Standard Bidding Document

📑 Procurement Notice (NIT)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

REQUEST FOR BIDS

PROCUREMENT OF CIVIL WORKS

  1. The Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA) has reserved Funds for the procurement planned for FY 2026-27. The Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA) intends to apply part of the proceeds of this Fund to cover eligible payments under the contract for the "LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD." with the reference of "P200199"
  2. The Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA) invites electronic Bids from eligible Bidders for procurement of Works (LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.) described in the bidding documents on EPADS v2.0.
  3. Single Stage-Two Envelope will be used by adopting Least Cost Based Selection (LCBS) Technique for the subject procurement, in line with the Public Procurement Rules, 2026 and any Regulations, Regulatory Guides, Procurement Guidelines or Instructions issued by the Authority from time to time.
  4. All Bids must be accompanied by a Bid Security amounting described in Bid Security Section in Bidding Document in the form of  Call at Deposit. Or all bids must be accompanied by bid securing declaration in the format specified in the Bidding documents
  5. E-Bidding documents, containing detailed terms & conditions, specifications and requirements etc. are available on e-Pak Acquisition and Disposal System (EPADS) at https://epads.gov.pk/opportunities/federal/procurements/200199 for all the interested bidders registered on EPADS v2.0. Bidders are required to get themselves registered on EPADS v2.0 to participate in Bidding process.
  6. The e-bids, prepared in accordance with the instructions in the e-Bidding documents, must be submitted through EPADS v2.0 on or before Wednesday, December 16, 2026 12:00 PM. E-bids will be opened by using EPADS v2.0 on the same day at Wednesday, December 16, 2026 12:30 PM. Manual submission of Bids shall not be entertained. Those vendor who have not yet registered on the new version of EPADS v2.0, may register themselves on https://vendors.epads.gov.pk/. A tutorial to explain the registration process is available at https://www.youtube.com/watch?v=MNW6T38v7tc.

In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.gov.pk).

 

 

Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director
10, Mauve Area, G-10/4, Islamabad Capital Territory
+92-321-538-5944
director.technical@fgeha.gov.pk

📑 Instructions to Bidders (ITB)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

A. INTRODUCTION

  1. Scope of Bid
    1. The Procuring agency/Employer (PA), as indicated in the Bid Data Sheet (BDS) invites Bids for the execution of Works as specified in the BDS and Section VI- Works Requirements. The name, identification, and number of lots (contracts) of this National/ International Competitive Bidding process are specified in the BDS.
  2. Source of Funds
    1. Source of funds as referred in Clause 2 of Bid Data Sheet.
  3. Eligible Bidders 
    1. A bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture or consortium. In the case of a joint venture or consortium, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture or consortium shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture or consortium during the Bidding process, and in case of award of contract, during the execution of contract. Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
      Any bid submitted by the joint venture shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
      (The limit on the number of members of JV or Consortium may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
    2. The invitation for bids is open to all prospective bidders subject to any provisions of incorporation or licensing by the respective national/ international incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidder keeping in view the requirement of that business.
    3. A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidders may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
      1. are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring agency/Employer to provide consulting services for the preparation of design or technical specifications of the works that are the subject of the bid; or
      2. have controlling shareholders in common; or 
      3. receive or have received any direct or indirect subsidy from any of them; or 
      4. have the same legal representative for purposes of this Bid; or
      5. have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the Procuring agency/Employer regarding this Bidding process; or
      6. Submit more than one bid in this bidding process.
    4. A Bidder may be ineligible if –
      1. he is declared bankrupt or, in the case of company or firm, insolvent;
      2. payments in favor of the bidder is suspended in accordance with the judgment of a court of law other than a judgment declaring bankruptcy and resulting (in accordance with the national laws) in the total or partial loss of the right to administer and dispose of its property;
      3. the bidder is convicted, by a final judgment of a Court of Law or relevant Professional Statuary Body, of any offence involving professional conduct;
      4. The bidder is debarred/ blacklisted by a national level Procuring agency/Employer and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration.
    5. As and when required, bidders shall provide to the Procuring agency/Employer evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
  4. Eligible Material and Equipment
    1. All the material and equipment to be mobilized under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such materials and equipment. For this purpose, ineligible countries are stated in the section-IV titled as “Eligible Countries”. 

B. BIDDING DOCUMENTS

  1. Contents of Bidding Documents 
    1. The scope of Works, bidding procedures, and terms and conditions of the contract are prescribed in the bidding documents.  In addition to the Invitation for Bids, the bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 7.1 include:
      1. Section I Instructions to Bidders (ITBs)
      2. Section II Bid Data Sheet (BDS)
      3. Section III Evaluation and Qualification Criteria
      4. Section IV Bidding Forms 
      5. Section V Eligible Countries
      6. Section VI Works Requirements
      7. Section VII General Conditions of Contract (GC)
      8. Section VIII Particular Conditions of Contract (PC
      9.  Section IX Contract Forms
    2. The bidder is expected to examine all instructions, forms, specifications, terms and conditions prescribed in the bidding documents. Failure to furnish all the information required in the bidding documents will be at the bidder’s risk and may result in the rejection of his bid. 
  2. Clarification of Bidding Document, Pre-bid Meeting
    1. A prospective bidder requiring any clarification of the bidding document may notify the Procuring agency/Employer through EPADS v2.0. 
    2. The Procuring agency/Employer shall respond to the request for clarification in accordance with the Public Procurement Rules 2026, Rule No.38 i.e. Clarifications of bids. 
    3. Should the Procuring Agency deem it necessary to amend the BIDDING document as a result of a clarification, it shall do so following the procedure under ITB 7.
    4. If indicated in the BDS, the bidder’s designated representative is invited at the bidder’s cost to attend a pre-bid meeting at the place, date and time mentioned in the BDS. During this pre-bid meeting, prospective bidders may request clarification of the schedule of requirement, the evaluation criteria or any other aspects of the bidding documents.
    5. Minutes of the pre-bid meeting, if applicable, including the text of the questions asked by bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS v2.0. Any modification to the bidding documents that may become necessary as a result of the pre-bid meeting shall be made by the Procuring agency/Employer exclusively through the use of an Addendum pursuant to ITB 7. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
    6. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works.  The costs of visiting the Site shall be at the bidder’s own expense.
    7. The bidder and any of its authorized personnel will be granted permission by the Procuring agency/Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the bidder and its personnel will release and indemnify the Procuring agency/Employer  from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
  3. Amendment of Bidding Documents
    1. The procuring agency may issue notification of any change, addition, modification or deletion in accordance with the Public Procurement Rules 2026, rule no. 34 i.e. Bidding Documents.
    2. To give prospective bidders reasonable time in which to take an addendum/corrigendum into account in preparing their bids, the Procuring agency/Employer may, at its discretion, extend the deadline for the submission of bids:
      Provided that the Procuring agency/Employer shall extend the deadline for submission of bid in pursuance of Public Procuement Rules 2026, rule no. 39  i.e. Extension of time for submission of bids, if such an addendum is issued within last three (03) days of the bid submission deadline.

C. PREPARATION OF BIDS

  1. Language of Bid
    1. The bid prepared by the bidder, as well as all correspondence and documents relating to the bid exchanged by the bidder and the Procuring agency/Employer shall be written in the English language unless specified in the BDS. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless specified in the BDS, in which case, for purposes of interpretation of the bidder, the translation shall govern.
  2. Documents Comprising the Bids
    1. The Bid prepared by the Bidder shall constitute the following components: -
      1. Documentary evidence established in accordance with ITB 9 that the material and equipment to be utilized by the Bidder for the executions of works are eligible material and equipment and conform to the Bidding Documents;
      2. Documentary evidence established in accordance with ITB 10 that the Bidder has been authorized to carry out the Construction works;
      3. Documentary evidence established in accordance with ITB 10 that the Bidder is eligible and/or qualified for the subject Bidding process;
      4. Letter of Bid and Schedules and Bid Prices completed in accordance with ITB 11 and 12;
      5. Completed schedules as required, including priced Bill of Quantities in accordance with ITB 11.
      6. Technical Proposal completed in all aspects in accordance with ITB 14.
      7. Bid security or Bid Securing Declaration furnished in accordance with ITB 16;
      8. Any other Document required in the BDS.
    2. In addition to the requirements, Bids submitted by a JV shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful Bid shall be signed by all members and submitted with the Bid, together with a copy of the proposed Agreement. Bids submitted by a joint venture of two (2) or more firms specified in Bidding Data, shall comply with the following requirements:
      1. The bid, and in case of a successful bid, the Form of Contract Agreement shall be signed by all members so as to be legally binding on all partners;
      2. One of the joint venture partners shall be nominated as being in-charge; and this authorization shall be evidenced by submitting a power of attorney signed by legally authorized signatories of all the joint venture partners;
      3. For the partner-in-charge shall always be duly authorized to deal with the Employer regarding all matters related with and/or incidental to the execution of Works as per the terms and Conditions of Contract and in this regard to incur any and all liabilities, receive instructions, give binding undertakings and receive payments on behalf of the joint venture;
      4. All partners of the joint venture shall at all times and under all circumstances be liable jointly and severally for the execution of the Contract in accordance with the Contract terms and a statement to this effect shall be included in the authorization mentioned under Sub-Para(b) above as well as in the Letter of Bid and in the Form of Contract Agreement (in case of a successful bid); and
      5. A copy of the agreement entered into by the joint venture partners shall be submitted with the bid stating the conditions under which it will function, its period of duration, the persons authorized to represent and obligate it and which persons will be directly responsible for due performance of the  Contract and can give valid receipts on behalf of the joint venture, the proportionate participation and corresponding duties & responsibilities of the several firms forming the joint venture, and any other information necessary to permit a full appraisal of its functioning. No amendments/modifications whatsoever in the joint venture agreement shall be agreed to between the joint venture partners without prior written consent of the Employer.
    3. The Bidder shall furnish, as part of its Bid, all those documents establishing the eligibility in conformity to the terms and conditions specified in the Bidding Documents for all material, equipment and works which the Bidder proposes to execute.
    4. The documentary evidence of conformity of the material, equipment and works to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of:
      1. a detailed description of the work methodology, approach, schedule and resources to be mobilized at site;
      2. any other procurement specific documentation requirement as stated in the BDS.
    5. The Bidder shall furnish in the Letter of Bid name(s) of the potential DAAB member(s) and attach their curriculum vitae. The list of potential DAAB member(s) proposed by the Employer (Contract Data 21.1) and by the Bidder (Letter of Bid) shall be subject to mutual review and agreement of the Parties in accordance with Sub-Clause 21.1 of the Conditions of Contract, and shall form the basis for the constitution of the DAAB in the event of Contract award.
  3. Documents Establishing Eligibility and Qualification of the Bidder
    1. The bidder shall furnish, as part of its bid, all those documents establishing the bidder’s eligibility to participate in the bidding process and/or its qualification to perform the contract if its bid is accepted.
    2. The documentary evidence of the bidder’s eligibility to bid shall establish to the satisfaction of the Procuring agency/Employer that the bidder, at the time of submission of its bid, is from an eligible country as defined in Section-V titled as “Eligible Countries”.
    3. The documentary evidence of the bidder’s qualification to perform the contract if its bid is accepted shall establish to the satisfaction of Procuring agency/Employer that:
      1. The bidder has the financial and technical capability necessary to perform the Contract, meets the qualification criteria specified in Section-III, Evaluation and Qualification Criteria and BDS.
      2. In the case of a bidder not doing business within Pakistan, the bidder is or will be (if awarded the contract) represented by a local bidder (Joint Venture) in accordance with the PEC works bylaws, and in case of award of works such foreign firm is required to participate in the execution of works to carry out its obligations as prescribed in the Conditions of Contract and /or Technical Specifications.
      3. That the bidder meets the qualification criteria listed in Section-III, Evaluation and Qualification Criteria and BDS. 
  4. Letter of Bid and Schedules
    1. The Bidder shall fill the Form of Bids furnished in the bidding documents. The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
  5. Bid Prices
    1. The bid prices quoted by the bidder in the Bidding Forms, Bill of Quantities and in the Price Schedule to Bid shall conform to the requirements specified below or exclusively mentioned hereafter in the bidding documents.
    2. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. If a Price Schedule shows items listed but not priced, their prices shall be construed to be included in the prices of other items in the Bill of Quantities and will not be paid for separately by the Procuring agency/Employer. 
    3. The Bid price to be quoted in the Form of Bid in accordance with ITB 11 shall be the total price of the bid
    4. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract.
    5. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract.
    6. If so specified in ITB 1.1, bids may be invited for individual lots (contracts) or for any combination of lots (packages).
    7. Prices quoted by the Bidder shall either be fixed or adjustable during the Bidder’s performance of the contract if specified in the BDS.
    8. All duties, taxes, and other levies payable by the Contractor under the Contract, or for any other cause, as of the date twenty-eight (28) days prior to the deadline for submission of bids, shall be included in the rates and prices and the total bid price submitted by the bidder.
  6. Currencies of Bid and Payment
    1. The unit rates and the prices shall be quoted by the Bidder entirely Pakistani Rupees. A Bidder expecting to incur expenditures in other currencies for inputs to the Works supplied from outside the Employer’s country (referred to as the “Foreign Currency Requirements”) shall indicate in Table III of Schedule-A to Bid the proportion of the Bid Price (excluding Provisional Sums) needed by him for the payment of such Foreign Currency Requirements; in such case the unit rates and the prices shall be quoted by the Bidder in Equivalent Pakistani Rupees.Comparison of Bids and tie of Bid shall be treated in accordance with the Public Procurement rules 2026, rule no. 42.
  7. Documents Comprising the Technical Proposal
    1. The bidder shall furnish a Technical Proposal including a statement of work methods, equipment, personnel, schedule and any other information as stipulated in Section IV– Bidding Forms, in sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the work requirements and the completion time.
  8. Bid Validity Period
    1. Bids shall remain valid for the period specified in the BDS after the bid submission deadline prescribed by the Procuring agency/Employer. A bid valid for a shorter period shall be rejected by the Procuring agency/Employer as non-responsive. The period of bid validity will be determined from the complementary bid securing instrument i.e. the expiry period of bid security or bid securing declaration as the case may be. 
    2. Under exceptional circumstances, prior to the expiration of the initial Bids/Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids/Bid. Such request for extension of the period of bid validity shall be carried out in accordance with the Public Procurement rules 2026, rule no. 37 i.e. Bid Validity.
  9. Bid Security or Bid Securing Declaration
    1. Pursuant to ITB 10.1 unless otherwise specified in the BDS, the bidder shall furnish as part of its bid, a Bid Security in accordance with the Public Procurement Rules 2026, rule no. 36 in the amount and currency specified in the BDS or Bid Securing Declaration as specified in the BDS in the format provided in Section IV (Bidding Forms). 
      In case Procuring agency/Employer is inviting bids in lots / packages, the bidder shall be required to submit his bid security against the respective lot/ package for which he is submitting his bid.
      Until the development of functionality of auto verification of financial instrument in EPADS v2.0, the scanned copy of bid security or bid securing declaration, as the case may be, shall be uploaded on EPADS v2.0 whereas the original instrument to be submitted to the procuring agency before closing of bid submission deadline, failing which shall result in rejection of Bid as non-responsive.
    2. The Bid Security shall be denominated in the local currency or in another freely convertible currency, and it shall be in the form specified in the BDS which shall be in any of the following:
      1. A bank guarantee, an irrevocable letter of credit issued by a Scheduled bank in the form provided in the Bidding Documents or another form acceptable to the Procuring agency/Employer and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bid Validity is extended. In either case, the form must include the complete name of the bidder; 
      2. A cashier’s or certified cheque; or
      3. Another security as indicated in the BDS.
    3. The Bid Security or Bid Securing Declaration shall be in accordance with the Form of the Bid Security or Bid Securing Declaration included in Schedule to Bid or another form approved by the Procuring agency/Employer prior to the bid submission.
    4. The Bid Security shall be payable promptly upon written demand by the Procuring agency/Employer in case any of the conditions listed in ITB 16.9 are invoked.
    5. Any bid not accompanied by a Bid Security or Bid Securing Declaration in accordance with ITB 16.1 or 16.3 shall be rejected by the Procuring agency/Employer and shall be declared as non-responsive bid, pursuant to ITB 25.
    6. Unsuccessful bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Procuring agency/Employer pursuant to ITB 15. The Procuring agency/Employer shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
      1. The expiry of the Bid Security;
      2. The entry into force of a procurement contract and the provision of a performance security (or guarantee), for the performance of the contract if such a security (or guarantee), is required by the Biding documents;
      3. The rejection by the Procuring agency/Employer of all Bids;
      4. The withdrawal of the bid prior to the deadline for the submission of bids, unless the biding documents stipulate that no such withdrawal is permitted.
    7. The successful bidder’s Bid Security will be discharged upon the bidder signing the contract pursuant to ITB 38, or furnishing the performance security (or guarantee), pursuant to ITB 39.
    8. The Bid Security may be forfeited or the Bid Securing Declaration executed:
      if a Bidder:
      1. Withdraws its Bid during the period of Bid Validity as specified by the Procuring agency/Employer, and referred by the bidder on the Form of Bid except as provided for in ITB 15.2; or 
      2. In the case of a successful bidder, if the bidder fails:
        1. to sign the contract in accordance with ITB 38; or
        2. to furnish performance security (or guarantee) in accordance with ITB 39.
    9. In case of Bid Security issued by the foreign bank is allowed by the Procuring agency/Employer, the same should be counter guaranteed by a corresponding bank in Pakistan. Furthermore, in case of joint venture, it should be in the name of Joint venture to ensure joint responsibility. In case the JV is not legally constituted at the time of bid submission, the bid security or bid securing declaration shall be in the names of Joint Venture or Lead/either Firm of the JV or in ratio of shares of the individual JV partners, submitting the bid.
  10. Withdrawal of Bids
    1. The Bidder shall prepare and submit Bids through EPADS with due diligence after carefully reading all the terms and condition before Bid submission deadline.

D. SUBMISSION OF BIDS

  1. Submission of Bids
    1. All bids shall be submitted through EPADS v2.0.
  2. Deadline for Submission of Bids
    1. All bids shall be received through EPADS v2.0 not later than bid submission deadline as specified in the BDS.
    2. The Procuring agency/Employer may, under exceptional circumstances and at its discretion, extend the deadline for the submission of bids, pursuant to Public Procurement Rules 2026, rule no. 39  Extension of Time for submission of bid, by amending the Bidding Documents in accordance with ITB 7, in which case all rights and obligations of the Procuring agency/Employer and bidders previously subject to the deadline will thereafter be subject to the new deadline.
  3. Withdrawal, Substitution and Modification of Bids
    1. A bidder may substitute or modify his bid after it has been submitted, provided that written notice of the substitution or modification of the bid, is received by the Procuring agency/Employer prior to the deadline for submission of bids.
    2. Revised bid may be submitted after the substitution or modification made in the original bid in accordance with ITB 20.1. 

E. OPENING AND EVALUATION OF BIDS

  1. Opening of Bids
    1. The Procuring Agency will open bids in accordance with the Public Procurement rules 2026, rule no.40 as specified in the BDS.
  2. Confidentiality
    1. Information relating to the examination, clarification, evaluation and comparison of bids and recommendation of contract award shall not be disclosed to bidders or any other persons not officially concerned with such process until the time of the announcement of the respective evaluation report.
  3. Clarification of Bids
    1. Clarification of Bidding Documents shall be carried out in accordance with the Public Procurement Rules 2026, rule no. 38 i.e. Clarifications.
    2. The alteration or modification in the bid which in any case affect the following parameters will be considered as a change in the substance of a bid:
      1. evaluation & qualification criteria;
      2. required scope of work;
      3. contract price;
      4. all securities requirements;
      5. tax requirements;
      6. terms and conditions of bidding documents.
      7. change in the ranking of the bidder
  4. Preliminary Examination of Bids
    1. Prior to the detailed evaluation of bids, the Procuring agency/Employer will determine whether each bid:
      1. has been prepared as per the format and contents defined by the Procuring agency/Employer in the bidding documents;
      2. has been properly signed; 
      3. is accompanied by the required securities; and 
      4. is substantially responsive to the requirements of the bidding documents. 
        The Procuring agency/Employer's determination of a bid's substantial responsiveness will be based on the contents of the bid itself.
    2. A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding Documents, without material deviation or reservation. A material deviation or reservation is one that: - 
      1. affects in any substantial way the scope, quality, or performance of the Works; 
      2. limits in any substantial way, inconsistent with the bidding documents, the Procuring agency/Employer's rights or the bidders’ obligations under the Contract; or 
      3. if rectified, would affect unfairly the competitive position of other bidders presenting substantially responsive bids.
    3. The Procuring agency/Employer will confirm that the documents and information specified under ITB 9, 10 and 11 have been provided in the bid. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Bidders, the bid shall be rejected.
    4. The Procuring agency/Employer may waive-off any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
      Explanation: A minor informality, non-conformity or irregularity is one that is merely a matter of form and not of substance. It also pertains to some of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the works. The Procuring agency/Employer either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is advantageous to the Procuring agency/Employer. Examples of minor informalities or irregularities include failure of a bidder to –
      1. Submit the number of copies of signed bids required by the invitation;
      2. Furnish required information concerning the number of its employees;
      3. the firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature.
    5. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer may request the bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Technical Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any such aspect of the technical Proposal linked with the ranking of the bidders. Failure of the bidder to comply with the request may result in the rejection of its bid.
    6. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer shall rectify quantifiable nonmaterial nonconformities or omissions related to the Financial Proposal. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of the missing or nonconforming item or component.
    7. If a bid is not substantially responsive, it will be rejected by the Procuring agency/Employer and may not subsequently be evaluated for complete technical responsiveness.
  5. Examination of Terms and Conditions; Technical Evaluation
    1. The Procuring agency/Employer shall examine the bid to confirm that all terms and conditions specified in the GC and the PC have been accepted by the bidder without any material deviation or reservation.
      For this purpose:
      “Deviation” means departure from the requirements specified in the Bidding Document.
      “Reservation” means setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding Document.
    2. The Procuring agency/Employer shall evaluate the technical aspects of the bid submitted in accordance with ITB 28, to confirm that all requirements specified in Section VI – Works Requirement, Technical Specifications of the Bidding Documents have been met without material deviation or reservation.
    3. If after the examination of the terms and conditions and the technical evaluation, the Procuring agency/Employer determines that the bid is not substantially responsive in accordance with ITB 25, it shall reject the bid.
  6. Correction of Arithmetic Errors
    1. Bids determined to be substantially responsive will be checked for any arithmetic errors.  Errors will be corrected as follows: -
      1. if there is a discrepancy between unit prices and the sub-total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the sub-total price shall be corrected, unless in the opinion of the Procuring agency/Employer there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected;
      2. if there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail, and the total shall be corrected; and 
      3. where there is a discrepancy between the amounts in figures and in words, the amount in words will govern.
      4. Where there is discrepancy between grand total of price schedule and amount mentioned on the Form of Bid, the amount referred in Price Schedule shall be treated as correct subject to elimination of other errors. 
    2. The amount stated in the Bid will, be rectified by the Procuring agency/Employer in accordance with the above procedure for the correction of errors and, with, the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount, its bid shall be rejected after forfeiture of Bid Security or execution of the Bid Securing Declaration, as the case may be, in accordance with ITB 39.3.
  7. Conversion to Single Currency
    1. Comparison of bids quoted in different currencies and conversion of bids into a single currency shall be carried out in accordance with the Public Procurement Rule 2026, rule no. 42(2) as specified in the BDS.
  8. Evaluation of Bids
    1. The Procuring agency/Employer shall evaluate and compare only the bids determined to be substantially responsive, pursuant to ITB 25.
    2. In evaluating the Technical Proposal of each Bid, the Procuring agency/Employer shall use the criteria and methodologies listed in the BDS and in terms of works requirement. No other evaluation criteria or methodologies shall be permitted.
    3. The Procuring agency/Employer’s evaluation of a bid will take into account:
      1. the bid price, excluding provisional sums and the provision, if any, for contingencies in the summary bill of quantities, but including day work items, where priced competitively;
      2. converting the amount resulting from applying above, if relevant, to a single currency in accordance with ITB 27;
    4. The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in bid evaluation.
    5. If these bidding documents allow bidders to quote separate prices for different lots, and the award to a single bidder of multiple lots, the methodology of evaluation to determine the lowest evaluated lot combinations in the Form of Bid, is specified in the BDS.
    6. If the bid, which results in the Evaluated Bid Price (Successful Bid), is seriously unbalanced or front loaded in the opinion of the Employer, the Employer may require the Bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated Contract payments, the Employer may require that the amount of the performance security be increased at the expense of the Bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under the Contract.
      Explanation:
      “Unbalanced” or “front-loaded” bids consist of deliberately submitting bids with artificially high prices or unit rates for the early stages of a construction project, offset by artificially low prices or unit rates for the later stages of the project, to improve the contractor’s cash flow.
  9. Domestic Preference
    1. If the BDS so specifies, the Procuring agency/Employer will grant a margin of preference to the domestic contractor in line with the rules, regulations, regulatory guides or instructions issued by the Authority from time to time. 
  10. Determination of Successful Bid
    1. The Procuring agency/Employer shall compare the evaluated bids in accordance with the predefined bidding procedure, of all substantially responsive bids to determine the Successful bidder.
  11. Qualification of Bidder
    1. The Procuring agency/Employer shall determine to its satisfaction whether the bidder is substantially responsive and whose bid is declared as Successful bid either continues to meet (if prequalification applies) or meets (if post-qualification applies) the qualifying criteria specified in Evaluation and Qualification Criteria.
      Note: In case of international bidding, the parameters for incorporation or licensing within Pakistan may be fulfilled as part of post qualification.
    2. The determination shall be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 10.
    3. Prior to contract award, the Procuring agency/Employer will verify that the successful bidder (including each member of a JV) is not blacklisted/debarred. The Procuring agency/Employer will conduct the same verification for each sub-contractor proposed by the successful bidder.
  12. Sub-Contractors
    1. The bidder shall provide details regarding any specialized sub-contractor to the Procuring agency/Employer. In case change of sub-contractors, the bidder shall promptly notify the Procuring agency/Employer and obtain approval for replacement of sub-contractors.
    2. Bidders may propose sub-contracting up to the percentage of total value of contracts or the volume of works as specified in the BDS.
  13. Abnormally Low Financial Bid
    1. A procuring Agency may reject abnormally low bids in accordance with the Public Procurement Rules 2026, rule no. 43. The decision of the Procuring agency/Employer to reject a bid and reasons for the decision shall be recorded in the procurement proceedings and promptly communicated to the bidder concerned. Moreover, the Procuring agency/Employer shall not incur any liability solely by rejecting abnormally bid 
      Guidance for Procuring agency/Employer:
      An abnormally low Bid means, a Bid containing Bid price that is less or lesser than twenty five percent (25%) of the Procuring agency/Employer’s estimate.
    2. The Procuring agency/Employer will determine to its satisfaction whether the bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily, in accordance with the criteria listed in ITB 10.
    3. The determination will take into account the bidder’s financial and technical capabilities.  It will be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 10, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    4. Procuring agency/Employer may seek “Certificate for Independent Price Determination” from the bidder and the results of reference checks may be used in determining award of contract.
      Explanation: The Certificate shall be furnished by the bidder. The bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc. 
    5. An affirmative determination will be a prerequisite for award of the contract to the bidder. A negative determination will result in rejection of the bidder’s bid, in which event the Procuring agency/Employer will proceed to the next ranked bidder to make a similar determination of that bidder’s capabilities to perform satisfactorily.

