Standard Bidding Document

📑 Procurement Notice (NIT)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

REQUEST FOR BIDS

PROCUREMENT OF CIVIL WORKS

  1. The Air University -P&D Department (Air University) has reserved Funds for the procurement planned for FY 2026-27. The Air University -P&D Department (Air University) intends to apply part of the proceeds of this Fund to cover eligible payments under the contract for the "Construction of Library and Classroom Block at H-11 Campus" with the reference of "P183681".
  2. The Air University -P&D Department (Air University) invites sealed Bids from eligible Bidders for procurement of Works (Construction of Library and Classroom Block at H-11 Campus) described in the bidding documents on EPADS v2.0.
  3. Single Stage-Two Envelope will be used by adopting Least Cost Based Selection (LCBS) Technique for the subject procurement, in line with the Public Procurement Rules, 2026 and any Regulations, Regulatory Guides, Procurement Guidelines or Instructions issued by the Authority from time to time.
  4. All Bids must be accompanied by a Bid Security amount described in Bid Security Section in Bidding Document in the form of  Pay Order, Banker's Cheque, Call at Deposit, Demand Draft. Or all bids must be accompanied by bid securing declaration in the format specified in the Bidding documents
  5. E-Bidding documents, containing detailed terms & conditions, specifications and requirements etc. are available on e-Pak Acquisition and Disposal System (EPADS) at https://epads.gov.pk/opportunities/federal/procurements/183681 for all the interested bidders registered on EPADS v2.0. Bidders are required to get themselves registered on EPADS v2.0 to participate in Bidding process.
  6. The e-bids, prepared in accordance with the instructions in the e-Bidding documents, must be submitted through EPADS v2.0 on or before Monday, November 23, 2026 11:00 AM. E-bids will be opened by using EPADS v2.0 on the same day at Monday, November 23, 2026 11:30 AM. Manual submission of Bids shall not be entertained. Those vendor who have not yet registered on the new version of EPADS v2.0, may register themselves on https://vendors.epads.gov.pk/. A tutorial to explain the registeration process is available at https://www.youtube.com/watch?v=MNW6T38v7tc.

In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).

 

 

Air University -P&D Department (Air University), Assistant Director
PAF Complex Sector E-9, Islamabad Capital Territory
+92-300-530-0386
ali.siddiqui@au.edu.pk

📑 Instructions to Bidders (ITB)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

A. INTRODUCTION

  1. Scope of Bid
    1. The Procuring agency/Employer (PA), as indicated in the Bid Data Sheet (BDS) invites Bids for the execution of Works as specified in the BDS and Section V- Works Requirements. The name, identification, and number of lots (contracts) of this National/ International Competitive Bidding process are specified in the BDS.
  2. Source of Funds
    1. Source of funds as referred in Clause 2 of Bid Data Sheet.
  3. Eligible Bidders
    1. A bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture or consortium. In the case of a joint venture or consortium, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture or consortium shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture or consortium during the Bidding process, and in case of award of contract, during the execution of contract. Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
      Any bid submitted by the joint venture, consortium or association shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
      (The limit on the number of members of JV or Consortium may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
    2. The invitation for bids is open to all prospective bidders subject to any provisions of incorporation or licensing by the respective national/ international incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidder keeping in view the requirement of that business.
    3. A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidders may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
      1. are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring agency/Employer to provide consulting services for the preparation of design or technical specifications of the works that are the subject of the bid; or
      2. have controlling shareholders in common; or
      3. receive or have received any direct or indirect subsidy from any of them; or
      4. have the same legal representative for purposes of this Bid; or
      5. have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the Procuring agency/Employer regarding this Bidding process; or
      6. Submit more than one bid in this bidding process.
    4. A Bidder may be ineligible if –
      1. he is declared bankrupt or, in the case of company or firm, insolvent;
      2. payments in favor of the bidder is suspended in accordance with the judgment of a court of law other than a judgment declaring bankruptcy and resulting (in accordance with the national laws) in the total or partial loss of the right to administer and dispose of its property;
      3. the bidder is convicted, by a final judgment of a Court of Law or relevant Professional Statuary Body, of any offence involving professional conduct;
      4. The bidder is debarred/ blacklisted by a national level Procuring agency/Employer and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration.
    5. As and when required, bidders shall provide to the Procuring agency/Employer evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
    6. Bidders shall submit proposal relating to the nature, conditions and modalities of sub-contracting wherever the sub-contracting of any elements of the contract is envisaged.
  4. Eligible Material and Equipment
    1. All the material and equipment to be mobilized under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such materials and equipment. For this purpose, ineligible countries are stated in the section-IV titled as “Eligible Countries”.

B. BIDDING DOCUMENTS

  1. Contents of Bidding Documents
    1. The scope of Works, bidding procedures, and terms and conditions of the contract are prescribed in the bidding documents.  In addition to the Invitation for Bids, the bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 7.1 include:
      Section I -Invitation for Bids 
      Section II Instructions to Bidders (ITBs)
      Section III Bid Data Sheet (BDS)
      Section IV Eligible Countries
      Section V Evaluation and Qualification Criteria
      Section VI Works Requirements Technical Specifications & Schedule of Requirements
      Section VII Standard Bidding Forms
      Section VIII General Conditions of Contract (GCC)
      Section IX Particular Conditions of Contract (PCC)
      Section X Contract Forms
    2. The bidder is expected to examine all instructions, forms, specifications, terms and conditions prescribed in the bidding documents. Failure to furnish all the information required in the bidding documents will be at the bidder’s risk and may result in the rejection of his bid. 
  2. Clarification of Bidding Document, Pre-bid Meeting
    1. A prospective bidder requiring any clarification of the bidding document may notify the Procuring agency/Employer through EPADS. 
    2. The Procuring agency/Employer shall respond to the request for clarification in accordance with Rule 31 of the Public Procurement Rules 2004.
    3. Should the Procuring Agency deem it necessary to amend the BIDDING document as a result of a clarification, it shall do so following the procedure under ITB 7.
    4. If indicated in the BDS, the bidder’s designated representative is invited at the bidder’s cost to attend a pre-bid meeting at the place, date and time mentioned in the BDS. During this pre-bid meeting, prospective bidders may request clarification of the schedule of requirement, the evaluation criteria or any other aspects of the bidding documents.
    5. Minutes of the pre-bid meeting, if applicable, including the text of the questions asked by bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS. Any modification to the bidding documents that may become necessary as a result of the pre-bid meeting shall be made by the Procuring agency/Employer exclusively through the use of an Addendum pursuant to ITB 7. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
    6. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works.  The costs of visiting the Site shall be at the bidder’s own expense.
    7. The bidder and any of its authorized personnel will be granted permission by the Procuring agency/Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the bidder and its personnel will release and indemnify the Procuring agency/Employer  from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
  3. Amendment of Bidding Documents
    1. The procuring agency may issue notification of any change, addition, modification or deletion in accordance with Rule 23 of the Public Procurement Rules 2004 i.e. Bidding Documents.
    2. To give prospective bidders reasonable time in which to take an addendum/corrigendum into account in preparing their bids, the Procuring agency/Employer may, at its discretion, extend the deadline for the submission of bids:
      Provided that the Procuring agency/Employer shall extend the deadline for submission of bid in pursuance of Rule 27 of the  Public Procurement Rules 2004, i.e. Extension of time for submission of bids, if such an addendum is issued within last three (03) days of the bid submission deadline.

C. PREPARATION OF BIDS

  1. Language of Bid
    1. The bid prepared by the bidder, as well as all correspondence and documents relating to the bid exchanged by the bidder and the Procuring agency/Employer shall be written in the English language unless specified in the BDS. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless specified in the BDS, in which case, for purposes of interpretation of the bidder, the translation shall govern.
  2. Documents Constituting the Bids   
    1. The Bids prepared by the Bidder shall constitute of all the documents required in the BDS.
  3. Documents Establishing Eligibility of Material, Equipment and Works, their Conformity to Bidding Documents
    1. The bid prepared by the bidder shall constitute the following components: -
      1. Documentary evidence established in accordance with ITB 10 that the material and equipment to be utilized by the Bidder for the executions of works are eligible material and equipment and conform to the Bidding Documents;
      2. Documentary evidence established in accordance with ITB 11 that the bidder has been authorized to carry out the Construction works;
      3. Documentary evidence established in accordance with ITB 11 that the bidder is eligible and/or qualified for the subject bidding process;
      4. Form of Bid and Bid Prices completed in accordance with ITB 12 and 13; 
      5. Completed schedules as required, including priced Bill of Quantities in accordance with ITB 13.
      6. Technical Proposal completed in all aspects in accordance with ITB-15. 
      7. Bid security or Bid Securing Declaration furnished in accordance with ITB 17;
      8. Any other document required in the BDS.
    2. In addition to the requirements, bids submitted by a JV shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful bid shall be signed by all members and submitted with the bid, together with a copy of the proposed Agreement.
    3. The bidder shall furnish, as part of its bid, all those documents establishing the eligibility in conformity to the terms and conditions specified in the bidding documents for all material, equipment and works which the bidder proposes to execute.
    4. The documentary evidence of conformity of the material, equipment and works to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of:
      1. a detailed description of the work methodology, approach, schedule and resources to be mobilized at site;
      2. an item-by-item commentary on the Procuring agency/Employer’s Technical Specifications demonstrating substantial responsiveness of the material, equipment and works to those specifications, or a statement of deviations and exceptions to the provisions of the Technical Specifications;
      3. any other procurement specific documentation requirement as stated in the BDS.
    5. The required documents and other accompanying documents must be in English. In case any other language than English is used the pertinent translation into English shall be attached to the original version.
  4. Documents Establishing Eligibility and Qualification of the Bidder   
    1. The bidder shall furnish, as part of its bid, all those documents establishing the bidder’s eligibility to participate in the bidding process and/or its qualification to perform the contract if its bid is accepted.
    2. The documentary evidence of the bidder’s eligibility to bid shall establish to the satisfaction of the Procuring agency/Employer that the bidder, at the time of submission of its bid, is from an eligible country as defined in Section-IV titled as “Eligible Countries”.
    3. The documentary evidence of the bidder’s qualification to perform the contract if its bid is accepted shall establish to the satisfaction of Procuring agency/Employer that:
      1. The bidder has the financial and technical capability necessary to perform the Contract, meets the qualification criteria specified in Section-V, Evaluation and Qualification Criteria and BDS.
      2. In the case of a bidder not doing business within Pakistan, the bidder is or will be (if awarded the contract) represented by a local bidder (Joint Venture) in accordance with the PEC works bylaws, and in case of award of works such foreign firm is required to participate in the execution of works to carry out its obligations as prescribed in the Conditions of Contract and /or Technical Specifications.
      3. That the bidder meets the qualification criteria listed in Section-V, Evaluation and Qualification Criteria and BDS. 
  5. Forms of Bid
    1. The Bidder shall fill the Form of Bids furnished in the bidding documents. The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
  6. Bid Prices
    1. The bid prices quoted by the bidder in the Standard bid Forms, Bill of Quantities and in the Price Schedules shall conform to the requirements specified below or exclusively mentioned hereafter in the bidding documents. 
    2. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. If a Price Schedule shows items listed but not priced, their prices shall be construed to be included in the prices of other items in the Bill of Quantities and will not be paid for separately by the Procuring agency/Employer. 
    3. Items not listed in the Price Schedule shall be assumed not to be included in the bid, and provided that the bid is still substantially responsive in their absence or due to their nominal nature, the corresponding average price of the respective item(s) of the remaining substantially responsive bidder(s) shall be construed to be the price of those missing item(s):
      Provided that:
      1. where there is only one (substantially) responsive bidder, or
      2. where there is provision for alternate proposals and the respective items are not listed in the other bids, 
        The Procuring agency/Employer may fix the price of missing items in accordance with market survey, and the same shall be considered as final price.
    4. The Bid price to be quoted in the Form of Bid in accordance with ITB 12 shall be the total price of the bid.
    5. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract. 
    6. If so specified in ITB 1.1, bids may be invited for individual lots (contracts) or for any combination of lots (packages). 
    7. Prices quoted by the Bidder shall be fixed during the bidder’s performance of the contract and not subject to variation on any account. A bid submitted with an adjustable price will be treated as non-responsive and shall be rejected, pursuant to ITB 27, unless otherwise price adjustment is permissible under Conditions of the Contract. 
    8. All duties, taxes, and other levies payable by the Contractor under the Contract, or for any other cause, as of the date twenty-eight (28) days prior to the deadline for submission of bids, shall be included in the rates and prices and the total bid price submitted by the bidder.
  7. Currencies of Bid and Payment
    1. Prices shall be quoted in Pakistani Rupees unless otherwise specified in the BDS. Comparison of bids and tie of bid shall be treated in accordance with the Rule 30(2) of Public Procurement Rules, 2004.
  8. Documents Comprising the Technical Proposal
    1. The bidder shall furnish a Technical Proposal including a statement of work methods, equipment, personnel, schedule and any other information as stipulated in Section VII – Standard Bid Forms, in sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the work requirements and the completion time.
  9. Bid Validity Period
    1. Bids shall remain valid for the period specified in the BDS after the bid submission deadline prescribed by the Procuring agency/Employer. A bid valid for a shorter period shall be rejected by the Procuring agency/Employer as non-responsive. The period of bid validity will be determined from the complementary bid securing instrument i.e. the expiry period of bid security or bid securing declaration as the case may be. 
    2. Under exceptional circumstances, prior to the expiration of the initial Bids/Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids/Bid. Such request for extension of the period of bid validity shall be carried out in accordance with Rule 26 of the Public Procurement Rules, 2004.
  10. Bid Security or Bid Securing Declaration
    1. Pursuant to ITB 11.1 unless otherwise specified in the BDS, the bidder shall furnish as part of its bid, a Bid Security in accordance with Rule 25 of the Public Procurement Rules, 2004 in the amount and currency specified in the BDS or Bid Securing Declaration as specified in the BDS in the format provided in Section VII (Standard Bidding Forms). 
      In case Procuring agency/Employer is inviting bids in lots / packages, the bidder shall be required to submit his bid security against the respective lot/ package for which he is submitting his bid.
      Until the development of functionality of auto verification of financial instrument in EPADS, the scanned copy of bid security or bid securing declaration, as the case may be, shall be uploaded on E-PADS whereas the original instrument to be submitted to the procuring agency before closing of bid submission deadline,
    2. The Bid Security shall be denominated in the local currency or in another freely convertible currency, and it shall be in the form specified in the BDS which shall be in any of the following:
      1. A bank guarantee, an irrevocable letter of credit issued by a Scheduled bank in the form provided in the Bidding Documents or another form acceptable to the Procuring agency/Employer and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bid Validity is extended. In either case, the form must include the complete name of the bidder; 
      2. A cashier’s or certified cheque; or
      3. Another security as indicated in the BDS.
    3. The Bid Security or Bid Securing Declaration shall be in accordance with the Form of the Bid Security or Bid Securing Declaration included in Section VII (Standard Bidding Forms) or another form approved by the Procuring agency/Employer prior to the bid submission.
    4. The Bid Security shall be payable promptly upon written demand by the Procuring agency/Employer in case any of the conditions listed in ITB 17.9 are invoked.
    5. Any bid not accompanied by a Bid Security or Bid Securing Declaration in accordance with ITB 17.1 or 17.3 shall be rejected by the Procuring agency/Employer and shall be declared as non-responsive bid, pursuant to ITB 27.
    6. Unsuccessful bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Procuring agency/Employer pursuant to ITB 16. The Procuring agency/Employer shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
      1. The expiry of the Bid Security;
      2. The entry into force of a procurement contract and the provision of a performance security (or guarantee), for the performance of the contract if such a security (or guarantee), is required by the Biding documents;
      3. The rejection by the Procuring agency/Employer of all Bids;
      4. The withdrawal of the bid prior to the deadline for the submission of bids, unless the biding documents stipulate that no such withdrawal is permitted.
    7. The successful bidder’s Bid Security will be discharged upon the bidder signing the contract pursuant to ITB 40, or furnishing the performance security (or guarantee), pursuant to ITB 41.
    8. The Bid Security may be forfeited or the Bid Securing Declaration executed:
      1. if a Bidder: 
        1. Withdraws its Bid during the period of Bid Validity as specified by the Procuring agency/Employer, and referred by the bidder on the Form of Bid except as provided for in ITB 16.2; or 
      2. In the case of a successful bidder, if the bidder fails:
        1. to sign the contract in accordance with ITB 40; or
        2. to furnish performance security (or guarantee) in accordance with ITB 41.
    9. In case of Bid Security issued by the foreign bank is allowed by the Procuring agency/Employer, the same should be counter guaranteed by a corresponding bank in Pakistan. Furthermore, in case of joint venture, it should be in the name of Joint venture to ensure joint responsibility. In case the JV is not legally constituted at the time of bid submission, the bid security or bid securing declaration shall be in the names of all future members as named in the letter of bid.
  11. Withdrawal of Bids   
    1. Before bid submission deadline, any bidder may withdraw, substitute, or modify its bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and the corresponding must accompany the respective written notice. 
  12. Format and Signing of Bid
    1. The Bidder shall prepare and submit Bids through EPADS with due diligence after carefully reading all the terms and condition before bid submission deadline.

