In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director
Survey of Pakistan, Murree Road Faizabad, Rawalpindi
+92-321-629-1301
cpcdatum@gmail.com
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan) The subject of procurement is: Establishment of Data Processing Labs Expected commencement date: Thursday, November 19, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P160599 |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 3 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, October 27, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 120 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Call at Deposit |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Survey of Pakistan, Murree Road Faizabad, Rawalpindi Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Friday, October 30, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Friday Date: October 30, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of: Call at Deposit |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
| NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| PEC Registration (Specialized Codes) Must hold a valid, active license from the Pakistan Engineering Council (PEC) in the relevant financial category (e.g., C-5 and above). The PEC license must cover the specific Specialized Codes required by the tender (e.g., BC-01 for Building Construction, CE-10, EE-04 for Low Voltage Systems, EE-06 for Data Centers/Specialized Electrical, etc.). | Yes |
| Provision of Item wise Breakup of bid document | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Technical Evaluation | ||
| PEC Qualification ( Codes C-5, BC-01, CE-10, EE-04, EE-06) (Quantitative)(Doc Required) | 40 | |
| Financial Capability (Quantitative)(Doc Required) | 30 | |
| Experince (Complition of jobs of similar nature) (Quantitative)(Doc Required) | 30 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Establishment of Data Processing Labs | Address: Survey of Pakistan, Murree Road Faizabad, Rawalpindi Schedule: 90 days Quantity: 1/job |
1/job | 1000000 PKR |
| Item | UNSPSC | Delivery Schedule | Quantity | Bid Security | Related to Job/Lot |
|---|---|---|---|---|---|
| Establishment of Data Processing Labs | Building construction management |
Address: Survey of Pakistan, Murree Road Faizabad, Rawalpindi
Schedule: 90 days
Quantity: 1/job
|
1/job | PKR |
No
Jobs Without Lots :
Job: Establishment of Data Processing Labs
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|---|
| 1 | 1. CIVIL WORK | |||||
| 2 | 1 | Taking out/Removing door, window, cabinet & ventilation window in first floor including cutting walls stacking salvaged material (serviceable and disposing off unserviceable material as directed within three chains, complete in all respects. | Each | 71 | 950 | 67450 |
| 3 | 2 | Dismantling burnt brick masonry in mud mortar in foundation, basement, plinth and first floor including stacking salvaged material (serviceable) and disposing off surplus material as directed within three chains (91.5 m). | Cft | 205 | 45 | 9225 |
| 4 | 3 | Removing of tiles in rooms including base mortar and stacking salvaged material service-able and disposing off unserviceable as directed within three chains, complete in all respects. | sft | 6373.5 | 35 | 223072 |
| 5 | 4 | Dismantling of complete plumbing system from 3 washrooms located within a single toilet block/room of the building (combined area approx. 13ft × 18ft 8inch each), including removal of internal water supply pipes, sewerage/drainage lines, sanitary fixtures (commodes, wash basins, showers, taps), cutting/disconnecting of fittings, safe removal and stacking of reusable items, and disposal of debris/unserviceable material outside the building premises, all complete as per site conditions and engineer’s instructions. | Job | 1 | 55000 | 55000 |
| 6 | 5 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls 9 to 13-1/2 inches (229 mm to 343 mm) thick including scaffolding, raking, out joints and curing etc. complete in first floor superstructure. | Cft | 978 | 580 | 567240 |
| 7 | 6 | Providing and applying approved anti-termite/pesticide treatment in existing building by drilling 12mm diameter holes at 300mm c/c along internal and external junctions and injecting Chlorpyrifos or equivalent chemical emulsions per manufacturer’s recommendations, including sealing of holes, complete in all aspects. | Rft | 750 | 110 | 82500 |
| 8 | 7 | Providing and fixing aluminum window of size 6'-0" × 6'-0", made from powder-coated aluminum (Chawla or equivalent) sections (minimum thickness 1.2mm), comprising of sliding/openable/fixed shutters as per design, fitted with 5mm thick clear/frosted/tinted glass, EPDM rubber gaskets, locks, handles, rollers (for sliding), complete in all respects including necessary fittings, fasteners, sealants and making good the wall edges, as per site requirement and instructions. | Nos | 13 | 38000 | 494000 |
| 9 | 8 | Providing and fixing framed glass door, size 4’-0” x 8’-6”(as per site), made of 5mm thick clear float glass in powder-coated aluminum frame including hinges, simple lock system and all necessary accessories. Complete with fixings and finishing as per engineer's instruction (Door Closer, Ghani Glass and Chawla aluminum or equivalent) | Nos | 14 | 45000 | 630000 |