F. AWARD OF CONTRACT

  1. Criteria of Award
    1. Subject to ITB 34 and 35, the Procuring agency/Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has been declared as Successful Bidder, provided that such bidder has been determined to be:
      1. eligible in accordance with the provisions of ITB 3;
      2. is determined to be qualified to perform the Contract satisfactorily; and 
      3. Successful negotiations have been concluded, if any.
  2. Negotiations
    1. The Committee of the Procuring agency/Employer may negotiate with the Successful Bidder in accordance with Public Procurement Rules 2026 rule no. 26(3).
  3. Procuring agency/Employer’s Right to reject All Bids
    1. The procuring agency has the right to reject all bids in accordance with the Public Procurement Rules 2026, rule no. 45 However, the Authority (i.e. PPRA) may call from the Procuring agency/Employer the justification of those grounds.
  4. Notification of Award
    1. The procuring agency shall announce and publish the evaluation result in accordance with the Public Procurement Rules 2026, rule no 48.
    2. Where no complaints have been lodged, the bidder whose bid has been accepted will be notified of the award by the Procuring agency/Employer prior to expiration of the bid validity period through EPADS. However, the Procuring agency/Employer shall not award any procurement contract at least for five (05) days after the announcement of final evaluation report. The notification letter (herein after and in the condition of the contract and contract form called “Letter of Acceptance” will specify the sum that the Procuring agency/Employer will pay the successful bidder in consideration for the execution and completion of the works as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price).
    3. The notification of award will constitute the formation of the Contract, subject to the bidder furnishing the Performance Security (or guarantee) in accordance with ITB 39 and signing of the contract in accordance with ITB 38. 
    4. Upon the successful bidder’s furnishing of the performance security (or guarantee) pursuant to ITB 39, the Procuring agency/Employer will promptly notify each unsuccessful bidder, the name of the successful bidder and the Contract amount and will discharge the Bid Security or Bid Securing Declaration of the bidder(s) pursuant to ITB 16. 
  5. Signing of Contract
    1. Promptly after notification of award, Procuring agency/Employer shall send the successful bidder the draft agreement, incorporating all terms and conditions as agreed by the parties to the contract.
    2. Immediately after the Redressal of grievance by the GRC, and after fulfillment of all conditions precedent of the Contract Form, the successful bidder and the Procuring agency/Employer shall sign the contract.
    3. Where no formal signing of a contract is required, work order issued to the bidder shall be construed to be the contract.
  6. Performance Security (or Guarantee)
    1. After the receipt of the Letter of Acceptance, the successful bidder, within the specified time, shall deliver to the Procuring agency/Employer a Performance Guarantee in the amount and in the form stipulated in the BDS and PC, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract.
    2. If the Performance Guarantee is provided by the successful bidder and it shall be in the form specified in the BDS which shall be in any of the following:
      1. certified cheque, cashier’s or manager’s cheque, or bank draft;
      2. irrevocable letter of credit issued by a scheduled bank of Pakistan or in the case of an irrevocable letter of credit issued by a foreign bank, the letter shall be confirmed or authenticated by a scheduled bank of Pakistan;
      3. bank guarantee confirmed by a reputable local bank or, in the case of a successful foreign bidder, bonded by a foreign bank; or
      4. surety bond callable upon demand issued by any reputable surety or insurance company.
        Any Performance Guarantee submitted shall be enforceable in Pakistan.
    3. Failure of the Most Advantageous Bidder to comply with the requirement of ITB 40 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security or declare blacklisted (in case bid securing declaration is submitted) in which event the Procuring agency/Employer may make the award to the next most advantageous bidder or reinitiate the procurement process afresh (as a case may be).
  7. Advance Payment
    1. Advance payment will be provided to the bidder in percentage and in the manner as agreed by the both parties in terms of Conditions of the Contract.
    2. The Procuring agency/Employer will provide an advance payment as stipulated in the Conditions of Contract, subject to a maximum amount, as stated and/or Conditions of the Contract.  The advance payment request shall be accompanied by an advance payment security (guarantee) in the form provided in Section X. For the purpose of receiving the advance payment, the bidder shall make and estimate of, and include in its bid, the expenses that will relate to the purchase of equipment, machinery, materials, and on the engagement of labor during the first month beginning with the date of the Procuring agency/Employer’s “Notice to Commence” as specified in the PCC.
  8. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted.
  9. Corrupt & Fraudulent Practices
    1. Procuring agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.

G. GRIEVANCE REDRESSAL & COMPLAINT REVIEW MECHANISM

  1. Grievance Redressal
    1. Grievance Redressal shall be carried out in accordance with the PPRA, rules i.e. Redressal of grievances by the procuring agency and “Redressal of Grievances Regulations”.

H. MECHANISM OF BLACKLISTING

  1. Mechanism of Blacklisting
    1. The Procuring agency/Employer shall proceed Blacklisting of Bidders/Contractors in accordance with Public Procurement Rules 2026, rule no. 65 rule i.e. Blacklisting and “Blacklisting and Debarment of Bidders or Contractors. 

📑 Bid Data Sheet (BDS)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

Bid Data Sheet (BDS)

The following specific data for the procurement of works shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITBs).  Whenever there is a conflict, the provisions herein shall prevail over those in ITBs.

A. Introduction

ITB Number   
Amendments of, and Supplements to, Clauses in the Instruction to Bidders

ITB Number 1.1

Name of Procuring agency/Employer: Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA)

The subject of procurement is: LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Period for completion of the works 728 Days

Commencement date execution of the works: 14 Days

Type of Procurement: Local

ITB Number 2.1

Financial year for the operations of the Procuring agency/Employer: 2026-27
Name of Project : 

Name of financing institution: 

Name and identification number of the Contract: P200199 

ITB Number 3.1

JV/Consortium or Association Allowed: No

Maximum number of members in the joint venture shall be: Nil.

B. Bidding Documents

ITB Number 6.4

The Bidders may seek clarifications through EPADS v2.0: Last Clarification Date: Sunday, December 13, 2026
Pre-Bid Meeting: Tuesday, December 8, 2026 11:00 AM

C. Preparation of Bids

ITB Number 8.1

The Language of all correspondences and documents related to the Bid is: English

ITB Number 5.1 & 9.1 

The following documents must be included to constitute the Bid

 

  1. Technical Bid Volume - I • Section I - Invitation for Bids • Section II - Instruction to Bidders (ITBs); • Section III - Bidding Data Sheet (BDS); • Section IV - Eligible Countries; • Section V – Evaluation and Qualification Criteria; • Section VI – Works Requirements Technical Specifications & Schedule of Requirements;
  2. Technical Bid Volume-I • Section VII – Standard Bidding Forms; • Section VIII – General Conditions of Contract (GCC) ; • Section IX – Special Conditions of Contract (SCC); - Part A – Contract Data; - Part B- Special Provisions; • Section X – Contract Forms
  3. Technical Bid Volume-II Specifications: - Part A – Specific Provisions; - Part B – Technical Provisions.
  4. Technical Bid Voulme-III Bid Drawings.
  5. Financial Bid Volume – IV • Letter of Financial Bid; • Preamble to Bill of Quantities; • Bill of Quantities.

ITB Number 9.4 (b)

Other procurement specific documentation requirements are: 

  1. The applicants must provide “Letter of Award” of in- hand projects and Taking Over/Completion Certificate of completed projects. No marks will be given to the projects for which above letter/certificate is not provided.
  2. Applicant shall provide complete information of the projects including scope, cost and covered area etc.
  3. The applicant must provide verifiable proof of employment for the staff as appointment letters, salary slips for the latest months and attach detailed CVs & valid PEC Registration Certificates / Diploma / Certificates of the Engineer, DAEs staff.
  4. Proportionate marks will be awarded if minimum number of corresponding equipment is less than minimum required.
  5. Applicant must provide an undertaking to the effect that the aforementioned equipment is available with the firm.
  6. The Bidder shall submit copies of annual audit reports for the last three years duly certified by the Chartered Accounts and must indicate the soundness of the Applicants financial position.
 

ITB Number 12.4

The Bid price will be/will not be subject to the price adjustment Yes
Price Adjustment Annexure is attached in the Annexure Section with the name of Adjustment Data
.

ITB Number 12.6

The Bid price shall be adjusted in accordance with Schedule-A to Bid – “Schedule of Adjustment Data” if available. 

ITB Number 13.1

Bidders to quote entirely in Pak rupees (PKR)

Schedule of Adjustment Data for Local Currency (LC)

Index Code Index Description Source of Index Weighting
1 Non-adjustable --- 0.45
2 Labour (Labourer (un-skilled) per day, shall be taken as representative of all types of Labour (skilled/unskilled) deployed at site) Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. 0.24
3 Cement (OPC cement per bag shall be taken as representative of all types of cement used at the site) Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. 0.06
4 Reinforcing Steel (½” Ø round M.S. Bars per tonne shall be taken as representative of all types and diameters of Steel Reinforcement) Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. 0.04
5 Crush/Bajri (rata) (per truck) (100 CFT) (Bajri(rata) shall be taken as representative of all types of coarse aggregates, base course and sub base course) Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. 0.06
6 High Speed Diesel (HSD) ( HSD shall be taken as representative of all kind of fuels used in connection with the Contract) Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. 0.15
Total Pakistan 1.00

ITB Number 15.1

The Bid Validity period shall be 120 Days days.

ITB Number 16.1

The amount of Bid Security shall be ... see section itemd and bid security

The currency of the Bid Security shall be: PKR.

ITB Number 16.2

The Bid Security shall be in the form of: Call at Deposit

D. Submission of Bids

ITB Number 19.1

The deadline for Bid submission is: Wednesday, December 16, 2026 12:00 PM
Address for submission of Original Bid Security: 10, Mauve Area, G-10/4, Islamabad Capital Territory

ITB Number  21.1
The Bid opening shall take place at: EPADS v2.0
Day : Wednesday
Date: December 16, 2026
Time : 12:30 PM

ITB Number 27.1
The currency that shall be used for Bid evaluation and comparison purposes to convert all Bid prices expressed in various currencies is: PKR Only
The source of exchange rate shall be: Nil
The date of exchange rate shall be: Nil

ITB Number 28.2 & 28.5
Least Cost Based Selection (LCBS)

see Evaluation Criteria

ITB Number 29.1
Domestic preference to apply.
Domestic preference: No  
Preference to domestic or national suppliers or contractors shall be provided in accordance with policies of the Federal Government and/or in accordance with the regulations issued by the Authority.
If Yes, The percentage for the domestic preference alongwith calculation formula is provided in the evaluation and qualification criteria.

ITB Number 32.2
Sub-contracting is allowed? : Yes

30 % of the total value of the contract.

39.1    The Performance Security (or guarantee) shall be 10.00%
39.2    The Performance Security (or guarantee) shall be in the form of: Bank Guarantee

Eligibility Criteria

All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.

Required Registration
NADRA CITIZENSHIP (CNIC/NICOP)
FBR (NTN)
FBR (GSTN)
PEC
Eligibility CriteriaDocument
i. Valid registration with PEC in category C-1 and above having CE-09, CE-10, CE-11(i), CE-11(vii), CE-11(ix), EE-04, EE-11(vi), EE-11(vv), EE-11(xvii) and EE-11(xxv) as codes of specialization.Yes
ii. Affidavit of no blacklisting prepared within the current month of submission of bid-ding document.Yes
iii. Information on any litigation or arbitration resulting from contracts completed or un-der execution by the Bidder. In case, the firm has never been involved in litigation, an affidavit to such effect should be providedYes
iv. Registration with income tax department (Valid NTN).Yes
v. Registration with Sales Tax Department (GST/PST).Yes
vi. On Active Tax Payer’s List at the time of submission of Bid.Yes

Evaluation Criteria

Least Cost Based Selection (LCBS)

Weightage

Technical Evaluation %
100
Technical Marks100
Passing Marks75
Experience Record
Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Roads, Earthworks, Area Development/ Area Grading, bridges etc. completed during the last five (05) years or currently in-hand. Completed Projects • 02 marks will be awarded for each completed project having cost > Rs. 1.0 billion maximum up to 04 marks. • 02 marks will be awarded for each completed project having cost from Rs. 700 million to 1.0 billion max-imum up to 04 marks. • No marks will be given for projects having cost less than 700 million. (Qualitative)(Doc Required)8
Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Roads, Earthworks, Area Development/ Area Grading, bridges etc. completed during the last five (05) years or currently in-hand. In-hand Projects • 01 mark will be awarded for each in-hand project having cost > Rs. 1.0 billion maximum up to 02 marks. • 01 mark will be awarded for each in-hand project having cost from Rs. 700 million to Rs. 1.0 billion maximum up to 02 marks. • No marks will be given for projects having cost less than 700 million (Qualitative)(Doc Required)4
Specialized Horticulture and Landscaping Experience Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Parks, Green Belts, beautification, Green Up-gradation, etc. completed during the last five (05) years or currently in-hand. Completed Projects • 04 marks will be awarded for each completed project having cost > Rs. 1.0 billion maximum up to 08 marks • 04 marks will be awarded for each completed project having cost from Rs. 700 million to Rs. 1.0 billion maximum up to 08 marks • No marks will be given for projects having cost less than 700 million. (Qualitative)(Doc Required)16
Specialized Horticulture and Landscaping Experience Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Parks, Green Belts, beautification, Green Up-gradation, etc. completed during the last five (05) years or currently in-hand. In-hand Projects • 03 marks will be awarded for each in-hand project having cost > Rs. 1.0 billion maximum up to 06 marks • 03 marks will be awarded for each in-hand project having cost from Rs. 700 million to Rs. 1.0 billion maximum up to 06 marks. • No marks will be given for projects having cost less than 700 million. (Qualitative)(Doc Required)12
Personnel Capabilities:
Project Manager/ Horticulturist (1) PHD or M.Sc. (Hons) Horticulture with minimum 10 years of relevant Experience to horticulture and landscaping works (Qualitative)(Doc Required)2
Horticulturist (1) B.Sc. (Hons) Horticulture (Landscaping) with minimum 08 years of relevant Experience to horticulture and landscaping works (Qualitative)(Doc Required)1
Civil Engineer 1 B.Sc. Civil Engineering registered with Pakistan Engineering Council (PEC) with minimum 06 years of relevant Experience to infrastructure works. (Qualitative)(Doc Required)2
Electrical Engineer 1 B.Sc. Electrical Engineering registered with Pakistan Engineering Council (PEC) with minimum 06 years of relevant Experience to infrastructure works. (Qualitative)(Doc Required)1
Quantity Surveyor 1 DAE (Civil) with 05 years hands on experience of beautification/up-gradation of horticulture and landscaping works/ infrastructure works (Qualitative)(Doc Required)1
Site Supervisor (Civil) 2 01 Personnel – 01 Mark DAE (Civil) with 05 years hands on experience of beautification/up-gradation of horticulture and landscaping works/ infrastructure works (Qualitative)(Doc Required)2
Site Supervisor (Horticulture & Landscaping) 2 01 Personnel – 01 Mark Diploma/ B.Sc. (Horticulture/ Landscaping) with 03 years hands on experience of beautification/up-gradation of horticulture and landscaping works including gardening and preparation of soft landscaping/green areas. (Qualitative)(Doc Required)2
Surveyor 1 DAE (Civil) with 05 years hands on experience of beautification/up-gradation of horticulture and landscaping works/ infrastructure works (Qualitative)(Doc Required)1
Gardner/Mali 20 01 Personnel – 0.15 Mark Preferably Literate with 05 years’ experience of gardening, horticulture and landscaping works. (Qualitative)(Doc Required)3
Equipment Capabilities
Excavators 02 Nos. (Qualitative)(Doc Required)1
Bull dozer and Wheel/ Crawler Loader 02 Nos. (Qualitative)(Doc Required)1
Dump trucks & Compactor 03 Nos. & Plain 01 No. (Qualitative)(Doc Required)1
Survey Equipment’s Total Station & Auto Level and Concrete mixer Machine , Min.(capacity 2 bag cement) 01 Each (Qualitative)(Doc Required)1
Tractor and trollies & Post Hole Digger 04 Nos. & 04 Nos. (Qualitative)(Doc Required)1
Water bowsers 04 Nos. (Qualitative)(Doc Required)1
Large Capacity Lawn Movers with collector and sweeping attachments 08 Nos (Qualitative)(Doc Required)1
Electrical shrub cutters 04 Nos (Qualitative)(Doc Required)1
Edging shear 04 Nos (Qualitative)(Doc Required)1
Battery powered cordless hedge cutter 02 Nos (Qualitative)(Doc Required)1
Battery operated brush cutter 08 Nos (Qualitative)(Doc Required)1
Grass trimmer & Tree branch cutter 10 Nos & 08 Nos (Qualitative)(Doc Required)1
Water pipe, 0.75” dia & Movable sprinkler with stand (or rain guns) 200 meters &10 Nos (Qualitative)(Doc Required)1
Sprayer, separate for spraying insecticides and anti-termite & Large bins to pile garden debris before garden 04 Nos & 08 Nos (Qualitative)(Doc Required)1
Wheel barrows 40 Nos (Qualitative)(Doc Required)1
Financial Capabilities
Average Annual Turn Over dur-ing the last (03) years. • Max Ten (10) marks shall be awarded if the average annual turnover for last three (03) years ≥ Rs. 01 billion. • Proportional Marks shall be awarded if the average annual turnover during the last three (03) years ≥ Rs. 700 million but ˂ Rs. 01 billion, calculated as: Marks = (Actual Turnover/ Max. Cap) x Max. Marks • For limit less than Rs. 700 million no marks shall be awarded. (Qualitative)(Doc Required)10
Working Capitals • Ten (10) Marks shall be awarded if the working capital for the last year ≥ Rs. 200 million. • Proportional Marks shall be awarded if the working capital for the last year is ≥ Rs. 100 million but ˂ Rs. 200 million, calcu-lated as: Marks = (Actual Working Capital/ Max. Cap) x Max. Marks • For limit less than Rs. 100 million no marks shall be awarded. (Qualitative)(Doc Required)10
Bank Credit Line (The bidder must provide an un-conditional, project specific credit line commitment letter from a scheduled bank in Pakistan on its official letterhead) • Ten (10) marks shall be awarded if the Bank Credit Line ≥ Rs. 250 million. • Proportional Marks shall be awarded if the Bank Credit Line ≥ Rs. 200 million but ˂ Rs. 250 million, calculated as: Marks = (Actual Bank Credit Line/ Max. Cap) x Max. Marks • Zero marks shall be given in case Bank Credit Line is less than Rs. 200 million (Qualitative)(Doc Required)10

Jobs/Lots

Lot Title : LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Bid Security : 28568283 PKR

Job Delivery Schedule Quantity
Civil Works
Address: 10, Mauve Area, G-10/4, Islamabad Capital Territory Schedule: 728 Days Quantity: 1/job
1/job
E/M Works
Address: 10, Mauve Area, G-10/4, Islamabad Capital Territory Schedule: 728 Days Quantity: 1/job
1/job
Horticuture Works
Address: 10, Mauve Area, G-10/4, Islamabad Capital Territory Schedule: 728 Days Quantity: 1/job
1/job

Work Specifications and Market Rates

Lot Title: LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Specifications / Requirements:

