The following specific data for the procurement of works shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITBs). Whenever there is a conflict, the provisions herein shall prevail over those in ITBs.
ITB Number 1.1
Name of Procuring agency/Employer: National Police Foundation (National Police Foundation)
The subject of procurement is: Construction of Houses and Associated Infrastructure Development for ICT Police
Period for completion of the works 119 Days
Commencement date execution of the works: 14 Days
Type of Procurement: Local
ITB Number 2.1
Financial year for the operations of the Procuring agency/Employer: 2026-27
Name of Project :
Name of financing institution:
Name and identification number of the Contract: P183357
ITB Number 3.1
JV/Consortium or Association Allowed: No
Maximum number of members in the joint venture shall be: Nil.
ITB Number 6.4
The Bidders may seek clarifications through EPADS v2.0: Last Clarification Date: Tuesday, December 1, 2026
ITB Number 8.1
The Language of all correspondences and documents related to the Bid is: English
ITB Number 5.1 & 9.1
The following documents must be included to constitute the Bid
No
ITB Number 9.4 (b)
Other procurement specific documentation requirements are:
Evidence of Security clearance from ICT Police
PEC Registration License Specialization Codes: CE-01, CE-09, CE-10, CE-11, EE-04, EE-05 and EE-11
Affidavit on Judicial Stamp Paper prepared within the current month of submission of bidding document that the firm has never been blacklisted
Income Tax Registration Certificate
Record of Active Taxpayer for Income Tax
Record of Active Taxpayer for Sales Tax
The applicants must provide Letter of Award and Taking Over/ Completion Certificate of completed projects. No marks will be given to the projects for which above certificates are not provided.
The applicants must provide Award Letter of in-hand projects. No marks will be given to the projects for which above certificate is not provided.
Provide the following for each personnel, failing which, no marks will be awarded: a. verifiable proof of employment with the bidder of the proposed staff b. detailed CV c. valid PEC Registration for Engineers d. Diploma Certificates of DAE staff
Provide an undertaking on stamp paper to the effect that the listed equipment is available with the firm and will be made available, as and when required, for the Project.
The bidder shall submit Audited financial statements for the last three years duly certified by the Chartered Accounts
Firms shall submit copies of Credit Line Facility in specific name of the Project.
ITB Number 12.4
The Bid price will be/will not be subject to the price adjustment Nil.
ITB Number 12.6
The Bid price shall be adjusted in accordance with Schedule-A to Bid – “Schedule of Adjustment Data” if available.
ITB Number 13.1
Bidders to quote entirely in Pak rupees (PKR)
ITB Number 15.1
The Bid Validity period shall be 90 Days days.
ITB Number 16.1
The amount of Bid Security shall be ... see section itemd and bid security
The currency of the Bid Security shall be: PKR.
ITB Number 16.2
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft
ITB Number 19.1
The deadline for Bid submission is: Friday, December 4, 2026 10:00 AM
Address for submission of Original Bid Security: Mauve Area G-10/4, Islamabad Capital Territory
ITB Number 21.1
The Bid opening shall take place at: EPADS v2.0
Day : Friday
Date: December 04, 2026
Time : 10:30 AM
ITB Number 27.1
The currency that shall be used for Bid evaluation and comparison purposes to convert all Bid prices expressed in various currencies is: PKR Only
The source of exchange rate shall be: Nil
The date of exchange rate shall be: Nil
ITB Number 28.2 & 28.5
Least Cost Based Selection (LCBS)
see Evaluation Criteria
ITB Number 29.1
Domestic preference to apply.
Domestic preference: No
Preference to domestic or national suppliers or contractors shall be provided in accordance with policies of the Federal Government and/or in accordance with the regulations issued by the Authority.
If Yes, The percentage for the domestic preference alongwith calculation formula is provided in the evaluation and qualification criteria.
ITB Number 32.2
Sub-contracting is allowed? : No
No % of the total value of the contract.
39.1 The Performance Security (or guarantee) shall be 0%
39.2 The Performance Security (or guarantee) shall be in the form of: Nil
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
| NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Valid registration with PEC in Category C-3 and at least in Specialization Codes: CE-01, CE-09, CE-10, CE-11, EE-04, EE-05 and EE-11 | Yes |
| An affidavit on judicial stamp paper of Rs. 100/- duly notarized, to the effect of not being debarred / blacklisted by any organization / department, prepared within the current month of submission of Bids | Yes |
| Security Clearance of firm from AIG General ICT Police. | Yes |
| The bidder must have executed (in last 5 years) , or be currently executing, at least three (03) construction projects for police organizations/departments other law-enforcement/government security institutions (Copy of the contract agreement/work order/completion certificate) | Yes |
| On Active Tax Payer’s List at the time of submission of Bid | Yes |
| Non-performance of a contract did not occur as a result of contractor default for last 15 years. | Yes |
| Bidder’s financial position and prospective long-term profitability sound according to criteria established in Financial Capabilities below and assuming that all pending litigation will be resolved against the Bidder | Yes |
| No consistent history of court/ arbitral award decisions against the Bidder since 1st January 2011. | Yes |
| Bidder shall be on the active taxpayer’s list of the Federal Board of Revenue for Income Tax | Yes |
| Bidder shall be on the active taxpayer’s list of the Federal Board of Revenue for Sales Tax | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 50 | |
| Experience Record | ||
| Experience as constructor in execution of Building / Roads/Housing Infrastructure development Projects completed during last ten (10) years. (Quantitative)(Doc Required) 12 marks will be awarded for each completed project having project cost ≥ Rs. 350M up to maximum of 24 marks (24) 08 marks will be awarded for each completed project having project cost from Rs. 320M to Rs. 349.99 M up to maximum of 24 marks (8) 06 marks will be awarded for each completed project having project cost from Rs. 290M to 319.99M up to maximum of 24 marks. (6) | 24 | |
| Experience as Contractor in execution of Building / Roads/Housing Infrastructure development projects currently in hand. (Quantitative)(Doc Required) 08 marks will be awarded for each in-hand project having project cost ≥ Rs. 350M up to maximum of 16 marks (16) 06 marks will be awarded for each in-hand project having project cost from Rs. 320M to Rs. 349.99 M up to maximum of 16 marks. (6) 04 marks will be awarded for each in-hand project having project cost from Rs. 290M to 319.99M up to maximum of 16 marks. (4) | 16 | |
| Personnel Capabilities | ||
| Project Manager (B.Sc. Civil Engineer registered with Pakistan Engineering Council) 4 Marks Will be awarded for B.Sc. Civil Engineer having at least 06 Years Relevant Experience (Quantitative)(Doc Required) | 4 | |
| Associate Engineer B-Tech / DAE Civil 3 Marks Will be awarded for B-Tech / DAE Civil having at least 05 Years Relevant Experience (Quantitative)(Doc Required) | 3 | |
| Associate Engineer B-Tech / DAE (E/M) 3 Marks Will be awarded for B-Tech / DAE E/M having at least 05 Years Relevant Experience (Quantitative)(Doc Required) | 3 | |
| Quantity Surveyor B-Tech / DAE Civil 3 Marks Will be awarded for B-Tech / DAE Civil having at least 05 Years Relevant Experience (Quantitative)(Doc Required) | 3 | |
| Surveyor B-Tech / DAE Civil/ Survey Certificate 2 Marks Will be awarded for Surveyor having Survey Certificate and at least 05 Years Relevant Experience (Quantitative)(Doc Required) | 2 | |
| Equipment Capabilities | ||
| 1 X Pneumatic Tyre Roller (Quantitative)(Doc Required) | 1 | |
| 1 X Bull Dozer (200 HP) (Quantitative)(Doc Required) | 1 | |
| 1 X Asphalt Paver Machine (Quantitative)(Doc Required) | 1 | |
| 1 X Vibratory Road Roller (10Ton) (Quantitative)(Doc Required) | 1 | |
| 1 X Sheep Foot Roller (10Ton) (Quantitative)(Doc Required) | 1 | |
| 2 X Excavator (Quantitative)(Doc Required) | 1 | |
| 1 X Grader (Quantitative)(Doc Required) | 1 | |
| 1 X Concrete Mixer Machine (Single Load) (Quantitative)(Doc Required) | 1 | |
| 30,000Rft Scafolding (Quantitative)(Doc Required) | 1 | |
| 20,000 Sft. Shuttering (Quantitative)(Doc Required) | 1 | |
| 2 X Dumpers (Quantitative)(Doc Required) | 1 | |
| 1 X Loader (Quantitative)(Doc Required) | 1 | |
| 1 X Tractor Trolley (Quantitative)(Doc Required) | 1 | |
| Water Bowser & Steel Cutting/ Bending Machine (Quantitative)(Doc Required) | 1 | |
| Generator Set (10KVA) & Total Station (Quantitative)(Doc Required) | 1 | |
| Annual Turnover | ||
| The minimum annual volume of construction work (Annual Turn Over) during any of the last three years shall be as under: (Quantitative)(Doc Required) 15 Marks will be awarded if the Turnover is more than PKR. 250 million. (15) 8 Marks will be awarded if the Turnover is in range of PKR. 200 million to PKR. 250 million (8) | 15 | |
| The amount of Working Capital (Current Assets – Current Liabilities) & credit facilities (in specific name of the Project), net of other construction commitments of the construction,
shall be as under: (Quantitative)(Doc Required) 15 Marks will be awarded if the Working Capital & credit facilities is more than PKR. 70 million. (15) 8 Marks will be awarded if the Working Capital & credit facilities is in range of PKR. 50 million to PKR. 70 million (8) | 15 | |
Lot Title : Construction of Houses and Associated Infrastructure Development for ICT Police
Bid Security : 7500000 PKR
| Job | Delivery Schedule | Quantity |
|---|---|---|
| Construction of Houses |
Address: Mauve Area G-10/4, Islamabad Capital Territory
Schedule: 120 Days
Quantity: 4/Qty
|
4/Qty |
| Infrastructure Development |
Address: Mauve Area G-10/4, Islamabad Capital Territory
Schedule: 120 Days
Quantity: 1/Qty
|
1/Qty |
Lot Title: Construction of Houses and Associated Infrastructure Development for ICT Police
Specifications / Requirements:
| Sr. No | ITEM No. | DESCRIPTION | UNIT | QUANTITY | RATE | RATE PER (unit basis) | AMOUNT |
|---|---|---|---|---|---|---|---|
| 1 | 1. ROADS, DRIVEWAYS & PAVED AREAS | ||||||
| 2 | GENERAL NOTE | ||||||
| 3 | Supply, installation, testing and commissioning of the following items of work, including all labour, tools, plant, accessories, etc. required for completion of each item as per specifications and as approved by the Engineer. | ||||||
| 4 | A. SCHEDULED ITEMS | ||||||
| 5 | 1-1 | Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor. | Cft | 619800 | 464.55 | 100 | 2879280.9 |
| 6 | 2nd chain (2nd 30 m) | Cft | 619800 | 85.15 | 100 | 527759.7 | |
| 7 | 3rd to 10th chain (60 to 300 m) | Cft | 4959000 | 53.15 | 100 | 2635708.5 | |
| 8 | 1000 to 3000 ft. (300 to 900 m) | Cft | 1239500 | 521.75 | 100 | 6467091.25 | |
| 9 | 1st Km | Cft | 619800 | 382.5 | 100 | 2370735 | |
| 10 | 2nd Km | Cft | 619800 | 183.25 | 100 | 1135783.5 | |
| 11 | 3rd Km | Cft | 142100 | 144.7 | 100 | 205618.7 | |
| 12 | 4th Km | Cft | 142100 | 103.8 | 100 | 147499.8 | |
| 13 | 5th Km | Cft | 142100 | 97.1 | 100 | 137979.1 | |
| 14 | 6th Km | Cft | 142100 | 95.55 | 100 | 135776.55 | |
| 15 | 7th Km | Cft | 142100 | 89.35 | 100 | 126966.35 | |
| 16 | 8th Km | Cft | 142100 | 88.4 | 100 | 125616.4 | |
| 17 | 9th Km | Cft | 142100 | 83.25 | 100 | 118298.25 | |
| 18 | 10th Km | Cft | 142100 | 78.3 | 100 | 111264.3 | |
| 19 | 11th Kms to 200Kms)(for 11 KM to 20 KM) | Cft | 1420500 | 69.3 | 100 | 984406.5 | |
| 20 | 11th Kms to 200Kms)(for 20KM to 30 KM ) | Cft | 1420500 | 69.3 | 100 | 984406.5 | |
| 21 | 11th Kms to 200Kms)(for 30KM to 40 KM ) | Cft | 1420500 | 69.3 | 100 | 984406.5 | |
| 22 | 11th Kms to 200Kms)(for 40KM to 50 KM ) | Cft | 1420500 | 69.3 | 100 | 984406.5 | |
| 23 | 3-2 | Earthwork excavation in ashes, sand and soft soil or silt clearance, undressed lead upto 50 ft (15 metre). | Cft | 338400 | 8932.7 | 1000 | 3022825.68 |
| 24 | 3-4 | Borrowpit excavation undressed lead upto 100 ft (30 metre). | |||||
| 25 | a) Ordinary soil | Cft | 14700 | 9006.4 | 1000 | 132394.08 | |
| 26 | 3-5 | Earthowrk in ordinary soil for embankments lead upto 100ft. (30 m), including ploughing and mixing with blade grade or disc harrow or other suitable equipment, and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects:- | |||||
| 27 | 95% to 100% Maximum modified AASHO dry density | Cft | 338400 | 11261.3 | 1000 | 3810823.92 | |
| 28 | 90% maximum modified AASHO dry density. | Cft | 145100 | 10856.75 | 1000 | 1575314.425 | |
| 29 | 3-7 | Earthwork excavation in open cutting upto 5'-0" (1.5 m) depth for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead:- | |||||
| 30 | B) By Mechanical means | ||||||
| 31 | Ordinary | Cft | 4410 | 12934.25 | 1000 | 57040.0425 | |
| 32 | Hard | Cft | 1330 | 14060.05 | 1000 | 18699.8665 | |
| 33 | gravel & shingle | Cft | 740 | 21310.3 | 1000 | 15769.622 | |
| 34 | 3-8 | Excavation in shingle or gravel formation and rock, not requiring blasting, undressed lead upto 100 f t (30 m) | |||||
| 35 | dry | Cft | 145100 | 30858.45 | 1000 | 4477561.095 | |
| 36 | 3-17 | Transportati on of earth all types when the total distance,including the lead covered in the item of work, is more than 1000 ft. (300 m) | |||||
| 37 | a) upto ¼ mile (400 m). | Cft | 5730 | 7190.5 | 1000 | 41201.565 | |
| 38 | b) for every 330 ft. (100 m) additional lead or part thereof,beyond ¼ mile (400 m) upto one mile. (1.6 Km.) | Cft | 5730 | 86.25 | 1000 | 494.2125 | |
| 39 | 3-25 | Compaction of earthwork with power road roller, includingploughing, mixing, moistening earth to optimum moisture content in layers, etc. complete: | |||||
| 40 | i) 95% to 100% maximum modified AASHO dry density. | Cft | 6040 | 2011.25 | 1000 | 12147.95 | |
| 41 | 3-32 | Turfing slopes of banks or lawns with grass sods including ploughing, laying, setting and watering (Turf got from within a distance of 5 miles (8 Km.) and maintenance for 15 days). | Sft | 22000 | 2706.9 | 100 | 595518 |
| 42 | 3-47 | Cutting and removing trees within a distance of 100 ft. (30 m) | |||||
| 43 | a) upto 2½ ft. (760 mm) girth | Each | 5 | 2426.15 | 1 | 12130.75 | |
| 44 | b) above 2½ ft. to 6 ft. (760 to 1800 mm) girth | Each | 5 | 4720.3 | 1 | 23601.5 | |
| 45 | 3-48 | Uprooting stump and removing within 100 ft. (30 m) from 2 ft.to 6 ft. (600 to 1800 mm) girth. | Each | 10 | 3045.25 | 1 | 30452.5 |
| 46 | 3-53 | Clearing and Grubbing | Sft | 14700 | 5992.2 | 1000 | 88085.34 |
| 47 | 3-54 | Compaction of natural ground | Sft | 105900 | 3479.6 | 1000 | 368489.64 |
| 48 | 3-52 | Leveling, dressing and making lawns. | Sft | 22000 | 812.05 | 1000 | 17865.1 |
| 49 | 4-46 | Dismantling and removing road pavements etc.,including screening and stacking of by products upto one chain (30 m). | |||||
| 50 | B) By Mechnical Mean | Cft | 22000 | 2432.65 | 100 | 535183 | |
| 51 | 6-5 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): | |||||
| 52 | (f) Ratio 1: 2: 4 | Cft | 147 | 49085.5 | 100 | 72155.685 | |
| 53 | h) Ratio 1:3:6 | Cft | 147 | 41542.3 | 100 | 61067.181 | |
| 54 | i) Ratio 1:4:8 | Cft | 2350 | 36029.5 | 100 | 846693.25 | |
| 55 | 6-53 | Providing and fixing precast Edge Kerb Stone (100mm to 150mm thick) of 3500 PSI Compressive Strength, embeded in PCC 1:2:4 over lean concrete 1:4:8 etc. Complete in all respect. | |||||
| 56 | b) With Painting (i) (300x150x300mm high) | Rft | 10700 | 676.2 | 1 | 7235340 | |
| 57 | 10-42 | Providing and laying Tuffpavers,having 7000PSI, crushing strength of approved manufacturer,over 2"to3"sand cushion i/c grouting with sand in joints i/c finishing to require slope . complete in all respect. (50% Grey / 50% Coloured) | |||||
| 58 | a) 50-mm thick | Sft | 7500 | 188.2 | 1 | 1411500 | |
| 59 | 13-36 | Painting Traffic L ane M ar ki ng of speci f i ed width (1.5mm thick), with Thermoplastic (TP) Pai nt including Gl ass B eads, compl et e in all respect , as approved and directed by Engineer incharge. | |||||
| 60 | i) 5" wide | Rft | 16900 | 49.45 | 1 | 835705 | |
| 61 | 18-3 | a) Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing,spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density,including carriage of all material to site of work except gravel and. aggregate. | |||||
| 62 | il) Crushed stone aggregate. | Cft | 103000 | 10874.25 | 100 | 11200477.5 | |
| 63 | 18-4 | a) Providing and laying base course of crushed stone aggregate of approved quality and grade, and supply and spreading of stone screening, including placing, mixing,spreading and compaction of base course material to required depth, camber and grade to achieve 100% maximum modified AASHO dry density, including carriage of all materials to site of work except gravel and aggregate. | Cft | 39700 | 14343.6 | 100 | 5694409.2 |
| 64 | 18-6 | Providing and laying bituminous priming coat, using 10 lbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg kerosene and 0.5 Kg binder per square metre | Sft | 110300 | 2582.55 | 100 | 2848552.65 |
| 65 | 18-10 | a) Providing and laying plant premixed bituminous carpet,including compaction and finishing to required camber, grade and density. | |||||
| 66 | xiii) 4.2% Bitumen | Sft-inch | 220700 | 7377.6 | 100 | 16282363.2 | |
| 67 | 18-11 | Scarifying old road surface including removal of debris within 1 chain (30 m). | Sft | 29400 | 676.7 | 100 | 198949.8 |
| 68 | Sub-Total Cost (Scheduled Items) - ROADS, DRIVEWAYS & PAVED AREAS = | ||||||
| 69 | B. NON-SCHEDULED ITEMS | ||||||
| 70 | No non-scheduled items in this section. | ||||||
| 71 | Sub-Total Cost (Non-Scheduled Items) - ROADS, DRIVEWAYS & PAVED AREAS = | ||||||
| 72 | 2. SANITARY SEWERAGE WORKS | ||||||
| 73 | GENERAL NOTE | ||||||
| 74 | Supply, installation, testing and commissioning of the following items of work, including all labour, tools, plant, accessories, etc. required for completion of each item as per specifications and as approved by the Engineer. | ||||||
| 75 | A. SCHEDULED ITEMS | ||||||
| 76 | SECTION-A: EARTHWORKS | ||||||
| 77 | 1-1 | Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor. | Cft | 85000 | 464.55 | 100 | 394867.5 |
| 78 | 2nd chain (2nd 30 m) | Cft | 85000 | 85.15 | 100 | 72377.5 | |
| 79 | 3rd to 10th chain (60 to 300 m) | Cft | 680000 | 53.15 | 100 | 361420 | |
| 80 | 1000 to 3000 ft. (300 to 900 m) | Cft | 170000 | 521.75 | 100 | 886975 | |
| 81 | 1st Km | Cft | 85000 | 382.5 | 100 | 325125 | |
| 82 | 2nd Km | Cft | 85000 | 183.25 | 100 | 155762.5 | |
| 83 | 3-43 | Earth work Excavation in open cutting for water supply pipe lines sewer lines and manholes as shown in drawing incl back filling shuttering of wooden vertical planks struts and beams incl dressing to correct section and dimentions according to template and level and removing of surface water in all type of soil except shingle graval and rock complete with all respects. | |||||
| 84 | 2) By Mechanical Means | ||||||
| 85 | i) 0 ft to 7.0 ft (0 to 2.10 m) depth | ||||||
| 86 | i) Sand, ashes or loose soil | Cft | 157900.2675 | 8066.6 | 1000 | 1273718.2978155 | |
| 87 | ii) Ordinary soil | Cft | 166736.4 | 10168.7 | 1000 | 1695492.43068 | |
| 88 | iii) Hard soil or soft murum | Cft | 157896.4 | 13433.6 | 1000 | 2121117.07904 | |
| 89 | 3-8 | Excavation in shingle or gravel formation and rock, not requiring blasting, undressed lead upto 100 ft (30 m) | |||||
