In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Â
Â
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)), Assistant Manager
6th Floor, Ext Block, Bahria Complex-IV, Gizri., Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-334-220-1532
sanjay.kumar@pidcl.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)) The subject of procurement is:Â UPLIFTING WORKS OF FAMILY PARK AT UC-02 BLOCK-J NORTH NAZIMABAD, DISTRICT CENTRAL, KARACHI. CONTRACT PACKAGE: PIDCL/SINDH/SAP/24-25/250/06/13 Expected commencement date: Friday, June 19, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2025-26 Name and identification number of the Contract: P27437Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Thursday, May 7, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
 |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 90 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; 6th Floor, Ext Block, Bahria Complex-IV, Gizri., Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Tuesday, May 19, 2026 10:30 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Tuesday Date:Â May 19, 2026 Time : 11:00 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Valid registration with PEC 2026 in category C-6 or above with appropriate code. | Yes |
| Electrical Licenses (for the electric works) | Yes |
| Valid/Active registration with income tax department (NTN Certificates) | Yes |
| Valid /Active Registration with SRB. | Yes |
| Income Tax return of last 03 years. | Yes |
| Joint venture will not be allowed | Yes |
| Fresh affidavits (E stamp paper) with effect that all documents/particulars/ information provided are true and correct. In case of bogus/tempered or false information/ certificates produce by the company/firm shall be liable to be black listed at any stage on separate E-Stamps paper. | Yes |
| Undertaking on fresh stamp paper (E stamp paper) that firm is not involved in any kind of litigation with any departmental rift, abandoned or necessary delay incompletion of any work on separate E-Stamps paper | Yes |
| Fresh affidavit (E stamp paper) to this effect that the firm/contractor have not been black listed previously by any executing agency on separate E-Stamps paper. | Yes |
| Note: The affidavits and undertaking required under clauses (f), (g), and (h) may be furnished on a single e-Stamp paper of 500 (Five Hundred Rupees), having all declarations clearly stated and duly notarized | Yes |
| The tender should be submitted along with the above required documentation/information. If any such required documents/information lacking, then the tender will not be considered by the PIDCL and no excuse will be entertained. | Yes |
Least Cost Based Selection (LCBS)
Lot Title : Family Park
Bid Security : 300000
| Job | Delivery Schedule | Quantity |
|---|---|---|
| Boundary Wall |
Address: North Nazimabad, Central (District), Karachi (Division), Sindh (Province).
Schedule: 90 Days
Quantity: 590
|
590 |
| External Development Works |
Address: North Nazimabad, Central (District), Karachi (Division), Sindh (Province).
Schedule: 90 Days
Quantity: 33696
|
33696 |
No
Lot Title: Family Park
Specifications / Requirements:
| Sr. No | Item Code | item of work | Qty | Â | Rate | Unit | Amount |
|---|---|---|---|---|---|---|---|
| 1 | Sub Head-I (Boundary Wall i/c Iron Work) | Â | Â | Â | Â | Â | Â |
| 2 | C-123 It-16 | Dismantling C.C. work cast in situ in foundation, basemont, plinth and ground floor including disposing of the material as directed within three chains (91.5 m). | 300 | cft | 6587.5 | %cft | 19,763 |
| 3 | C-123 It-11 | Dismantling C.C. block masonary workin lime or cement mortar in foundation, basemont, plinth and ground floor including stacking salvaged material and disposing of surplus material as directed within three chains (91.5 m). | 240 | cft | 3006.25 | %cft | 7,215 |
| 4 | C-103 it-1 | Excavation for foundation trenches and drains in all kinds of soil (except gravelly and murum soil, wet silt, clay or mud conglomeration of gravel and boulders, soft, sandy or disintegrated sandy and hard rock) and back filling the excavated material in foundation, plinth or under floor including breaking clods, watering, consolidation by ramming in layers not exceeding 9 inches in depth to full compaction, dressing and disposal of surplus excavated stuff as directed, lead upto one chain and lift upto 5 feet | 400 | cft | 1624.63 | %cft | 6,499 |
| 5 | C-105 it-12 | Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 3 inches and down gauge in foundation including levelling, compacting and curing etc. complete. | 244.2 | cft | 22562.15 | %cft | 55,097 |
| 6 | C-114 it-4 +136 | Providing and laying reinforced cement concrete using screened graded bajri 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth . | 30 | cft | 41920.62 | %cft | 12,576 |
