In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)), Project Director
GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province).
+92-310-149-4444
pdgsc@mepco.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)) The subject of procurement is:Â TENDER NO. 19/GSC (2026-27) - Construction of Boundary wall (RCC Frame Structure & Brick Work) and main entry gate for new 132KV Grid Station SHRIMP Farm Rakh Ali Wali Alipur (Deposit Work) Expected commencement date: Monday, March 1, 2027 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P197382Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 2 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Saturday, November 28, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 150 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Demand Draft  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Tuesday, December 1, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Tuesday Date:Â December 01, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Pay Order, Banker's Cheque, Call at Deposit, Demand Draft |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
| FBR (NTN) Punjab (PRA) PEC |
| Eligibility Criteria | Document |
|---|---|
| Pakistan Engineering Council valid certificate with at-least Category C-5 having Specialization Code CE-10 must be provided | Yes |
| The bidder shall be in the active tax payer list (ATL) and will provide income returns for last three years | Yes |
| The contractors are required to submit their registration for sales tax with Punjab Revenue Authority | Yes |
| The contractor having two or more works in hand which are yet not completed and are beyond the stipulated time limit on the part of contractor, in GSC MEPCO will not eligible to participate in the tender | Yes |
| Bidder / tenderer will submit a certificate that the firm is not blacklisted / debarred from WAPDA / DISCOs / GENCOs / NGC or any international organization at present | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| CONTRACT EXPERIENCE AND ITS VERIFICATION | ||
| CONTRACT EXPERIENCE AND ITS VERIFICATION (Quantitative)(Doc Required) The bidder must have completed two contracts of same nature along with its completion successfully as main contractor within Ten years awarded by WAPDA / NTDC / DISCOs. The consolidated value of these contracts must be more than 60% of the estimated / B.O.Q Cost. The bidder shall provide complete documents including contract agreement / work order and completion certificate. (60) The bidder must have completed One contract of same nature along with its completion successfully as main contractor within Ten years awarded by WAPDA / NTDC / DISCOs. The value of this contract must be more than 60% of the estimated / B.O.Q Cost. The bidder shall provide complete documents including contract agreement / work order and completion certificate (30) | 60 | |
| AVERAGE ANNUAL TURNOVER | ||
| AVERAGE ANNUAL TURNOVER (Quantitative)(Doc Required) The bidder will provided the average annual turnover with tax returns from FBR should be at least 1.5 times the BOQ amount for last three (03) years, verified from certified auditor and current month bank statement showing 25% balance amount of work in bank. (40) | 40 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Construction of boundary wall | Address: 132KV Grid Station Shrimp Farm Rakh Aliwali, Ali Pur Schedule: 120 Days Quantity: 510/sqm |
510/sqm | 850000 PKR |
No
Jobs Without Lots :
Job: Construction of boundary wall
Specifications / Requirements:
| Sr. No | Sr. No. | Description | Unit | Qty | Rate | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Excavation in foundation of biulding, bridges and other structures I/c dag-belling dressing refilling arround structure with excavated earth water and ramming lead upto 31-M & lift upto 1.5-M in ordinary soil. (SRP-2-5/22-b) | Â | Â | Â | Â | Â |