| 90 | Dry | Cft | 17559.57375 | 30858.45 | 1000 | 541861.22858569 | |
| 91 | 10-3 | Supplying and filling sand under floor; or plugging in wells | Cft | 13386.128765625 | 3556.7 | 100 | 476104.44180698 |
| 92 | 10-4 | Providing, laying, watering and ramming brick or stone ballast 1½" to 2" (40 mm to 50 mm) gauge mixed with 25% sand, for floor foundation, complete in all respects. | Cft | 5000 | 14479.4 | 100 | 723970 |
| 93 | SECTION-B: CEMENT CONCRETE & MASONRY WORKS | ||||||
| 94 | 6-5 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): | |||||
| 95 | Ratio 1:2:4 | Cft | 3423.7739382813 | 49085.5 | 100 | 1680576.556475 | |
| 96 | Ratio 1:4:8 | Cft | 1600 | 36029.5 | 100 | 576472 | |
| 97 | 7-4 | Pacca brick work in foundation and plinth in:- | |||||
| 98 | Cement Sand mortar 1:3 | Cft | 3800 | 44382.85 | 100 | 1686548.3 | |
| 99 | 11-8 | Cement plaster 1:3 upto 20' (6.00 m) height: | |||||
| 100 | (b) ½" (13 mm) thick | Sft | 11600 | 5206.85 | 100 | 603994.6 | |
| 101 | 13-9 | Bitumen coating to plastered or cement concrete surface: | |||||
| 102 | iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m) | Sft | 5802.72 | 1670.8 | 100 | 96951.84576 | |
| 103 | 21-1 | Providing and laying R.C.C. pipe, moulded with cement concrete 1:1½:3, with spigot socket or collar joint, etc. including cost of reinforcement, conforming to B.S. 5911:Part I: 1981, Class "L" including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing, cutting pipeswhere necessary, finishing and testing, etc., complete. | |||||
| 104 | (iii) 225 mm (9') id | Rft | 8280 | 606.75 | 1 | 5023890 | |
| 105 | 21-11 | Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels. | Each | 170 | 661.35 | 1 | 112429.5 |
| 106 | 21-16 | Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22"( 550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. | Set | 40 | 11484 | 1 | 459360 |
| 107 | Sub-Total Cost (Scheduled Items) - SANITARY SEWERAGE WORKS = | ||||||
| 108 | B. NON-SCHEDULED ITEMS | ||||||
| 109 | No non-scheduled items in this section. | ||||||
| 110 | Sub-Total Cost (Non-Scheduled Items) - SANITARY SEWERAGE WORKS = | ||||||
| 111 | 3. STORM WATER DRAINAGE WORKS | ||||||
| 112 | GENERAL NOTE | ||||||
| 113 | Supply, installation, testing and commissioning of the following items of work, including all labour, tools, plant, accessories, etc. required for completion of each item as per specifications and as approved by the Engineer. | ||||||
| 114 | A. SCHEDULED ITEMS | ||||||
| 115 | 1-1 | Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor. (respective distance shall be used from the schedule) | Cft | 54325 | 464.55 | 100 | 252366.7875 |
| 116 | 2nd chain (2nd 30 m) | Cft | 54325 | 85.15 | 100 | 46257.7375 | |
| 117 | 3rd to 10th chain (60 to 300 m) | Cft | 434600 | 53.15 | 100 | 230989.9 | |
| 118 | 3-7 | Earthwork excavation in open cutting upto 5'-0" (1.5 m) depth for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead:- | |||||
| 119 | B) By Mechanical means | ||||||
| 120 | Ordinary | Cft | 34851.6 | 12934.25 | 1000 | 450779.3073 | |
| 121 | Hard | Cft | 2904.3 | 14060.05 | 1000 | 40834.603215 | |
| 122 | Very hard | Cft | 2904.3 | 15185.85 | 1000 | 44104.264155 | |
| 123 | gravel & shingle | Cft | 5808.6 | 21310.3 | 1000 | 123783.00858 | |
| 124 | 3-7 | 2) Earthwork excavation in open cutting 5.01 ft. (1.5 m) to 10.0 ft. (3.0 mm) depth for storm water channels, drains,sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works,shuttering and timbering the trenches, dressed to designedlevel and dimensions, trimming, removal of surface water from renches, back filling and surplus excavated material disposed of and dressed within 100 ft. (30 m) lead:- | |||||
| 125 | B) By Mechanical means | ||||||
| 126 | Ordinary | Cft | 2904.3 | 14060.05 | 1000 | 40834.603215 | |
| 127 | Hard | Cft | 2904.3 | 15748.75 | 1000 | 45739.094625 | |
| 128 | Very hard | Cft | 2904.3 | 17156 | 1000 | 49826.1708 | |
| 129 | gravel & shingle | Cft | 2904.3 | 25015.25 | 1000 | 72651.790575 | |
| 130 | 4-19 | (a) Dismantling cement concrete Plain 1:4:8 | Cft | 1500 | 8932.7 | 100 | 133990.5 |
| 131 | 4-20 | Dismantling cement concrete reinforced, separating reinforcement from concrete, cleaning and straightening the same. | Cft | 1000 | 29234.3 | 100 | 292343 |
| 132 | 6-5 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): | |||||
| 133 | h) Ratio 1:3:6 | Cft | 500 | 41542.3 | 100 | 207711.5 | |
| 134 | i) Ratio 1:4:8 | Cft | 3358 | 36029.5 | 100 | 1209870.61 | |
| 135 | 6-6 | Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- | |||||
| 136 | (a)(i) Reinforced cement concrete in roof slab, beams,columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects:- | ||||||
| 137 | (3) Type C (nominal mix 1: 2: 4) | Cft | 5729 | 773.55 | 1 | 4431667.95 | |
| 138 | (b)Reinforced cement concrete in retaining / Shear walls laid in situ or precast laid in position,o rprestressed members cast in situ (Formworkon both sides) , complete in all respects: | ||||||
| 139 | (3) Type C (nominal mix 1:2:4) | ||||||
| 140 | (i) Upto 9" thick (Avg) | Cft | 9097 | 742.45 | 1 | 6754067.65 | |
| 141 | (c) Reinforced cement concrete in Pile cap, slab of rafts / strip foundation, base slab of column and retaining walls; etc and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering) complete in all respects:- | ||||||
| 142 | (3) Type C (nominal mix 1: 2: 4) | Cft | 6937 | 618.1 | 1 | 4287759.7 | |
| 143 | 6-12 | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings,including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): | |||||
| 144 | (b) Deformed bars | ||||||
| 145 | (i) (Grade-40) | Cwt | 814.8 | 15315.25 | 1 | 12478865.7 | |
| 146 | (ii) (Grade-60) | Cwt | 349.2 | 15660.55 | 1 | 5468664.06 | |
| 147 | Sub-Total Cost (Scheduled Items) - STORM WATER DRAINAGE WORKS = | ||||||
| 148 | B. NON-SCHEDULED ITEMS | ||||||
| 149 | No non-scheduled items in this section. | ||||||
| 150 | Sub-Total Cost (Non-Scheduled Items) - STORM WATER DRAINAGE WORKS = | ||||||
| 151 | 4. WATER DISTRIBUTION SYSTEM | ||||||
| 152 | A. SCHEDULED ITEMS | ||||||
| 153 | SECTION - A | ||||||
| 154 | EARTH EXCAVATION | ||||||
| 155 | 03-43 | Earth work excavation in open cutting for water supply lines, sewers and manholes including backfilling, shuttering of wooden vertical planks, struts and beams, dressing to correct section and dimension according to templates and levels and removing surface water i/c back filling in all types of soil except shingle, gravel and rock, complete in all respect. 1) By Manual i) 0 ft. to 7.0 ft. (0 to 2.10 m) depth | 1000 Cft | 46.0992 | 17865.4 | 1 | 823580.64768 |
| 156 | SECTION - B | ||||||
| 157 | SAND FILING | ||||||
| 158 | 10-03 | Supplying and filling sand under floor; or plugging in wells. | 100 Cft | 72.4416 | 3556.7 | 1 | 257653.03872 |
| 159 | SECTION - C | ||||||
| 160 | HDPE PIPE | ||||||
| 161 | 23-30 | Providing, laying, cutting, jointing, testing and disinfecting High Density Polyethylene Pipe (HDPE-100) working presure pipe conforming to standard ISO 4427, DIN 8074 / 8075, PS 3580, Beta/ Dadex / Popular/ IIL or approved equivalent manufacturer, including the cost of specials, intrenches, as approved & directed by the Engineer incharge, complete in all respects c) PN-10 (SDR-17) | |||||
| 162 | 7) 90 mm | Rft | 3890 | 343.55 | 1 | 1336409.5 | |
| 163 | 8) 110 mm | Rft | 5290 | 510.05 | 1 | 2698164.5 | |
| 164 | 10) 160 mm | Rft | 303 | 1055.45 | 1 | 319801.35 | |
| 165 | SECTION - D | ||||||
| 166 | PLAIN CEMENT CONCRETE | ||||||
| 167 | 06-5 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): f) Ratio 1: 2: 4 | 100 Cft | 6 | 49085.5 | 1 | 294513 |
| 168 | SLUICE VALVE CHAMBER | ||||||
| 169 | SECTION - E | ||||||
| 170 | EARTHWORK & BACK FILLING | ||||||
| 171 | 03-43 | Earth work excavation in open cutting for water supply lines, sewers and manholes including backfilling, shuttering of wooden vertical planks, struts and beams, dressing to correct section and dimension according to templates and levels and removing surface water i/c back filling in all types of soil except shingle, gravel and rock, complete in all respect. | |||||
| 172 | By Mechanical Means | ||||||
| 173 | 0 ft. to 7.0 ft. (0 to 2.10 m) depth | ||||||
| 174 | Ordinary soil | 1000 Cft | 1.433 | 10168.7 | 1 | 14571.7471 | |
| 175 | SECTION - F | ||||||
| 176 | REINFORCEMENT | ||||||
| 177 | 06-11 | Fabrication of mildsteel reinforcement deformed bar cage of specified yield strength for R.C.C bored piles including cutting bending, lowering of cage with crane in position,welding and fastening, including the cost of binding wire, Cranemachine (also includes removal of rust from the bars) as approved and directed by the Engineer Incharge | |||||
| 178 | Deformed bars | ||||||
| 179 | Grade-40 | 100 Kg | 2.99 | 29352.9 | 1 | 87765.171 | |
| 180 | SECTION - G | ||||||
| 181 | PCC & RCC CONCRETE | ||||||
| 182 | 06-05 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): | |||||
| 183 | Ratio 1: 2: 4 | 100 Cft | 0.21 | 49085.5 | 1 | 10307.955 | |
| 184 | Ratio 1: 4: 8 | 100 Cft | 1.4 | 36029.5 | 1 | 50441.3 | |
| 185 | 06-06 | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- | |||||
| 186 | Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects:- | ||||||
| 187 | Ratio 1: 2: 4 | Cft | 82 | 773.55 | 1 | 63431.1 | |
| 188 | SECTION - H | ||||||
| 189 | BRICK MASONRY | ||||||
| 190 | 07-04 | Pacca brick work in foundation and plinth in:- | |||||
| 191 | Cement, sand mortar:- | ||||||
| 192 | Ratio 1:4 | 100 Cft | 5.46 | 42355.65 | 1 | 231261.849 | |
| 193 | SECTION - I | ||||||
| 194 | PLASTER WORK | ||||||
| 195 | 11-09 | Cement plaster 1:4 upto 20' (6.00 m) height:- | |||||
| 196 | ½" (13 mm) thick | 100 Sft | 5.83 | 4958.8 | 1 | 28909.804 | |
| 197 | ¾" (20 mm) thick | 100 Sft | 9.61 | 6641.3 | 1 | 63822.893 | |
| 198 | SECTION - J | ||||||
| 199 | MANHOLE COVER | ||||||
| 200 | 21-16 | Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. | Each | 10 | 11484 | 1 | 114840 |
| 201 | SECTION - K | ||||||
| 202 | VALVES | ||||||
| 203 | 23-42 | Providing and fixing heavy duty Gate valve of specified diameter and material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK), Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all accessories flanges,nut/bolt and gaskit where required complete in all respect as approved and directed by the Engineer Incharge (b) Flange Ended Ductile Iron Valve | |||||
| 204 | (viii) 3" dia | Each | 6 | 22852.6 | 1 | 137115.6 | |
| 205 | (ix) 4" dia | Each | 3 | 30780 | 1 | 92340 | |
| 206 | (xi) 6" dia | Each | 1 | 49893.6 | 1 | 49893.6 | |
| 207 | AIR VALVE CHAMBER | ||||||
| 208 | SECTION - L | ||||||
| 209 | EARTHWORK & BACK FILLING | ||||||
| 210 | 03-43 | Earth work excavation in open cutting for water supply lines, sewers and manholes including backfilling, shuttering of wooden vertical planks, struts and beams, dressing to correct section and dimension according to templates and levels and removing surface water i/c back filling in all types of soil except shingle, gravel and rock, complete in all respect. | |||||
| 211 | By Mechanical Means | ||||||
| 212 | 0 ft. to 7.0 ft. (0 to 2.10 m) depth | ||||||
| 213 | Ordinary soil | 1000 Cft | 0.43 | 10168.7 | 1 | 4372.541 | |
| 214 | SECTION - M | ||||||
| 215 | REINFORCEMENT | ||||||
| 216 | 06-11 | Fabrication of mildsteel reinforcement deformed bar cage of specified yield strength for R.C.C bored piles including cutting bending, lowering of cage with crane in position,welding and fastening, including the cost of binding wire, Cranemachine (also includes removal of rust from the bars) as approved and directed by the Engineer Incharge | |||||
| 217 | Deformed bars | ||||||
| 218 | Grade-40 | 100 Kg | 0.9 | 36029.5 | 1 | 32426.55 | |
| 219 | SECTION - N | ||||||
| 220 | PCC & RCC CONCRETE | ||||||
| 221 | 06-05 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): | |||||
| 222 | Ratio 1: 2: 4 | 100 Cft | 0.02 | 49085.5 | 1 | 981.71 | |
| 223 | Ratio 1: 4: 8 | 100 Cft | 0.42 | 36029.5 | 1 | 15132.39 | |
| 224 | 06-06 | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- | |||||
| 225 | Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects:- | ||||||
| 226 | Ratio 1: 2: 4 | Cft | 25 | 773.55 | 1 | 19338.75 | |
| 227 | SECTION - O | ||||||
| 228 | BRICK MASONRY | ||||||
| 229 | 07-04 | Pacca brick work in foundation and plinth in:- | |||||
| 230 | Cement, sand mortar:- | ||||||
| 231 | Ratio 1:4 | 100 Cft | 1.64 | 42355.65 | 1 | 69463.266 | |
| 232 | SECTION - P | ||||||
| 233 | PLASTER WORK | ||||||
| 234 | 11-09 | Cement plaster 1:4 upto 20' (6.00 m) height:- | |||||
| 235 | ½" (13 mm) thick | 100 Sft | 1.75 | 4958.8 | 1 | 8677.9 | |
| 236 | ¾" (20 mm) thick | 100 Sft | 2.88 | 6641.3 | 1 | 19126.944 | |
| 237 | SECTION - Q | ||||||
| 238 | VALVES | ||||||
| 239 | 23-42 | Providing and fixing heavy duty Gate valve of specified diameter and material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK) Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all accessories flanges,nut/bolt and gaskit where required complete in allrespect as approved and directed by the Engineer Incharge. (b) Flange Ended Ductile Iron Valve (ix) 4" dia | Each | 3 | 30780 | 1 | 92340 |
| 240 | 23-37 | Providing and fixing, air valve 2½ (65mm) dia of B.S.S. quality and weight (complete with jointing material). | |||||
| 241 | double | Each | 3 | 14405.2 | 1 | 43215.6 | |
| 242 | WASHOUT CHAMBER | ||||||
| 243 | SECTION - R | ||||||
| 244 | EARTHWORK & BACK FILLING | ||||||
| 245 | 03-43 | Earth work excavation in open cutting for water supply lines, sewers and manholes including backfilling, shuttering of wooden vertical planks, struts and beams, dressing to correct section and dimension according to templates and levels and removing surface water i/c back filling in all types of soil except shingle, gravel and rock, complete in all respect. | |||||
| 246 | By Mechanical Means | ||||||
| 247 | 0 ft. to 7.0 ft. (0 to 2.10 m) depth | ||||||
| 248 | Ordinary soil | 1000 Cft | 0.43 | 10168.7 | 1 | 4372.541 | |
| 249 | SECTION - S | ||||||
| 250 | REINFORCEMENT | ||||||
| 251 | 06-11 | Fabrication of mildsteel reinforcement deformed bar cage of specified yield strength for R.C.C bored piles including cutting bending, lowering of cage with crane in position,welding and fastening, including the cost of binding wire, Cranemachine (also includes removal of rust from the bars) as approved and directed by the Engineer Incharge | |||||
| 252 | Deformed bars | ||||||
| 253 | Grade-40 | 100 Kg | 0.84 | 29352.9 | 1 | 24656.436 | |
| 254 | SECTION - T | ||||||
| 255 | PCC & RCC CONCRETE | ||||||
| 256 | 06-05 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): | |||||
| 257 | Ratio 1: 2: 4 | 100 Cft | 0.11 | 49085.5 | 1 | 5399.405 | |
| 258 | Ratio 1: 4: 8 | 100 Cft | 0.42 | 36029.5 | 1 | 15132.39 | |
| 259 | 06-06 | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- | |||||
| 260 | Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects:- | ||||||
| 261 | Ratio 1: 2: 4 | Cft | 25 | 773.55 | 1 | 19338.75 | |
| 262 | SECTION - U | ||||||
| 263 | BRICK MASONRY | ||||||
| 264 | 07-04 | Pacca brick work in foundation and plinth in:- | |||||
| 265 | Cement, sand mortar:- | ||||||
| 266 | Ratio 1:4 | 100 Cft | 1.64 | 42355.65 | 1 | 69463.266 | |
| 267 | SECTION - V | ||||||
| 268 | PLASTER WORK | ||||||
| 269 | 11-09 | Cement plaster 1:4 upto 20' (6.00 m) height:- | |||||
| 270 | ½" (13 mm) thick | 100 Sft | 1.75 | 4958.8 | 1 | 8677.9 | |
| 271 | ¾" (20 mm) thick | 100 Sft | 2.88 | 6641.3 | 1 | 19126.944 | |
| 272 | SECTION - W | ||||||
| 273 | MANHOLE COVER | ||||||
| 274 | 21-16 | Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects. | Each | 3 | 11484 | 1 | 34452 |
| 275 | SECTION - X | ||||||
| 276 | VALVES | ||||||
| 277 | 23-42 | Providing and fixing heavy duty Gate valve of specified diameter and material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK), Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all accessories flanges,nut/bolt and gaskit where required complete in all respect as approved and directed by the Engineer Incharge (b) Flange Ended Ductile Iron Valve | |||||
| 278 | (viii) 3" dia | Each | 1 | 22852.6 | 1 | 22852.6 | |
| 279 | (ix) 4" dia | Each | 1 | 30780 | 1 | 30780 | |
| 280 | (xi) 6" dia | Each | 1 | 49893.6 | 1 | 49893.6 | |
| 281 | Sub-Total Cost (Scheduled Items) - WATER DISTRIBUTION SYSTEM = | ||||||
| 282 | B. NON-SCHEDULED ITEMS | ||||||
| 283 | REF. SPECS. NO. 5216 | ||||||
| 284 | SECTION - Y | ||||||
| 285 | HOUSE CONNECTION | ||||||
| 286 | NSI-01 | Providing, laying and Testing House/Service connection, Comprising of saddle clamp of Specified Dia, 32mm Dia male threaded adapter, 32mm Dia equal tee, 32mm Dia HDPE pipe piece with 32mm Dia end cap etc, complete in all respects and as approved by the Engineer. (Excavation, backfilling and carriage of surplus materials will be paid separately) Connection from 110mm dia pipe | No. | 25 | 7880 | 1 | 197000 |
| 287 | NSI-02 | Providing, laying and Testing House/Service connection, Comprising of saddle clamp of Specified Dia, 32mm Dia male threaded adapter, 32mm Dia equal tee, 32mm Dia HDPE pipe piece with 32mm Dia end cap etc, complete in all respects and as approved by the Engineer. (Excavation, backfilling and carriage of surplus materials will be paid separately) Connection from 90mm dia pipe | No. | 30 | 8025 | 1 | 240750 |
| 288 | Sub-Total Cost (Non-Scheduled Items) - WATER DISTRIBUTION SYSTEM = | ||||||
| 289 | 5. ELECTRIC BOQ (STREET LIGHTING) | ||||||
| 290 | GENERAL NOTES: | ||||||
| 291 | SCOPE : (Applicable to all sections) | ||||||
| 292 | Supply, installation, testing and commissioning of the following items of work, including all labour, tools, plant, accessories, etc. required for completion of each item as per specifications and as approved by the Engineer. | ||||||
| 293 | A. SCHEDULED ITEMS | ||||||
| 294 | 24-70 | Supplying, installation and commissioning of LED Luminaries (street lights) of specified wattage and lumens conforming to IP 66 & IK 08 or above, Philips/Osram/Thorn or approved equivalent manufacturer with corrosion resistant die casted Aluminum housing, silicon gasket in special groove, f1 rated polycarbonate optic complete with LED Chip (Philips Lumiled/Cree/Nichia/Osram make or equivalent approved manufacturer), programmable LED driver (Harvard/TCI/Lumotech/Philips/VOSSLOH Schwabe/Lightech make or approved equivalent manufacturer), minimum 10kv surge protection rating device i/c the cost of all accessories/components required for proper operation, fully flexible for future upgradation and easy replacements for maintenance purposes, i/c bucket elevator charges as approved and directed by the Engineer Incharge. | |||||
| 295 | 140 Lm/Watt | ||||||
| 296 | 60 Watt with 8400 lumens | Each | 85 | 41643 | 1 | 3539655 | |
| 297 | LT CABLES | ||||||
| 298 | 24-15 | Supply and erection of PVC insulated, PVC Sheathed flexible copper conductor cables, in prelaid PVCpipe/MS conduit/GI pipe/wooden strip batten/wooden casing an capping/G.I. wire/trenches (rate for cables only):- | |||||
| 299 | Flexible 3 core, 600/1000 volt non armoured cable: | ||||||
| 300 | 1.5mm sq (3/0.029") | Rft | 2620 | 131.75 | 1 | 345185 | |
| 301 | PVC Conduit | ||||||
| 302 | Providing, laying, testing and commissioning µ-PVC Un (plasticized Polyvinyl Chloride) Pressure pipe of nominal diameter, conforming to PS- 3051/BS-3505, Dadex/Popular / Beta or approved equivalent manufacturer, i/c the cost of solvent and specials complete. As approved and directed by the Engineer Incharge. a) Class D | ||||||
| 303 | (iii) | 2" | Rft | 730 | 242 | 1 | 176660 |
| 304 | (v) | 4" | Rft | 292 | 855 | 1 | 249660 |