| 10 | 9 | Providing and fixing a Single leaf steel door, made of 1.2mm thick galvanized steel sheet with reinforced steel frame, finished with primer and enamel paint. The door shall be equipped with a biometric smart lock (with fingerprint, PIN code, and RFID access), heavy-duty stainless steel hinges, handles, and all necessary accessories. The door frame shall be fixed properly with masonry or concrete wall including necessary anchors and fittings. Complete in all respects as per specifications and engineer’s instructions. | Nos | 2 | 58000 | 116000 |
| 11 | 10 | Providing and fixing a double leaf steel door, made of 1.2mm thick galvanized steel sheet with reinforced steel frame, finished with primer and enamel paint. Simple lock system and all necessary accessories. Heavy-duty stainless steel hinges, handles, and all necessary accessories. The door frame shall be fixed properly with masonry or concrete wall including necessary anchors and fittings. Complete in all respects as per specifications and engineer’s instructions. | Nos | 1 | 95000 | 95000 |
| 12 | 11 | Providing and installing wooden storage/display cabinet of size 6’-0” (width) × 8’-0” (height), made with laminated MDF/laminate board, with shelves, hinged doors, soft-close fittings, and integrated warm white LED strip lights on inner panels, complete with wiring, switch, and transformer. Finished in polish/laminate texture as approved. All installation, accessories, and finishing included as per instructions. | Nos | 13 | 65000 | 845000 |
| 13 | 12 | Providing and fixing stainless steel fire-rated steel door (Grade 304), single leaf, size 4’-0” x 8’-6”, fabricated from 1.5mm thick SS sheet with internal reinforced frame, insulated with fire-rated core material (e.g rock wool 100kg/m3), 90-minutes fire rating certified, fire rated heavy duty hinges, handles set and integrated two biometric smart lock (with fingerprint, PIN code, and RFID access), complete with all accessories, wiring (if required), programming, and hardware, complete in stainless steel chowkat including fixing in position and making good the wall, all complete as per specifications and engineer’s instructions. | Nos | 2 | 145000 | 290000 |
| 14 | 13 | 1/2" (13 mm) thick cement plaster 1:4 on walls and columns etc. in basement, plinth, mezzanine and first floor including making edges, corners, and curing etc., complete. | Sft | 1483 | 75 | 111225 |
| 15 | 14 | Providing and laying floor of 3/4 inches (19 mm) thick Granite stone Pakistani Original more than 5 sqft upto 7 Sq. ft. (0.46 sqm upto 0.65 sqm) size fine dressed on the surface without winding in first floor over 1 inch (25 mm) lime mortar 1:2 (one lime, two sand) setting the marble tiles with grey cement slurry including curing rubbing and polishing etc. complete in all aspects, including the cost of mortar. | Sft | 30 | 850 | 25500 |
| 16 | 15 | Providing and laying glazed/ nonskid vitrified porcelain tiles (polished) 2ft x 4ft each, (Oreal or equivalent) on walls and floors, in any floor, laid with dry bond (stile bond) over a base of 1” thick cement mortar (1:3) including jointing to tiles with joint filer of approved quality and fixed by skilled labor as per directions of engineer in charge, complete in all respects. | Sft | 6052.5 | 380 | 2299950 |
| 17 | 16 | Providing and laying anti-static raised flooring system in the Data Processing Lab, comprising of anti-static HPL laminated floor tiles (600mm x 600mm), load-bearing capacity minimum 1000 kg/m², with steel encapsulated panels, calcium sulphate or high-density particle board core. Floor height raised to 1.5ft to 2ft above finished floor level using adjustable galvanized steel pedestals and stringers for stability. Anti-static surface resistance between 106–109 ohms, with copper strip grounding connected to earth pit. Complete with edge trims, ramps (if required), earthing, and proper sealing to prevent dust accumulation. All installation to be done by skilled labor as per ANSI/BIFMA and ISO standards under the supervision of an engineer. | Sft | 638 | 1450 | 925100 |
| 18 | 17 | Supply and installation of a suspended ceiling system comprising aluminum strips/panels or other approved non-combustible material, complete with supporting framework, accessories, and finishing. The contractor shall provide separate and properly supported cable trays/conduits for electrical power, data/network, CCTV, fire alarm, and intercom cabling. Power and data cables shall be routed separately to minimize interference. Adequate access panels shall be provided for inspection and maintenance of concealed services. The ceiling and all penetrations within the server room shall comply with the applicable fire-safety requirements and shall not obstruct cooling airflow or maintenance access. All materials, installation, and finishing shall be completed as per approved drawings and specifications. | Sft | 6052.5 | 320 | 1936800 |
| 19 | 18 | Distempering with vinyle distemper (ICI, Dulux, Paintex or equivalent) of approved make and shade in two coats over and including the cost of one priming coat of lime wash including sand papering, dusting, and filling the holes, cracks and inequalities, if any, at any height in any floor. | Sft | 14436 | 18 | 259848 |