Sr. NoRef. No.DescriptionUnitQtyRate Amount
1Ch. 3 / Item 53Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof]1000 Sft22620005292.2One Crore Nineteen Lakh Seventy Thousand Nine Hundred Fifty Six Rupees Only11970956
2Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels]1000 Cft15370008385.7One Crore Twenty Eight Lakh Eighty Eight Thousand Eight Hundred Twenty One Rupees Only12888821
3Ch. 3 / Item 5(ii)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing]1000 Cft153700010856.75One Crore Sixty Six Lakh Eighty Six Thousand Eight Hundred Twenty Five Rupees Only16686825
4NSI / EW-BFFilling to formation level with approved select material borrowed from outside, in layers, watered and compacted.1000 Cft70095015386.45One Crore Seven Lakh Eighty Five Thousand One Hundred Thirty Two Rupees Only10785132
5Ch. 3 / Item 17(a)Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead]1000 Cft 7190.5Zero Rupees Only 
6Ch. 3 / Item 54Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works]1000 Sft22620003479.6Seventy Eight Lakh Seventy Thousand Eight Hundred Fifty Five Rupees Only7870855
7Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing]1000 Cft5589.498069498111147.4Sixty Two Thousand Three Hundred Eight Rupees Only62308
8Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing]100 Cft621.0553410553436029.5Two Lakh Twenty Three Thousand Seven Hundred Sixty Three Rupees Only223763
9Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing]Cft1048.0308880309697.5Seven Lakh Thirty One Thousand Two Rupees Only731002
10Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding]100 Kg2305.66795366830827.85Seven Lakh Ten Thousand Seven Hundred Eighty Eight Rupees Only710788
11Ch. 8 / Item 2(d)(iii)Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall]100 Cft873.3590733590735682.6Three Lakh Eleven Thousand Six Hundred Thirty Seven Rupees Only311637
12Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing]100 Cft1921.3899613938677.7Seven Lakh Forty Three Thousand One Hundred Forty Nine Rupees Only743149
13Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall]100 Cft58.22393822393849085.5Twenty Eight Thousand Five Hundred Eighty Rupees Only28580
14Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall]100 Sft5123.70656370667231.25Three Lakh Seventy Thousand Five Hundred Eight Rupees Only370508
15Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted]1000 Cft3047.052767052811261.3Thirty Four Thousand Three Hundred Fourteen Rupees Only34314
16Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall]Rft465.791505791511587.5Seven Lakh Thirty Nine Thousand Four Hundred Forty Four Rupees Only739444
17Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil]1000 Cft3480011147.4Three Lakh Eighty Seven Thousand Nine Hundred Thirty Rupees Only387930
18Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway]100 Cft1160010874.25Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only1261413
19Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers]100 Cft232003556.7Eight Lakh Twenty Five Thousand One Hundred Fifty Four Rupees Only825154
20Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand]Sft69600231.35One Crore Sixty One Lakh One Thousand Nine Hundred Sixty Rupees Only16101960
21Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3]Rft23200573.35One Crore Thirty Three Lakh One Thousand Seven Hundred Twenty Rupees Only13301720
22Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of cycle-track sub-grade to designed level, in ordinary soil]1000 Cft7733.333333333311147.4Eighty Six Thousand Two Hundred Seven Rupees Only86207
23Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular base course, 1 in thick, under the cycle track]100 Cft3866.666666666710874.25Four Lakh Twenty Thousand Four Hundred Seventy One Rupees Only420471
24Ch. 18 / Item 6Providing and laying bituminous priming coat, using 10 lbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg kerosene and 0.5 Kg binder per square metre. [Ch. 18, Item 6: Providing and laying bituminous priming coat over the granular base of the cycle track]100 Sft464002582.55Eleven Lakh Ninety Eight Thousand Three Hundred Three Rupees Only1198303
25Ch. 18 / Item 10(a)Providing and laying plant premixed bituminous carpet, including compaction and finishing to required camber, grade and density - wearing course, at the bitumen content of the approved Job Mix Formula (rate per inch thickness per 100 Sft, converted to Cft). [Ch. 18, Item 10(a): Providing and laying plant-premixed bituminous carpet wearing course, 1 in thick, to the cycle track, compacted and finished to camber and grade]Cft3866.6666666667931.93Thirty Six Lakh Three Thousand Four Hundred Sixty Three Rupees Only3603463
26Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the cycle track]Rft11600573.35Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only6650860
27NSI / EW-DLPreparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller.100 Sft464001650Seven Lakh Sixty Five Thousand Six Hundred Rupees Only765600
28Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade]100 Cft1160010874.25Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only1261413
29Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track]Rft11600573.35Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only6650860
30COMP / CA-17Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete.Each20363141.15Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only7262823
31Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as bedding under the performance-deck stage]100 Cft418.879020478643556.7Fourteen Thousand Eight Hundred Ninety Eight Rupees Only14898
32Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 4 in thick, as base slab under the stage]100 Cft418.8790204786449085.5Two Lakh Five Thousand Six Hundred Nine Rupees Only205609
33Ch. 10 / Item 22(a)(i)Providing and laying mosaic flooring consisting of one part of cement and marble powder in the ratio of 3:1 and two parts of marble chips, laid over 1" (25 mm) thick flooring of 1:2:4 cement concrete, including rubbing and polishing complete with finishing: 1-3/8" (35 mm) thick mosaic flooring, consisting of 3/8" (10 mm) mosaic topping, using grey cement. [Ch. 10, Item 22(a)(i): Providing and laying 35 mm mosaic / terrazzo flooring with marble chips, including rubbing and polishing, to the stage]100 Sft1256.637061435931412.9Three Lakh Ninety Four Thousand Seven Hundred Forty Six Rupees Only394746
34Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry in cement-sand mortar 1:6 in the concentric seating steps, 2 ft thick x 5 ft high, including dressing of stones and curing]100 Cft9738.937226128438677.7Thirty Seven Lakh Sixty Six Thousand Seven Hundred Ninety Seven Rupees Only3766797
35Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as cap on the masonry seating steps]100 Cft324.6312408709549085.5One Lakh Fifty Nine Thousand Three Hundred Forty Seven Rupees Only159347
36Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing in cement mortar 1:3 to exposed stone-masonry faces of the seating steps]100 Sft4869.46861306427231.25Three Lakh Fifty Two Thousand One Hundred Twenty Three Rupees Only352123
37Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm precast concrete interlocking tuff pavers to the plaza apron around the seating circle]Sft5419.2473274424231.35Twelve Lakh Fifty Three Thousand Seven Hundred Forty Three Rupees Only1253743
38Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the plaza pavers]100 Cft1806.41577581413556.7Sixty Four Thousand Two Hundred Forty Nine Rupees Only64249
39Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Desilting of the bed of the existing natural pond in Zone-3]1000 Cft2430008385.7Twenty Lakh Thirty Seven Thousand Seven Hundred Twenty Five Rupees Only2037725
40Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Excavation of the pond to the enlarged section, 200 ft wide and 8.5 ft deep with 2:1 banks, dressed to the designed section]1000 Cft13677008385.7One Crore Fourteen Lakh Sixty Nine Thousand One Hundred Twenty Two Rupees Only11469122
41Ch. 3 / Item 17(a)Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of the silt and the surplus excavated material of the pond to approved dumping ground]1000 Cft16107007190.5One Crore Fifteen Lakh Eighty One Thousand Seven Hundred Thirty Eight Rupees Only11581738
42Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Clean screened sand, 3 in thick, as filter bedding under the stone pitching of the pond banks]100 Cft15205.2622469993556.7Five Lakh Forty Thousand Eight Hundred Six Rupees Only540806
43Ch. 16 / Item 28Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Stone pitching, 1 ft thick, on the pitched banks of the pond]100 Cft60821.04898799415198.5Ninety Two Lakh Forty Three Thousand Eight Hundred Eighty Seven Rupees Only9243887
44Ch. 16 / Item 28Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Stone pitching, 6 in thick, to the 4 ft wide toe apron at the bottom of the banks]100 Cft640015198.5Nine Lakh Seventy Two Thousand Seven Hundred Four Rupees Only972704
45Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4 in the toe beam, 1 ft 6 in x 1 ft 6 in]100 Cft720049085.5Thirty Five Lakh Thirty Four Thousand One Hundred Fifty Six Rupees Only3534156
46Ch. 16 / Item 34Grouting stone filling or pitching, with bajri. [Ch. 16, Item 34: Grouting of the pitching and the toe apron with bajri]100 Cft67221.0489879943905.7Twenty Six Lakh Twenty Five Thousand Four Hundred Fifty Three Rupees Only2625453
47Ch. 1 / Item 1Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead from the approved source to site (composite of the chain and kilometre rates of the item). [Ch. 1, Item 1: Carriage of stone, aggregate and sand for the pond banks and walkway]100 Cft106692.977901664590Forty Eight Lakh Ninety Seven Thousand Two Hundred Eight Rupees Only4897208
48NSI / EW-DLDressing and levelling of the walkway sub-grade to designed section, with compaction.100 Sft256001650Four Lakh Twenty Two Thousand Four Hundred Rupees Only422400
49Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Sand bedding, 4 in thick, under the walkway]100 Cft8533.33333333333556.7Three Lakh Three Thousand Five Hundred Five Rupees Only303505
50Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4, 4 in thick, as the walkway slab]100 Cft8533.333333333349085.5Forty One Lakh Eighty Eight Thousand Six Hundred Twenty Nine Rupees Only4188629
51Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Tuff-paver wearing surface of the walkway]Sft25600231.35Fifty Nine Lakh Twenty Two Thousand Five Hundred Sixty Rupees Only5922560
52Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Precast edge kerb stone to both edges of the walkway]Rft6400573.35Thirty Six Lakh Sixty Nine Thousand Four Hundred Forty Rupees Only3669440
53Ch. 3 / Item 21, 2(a)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth from 5.1 ft. (1.5 m) to 15 ft. (4.5 m), in ordinary soil. [Ch. 3, Item 21, 2(a)(ii): Excavation in foundation of the weir, its aprons and the stilling basin, 5.1 ft to 15 ft deep]1000 Cft1993613528.2Two Lakh Sixty Nine Thousand Six Hundred Ninety Eight Rupees Only269698
54Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Well-compacted granular fill of stone product, 3 ft thick, under the aprons and the weir base]100 Cft1005010874.25Ten Lakh Ninety Two Thousand Eight Hundred Sixty Two Rupees Only1092862
55Ch. 6 / Item 6(a)(3)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - Type C (nominal mix 1:2:4). [Ch. 6, Item 6(a)(3): Reinforced cement concrete 1:2:4 in the upstream apron and the weir base slab, 8 in thick]Cft1400773.55Ten Lakh Eighty Two Thousand Nine Hundred Seventy Rupees Only1082970
56Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Reinforcement, deformed bars Grade-60, in the apron and base slab]100 Kg308030827.85Nine Lakh Forty Nine Thousand Four Hundred Ninety Eight Rupees Only949498
57Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4 in the downstream apron, 8 in thick]100 Cft833.3333333333349085.5Four Lakh Nine Thousand Forty Six Rupees Only409046
58Ch. 16 / Item 28Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Hand-placed angular hard stone laid in mortar forming the body of the weir (crest 8 ft, base 27 ft, height 10 ft)]100 Cft875015198.5Thirteen Lakh Twenty Nine Thousand Eight Hundred Sixty Nine Rupees Only1329869
59COMP / CA-20Shotcrete facing 6 in thick (1:2:2) to both faces and the crest of the weir.Sft1779.31142241341531.2Twenty Seven Lakh Twenty Four Thousand Four Hundred Eighty Two Rupees Only2724482
60Ch. 16 / Item 27Providing and laying stone pitching / filling, dry hand packed, as filling behind retaining walls or in pitching and aprons. [Ch. 16, Item 27: Dry hand-packed stone fill, 3 ft thick, in the stilling basin, with friction blocks]100 Cft33008234.15Two Lakh Seventy One Thousand Seven Hundred Twenty Seven Rupees Only271727
61Ch. 1 / Item 1Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the shorter lead adopted for the nullah and lake works. [Ch. 1, Item 1: Carriage of stone, aggregate and sand for the weir and its aprons]100 Cft24333.3333333333881.75Nine Lakh Forty Four Thousand Five Hundred Fifty Nine Rupees Only944559
62NSI / EW-DLGround preparation for the plant nursery (244 ft x 200 ft) - clearing, levelling, dressing and compaction.100 Sft488001650Eight Lakh Five Thousand Two Hundred Rupees Only805200
63NSI / EW-DLGround preparation for the fruit nursery (150 ft square) - clearing, levelling, dressing and compaction.100 Sft225001650Three Lakh Seventy One Thousand Two Hundred Fifty Rupees Only371250
64Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation for the footings of the shed posts, in ordinary soil, including refilling and ramming]1000 Cft2199.37511147.4Twenty Four Thousand Five Hundred Seventeen Rupees Only24517
65Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4 in the footings of the shed posts, 1.5 ft x 1.5 ft x 2.5 ft]100 Cft2199.37549085.5Ten Lakh Seventy Nine Thousand Five Hundred Seventy Four Rupees Only1079574
66Ch. 25 / Item 10Fabrication of heavy steel / iron work, with angle, tees, flat iron, round iron and sheet iron for making trusses, girders, tanks, etc., including cutting, drilling, rivetting, handling, assembling and fixing, but excluding erection in position. [Ch. 25, Item 10: Fabrication of the shed structure of G.I. pipes - 2 in posts and 1-1/2 in top runners on both grid lines - cut, welded / clamped, with base and cap fittings]100 Kg20327.136401.6Seventy Three Lakh Ninety Nine Thousand Three Hundred Ninety Rupees Only7399390
67Ch. 25 / Item 11Erection and fitting in position iron trusses, staging of water tanks, etc. [Ch. 25, Item 11: Erection and fitting in position of the shed structure]100 Kg20327.11535.9Three Lakh Twelve Thousand Two Hundred Four Rupees Only312204
68MKT / NS-1Green HDPE shade net over the roof and the four sides of both sheds, stretched and tied to the runners.Sft8618030Twenty Five Lakh Eighty Five Thousand Four Hundred Rupees Only2585400
69Ch. 3 / Item 21, 1(a)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft (1.5 m): 1) depth upto 5 ft (1.5 m) - a) by manual - ii) ordinary soil. [Ch. 3, Item 21, 1(a)(ii): Excavation in foundation of the room, by manual means, in ordinary soil, including refilling, watering and ramming]1000 Cft188017088.2Thirty Two Thousand One Hundred Twenty Six Rupees Only32126
70Ch. 6 / Item 3(b)Cement concrete brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge, in foundation and plinth: (b) ratio 1:4:8. [Ch. 6, Item 3(b): Cement concrete brick / stone ballast 1:4:8 in foundation]100 Cft3536435.6Twelve Thousand Seven Hundred Fifty Two Rupees Only12752
71Ch. 7 / Item 4(i)Pacca brick work in foundation and plinth in: i) cement, sand mortar - ratio 1:3. [Ch. 7, Item 4(i): Pacca brick work in foundation and plinth in cement-sand mortar 1:3]100 Cft16444342.85Seventy Two Thousand Seven Hundred Twenty Two Rupees Only72722
72Ch. 6 / Item 37(b)(ii)Providing and laying damp proof course of cement concrete 1:2:4 (using cement, sand and shingle), including bitumen coating: (b) with 2 coats of bitumen - ii) 2" thick (50 mm). [Ch. 6, Item 37(b)(ii): Damp proof course of cement concrete 1:2:4, 2" thick, with 2 coats of bitumen]100 Sft6214064.3Eight Thousand Seven Hundred Twenty Rupees Only8720
73Ch. 6 / Item 39(b)(2)(b)Providing and laying vertical damp proof course with cement sand plaster and bitumen coating: (b) with 2 coats of bitumen - 2) ratio 1:3 - b) 3/4" thick (20 mm). [Ch. 6, Item 39(b)(2)(b): Vertical damp proof course of cement-sand plaster 1:3, 3/4" thick, with 2 coats of bitumen]100 Sft869434.5Eight Thousand One Hundred Fourteen Rupees Only8114
74Ch. 7 / Item 5(i)Pacca brick work in ground floor: i) cement, sand mortar - ratio 1:4. [Ch. 7, Item 5(i): Pacca brick work in the superstructure (ground floor) in cement-sand mortar 1:4]100 Cft38443384.35One Lakh Sixty Six Thousand Five Hundred Ninety Six Rupees Only166596
75Ch. 3 / Item 15(i)Filling, watering and ramming earth under floors: i) with surplus earth from foundation, etc. [Ch. 3, Item 15(i): Filling, watering and ramming earth under the floor with surplus earth from the foundation]1000 Cft11908155.5Nine Thousand Seven Hundred Five Rupees Only9705
76Ch. 3 / Item 15(ii)Filling, watering and ramming earth under floors: ii) with new earth excavated from outside, lead upto one chain (30 m). [Ch. 3, Item 15(ii): Filling, watering and ramming earth under the floor with new earth from outside, lead upto one chain]1000 Cft39017545.5Six Thousand Eight Hundred Forty Three Rupees Only6843
77Ch. 3 / Item 16(i)Extra for every 50 ft (15 m) additional lead or part thereof: i) for earthwork soft, ordinary, hard and very hard. [Ch. 3, Item 16(i): Extra for additional lead of the new earth - two increments of 50 ft, as priced in the source estimate]1000 Cft78074.25Fifty Eight Rupees Only58
78Ch. 6 / Item 2Dry rammed brick or stone ballast, 1-1/2" to 2" (40 mm to 50 mm) gauge. [Ch. 6, Item 2: Dry rammed brick / stone ballast 1-1/2" to 2" gauge under the floor]100 Cft5014076.5Seven Thousand Thirty Eight Rupees Only7038
79Ch. 6 / Item 5(f)Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4]100 Cft149085.5Four Hundred Ninety One Rupees Only491
80Ch. 6 / Item 5(i)Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (i) ratio 1:4:8. [Ch. 6, Item 5(i): Plain cement concrete 1:4:8 under the floor]100 Cft2536029.5Nine Thousand Seven Rupees Only9007
81Ch. 10 / Item 16(c)Providing and laying topping of cement concrete 1:2:4, including surface finishing and dividing in panels: (c) 1-1/2" (40 mm) thick. [Ch. 10, Item 16(c): Cement concrete 1:2:4 floor topping, 1-1/2" thick, finished and divided in panels]100 Sft9910169.6Ten Thousand Sixty Eight Rupees Only10068
82Ch. 6 / Item 6(a)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (a) reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(a)(2): Reinforced cement concrete Type B (1:1.5:3) in roof slab, beams, columns and lintels]Cft126.07853.15One Lakh Seven Thousand Five Hundred Fifty Seven Rupees Only107557
83Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (c) reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6(a-d) above not requiring form work (i.e. horizontal shuttering) complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Reinforced cement concrete Type B (1:1.5:3) in the raft / strip foundation and plinth beams]Cft90.4697.5Sixty Three Thousand Fifty Four Rupees Only63054
84Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): (b) deformed bars - (ii) Grade-60. [Ch. 6, Item 12(b)(ii): Fabrication of deformed bar reinforcement Grade-60, cut, bent, placed and bound]100 Kg54030827.85One Lakh Sixty Six Thousand Four Hundred Seventy Rupees Only166470
85Ch. 11 / Item 9(c)Cement plaster 1:4 upto 20 ft (6.00 m) height: c) 3/4" (20 mm) thick. [Ch. 11, Item 9(c): Cement plaster 1:4, 3/4" thick, to the walls]100 Sft5146641.3Thirty Four Thousand One Hundred Thirty Six Rupees Only34136
86Ch. 11 / Item 18(a)Cement pointing struck joints, on walls, upto 20 ft (6.00 m) height: a) ratio 1:2. [Ch. 11, Item 18(a): Cement pointing struck joints 1:2 to the external brick faces]100 Sft5585418.05Thirty Thousand Two Hundred Thirty Three Rupees Only30233
87Ch. 11 / Item 12(c)Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slabs only, upto 20 ft height: c) 1:4. [Ch. 11, Item 12(c): Cement plaster 1:4, 3/8" thick, under the soffit of the roof slab]100 Sft2165537.2Eleven Thousand Nine Hundred Sixty Rupees Only11960
88Ch. 9 / Item 5Single layer of tiles 9" x 4-1/2" x 1-1/2" (225 x 113 x 40 mm) laid over 4" (100 mm) earth and 1" (25 mm) mud plaster without bhoosa, grouted with cement sand 1:3 on top of RCC roof slab, provided with 34 lbs per 100 Sft or 1.72 kg/sq.m bitumen coating sand blinded. [Ch. 9, Item 5: Single layer of roof tiles over 4" earth and 1" mud plaster with bitumen coating]100 Sft20114518.05Twenty Nine Thousand One Hundred Eighty One Rupees Only29181
89Ch. 9 / Item 14Khassi parnalas in cement, sand mortar 1:2, 12" (300 mm) outside width finished smooth with a floating coat of neat cement. [Ch. 9, Item 14: Khassi parnalas 12" wide in cement-sand mortar 1:2]Rft12.5279.45Three Thousand Four Hundred Ninety Three Rupees Only3493
90Ch. 9 / Item 15Khuras on roof 2' x 2' x 6" (600 x 600 x 150 mm). [Ch. 9, Item 15: Khuras on roof 2 ft x 2 ft x 6 in]Each11240.85One Thousand Two Hundred Forty One Rupees Only1241
91Ch. 9 / Item 16Bottom khuras of brick masonry in cement mortar 1:6, 4' x 2' x 4-1/2" (1200 x 600 x 113 mm) over 3" (75 mm) cement concrete 1:4:8. [Ch. 9, Item 16: Bottom khuras of brick masonry 4 ft x 2 ft x 4-1/2 in]Each12399.3Two Thousand Three Hundred Ninety Nine Rupees Only2399
92Ch. 11 / Item 26(a)(iii)White washing: a) new surface - iii) three coats. [Ch. 11, Item 26(a)(iii): White washing three coats on new surfaces]100 Sft495971.55Four Thousand Eight Hundred Nine Rupees Only4809
93Ch. 25 / Item 61(ii)P/F iron door comprising of specified leaves made of 1-1/4" x 1-1/4" x 3/16" MS angle iron for leaf frame, diagonal and horizontal braces duly welded with MS sheet 18-SWG i/c the cost of sliding bolt, tower bolt and painting 3-coats but excluding the cost of chowkat, complete in all respect as approved and directed by the Engineer Incharge: (ii) double leaf. [Ch. 25, Item 61(ii): Iron door, double leaf, of M.S. angle frame and 18 SWG sheet, painted, excluding chowkat]Sft281481.9Forty One Thousand Four Hundred Ninety Three Rupees Only41493
94Ch. 12 / Item 17(ii)Providing and fixing 2" wide MS / GI chowkat single / double rebate made of 16 SWG MS sheet pressed / welded / supported with M.S. flat 1-1/4" x 1/8" i/c 6" long M.S. flat 1" x 1/8" hold fasts (6 Nos) welded / screwed, punching of lock hole covered with MS box, coating with antirust paint including filling with cement sand mortar (1:8) and embedding hold fast in cement concrete (1:2:4), complete in all respect as approved and directed by the Engineer Incharge: (ii) 10.5" wide. [Ch. 12, Item 17(ii): M.S. / G.I. pressed-steel chowkat 10.5" wide for the door]Sft28733.4Twenty Thousand Five Hundred Thirty Five Rupees Only20535
95Ch. 25 / Item 45(a)Providing and fixing steel windows using M.S. sheet (16 SWG) moulded tubular pipe 1-1/2" x 1-1/2" (40 x 40 mm) for frame and 1-1/4" x 1-1/4" (30 x 30 mm) for leaves including M.S. square bars 1/4" x 1/4" (6 x 6 mm) welded around each panel of frame, 5 mm thick glass panes fixed with double M.S. square tubular pipe 3/8" x 3/8" (10 x 10 mm) (22 SWG) beading with U-shaped rubber lining, brass fitting, holdfast, including painting three coats complete in all respects: a) for openable panels fixed with wire gauze 24 SWG, 12 x 12 mesh and glass panes 1/4" (6 mm) thick. [Ch. 25, Item 45(a): Steel windows of moulded tubular M.S. sections with wire gauze and glass panes, painted]Sft181345.65Twenty Four Thousand Two Hundred Twenty Two Rupees Only24222
96Ch. 1 / Item 1Carriage of 100 Cft (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead P_TWLEAD from the approved quarry (sum of the kilometre rates of the item: 1st to 10th km, then 69.30 per km). [Ch. 1, Item 1: Carriage of crushed stone aggregate and bajri for the concrete, from the approved quarry]100 Cft2063425.2Seven Thousand Fifty Six Rupees Only7056
97NSI / NB-3Supply and erection of a green shade structure for the nursery - frame with green shade cover, anchored to the ground, complete.Job1200000Two Lakh Rupees Only200000
98NSI / NB-4Supply and fixing of green jali (shade net) in rolls for the nursery beds and the shade structure.Roll515000Seventy Five Thousand Rupees Only75000
99NSI / NB-5Fencing of the nursery area with posts, wire mesh and an entrance gate, complete.Job1300000Three Lakh Rupees Only300000
100NSI / NB-6Construction of a room / store for the nursery, complete with door, window, flooring and finishes.No.2800000Sixteen Lakh Rupees Only1600000
101NSI / NB-19Water bore for the nursery with pump, pipework and electrical connection, complete.Job1600000Six Lakh Rupees Only600000
102NSI / EW-DLPreparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling.100 Sft321692.432428551650Fifty Three Lakh Seven Thousand Nine Hundred Twenty Five Rupees Only5307925
103Ch. 3 / Item 53Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof]1000 Sft22620005292.2One Crore Nineteen Lakh Seventy Thousand Nine Hundred Fifty Six Rupees Only11970956
104Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels]1000 Cft15370008385.7One Crore Twenty Eight Lakh Eighty Eight Thousand Eight Hundred Twenty One Rupees Only12888821
105Ch. 3 / Item 5(ii)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing]1000 Cft153700010856.75One Crore Sixty Six Lakh Eighty Six Thousand Eight Hundred Twenty Five Rupees Only16686825
106NSI / EW-BFFilling to formation level with approved select material borrowed from outside, in layers, watered and compacted.1000 Cft70095015386.45One Crore Seven Lakh Eighty Five Thousand One Hundred Thirty Two Rupees Only10785132
107Ch. 3 / Item 17(a)Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead]1000 Cft 7190.5Zero Rupees Only 
108Ch. 3 / Item 54Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works]1000 Sft22620003479.6Seventy Eight Lakh Seventy Thousand Eight Hundred Fifty Five Rupees Only7870855
109Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing]1000 Cft5589.498069498111147.4Sixty Two Thousand Three Hundred Eight Rupees Only62308
110Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing]100 Cft621.0553410553436029.5Two Lakh Twenty Three Thousand Seven Hundred Sixty Three Rupees Only223763
111Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing]Cft1048.0308880309697.5Seven Lakh Thirty One Thousand Two Rupees Only731002
112Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding]100 Kg2305.66795366830827.85Seven Lakh Ten Thousand Seven Hundred Eighty Eight Rupees Only710788
113Ch. 8 / Item 2(d)(iii)Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall]100 Cft873.3590733590735682.6Three Lakh Eleven Thousand Six Hundred Thirty Seven Rupees Only311637
114Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing]100 Cft1921.3899613938677.7Seven Lakh Forty Three Thousand One Hundred Forty Nine Rupees Only743149
115Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall]100 Cft58.22393822393849085.5Twenty Eight Thousand Five Hundred Eighty Rupees Only28580
116Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall]100 Sft5123.70656370667231.25Three Lakh Seventy Thousand Five Hundred Eight Rupees Only370508
117Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted]1000 Cft3047.052767052811261.3Thirty Four Thousand Three Hundred Fourteen Rupees Only34314
118Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall]Rft465.791505791511587.5Seven Lakh Thirty Nine Thousand Four Hundred Forty Four Rupees Only739444
119Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil]1000 Cft3480011147.4Three Lakh Eighty Seven Thousand Nine Hundred Thirty Rupees Only387930
120Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway]100 Cft1160010874.25Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only1261413
121Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers]100 Cft232003556.7Eight Lakh Twenty Five Thousand One Hundred Fifty Four Rupees Only825154
122Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand]Sft69600231.35One Crore Sixty One Lakh One Thousand Nine Hundred Sixty Rupees Only16101960
123Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3]Rft23200573.35One Crore Thirty Three Lakh One Thousand Seven Hundred Twenty Rupees Only13301720
124NSI / EW-DLPreparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller.100 Sft464001650Seven Lakh Sixty Five Thousand Six Hundred Rupees Only765600
125Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade]100 Cft1160010874.25Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only1261413
126Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track]Rft11600573.35Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only6650860
127COMP / CA-17Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete.Each20363141.15Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only7262823
128NSI / EW-DLPreparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling.100 Sft422234.166795371650Sixty Nine Lakh Sixty Six Thousand Eight Hundred Sixty Four Rupees Only6966864
129Ch. 3 / Item 53Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof]1000 Sft11310005292.2Fifty Nine Lakh Eighty Five Thousand Four Hundred Seventy Eight Rupees Only5985478
130Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels]1000 Cft7685008385.7Sixty Four Lakh Forty Four Thousand Four Hundred Ten Rupees Only6444410
131Ch. 3 / Item 5(ii)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing]1000 Cft76850010856.75Eighty Three Lakh Forty Three Thousand Four Hundred Twelve Rupees Only8343412
132NSI / EW-BFFilling to formation level with approved select material borrowed from outside, in layers, watered and compacted.1000 Cft35047515386.45Fifty Three Lakh Ninety Two Thousand Five Hundred Sixty Six Rupees Only5392566
133Ch. 3 / Item 17(a)Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead]1000 Cft 7190.5Zero Rupees Only 
134Ch. 3 / Item 54Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works]1000 Sft11310003479.6Thirty Nine Lakh Thirty Five Thousand Four Hundred Twenty Eight Rupees Only3935428
135Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing]1000 Cft5589.498069498111147.4Sixty Two Thousand Three Hundred Eight Rupees Only62308
136Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing]100 Cft621.0553410553436029.5Two Lakh Twenty Three Thousand Seven Hundred Sixty Three Rupees Only223763
137Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing]Cft1048.0308880309697.5Seven Lakh Thirty One Thousand Two Rupees Only731002
138Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding]100 Kg2305.66795366830827.85Seven Lakh Ten Thousand Seven Hundred Eighty Eight Rupees Only710788
139Ch. 8 / Item 2(d)(iii)Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall]100 Cft873.3590733590735682.6Three Lakh Eleven Thousand Six Hundred Thirty Seven Rupees Only311637
140Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing]100 Cft1921.3899613938677.7Seven Lakh Forty Three Thousand One Hundred Forty Nine Rupees Only743149
141Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall]100 Cft58.22393822393849085.5Twenty Eight Thousand Five Hundred Eighty Rupees Only28580
142Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall]100 Sft5123.70656370667231.25Three Lakh Seventy Thousand Five Hundred Eight Rupees Only370508
143Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted]1000 Cft3047.052767052811261.3Thirty Four Thousand Three Hundred Fourteen Rupees Only34314
144Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall]Rft465.791505791511587.5Seven Lakh Thirty Nine Thousand Four Hundred Forty Four Rupees Only739444
145Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil]1000 Cft3480011147.4Three Lakh Eighty Seven Thousand Nine Hundred Thirty Rupees Only387930
146Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway]100 Cft1160010874.25Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only1261413
147Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers]100 Cft232003556.7Eight Lakh Twenty Five Thousand One Hundred Fifty Four Rupees Only825154
148Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand]Sft69600231.35One Crore Sixty One Lakh One Thousand Nine Hundred Sixty Rupees Only16101960
149Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3]Rft23200573.35One Crore Thirty Three Lakh One Thousand Seven Hundred Twenty Rupees Only13301720
150NSI / EW-DLPreparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller.100 Sft464001650Seven Lakh Sixty Five Thousand Six Hundred Rupees Only765600
151Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade]100 Cft1160010874.25Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only1261413
152Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track]Rft11600573.35Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only6650860
153COMP / CA-17Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete.Each20363141.15Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only7262823
154NSI / EW-DLPreparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling.100 Sft196034.166795371650Thirty Two Lakh Thirty Four Thousand Five Hundred Sixty Four Rupees Only3234564
155Ch. 3 / Item 53Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof]1000 Sft2730005292.2Fourteen Lakh Forty Four Thousand Seven Hundred Seventy One Rupees Only1444771
156Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels]1000 Cft1855008385.7Fifteen Lakh Fifty Five Thousand Five Hundred Forty Seven Rupees Only1555547
157Ch. 3 / Item 5(ii)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing]1000 Cft18550010856.75Twenty Lakh Thirteen Thousand Nine Hundred Twenty Seven Rupees Only2013927
158NSI / EW-BFFilling to formation level with approved select material borrowed from outside, in layers, watered and compacted.1000 Cft84597.41379310315386.45Thirteen Lakh One Thousand Six Hundred Fifty Four Rupees Only1301654
159Ch. 3 / Item 17(a)Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead]1000 Cft 7190.5Zero Rupees Only 
160Ch. 3 / Item 54Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works]1000 Sft2730003479.6Nine Lakh Forty Nine Thousand Nine Hundred Thirty One Rupees Only949931
161Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing]1000 Cft674.5945945945911147.4Seven Thousand Five Hundred Twenty Rupees Only7520
162Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing]100 Cft74.95495495495536029.5Twenty Seven Thousand Six Rupees Only27006
163Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing]Cft126.48648648649697.5Eighty Eight Thousand Two Hundred Twenty Four Rupees Only88224
164Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding]100 Kg278.2702702702730827.85Eighty Five Thousand Seven Hundred Eighty Five Rupees Only85785
165Ch. 8 / Item 2(d)(iii)Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall]100 Cft105.4054054054135682.6Thirty Seven Thousand Six Hundred Eleven Rupees Only37611
166Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing]100 Cft231.8918918918938677.7Eighty Nine Thousand Six Hundred Ninety Rupees Only89690
167Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall]100 Cft7.02702702702749085.5Three Thousand Four Hundred Forty Nine Rupees Only3449
168Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall]100 Sft618.378378378387231.25Forty Four Thousand Seven Hundred Sixteen Rupees Only44716
169Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted]1000 Cft367.7477477477511261.3Four Thousand One Hundred Forty One Rupees Only4141
170Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall]Rft56.2162162162161587.5Eighty Nine Thousand Two Hundred Forty Three Rupees Only89243
171Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil]1000 Cft420011147.4Forty Six Thousand Eight Hundred Nineteen Rupees Only46819
172Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway]100 Cft140010874.25One Lakh Fifty Two Thousand Two Hundred Forty Rupees Only152240
173Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers]100 Cft28003556.7Ninety Nine Thousand Five Hundred Eighty Eight Rupees Only99588
174Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand]Sft8400231.35Nineteen Lakh Forty Three Thousand Three Hundred Forty Rupees Only1943340
175Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3]Rft2800573.35Sixteen Lakh Five Thousand Three Hundred Eighty Rupees Only1605380
176NSI / EW-DLPreparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller.100 Sft56001650Ninety Two Thousand Four Hundred Rupees Only92400
177Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade]100 Cft140010874.25One Lakh Fifty Two Thousand Two Hundred Forty Rupees Only152240
178Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track]Rft1400573.35Eight Lakh Two Thousand Six Hundred Ninety Rupees Only802690
179COMP / CA-17Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete.Each20363141.15Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only7262823
180NSI / EW-DLPreparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling.100 Sft51412.8270270271650Eight Lakh Forty Eight Thousand Three Hundred Twelve Rupees Only848312
181Ch. 3 / Item 53Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof]1000 Sft11700005292.2Sixty One Lakh Ninety One Thousand Eight Hundred Seventy Four Rupees Only6191874
182Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels]1000 Cft7950008385.7Sixty Six Lakh Sixty Six Thousand Six Hundred Thirty Two Rupees Only6666632
183Ch. 3 / Item 5(ii)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing]1000 Cft79500010856.75Eighty Six Lakh Thirty One Thousand One Hundred Sixteen Rupees Only8631116
184NSI / EW-BFFilling to formation level with approved select material borrowed from outside, in layers, watered and compacted.1000 Cft362560.3448275915386.45Fifty Five Lakh Seventy Eight Thousand Five Hundred Seventeen Rupees Only5578517
185Ch. 3 / Item 17(a)Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead]1000 Cft 7190.5Zero Rupees Only 
186Ch. 3 / Item 54Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works]1000 Sft11700003479.6Forty Lakh Seventy One Thousand One Hundred Thirty Two Rupees Only4071132
187Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing]1000 Cft7516.911196911211147.4Eighty Three Thousand Seven Hundred Ninety Four Rupees Only83794
188Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing]100 Cft835.2123552123636029.5Three Lakh Nine Hundred Twenty Three Rupees Only300923
189Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing]Cft1409.4208494208697.5Nine Lakh Eighty Three Thousand Seventy One Rupees Only983071
190Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding]100 Kg3100.725868725930827.85Nine Lakh Fifty Five Thousand Eight Hundred Eighty Seven Rupees Only955887
191Ch. 8 / Item 2(d)(iii)Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall]100 Cft1174.517374517435682.6Four Lakh Nineteen Thousand Ninety Eight Rupees Only419098
192Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing]100 Cft2583.938223938238677.7Nine Lakh Ninety Nine Thousand Four Hundred Eight Rupees Only999408
193Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall]100 Cft78.30115830115849085.5Thirty Eight Thousand Four Hundred Thirty Five Rupees Only38435
194Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall]100 Sft6890.50193050197231.25Four Lakh Ninety Eight Thousand Two Hundred Sixty Nine Rupees Only498269
195Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted]1000 Cft4097.760617760611261.3Forty Six Thousand One Hundred Forty Six Rupees Only46146
196Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall]Rft626.409266409271587.5Nine Lakh Ninety Four Thousand Four Hundred Twenty Five Rupees Only994425
197Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil]1000 Cft4680011147.4Five Lakh Twenty One Thousand Six Hundred Ninety Eight Rupees Only521698
198Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway]100 Cft1560010874.25Sixteen Lakh Ninety Six Thousand Three Hundred Eighty Three Rupees Only1696383
199Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers]100 Cft312003556.7Eleven Lakh Nine Thousand Six Hundred Ninety Rupees Only1109690
200Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand]Sft93600231.35Two Crore Sixteen Lakh Fifty Four Thousand Three Hundred Sixty Rupees Only21654360
201Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3]Rft31200573.35One Crore Seventy Eight Lakh Eighty Eight Thousand Five Hundred Twenty Rupees Only17888520
202NSI / EW-DLPreparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller.100 Sft624001650Ten Lakh Twenty Nine Thousand Six Hundred Rupees Only1029600
203Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade]100 Cft1560010874.25Sixteen Lakh Ninety Six Thousand Three Hundred Eighty Three Rupees Only1696383
204Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track]Rft15600573.35Eighty Nine Lakh Forty Four Thousand Two Hundred Sixty Rupees Only8944260
205COMP / CA-17Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete.Each20363141.15Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only7262823
206NSI / EW-DLPreparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling.100 Sft193751.272586871650Thirty One Lakh Ninety Six Thousand Eight Hundred Ninety Six Rupees Only3196896
207Ch. 3 / Item 53Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the park site, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof]1000 Sft2286905292.2Twelve Lakh Ten Thousand Two Hundred Seventy Three Rupees Only1210273
208Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Cutting down mounds and ridges inside the park to balance the filling areas, regular excavation dressed to designed section and levels, including haulage within the park]1000 Cft6860708385.7Fifty Seven Lakh Fifty Three Thousand One Hundred Seventy Seven Rupees Only5753177
209Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Earth filling to raise the park, average 3 ft depth over the whole park area, with the material obtained from the park cut, laid in layers, watered and compacted]1000 Cft68607011261.3Seventy Seven Lakh Twenty Six Thousand Forty Rupees Only7726040
210NSI / EW-BFEarth filling with approved select material borrowed from outside - only the shortfall that the site cut cannot balance.1000 Cft 15386.45Zero Rupees Only 
211NSI / EW-DLDressing and levelling of the finished fill surface to designed section, including compaction with power road roller.100 Sft2286901650Thirty Seven Lakh Seventy Three Thousand Three Hundred Eighty Five Rupees Only3773385
212Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the park boundary wall, 3 ft wide x 2 ft 6 in deep, by excavator in ordinary soil]1000 Cft14550.68904593611147.4One Lakh Sixty Two Thousand Two Hundred Two Rupees Only162202
213Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick, as lean course under the wall footing]100 Cft1940.091872791536029.5Six Lakh Ninety Nine Thousand Five Rupees Only699005
214Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 2 ft 6 in wide x 9 in thick, including formwork and curing]Cft3637.6722614841697.5Twenty Five Lakh Thirty Seven Thousand Two Hundred Seventy Six Rupees Only2537276
215Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing]100 Kg8002.87897526530827.85Twenty Four Lakh Sixty Seven Thousand One Hundred Sixteen Rupees Only2467116
216Ch. 8 / Item 2(d)(iii)Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in foundation and upto plinth]100 Cft4365.206713780935682.6Fifteen Lakh Fifty Seven Thousand Six Hundred Nineteen Rupees Only1557619
217Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in the wall above plinth, 4 ft high]100 Cft11640.55123674938677.7Forty Five Lakh Two Thousand Two Hundred Ninety Seven Rupees Only4502297
218Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on the boundary wall]100 Cft485.0229681978849085.5Two Lakh Thirty Eight Thousand Seventy Six Rupees Only238076
219Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the boundary wall]100 Sft15520.7349823327231.25Eleven Lakh Twenty Two Thousand Three Hundred Forty Three Rupees Only1122343
220Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, watered and compacted]1000 Cft4607.718197879911261.3Fifty One Thousand Eight Hundred Eighty Nine Rupees Only51889
221Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of the perimeter walkway sub-grade to designed level]1000 Cft5820.275618374611147.4Sixty Four Thousand Eight Hundred Eighty One Rupees Only64881
222Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the perimeter walkway]100 Cft1940.091872791510874.25Two Lakh Ten Thousand Nine Hundred Seventy Rupees Only210970
223Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the walkway pavers]100 Cft3880.1837455833556.7One Lakh Thirty Eight Thousand Six Rupees Only138006
224Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm precast concrete interlocking tuff pavers, 7000 psi, to the perimeter walkway 6 ft wide, including grouting joints]Sft11640.551236749231.35Twenty Six Lakh Ninety Three Thousand Forty Two Rupees Only2693042
225Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the perimeter walkway]Rft3880.183745583573.35Twenty Two Lakh Twenty Four Thousand Seven Hundred Three Rupees Only2224703
226Ch. 10 / Item 4Providing, laying, watering and ramming brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge mixed with 25% sand, for foundation, complete in all respects. [Ch. 10, Item 4: Providing, laying, watering and ramming compacted granular fill 4 in thick to the internal footpath, 4 ft wide]100 Cft5523.913043478314479.4Seven Lakh Ninety Nine Thousand Eight Hundred Twenty Nine Rupees Only799829
227COMP / CA-16Providing and laying hand-packed rock-stone fill sub-walkway, 1 ft size stone, 3 ft wide, over compacted sub-grade.Sft7457.2826086957153.68Eleven Lakh Forty Six Thousand Thirty Five Rupees Only1146035
228Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Excavation / trimming of the compacted park fill to the stair profile, dressed to designed section]1000 Cft205.055946790728385.7One Thousand Seven Hundred Twenty Rupees Only1720
229Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 3 in thick, as blinding under the stair slab, landings and cheek walls]100 Cft42.34851075025836029.5Fifteen Thousand Two Hundred Fifty Eight Rupees Only15258
230Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair waist slab and top / bottom landings, 6 in thick, including formwork and curing]100 Cft71.32380757938149085.5Thirty Five Thousand Ten Rupees Only35010
231Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair steps (6 in risers x 12 in treads, 8 ft long), broom-finished treads and rounded nosings]100 Cft1249085.5Five Thousand Eight Hundred Ninety Rupees Only5890
232Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair cheek walls, 9 in thick, both sides, including formwork and curing]100 Cft53.49285568453649085.5Twenty Six Thousand Two Hundred Fifty Seven Rupees Only26257
233Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing M.S. stair handrail (box section 1-1/2 in x 3 in with square-bar balusters), both sides, grouted into the cheek walls]Rft15.6619037896911587.5Twenty Four Thousand Eight Hundred Sixty Three Rupees Only24863
234Ch. 3 / Item 7, 1(A)(i)Earthwork excavation in open cutting for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead: upto 5 ft. (1.5 m) depth, by manual, ordinary soil. [Ch. 3, Item 7, 1(A)(i): Earthwork excavation in open cutting upto 5 ft depth for the storm-water pipe trench, including shoring, dressing to designed level and grade and removal of surface water]1000 Cft9700.459363957614409.7One Lakh Thirty Nine Thousand Seven Hundred Eighty One Rupees Only139781
235Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand as bedding and surround to the storm-water pipe]100 Cft2425.11484098943556.7Eighty Six Thousand Two Hundred Fifty Four Rupees Only86254
236Ch. 21 / Item 3(a)(i)Providing and laying R.C.C. pipe sewers, moulded with cement concrete 4000 psi conforming to ASTM Specification C-76-20, specific class, Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing, etc., complete: Class-II, 310 mm (12") i/d. [Ch. 21, Item 3(a)(i): Providing and laying R.C.C. pipe sewer, 310 mm (12 in) internal diameter, Class-II to ASTM C-76, including carriage, lowering in trench to correct alignment and grade, jointing with rubber ring and testing]Rft970.04593639576909.2Eight Lakh Eighty One Thousand Nine Hundred Sixty Six Rupees Only881966
237COMP / CA-19Constructing storm-water manhole 3 ft x 3 ft internal, average 5 ft deep, including excavation, P.C.C. base, brick-masonry chamber rendered inside, R.C.C. cover slab with 6 in R.C.C. cover and frame, steps and benching - complete.Each660761.75Three Lakh Sixty Four Thousand Five Hundred Seventy One Rupees Only364571
238Ch. 21 / Item 6Constructing standard gully grating chamber, 3' x 2-1/2' (900 x 750 mm), with chinaware trap as per PHED Drawing STD/PD No. 3 of 1977, complete in all respects. [Ch. 21, Item 6: Constructing standard gully grating chamber 3 ft x 2 ft 6 in with chinaware trap as per PHED standard drawing, complete in all respects]Each721861.6One Lakh Fifty Three Thousand Thirty One Rupees Only153031
239Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling of the pipe trench with approved excavated material in layers not exceeding 6 in, watered and compacted]1000 Cft7275.344522968211261.3Eighty One Thousand Nine Hundred Thirty Rupees Only81930
240NSI / EW-BFEarth filling with approved select material borrowed from outside - only the shortfall that the site cut cannot balance.1000 Cft100200015386.45One Crore Fifty Four Lakh Seventeen Thousand Two Hundred Twenty Three Rupees Only15417223
241NSI / EW-DLDressing and levelling of the finished fill surface to designed section, including compaction with power road roller.100 Sft3340001650Fifty Five Lakh Eleven Thousand Rupees Only5511000
242Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the park boundary wall, 3 ft wide x 2 ft 6 in deep, by excavator in ordinary soil]1000 Cft1752011147.4One Lakh Ninety Five Thousand Three Hundred Two Rupees Only195302
243Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick, as lean course under the wall footing]100 Cft233636029.5Eight Lakh Forty One Thousand Six Hundred Forty Nine Rupees Only841649
244Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 2 ft 6 in wide x 9 in thick, including formwork and curing]Cft4380697.5Thirty Lakh Fifty Five Thousand Fifty Rupees Only3055050
245Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing]100 Kg963630827.85Twenty Nine Lakh Seventy Thousand Five Hundred Seventy Two Rupees Only2970572
246Ch. 8 / Item 2(d)(iii)Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in foundation and upto plinth]100 Cft525635682.6Eighteen Lakh Seventy Five Thousand Four Hundred Seventy Seven Rupees Only1875477
247Ch. 8 / Item 4(d)(iii)Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in the wall above plinth, 4 ft high]100 Cft1401638677.7Fifty Four Lakh Twenty One Thousand Sixty Six Rupees Only5421066
248Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on the boundary wall]100 Cft58449085.5Two Lakh Eighty Six Thousand Six Hundred Fifty Nine Rupees Only286659
249Ch. 11 / Item 20(c)(ii)Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the boundary wall]100 Sft186887231.25Thirteen Lakh Fifty One Thousand Three Hundred Seventy Six Rupees Only1351376
250Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, watered and compacted]1000 Cft554811261.3Sixty Two Thousand Four Hundred Seventy Eight Rupees Only62478
251Ch. 3 / Item 21, 1(b)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of the perimeter walkway sub-grade to designed level]1000 Cft700811147.4Seventy Eight Thousand One Hundred Twenty One Rupees Only78121
252Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the perimeter walkway]100 Cft233610874.25Two Lakh Fifty Four Thousand Twenty Two Rupees Only254022
253Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the walkway pavers]100 Cft46723556.7One Lakh Sixty Six Thousand One Hundred Sixty Nine Rupees Only166169
254Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm precast concrete interlocking tuff pavers, 7000 psi, to the perimeter walkway 6 ft wide, including grouting joints]Sft14016231.35Thirty Two Lakh Forty Two Thousand Six Hundred Two Rupees Only3242602
255Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the perimeter walkway]Rft4672573.35Twenty Six Lakh Seventy Eight Thousand Six Hundred Ninety One Rupees Only2678691
256Ch. 10 / Item 4Providing, laying, watering and ramming brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge mixed with 25% sand, for foundation, complete in all respects. [Ch. 10, Item 4: Providing, laying, watering and ramming compacted granular fill 4 in thick to the internal footpath, 4 ft wide]100 Cft8067.632850241514479.4Eleven Lakh Sixty Eight Thousand One Hundred Forty Five Rupees Only1168145
257COMP / CA-16Providing and laying hand-packed rock-stone fill sub-walkway, 1 ft size stone, 3 ft wide, over compacted sub-grade.Sft10891.304347826153.68Sixteen Lakh Seventy Three Thousand Seven Hundred Seventy Six Rupees Only1673776
258Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Excavation / trimming of the compacted park fill to the stair profile, dressed to designed section]1000 Cft205.055946790728385.7One Thousand Seven Hundred Twenty Rupees Only1720
259Ch. 6 / Item 5(i)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 3 in thick, as blinding under the stair slab, landings and cheek walls]100 Cft42.34851075025836029.5Fifteen Thousand Two Hundred Fifty Eight Rupees Only15258
260Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair waist slab and top / bottom landings, 6 in thick, including formwork and curing]100 Cft71.32380757938149085.5Thirty Five Thousand Ten Rupees Only35010
261Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair steps (6 in risers x 12 in treads, 8 ft long), broom-finished treads and rounded nosings]100 Cft1249085.5Five Thousand Eight Hundred Ninety Rupees Only5890
262Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair cheek walls, 9 in thick, both sides, including formwork and curing]100 Cft53.49285568453649085.5Twenty Six Thousand Two Hundred Fifty Seven Rupees Only26257
263Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing M.S. stair handrail (box section 1-1/2 in x 3 in with square-bar balusters), both sides, grouted into the cheek walls]Rft15.6619037896911587.5Twenty Four Thousand Eight Hundred Sixty Three Rupees Only24863
264Ch. 3 / Item 7, 1(A)(i)Earthwork excavation in open cutting for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead: upto 5 ft. (1.5 m) depth, by manual, ordinary soil. [Ch. 3, Item 7, 1(A)(i): Earthwork excavation in open cutting upto 5 ft depth for the storm-water pipe trench, including shoring, dressing to designed level and grade and removal of surface water]1000 Cft1168014409.7One Lakh Sixty Eight Thousand Three Hundred Five Rupees Only168305
265Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand as bedding and surround to the storm-water pipe]100 Cft29203556.7One Lakh Three Thousand Eight Hundred Fifty Six Rupees Only103856
266Ch. 21 / Item 3(a)(i)Providing and laying R.C.C. pipe sewers, moulded with cement concrete 4000 psi conforming to ASTM Specification C-76-20, specific class, Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing, etc., complete: Class-II, 310 mm (12") i/d. [Ch. 21, Item 3(a)(i): Providing and laying R.C.C. pipe sewer, 310 mm (12 in) internal diameter, Class-II to ASTM C-76, including carriage, lowering in trench to correct alignment and grade, jointing with rubber ring and testing]Rft1168909.2Ten Lakh Sixty One Thousand Nine Hundred Forty Six Rupees Only1061946
267COMP / CA-19Constructing storm-water manhole 3 ft x 3 ft internal, average 5 ft deep, including excavation, P.C.C. base, brick-masonry chamber rendered inside, R.C.C. cover slab with 6 in R.C.C. cover and frame, steps and benching - complete.Each760761.75Four Lakh Twenty Five Thousand Three Hundred Thirty Two Rupees Only425332
268Ch. 21 / Item 6Constructing standard gully grating chamber, 3' x 2-1/2' (900 x 750 mm), with chinaware trap as per PHED Drawing STD/PD No. 3 of 1977, complete in all respects. [Ch. 21, Item 6: Constructing standard gully grating chamber 3 ft x 2 ft 6 in with chinaware trap as per PHED standard drawing, complete in all respects]Each821861.6One Lakh Seventy Four Thousand Eight Hundred Ninety Three Rupees Only174893
269Ch. 3 / Item 5(i)Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling of the pipe trench with approved excavated material in layers not exceeding 6 in, watered and compacted]1000 Cft876011261.3Ninety Eight Thousand Six Hundred Forty Nine Rupees Only98649
270Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt]Sft10800231.35Twenty Four Lakh Ninety Eight Thousand Five Hundred Eighty Rupees Only2498580
271Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers]100 Cft36003556.7One Lakh Twenty Eight Thousand Forty One Rupees Only128041
272Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt]Sft10800231.35Twenty Four Lakh Ninety Eight Thousand Five Hundred Eighty Rupees Only2498580
273Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers]100 Cft36003556.7One Lakh Twenty Eight Thousand Forty One Rupees Only128041
274Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt]Sft10800231.35Twenty Four Lakh Ninety Eight Thousand Five Hundred Eighty Rupees Only2498580
275Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers]100 Cft36003556.7One Lakh Twenty Eight Thousand Forty One Rupees Only128041
276Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt]Sft1350231.35Three Lakh Twelve Thousand Three Hundred Twenty Three Rupees Only312323
277Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers]100 Cft4503556.7Sixteen Thousand Five Rupees Only16005
278Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt]Sft14850231.35Thirty Four Lakh Thirty Five Thousand Five Hundred Forty Eight Rupees Only3435548
279Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers]100 Cft49503556.7One Lakh Seventy Six Thousand Fifty Seven Rupees Only176057
280COMP / CA-21Supply, fabrication and erection of wicket gate 12'-0" x 7'-0" in the park boundary wall, wide enough for a vehicle - double-leaf wrought-iron grill gate with a pedestrian door in one leaf, hot-dip galvanised and powder-coated, on 100x100x5 mm hollow-box posts in R.C.C. foundations, with lock set, hinges, drop bolts and stoppers - complete.Each1160229.98One Lakh Sixty Thousand Two Hundred Thirty Rupees Only160230
281COMP / CA-22Supply, installation, testing and commissioning of revolving pedestrian entrance gate (full-height three-arm turnstile), hot-dip galvanised and powder-coated steel, on P.C.C. foundation with guide railings to the approach - complete and operational.Each1596619.03Five Lakh Ninety Six Thousand Six Hundred Nineteen Rupees Only596619
282COMP / CA-23Forming vehicle crossing at the wicket gate, 12'-0" wide - mountable kerb and heavy-duty tuff-paver crossing on a granular base with edge beams, so that a fire tender or an ambulance can drive in through the wicket gate.Each189251.6Eighty Nine Thousand Two Hundred Fifty Two Rupees Only89252
283Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the entrance apron at each gate position]Sft800231.35One Lakh Eighty Five Thousand Eighty Rupees Only185080
284Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the gate-apron pavers]100 Cft266.666666666673556.7Nine Thousand Four Hundred Eighty Five Rupees Only9485
285COMP / CA-21Supply, fabrication and erection of wicket gate 12'-0" x 7'-0" in the park boundary wall, wide enough for a vehicle - double-leaf wrought-iron grill gate with a pedestrian door in one leaf, hot-dip galvanised and powder-coated, on 100x100x5 mm hollow-box posts in R.C.C. foundations, with lock set, hinges, drop bolts and stoppers - complete.Each1160229.98One Lakh Sixty Thousand Two Hundred Thirty Rupees Only160230
286COMP / CA-22Supply, installation, testing and commissioning of revolving pedestrian entrance gate (full-height three-arm turnstile), hot-dip galvanised and powder-coated steel, on P.C.C. foundation with guide railings to the approach - complete and operational.Each1596619.03Five Lakh Ninety Six Thousand Six Hundred Nineteen Rupees Only596619
287COMP / CA-23Forming vehicle crossing at the wicket gate, 12'-0" wide - mountable kerb and heavy-duty tuff-paver crossing on a granular base with edge beams, so that a fire tender or an ambulance can drive in through the wicket gate.Each189251.6Eighty Nine Thousand Two Hundred Fifty Two Rupees Only89252
288Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the entrance apron at each gate position]Sft800231.35One Lakh Eighty Five Thousand Eighty Rupees Only185080
289Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the gate-apron pavers]100 Cft266.666666666673556.7Nine Thousand Four Hundred Eighty Five Rupees Only9485
290NSI / EW-DLDressing and levelling of the footpath sub-grade to designed section, including compaction and moistening to optimum moisture content.100 Sft360001650Five Lakh Ninety Four Thousand Rupees Only594000
291Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as bedding under the footpath]100 Cft120003556.7Four Lakh Twenty Six Thousand Eight Hundred Four Rupees Only426804
292Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 4" thick, as the footpath slab, including placing, compacting, finishing and curing]100 Cft1200049085.5Fifty Eight Lakh Ninety Thousand Two Hundred Sixty Rupees Only5890260
293Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi crushing strength, in approved pattern with 50% grey and 50% coloured, over sand cushion, including grouting of joints]Sft36000231.35Eighty Three Lakh Twenty Eight Thousand Six Hundred Rupees Only8328600
294Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone (4" to 6" thick) of 3500 psi compressive strength to both edges of both footpaths, laid in cement-sand mortar 1:3, complete]Rft18000573.35One Crore Three Lakh Twenty Thousand Three Hundred Rupees Only10320300
295Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. safety railing 3'-0" high, main member 76x76x3 mm hollow box section, welded with intermediate members, ON THE TOP SECTION of both banks of the channel, complete in all respects]Rft90001587.5One Crore Forty Two Lakh Eighty Seven Thousand Five Hundred Rupees Only14287500
296Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete ratio 1:1.5:3 in public access steps from footpath level down to the channel (80 Cft per flight), including formwork and finishing]Cft800697.5Five Lakh Fifty Eight Thousand Rupees Only558000
297Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the access steps]100 Kg176030827.85Five Lakh Forty Two Thousand Five Hundred Seventy Rupees Only542570
298NSI / EW-DLDressing and levelling of the footpath sub-grade to designed section, including compaction and moistening to optimum moisture content.100 Sft320001650Five Lakh Twenty Eight Thousand Rupees Only528000
299Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as bedding under the footpath]100 Cft10666.6666666673556.7Three Lakh Seventy Nine Thousand Three Hundred Eighty One Rupees Only379381
300Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 4" thick, as the footpath slab, including placing, compacting, finishing and curing]100 Cft10666.66666666749085.5Fifty Two Lakh Thirty Five Thousand Seven Hundred Eighty Seven Rupees Only5235787
301Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi crushing strength, in approved pattern with 50% grey and 50% coloured, over sand cushion, including grouting of joints]Sft32000231.35Seventy Four Lakh Three Thousand Two Hundred Rupees Only7403200
302Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone (4" to 6" thick) of 3500 psi compressive strength to both edges of both footpaths, laid in cement-sand mortar 1:3, complete]Rft16000573.35Ninety One Lakh Seventy Three Thousand Six Hundred Rupees Only9173600
303Ch. 25 / Item 34Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. safety railing 3'-0" high, main member 76x76x3 mm hollow box section, welded with intermediate members, ON THE TOP SECTION of both banks of the channel, complete in all respects]Rft80001587.5One Crore Twenty Seven Lakh Rupees Only12700000
304Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete ratio 1:1.5:3 in public access steps from footpath level down to the channel (80 Cft per flight), including formwork and finishing]Cft640697.5Four Lakh Forty Six Thousand Four Hundred Rupees Only446400
305Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the access steps]100 Kg140830827.85Four Lakh Thirty Four Thousand Fifty Six Rupees Only434056
306Ch. 3 / Item 53Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the lake margin and of the corridor of the perimeter walkway, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof]1000 Sft179555292.2Ninety Five Thousand Twenty One Rupees Only95021
307Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Desilting and re-profiling of the bed of the existing lake, average 2'-0" deep, including dressing to the designed profile and disposal of the silt within the measured lead]1000 Cft1415708385.7Eleven Lakh Eighty Seven Thousand One Hundred Sixty Four Rupees Only1187164
308Ch. 3 / Item 6Regular excavation dressed. [Ch. 3, Item 6: Excavation and trimming of the lake bank to the designed 1:2 batter, 12'-0" high, dressed to section and levels]1000 Cft340208385.7Two Lakh Eighty Five Thousand Two Hundred Eighty Two Rupees Only285282
309Ch. 3 / Item 17(a)Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of silt and surplus excavated material of all types to approved dumping ground, total distance upto 5 km lead]1000 Cft1755907190.5Twelve Lakh Sixty Two Thousand Five Hundred Eighty Rupees Only1262580
310Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 3" thick, as filter bedding under the stone pitching of the lake bank]100 Cft3169.6263581063556.7One Lakh Twelve Thousand Seven Hundred Thirty Four Rupees Only112734
311Ch. 16 / Item 28Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Providing and laying stone pitching, 1'-0" thick, with hammer-dressed stones laid in courses on the prepared 1:2 slope of the lake bank, complete in all respects]100 Cft12678.50543242415198.5Nineteen Lakh Twenty Six Thousand Nine Hundred Forty Three Rupees Only1926943
312Ch. 16 / Item 28Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Providing and laying stone pitching, 6" thick, to the 4'-0" wide toe apron at the bottom of the pitched slope]100 Cft189015198.5Two Lakh Eighty Seven Thousand Two Hundred Fifty Two Rupees Only287252
313Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4 in the toe beam under the apron, 1'-6" x 1'-6", including formwork, compacting, finishing and curing]100 Cft2126.2549085.5Ten Lakh Forty Three Thousand Six Hundred Eighty Rupees Only1043680
314Ch. 16 / Item 34Grouting stone filling or pitching, with bajri. [Ch. 16, Item 34: Grouting of the stone pitching and the toe apron with bajri]100 Cft14568.5054324243905.7Five Lakh Sixty Nine Thousand Two Rupees Only569002
315Ch. 1 / Item 1Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead from the approved source to site (composite of the chain and kilometre rates of the item). [Ch. 1, Item 1: Carriage of stone, aggregate, sand and other materials for the lake pitching, toe and walkway]100 Cft24904.381790534590Eleven Lakh Forty Three Thousand One Hundred Eleven Rupees Only1143111
316NSI / EW-DLDressing and levelling of the walkway sub-grade to designed section, including compaction and moistening to optimum moisture content.100 Sft75601650One Lakh Twenty Four Thousand Seven Hundred Forty Rupees Only124740
317Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as bedding under the walkway]100 Cft25203556.7Eighty Nine Thousand Six Hundred Twenty Nine Rupees Only89629
318Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 4" thick, as the walkway slab, including placing, compacting, finishing and curing]100 Cft252049085.5Twelve Lakh Thirty Six Thousand Nine Hundred Fifty Five Rupees Only1236955
319Ch. 10 / Item 44Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi crushing strength, in approved pattern, over sand cushion, including grouting of joints]Sft7560231.35Seventeen Lakh Forty Nine Thousand Six Rupees Only1749006
320Ch. 10 / Item 45Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone (4" to 6" thick) of 3500 psi compressive strength to both edges of the walkway, laid in cement-sand mortar 1:3, complete]Rft1890573.35Ten Lakh Eighty Three Thousand Six Hundred Thirty Two Rupees Only1083632
321Ch. 3 / Item 21, 2(a)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth from 5.1 ft. (1.5 m) to 15 ft. (4.5 m), in ordinary soil. [Ch. 3, Item 21, 2(a)(ii): Excavation in foundation of the weir, its aprons and the stilling basin, from 5.1 ft to 15 ft depth, by excavator, in ordinary soil, including dagbelling, dressing and refilling around the structure]1000 Cft925613528.2One Lakh Twenty Five Thousand Two Hundred Seventeen Rupees Only125217
322Ch. 18 / Item 3(a)(ii)Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying well-compacted granular fill of stone product of approved quality, 3'-0" thick, under the aprons and the weir base, including placing, spreading and compaction to specified density]100 Cft402010874.25Four Lakh Thirty Seven Thousand One Hundred Forty Five Rupees Only437145
323Ch. 6 / Item 6(a)(3)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - Type C (nominal mix 1:2:4). [Ch. 6, Item 6(a)(3): Providing and laying reinforced cement concrete ratio 1:2:4, 8" thick, in the upstream apron and the weir base slab, including formwork, compacting, finishing and curing]Cft560773.55Four Lakh Thirty Three Thousand One Hundred Eighty Eight Rupees Only433188
324Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-40 in the apron and base slab, including cutting, bending, laying in position and binding]100 Kg123230827.85Three Lakh Seventy Nine Thousand Seven Hundred Ninety Nine Rupees Only379799
325Ch. 6 / Item 5(f)Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 8" thick, in the downstream apron, including compacting, finishing and curing]100 Cft333.3333333333349085.5One Lakh Sixty Three Thousand Six Hundred Eighteen Rupees Only163618
326Ch. 16 / Item 28Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Providing and laying hand-placed angular hard stone of toughness more than 1,500 psi, set in mortar, forming the body of the stone-fill weir (crest 8'-0", base 27'-0", height 10'-0"), complete in all respects]100 Cft350015198.5Five Lakh Thirty One Thousand Nine Hundred Forty Eight Rupees Only531948
327COMP / CA-20Providing and applying 6" thick shotcrete (1:2:2) to both faces and the crest of the weir, including #1 stainless steel re-bars at 6" centres both ways, surface preparation, nozzle work, rebound allowance and curing, complete.Sft711.724568965351531.2Ten Lakh Eighty Nine Thousand Seven Hundred Ninety Three Rupees Only1089793
328Ch. 16 / Item 27Providing and laying stone pitching / filling, dry hand packed, as filling behind retaining walls or in pitching and aprons. [Ch. 16, Item 27: Providing and laying dry hand-packed stone fill, 3'-0" thick, in the stilling basin downstream of the apron, including 12" friction blocks at 5'-0" centres, complete]100 Cft13208234.15One Lakh Eight Thousand Six Hundred Ninety One Rupees Only108691
329Ch. 1 / Item 1Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the shorter lead adopted for the nullah and lake works. [Ch. 1, Item 1: Carriage of stone, aggregate, sand and other materials for the weir, its aprons and the stilling basin]100 Cft9733.33333333333881.75Three Lakh Seventy Seven Thousand Eight Hundred Twenty Four Rupees Only377824
330Ch. 3 / Item 2Earthwork excavation in ashes, sand and soft soil or silt clearance, undressed lead upto 50 ft (15 metre) through mechanical means. [Ch. 3, Item 2: Earthwork excavation for the water storage pit 35 ft x 25 ft x 5 ft at each well, undressed, lead upto 50 ft]1000 Cft218758932.7One Lakh Ninety Five Thousand Four Hundred Three Rupees Only195403
331Ch. 23 / Item 2(a)(i)Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (a) from ground level to 250 ft (75 m) below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(a)(i): Direct / reverse rotary drilling of the bore, 15" to 18" i/d, from ground level to 250 ft]Rft1250956.3Eleven Lakh Ninety Five Thousand Three Hundred Seventy Five Rupees Only1195375
332Ch. 23 / Item 2(b)(i)Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (b) exceeding 250 ft (75 m) depth below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(b)(i): Direct / reverse rotary drilling of the bore, 15" to 18" i/d, below 250 ft to the full depth]Rft17501050.55Eighteen Lakh Thirty Eight Thousand Four Hundred Sixty Three Rupees Only1838463
333Ch. 23 / Item 12(g)Providing and installing M.S. blind pipe socketed / welded joint, M.S. reducer (where necessary), in tubewell bore hole, including jointing / welding with strainer, etc. complete: (g) 8" i/d, 3/16" (200 mm i/d, 5 mm) thick. [Ch. 23, Item 12(g): M.S. blind pipe 8" i/d, 3/16" thick, socketed / welded, in the bore hole (replaces the FRP blank pipe of the source)]Rft27003537.8Ninety Five Lakh Fifty Two Thousand Sixty Rupees Only9552060