| 305 | Earth for poles | ||||||
| 306 | 24-118 | Providing, making & testing/commissioning of Rod type Earth point comprising of 5/8" dia. (16 mm dia) 10 ft long copper coated M.S. rod driven in ground duly fixed with clamp with Tinned earth test link copper plate (300x50x10mm), i/c the cost of brass nuts,spacers, bolts washers lugs etc but excluding the cost of copper strand & manhole. as approved and directed by Engineer Incharge (Rod Type Earthing). | Each | 85 | 21210.95 | 1 | 1802930.75 |
| 307 | Sub-Total Cost (Scheduled Items) - ELECTRIC BOQ (STREET LIGHTING) = | ||||||
| 308 | B. NON-SCHEDULED ITEMS | ||||||
| 309 | LT DISTRIBUTION BOARD | ||||||
| 310 | (Ref. Spec. 8001 , 8133) | ||||||
| 311 | LT 415V AC weather proof DBs shall be made from 14 SWG sheet steel and LT 415V AC indoor DBs shall be made from 16 SWG sheet steel. These shall be designed, fabricated and manufactured as a free standing floor type and recessed / surface mounted on wall (as per single line diagram shown on drawings). The sheet metal work shall be cleaned down to bare shining metal degreased, derusted and painted with TWO base coats of antirust RED paint. The sheet metal work shall be finished in TWO coats of powder paint. The color and shade shall be as approved by the Engineer. The distribution Board shall be complete with all internal wirings, tags, identification labels, TPN and E copper busbars,Energy analyzer accessories etc. The DB should be provided with the armored glands. The bus-bars shall be insulated in RED, YELLOW, BLUE and BLACK insulations. The insulation shall be heat shrinkable type or as directed by the Engineer. | ||||||
| 312 | NS-01 | Light Control Panel (LCP) including MCCB, MCB, Panel Photocell timer, MC Outdoor type | Job | 2 | 200000 | 1 | 400000 |
| 313 | STREET LIGHT POLE | ||||||
| 314 | (Ref. Spec. 8001, 8262) | ||||||
| 315 | Supplying, installation testing and commissioning of Octagonal shape electric street light pole, made of hot dipped 4.5 mm thick galvanized steel, tappered from bottom and top, with arm for luminaire installation, duly G.I.welded with base plate with the help of 4 no triangular stiffeners of GI sheet, with built in junction box with shutter, i/c the cost of nuts & J-rag bolts, duly fixed in concrete foundation,including price of concrete foundation as per drawings and as approved by the Engineer In charge. | ||||||
| 316 | NS-02 | 6 Meter height Single Arm | Job | 85 | 100000 | 1 | 8500000 |
| 317 | LT CABLES | ||||||
| 318 | (Ref. Spec. 8001, 8212) | ||||||
| 319 | NS-03 | Supply and erection of Four core PVC insulated, PVC sheathed Aluminium conductor, 600/1000 volts grade cable, in prelaid G.I. pipe/M.S. conduits/ PVC pipe/G.I. wire/trenches, etc (rate for cable only): | |||||
| 320 | i) | Four core armoured cable: 16mm sq | Rft | 1460 | 410 | 1 | 598600 |
| 321 | ii) | Four core armoured cable: 25mm sq | Rft | 13200 | 510 | 1 | 6732000 |
| 322 | CIVIL WORKS | ||||||
| 323 | NS-04 | Trench Excavation and backfill with sand refilling and brick laying,compacting etc for LT cable as approved by the Engineer. | Cft | 40000 | 35 | 1 | 1400000 |
| 324 | NS-05 | Construction of Road Crossing for LT complete in all respects as per WAPDA standards. | No. | 10 | 10000 | 1 | 100000 |
| 325 | Sub-Total Cost (Non-Scheduled Items) - ELECTRIC BOQ (STREET LIGHTING) = | ||||||
| 326 | 6. HT & LT | ||||||
| 327 | GENERAL NOTES: | ||||||
| 328 | Design, fabrication, manufacturing, supply installation, testing and commissioning of the following BOQ items of work (unless stated elsewhere/otherwise), including all material, labours, plants, tools, accessories etc. as required for proper completion of each item per technical specifications of the tender documents & WAPDA specifications, drawings/typical details of the tender documents and as per instructions of Engineer. NOTE: (The contractor/client shall obtain the demand notice from IESCO prior to commencement of the works). | ||||||
| 329 | A. SCHEDULED ITEMS | ||||||
| 330 | HT CABLES (8.7/15 kV) | ||||||
| 331 | 24-14 | Supply laying, testing and commissioning of Single Core XLPE Cross linked polyethelene) insulated stranded Aluminium Conductor cable of 8.7/15 KV grade made of Pakistan Cable/Newage with Semiconducting tape screened, Copper tape screen, PVC filler binder, Extruded PVC sheath in trenches/prelaid pipes as per Wapda specifications i/c the cost of ties and cable identification tags (rate for cables only): | |||||
| 332 | (b) | Armoured Cable | |||||
| 333 | vii) | 240mm sq. | Rft | 1460 | 1300.55 | 1 | 1898803 |
| 334 | 24-13 | Supply, installation, testing, commissioning and termination of 8.7/ 15kV, AL/XLPE/UA/PVC three Core (MV cables) of Pakistan cables / Newage or approved equivalent along with cable glands, in already installed cable trench / cable ladder / cable tray / duct bank. | |||||
| 335 | (b) | Armoured Cable | |||||
| 336 | iv) | 120mm sq. | Rft | 2920 | 3014.6 | 1 | 8802632 |
| 337 | 23-15 | Providing, laying, testing and commissioning µ-PVCUn (plasticized Polyvinyl Chloride) Pressure pipe of nominal diameter, conforming to PS- 3051/BS-3505, Dadex/Popular / Beta or approved equivalent manufacturer, i/c the cost of solvent and specials complete. As approved and directed by the Engineer Incharge . a) Class D | |||||
| 338 | (iii) 2" | Rft | 730 | 242.25 | 1 | 176842.5 | |
| 339 | (v) 4" | Rft | 730 | 855.15 | 1 | 624259.5 | |
| 340 | 23-20 | Providing, laying, cutting, jointing, testing and disinfecting Asbestos Cement / Fibre Cement pipe line in trenches, with comet joint and rubber ring, complete in all respects:- | |||||
| 341 | B Class Working Pressure | ||||||
| 342 | i) 3" i/d (75 mm) | Rft | 2190 | 278.2 | 1 | 609258 | |
| 343 | Sub-Total Cost (Scheduled Items) - HT & LT = | ||||||
| 344 | B. NON-SCHEDULED ITEMS | ||||||
| 345 | HT SYSTEM | ||||||
| 346 | NS-01 | Supply, Installation, testing and commissioning of MV termination kit for 1 core 240 mm2 Aluminum conductor 8.7/15 kV cable . | No. | 6 | 31255 | 1 | 187530 |
| 347 | NS-02 | Supply, Installation, testing and commissioning of MV joint kit for 1 core 240 mm2 Aluminum conductor 8.7/15 kV cable. | No. | 3 | 32910 | 1 | 98730 |
| 348 | NS-03 | Supply, Installation, testing and commissioning of MV termination kit for 3 core 120 mm2 (3 core 4/0 AWG Aluminum conductor 8.7/15 kV . | No. | 36 | 31255 | 1 | 1125180 |
| 349 | NS-04 | Supply, Installation, testing and commissioning of MV joint kit for 3 core, 4/0 AWG 8.7/15 kV Aluminum conductor cable | No. | 6 | 32910 | 1 | 197460 |
| 350 | TRANSFORMERS | ||||||
| 351 | NS-05 | Outdoor type 200KVA, three phase, 11/0.415 kV Pad mounted transformer with LT & HT Compartments. The complete unit shall be designed, fabricated commissioned as per latest WAPDA's technical specifications. | No. | 5 | 3687500 | 1 | 18437500 |
| 352 | NS-06 | Outdoor type 100KVA, three phase, 11/0.415 kV Pad mounted transformer with LT & HT Compartments.The complete unit shall be designed, fabricated commissioned as per latest WAPDA's technical specifications ( for street light) | No. | 1 | 2056150 | 1 | 2056150 |
| 353 | NS-07 | Earthing set complete including ground conductor (10mm standard GI wire) Clamps, MS Galvanized earth rod 10ftx5/8" and earth rod clampetc.obtain the specified earth resistance ,as per requirement,specifiactions and approval of Engineer In Charge. The earthing shall be carried out as per WAPDA Standards. | |||||
| 354 | Galvanized Steel Wire 10mm (10kg per earth) | Kg | 60 | 657 | 1 | 39420 | |
| 355 | Earth Rod | No. | 12 | 3703 | 1 | 44436 | |
| 356 | LT CABLES | ||||||
| 357 | NS-08 | Supply, installation, testing and commissioning of 4-core 37/083 PVC/PVC Aluminium conductor cable to be buried in ground from Transformer to feeder pillars. | Rft | 7290 | 1946 | 1 | 14186340 |
| 358 | NS-09 | Lugs for LT Cables (4/c) 37/083 PVC/PVC Aluminium conductor | No. | 180 | 503 | 1 | 90540 |
| 359 | LV FEEDER PILLARS | ||||||
| 360 | NS-10 | LV feeder pillars/Service Box for LV distribution system. The LV feeder pillar consists of connectors, insulators, busbars, thimbles, etc. The LV Feeder Pillars shall be completely designed, fabricated, manufactured and installed as per WAPDA's technical specifications and standards. | Job | 43 | 125000 | 1 | 5375000 |
| 361 | NS-11 | Earthing set complete including ground conductor (10mm standard GI wire) Clamps, MS Galvanized earth rod 10ftx5/8" and earth rod clamp etc.obtain the specified earth resistance ,as per requirement,specifiactions and approval of Engineer In Charge. The earthing shall be carried out as per WAPDA Standards. | |||||
| 362 | Galvanized Steel Wire 10mm (10kg per earth) | Kg | 430 | 657 | 1 | 282510 | |
| 363 | Earth Rod | No. | 43 | 3703 | 1 | 159229 | |
| 364 | CIVIL WORKS | ||||||
| 365 | NS-12 | Foundation For Transformer including all types of civil works as per WAPDA Standards | Job | 6 | 120000 | 1 | 720000 |
| 366 | NS-13 | Foundation For Feeder Pillar including all types of civil works as per WAPDA Standards | Job | 43 | 7000 | 1 | 301000 |
| 367 | NS-14 | Trench Excavation and backfill with sand refilling and brick laying,compacting etc for HT cable as per WAPDA standards Size (2x4)ft | Rft | 5000 | 400 | 1 | 2000000 |
| 368 | NS-15 | Trench Excavation and backfill with sand refilling and brick laying,compacting etc for LT cable as per WAPDA standards Size (1.5x2.5)ft | Rft | 5000 | 200 | 1 | 1000000 |
| 369 | NS-16 | Main Hole Size 2x2x4 ft with Bottom slab and top RCC Cover,with plaster complete in all respects as per WAPDA standards | No. | 5 | 25000 | 1 | 125000 |
| 370 | NS-17 | Main Hole Size 4x6x4ft with Bottom slab and top RCC Cover,with plaster complete in all respects as per WAPDA standards. | No. | 10 | 50000 | 1 | 500000 |
| 371 | NS-18 | Construction of Gate Crossing for LT cables including conduit complete in all respects as per WAPDA standards. | No. | 49 | 8000 | 1 | 392000 |
| 372 | NS-19 | Construction of Road Crossing for HT cables complete in all respects as per WAPDA standards. | No. | 5 | 15000 | 1 | 75000 |
| 373 | NS-20 | Construction of Road Crossing for LT cables complete in all respects as per WAPDA standards. | No. | 10 | 10000 | 1 | 100000 |
| 374 | CONSULTANCY SERVICES - DESIGN BOOK, IESCO APPROVAL & HANDING OVER | ||||||
| 375 | NS-21 | Preparation and submission of Design Book for external electrification of the project. Ref: Consultancy quotation No. MEPCE_Quote_PL_311026_01 dated 31-10-2026 submitted to the Director in Chief, National Police Foundation, Islamabad, for 'Consultancy Services for Design Book of External Electrification, IESCO Approval and Handing Over of the Built-up System' (ICT Homes and associated infrastructure). Scope: site survey; load assessment as per NEPRA/IESCO criteria; analysis of 11 kV feeders emanating from the nearby 132 kV grid station; preparation of Bill of Quantities, cost estimate, technical drawings and single line diagram; compilation of the design book and its submission to the Client for vetting by the Client's technical team. Deliverable: complete design book in hard and soft copy (drawings in AutoCAD format). Paid as a lump sum for the stated deliverables; the quoted fee is exclusive of applicable taxes, which shall be paid at prevailing rates against valid invoices. IESCO cost deposits (capital cost, security, design vetting, bank guarantee, transmission line study and supervision charges) are NOT included and will be paid separately to IESCO. Payment shall be released only against submission and acceptance of the stated deliverables, as per the work order issued by the Client. | Job | 1 | 800000 | 1 | 800000 |
| 376 | NS-22 | Vetting of the Purchase Orders for electrical material from IESCO. Ref: Consultancy quotation No. MEPCE_Quote_PL_311026_01 dated 31-10-2026 submitted to the Director in Chief, National Police Foundation, Islamabad, for 'Consultancy Services for Design Book of External Electrification, IESCO Approval and Handing Over of the Built-up System' (ICT Homes and associated infrastructure). Scope: assistance to the Client in preparation of purchase orders for procurement of material; submission of the purchase orders to IESCO for vetting; follow-up with IESCO until vetting; and obtaining the IESCO vetting letter. Deliverable: IESCO vetting letter for the purchase orders. Paid as a lump sum for the stated deliverables; the quoted fee is exclusive of applicable taxes, which shall be paid at prevailing rates against valid invoices. IESCO cost deposits (capital cost, security, design vetting, bank guarantee, transmission line study and supervision charges) are NOT included and will be paid separately to IESCO. Payment shall be released only against submission and acceptance of the stated deliverables, as per the work order issued by the Client. | Job | 1 | 600000 | 1 | 600000 |
| 377 | NS-23 | Coordination and follow-up with IESCO for approval of the Design Book. Ref: Consultancy quotation No. MEPCE_Quote_PL_311026_01 dated 31-10-2026 submitted to the Director in Chief, National Police Foundation, Islamabad, for 'Consultancy Services for Design Book of External Electrification, IESCO Approval and Handing Over of the Built-up System' (ICT Homes and associated infrastructure). Scope: processing the case in the office of Chief Engineer (P&E) IESCO; joint survey with the IESCO team for briefing on the site and location of the proposed grid station; vetting of the design book by IESCO; preparation of responses to technical queries raised by IESCO till issuance of the demand notice; processing for issuance of the demand notice; and assistance in submission of payment of demand notices / security deposits to Finance Director IESCO, Islamabad. Deliverable: IESCO design approval and demand notice. Paid as a lump sum for the stated deliverables; the quoted fee is exclusive of applicable taxes, which shall be paid at prevailing rates against valid invoices. IESCO cost deposits (capital cost, security, design vetting, bank guarantee, transmission line study and supervision charges) are NOT included and will be paid separately to IESCO. Payment shall be released only against submission and acceptance of the stated deliverables, as per the work order issued by the Client. | Job | 1 | 1500000 | 1 | 1500000 |
| 378 | NS-24 | Coordination and follow-up with IESCO for handing over of the built-up system. Ref: Consultancy quotation No. MEPCE_Quote_PL_311026_01 dated 31-10-2026 submitted to the Director in Chief, National Police Foundation, Islamabad, for 'Consultancy Services for Design Book of External Electrification, IESCO Approval and Handing Over of the Built-up System' (ICT Homes and associated infrastructure). Scope: preparation of as-built drawings; preparation of the completion report as per IESCO requirements; submission of the design book to IESCO for handing over; follow-up for formation of the IESCO technical committee; supervision of the joint site visit with the IESCO technical team for taking over; and follow-up for submission of the technical report and issuance of the handing over letter. Deliverable: IESCO handing over letter for the built-up system. Work shall be executed through an IESCO approved contractor. Paid as a lump sum for the stated deliverables; the quoted fee is exclusive of applicable taxes, which shall be paid at prevailing rates against valid invoices. IESCO cost deposits (capital cost, security, design vetting, bank guarantee, transmission line study and supervision charges) are NOT included and will be paid separately to IESCO. Payment shall be released only against submission and acceptance of the stated deliverables, as per the work order issued by the Client. | Job | 1 | 1500000 | 1 | 1500000 |
| 379 | Sub-Total Cost (Non-Scheduled Items) - HT & LT = | ||||||
| 380 | 7. LANDSCAPING & HORTICULTURE WORKS | ||||||
| 381 | GENERAL NOTES: | ||||||
| 382 | Landscaping and horticulture works for the whole project area (road verges, medians, open spaces, parks, building surroundings and boundary strips), including supply of all plants, topsoil, manure, fertilizers, pesticides, water, labour, tools, plant and transport, complete in all respects as per the landscape drawings, approved plant schedule and directions of the Engineer. All plants shall be healthy, nursery-grown, true to species and size, and shall be maintained by the Contractor until the end of the establishment period; dead or failed plants shall be replaced at the Contractor's cost. | ||||||
| 383 | A. SCHEDULED ITEMS | ||||||
| 384 | No scheduled items in this section. | ||||||
| 385 | Sub-Total Cost (Scheduled Items) - LANDSCAPING & HORTICULTURE | ||||||
| 386 | B. NON-SCHEDULED ITEMS | ||||||
| 387 | SOIL PREPARATION | ||||||
| 388 | NS-01 | Supplying, spreading and levelling imported fertile sandy-loam topsoil mixed with well-rotted farmyard manure (FYM) in the ratio 3:1, 6" (150 mm) average thickness, over lawns, plant beds, medians and road verges, including removal of stones/debris, fine grading and dressing to the required levels and slopes as directed by the Engineer. | Cft | 70000 | 90 | 1 | 6300000 |
| 389 | TURFING | ||||||
| 390 | NS-02 | Supplying and planting approved variety lawn grass (Korean / Mexican grass) in rolled turf or plugs at maximum 4" (100 mm) c/c over prepared ground, including top-dressing, rolling, initial watering, fertilizer application and weeding until the grass is fully established and covers the entire area. | Sft | 120000 | 45 | 1 | 5400000 |
| 391 | TREES, PALMS & PLANTS | ||||||
| 392 | NS-03 | Supplying and planting evergreen/shade trees (Neem, Ashoka, Arjun, Jamun, Sukh Chain or equivalent), 8 ft to 10 ft (2.4 m to 3.0 m) height, in pits 3 ft x 3 ft x 3 ft (0.9 m) filled with topsoil and FYM, including staking, watering and 3 months guarantee against failure. | Each | 350 | 4500 | 1 | 1575000 |
| 393 | NS-04 | Supplying and planting ornamental palms (Washingtonia, Date or Queen palm), 8 ft to 10 ft (2.4 m to 3.0 m) clear trunk height, in prepared pits including soil mixture, staking, anti-termite treatment and watering, complete in all respects. | Each | 72 | 15000 | 1 | 1080000 |
| 394 | NS-05 | Supplying and planting ornamental/flowering shrubs and hedge plants (Bougainvillea, Duranta, Hibiscus, Oleander, Ixora or equivalent), 2 ft to 3 ft (0.6 m to 0.9 m) height, in continuous hedges and shrub beds at specified spacing, including soil preparation, watering and trimming to shape. | Each | 4800 | 450 | 1 | 2160000 |
| 395 | NS-06 | Providing seasonal flower beds and groundcover plantation (Lantana, Vinca, Portulaca, Marigold or equivalent), including bed preparation with topsoil and manure, planting at specified spacing, mulching and watering. | Sft | 18000 | 120 | 1 | 2160000 |
| 396 | NS-07 | Providing and fixing galvanized MS tree guards/stakes with ties for newly planted trees, 6 ft (1.8 m) height, painted with two coats of enamel paint over primer, including fixing in ground. | Each | 350 | 1500 | 1 | 525000 |
| 397 | ESTABLISHMENT & MAINTENANCE | ||||||
| 398 | NS-08 | Maintenance of the entire landscaped area for six (06) months after planting, including regular watering, mowing, weeding, pruning, fertilizing, pest control, replacement of failed plants and keeping the area clean, as directed by the Engineer. | Job | 1 | 800000 | 1 | 800000 |
| 399 | Sub-Total Cost (Non-Scheduled Items) - LANDSCAPING & HORTICULTURE | ||||||
| 401 | 8. HOUSES (4 Nos.) | ||||||
| 402 | I. CIVIL WORKS | ||||||
| 403 | A. SCHEDULED ITEMS | ||||||
| 404 | 03-21 | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming lead upto one chain (30 m) lift upto 5 ft (1.5m) 2) a) By Excavator (iii) Hard soil or Soft murum | 1000 Cft | 39.04 | 12788.2 | 1 | 499251.328 |