| 20 | 19 | Preparing surface and painting with Matt/Glossy high chemical resistant/hard wearing Polyurethane paint (Epoxy Paint) by sprayer/brush i/c the cost of Primer coat, all material and labour complete in all respects as approved and directed by the Engineer Incharge (i) Priming Coat (ii) Each and subsequent Coat | Sft | 2032 | 65 | 132080 |
| 21 | 20 | Painting 3 coat of weather shield paint of approved make and shade including cleaning of surface sand papering etc, at any height in any floor. | Sft | 10750 | 42 | 451500 |
| 22 | 21 | P/F windows roll blinds sunscreen, dark out, or translucent fabric any colour/shade best quality (Imported) with manual roll up arrangement complete in all respect with all other required accessories and hardware from the approved suppliers and manufacturers, on 6 Nos of window of size (6'-0" × 6'-0"), as per direction of Engineer In charge | Sft | 280 | 280 | 78400 |
| 23 | 22 | Providing and applying torch-on water proofing bitumenous membrane of specified thickness (made of Roof-Grip/Euro Bit) duly lapped/connected by heating with Torch over ps-6 primer i/c preparation/smoothen the surface complete in all respect as approved and directed by the Engineer Incharge Plain 4mm | Sft | 4300 | 165 | 709500 |
| 24 | 23 | Providing and fixing of stainless steel sheet (Grade 304) of 0.9mm thickness on wall surface for fire protection, fixed with suitable fasteners and adhesive complete in all respects | Sft | 2032 | 580 | 1178560 |
| 25 | 24 | Providing, fabricating, and installing steel stairs for emergency exit from first floor, including structural steel framework, treads, risers, handrails, landings, and supports as per approved design and specifications. Stairs to be made of mild steel sections with anti-slip surface finish, painted with primer and two coats of approved enamel paint, complete with welding, bolting, and all necessary accessories. Work to include fixing in position, alignment, and making good all damages | Job | 1 | 420000 | 420000 |
| 26 | 25 | Roof Waterproofing and Acceptance Testing: Complete roof waterproofing, sealing, and associated drainage works above the server room, including inspection and suitable water-tightness/flood testing or an approved equivalent method before installation or commissioning of sensitive IT equipment. The contractor shall rectify any leakage or seepage and provide a written waterproofing warranty for the completed works. | Job | 1 | 220000 | 220000 |
| 27 | 2. ELECTRICAL WORK | |||||
| 28 | 1 | Dismantling of light and fan or call bell point all system of wiring except wiring in recessed conduit including finishing and making good the wall as required. | Point. | 200 | 150 | 30000 |
| 29 | 2 | Dismantling of ordinary plug point of all system of wiring except wiring in recessed conduit including finishing and making good the wall as required. | Point. | 100 | 150 | 15000 |
| 30 | 3 | Dismantling of sub-main upto 7/.036 or 7/0.044 (6 mm² or 10 mm²) all type of wiring except wiring in recessed conduit including finishing and making good the wall as required. | P/Meter | 250 | 110 | 27500 |
| 31 | 4 | Providing, fixing, Two core, 1.5mm, Fire resistant cable, minimum fire rating of 2 hour, laid in conduit (25mm dia), complete in all respect, as approved by the Engineer in-charge. | P/Meter | 360 | 180 | 64800 |
| 32 | 5 | Dismantling of all type of fittings including finishing and making good the wall as required. | Each | 100 | 200 | 20000 |
| 33 | 6 | Wiring for light, fan or call bell point with 1.5 mm² single core, PVC insulated wire copper conductor wire, partly in 20 mm (3/4") dia PVC recessed conduit & partly in uPVC duct fitted on surface, including 1mm²single core PVC insulated wire as ECC as required. | Point | 1600 | 380 | 608000 |
| 34 | 7 | Wiring for plug point with 1.5 mm² single core, PVC insulated wire copper conductor wire, partly in 20 mm (3/4")dia PVC recessed conduit & partly in uPVC CABLE DUCT fitted on surface, including 1mm² single core PVC insulated wire as ECC as required. | Point | 120 | 420 | 50400 |
| 35 | 8 | Wiring for sub-main with 2x 4 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 16x16 mm uPVC duct fitted on surface including 1.5 mm² PVC insulated wire single core wire as ECC as required. | P/Meter | 400 | 280 | 112000 |
| 36 | 9 | Wiring for sub-main with 2x 6 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 16x25 mm uPVC duct fitted on surface including 1.5 mm² PVC insulated wire single core wire as ECC as required. | P/Meter | 400 | 350 | 140000 |
| 37 | 10 | Providing & laying 3½ core, PVC insulated & PVC sheathed, 600/1000 volts grade with stranded copper conductor , un armoured, L.T cable in existing all kind of conduit or cable duct as per Pak. P.W.D specification as required. 35 mm² | P/Meter | 350 | 1650 | 577500 |