| 7 | C-106 it-12 | Providing and laying in situ 1:3:6 (1 cement 3 sand and 6 coarse aggregate) cement concrete using crushed graded boulders 3/4 inch and down gauge in foundation, basement and plinth including form work, compacting, curing and removal of form work etc. complete, foundation and basement up to 5 feet depth and plinth up to 4 feet height from ground level . | 740 | cft | 34857.58 | %cft | 257,946 |
| 8 | C-114 it-8 + 136 | Providing and laying reinforced cement concrete using screened graded bajri 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs.. per sq inch at 28 days with a mix not leaner than 1:2:4 in plinth beams of required shape and design including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, tn foundation basement and plinth | 370 | cft | 40365.27 | %cft | 149,351 |
| 9 | C-114 it-24 + 136 | Providing and laying reinforced cement concrete using screened graded bajri 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in the ground floor | 190 | cft | 52698.67 | %cft | 100,127 |
| 10 | C-110 it-44 + 100 | Providing and laying 1:3:6 cement concrete solid block masonry 4 to 6 inches thick using graded screened bajri 3/4 inch and down gauge set in lime cement mortar 1:6 including scaffolding, raking out joints and curing etc. complete in ground floor superstructure. | 925 | cft | 32713.46 | %cft | 302,600 |
| 11 | C-119 it-32 | Providing and fixing iron grills with required section of flat iron as per approved design including welding all sides of the section at the junction, and fixing with sunk iron screws, painting two coats of red oxide paint etc. complete as required in any floor in masonry or concrete work. | 2100 | kg | 290.89 | P.kg | 610,869 |
| 12 | C-119 it-18 | Providing and fixing steel gate of flat iron sections of approved design with or without M.S. sheet covering including hold fast, with or without rollers and track arrangement including providing wicket shutter of required size with all accessories and locking arrangement complete as per direction of the Engineer-in-Charge. | 432 | kg | 346.44 | P.kg | 149,662 |
| 13 | C-122 it-6 | 1/2" thick cement plaster 1:6 on walls and columns etc. in basement, plinth, mezzanine and ground floor including making edges, comers, and curing etc., complete. | 7080 | sft | 4034.92 | %sft | 285,672 |
| 14 | C-122 it-151 | Distempering with vinyle distemper (ICI) Dulux Paintex of approved make and shade in two coats over and including the cost of one priming coat of lime wash including sand papering, dusting, and filling the holes, cracks and inequalities, if any, at any height in any floor. | 800 | sft | 3401.25 | %sft | 27,210 |
| 15 | C-118 it-90 | Providing & laying wall finish coat of any colour graffiate wall coating 1.5 mm to 3 mm thick straight and swirt for exterior surface at any hight and any floor. | 7080 | sft | 6085.94 | %sft | 430,885 |
| 16 | C-122 it-159 | Painting iron work with synthetic enamel paint of approved make and shade two coats over and including the cost of one priming coat complete at any height in any floor . | 2950 | sft | 6071.25 | %sft | 179,102 |
| 17 | C-114 I -166 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground/ 2nd floor of building including septic tanks and under ground tanks and in projections for future extension . | 35.8 | Cwt. | 14349.01 | P.Cwt | 513,695 |
| 18 | Â | Jafiri | 400 | Sft | 139.72 | P.Sft | 55,885 |
| 19 | Â | Providing manufacturing and fixing Stone Octogone / Canopy inclding heavy 2-1/2" x 3/8" thick angle iron MS Bars, making base structure of Cement concrete floor, 8 Nos. of 12" dia Round Columns, 8 Nos. of Stone Seating arrangments etc complete as per direction drawings & specification and instruction of Engineer Incharge. Drawing attached. | 1 | No | 850000 | Each | 850,000 |
| 20 | Sub Head-II (External Development) | Â | Â | Â | Â | Â | Â |
| 21 | A/R | Providing and laying fair face precast CC 1:2:4 Road Kerb edge stone size 12" long , 18" deep, 6" wide bottom, 4" wide top) laid in C.M 1:4 including cost of excavation &1:12 C.C 3" thick as under neath, back filling of edxcavated stuff and its disposal within one chain lead as desired as per direction of the Engineer in charge. | 670 | rft | 532.8 | P.Rft | 356,976 |
| 22 | C-102 it-14 | Supplying and filling approved quality imported earth in depressions within a radius of 5 miles (8 km) including breaking clods, levelling, dressing, watering and consolidating in 6 inches (152 mm) layers etc. complete, including all lifts. | 8424 | cft | 3662.48 | %cft | 308,527 |