| 405 | 03-15 | Filling, watering and ramming earth under floors. i) with surplus earth from foundation, etc. | 1000 Cft | 27.56 | 8155.5 | 1 | 224765.58 |
| 406 | ii) | ii) With new earth excavated from outside lead upto one chain (30 m). | 1000 Cft | 10.2 | 17545.5 | 1 | 178964.1 |
| 407 | 03-54 | Compaction of natural ground | 1000 Sft | 9.86 | 3479.6 | 1 | 34308.856 |
| 408 | 06-05 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate) including all lead and lift. Ratio 1:2:4 | 100 Cft | 8.36 | 49107.58 | 1 | 410539.3688 |
| 409 | 06-05 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate) including all lead and lift. Ratio 1:3:6 | 100 Cft | 2.52 | 41565.38 | 1 | 104744.7576 |
| 410 | 06-05 | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate) including all lead and lift. Ratio 1:4:8 | 100 Cft | 70.2 | 36053.08 | 1 | 2530926.216 |
| 411 | 06-06 | Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.). a.) (i) Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects. including all lead and lift. (2) Type B (nominal mix 1:1½: 3) | Per Cft | 14752 | 874.23 | 1 | 12896640.96 |
| 412 | 06-06 | Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.). a.) (i) Reinforced cement concrete in roof slab, beams, columns lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects. including all lead and lift. (3) Type C (nominal mix 1: 2: 4) | Per Cft | 248 | 795.63 | 1 | 197316.24 |
| 413 | 06-06 | Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.). (b) (ii) Reinforced cement concrete in retaining/ Shear walls laid in situ or precast laid in position, or prestressed members cast in situ (Formwork on both sides) , complete in all respects:including all lead and lift. (2) Type B (nominal mix 1:1-1/2:3) (i) Upto 9" thick (Avg) | Per Cft | 2228 | 840.73 | 1 | 1873146.44 |
| 414 | 06-06 | Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.). (c) (iii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and footing beams, other structural members other than those mentioned in 6(a) (i)&(ii) above not requiring form work (i.e. horizontal shuttering) complete in all respects:- including all lead and lift. (2) Type B (nominal mix 1: 1½: 3) | Per Cft | 5096 | 718.58 | 1 | 3661883.68 |
| 415 | 06-12 | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars). (b) Deformed bars i) Grade-40 | 100kg | 468.4 | 30148.15 | 1 | 14121393.46 |
| 416 | 06-32 | Providing and embedding 10" (250mm) wide PVC water stopper in expansion joints of RCC structures (Retaining walls, water tanks, Slabs) complete in all respect. ii) 10 mm thick | Rft | 328 | 816 | 1 | 267648 |
| 417 | 06-37 | Providing and laying damp proof course of cement concrete 1:2: 4(using cement, sand and shingle), including bitumen coating :- (b) with 2 coats of bitumen: ii) 2" thick (50 mm) | 100Sft | 9.72 | 14064.3 | 1 | 136704.996 |
| 418 | 07-04(i) | Pacca brick work in 1:4 C/S mortar in foundation and upto plinth top:- | 100Cft | 77.76 | 42355.65 | 1 | 3293575.344 |
| 419 | 07-05 (i) | Pacca brick work in 1:4 C/S mortar in Ground floor | 100 Cft | 235.28 | 43384.35 | 1 | 10207469.868 |
| 420 | 07-06-i | Pacca brick work in 1:4 C/S mortar.'Add extra labour on item No. 5 for brickwork in (i) first floor:- | 100 Cft | 99.76 | 1793.45 | 1 | 178914.572 |
| 421 | 09-15 | Khuras on roof 2'x2'x6" (600 x 600 x 150 mm) | Each | 24 | 1240.85 | 1 | 29780.4 |
| 422 | 09-35 (iii) | Providing and laying roof insulation, comprising of single layer of tiles 9"x4½"x1½" (225x113x40 mm) grouted with cement sand mortar 1:3 laid over 2" (50 mm) thick earth (including mud plaster) over thermopore sheet, over polythene sheet 300 gauge over a layer of bitumen, complete in all respects:- iii) Thermopore sheet 1" (25 mm) thick | 100 Sft | 80.12 | 18654.85 | 1 | 1494626.582 |
| 423 | 09-46 | Providing and applying torch-on plain water proofing bitumenous membrane of specified thickness (made of Roof-Grip/ Euro Bit) duly lapped/connected by heating with Torch over ps-6 primer i/c preparation/smoothen the surface complete in all respect as approved and directed by the Engineer Incharge a) Plain i) 3 mm thick | Per Sft | 8012 | 126.35 | 1 | 1012316.2 |
| 424 | 09-51 | P/L false ceiling comprising of 5/8" thick plaster of paris sheet of required size in approved design with one line of 6" wide niche all around , hanging with Copper wire (16 SWG) duly enriched with POP and flaxen i/c the cost of making space for rope light/screws/jute/making holes for lights and rawal plugs complete in all respects as approved and directed by the Incharge.(Measurement will be made as per carpet Area). | Per Sft | 10292 | 130.9 | 1 | 1347222.8 |
| 425 | 06-02 | Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge. | 100Cft | 51.16 | 14076.5 | 1 | 720153.74 |
| 426 | 10-14 | Cement concrete tiles laid in 1:2 cement mortar, over 3/4" (20 mm) thick bed of cement mortar 1:2:- (a) 12"x12"x1" (300 x 300 x 25 mm) | 100 Sft | 10.8 | 21784.9 | 1 | 235276.92 |
| 427 | 10-25 | Rubbing and polishing old grit/ mosaic floor, including repairing voids, uneven surface, complete in all respects b) New Grit / Mosaic Floor | 100 Sft | 103.76 | 4838.65 | 1 | 502058.324 |
| 428 | 10-34 | Mosaic dado or skirting with one part of cement and marble powder in the ratio of 3:1 and two parts of marble chips, laid over ½"(13 mm) thick cement plaster 1:3, including rubbing and polishing, complete with finishing: (a) using grey cement: i) 1/2"(13 mm) thick | 100 Sft | 25.32 | 20227.25 | 1 | 512153.97 |
| 429 | 10-35 | Providing and laying superb quality Porcelain glazed tiles of Master/ Stile brand or approved equivalent manufacturer, skirting/dado of specified size, Color and Shade with adhesive/ bond over 1/2"thick (1:2) cement plaster i/c the cost of and sealer for finishing the joints, cutting grinding complete in all respect as approved and directed by the Engineer Incharge a) Full body Glazed tiles (iii) 600mm x 600 mm (24"x24") | Per Sft | 10392 | 459.75 | 1 | 4777722 |
| 430 | 10-35 | Providing and laying superb quality Porcelain glazed tiles of Master/ Stile brand or approved equivalent manufacturer, skirting/dado of specified size, Color and Shade with adhesive/ bond over 1/2"thick (1:2) cement plaster i/c the cost of and sealer for finishing the joints, cutting grinding complete in all respect as approved and directed by the Engineer Incharge a) Full body Glazed tiles (iv) 600mmx 1200 mm (24"x48") | Per Sft | 3104 | 510.15 | 1 | 1583505.6 |
| 431 | 10-38 | Providing and laying 1" thick terrazo tile for specified colour & size full body, best quality with minimum 5000 PSI in approved design with adhesive bond over 3/4" thick 1:3 cement plaster i/c the cost of sealer for finishing the joints i/c cutting, grinding, rubbing, filling Complete in all respect as approved and directed by the Engineer incharge. (Without Polishing) b) Size 24"x24"x1" ii) Coloured | Sft | 10376 | 451.45 | 1 | 4684245.2 |
| 432 | 10-46 | Providing and laying superb quality Porcelain glazed tiles flooring of Master/ Stile brand or approved equivalent manufacturer of specified size in approved design,Color and Shade with adhesive/bond over 3/4"thick (1:3) cement plaster i/c the cost of sealer for finishing the joints i/c cutting grinding complete in all respect as approved and directed by the Engineer Incharge. a) Full body Glazed tiles (iii) 600mm x 600 mm (24"x24") | Per Sft | 1948 | 459.6 | 1 | 895300.8 |
| 433 | 10-46 | Providing and laying superb quality Porcelain glazed tiles flooring of Master/ Stile brand or approved equivalent manufacturer of specified size in approved design,Color and Shade with adhesive/bond over 3/4"thick (1:3) cement plaster i/c the cost of sealer for finishing the joints i/c cutting grinding complete in all respect as approved and directed by the Engineer Incharge. a) Full body Glazed tiles (iv) 600mmx 1200 mm (24"x48") | Per Sft | 11828 | 510 | 1 | 6032280 |
| 434 | 10-48 | Providing and laying 3/4" thick full width Prepolished Marble slab for Vanities / Shelves / Treads/Risers/Window Cills , having Uniform texture (Spotless) with adhesive bond over 3/4" thick (1:2) cement sand mortor i/c the cost of matching sealer complete in all respects as approved and directed by the Engineer Incharge i) 3/4" thick China Verona | Per Sft | 1344 | 642.5 | 1 | 863520 |
| 435 | 10-50 | Extra for Bevelling charges of marble edge in approved design complete in all respects i/c the cost of Carborandam disc as approved and directed by the Engineer Incharge. | Per Rft | 552 | 39.9 | 1 | 22024.8 |
| 436 | 10-51 | Extra cost for making hole in Marble slab for fixtures, Sink,burners,basin Vanities i/c cost of bevelling of internal edge as approved and directed by the Engineer Incharge. | Each | 28 | 980.7 | 1 | 27459.6 |
| 437 | 10-47 | Providing and laying Marble flooring / Skirting of required size and specified thickness, with adhesive bond over 3/4" thick bedding of (1:2) cement sand mortor i/c the cost of matching sealer,cutting,grinding and chemical polishing, complete in all respect as approved and directed by the Engineer Incharge. viii) China Verona uniform texture (Spotless) 3/4" thick (size 12"x24"/12"x36") | Per Sft | 176 | 539.3 | 1 | 94916.8 |
| 438 | 10-19 | Extra labour for each storey above ground, for mosaic, conglomerate, tiles, stone and wooden floor.(First floor) | 100 Sft | 116 | 1218.1 | 1 | 141299.6 |
| 439 | 11-9(b) | Cement plaster 1:4 upto 20' (6.00 m) height: b) ½" (13 mm) thick | 100 Sft | 319.68 | 4958.8 | 1 | 1585229.184 |
| 440 | 11-9(c) | Cement plaster 1:4 upto 20' (6.00 m) height: c) ¾" (20 mm) thick | 100 Sft | 229.92 | 6641.3 | 1 | 1526967.696 |
| 441 | 11-29 | Extra for lime, mud or cement plaster and pointing from 20' (6.00 m) and above for each additional 10' (3.00 m) height or part thereof. (20'~30') | 100 Sft | 70 | 659.45 | 1 | 46161.5 |
| 442 | 11-12 | Cement plaster 3/8" (10 mm) thick under soffit of R.C.C.roof slabs only, upto 20' height. b) 1:3 | 100 Sft | 49.08 | 5676.55 | 1 | 278605.074 |
| 443 | 11-29 | Extra for lime, mud or cement plaster and pointing from 20' (6.00 m) and above for each additional 10' (3.00 m) height or part thereof. (20'~30') | 100 Sft | 23.96 | 659.45 | 1 | 15800.422 |
| 444 | 11-39 | Preparing surface and applying Graffiato Weather Coating (Co-polymer emulsion) of approved colour & shade with weather resistant pigment, highly water repellant with Metalic Spatula having top class finish by smoothing with a plastic Spatula, on a base coat (Primer) over well cleaned plastered surface complete in all respect as approved and directed by the Engineer Incharge. | Per Sft | 22992 | 86.45 | 1 | 1987658.4 |
| 445 | 13-9 | Bitumen coating to plastered or cement concrete surface:- i) 20 lbs. per 100 Sft. (9.07 Kg per Sq.m) | 100 Sft | 94.8 | 2825.1 | 1 | 267819.48 |
| 446 | 13-31 | Preparing surface and painting emulsion paint : a) 1st coat | 100 Sft | 368.76 | 1791.6 | 1 | 660670.416 |
| 447 | 13-31 | Preparing surface and painting emulsion paint : b) 2nd & each subsequent coat. | 100 Sft | 737.52 | 1395.55 | 1 | 1029246.036 |
| 448 | 13-46 | Providing and applying wall putty of 2mm thickness over plastered surface (new surface) to prepare the surface even and smooth complete in all respect. | 100 Sft | 368.76 | 576.25 | 1 | 212497.95 |
| 449 | 12-23 | Providing and fixing wooden box type wardrobe 22" (550mm) deep including ¾" (20 mm) thick boxing and shelves, hanger rods hard board back drawers, brass fittings, locking arrangements, handles, internal bolts, shoe rods, etc. including three coats of enamel paint:- i) Partal wood boxing and deodar wood shelves and leaves, etc. | Per Sft | 1524 | 2651.4 | 1 | 4040733.6 |
| 450 | 12-59 | Providing & fixing box type kitchen cabinets consisting of 3/4" thick both side Laminated MDF sheet shutter and boxes and back of 3 mm thick laminated MDF sheet i/c the cost of PVC edge binding duly hot pressed on all edges of the shutters /panels etc., with machine i/c the cost of self closing blum type hinges S.S, handles, screws, Glue and rawal plugs, locking arrangement complete in all respect as approved and directed by Engineer Incharge. | Per Sft | 744 | 1651.3 | 1 | 1228567.2 |
| 451 | 12-64 | Providing and fixing Imported Mortise Lever Handle Lock with back plate (Machine, Cylinders, Lever Handles (Pair) and backplate (Pair) of approved quality, design & finish, including the cost of all accessories to complete the job as shown on drawing and as per specification, complete in all respect, as approved and directed by the Engineer Incharge | Each | 4 | 4569.55 | 1 | 18278.2 |
| 452 | 25-51 | Providing and fitting all types of glazed aluminium windows of anodised/ powder coated partly fixed and partly sliding using delux sections of approved manufacturer having frame size of 100 x 30 mm (4"x1-1/4") and leaf frame sections of 50 x 20 mm (2"x¾"), all of 1.6mm thickness including 5 mm thick imported tinted glass with rubber gasket using approved standard latches, hardware etc., as approved by the Engineer in-charge | Per Sft. | 4456 | 1290.6 | 1 | 5750913.6 |
| 453 | 25-52 | Providing and fixing Aluminum Fly screen comprising of fiber/ Aluminum wire guaze (Malasian) fixed in aluminum frame of approved manufacturer / powder coated of size 1-1/2"x1/2" and 1.6mm thick with rubber gasket i/c cost of Hardwares as approved and directed by the engineer incharge. complete in all respect. | Per Sft. | 2228 | 538.3 | 1 | 1199332.4 |
| 454 | 12-05 | Providing and fixing 1st class solid wood wrought joinery in panelled or panelled and glazed doors and windows of specified thickness with 1" thick solid wood panels with step and 1-1/2"x2-1/2" beadings all around the panels i/c the cost of Tower bolt and handles complete in all respect (Excluding the cost of sliding bolt,lock and chowkats (frame), etc.) as approved and directed by the Engineer Incharge b) Ash wood Door (i) 2" thick (50 mm) | Sft | 156 | 3753.45 | 1 | 585538.2 |
| 455 | 12-13 | P/F 1-1/2" thick solid flush door comprising of 2.5 mm thick Deodar/Ash/Oak ply with grooves , compressed over 2.5 mm thick commercial ply over 1" thick packing wood in style and rails under proper pressure i/c the cost of nails, tower bolt , handles, glue, sawing charges and lacquar polishing to show the grains of ply properly, sand papering and 3/8" thick matching wooden lipping as approved and directed by the Engineer Incharge. | Per Sft | 2132 | 909.2 | 1 | 1938414.4 |
| 456 | 12-18 | Providing and fixing 3"x4-1/2" chowkat for doors, windows and C. windows, including holdfast, etc b) Deodar wood | Per Sft | 2288 | 1075.45 | 1 | 2460629.6 |
| 457 | 12-30 | Providing and fixing approved quality rim lock adjustable over the style surface | Each | 80 | 1680 | 1 | 134400 |
| 458 | 25-31 | Making and fixing steel grated door with 1/16" thick (1.5mm) sheeting, including angle iron frame 2"x2"x3/8" (50x50x10 mm) and ¾" (20 mm) square bars 4" (100 mm)centre to centre, with locking arrangement. | Per Sft | 560 | 2648.1 | 1 | 1482936 |
| 459 | 25-38 | Providing and fixing 2'-9" high stair railing comprising of non magnetic (304) Stain less steel 2" dia pipe railing of 18 SWG welded with vertical posts of 2" dia stainless steel round/ Squar pipe/ Tong (chimta) @ 2-ft c/c fixed on alternate steps with 3" long steel screws and brass rawal plugs , 3-Nos diagonal stainless steel pipes of 1/2" dia passes through goties fixed on vertical post, i/c stainles steel welding, fixing & polishing complete in all respects as approved and directed by the Engineer Incharge | Per Rft | 144 | 3387.45 | 1 | 487792.8 |
| 460 | 25-63 | Providing and fixing 5 ft dia MS Spiral Stair comprising of triangular steps made of 1-1/4"x1-1/4"x3/16" duly welded with 3/8"MS squar bars steps, supported/welded with main vertical post of 4" dia GI pipe (Medium Quality) embeded in PCC in ground i/c the cost of pipe railing comprising of 2" dia MS pipe of 16 SWG supportrd with 2 no 5/8" squar bars in each step, i/c fixing & painting complete in all respects as approved and directed by the Engineer Incharge(Measurement will be made above ground level). | Per Rft | 100 | 7664.35 | 1 | 766435 |
| 461 | 26-43 | Spraying termite proofing by using liquid FMC/ Biflex/ Terminex Exin/ Ms Hextar or equivalent @ specified suspension concenterate (SC), Mixing Ability-HEXTAR with Ratio (1:250) = 540 Sft or equivalent approved liquid applying with shower and certificate will be provided by the contractor for 10-years complete in all respect .as approved by the Engineer Incharge | Sft | 18900 | 12.7 | 1 | 240030 |
| 462 | Sub-Total Cost (Scheduled Items) - CIVIL WORKS = | ||||||
| 463 | NSI-01 | Provide & fix expended metal 1/2" to 3/4", 22 guage fixed walls or on area as required and specified on drawings with steel nails with washers complete in all respects. | Sft. | 5372 | 110 | 1 | 590920 |
| 464 | NSI-02 | Structural/glazing system with 2 mm thick and 100mm wide powder coated (in approved colour) base frame system as per the recommendations of the specialized facade designer and agreed by the approved manufacturer and stainless steel fittings using insulated glazing unit (IGU) system comprising of 6mm thick imported Low-E glass of approved color/shade having Low-E coating on surface no. 2 (inside the outer glass) and 6mm thick clear tempered glass (inner glass), with 12 mm wide aluminum spacers Low-E glass shall have a maximum of 3.7 U-factor with 0.45 solar heat gain coefficient. The glass to be used shall be from Pilkington/Guardian or an approved equivalent manufacturer. Doors in the curtain wall shall be of 12 mm thick Low-E tempered glass of approved color/shade, having handles 1500 mm long with 38mm dia & 2 mm wall thickness pipes of SS-316 brushed finish. All joints between the panels shall be sealed with minimum clear silicon sealant from Dow Corning of an approved equivalent. The Contractor shall submit shop drawings for the approval of the Engineer. | Sft | 720 | 3800 | 1 | 2736000 |
| 465 | NSI-03 | Providing and laying Structural Back fill using Granular Material brought from out site including compaction complete in all respects. | Cft | 7880 | 80 | 1 | 630400 |
| 466 | Sub-Total Cost (Non-Scheduled Items) - CIVIL WORKS = | ||||||
| 467 | II. PLUMBING WORKS | ||||||
| 468 | A. SCHEDULED ITEMS | ||||||
| 469 | 19 / 3 B iii. | Providing and fitting imported floor mounted Europeon coupled set of Water Closet (WC) and flushing Cistern of PORTA/ Marachi brand (full size) manufacturer i/c the cost of CP/rubber connection, thimble, seat cover and rawal bolts complete in all respects as approved and directed by the Engineer Incharge. One Piece PORTA HD 102N Toilet Cito with Hydraulic Seat Cover | Each | 20 | 59851.1 | 1 | 1197022 |
| 470 | 19 / 5 | Providing and fitting white glazed earthen ware water closet, squartter type, with separate foot rest. | Each | 4 | 8761.75 | 1 | 35047 |
| 471 | 19/12/b-i | Providing and fitting plastic made low down flushing cistern 13.63 litre (3 gallons) capacity, including bracket set, copper connection, etc. complete , white | Each | 4 | 5804.95 | 1 | 23219.8 |
| 472 | 19/46 | Providing, fixing, testing and commissioning of μ-PVC (Unplasticized polyvinyl Chloride ) Nikasi/ waste pipe Fittings make of Dadex /Popular/Beta or approved equivalent manufacturer, conforming to BS 4514 / BS 5255 including the cost of Solvents complete in all respect as approved and directed by the Engineer Incharge. P-Trap (i) 4" dia | Each | 4 | 960.2 | 1 | 3840.8 |
| 473 | 19 / 4 / ii page 118 | Providing and fixing, flushing bend of PVC , 4cm (1-1/2") | Each | 4 | 394.65 | 1 | 1578.6 |
| 474 | 19 / 7 (i) | Providing and fitting glazed earthen ware wash hand basin/vanity 56x40 cm (22"x16") including bracket set, waste pipe and waste coupling, etc. white with pedestal | Each | 8 | 12051.55 | 1 | 96412.4 |