| 38 | 11 | The bidding company/contractor shall be fully responsible for the site survey, heat-load assessment, HVAC design, equipment selection, capacity calculations, airflow arrangement, and installation of the server-room cooling system. The design shall consider the actual and anticipated IT equipment load, UPS and other heat-generating equipment, occupancy, lighting, room envelope, and other relevant heat sources. The HVAC system shall be designed for continuous 24/7 operation, with appropriate redundancy, temperature and humidity control, air distribution, and provisions for maintenance without disrupting server-room operations. The contractor shall submit detailed HVAC design calculations, equipment schedules, airflow layout, and coordinated shop drawings for approval before installation. The contractor shall also be responsible for integrated testing and commissioning to demonstrate that the installed system meets the approved design conditions and performance requirements. | Job | 1 | 4500000 | 4500000 |
| 39 | 12 | Supply & fixing 40mm (1½") dia uPVC conduit with all especial such as bends, sockets, Junction etc recessed in the wall or column as required. | P/Meter | 90 | 180 | 16200 |
| 40 | 13 | Supply & fixing 50mm (2") dia uPVC conduit with all especial such as bends, sockets, Junction etc recessed in the in the wall or floor as required. | P/Meter | 160 | 240 | 38400 |
| 41 | 14 | Providing & fixing of 25x25 mm uPVC duct fitted on surface as required. | P/Meter | 120 | 110 | 13200 |
| 42 | 15 | Providing & fixing of 40x60 mm uPVC duct fitted on surface as required. | P/Meter | 120 | 180 | 21600 |
| 43 | 16 | Providing & fixing of 16x25 mm uPVC duct fitted on surface as required. | P/Meter | 40 | 90 | 3600 |
| 44 | 17 | Providing & fixing 10 Amps Polycarbonate flame retardant S.P switch with fancy required gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.(Schneider / Philips ) | No. | 60 | 350 | 21000 |
| 45 | 18 | Providing & fixing 13 Amps Polycarbonate flame retardant 3-Pin switch socket unit with fancy gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.(Schneider / Philips ) | No. | 75 | 450 | 33750 |
| 46 | 19 | Providing & fixing 15 Amps Polycarbonate flame retardant 3-Pin switch socket unit with fancy gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.( Schneider / Philips ) | No. | 50 | 550 | 27500 |
| 47 | 20 | Providing & fixing 6 to 32 Amps, S.P MCCB fixed on existing board , I/c inter-connection as required. | No. | 32 | 1800 | 57600 |
| 48 | 21 | Providing & fixing 50 to 63 Amps, S.P MCCB fixed on existing board , I/c inter-connection as required. | No. | 8 | 2500 | 20000 |
| 49 | 22 | Providing & fixing 10 to 60 Amps,( High Breaking Capacity) T.P MCCB fixed on existing board , I/c inter-connection as required. | No. | 40 | 6500 | 260000 |
| 50 | 23 | Providing & fixing 75 to100 Amps,( Low Breaking Capacity) T.P MCCB fixed on existing board , I/c inter-connection as required. | No. | 5 | 9500 | 47500 |
| 51 | 24 | Providing & fixing Cubical type metal sheet Distribution board with locking arrangement, vermin protected duly powder coated paint i/c all fastening material including wiring with suitable gauge PVC x PVC wire complete as required. | P/Sft | 24 | 1200 | 28800 |
| 52 | 25 | Providing & fixing 70 to 100 Amps, 4 pole, three phase bus bar strip fitted in given Distribution board complete with bus bar insulator, screws, bolts etc as required. | Each | 5 | 8500 | 42500 |
| 53 | 26 | Providing & fixing pilot lamp set fitted on existing board I/c connection as required. | Set | 5 | 1500 | 7500 |
| 54 | 27 | Providing, Installation, Testing & Commissioning of recessed / surface mounted ceiling lights / downlights including driver, having warm / neutral white / cool white colour, 80-90 lm/watts efficiency, 0.9 or above power factor, 20000 - 25000 hours life cycle, including connection, complete in all respect as approved by the Engineer Incharge. | 2200 | 105600 | ||
| 55 | i. 16-18 Watts | Each. | 48 | 2800 | 50400 | |
| 56 | ii. 22-24 Watts | Each. | 18 | 1500 | ||
| 57 | 28 | Providing, Installation, Testing & Commissioning of recessed / surface mounted LED Panel Light including driver, having warm / neutral white / cool white colour, 80-100 lm/watts efficiency, 0.9 or above power factor, 20000-25000 hours life cycle, including connection, complete in all respect as approved by the Engineer Incharge. | Each. | 18 | 2200 | |
| 58 | i. 34-36 Watts (2 x 2) | Each | 32 | 4500 | 144000 | |
| 59 | 30 | Providing, installation, testing and commissioning of Refrigerant Copper Pipe, 22 gauge with all type of fittings like, elbow, clamping, aero flex insulation, wrapping tape, etc complete in all respect as approved by the Engineer Incharge. | ||||
| 60 | i. 5/8'' | Rft | 120 | 520 | 62400 | |
| 61 | 31 | Providing, fixing, testing and commissioning of microprocessor based 02 loop addressable fire control panel surface /recessed mounting type with full switching programming capabilities ,system suitable for operation at 230 volts 50hz with full functionality as per specification, drawing, etc. complete in all respect as approved by the Engineer Incharge | Job | 2 | 180000 | 360000 |
| 62 | 32 | Providing, fixing, testing and commissioning of addressable multi detector (smoke & heat) with addressable base with full functioning switching programming capabilities ,system as per specification & recommended of drawing / manufacturer with allied components, complete in all respect as approved by the Engineer Incharge | Job | 15 | 7500 | 112500 |
| 63 | 33 | Providing, fixing, testing and commissioning of addressable manual call point with addressable base with full functioning switching programming capabilities ,system as per specification & recommended of drawing / manufacturer with allied components, complete in all respect as approved by the Engineer Incharge | Job | 3 | 6500 | 19500 |