| 23 | C-117 it-94 | Providing and laying 1:4:8 cement concrete in any thickness using 2" (51 mm) and down gauge stone ballast of approved grade and quality over prepared sub-grade or sand cushion in roads, paths, creteways laid to required gradient and camber including cost of necessary form work and its removal compacting with vibrators including curing etc. complete . | 737.5 | cft | 27877.27 | % cft | 205,595 |
| 24 | C-117 it-157 | Providing and laying in floor C.C. 1:2:4: tuff paver 2-1/2" thick of approved design and colour pattren (average strength 7000 psi) laid on sand cushion filling of joint with sand and warring etc. complete as per direction of Engineer Incharge. (the cost of sand cushion is included) | 3700 | sft | 135.13 | P.sft | 499,981 |
| 25 | C-122 it-157 | Painting plastered surface with super glass synthetic enamel paint of approved make and shade two coats over and including the cost of one coat of priming complete at any height in any floor | 1005 | sft | 5686.75 | %sft | 57,152 |
| 26 | C-126 It-6 | Supplying and stacking approved garden soil (sweet earth) free from salts, pebbles and grass roots etc. including all leads and lifts. | 8424 | cft | 3456.25 | %cft | 291,155 |
| 27 | C-126 it-7 | Spreading approved garden soil (sweet earth) in uniform thickness including mixing and breaking clods and dressing fine for grassing including disposal of rubbish within 3 chains (92 m) complete . | 4250 | cft | 296.88 | %cft | 12,617 |
| 28 | C-126 it-02 | Supplying and stacking well decayed cowdung manure from approved source including all leads and lifts. | 4250 | cft | 6278.13 | %cft | 266,821 |
| 29 | C-126 it-03 | Spreading cowdung manure and mixing the same upto any depth in the prepared bed including breaking clods, dressing fine for grassing, including, disposal of rubbish within 3 chains (92 m) complete . | 2850 | cft | 343.75 | %cft | 9,797 |
| 30 | C-126 it-4 | Supplying and stacking well decayed sewage manure from approved sources including all leads and lifts . | 2850 | cft | 12528.13 | %cft | 357,052 |
| 31 | C126 it-5 | Spreading sewage manure in uniform thickness in the prepared bed including mixing with original soil upto any depth including breaking clods and dressing fine for grassing as directed by the Engineer-in-charge including disposal of rubbish within 3 chains (92 m) complete. | 2850 | cft | 315.63 | %cft | 8,995 |
| 32 | C-126 it-12 | Supplying live (local) grass in slabs with earth intact including all lead and lifts. | 6450 | sft | 28.13 | P.sft | 181,439 |
| 33 | C-12 it-13 | Grassing fine by dribbling grass roots 3" apart including watering, weeding till such time the grass is set and becomes green and is fit for mowing | 6450 | sft | 755 | %sft | 48,698 |
| 34 | C-126 it-15 | Providing and fixing 4 seated white or coloured light shade marble mosaic benches (5-1/2 ft. x 1-1/2 ft. x 1-3/4 ft.) (1676 mm x 533 mm x 457 mm) without back of approved design and drawing in white cement including cartage, loading and unloading etc. complete . | 6 | no | 18825 | Each | 112,950 |
| 35 | C-306 it-11 | Providing and fixing un platisized polyvinyl chloride pipe (u.P.V.C) "E" class with specials) and clamps etc., including cutting and fitting, complete with and including the cost of breaking through walls and roof and making good etc.; after cleaning the pipe and cartage within 10 miles (working pressure 12 kg/cm2): 3/4 inch dia. | 160 | rft | 96.88 | P.Rft | 15,501 |
| 36 | C-306 it-7 | Providing and fixing 3/4 inch dia full way gun metal valves with wheels threaded or flanged ends with rubber washers, (standard patterns) | 4 | no | 2017.9 | Each | 8,072 |
| 37 | M/R | Providing and fixing 1HP water pump as per direction of Engineer Incharge. | 1 | no | 28000 | Each | 28,000 |
| 38 | M/R | Providing and growig various of plants i/c watering, cowdung till such time the plants is set becomes green and is fit for mowing (upto 1'-6" dia pots) | Â | Lumpsum | Â | Â | 80,000 |
| 39 | M/R | Providing and fixing Dustbin of Fibre sheet alongwith 3" GI Pole fixed underground on base of 1:4:8 cement concrete and refilling the excavated material including paiting work etc complete as per direction of Engineer Incharge. | 4 | no | 15000 | Each | 60,000 |
| 40 | Sub Head-III (Under Ground Water Tank) | Â | Â | Â | Â | Â | Â |
| 41 | C-103 I -10 | Excavation for raft foundations, underground tanks and septic tanks (rectangular or square) in all kinds of soil (except gravelly and murum soil wet silt, clay or mud, conglomeration of gravel and boulders, soft, sandy or disintegrated and hard rock) and back filling the excavated material all round the trenches including breaking clods, watering, consolidation by ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction, dressing and disposal of surplus excavated stuff as directed, lead up to one chain (30.5 R.m) and lift upto 5 feet (1.52 m). | 661 | Cft | 1358.75 | %Cft | 8,981 |