D. SUBMISSION OF BIDS

  1. Submission of Bids through EPADS v2.0
    1. All bids shall be submitted through EPADS v2.0.
  2. Deadline for Submission of Bids
    1. All bids shall be received through EPADS v2.0 not later than bid submission deadline as specified in the BDS.
    2. The Procuring agency/Employer may, under exceptional circumstances and at its discretion, extend the deadline for the submission of bids, pursuant to Rule 27 of the Public Procurement Rules, 2004. Extension of Time for submission of bid, by amending the Bidding Documents in accordance with ITB 7, in which case all rights and obligations of the Procuring agency/Employer and bidders previously subject to the deadline will thereafter be subject to the new deadline.
  3. Substitution and Modification of bids
    1. A bidder may substitute or modify his bid after it has been submitted, provided that written notice of the substitution or modification of the bid, is received by the Procuring agency/Employer prior to the deadline for submission of bids.
    2. Revised bid may be submitted after the substitution or modification made in the original bid in accordance with the provisions referred in ITB 18. 

E. OPENING AND EVALUATION OF BIDS

  1. Opening of Bids
    1. The Procuring Agency will open bids in accordance with Rule 28 of the Public Procurement Rules, 2004 and as specified in the BDS.
  2. Confidentiality
    1. Information relating to the examination, clarification, evaluation and comparison of bids and recommendation of contract award shall not be disclosed to bidders or any other persons not officially concerned with such process until the time of the announcement of the respective evaluation report.
  3. Clarification of Bids
    1. Clarification of Bidding Documents shall be carried out in accordance with Rule 31 of the Public Procurement Rules, 2004.
    2. The alteration or modification in the bid which in any case affect the following parameters will be considered as a change in the substance of a bid:
      1. evaluation & qualification criteria;
      2. required scope of work;
      3. contract price;
      4. all securities requirements;
      5. tax requirements;
      6. terms and conditions of bidding documents.
      7. change in the ranking of the bidder
  4. Preliminary Examination of Bids 
    1. Prior to the detailed evaluation of bids, the Procuring agency/Employer will determine whether each bid:
      1. meets the eligibility criteria defined in ITB 3 and ITB 4; 
      2. has been prepared as per the format and contents defined by the Procuring agency/Employer in the bidding documents;
      3. has been properly signed; 
      4. is accompanied by the required securities; and 
      5. is substantially responsive to the requirements of the bidding documents. 
        The Procuring agency/Employer's determination of a bid's substantial responsiveness will be based on the contents of the bid itself.
    2. A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding Documents, without material deviation or reservation. A material deviation or reservation is one that: - 
      1. affects in any substantial way the scope, quality, or performance of the Works; 
      2. limits in any substantial way, inconsistent with the bidding documents, the Procuring agency/Employer's rights or the bidders’ obligations under the Contract; or 
      3. if rectified, would affect unfairly the competitive position of other bidders presenting substantially responsive bids.
    3. The Procuring agency/Employer will confirm that the documents and information specified under ITB 9, 10 and 11 have been provided in the bid. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Bidders, the bid shall be rejected.
    4. The Procuring agency/Employer may waive-off any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
      Explanation: A minor informality, non-conformity or irregularity is one that is merely a matter of form and not of substance. It also pertains to some immaterial defect in a Bid or variation of a bid from the exact requirements of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the works. The Procuring agency/Employer either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is advantageous to the Procuring agency/Employer. Examples of minor informalities or irregularities include failure of a bidder to –
      1. Submit the number of copies of signed bids required by the invitation;
      2. Furnish required information concerning the number of its employees;
      3. the firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature.
    5. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer may request the bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Technical Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any such aspect of the technical Proposal linked with the ranking of the bidders. Failure of the bidder to comply with the request may result in the rejection of its bid.
    6. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer shall rectify quantifiable nonmaterial nonconformities or omissions related to the Financial Proposal. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of the missing or nonconforming item or component. 
    7. If a bid is not substantially responsive, it will be rejected by the Procuring agency/Employer and may not subsequently be evaluated for complete technical responsiveness. 
  5. Examination of Terms and Conditions; Technical Evaluation
    1. The Procuring agency/Employer shall examine the bid to confirm that all terms and conditions specified in the GCC and the PCC have been accepted by the bidder without any material deviation or reservation.
      For this purpose:
      “Deviation” means departure from the requirements specified in the Bidding Document.
      “Reservation” means setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding Document.
    2. The Procuring agency/Employer shall evaluate the technical aspects of the bid submitted in accordance with ITB 30, to confirm that all requirements specified in Section VI – Works Requirement, Technical Specifications of the Bidding Documents have been met without material deviation or reservation.
    3. If after the examination of the terms and conditions and the technical evaluation, the Procuring agency/Employer determines that the bid is not substantially responsive in accordance with ITB 27, it shall reject the bid.
  6. Correction of Arithmetic Errors
    1. Bids determined to be substantially responsive will be checked for any arithmetic errors.  Errors will be corrected as follows: -
      1. if there is a discrepancy between unit prices and the sub-total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the sub-total price shall be corrected, unless in the opinion of the Procuring agency/Employer there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected;
      2. if there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail, and the total shall be corrected; and 
      3. where there is a discrepancy between the amounts in figures and in words, the amount in words will govern.
      4. Where there is discrepancy between grand total of price schedule and amount mentioned on the Form of Bid, the amount referred in Price Schedule shall be treated as correct subject to elimination of other errors. 
    2. The amount stated in the Bid will, be rectified by the Procuring agency/Employer in accordance with the above procedure for the correction of errors and, with, the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount, its bid shall be rejected after forfeiture of Bid Security or execution of the Bid Securing Declaration, as the case may be, in accordance with ITB 41.3.
  7. Conversion to Single Currency
    1. The unit rates and the prices shall be quoted by the bidder entirely in Pak rupees. A bidder expecting to incur expenditures in other currencies for inputs to the Works from outside the Procuring agency/Employer’s country (referred to as the “Foreign Currency Requirements”) shall indicate the same in the letter of bid-financial proposal. The proportion of the Bid Price (excluding Provisional Sums) needed by him for the payment of such Foreign Currency Requirements either (i) entirely in the currency of the Bidder’s home country or, (ii) at the bidder’s option, entirely in Pak rupees provided always that a bidder expecting to incur expenditures in a currency or currencies other than those stated in (i) and (ii) above for a portion of the foreign currency requirements, and wishing to be paid accordingly, shall indicate the respective portions in his bid. Comparison of bids quoted in different currencies and conversion of bids into a single currency shall be carried out in accordance with Rule 30(2) of the Public Procurement Rules, 2004.
  8. Evaluation of Bids
    1. The Procuring agency/Employer shall evaluate and compare only the bids determined to be substantially responsive, pursuant to ITB 27.
    2. In evaluating the Technical Proposal of each Bid, the Procuring agency/Employer shall use the criteria and methodologies listed in the BDS and in terms of works requirement. No other evaluation criteria or methodologies shall be permitted.
    3. The Procuring agency/Employer’s evaluation of a bid will take into account:
      1. the bid price, excluding provisional sums and the provision, if any, for contingencies in the summary bill of quantities, but including day work items, where priced competitively;
      2. converting the amount resulting from applying above, if relevant, to a single currency in accordance with ITB 29;
    4. The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in bid evaluation.
    5. If these bidding documents allow bidders to quote separate prices for different lots, and the award to a single bidder of multiple lots, the methodology of evaluation to determine the lowest evaluated lot combinations in the Form of Bid, is specified in the BDS.
    6. If the bid, which results in the Evaluated Bid Price (Successful Bid), is seriously unbalanced or front loaded in the opinion of the Employer, the Employer may require the Bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated Contract payments, the Employer may require that the amount of the performance security be increased at the expense of the Bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under the Contract.
      Explanation:
      “Unbalanced” or “front-loaded” bids consist of deliberately submitting bids with artificially high prices or unit rates for the early stages of a construction project, offset by artificially low prices or unit rates for the later stages of the project, to improve the contractor’s cash flow.
  9. Domestic Preference
    1. If the BDS so specifies, the Procuring agency/Employer will grant a margin of preference to the domestic contractor in line with the rules, regulations, regulatory guides or instructions issued by the Authority from time to time. 
  10. Determination of Successful Bid
    1. The Procuring agency/Employer shall compare the evaluated bids in accordance with the predefined bidding procedure, of all substantially responsive bids to determine the Successful bidder. 
  11. Qualification of Bidder 
    1. The Procuring agency/Employer shall determine to its satisfaction whether the bidder is substantially responsive and whose bid is declared as Successful bid either continues to meet (if prequalification applies) or meets (if post-qualification applies) the qualifying criteria specified in Evaluation and Qualification Criteria.
      Note: In case of international bidding, the parameters for incorporation or licensing within Pakistan may be fulfilled as part of post qualification.
    2. The determination shall be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11.
    3. Prior to contract award, the Procuring agency/Employer will verify that the successful bidder (including each member of a JV) is not blacklisted/debarred. The Procuring agency/Employer will conduct the same verification for each sub-contractor proposed by the successful bidder. 
  12. Sub-Contractors
    1. The bidder shall provide details regarding any specialized sub-contractor to the Procuring agency/Employer. In case change of sub-contractors, the bidder shall promptly notify the Procuring agency/Employer and obtain approval for replacement of sub-contractors.
    2. Bidders may propose sub-contracting up to the percentage of total value of contracts or the volume of works as specified in the BDS.
  13. Abnormally Low Financial Bid
    1. A procuring Agency may reject abnormally low bids. The decision of the Procuring agency/Employer to reject a bid and reasons for the decision shall be recorded in the procurement proceedings and promptly communicated to the bidder concerned. Moreover, the Procuring agency/Employer shall not incur any liability solely by rejecting abnormally bid
      Guidance for Procuring agency/Employer:
      An abnormally low bid means, in the light of the Procuring agency/Employer’s estimate and of all the bids submitted, the bid appears to be abnormally low by not providing a margin for normal levels of profit. In order to identify the Abnormally Low Bid (ALB) following approaches can be considered to minimize the scope of subjectivity:
      1. Comparing the bid price with the cost estimate; 
      2. Comparing the bid price with the bids offered by other bidders submitting substantially responsive bids; and 
      3. Comparing the bid price with prices paid in similar contracts in the recent past either government- or development partner-funded.
    2. The Procuring agency/Employer will determine to its satisfaction whether the bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily, in accordance with the criteria listed in ITB 11
    3. The determination will take into account the bidder’s financial and technical capabilities.  It will be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    4. Procuring agency/Employer may seek “Certificate for Independent Price Determination” from the bidder and the results of reference checks may be used in determining award of contract.
      Explanation: The Certificate shall be furnished by the bidder. The bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc. 
    5. An affirmative determination will be a prerequisite for award of the contract to the bidder. A negative determination will result in rejection of the bidder’s bid, in which event the Procuring agency/Employer will proceed to the next ranked bidder to make a similar determination of that bidder’s capabilities to perform satisfactorily.

F. AWARD OF CONTRACT

  1. Criteria of Award
    1. Subject to ITB 36 and 37, the Procuring agency/Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has been declared as Successful Bidder, provided that such bidder has been determined to be:
      1. eligible in accordance with the provisions of ITB 3; 
      2. is determined to be qualified to perform the Contract satisfactorily; and 
      3. Successful negotiations have been concluded, if any.
  2. Negotiations
    1. The Committee of the Procuring agency/Employer may negotiate with the Most Advantageous Bidder relating to the following areas:
      1. a minor alteration to the technical (drawings, design technical specifications) details of the statement of works;
      2. Methodology, work plan, staffing in view to streamline the work;
      3. a minor amendment to the Particular conditions of Contract;
      4. finalizing payment arrangements;
      5. clarifying details that were not apparent or could not be finalized at the time of Bidding; 
    2. Where negotiation fails to result into an agreement, the Procuring agency/Employer may invite the next ranked bidder for negotiations. Where negotiations are commenced with the next ranked bidder, the Procuring agency/Employer shall not reopen earlier negotiations.
  3. Procuring agency's Right to reject All Bids
    1. The procuring agency has the right to reject all bids in accordance with Rule 33 of the Public Procurement Rules, 2004. However, the Authority (i.e. PPRA) may call from the Procuring agency/Employer the justification of those grounds. 
  4. Notification of Award
    1. The procuring agency shall announce and publish the evaluation result in accordance with Rule 35 of the Public Procurement Rules, 2004.
    2. Where no complaints have been lodged, the bidder whose bid has been accepted will be notified of the award by the Procuring agency/Employer prior to expiration of the bid validity period through EPADS. However, the Procuring agency/Employer shall not award any procurement contract at least for five (05) days after the announcement of final evaluation report. The notification letter (herein after and in the condition of the contract and contract form called “Letter of Acceptance” will specify the sum that the Procuring agency/Employer will pay the successful bidder in consideration for the execution and completion of the works as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price). 
    3. The notification of award will constitute the formation of the Contract, subject to the bidder furnishing the Performance Security (or guarantee) in accordance with ITB 41 and signing of the contract in accordance with ITB 40. 
    4. Upon the successful bidder’s furnishing of the performance security (or guarantee) pursuant to ITB 41, the Procuring agency/Employer will promptly notify each unsuccessful bidder, the name of the successful bidder and the Contract amount and will discharge the Bid Security or Bid Securing Declaration of the bidder(s) pursuant to ITB 17.
  5. Signing of Contract
    1. Promptly after notification of award, Procuring agency/Employer shall send the successful bidder the draft agreement, incorporating all terms and conditions as agreed by the parties to the contract. 
    2. Immediately after the Redressal of grievance by the GRC, and after fulfillment of all conditions precedent of the Contract Form, the successful bidder and the Procuring agency/Employer shall sign the contract.
    3. Where no formal signing of a contract is required, work order issued to the bidder shall be construed to be the contract. 
  6. Performance Security (or Guarantee)
    1. After the receipt of the Letter of Acceptance, the successful bidder, within the specified time, shall deliver to the Procuring agency/Employer a Performance Guarantee in the amount and in the form stipulated in the BDS and PCC, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract.
    2. If the Performance Guarantee is provided by the successful bidder and it shall be in the form specified in the BDS which shall be in any of the following:
      1. certified cheque, cashier’s or manager’s cheque, or bank draft; 
      2. irrevocable letter of credit issued by a scheduled bank of Pakistan or in the case of an irrevocable letter of credit issued by a foreign bank, the letter shall be confirmed or authenticated by a scheduled bank of Pakistan; 
      3. bank guarantee confirmed by a reputable local bank or, in the case of a successful foreign bidder, bonded by a foreign bank; or
      4. surety bond callable upon demand issued by any reputable surety or insurance company.
        Any Performance Guarantee submitted shall be enforceable in Pakistan.
    3. Failure of the Most Advantageous Bidder to comply with the requirement of ITB 40 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security or declare blacklisted (in case bid securing declaration is submitted) in which event the Procuring agency/Employer may make the award to the next most advantageous bidder or reinitiate the procurement process afresh (as a case may be).
  7. Advance Payment
    1. Advance payment will be provided to the bidder in percentage and in the manner as agreed by the both parties in terms of Conditions of the Contract. 
    2. The Procuring agency/Employer will provide an advance payment as stipulated in the Conditions of Contract, subject to a maximum amount, as stated and/or Conditions of the Contract.  The advance payment request shall be accompanied by an advance payment security (guarantee) in the form provided in Section X. For the purpose of receiving the advance payment, the bidder shall make and estimate of, and include in its bid, the expenses that will relate to the purchase of equipment, machinery, materials, and on the engagement of labor during the first month beginning with the date of the Procuring agency/Employer’s “Notice to Commence” as specified in the PCC.
  8. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted.
  9. Corrupt & Fraudulent Practices
    1. Procuring agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.  