| 64 | 34 | Providing, fixing, testing and commissioning of addressable Loop Powered Sounder, ceiling mounted, performing full functioning switching programming capabilities ,system as per specification & recommended of drawing / manufacturer, complete in all respect as approved by the Engineer Incharge | Job | 2 | 8500 | 17000 |
| 65 | 35 | Providing and fixing Earthing set with 2'x2'x1/8'' copper plate buried in the ground at a depth of 12 feet or less if water comes out from the ground level (with salt and charcoal, or Earthing chemical Powder) etc making the pit 12 feet deep by excavation of all type of soil (except soft or hard rock) i/c fixing of 8 SWG copper wire in 1/2 '' G.I conduit complete in all respect as required. | Job | 3 | 55000 | 165000 |
| 66 | 36 | Providing and fixing 1-1/2'' x 1/3'' Thick copper strip with suitable saddle at 12'' intervals complete as required. | P/Meter | 20 | 2200 | 44000 |
| 67 | 37 | Providing & installing False Ceiling Fan (Box Fan) with remote, 18" size including connections, complete in all respect as approved by the Engineer Incharge (Voldam / Pak / Royal) | Each | 20 | 11000 | 220000 |
| 68 | 38 | Providing, Installation, Testing & Commissioning of Online UPS, with standard backup of 30 minutes, 3 phase in and single phase out, suitable for operation at 380/400 volts, 50 Hz, AC supply, complete in all respect as approved by the Engineer Incharge. 5 KVA | Each | 1 | 1450000 | 1450000 |
| 69 | 39 | Providing and fixing fire extinguisher FM 200 system (Naffco) with electrical panel, input & output devices complete fittings and nosel with abot /LPS switches necessary fittings (completed in all aspects) as directed by Engineer Incharge. | Each | 2 | 1100000 | 2200000 |
| 70 | 40 | Providing and fixing three phase rotary manual changeover 4 pole of approved quality as required | Each | 1 | 28000 | 28000 |
| 71 | 41 | Dedicated Main Distribution Panel: Design, supply, installation, testing, and commissioning of a dedicated distribution panel for the data processing lab and associated facilities, including load assessment, approved load schedule, single-line diagram, properly sized cables, circuit breakers, protection devices, earthing, and all associated accessories. | Job | 1 | 650000 | 650000 |
| 72 | 42 | UPS and Battery Backup System: Supply, installation, testing, and commissioning of an online double-conversion UPS system with suitable battery bank, sized according to the calculated critical IT load and approved load schedule. The system shall provide a minimum 30-minute backup at the approved design load, or as specified in the approved design, and shall include maintenance/static bypass, battery monitoring, necessary protection, and all accessories. | Job | 1 | 1800000 | 1800000 |
| 73 | 43 | Automatic Voltage Regulator / Stabilizer: Supply, installation, testing, and commissioning of suitably rated automatic voltage stabilizers/regulators for the data processing lab and associated facilities electrical supply, designed to accommodate the calculated electrical load and fluctuations in incoming voltage. The system shall be properly coordinated with the UPS, HVAC equipment, and electrical distribution system, including necessary bypass and protection arrangements | Job | 1 | 750000 | 750000 |
| 74 | 44 | Surge Protection and Power Quality Monitoring: Supply and installation of coordinated surge protection devices (SPDs) at the main electrical panel and other required distribution points. The system shall include appropriate protection against transient surges and voltage disturbances, together with power-quality monitoring for voltage, current, frequency, phase imbalance, and other relevant electrical parameters | Job | 1 | 450000 | 450000 |
| 75 | 45 | Rack Power Distribution: Supply and installation of dedicated rack power distribution units (PDUs), protected circuits, power cabling, and accessories for all server and network racks. The arrangement shall provide appropriate load balancing, circuit identification, grounding, and safe power distribution to the installed equipment. | Job | 1 | 22000 | 330000 |
| 76 | 46 | Server Room Access Control System: Supply, installation, configuration, testing, and commissioning of an electronic access control system for the server room, comprising biometric/RFID/PIN-based access, electronic door locks, access controller, door status sensors, exit hardware, and associated accessories. The system shall maintain access logs and integrate with the CCTV/security system where applicable. Emergency exit and safe egress shall remain possible during power, network, or system failure in accordance with applicable life-safety requirements. | Job | 1 | 350000 | 350000 |
| 77 | 47 | Environmental and Equipment Monitoring System: Supply and installation of a centralized environmental and equipment monitoring system for the server room, including temperature and humidity sensors at rack air intakes, water-leak detection beneath the raised floor and near HVAC condensate points, door status monitoring, and monitoring of UPS, battery, and HVAC operating conditions. The system shall provide audible/visual alarms, event logging, and remote notifications, with a centralized monitoring interface. | Job | 1 | 450000 | 450000 |
