In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Directorate General Immigration & Passports (Directorate General of Immigration and Passports), Assistant Director
Sector G-8/1, Islamabad Capital Territory
+92-333-575-8626
logistics@dgip.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Directorate General Immigration & Passports (Directorate General of Immigration and Passports) The subject of procurement is:Â Up-gradation of RPO of Directorate General of Immigration & Passport HQ, Islamabad Expected commencement date: Monday, December 28, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P174195Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Sunday, November 8, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Directorate General Immigration & Passports (Directorate General of Immigration and Passports) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 180 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Demand Draft  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Sector G-8/1, Islamabad Capital Territory Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Wednesday, November 11, 2026 11:30 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Wednesday Date:Â November 11, 2026 Time : 12:00 PM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 5.00%. The Performance Guarantee shall be acceptable in the form of:Â Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
| NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) |
| Eligibility Criteria | Document |
|---|---|
| List of site up-gradation/construction projects/completed and in process with a value of PKR 1000 million and above during last 10 years. Minimum 20 projects should be executed or in process by the bidder during last 10 years | Yes |
| Site up-gradation works/construction works executed with DGIP during last 3 years. Minimum 02 projects | Yes |
| Proof of experience of site up-gradation/construction works (minimum 25 years’ experience required in Govt, semi Govt, autonomous bodies only). (The experience will be counted from the date on work order). | Yes |
| Copy of Pakistan Engineering Council (PEC) registration certificate under category C2 – BC02, CE01, CE10, CE-11. EE-01, EE-02, EE-04, EE-06, EE-07, EE-11 | Yes |
| Bidders are required to provide latest affidavit on stamp paper or E-stamp paper worth Rs.100/- that the company is neither black listed nor in litigation in any office client and if there is any litigation, the bidder will be bound to disclose the same with nature thereof | Yes |
| Financial soundness of a company: The Company will provide last one year bank statement with credit turnover of Rs. 300 million during the period from 1st July 2025 to 30th June, 2026 including number of accounts maintained by the Company. The copies of the bank statement for the said period of all relevant accounts maintained in the name of the company may be provided | Yes |
| Copy or copies of bid bond (earnest money only) as mentioned in this tender document should be attached with technical bid. Original bid bond has to be attached with the financial bid | Yes |
| The bidder should have head offices in Islamabad and branch office in swat city where the proposed site is located | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 75 | |
| Technical Evaluation Criteria | ||
| Proof of registration with Pakistan Engineering Council with C2 category, with relevant code. C2 – BC02, CE01,CE10, CE-11. EE-01, EE-02, EE-04, EE-06, EE-07, EE-11. (Quantitative)(Doc Required) | 10 | |
| The bidder should have head offices in Islamabad, and branch office in swat city where the proposed site is located. (Quantitative)(Doc Required) | 15 | |
| List of (20 nos) site up-gradation/construction projects/completed and in process with a value of PKR 1000 million and above during last 10 years .Minimum 20 projects (Quantitative)(Doc Required) 25 and above (15) 20 to 24 projects (10) | 15 | |
| Site up-gradation works/construction works executed with DGIP during last 3 years. Minimum 2 Nos projects (Quantitative)(Doc Required) 2 and above (30) 1 project (15) | 30 | |