| 2 | Â | Long side Column Foundaton (134.12) | Â | Â | Â | Â | Â |
| 3 | Â | Short side Column Foundaton (120.71) | Â | Â | Â | Â | Â |
| 4 | Â | Long side wall panal | Â | Â | Â | Â | Â |
| 5 | Â | Short side wall panal | Â | Â | Â | Â | Â |
| 6 | Â | M.Gate | Â | Â | Â | Â | Â |
| 7 | Â | Â | Cum | 705.32 | 463.536 | Three hundred twenty-six thousand, nine hundred forty-one | 326941.21152 |
| 8 | 2 | Cement concrete plane I/c placing, compacting, finishing curing complete (I/C screening & washing of stone aggregate) without shutterin Ratio 1:4:8 (SRP-5-1/2-d). | Â | Â | Â | Â | Â |
| 9 | Â | Long side Column Foundaton (134.12) | Â | Â | Â | Â | Â |
| 10 | Â | Short side Column Foundaton (120.71) | Â | Â | Â | Â | Â |
| 11 | Â | Long side wall panal | Â | Â | Â | Â | Â |
| 12 | Â | Short side wall panal | Â | Â | Â | Â | Â |
| 13 | Â | M.Gate | Â | Â | Â | Â | Â |
| 14 | Â | Â | Cum | 56.12 | 11389.8544 | Six hundred thirty-nine thousand, one hundred forty-nine | 639198.628928 |
| 15 | 3 | Supplying and fabrication of Intermediate grade deformed reinforcement for R.C.C. in slabs,beams, columns and pile caps, including cutting,bending laying in positionincluding cost of binding wire. 60,000 psi (420 MPa) yield (SRP-5-3/6-b). | Â | Â | Â | Â | Â |
| 16 | Â | Long Side 13mm M.B Column Foundation (134.12) | Â | Â | Â | Â | Â |
| 17 | Â | Short side 13mm D.B A-B Column Foundation (120.71) | Â | Â | Â | Â | Â |
| 18 | Â | 19mm vertical Dowel Bars long side Column i/c Expnsion joint extra columns i/c over lap up to B-1 Ist stage | Â | Â | Â | Â | Â |
| 19 | Â | 10mm vertical Dowel Bars Strips long side Column i/c Expnsion joint extra columns i/c over lap | Â | Â | Â | Â | Â |
| 20 | Â | 19mm vertical Dowel Bars Short side Column i/c Expnsion joint extra columns i/c over lap up to B-1 2nd stage & up to B-2 | Â | Â | Â | Â | Â |
| 21 | Â | 10mm vertical Dowel Bars Strips Short side Column i/c Expnsion joint extra columns i/c over lap | Â | Â | Â | Â | Â |
| 22 | Â | Long side B-1 19mm straght Bars i/c L shape corner i/c over lap beam | Â | Â | Â | Â | Â |
| 23 | Â | Long side B-1 13mm Bars i/c Bent up extra cut length (Botum) | Â | Â | Â | Â | Â |
| 24 | Â | Long side B-1 13mm Bars i/c Bent up extra cut length Top of column | Â | Â | Â | Â | Â |
| 25 | Â | Long Side B-1 10mm Bars for strips | Â | Â | Â | Â | Â |
| 26 | Â | Short Side B-1 19mm straght Bars i/c L shape corner i/c over lap beam | Â | Â | Â | Â | Â |
| 27 | Â | Short side B-1 13mm Bars i/c Bent up extra cut length (Botum) | Â | Â | Â | Â | Â |
| 28 | Â | Short side B-1 13mm Bars i/c Bent up extra cut length Top of column | Â | Â | Â | Â | Â |
| 29 | Â | Short side B-1 10mm Bars for strips | Â | Â | Â | Â | Â |
| 30 | Â | Long side vertical bars i/c over lap up to B-2 19mm dia | Â | Â | Â | Â | Â |
| 31 | Â | Long side vertical column up to B-2 10mm Bars for strips | Â | Â | Â | Â | Â |
| 32 | Â | Short side vertical bars i/c over lap up to B-2 19mm dia | Â | Â | Â | Â | Â |
| 33 | Â | Short side vertical column up to B-2 10mm Bars for strips | Â | Â | Â | Â | Â |
| 34 | Â | Long side B-2 13mm straght Bars i/c L shape corner i/c over lap beam | Â | Â | Â | Â | Â |
| 35 | Â | Long side B-2 13mm Bars i/c Bent up extra cut length (Botum) | Â | Â | Â | Â | Â |
| 36 | Â | Long side B-2 13mm Bars i/c Bent up extra cut length Top of column | Â | Â | Â | Â | Â |
| 37 | Â | Long Side B-2 10mm Bars for strips | Â | Â | Â | Â | Â |
| 38 | Â | Short Side B-2 13mm straght Bars i/c L shape corner i/c over lap beam | Â | Â | Â | Â | Â |
| 39 | Â | Short side B-2 13mm Bars i/c Bent up extra cut length (Botum) | Â | Â | Â | Â | Â |