| 78 | 48 | Fire-Rated Server Room Enclosure and Penetrations: Provision, sealing, and finishing of server-room walls, ceiling, doors, cable openings, and service penetrations to meet the approved fire-resistance requirements. All penetrations shall be sealed using approved fire-stopping materials compatible with the required fire rating. Stainless steel sheet or decorative cladding alone shall not be accepted as evidence of fire resistance. | Job | 1 | 400000 | 400000 |
| 79 | 49 | Complete Server Room HVAC Design and Performance Responsibility: The bidding company/contractor shall be responsible for the complete design of the server-room HVAC system, including site survey, IT equipment heat-load calculations, sensible and latent heat assessment, cooling capacity selection, airflow distribution, hot/cold aisle arrangement, temperature and humidity control, equipment redundancy, condensate drainage, control systems, and coordination with racks, raised flooring, electrical systems, and fire-safety arrangements. The system shall be suitable for continuous 24/7 operation and the actual and anticipated server-room load. The contractor shall submit signed design calculations, equipment schedules, airflow drawings, and coordinated shop drawings for approval before procurement and installation. The contractor shall warrant the performance of the complete HVAC system and rectify, at its own cost, any deficiency in design, capacity, airflow, or performance. | Job | 1 | 950000 | 950000 |
| 80 | 3. NETWORKING & IT INFRASTRUCTURE | |||||
| 81 | 1 | Ground-to-First-Floor Network Backbone: Survey, testing, identification, and integration of existing network cables between the ground and first floors, including provision and installation of a suitable fiber-optic backbone, optical distribution frame (ODF), fiber termination, patch cords, transceivers, and required accessories. The system shall provide reliable connectivity between the existing ground-floor network and the first-floor data processing lab and associated facilities. All fiber links shall be tested, labelled, and documented. | Job | 1 | 350000 | |
| 82 | 2 | Core and Distribution Network Design and Configuration: Design, configuration, testing, and commissioning of the data processing lab and associated facilities core/distribution network, including switching roles, uplink capacity, Layer-3 routing, VLANs, network redundancy, management access, firmware, licensing, configuration backup, and basic security hardening. The contractor shall submit the proposed network architecture and topology for approval before implementation and ensure compatibility with the existing network infrastructure. | Job | 1 | 850000 | |
| 83 | 3 | Intercom / Mini PABX System: Supply, installation, configuration, testing, and commissioning of a mini PABX/IP-PBX intercom system to provide communication between the ground and first floors, including required extensions, handsets/endpoints, interface equipment, and accessories. Existing ground-floor intercom cabling shall be surveyed and reused wherever technically suitable. The system Shall be IP-based and shall support future expension,IP extensions, centralized configuration,system backup. The system shall be fully tested and integrated with the existing communication arrangement. | Job | 1 | 250000 | |
| 84 | 4 | Wiring of CCTV Camera with STP /UTP Cat-6 (8 rolls) in PVC conduit/duct i/c connectors complete in all respect as approved by the Engineer Incharge All intsalled links shall be tested and certified. All Copper network cables shall be 100% solid copper,CCA(Copper Cold Aliminium) cable shall not be accepted | Nos | 8 | 280000 | |
| 85 | 5 | Providing, punching, testing and commissioning of RJ-45 connector, complete in all respect as approved by the engineer incharge. All Rj-45 termination shall be tested for continuity ,wire-map,insertion loss and performance. | Each | 350 | 122500 | |
| 86 | 6 | Supply, installation, testing and commissioning of 16 Channel NVR 16 PoE/Poe+ ports having following specifications:-Max recording rate: 180Mbps Embedded system: Linux or latest, VGA and HDMI(upto 4K support) & Dual Monitor Compression:H.265, H.264, MJPEG, Internal storage: upto 8 SATA (Max 48TB), External storage: 1 e-SATA, Monitoring: Web viewer and Mobile viewer, Camera support: ONVIF, complete in all respect as approved by the Engineer Incharge. .NVR shall support RAID,remote monitoring, playback,backup/export and ONVIF-complaint cameras. NVR shall be provided with sufficient surveillince grade storage to retain continuous recording. | P/Job | 1 | 280000 | |
| 87 | 7 | Providing, Fixing & Installing POE Giga Bit switches, complete in all respect as approved by the engineer incharge as required. Support IEEE 802.3af/at,VLAN, STP/RSTP. | ||||
| 88 | i. 8 Port POE Switch | P/Job | 2 | 90000 | ||
| 89 | 8 | Supply, installation, testing and commissioning of Bullet IP camera having following specifications:- Image device: At least 1/2.8 inch, Resolution & frames/sec: At least 2 MP/30fps Video Compression:H.265,H.264, MJPEG Focal length (Varifocal): At least upto 12mm, Min illumination: 0 lux(B/W), 0.095 lux (Colour), Infrared viewable length: At least 30 m, Weather proof standard: IP 66 at least, Vandal proof standard: At least IK10, complete in all respect as approved by the Engineer Incharge | P/Job | 11 | 264000 | |