| Financial soundness of a company (From bank statement). The Company will provide last one year bank statement with turnover of Rs. 300 million during the period from 1st July 2025 to 30th June, 2026. Including number of accounts maintained by the Company. (Quantitative)(Doc Required) | 10 | |
| Proof of site up-gradation/construction works (minimum 25 years’ experience required in govt, semi govt, autonomous bodies only). (The experience will be evaluated from the date on work order) (Quantitative)(Doc Required) | 10 | |
| Satisfactory performance certificate from clients (Government / Semi Government / Autonomous bodies) must be attached (minimum 05) for execution of up-gradation/renovation works. Moreover, any bidder who executed the up-gradation works at DG I&P during last five years will be liable to provide one out of Five (01) satisfactory performance certificate duly issued by DG I&P Without these ten (10) certificates, bid will be rejected straight away. (10 marks) (Quantitative)(Doc Required) 10 and above certificates (10) 5 to 9 certificate (5) | 10 | |
Lot Title : Up-gradation/renovation of RPO of Directorate General of Immigration and Passports
Bid Security : 1518170 PKR
| Job | Delivery Schedule | Quantity |
|---|---|---|
| Ground Floor Main Processing Hall,Hall,a. Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 6909/sqm
|
6909/sqm |
| b. Tile |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 7326/sqft
|
7326/sqft |
| c. Paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 16005/sqft
|
16005/sqft |
| d. New Slab |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 1/job
|
1/job |
| Washrooms Complete with all accessories, a. Water Supply and sewerage lines Male |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| b. Water Supply and Sewerage Female |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| c. Complete washroom with Tiles, Utilities and Accessories Male |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 2/set
|
2/set |
| d. Complete washroom with Tiles, Utilities and Accessories Female |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 2/set
|
2/set |
| Glass Work Partition Work, a .Glass Partition Work at GF |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 908/sqft
|
908/sqft |
| Windows, a. Windows at ground floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 320/sqft
|
320/sqft |
| Doors, a .Automatic sliding glass doors. Qty 18 nos |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 320/sqft
|
320/sqft |
| b. Glass Swing doors 4 doors |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 532/sqft
|
532/sqft |
| Dry Wall Partition Work, a. Dry wall partition ground floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1322/sqft
|
1322/sqft |
| Electric Works, a. Lights |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| b. Fans |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 1/job
|
1/job |
| c. Wiring and cabling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| wooden fixtures, a. wooden fixtures in ground floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Sinology, a .Complete sinology for first floor |
Address: RPO Swat KPK
Schedule: Days112
Quantity: 1/job
|
1/job |
| Plantation work at ground floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| CCTV works, a. Complete CCTV With installation |
Address: RPO Swat KPK
Schedule: Days 112
Quantity: 1/job
|
1/job |
| First Floor, AD Room 1, a. Floor Tile |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 448/sqft
|
448/sqft |
| b .Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 448/sqft
|
448/sqft |
| c.paint |
Address: RPO Swat KPKy
Schedule: 112 Days
Quantity: 2980/sqft
|
2980/sqft |
| d. Washroom inside room |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| e. wooden fixtures at bed room |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| f. Electrical Work |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| g. Door ,Window and curtain |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Washroom for Staff, a. Water Supply staff |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| b. Washrooms Complete with all accessories Staff |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 2/set