| 475 | 19 / 7 (v) | Under Counter Vanity Basin | Each | 16 | 13047.55 | 1 | 208760.8 |
| 476 | 19 / 8 | Providing and fixing stainless steel sink with drain board, size 120x60 cm (48"x24") including bracket set, waste pipe and waste coupling. | Each | 8 | 15809.45 | 1 | 126475.6 |
| 477 | 19 / 27 | Providing and fixing, chromium plated mixing valve, for wash hand basin, sink or shower. | Each | 8 | 3950 | 1 | 31600 |
| 478 | 19 / 13 | Providing and fixing, chromium plated soap dish. | Each | 24 | 981.6 | 1 | 23558.4 |
| 479 | 19 / 15 | Providing and fixing, chromium plated toilet paper holder. | Each | 20 | 1271.85 | 1 | 25437 |
| 480 | 19 / 16 / i | Providing and fixing, chromium plated towel rail, 60 cm (24") long, and 2 cm (¾") dia | Each | 24 | 1337.2 | 1 | 32092.8 |
| 481 | 19 / 17 | Providing and fixing looking glass 55x40 cm (22"x16") size and minimum 5 mm thick, first quality. | Each | 24 | 1546.2 | 1 | 37108.8 |
| 482 | 19 / 24/ ii | Providing and fixing chromium plated bib cock 1.5cm (1/2") | Each | 20 | 1588 | 1 | 31760 |
| 483 | 19 / 25 | Providing and fixing chromium plated Tee stop cock 15mm (1/2") | Each | 76 | 2068 | 1 | 157168 |
| 484 | 19 / 49 i | Providing and fixing CP bath Room Set made of Sonex / Master / Faisal comprising of 3-No Tee stop cocks, lever type Basin Mixer, double Bib Cock, open wall shower, Muslim shower, waste coupling and bottle trap etc. complete in all respect as approved and directed by the Engineer incharge Lever Type Basin Mixer | Each | 24 | 6707 | 1 | 160968 |
| 485 | 19 / 49 ii | Double Bib Cock | Each | 24 | 1907 | 1 | 45768 |
| 486 | 19 / 49 iii | Open Type Wall Shower | Each | 20 | 18707 | 1 | 374140 |
| 487 | 19 / 49 iv | Muslim shower | Each | 24 | 2387 | 1 | 57288 |
| 488 | 19 / 49 v | Bottle Trap | Each | 24 | 1487 | 1 | 35688 |
| 489 | 19 / 7 / i page 121 | Providing and fixing 1.5 cm (½") dia connection, including check nuts, etc, (plastic rubber connection) | Each | 24 | 388.8 | 1 | 9331.2 |
| 490 | 19 / 53 ii | Supply & Installation of Duel (Electric and Gas Water Heaters) with factory-installed pressure relief valve, adjustable water temperature control thermostate, Copper connections for specific capacity having leaving waterr temprature 140 deg F & working pressure 15 PSI, Ambasador/Canon or approved manufacturer i/c cost of all accessories to complete the job as per specifications and standards & making connection, complete in all respect as approved and directed by Engineer Incharge. 55 Gallons | Each | 4 | 83161.5 | 1 | 332646 |
| 491 | 23 / 33 / b (ii) | Providing, laying, testing and commissioning of POLYPROPYLENE RANDOM COPOLYMER ( PPRC ) water supply pipe (Dadex / Popular / Beta or equivalent ) with specified pressure rating PN ( PRESSURE NOMINAL ) and conforming to DIN 8077 - 8078 code i/c cost of solvent, specials, making jharries complete in all respect as approved and directed by Engineer Incharge. ( Internal / External Diameters mentioned ). PN20 25mm dia | Rft | 1200 | 101.85 | 1 | 122220 |
| 492 | 23 / 33 / b (iii) | Providing, laying, testing and commissioning of POLYPROPYLENE RANDOM COPOLYMER ( PPRC ) water supply pipe (Dadex / Popular / Beta or equivalent ) with specified pressure rating PN ( PRESSURE NOMINAL ) and conforming to DIN 8077 - 8078 code i/c cost of solvent, specials, making jharries complete in all respect as approved and directed by Engineer Incharge. ( Internal / External Diameters mentioned ). PN20 32mm dia | Rft | 800 | 162.1 | 1 | 129680 |
| 493 | 23 / 33 / b (iv) | Providing, laying, testing and commissioning of POLYPROPYLENE RANDOM COPOLYMER ( PPRC ) water supply pipe (Dadex / Popular / Beta or equivalent ) with specified pressure rating PN ( PRESSURE NOMINAL ) and conforming to DIN 8077 - 8078 code i/c cost of solvent, specials, making jharries complete in all respect as approved and directed by Engineer Incharge. ( Internal / External Diameters mentioned ). PN20 40mm dia | Rft | 1400 | 247.3 | 1 | 346220 |
| 494 | 23 / 38 (i) | Providing and fixing CP heavy duty brass Ball valve with CP handle of specified diameter made of Faisal/Sonex / Master best quality or equivalent complete in all respect as approved and directed by the Engineer Incharge. 1/2" dia | Each | 12 | 1248 | 1 | 14976 |
| 495 | 23 / 38 (ii) | Providing and fixing CP heavy duty brass Ball valve with CP handle of specified diameter made of Faisal/Sonex / Master best quality or equivalent complete in all respect as approved and directed by the Engineer Incharge. 3/4" dia | Each | 4 | 1524 | 1 | 6096 |
| 496 | 23 / 42 a-ii | Providing and fixing heavy duty Gate valve of specified diameter and material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK) or Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all accessories flanges, nut/bolt and gaskit where required complete in all respect as approved and directed by the Engineer Incharge. 3/4" dia Brass Threaded Valves | Each | 32 | 3510 | 1 | 112320 |
| 497 | 23 / 42 a-iii | Providing and fixing heavy duty Gate valve of specified diameter and material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK) or Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all accessories flanges, nut/bolt and gaskit where required complete in all respect as approved and directed by the Engineer Incharge.1" dia Brass Threaded Valves | Each | 20 | 5025.6 | 1 | 100512 |
| 498 | 23 / 42 a-iv | Providing and fixing heavy duty Gate valve of specified diameter and material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK) or Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all accessories flanges, nut/bolt and gaskit where required complete in all respect as approved and directed by the Engineer Incharge.1-1/4" dia Brass Threaded Valves | Each | 8 | 7039.2 | 1 | 56313.6 |
| 499 | 23 / 44 a-iii | Providing and fixing heavy duty Check Valve of specified diameter and material for pressure rating PN-16 made of Crane (USA), Hatersly (UK), Scon (Pakistan) or approved equivalent manufacturer i/c the cost of all accessories flanges,nut/bolt and gaskit where required complete in all Providing and fixing heavy duty Check Valve of specified diameter and respect as approved and directed by the Engineer Incharge 1" dia Brass Threaded Valves | Each | 4 | 5269.2 | 1 | 21076.8 |
| 500 | 23 / 44 a-iv | Providing and fixing heavy duty Check Valve of specified diameter and material for pressure rating PN-16 made of Crane (USA), Hatersly (UK), Scon (Pakistan) or approved equivalent manufacturer i/c the cost of all accessories flanges,nut/bolt and gaskit where required complete in all Providing and fixing heavy duty Check Valve of specified diameter and respect as approved and directed by the Engineer Incharge 1-1/4" dia Brass Threaded Valves | Each | 8 | 7212 | 1 | 57696 |
| 501 | 23 / 45 a-ii | Supply & installation of heavy duty Brass PN-16 air Vents of specified size provided at the highest points (Pipe Risers) to expel air as approved and directed by the Engineer Incharge, Automatic 3/4 inches | Each | 8 | 1896 | 1 | 15168 |
| 502 | 19 / 8 page 121 iii | Providing and fixing brass ball float valve: 2.5 cm (1") dia | Each | 4 | 1550 | 1 | 6200 |
| 503 | 19 / 45 iii | Providing, fixing, testing and commissioning of (Unplasticized Polyvinyl Chloride Nikasi /SWV pipe, Dadex /Popular /Beta or approved equivalent manufacturer ,plain/Bell Ended/ ZJoints conforming to BS4514/ BS5255- EN1329 including the cost of specials and Solvents complete in all respects ,as per drawings & specifications and /or as approved and directed by the Engineer Incharge. 50mm | Rft | 240 | 103.95 | 1 | 24948 |
| 504 | 19 / 45 iv | Providing, fixing, testing and commissioning of (Unplasticized Polyvinyl Chloride Nikasi /SWV pipe, Dadex /Popular /Beta or approved equivalent manufacturer ,plain/Bell Ended/ ZJoints conforming to BS4514/ BS5255- EN1329 including the cost of specials and Solvents complete in all respects ,as per drawings & specifications and /or as approved and directed by the Engineer Incharge. 82mm | Rft | 600 | 160.6 | 1 | 96360 |
| 505 | 19 / 45 v | Providing, fixing, testing and commissioning of (Unplasticized Polyvinyl Chloride Nikasi /SWV pipe, Dadex /Popular /Beta or approved equivalent manufacturer ,plain/Bell Ended/ ZJoints conforming to BS4514/ BS5255- EN1329 including the cost of specials and Solvents complete in all respects ,as per drawings & specifications and /or as approved and directed by the Engineer Incharge. 110mm | Rft | 400 | 254.3 | 1 | 101720 |
| 506 | 19 / 45 vi | Providing, fixing, testing and commissioning of (Unplasticized Polyvinyl Chloride Nikasi /SWV pipe, Dadex /Popular /Beta or approved equivalent manufacturer ,plain/Bell Ended/ ZJoints conforming to BS4514/ BS5255- EN1329 including the cost of specials and Solvents complete in all respects ,as per drawings & specifications and /or as approved and directed by the Engineer Incharge. 160mm | Rft | 600 | 493.4 | 1 | 296040 |
| 507 | 19 / 46 b-i | Providing, fixing, testing and commissioning of µ-PVC (Unplasticized polyvinyl Chloride ) Nikasi / waste pipe Fittings make of Dadex / Popular / Beta or approved equivalent manufacturer, conforming to BS 4514 / BS 5255 including the cost of Solvents complete in all respect as approved and directed by the Engineer Incharge. Multi-Trap 4" | Each | 48 | 1436.1 | 1 | 68932.8 |
| 508 | 19 / 46 c-ii | Providing, fixing, testing and commissioning of µ-PVC (Unplasticized polyvinyl Chloride ) Nikasi / waste pipe Fittings make of Dadex / Popular / Beta or approved equivalent manufacturer, conforming to BS 4514 / BS 5255 including the cost of Solvents complete in all respect as approved and directed by the Engineer Incharge. Vent Cowel 3" | Each | 20 | 386.1 | 1 | 7722 |
| 509 | 19 / 46 d-i | Providing, fixing, testing and commissioning of µ-PVC (Unplasticized polyvinyl Chloride ) Nikasi / waste pipe Fittings make of Dadex / Popular / Beta or approved equivalent manufacturer, conforming to BS 4514 / BS 5255 including the cost of Solvents complete in all respect as approved and directed by the Engineer Incharge. Clean out 4" Dia | Each | 4 | 441.4 | 1 | 1765.6 |
| 510 | 19 / 46 d-ii | Providing, fixing, testing and commissioning of µ-PVC (Unplasticized polyvinyl Chloride ) Nikasi / waste pipe Fittings make of Dadex / Popular / Beta or approved equivalent manufacturer, conforming to BS 4514 / BS 5255 including the cost of Solvents complete in all respect as approved and directed by the Engineer Incharge. Clean out 3" Dia | Each | 4 | 354.3 | 1 | 1417.2 |
| 511 | 19 / 12 page 122 (i) | Providing and Fixing of SS 304 Floor Drain, complete in all respect as approved and directed by Engineer Incharge. 4" Diameter | Each | 20 | 1254.95 | 1 | 25099 |
| 512 | 21 / 5 (a) | Constructing gully grating chamber, 12"x12", ( 300x300 mm) complete in all respects: with C.I. gully trap, weighing 81 lbs. (36.75 Kg.) frame hinged safety type. | Each | 20 | 17360.1 | 1 | 347202 |
| 513 | 19 / 45 (v) | Providing, fixing, testing and commissioning of (Unplasticized Polyvinyl Chloride Nikasi /SWV pipe, Dadex /Popular /Beta or approved equivalent manufacturer ,plain/Bell Ended/ ZJoints conforming to BS4514/ BS5255- EN1329 including the cost of specials and Solvents complete in all respects ,as per drawings & specifications and /or as approved and directed by the Engineer Incharge. 110mm | Rft | 200 | 254.3 | 1 | 50860 |
| 514 | 19 / 13 page 122 (i) | Providing and Fixing of SS 304 Roof / scupper Drain, complete in all respect as approved and directed by Engineer Incharge. 4" Diameter | Each | 8 | 1284.8 | 1 | 10278.4 |
| 515 | 23 / 54 (i) | Providing and fixing of fire extinguishers of following type and capacities complete in all respect as approved and directed by the Engineer Incharge: Dry Chemical Powder capacity 6 Kg | Each | 4 | 13329.6 | 1 | 53318.4 |
| 516 | 23 / 54 (ii) | Providing and fixing of fire extinguishers of following type and capacities complete in all respect as approved and directed by the Engineer Incharge: K-Type wet chemical capacity 6 Litters. | Each | 4 | 48232.8 | 1 | 192931.2 |
| 517 | 19 / 37 (i) | Supply and fitting of cast iron manhole cover square / circular with frame, etc. complete. 30 cm (12") | Each | 24 | 2532 | 1 | 60768 |
| 518 | 19 / 37 (ii) | Supply and fitting of cast iron manhole cover square / circular with frame, etc. complete. 45 cm (18") | Each | 4 | 3492 | 1 | 13968 |
| 519 | 19 / 37 (iii) | Supply and fitting of cast iron manhole cover square / circular with frame, etc. complete. 60 cm (24") | Each | 8 | 6089.85 | 1 | 48718.8 |
| 520 | Sub-Total Cost (Scheduled Items) - PLUMBING WORKS = | ||||||
| 521 | B. NON-SCHEDULED ITEMS | ||||||
| 522 | NS-01 | Triple water filter (10") including inlet and outlet connections, power supply, and all accessories for complete installation | Each. | 4 | 32450 | 1 | 129800 |
| 523 | NS-01 | G.I. water pipes conforming to BS-1387, Medium Grade, I/c all fittings, wraping polythene tape, giving anticorrosion treatment, applying protective painting, clamps, hangers & supports, making holes in concrete or masonry and then repairing holes, flushing, disinfecting, testing and commissioning etc. of approved make, of the following diameters,complete in all respects. 3/4 inch | Rft | 40 | 515 | 1 | 20600 |
| 524 | NS-02 | G.I. water pipes conforming to BS-1387, Medium Grade, I/c all fittings, wraping polythene tape, giving anticorrosion treatment, applying protective painting, clamps, hangers & supports, making holes in concrete or masonry and then repairing holes, flushing, disinfecting, testing and commissioning etc. of approved make, of the following diameters,complete in all respects. 1 inch | Rft | 80 | 755 | 1 | 60400 |
| 525 | NS-03 | G.I. water pipes conforming to BS-1387, Medium Grade, I/c all fittings, wraping polythene tape, giving anticorrosion treatment, applying protective painting, clamps, hangers & supports, making holes in concrete or masonry and then repairing holes, flushing, disinfecting, testing and commissioning etc. of approved make, of the following diameters,complete in all respects. 1-1/4 inches | Rft | 80 | 825 | 1 | 66000 |
| 526 | NS-04 | G.I. pipes for gas works conforming to BS-1387, Medium Grade, I/c all fittings, wraping polythene tape, giving anticorrosion treatment, applying protective painting, clamps, hangers & supports, making holes in concrete or masonry and then repairing holes, flushing, disinfecting, testing and commissioning etc. of approved make, of the following diameters,complete in all respects. 1/2 inch | Rft | 120 | 425 | 1 | 51000 |
| 527 | NS-05 | G.I. pipes for gas works conforming to BS-1387, Medium Grade, I/c all fittings, wraping polythene tape, giving anticorrosion treatment, applying protective painting, clamps, hangers & supports, making holes in concrete or masonry and then repairing holes, flushing, disinfecting, testing and commissioning etc. of approved make, of the following diameters,complete in all respects.3/4 inch | Rft | 800 | 515 | 1 | 412000 |
| 528 | NS-06 | 3/4" diameter Galvanised MS ladder rungs for water tanks; each rung of 18" width, 6" projected outside the wall and 6" embeded in RCC on both ends; including all necessary works for complete installation. | Each | 40 | 1490 | 1 | 59600 |
| 529 | NS-07 | Dia 2" u-turned G.I. vent pipes, puddle plate, with insect proof mesh at open end etc., complete in all respects. | Job | 4 | 7545 | 1 | 30180 |
| 530 | NS-08 | Automatically operated submersible stainless steel centrifugal pump set (in UGWT) for lifting water from Underground water tank to Overhead water tank for potable water, comprising pump with electric motors, Head=03 Bars and discharge=20 gpm, including all accessories, level switches to be installed in overhead & under ground water tank for automatic operation of pumps at set levels, dry running protection, motor control unit, Gate valve, check valve etc manual tools, spare parts etc, complete in all respects as shown in drawings and as directed by the Engineer. Capacity = 20gpm Head = 3 Bar | Job | 4 | 283000 | 1 | 1132000 |
| 531 | NS-09 | Skid mounted, automatically operated fully integrated self priming Pressure Booster pump set for potable water supply comprising 02 pumps (01 working & 01 standby) with electric motors and integrated parts (intelligent controller, speed-controlled drive (VFD), integrated pressure tank, sensors, gate valves, non return valves, strainer etc) including all accessories, Motor control unit, Pressure switches, pressure gauges, manual, tools, spare parts etc, Each pump of the following Capacity and Pumping head. Capacity = 10-30 US gpm Head =02-03 Bars | Job | 4 | 354000 | 1 | 1416000 |
| 532 | Sub-Total Cost (Non-Scheduled Items) - PLUMBING WORKS = | ||||||
| 533 | III. ELECTRICAL WORKS | ||||||
| 534 | A. SCHEDULED ITEMS | ||||||
| 535 | 2 (ii) | Supply and erection of PVC pipe for wiring recessed in walls, including inspection boxes, pull boxes, hooks, cutting jharries, and repairing surface, etc., complete with all specials. 20 mm i/d | Rft. | 20000 | 120.45 | 1 | 2409000 |
| 536 | 2 (iii) | Supply and erection of PVC pipe for wiring recessed in walls, including inspection boxes, pull boxes, hooks, cutting jharries, and repairing surface, etc., complete with all specials. 25 mm i/d | Rft. | 10000 | 140.15 | 1 | 1401500 |
| 537 | 2 (iii) | Supply and erection of PVC pipe for wiring recessed in walls, including inspection boxes, pull boxes, hooks, cutting jharries, and repairing surface, etc., complete with all specials. 50 mm i/d | Rft. | 120 | 241.95 | 1 | 29034 |
| 538 | 2 (viii) | Supply and erection of PVC pipe for wiring recessed in walls, including inspection boxes, pull boxes, hooks, cutting jharries, and repairing surface, etc., complete with all specials. 100 mm i/d | Rft. | 600 | 385.55 | 1 | 231330 |
| 539 | 105 (a) i | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Small) 01 Gange | Each | 20 | 463.2 | 1 | 9264 |
| 540 | 105 (a) ii | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Small) 02 Gange | Each | 40 | 704.4 | 1 | 28176 |
| 541 | 105 (a) iii | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Small) Three pin Light Plug 10/13 Amp | Each | 184 | 754.45 | 1 | 138818.8 |
| 542 | 105 (a) iv | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Small) Telephone / TV/Datacable socket | Each | 24 | 662.45 | 1 | 15898.8 |
| 543 | 105 (a) vi | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Small) Fan Dimmer | Each | 64 | 740.6 | 1 | 47398.4 |
| 544 | 105 (a) vii | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Small) Bell push | Each | 4 | 598.2 | 1 | 2392.8 |
| 545 | 105 (a) viii | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Small) Three Pin Power Plug 15-32 Amp | Each | 44 | 924.55 | 1 | 40680.2 |
| 546 | 105 (b) i | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Large) 04 Gange | Each | 40 | 981.25 | 1 | 39250 |
| 547 | 105 (b) ii | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Large) 05 Gange | Each | 40 | 1151.35 | 1 | 46054 |
| 548 | 105 (b) iii | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge One way Gange Switch (Large) 06 Gange | Each | 8 | 1405.85 | 1 | 11246.8 |
| 549 | 105 (c) i | P/F PVC doublelayer Switch kit Faceplate with specified switch holes i/c the cost of switches / sockets / dimmer made of Hi-Life / Bush / Schenider or approved equvilent manufacturer, screws complete as approved and directed by the Engineer Incharge Two way Gange Switch Small 01 Gange One Way/ Two Way | Each | 8 | 775.85 | 1 | 6206.8 |
| 550 | 8 c (ii) | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/wooden casing an capping/G.I. wire/trenches (rate for cables only):- 450/750 volts, PVC insulated: 1.5 mm sq (3/0.029") | Per Rft. | 60000 | 42.75 | 1 | 2565000 |