334Ch. 23 / Item 9(v)Providing and installing Fiberglass Reinforced Polypropelene (FRP) strainer of specified wall thickness having slot size of 0.9 mm to 1.10 mm in tubewell borehole i/c the cost of male / female coupling with nylone strip, studs complete in all respect as approved and directed by the Engineer Incharge: (v) 8" dia (5 mm thickness). [Ch. 23, Item 9(v): FRP strainer 8" dia, 5 mm wall, slot 0.9 - 1.10 mm, in the bore hole]Rft2502650.4Six Lakh Sixty Two Thousand Six Hundred Rupees Only662600
335Ch. 23 / Item 10(v)Providing and installing Fiber glass Reinforced Polypropelene (FRP) bail plug of specified wall thickness in tubewell bore hole i/c the cost of male / female coupling with nylone strip, studs complete in all respect as approved and directed by the Engineer Incharge: (v) 8" dia (5 mm thickness). [Ch. 23, Item 10(v): FRP bail plug 8" dia, 5 mm wall, at the bottom of the assembly]Rft502495.4One Lakh Twenty Four Thousand Seven Hundred Seventy Rupees Only124770
336Ch. 23 / Item 17Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3 mm), around tubewell in bore hole (including wastage etc.). [Ch. 23, Item 17: Shrouding with graded pea gravel 3/8" to 1/8" around the well assembly]Cft4140189.3Seven Lakh Eighty Three Thousand Seven Hundred Two Rupees Only783702
337Ch. 23 / Item 31Providing & mixing bentonite clay / powder having swelling factor of 1200% for lining / seal and plug earthen bore holes / ponds in the specified ratio conforming to IS:6186 for stabilization of soil as specified by the designer etc. complete in all respect. [Ch. 23, Item 31: Bentonite clay / powder for the seal and plug of the bore hole]Pound528013.2Sixty Nine Thousand Six Hundred Ninety Six Rupees Only69696
338Ch. 23 / Item 13(a)(i)Providing and installing P.V.C. blind pipe, B.S.S., in tubewell bore hole, including sockets and solvents and jointing with strainer (PS-3051 = BS-3505), etc. complete: (a) Class-B (6 bar) - (i) 3" i/d (75 mm). [Ch. 23, Item 13(a)(i): P.V.C. blind pipe Class-B 3" i/d for gravel feeding]Rft150401.5Sixty Thousand Two Hundred Twenty Five Rupees Only60225
339Ch. 23 / Item 16(i)Testing and developing of tubewell of size 6" (150 mm) i/d and above continuously: (i) upto 1.5 cs discharge. [Ch. 23, Item 16(i): Testing and developing of the tube well continuously (discharge upto 1.5 cusec), including the long-duration pumping test]Hour1003195.35Three Lakh Nineteen Thousand Five Hundred Thirty Five Rupees Only319535
340NSI / TW-N1Taking samples of the strata at every 5 ft, with construction charts and analysis.Each600202One Lakh Twenty One Thousand Two Hundred Rupees Only121200
341NSI / TW-N2Geophysical logging of the bore.Job563180Three Lakh Fifteen Thousand Nine Hundred Rupees Only315900
342NSI / TW-N3M.S. centralizers.Each752906Two Lakh Seventeen Thousand Nine Hundred Fifty Rupees Only217950
343NSI / TW-N4Chemical and physical analysis of water samples after every 24 hours of pumping.Job1017021One Lakh Seventy Thousand Two Hundred Ten Rupees Only170210
344NSI / TW-N5M.S. cap 8" dia, 1/4" thick.Each52249Eleven Thousand Two Hundred Forty Five Rupees Only11245
345NSI / TW-N6Submersible pump set 0.25 cfs, head 250 ft, with motor, cable and motor control unit, installed, tested and commissioned.Each52039040One Crore One Lakh Ninety Five Thousand Two Hundred Rupees Only10195200
346NSI / TW-N7Hypo-chlorinator with dosing pump and controller.Job5150841.2Seven Lakh Fifty Four Thousand Two Hundred Six Rupees Only754206
347Ch. 3 / Item 2Earthwork excavation in ashes, sand and soft soil or silt clearance, undressed lead upto 50 ft (15 metre) through mechanical means. [Ch. 3, Item 2: Earthwork excavation for the water pit 35 ft x 25 ft x 5 ft at each trial bore, undressed, lead upto 50 ft]1000 Cft437508932.7Three Lakh Ninety Thousand Eight Hundred Six Rupees Only390806
348Ch. 23 / Item 2(a)(i)Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (a) from ground level to 250 ft (75 m) below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(a)(i): Direct / reverse rotary drilling of the trial bore, 15" to 18" i/d, from ground level to 250 ft]Rft2500956.3Twenty Three Lakh Ninety Thousand Seven Hundred Fifty Rupees Only2390750
349Ch. 23 / Item 2(b)(i)Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (b) exceeding 250 ft (75 m) depth below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(b)(i): Direct / reverse rotary drilling of the trial bore, 15" to 18" i/d, below 250 ft to the full depth]Rft35001050.55Thirty Six Lakh Seventy Six Thousand Nine Hundred Twenty Five Rupees Only3676925
350Ch. 10 / Item 3Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling sand for plugging the trial bore after logging and sampling]100 Cft106203556.7Three Lakh Seventy Seven Thousand Seven Hundred Twenty Two Rupees Only377722
351NSI / TW-N1Taking samples of the strata at every 5 ft, with construction charts and analysis.Each1200202Two Lakh Forty Two Thousand Four Hundred Rupees Only242400
352NSI / TW-N2Geophysical logging of the trial bore.Job1063180Six Lakh Thirty One Thousand Eight Hundred Rupees Only631800
353NSI / TW-N4Chemical and physical analysis of the water sample.Job1017021One Lakh Seventy Thousand Two Hundred Ten Rupees Only170210
354Ch. 3 / Item 21, 1(a)(ii)Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft (1.5 m): 1) depth upto 5 ft (1.5 m) - a) by manual - ii) ordinary soil. [Ch. 3, Item 21, 1(a)(ii): Excavation in foundation of the room, by manual means, in ordinary soil, including refilling, watering and ramming]1000 Cft940017088.2One Lakh Sixty Thousand Six Hundred Twenty Nine Rupees Only160629
355Ch. 6 / Item 3(b)Cement concrete brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge, in foundation and plinth: (b) ratio 1:4:8. [Ch. 6, Item 3(b): Cement concrete brick / stone ballast 1:4:8 in foundation]100 Cft17536435.6Sixty Three Thousand Seven Hundred Sixty Two Rupees Only63762
356Ch. 7 / Item 4(i)Pacca brick work in foundation and plinth in: i) cement, sand mortar - ratio 1:3. [Ch. 7, Item 4(i): Pacca brick work in foundation and plinth in cement-sand mortar 1:3]100 Cft82044342.85Three Lakh Sixty Three Thousand Six Hundred Eleven Rupees Only363611
357Ch. 6 / Item 37(b)(ii)Providing and laying damp proof course of cement concrete 1:2:4 (using cement, sand and shingle), including bitumen coating: (b) with 2 coats of bitumen - ii) 2" thick (50 mm). [Ch. 6, Item 37(b)(ii): Damp proof course of cement concrete 1:2:4, 2" thick, with 2 coats of bitumen]100 Sft31014064.3Forty Three Thousand Five Hundred Ninety Nine Rupees Only43599
358Ch. 6 / Item 39(b)(2)(b)Providing and laying vertical damp proof course with cement sand plaster and bitumen coating: (b) with 2 coats of bitumen - 2) ratio 1:3 - b) 3/4" thick (20 mm). [Ch. 6, Item 39(b)(2)(b): Vertical damp proof course of cement-sand plaster 1:3, 3/4" thick, with 2 coats of bitumen]100 Sft4309434.5Forty Thousand Five Hundred Sixty Eight Rupees Only40568
359Ch. 7 / Item 5(i)Pacca brick work in ground floor: i) cement, sand mortar - ratio 1:4. [Ch. 7, Item 5(i): Pacca brick work in the superstructure (ground floor) in cement-sand mortar 1:4]100 Cft192043384.35Eight Lakh Thirty Two Thousand Nine Hundred Eighty Rupees Only832980
360Ch. 3 / Item 15(i)Filling, watering and ramming earth under floors: i) with surplus earth from foundation, etc. [Ch. 3, Item 15(i): Filling, watering and ramming earth under the floor with surplus earth from the foundation]1000 Cft59508155.5Forty Eight Thousand Five Hundred Twenty Five Rupees Only48525
361Ch. 3 / Item 15(ii)Filling, watering and ramming earth under floors: ii) with new earth excavated from outside, lead upto one chain (30 m). [Ch. 3, Item 15(ii): Filling, watering and ramming earth under the floor with new earth from outside, lead upto one chain]1000 Cft195017545.5Thirty Four Thousand Two Hundred Fourteen Rupees Only34214
362Ch. 3 / Item 16(i)Extra for every 50 ft (15 m) additional lead or part thereof: i) for earthwork soft, ordinary, hard and very hard. [Ch. 3, Item 16(i): Extra for additional lead of the new earth - two increments of 50 ft, as priced in the source estimate]1000 Cft390074.25Two Hundred Ninety Rupees Only290
363Ch. 6 / Item 2Dry rammed brick or stone ballast, 1-1/2" to 2" (40 mm to 50 mm) gauge. [Ch. 6, Item 2: Dry rammed brick / stone ballast 1-1/2" to 2" gauge under the floor]100 Cft25014076.5Thirty Five Thousand One Hundred Ninety One Rupees Only35191
364Ch. 6 / Item 5(f)Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4]100 Cft549085.5Two Thousand Four Hundred Fifty Four Rupees Only2454
365Ch. 6 / Item 5(i)Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (i) ratio 1:4:8. [Ch. 6, Item 5(i): Plain cement concrete 1:4:8 under the floor]100 Cft12536029.5Forty Five Thousand Thirty Seven Rupees Only45037
366Ch. 10 / Item 16(c)Providing and laying topping of cement concrete 1:2:4, including surface finishing and dividing in panels: (c) 1-1/2" (40 mm) thick. [Ch. 10, Item 16(c): Cement concrete 1:2:4 floor topping, 1-1/2" thick, finished and divided in panels]100 Sft49510169.6Fifty Thousand Three Hundred Forty Rupees Only50340
367Ch. 6 / Item 6(a)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (a) reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(a)(2): Reinforced cement concrete Type B (1:1.5:3) in roof slab, beams, columns and lintels]Cft630.35853.15Five Lakh Thirty Seven Thousand Seven Hundred Eighty Three Rupees Only537783
368Ch. 6 / Item 6(c)(2)Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (c) reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6(a-d) above not requiring form work (i.e. horizontal shuttering) complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Reinforced cement concrete Type B (1:1.5:3) in the raft / strip foundation and plinth beams]Cft452697.5Three Lakh Fifteen Thousand Two Hundred Seventy Rupees Only315270
369Ch. 6 / Item 12(b)(ii)Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): (b) deformed bars - (ii) Grade-60. [Ch. 6, Item 12(b)(ii): Fabrication of deformed bar reinforcement Grade-60, cut, bent, placed and bound]100 Kg270030827.85Eight Lakh Thirty Two Thousand Three Hundred Fifty Two Rupees Only832352
370Ch. 11 / Item 9(c)Cement plaster 1:4 upto 20 ft (6.00 m) height: c) 3/4" (20 mm) thick. [Ch. 11, Item 9(c): Cement plaster 1:4, 3/4" thick, to the walls]100 Sft25706641.3One Lakh Seventy Thousand Six Hundred Eighty One Rupees Only170681
371Ch. 11 / Item 18(a)Cement pointing struck joints, on walls, upto 20 ft (6.00 m) height: a) ratio 1:2. [Ch. 11, Item 18(a): Cement pointing struck joints 1:2 to the external brick faces]100 Sft27905418.05One Lakh Fifty One Thousand One Hundred Sixty Four Rupees Only151164
372Ch. 11 / Item 12(c)Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slabs only, upto 20 ft height: c) 1:4. [Ch. 11, Item 12(c): Cement plaster 1:4, 3/8" thick, under the soffit of the roof slab]100 Sft10805537.2Fifty Nine Thousand Eight Hundred Two Rupees Only59802
373Ch. 9 / Item 5Single layer of tiles 9" x 4-1/2" x 1-1/2" (225 x 113 x 40 mm) laid over 4" (100 mm) earth and 1" (25 mm) mud plaster without bhoosa, grouted with cement sand 1:3 on top of RCC roof slab, provided with 34 lbs per 100 Sft or 1.72 kg/sq.m bitumen coating sand blinded. [Ch. 9, Item 5: Single layer of roof tiles over 4" earth and 1" mud plaster with bitumen coating]100 Sft100514518.05One Lakh Forty Five Thousand Nine Hundred Six Rupees Only145906
374Ch. 9 / Item 14Khassi parnalas in cement, sand mortar 1:2, 12" (300 mm) outside width finished smooth with a floating coat of neat cement. [Ch. 9, Item 14: Khassi parnalas 12" wide in cement-sand mortar 1:2]Rft62.5279.45Seventeen Thousand Four Hundred Sixty Six Rupees Only17466
375Ch. 9 / Item 15Khuras on roof 2' x 2' x 6" (600 x 600 x 150 mm). [Ch. 9, Item 15: Khuras on roof 2 ft x 2 ft x 6 in]Each51240.85Six Thousand Two Hundred Four Rupees Only6204
376Ch. 9 / Item 16Bottom khuras of brick masonry in cement mortar 1:6, 4' x 2' x 4-1/2" (1200 x 600 x 113 mm) over 3" (75 mm) cement concrete 1:4:8. [Ch. 9, Item 16: Bottom khuras of brick masonry 4 ft x 2 ft x 4-1/2 in]Each52399.3Eleven Thousand Nine Hundred Ninety Seven Rupees Only11997
377Ch. 11 / Item 26(a)(iii)White washing: a) new surface - iii) three coats. [Ch. 11, Item 26(a)(iii): White washing three coats on new surfaces]100 Sft2475971.55Twenty Four Thousand Forty Six Rupees Only24046
378Ch. 25 / Item 61(ii)P/F iron door comprising of specified leaves made of 1-1/4" x 1-1/4" x 3/16" MS angle iron for leaf frame, diagonal and horizontal braces duly welded with MS sheet 18-SWG i/c the cost of sliding bolt, tower bolt and painting 3-coats but excluding the cost of chowkat, complete in all respect as approved and directed by the Engineer Incharge: (ii) double leaf. [Ch. 25, Item 61(ii): Iron door, double leaf, of M.S. angle frame and 18 SWG sheet, painted, excluding chowkat]Sft1401481.9Two Lakh Seven Thousand Four Hundred Sixty Six Rupees Only207466
379Ch. 12 / Item 17(ii)Providing and fixing 2" wide MS / GI chowkat single / double rebate made of 16 SWG MS sheet pressed / welded / supported with M.S. flat 1-1/4" x 1/8" i/c 6" long M.S. flat 1" x 1/8" hold fasts (6 Nos) welded / screwed, punching of lock hole covered with MS box, coating with antirust paint including filling with cement sand mortar (1:8) and embedding hold fast in cement concrete (1:2:4), complete in all respect as approved and directed by the Engineer Incharge: (ii) 10.5" wide. [Ch. 12, Item 17(ii): M.S. / G.I. pressed-steel chowkat 10.5" wide for the door]Sft140733.4One Lakh Two Thousand Six Hundred Seventy Six Rupees Only102676
380Ch. 25 / Item 45(a)Providing and fixing steel windows using M.S. sheet (16 SWG) moulded tubular pipe 1-1/2" x 1-1/2" (40 x 40 mm) for frame and 1-1/4" x 1-1/4" (30 x 30 mm) for leaves including M.S. square bars 1/4" x 1/4" (6 x 6 mm) welded around each panel of frame, 5 mm thick glass panes fixed with double M.S. square tubular pipe 3/8" x 3/8" (10 x 10 mm) (22 SWG) beading with U-shaped rubber lining, brass fitting, holdfast, including painting three coats complete in all respects: a) for openable panels fixed with wire gauze 24 SWG, 12 x 12 mesh and glass panes 1/4" (6 mm) thick. [Ch. 25, Item 45(a): Steel windows of moulded tubular M.S. sections with wire gauze and glass panes, painted]Sft901345.65One Lakh Twenty One Thousand One Hundred Nine Rupees Only121109
381Ch. 25 / Item 10Fabrication of heavy steel / iron work, with angle, tees, flat iron, round iron and sheet iron for making trusses, girders, tanks, etc., including cutting, drilling, revitting, handling, assembling and fixing, but excluding erection in position. [Ch. 25, Item 10: Fabrication of heavy steel work for the well top cover, base plate and lifting girder]100 Kg166036401.6Six Lakh Four Thousand Two Hundred Sixty Seven Rupees Only604267
382Ch. 25 / Item 11Erection and fitting in position iron trusses, staging of water tanks, etc. [Ch. 25, Item 11: Erection and fitting in position of the steel work above]100 Kg16601535.9Twenty Five Thousand Four Hundred Ninety Six Rupees Only25496
383Ch. 23 / Item 52Providing and fixing chain pulley block of 5 ton capacity with 5 metre length of chain, as per required specifications complete in all respect and as approved by the Engineer Incharge. [Ch. 23, Item 52: Chain pulley block of 5 ton capacity with 5 m chain]Each553030Two Lakh Sixty Five Thousand One Hundred Fifty Rupees Only265150
384Ch. 1 / Item 1Carriage of 100 Cft (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead P_TWLEAD from the approved quarry (sum of the kilometre rates of the item: 1st to 10th km, then 69.30 per km). [Ch. 1, Item 1: Carriage of crushed stone aggregate and bajri for the concrete, from the approved quarry]100 Cft10303425.2Thirty Five Thousand Two Hundred Eighty Rupees Only35280
385NSI / TE-C1Wiring of light / fan points from the switch, in concealed PVC pipe, with switches and boxes.Each152720Forty Thousand Eight Hundred Rupees Only40800
386NSI / TE-C2Circuit wiring from the MCB board to the gang switch board, 3 x 2.5 sq.mm in PVC conduit.Each58871Forty Four Thousand Three Hundred Fifty Five Rupees Only44355
387NSI / TE-C3Wiring from one light point to another light point.Each102246Twenty Two Thousand Four Hundred Sixty Rupees Only22460
388NSI / TE-C45 A switch socket unit wired with 3 x 4 sq.mm cable in concealed conduit.Each510838Fifty Four Thousand One Hundred Ninety Rupees Only54190
389NSI / TE-C5Wiring from one socket to another socket with 3 x 2.5 sq.mm cable.Each55914Twenty Nine Thousand Five Hundred Seventy Rupees Only29570
390NSI / TE-C615/20 A switch socket unit wired with 3 x 6 sq.mm cable from the D.B.Each513463Sixty Seven Thousand Three Hundred Fifteen Rupees Only67315
391Ch. 24 / Item 11(c)(vi)Supply and erection of PVC insulated, PVC sheathed copper conductor cables for service connection, in prelaid pipe / G.I. wire / trenches, etc. (rate for cable only): c) four core, 600/1000 volt non armoured cable - vi) 10 mm (7/0.052"). [Ch. 24, Item 11(c)(vi): Four-core 10 sq.mm PVC/PVC copper cable 600/1000 V, non-armoured, for the service connection]Rft250621.9One Lakh Fifty Five Thousand Four Hundred Seventy Five Rupees Only155475
392Ch. 24 / Item 11(c)(viii)Supply and erection of PVC insulated, PVC sheathed copper conductor cables for service connection, in prelaid pipe / G.I. wire / trenches, etc. (rate for cable only): c) four core, 600/1000 volt non armoured cable - viii) 25 mm (19/0.052"). [Ch. 24, Item 11(c)(viii): Four-core 25 sq.mm PVC/PVC copper cable 600/1000 V, non-armoured, for the service connection]Rft10001465Fourteen Lakh Sixty Five Thousand Rupees Only1465000
393Ch. 24 / Item 8(c)(vi)Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe / M.S. conduit / G.I. pipe / wooden strip batten / wooden casing and capping / G.I. wire / trenches (rate for cables only): c) 450/750 volts, PVC insulated - vi) 10 mm sq (7/0.052"). [Ch. 24, Item 8(c)(vi): Single-core 10 sq.mm PVC insulated copper cable 450/750 V in prelaid pipe]Rft500182.3Ninety One Thousand One Hundred Fifty Rupees Only91150
394Ch. 24 / Item 8(c)(vii)Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe / M.S. conduit / G.I. pipe / wooden strip batten / wooden casing and capping / G.I. wire / trenches (rate for cables only): c) 450/750 volts, PVC insulated - vii) 16 mm sq (7/0.064"). [Ch. 24, Item 8(c)(vii): Single-core 16 sq.mm PVC insulated copper cable 450/750 V in prelaid pipe]Rft1500274.6Four Lakh Eleven Thousand Nine Hundred Rupees Only411900
395Ch. 24 / Item 99(i)Providing and fixing 4" deep cable tray with straight flange fabricated with perforated G.I. sheet of specified gauge, size and depth duly supported on painted brackets of MS angle iron of 1-1/2" x 1-1/2" x 3/16" and MS patti of 1-1/2" x 3/16" size @ 3 ft c/c, hangers i/c the cost of hardwares as approved and directed by the Engineer Incharge: 14 SWG - (i) 12" x 4". [Ch. 24, Item 99(i): Perforated G.I. cable tray 12" x 4", 14 SWG, on M.S. angle brackets at 3 ft centres]Rft2501307.35Three Lakh Twenty Six Thousand Eight Hundred Thirty Eight Rupees Only326838
396Ch. 24 / Item 102(a)(ii)Providing and fixing Pakistan Energy Label NEECA approved copper winded exhaust fan i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge: a) plastic body - (ii) 12" dia. [Ch. 24, Item 102(a)(ii): Exhaust fan 12" dia, plastic body, copper winding, with louver and shutter]Each55685.5Twenty Eight Thousand Four Hundred Twenty Eight Rupees Only28428
397NSI / TE-N1Two-core 10 sq.mm PVC/PVC copper cable 600/1000 V with glands and lugs.Rft250360Ninety Thousand Rupees Only90000
398NSI / TE-N2LED batten light fixture 18 W.Each103284Thirty Two Thousand Eight Hundred Forty Rupees Only32840
399NSI / TE-N3Wall bracket LED light fixture 12 W.Each55065Twenty Five Thousand Three Hundred Twenty Five Rupees Only25325
400Ch. 24 / Item 103(i)Providing and fixing Pakistan Energy Label NEECA approved copper winded wall bracket fan i/c the cost of necessary cable and hardware for connection as approved and directed by Engineer Incharge: i) 18" sweep dia. [Ch. 24, Item 103(i): Wall bracket fan 18" sweep, copper winding]Each56861.15Thirty Four Thousand Three Hundred Six Rupees Only34306
401NSI / TE-N4uPVC conduit 100 mm dia, Class-B.Rft400876Three Lakh Fifty Thousand Four Hundred Rupees Only350400
402NSI / TE-N5uPVC conduit 100 mm dia, Class-D.Rft2501410Three Lakh Fifty Two Thousand Five Hundred Rupees Only352500
403NSI / TE-N6Distribution board for the tube-well room, complete as specified.Each559789Two Lakh Ninety Eight Thousand Nine Hundred Forty Five Rupees Only298945
404NSI / TE-N7LV switchgear panel / main panel board, complete as specified.Each5397311Nineteen Lakh Eighty Six Thousand Five Hundred Fifty Five Rupees Only1986555
405Ch. 24 / Item 118Providing, making & testing / commissioning of rod type earth point comprising of 5/8" dia (16 mm dia) 10 ft long copper coated M.S. rod driven in ground duly fixed with clamp with tinned earth test link copper plate (300 x 50 x 10 mm), i/c the cost of brass nuts, spacers, bolts, washers, lugs etc. but excluding the cost of copper strand & manhole, as approved and directed by Engineer Incharge (rod type earthing). [Ch. 24, Item 118: Rod-type earth point, 10 ft x 5/8" copper-coated M.S. rod with test link]Job2521210.95Five Lakh Thirty Thousand Two Hundred Seventy Four Rupees Only530274
406NSI / TE-N8Power factor improvement panel 10 kVAR, complete as specified.Each5335073Sixteen Lakh Seventy Five Thousand Three Hundred Sixty Five Rupees Only1675365
407COMP / CA-29Design, supply, installation, testing and commissioning of a complete solar power system for the tube well and its pump room, comprising approximately 20 kWp capacity of Tier-1 N-type bifacial photovoltaic (PV) modules, terminated with MC4 connectors, complete with branded 6 mm² DC solar cables as required. The solar PV modules shall carry a minimum 15-year manufacturer's warranty. The system shall include a hot-dip galvanized/powder-coated 12 SWG solar panel mounting structure, including stainless-steel (SS) bolts, mid-clamps, end-clamps, accessories and 1-foot-long J-bolts as required; a 25 kW, three-phase hybrid inverter with pure sine-wave output, IP65 protection, suitable pump soft-start facility and compatibility with the proposed PV array and battery bank, carrying a minimum 10-year manufacturer's warranty; and a 100 kWh LiFePO₄ battery energy storage system carrying a minimum 10-year manufacturer's warranty. The system shall further include complete AC/DC cabling, combiner boxes, distribution/changeover panels, fuses, surge protection devices (SPDs), four-pole isolator, and all necessary connectors and accessories; separate DC and AC earthing systems for the PV array and inverter, each having earth resistance of less than 5 ohms; a lightning protection system comprising air terminals (lightning rods/arresters), down conductors and earthing arrangements; protective fencing, foundations, cable termination, interconnections, transportation, labour, installation, configuration, testing, commissioning and all ancillary works required to provide a complete, safe and operational system, in accordance with applicable standards, manufacturer recommendations and approved drawings. All warranties shall be supported by official manufacturer's warranty certificates and shall commence from the date of successful commissioning and acceptance of the system, subject to the applicable warranty terms. Rate analysis reference: CA-29. Complete in all respects.Set59147312.07Four Crore Fifty Seven Lakh Thirty Six Thousand Five Hundred Sixty Rupees Only45736560
408NSI / NB-1Supply of indoor plants for the nursery stock - assorted species as approved by the Engineer, healthy and well rooted, in nursery bags, delivered to the nursery.No.3500300Ten Lakh Fifty Thousand Rupees Only1050000
409NSI / NB-2Supply of outdoor plants for the nursery stock - assorted ornamental and landscape species as approved by the Engineer, healthy and well rooted, in nursery bags, delivered to the nursery.No.3000300Nine Lakh Rupees Only900000
410NSI / NB-7Supply of grow bags for raising plants in the nursery.No.4000300Twelve Lakh Rupees Only1200000
411NSI / NB-8Supply of plant pots for the nursery.No.1000400Four Lakh Rupees Only400000
412NSI / NB-9Supply of polythene nursery bags, in bundles.Bundle75500Thirty Eight Thousand Five Hundred Rupees Only38500
413NSI / NB-10Supply of bhall (fine river silt) for the potting mixture, delivered to the nursery by trolley.Trolley1012000One Lakh Twenty Thousand Rupees Only120000
414NSI / NB-11Labour for setting up the nursery - filling of bags and pots, bed preparation and shifting of plants.Man-day51500Seven Thousand Five Hundred Rupees Only7500
415NSI / NB-12Supply of plant and flower seed packs.Pack1501200One Lakh Eighty Thousand Rupees Only180000
416NSI / NB-13Supply of plant cuttings for propagation in the nursery.No.200050One Lakh Rupees Only100000
417NSI / NB-14Supply of polythene sheet roll for the nursery beds and propagation.Roll110000Ten Thousand Rupees Only10000
418NSI / NB-15Supply of fertilizer for the nursery, in bags.Bag55000Twenty Five Thousand Rupees Only25000
419NSI / NB-16Supply of well-rotted cow dung (farmyard manure) for the potting mixture, delivered by trolley.Trolley33000Nine Thousand Rupees Only9000
420NSI / NB-17Supply of nursery hand tools - spades, khurpas, secateurs, rakes, watering cans and the like.No.201500Thirty Thousand Rupees Only30000
421NSI / NB-18Supply of bamboo sticks for staking the plants.No.300100Thirty Thousand Rupees Only30000
422NSI / NB-20Supply of a hand cart (wheel barrow) for the nursery.No.18000Eight Thousand Rupees Only8000
423NSI / NB-21Supply of a loader rickshaw for the nursery.No.1500000Five Lakh Rupees Only500000
424NSI / NB-22Supply of a lawn watering hose roll for the nursery.Roll117000Seventeen Thousand Rupees Only17000
425NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt.Sft1608462.16214277.5One Crore Twenty Lakh Sixty Three Thousand Four Hundred Sixty Six Rupees Only12063466
426COMP / CA-25Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing.Rft7540433.61Thirty Two Lakh Sixty Nine Thousand Four Hundred Nineteen Rupees Only3269419
427COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main.Each4022849.37Nine Lakh Thirteen Thousand Nine Hundred Seventy Five Rupees Only913975
428Plant / SP-01Supply and planting of Guava Mexican (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2204754.41Ten Lakh Forty Five Thousand Nine Hundred Seventy Rupees Only1045970
429Plant / SP-02Supply and planting of Fig (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1604754.41Seven Lakh Sixty Thousand Seven Hundred Six Rupees Only760706
430Plant / SP-03Supply and planting of Jamun (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1804754.41Eight Lakh Fifty Five Thousand Seven Hundred Ninety Four Rupees Only855794
431Plant / SP-04Supply and planting of Papaya (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1604754.41Seven Lakh Sixty Thousand Seven Hundred Six Rupees Only760706
432Plant / SP-05Supply and planting of Grapes (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.904754.41Four Lakh Twenty Seven Thousand Eight Hundred Ninety Seven Rupees Only427897
433Plant / SP-06Supply and planting of Spineless Ber (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1204754.41Five Lakh Seventy Thousand Five Hundred Twenty Nine Rupees Only570529
434Plant / SP-07Supply and planting of Shahtoot (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1304754.41Six Lakh Eighteen Thousand Seventy Three Rupees Only618073
435Plant / SP-08Supply and planting of Imli (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1404229.41Five Lakh Ninety Two Thousand One Hundred Seventeen Rupees Only592117
436Plant / SP-09Supply and planting of Falsa (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1304754.41Six Lakh Eighteen Thousand Seventy Three Rupees Only618073
437Plant / SP-10Supply and planting of Lichi (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1305804.41Seven Lakh Fifty Four Thousand Five Hundred Seventy Three Rupees Only754573
438Plant / SP-11Supply and planting of Pear (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1204754.41Five Lakh Seventy Thousand Five Hundred Twenty Nine Rupees Only570529
439Plant / SP-12Supply and planting of Louqat (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1203704.41Four Lakh Forty Four Thousand Five Hundred Twenty Nine Rupees Only444529
440Plant / SP-13Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1803914.41Seven Lakh Four Thousand Five Hundred Ninety Four Rupees Only704594
441Plant / SP-14Supply and planting of Kachnar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.803809.41Three Lakh Four Thousand Seven Hundred Fifty Three Rupees Only304753
442Plant / SP-15Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1303809.41Four Lakh Ninety Five Thousand Two Hundred Twenty Three Rupees Only495223
443Plant / SP-16Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1803809.41Six Lakh Eighty Five Thousand Six Hundred Ninety Four Rupees Only685694
444Plant / SP-17Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1503914.41Five Lakh Eighty Seven Thousand One Hundred Sixty Two Rupees Only587162
445Plant / SP-18Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1553809.41Five Lakh Ninety Thousand Four Hundred Fifty Nine Rupees Only590459
446Plant / SP-19Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003809.41Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only761882
447Plant / SP-20Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003704.41Seven Lakh Forty Thousand Eight Hundred Eighty Two Rupees Only740882
448Plant / SP-21Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1853914.41Seven Lakh Twenty Four Thousand One Hundred Sixty Six Rupees Only724166
449Plant / SP-22Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1604754.41Seven Lakh Sixty Thousand Seven Hundred Six Rupees Only760706
450Plant / SP-34Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.1601904.29Three Lakh Four Thousand Six Hundred Eighty Six Rupees Only304686
451Plant / SP-35Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.160486.79Seventy Seven Thousand Eight Hundred Eighty Six Rupees Only77886
452Plant / SP-36Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.160434.29Sixty Nine Thousand Four Hundred Eighty Six Rupees Only69486
453Plant / SP-37Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.160413.29Sixty Six Thousand One Hundred Twenty Six Rupees Only66126
454Plant / SP-38Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.160413.29Sixty Six Thousand One Hundred Twenty Six Rupees Only66126
455Plant / SP-39Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.160465.79Seventy Four Thousand Five Hundred Twenty Six Rupees Only74526
456Plant / SP-40Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.160413.29Sixty Six Thousand One Hundred Twenty Six Rupees Only66126
457Plant / SP-41Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.180381.79Sixty Eight Thousand Seven Hundred Twenty Two Rupees Only68722
458Plant / SP-43Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.190486.79Ninety Two Thousand Four Hundred Ninety Rupees Only92490
459Plant / SP-46Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.190434.29Eighty Two Thousand Five Hundred Fifteen Rupees Only82515
460COMP / CA-27Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each149765.51One Lakh Thirty Six Thousand Seven Hundred Seventeen Rupees Only136717
461COMP / CA-28Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each149590.51One Lakh Thirty Four Thousand Two Hundred Sixty Seven Rupees Only134267
462COMP / CA-15Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal886.2050480125251000Four Crore Fifty One Lakh Ninety Six Thousand Four Hundred Fifty Seven Rupees Only45196457
463NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt.Sft2111170.83397687.5One Crore Fifty Eight Lakh Thirty Three Thousand Seven Hundred Eighty One Rupees Only15833781
464COMP / CA-25Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing.Rft7540433.61Thirty Two Lakh Sixty Nine Thousand Four Hundred Nineteen Rupees Only3269419
465COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main.Each4022849.37Nine Lakh Thirteen Thousand Nine Hundred Seventy Five Rupees Only913975
466Plant / SP-13Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003914.41Seven Lakh Eighty Two Thousand Eight Hundred Eighty Two Rupees Only782882
467Plant / SP-20Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003704.41Seven Lakh Forty Thousand Eight Hundred Eighty Two Rupees Only740882
468Plant / SP-15Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003809.41Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only761882
469Plant / SP-16Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003809.41Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only761882
470Plant / SP-17Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003914.41Seven Lakh Eighty Two Thousand Eight Hundred Eighty Two Rupees Only782882
471Plant / SP-18Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003809.41Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only761882
472Plant / SP-19Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003809.41Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only761882
473Plant / SP-22Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1504754.41Seven Lakh Thirteen Thousand One Hundred Sixty Two Rupees Only713162
474Plant / SP-21Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1503914.41Five Lakh Eighty Seven Thousand One Hundred Sixty Two Rupees Only587162
475Plant / SP-23Supply and planting of Kurrajong (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2004019.41Eight Lakh Three Thousand Eight Hundred Eighty Two Rupees Only803882
476Plant / SP-24Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003809.41Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only761882
477Plant / SP-25Supply and planting of Weeping Willow (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003809.41Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only761882
478Plant / SP-26Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2004019.41Eight Lakh Three Thousand Eight Hundred Eighty Two Rupees Only803882
479Plant / SP-27Supply and planting of Bottle Brush (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.2003777.91Seven Lakh Fifty Five Thousand Five Hundred Eighty Two Rupees Only755582
480Plant / SP-34Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.2001904.29Three Lakh Eighty Thousand Eight Hundred Fifty Eight Rupees Only380858
481Plant / SP-35Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.200486.79Ninety Seven Thousand Three Hundred Fifty Eight Rupees Only97358
482Plant / SP-36Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.200434.29Eighty Six Thousand Eight Hundred Fifty Eight Rupees Only86858
483Plant / SP-37Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.150413.29Sixty One Thousand Nine Hundred Ninety Four Rupees Only61994
484Plant / SP-38Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.200413.29Eighty Two Thousand Six Hundred Fifty Eight Rupees Only82658
485Plant / SP-39Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.150465.79Sixty Nine Thousand Eight Hundred Sixty Nine Rupees Only69869
486Plant / SP-40Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.200413.29Eighty Two Thousand Six Hundred Fifty Eight Rupees Only82658
487Plant / SP-41Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.200381.79Seventy Six Thousand Three Hundred Fifty Eight Rupees Only76358
488Plant / SP-42Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.300527.74One Lakh Fifty Eight Thousand Three Hundred Twenty Two Rupees Only158322
489Plant / SP-44Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.150455.29Sixty Eight Thousand Two Hundred Ninety Four Rupees Only68294
490Plant / SP-43Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.150486.79Seventy Three Thousand Nineteen Rupees Only73019
491Plant / SP-46Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.200434.29Eighty Six Thousand Eight Hundred Fifty Eight Rupees Only86858
492COMP / CA-27Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each149765.51One Lakh Thirty Six Thousand Seven Hundred Seventeen Rupees Only136717
493COMP / CA-28Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each149590.51One Lakh Thirty Four Thousand Two Hundred Sixty Seven Rupees Only134267
494COMP / CA-15Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal1163.179522852351000Five Crore Ninety Three Lakh Twenty Two Thousand One Hundred Fifty Six Rupees Only59322156
495NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt.Sft980170.833976837.5Seventy Three Lakh Fifty One Thousand Two Hundred Eighty One Rupees Only7351281
496COMP / CA-25Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing.Rft7540433.61Thirty Two Lakh Sixty Nine Thousand Four Hundred Nineteen Rupees Only3269419
497COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main.Each4022849.37Nine Lakh Thirteen Thousand Nine Hundred Seventy Five Rupees Only913975
498Plant / SP-13Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003914.41Three Lakh Ninety One Thousand Four Hundred Forty One Rupees Only391441
499Plant / SP-20Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003704.41Three Lakh Seventy Thousand Four Hundred Forty One Rupees Only370441
500Plant / SP-28Supply and planting of Putanjiva (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1004019.41Four Lakh One Thousand Nine Hundred Forty One Rupees Only401941
501Plant / SP-16Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003809.41Three Lakh Eighty Thousand Nine Hundred Forty One Rupees Only380941
502Plant / SP-17Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003914.41Three Lakh Ninety One Thousand Four Hundred Forty One Rupees Only391441
503Plant / SP-29Supply and planting of Chestnut Tree/Shah Baloot (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003977.41Three Lakh Ninety Seven Thousand Seven Hundred Forty One Rupees Only397741
504Plant / SP-19Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003809.41Three Lakh Eighty Thousand Nine Hundred Forty One Rupees Only380941
505Plant / SP-22Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1004754.41Four Lakh Seventy Five Thousand Four Hundred Forty One Rupees Only475441
506Plant / SP-21Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003914.41Three Lakh Ninety One Thousand Four Hundred Forty One Rupees Only391441
507Plant / SP-30Supply and planting of Sapium (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003284.41Three Lakh Twenty Eight Thousand Four Hundred Forty One Rupees Only328441
508Plant / SP-24Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1003809.41Three Lakh Eighty Thousand Nine Hundred Forty One Rupees Only380941
509Plant / SP-31Supply and planting of Katsagan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1004754.41Four Lakh Seventy Five Thousand Four Hundred Forty One Rupees Only475441
510Plant / SP-26Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1004019.41Four Lakh One Thousand Nine Hundred Forty One Rupees Only401941
511Plant / SP-32Supply and planting of Amla (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1004019.41Four Lakh One Thousand Nine Hundred Forty One Rupees Only401941
512Plant / SP-34Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.1001904.29One Lakh Ninety Thousand Four Hundred Twenty Nine Rupees Only190429
513Plant / SP-35Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100486.79Forty Eight Thousand Six Hundred Seventy Nine Rupees Only48679
514Plant / SP-36Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100434.29Forty Three Thousand Four Hundred Twenty Nine Rupees Only43429
515Plant / SP-37Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100413.29Forty One Thousand Three Hundred Twenty Nine Rupees Only41329
516Plant / SP-38Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100413.29Forty One Thousand Three Hundred Twenty Nine Rupees Only41329
517Plant / SP-39Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100465.79Forty Six Thousand Five Hundred Seventy Nine Rupees Only46579
518Plant / SP-40Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100413.29Forty One Thousand Three Hundred Twenty Nine Rupees Only41329
519Plant / SP-41Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100381.79Thirty Eight Thousand One Hundred Seventy Nine Rupees Only38179
520Plant / SP-42Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100527.74Fifty Two Thousand Seven Hundred Seventy Four Rupees Only52774
521Plant / SP-44Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100455.29Forty Five Thousand Five Hundred Twenty Nine Rupees Only45529
522Plant / SP-43Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100486.79Forty Eight Thousand Six Hundred Seventy Nine Rupees Only48679
523Plant / SP-46Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100434.29Forty Three Thousand Four Hundred Twenty Nine Rupees Only43429
524Plant / SP-47Supply and planting of MorPunkh (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.100434.29Forty Three Thousand Four Hundred Twenty Nine Rupees Only43429
525COMP / CA-27Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each149765.51One Lakh Thirty Six Thousand Seven Hundred Seventeen Rupees Only136717
526COMP / CA-28Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each149590.51One Lakh Thirty Four Thousand Two Hundred Sixty Seven Rupees Only134267
527COMP / CA-15Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal540.0390269844851000Two Crore Seventy Five Lakh Forty One Thousand Nine Hundred Ninety Rupees Only27541990
528NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt.Sft257064.135135147.5Nineteen Lakh Twenty Seven Thousand Nine Hundred Eighty One Rupees Only1927981
529COMP / CA-25Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing.Rft910433.61Three Lakh Ninety Four Thousand Five Hundred Eighty Five Rupees Only394585
530COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main.Each622849.37One Lakh Thirty Seven Thousand Ninety Six Rupees Only137096
531Plant / SP-13Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123914.41Forty Six Thousand Nine Hundred Seventy Three Rupees Only46973
532Plant / SP-20Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123704.41Forty Four Thousand Four Hundred Fifty Three Rupees Only44453
533Plant / SP-15Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123809.41Forty Five Thousand Seven Hundred Thirteen Rupees Only45713
534Plant / SP-16Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123809.41Forty Five Thousand Seven Hundred Thirteen Rupees Only45713
535Plant / SP-17Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123914.41Forty Six Thousand Nine Hundred Seventy Three Rupees Only46973
536Plant / SP-18Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123809.41Forty Five Thousand Seven Hundred Thirteen Rupees Only45713
537Plant / SP-19Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123809.41Forty Five Thousand Seven Hundred Thirteen Rupees Only45713
538Plant / SP-22Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.94754.41Forty Two Thousand Seven Hundred Ninety Rupees Only42790
539Plant / SP-21Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.93914.41Thirty Five Thousand Two Hundred Thirty Rupees Only35230
540Plant / SP-23Supply and planting of Kurrajong (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.124019.41Forty Eight Thousand Two Hundred Thirty Three Rupees Only48233
541Plant / SP-24Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123809.41Forty Five Thousand Seven Hundred Thirteen Rupees Only45713
542Plant / SP-25Supply and planting of Weeping Willow (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123809.41Forty Five Thousand Seven Hundred Thirteen Rupees Only45713
543Plant / SP-26Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.124019.41Forty Eight Thousand Two Hundred Thirty Three Rupees Only48233
544Plant / SP-27Supply and planting of Bottle Brush (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.123777.91Forty Five Thousand Three Hundred Thirty Five Rupees Only45335
545Plant / SP-34Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.121904.29Twenty Two Thousand Eight Hundred Fifty One Rupees Only22851
546Plant / SP-35Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.12486.79Five Thousand Eight Hundred Forty One Rupees Only5841
547Plant / SP-36Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.12434.29Five Thousand Two Hundred Eleven Rupees Only5211
548Plant / SP-37Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.9413.29Three Thousand Seven Hundred Twenty Rupees Only3720
549Plant / SP-38Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.12413.29Four Thousand Nine Hundred Fifty Nine Rupees Only4959
550Plant / SP-39Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.9465.79Four Thousand One Hundred Ninety Two Rupees Only4192
551Plant / SP-40Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.12413.29Four Thousand Nine Hundred Fifty Nine Rupees Only4959
552Plant / SP-41Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.12381.79Four Thousand Five Hundred Eighty One Rupees Only4581
553Plant / SP-42Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.18527.74Nine Thousand Four Hundred Ninety Nine Rupees Only9499
554Plant / SP-44Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.9455.29Four Thousand Ninety Eight Rupees Only4098
555Plant / SP-43Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.9486.79Four Thousand Three Hundred Eighty One Rupees Only4381
556Plant / SP-46Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.12434.29Five Thousand Two Hundred Eleven Rupees Only5211
557COMP / CA-27Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each29765.51Nineteen Thousand Five Hundred Thirty One Rupees Only19531
558COMP / CA-28Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each29590.51Nineteen Thousand One Hundred Eighty One Rupees Only19181
559COMP / CA-15Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal141.6331323058651000Seventy Two Lakh Twenty Three Thousand Two Hundred Ninety Rupees Only7223290
560NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt.Sft968756.362934367.5Seventy Two Lakh Sixty Five Thousand Six Hundred Seventy Three Rupees Only7265673
561COMP / CA-25Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing.Rft10140433.61Forty Three Lakh Ninety Six Thousand Eight Hundred Five Rupees Only4396805
562COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main.Each5222849.37Eleven Lakh Eighty Eight Thousand One Hundred Sixty Seven Rupees Only1188167
563Plant / SP-13Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343914.41Five Lakh Twenty Four Thousand Five Hundred Thirty One Rupees Only524531
564Plant / SP-20Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343704.41Four Lakh Ninety Six Thousand Three Hundred Ninety One Rupees Only496391
565Plant / SP-15Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343809.41Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only510461
566Plant / SP-16Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343809.41Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only510461
567Plant / SP-17Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343914.41Five Lakh Twenty Four Thousand Five Hundred Thirty One Rupees Only524531
568Plant / SP-18Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343809.41Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only510461
569Plant / SP-19Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343809.41Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only510461
570Plant / SP-22Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1014754.41Four Lakh Eighty Thousand One Hundred Ninety Five Rupees Only480195
571Plant / SP-21Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1013914.41Three Lakh Ninety Five Thousand Three Hundred Fifty Five Rupees Only395355
572Plant / SP-23Supply and planting of Kurrajong (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1344019.41Five Lakh Thirty Eight Thousand Six Hundred One Rupees Only538601
573Plant / SP-24Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343809.41Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only510461
574Plant / SP-25Supply and planting of Weeping Willow (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343809.41Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only510461
575Plant / SP-26Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1344019.41Five Lakh Thirty Eight Thousand Six Hundred One Rupees Only538601
576Plant / SP-27Supply and planting of Bottle Brush (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care.No.1343777.91Five Lakh Six Thousand Two Hundred Forty Rupees Only506240
577Plant / SP-34Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.1341904.29Two Lakh Fifty Five Thousand One Hundred Seventy Five Rupees Only255175
578Plant / SP-35Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.134486.79Sixty Five Thousand Two Hundred Thirty Rupees Only65230
579Plant / SP-36Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.134434.29Fifty Eight Thousand One Hundred Ninety Five Rupees Only58195
580Plant / SP-37Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.101413.29Forty One Thousand Seven Hundred Forty Two Rupees Only41742
581Plant / SP-38Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.134413.29Fifty Five Thousand Three Hundred Eighty One Rupees Only55381
582Plant / SP-39Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.101465.79Forty Seven Thousand Forty Five Rupees Only47045
583Plant / SP-40Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.134413.29Fifty Five Thousand Three Hundred Eighty One Rupees Only55381
584Plant / SP-41Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.134381.79Fifty One Thousand One Hundred Sixty Rupees Only51160
585Plant / SP-42Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.202527.74One Lakh Six Thousand Six Hundred Three Rupees Only106603
586Plant / SP-44Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.101455.29Forty Five Thousand Nine Hundred Eighty Four Rupees Only45984
587Plant / SP-43Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.101486.79Forty Nine Thousand One Hundred Sixty Six Rupees Only49166
588Plant / SP-46Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care.No.134434.29Fifty Eight Thousand One Hundred Ninety Five Rupees Only58195
589COMP / CA-27Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each199765.51One Lakh Eighty Five Thousand Five Hundred Forty Five Rupees Only185545
590COMP / CA-28Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each199590.51One Lakh Eighty Two Thousand Two Hundred Twenty Rupees Only182220
591COMP / CA-15Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal533.7500622227951000Two Crore Seventy Two Lakh Twenty One Thousand Two Hundred Fifty Three Rupees Only27221253
592NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the park.Sft178887.789214937.5Thirteen Lakh Forty One Thousand Six Hundred Fifty Eight Rupees Only1341658
593COMP / CA-14Turfing with Dhaka grass over 70% of the net soft-landscape area of the park.Sft125221.4524504536Forty Five Lakh Seven Thousand Nine Hundred Seventy Two Rupees Only4507972
594COMP / CA-25Providing and laying buried HDPE watering main, 2 in dia, around the park, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing.Rft2328.1102473498433.61Ten Lakh Nine Thousand Four Hundred Ninety Two Rupees Only1009492
595COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main.Each722849.37One Lakh Fifty Nine Thousand Nine Hundred Forty Six Rupees Only159946
596Plant / PK-MIX-TSupply and planting of trees - mix of the 15 tree species on the Client park list in equal numbers (perimeter row and lawn trees).No.1233922.81Four Lakh Eighty Two Thousand Five Hundred Six Rupees Only482506
597Plant / PK-MIX-SSupply and planting of shrubs / bushes - mix of the 12 shrub species on the Client park list in equal numbers (borders).No.1003563.7Five Lakh Sixty Five Thousand Three Hundred Ninety One Rupees Only565391
598COMP / CA-27Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each69765.51Fifty Eight Thousand Five Hundred Ninety Three Rupees Only58593
599COMP / CA-28Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each69590.51Fifty Seven Thousand Five Hundred Forty Three Rupees Only57543
600COMP / CA-15Landscape establishment and maintenance of the park for three years - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal98.56076540767751000Fifty Lakh Twenty Six Thousand Five Hundred Ninety Nine Rupees Only5026599
601NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the park.Sft270163.297101457.5Twenty Lakh Twenty Six Thousand Two Hundred Twenty Five Rupees Only2026225
602COMP / CA-14Turfing with Dhaka grass over 70% of the net soft-landscape area of the park.Sft189114.3079710136Sixty Eight Lakh Eight Thousand One Hundred Fifteen Rupees Only6808115
603COMP / CA-25Providing and laying buried HDPE watering main, 2 in dia, around the park, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing.Rft2803.2433.61Twelve Lakh Fifteen Thousand Four Hundred Ninety Six Rupees Only1215496
604COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main.Each822849.37One Lakh Eighty Two Thousand Seven Hundred Ninety Five Rupees Only182795
605Plant / PK-MIX-TSupply and planting of trees - mix of the 15 tree species on the Client park list in equal numbers (perimeter row and lawn trees).No.1623922.81Six Lakh Thirty Five Thousand Four Hundred Ninety Five Rupees Only635495
606Plant / PK-MIX-SSupply and planting of shrubs / bushes - mix of the 12 shrub species on the Client park list in equal numbers (borders).No.1341563.7Seven Lakh Fifty Five Thousand Nine Hundred Twenty Two Rupees Only755922
607COMP / CA-27Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each69765.51Fifty Eight Thousand Five Hundred Ninety Three Rupees Only58593
608COMP / CA-28Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care.Each69590.51Fifty Seven Thousand Five Hundred Forty Three Rupees Only57543
609COMP / CA-15Landscape establishment and maintenance of the park for three years - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal148.8503014333151000Seventy Five Lakh Ninety One Thousand Three Hundred Sixty Five Rupees Only7591365
610NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1'-0" thick, over the prepared formation of all central medians and roadside green strips.Sft12499787.5Ninety Three Lakh Seventy Four Thousand Eight Hundred Thirty Five Rupees Only9374835
611COMP / CA-14Turfing with Dhaka grass over 70% of the median and roadside soft area, including levelling, dressing, laying, rolling, first watering and maintenance until established.Sft874984.636Three Crore Fourteen Lakh Ninety Nine Thousand Four Hundred Forty Six Rupees Only31499446
612COMP / CA-15Landscape establishment and maintenance of the road central medians and roadside green strips for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal688.6931129476651000Three Crore Fifty One Lakh Twenty Three Thousand Three Hundred Forty Nine Rupees Only35123349
613Plant / Q-T32Supply and planting of AMALTAS (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.4103914.41Sixteen Lakh Four Thousand Nine Hundred Eight Rupees Only1604908
614Plant / Q-S01Supply and planting of HAMELIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.324434.29One Lakh Forty Thousand Seven Hundred Ten Rupees Only140710
615Plant / Q-S02Supply and planting of MARWA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1228434.29Five Lakh Thirty Three Thousand Three Hundred Eight Rupees Only533308
616Plant / Q-S03Supply and planting of ICE BERG (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1228486.79Five Lakh Ninety Seven Thousand Seven Hundred Seventy Eight Rupees Only597778
617Plant / Q-S04Supply and planting of HABISCUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.275413.29One Lakh Thirteen Thousand Six Hundred Fifty Five Rupees Only113655
618Plant / Q-S05Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.275413.29One Lakh Thirteen Thousand Six Hundred Fifty Five Rupees Only113655
619Plant / Q-S06Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.275413.29One Lakh Thirteen Thousand Six Hundred Fifty Five Rupees Only113655
620Plant / Q-T33Supply and planting of KURRAJONG (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.2694019.41Ten Lakh Eighty One Thousand Two Hundred Twenty One Rupees Only1081221
621Plant / Q-S07Supply and planting of POTATO TREE (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.215591.79One Lakh Twenty Seven Thousand Two Hundred Thirty Five Rupees Only127235
622Plant / Q-S08Supply and planting of VINCA MINOR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1600486.79Seven Lakh Seventy Eight Thousand Eight Hundred Sixty Four Rupees Only778864
623Plant / Q-S09Supply and planting of EUPHORBIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1600402.79Six Lakh Forty Four Thousand Four Hundred Sixty Four Rupees Only644464
624Plant / Q-S10Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.90413.29Thirty Seven Thousand One Hundred Ninety Six Rupees Only37196
625Plant / Q-S11Supply and planting of TECOMA GROCHA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.90486.79Forty Three Thousand Eight Hundred Eleven Rupees Only43811
626Plant / Q-S13Supply and planting of BURNING BUSH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.90434.29Thirty Nine Thousand Eighty Six Rupees Only39086
627Plant / Q-T34Supply and planting of Chinar (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.2683914.41Ten Lakh Forty Nine Thousand Sixty Two Rupees Only1049062
628Plant / Q-S04Supply and planting of HABISCUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.90413.29Thirty Seven Thousand One Hundred Ninety Six Rupees Only37196
629Plant / Q-S06Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.90413.29Thirty Seven Thousand One Hundred Ninety Six Rupees Only37196
630Plant / Q-S14Supply and planting of CASSIA GALAUCA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.215434.29Ninety Three Thousand Three Hundred Seventy Two Rupees Only93372
631Plant / Q-S15Supply and planting of DESI GULAB (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1200392.29Four Lakh Seventy Thousand Seven Hundred Forty Eight Rupees Only470748
632Plant / Q-S16Supply and planting of MOTIYA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1200381.79Four Lakh Fifty Eight Thousand One Hundred Forty Eight Rupees Only458148
633Plant / Q-S17Supply and planting of HARSINGHAR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.90465.79Forty One Thousand Nine Hundred Twenty One Rupees Only41921
634Plant / Q-T35Supply and planting of Pine (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.1254229.41Five Lakh Twenty Eight Thousand Six Hundred Seventy Six Rupees Only528676
635Plant / Q-S03Supply and planting of ICE BERG (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.200486.79Ninety Seven Thousand Three Hundred Fifty Eight Rupees Only97358
636Plant / Q-S06Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.65413.29Twenty Six Thousand Eight Hundred Sixty Four Rupees Only26864
637Plant / Q-S10Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.65413.29Twenty Six Thousand Eight Hundred Sixty Four Rupees Only26864
638Plant / Q-S18Supply and planting of ARIZONA CYPRUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.125539.29Sixty Seven Thousand Four Hundred Eleven Rupees Only67411
639Plant / Q-S19Supply and planting of DAY LILLY (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.200434.29Eighty Six Thousand Eight Hundred Fifty Eight Rupees Only86858
640Plant / Q-T36Supply and planting of BRACHYCHITON FLAME TREE (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.2884754.41Thirteen Lakh Sixty Nine Thousand Two Hundred Seventy Rupees Only1369270
641Plant / Q-S12Supply and planting of TECOMA STANS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.72455.29Thirty Two Thousand Seven Hundred Eighty One Rupees Only32781
642Plant / Q-S17Supply and planting of HARSINGHAR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.144465.79Sixty Seven Thousand Seventy Four Rupees Only67074
643Plant / Q-S20Supply and planting of JATROPHA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.72434.29Thirty One Thousand Two Hundred Sixty Nine Rupees Only31269
644Plant / Q-S21Supply and planting of PLUMBAGO AURICULATA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.72539.29Thirty Eight Thousand Eight Hundred Twenty Nine Rupees Only38829
645Plant / Q-T37Supply and planting of TERMINALIA (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.4303809.41Sixteen Lakh Thirty Eight Thousand Forty Six Rupees Only1638046
646Plant / Q-S05Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.110413.29Forty Five Thousand Four Hundred Sixty Two Rupees Only45462
647Plant / Q-S13Supply and planting of BURNING BUSH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.110434.29Forty Seven Thousand Seven Hundred Seventy Two Rupees Only47772
648Plant / Q-S22Supply and planting of PITTOSPORUM (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.250486.79One Lakh Twenty One Thousand Six Hundred Ninety Eight Rupees Only121698
649Plant / Q-S23Supply and planting of BRUNFELSIA Punsilora (Franciscia) (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.250486.79One Lakh Twenty One Thousand Six Hundred Ninety Eight Rupees Only121698
650Plant / Q-T07Supply and planting of Erithrina Subrosa/Gul-e- Nishtar (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.1844019.41Seven Lakh Thirty Nine Thousand Five Hundred Seventy One Rupees Only739571
651Plant / Q-S02Supply and planting of MARWA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.103434.29Forty Four Thousand Seven Hundred Thirty Two Rupees Only44732
652Plant / Q-S05Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.50413.29Twenty Thousand Six Hundred Sixty Five Rupees Only20665
653Plant / Q-S11Supply and planting of TECOMA GROCHA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.50486.79Twenty Four Thousand Three Hundred Forty Rupees Only24340
654Plant / Q-S23Supply and planting of BRUNFELSIA Punsilora (Franciscia) (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.103486.79Fifty Thousand One Hundred Thirty Nine Rupees Only50139
655Plant / Q-T38Supply and planting of KACHNAR (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.2873809.41Ten Lakh Ninety Three Thousand Three Hundred One Rupees Only1093301
656Plant / Q-S02Supply and planting of MARWA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.96434.29Forty One Thousand Six Hundred Ninety Two Rupees Only41692
657Plant / Q-S04Supply and planting of HABISCUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.96413.29Thirty Nine Thousand Six Hundred Seventy Six Rupees Only39676
658Plant / Q-S06Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.287413.29One Lakh Eighteen Thousand Six Hundred Fourteen Rupees Only118614
659Plant / Q-S13Supply and planting of BURNING BUSH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.96434.29Forty One Thousand Six Hundred Ninety Two Rupees Only41692
660Plant / Q-S15Supply and planting of DESI GULAB (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1200392.29Four Lakh Seventy Thousand Seven Hundred Forty Eight Rupees Only470748
661Plant / Q-S24Supply and planting of MORPUNKH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.1200434.29Five Lakh Twenty One Thousand One Hundred Forty Eight Rupees Only521148
662Plant / Q-T39Supply and planting of ALSTONIA (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.1203809.41Four Lakh Fifty Seven Thousand One Hundred Twenty Nine Rupees Only457129
663Plant / Q-T40Supply and planting of FIDDLEWOOD (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.964439.41Four Lakh Twenty Six Thousand One Hundred Eighty Three Rupees Only426183
664Plant / Q-S05Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.60413.29Twenty Four Thousand Seven Hundred Ninety Seven Rupees Only24797
665Plant / Q-S06Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.60413.29Twenty Four Thousand Seven Hundred Ninety Seven Rupees Only24797
666Plant / Q-S16Supply and planting of MOTIYA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.700381.79Two Lakh Sixty Seven Thousand Two Hundred Fifty Three Rupees Only267253
667Plant / Q-S08Supply and planting of VINCA MINOR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.700486.79Three Lakh Forty Thousand Seven Hundred Fifty Three Rupees Only340753
668Plant / Q-S25Supply and planting of MELALEUCA (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.823305.41Two Lakh Seventy One Thousand Forty Four Rupees Only271044
669Plant / Q-T41Supply and planting of Bakain (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.1023704.41Three Lakh Seventy Seven Thousand Eight Hundred Fifty Rupees Only377850
670Plant / Q-S10Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.52413.29Twenty One Thousand Four Hundred Ninety One Rupees Only21491
671Plant / Q-S26Supply and planting of ROSE (MULTICOLOR) (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.916527.74Four Lakh Eighty Three Thousand Four Hundred Ten Rupees Only483410
672Plant / Q-S27Supply and planting of VITEX (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.52486.79Twenty Five Thousand Three Hundred Thirteen Rupees Only25313
673Plant / Q-S28Supply and planting of SAPIUM (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance.No.1643284.41Five Lakh Thirty Eight Thousand Six Hundred Forty Three Rupees Only538643
674Plant / Q-S05Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.35413.29Fourteen Thousand Four Hundred Sixty Five Rupees Only14465
675Plant / Q-S06Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.42413.29Seventeen Thousand Three Hundred Fifty Eight Rupees Only17358
676Plant / Q-S10Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.42413.29Seventeen Thousand Three Hundred Fifty Eight Rupees Only17358
677Plant / Q-S12Supply and planting of TECOMA STANS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance.No.35455.29Fifteen Thousand Nine Hundred Thirty Five Rupees Only15935
678NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1'-0" thick, over the prepared sub-grade of the channel-side green buffer strip.Sft1080007.5Eight Lakh Ten Thousand Rupees Only810000
679COMP / CA-14Turfing with Dhaka grass over the prepared bed of the channel-side green buffer, including levelling, dressing, laying, rolling and watering until established - 70% of the buffer area.Sft7560036Twenty Seven Lakh Twenty One Thousand Six Hundred Rupees Only2721600
680COMP / CA-26Supply and planting of shade trees along the buffer strip at 30 ft centres on each bank, complete with pit excavation, sweet-earth and manure backfill, stake and guard, initial watering and first-season care.Each2264603.01Ten Lakh Forty Thousand Two Hundred Eighty Rupees Only1040280
681COMP / CA-25Providing and laying buried HDPE watering main, 2" dia, along each bank, including trenching, bedding, specials, thrust blocks, backfilling and testing, complete.Rft9000433.61Thirty Nine Lakh Two Thousand Four Hundred Ninety Rupees Only3902490
682COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main, complete.Each3022849.37Six Lakh Eighty Five Thousand Four Hundred Eighty One Rupees Only685481
683COMP / CA-15Landscape establishment and maintenance of the channel-side green buffer for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal59.50413223140551000Thirty Lakh Thirty Four Thousand Seven Hundred Eleven Rupees Only3034711
684NSI / LS-6Supply and spreading of sweet earth (imported fertile topsoil), 1'-0" thick, over the prepared sub-grade of the channel-side green buffer strip.Sft960007.5Seven Lakh Twenty Thousand Rupees Only720000
685COMP / CA-14Turfing with Dhaka grass over the prepared bed of the channel-side green buffer, including levelling, dressing, laying, rolling and watering until established - 70% of the buffer area.Sft6720036Twenty Four Lakh Nineteen Thousand Two Hundred Rupees Only2419200
686COMP / CA-26Supply and planting of shade trees along the buffer strip at 30 ft centres on each bank, complete with pit excavation, sweet-earth and manure backfill, stake and guard, initial watering and first-season care.Each2004603.01Nine Lakh Twenty Thousand Six Hundred Two Rupees Only920602
687COMP / CA-25Providing and laying buried HDPE watering main, 2" dia, along each bank, including trenching, bedding, specials, thrust blocks, backfilling and testing, complete.Rft8000433.61Thirty Four Lakh Sixty Eight Thousand Eight Hundred Eighty Rupees Only3468880
688COMP / CA-24Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main, complete.Each2822849.37Six Lakh Thirty Nine Thousand Seven Hundred Eighty Two Rupees Only639782
689COMP / CA-15Landscape establishment and maintenance of the channel-side green buffer for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement.Kanal52.89256198347151000Twenty Six Lakh Ninety Seven Thousand Five Hundred Twenty One Rupees Only2697521
690COMP / CA-7Providing and laying 2 in EPDM / rubber safety tiles to ASTM F1292 over 4 in P.C.C. base with kerb edge restraint, to the children's play area (100 ft x 50 ft).Sft50001134.27Fifty Six Lakh Seventy One Thousand Three Hundred Fifty Rupees Only5671350
691COMP / CA-7Providing and laying 2 in EPDM / rubber safety tiles over 4 in P.C.C. base to the open-air gym area (70 ft square).Sft49001134.27Fifty Five Lakh Fifty Seven Thousand Nine Hundred Twenty Three Rupees Only5557923
692COMP / CA-11Supply and installation of children's multi-play structure (tower, slide, climbing net and swings), complete with foundations.Set11330929.71Thirteen Lakh Thirty Thousand Nine Hundred Thirty Rupees Only1330930
693COMP / CA-12Supply and installation of outdoor open-air gym equipment station, galvanised / powder coated, complete with foundations.Each6198115.4Eleven Lakh Eighty Eight Thousand Six Hundred Ninety Two Rupees Only1188692
694COMP / CA-1Supply, fabrication and erection of gazebo 19 ft x 19 ft, 14 ft clear height, complete as specified for the green-belt gazebos.Each11237233.88Twelve Lakh Thirty Seven Thousand Two Hundred Thirty Four Rupees Only1237234
695COMP / CA-4Supply and fixing of park bench with recycled plastic (HDPE) lumber slats on galvanised M.S. frame.Each4465340.4Twenty Eight Lakh Seventy Four Thousand Nine Hundred Seventy Eight Rupees Only2874978
696COMP / CA-5Supply and fixing of 60-litre waste bin.Each2217720.2Three Lakh Eighty Nine Thousand Eight Hundred Forty Four Rupees Only389844
697MKT / SL-2Solar flood light 2 x 60 W LED (two on each pole) on a hot-dip galvanized pole 4-6 m high, complete as specified - rest areas.Each28450000One Crore Twenty Six Lakh Rupees Only12600000
698MKT / SL-3Solar post-top light 30-40 W LED on a hot-dip galvanized pole 3-4 m high, complete as specified - walkways.Each122300000Three Crore Sixty Six Lakh Rupees Only36600000
699COMP / CA-7Providing and laying 2 in EPDM / rubber safety tiles to ASTM F1292 over 4 in P.C.C. base with kerb edge restraint, to the children's play area (100 ft x 50 ft).Sft50001134.27Fifty Six Lakh Seventy One Thousand Three Hundred Fifty Rupees Only5671350
700COMP / CA-7Providing and laying 2 in EPDM / rubber safety tiles over 4 in P.C.C. base to the open-air gym area (70 ft square).Sft49001134.27Fifty Five Lakh Fifty Seven Thousand Nine Hundred Twenty Three Rupees Only5557923
701COMP / CA-11Supply and installation of children's multi-play structure (tower, slide, climbing net and swings), complete with foundations.Set11330929.71Thirteen Lakh Thirty Thousand Nine Hundred Thirty Rupees Only1330930
702COMP / CA-12Supply and installation of outdoor open-air gym equipment station, galvanised / powder coated, complete with foundations.Each6198115.4Eleven Lakh Eighty Eight Thousand Six Hundred Ninety Two Rupees Only1188692
703COMP / CA-1Supply, fabrication and erection of gazebo 19 ft x 19 ft, 14 ft clear height, complete as specified for the green-belt gazebos.Each11237233.88Twelve Lakh Thirty Seven Thousand Two Hundred Thirty Four Rupees Only1237234
704COMP / CA-4Supply and fixing of park bench with recycled plastic (HDPE) lumber slats on galvanised M.S. frame.Each6565340.4Forty Two Lakh Forty Seven Thousand One Hundred Twenty Six Rupees Only4247126
705COMP / CA-5Supply and fixing of 60-litre waste bin.Each3217720.2Five Lakh Sixty Seven Thousand Forty Six Rupees Only567046
706MKT / SL-2Solar flood light 2 x 60 W LED (two on each pole) on a hot-dip galvanized pole 4-6 m high, complete as specified - rest areas.Each42450000One Crore Eighty Nine Lakh Rupees Only18900000
707MKT / SL-3Solar post-top light 30-40 W LED on a hot-dip galvanized pole 3-4 m high, complete as specified - walkways.Each178300000Five Crore Thirty Four Lakh Rupees Only53400000
708COMP / CA-4Supply and fixing of bench with UV-stabilised outdoor-grade recycled plastic (HDPE) lumber slats on hot-dip galvanised M.S. frame, anchored on P.C.C. base - complete.Each765340.4Four Lakh Fifty Seven Thousand Three Hundred Eighty Three Rupees Only457383
709COMP / CA-5Supply and fixing of 60-litre waste bin, recycled plastic / HDPE body on galvanised M.S. frame, anchored on P.C.C. base - complete.Each417720.2Seventy Thousand Eight Hundred Eighty One Rupees Only70881
710COMP / CA-6Supply, installation, testing and commissioning of decorative landscape lamp post / lantern 8'-0" high, hot-dip galvanised and black powder-coated M.S. with LED 3000 K lamp, on P.C.C. foundation with conduit and cabling - complete.Each2566652.36Sixteen Lakh Sixty Six Thousand Three Hundred Nine Rupees Only1666309
GRAND TOTAL:Rs 1,428,414,137.00