G. GRIEVANCE REDRESSAL & COMPLAINT REVIEW MECHANISM

  1. Grievance Redressal
    1. Grievance Redressal shall be carried out in accordance with Rule 48 of the Public Procurement Rules, 2004 i.e. Redressal of grievances by the procuring agency and “Redressal of Grievances Regulations 2021”.

H. MECHANISM OF BLACKLISTING

  1. Mechanism of Blacklisting
    1. The Procuring agency/Employer shall proceed Blacklisting of Bidders/Contractors in accordance with Rule 19 of the Public Procurement Rules, 2004 i.e. Blacklisting and “Blacklisting and Debarment of Bidders or Contractors Regulations 2024. 

📑 Bid Data Sheet (BDS)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

Bids Data Sheet (BDS)

The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB).  Whenever there is a conflict, the provisions herein shall prevail over those in ITB.

BDS Clause Number

ITB Number

Amendments of, and Supplements to, Clauses in the Instruction to Bidders

A. Introduction

1

1.1

Name of Procuring Agency: Air University -P&D Department (Air University)

The subject of procurement is: Construction of Library and Classroom Block at H-11 Campus

Expected commencement date: Monday, December 7, 2026

2.

2.1

Financial year for the operations of the Procuring Agency: 2026-27

Name and identification number of the Contract: P183681 

3. 3.1 JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil

B. Bidding Documents

4.

6.2 & 6.4

The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Friday, November 20, 2026

5. 7.2

Any addendum, in case issued, shall be published on Air University -P&D Department (Air University) website  and on EPADS v2.0.

C. Preparation of Bids

6.

8.1

List of documents required along with the bid: No
 

7. 9.1

The qualification criteria to establish the supply / production capability of the bidder.

see Eligibility Criteria
8. 11.2 


Works and Their related documents:
See section Required Scope of Work
 

9. 11.1 Price schedule will be provided according to the format defined and acquired.
see section price schedule.
10. 11.4

 Specifications:

see section of specifications.

11.

11.5 & 13.5

The price shall be Fixed.
The bid price shall be adjusted in accordance with Appendix provided – Formula for Price Adjustment.

12.

14.1

Currency of the Bids shall be : PKR

13.

16.1

The Bids/Bid Validity period shall be: 90 Days

14.

17.1 

The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6

15. 17.2

The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Demand Draft  

16. 15.1

Alternative Bids to the requirements of the bidding documents will not be permitted.

D. Submission of Bids

17.

18.1 & 21.1

Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;

PAF Complex Sector E-9, Islamabad Capital Territory

Bids that are not submitted on EPADS v2.0 shall be disqualified.

The deadline for Bids submission is: Monday, November 23, 2026 11:00 AM

E. Opening and Evaluation of Bids

18.

24.1

The Bids opening shall take place on EPADS v2.0.

Day : Monday

Date: November 23, 2026

Time : 11:30 AM

19.

30.2

Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria

F. Award of Contract

20.

41.1 & 41.2

The Performance guarantee shall: 10.00%.

The Performance Guarantee shall be acceptable in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft

21. 45.1

Arbitrator shall be appointed by mutual consent of the both parties.

G. Review of Procurement Decisions

22.

37

Grievance against this procurement shall be submitted online on EPADS v2.0.

Eligibility Criteria

All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.

Required Registration
NADRA CITIZENSHIP (CNIC/NICOP)
FBR (NTN)
FBR (GSTN)
PEC
Registrar of Firms
Eligibility CriteriaDocument
PEC Cat C3 or above may apply onlyYes

Evaluation Criteria

Least Cost Based Selection (LCBS)

Weightage

Technical Evaluation %
100
Technical Marks100
Passing Marks60
Experience
Similar Works (Each project) completed in last 03 years (supported by documents ) to be attached with application. Approx Value Rs.350 Mil or higher (Quantitative)(Doc Required)

  3 Project   (30)

  2 Projects   (20)

  1 Project   (10)

30
Ongoing Works (Each project) of similar nature (supported by documents ) to be attached with application. Approx Value Rs.350 Mil or higher (Quantitative)(Doc Required)

  3 projects   (30)

  2 Projects   (20)

  1 Project   (10)

30
Profile
Management and Engineering Staff (Quantitative)(Doc Required)

  Minimum 3 or more engineers along with 5 administrative staff   (5)

  Lower number of staff than mentioned   (1)

5
Availability of Relevant Equipments (Quantitative)(Doc Required)

  Significant Detail attached   (5)

  Incomplete details   (1)

5
Financial Capability
Average annual construction turn over in millions for the last 03 years (Quantitative)(Doc Required)

  Sufficient Turnover   (10)

  Insufficient Turnover   (1)

10
Work Plan
Tentative Work Plan Attached (Quantitative)(Doc Required)5
Affidavit for Litigation and Blacklisting
Affidavit for Litigation and Blacklisting - Attached (Quantitative)(Doc Required)5
Feedback
Feedback from previous employers (Quantitative)(Doc Required)

  Satisfactory Feedback from previous employers   (10)

  Unsatisfactory Feedback from previous employers   (1)

10

Jobs/Lots

Jobs Without Lots :

JobDelivery ScheduleQuantityBid Security
BoQ
Address: AU H-11 Campus, Islamabad
Schedule: 250 Days
Quantity: 1/Qty
1/Qty 7759703 PKR

Related Services :

No

Work Specifications and Market Rates

Jobs Without Lots :

Job: BoQ

Specifications / Requirements:

Sr. NoRef. No.DescriptionUnitQtyRateAmount
1 Structure Works    
2 GENERAL NOTE    
3 Scope (Application to all sections)    
4 Supply, installation, testing and commissioning of the following items of works, including all materials, labour, tools, accessories, etc required completion of each item as per specifications and approved by Engineer. All types of quality tests will be carried out and cost will be bared by contractor. during the work execution dewatering will be reponsiblity of contractor.    
5 Breaking and Removal of Existing Labor Camp    
61Breaking, dismantling, and removal of the existing labor camp measuring approximately 2,700 Sft, comprising block masonry walls, precast cement concrete beams and slabs, and PCC flooring, including collection, cleaning, and careful stacking of reusable materials at a designated location for reuse, and loading, transportation, and disposal of all unusable materials out of the university premises and as directed by the Engineer In charge.Job1150000150000
72Re routing of HDPE Pipes 3 Nos For Water Supply/ Fire Fight System of below mention Dia. that is 90mm, 160mm & 200mm. Polyethylene Pipe (PE-100), as per required dia. Class PN-16 / SDR-11, Butt Fusion Jointed, including cost of Bend/elbow. TEE, Threaded/coupler/Union connection with Gi or MS pipe / HDPE where required complete in all respects (excl cost of Excavation) around 110 Rft each pipe.Rft11015016500
83Providing & Laying of new pipes as mentioned below to connecting and joint with existing HDPE pipes including all necessary Tee bend sockets etc. a. Polyethylene Pipe (PE-100), 90 mm Dia Class PN-16 / SDR-11 supply and fixing. b. Polyethylene Pipe (PE-100), 160 mm Dia Class PN-16 / SDR-11 ( supply and fixing. c. Polyethylene Pipe (PE-100 200 mm Dia Class PN-16 /) SDR-11 supply and fixing    
9a90mm DiaRft350875306250
10b160mm DiaRft3502650927500
11c200mm DiaRft35041601456000
12 Excavation/ Cutting for Foundation    
134Earthwork/ Excavation in open cutting up to any depth all type of soil for building such as Ordinary /Hard Soil and Rock etc. for foundation/ to achieve +0.00 level/ New Ground level including under pinning and shoring to protect existing works, shuttering and timbering, dressed to designed level and dimensions and disposal of surplus excavated material to any lead/ out of university premises , Complete in all respect as per Drawings and instruction of Engineer-in charge .Excavation for creating working space will not be considered for payment .Cft75000171275000
145Earthwork/ Excavation in open cutting up to any depth all type of soil for building such as Ordinary /Hard Soil and Rock etc. for foundation including under pinning and shoring to protect existing works, shuttering and timbering, dressed to designed level and dimensions and compaction the excavated surface up to 95% AASHO and disposal of surplus excavated material to any lead/ out of university premises , Complete in all respect as per Drawings and instruction of Engineer-in charge. Excavation for creating working space will not be considered for payment .Cft120000172040000
15 Back Filling     
166Back filling under floor, above ground level / around plinths as where required with soil obtained from excavation in 6" layer and compaction up to 95% AASHTO Complete in all respect as per Drawings and instruction of Engineer-in chargeCft2900010290000
177Providing and filling (Lawrancepur) sand under floor, at any level / around plinths as where required in layer not exceeding 6"thick including consolidation ,watering compaction , leveling and dressing Complete in all respect as per Drawings and instruction of Engineer-in chargeCft1020088897600
18 Hard Core     
198A bed of Earthquake impact retardant Aggregates (EIRA) mixture having in layers laid below the foundation/ as where required in ratio of 70:30 coarse aggregates & fine aggregates (shingles). 6" layer compaction up to 95% AASHO for the strength, to be checked and approved by the Engineer- incharge , complete in all respect Cft 750080600000
20 Spray Anti-Termite    
219Spraying anti-termite liquid of Agenda 25 EC Bayer Environmental (Ratio 1 litter liquid with 250 Litter of water with 3 repeated operations @ 4 liters chemical /10 Sft would be used on horizontal / vertical surfaces by using mechanical equipment for spraying, complete in all respect as per instruction of Engineer - in charge .    
22aUnder Footing / FoundationSft1600031496000
23bUnder Floor Sft 1100031341000
24 PCC 1:4:8     
2510Providing/laying of cement concrete (1:4:8) in foundation using Lawrancepur Sand and Margala 3/4" thick down Crush as all specified. With machine mixing, placing, including required formwork and its removal, curing etc. complete in all respect as per drawings and instruction of Engineer -in charge Cft34004371485800
26 Foundation & Retaining Wall    
2711Providing and laying reinforced cement concrete using (Batching Plant Concrete) lawrencepur sand and margala crushed aggregate 3/4" (19mm or as recommended by Lab) and down gauge 4000 psi (cylindrical strength) on 28 days in foundation of any shape , including vibrating compacting, curing, and water tightening form-work (steel form work or steel scaffolding pipes with 1”thick plywood sheets not used more than 2 times each side) & its removal Note: The Contractor shall provide approved concrete mix design with add mix (Super Plasticizer to achieve the required strength) from a recognized Lab as approved by the Engineer. complete in all respect as per drawings and instructions of Engineer in Charge .(Curing 14 days)     
28aa) Columns Footings & Retaining wall foundation Cft108008198845200
29bb) Retaining wall Cft580010005800000
30 Columns/ Lift Walls    
3112Providing and laying reinforced cement concrete using (Batching Plant Concrete) lawrencepur sand and margala crushed aggregate 3/4" (19mm or as recommended by Lab) and down gauge 4000 psi (cylindrical strength) on 28 days in foundation of any shape , including vibrating compacting, curing, and water tightening form-work (steel form work or steel scaffolding pipes with 1”thick plywood sheets not used more than 2 times each side) & its removal Note: The Contractor shall provide approved concrete mix design with add mix (Super Plasticizer to achieve the required strength) from a recognized Lab as approved by the Engineer. complete in all respect as per drawings and instructions of Engineer in Charge . (Curing 14 days)    
32aLower Ground Floor /BasementCft210010002100000
33bUpper Ground Floor Cft115010001150000
34c1st FloorCft115010001150000
35d2nd FloorCft134310001343000
36eMumty /Above 2nd floor roof level Cft3001000300000
37 Beams    
3813Providing and laying reinforced cement concrete using (Batching Plant Concrete) lawrencepur sand and margala crushed aggregate 3/4" (19mm or as recommended by Lab) and down gauge 4000 psi (cylindrical strength) on 28 days in foundation of any shape , including vibrating compacting, curing, and water tightening form-work (steel form work or steel scaffolding pipes with 1”thick plywood sheets not used more than 2 times each side) & its removal Note: The Contractor shall provide approved concrete mix design with add mix (Super Plasticizer to achieve the required strength) from a recognized Lab as approved by the Engineer. complete in all respect as per drawings and instructions of Engineer in Charge . (Curing 14 days)     
39aLower Ground Floor /BasementCft37008193030300
40bUpper Ground Floor Cft37008193030300
41c1st FloorCft37008193030300
42d2nd FloorCft37008193030300
43eAbove 2nd floor roof level Cft 150819122850
4414RCC Slab    
45aLower Ground Floor /BasementCft48508193972150
46bUpper Ground Floor Cft72258195917275
47c1st FloorCft70758195794425
48d2nd FloorCft74748196121206
49eAbove 2nd floor roof level Cft350819286650
5015Same as above item No #13 but for RCC 3000 PSI    
51aPlinth BeamCft15507701193500
52bSlab on GradeCft73507705659500
53cStairs & Ramp (All/ Any Floor) Cft19207701478400
54d RCC Roof ParapetCft625770481250
55eOHW tank Cft870770669900
56f Septic Tank / SUMPCft865770666050
57gLintels Beams & windows shades (All/Any Floor) Cft870770669900
58hMumty Slab & BeamsCft350770269500
59iAny where required Cft150770115500
6016Reinforcing Steel     
61 Providing, cleaning, cutting, bending, placing & fixing in position etc., high tensile steel deformed bars confirming to ASTM-A615 -02 including cost of spacer blocks, binding wire, complete in all respect as shown on drawings and or as directed and approved by the Engineer. (Over Laps and Chairs will not consider for payment) complete in all respect as per drawings and instruction of Engineer. including the cost of lab tests .    
62a60 Grade ( Any Floor)Kg16450031952475500
63b40 Grade (Any Floor)Kg13070031441039800
64 Water Proofing     
6517Water proofing of overhead water tank with 1/2" thick Cement sand Plaster with 1:3, with 1/2" Terrazzo over and including the plaster 1:2(one part of cement and 2 Parts of marble Chips) 0 or 9 Number Marble Chips complete in all respect as directed by Engineer In charge including all the necessary arrangements such as formwork etc. for completion of work    
66 overhead water tank & Septic Tank (inside) and outer side of Retaining wall Sft93003253022500
6718Providing and applying water proofing 4mm thick torch bonding bituminous membrane including primer (roof grip or equivalent as approved by engineer) as per manufacturer specification complete in all respect on external side of retaining wall as per drawings and instruction of engineerSft8170122996740
6819Providing and fixing of PVC water stopper 250 mm wide and 12mm thick as and where required for construction joints properly lapped / jointed where required and properly placed vertically or horizontally in concrete, sample as approved by the engineer, complete in all respect as per drawings and instruction of engineerRft680870591600
69 Architectural Works    
70 GENERAL NOTE    
71 Scope (Application to all sections)    
72 Supply, installation, testing and commissioning of the following items of works, including all materials, labor, tools, accessories, etc. required completion of each item as per specifications and approved by Engineer.    
73 Horizontal DPC     
741DPC 2" thick IPCC 1:2:4, including water proofing agent, form work, complete in all respects as per manufacture specification as approved by the engineer Sft 2005711400
75 Plinth Protection     
762Providing and laying Plinth Protection total width 30" with 9" thick Toe wall 1'-6" deep including 3" thick PCC 1:4:8 under toe wall, PCC 1:4:8, 3" thick and PCC 1:2:4, 3" thick finish with steel garmala, 4ft long panel with marble petty divider using Lawrancepur sand and margala crush, including required front plater & backfill & compaction as approved by Engineer Rft450250112500
77 Bricks    
783Providing and laying First Class solid brick masonry work (at any floor / height) 1800 PSI crushing strength and water absorption 15% of its weight including lab report result in 1:6 cm any thickness and above wall in super structure with holding strip 1'-6" c/c vertical 1"x1/8" Patti 4"+12" (16" long) making 2 holes to fix on columns with 2" long 6mm Dia expansion bolt 2 Nos etc. complete as approved by the Engineer (Curing 7 days) sample to be approved     
79asame as above but 9" and above thick Wall Set in 1:6 cement mortar Cft1862557210653500
80bsame as above but 4.5" thick Wall Set in 1:4 cement mortar Cft27006471746900
81 Plaster     
8243/4" (19 mm) cement plaster 1:4 on walls and columns etc.at any floor including making edges, corners, and curing etc. Complete All the concrete and masonry joint to have GI Expanded Metal sheet on the overlapping by 4 inches on either surface properly nailed (SS nail). Before plastering to ensure crack free plaster joint , in true line, plumb, trowel, including form work curing complete in all respects and as directed by Engineer incharge.Sft48000622976000
8351/2" (13 mm) cement plaster 1:4 on Ceiling & Beams etc. at any floor including making edges, corners, and curing etc. Complete, in true line, plumb, trowel, including form work curing complete in all respects and as directed by Engineer incharge.Sft32000421344000
846External Plaster up to 1.5" thick with grooves up to 1.5" wide 3/4" deep plaster with 1:4 CM as showmen on drawings including base plaster to any height, All the concrete and masonry joint to have GI Expanded Metal sheet on the overlapping by 4 inches on either surface properly nailed (SS nail). Before plastering to ensure crack free plaster joint in true line, plumb, trowel, including form work curing complete in all respects and as directed by Engineer incharge.Sft235001052467500
85 Paint Internal    
867 P/ Apply three coats of water based (Jotun or equivalent) after the preparation of surface on walls and ceiling all as approved. Painting with Mat Enamel paint of approved shade three coats over primer applied over putty filled surface prepared with sand papering including formwork & the cost of one priming coat complete over plastered surface on walls and ceiling etc. at any height and any floor and as directed by the Engineer In charge.    
877aWalls Matt Enamel /water based Sft 48000401920000
887bCeiling (Plastic Emulsion) Sft 43000401720000
898Providing & applying 1.5 mm thick fine textured high quality Sandtex Coating formed of special Acrylic base protective decorative coating of approved color & shade with trowel having top class finish over well cleaned plastered surface i/c preparation and cleaning the surface, complete in all respect as approved and directed by the for horizontal and vertical joints of concrete interfacing masonry with Preparing surface and applying Graffiato Weather CoatingSft 106081401485120
90 External Paint     
919Painting three coats with weather shield paint (Jotun original make) of approved shade on plaster surface (external) including form work & the cost of clearing the surface, sand papering etc. complete in all respect or as directed by Engineer In charge.Sft23500651527500
92 False Ceiling 4'x8'    
9310P/F panels false ceiling Gypsum board tile (DFB) gypsum 4’ x 8’ 12mm thick sheet (Elephant Brand made in Thailand) including alkaline sheet with concealed frame GI 26 gauge suspended under existing roof to be fixed with hanging steel wires CKM including treatment of joints & formwork complete all as specified and approved and as directed by the Engineer In charge.Sft72002501800000
94 False Ceiling 2'x2'    
9511Providing and fixing 2'x2' size 3/8 thick laminated gypsum board false ceiling panels as approved pattern placed over imported high grade steel wall/ column molding main and cross "T" bar framing having self locking clips, nails and screws, sections powered coated in approved color suspension system consisting of GI adjustable hangers of 10 SWG, stiffeners, expansion bolts including provision for AC diffusers/ light fixture having (No deduction will be made for any fixture having area up to 4 sqft. as approved by Engineer Imported Make IRSH, BORAL or equivalentSft6500140910000
96 Windows / Ventilators    
9712Supplying of aluminum window Sliding / Fixed (Deluxe Model) of Anodizes aluminum any color section 2.0 mm thick and 100mm wide up to any height as specified including fixing on concrete, wooden or steel frames complete with all necessary fitting including 6mm thick tinted dark grey blackish as per old building color glass (Ghani Glass) fixed with rubber bead all as spd including locking system and insect screening with imported fiber mesh same color as approved. (Lucky aluminum or equaling) Sft295017505162500
9812aSame as above but ventilatorsSft68519001301500
9913providing and applying of Frost Paper of any shape & design and as directed by the engineer In charge.Sft7009063000
100 Aluminum Door    
10114Providing and fixing 12mm thick tempered glass (Ghani Glass) door with top & bottom 4" high 2mm section aluminum rail and floor mounted double action (door closer), locking arrangement Italian make door handles (CP 36" long) as shown on drawing with motor fitting best quality including all supporting hinges + clipping (Lucky aluminum or equaling) Sft1901657314830
10214aSame as above but 12" mm thick fix Tempered glass Partition Sft1201400168000
103 Ash Veneered Door    
10415Providing making and fixing in position 1st class white Oak Wood 1-1/2" thick paneled door shutter frame having top, bottom, side and center rails may not less than 5" wide and Door panel made with 3/4" thick MDF sheet, having grooves as shown in drawing, including 2"x5" 1st Class white Oak wood door frame fixed to wall with expansion bolts 4 Nos on each side including 3"x5/8" and 5/8"x1" architrave at wall/ frame joint, finish with wood stain lacquer polish including matching color S.S, hinges, door stopper, S.S tower bolt, S.S Rosette double cylinder approved locks, complete as per drawings specifications and as directed by the Engineer (Basic price for lock Rs 8000)Sft167024804141600
10515aSame as above but including sun lights with 6mm tempered tinted Glass with wooden frame as mentioned in drawings and as directed by the engineer in charge D1A & DW1Sft1702480421600
106 Hydraulic Door Closer     
10716Providing and fixing Japan make locally available New Star Japan made Hydraulic door closer to wood or aluminum door etc., complete as per drawings, specifications and as directed by the Engineer.Each 35200070000
108 uPVC (AVT) Doors     
10917Providing, making and fixing in position first quality uPVC steppe type painted doors having injection molded surface with reaction injected molded rigid polyurethane core flush shutters of AVT or approved equivalent including uPVC door frame, fixed to wall by mean of expansion bolts 4 Nos on each side including uPVC architrave on both sides at wall/ frame joints, including approved handle locks, tower bolts, stainless steel hinges and door stopper, complete as per manufacturer's specifications, drawing and as directed by the Engineer Sft 84017001428000
110 Steel Door for Mumty/ Electric Room    
11118Providing and fixing single leaf steel doors made to Crittall or equivalent standard and of approved sections fully paneled with M. S . Sheet of 16 gauge and 1"x1"x18swg ms pipe painted with two coats of red oxide paint & 3 coats of oil based enamel paint including using approved brass section oxidized fitting iron lugs, locking arrangements cutting holes and making good damages to walls etc. complete as required in any floor. The MS Sheet shall be bent @ 9 inches in 1"x1" U shape. door frame ms angle iron \ 2"x2"x3mm complete in all respectsSft1281035132480
112 Duct Shutters     
11319Providing, fabricating, and fixing MS sheet horizontal louvers of 16 SWG in Z-shaped configuration, comprising a frame of 1" × 2" MS hollow pipe of 18 SWG and an external frame of 2" × 2" MS hollow pipe of 16 SWG, securely fixed with expansion bolts. The complete shutter shall be divided into independent 8'-0" heigh sections, each independently openable, and shall include all necessary hinges, tower bolts, handles, locking arrangements, and associated fittings. The entire MS assembly shall be finished with two coats of red oxide primer and three coats of oil-based synthetic enamel paint, including all materials, labor, fabrication, installation, and accessories, as approved by the Engineer-in-Charge, complete in all respects.Sft3161129356764
114 Emergency Stair    
11520Providing, fabricating, cutting, welding, erecting in position steel stringer made of MS Channel ISMC 250 (10"x3") @ 30.6 kg/m, 2 Nos per flight, Landing frame made of ISA 50x50x6mm & ISMC 150, including base plates 300x300x12mm, vertical MS column as where required 10mm thick, stiffeners, full welding, grinding, lifting, scaffolding etc. Steel Grade ASTM A36 / Grade 40. MS Chequered Plate 6mm thick (4.5mm min +1.5mm chequer) for treads size 4'-0" x 11" & landings 4'-0" x 4'-0", welded to stringers/frames with 5mm continuous fillet weld, including 50x5mm MS flat iron nosing at edge, MS handrail 1060mm high, comprising top rail 50x50mm hollow x 16SWG MS pipe (1.5"), middle rail 25x25mm 18SWG, vertical balusters 25x25mm @ 250mm c/c max, bottom toe plate 100x6mm flat, welded to treads/stringers, bends, caps, complete both sides of stair including landing railing. wall cleats / anchor plates 200x200x10mm with 4 Nos Hilti anchor bolts 12mm x 100mm for lateral support at each floor level including C channel, including drilling in RCC/brick, b) one coat of red oxide and three coats enamel paint (Jotan) any approved color, Complete in all respects Rft160130002080000