| 40 | Â | Short side B-2 13mm Bars i/c Bent up extra cut length Top of column | Â | Â | Â | Â | Â |
| 41 | Â | Short side B-2 10mm Bars for strips | Â | Â | Â | Â | Â |
| 42 | Â | M.Gate Piller Main & distrubtion bar 13mm | Â | Â | Â | Â | Â |
| 43 | Â | 19mm vertical Dowel Bars Column | Â | Â | Â | Â | Â |
| 44 | Â | 19mm vertical up to Top column | Â | Â | Â | Â | Â |
| 45 | Â | 10mm Bars for strips | Â | Â | Â | Â | Â |
| 46 | Â | 10mm Bars for Razer barbed wire | Â | Â | Â | Â | Â |
| 47 | Â | Â | Kg | 47359.87 | 320.1252 | Fifteen million, one hundred sixty-one thousand, eighty-six | 15161087.855724 |
| 48 | 4 | Reinforced cement concrete work using coarse sand except the cost of steel reinforcement and its labour for bending and binding. This rate also includes all kinds of forms moulds; lifting shuttering, curing, rendering and finishing (including screening and washing of shingle) In-situ in roof slabs,beams, columns, rafts, lintels and other structural members complete in all respect Ratio:1:1.5:3 (SRP-5-1/3-aii). | Â | Â | Â | Â | Â |
| 49 | Â | Coulmn Footing long side. | Â | Â | Â | Â | Â |
| 50 | Â | Coulmn Bottum to Top Level long side | Â | Â | Â | Â | Â |
| 51 | Â | Beam-1 long side | Â | Â | Â | Â | Â |
| 52 | Â | Beam-2 long side | Â | Â | Â | Â | Â |
| 53 | Â | Coulmn Footing short side. | Â | Â | Â | Â | Â |
| 54 | Â | Coulmn Bottum to Top Level short side | Â | Â | Â | Â | Â |
| 55 | Â | Beam-1 short side | Â | Â | Â | Â | Â |
| 56 | Â | Beam-2 short side | Â | Â | Â | Â | Â |
| 57 | Â | M.Gate column footing | Â | Â | Â | Â | Â |
| 58 | Â | M.Gate Pillers | Â | Â | Â | Â | Â |
| 59 | Â | Â | Cum | 280.65 | 28392.1368 | Seven million, nine hundred sixty-eight thousand, one hundred seventy-six | 7968253.19292 |
| 60 | 5 | Bricks work in foundation and plinth in Cement sand mortar. Ratio:1:5 (SRP-6-1/1-d). | Â | Â | Â | Â | Â |
| 61 | Â | Long side wall Ist step | Â | Â | Â | Â | Â |
| 62 | Â | Long side wall 2nd step | Â | Â | Â | Â | Â |
| 63 | Â | Long side wall 3rd step | Â | Â | Â | Â | Â |
| 64 | Â | Short side wall Ist step | Â | Â | Â | Â | Â |
| 65 | Â | Short side wall 2nd step | Â | Â | Â | Â | Â |
| 66 | Â | Short side wall 3rd step | Â | Â | Â | Â | Â |
| 67 | Â | M.Gate Piller 1st Step | Â | Â | Â | Â | Â |
| 68 | Â | M.Gate Piller 2nd Step | Â | Â | Â | Â | Â |
| 69 | Â | Deduction of M.Gate Hallow Pillers | Â | Â | Â | Â | Â |
| 70 | Â | Â | Cum | 394.57 | 10875.6844 | Four million, two hundred ninety-one thousand, two hundred forty-six | 4291218.793708 |
| 71 | 6 | Bricks work other than building including striking of joints upto 3.0 m height in Cement sand mortar. Ratio:1:5 (SRP-6-1/4-d). | Â | Â | Â | Â | Â |
| 72 | Â | Long side wall panal | Â | Â | Â | Â | Â |
| 73 | Â | Short side wall panal | Â | Â | Â | Â | Â |
| 74 | Â | M.Gate Piller Brick Work | Â | Â | Â | Â | Â |
| 75 | Â | Deduction of Main Gate pillars for Hallow Portion | Â | Â | Â | Â | Â |
| 76 | Â | Deduction for Main Gate opening | Â | Â | Â | Â | Â |
| 77 | Â | Â | Cum | 220.72 | 11441.9732 | Two million, five hundred twenty-five thousand, four hundred fifty | 2525472.324704 |
| 78 | 7 | Bitumen coating to plaster / concrete two coat (SRP-12-4/10). | Â | Â | Â | Â | Â |
| 79 | Â | Long side B-1 Top | Â | Â | Â | Â | Â |
| 80 | Â | Short side B-1 Top | Â | Â | Â | Â | Â |
| 81 | Â | Â | Sqm | 116.84 | 192.7224 | Twenty-two thousand, five hundred seventeen | 22517.685216 |
| 82 | 8 | Making and fixing steel grated door with 2.0mm thick sheeting including angle iron frame 50x50x10mm and 20mm square bars 100mm center to center locking arrangement (SRP-20-3/27). | Â | Â | Â | Â | Â |
| 83 | Â | Main Gate complete in all respect as per instruction incharg. | Â | Â | Â | Â | Â |
| 84 | Â | Single Leaf (side Door) i/c above vertical grills | Â | Â | Â | Â | Â |