Scope of Work

  1. Scope of work:

The scope of work includes but not limited to the following:

  • Green Belts
  • Major/Main Roads
  • Plantation, Railing and Footpath along Nullahs
  • Developments of Lakes and Wiers
  • Model Park and Lake Park in F-14
  • Trial Bore and Tube Wells 
  • Establishment of Nursery

 

  1. Terms & Conditions:
  1.  The plant Size shall be supplied strictly according to the Height, Girth/Stem, Diameter and other Specification given in the BOQ.  (Height > 12 Ft with strong stem, Pot Size > 24-30)
  2. All plants supplied shall be healthy, vigorous, disease free, Pest free and should not carrying fungal infections.
  3. Plants shall have healthy and sufficiently grown roots and having sizeable Root-Ball, appropriate to their size. Root-Ball shall be intact during transportation.
  4. The contractor shall supply the exactly approved species/variety mentioned in the BOQ. Substitution species shall not be permitted without the prior approval of competent authority.
  5.  Any plant that dies, severely diseased, dries out or fail to establish during the specified maintenance period shall be replaced by contractor with the healthy plant of the same specie or equal or better size at no additional cost.
  6. The maintenance time for all the plants should be three (03) years and the time of each plant will be started to count when it will be planted.
  7. All costs associated with the replacement including the plants, transportation, excavation, planting, staking watering and related operations shall be borne by the contractor.
  8. The authorized representative shall have the right to inspect and approve plants at the site. Rejected plants shall be replaced by the contracted at no additional cost.
  9. The contractor shall be responsible for complete maintenance and upkeep of all planted areas throughout the contract/maintenance period, including regular watering, hoeing, weeding, soil preparation, pruning, trimming, shaping and removal of dead/diseased branches, application of fertilizers, manures and plant nutrients, pest and diseased control, soil conditioning, mulching, staking and support of plants where required, replacement of dead damaged and diseased plants and all other necessary horticultural operation required to maintain a plant.

Brief Description

Landscaping and Horticulture Works in Sector F-14/15, Islamabad.

Price Schedule

For Individual Jobs

# Job Title Quantity Unit Price (PKR) Total Price (PKR) Delivery Location Delivery Period / Year Country of Origin
1
2
For Lots
# Lot Title Total Lot Price (PKR) Country of Origin
1[Lot 1 Title]

📑 General Conditions of Contract (GCC)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

Red Book:
© FIDIC 2017. All rights reserved.

The Conditions of Contract are the “General Conditions” which form part of the “Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC) and the following “Particular Conditions” which shall complement the General Conditions of the Contract.

The successful Bidder, upon contract award, shall be required to furnish two (02) copies of aforementioned “General Conditions” for incorporation in the Works Contract.

International Federation of Consulting Engineers (FIDIC) FIDIC
Bookshop – Box- 311 – CH – 1215 Geneva 15, Switzerland
Fax: +41 22 799 49 054
Telephone: +41 22 568 0500
E-mail: fidic@fidic.org
Website:
www.fidic.org
FIDIC code: ISBN13: 978-2-88432-084-9

📑 Special Conditions of Contract (SCC)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

PARTICULAR  CONDITIONS OF CONTRACT (PCC)

Particular Conditions
(Mandatory Provisions not to be amended/substituted) 

The Particular Conditions (PCC) complement the General Conditions (GCC) to specify dates, contractual requirements, and special circumstances related to the Works. The PCC consists of two parts, Part A - Contract Data and Part B - Special Provisions. The provisions to be found in the Special Provisions (Particular Conditions - Part B) take precedence over the equivalent provisions found under the same Sub-Clause number(s) in the General Conditions, and the provisions of the Contract Data (Particular Conditions - Part A) take precedence over the Special Provisions (Particular Conditions - Part B).

PART A - Contract Data

Sub-Clause 1.1.27
Defects Notification Period (DNP): 1092 Days

Sub-Clause 1.1.31 
Employer's name & address: Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory

Sub-Clause 1.1.35 
Engineer's name & address: M/s Osmani & Company (Pvt.) Ltd 

Site Camp Office F-14/15, Opposite to sector G-14/4, Islamabad.

Sub-Clause 1.1.84
Time for Completion: 728 days for whole of the works

Sub-Clause 1.3 (a)(ii)
Agreed method of electronic transmission: Not Agreed

Sub-Clause 1.3 (d)
Address of Empoyer for Communications: 10, Mauve Area, G-10/4, Islamabad Capital Territory
Address of Engineer for Communications: 

Site Camp Office F-14/15, Opposite to sector G-14/4, Islamabad.


Address of Contractor for Communications: -----------------------------

Sub-Clause 1.4
Contract shall be governed by the law of:    Islamic Republic of Pakistan
Ruling language: English
Language for communications: English

Sub-Clause 2.1
After receiving the Letter of Acceptance, the Contractor shall be given right of access to all or part of the Site within: 14 days after Commencement Date

Sub-Clause 2.4
Employer’s financial arrangements:

Self Finance

Sub-Clause 3.2 (e)(ii)
Engineer’s Duties and Authority: Variation resulting in an increase of the Accepted Contract Amount in excess ofone percent (1%)subject to accumulative Variations not exceeding five percent (5%)of the Accepted Contract Amount 

Sub-Clause 4.2
Performance Security (as percentage of the Accepted Contract Amount in Currencies): 10.00%
Form of Performance Guarantee: Bank Guarantee

Sub-Clause 4.2.1
List of Insurance Companies:

N/A

Sub-Clause 4.7.2
period for notification of errors in the items of reference: Twenty Eight (28) days

Sub-Clause 4.19
Period of payment for temporary utilities: Each Month

Sub-Clause 5.1 (a)
Maximum allowable accumulated value of work subcontracted (as a percentage of the Accepted Contract Amount): 30 %

Sub-Clause 5.1 (b)
Parts of the Works for which subcontracting is not permitted: 70

Sub-Clause 6.5
Normal working hours on the Site: 8

Sub-Clause 8.3
Number of additional paper copies of programmes: 6

Sub-Clause 8.8 & 14.15(b)
Delay Damages payable for each day of delay 0.01% of the Accepted Contract Amountfor delay in completion of whole of the Works

Sub-Clause 8.8
Maximum amount of Delay Damages    10.00 % of the Accepted Contract Amount

Sub-Clause 8.14
Applicability of Incentives for Early Completion    No

Sub-Clause 12.3
Percentage profit (Not more than 10%):    Nil

Sub-Clause 13.4.(b)(ii)
Percentage rate to be applied to Provisional Sums for overhead charges and profit: Twenty Five percent (25%)

Sub-Clause 14.2
Total Advance Payment: Fifteen percent (15%) of the Accepted Contract Amount excluding Provisional Sums payable in the currencies and proportions in which the Accepted Contract Amount is payable

Sub-Clause 14.2.1
Advance Payment Insurance Allowed

The advance payment shall be released in two parts: the first installment after submission of the request letter and provision of unconditional and irrevocable Bank Guarantee within fifteen days of signing contract agreement and the remaining half after provision of facilities as prescribed in special provisions and achieving 04% of physical progress within 42 days of signing of contract agreement.