11621Providing & laying CC 1:2:4 for footing 2'x2'x3' deep, including excavation, formwork, 4 Nos anchor J bolts for each foundation 19mm Dia x 600mm long with nuts, Base plates 200x200x10mm & washers per base plate, complete.Job1170000170000
117 SS Railing    
11822Vertical post consists to two pressed stainless steel rectangular shape with spacers top & bottom universal joints for any regular movement. Top rail 3"x 1" ss 16 SWG rectangular high stainless steel 3'-0" high S.S posts 36" distance c/c installed railing on stair, (master pieces standard railing) non magnetic or equaling Railing on any floor as per drawings with 3 No 3/4" Dia rectangular SS tubes/ pipes through below top rail samples approved by the Client contractor will provide a sample of complete railing with basic shop price of railing.Rft2002105421000
119 PCC 1:4:8 under Floor    
12023PCC 1:4:8 using lawrancepur sand and margala crush as under floor or where as required including formwork, Complete in all respects any floor as directed by EngineerCft52004372272400
121 PCC 1:3:6    
12224PCC 1:3:6 using lawrancepur sand and margala crush where as required including formwork, Complete in all respects any floor as directed by EngineerCft800470376000
123 PCC 1:2:4 under Floor    
12425PCC 1:2:4 using lawrancepur sand and margala crush as under floor or where as required including formwork curing, Complete in all respects any floor as directed by EngineerCft64005203328000
125 Water Proofing     
12626Providing and applying water proofing under floor 4mm thick torch bonding bituminous membrane including primer (roof grip or equivalent as approved by engineer) as per manufacturer specification complete in all respect on external side of retaining wall as per drawings and instruction of engineerSft123001221500600
12727Water proofing of 3/4" thick terrazzo 1:2(one part of cement and 2 Parts of marble Chips) 0 or 9 Number Marble Chips, complete in all respect in good level finish as directed by Engineer In charge including all the necessary arrangements for completion of work Sft2500325812500
128 Roof Insulation     
12928Providing and laying terrazzo in flooring of approved shade having minimum terrazzo thickness of 5/8 inch having 3'x3' panels with 1/2" x 1½" thick Jet Black Patti Marble (one part of grey cement and two parts marble chips of approved color and including average 5 to 7 no's) laid with cement slurry over and including average 3" thick Average 1:2:4 PCC including curing, grinding, chemical polishing etc. complete in all respects as per specifications and instructions provided by Engineer in Charge.Sft 110009039933000
13029Terrazzo Skirting of 3/4" thick terrazzo 1:2(one part of cement and 2 Parts of marble Chips) 0 or 9 Number Marble Chips, with hand grinding and polish complete in all respect in good level finish as directed by Engineer In charge including all the necessary arrangements for completion of work Sft800150120000
131 Flooring    
13230Providing and laying of terrazzo tiles in flooring of size 12"x12"x1" of approved and shade having minimum terrazzo thickness 5/8" ( 1 part of gray cement and two part of marble chips of approved color and quality 5 to 7 no's) laid with cement slurry over and including 1-1/2" thick 1:3 cement base plaster, with grouting of joints in matching color including curing grinding polishing complete in all respects. Sft76203252476500
13331Providing and fixing of marble skirting (sunny gray) 1/2" thick factory polished with tile bond, minimum 2 feet length fill joints with matching color, complete in all respects Sft35013045500
13432Providing and laying polished/matt finish Porcelain tile size as per approved sample of approved make, color, and shade with patches/borders pattern in dark color, laid with tile bond over and including 1" thick 1:4 cement sand base mortar, joints fill with matching tile filler, complete as per detail shown on the drawing, specifications, and as directed by the Engineer. (Floor Type as per dwg) Note: Purchase Rate of Porcelain Tile supplied at site should be taken as Rs.400/- per sft.Sft3270060019620000
13533Providing and laying polished/matt finish Porcelain tile skirting size as per approved sample of approved make, color, and shade with patches/borders pattern in dark color, laid with tile bond over joints fill with matching tile filler, complete as per detail shown on the drawing, specifications, and as directed by the Engineer. (Floor Type as per dwg) Note: Purchase Rate of Porcelain Tile supplied at site should be taken as Rs.400/- per sft.Sft1560600936000
13634Providing and fixing in porcelain glazed tiles of approved make, shade and color, in dado fixed with Tile bond and filling the joints with tile filler of same color, including CSM (1:6) plaster 3/4" thick in true level, line and plumb and properly cured, complete as per drawings, specifications and as directed by the Engineer. Note: Purchase Rate of Porcelain Tile supplied at site should be taken as Rs.300/- per sft.Sft67625103448620
13735Providing and laying in Bath room non skid Porcelain tiles in floor of approved size and make, shade and color with tile bond filling, joints with tile filler of same color over and including 1" thick 1:4 cement sand base mortar over and already laid pcc leveling screed having 1" slope towards floor drain etc., complete as directed by the Engineer.(Floor Type as per dwg.) Note: Purchase Rate of Porcelain Tile supplied at site should be taken as Rs.300/- per sft.Sft25005101275000
13836Providing and fixing 12" wide 1"thick granite step full size prepolish front golah including, three grooves, base mortar 1.2 cm slurry filling the joint match color for stair 1 as approved (basic shop price Rs 550/ Sft)Sft18108141473340
13936Same as above 3/4" thick Landing Marble in required size prepolished as approved (basic shop price Rs 500/ Sft)Sft905780705900
14037Same as above granite 3/4" thick Riser / Skirting prepolished (basic shop price Rs 500/Sft561780437580
14137Same as above granite 1" thick for ablution sittings prepolished (basic shop price Rs 550/ four sides nosingSft3078023400
142 Same as above granite 3/4" thick on Lift walls mechanical fix ( Clamps and screws / channels) with groves prepolished (basic shop price Rs 500/Sft220880193600
14338 Marble Window Sill Providing & Laying window sill Full length or 6 feet minimum (Edge bull nosing both sides 12" to 15" wide) 3/4" thick with cement sand mortar 1:2 joints filling with matching color as per Drawing sunny white factory polished.Sft815160130400
14439Marble on parapet 3/4" thick up to 12" wide Sunny Gray marble pre-polish with Golah edging min 4'-0" long fixed with 1:2 cm mortar and with 4" long screws & Rawal plugs, joint filling, complete in all respects.Sft65013084500
14540Wardrobes Providing, making and fixing 24" deep Ward Robes using 5/8" thick Laminated MDF shelves fixed on wooden battens and 1 1/2"x2" well seasoned kal wood facing frame and 3/4" thick Laminated MDF shutters panel and Deodar wood leaping and architrave as shown on drawing including the cost of lacquer polish inside and outside on wood including Aluminum rod 3/4' Dia cabinet hinges, handles, drawer, steel carriage and lock with key etc. Complete as per instructions of the Engineer.Sft40150060000
14641Provision of Mehrab (wooden structure) as per drawings and specifications complete in all respects and as directed by the engineer incharge.Job1250000250000
14742Providing and fixing rain water down pipe (AGM or equivalent) heavy duty 5" Dia with MS clump 4' c/c, including Tee, bend, sockets etc. as approved by EngineerRft600709425400
14843Providing and making of Khurras on roof size 2'x2'x3" in with terrazzo toping complete in all respects including cost iron roof drain four side screening (alpine brand)No12100012000
149 External civil works    
1504Earthwork/ Excavation in open cutting up to any depth all type of soil for building such as Ordinary /Hard Soil and Rock etc. for foundation/ to achieve +0.00 level/ New Ground level dressed to designed level and dimensions and compaction the excavated surface up to 95% AASHO dressed to designed level and dimensions and disposal of surplus excavated material to any lead/ out of university premises , Complete in all respect as per Drawings and instruction of Engineer-in charge .Excavation for creating working space will not be considered for payment .Cft60000171020000
151 PCC 1:3:6     
15210Providing/laying of cement concrete (1:3:6) in floor Batching plant mix using Lawrancepur Sand and Margala 3/4" thick down Crush as all specified., placing, including required formwork and its removal, curing etc. complete in all respect as per drawings and instruction of Engineer -in charge Cft52004702444000
153 PCC 1:2:4     
15410Providing/laying of cement concrete (1:2:4) in floor in panels 6'x6' with marble Pati, Batching plant mix using Lawrancepur Sand and Margala 3/4" thick down Crush as all specified., placing in true level finish with steel trowel, including required formwork and its removal, curing etc. complete in all respect as per drawings and instruction of Engineer -in charge Cft22005201144000
155 Bottoming/sub base of any thickness as specified using Soil Aggregate/Granular Base Material of CBR 30% laid and compacted to 90% Modified AASHTO density, by appropriate compaction equipment and roller complete in all respect and as per instruction of engineer in chargeCft300080240000
156 Providing and laying 50mm thick C.C Pavers of 6000 psi compressive strength in combination of 70% Gray and 30% colored as per required size and laid in pattern over & including 2" average thickness of sand along with grouting the joints with sand and compacting the pavers up to the satisfactory level complete in all respect and as per instructions of engineer in charge.Sft60001721032000
157 Providing and laying PCC Kerb Stone size 450x300x150 including setting joints and pointing in 1:4 C/S mortar, complete in all respect and as per instructions of engineer in charge. Along with required ExcavationRft350421147350
158 Bricks    
1593Providing and laying First Class solid brick masonry work (at any floor / height) 9" thick and above 1800 PSI crushing strength and water absorption 15% of its weight including lab report result in 1:6 cm any thickness and above wall in sub structure complete as approved by the Engineer (Curing 7 days) sample to be approved Cft25005721430000
16043/4" (19 mm) cement plaster 1:4 on walls and columns etc.at any floor including making edges, corners, and curing etc. Complete Before plastering to ensure crack free plaster joint , in true line, plumb, trowel, including form work curing complete in all respects and as directed by Engineer incharge.Sft450062279000
161 Plumbing Works    
162 GENERAL NOTE    
163 Scope (Application to all sections)    
164 Supply, installation, testing and commissioning of the following items of works, including all materials, labor, tools, accessories, etc. required completion of each item as per specifications and approved by Engineer.    
165 Water Closet European one Piece     
1661S/F water closet apparatus European pattern couple set including hydraulic Seat Cover complete with flushing cistern in white/light color any size or make, fixed to concrete, brick, stone, or wood work, PORTA all as spd as approved (basic shop price Rs 20,000)Each 3622000792000
167 Water Closet squartter Type Indian     
1682Providing and fitting white glazed earthen ware water closet including P-Trape, uPVC hockey pipe 2" Dia squartter type, with foot rest. I/C flushing Tank with complete fitting PORTA all as spd as approved (basic shop price Rs 9000)Each 1111000121000
169 Mirror     
1703P/F mirror with sides tappered 1" all around any shape, size and pattern 5mm thick Belgium made making edges fixed on stone, or woodwork including screw and brackets.etc complete in all respect as directed by Engineer in Charge.Sft14020028000
171 Vanity Counter    
1724Providing and Fixing vanity counter 2'-0" wide, 3/4" thick Granite marble prepolished golah making vanity hole including base mortar cement slurry fix on 2" thick RCC slab with with reinforcement bars 3" thick brick wall 1/2" thick 1:4 cm plaster etc complete with vertical marble as approved as per drawing (Basic Shop price of Granite Rs 550/ Sft)Sft12075090000
173 Under counter Vanities     
1745Providing and Fitting Vanities (Porta Make) including cutting of Granite and nosing Approved Shape complete in all respect as per drawing as approved (Basic Shop price Rs 4000)Each235500126500
175 Hand Basin    
1766Providing and fitting glazed earthen ware wash hand basin (Porta Make) including bracket set, waste pipe and waste coupling, etc. i) white, with pedestal (basic shop price Rs 6000)Each4750030000
177 Copper Connection Pipe     
1787Providing and fixing Copper Connection pipe for Vanity, Basin & WC etc complete in all respect as approved Each 7745034650
179 Paper Holder     
1808P/F Supply and fix toilet paper holder S.S heavy duty any shape pattern and size complete with plugs, screws etc fixed to concrete, brick, stone or wood work best quality as approved (basic shop price Rs 1500)Each 36250090000
181 Towel Rail     
1829P/F Supply and fix towel rail, chromium plated, heavy duty single rod any pattern, shape and size complete with plugs, screws etc fixed to concrete, brick, stone or wood work as approved (basic shop price Rs 1500)Each 10250025000
183 Double Bib Cock     
18410Bib cock double chromium plated 1/2"Ø with Toilet shower etc complete (basic shop price Rs 5000)Each 486500312000
185 Wall Shower    
18611Wall shower complete set (basic shop price Rs 15000)Each 4818000864000
187 CP Vanity Mixer     
18812C.P. Vanity/ Basin mixer fancy head any pattern and shape screw down high pressure; lettered “HOT” and “COLD” with long screw shanks any fly nuts complete, supply and fixing (basic shop price Rs 5000)Each 277000189000
18913Providing and Installation of abulation mixer for abulation area, Purchase Price Rs.6,500/-Each 218500178500
190 Soap Dish    
19114Proiding and Fixing Soap Dish (basic shop price Rs 1500)Each25220055000
19215Providing and fixing grip handle for special person as approved (Basic Shop price 3000)Each 8350028000
193 Stopcock     
19416Stopcock chromium plated screw down high pressure; fancy type; but tee stop cock (basic shop price Rs 1800)Each 752300172500
195 Water Cooler     
19617Providing and Fixing Water Cooler General, Supreme imported comperssor copper condenser, copper motor, food grade storage tank one year warranty 35 Ltr (Orient / Heire or Equivalent)Each 750000350000
197 Water Geyser     
19818Providing and Fixing Electric water geyser(NASGAS, Singer or equivalent) 10L all as spd. complete fitting etc in all respect Each 12200022000
199 Water Geyser     
20019Providing and Fixing hybrid water geyser(NASGAS, Singer or equivalent) 35L all as spd. complete fitting etc in all respect Each 265000130000
201 Floor Trap    
20220Providing and Fixing Floor Traps (AGM) muilti connection with SS grating 8"x8" etc complete i/c fixing mortarEach823600295200
203 SS Bottle Trap    
20421Providing and Fixing SS Bottle Trap With all Fitting As Approved complete in ass respects.Each23225051750
20522Gully Trap Excavate to dispose off surplus spoil on site, make good the surface disturbed, supply (230mm x 230mm x 100mm outlet) surface gullies and bed, and surround in 100mm of CC type-'C', provide 100mm x 125mm rounded CC type- 'C' curb or 900mm x 900mm x 100mm dished CC type- 'C' top and 250mm x 250mm galvanized stainless steel loose grating, complete in all respects.Each240008000
206 Clean Out    
20723Providing and Fixing uPVC AGM clean out 3" dia With all Fitting As Approved complete in ass respects.Each15150022500
20824Providing and Fixing uPVC AGM clean out 4" dia With all Fitting As Approved complete in ass respects.Each15180027000
20925Providing and Fixing uPVC AGM clean out 5" dia With all Fitting As Approved complete in ass respects.Each15210031500
210 CC Cloth Hook    
21126Providing and Fixing SS double cloth hooks With all Fitting As Approved complete in ass respects.Each7035024500
212 Water Motor     
21327Centrifugal Pump Set Centrifugal Pumping set (KSB) with A.C electric motor, 400V, 3 phase, 10 HP, 50 cycles, motor and pump directly coupled and mounted on common bed plate/ channel base, duly aligned, head 15 M, Capacity 200-300 GPM, 1450 RPM, Complete, with anchoring bolts/ nuts, Motor efficiency IE-2, Insulation class 'F', enclosure characteristics IP-55, supply and fixing. including suckssion pipe upto 20 ft with Valve. including Electric DB from KSBEach1550000550000
21428Providing and Fixing 0.5 HP Submersible Non Clogging Pump (KSB) with complete all accosries as per approved make in all respect for soomth functioning, dia as directed by the Engineer in Charge (Head 18 ft with discharge 30GPM) including Electric DB from KSBEach270000140000
21529Sluice Valve, according to BSS-3464 class 150, (Table 18-1-6) flanged and drilled to BS, Table 18-1-10, complete with rubber packing, 80 mm dia, supply and fixing. KITZEach22600052000
216 GI Pipes Water Tank to Bath Rooms    
21730Providing, laying, cutting, jointing, testing and disinfecting G.I. pipeline in trenches, with all accessories such as socket joints, Elbow, Union etc. complete G.I. pipes of IIL-L Karachi complete in all respects.    
218a1" i/d (25 mm) Rft5030015000
219b1½" i/d (40 mm) Rft360545196200
220c2" i/d (50 mm) Rft205688141040
221d2 1/2"id (65mm) Rft340944320960
222e3" id (80mm) pressure pipe IIL-MRft6098058800
223 Gate Valve     
22431Providing and fixing gun metal Peet/gate valve (screwed):- (Kitz / equalent make)    
225c40 mm(1½") diaEach10500050000
226d50 mm(2") diaEach2650013000
227e65mm (21/2")diaEach41100044000
228f65mm (21/2")dia non return valveEach21800036000
229g65mm (21/2")dia Sand strainer including all accessories complete.Each11800018000
230 PPRC Pipe    
23132P/F PPRC Pipe heavy duty for Cold/ Hot Water with all fitting Tee, Elbow union sockets etc fitting and testing with pressure pump conceled in walls & floor i/c hocks etc complete. RAK-THEARAM UAE or equivalent PN16, PN20    
232 First Floor    
233a3/4" dia 20mmRft48974656
234b1" dia 25mmRft 29011332770
235c1-1/4" dia 32mmRft54216388346
236d1-1/2" dia 40mmRft535253135355
23733Gate Valve (for PPRC Pipes)    
238a3/4" dia 20mmEach225005000
239b1" dia 25mmEach4290011600
240c1-1/4" dia 32mmEach5320016000
241d1-1/2" dia 40mmEach3400012000
242 UPVC Pipe     
24334P/F UPVC Pipe heavy duty for bath/ toilet out let pipes i/c all fitting sockets bend tees Y Tees etc. Vertical and Horizantal i/c PCC cover on horizantal pipes and steel clumps 5'-0" c/c for vertical pipes I/c Air Pipes AGM Saudi Arabia or equivalent Piping System,     
244a6"Ø Rft75121491050
245b5"Ø Rft160709113440
246c4"Ø Rft410680278800
247d3" Ø Rft510577294270
248e2"Ø Rft8525521675
249fAir Grill 3" DiaEach73492443
250gAir Grill 2" DiaEach72521764
251 Main Holes     
25235Excavation for foundation & Back filling for structural elements in 6" layers including shoring watering raming etc complete balance surplus material disposed off to any leadCft9601716320
25336Providing/laying of cement concrete (1:3:6) in foundation using crush or broken stone all as spd.Cft20045791400
25437Providing and laying first class brick masonery work in 1:4 cm 9" thick walls around including curing etc as approved Cft412572235664
2553813 mm thick cement plaster 1:3 finished including terrazzo lining with 1:2 as specified.Sft4536228086
25639P/L PCC 1:3:6 in main holes, complete in all respects Cft20445793228
25740Providing and fixing main hole covers cost iron heavy duty 2'-0"x2'-0" (apline) with outer fram fixed in concrete / brick wall etc complete in all respects. 25 to 30KgNos51000050000
25841Providing and fixing main hole covers Grating type cost iron heavy duty 2'-0"x2'-0" (apline) with outer fram fixed in concrete / brick wall etc complete in all respects. 25 to 30KgNos41000040000
25942Providing and fixing main hole covers cost iron medium duty 2'-0"x2'-0" (apline) with outer fram fixed in concrete / brick wall etc complete in all respects. 20 to 25KgNos218000168000
260 UPVC Pipes     
26143Providing and laying UPVC (AGM Saudi Arabia or equivalent) with alighment and grade, jonting with jointing materials including all accessories tee bend sockets etc, excavation, back filling compaction as approved     
262a6" dia Rft60121472840
263b8" dia Rft6851242850770
264 RCC Pipes     
26544Supply and fix reinforced cement concrete pipes 300mm bore, laid and jointed with spigot socket or collars, joint treatment, as specified. Including excavation, sand fill, required pcc complete in all respetcs. Best quality    
266 12" dia Rft60150090000
267 FIRE FIGHTING    
268 Fire Extinguisher     
