works which the bidder proposes to execute.
    4. The documentary evidence of conformity of the material, equipment and works to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of:
      1. a detailed description of the work methodology, approach, schedule and resources to be mobilized at site;
      2. an item-by-item commentary on the Procuring agency/Employer’s Technical Specifications demonstrating substantial responsiveness of the material, equipment and works to those specifications, or a statement of deviations and exceptions to the provisions of the Technical Specifications;
      3. any other procurement specific documentation requirement as stated in the BDS.
    5. The required documents and other accompanying documents must be in English. In case any other language than English is used the pertinent translation into English shall be attached to the original version.
  4. Documents Establishing Eligibility and Qualification of the Bidder   
    1. The bidder shall furnish, as part of its bid, all those documents establishing the bidder’s eligibility to participate in the bidding process and/or its qualification to perform the contract if its bid is accepted.
    2. The documentary evidence of the bidder’s eligibility to bid shall establish to the satisfaction of the Procuring agency/Employer that the bidder, at the time of submission of its bid, is from an eligible country as defined in Section-IV titled as “Eligible Countries”.
    3. The documentary evidence of the bidder’s qualification to perform the contract if its bid is accepted shall establish to the satisfaction of Procuring agency/Employer that:
      1. The bidder has the financial and technical capability necessary to perform the Contract, meets the qualification criteria specified in Section-V, Evaluation and Qualification Criteria and BDS.
      2. In the case of a bidder not doing business within Pakistan, the bidder is or will be (if awarded the contract) represented by a local bidder (Joint Venture) in accordance with the PEC works bylaws, and in case of award of works such foreign firm is required to participate in the execution of works to carry out its obligations as prescribed in the Conditions of Contract and /or Technical Specifications.
      3. That the bidder meets the qualification criteria listed in Section-V, Evaluation and Qualification Criteria and BDS. 
  5. Forms of Bid
    1. The Bidder shall fill the Form of Bids furnished in the bidding documents. The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
  6. Bid Prices
    1. The bid prices quoted by the bidder in the Standard bid Forms, Bill of Quantities and in the Price Schedules shall conform to the requirements specified below or exclusively mentioned hereafter in the bidding documents. 
    2. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. If a Price Schedule shows items listed but not priced, their prices shall be construed to be included in the prices of other items in the Bill of Quantities and will not be paid for separately by the Procuring agency/Employer. 
    3. Items not listed in the Price Schedule shall be assumed not to be included in the bid, and provided that the bid is still substantially responsive in their absence or due to their nominal nature, the corresponding average price of the respective item(s) of the remaining substantially responsive bidder(s) shall be construed to be the price of those missing item(s):
      Provided that:
      1. where there is only one (substantially) responsive bidder, or
      2. where there is provision for alternate proposals and the respective items are not listed in the other bids, 
        The Procuring agency/Employer may fix the price of missing items in accordance with market survey, and the same shall be considered as final price.
    4. The Bid price to be quoted in the Form of Bid in accordance with ITB 12 shall be the total price of the bid.
    5. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract. 
    6. If so specified in ITB 1.1, bids may be invited for individual lots (contracts) or for any combination of lots (packages). 
    7. Prices quoted by the Bidder shall be fixed during the bidder’s performance of the contract and not subject to variation on any account. A bid submitted with an adjustable price will be treated as non-responsive and shall be rejected, pursuant to ITB 27, unless otherwise price adjustment is permissible under Conditions of the Contract. 
    8. All duties, taxes, and other levies payable by the Contractor under the Contract, or for any other cause, as of the date twenty-eight (28) days prior to the deadline for submission of bids, shall be included in the rates and prices and the total bid price submitted by the bidder.
  7. Currencies of Bid and Payment
    1. Prices shall be quoted in Pakistani Rupees unless otherwise specified in the BDS. Comparison of bids and tie of bid shall be treated in accordance with the Rule 30(2) of Public Procurement Rules, 2004.
  8. Documents Comprising the Technical Proposal
    1. The bidder shall furnish a Technical Proposal including a statement of work methods, equipment, personnel, schedule and any other information as stipulated in Section VII – Standard Bid Forms, in sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the work requirements and the completion time.
  9. Bid Validity Period
    1. Bids shall remain valid for the period specified in the BDS after the bid submission deadline prescribed by the Procuring agency/Employer. A bid valid for a shorter period shall be rejected by the Procuring agency/Employer as non-responsive. The period of bid validity will be determined from the complementary bid securing instrument i.e. the expiry period of bid security or bid securing declaration as the case may be. 
    2. Under exceptional circumstances, prior to the expiration of the initial Bids/Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids/Bid. Such request for extension of the period of bid validity shall be carried out in accordance with Rule 26 of the Public Procurement Rules, 2004.
  10. Bid Security or Bid Securing Declaration
    1. Pursuant to ITB 11.1 unless otherwise specified in the BDS, the bidder shall furnish as part of its bid, a Bid Security in accordance with Rule 25 of the Public Procurement Rules, 2004 in the amount and currency specified in the BDS or Bid Securing Declaration as specified in the BDS in the format provided in Section VII (Standard Bidding Forms). 
      In case Procuring agency/Employer is inviting bids in lots / packages, the bidder shall be required to submit his bid security against the respective lot/ package for which he is submitting his bid.
      Until the development of functionality of auto verification of financial instrument in EPADS, the scanned copy of bid security or bid securing declaration, as the case may be, shall be uploaded on E-PADS whereas the original instrument to be submitted to the procuring agency before closing of bid submission deadline,
    2. The Bid Security shall be denominated in the local currency or in another freely convertible currency, and it shall be in the form specified in the BDS which shall be in any of the following:
      1. A bank guarantee, an irrevocable letter of credit issued by a Scheduled bank in the form provided in the Bidding Documents or another form acceptable to the Procuring agency/Employer and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bid Validity is extended. In either case, the form must include the complete name of the bidder; 
      2. A cashier’s or certified cheque; or
      3. Another security as indicated in the BDS.
    3. The Bid Security or Bid Securing Declaration shall be in accordance with the Form of the Bid Security or Bid Securing Declaration included in Section VII (Standard Bidding Forms) or another form approved by the Procuring agency/Employer prior to the bid submission.
    4. The Bid Security shall be payable promptly upon written demand by the Procuring agency/Employer in case any of the conditions listed in ITB 17.9 are invoked.
    5. Any bid not accompanied by a Bid Security or Bid Securing Declaration in accordance with ITB 17.1 or 17.3 shall be rejected by the Procuring agency/Employer and shall be declared as non-responsive bid, pursuant to ITB 27.
    6. Unsuccessful bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Procuring agency/Employer pursuant to ITB 16. The Procuring agency/Employer shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
      1. The expiry of the Bid Security;
      2. The entry into force of a procurement contract and the provision of a performance security (or guarantee), for the performance of the contract if such a security (or guarantee), is required by the Biding documents;
      3. The rejection by the Procuring agency/Employer of all Bids;
      4. The withdrawal of the bid prior to the deadline for the submission of bids, unless the biding documents stipulate that no such withdrawal is permitted.
    7. The successful bidder’s Bid Security will be discharged upon the bidder signing the contract pursuant to ITB 40, or furnishing the performance security (or guarantee), pursuant to ITB 41.
    8. The Bid Security may be forfeited or the Bid Securing Declaration executed:
      1. if a Bidder: 
        1. Withdraws its Bid during the period of Bid Validity as specified by the Procuring agency/Employer, and referred by the bidder on the Form of Bid except as provided for in ITB 16.2; or 
      2. In the case of a successful bidder, if the bidder fails:
        1. to sign the contract in accordance with ITB 40; or
        2. to furnish performance security (or guarantee) in accordance with ITB 41.
    9. In case of Bid Security issued by the foreign bank is allowed by the Procuring agency/Employer, the same should be counter guaranteed by a corresponding bank in Pakistan. Furthermore, in case of joint venture, it should be in the name of Joint venture to ensure joint responsibility. In case the JV is not legally constituted at the time of bid submission, the bid security or bid securing declaration shall be in the names of all future members as named in the letter of bid.
  11. Withdrawal of Bids   
    1. Before bid submission deadline, any bidder may withdraw, substitute, or modify its bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and the corresponding must accompany the respective written notice. 
  12. Format and Signing of Bid
    1. The Bidder shall prepare and submit Bids through EPADS with due diligence after carefully reading all the terms and condition before bid submission deadline.

D. SUBMISSION OF BIDS

  1. Submission of Bids through EPADS v2.0
    1. All bids shall be submitted through EPADS v2.0.
  2. Deadline for Submission of Bids
    1. All bids shall be received through EPADS v2.0 not later than bid submission deadline as specified in the BDS.
    2. The Procuring agency/Employer may, under exceptional circumstances and at its discretion, extend the deadline for the submission of bids, pursuant to Rule 27 of the Public Procurement Rules, 2004. Extension of Time for submission of bid, by amending the Bidding Documents in accordance with ITB 7, in which case all rights and obligations of the Procuring agency/Employer and bidders previously subject to the deadline will thereafter be subject to the new deadline.
  3. Substitution and Modification of bids
    1. A bidder may substitute or modify his bid after it has been submitted, provided that written notice of the substitution or modification of the bid, is received by the Procuring agency/Employer prior to the deadline for submission of bids.
    2. Revised bid may be submitted after the substitution or modification made in the original bid in accordance with the provisions referred in ITB 18. 