| 85 | Â | Â | Sqm | 15.39 | 28856.276 | Four hundred forty-four thousand, sixty-three | 444098.08764 |
| 86 | 9 | Painting new surfaces,) Preparing surface and painting of doors and window any type (including edges i+iiCoats) (SRP-12-2/5-c). | Â | Â | Â | Â | Â |
| 87 | Â | Take 2-times Qty of Item No. 9 | Sqm | 30.78 | 688.3904 | Twenty-one thousand, one hundred eighty-seven | 21188.656512 |
| 88 | 10 | Providing / Fixing WAPDA/MEPCO Monogram on the main entry gate of G/S prepared from 16 gauge MS Sheet (SRP-20-8/79) | Â | Â | Â | Â | Â |
| 89 | Â | Main Gate | Nos | 2 | 3049.756 | Six thousand, ninety-nine | 6099.512 |
| 90 | 11 | Providing and fixing Razor barbe.d wire fencing having460mm ring at150mm centre to centre hanging on 10mm dia MS bar complete. (SRP-20-23/186). | Â | Â | Â | Â | Â |
| 91 | Â | Long side wall | Â | Â | Â | Â | Â |
| 92 | Â | Short side | Â | Â | Â | Â | Â |
| 93 | Â | Â | Mtr | 508 | 1818.9612 | Nine hundred twenty-four thousand, thirty-two | 924032.2896 |
| 94 | 12 | Cement plasters (1:3) up to 1st floor to height 13mm thick . (SRP-10-1/4-c). | Â | Â | Â | Â | Â |
| 95 | Â | Long side wall | Â | Â | Â | Â | Â |
| 96 | Â | Short side wall | Â | Â | Â | Â | Â |
| 97 | Â | Main Gate pillar | Â | Â | Â | Â | Â |
| 98 | Â | Deduction for column long side | Â | Â | Â | Â | Â |
| 99 | Â | Deduction for column short side | Â | Â | Â | Â | Â |
| 100 | Â | Â | Sqm | 5326.93 | 442.134 | Two million, three hundred fifty-five thousand, two hundred sixteen | 2355216.86862 |
| 101 | 13 | Making grooves 25x13 mm. (SRP-20-5/42). | Â | Â | Â | Â | Â |
| 102 | Â | long side | Â | Â | Â | Â | Â |
| 103 | Â | Short side | Â | Â | Â | Â | Â |
| 104 | Â | B-I long side | Â | Â | Â | Â | Â |
| 105 | Â | Short side | Â | Â | Â | Â | Â |
| 106 | Â | B-2 long side | Â | Â | Â | Â | Â |
| 107 | Â | Short side | Â | Â | Â | Â | Â |
| 108 | Â | Â | Mtr | 4777.12 | 57.4084 | Two hundred seventy-four thousand, nine hundred sixty-seven | 274246.815808 |
| 109 | 14 | Difference S.R Cement (SRP-22-16/649)- (22-4/160) | Â | Â | Â | Â | Â |
| 110 | Â | P.C.C 1:4:8 Same as Item No.2 (56.12 Cum x 3.18) | Â | Â | Â | Â | Â |
| 111 | Â | R.C.C 1:2:4 Ration as item No.4 Take 3/4 (210.49 Cum x 8) | Â | Â | Â | Â | Â |
| 112 | Â | Brick work Ratio 1:5 Qty Same As Item No.5 (394.57 Cumx 2.50) | Â | Â | Â | Â | Â |
| 113 | Â | Cement Plasters as item No.13 Take 1/2 (2663.47 x 0.124) | Â | Â | Â | Â | Â |
| 114 | Â | Â | Bags | 3179.08 | 46.4 | One hundred forty-seven thousand, five hundred nine | 147509.312 |
| 115 | 15 | Providing and laying thermo pore sheet 50mm thick (SRP-20-23/183-b). | Â | Â | Â | Â | Â |
| 116 | Â | For Expension Joints complete wall | Sqm | 17.72 | 1398.438 | Twenty-four thousand, seven hundred eighty-six | 24780.32136 |
| 117 | 16 | Providing and fixing aluminum joint cover (gole) 75mm size on expansion joint (SRP-20-7/68). | Â | Â | Â | Â | Â |
| 118 | Â | For Expension Joints complete wall | Mtr | 154.08 | 449.0476 | Sixty-nine thousand, two hundred forty-six | 69189.254208 |
| 119 | 17 | Filling watering ramming earth under floor with New earth excavated from outside lead up to3M.inner & Wall (execution from outside) lead up to 31 m and lift up to 1.50 lead with 3KM extra lead. (SRP-2-5/26)+(1-1/1). | Â | Â | Â | Â | Â |
| 120 | Â | Out side boundary wall | Â | Â | Â | Â | Â |
| 121 | Â | inner side boundary wall | Â | Â | Â | Â | Â |
| 122 | Â | Extra for M.Gate Ramp etc | Â | Â | Â | Â | Â |
| 123 | Â | Â | Cum | 5998.41 | 728.8396 | Four million, three hundred seventy-one thousand, two hundred fifty-two | 4371878.745036 |
| 124 | Â | Note :- The unit rates are inclusive of 16% PST | Â | Â | Â | Â | Â |
| GRAND TOTAL: | Rs 39,572,929.56 |