| 42 | C-103 I -10 + 28 | …………………do…………….. Lift up to 5 to 8 feet | 529 | Cft | 1596.25 | %Cft | 8,444 |
| 43 | C-105 I -13 | Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete. | 66 | Cft | 21744.25 | %Cft | 14,351 |
| 44 | C-114 I -99+136 | Providing and laying reinforced cement concrete using Crushed graded boulders 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq. inch at 28 days with a mix not leaner than 1:2:4 in foundation or bottom slab of rectangular underground tank including form works and its removal, levelling, compacting and curing etc. complete but excluding the cost of reinforcement.. | 132 | Cft | 31431.41 | %Cft | 41,489 |
| 45 | C-114 I -101+ 136 | Providing and laying reinforced cement concrete using, crushed graded boulders 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq. inch at 28 days with a mix not leaner than 1:2:4 in walls of rectangular underground water tank or septic tank including form works and its removal, compacting and curing etc. complete, but excluding the cost of reinforcement.. | 210 | Cft | 54533.03 | %Cft | 114,519 |
| 46 | C-114 I -104+ 136 | Providing and laying reinforced cement concrete using, crushed graded boulders 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq. inch at 28 days with a mix not leaner than 1:2:4 in top slab of rectangular underground water tank or septic tank its removal, compacting and curing ate. complete but excluding the cost of reinforcement . | 53 | Cft | 46752.23 | %Cft | 24,779 |
| 47 | C-122 I -02+90+ 91 | 1/4" (6.4 mm) thick cement plaster 1:4 on soffits of ceiling, cantilever slabs, sides and soffits of beams etc., in basement, mezzanine and ground floor including making edges, corners and curing etc., complete . | 132 | Sft | 4403.84 | %Sft | 5,813 |
| 48 | C-122 I-04 | 1/2" (13 mm) thick cement plaster 1:4 on walls and columns etc. in basement, plinth, mezzanine and ground floor including making edges, corners, and curing etc., complete . | 512 | Sft | 4381.84 | %Sft | 22,435 |
| 49 | C-108 I-12 | Providing a coat of bitumen emulsion at 10 Lbs. per % sft. (0.49 Kg/sm) on walls and floor in ground floor. | 332 | Sft | 1010.75 | %Sft | 3,356 |
| 50 | P-96 I-44 | Cast Iron Foot Rest.(wt. 4.0 kg.) | 8 | Each | 800 | Each | 6,400 |
| 51 | C-124 I-141 | Providing and laying gola 3" x 3" (76 mm x 76 mm) concrete 1:2:4 using graded screened bajri at junction of roof slab and walls and finished with cement plaster 1:4 including curing etc. complete. | 64 | Rft | 3202.36 | %Rft | 2,050 |
| 52 | C-117 I- 06+25+ 26 | Providing and laying floors of 2 inches (51 mm) thick 1:2:4 cement concrete using graded screened bajri 3/4 inch (19 mm) and down gauge in 2nd floor laid in panels including form work, consolidation, finishing, and curing etc. complete. | 174 | Sft | 7473.52 | %Sft | 13,004 |
| GRAND TOTAL: | Rs 7,189,103.00 |
Uplifting of Family Park
1. Boundary Wall
2. External Development
3. Under Ground Tank
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
|
Number of GC Clause |
Amendments of, and Supplements to, Clauses in the General Conditions of Contract |
|
 |
Definitions The Procuring Agency is: Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)), Assistant Manager 6th Floor, Ext Block, Bahria Complex-IV, Gizri., Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province). The Supplier is: The title of the subject procurement is:UPLIFTING WORKS OF FAMILY PARK AT UC-02 BLOCK-J NORTH NAZIMABAD, DISTRICT CENTRAL, KARACHI. CONTRACT PACKAGE: PIDCL/SINDH/SAP/24-25/250/06/13 |
|
GCC 2 |
Applicable/Governing Law: The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan |
|
GCC 3 |
Language: The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English. |
|
GCC 4 |
Notices: The addresses for the notices are: Procuring Agency: Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)), Assistant Manager Contractor/ Bidder:  [Name, address and telephone number]. The Contractor/ Bidder’s Representative(s) [Name, address, telephone number and e-mail address]  |
|
GCC 6.1 |
The Authorized Representatives are:  For the Procuring Agency: Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)), Assistant Manager For the Bidder: Name: ……………………… Designation: …………….. Address: ……………………………..  |
|
GCC 7 |
Effectiveness of the contract The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties |
|
GCC 8 |
Commencement of Contract: The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract. |
|
GCC 10.2 |
Expiration of Contract: The time period shall be …………………. |
|
GCC 14 |
Termination In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements. |
|
GCC 16 |
Conflict of Interest: The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17. |
|
GCC 20 |