E. OPENING AND EVALUATION OF BIDS

  1. Opening of Bids
    1. The Procuring Agency will open bids in accordance with Rule 28 of the Public Procurement Rules, 2004 and as specified in the BDS.
  2. Confidentiality
    1. Information relating to the examination, clarification, evaluation and comparison of bids and recommendation of contract award shall not be disclosed to bidders or any other persons not officially concerned with such process until the time of the announcement of the respective evaluation report.
  3. Clarification of Bids
    1. Clarification of Bidding Documents shall be carried out in accordance with Rule 31 of the Public Procurement Rules, 2004.
    2. The alteration or modification in the bid which in any case affect the following parameters will be considered as a change in the substance of a bid:
      1. evaluation & qualification criteria;
      2. required scope of work;
      3. contract price;
      4. all securities requirements;
      5. tax requirements;
      6. terms and conditions of bidding documents.
      7. change in the ranking of the bidder
  4. Preliminary Examination of Bids 
    1. Prior to the detailed evaluation of bids, the Procuring agency/Employer will determine whether each bid:
      1. meets the eligibility criteria defined in ITB 3 and ITB 4; 
      2. has been prepared as per the format and contents defined by the Procuring agency/Employer in the bidding documents;
      3. has been properly signed; 
      4. is accompanied by the required securities; and 
      5. is substantially responsive to the requirements of the bidding documents. 
        The Procuring agency/Employer's determination of a bid's substantial responsiveness will be based on the contents of the bid itself.
    2. A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding Documents, without material deviation or reservation. A material deviation or reservation is one that: - 
      1. affects in any substantial way the scope, quality, or performance of the Works; 
      2. limits in any substantial way, inconsistent with the bidding documents, the Procuring agency/Employer's rights or the bidders’ obligations under the Contract; or 
      3. if rectified, would affect unfairly the competitive position of other bidders presenting substantially responsive bids.
    3. The Procuring agency/Employer will confirm that the documents and information specified under ITB 9, 10 and 11 have been provided in the bid. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Bidders, the bid shall be rejected.
    4. The Procuring agency/Employer may waive-off any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
      Explanation: A minor informality, non-conformity or irregularity is one that is merely a matter of form and not of substance. It also pertains to some immaterial defect in a Bid or variation of a bid from the exact requirements of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the works. The Procuring agency/Employer either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is advantageous to the Procuring agency/Employer. Examples of minor informalities or irregularities include failure of a bidder to –
      1. Submit the number of copies of signed bids required by the invitation;
      2. Furnish required information concerning the number of its employees;
      3. the firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature.
    5. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer may request the bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Technical Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any such aspect of the technical Proposal linked with the ranking of the bidders. Failure of the bidder to comply with the request may result in the rejection of its bid.
    6. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer shall rectify quantifiable nonmaterial nonconformities or omissions related to the Financial Proposal. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of the missing or nonconforming item or component. 
    7. If a bid is not substantially responsive, it will be rejected by the Procuring agency/Employer and may not subsequently be evaluated for complete technical responsiveness. 
  5. Examination of Terms and Conditions; Technical Evaluation
    1. The Procuring agency/Employer shall examine the bid to confirm that all terms and conditions specified in the GCC and the PCC have been accepted by the bidder without any material deviation or reservation.
      For this purpose:
      “Deviation” means departure from the requirements specified in the Bidding Document.
      “Reservation” means setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding Document.
    2. The Procuring agency/Employer shall evaluate the technical aspects of the bid submitted in accordance with ITB 30, to confirm that all requirements specified in Section VI – Works Requirement, Technical Specifications of the Bidding Documents have been met without material deviation or reservation.
    3. If after the examination of the terms and conditions and the technical evaluation, the Procuring agency/Employer determines that the bid is not substantially responsive in accordance with ITB 27, it shall reject the bid.
  6. Correction of Arithmetic Errors
    1. Bids determined to be substantially responsive will be checked for any arithmetic errors.  Errors will be corrected as follows: -
      1. if there is a discrepancy between unit prices and the sub-total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the sub-total price shall be corrected, unless in the opinion of the Procuring agency/Employer there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected;
      2. if there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail, and the total shall be corrected; and 
      3. where there is a discrepancy between the amounts in figures and in words, the amount in words will govern.
      4. Where there is discrepancy between grand total of price schedule and amount mentioned on the Form of Bid, the amount referred in Price Schedule shall be treated as correct subject to elimination of other errors. 
    2. The amount stated in the Bid will, be rectified by the Procuring agency/Employer in accordance with the above procedure for the correction of errors and, with, the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount, its bid shall be rejected after forfeiture of Bid Security or execution of the Bid Securing Declaration, as the case may be, in accordance with ITB 41.3.
  7. Conversion to Single Currency
    1. The unit rates and the prices shall be quoted by the bidder entirely in Pak rupees. A bidder expecting to incur expenditures in other currencies for inputs to the Works from outside the Procuring agency/Employer’s country (referred to as the “Foreign Currency Requirements”) shall indicate the same in the letter of bid-financial proposal. The proportion of the Bid Price (excluding Provisional Sums) needed by him for the payment of such Foreign Currency Requirements either (i) entirely in the currency of the Bidder’s home country or, (ii) at the bidder’s option, entirely in Pak rupees provided always that a bidder expecting to incur expenditures in a currency or currencies other than those stated in (i) and (ii) above for a portion of the foreign currency requirements, and wishing to be paid accordingly, shall indicate the respective portions in his bid. Comparison of bids quoted in different currencies and conversion of bids into a single currency shall be carried out in accordance with Rule 30(2) of the Public Procurement Rules, 2004.
  8. Evaluation of Bids
    1. The Procuring agency/Employer shall evaluate and compare only the bids determined to be substantially responsive, pursuant to ITB 27.
    2. In evaluating the Technical Proposal of each Bid, the Procuring agency/Employer shall use the criteria and methodologies listed in the BDS and in terms of works requirement. No other evaluation criteria or methodologies shall be permitted.
    3. The Procuring agency/Employer’s evaluation of a bid will take into account:
      1. the bid price, excluding provisional sums and the provision, if any, for contingencies in the summary bill of quantities, but including day work items, where priced competitively;
      2. converting the amount resulting from applying above, if relevant, to a single currency in accordance with ITB 29;
    4. The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in bid evaluation.
    5. If these bidding documents allow bidders to quote separate prices for different lots, and the award to a single bidder of multiple lots, the methodology of evaluation to determine the lowest evaluated lot combinations in the Form of Bid, is specified in the BDS.
    6. If the bid, which results in the Evaluated Bid Price (Successful Bid), is seriously unbalanced or front loaded in the opinion of the Employer, the Employer may require the Bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated Contract payments, the Employer may require that the amount of the performance security be increased at the expense of the Bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under the Contract.
      Explanation:
      “Unbalanced” or “front-loaded” bids consist of deliberately submitting bids with artificially high prices or unit rates for the early stages of a construction project, offset by artificially low prices or unit rates for the later stages of the project, to improve the contractor’s cash flow.
  9. Domestic Preference
    1. If the BDS so specifies, the Procuring agency/Employer will grant a margin of preference to the domestic contractor in line with the rules, regulations, regulatory guides or instructions issued by the Authority from time to time. 
  10. Determination of Successful Bid
    1. The Procuring agency/Employer shall compare the evaluated bids in accordance with the predefined bidding procedure, of all substantially responsive bids to determine the Successful bidder. 
  11. Qualification of Bidder 
    1. The Procuring agency/Employer shall determine to its satisfaction whether the bidder is substantially responsive and whose bid is declared as Successful bid either continues to meet (if prequalification applies) or meets (if post-qualification applies) the qualifying criteria specified in Evaluation and Qualification Criteria.
      Note: In case of international bidding, the parameters for incorporation or licensing within Pakistan may be fulfilled as part of post qualification.
    2. The determination shall be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11.
    3. Prior to contract award, the Procuring agency/Employer will verify that the successful bidder (including each member of a JV) is not blacklisted/debarred. The Procuring agency/Employer will conduct the same verification for each sub-contractor proposed by the successful bidder. 
  12. Sub-Contractors
    1. The bidder shall provide details regarding any specialized sub-contractor to the Procuring agency/Employer. In case change of sub-contractors, the bidder shall promptly notify the Procuring agency/Employer and obtain approval for replacement of sub-contractors.
    2. Bidders may propose sub-contracting up to the percentage of total value of contracts or the volume of works as specified in the BDS.
  13. Abnormally Low Financial Bid
    1. A procuring Agency may reject abnormally low bids. The decision of the Procuring agency/Employer to reject a bid and reasons for the decision shall be recorded in the procurement proceedings and promptly communicated to the bidder concerned. Moreover, the Procuring agency/Employer shall not incur any liability solely by rejecting abnormally bid
      Guidance for Procuring agency/Employer:
      An abnormally low bid means, in the light of the Procuring agency/Employer’s estimate and of all the bids submitted, the bid appears to be abnormally low by not providing a margin for normal levels of profit. In order to identify the Abnormally Low Bid (ALB) following approaches can be considered to minimize the scope of subjectivity:
      1. Comparing the bid price with the cost estimate; 
      2. Comparing the bid price with the bids offered by other bidders submitting substantially responsive bids; and 
      3. Comparing the bid price with prices paid in similar contracts in the recent past either government- or development partner-funded.
    2. The Procuring agency/Employer will determine to its satisfaction whether the bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily, in accordance with the criteria listed in ITB 11
    3. The determination will take into account the bidder’s financial and technical capabilities.  It will be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    4. Procuring agency/Employer may seek “Certificate for Independent Price Determination” from the bidder and the results of reference checks may be used in determining award of contract.
      Explanation: The Certificate shall be furnished by the bidder. The bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc. 
    5. An affirmative determination will be a prerequisite for award of the contract to the bidder. A negative determination will result in rejection of the bidder’s bid, in which event the Procuring agency/Employer will proceed to the next ranked bidder to make a similar determination of that bidder’s capabilities to perform satisfactorily.