| 551 | 8 c (iii) | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/wooden casing an capping/G.I. wire/trenches (rate for cables only):- 450/750 volts, PVC insulated: 2.5 mm sq (7/0.029") | Per Rft. | 12000 | 63.1 | 1 | 757200 |
| 552 | 8 c (iv) | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe/M.S. conduit/G.I pipe/wooden strip batten/wooden casing an capping/G.I. wire/trenches (rate for cables only):- 450/750 volts, PVC insulated: 4 mm sq (7/0.036") | Per Rft. | 12000 | 83.4 | 1 | 1000800 |
| 553 | 10(v) | Supply and erection of single core PVC insulated, PVC sheathed copper conductor, 600/1000 volts grade cable, in prelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches, etc (rate for cable only):- 6 mm sq (7/0.044") | Per Rft. | 120 | 102.6 | 1 | 12312 |
| 554 | 10(vi) | Supply and erection of single core PVC insulated, PVC sheathed copper conductor, 600/1000 volts grade cable, in prelaid G.I. pipe/M.S. conduits/PVC pipe/G.I. wire/trenches, etc (rate for cable only):- 10 mm sq (7/0.052") | Per Rft. | 600 | 159.5 | 1 | 95700 |
| 555 | 11 c (v) | Supply and erection of copper conductor cables for service connection, in prelaid pipe/G.I. wire/trenches, etc. (rate for cable only):- PVC insulated, PVC sheathed 4 core, 600/1000 volt non armoured cable:- 6 mm sq (7/0.044") | Per Rft. | 120 | 391.45 | 1 | 46974 |
| 556 | 11 c (vi) | Supply and erection of copper conductor cables for service connection, in prelaid pipe/G.I. wire/trenches, etc. (rate for cable only):- PVC insulated, PVC sheathed 4 core, 600/1000 volt non armoured cable:- 10 mm sq (7/0.052") | Per Rft. | 600 | 621.9 | 1 | 373140 |
| 557 | 11 c (vii) | Supply and erection of copper conductor cables for service connection, in prelaid pipe/G.I. wire/trenches, etc. (rate for cable only):- PVC insulated, PVC sheathed 4 core, 600/1000 volt non armoured cable:- 16 mm sq (7/0.064") | Per Rft. | 40 | 951.05 | 1 | 38042 |
| 558 | 102 a-(i) | Providing and fixing Copper winded Exhaust fan with louver and shutter made of Pak/Younas/G.F.C. i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge. Plastic body - 10" dia | Each | 20 | 5235.5 | 1 | 104710 |
| 559 | 102 a-(ii) | Providing and fixing Copper winded Exhaust fan with louver and shutter made of Pak/Younas/G.F.C. i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge. Plastic body - 12" dia | Each | 4 | 5685.5 | 1 | 22742 |
| 560 | 102 b-(i) | Providing and fixing Copper winded Exhaust fan with louver and shutter made of Pak/Younas/G.F.C. i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge. Plastic body - 12" sweep | Each | 4 | 5516.75 | 1 | 22067 |
| 561 | 103 ii | Providing and fixing Pakistan Energy Label NEECA approved Copper winded wall bracket Fan i/c the cost of necessary cable and hardware for connection as approved and directed by Engineer Incharge. 24" Sweep dia | Each | 4 | 10703 | 1 | 42812 |
| 562 | 104 iii | Providing and fixing Pakistan Energy Label NEECA approved Copper winded Ceiling Fan i/c the cost of necessary cable and hardware for connection as approved and directed by Engineer Incharge. 56" dia | Each | 64 | 10180.2 | 1 | 651532.8 |
| 563 | 123 | Supply, Installation and commissioning of wiring with 4-pair data Cable, 23AWG UL/ EN listed cable *Conforming to following standards: TIA/EIA568/ISO/IEC11801, in prelaid conduit/ cable tray from including all accessories, Manufacturer/ OEM Authorization, Make: Schneider/ i-connect UK/ 3M Corning USA/ D-Link/ Pollo Australian or equivalent complete in all respect as approved and directed by Engineer Incharge. | |||||
| 564 | a-ii | UTP (Unshielded Twisted pair) CAT-6A (Min.1G/ 10G @ 500MHz or higher) | P.Rft | 4000 | 69.6 | 1 | 278400 |
| 565 | 131 | Supply and installation of Cable Metal Organizer, 19" Rack mounted with high graded epoxy powder coating and slideable top-UL Listed. Made of Schneider/ i-Connect UK/ 3M Corning :Pollo Australia or equivalent approved manufacturer and directed by the Engineer Incharge. | Each | 4 | 4108.8 | 1 | 16435.2 |
| 566 | 85 a iii | Suppling,Installation and comissioning of MCB (Miniature Circuit Breaker) of specified rating made of LEGRAND FRANCE/ GE U.S.A / SCHNEIDER GERMANY /SIEMEN GERMAN/TERASAKI JAPAN/ SWITZERLAND or approved equivalent manufacturer in prelaid DBs and Panels i/c the cost of screwes,necessary wire complete in all respect as approved and directed by the Engineer Incharge Single Pole 6-63 Amp (10 KA) | Each | 140 | 1459.05 | 1 | 204267 |
| 567 | 85 b ii | Suppling,Installation and comissioning of MCB (Miniature Circuit Breaker) of specified rating made of LEGRAND FRANCE/ GE U.S.A / SCHNEIDER GERMANY /SIEMEN GERMAN/TERASAKI JAPAN/ SWITZERLAND or approved equivalent manufacturer in prelaid DBs and Panels i/c the cost of screwes,necessary wire complete in all respect as approved and directed by the Engineer Incharge Double Pole iii) 6-63 Amp (10 KA) | Each | 8 | 5621.55 | 1 | 44972.4 |
| 568 | 85 b iv | Suppling,Installation and comissioning of MCB (Miniature Circuit Breaker) of specified rating made of LEGRAND FRANCE/ GE U.S.A / SCHNEIDER GERMANY /SIEMEN GERMAN/TERASAKI JAPAN/ SWITZERLAND or approved equivalent manufacturer in prelaid DBs and Panels i/c the cost of screwes,necessary wire complete in all respect as approved and directed by the Engineer Incharge Double Pole 63 Amp (Incoming Breaker) | Each | 8 | 5621.55 | 1 | 44972.4 |
| 569 | 90 a i | P/F wall mounted DB (Distribution Board) made with 16SWG sheet (Recessded/Surface mounted Type), Powder coated Paint, i/c the cost of Lock, Indication lights,Thimble, Copper Comb, Wiring, Netural & Earth Bar, Door Earthing, Digital Voltmeter,Digital Ammeter,Volt Selector Switch,Ammeter selector switch,Current Transformers and Controles Complete in all respect as approved and directed by the Engineer P/F wall mounted DB (Distribution Board) made with 16SWG Sheet Incharge (Breakers will be Paid Separately). 6" deep 20~60A | P.CFT | 400 | 2436.7 | 1 | 974680 |
| 570 | 94 i | Providing and fixing DB/Panel accessories of required rating and size i/c copper screws of approved brand Complete in all respect as approved and directed by the Engineer Incharge Selector Switch | Each | 8 | 1228.8 | 1 | 9830.4 |
| 571 | 94 iii | Providing and fixing DB/Panel accessories of required rating and size i/c copper screws of approved brand Complete in all respect as approved and directed by the Engineer Incharge Digital Voltmeter (0-600 Volt) | Each | 8 | 1012.8 | 1 | 8102.4 |
| 572 | 94 iv | Providing and fixing DB/Panel accessories of required rating and size i/c copper screws of approved brand Complete in all respect as approved and directed by the Engineer Incharge Digital Ammeter (0-9999 Amp) | Each | 8 | 1228.8 | 1 | 9830.4 |
| 573 | 94 v | Providing and fixing DB/Panel accessories of required rating and size i/c copper screws of approved brand Complete in all respect as approved and directed by the Engineer Incharge LED Phase Indicator | Each | 24 | 622.8 | 1 | 14947.2 |
| 574 | 94 vi | Providing and fixing DB/Panel accessories of required rating and size i/c copper screws of approved brand Complete in all respect as approved and directed by the Engineer Incharge Push Button ON/OFF (Make: Schneider/Himal/Eqv.) | Each | 24 | 631.15 | 1 | 15147.6 |
| 575 | 76 b i | Supply and erection of electric energy meter, including meter testing fee, etc b) Three phase, 4 wires: i) 3x50 Amp, 400 volts | Each | 4 | 20909.45 | 1 | 83637.8 |
| 576 | B. NON-SCHEDULED ITEMS | ||||||
| 577 | NS-01 | Supply, installation, testing & commissioning of following LED Light fixtures complete with Electronic ballast (unless mention otherwise), lamps, lamp holders,SPD, Earth Protection and mounting accessories etc., as per specification, complete in all respects, as per drawings and specification, complete in all respect. Lighting fixtures sample must be submitted to consultant for approval. PF> 0.9, CRI>80, 110 Lumens/watt. Operating Life 30,000hrs, IEC Certified. Note: Refer light fixtures drawings/Schedule for complete light fixtures details. 40 watt Surface mounted Damp proof LED Light Fixture with 4400 lumens min., 30000 Life Hrs. fixed output LED driver, IP20 rated, PF=.95 complete in all respects. | No. | 76 | 9500 | 1 | 722000 |
| 578 | NS-02 | Supply, installation, testing & commissioning of following LED Light fixtures complete with Electronic ballast (unless mention otherwise), lamps, lamp holders,SPD, Earth Protection and mounting accessories etc., as per specification, complete in all respects, as per drawings and specification, complete in all respect. Lighting fixtures sample must be submitted to consultant for approval. PF> 0.9, CRI>80, 110 Lumens/watt. Operating Life 30,000hrs, IEC Certified. Note: Refer light fixtures drawings/Schedule for complete light fixtures details. (16-20) Watt Surface mounted LED batten Light Fixture with 2000 lumens min., 30000 Life Hrs. fixed output LED driver, IP20 rated, complete in all respects. | No. | 60 | 2500 | 1 | 150000 |
| 579 | NS-03 | Supply, installation, testing & commissioning of following LED Light fixtures complete with Electronic ballast (unless mention otherwise), lamps, lamp holders,SPD, Earth Protection and mounting accessories etc., as per specification, complete in all respects, as per drawings and specification, complete in all respect. Lighting fixtures sample must be submitted to consultant for approval. PF> 0.9, CRI>80, 110 Lumens/watt. Operating Life 30,000hrs, IEC Certified. Note: Refer light fixtures drawings/Schedule for complete light fixtures details. 15-20 W Surface/ ceiling Mounted LED downlight with bult in integrated driver and frosted glass diffuser | No. | 344 | 3500 | 1 | 1204000 |
| 580 | NS-04 | Supply, installation, testing & commissioning of following LED Light fixtures complete with Electronic ballast (unless mention otherwise), lamps, lamp holders,SPD, Earth Protection and mounting accessories etc., as per specification, complete in all respects, as per drawings and specification, complete in all respect. Lighting fixtures sample must be submitted to consultant for approval. PF> 0.9, CRI>80, 110 Lumens/watt. Operating Life 30,000hrs, IEC Certified. Note: Refer light fixtures drawings/Schedule for complete light fixtures details. 7-10 W Surface/ ceiling Mounted LED downlight with bult in integrated driver and frosted glass diffuser | No. | 40 | 1950 | 1 | 78000 |
| 581 | NS-05 | Supply, installation, testing & commissioning of following LED Light fixtures complete with Electronic ballast (unless mention otherwise), lamps, lamp holders,SPD, Earth Protection and mounting accessories etc., as per specification, complete in all respects, as per drawings and specification, complete in all respect. Lighting fixtures sample must be submitted to consultant for approval. PF> 0.9, CRI>80, 110 Lumens/watt. Operating Life 30,000hrs, IEC Certified. Note: Refer light fixtures drawings/Schedule for complete light fixtures details. Outdoor type LED bulkhead wall light of minimum 1500 lumens light output, IP-55 or better rated | No. | 76 | 6500 | 1 | 494000 |
| 582 | NS-06 | Supply, installation, testing & commissioning of following LED Light fixtures complete with Electronic ballast (unless mention otherwise), lamps, lamp holders,SPD, Earth Protection and mounting accessories etc., as per specification, complete in all respects, as per drawings and specification, complete in all respect. Lighting fixtures sample must be submitted to consultant for approval. PF> 0.9, CRI>80, 110 Lumens/watt. Operating Life 30,000hrs, IEC Certified. Note: Refer light fixtures drawings/Schedule for complete light fixtures details. Schliender as approved by the Engineer/Architect | No. | 12 | 20000 | 1 | 240000 |
| 583 | NS-07 | 305 mm long, 50 mm wide and 6mm thick copper busbar as ECP (Earth Connecting Point) complete with insulators, washers, nuts, bolts mounting installation and operational accessories as per site requirements. | Job | 4 | 95500 | 1 | 382000 |
| 584 | Sub-Total Cost (Non-Scheduled Items) - ELECTRICAL WORKS = | ||||||
| 585 | Sub-Total Cost - HOUSES = | ||||||
| 586 | OVERALL TOTAL (Infrastructure + Houses) = | ||||||
| GRAND TOTAL: | Rs 385,764,801.52 |
The scope of works mainly comprises Civil, Electrical, Plumbing for Buildings, Infrastructure Development and related Ancillary Works lying within the boundaries and limits as shown on the drawings and any such additional areas adjacent thereto as may be designated by the Engineer from time to time for the construction to be performed under the Contract, and all such areas and additional areas shall comprise the Site.
The scope of works mainly comprises Civil, Electrical, Plumbing for Buildings, Infrastructure Development and related Ancillary Works lying within the boundaries and limits as shown on the drawings and any such additional areas adjacent thereto as may be designated by the Engineer from time to time for the construction to be performed under the Contract, and all such areas and additional areas shall comprise the Site.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Lot Title : Construction of Houses and Associated Infrastructure Development for ICT Police
Job: Construction of Houses




Job: Infrastructure Development





Red Book:
© FIDIC 2017. All rights reserved.
The Conditions of Contract are the “General Conditions” which form part of the “Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC) and the following “Particular Conditions” which shall complement the General Conditions of the Contract.
The successful Bidder, upon contract award, shall be required to furnish two (02) copies of aforementioned “General Conditions” for incorporation in the Works Contract.
International Federation of Consulting Engineers (FIDIC) FIDIC
Bookshop – Box- 311 – CH – 1215 Geneva 15, Switzerland
Fax: +41 22 799 49 054
Telephone: +41 22 568 0500
E-mail: fidic@fidic.org
Website: www.fidic.org
FIDIC code: ISBN13: 978-2-88432-084-9
Particular Conditions
(Mandatory Provisions not to be amended/substituted)
The Particular Conditions (PCC) complement the General Conditions (GCC) to specify dates, contractual requirements, and special circumstances related to the Works. The PCC consists of two parts, Part A - Contract Data and Part B - Special Provisions. The provisions to be found in the Special Provisions (Particular Conditions - Part B) take precedence over the equivalent provisions found under the same Sub-Clause number(s) in the General Conditions, and the provisions of the Contract Data (Particular Conditions - Part A) take precedence over the Special Provisions (Particular Conditions - Part B).
Sub-Clause 1.1.27
Defects Notification Period (DNP): 365 Days
Sub-Clause 1.1.31
Employer's name & address: National Police Foundation (National Police Foundation), Assistant Director Admin Mauve Area G-10/4, Islamabad Capital Territory
Sub-Clause 1.1.35
Engineer's name & address: National Engineering Services Pakistan (Pvt.) Limited (NESPAK)
NESPAK House, Sector-G, 5/2, P.O. Box 2461, Islamabad, Pakistan
Sub-Clause 1.1.84
Time for Completion: 119 days for whole of the works
Sub-Clause 1.3 (a)(ii)
Agreed method of electronic transmission: Not Agreed
Sub-Clause 1.3 (d)
Address of Empoyer for Communications: Mauve Area G-10/4, Islamabad Capital Territory
Address of Engineer for Communications:
NESPAK House, Sector-G, 5/2, P.O. Box 2461, Islamabad, Pakistan
Sub-Clause 1.4
Contract shall be governed by the law of: Islamic Republic of Pakistan
Ruling language: English
Language for communications: English
Sub-Clause 2.1
After receiving the Letter of Acceptance, the Contractor shall be given right of access to all or part of the Site within: 14 days after Commencement Date
Sub-Clause 2.4
Employer’s financial arrangements:
The Employer has sufficient funds to cover the Cost of the entire
Project.
Sub-Clause 3.2 (e)(ii)
Engineer’s Duties and Authority: Variation resulting in an increase of the Accepted Contract Amount in excess ofone percent (1%)subject to accumulative Variations not exceeding five percent (5%)of the Accepted Contract Amount
Sub-Clause 4.2
Performance Security (as percentage of the Accepted Contract Amount in Currencies): 0%
Form of Performance Guarantee: Nil
Sub-Clause 4.2.1
List of Insurance Companies:
IGI General Insurance Limited
Adamjee Insurance Company Limited
Jubilee General Insurance Company Limited
East West Insurance Company Limited
Sub-Clause 4.7.2
period for notification of errors in the items of reference: Twenty Eight (28) days
Sub-Clause 4.19
Period of payment for temporary utilities: Each Month
Sub-Clause 5.1 (a)
Maximum allowable accumulated value of work subcontracted (as a percentage of the Accepted Contract Amount): 25 %
Sub-Clause 5.1 (b)
Parts of the Works for which subcontracting is not permitted: 1
Sub-Clause 6.5
Normal working hours on the Site: 8
Sub-Clause 8.3
Number of additional paper copies of programmes: 3
Sub-Clause 8.8 & 14.15(b)
Delay Damages payable for each day of delay 0.10% of the Accepted Contract Amountfor delay in completion of whole of the Works
Sub-Clause 8.8
Maximum amount of Delay Damages 10.00 % of the Accepted Contract Amount
Sub-Clause 8.14
Applicability of Incentives for Early Completion No
Sub-Clause 12.3
Percentage profit (Not more than 10%): Nil
Sub-Clause 13.4.(b)(ii)
Percentage rate to be applied to Provisional Sums for overhead charges and profit: Twenty Five percent (25%)
Sub-Clause 14.2
Total Advance Payment: Fifteen percent (15%) of the Accepted Contract Amount excluding Provisional Sums payable in the currencies and proportions in which the Accepted Contract Amount is payable
Sub-Clause 14.2.1
Advance Payment Insurance Allowed
Sub-Clause 14.2.3
Percentage deductions for the repayment of the Advance Payment: Deduction shall be made at the amortization rate of 17.5 % of the value of the Works executed of each IPC as provided in paragraph (i) of Sub-Clause GCC 14.3, starting from 2nd IPC provided that the advance payment shall be completely repaid prior to the time when 90% of the Accepted Contract Amount less Provisional Sums has been certified for payment. It may be more than 17.5% in the last instalment to ensure full repayment.
Sub-Clause 14.3
Period of payment One Month
Sub-Clause 14.3(b)
Number of additional paper copies of Statements: 4
Sub-Clause 14.3 (iii)
Percentage of retention: Seven percent (7%)
Sub-Clause 14.3 (iii)
Limit of Retention Money (as a percentage of the Accepted Contract Amount): Five percent (5%)
Sub-Clause 14.5(b)(i)
Plant and Materials for payment when shipped: Plant and Materials under Bill of “Imported Plant and Materials”
Sub-Clause 14.5(c)(i)
Plant and Materials for payment when delivered to the Site: Plant and Non Perishable Materials
Sub-Clause 14.6.2
Minimum amount of Interim Payment Certificate (IPC): Yes
The Minimum Amount IPC is 10% of the Accepted Contract Amount.
[Employer to give value not exceeding one fifth of the average expected value of Interim Payment Certificate]
Sub-Clause 14.7(a)
Period of payment of Advance Payment to the Contractor: 14 days
Sub-Clause 14.7b(i)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.6: 14 days
Sub-Clause 14.7b(ii)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.13 (Final Payment): 28 days
Sub-Clause 14.7(c)
Period for the Employer to make final payment to the Contractor: 56 days
Sub-Clause 14.8
Financing charges for delayed payment Local Currency (PKR):
6-Month KIBOR (Offer) +3% per annum.
Foreign Currency:
USD
6-Month SOFR (Secured Overnight Financing Rate for USD) +1% per annum.
EURO
6-Month EURIBOR (EURO Interbank Offered Rate for EURO) +1% per annum.
Others
Appropriate rates +1% (for other foreign currencies, Ref. Schedule-A, A-4 to Bid).