Liquidated Damages If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 10.00%Â of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority. |
|
GCC 21 |
Performance Guarantee: The amount of performance guarantee shall be 10.00%Â of the contract price in acceptable form of Bank Guarantee |
|
GCC 27 |
Currency of Payment: All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees. |
|
GCC 28 |
Payment terms: Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract. |
| Â | Â |
|
GCC 29 |
Identifying Defects: The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided. Delivery & DocumentsBid security in shape of Pay Order / CDR / Bank Guarantees (mentioning name of the Contractor’s Firm and in favor of Pakistan Infrastructure Development Company Limited). In case of bogus/fake Pay Order / CDR / Bank Guarantee procuring agency shall be liable to blacklist the firm/contractor. Original Pay Order / CDR / Bank Guarantee for bid security and tender fee in shape of pay order shall be delivered to employer's address before the deadline submission of bid. Late delivered bid security and tender fee will lead to mark bid as non-responsive. Scanned copy of bid security and tender fee shall be attached with bid to be uploaded on EPADS. Bidders are required to submit their bids electronically via the E-Pak Acquisition & Disposal System (E-PADS) using the upload function, no alternative submission methods will be accepted. The bid submission must be accompanied by a scanned copy of the tender fee, amounting to Rs. 5,000/- and scanned copy of Bid Security. Furthermore, the original sealed Tender Fee (Pay Order/CDR), Bid Security Pay Order / CDR / Bank Guarantee and E-Stamp Paper are to be delivered. |
|
GCC 31 Â |
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder. Arbitrator’s fee: The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties. Appointing Authority for Arbitrator: By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties. Rules of procedure for arbitration proceedings: Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator. Place of Arbitration and Award: The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties. |
Date: [insert date (as day, month and year)]
Bid No.:P27437
To: Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)), Assistant Manager 6th Floor, Ext Block, Bahria Complex-IV, Gizri., Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
Â
Â
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
Â
THIS AGREEMENT made the _____ day of __________ 20_____ between Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)), Assistant Manager 6th Floor, Ext Block, Bahria Complex-IV, Gizri., Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
Â
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., UPLIFTING WORKS OF FAMILY PARK AT UC-02 BLOCK-J NORTH NAZIMABAD, DISTRICT CENTRAL, KARACHI. CONTRACT PACKAGE: PIDCL/SINDH/SAP/24-25/250/06/13 (P27437) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
Â
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1.  In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2.  The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3.  In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4.  The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
Â
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Â
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Bidder: …………………………………………………
Â
Â
Â
Contract                          Number:  Contract                              Value:  Contract Title:
Dated:
Â
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Â
To:     Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL)), Assistant Manager 6th Floor, Ext Block, Bahria Complex-IV, Gizri., Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
Â
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
Â
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
Â
AND WHEREAS we have agreed to give the Bidders guarantee:
Â
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarÂantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
Â
This guarantee is valid until the: [insert date]
Â
Â
Signature and seal of the Guarantors
Â
Â
_____________________________________________________________________
[name of bank or financial institution]
Â
Â
_____________________________________________________________________
[address]
Â
Â
_____________________________________________________________________
[date}
The Contractor may Fill the Rate on the Attached Annexure and the same may be uploaded with the Bid. The Bid Amount must be Same as of the Quoted Amount.
At least two Work Orders of similar Nature completed during the last five (05) years, each having the cost equal to or more than the Estimated Cost of the Project. It is mandatory for the contractor to provide Work Orders along with Completion Certificates.