2691Fire Extinguisher as per NFPA-20/UL/FM approved (Portable CO2) Carbon Dioxide, 5 Kg capacity. Along with fixing hooks No.1812000216000
2702Fire extinguisher as per NFPA-20/UL/FM approved (Portable DCP) dry chemical powder type, 6 Kg capacity. Along with fixing hooksNo.18470084600
271 MS Pipe    
2723MS pipe, Water Quality (Sh. 40), seamless 50 mm Dia, with all fittings i.e. sockets, bends, tees, elbows etc. where required, laid complete in trenches, as specified, supply and fixing. Huffaz / Jamal make, including enamel paint Rft6055033000
2734MS pipe, Water Quality (Sh. 40), seamless 65 mm Dia, with all fittings i.e. sockets, bends, tees, elbows etc. where required, laid complete in trenches, as specified, supply and fixing. Huffaz / Jamal make, including enamel paint Rft8075060000
2745MS pipe, Water Quality (Sh. 40), seamless 80 mm Dia, with all fittings i.e. sockets, bends, tees, elbows etc. where required, laid complete in trenches, as specified, supply and fixing. Huffaz / Jamal make, including enamel paint Rft701460102200
2756MS pipe, Water Quality (Sh. 40), seamless 100 mm Dia, with all fittings i.e. sockets, bends, tees, elbows etc. where required, laid complete in trenches, as specified, supply and fixing. Huffaz / Jamal make, including enamel paint Rft74418001339200
276 Gate Valve     
2777Providing, installation, testing and comisioning of 50 mm Dia flanged end gate valve for fir system, UL listed/ FM / NFPA approved, complete with all including jointing and fixing in position complete in all respect as per approved drawings, specifications. (Imported Kitz)No.1052000520000
2788Providing, installation, testing and comisioning of 65 mm Dia flanged end gate valve for fir system, UL listed/ FM / NFPA approved, complete with all including jointing and fixing in position complete in all respect as per approved drawings, specifications. (Imported Kitz)No.568000340000
2799Providing, installation, testing and comisioning of 80 mm Dia flanged end gate valve for fir system, UL listed/ FM / NFPA approved, complete with all including jointing and fixing in position complete in all respect as per approved drawings, specifications. (Imported Kitz)No.485000340000
28010Providing, installation, testing and commissioning of 100 mm Dia flanged end gate valve for fire fighting system, UL listed/FM /NFPA approved, complete with all accessories including jointing and fixing in position complete in all respect as per approved drawings, specifications. (Imported Kitz)No.4110000440000
28111Providing and installation, testing and commissioning of Fire Hose Cabinets, Double compartments(Recessed / wall mounted type), Including following items fixed in cabinet. Cabinets and all items shall be as per NFPA /BS/EN standards. i) 1- No. 100 feet x Dia 2-1/2" fire hose with quick connect couplings at both ends. ii) 1-No. fire hose reel with Dia 1 inch x 100 feet Fire Hose, automatic openable valve, pressure reducing valve Dia 1 inch, and adjustable spray nozzle. iii) 1 No. Fire Hydrant valves/ Landing valves Dia 2.5 inch, flanged type. iv) 1-No. DCP 4.5 kgs. Fire extinguisher. v) 1-No. CO2 Type, 4.5 kgs Fire Extinguisher.No.102200002200000
282 Fire Hydrant    
28312Fire Hydrant flanged and drilled to BS Table 18-1-10, complete with rubber packing, 80mm Dia, supply and fixing.No.454000216000
28413100 feet x Dia 2-1/2" fire polyester hose with quick connect couplings at both endsNo.24500090000
285 Electrical works    
286 GENERAL NOTE    
287 Scope (Application to all sections)    
288 Supply, installation, testing and commissioning of the following items of works, including all materials, labour, tools, accessories, etc required completion of each item as per specifications and approved by Engineer.    
2891Wiring     
290a)Supply, installation, testing & commissioning of electrical wiring , consisting of 3 x 2.5 mm² copper pvc wires of Pakistan, NewAge or Fast Cables as approved in PVC conduits of appropriate size, of Beta recessed in walls/ coloumns/ roof slab or fixed on surface with metal saddles, complete with accessories such as bends, sockets,circular boxes, junctionboxes etc.,cost to be included from DB to first point/first socket as per drawing of the circuit, complete in all respect including connections as required.No2003500700000
291b)As above but point to point wiring with 3 x 1.5 mm2 No50025001250000
292c)As items no 1(a) but 3x4sqmm copper PVC from DB to first socket outlet .No1504000600000
293d)As above but from socket to socket with 3x 4mm² .No4002000800000
294e)As items no 1(a) but 3x6sqmm copper PVC from DB to AC socket outlet .Mtr30007502250000
295f)As above but from socket to outdoor unit with 3x 4mm² including switch off box (32amp breaker)No1203000360000
296g) supply and installation 30A DP switch outlet on steel box for AC,SNo803000240000
2972Cables    
298 Supply, installation, Testing & Commissioning of cables of given sizes of Pakistan cables or equivalent, approved in PVC conduits/ pipe of appropriate size as approved by engineer inchagre.    
299a)1cx 70mm2 Copper Pvc/Pvc cableRM1001800180000
300b)1cx 16mm2 Copper Pvc(Ecc) cable RM15055382950
301c)4cx 16mm2 Copper Pvc/Pvc cableRM50160080000
302d)4cx 10mm2 Copper Pvc cable RM1001400140000
303e)4cx 35mm2 Copper Pvc/Pvc cableRM1505000750000
304f) 4Cx 185mm2 copper. Pvc/Pvc cableRM130240003120000
305h) 4Cx 95mm² Copper. Pvc/PvcRM120120001440000
306i) 4Cx 70mm² Copper. Pvc/PvcRM809000720000
3073 ACCESSORIES (swith & socket)    
308 Supply &installation testing & commissioning of switches & sockets of Legrand or equivalent as per maufecturer's list as approved of following discription.    
309 SWITCHES    
310a)1 gang one way with steel back boxNo33150049500
311b)2 gang one way with steel back boxNo50160080000
312c)3 gang one way with steel back boxNo761800136800
313d)4 gang one way with steel back boxNo12180021600
314e)5 gang one way with steel back boxNo30190057000
315f)6 gang one way with steel back boxNo801970157600
316g) 1 gang Two way with steel back boxNo28130036400
317h) 2 gang Two way with steel back boxNo26170044200
318i)Fan Dimmer with steel back boxNo2002200440000
319 SOCKETS    
320j)13 A socket with steel back boxNo2501800450000
321k)15 A switch socket with steel back boxNo50180090000
3224PVC CONDUIT/DUCT    
323a)Supply andfixing 25mm dia pvc conduit with bend ,socket, etc as requiredRft20003060000
324b)Supply andfixing 50mm dia pvc conduit with bend ,socket, etc as requiredRft200060120000
325c)Supply andfixing 40X40mm PVC duct as requiredRft1500180270000
3265CABLE TRAY    
327a)supply and installation of 16 SWG 18"X3" G.I perforated cable tray with cover suitable hangers, anchor boltsRft.400950380000
328b)supply and installation of 16 SWG 12"X3" G.I perforated cable tray with cover suitable hangers, anchor boltsRft.300750225000
329c)supply and installation of 16 SWG 6"X3" G.I perforated cable tray with cover suitable hangers, anchor boltsRft.300500150000
3306 LIGHT FIXTURES    
331a)Supply and installation of Out door type 20w LED IP66 light fixture of Philips/FT/SunlightNo29220063800
332b)Supply and installation of 7W LED light fixtureNo50120060000
333c)Supply and installation of 18W LED recessed light fixture of philips/FT/sunlightNo1201800216000
334d)Supply and installation of 40W LED 4 feet Surface mounted light fixture of philips/FT/sunlight 2001800360000
335e)supply and installation of 2'x2' LED panel light fixture of philips/ft/sunlight 36w recessed type No15075001125000
336f)As above but Flood light 200W LED, IP 66.No922000198000
3377Fans    
338a)Supply & installation of 56" ceiling fan with fan box as required (lahore fan).No22090001980000
339b)supply and inatalation of 18" Wall Bracket fan of Pak fan,No16600096000
340c)supply and installation of metal boady 12" Dia Exhaust Fan (lahore fan)No258000200000
341d)supply and installation of fan rod 2'.6" as approved by engineerNo220550121000
3428 LV PANEL, DISTRIBUTION BOARDS    
343a) Supply & Installation, testing & commissioning of Main LV Panel , made of 16 SWG and angular frame, ICI red oxide painted for rust protection then powder coated in furnace of approved colour with voltmeter & ammeter, energy analyzer selector switches R.Y.B indicators, wires PVC duct, imported copper bus bar etc. complete in all respect. Main LT panel incoming - 800amps MCCB TP adj 2no,s out going - as approved by engineerNo112000001200000
344b) Supply & Installation, testing & commissioning of LT Panel , made of 16 SWG and angular frame, ICI red oxide painted for rust protection then powder coated in furnace of approved colour with voltmeter & ammeter, energy analyzer selector switches R.Y.B indicators, wires PVC duct, imported copper bus bar etc. complete in all respect. incoming - 800amps MCCB TP 1no,s out going - 200 amps TP MCCB adj 4 no,s 100 amps TP MCCB adj 2 no,s No1800000800000
345c)Supply & Installation, testing & commissioning of ELT Panel , made of 16 SWG and angular frame, ICI red oxide painted for rust protection then powder coated in furnace of approved colour with voltmeter & ammeter, energy analyzer selector switches R.Y.B indicators, wires PVC duct, imported copper bus bar etc. complete in all respect. incoming - 400amps MCCB TP 1no,s out going - 63 amps TP MCCB 8 no,s 40 amps TP MCCB 4 no,s 1 No1700000700000
346d)Same as above but ATS Panel for 200 kva genset with MOR as approved by engineerNo112000001200000
347e)Same as above but PFI Panel for 250 kvar as approved by engineerNo1300000300000
348f)As above but D.B L/P incoming 63 amps MCCB TP outgoing 20 amps mcb 3no,s 16 amps mcb 6 no,s 10 amps mcb 10 no,sNo52000001000000
349g)As above but D.B AC,S incoming 200 amps MCCB TP outgoing 32 amps mcb 12no,s 20 amps mcb 9 no,s No5190000950000
350 As above but D.B LAB incoming 40 amps MCCB TP outgoing 16 amps mcb 12 no,s No4190000760000
351h)As above but UPS DB incoming 40 amps MCCB TP outgoing 16 amps mcb 12 no,s No2190000380000
352i)As above but D.B LIFT incoming 100 amps MCCB TP No17000070000
3539FIRE Alarm Addressable System    
354a)Supply and installation of smoke detector Eaton Cooper Menvier U.K intelligent Addressable equivalent complete with Base.No1502700405000
355b)Supply and installation of heat detector Eaton Cooper Menvier U.K intelligent Addressable equivalent complete with Base.No10270027000
356c)Supply and installation of call point Eaton Cooper Menvier U.K intelligent Addressable equivalent complete with Base.No12600072000
357d)Supply and installation of sounder Eaton Cooper Menvier U.K intelligent Addressable equivalent complete with Base.No12600072000
358e)supply and laying of 2x 1. 5 mm2 PVC insulated Cable with screen & drain wire of 2MKablo Turkey (1 hour fire resistant)or equivalent as per maufecturer's list, appropriate size of pvc conduit, concealed in Wall or Floor/run over trunking /cable tray as required as per situation of site as required and approvedRft3000130390000
359f)Main fire alarm panel 2 loop addressable type with all necessary indications & functions Cooper UK ,as approved by engineerNo1550000550000
36010EARTHING SYSTEM    
361a)Supply & laying of 1Cx70mm² copper (bare) RM2003000600000
362b)Supply, installation, testing of 25x3mm copper strip fixed on roof topRm2002500500000
363c)supply and installation of earth electrod 3ft longNo3600018000
364d)Earth Connecting Point (copper) 300x50x10mmNo8400032000
365e)Pure copper rod 2 no’s 20mm dia 10 ft long for each pit and 30 ft deep and 6 inch dia earthing bore including 2inch dia upvc pipe and 1.5 ft x 1.5 ftx1ft Earthing pits with complete fitting including heavy duty cast iron covers , complete fitting in all aspects Along with testing of Earthing system as per StandardsNo101700001700000
36611External Electrical Work    
367a)Excavation making of 2 1/2'x 4' trench provision of 8" thick sand bed, laying of RCC pipes 1" dia laying back filling, complete ai all respect.Rm300309000
368b)supply and laying of 15 KV HT Cable 3x70mmsq xlpe copper armoured (pakistan cable) as approved by engineer factory test required of cableRm300120003600000
369c)Termination kit for HT cable No260000120000
370d)cable pulling pit 6x6x5 made of RCC 1;2;4 and RCC cover with MS angle frame for pulling of cable including all accessores as per instruction of engieerNo355000165000
371e)Supply and installation of 400KVA step down /seal type (PEL OR equivalent ) wapda approved standard transformer pad mounted with Main breaker 800amps and 2 no’s 300 amp breakers including foundation and all civil work complete in all respect as approved by engineer No138000003800000
372f)supply and installation of 100 kva generator with weather proof/ sound proof canopy built in fuel tank and havey duty MS additional feul tank 500 litres Imported (cater pillar),(cummins power) or euivalent as approved by engineerNo160000006000000
373g)supply and installation of 11kv HT panel 630 amps type tested triple pole vaccum circuit breaker ABB (VD4) Digital protection relay micom 123 (schneider) ct ratio 50/5 as per wapda standerd as approved by engineer.No130000003000000
374h)Rerouting of existing 4x35mmsq cable including laying termination as per site requirment.Mtr120404800
375 Air Conditioning    
376 SINGLE SPLIT WALL MOUNTED TYPE UNITS    
3771Supply and installation of DC inverter wall mounted air conditioning units. The air conditioning units shell be complete with indoor and outdoor unit T3 compressor R 410 A refrigerant power supply 220/1 phase /50hz including angle iron stand or brackets (Midea or equivalent) complete in all respect as approved by engineer    
378a)1 TonNos3120000360000
379b)1.5 TonNos5160000800000
380c)2 TONNos6021000012600000
381d)2 Ton Ceiling cassette type Nos102700002700000
382e)2 Ton floor standing type Nos53100001550000
3832Supply and laying of copper pipe minimum 22 gauge including insulation and pvc Duct with indoor to outdoor unit shell be complete in all respect as per approved by engineer (golden dragon, muller)    
384a)1/2"RFT20004080000
385c)3/8"RFT400030120000
386d)5/8"RFT250050125000
3873Supply & Installation of UPVC Drain Pipes (including elbows. Tees, sockets ) (AGM Sch-40)     
388a)1.0"RFT5000160800000
3894Supply and laying of control cable 4x2.5mmsq pvc copper as per approved by engineer(Pakistan cable)RFT50002301150000
3906Supply and laying of 3x4mmsq pvc copper wire from DB to AC switch including pvc pipe as per approved by engineer(Pakistan cable)RFT90003603240000
391 Supply and laying of 3x4mmsq pvc copper wire from AC switch to indoor unit including pvc pipe as per approved by engineer(Pakistan cable)RFT30003601080000
39274Cx 150mm2 copper. Pvc/Pvc cableRM120220002640000
3938Extra refigerent gas as per requirmentjob1150000150000
3949Out Door Compressor Angle Iron Support frame     
395a)supply and insttallation of out door heavy duty Angle iron fram as approved by engineerNos80100080000
396 IT works    
3971Network Cabling Points : Providing, installing, testing and commissioning of Network & telecommunication RJ45 outlet points from the relevant floor distributor cabinet using CAT-6, 23 AWG, UTP, 1 Gbps supported cable, including suitable concealed or surface-mounted PVC conduits or PVC trunking/channel as per building requirement with concelled back boxes with termination accessories, cable dressing, labeling, cutting and making holes in walls complete in all respects.All Cables should be Fluke Tested, Documented, Dressed up with tags in Racks, and ready to use No.171150002565000
3982Faceplates : Supply, installation, testing and commissioning of simplex faceplate with one RJ-45 I/O CAT-6 UTP telecommunication outlet, including a 16 SWG sheet steel back box finished with powder-coated paint, RJ-45 CAT-6 UTP jack, mounting frame, screws, and all necessary fixing and mounting accessories, complete in all respects. Brannds - Corning, Schneider No.752200165000
3993Patch Panels : Supply, installation, testing and commissioning of 24-port CAT-6 U/UTP, 1G supported modular RJ-45 loaded patch panel,(Only for Data Cabling) compatible with a 42-inch rack, installed in a floor-mounted or wall-mounted Network cabinet, complete with built-in rear cable management, cable termination facilities, labeling, mounting brackets, screws, and all necessary installation accessories, complete in all respects.No.3800024000
4004Cable Managers -24 Port - Rack Mout - Corning or equal with instlalation No.9500045000
4015Patch Cords : Following type CAT-6, 23AWG UTP Giga Speed patch cord with required connector at both ends: Corning or better    
40261 metre (3 ft.) long (Rack Side)No.65100065000
40373 metre (10 ft.) long (User Side)No.65150097500
404842 U Rack : Supply, installation, testing and commissioning of an A+ Quality 42U server rack, with dimensions of 800 mm (W) × 1000 mm (D), suitable for housing telecommunications and networking equipment, complete with front and rear access doors, removable side panels, vertical mounting rails, ventilation provisions, cable entry facilities, earthing arrangements, adjustable levelling feet, castors, and all necessary mounting hardware and accessories, complete in all respectsNo.2150000300000
4059Cable Tray : Supply, installation, and fixing of 6-inch × 2-inch GI sheet steel cable Tray with tight covers, fabricated from 16 SWG galvanized iron sheet, complete with removable covers, joints, bends, tees, reducers, mounting brackets, hangers, supports, fixing hardware, and all necessary accessories for proper cable routing and protection, including cutting, fitting, alignment, and secure installation, complete in all respects.Rft.900480432000
40610Optical Fiber with Laying installation : Laying of optical Fiber Cable from Existing Admin Block to Newly constructed Block with 24 Core Optical Fiber Cable Single Mode, of known brands of PTCL, Corning etc including laying termination on both ends with all required accessories complete in all respect. The Fiber should be tested through Latest OTDR and report submitted to AU Team Mtr500200100000
40711Rack Mouse ODF -24 Ports Well known Brands like Corning, Schneider etc. Fully loaded with pigtails, splicing etc . Installation with splicing and complete in all respect. No.22500050000
40812Patch Cords - Optical Fiber - 03 Meter - Single ModeNo.30250075000
40913Civil Work : Digging and Laying of 4" Class B uPVC Pipe in depth of 3 Feet from the surface, Digging, laying pipe, back fill, compaction, leveling complete in all respect. AGMRft160012141942400
41014Same as above but 6" diaRft220680149600
41115 Making of Main holes 2'x2'x3' clear size &/ depth with brick masonry 9" thick 1:4CM, Plaster 1:4, PCC at bottom 1:2:4 4" thick, with cast iron covers 2' x 2' heave duty (Alpine) with frame complete in all respects and as directed by engineer incharge No350000150000
412 Networking in Computer Labs    
4131Wiring of Network Cable in Computer labs in concelled pipes. RJ-45 connectors on both ends of Cable. Cable should be Cat-VI 23AWG of well known Brands like Corning, Schneider or equvilent. All Cables should be properly tested through latest Fluke Tester, documentation fo cables, tagging and dressed up in Rack properly. including 1.5" dia pvc conduit (beta)No.208800166400
4142Data Racks - 9U for computer Labs. A+ Quality with installation. No.42000080000
415 LIFT    
4161ELEVATOR     
417 Supply, installation, testing, and commissioning of new passenger Elevator Machine Room less Type fully complied and certified by EN/BS/American Standard and for public use in buildings of minimum features including VVVF, high efficiency motor, complete stainless steel finish, for ambient condition of 50 °C, capacity of 800 Kg, speed 1.0 m/s, 4stops/4openings,entrance 900mm. Lift (completely imported) shall minimum includes car, hoisting machinery, counter-weight, supports, brackets, automatic controls, embedded parts, access ladder, separator screen & trap door, electric overload, shaft lightening, intercom system, emergency operation for cabin/door, emergency recovery device (ups/battery) and safety devices complete in all respect as per specification and according to EN 81 standard compliance.civil work such as finishing of doors/slab duly plastering and painting provision of scaffloding complete in all respect .All taxes/duties shall be included as per specification as approved by client engineer.No.11400000014000000
418 *NOTE:    
419 1. Approved Brand ,Schindler (china) or equivalent 2. Rate qouted should include Tool Kit, Spare parts and Operation & Maintanainance (24 hours x7 days manned by technical person) for 12 Month 3. Must have maintenance office in Rawalpindi / Islamabad 4. Third party inspection requird after installation of lift and also material inspection 5. complete import documents/certificate to be provided from orignal manufacturer.    
GRAND TOTAL:Rs 387,985,157.00