|
2/set |
| a.Door and windows |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Technical officer-2 a. Floor Tile |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 328/sqft
|
328/sqft |
| b. Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 328/sqft
|
328/sqft |
| c. paint |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 1068/sqft
|
1068/sqft |
| d. Washroom inside room |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| e.wooden fixtures at bed room |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| f. Electrical Works |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| g. Door ,Window and curtain |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Conference Room, a. Front Glass Partition With door |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 217/sqft
|
217/sqft |
| b. Paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 732/sqft
|
732/sqft |
| d. electrical works |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Locker Room, a. Dry Wall |
Address: RPO Swat KPK
Schedule: Days112
Quantity: 175/sqft
|
175/sqft |
| b.Paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 513/sqft
|
513/sqft |
| c. Door |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 21/sqft
|
21/sqft |
| d. Floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 154/sqft
|
154/sqft |
| e. Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 154/sqft
|
154/sqft |
| f. Steel Racks |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 112/sqft
|
112/sqft |
| g. Electrical Works |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Rest Room No 3, a. Floor Tile |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 792/sqft
|
792/sqft |
| b. Ceiling |
Address: RPO Swat KPK
Schedule: Days112
Quantity: 366/sqft
|
366/sqft |
| c. paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 939/sqft
|
939/sqft |
| d. Washroom inside room |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| e. wooden fixtures |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 1/job
|
1/job |
| f. Electrical Work |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| g. Window and curtain |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Cashier Room 4, a. Floor Tile |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 560/sqft
|
560/sqft |
| b. Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 245/sqft
|
245/sqft |
| c. paint |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 806/sqft
|
806/sqft |
| d. wooden fixtures |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| e. Electrical Work |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| f. Window and curtain |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Scanning Room, a. Floor Tiles |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 160/sqft
|
160/sqft |
| b.Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 160/sqft
|
160/sqft |
| c. Paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 721/sqft
|
721/sqft |
| d. wooden fixtures |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 1/job
|
1/job |
| e. Electrification |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Server Room, a. Floor Tiles |
Address: RPO Swat KPK
Schedule: Days112
Quantity: 160/sqft
|
160/sqft |
| b. Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 160/sqft
|
160/sqft |
| c. Paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 668/sqft
|
668/sqft |
| d. Electrification |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 1/job
|
1/job |
| f. Door |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 21/sqft
|
21/sqft |
| Kitchen, a. Floor Tiles |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 96/sqft
|
96/sqft |
| b. Ceiling |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 96/sqft
|
96/sqft |