Sub-Clause 14.11.1(b)
Number of additional paper copies of draft Final Statements: 4
[insert number of copies say six (06)]
Sub-Clause 14.15
Currencies of payment of Contract Price: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(a)(i)
Proportions or amounts of Local and Foreign currencies: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(c)
Currencies and proportions for payment of Delay Damages: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(f)
rates of exchange: as stated in the Table IV of Schedule A (If Given)
Sub-Clause 17.2(d)
Forces of nature, the risks of which are allocated to the Contractor: Nil
Sub-Clause 19.1
Permitted deductible limits:
i) insurance required for the Works: Ten percent (10%) of loss amount on each & every loss
ii) insurance required for Goods: Nil
iii) insurance required for liability for breach of professional duty: Nil
iv) insurance required against liability for fitness for purpose (if any is required): Nil
v) insurance required for injury to persons and damage to property: Nil
vi) insurance required for injury to employees: Nil
vii) other insurances required by Laws and by local practice : Nil
Periods for submission of insurance:
a) evidence of insurance: Not later than the Commencement Date
b) relevant policies: Within twenty eight (28) day from the Commencement Date
Sub-Clause 19.2.1(b)
Additional amount to be insured (as a percentage of the replacement value): 15% of the replacement value (Accepted Contract Amount)
Sub-Clause 19.2.2
Extent of insurance required for Goods: From Ex-Works (i.e., works, factory, warehouse, etc) to delivery at the Site
Amount of insurance required for Goods: Full replacement value
Sub-Clause 19.2.3(a)
Amount of insurance required for liability for breach of professional duty: Full replacement value of the Works to be designed by the Contractor
Sub-Clause 19.2.3(b)
Insurance required against liability for fitness for purpose: Yes
Sub-Clause 19.2.3
Period of insurance required for liability for breach of professional duty: Until the date of issuance of Performance Certificate
Sub-Clause 19.2.4
Amount of insurance required for injury to persons and damage to property: Injury to person and Fatal case:
in accordance with Workmen Compensation Act
Damage to Property: The Amount of Insurance Required for Person Injury is n accordance with Workmen Compensation Act
The Amount of Insurance Required for Damage to Property is PKR 1 million without limit to the number of incidents as per his assessment of the adjoining property(ies) other than the Works]
without limit to the number of incidents
Sub-Clause 19.2.6
Other insurances required by Laws and by local practice: All insurances as applicable, to the extent of execution of the project, under Federal and Provincial laws of Islamic Republic of Pakistan
Sub-Clause 21.1
Time for appointment of the DAAB: Within 28 days from the Commencement Date.
In case the Accepted Contract Amount is lesser than PKR one (01) billion, appointment of the DAAB shall be made when Dispute arises between the Parties.
Sub-Clause 21.1
The DAAB shall comprise 1
[insert either “a sole Member” or “Three Members”]
[For a Contract estimated to cost above PKR 2.5billion, the DAAB shall comprise of three members. For a Contract estimated to cost between PKR1billion and PKR2.5billion, the DAAB may comprise of three members or a sole member. For a Contract estimated to cost less than PKR1billion, a sole member is recommended.]
Sub-Clause 21.1
List of proposed members of DAAB
- proposed by Employer
to be inserted at the time of signing of the Contract]. one sole member to be appointed with mutual consent of both parties
Sub-Clause 21.2
Appointing entity (official) for DAAB members Managing Director Public Procurement Regulatory Authority (PPRA) or Chairman Pakistan Engineering Council (PEC) from the list of PEC approved arbitrators published at its website
Sub-Clause 21.6
Rules of Arbitration: PEC Rules of Conciliation and Arbitration or Pakistan Arbitration Act of 1940, if the former is inactive.
The place of Arbitration shall be in the Employer’s country: Islamabad,Pakistan
[Insert name of city]
PartB - Special Provisions
1.1 Definitions
1.1.76 “Specification”
Following is added at the end:
“and consists of two parts i.e.,
i) “Part A - Specific Provisions”; and
ii) “Part B - Technical Provisions”.”
1.2 Interpretation
“and” is deleted from the end of sub-paragraph (i) and added at the end of sub-paragraph (j).
Sub-paragraph (k) is added:
“(k) The word “tender” is synonymous with “bid” the word tenderer with “bidder”, the words “tender documents” with “bidding documents” and “Schedule of Prices” with “Bill of Quantities”, as applicable.”
1.5 Priority of Documents The documents listed at (a) through (k) of this Sub-Clause are deleted and substituted with the following:
(a) the Contract Agreement;
(b) the Letter of Acceptance;
(c) the Letter of Bid;
(d) the Particular Conditions Part A - Contract Data;
(e) the Particular Conditions Part B - SpecialProvisions;
(f) the General Conditions;
(g) the Specification Part A - SpecificProvisions;
(h) the Specification Part B- Technical Provisions;
(i) the Drawings;
(j) the completed Schedules to Bid includingBillof Quantities;
(k) the JV Undertaking (if the Contractor is a JV); and
(l) any other documents forming part of the Contract.
The addenda/corrigenda, if any, shall be deemed to have been incorporated at the appropriate places in the documents forming the Contract.
1.6 Contract Agreement
In the last line of the 1st paragraph the text “shall be borne by the Employer” is substituted by“ shall be reimbursed by the Employer to the Contractor”.
3.1 The Engineer
In sub-paragraph (a) the text “as defined in the Pakistan Engineering Council Act, 1975 (Act No.V of 1976)” are added after the words “professional engineer”.
3.2 Engineer’s Duties and Authority
The Engineer shall obtain the consent in writing of the Employer before taking action under the following Sub-Clauses of these Conditions:
(a) Consenting to the subcontracting of any part of the Works under Sub-Clause 5.1 [Subcontractors]
(b) Any action under Sub-Clauses 8.9 [Employer’s Suspension] and 8.12 [Prolonged Suspension]
(c) Issuance of “Taking Over Certificate” under Sub-Clause 10.1 [Taking Over the Works and Sections].
(d) Issuing the “Performance Certificate” under Sub-Clause 11.9 [Performance Certificate].
(e) Sub-Clause 13.1 [Right to Vary]: instructing a Variation, except;
(i) in an emergency situation as determined by the Engineer, or
(ii) if such a Variation would increase the Accepted Contract Amount by less than the percentage specified in the Contract Data.
(f) Sub-Clause 13.3 [Variation Procedure]: approving a proposal for Variation submitted by the Contractor in accordance with Sub-Clause 13.3.2 [Variation by Request for Proposal] or 13.2 [Value Engineering].
(g) Certifying release of second half of the Retention Money under Sub-Clause 14.9 [Release of Retention Money].
(h) Issuing Final Payment Certificate under Sub-Clause 14.13 [Issue of FPC].
(i)
*[insert Sub-Clause number (not Sub-Clause 3.7 [Agreement or Determination]
Any such requirement shall not be applied to any action by the Engineer under Sub-Clause 3.7 [Agreement or Determination], as stated in Sub-Clause 3.2 [Engineer’s Duties and Authority] of the General Conditions.
Notwithstanding the obligation, as set out above, to obtain approval, if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of the Works or of adjoining property, he may, without relieving the Contractor of any of his duties and responsibility under the Contract, instruct the Contractor to execute all such work or to do all such things as may, in the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith comply, despite the absence of approval of the Employer, with any such instruction of the Engineer. The Engineer shall determine an addition to the Contract Price, in respect of such instruction, in accordance with Clause 13 and shall notify the Contractor accordingly, with a copy to the Employer.
Following is added after the words “the Employer’s consent is required” in 4th paragraph:
“stating that the Employer’s consent has been obtained for that specified authority”
4.2 Performance Security
4.2.1 Contractor’s Obligations
The entity issuing the Performance Security and its form shall be as under:
The Performance Security shall be, at the option of the Contractor,issuedin the prescribed form included in the Bidding Documents,by(a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistan or (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofratingas provided in Table below:
Accepted Contract Amount (In Eq. PKR million) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
In case of Joint Venture, the Performance Security shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
Following paragraph is added at the end of this Sub-Clause:
“The amount of Performance Security shall be reducedto 50%following issue of the Taking-Over Certificate for the whole of the Works under Clause 10 of Conditions of Contract.”
4.3 Contractor’s Representative
In second paragraphthe text “professional engineer as defined in the Pakistan Engineering Council Act, 1975 (Act No. V of 1976) (having temporary licence in case of foreign engineer under Section 12 of the Pakistan Engineering Council Act, 1975 (Act No. V of 1976)” are added after the words “qualified, experienced”.
In the 3rd paragraph the words “28 days” are substituted by “14 days”. In 2nd line of 4thparagraph the text “or appoint a replacement” is substituted by “except appointment of a suitable temporary replacement is deployed at the Site”
4.4 Contractor’s Documents
4.4.2 As-Built Records
First paragraph is deleted and the text in the last paragraph is substituted with the following:
“The Contractor shall furnish to the Engineer 6 copies, one reproducible and one electronic copy(provided the Engineer has made available to the Contractor editable form of the Drawings)of all Drawings amended to conform to the Works as built.In case the Engineer does not make available to the Contractor editable form of the Drawings, the Contractor shall furnish to the Engineer as-built data for incorporation in the Drawings. Upon receipt of PDF versions of the as-built drawings prepared by the Engineer, the Contractor shall furnish to the Engineer 6copies and one reproducible of these Drawings.
The price of such Drawings shall be deemed to be included in the Contract Price.”
Following Sub-Clause is added:
4.4.4 ShopDrawings
The Contractor shall submit to the Engineer for review 3 copies of all shop and erection drawings applicable to this Contract as per provision of relevant Sub-Clause of the Contract.
Review and approval by the Engineer shall not exceed 21 days and be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory and the Engineer’s review or approval shall not relieve the Contractor of any of his responsibilities under the Contract.
4.8 Health and Safety Obligations
The following text is added at the end ofthis Sub-Clause:
In the event of work being carried out outside the normal working hours and in the event of work being carried out at night, the Contractor shall at his own cost, provide and maintain such good and sufficient light as will enable the work to proceed satisfactorily and without danger. The approaches to the Site and the Works where the night work is being carried out shall be sufficiently lighted. All arrangement adopted for such lighting shall be to the satisfaction of the Engineer.
4.20 Progress Reports
At the end of sub-paragraph (g) the word “and” is deleted and at the end of sub-paragraph (h) the full stop (.) is replaced with “;”, and the following new sub-paragraphs are added as:
(i) planned programme for the execution of the Works for next 56 days to enable the Engineer to determine its programme of inspection and testing;
(j) monthly summery of daily job record indicating weather conditions, deployment of Contractor’s Equipment, labour employment, local material procurement and material import, if any; and
(k) salient contractual and project information.
5.1 Subcontractors
Add the following text at the end of paragraph (ii):
“underSchedule to Bid”
The following is added at the end of the last paragraph of Sub-Clause 5.1:
“All subcontracts relating to the Works shall include provisions which entitle the Employer to require the subcontract to be assigned to the Employer under sub-paragraph (a) of Sub-Clause 15.2.3 [After Termination].
The Contractor shall give reasonable opportunity to contractors from Islamic Republic of Pakistan for subcontracts for the Works, and endeavour to employ such contractors as Subcontractors.”
5.2 Nominated Subcontractors
5.2.2 Objection to Nomination
In sub-paragraph (c), “and” is deleted from the end of (i);
“.” at the end of (ii) is replaced with: “, and”.
The following is then added as (iii):
“(iii) be paid only if and when the Contractor has received from the Employer payments for sums due under the Subcontract referred to under Sub-Clause 5.2.3 [Payment to nominated Subcontractors].”
6.1 Engagement of Staff and Labour
The following paragraph is added at the end of the Sub-Clause:
“The Contractor shall, to the extent practicable and reasonable, employ staff (not less than 50%) and labour (not less than 85%) with appropriate qualifications and experience from sources within the Islamic Republic of Pakistan.”
6.7 Health and Safety of Personnel
The existing text is substituted with the following:
“In order to provide for the safety, health and welfare of persons, and for prevention of damage of any kind, all operations for the purposes of or in connection with the Contract shall be carried out in compliance with the Safety Requirements of the Government of Pakistan with such modifications thereto as the Engineer may authorize or direct and the Contractor shall take or cause to be taken such further measures and comply with such further requirements as the Engineer may determine to be reasonably necessary for such purpose. The Contractor shall also provide all other medical services and appoint a health and safety officer at Site if stated in the Specifications. In case of any fatality or serious accident, the Contractor shall, in addition, notify the Engineer immediately by the quickest available means.”
6.8 Contractor’s Superintendence
Insert at the end of sub-paragraph (a) of this Sub-Clause:
"or, if not, the Contractor shall make competent interpreters available during all working hours, in a number sufficient for those persons to properly perform their superintendence duties"
The following text is added at the end of this Sub-Clause:
“The Contractor’s authorized representative and his other engineers working at site shall possess valid registration with the Pakistan Engineering Council.
The Contractor’s authorized representative at Site shall be authorized to exercise adequate administrative and financial powers on behalf of the Contractor so as to achieve completion of the Works as per the Contract.”
6.12 Key Personnel
The following is inserted at the end of the last paragraph:
“If any of the Key Personnel are not fluent in this language, the Contractor shall make competent interpreters available during all working hours in a number deemed sufficient by the Engineer.”
The following Sub-Clauses 6.13 to 6.26 are added at the end of Sub-Clause 6.12:
6.13 Foreign Personnel
The Contractor may bring in to the Country any foreign personnel who are necessary for the execution of the Works to the extent allowed by the applicable Laws. The Contractor shall ensure that these personnel are provided with the required residence visas and work permits. The Employer will, if requested by the Contractor, use all reasonable endeavours in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national, or government permission required for bringing in the Contractor’s personnel.
The Contractor shall be responsible for the return of these personnel to the place where they were recruited or to their domicile. In the event of the death in the Country of any of these personnel or members of their families, the Contractor shall similarly be responsible for making the appropriate arrangements for their return or burial.
6.14 Supply of Foodstuffs
The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Specification at reasonable prices for the Contractor’s Personnel for the purposes of or in connection with the Contract.
6.15 Supply of Water
The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor’s Personnel.
6.16 Measures against Insect and Pest Nuisance
The Contractor shall at all times take the necessary precautions to protect the Contractor’s Personnel employed on the Site from insect and pest nuisance, and to reduce the danger to their health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.
6.17 Alcoholic Liquor or Drugs
The Contractor shall not, otherwise than in accordance with the Laws of the Country, import, sell, give, barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift, barter or disposal thereto by Contractor’s Personnel.
6.18 Arms and Ammunition
The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor’s Personnel to do so.
6.19 Festivals and Religious Customs
The Contractor shall respect the Country’s recognized festivals, days of rest and religious or other customs.
6.20 Funeral Arrangements
The Contractor shall be responsible, to the extent required by local regulations, for making any funeral arrangements for any of its local employees who may die while engaged upon the Works.
6.21 Forced Labour
The Contractor, including its Subcontractors, shall not employ or engage forced labour which consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.
6.22 Child Labour
The Contractor, including its Subcontractors, shall not employ or engage child labour in accordance with relevant law(s) in force in Islamic Republic of Pakistan.
6.23 Employment Records of Workers
The Contractor shall keep complete and accurate records of the employment of labour at the Site. The records shall include the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis and submitted to the Engineer. These records shall be included in the details to be submitted by the Contractor under Sub-Clause 6.10 [Contractor’s Records].
6.24 Workers’ Organizations
The Contractor shall comply with the relevant labour laws of Pakistan which recognize workers’ rights to form and to join workers’ organizations/Trade Union of their choosing and to bargain collectively without interference.
6.25 Non-Discrimination and Equal Opportunity
The Contractor shall not make decisions relating to the employment or treatment of Contractor’s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor’s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices.
Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure nondiscrimination and equal opportunity, including for specific groups such as women, persons with disabilities, migrant workers and children (of working age in accordance with Sub-Clause 6.22).
6.26 Epidemics
In the event of any out-break of illness of epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government or the local medical or sanitary authorities for the purpose of overcoming the same.
7.7 Ownership of Plant and Materials
The following is added before the first paragraph:
“Except as otherwise provided in the Contract,”
The following is added at the end of the Sub-Clause:
"No Plant and/or Materials that is the property of the Employer shallbe removed from the Site. If it becomes necessary to:
(i) remove any item of such Plant from the Site for the purposesof repair, the Contractor shall give a Notice, with reasons, tothe Engineer requesting consent to remove the defective ordamaged item off the Site. This Notice shall clearly identifythe item of defective or damaged Plant, and shall give detailsof: the defect or damage to be repaired; the place to whichdefective or damaged item of Plant is to be taken for repair;the transportation to be used (and insurance cover for suchtransportation); the proposed inspections and testing off theSite; and the planned duration required before the repaireditem of Plant shall be returned to the Site. The Contractorshall also provide any further details that the Employer mayreasonably require; or
(ii) replace any item(s) of such Plant and/or Materials, theContractor shall give a Notice, with reasons, to the Engineerclearly identifying the item(s) of Plant and/or Materials to bereplaced, and giving details of the due date of delivery tothe Site of the replacement item(s).
Where any item of Plant and/or Materials has become the propertyof the Employer under this Sub-Clause before it has been deliveredto the Site, the Contractor shall ensure that such an item is notmoved except for its delivery to the Site.
The Contractor shall indemnify and hold the Employer harmlessagainst and from the consequences of any defect in title orencumbrance or charge (except any reasonable restrictionarising from the intellectual property rights of the manufacturer orproducer) on any item of Plant and/or Materials that has becomethe property of the Employer under this Sub-Clause."
The following Sub-Clause7.9 is added after Sub Clause 7.8:
7.9 Use of Pakistani Materials and Services
The Contractor shall, so far as may be consistent with the Contract, make the maximum use of materials, supplies, plant and equipment indigenous to or produced or fabricated in Pakistan and services available in Pakistan provided such materials, supplies, plant, equipment and services shall be of required standard.
8.1 Commencement of Works
The following is added before the first paragraph:
“After signing of the Contract Agreement by both Parties,” and thereafter the word “The” is replaced with the word “the”.
8.5 Extension of Time for Completion
The following is added after paragraph (c):
“for last five years”.
The following Sub-Clause 8.14 is added after Sub-Clause 8.13:
8.14 Incentives For Early Completion
If Contract Data does not state applicability of incentives for early completion, this Sub-Clause shall not apply.
The Contractor shall be entitled subject to Sub-Clause 20.2 [Claims for Payment and/or EOT] to bonus payment if the Works and/or each Section is completed earlier than the Time for Completion for the Works or Section (as the case may be). The amount of bonus for early completion of the Works and/or each Section shall be upto a limit and at a rate to 50% of the relevant limit and rate of delay damages prescribed in Contract Data and shall be paid for every day which shall elapse between the relevant Date of Completion of the Works or Section and the relevant Time for Completion.
For the purposes of calculating any bonus payment, the applicableTime for Completion stated in the Contract Data is fixed and noadjustments of this time by reason of granting an EOT will beallowed.
The following Sub-Clause 11.12 is added after Sub-Clause 11.11:
11.12 Supervisory Assistance During DNP
If provided under the Schedule of Prices, the Contractor shall provide supervisory assistance to the Employer during the DNP for the Works. Such supervisory assistance shall be as described in the Specification for the purpose of supporting the Employer's operation and maintenance of the Plant for the period specified in the Schedule of Prices after the Date of Completion.
12.2 Method of Measurement
The following paragraph is added at the end of the Sub-Clause:
“Summary of measured quantity for payment shall be delineated item-wise under four headsnamely; “Schedule of Prices Quantity”, “Quantity Executed To-date”, “Quantity Certified Previously” and “Net Quantity Executed under this Certificate”.
12.3 Valuation of the Works
The following text is added at the end of fifth paragraph of the Sub-Clause:
“Sum of overhead charges and profit for sub-paragraph (a) shall be Twenty Five percent (25%)”.
13.4 Provisional Sums
The following paragraph is inserted as the penultimate paragraph:
“The Provisional Sum shall be used to cover the Employer’s share of the DAAB members’ fees and expenses, in accordance with Clause 21. No prior instruction of the Engineer shall be required with respect to the work of the DAAB. The Contractor shall submit the DAAB members’ invoices and the satisfactory evidence of having paid 100% of such invoices as part of the substantiation of those Statements submitted under Sub-Clause 14.3.
13.6 Adjustments for Changes in Laws
The following paragraphsare added at the end of the Sub-Clause:
“Notwithstanding the foregoing, the Contractor shall not be entitled to an extension of time if the relevant delay has already been taken into account in the determination of a previous extension of time and such Cost shall not be separately paid if the same shall already have been taken into account in the indexing of any inputs to the Table of Adjustment Data in accordance with the provisions of Sub-Clause 13.7 [Adjustments for Changes in Cost].”
14.1 The Contract Price
The following is added at the end of the Sub-Clause:
“Notwithstanding the provisions of subparagraph (b), Contractor's Equipment, including essential spare parts, imported by the Contractor for the sole purpose of executing the Contract shall be temporarily exempt from the payment of import duties and taxes upon initial importation, provided the Contractor shall post with the customs authorities at the port of entry an approved re-export bond or bank guarantee, valid until the Time for Completion plus six months, in an amount equal to the full import duties and taxes which would be payable on the assessed imported value of such Contractor's Equipment and spare parts, and callable in the event the Contractor's Equipment is not re-exported from the Country on completion of the Contract. A copy of the bond or bank guarantee endorsed by the customs authorities shall be provided by the Contractor to the Employer upon the importation of individual items of Contractor's Equipment and spare parts. Upon re-export of individual items of Contractor's Equipment or spare parts, or upon the completion of the Contract, the Contractor shall prepare, for approval by the customs authorities, an assessment of the residual value of the Contractor's Equipment and spare part to be re-exported, based on the depreciation scale(s) and other criteria used by the customs authorities for such purposes under the provisions of the applicable Laws. Import duties and taxes shall be due and payable to the customs authorities by the Contractor on (a) the difference between the initial imported value and the residual value of the Contractor's Equipment and spare parts to re-exported; and (b) on the initial imported value of the Contractor's Equipment and spare parts remaining in the Country after completion of the Contract. Upon payment of such dues within 28 days of being invoiced, the bond or bank guarantee shall be reduced or released accordingly; otherwise the security shall be called in the full amount remaining.”