Scope of Work

Construction of Library and Classroom Block at AU H-11 Campus, Complete scope of work is described in Attached BoQ

Price Schedule

For Individual Jobs

# Job Title Quantity Unit Price (PKR) Total Price (PKR) Delivery Location Delivery Period / Year Country of Origin
1
2
For Lots
# Lot Title Total Lot Price (PKR) Country of Origin
1[Lot 1 Title]

 

 

 

📑 General Conditions of Contract (GCC)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

A. General

  1. Definitions
    1. Unless the context otherwise requires, the following terms whenever used in this Contract shall have the same meaning and shall be interpreted as  indicated
      1. “Applicable Law” means the laws and any other instruments having the force of law in the Government’s Country, or in such other country as may be specified in the Special Conditions of the Contract (SC), as they may be issued and in force from time to time;
      2. “The Contract” means an agreement enforceable by law;
      3. “The Contract Price” means the price payable to the Contractor under the Contract for the full and proper performance of its contractual obligations;
      4. “The Services” means the work to be performed by the Contractor pursuant to this Contract and as prescribed in the Specifications and Schedule of Activities included in the Contractor’s Bid;
      5. “Ancillary Services” means those services ancillary to the provision of Services, such as transportation and insurance, and any other incidental services, such as installation, commissioning, provision of technical assistance, training, and other such obligations of the Contractor covered under the Contract;
      6. “GCC” means the General Conditions of Contract contained in this section;
      7. “SCC” means the Special Conditions of Contract by which the GCC may be amended or supplemented;
      8. “Day” means calendar day unless indicated otherwise;
      9. “Effective Date” means the date on which this Contract comes into force and effect;
      10. “The  Contractor” means the individual or corporate body whose Bids to provide the Services has been accepted by the Procuring Agency;
      11. “The Project Site,” where applicable, means the place or places named in Bid Data Sheet and technical Specifications;
      12. “Government” means the Government of Pakistan;
      13. “Local Currency” means the currency of Pakistan;
      14.  “In Writing” means communicated in written form with proof of receipt;
      15. “Completion Date” means the date of completion of the Services by the Contractor  as certified by the Procuring Agency;
      16. “Foreign Currency” means any currency other than the currency of the country of the Procuring Agency;
      17. “Party” means the Procuring Agency or the Contractor, as the case may be, and “Parties” means both of them;
      18.  "Service" means any object of procurement other than goods or works;
      19. “Subcontractor” means any entity to which the Bidder subcontracts any part of the Services.
  2. Applicable Law
    1. The contract shall be governed and interpreted in accordance with the laws of Pakistan, unless otherwise specified in SCC.
  3. Language
    1. The Contract as well as all correspondence and documents relating to the Contract exchanged between the Contractorand the Procuring Agency, shall be written in the English language unless otherwise stated in the SCC.  Supporting documents and printed literature that are part of the Contract may be in another language provided these are accompanied by an accurate translation of the relevant passages in English, in which case, for purposes of interpretation of the Contract, this translation shall govern.
  4. Notices
    1. Any notice, request, or consent made pursuant to this Contract shall be in writing and shall be deemed to have been made when delivered in person to an authorized representative of the Party to whom the communication is addressed, or when sent by registered mail, telex, telegram, or facsimile to such Party at the address specified in the SCC.
  5. Location
    1. The Services shall be performed at such locations as the Procuring Agency may approve and as specified in SCC.
    2. A {DOCUMENTS}
  6. Authorized Representatives / Authority of Member in charge
    1. Any action required or permitted to be taken, and any document required or permitted to be executed, under this Contract by the Procuring Agency or the Contractor may be taken or executed by the officials specified in the SCC.

B. Commencement, Completion, Modification, and Termination of Contract

  1. Effectiveness of Contract
    1. This Contract shall come into effect on the date the Contract is signed by both parties and such other later date as may be stated in the SCC.
  2. Commencement of Services
    1. The Contractor shall confirm availability of Key Experts and begin carrying out the Services not later than the number of days after the Effective Date specified in the SCC.
  3. Program schedule
    1. Before commencement of the Services, the Contractor shall submit to the Procuring Agency for approval a Program showing the general methods, arrangements, order and timing for all activities. The Services shall be carried out in accordance with the approved Program as updated.
  4. Starting Date/Expiration Date
    1. The Contractor shall start carrying out the Services Five (05) days after the date the Contract becomes effective, or at such other date as may be specified in the SCC.
    2. Unless terminated earlier pursuant to Clause GCC 14 hereof, this Contract shall expire at the end of such time period after the Effective Date as specified in the SCC.
  5. Entire Agreement
    1. This Contract contains all covenants, stipulations and provisions agreed by the Parties.  No agent or representative of either Party has authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein.
  6. Modification
    1. Any modification or variation of the terms and conditions of this Contract, including any modification or variation of the scope of the Services, may only be made by written agreement between the Parties. However, each Party shall give due consideration to any modification(s) or variation(s) made by the other Party.
    2. In cases of any modification(s) or variation(s), the prior written consent of the Procuring Agency is required.
  7. Force Majeure
    1. Definition
      For the purposes of this Contract, “Force Majeure” means an event which is beyond the reasonable control of a Contractor and which makes a Contractor’s performance of its obligations under the Contract impossible or so impractical as to be considered impossible under the circumstances.
    2. No Breach of Contract
      The failure of a Party to fulfill any of its obligations under the contract shall not be considered to be a breach of, or default under, this Contract in so far as such inability arises from an event of Force Majeure, provided that the Party affected by such an event (a) has taken all reasonable precautions, due care and reasonable alternative measures in order to carry out the terms and conditions of this Contract, and (b) has informed the other Party as soon as possible about the occurrence of such an event.
    3. Extension of Time
      Any period within which a Contractor shall, pursuant to this Contract, complete any action or task, shall be extended for a period equal to the time during which such Party was unable to perform such action as a result of Force Majeure.
    4. Payments
      During the period of their inability to perform the Services as a result of an event of Force Majeure, the Contractor shall be entitled to continue to be paid under the terms of this Contract, as well as to be reimbursed for additional costs reasonably and necessarily incurred by them during such period for the purposes of the Services and in reactivating the Service after the end of such period.
  8. Termination
    1. By the Procuring Agency
      The Procuring Agency may terminate this Contract in case of the occurrence of any of the events specified in paragraphs (a) through (e) of this Clause. In such an occurrence the Procuring Agency shall give at least thirty (30) calendar days’ written notice of termination to the Contractor in case of the events referred to in (a) through (d); at least sixty (60) calendar days’ written notice in case of the event referred to in (e);
      1. If the Contractor fails to remedy a failure in the performance of its obligations hereunder, as specified in a notice of suspension;
      2. If the Contractor becomes (or, if the Contractor consists of more than one entity, if any of its members becomes) insolvent or bankrupt or enter into any agreements with their creditors for relief of debt or take advantage of any law for the benefit of debtors or go into liquidation or receivership whether compulsory or voluntary;
      3. If the Contractor fails to comply with any final decision reached as a result of arbitration proceedings;
      4. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      5. If the Procuring Agency, in its sole discretion and for any reason whatsoever, decides to terminate this Contract;
    2. By the Contractor
      The Contractor may terminate this Contract, by not less than thirty (30) calendar days’ written notice to the Procuring Agency, in case of the occurrence of any of the events specified in paragraphs (a) through (d) of this Clause.
      1. If the Procuring Agency fails to pay any money due to the Contractor pursuant to this Contract and not subject to dispute within forty-five (45) calendar days after receiving written notice from the Contractor that such payment is overdue;
      2. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      3. If the Procuring Agency fails to comply with any final decision reached as a result of arbitration;
      4. If the Procuring Agency is in material breach of its obligations pursuant to this Contract and has not remedied the same within forty-five (45) days (or such longer period as the Bidder may have subsequently approved in writing) following the receipt by the Procuring Agency of the Contractor’s notice specifying such breach.