| c. Paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 511/sqft
|
511/sqft |
| f. wooden fixtures |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| g. Electrification |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| f. Door |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 21/sqft
|
21/sqft |
| Lobby, a. Floor Tiles |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 392/sqft
|
392/sqft |
| b. Ceiling |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 392/sqft
|
392/sqft |
| c. paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1315/sqft
|
1315/sqft |
| d. Electrification |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 1/job
|
1/job |
| Record Room, a. Floor Tile |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 915/sqft
|
915/sqft |
| b. Ceiling |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 915/sqft
|
915/sqft |
| c. Paint |
Address: RPO Swat KPK
Schedule: 112 days
Quantity: 1520/sqft
|
1520/sqft |
| d. electrification |
Address: RPO Swat KPK
Schedule: 112 days
Quantity: 1/job
|
1/job |
| e. Racks |
Address: RPO Swat KPK
Schedule: 112 days
Quantity: 582/sqft
|
582/sqft |
| f. Door |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 40/sqft
|
40/sqft |
| Parapet wall tile cladding and repair |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 450/sqft
|
450/sqft |
| Replacement of outer area marble on first floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 2058/sqft
|
2058/sqft |
| Shed at first floor |
Address: RPO Swat KPK
Schedule: 112Days
Quantity: 150/sqft
|
150/sqft |
| Stair Case all floors, a. Plaster repair etc |
Address: RPO Swat KPK
Schedule: Days112
Quantity: 1368/sqft
|
1368/sqft |
| b. Paint |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1368/sqft
|
1368/sqft |
| c. Slab at each landing |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 30/sqft
|
30/sqft |
| d. Railing |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 252/sqft
|
252/sqft |
| Roof Top, a. Tank Repair |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 4272/sqft
|
4272/sqft |
| b. Screeding Floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 4272/sqft
|
4272/sqft |
| c. Marble Floor |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 4272/sqft
|
4272/sqft |
| d. Parapet wall |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 814/sqft
|
814/sqft |
| e. Mumty Top repair and screeding |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 392/sqft
|
392/sqft |
| External Works in Ground Floor, New gates both main and wicket with revamped pillars work |
Address: RPO Swat KPK
Schedule: Days112
Quantity: 1/job
|
1/job |
| Tuff Tile with curbs and edges, a. Tuff tile |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 10356/sqft
|
10356/sqft |
| b. Curbs and edges |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 584/Rft
|
584/Rft |
| c. Grating for drainage line |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 292/Rft
|
292/Rft |
| Delivery, a. que separator |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 120/RFT
|
120/RFT |
| b. Shed at que |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 750/sqft
|
750/sqft |
| Garden, Setting Garden area with bench, boulders, and garden lights |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Gurad Room with civil works, electrical and other allied works,New Septic Tank and soakage pits for the building. |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| Dismantling Work, |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
| IT Equipment, Computer system (core i-7) dell or equivalent 13 Generation with LEDs |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 10/Qty
|
10/Qty |
| Any other item identified during execution process |
Address: RPO Swat KPK
Schedule: 112 Days
Quantity: 1/job
|
1/job |
No
Lot Title: Up-gradation/renovation of RPO of Directorate General of Immigration and Passports
Specifications / Requirements:
| Sr. No | S.No. | Description | Unit | Qty | Rate | GST | Amount |
|---|---|---|---|---|---|---|---|
| 1 | Ground Floor Main Processing Hall | Â | Â | Â | Â | Â | Â |