| 90 | 9 | Providing and installing of LED smart TV latest model suitable for operation on 220/230 V, 50 Hz AC supply including USB / HDMI Ports, Video In, Audio In, switchable to HDMI-I to HDMI-II via wireless remote, flexible cord,shoe, wifi, bluetooth, wall bracket, rawal bolts, etc, complete with electric connection, as approved by the engineer incharge as required. | ||||
| 91 | i. 48 - 50 Inch | P/Job | 3 | 360000 | ||
| 92 | ii. 55 Inch | P/Job | 3 | 480000 | ||
| 93 | iii. 85 inch | P/Job | 1 | 310000 | ||
| 94 | 12 | Providing installation of patch (5m)cord as approved by Engineer.(Schneider/clipsal/5M) | Nos | 40 | 32000 | |
| 95 | 13 | Providing installation of patch (3m)cord as approved by Engineer.(Schneider/clipsal/3M) | Each | 100 | 60000 | |
| 96 | 14 | Providing LC to LC fiber cable patch cord as required (Schneider/clipsal/50M).Fiber shall be OS2 single-mode,duplex, 9/125um,compatible with installed fiber backbone and SFP?SFP+ transceives. | Nos | 12 | 54000 | |
| 97 | 15 | Providing, testing, Installation and commissioning 48 port 2x1 SFP uplink ports in metal box including cable manager and patch panel 3M as approved Cisco. Aslo supporting VLAN,STP/RSTP/MSTP,LACP,SNMP and redundant managment features. | Each | 2 | 760000 | |
| 98 | 16 | Providing installation of multimode fiber data transfer wavelength etc complete as approved Cisco.fiber shall be minimum OM4,50/125um icluding all required connectors,termination, testing and accessories | Each | 4 | 180000 | |
| 99 | 17 | Providing and fixing polycarbonate flame retardant data socket with fancy gang plate recessed in walls including connection as required 3M | Each | 60 | 39000 | |
| 100 | 18 | Supply, installation, testing and commissioning of Next-Generation Firewall (Fortinet FortiGate-70G or equivalent) in High availability(HA), Active-passion with synchronized configuration and automatic failover.also support IPS/IDS, Antivirus,apllication control SSL inspection Capability and IPsec/SSL VPN..i including standard accessories, mounting arrangements and required configuration, complete as approved by the Engineer-in-Charge. | Nos | 2 | 2900000 | |
| 101 | 19 | Supply of 01-year Unified Threat Protection (UTP) / Security Services subscription license for FortiGate-70G including activation and verification, complete as approved by the Engineer-in-Charge. | Nos | 2 | 700000 | |
| 102 | 20 | Supply and installation of HDMI Display Splitter (input/output as required at site), complete with accessories, testing and commissioning, as approved by the Engineer-in-Charge. | Nos | 4 | 72000 | |
| 103 | 21 | Supply and installation of HDMI Cable (10 meters) high-quality minimum 4k resolution at 60Hz with required connectors, complete as approved by the Engineer-in-Charge. | Nos | 7 | 31500 | |
| 104 | 22 | Supply and installation of Network Patch Panel (Cat-6,19” rack mount, ports as required), complete with accessories, as approved by the Engineer-in-Charge. | Nos | 4 | 48000 | |
| 105 | 23 | Supply and installation of Cable Manager (rack mount, suitable size as required), complete with fixing accessories, as approved by the Engineer-in-Charge. | Nos | 4 | 22000 | |
| 106 | 24 | Supply and installation of I/O outlets / keystone jacks (network I/O as required) shall be Cat-6, 100% copper including termination and accessories, complete as approved by the Engineer-in-Charge. | Nos | 50 | 20000 | |
| 107 | 25 | Supply and installation of I/O connectors / terminations compatible with I/O outlets/keystones, complete as approved by the Engineer-in-Charge. | Nos | 50 | 12500 | |
| 108 | 26 | Supply, installation and testing of LC-to-LC SFP+ Transceivers (10Gb) compatible with installed equipment, complete with commissioning, as approved by the Engineer-in-Charge. | Nos | 24 | 432000 | |
| 109 | 27 | Supply and installation of Media Converter, complete with power adaptor and required accessories, testing and commissioning, as approved by the Engineer-in-Charge. | Nos | 2 | 16000 | |
| 110 | 28 | Supply and installation of Fiber-to-Ethernet Media Converter, complete with accessories and power adaptor, testing and commissioning, as approved by the Engineer-in-Charge. | Nos | 2 | 18000 | |
| 111 | 29 | Supply of Cable Ties (3mm) – Packs, suitable for structured cabling works, complete as approved by the Engineer-in-Charge. | Packs | 3 | 4500 | |
| 112 | 30 | Supply of Velcro Cable Tie Roll (1mm × 5m) or equivalent for cable dressing, as approved by the Engineer-in-Charge. | Nos | 5 | 12500 | |
| 113 | 31 | Supply of Power Cables suitable for servers/switches/PDUs as required, complete as approved by the Engineer-in-Charge. | Nos | 50 | 60000 | |
| 114 | 32 | Supply and installation of Rack Mount PDU with C13 ports, suitable rating and configuration as required, complete with fixing accessories, testing and commissioning, as approved by the Engineer-in-Charge. | Nos | 15 | 330000 | |
| 115 | 33 | Supply, installation and commissioning of Server Rack 42U (1200mm × 600mm) complete with doors, side panels, casters/levelers, grounding, ventilation and standard accessories, as approved by the Engineer-in-Charge. | Nos | 5 | 925000 | |