C. Obligations of the Contractor

  1. General
    1. Standard of Performance
      1. The Contractor shall perform the Services and carry out the Services with all due diligence, efficiency and economy, in accordance with generally accepted professional standards and practices, and shall observe sound management practices, and employ appropriate technology and safe and effective equipment, machinery, materials and methods. The Contractor shall always act, in respect of any matter relating to this Contract or to the Services, as a faithful adviser to the Procuring Agency, and shall at all times support and safeguard the Procuring Agency’s legitimate interests in any dealings with the third parties;
      2. The Contractor shall employ and provide such qualified and experienced Experts and Sub-Contractors as are required to carry out the Services.
    2. Law Applicable to Services
      The Contractor shall perform the Services in accordance with the Contract and in accordance with the Law of Pakistan and shall take all practicable steps to ensure that any of its Experts and Sub-Bidders, comply with the Applicable Law. 
  2. Conflict of Interests
    1. Contractor Not to Benefit from Commissions and Discounts
      The remuneration of the Contractor shall constitute the Contractor’s sole remuneration in connection with this Contract or the Services, and the Contractor shall not accept for their own benefit any trade commission, discount, or similar payment in connection with activities pursuant to this Contract or to the Services or in the discharge of their obligations under the Contract, and the Contractor shall use their best efforts to ensure that the Personnel, any Subcontractors, and agents of either of them similarly shall not receive any such additional remuneration.
    2. Contractor and Affiliates Not to be Otherwise Interested in Project
      The Contractor agree that, during the term of this Contract and after its termination, the Contractor and its affiliates, as well as any Subcontractor and any of its affiliates, shall be disqualified from providing Services (other than the Services and any continuation thereof) for any project resulting from or closely related to the Services.
    3. Prohibition of Conflicting Activities
      Neither the Bidder nor its Subcontractors nor the Personnel shall engage, either directly or indirectly, in any of the following activities:
      1. during the term of this Contract, any business or professional activities in the Government’s country which would conflict with the activities assigned to them under this Contract;
      2. during the term of this Contract, neither the Contractor nor their Subcontractors shall hire public employees in active duty or on any type of leave, to perform any activity under this Contract;
      3. after the termination of this Contract, such other activities as may be specified in the SCC.
  3. Insurance to be Taken Out by the Contractor
    1. The Contractor(a) shall take out and maintain, and shall cause any Subcontractors to take out and maintain, at its (or the Sub-contractors’, as the case may be) own cost but on terms and conditions approved by the Procuring Agency, insurance against the risks, and for the coverage, as shall be specified in the SCC; and (b) at the Procuring Agency’s request, shall provide evidence to the Procuring Agency showing that such insurance has been taken out and maintained and that the current premiums have been paid.
  4. Contractor’s Actions Requiring Procuring Agency’s Prior Approval
    1. The Contractor shall obtain the Procuring Agency’s prior approval in writing before taking any of the following actions:
      1. appointing such members of the Personnel not provided by the Contractor;
      2. changing the Program of activities; and
      3. any other action that may be specified in the SCC.
  5. Reporting Obligations
    1. The Contractor shall submit to the Procuring Agency the reports and documents in the numbers, and within the periods as prescribed by the Procuring Agency.
  6. Liquidated Damages
    1. Payments of Liquidated Damages
      The Contractor shall pay liquidated damages to the Procuring Agency at the rate per day stated in the SCC for each day that the Completion Date is later than the Intended Completion Date.  The total amount of liquidated damages shall not exceed the amount defined in the SCC.  The Procuring Agency may deduct liquidated damages from payments due to the Contractor.  Payment of liquidated damages shall not affect the Contractor’s liabilities.
    2. Correction for Over-payment
      If the Intended Completion Date is extended after liquidated damages have been paid, the Procuring Agency shall correct any overpayment of liquidated damages by the Contractor by adjusting the next payment certificate.  The Contractor shall be paid interest on the overpayment, calculated from the date of payment to the date of repayment, at the rates specified in SCC.
    3. Lack of performance penalty
      If the Contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, a penalty for Lack of performance will be paid by the Contractor. The amount to be paid will be calculated as a percentage of the cost of having the Defect corrected, assessed as specified in the Contractor
  7. Performance Guarantee
    1. Within the time stipulated in the acceptance letter from the Procuring Agency, the successful Bidder shall furnish the Performance Guarantee in shape and amount specified in SCC.
    2. The proceeds of the Performance Guarantee shall be payable to the Procuring agency as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract.
    3. The Performance Guarantee shall be denominated in the currency of the Contract, or in a freely convertible currency acceptable to the Procuring agency and shall be in the acceptable form as specified in SCC.
    4. The Performance Guarantee will be discharged by the Procuring agency and returned to the Supplier not later than thirty (30) days following the date of completion of the Supplier’s performance obligations under the Contract, including any warranty obligations, unless otherwise specified in SCC.
  8. Sustainable Procurement
    1. The Contractor shall conform to the sustainable procurement contractual provisions, if and as specified in the SCC.

D. Contractor’s Personnel

  1. Description of Personnel
    1. The titles, agreed job descriptions, minimum qualifications, and estimated periods of engagement in the carrying out of the Services of the Contractor’s Key Personnel.  The Key Personnel listed by title as well as by name are hereby approved by the Procuring Agency.
  2. Removal and / or Replacement of Personnel
    1. Except as the Procuring Agency may otherwise agree, no changes shall be made in the Key Personnel.  If, for any reason beyond the reasonable control of the Contractor, it becomes necessary to replace any of the Key Personnel, the Contractor shall provide as a replacement a person of equivalent or better qualifications.
    2. If the Procuring Agency finds that any of the Personnel have (i) committed serious misconduct or have been charged with having committed a criminal action, or (ii) have reasonable cause to be dissatisfied with the performance of any of the Personnel, then the Contractor shall, at the Procuring Agency’s written request specifying the grounds thereof, provide as a replacement a person with qualifications and experience acceptable to the Procuring Agency.
    3. The Contractor shall have no claim for additional costs arising out of or incidental to any removal and/or replacement of Personnel.

E. Obligations of the Procuring Agency

  1. Change in the Applicable Law
    1. If, after the date of this Contract, there is any change in the Applicable Law with respect to taxes and duties which increases or decreases the cost of the Services rendered by the Contractor, then the remuneration and reimbursable expenses otherwise payable to the Contractor under this Contract shall be increased or decreased accordingly by agreement between the Parties, and corresponding adjustments shall be made to the amounts referred in the SCC.
  2. Services and Facilities
    1. The Procuring Agency shall make available to the Contractor and the Experts, for the purposes of the Services and free of any charge, the services, facilities and property described in the Terms of Reference, at the times and in the manner specified in the Terms of Reference.
    2. In case that such services, facilities and property shall not be made available to the Contractor, the Parties shall agree on (i) any time extension that it may be appropriate to grant to the Contractor for the performance of the Services, (ii) the manner in which the Contractor shall procure any such services, facilities and property from other sources, and (iii) the additional payments, if any, to be made to the Contractor as a result thereof.

F. Payments to the Contractor

  1. Contract Price
    1. The price payable shall be in Pakistani Rupees unless otherwise specified in the SCC.
  2. Terms and Conditions of Payment
    1. Payments will be made to the Contractor according to the payment schedule stated in the SCC and as per actual invoice submitted by the Contractor.
    2. Unless otherwise stated in the SCC, the advance payment shall be made against the provision by the Contractor of a bank guarantee for the same amount, and shall be valid for the period stated in the SCC.  Any other payment shall be made after the conditions listed in the SCC for such payment have been met, and the Contractor have submitted an invoice to the Procuring Agency specifying the amount due.
  3. Quality Control Identifying Defects
    1. The principle and modalities of Inspection of the Services by the Procuring Agency shall be as indicated in the SCC. The Procuring Agency shall check the Contractor’s performance and notify him of any Defects that are found.  Such checking shall not affect the Contractor’s responsibilities.  The Procuring Agency may instruct the Contractor to search for a Defect and to uncover and test any service that the Procuring Agency considers may have a Defect. Defect Liability Period is as defined in the SCC.
    2. A {INSPECTION}
  4. Correction of Defects, and Lack of Performance Penalty
    1. The Procuring Agency shall give notice to the contractor of any Defects before the end of the Contract.  The Defects liability period shall be extended for as long as Defects remain to be corrected.
    2. Every time notice a Defect is given; the contractor shall correct the notified Defect within the length of time specified by the Procuring Agency’s notice.
    3. If the contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, the Procuring Agency will assess the cost of having the Defect corrected, the contractor will pay this amount, and a Penalty for Lack of Performance.
  5. Settlement of Disputes Amicable Settlement
    1. The Parties shall use their best efforts to settle amicably all disputes arising out of or in connection with this Contract or its interpretation.
  6. Dispute Settlement
    1. Arbitration
      If any dispute of any kind whatsoever shall arise between the procuring agency and the contractor in connection with or arising out of the Contract, including without prejudice to the generality of the foregoing, any question regarding its existence, validity or termination, or the execution of the contract, the parties shall seek to resolve any such dispute or difference by mutual consultation. If the parties fail to resolve such a dispute or difference even after negotiations or mediation, then the dispute shall be referred within fourteen (14) days in writing by either party to the Arbitrator, with a copy to the other party.
      Any dispute in respect of which a notice of intention to commence arbitration has been given, in accordance with GCC sub-clause 32.1, shall be finally settled by arbitration. Arbitration may be commenced prior to or after completion of the Contract. Arbitration proceedings shall be conducted in accordance with Arbitration Act 1940.
      Notwithstanding any reference to arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless otherwise agreed. The Procuring Agency shall continue to pay the Contractor any undisputed amounts due under the Contract during the resolution of any dispute.

📑 Special Conditions of Contract (SCC)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

SECTION VIII. SPECIAL CONDITIONS OF CONTRACT

The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.

Number of GC Clause

Amendments of, and Supplements to, Clauses in the General Conditions of Contract

Number of GC Clause 1

Definitions

The Procuring Agency is: Air University -P&D Department (Air University), Assistant Director PAF Complex Sector E-9, Islamabad Capital Territory

The Supplier is:

The title of the subject procurement is: Construction of Library and Classroom Block at H-11 Campus

Number of GC Clause 2

Applicable/Governing Law:

The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan

Number of GC Clause 3

Language:

The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.

Number of GC Clause 4

Notices:

The addresses for the notices are:

Procuring Agency:

Air University -P&D Department (Air University), Assistant Director
PAF Complex Sector E-9, Islamabad Capital Territory
+92-300-530-0386
ali.siddiqui@au.edu.pk

Contractor/ Bidder:

[Name, address and telephone number]

The Contractor/ Bidder’s Representative(s)

[Name, address, telephone number and e-mail address]

Number of GC Clause 6.1

The Authorized Representatives are:

For the Procuring Agency:

Air University -P&D Department (Air University), Assistant Director
PAF Complex Sector E-9, Islamabad Capital Territory
+92-300-530-0386
ali.siddiqui@au.edu.pk

For the Bidder:

Name: ………………………………………

Designation: ……………………..

Address: …………………………………………..

Number of GC Clause 7

Effectiveness of the contract

The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties

Number of GC Clause 8

Commencement of Contract:

The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.

Number of GC Clause 10.2

Expiration of Contract:

The time period shall be ……………………………

Number of GC Clause 14

Termination

In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.

Number of GC Clause 16

Conflict of Interest:

The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.

Number of GC Clause 20

Liquidated Damages

If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.

Number of GC Clause 21

Performance Guarantee:

The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft

Number of GC Clause 27

Currency of Payment:

All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.

Number of GC Clause 28

Payment terms:

Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.

Number of GC Clause 29

Identifying Defects:

The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.

Inspections & Tests Requirements

For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)

For Physical Fitness having No Damages (Certificate from supplier)

For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)

For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)

For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)

Delivery & Documents

Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;

Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;

Copies of the packing list identifying contents of each package;

Insurance Certificate;

Manufacturer’s or Supplier’s Valid Warranty Certificate;

Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;

Certificate of Origin.

The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock

Number of GC Clause 31

Following is the guidance for Dispute Resolution

  1. If any dispute of any kind whatsoever shall arise between the Authority and the Bidder in connection with or arising out of the Contract... (full clause unchanged)
  2. At future of negotiation the dispute shall be resolved through mediation...
  3. At failure of mediation, arbitration under Arbitration Act 1940...
  4. Cost sharing equally...
  5. Proceedings may commence before/after completion...

Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.

Rules of procedure for arbitration proceedings:

Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.

Place of Arbitration and Award:

The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.

📑 Bid Securing Declaration (BSD)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

Form 9: Bid Securing Declaration

Date: [insert date (as day, month and year)]

Bid No.:P183681

To: Air University -P&D Department (Air University), Assistant Director PAF Complex Sector E-9, Islamabad Capital Territory

 

 

We, the undersigned, declare that:

We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.

We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:

  1. have  withdrawn  or  modified  our  Bid  during  the  period  of  Bid  Validity specified in the Form of Bid;
  2. Disagreement to arithmetical correction made to the Bid price; or
  3. having been notified of the acceptance of our Bid by the Procuring Agency during the period of Bid Validity, (i) failure to sign the contract if required by Procuring Agency to do so or (ii) fail or refuse to furnish the Performance Security or to comply with any other condition precedent to signing the contract specified in the Bidding Documents.

We understand this Bid Securing Declaration shall expire if we are not the successful

Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.

 

📑 Contract Form (CNF)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

SECTION IX: CONTRACT FORMS

 

THIS AGREEMENT made the _____ day of __________ 20_____ between Air University -P&D Department (Air University), Assistant Director PAF Complex Sector E-9, Islamabad Capital Territory

 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:

 

WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Construction of Library and Classroom Block at H-11 Campus (P183681) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).

 

NOW THIS CONTRACT WITNESSETH AS FOLLOWS:

1.   In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.

2.   The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-

  1. This form of Contract;
  2. the Form of Bids and the Price Schedule submitted by the Bidder;
  3. the Schedule of Requirements;
  4. the Technical Specifications;
  5. the Special Conditions of Contract;
  6. the General Conditions of the Contract;
  7. the Procuring Agency’s Letter of Acceptance; and
  8. [add here: any other documents]

3.   In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.

4.   The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.

 

IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.

 

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Procuring Agency:

………………………………………………

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Bidder: …………………………………………………

 

 

📑 Integrity Pact (INP)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

Integrity Pact

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC. PAYABLE BYTHE SUPPLIERS OF GOODS, SERVICES & WORKS IN  CONTRACTS WORTH RS.10.00 MILLION OR MORE

 

Contract                           Number:  Contract                               Value:  Contract Title:

Dated:

 

[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.

Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.

[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

📑 Performance Guarantee Form (PGF)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

Performance Guarantee Form

 

To:     Air University -P&D Department (Air University), Assistant Director PAF Complex Sector E-9, Islamabad Capital Territory

 

WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No.  [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).

 

AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.

 

AND WHEREAS we have agreed to give the Bidders guarantee:

 

THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guar­antee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.

 

This guarantee is valid until the: [insert date]

 

 

Signature and seal of the Guarantors

 

 

_____________________________________________________________________

[name of bank or financial institution]

 

 

_____________________________________________________________________

[address]

 

 

_____________________________________________________________________

[date}

📑 Annexure (ANX)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

Standard Bidding Documents

Unknown

Approved Manufacturer LIst

Unknown

Tender Drawings - Architecture

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawing - Plumbing

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawing - Water Supply

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawing - Fire Fighting

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawings - Fire Alarm

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawings - HVAC

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawings - IT A

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawing - IT B

Tender Drawings - Not for Construction - working drawings will be issued to the winning bidder

Unknown

Tender Drawings - Electrical

Tender drawings - not for construction - Working drawings will be issued to winning bidder

Unknown

Tender Drawings - Structure

Tender Drawings - Not For Construction - Working Drawings will be provided to winning bidder 

Unknown

📑 Procurement Forms (PFD)

Construction of Library and Classroom Block at H-11 Campus

Published on: Thursday, November 5, 2026 02:20 PM

Ref# : P183681
QR Code

Past Construction Experiences

Contractor's Key Personnel Representative and Their Schedules

Financial Resources

Past Experience and Completed Contracts

Historical Contract Non-Performance, and Pending Litigation and Litigation History

Current Contracts and Their Progress

Financial Capacity and Net Worth Evaluation Form

Average Annual Turnover