| 2 | i | Hall | Â | Â | Â | Â | Â |
| 3 | Â | a. Ceiling | Sft | 6909 | 410 | Â | 2832690 |
| 4 | Â | b. Tile | Sft | 7326 | 450 | Â | 3296700 |
| 5 | Â | c. Paint | Sft | 16005 | 190 | Â | 3040950 |
| 6 | Â | d. New Slab | Job | 1 | 3113360 | Â | 3113360 |
| 7 | ii | Washrooms Complete with all accessories | Â | Â | Â | Â | Â |
| 8 | Â | a. Water Supply and sewerage lines Male | Job | 1 | 267200 | Â | 267200 |
| 9 | Â | b. Water Supply and Sewerage Female | Job | 1 | 419200 | Â | 419200 |
| 10 | Â | c. Complete washroom with Tiles, Utilities and Accessories Male | Unit | 2 | 481348 | Â | 962696 |
| 11 | Â | d. Complete washroom with Tiles, Utilities and Accessories Female | Unit | 2 | 524801.5 | Â | 1049603 |
| 12 | iii | Glass Work Partition Work | Â | Â | Â | Â | Â |
| 13 | Â | a .Glass Partition Work at GF | Sft | 908 | 2300 | Â | 2088400 |
| 14 | Iv | Windows | Â | Â | Â | Â | Â |
| 15 | Â | a. Windows at ground floor | Sft | 320 | 2000 | Â | 640000 |
| 16 | v | Doors | Â | Â | Â | Â | Â |
| 17 | Â | a .Automatic sliding glass doors. Qty 18 nos | Sft | 320 | 5000 | Â | 1600000 |
| 18 | Â | b. Glass Swing doors 4 doors | Sft | 532 | 3500 | Â | 1862000 |
| 19 | vi | Dry Wall Partition Work | Â | Â | Â | Â | Â |
| 20 | Â | a. Dry wall partition ground floor | Sft | 1322 | 1200 | Â | 1586400 |
| 21 | vii | Electric Works | Â | Â | Â | Â | Â |
| 22 | Â | a. Lights | job | 1 | 1112920 | Â | 1112920 |
| 23 | Â | b. Fans | Job | 1 | 525000 | Â | 525000 |
| 24 | Â | c. Wiring and cabling | Job | 1 | 4050000 | Â | 4050000 |
| 25 | vii | wooden fixtures | Â | Â | Â | Â | Â |
| 26 | Â | a. wooden fixtures in ground floor | Job | 1 | 7515000 | Â | 7515000 |
| 27 | viii | Sinology | Â | Â | Â | Â | Â |
| 28 | Â | a .Complete sinology for first floor | job | 1 | 652000 | Â | 652000 |
| 29 | xi | Plantation work at ground floor | Â | Â | Â | Â | Â |
| 30 | Â | a. complete plantation work with planter and plant of suitable size | Job | 1 | 288000 | Â | 288000 |
| 31 | x | CCTV works | Â | Â | Â | Â | Â |
| 32 | Â | a. Complete CCTV With installation | job | 1 | 1200000 | Â | 1200000 |
| 33 | First Floor | Â | Â | Â | Â | Â | Â |
| 34 | i | AD Room 1 | Â | Â | Â | Â | Â |
| 35 | Â | a. Floor Tile | sft | 448 | 650 | Â | 291200 |
| 36 | Â | b .Ceiling | sft | 448 | 350 | Â | 156800 |
| 37 | Â | c.paint | sft | 2980 | 200 | Â | 596000 |
| 38 | Â | d. Washroom inside room | Job | 1 | 287750 | Â | 287750 |
| 39 | Â | e. wooden fixtures at bed room | Job | 1 | 335000 | Â | 335000 |
| 40 | Â | f. Electrical Work | Job | 1 | 201000 | Â | 201000 |
| 41 | Â | g. Door ,Window and curtain | Job | 1 | 294750 | Â | 294750 |
| 42 | ii | Washroom for Staff | Â | Â | Â | Â | Â |
| 43 | Â | a. Water Supply staff | Job | 1 | 418600 | Â | 418600 |
| 44 | Â | b. Washrooms Complete with all accessories Staff | Units | 2 | 658176.5 | Â | 1316353 |
| 45 | Â | a.Door and windows | Job | 1 | 258750 | Â | 258750 |
| 46 | iii | Technical officer-2 | Â | Â | Â | Â | Â |
| 47 | Â | a. Floor Tile | sft | 328 | 650 | Â | 213200 |
| 48 | Â | b. Ceiling | sft | 328 | 350 | Â | 114800 |
| 49 | Â | c. paint | sft | 1068 | 200 | Â | 213600 |
| 50 | Â | d. Washroom inside room | Job | 1 | 293500 | Â | 293500 |
| 51 | Â | e.wooden fixtures at bed room | Job | 1 | 335000 | Â | 335000 |
| 52 | Â | f. Electrical Works | Job | 1 | 201000 | Â | 201000 |
| 53 | Â | g. Door ,Window and curtain | Job | 1 | 294750 | Â | 294750 |
| 54 | iv | Conference Room | Â | Â | Â | Â | Â |
| 55 | Â | a. Front Glass Partition With door | sft | 217 | 2506.3291139241 | Â | 543873.41772152 |
| 56 | Â | b. Paint | sft | 732 | 200 | Â | 146400 |
| 57 | Â | d. electrical works | Job | 1 | 331000 | Â | 331000 |
| 58 | Â | g. Window and blinds | Â | Â | Â | Â | Â |
| 59 | v | Locker Room | Â | Â | Â | Â | Â |
| 60 | Â | a. Dry Wall | Sft | 175 | 750 | Â | 131250 |
| 61 | Â | b.Paint | Sft | 513 | 200 | Â | 102600 |
| 62 | Â | c. Door | Sft | 21 | 4500 | Â | 94500 |
| 63 | Â | d. Floor | Sft | 154 | 650 | Â | 100100 |