| 116 | 34 | Supply of Label Printer Cartridges compatible with the supplied label printer, complete as approved by the Engineer-in-Charge. | Nos | 12 | 54000 | |
| 117 | 35 | Supply of Cage Nuts suitable for 19” racks, complete as approved by the Engineer-in-Charge. | Nos | 100 | 3000 | |
| 118 | 36 | Supply of Cage Screws suitable for 19” racks, complete as approved by the Engineer-in-Charge. | Nos | 100 | 3000 | |
| 119 | 37 | Supply of Crimping Tool suitable for RJ-45/RJ-11 (as required) with standard accessories, complete as approved by the Engineer-in-Charge. | Nos | 2 | 7000 | |
| 120 | 38 | Integrated Testing and Commissioning of All Systems: Complete testing, commissioning, and demonstration of the integrated operation of all installed systems, including electrical distribution, UPS and battery backup, AVR/stabilizers, surge protection, rack PDUs, HVAC, environmental monitoring, access control, CCTV, fire alarm and FM-200 systems, network switches, firewall, fiber-optic links, and intercom. Testing shall include simulated power failure, UPS transfer and battery autonomy, HVAC restart/failure scenarios, alarm generation, network connectivity, and applicable failover arrangements. All testing shall be conducted in coordination with Survey of Pakistan representatives, and signed commissioning and test reports shall be submitted before final acceptance. Fire suppression interlocks shall be tested using approved procedures without accidental discharge of the extinguishing agent. | Job | 1 | 650000 | |
| 121 | 39 | As-Built Drawings and Complete Technical Documentation: Preparation and submission of complete as-built drawings and documentation covering architectural, civil, electrical, HVAC, fire-safety, security, and network installations. The documentation shall include electrical single-line diagrams, cable schedules, network topology, VLAN/IP and port maps, fiber-core and ODF details, fiber test/OTDR reports, rack elevations, equipment layouts, rack power schedules, HVAC drawings, fire-system drawings, equipment manuals, configuration backups, licenses, warranties, maintenance schedules, and commissioning reports. All documents shall be handed over in both editable soft copy and hard copy formats, as approved by Survey of Pakistan. | Job | 1 | 250000 | |
| 122 | 40 | Training of Survey of Pakistan Personnel: Conduct practical on-site training for designated Survey of Pakistan personnel covering operation, monitoring, troubleshooting, and routine maintenance of all installed systems, including UPS and batteries, electrical panels, AVR/stabilizers, surge protection, HVAC, environmental monitoring, fire suppression, access control, network equipment, firewall, fiber-optic infrastructure, and intercom. Training shall include operating manuals, training materials, attendance records, and demonstration of routine and emergency procedures. All administrative credentials, licenses, and configuration backups shall be securely handed over to the authorized personnel. | Job | 1 | 150000 | |
| 123 | Defects Liability, Warranty and Technical Support: The contractor shall provide a minimum defects-liability and comprehensive technical support period of 12 months from the date of final acceptance, or a longer period where specified in the contract. The arrangement shall cover defects in workmanship, installation, integration, and system performance, including repair or replacement at the contractor's cost. Manufacturer warranties, technical support contacts, escalation procedures, response and restoration times, preventive maintenance visits, firmware/software updates, and spare-parts availability shall be specified in the bid. | job | 1 | 1200000 | ||
| GRAND TOTAL: | Rs 42,798,200.00 |
Civil Works & Finishing
Electrical & HAVC Systems
Networking & IT Infrastructure
Testing & Handover
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi
The Supplier is:
The title of the subject procurement is: Establishment of Data Processing Labs
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director
Survey of Pakistan, Murree Road Faizabad, Rawalpindi
+92-321-629-1301
cpcdatum@gmail.com
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director
Survey of Pakistan, Murree Road Faizabad, Rawalpindi
+92-321-629-1301
cpcdatum@gmail.com
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 1.00% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Call at Deposit
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P160599
To: No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Establishment of Data Processing Labs (P160599) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: No.6 Geodetic Unit/CPC DAtum (Survey of Pakistan), Deputy Director Survey of Pakistan, Murree Road Faizabad, Rawalpindi
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
The Payments shall be made as per this Payment Schedule
The bidder should provide details of atleast 3 jobs of similiar nature
THe bidder may submit Financial Resoureces duly supported by verified bank statments (The bidder must have sufficient funds to complete the job)
The bidder may provide the details if applicable otherwise may submit as Nil
Duly supported by bank statements