F. AWARD OF CONTRACT

  1. Criteria of Award
    1. Subject to ITB 36 and 37, the Procuring agency/Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has been declared as Successful Bidder, provided that such bidder has been determined to be:
      1. eligible in accordance with the provisions of ITB 3; 
      2. is determined to be qualified to perform the Contract satisfactorily; and 
      3. Successful negotiations have been concluded, if any.
  2. Negotiations
    1. The Committee of the Procuring agency/Employer may negotiate with the Most Advantageous Bidder relating to the following areas:
      1. a minor alteration to the technical (drawings, design technical specifications) details of the statement of works;
      2. Methodology, work plan, staffing in view to streamline the work;
      3. a minor amendment to the Particular conditions of Contract;
      4. finalizing payment arrangements;
      5. clarifying details that were not apparent or could not be finalized at the time of Bidding; 
    2. Where negotiation fails to result into an agreement, the Procuring agency/Employer may invite the next ranked bidder for negotiations. Where negotiations are commenced with the next ranked bidder, the Procuring agency/Employer shall not reopen earlier negotiations.
  3. Procuring agency's Right to reject All Bids
    1. The procuring agency has the right to reject all bids in accordance with Rule 33 of the Public Procurement Rules, 2004. However, the Authority (i.e. PPRA) may call from the Procuring agency/Employer the justification of those grounds. 
  4. Notification of Award
    1. The procuring agency shall announce and publish the evaluation result in accordance with Rule 35 of the Public Procurement Rules, 2004.
    2. Where no complaints have been lodged, the bidder whose bid has been accepted will be notified of the award by the Procuring agency/Employer prior to expiration of the bid validity period through EPADS. However, the Procuring agency/Employer shall not award any procurement contract at least for five (05) days after the announcement of final evaluation report. The notification letter (herein after and in the condition of the contract and contract form called “Letter of Acceptance” will specify the sum that the Procuring agency/Employer will pay the successful bidder in consideration for the execution and completion of the works as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price). 
    3. The notification of award will constitute the formation of the Contract, subject to the bidder furnishing the Performance Security (or guarantee) in accordance with ITB 41 and signing of the contract in accordance with ITB 40. 
    4. Upon the successful bidder’s furnishing of the performance security (or guarantee) pursuant to ITB 41, the Procuring agency/Employer will promptly notify each unsuccessful bidder, the name of the successful bidder and the Contract amount and will discharge the Bid Security or Bid Securing Declaration of the bidder(s) pursuant to ITB 17.
  5. Signing of Contract
    1. Promptly after notification of award, Procuring agency/Employer shall send the successful bidder the draft agreement, incorporating all terms and conditions as agreed by the parties to the contract. 
    2. Immediately after the Redressal of grievance by the GRC, and after fulfillment of all conditions precedent of the Contract Form, the successful bidder and the Procuring agency/Employer shall sign the contract.
    3. Where no formal signing of a contract is required, work order issued to the bidder shall be construed to be the contract. 
  6. Performance Security (or Guarantee)
    1. After the receipt of the Letter of Acceptance, the successful bidder, within the specified time, shall deliver to the Procuring agency/Employer a Performance Guarantee in the amount and in the form stipulated in the BDS and PCC, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract.
    2. If the Performance Guarantee is provided by the successful bidder and it shall be in the form specified in the BDS which shall be in any of the following:
      1. certified cheque, cashier’s or manager’s cheque, or bank draft; 
      2. irrevocable letter of credit issued by a scheduled bank of Pakistan or in the case of an irrevocable letter of credit issued by a foreign bank, the letter shall be confirmed or authenticated by a scheduled bank of Pakistan; 
      3. bank guarantee confirmed by a reputable local bank or, in the case of a successful foreign bidder, bonded by a foreign bank; or
      4. surety bond callable upon demand issued by any reputable surety or insurance company.
        Any Performance Guarantee submitted shall be enforceable in Pakistan.
    3. Failure of the Most Advantageous Bidder to comply with the requirement of ITB 40 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security or declare blacklisted (in case bid securing declaration is submitted) in which event the Procuring agency/Employer may make the award to the next most advantageous bidder or reinitiate the procurement process afresh (as a case may be).
  7. Advance Payment
    1. Advance payment will be provided to the bidder in percentage and in the manner as agreed by the both parties in terms of Conditions of the Contract. 
    2. The Procuring agency/Employer will provide an advance payment as stipulated in the Conditions of Contract, subject to a maximum amount, as stated and/or Conditions of the Contract.  The advance payment request shall be accompanied by an advance payment security (guarantee) in the form provided in Section X. For the purpose of receiving the advance payment, the bidder shall make and estimate of, and include in its bid, the expenses that will relate to the purchase of equipment, machinery, materials, and on the engagement of labor during the first month beginning with the date of the Procuring agency/Employer’s “Notice to Commence” as specified in the PCC.
  8. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted.
  9. Corrupt & Fraudulent Practices
    1. Procuring agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.  

G. GRIEVANCE REDRESSAL & COMPLAINT REVIEW MECHANISM

  1. Grievance Redressal
    1. Grievance Redressal shall be carried out in accordance with Rule 48 of the Public Procurement Rules, 2004 i.e. Redressal of grievances by the procuring agency and “Redressal of Grievances Regulations 2021”.

H. MECHANISM OF BLACKLISTING

  1. Mechanism of Blacklisting
    1. The Procuring agency/Employer shall proceed Blacklisting of Bidders/Contractors in accordance with Rule 19 of the Public Procurement Rules, 2004 i.e. Blacklisting and “Blacklisting and Debarment of Bidders or Contractors Regulations 2024. 

📑 Bid Data Sheet (BDS)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

Bids Data Sheet (BDS)

The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB).  Whenever there is a conflict, the provisions herein shall prevail over those in ITB.

BDS Clause Number

ITB Number

Amendments of, and Supplements to, Clauses in the Instruction to Bidders

A. Introduction

1

1.1

Name of Procuring Agency: No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan)

The subject of procurement is: Establishment of Data Processing Labs

Expected commencement date: Thursday, November 19, 2026

2.

2.1

Financial year for the operations of the Procuring Agency: 2026-27

Name and identification number of the Contract: P160599 

3. 3.1 JV/Consortium or Association Allowed: Yes
Number of JV/Consortium Members: 3

B. Bidding Documents

4.

6.2 & 6.4

The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, October 27, 2026

5. 7.2

Any addendum, in case issued, shall be published on No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan) website  and on EPADS v2.0.

C. Preparation of Bids

6.

8.1

List of documents required along with the bid: No
 

7. 9.1

The qualification criteria to establish the supply / production capability of the bidder.

see Eligibility Criteria
8. 11.2 


Works and Their related documents:
See section Required Scope of Work
 

9. 11.1 Price schedule will be provided according to the format defined and acquired.
see section price schedule.
10. 11.4

 Specifications:

see section of specifications.

11.

11.5 & 13.5

The price shall be Fixed.
The bid price shall be adjusted in accordance with Appendix provided – Formula for Price Adjustment.

12.

14.1

Currency of the Bids shall be : PKR

13.

16.1

The Bids/Bid Validity period shall be: 120 Days

14.

17.1 

The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6

15. 17.2

The Bid Security shall be in the form of: Call at Deposit  

16. 15.1

Alternative Bids to the requirements of the bidding documents will not be permitted.

D. Submission of Bids

17.

18.1 & 21.1

Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;

Survey of Pakistan, Murree Road Faizabad, Rawalpindi

Bids that are not submitted on EPADS v2.0 shall be disqualified.

The deadline for Bids submission is: Friday, October 30, 2026 11:00 AM

E. Opening and Evaluation of Bids

18.

24.1

The Bids opening shall take place on EPADS v2.0.

Day : Friday

Date: October 30, 2026

Time : 11:30 AM

19.

30.2

Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria

F. Award of Contract

20.

41.1 & 41.2

The Performance guarantee shall: 10.00%.

The Performance Guarantee shall be acceptable in the form of: Call at Deposit

21. 45.1

Arbitrator shall be appointed by mutual consent of the both parties.

G. Review of Procurement Decisions

22.

37

Grievance against this procurement shall be submitted online on EPADS v2.0.

Eligibility Criteria

All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.

Required Registration
NADRA CITIZENSHIP (CNIC/NICOP)
FBR (NTN)
FBR (GSTN)
PEC
Eligibility CriteriaDocument
PEC Registration (Specialized Codes) Must hold a valid, active license from the Pakistan Engineering Council (PEC) in the relevant financial category (e.g., C-5 and above). The PEC license must cover the specific Specialized Codes required by the tender (e.g., BC-01 for Building Construction, CE-10, EE-04 for Low Voltage Systems, EE-06 for Data Centers/Specialized Electrical, etc.).Yes
Provision of Item wise Breakup of bid documentYes

Evaluation Criteria

Least Cost Based Selection (LCBS)

Weightage

Technical Evaluation %
100
Technical Marks100
Passing Marks70
Technical Evaluation
PEC Qualification ( Codes C-5, BC-01, CE-10, EE-04, EE-06) (Quantitative)(Doc Required)40
Financial Capability (Quantitative)(Doc Required)30
Experince (Complition of jobs of similar nature) (Quantitative)(Doc Required)30

Jobs/Lots

Jobs Without Lots :

JobDelivery ScheduleQuantityBid Security
Establishment of Data Processing Labs
Address: Survey of Pakistan, Murree Road Faizabad, Rawalpindi
Schedule: 90 days
Quantity: 1/job
1/job 1000000 PKR
Items Without Lots :
Item UNSPSC Delivery Schedule Quantity Bid Security Related to Job/Lot
Establishment of Data Processing Labs Building construction management
Address: Survey of Pakistan, Murree Road Faizabad, Rawalpindi Schedule: 90 days Quantity: 1/job
1/job PKR

Related Services :

No

Work Specifications and Market Rates

Jobs Without Lots :

Job: Establishment of Data Processing Labs

Specifications / Requirements:

Sr. NoRef. No.DescriptionUnitQtyRateAmount
11. CIVIL WORK     
21Taking out/Removing door, window, cabinet & ventilation window in first floor including cutting walls stacking salvaged material (serviceable and disposing off unserviceable material as directed within three chains, complete in all respects.Each7195067450
32Dismantling burnt brick masonry in mud mortar in foundation, basement, plinth and first floor including stacking salvaged material (serviceable) and disposing off surplus material as directed within three chains (91.5 m).Cft205459225
43Removing of tiles in rooms including base mortar and stacking salvaged material service-able and disposing off unserviceable as directed within three chains, complete in all respects.sft6373.535223072
54Dismantling of complete plumbing system from 3 washrooms located within a single toilet block/room of the building (combined area approx. 13ft × 18ft 8inch each), including removal of internal water supply pipes, sewerage/drainage lines, sanitary fixtures (commodes, wash basins, showers, taps), cutting/disconnecting of fittings, safe removal and stacking of reusable items, and disposal of debris/unserviceable material outside the building premises, all complete as per site conditions and engineer’s instructions.Job15500055000
65Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls 9 to 13-1/2 inches (229 mm to 343 mm) thick including scaffolding, raking, out joints and curing etc. complete in first floor superstructure.Cft978580567240
76Providing and applying approved anti-termite/pesticide treatment in existing building by drilling 12mm diameter holes at 300mm c/c along internal and external junctions and injecting Chlorpyrifos or equivalent chemical emulsions per manufacturer’s recommendations, including sealing of holes, complete in all aspects.Rft75011082500
87Providing and fixing aluminum window of size 6'-0" × 6'-0", made from powder-coated aluminum (Chawla or equivalent) sections (minimum thickness 1.2mm), comprising of sliding/openable/fixed shutters as per design, fitted with 5mm thick clear/frosted/tinted glass, EPDM rubber gaskets, locks, handles, rollers (for sliding), complete in all respects including necessary fittings, fasteners, sealants and making good the wall edges, as per site requirement and instructions.Nos1338000494000
98Providing and fixing framed glass door, size 4’-0” x 8’-6”(as per site), made of 5mm thick clear float glass in powder-coated aluminum frame including hinges, simple lock system and all necessary accessories. Complete with fixings and finishing as per engineer's instruction (Door Closer, Ghani Glass and Chawla aluminum or equivalent)Nos1445000630000
109Providing and fixing a Single leaf steel door, made of 1.2mm thick galvanized steel sheet with reinforced steel frame, finished with primer and enamel paint. The door shall be equipped with a biometric smart lock (with fingerprint, PIN code, and RFID access), heavy-duty stainless steel hinges, handles, and all necessary accessories. The door frame shall be fixed properly with masonry or concrete wall including necessary anchors and fittings. Complete in all respects as per specifications and engineer’s instructions.Nos258000116000
1110Providing and fixing a double leaf steel door, made of 1.2mm thick galvanized steel sheet with reinforced steel frame, finished with primer and enamel paint. Simple lock system and all necessary accessories. Heavy-duty stainless steel hinges, handles, and all necessary accessories. The door frame shall be fixed properly with masonry or concrete wall including necessary anchors and fittings. Complete in all respects as per specifications and engineer’s instructions.Nos19500095000
1211Providing and installing wooden storage/display cabinet of size 6’-0” (width) × 8’-0” (height), made with laminated MDF/laminate board, with shelves, hinged doors, soft-close fittings, and integrated warm white LED strip lights on inner panels, complete with wiring, switch, and transformer. Finished in polish/laminate texture as approved. All installation, accessories, and finishing included as per instructions.Nos1365000845000
1312Providing and fixing stainless steel fire-rated steel door (Grade 304), single leaf, size 4’-0” x 8’-6”, fabricated from 1.5mm thick SS sheet with internal reinforced frame, insulated with fire-rated core material (e.g rock wool 100kg/m3), 90-minutes fire rating certified, fire rated heavy duty hinges, handles set and integrated two biometric smart lock (with fingerprint, PIN code, and RFID access), complete with all accessories, wiring (if required), programming, and hardware, complete in stainless steel chowkat including fixing in position and making good the wall, all complete as per specifications and engineer’s instructions.Nos2145000290000
14131/2" (13 mm) thick cement plaster 1:4 on walls and columns etc. in basement, plinth, mezzanine and first floor including making edges, corners, and curing etc., complete.Sft148375111225
1514Providing and laying floor of 3/4 inches (19 mm) thick Granite stone Pakistani Original more than 5 sqft upto 7 Sq. ft. (0.46 sqm upto 0.65 sqm) size fine dressed on the surface without winding in first floor over 1 inch (25 mm) lime mortar 1:2 (one lime, two sand) setting the marble tiles with grey cement slurry including curing rubbing and polishing etc. complete in all aspects, including the cost of mortar.Sft3085025500
1615Providing and laying glazed/ nonskid vitrified porcelain tiles (polished) 2ft x 4ft each, (Oreal or equivalent) on walls and floors, in any floor, laid with dry bond (stile bond) over a base of 1” thick cement mortar (1:3) including jointing to tiles with joint filer of approved quality and fixed by skilled labor as per directions of engineer in charge, complete in all respects.Sft6052.53802299950
1716Providing and laying anti-static raised flooring system in the Data Processing Lab, comprising of anti-static HPL laminated floor tiles (600mm x 600mm), load-bearing capacity minimum 1000 kg/m², with steel encapsulated panels, calcium sulphate or high-density particle board core. Floor height raised to 1.5ft to 2ft above finished floor level using adjustable galvanized steel pedestals and stringers for stability. Anti-static surface resistance between 106–109 ohms, with copper strip grounding connected to earth pit. Complete with edge trims, ramps (if required), earthing, and proper sealing to prevent dust accumulation. All installation to be done by skilled labor as per ANSI/BIFMA and ISO standards under the supervision of an engineer.Sft6381450925100
1817Supply and installation of a suspended ceiling system comprising aluminum strips/panels or other approved non-combustible material, complete with supporting framework, accessories, and finishing. The contractor shall provide separate and properly supported cable trays/conduits for electrical power, data/network, CCTV, fire alarm, and intercom cabling. Power and data cables shall be routed separately to minimize interference. Adequate access panels shall be provided for inspection and maintenance of concealed services. The ceiling and all penetrations within the server room shall comply with the applicable fire-safety requirements and shall not obstruct cooling airflow or maintenance access. All materials, installation, and finishing shall be completed as per approved drawings and specifications.Sft6052.53201936800
1918Distempering with vinyle distemper (ICI, Dulux, Paintex or equivalent) of approved make and shade in two coats over and including the cost of one priming coat of lime wash including sand papering, dusting, and filling the holes, cracks and inequalities, if any, at any height in any floor.Sft1443618259848
2019Preparing surface and painting with Matt/Glossy high chemical resistant/hard wearing Polyurethane paint (Epoxy Paint) by sprayer/brush i/c the cost of Primer coat, all material and labour complete in all respects as approved and directed by the Engineer Incharge (i) Priming Coat (ii) Each and subsequent CoatSft203265132080
2120Painting 3 coat of weather shield paint of approved make and shade including cleaning of surface sand papering etc, at any height in any floor.Sft1075042451500
2221P/F windows roll blinds sunscreen, dark out, or translucent fabric any colour/shade best quality (Imported) with manual roll up arrangement complete in all respect with all other required accessories and hardware from the approved suppliers and manufacturers, on 6 Nos of window of size (6'-0" × 6'-0"), as per direction of Engineer In chargeSft28028078400
2322Providing and applying torch-on water proofing bitumenous membrane of specified thickness (made of Roof-Grip/Euro Bit) duly lapped/connected by heating with Torch over ps-6 primer i/c preparation/smoothen the surface complete in all respect as approved and directed by the Engineer Incharge Plain 4mmSft4300165709500
2423Providing and fixing of stainless steel sheet (Grade 304) of 0.9mm thickness on wall surface for fire protection, fixed with suitable fasteners and adhesive complete in all respects Sft20325801178560
2524Providing, fabricating, and installing steel stairs for emergency exit from first floor, including structural steel framework, treads, risers, handrails, landings, and supports as per approved design and specifications. Stairs to be made of mild steel sections with anti-slip surface finish, painted with primer and two coats of approved enamel paint, complete with welding, bolting, and all necessary accessories. Work to include fixing in position, alignment, and making good all damagesJob1420000420000
2625Roof Waterproofing and Acceptance Testing: Complete roof waterproofing, sealing, and associated drainage works above the server room, including inspection and suitable water-tightness/flood testing or an approved equivalent method before installation or commissioning of sensitive IT equipment. The contractor shall rectify any leakage or seepage and provide a written waterproofing warranty for the completed works.Job1220000220000
272. ELECTRICAL WORK     
281Dismantling of light and fan or call bell point all system of wiring except wiring in recessed conduit including finishing and making good the wall as required.Point.20015030000
292Dismantling of ordinary plug point of all system of wiring except wiring in recessed conduit including finishing and making good the wall as required.Point.10015015000
303Dismantling of sub-main upto 7/.036 or 7/0.044 (6 mm² or 10 mm²) all type of wiring except wiring in recessed conduit including finishing and making good the wall as required.P/Meter25011027500
314Providing, fixing, Two core, 1.5mm, Fire resistant cable, minimum fire rating of 2 hour, laid in conduit (25mm dia), complete in all respect, as approved by the Engineer in-charge.P/Meter36018064800
325Dismantling of all type of fittings including finishing and making good the wall as required.Each10020020000
336Wiring for light, fan or call bell point with 1.5 mm² single core, PVC insulated wire copper conductor wire, partly in 20 mm (3/4") dia PVC recessed conduit & partly in uPVC duct fitted on surface, including 1mm²single core PVC insulated wire as ECC as required.Point1600380608000
347Wiring for plug point with 1.5 mm² single core, PVC insulated wire copper conductor wire, partly in 20 mm (3/4")dia PVC recessed conduit & partly in uPVC CABLE DUCT fitted on surface, including 1mm² single core PVC insulated wire as ECC as required.Point12042050400
358Wiring for sub-main with 2x 4 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 16x16 mm uPVC duct fitted on surface including 1.5 mm² PVC insulated wire single core wire as ECC as required.P/Meter400280112000
369Wiring for sub-main with 2x 6 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 16x25 mm uPVC duct fitted on surface including 1.5 mm² PVC insulated wire single core wire as ECC as required.P/Meter400350140000
3710Providing & laying 3½ core, PVC insulated & PVC sheathed, 600/1000 volts grade with stranded copper conductor , un armoured, L.T cable in existing all kind of conduit or cable duct as per Pak. P.W.D specification as required. 35 mm²P/Meter3501650577500
3811The bidding company/contractor shall be fully responsible for the site survey, heat-load assessment, HVAC design, equipment selection, capacity calculations, airflow arrangement, and installation of the server-room cooling system. The design shall consider the actual and anticipated IT equipment load, UPS and other heat-generating equipment, occupancy, lighting, room envelope, and other relevant heat sources. The HVAC system shall be designed for continuous 24/7 operation, with appropriate redundancy, temperature and humidity control, air distribution, and provisions for maintenance without disrupting server-room operations. The contractor shall submit detailed HVAC design calculations, equipment schedules, airflow layout, and coordinated shop drawings for approval before installation. The contractor shall also be responsible for integrated testing and commissioning to demonstrate that the installed system meets the approved design conditions and performance requirements.Job145000004500000
3912Supply & fixing 40mm (1½") dia uPVC conduit with all especial such as bends, sockets, Junction etc recessed in the wall or column as required. P/Meter9018016200
4013Supply & fixing 50mm (2") dia uPVC conduit with all especial such as bends, sockets, Junction etc recessed in the in the wall or floor as required. P/Meter16024038400
4114Providing & fixing of 25x25 mm uPVC duct fitted on surface as required.P/Meter12011013200
4215Providing & fixing of 40x60 mm uPVC duct fitted on surface as required.P/Meter12018021600
4316Providing & fixing of 16x25 mm uPVC duct fitted on surface as required.P/Meter40903600
4417Providing & fixing 10 Amps Polycarbonate flame retardant S.P switch with fancy required gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.(Schneider / Philips )No.6035021000
4518Providing & fixing 13 Amps Polycarbonate flame retardant 3-Pin switch socket unit with fancy gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.(Schneider / Philips )No.7545033750
4619Providing & fixing 15 Amps Polycarbonate flame retardant 3-Pin switch socket unit with fancy gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.( Schneider / Philips )No.5055027500
4720Providing & fixing 6 to 32 Amps, S.P MCCB fixed on existing board , I/c inter-connection as required.No.32180057600
4821Providing & fixing 50 to 63 Amps, S.P MCCB fixed on existing board , I/c inter-connection as required.No.8250020000
4922Providing & fixing 10 to 60 Amps,( High Breaking Capacity) T.P MCCB fixed on existing board , I/c inter-connection as required.No.406500260000
5023Providing & fixing 75 to100 Amps,( Low Breaking Capacity) T.P MCCB fixed on existing board , I/c inter-connection as required.No.5950047500
5124Providing & fixing Cubical type metal sheet Distribution board with locking arrangement, vermin protected duly powder coated paint i/c all fastening material including wiring with suitable gauge PVC x PVC wire complete as required. P/Sft24120028800
5225Providing & fixing 70 to 100 Amps, 4 pole, three phase bus bar strip fitted in given Distribution board complete with bus bar insulator, screws, bolts etc as required.Each5850042500
5326Providing & fixing pilot lamp set fitted on existing board I/c connection as required.Set515007500
5427Providing, Installation, Testing & Commissioning of recessed / surface mounted ceiling lights / downlights including driver, having warm / neutral white / cool white colour, 80-90 lm/watts efficiency, 0.9 or above power factor, 20000 - 25000 hours life cycle, including connection, complete in all respect as approved by the Engineer Incharge.  2200105600
55 i. 16-18 WattsEach.48280050400
56 ii. 22-24 WattsEach.181500 
5728Providing, Installation, Testing & Commissioning of recessed / surface mounted LED Panel Light including driver, having warm / neutral white / cool white colour, 80-100 lm/watts efficiency, 0.9 or above power factor, 20000-25000 hours life cycle, including connection, complete in all respect as approved by the Engineer Incharge.Each.182200 
58 i. 34-36 Watts (2 x 2)Each324500144000
5930Providing, installation, testing and commissioning of Refrigerant Copper Pipe, 22 gauge with all type of fittings like, elbow, clamping, aero flex insulation, wrapping tape, etc complete in all respect as approved by the Engineer Incharge.    
60 i. 5/8''Rft12052062400
6131Providing, fixing, testing and commissioning of microprocessor based 02 loop addressable fire control panel surface /recessed mounting type with full switching programming capabilities ,system suitable for operation at 230 volts 50hz with full functionality as per specification, drawing, etc. complete in all respect as approved by the Engineer InchargeJob2180000360000
6232Providing, fixing, testing and commissioning of addressable multi detector (smoke & heat) with addressable base with full functioning switching programming capabilities ,system as per specification & recommended of drawing / manufacturer with allied components, complete in all respect as approved by the Engineer InchargeJob157500112500
6333Providing, fixing, testing and commissioning of addressable manual call point with addressable base with full functioning switching programming capabilities ,system as per specification & recommended of drawing / manufacturer with allied components, complete in all respect as approved by the Engineer InchargeJob3650019500
6434Providing, fixing, testing and commissioning of addressable Loop Powered Sounder, ceiling mounted, performing full functioning switching programming capabilities ,system as per specification & recommended of drawing / manufacturer, complete in all respect as approved by the Engineer InchargeJob2850017000