| 64 | Â | e. Ceiling | Sft | 154 | 350 | Â | 53900 |
| 65 | Â | f. Steel Racks | Sft | 112 | 1500 | Â | 168000 |
| 66 | Â | g. Electrical Works | Job | 1 | 150000 | Â | 150000 |
| 67 | iii | Rest Room No 3 | Â | Â | Â | Â | Â |
| 68 | Â | a. Floor Tile | sft | 792 | 650 | Â | 514800 |
| 69 | Â | b. Ceiling | sft | 366 | 350 | Â | 128100 |
| 70 | Â | c. paint | sft | 939 | 200 | Â | 187800 |
| 71 | Â | d. Washroom inside room | Job | 1 | 650900 | Â | 650900 |
| 72 | Â | e. wooden fixtures | Job | 1 | 335000 | Â | 335000 |
| 73 | Â | f. Electrical Work | Job | 1 | 230000 | Â | 230000 |
| 74 | Â | g. Window and curtain | Job | 1 | 294750 | Â | 294750 |
| 75 | vi | Cashier Room 4 | Â | Â | Â | Â | Â |
| 76 | Â | a. Floor Tile | sft | 560 | 650 | Â | 364000 |
| 77 | Â | b. Ceiling | sft | 245 | 350 | Â | 85750 |
| 78 | Â | c. paint | sft | 806 | 200 | Â | 161200 |
| 79 | Â | d. wooden fixtures | Job | 1 | 335000 | Â | 335000 |
| 80 | Â | e. Electrical Work | Job | 1 | 230000 | Â | 230000 |
| 81 | Â | f. Window and curtain | Job | 1 | 294750 | Â | 294750 |
| 82 | vii | Scanning Room | Â | Â | Â | Â | Â |
| 83 | Â | a. Floor Tiles | Sft | 160 | 650 | Â | 104000 |
| 84 | Â | b.Ceiling | Sft | 160 | 350 | Â | 56000 |
| 85 | Â | c. Paint | Sft | 721 | 200 | Â | 144200 |
| 86 | Â | d. wooden fixtures | Job | 1 | 320000 | Â | 320000 |
| 87 | Â | e. Electrification | Job | 1 | 232000 | Â | 232000 |
| 88 | Â | f. Door | Â | Â | Â | Â | Â |
| 89 | vii | Server Room | Â | Â | Â | Â | Â |
| 90 | Â | a. Floor Tiles | Sft | 160 | 650 | Â | 104000 |
| 91 | Â | b. Ceiling | Sft | 160 | 350 | Â | 56000 |
| 92 | Â | c. Paint | Sft | 668 | 200 | Â | 133600 |
| 93 | Â | d. Electrification | Job | 1 | 353000 | Â | 353000 |
| 94 | Â | f. Door | Sft | 21 | 3500 | Â | 73500 |
| 95 | viii | Kitchen | Â | Â | Â | Â | Â |
| 96 | Â | a. Floor Tiles | Sft | 96 | 650 | Â | 62400 |
| 97 | Â | b. Ceiling | Sft | 96 | 350 | Â | 33600 |
| 98 | Â | c. Paint | Sft | 511 | 200 | Â | 102200 |
| 99 | Â | f. wooden fixtures | Job | 1 | 240000 | Â | 240000 |
| 100 | Â | g. Electrification | Job | 1 | 163000 | Â | 163000 |
| 101 | Â | f. Door | Sft | 21 | 3500 | Â | 73500 |
| 102 | ix | Lobby | Â | Â | Â | Â | Â |
| 103 | Â | a. Floor Tiles | Sft | 392 | 650 | Â | 254800 |
| 104 | Â | b. Ceiling | sft | 392 | 350 | Â | 137200 |
| 105 | Â | c. paint | sft | 1315 | 200 | Â | 263000 |
| 106 | Â | d. Electrification | job | 1 | 290000 | Â | 290000 |
| 107 | v | Record Room | Â | Â | Â | Â | Â |
| 108 | Â | a. Floor Tile | sft | 915 | 650 | Â | 594750 |
| 109 | Â | b. Ceiling | sft | 915 | 350 | Â | 320250 |
| 110 | Â | c. Paint | sft | 1520 | 200 | Â | 304000 |
| 111 | Â | d. electrification | job | 1 | 634000 | Â | 634000 |
| 112 | Â | e. Racks | Sft | 582 | 1300 | Â | 756600 |
| 113 | Â | f. Door | sft | 40 | 3500 | Â | 140000 |
| 114 | vi | Parapet wall tile cladding and repair | Sft | 450 | 600 | Â | 270000 |
| 115 | vii | Replacement of outer area marble on first floor | Sft | 2058 | 450 | Â | 926100 |
| 116 | viii | Shed at first floor | Sft | 150 | 2500 | Â | 375000 |
| 117 | iv | Stair Case all floors | Â | Â | Â | Â | Â |
| 118 | Â | a. Plaster repair etc | Sft | 1368 | 160 | Â | 218880 |
| 119 | Â | b. Paint | Sft | 1368 | 200 | Â | 273600 |
| 120 | Â | c. Slab at each landing | Sft | 30 | 8000 | Â | 240000 |
| 121 | Â | d. Railing | Sft | 252 | 3000 | Â | 756000 |
| 122 | Â | Roof Top | Â | Â | Â | Â | Â |
| 123 | i | a. Tank Repair | Sft | 4272 | 50 | Â | 213600 |
| 124 | ii | b. Screeding Floor | Sft | 4272 | 200 | Â | 854400 |
| 125 | ii | c. Marble Floor | Sft | 4272 | 410 | Â | 1751520 |
| 126 | iii | d. Parapet wall | Sft | 814 | 650 | Â | 529100 |
| 127 | iv | e. Mumty Top repair and screeding | Sft | 392 | 400 | Â | 154976 |
| 128 | Â | External Works in Ground Floor | Â | Â | Â | Â | Â |
| 129 | i | New gates both main and wicket with revamped pillars work | Job | 1 | 1000000 | Â | 1000000 |
| 130 | ii | Tuff Tile with curbs and edges | Â | Â | Â | Â | Â |
| 131 | Â | a. Tuff tile | Sft | 10356 | 280 | Â | 2899680 |