[The Employer may change or delete this Sub-Clause as per Project requirements]
14.2 Advance Payment
14.2.1 Advance Payment Guarantee
The entity issuing the Advance PaymentGuaranteeand its form shall be as under:
The Advance PaymentGuarantee shall be in the form of Guarantee issued by (a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistanor (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
In case of Joint Venture, the Advance PaymentGuarantee(s)shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
14.6 Issue of IPC
14.6.1 The IPC
In the first line of the 1st paragraph the words “28 days” are substituted by “14 days”.
14.7 Payment
The words “or through crossed cheque in favour of the Contractor or JV partners. The Payment to JV partners shall be made at the request of the Joint Ventures in the ratio of their shares specified by them” are added at the end of the Sub-Clause.
14.8 Delayed Payment
In the first paragraph, third line, the words “compounded monthly” are deleted.
The text of 2nd paragraph is deleted and substituted with the following:
“The Employer shall pay to the Contractor compensation at the rate stated in the Contract Data.”
14.9 Release of Retention Money
The following is added at the end of Sub-Clause 14.9:
“Unless otherwise stated in the Contract, when the Taking-Over Certificate has been issued for the Works and the first half of the Retention Money has been certified for payment by the Engineer, the Contractor shall be entitled to substitute a guarantee, in the form annexed to the Particular Conditions or in another form approved by the Employer and issued by a schedule bank selected by the Contractor, for the second half of the Retention Money. The Contractor shall ensure that the guarantee is in the amounts and currencies of the second half of the Retention Money and is valid and enforceable until the Contractor has executed and completed the Works and remedied any defects, as specified for the Performance Security. On receipt by the Employer of the required guarantee, the Engineer shall certify, and the Employer shall pay the second half of the Retention Money. The release of the second half of the Retention Money against a guarantee shall then be in lieu of the release after the latest of the expiry dates of the Defects Notification Periods. The Employer shall return the guarantee to the Contractor within 21 days after receiving a copy of the Performance Certificate.
If the Performance Security required under Sub-Clause 4.2 is in the form of a demand guarantee, and the amount guaranteed under them when the Taking-Over Certificate is issued is more than half of the Retention Money, then the Retention Money guarantee will not be required. If the amount guaranteed under the Performance Security when the Taking-Over Certificate is issued is less than half of the Retention Money, the Retention Money guarantee will only be required for the difference between half of the Retention Money and the amount guaranteed under the Performance Security.
15.2 Termination for Contractor’s Default
15.2.1 Notice
Following text is added at the end of sub-paragraph (h) of this Sub-Clause:
“For the purposes of this Contract, corrupt and fraudulent practices have been defined in Public Procurement Rules 2004.”
15.2.3 After Termination
The word “and” at the end of sub-paragraph (ii) of paragraph (b) is deleted the following paragraph is added after sub-paragraph (iii):
“(iv) all Employer-Supplied Materials and/or Employer's Equipment madeavailable to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer's Equipment], and”
15.4 Payment after Termination
The following text is added at the end of this Sub-Clause:
“The Employer shall be entitled to sell any of the Contractor’s Equipment, Temporary Works and unused materials and apply the proceeds of sale towards payment of any debt due from the Contractor to the Employer under this Clause including any outstanding payments to the Subcontractors.
16.2 Termination by Contractor
16.2.1 Notice
The sub-paragraph (j) is deleted in its entirety.
At the end of sub-paragraph (i) “; or” is replaced with “.” and at the end of sub-paragraph (h) “;” is replaced with “; or”.
In sub-paragraph (f) “84 days” are replaced with “180 days” and text “for reasons not attributable to the Contractor” is added at the end.
16.3 Contractor’s Obligations After Termination
Sub-paragraph (c) is deleted and replaced with:
"(c) deliver to the Engineer all Employer-Supplied Materials and/orEmployer's Equipment made available to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer’s Equipment]; and
(d) remove all other Goods from the Site, except as necessary for safety,and leave the Site."
17.1 Responsibility for Care of the Works
After the two instances of “Goods” in the last paragraph, the words “Employer-Supplied Materials and/orEmployer's Equipment” are added.
The following Sub-Clause 17.7 is added after Sub-Clause 17.6:
17.7 Use of Employer’s Accommodation/Facilities
The Contractor shall take full responsibility for the care of the items of the Employer’s facilities and/or accommodation, if any, as detailed in the Specification, from the date of use and/or occupation by the Contractor until the date on which such use and/or occupation is re-vested in the Employer.
If any loss or damage happens to any of the above items during a time while the Contractor is responsible for its care, arising from any cause other than a cause for which the Employer is responsible or liable, the Contractor shall promptly rectify the loss or damage at the Contractor’s risk and cost.
18.1 Exceptional Events
The words “or disorder” are replaced with “disorder or sabotage” in sub-paragraph (c) of the Clause.
18.4 Consequences of an Exceptional Event
The following is added at the end of sub-paragraph (b) after deleting the “.”:
“, including the costs of rectifying or replacing the Works and/or Goods damaged or destroyed by Exceptional Events, to the extent they are not indemnified through the insurance policy referred to in Sub-Clause 19.2 [Insurance to be provided by the Contractor].”
18.5 Optional Termination
In sub-paragraph (c), the words “and necessarily” areadded after the words “was reasonably”.
19.1 General Requirements
Following text is added at the end of first paragraph:
“The Contractor shall immediately after the date of the Letter of Acceptance submit the draft of insurance policies for the Employer’s consent.”
Following text is added at the end of third paragraph:
“The Contractor shall, within the respective periods stated in the Contract Data submit to the Engineer and the Employer a) evidence that the insurances described in this Clause have been effected, and b) copies of policies of the insurances described in Sub-Clauses 19.2.1, 19.2.4 and 19.2.5.”
19.2 Insurance to be provided by the Contractor
19.2.5 Injury to employees
The words “sickness, disease” are deleted in the third line of first paragraph.
The following Sub-Clause is added after Sub-Clause 19.2.6:
19.2.7 Insurance Company
“The Contractor shall be obliged to place all insurances described in this Clause with insurers listed in the Contract Data and rated byPACRA/VISofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
21.6 Arbitration
The word “international” is deleted in the sixth line of first paragraph. The text of sub-paragraph (a) is substituted with the following:
“the Dispute shall be finally settled under the Rules of Arbitration, specified in the Contract Data;”
The following Clauses are added after Clause 21
22 Custom Duty
[Employer may incorporate provisions where applicable. However, in order to make the bid more balanced, the payment of Customs Duties should be the responsibility of the Employer.]
23 Taxes
The Contractor, Subcontractors and their employees shall be liable to pay income tax, withholding tax, super tax and other taxes on income arising out of the Contract. The rates and prices as stated in the contract shall be deemed to cover all such taxes.
24 Integrity Part
If it is found and established at any stage that the Contractor or any of his Subcontractors, agents or servants have violated or involved in violation of the Integrity Pact signed by the Contractor then the Employer shall be entitled to :
(a) recover from the Contractor an amount equivalent to ten times the sum of any commission, gratification, bribe, finder’s fee or kickback given by the Contractor or any of his Subcontractors, agent or servants;
(b) terminate the Contract; and
(c) recover from the Contractor any loss or damage to the Employer as a result of such termination or of any other corrupt business practices of the Contractor or any of his Subcontractors, agent or servants.
The termination under sub-paragraph(b) of this Sub-Clause shall proceed in the manner prescribed under Sub-Clause 15.1 to 15.4 and the payment under Sub-Clause 15.4 shall be made after having deducted the amounts due to the Employer under sub-paragraph(a) and (c) of this Sub-Clause.
Appendix General Conditions of Dispute Avoidance/Adjudication Agreement
12 Disputes Under DAAB Agreement
In the first paragraph, third, fourth and fifth line, the text “under the Rules of Arbitration of the International Chamber of Commerce 2017……………shall apply” is substituted with “under the Arbitration Act 1940 by sole arbitrator appointed by the Managing Director Public Procurement Regulatory Authority or Chairman Pakistan Engineering Council.”
Date:
No.:
Alternative No.: P183357
To: National Police Foundation (National Police Foundation), Assistant Director Admin Mauve Area G-10/4, Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid-Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
(a) have withdrawn our Bid during the period of Bid validity specified in the Letter of Bid; or
(b) having been notified of the acceptance of our Bid by the Procuring agency/Employer during the period of Bid validity, (i) fail or refuse to sign the Contract; or (ii) fail or refuse to furnish the Performance Security (or guarantee), if required, in accordance with the ITB.
We understand this Bid Securing Declaration shall expire if we are not the successful Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight days after the expiration of our Bid.
Name of the Bidder*
Name of the person duly authorized to sign the Bid on behalf of the Bidder** _______
Title of the person signing the Bid ______________________
Signature of the person named above ______________________
Date signed ________________________________ day of ___________________, _____
*: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder
**: Person signing the Bid shall have the power of attorney given by the Bidder attached to the Bid
[Note: In case of a Joint Venture, the Bid-Securing Declaration must be in the name of all members to the Joint Venture that submits the Bid.]
THIS CONTRACT AGREEMENT (hereinafter called the “Agreement”) made on the _________ day of __________ (month) 20_____ between National Police Foundation (National Police Foundation), Assistant Director Admin Mauve Area G-10/4, Islamabad Capital Territory (hereinafter called the “Employer”) of the one part and __________________________________________________ (hereinafter called the “Contractor”) of the other part.
WHEREAS the Employer is desirous that certain Works, viz., Construction of Houses and Associated Infrastructure Development for ICT Police (P183357) should be executed by the Contractor and has accepted a Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein.
NOW this Agreement witnessed as follows:
1. In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents, in the order of priority, after incorporating addenda, if any, except those parts relating to Instructions to Bidders shall be deemed to form and be read and construed as part of this Agreement:
a) This Contract Agreement;
b) The Letter of Acceptance;
c) The Letter of Bid;
d) The Particular Conditions Part A - Contract Data;
e) The Particular Conditions Part B - SpecialProvisions;
f) The General Conditions;
g) The Specifications Part A - SpecificProvisions;
h) The Specifications Part B- Technical Provisions;
i) The Drawings;
j) The Completed Schedules to Bid including Schedule of Prices;
k) the JV Undertaking (if the Contractor is a JV); and
l) [Employer to insert any other documents forming part of the Contract]
The addenda/corrigenda,if any, (Excluding part relating to Instructions to Bidders alongwith Bidding Data) shall be deemed to have been incorporated at the appropriate places in the “Documents forming the Contract”.
3. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy defects therein in conformity and in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor, in consideration of the execution and completion of the Works as per provisions of the Contract, the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.
IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on the day, month and year first before written in accordance with their respective laws.
Signature of the Contactor Signature of Employer
(Seal) (Seal)
Signed, Sealed and Delivered in the presence of:
Witness Witness
(Name, Title and Address) (Name, Title and Address)
[All italicised text and any text within square brackets (except sub-clause headings) in this form of agreement is for use in preparing the form and should be deleted from the final product].
Name and details of the Contract Construction of Houses and Associated Infrastructure Development for ICT Police
______________________________________________________________________________
This Agreement made the ______day of ______ [month], _____ [year], between
Name and contact details of the Employer National Police Foundation (National Police Foundation), Assistant Director Admin
Mauve Area G-10/4, Islamabad Capital Territory
+92-333-101-7652
procurement@npf.org.pk
Name and contact details of the Contractor _____________________________________ (name)
____________________________________ (address)
__________________________________ (telephone)
___________________(email / other contact details);
Name and contact details of the DAAB Member _____________________________________ (name)
____________________________________ (address)
__________________________________ (telephone)
___________________(email / other contact details);
Whereas:
A. the Employer and the Contractor have entered (or intend to enter) into the Contract;
B. under the Contract, the “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole member or three members (as stated in the Contract Data of the Contract) so named in the Contract, or appointed under Sub-Clause 21.1 [Constitution of the DAAB] or Sub-Clause 21.2 [Failure to Appoint DAAB Members] of the Conditions of Contract;
C. the Employer and the Contractor desire jointly to appoint the above-named DAAB Member to act on the DAAB as:
a. the sole member of the DAAB, and where this is the case, all references to the “Other Members” do not apply; or
b. one of three members / chairman [delete the one which is not applicable] of the DAAB and, where this is the case, the other two persons are:
____________________________ (name) _________________________ (name)
___________________________ (address) _______________________ (address)
_____________________________(telephone) ______________________(telephone)
______________(email/ other contact details) _______ (email/other contact details)
the “Other Members”; and
D. the DAAB Member accepts this appointment.
The Employer, Contractor and DAAB Member jointly agree as follows:
1. The conditions of this DAAB Agreement comprise:
(a) Clause 21 [Disputes and Arbitration] of the Conditions of Contract, and any other provisions of the Contract that are applicable to the DAAB’s Activities; and
(b) the “General Conditions of Dispute Avoidance/Adjudication Agreement”, which is appended to the General Conditions of the “Conditions of Contract for Construction” Second Edition 2017 published by FIDIC (“GCs”), as amended and/or added to by the following provisions.
2. [Details of amendments to the GCs, if any. For example:
In the procedural rules annexed to the GCs, Rule _ is deleted and replaced by: “ … “]
3. The DAAB Member shall be paid in accordance with Clause 9 of the GCs. The currency of payment shall be ________.
In respect of Sub-Clauses 9.1 and 9.2 of the GCs, the amounts of the DAAB Member’s monthly fee and daily fee shall be:
monthly fee___________________ per month, and
daily fee of____________________ per day
(or as otherwise set under Sub-Clause 9.3 of the GCs).
4. In consideration of the above fees, and other payments to be made to the DAAB Member in accordance with the GCs, the DAAB Member undertakes to act as DAAB Member in accordance with the terms of this DAAB Agreement.
5. The Employer and the Contractor shall be jointly and severally liable for the DAAB Member’s fees and other payments to be made to the DAAB Member in accordance with the GCs.
6. This DAAB Agreement shall be governed by the law of _____________ (if not stated, the law that governs the Contract under Sub-Clause 1.4 of the Conditions of Contract).
SIGNED by:_______________ SIGNED by:_______________ SIGNED by:_______________
Print name:_________________ Print name:_________________ DAAB Member
Title: _____________________ Title:______________________ Title:______________________
for and on behalf of the
Employer for and on behalf of the
Contractor
in the presence of in the presence of in the presence of
Witness:___________________ Witness:___________________ Witness:___________________
Name:_____________________ Name:_____________________ Name:_____________________
Address:___________________ Address:___________________ Address:___________________
__________________________ __________________________ __________________________
Date:______________________ Date:______________________ Date:______________________
Guarantee No._________________________________________ Date _________________
WHEREAS _____________________________________ (hereinafter called the 'Employer')
has entered into a Contract for __________________________________________________
(Particulars of Contract)
with ____________________________________________ (hereinafter called the "Contractor').
AND WHEREAS, the Employer has agreed to advance to the Contractor, at the Contractor's request, an amount of Pak Rupees ___________________________________ (PKR _________ ) which amount shall be advanced to the Contractor as per provisions of the Contract.
AND WHEREAS, the Employer has asked the Contractor to furnish Guarantee to secure the mobilization advance for the performance of his obligations under the said Contract.
AND WHEREAS, ____________________________________________________________
(hereinafter called the “Guarantor”) at the request of the Contractor and in consideration of theEmployer agreeing to make the above advance to the Contractor, has agreed to furnish the said Guarantee.
NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the advance for the purpose of above mentioned Contract and if he fails and commits default in fulfilment of any of his obligations for which the advance payment is made, the Guarantor shall be liable to the Employer for payment not exceeding the aforementioned amount.
Notice in writing of any default,on the part of the Contractor, of which the Employer at his discretion of making decision, shall be given by the Employer to the Guarantor, and on such first written demand, payment shall be made by the Guarantor of all sums then due under this Guarantee without any reference to the Contractor and without any objection.
This Guarantee shall remain in force until the advance is fully adjusted against payments from the Interim Payment Certificates of the Contractor or until _________________________whichever is earlier. (Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of
PKR ______________________ (PakRupees ________________________________________________).
This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the aforesaid date or earlier if the advance made to the Contractor is fully adjusted against paymentsfrom Interim Payment Certificates of the Contractor provided that the Guarantor
agrees that the aforesaid period of validity shall be deemed to be extended if on the above mentioned date the advance payment is not fully adjusted.
Guarantor
(Scheduled Bank/ Insurance Company)
Signature ________________________________________________
Name ________________________________________________
Title ________________________________________________
WITNESS:
1. ________________________________________________
________________________________________________
Corporate Secretary (Seal) Corporate Guarantor (Seal)
2. ________________________________________________
________________________________________________
Name, Title & Address
________________________________ [Guarantor letterhead or SWIFT identifier code]
Beneficiary: ___________________ [Insert name and Address of Employer]
Date: ________________[Insert date of issue]
RETENTION MONEY GUARANTEE No.: [Insert guarantee reference number]
Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]
We have been informed that ________________ [insert name of Contractor, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called "the Contractor") has entered into Contract No. _____________ [insert reference number of the contract] dated ____________ with the Employer, for the execution of _____________________ [insert name of contract and brief description of Works] (hereinafter called "the Contract").
Furthermore, we understand that, according to the conditions of the Contract, the Employer retains moneys up to the limit set forth in the Contract (“the Retention Money”), and that when the Taking-Over Certificate has been issued under the Contract and the first half of the Retention Money has been certified for payment, payment of [insert the second half of the Retention Money orifthe amount guaranteed under the Performance Guarantee when the Taking-Over Certificate is issued is less than half of the Retention Money, the difference between half of the Retention Money and the amount guaranteed under the Performance Security and, if required, the ES Performance Security] is to be made against a Retention Money guarantee.
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ [insert amount in figures] () [amount in words] upon receipt by us of the Employer’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating that the Applicant is in breach of its obligation(s) under the Contract, without your needing to prove or show grounds for your demand or the sum specified therein.
A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Employer’s bank stating that the second half of the Retention Money as referred to above has been credited to the contractor on its account number ___________ at _________________ [insert name and address of Contractor’s bank].
This guarantee shall expire no later than the …. day of ……, 2…, and any demand for payment under it must be received by us at the office indicated above on or before that date.
____________________
[signature(s)]
Note: All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Name of Employer: ……………… Name of Bidder/Contractor: ……………
Signature: …………………… Signature: …………………………….
[Seal] [Seal]
Guarantee No.___________________
Executed on ____________________
Expiry date _____________________
Name of Guarantor with address: _________________________________________________________________________________________________________________________________
Name of Principal (Contractor) with address:___________________________________________________________________________________________________________________________
Penal Sum of Security (express in words and figures) ____________________________________________________________________________________________________________________
Letter of Acceptance No. _____________________________________Dated __________________
KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bidding Documents and above said Letter of Acceptance (hereinafter called the Documents) and at the request of the said Principal we, the Guarantor above named, are held and firmly bound unto the National Police Foundation (National Police Foundation), Assistant Director Admin Mauve Area G-10/4, Islamabad Capital Territory (hereinafter called the Employer) in the penal sum of the amount stated above for the payment of which sum well and truly to be made to the said Employer, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has accepted the Employer's above said Letter of Acceptance for _____________________________________ ________________________________
(Name of Contract) for the Construction of Houses and Associated Infrastructure Development for ICT Police (P183357)
______________________________________________ (Name of Project).
NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all the undertakings, covenants, terms and conditions of the said Documents during the original terms of the said Documents and any extensions thereof that may be granted by the Employer, with or without notice to the Guarantor, which notice is, hereby, waived and shall also well and truly perform and fulfill all the undertakings, covenants terms and conditions of the Contract and of any and all modifications of said Documents that may hereafter be made, notice of which modifications to the Guarantor being hereby waived, then, this obligation to be void; otherwise to remain in full force and virtue till all requirements of Clause11, Defects After Taking Over, of Conditions of Contract are fulfilled.
Our total liability under this Guarantee is limited to the sum stated above and it is a condition of any liability attaching to us under this Guarantee that the claim for payment in writing shall be received by us within the validity period of this Guarantee, failing which we shall be discharged of our liability, if any, under this Guarantee.
We, _________________________________________________ (the Guarantor), waiving all objections and defense under the Contract, do hereby irrevocably and independently guarantee to pay to the Employer without delay upon the Employer's first written demand without cavil or arguments and without requiring the Employer to prove or to show grounds or reasons for such demand any sum or sums up to the amount stated above, against the Employer's written declaration that the Principal has refused or failed to perform the obligations under the Contract which payment will be effected by the Guarantor to Employer’s designated Bank & Account Number.
PROVIDED ALSO THAT the Employer shall decide, whether the Principal (Contractor) has duly performed his obligations under the Contract or has defaulted in fulfilling said obligations and the Guarantor shall pay without objection any sum or sums up to the amount stated above upon first written demand from the Employer forthwith and without any reference to the Principal or any other person.
IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its seal on the date indicated above, the name and corporate seal of the Guarantor being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.
Guarantor
(Schedule Bank/ Insurance Company)
Signature: _________________________________________________
Name: _________________________________________________
Title: _________________________________________________
Corporate Guarantor (Seal)
WITNESS:
1.
_________________________________________________
_________________________________________________
2.
_________________________________________________
_________________________________________________
Name, Title & Address