6535Providing and fixing Earthing set with 2'x2'x1/8'' copper plate buried in the ground at a depth of 12 feet or less if water comes out from the ground level (with salt and charcoal, or Earthing chemical Powder) etc making the pit 12 feet deep by excavation of all type of soil (except soft or hard rock) i/c fixing of 8 SWG copper wire in 1/2 '' G.I conduit complete in all respect as required. Job355000165000
6636Providing and fixing 1-1/2'' x 1/3'' Thick copper strip with suitable saddle at 12'' intervals complete as required.P/Meter20220044000
6737Providing & installing False Ceiling Fan (Box Fan) with remote, 18" size including connections, complete in all respect as approved by the Engineer Incharge (Voldam / Pak / Royal) Each2011000220000
6838Providing, Installation, Testing & Commissioning of Online UPS, with standard backup of 30 minutes, 3 phase in and single phase out, suitable for operation at 380/400 volts, 50 Hz, AC supply, complete in all respect as approved by the Engineer Incharge. 5 KVAEach114500001450000
6939Providing and fixing fire extinguisher FM 200 system (Naffco) with electrical panel, input & output devices complete fittings and nosel with abot /LPS switches necessary fittings (completed in all aspects) as directed by Engineer Incharge.Each211000002200000
7040Providing and fixing three phase rotary manual changeover 4 pole of approved quality as requiredEach12800028000
7141Dedicated Main Distribution Panel: Design, supply, installation, testing, and commissioning of a dedicated distribution panel for the data processing lab and associated facilities, including load assessment, approved load schedule, single-line diagram, properly sized cables, circuit breakers, protection devices, earthing, and all associated accessories.Job1650000650000
7242UPS and Battery Backup System: Supply, installation, testing, and commissioning of an online double-conversion UPS system with suitable battery bank, sized according to the calculated critical IT load and approved load schedule. The system shall provide a minimum 30-minute backup at the approved design load, or as specified in the approved design, and shall include maintenance/static bypass, battery monitoring, necessary protection, and all accessories.Job118000001800000
7343Automatic Voltage Regulator / Stabilizer: Supply, installation, testing, and commissioning of suitably rated automatic voltage stabilizers/regulators for the data processing lab and associated facilities electrical supply, designed to accommodate the calculated electrical load and fluctuations in incoming voltage. The system shall be properly coordinated with the UPS, HVAC equipment, and electrical distribution system, including necessary bypass and protection arrangementsJob1750000750000
7444Surge Protection and Power Quality Monitoring: Supply and installation of coordinated surge protection devices (SPDs) at the main electrical panel and other required distribution points. The system shall include appropriate protection against transient surges and voltage disturbances, together with power-quality monitoring for voltage, current, frequency, phase imbalance, and other relevant electrical parametersJob1450000450000
7545Rack Power Distribution: Supply and installation of dedicated rack power distribution units (PDUs), protected circuits, power cabling, and accessories for all server and network racks. The arrangement shall provide appropriate load balancing, circuit identification, grounding, and safe power distribution to the installed equipment.Job122000330000
7646Server Room Access Control System: Supply, installation, configuration, testing, and commissioning of an electronic access control system for the server room, comprising biometric/RFID/PIN-based access, electronic door locks, access controller, door status sensors, exit hardware, and associated accessories. The system shall maintain access logs and integrate with the CCTV/security system where applicable. Emergency exit and safe egress shall remain possible during power, network, or system failure in accordance with applicable life-safety requirements.Job1350000350000
7747Environmental and Equipment Monitoring System: Supply and installation of a centralized environmental and equipment monitoring system for the server room, including temperature and humidity sensors at rack air intakes, water-leak detection beneath the raised floor and near HVAC condensate points, door status monitoring, and monitoring of UPS, battery, and HVAC operating conditions. The system shall provide audible/visual alarms, event logging, and remote notifications, with a centralized monitoring interface.Job1450000450000
7848Fire-Rated Server Room Enclosure and Penetrations: Provision, sealing, and finishing of server-room walls, ceiling, doors, cable openings, and service penetrations to meet the approved fire-resistance requirements. All penetrations shall be sealed using approved fire-stopping materials compatible with the required fire rating. Stainless steel sheet or decorative cladding alone shall not be accepted as evidence of fire resistance.Job1400000400000
7949Complete Server Room HVAC Design and Performance Responsibility: The bidding company/contractor shall be responsible for the complete design of the server-room HVAC system, including site survey, IT equipment heat-load calculations, sensible and latent heat assessment, cooling capacity selection, airflow distribution, hot/cold aisle arrangement, temperature and humidity control, equipment redundancy, condensate drainage, control systems, and coordination with racks, raised flooring, electrical systems, and fire-safety arrangements. The system shall be suitable for continuous 24/7 operation and the actual and anticipated server-room load. The contractor shall submit signed design calculations, equipment schedules, airflow drawings, and coordinated shop drawings for approval before procurement and installation. The contractor shall warrant the performance of the complete HVAC system and rectify, at its own cost, any deficiency in design, capacity, airflow, or performance.Job1950000950000
803. NETWORKING & IT INFRASTRUCTURE     
811Ground-to-First-Floor Network Backbone: Survey, testing, identification, and integration of existing network cables between the ground and first floors, including provision and installation of a suitable fiber-optic backbone, optical distribution frame (ODF), fiber termination, patch cords, transceivers, and required accessories. The system shall provide reliable connectivity between the existing ground-floor network and the first-floor data processing lab and associated facilities. All fiber links shall be tested, labelled, and documented.Job1 350000
822Core and Distribution Network Design and Configuration: Design, configuration, testing, and commissioning of the data processing lab and associated facilities core/distribution network, including switching roles, uplink capacity, Layer-3 routing, VLANs, network redundancy, management access, firmware, licensing, configuration backup, and basic security hardening. The contractor shall submit the proposed network architecture and topology for approval before implementation and ensure compatibility with the existing network infrastructure.Job1 850000
833Intercom / Mini PABX System: Supply, installation, configuration, testing, and commissioning of a mini PABX/IP-PBX intercom system to provide communication between the ground and first floors, including required extensions, handsets/endpoints, interface equipment, and accessories. Existing ground-floor intercom cabling shall be surveyed and reused wherever technically suitable. The system Shall be IP-based and shall support future expension,IP extensions, centralized configuration,system backup. The system shall be fully tested and integrated with the existing communication arrangement.Job1 250000
844Wiring of CCTV Camera with STP /UTP Cat-6 (8 rolls) in PVC conduit/duct i/c connectors complete in all respect as approved by the Engineer Incharge All intsalled links shall be tested and certified. All Copper network cables shall be 100% solid copper,CCA(Copper Cold Aliminium) cable shall not be acceptedNos8 280000
855Providing, punching, testing and commissioning of RJ-45 connector, complete in all respect as approved by the engineer incharge. All Rj-45 termination shall be tested for continuity ,wire-map,insertion loss and performance.Each350 122500
866Supply, installation, testing and commissioning of 16 Channel NVR 16 PoE/Poe+ ports having following specifications:-Max recording rate: 180Mbps Embedded system: Linux or latest, VGA and HDMI(upto 4K support) & Dual Monitor Compression:H.265, H.264, MJPEG, Internal storage: upto 8 SATA (Max 48TB), External storage: 1 e-SATA, Monitoring: Web viewer and Mobile viewer, Camera support: ONVIF, complete in all respect as approved by the Engineer Incharge. .NVR shall support RAID,remote monitoring, playback,backup/export and ONVIF-complaint cameras. NVR shall be provided with sufficient surveillince grade storage to retain continuous recording.P/Job1 280000
877Providing, Fixing & Installing POE Giga Bit switches, complete in all respect as approved by the engineer incharge as required. Support IEEE 802.3af/at,VLAN, STP/RSTP.    
88 i. 8 Port POE SwitchP/Job2 90000
898Supply, installation, testing and commissioning of Bullet IP camera having following specifications:- Image device: At least 1/2.8 inch, Resolution & frames/sec: At least 2 MP/30fps Video Compression:H.265,H.264, MJPEG Focal length (Varifocal): At least upto 12mm, Min illumination: 0 lux(B/W), 0.095 lux (Colour), Infrared viewable length: At least 30 m, Weather proof standard: IP 66 at least, Vandal proof standard: At least IK10, complete in all respect as approved by the Engineer InchargeP/Job11 264000
909Providing and installing of LED smart TV latest model suitable for operation on 220/230 V, 50 Hz AC supply including USB / HDMI Ports, Video In, Audio In, switchable to HDMI-I to HDMI-II via wireless remote, flexible cord,shoe, wifi, bluetooth, wall bracket, rawal bolts, etc, complete with electric connection, as approved by the engineer incharge as required.    
91 i. 48 - 50 InchP/Job3 360000
92 ii. 55 InchP/Job3 480000
93 iii. 85 inchP/Job1 310000
9412Providing installation of patch (5m)cord as approved by Engineer.(Schneider/clipsal/5M)Nos40 32000
9513Providing installation of patch (3m)cord as approved by Engineer.(Schneider/clipsal/3M)Each100 60000
9614Providing LC to LC fiber cable patch cord as required (Schneider/clipsal/50M).Fiber shall be OS2 single-mode,duplex, 9/125um,compatible with installed fiber backbone and SFP?SFP+ transceives.Nos12 54000
9715Providing, testing, Installation and commissioning 48 port 2x1 SFP uplink ports in metal box including cable manager and patch panel 3M as approved Cisco. Aslo supporting VLAN,STP/RSTP/MSTP,LACP,SNMP and redundant managment features.Each2 760000
9816Providing installation of multimode fiber data transfer wavelength etc complete as approved Cisco.fiber shall be minimum OM4,50/125um icluding all required connectors,termination, testing and accessoriesEach4 180000
9917Providing and fixing polycarbonate flame retardant data socket with fancy gang plate recessed in walls including connection as required 3MEach60 39000
10018Supply, installation, testing and commissioning of Next-Generation Firewall (Fortinet FortiGate-70G or equivalent) in High availability(HA), Active-passion with synchronized configuration and automatic failover.also support IPS/IDS, Antivirus,apllication control SSL inspection Capability and IPsec/SSL VPN..i including standard accessories, mounting arrangements and required configuration, complete as approved by the Engineer-in-Charge.Nos2 2900000
10119Supply of 01-year Unified Threat Protection (UTP) / Security Services subscription license for FortiGate-70G including activation and verification, complete as approved by the Engineer-in-Charge.Nos2 700000
10220Supply and installation of HDMI Display Splitter (input/output as required at site), complete with accessories, testing and commissioning, as approved by the Engineer-in-Charge.Nos4 72000
10321Supply and installation of HDMI Cable (10 meters) high-quality minimum 4k resolution at 60Hz with required connectors, complete as approved by the Engineer-in-Charge.Nos7 31500
10422Supply and installation of Network Patch Panel (Cat-6,19” rack mount, ports as required), complete with accessories, as approved by the Engineer-in-Charge.Nos4 48000
10523Supply and installation of Cable Manager (rack mount, suitable size as required), complete with fixing accessories, as approved by the Engineer-in-Charge.Nos4 22000
10624Supply and installation of I/O outlets / keystone jacks (network I/O as required) shall be Cat-6, 100% copper including termination and accessories, complete as approved by the Engineer-in-Charge.Nos50 20000
10725Supply and installation of I/O connectors / terminations compatible with I/O outlets/keystones, complete as approved by the Engineer-in-Charge.Nos50 12500
10826Supply, installation and testing of LC-to-LC SFP+ Transceivers (10Gb) compatible with installed equipment, complete with commissioning, as approved by the Engineer-in-Charge.Nos24 432000
10927Supply and installation of Media Converter, complete with power adaptor and required accessories, testing and commissioning, as approved by the Engineer-in-Charge.Nos2 16000
11028Supply and installation of Fiber-to-Ethernet Media Converter, complete with accessories and power adaptor, testing and commissioning, as approved by the Engineer-in-Charge.Nos2 18000
11129Supply of Cable Ties (3mm) – Packs, suitable for structured cabling works, complete as approved by the Engineer-in-Charge.Packs3 4500
11230Supply of Velcro Cable Tie Roll (1mm × 5m) or equivalent for cable dressing, as approved by the Engineer-in-Charge.Nos5 12500
11331Supply of Power Cables suitable for servers/switches/PDUs as required, complete as approved by the Engineer-in-Charge.Nos50 60000
11432Supply and installation of Rack Mount PDU with C13 ports, suitable rating and configuration as required, complete with fixing accessories, testing and commissioning, as approved by the Engineer-in-Charge.Nos15 330000
11533Supply, installation and commissioning of Server Rack 42U (1200mm × 600mm) complete with doors, side panels, casters/levelers, grounding, ventilation and standard accessories, as approved by the Engineer-in-Charge.Nos5 925000
11634Supply of Label Printer Cartridges compatible with the supplied label printer, complete as approved by the Engineer-in-Charge.Nos12 54000
11735Supply of Cage Nuts suitable for 19” racks, complete as approved by the Engineer-in-Charge.Nos100 3000
11836Supply of Cage Screws suitable for 19” racks, complete as approved by the Engineer-in-Charge.Nos100 3000
11937Supply of Crimping Tool suitable for RJ-45/RJ-11 (as required) with standard accessories, complete as approved by the Engineer-in-Charge.Nos2 7000
12038Integrated Testing and Commissioning of All Systems: Complete testing, commissioning, and demonstration of the integrated operation of all installed systems, including electrical distribution, UPS and battery backup, AVR/stabilizers, surge protection, rack PDUs, HVAC, environmental monitoring, access control, CCTV, fire alarm and FM-200 systems, network switches, firewall, fiber-optic links, and intercom. Testing shall include simulated power failure, UPS transfer and battery autonomy, HVAC restart/failure scenarios, alarm generation, network connectivity, and applicable failover arrangements. All testing shall be conducted in coordination with Survey of Pakistan representatives, and signed commissioning and test reports shall be submitted before final acceptance. Fire suppression interlocks shall be tested using approved procedures without accidental discharge of the extinguishing agent.Job1 650000
12139As-Built Drawings and Complete Technical Documentation: Preparation and submission of complete as-built drawings and documentation covering architectural, civil, electrical, HVAC, fire-safety, security, and network installations. The documentation shall include electrical single-line diagrams, cable schedules, network topology, VLAN/IP and port maps, fiber-core and ODF details, fiber test/OTDR reports, rack elevations, equipment layouts, rack power schedules, HVAC drawings, fire-system drawings, equipment manuals, configuration backups, licenses, warranties, maintenance schedules, and commissioning reports. All documents shall be handed over in both editable soft copy and hard copy formats, as approved by Survey of Pakistan.Job1 250000
12240Training of Survey of Pakistan Personnel: Conduct practical on-site training for designated Survey of Pakistan personnel covering operation, monitoring, troubleshooting, and routine maintenance of all installed systems, including UPS and batteries, electrical panels, AVR/stabilizers, surge protection, HVAC, environmental monitoring, fire suppression, access control, network equipment, firewall, fiber-optic infrastructure, and intercom. Training shall include operating manuals, training materials, attendance records, and demonstration of routine and emergency procedures. All administrative credentials, licenses, and configuration backups shall be securely handed over to the authorized personnel.Job1 150000
123 Defects Liability, Warranty and Technical Support: The contractor shall provide a minimum defects-liability and comprehensive technical support period of 12 months from the date of final acceptance, or a longer period where specified in the contract. The arrangement shall cover defects in workmanship, installation, integration, and system performance, including repair or replacement at the contractor's cost. Manufacturer warranties, technical support contacts, escalation procedures, response and restoration times, preventive maintenance visits, firmware/software updates, and spare-parts availability shall be specified in the bid.job1 1200000
GRAND TOTAL:Rs 42,798,200.00