| 132 | Â | b. Curbs and edges | Rft | 584 | 300 | Â | 175200 |
| 133 | Â | c. Grating for drainage line | Rft | 292 | 1000 | Â | 292000 |
| 134 | iii | Delivery | Â | Â | Â | Â | Â |
| 135 | Â | a. que separator | Rft | 120 | 3000 | Â | 360000 |
| 136 | Â | b. Shed at que | Sft | 750 | 2500 | Â | 1875000 |
| 137 | iv | Garden | Â | Â | Â | Â | Â |
| 138 | Â | Setting Garden area with bench, boulders, and garden lights | Job | 1 | 730000 | Â | 730000 |
| 139 | v | Gurad Room with civil works, electrical and other allied works | Â | Â | Â | Â | Â |
| 140 | vi | New Septic Tank and soakage pits for the building. | Job | 1 | 560000 | Â | 560000 |
| 141 | Â | Dismantling Work | Job | 1 | 950000 | Â | 950000 |
| 142 | Â | IT Equipment | Â | Â | Â | Â | Â |
| 143 | a | Computer system (core i-7) dell or equivalent 13 Generation with LEDs | No | 10 | 500000 | Â | 5000000 |
| 144 | Â | Any other item identified during execution process | Job | 1 | Â | Â | Â |
| GRAND TOTAL: | Rs 75,908,501.42 |
The successful bidder will be responsible for execution of site Up-Gradation/Renovation works at RPO Swat
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Directorate General Immigration & Passports (Directorate General of Immigration and Passports), Assistant Director Sector G-8/1, Islamabad Capital Territory
The Supplier is:
The title of the subject procurement is: Up-gradation of RPO of Directorate General of Immigration & Passport HQ, Islamabad
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Directorate General Immigration & Passports (Directorate General of Immigration and Passports), Assistant Director
Sector G-8/1, Islamabad Capital Territory
+92-333-575-8626
logistics@dgip.gov.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Directorate General Immigration & Passports (Directorate General of Immigration and Passports), Assistant Director
Sector G-8/1, Islamabad Capital Territory
+92-333-575-8626
logistics@dgip.gov.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 2.00% to 2.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 5.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P174195
To: Directorate General Immigration & Passports (Directorate General of Immigration and Passports), Assistant Director Sector G-8/1, Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Directorate General Immigration & Passports (Directorate General of Immigration and Passports), Assistant Director Sector G-8/1, Islamabad Capital Territory
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Up-gradation of RPO of Directorate General of Immigration & Passport HQ, Islamabad (P174195) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Directorate General Immigration & Passports (Directorate General of Immigration and Passports), Assistant Director Sector G-8/1, Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
List of site up-gradation/construction projects/completed and in process with a value of PKR 1000 million and above during last 10 years. Minimum 20 projects should be executed or in process by the bidder during last 10 years
1. Copy of Pakistan Engineering Council (PEC) registration certificate under category C2 – BC02, CE01, CE10, CE-11. EE-01, EE-02, EE-04, EE-06, EE-07, EE-11,
2. Copy or copies of bid bond (earnest money only) as mentioned in this tender document should be attached with technical bid. Original bid bond has to be attached with the financial bid.
3. The bidder should have head offices in Islamabad and branch office in swat city where the proposed site is located
Bidders are required to provide latest affidavit on stamp paper or E-stamp paper worth Rs.100/- that the company is neither black listed nor in litigation in any office client and if there is any litigation, the bidder will be bound to disclose the same with nature thereof
List of site up-gradation/construction projects/completed and in process with a value of PKR 1000 million and above during last 10 years. Minimum 20 projects should be executed or in process by the bidder during last 10 years