Construction of Boundary wall (RCC Frame Structure & Brick Work) and main entry gate for new 132KV Grid Station SHRIMP Farm Rakh Ali Wali Alipur (Deposit Work)
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)), Project Director GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province).
The Supplier is:
The title of the subject procurement is: TENDER NO. 19/GSC (2026-27) - Construction of Boundary wall (RCC Frame Structure & Brick Work) and main entry gate for new 132KV Grid Station SHRIMP Farm Rakh Ali Wali Alipur (Deposit Work)
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)), Project Director
GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province).
+92-310-149-4444
pdgsc@mepco.com.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)), Project Director
GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province).
+92-310-149-4444
pdgsc@mepco.com.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.25% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Demand Draft
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Completion certificate will be issued by XEN (Civil) Division GSC MEPCO Multan after successful completion of the boundary wall work by the contractor
Completion certificate will be issued by XEN (Civil) Division GSC MEPCO Multan after successful completion of the boundary wall work by the contractor
Performance guarantee will be released after issuance of completion certificate by Executive Engineer (Civil) Division GSC MEPCO Multan
5% withheld retention money out of 10% will be released after the issuance of completion certificate by the Executive Engineer (Civil) Division GSC MEPCO Multan and remaining 5% retention money will be with held till the defect liability period and will be released after issuance of defect liability certificate by the Executive Engineer (Civil) Division GSC MEPCO Multan
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P197382
To: Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)), Project Director GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)), Project Director GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., TENDER NO. 19/GSC (2026-27) - Construction of Boundary wall (RCC Frame Structure & Brick Work) and main entry gate for new 132KV Grid Station SHRIMP Farm Rakh Ali Wali Alipur (Deposit Work) (P197382) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Office of Project Director (GSC) (Multan Electric Power Company (MEPCO)), Project Director GSC Complex near 132 Kv Grid Station Khanewal Road., Multan City, Multan (District), Multan Division (Division), Punjab (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
The bidder must have completed two contracts of same nature along with its completion successfully as main contractor within Ten years awarded by WAPDA / NTDC / DISCOs. The consolidated value of these contracts must be more than 60% of the estimated / B.O.Q Cost. The bidder shall provide complete documents including contract agreement / work order and completion certificate
(1) The contractor having two or more works in hand which are yet not completed and are beyond the stipulated time limit on the part of contractor, in GSC MEPCO will not eligible to participate in the tender.Â
(2) Bidder / tenderer will submit a certificate that the firm is not blacklisted / debarred from WAPDA / DISCOs / GENCOs / NGC or any international organization at present
The bidder shall be in the active tax payer list (ATL) and will provide income returns for last three years
The bidder will provided the average annual turnover with tax returns from FBR should be at least 1.5 times the BOQ amount for last three (03) years, verified from certified auditor and current month bank statement showing 25% balance amount of work in bank