Scope of Work

Civil Works & Finishing

Electrical & HAVC Systems

Networking & IT Infrastructure

Testing & Handover

Price Schedule

For Individual Jobs

# Job Title Quantity Unit Price (PKR) Total Price (PKR) Delivery Location Delivery Period / Year Country of Origin
1
2
For Lots
# Lot Title Total Lot Price (PKR) Country of Origin
1[Lot 1 Title]

 

 

 

📑 General Conditions of Contract (GCC)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

A. General

  1. Definitions
    1. Unless the context otherwise requires, the following terms whenever used in this Contract shall have the same meaning and shall be interpreted as  indicated
      1. “Applicable Law” means the laws and any other instruments having the force of law in the Government’s Country, or in such other country as may be specified in the Special Conditions of the Contract (SC), as they may be issued and in force from time to time;
      2. “The Contract” means an agreement enforceable by law;
      3. “The Contract Price” means the price payable to the Contractor under the Contract for the full and proper performance of its contractual obligations;
      4. “The Services” means the work to be performed by the Contractor pursuant to this Contract and as prescribed in the Specifications and Schedule of Activities included in the Contractor’s Bid;
      5. “Ancillary Services” means those services ancillary to the provision of Services, such as transportation and insurance, and any other incidental services, such as installation, commissioning, provision of technical assistance, training, and other such obligations of the Contractor covered under the Contract;
      6. “GCC” means the General Conditions of Contract contained in this section;
      7. “SCC” means the Special Conditions of Contract by which the GCC may be amended or supplemented;
      8. “Day” means calendar day unless indicated otherwise;
      9. “Effective Date” means the date on which this Contract comes into force and effect;
      10. “The  Contractor” means the individual or corporate body whose Bids to provide the Services has been accepted by the Procuring Agency;
      11. “The Project Site,” where applicable, means the place or places named in Bid Data Sheet and technical Specifications;
      12. “Government” means the Government of Pakistan;
      13. “Local Currency” means the currency of Pakistan;
      14.  “In Writing” means communicated in written form with proof of receipt;
      15. “Completion Date” means the date of completion of the Services by the Contractor  as certified by the Procuring Agency;
      16. “Foreign Currency” means any currency other than the currency of the country of the Procuring Agency;
      17. “Party” means the Procuring Agency or the Contractor, as the case may be, and “Parties” means both of them;
      18.  "Service" means any object of procurement other than goods or works;
      19. “Subcontractor” means any entity to which the Bidder subcontracts any part of the Services.
  2. Applicable Law
    1. The contract shall be governed and interpreted in accordance with the laws of Pakistan, unless otherwise specified in SCC.
  3. Language
    1. The Contract as well as all correspondence and documents relating to the Contract exchanged between the Contractorand the Procuring Agency, shall be written in the English language unless otherwise stated in the SCC.  Supporting documents and printed literature that are part of the Contract may be in another language provided these are accompanied by an accurate translation of the relevant passages in English, in which case, for purposes of interpretation of the Contract, this translation shall govern.
  4. Notices
    1. Any notice, request, or consent made pursuant to this Contract shall be in writing and shall be deemed to have been made when delivered in person to an authorized representative of the Party to whom the communication is addressed, or when sent by registered mail, telex, telegram, or facsimile to such Party at the address specified in the SCC.
  5. Location
    1. The Services shall be performed at such locations as the Procuring Agency may approve and as specified in SCC.
    2. A {DOCUMENTS}
  6. Authorized Representatives / Authority of Member in charge
    1. Any action required or permitted to be taken, and any document required or permitted to be executed, under this Contract by the Procuring Agency or the Contractor may be taken or executed by the officials specified in the SCC.

B. Commencement, Completion, Modification, and Termination of Contract

  1. Effectiveness of Contract
    1. This Contract shall come into effect on the date the Contract is signed by both parties and such other later date as may be stated in the SCC.
  2. Commencement of Services
    1. The Contractor shall confirm availability of Key Experts and begin carrying out the Services not later than the number of days after the Effective Date specified in the SCC.
  3. Program schedule
    1. Before commencement of the Services, the Contractor shall submit to the Procuring Agency for approval a Program showing the general methods, arrangements, order and timing for all activities. The Services shall be carried out in accordance with the approved Program as updated.
  4. Starting Date/Expiration Date
    1. The Contractor shall start carrying out the Services Five (05) days after the date the Contract becomes effective, or at such other date as may be specified in the SCC.
    2. Unless terminated earlier pursuant to Clause GCC 14 hereof, this Contract shall expire at the end of such time period after the Effective Date as specified in the SCC.
  5. Entire Agreement
    1. This Contract contains all covenants, stipulations and provisions agreed by the Parties.  No agent or representative of either Party has authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein.
  6. Modification
    1. Any modification or variation of the terms and conditions of this Contract, including any modification or variation of the scope of the Services, may only be made by written agreement between the Parties. However, each Party shall give due consideration to any modification(s) or variation(s) made by the other Party.
    2. In cases of any modification(s) or variation(s), the prior written consent of the Procuring Agency is required.
  7. Force Majeure
    1. Definition
      For the purposes of this Contract, “Force Majeure” means an event which is beyond the reasonable control of a Contractor and which makes a Contractor’s performance of its obligations under the Contract impossible or so impractical as to be considered impossible under the circumstances.
    2. No Breach of Contract
      The failure of a Party to fulfill any of its obligations under the contract shall not be considered to be a breach of, or default under, this Contract in so far as such inability arises from an event of Force Majeure, provided that the Party affected by such an event (a) has taken all reasonable precautions, due care and reasonable alternative measures in order to carry out the terms and conditions of this Contract, and (b) has informed the other Party as soon as possible about the occurrence of such an event.
    3. Extension of Time
      Any period within which a Contractor shall, pursuant to this Contract, complete any action or task, shall be extended for a period equal to the time during which such Party was unable to perform such action as a result of Force Majeure.
    4. Payments
      During the period of their inability to perform the Services as a result of an event of Force Majeure, the Contractor shall be entitled to continue to be paid under the terms of this Contract, as well as to be reimbursed for additional costs reasonably and necessarily incurred by them during such period for the purposes of the Services and in reactivating the Service after the end of such period.
  8. Termination
    1. By the Procuring Agency
      The Procuring Agency may terminate this Contract in case of the occurrence of any of the events specified in paragraphs (a) through (e) of this Clause. In such an occurrence the Procuring Agency shall give at least thirty (30) calendar days’ written notice of termination to the Contractor in case of the events referred to in (a) through (d); at least sixty (60) calendar days’ written notice in case of the event referred to in (e);
      1. If the Contractor fails to remedy a failure in the performance of its obligations hereunder, as specified in a notice of suspension;
      2. If the Contractor becomes (or, if the Contractor consists of more than one entity, if any of its members becomes) insolvent or bankrupt or enter into any agreements with their creditors for relief of debt or take advantage of any law for the benefit of debtors or go into liquidation or receivership whether compulsory or voluntary;
      3. If the Contractor fails to comply with any final decision reached as a result of arbitration proceedings;
      4. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      5. If the Procuring Agency, in its sole discretion and for any reason whatsoever, decides to terminate this Contract;
    2. By the Contractor
      The Contractor may terminate this Contract, by not less than thirty (30) calendar days’ written notice to the Procuring Agency, in case of the occurrence of any of the events specified in paragraphs (a) through (d) of this Clause.
      1. If the Procuring Agency fails to pay any money due to the Contractor pursuant to this Contract and not subject to dispute within forty-five (45) calendar days after receiving written notice from the Contractor that such payment is overdue;
      2. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      3. If the Procuring Agency fails to comply with any final decision reached as a result of arbitration;
      4. If the Procuring Agency is in material breach of its obligations pursuant to this Contract and has not remedied the same within forty-five (45) days (or such longer period as the Bidder may have subsequently approved in writing) following the receipt by the Procuring Agency of the Contractor’s notice specifying such breach.

C. Obligations of the Contractor

  1. General
    1. Standard of Performance
      1. The Contractor shall perform the Services and carry out the Services with all due diligence, efficiency and economy, in accordance with generally accepted professional standards and practices, and shall observe sound management practices, and employ appropriate technology and safe and effective equipment, machinery, materials and methods. The Contractor shall always act, in respect of any matter relating to this Contract or to the Services, as a faithful adviser to the Procuring Agency, and shall at all times support and safeguard the Procuring Agency’s legitimate interests in any dealings with the third parties;
      2. The Contractor shall employ and provide such qualified and experienced Experts and Sub-Contractors as are required to carry out the Services.
    2. Law Applicable to Services
      The Contractor shall perform the Services in accordance with the Contract and in accordance with the Law of Pakistan and shall take all practicable steps to ensure that any of its Experts and Sub-Bidders, comply with the Applicable Law. 
  2. Conflict of Interests
    1. Contractor Not to Benefit from Commissions and Discounts
      The remuneration of the Contractor shall constitute the Contractor’s sole remuneration in connection with this Contract or the Services, and the Contractor shall not accept for their own benefit any trade commission, discount, or similar payment in connection with activities pursuant to this Contract or to the Services or in the discharge of their obligations under the Contract, and the Contractor shall use their best efforts to ensure that the Personnel, any Subcontractors, and agents of either of them similarly shall not receive any such additional remuneration.
    2. Contractor and Affiliates Not to be Otherwise Interested in Project
      The Contractor agree that, during the term of this Contract and after its termination, the Contractor and its affiliates, as well as any Subcontractor and any of its affiliates, shall be disqualified from providing Services (other than the Services and any continuation thereof) for any project resulting from or closely related to the Services.
    3. Prohibition of Conflicting Activities
      Neither the Bidder nor its Subcontractors nor the Personnel shall engage, either directly or indirectly, in any of the following activities:
      1. during the term of this Contract, any business or professional activities in the Government’s country which would conflict with the activities assigned to them under this Contract;
      2. during the term of this Contract, neither the Contractor nor their Subcontractors shall hire public employees in active duty or on any type of leave, to perform any activity under this Contract;
      3. after the termination of this Contract, such other activities as may be specified in the SCC.
  3. Insurance to be Taken Out by the Contractor
    1. The Contractor(a) shall take out and maintain, and shall cause any Subcontractors to take out and maintain, at its (or the Sub-contractors’, as the case may be) own cost but on terms and conditions approved by the Procuring Agency, insurance against the risks, and for the coverage, as shall be specified in the SCC; and (b) at the Procuring Agency’s request, shall provide evidence to the Procuring Agency showing that such insurance has been taken out and maintained and that the current premiums have been paid.
  4. Contractor’s Actions Requiring Procuring Agency’s Prior Approval
    1. The Contractor shall obtain the Procuring Agency’s prior approval in writing before taking any of the following actions:
      1. appointing such members of the Personnel not provided by the Contractor;
      2. changing the Program of activities; and
      3. any other action that may be specified in the SCC.
  5. Reporting Obligations
    1. The Contractor shall submit to the Procuring Agency the reports and documents in the numbers, and within the periods as prescribed by the Procuring Agency.
  6. Liquidated Damages
    1. Payments of Liquidated Damages
      The Contractor shall pay liquidated damages to the Procuring Agency at the rate per day stated in the SCC for each day that the Completion Date is later than the Intended Completion Date.  The total amount of liquidated damages shall not exceed the amount defined in the SCC.  The Procuring Agency may deduct liquidated damages from payments due to the Contractor.  Payment of liquidated damages shall not affect the Contractor’s liabilities.
    2. Correction for Over-payment
      If the Intended Completion Date is extended after liquidated damages have been paid, the Procuring Agency shall correct any overpayment of liquidated damages by the Contractor by adjusting the next payment certificate.  The Contractor shall be paid interest on the overpayment, calculated from the date of payment to the date of repayment, at the rates specified in SCC.
    3. Lack of performance penalty
      If the Contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, a penalty for Lack of performance will be paid by the Contractor. The amount to be paid will be calculated as a percentage of the cost of having the Defect corrected, assessed as specified in the Contractor
  7. Performance Guarantee
    1. Within the time stipulated in the acceptance letter from the Procuring Agency, the successful Bidder shall furnish the Performance Guarantee in shape and amount specified in SCC.
    2. The proceeds of the Performance Guarantee shall be payable to the Procuring agency as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract.
    3. The Performance Guarantee shall be denominated in the currency of the Contract, or in a freely convertible currency acceptable to the Procuring agency and shall be in the acceptable form as specified in SCC.
    4. The Performance Guarantee will be discharged by the Procuring agency and returned to the Supplier not later than thirty (30) days following the date of completion of the Supplier’s performance obligations under the Contract, including any warranty obligations, unless otherwise specified in SCC.
  8. Sustainable Procurement
    1. The Contractor shall conform to the sustainable procurement contractual provisions, if and as specified in the SCC.

D. Contractor’s Personnel

  1. Description of Personnel
    1. The titles, agreed job descriptions, minimum qualifications, and estimated periods of engagement in the carrying out of the Services of the Contractor’s Key Personnel.  The Key Personnel listed by title as well as by name are hereby approved by the Procuring Agency.
  2. Removal and / or Replacement of Personnel
    1. Except as the Procuring Agency may otherwise agree, no changes shall be made in the Key Personnel.  If, for any reason beyond the reasonable control of the Contractor, it becomes necessary to replace any of the Key Personnel, the Contractor shall provide as a replacement a person of equivalent or better qualifications.
    2. If the Procuring Agency finds that any of the Personnel have (i) committed serious misconduct or have been charged with having committed a criminal action, or (ii) have reasonable cause to be dissatisfied with the performance of any of the Personnel, then the Contractor shall, at the Procuring Agency’s written request specifying the grounds thereof, provide as a replacement a person with qualifications and experience acceptable to the Procuring Agency.
    3. The Contractor shall have no claim for additional costs arising out of or incidental to any removal and/or replacement of Personnel.

E. Obligations of the Procuring Agency

  1. Change in the Applicable Law
    1. If, after the date of this Contract, there is any change in the Applicable Law with respect to taxes and duties which increases or decreases the cost of the Services rendered by the Contractor, then the remuneration and reimbursable expenses otherwise payable to the Contractor under this Contract shall be increased or decreased accordingly by agreement between the Parties, and corresponding adjustments shall be made to the amounts referred in the SCC.
  2. Services and Facilities
    1. The Procuring Agency shall make available to the Contractor and the Experts, for the purposes of the Services and free of any charge, the services, facilities and property described in the Terms of Reference, at the times and in the manner specified in the Terms of Reference.
    2. In case that such services, facilities and property shall not be made available to the Contractor, the Parties shall agree on (i) any time extension that it may be appropriate to grant to the Contractor for the performance of the Services, (ii) the manner in which the Contractor shall procure any such services, facilities and property from other sources, and (iii) the additional payments, if any, to be made to the Contractor as a result thereof.

F. Payments to the Contractor

  1. Contract Price
    1. The price payable shall be in Pakistani Rupees unless otherwise specified in the SCC.
  2. Terms and Conditions of Payment
    1. Payments will be made to the Contractor according to the payment schedule stated in the SCC and as per actual invoice submitted by the Contractor.
    2. Unless otherwise stated in the SCC, the advance payment shall be made against the provision by the Contractor of a bank guarantee for the same amount, and shall be valid for the period stated in the SCC.  Any other payment shall be made after the conditions listed in the SCC for such payment have been met, and the Contractor have submitted an invoice to the Procuring Agency specifying the amount due.
  3. Quality Control Identifying Defects
    1. The principle and modalities of Inspection of the Services by the Procuring Agency shall be as indicated in the SCC. The Procuring Agency shall check the Contractor’s performance and notify him of any Defects that are found.  Such checking shall not affect the Contractor’s responsibilities.  The Procuring Agency may instruct the Contractor to search for a Defect and to uncover and test any service that the Procuring Agency considers may have a Defect. Defect Liability Period is as defined in the SCC.
    2. A {INSPECTION}
  4. Correction of Defects, and Lack of Performance Penalty
    1. The Procuring Agency shall give notice to the contractor of any Defects before the end of the Contract.  The Defects liability period shall be extended for as long as Defects remain to be corrected.
    2. Every time notice a Defect is given; the contractor shall correct the notified Defect within the length of time specified by the Procuring Agency’s notice.
    3. If the contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, the Procuring Agency will assess the cost of having the Defect corrected, the contractor will pay this amount, and a Penalty for Lack of Performance.
  5. Settlement of Disputes Amicable Settlement
    1. The Parties shall use their best efforts to settle amicably all disputes arising out of or in connection with this Contract or its interpretation.
  6. Dispute Settlement
    1. Arbitration
      If any dispute of any kind whatsoever shall arise between the procuring agency and the contractor in connection with or arising out of the Contract, including without prejudice to the generality of the foregoing, any question regarding its existence, validity or termination, or the execution of the contract, the parties shall seek to resolve any such dispute or difference by mutual consultation. If the parties fail to resolve such a dispute or difference even after negotiations or mediation, then the dispute shall be referred within fourteen (14) days in writing by either party to the Arbitrator, with a copy to the other party.
      Any dispute in respect of which a notice of intention to commence arbitration has been given, in accordance with GCC sub-clause 32.1, shall be finally settled by arbitration. Arbitration may be commenced prior to or after completion of the Contract. Arbitration proceedings shall be conducted in accordance with Arbitration Act 1940.
      Notwithstanding any reference to arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless otherwise agreed. The Procuring Agency shall continue to pay the Contractor any undisputed amounts due under the Contract during the resolution of any dispute.

📑 Special Conditions of Contract (SCC)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

SECTION VIII. SPECIAL CONDITIONS OF CONTRACT

The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.

Number of GC Clause

Amendments of, and Supplements to, Clauses in the General Conditions of Contract

Number of GC Clause 1

Definitions

The Procuring Agency is: No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi

The Supplier is:

The title of the subject procurement is: Establishment of Data Processing Labs

Number of GC Clause 2

Applicable/Governing Law:

The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan

Number of GC Clause 3

Language:

The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.

Number of GC Clause 4

Notices:

The addresses for the notices are:

Procuring Agency:

No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director
Survey of Pakistan, Murree Road Faizabad, Rawalpindi
+92-321-629-1301
cpcdatum@gmail.com

Contractor/ Bidder:

[Name, address and telephone number]

The Contractor/ Bidder’s Representative(s)

[Name, address, telephone number and e-mail address]

Number of GC Clause 6.1

The Authorized Representatives are:

For the Procuring Agency:

No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director
Survey of Pakistan, Murree Road Faizabad, Rawalpindi
+92-321-629-1301
cpcdatum@gmail.com

For the Bidder:

Name: ………………………………………

Designation: ……………………..

Address: …………………………………………..

Number of GC Clause 7

Effectiveness of the contract

The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties

Number of GC Clause 8

Commencement of Contract:

The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.

Number of GC Clause 10.2

Expiration of Contract:

The time period shall be ……………………………

Number of GC Clause 14

Termination

In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.

Number of GC Clause 16

Conflict of Interest:

The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.

Number of GC Clause 20

Liquidated Damages

If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 1.00% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.

Number of GC Clause 21

Performance Guarantee:

The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Call at Deposit

Number of GC Clause 27

Currency of Payment:

All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.

Number of GC Clause 28

Payment terms:

Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.

Number of GC Clause 29

Identifying Defects:

The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.

Inspections & Tests Requirements

For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)

For Physical Fitness having No Damages (Certificate from supplier)

For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)

For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)

For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)

Delivery & Documents

Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;

Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;

Copies of the packing list identifying contents of each package;

Insurance Certificate;

Manufacturer’s or Supplier’s Valid Warranty Certificate;

Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;

Certificate of Origin.

The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock

Number of GC Clause 31

Following is the guidance for Dispute Resolution

  1. If any dispute of any kind whatsoever shall arise between the Authority and the Bidder in connection with or arising out of the Contract... (full clause unchanged)
  2. At future of negotiation the dispute shall be resolved through mediation...
  3. At failure of mediation, arbitration under Arbitration Act 1940...
  4. Cost sharing equally...
  5. Proceedings may commence before/after completion...

Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.

Rules of procedure for arbitration proceedings:

Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.

Place of Arbitration and Award:

The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.

📑 Bid Securing Declaration (BSD)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

Form 9: Bid Securing Declaration

Date: [insert date (as day, month and year)]

Bid No.:P160599

To: No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi

 

 

We, the undersigned, declare that:

We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.

We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:

  1. have  withdrawn  or  modified  our  Bid  during  the  period  of  Bid  Validity specified in the Form of Bid;
  2. Disagreement to arithmetical correction made to the Bid price; or
  3. having been notified of the acceptance of our Bid by the Procuring Agency during the period of Bid Validity, (i) failure to sign the contract if required by Procuring Agency to do so or (ii) fail or refuse to furnish the Performance Security or to comply with any other condition precedent to signing the contract specified in the Bidding Documents.

We understand this Bid Securing Declaration shall expire if we are not the successful

Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.

 

📑 Contract Form (CNF)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

SECTION IX: CONTRACT FORMS

 

THIS AGREEMENT made the _____ day of __________ 20_____ between No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi

 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:

 

WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Establishment of Data Processing Labs (P160599) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).

 

NOW THIS CONTRACT WITNESSETH AS FOLLOWS:

1.   In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.

2.   The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-

  1. This form of Contract;
  2. the Form of Bids and the Price Schedule submitted by the Bidder;
  3. the Schedule of Requirements;
  4. the Technical Specifications;
  5. the Special Conditions of Contract;
  6. the General Conditions of the Contract;
  7. the Procuring Agency’s Letter of Acceptance; and
  8. [add here: any other documents]

3.   In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.

4.   The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.

 

IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.

 

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Procuring Agency:

………………………………………………

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Bidder: …………………………………………………

 

 

📑 Integrity Pact (INP)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

Integrity Pact

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC. PAYABLE BYTHE SUPPLIERS OF GOODS, SERVICES & WORKS IN  CONTRACTS WORTH RS.10.00 MILLION OR MORE

 

Contract                           Number:  Contract                               Value:  Contract Title:

Dated:

 

[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.

Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.

[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

📑 Performance Guarantee Form (PGF)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

Performance Guarantee Form

 

To:     No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi

 

WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No.  [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).

 

AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.

 

AND WHEREAS we have agreed to give the Bidders guarantee:

 

THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guar­antee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.

 

This guarantee is valid until the: [insert date]

 

 

Signature and seal of the Guarantors

 

 

_____________________________________________________________________

[name of bank or financial institution]

 

 

_____________________________________________________________________

[address]

 

 

_____________________________________________________________________

[date}

📑 Annexure (ANX)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

Existing Building Plan

Unknown

Payment Schedule

The Payments shall be made as per this Payment Schedule

Unknown

📑 Procurement Forms (PFD)

Establishment of Data Processing Labs

Published on: Tuesday, October 20, 2026 12:30 PM

Ref# : P160599
QR Code

Past Construction Experiences

The bidder should provide details of atleast 3 jobs of similiar nature

Contractor's Key Personnel Representative and Their Schedules

Financial Resources

THe bidder may submit Financial Resoureces duly supported by verified bank statments (The bidder must have sufficient funds to complete the job)

Past Experience and Completed Contracts

Historical Contract Non-Performance, and Pending Litigation and Litigation History

The bidder may provide the details if applicable otherwise may submit as Nil

Current Contracts and Their Progress

Financial Capacity and Net Worth Evaluation Form

Duly supported by bank statements

Average Annual Turnover