Sub-Clause 14.2.3
Percentage deductions for the repayment of the Advance Payment: Deduction shall be made at the amortization rate of 17.5 % of the value of the Works executed of each IPC as provided in paragraph (i) of Sub-Clause GCC 14.3, starting from 2nd IPC provided that the advance payment shall be completely repaid prior to the time when 90% of the Accepted Contract Amount less Provisional Sums has been certified for payment. It may be more than 17.5% in the last instalment to ensure full repayment.

Sub-Clause 14.3
Period of payment    One Month

Sub-Clause 14.3(b)
Number of additional paper copies of Statements: 2

Sub-Clause 14.3 (iii)
Percentage of retention: Seven percent (7%)

Sub-Clause 14.3 (iii)
Limit of Retention Money (as a percentage of the Accepted Contract Amount): Five percent (5%)

Sub-Clause 14.5(b)(i)
Plant and Materials for payment when shipped: Plant and Materials under Bill of “Imported Plant and Materials” 

Sub-Clause 14.5(c)(i)
Plant and Materials for payment when delivered to the Site: Plant and Non Perishable Materials 

Sub-Clause 14.6.2
Minimum amount of Interim Payment Certificate (IPC): Yes
The Minimum Amount IPC is 60 Million

[Employer to give value not exceeding one fifth of the average expected value of Interim Payment Certificate]

Sub-Clause 14.7(a)
Period of payment of Advance Payment to the Contractor: 14 days

Sub-Clause 14.7b(i)   
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.6:    28 days

Sub-Clause 14.7b(ii)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.13 (Final Payment): 56 days 

Sub-Clause 14.7(c)
Period for the Employer to make final payment to the Contractor: 56 days 

Sub-Clause 14.8
Financing charges for delayed payment Local Currency (PKR):
6-Month KIBOR (Offer) +3% per annum.
Foreign Currency: 
USD
6-Month SOFR (Secured Overnight Financing Rate for USD) +1% per annum.

EURO
6-Month EURIBOR (EURO Interbank Offered Rate for EURO) +1% per annum.

Others
Appropriate rates +1% (for other foreign currencies, Ref. Schedule-A, A-4 to Bid).

Sub-Clause 14.11.1(b)
Number of additional paper copies of draft Final Statements: 6
[insert number of copies say six (06)]

Sub-Clause 14.15
Currencies of payment of Contract Price: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(a)(i)
Proportions or amounts of Local and Foreign currencies: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(c)
Currencies and proportions for payment of Delay Damages: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(f)
rates of exchange: as stated in the Table IV of Schedule A (If Given)

Sub-Clause 17.2(d)
Forces of nature, the risks of which are allocated to the Contractor: Nil

Sub-Clause 19.1
Permitted deductible limits: 
i)    insurance required for the Works: Ten percent (10%) of loss amount on each & every loss
ii)    insurance required for Goods: Nil
iii)    insurance required for liability for breach of professional duty: Nil
iv)    insurance required against liability for fitness for purpose (if any is required): Nil
v)    insurance required for injury to persons and damage to property: Nil
vi)    insurance required for injury to employees: Nil
vii)    other insurances required by Laws and by local practice : Nil  

Periods for submission of insurance:
a)    evidence of insurance: Not later than the Commencement Date
b)    relevant policies: Within twenty eight (28) day from the Commencement Date

Sub-Clause 19.2.1(b)
Additional amount to be insured (as a percentage of the replacement value): 15% of the replacement value (Accepted Contract Amount)
Sub-Clause 19.2.2 
Extent of insurance required for Goods: From Ex-Works (i.e., works, factory, warehouse, etc) to delivery at the Site
Amount of insurance required for Goods: Full replacement value

Sub-Clause 19.2.3(a)
Amount of insurance required for liability for breach of professional duty: Full replacement value of the Works to be designed by the Contractor

Sub-Clause 19.2.3(b)
Insurance required against liability for fitness for purpose: Yes

Sub-Clause 19.2.3
Period of insurance required for liability for breach of professional duty: Until the date of issuance of Performance Certificate

Sub-Clause 19.2.4
Amount of insurance required for injury to persons and damage to property: Injury to person and Fatal case: 
in accordance with Workmen Compensation Act
Damage to Property: The Amount of Insurance Required for Person Injury is 500000
The Amount of Insurance Required for Damage to Property is 1000000 as per his assessment of the adjoining property(ies) other than the Works]
without limit to the number of incidents

Sub-Clause 19.2.6
Other insurances required by Laws and by local practice: All insurances as applicable, to the extent of execution of the project, under Federal and Provincial laws of Islamic Republic of Pakistan

Sub-Clause 21.1
Time for appointment of the DAAB: Within 28 days from the Commencement Date.
In case the Accepted Contract Amount is lesser than PKR one (01) billion, appointment of the DAAB shall be made when Dispute arises between the Parties.

Sub-Clause 21.1
The DAAB shall comprise  3
[insert either “a sole Member” or “Three Members”]
[For a Contract estimated to cost above PKR 2.5billion, the DAAB shall comprise of three members. For a Contract estimated to cost between PKR1billion and PKR2.5billion, the DAAB may comprise of three members or a sole member. For a Contract estimated to cost less than PKR1billion, a sole member is recommended.]

Sub-Clause 21.1
List of proposed members of DAAB
- proposed by Employer

Chief Engineer

Director Law

Director Finance


- proposed by Contractor
[to be inserted at the time of signing of the Contract]
1.________________
2.________________
3.________________

Sub-Clause 21.2
Appointing entity (official) for DAAB members    Managing Director Public Procurement Regulatory Authority (PPRA) or Chairman Pakistan Engineering Council (PEC) from the list of PEC approved arbitrators published at its website

Sub-Clause 21.6
Rules of Arbitration: PEC Rules of Conciliation and Arbitration or Pakistan Arbitration Act of 1940, if the former is inactive.
The place of Arbitration shall be in the Employer’s country: Islamabad
[Insert name of city]

 

Particular Conditions

PartB - Special Provisions

1.1    Definitions

1.1.76 “Specification”
Following is added at the end:
“and consists of two parts i.e.,
i)    “Part A - Specific Provisions”; and 
ii)    “Part B - Technical Provisions”.”

1.2    Interpretation

“and” is deleted from the end of sub-paragraph (i) and added at the end of sub-paragraph (j). 
Sub-paragraph (k) is added:
“(k)    The word “tender” is synonymous with “bid” the word tenderer with “bidder”, the words “tender documents” with “bidding documents” and “Schedule of Prices” with “Bill of Quantities”, as applicable.”


1.5    Priority of Documents   

The documents listed at (a) through (k) of this Sub-Clause are deleted and substituted with the following:
(a)    the Contract Agreement;
(b)    the Letter of Acceptance;
(c)    the Letter of Bid;
(d)    the Particular Conditions Part A - Contract Data;
(e)    the Particular Conditions Part B - SpecialProvisions;
(f)    the General Conditions;
(g)    the Specification Part A - SpecificProvisions;
(h)    the Specification Part B- Technical Provisions;
(i)    the Drawings;
(j)    the completed Schedules to Bid includingBillof Quantities;
(k)    the JV Undertaking (if the Contractor is a JV); and
(l)    any other documents forming part of the Contract.
The addenda/corrigenda, if any, shall be deemed to have been incorporated at the appropriate places in the documents forming the Contract.

1.6    Contract Agreement

In the last line of the 1st paragraph the text “shall be borne by the Employer” is substituted by“ shall be reimbursed by the Employer to the Contractor”.

3.1    The Engineer

In sub-paragraph (a) the text “as defined in the Pakistan Engineering Council Act, 1975 (Act No.V of 1976)” are added after the words “professional engineer”.

3.2    Engineer’s Duties and Authority

The Engineer shall obtain the consent in writing of the Employer before taking action under the following Sub-Clauses of these Conditions:
(a)    Consenting to the subcontracting of any part of the Works under Sub-Clause 5.1 [Subcontractors]
(b)    Any action under Sub-Clauses 8.9 [Employer’s Suspension] and 8.12 [Prolonged Suspension]
(c)    Issuance of “Taking Over Certificate” under Sub-Clause 10.1 [Taking Over the Works and Sections].
(d)    Issuing the “Performance Certificate” under Sub-Clause 11.9 [Performance Certificate].
(e)    Sub-Clause 13.1 [Right to Vary]: instructing a Variation, except;
(i)    in an emergency situation as determined by the Engineer, or
(ii)    if such a Variation would increase the Accepted Contract Amount by less than the percentage specified in the Contract Data.
(f)    Sub-Clause 13.3 [Variation Procedure]: approving a proposal for Variation submitted by the Contractor in accordance with Sub-Clause 13.3.2 [Variation by Request for Proposal] or 13.2 [Value Engineering].
(g)    Certifying release of second half of the Retention Money under Sub-Clause 14.9 [Release of Retention Money].
(h)    Issuing Final Payment Certificate under Sub-Clause 14.13 [Issue of FPC].
(i)    
*[insert Sub-Clause number (not Sub-Clause 3.7 [Agreement or Determination]
Any such requirement shall not be applied to any action by the Engineer under Sub-Clause 3.7 [Agreement or Determination], as stated in Sub-Clause 3.2 [Engineer’s Duties and Authority] of the General Conditions.
Notwithstanding the obligation, as set out above, to obtain approval, if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of the Works or of adjoining property, he may, without relieving the Contractor of any of his duties and responsibility under the Contract, instruct the Contractor to execute all such work or to do all such things as may, in the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith comply, despite the absence of approval of the Employer, with any such instruction of the Engineer. The Engineer shall determine an addition to the Contract Price, in respect of such instruction, in accordance with Clause 13 and shall notify the Contractor accordingly, with a copy to the Employer.
Following is added after the words “the Employer’s consent is required” in 4th paragraph:
“stating that the Employer’s consent has been obtained for that specified authority”

4.2    Performance Security

4.2.1    Contractor’s Obligations
The entity issuing the Performance Security and its form shall be as under:
The Performance Security shall be, at the option of the Contractor,issuedin the prescribed form included in the Bidding Documents,by(a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistan or (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofratingas provided in Table below:
Accepted Contract Amount (In Eq. PKR million)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA
In case of Joint Venture, the Performance Security shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
Following paragraph is added at the end of this Sub-Clause:
“The amount of Performance Security shall be reducedto 50%following issue of the Taking-Over Certificate for the whole of the Works under Clause 10 of Conditions of Contract.”

4.3    Contractor’s Representative

In second paragraphthe text “professional engineer as defined in the Pakistan Engineering Council Act, 1975 (Act No. V of 1976) (having temporary licence in case of foreign engineer under Section 12 of the Pakistan Engineering Council Act, 1975 (Act No. V of 1976)” are added after the words “qualified, experienced”.
In the 3rd paragraph the words “28 days” are substituted by “14 days”. In 2nd line of 4thparagraph the text “or appoint a replacement” is substituted by “except appointment of a suitable temporary replacement is deployed at the Site”

4.4    Contractor’s Documents

4.4.2    As-Built Records
First paragraph is deleted and the text in the last paragraph is substituted with the following:
“The Contractor shall furnish to the Engineer 6 copies, one reproducible and one electronic copy(provided the Engineer has made available to the Contractor editable form of the Drawings)of all Drawings amended to conform to the Works as built.In case the Engineer does not make available to the Contractor editable form of the Drawings, the Contractor shall furnish to the Engineer as-built data for incorporation in the Drawings. Upon receipt of PDF versions of the as-built drawings prepared by the Engineer, the Contractor shall furnish to the Engineer 6copies and one reproducible of these Drawings.
The price of such Drawings shall be deemed to be included in the Contract Price.”
Following Sub-Clause is added:
4.4.4    ShopDrawings
The Contractor shall submit to the Engineer for review 3 copies of all shop and erection drawings applicable to this Contract as per provision of relevant Sub-Clause of the Contract.
Review and approval by the Engineer shall not exceed 21 days and be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory and the Engineer’s review or approval shall not relieve the Contractor of any of his responsibilities under the Contract.

4.8    Health and Safety Obligations

The following text is added at the end ofthis Sub-Clause:
In the event of work being carried out outside the normal working hours and in the event of work being carried out at night, the Contractor shall at his own cost, provide and maintain such good and sufficient light as will enable the work to proceed satisfactorily and without danger. The approaches to the Site and the Works where the night work is being carried out shall be sufficiently lighted. All arrangement adopted for such lighting shall be to the satisfaction of the Engineer.

4.20    Progress Reports

At the end of sub-paragraph (g) the word “and” is deleted and at the end of sub-paragraph (h) the full stop (.) is replaced with “;”, and the following new sub-paragraphs are added as:
(i)    planned programme for the execution of the Works for next 56 days to enable the Engineer to determine its programme of inspection and testing;
(j)    monthly summery of daily job record indicating weather conditions, deployment of Contractor’s Equipment, labour employment, local material procurement and material import, if any; and
(k)    salient contractual and project information.

5.1    Subcontractors

Add the following text at the end of paragraph (ii):
“underSchedule to Bid”
The following is added at the end of the last paragraph of Sub-Clause 5.1:
“All subcontracts relating to the Works shall include provisions which entitle the Employer to require the subcontract to be assigned to the Employer under sub-paragraph (a) of Sub-Clause 15.2.3 [After Termination].
The Contractor shall give reasonable opportunity to contractors from Islamic Republic of Pakistan for subcontracts for the Works, and endeavour to employ such contractors as Subcontractors.”

5.2    Nominated Subcontractors

5.2.2    Objection to Nomination
In sub-paragraph (c), “and” is deleted from the end of (i);
 “.” at the end of (ii) is replaced with: “, and”. 
The following is then added as (iii):  
“(iii)    be paid only if and when the Contractor has received from the Employer payments for sums due under the Subcontract referred to under Sub-Clause 5.2.3 [Payment to nominated Subcontractors].”

6.1    Engagement of Staff and Labour

The following paragraph is added at the end of the Sub-Clause:
“The Contractor shall, to the extent practicable and reasonable, employ staff (not less than 50%) and labour (not less than 85%) with appropriate qualifications and experience from sources within the Islamic Republic of Pakistan.”

6.7    Health and Safety of Personnel

The existing text is substituted with the following:
“In order to provide for the safety, health and welfare of persons, and for prevention of damage of any kind, all operations for the purposes of or in connection with the Contract shall be carried out in compliance with the Safety Requirements of the Government of Pakistan with such modifications thereto as the Engineer may authorize or direct and the Contractor shall take or cause to be taken such further measures and comply with such further requirements as the Engineer may determine to be reasonably necessary for such purpose. The Contractor shall also provide all other medical services and appoint a health and safety officer at Site if stated in the Specifications. In case of any fatality or serious accident, the Contractor shall, in addition, notify the Engineer immediately by the quickest available means.”

6.8    Contractor’s Superintendence

Insert at the end of sub-paragraph (a) of this Sub-Clause:
"or, if not, the Contractor shall make competent interpreters available during all working hours, in a number sufficient for those persons to properly perform their superintendence duties"
The following text is added at the end of this Sub-Clause: 
“The Contractor’s authorized representative and his other engineers working at site shall possess valid registration with the Pakistan Engineering Council.
The Contractor’s authorized representative at Site shall be authorized to exercise adequate administrative and financial powers on behalf of the Contractor so as to achieve completion of the Works as per the Contract.”

6.12    Key Personnel

The following is inserted at the end of the last paragraph: 
“If any of the Key Personnel are not fluent in this language, the Contractor shall make competent interpreters available during all working hours in a number deemed sufficient by the Engineer.”
The following Sub-Clauses 6.13 to 6.26 are added at the end of Sub-Clause 6.12:

6.13    Foreign Personnel

The Contractor may bring in to the Country any foreign personnel who are necessary for the execution of the Works to the extent allowed by the applicable Laws. The Contractor shall ensure that these personnel are provided with the required residence visas and work permits. The Employer will, if requested by the Contractor, use all reasonable endeavours in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national, or government permission required for bringing in the Contractor’s personnel.
The Contractor shall be responsible for the return of these personnel to the place where they were recruited or to their domicile. In the event of the death in the Country of any of these personnel or members of their families, the Contractor shall similarly be responsible for making the appropriate arrangements for their return or burial.

6.14    Supply of Foodstuffs

The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Specification at reasonable prices for the Contractor’s Personnel for the purposes of or in connection with the Contract.

6.15    Supply of Water

The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor’s Personnel.

6.16    Measures against Insect and Pest Nuisance

The Contractor shall at all times take the necessary precautions to protect the Contractor’s Personnel employed on the Site from insect and pest nuisance, and to reduce the danger to their health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.

6.17    Alcoholic Liquor or Drugs

The Contractor shall not, otherwise than in accordance with the Laws of the Country, import, sell, give, barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift, barter or disposal thereto by Contractor’s Personnel.

6.18    Arms and Ammunition

The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor’s Personnel to do so.

6.19    Festivals and Religious Customs

The Contractor shall respect the Country’s recognized festivals, days of rest and religious or other customs.

6.20    Funeral Arrangements

The Contractor shall be responsible, to the extent required by local regulations, for making any funeral arrangements for any of its local employees who may die while engaged upon the Works.

6.21    Forced Labour

The Contractor, including its Subcontractors, shall not employ or engage forced labour which consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.

6.22    Child Labour

The Contractor, including its Subcontractors, shall not employ or engage child labour in accordance with relevant law(s) in force in Islamic Republic of Pakistan.

6.23    Employment Records of Workers

The Contractor shall keep complete and accurate records of the employment of labour at the Site. The records shall include the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis and submitted to the Engineer. These records shall be included in the details to be submitted by the Contractor under Sub-Clause 6.10 [Contractor’s Records].

6.24    Workers’ Organizations

The Contractor shall comply with the relevant labour laws of Pakistan which recognize workers’ rights to form and to join workers’ organizations/Trade Union of their choosing and to bargain collectively without interference.

6.25    Non-Discrimination and Equal Opportunity

The Contractor shall not make decisions relating to the employment or treatment of Contractor’s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor’s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices. 
Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure nondiscrimination and equal opportunity, including for specific groups such as women, persons with disabilities, migrant workers and children (of working age in accordance with Sub-Clause 6.22).

6.26    Epidemics   

In the event of any out-break of illness of epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government or the local medical or sanitary authorities for the purpose of overcoming the same.

7.7    Ownership of Plant and Materials

The following is added before the first paragraph:
“Except as otherwise provided in the Contract,” 
The following is added at the end of the Sub-Clause:
"No Plant and/or Materials that is the property of the Employer shallbe removed from the Site. If it becomes necessary to:
(i)    remove any item of such Plant from the Site for the purposesof repair, the Contractor shall give a Notice, with reasons, tothe Engineer requesting consent to remove the defective ordamaged item off the Site. This Notice shall clearly identifythe item of defective or damaged Plant, and shall give detailsof: the defect or damage to be repaired; the place to whichdefective or damaged item of Plant is to be taken for repair;the transportation to be used (and insurance cover for suchtransportation); the proposed inspections and testing off theSite; and the planned duration required before the repaireditem of Plant shall be returned to the Site. The Contractorshall also provide any further details that the Employer mayreasonably require; or
(ii)    replace any item(s) of such Plant and/or Materials, theContractor shall give a Notice, with reasons, to the Engineerclearly identifying the item(s) of Plant and/or Materials to bereplaced, and giving details of the due date of delivery tothe Site of the replacement item(s).
Where any item of Plant and/or Materials has become the propertyof the Employer under this Sub-Clause before it has been deliveredto the Site, the Contractor shall ensure that such an item is notmoved except for its delivery to the Site.
The Contractor shall indemnify and hold the Employer harmlessagainst and from the consequences of any defect in title orencumbrance or charge (except any reasonable restrictionarising from the intellectual property rights of the manufacturer orproducer) on any item of Plant and/or Materials that has becomethe property of the Employer under this Sub-Clause."
The following Sub-Clause7.9 is added after Sub Clause 7.8:

7.9    Use of Pakistani Materials and Services

The Contractor shall, so far as may be consistent with the Contract, make the maximum use of materials, supplies, plant and equipment indigenous to or produced or fabricated in Pakistan and services available in Pakistan provided such materials, supplies, plant, equipment and services shall be of required standard.

8.1    Commencement of Works

The following is added before the first paragraph:
“After signing of the Contract Agreement by both Parties,” and thereafter the word “The” is replaced with the word “the”.

8.5    Extension of Time for Completion

The following is added after paragraph (c):
“for last five years”.
The following Sub-Clause 8.14 is added after Sub-Clause 8.13:

8.14    Incentives For Early Completion

If Contract Data does not state applicability of incentives for early completion, this Sub-Clause shall not apply.
The Contractor shall be entitled subject to Sub-Clause 20.2 [Claims for Payment and/or EOT] to bonus payment if the Works and/or each Section is completed earlier than the Time for Completion for the Works or Section (as the case may be). The amount of bonus for early completion of the Works and/or each Section shall be upto a limit and at a rate to 50% of the relevant limit and rate of delay damages prescribed in Contract Data and shall be paid for every day which shall elapse between the relevant Date of Completion of the Works or Section and the relevant Time for Completion.
For the purposes of calculating any bonus payment, the applicableTime for Completion stated in the Contract Data is fixed and noadjustments of this time by reason of granting an EOT will beallowed.
The following Sub-Clause 11.12 is added after Sub-Clause 11.11:

11.12    Supervisory Assistance During DNP

If provided under the Schedule of Prices, the Contractor shall provide supervisory assistance to the Employer during the DNP for the Works. Such supervisory assistance shall be as described in the Specification for the purpose of supporting the Employer's operation and maintenance of the Plant for the period specified in the Schedule of Prices after the Date of Completion.

12.2    Method of Measurement

The following paragraph is added at the end of the Sub-Clause:
“Summary of measured quantity for payment shall be delineated item-wise under four headsnamely; “Schedule of Prices Quantity”, “Quantity Executed To-date”, “Quantity Certified Previously” and “Net Quantity Executed under this Certificate”.

12.3    Valuation of the Works

The following text is added at the end of fifth paragraph of the Sub-Clause:
“Sum of overhead charges and profit for sub-paragraph (a) shall be Twenty Five percent (25%)”.

13.4    Provisional Sums

The following paragraph is inserted as the penultimate paragraph:
“The Provisional Sum shall be used to cover the Employer’s share of the DAAB members’ fees and expenses, in accordance with Clause 21. No prior instruction of the Engineer shall be required with respect to the work of the DAAB. The Contractor shall submit the DAAB members’ invoices and the satisfactory evidence of having paid 100% of such invoices as part of the substantiation of those Statements submitted under Sub-Clause 14.3.

13.6    Adjustments for Changes in Laws

The following paragraphsare added at the end of the Sub-Clause:
“Notwithstanding the foregoing, the Contractor shall not be entitled to an extension of time if the relevant delay has already been taken into account in the determination of a previous extension of time and such Cost shall not be separately paid if the same shall already have been taken into account in the indexing of any inputs to the Table of Adjustment Data in accordance with the provisions of Sub-Clause 13.7 [Adjustments for Changes in Cost].”

14.1    The Contract Price

The following is added at the end of the Sub-Clause: 
“Notwithstanding the provisions of subparagraph (b), Contractor's Equipment, including essential spare parts, imported by the Contractor for the sole purpose of executing the Contract shall be temporarily exempt from the payment of import duties and taxes upon initial importation, provided the Contractor shall post with the customs authorities at the port of entry an approved re-export bond or bank guarantee, valid until the Time for Completion plus six months, in an amount equal to the full import duties and taxes which would be payable on the assessed imported value of such Contractor's Equipment and spare parts, and callable in the event the Contractor's Equipment is not re-exported from the Country on completion of the Contract. A copy of the bond or bank guarantee endorsed by the customs authorities shall be provided by the Contractor to the Employer upon the importation of individual items of Contractor's Equipment and spare parts. Upon re-export of individual items of Contractor's Equipment or spare parts, or upon the completion of the Contract, the Contractor shall prepare, for approval by the customs authorities, an assessment of the residual value of the Contractor's Equipment and spare part to be re-exported, based on the depreciation scale(s) and other criteria used by the customs authorities for such purposes under the provisions of the applicable Laws. Import duties and taxes shall be due and payable to the customs authorities by the Contractor on (a) the difference between the initial imported value and the residual value of the Contractor's Equipment and spare parts to re-exported; and (b) on the initial imported value of the Contractor's Equipment and spare parts remaining in the Country after completion of the Contract. Upon payment of such dues within 28 days of being invoiced, the bond or bank guarantee shall be reduced or released accordingly; otherwise the security shall be called in the full amount remaining.”
[The Employer may change or delete this Sub-Clause as per Project requirements]

14.2    Advance Payment

14.2.1    Advance Payment Guarantee
The entity issuing the Advance PaymentGuaranteeand its form shall be as under:
The Advance PaymentGuarantee shall be in the form of Guarantee issued by (a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistanor (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA
In case of Joint Venture, the Advance PaymentGuarantee(s)shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.

14.6    Issue of IPC

14.6.1    The IPC
In the first line of the 1st paragraph the words “28 days” are substituted by “14 days”.

14.7    Payment

The words “or through crossed cheque in favour of the Contractor or JV partners. The Payment to JV partners shall be made at the request of the Joint Ventures in the ratio of their shares specified by them” are added at the end of the Sub-Clause.

14.8    Delayed Payment

In the first paragraph, third line, the words “compounded monthly” are deleted.
The text of 2nd paragraph is deleted and substituted with the following:
“The Employer shall pay to the Contractor compensation at the rate stated in the Contract Data.”

14.9    Release of Retention Money

The following is added at the end of Sub-Clause 14.9:
“Unless otherwise stated in the Contract, when the Taking-Over Certificate has been issued for the Works and the first half of the Retention Money has been certified for payment by the Engineer, the Contractor shall be entitled to substitute a guarantee, in the form annexed to the Particular Conditions or in another form approved by the Employer and issued by a schedule bank selected by the Contractor, for the second half of the Retention Money. The Contractor shall ensure that the guarantee is in the amounts and currencies of the second half of the Retention Money and is valid and enforceable until the Contractor has executed and completed the Works and remedied any defects, as specified for the Performance Security. On receipt by the Employer of the required guarantee, the Engineer shall certify, and the Employer shall pay the second half of the Retention Money. The release of the second half of the Retention Money against a guarantee shall then be in lieu of the release after the latest of the expiry dates of the Defects Notification Periods. The Employer shall return the guarantee to the Contractor within 21 days after receiving a copy of the Performance Certificate.

If the Performance Security required under Sub-Clause 4.2 is in the form of a demand guarantee, and the amount guaranteed under them when the Taking-Over Certificate is issued is more than half of the Retention Money, then the Retention Money guarantee will not be required. If the amount guaranteed under the Performance Security when the Taking-Over Certificate is issued is less than half of the Retention Money, the Retention Money guarantee will only be required for the difference between half of the Retention Money and the amount guaranteed under the Performance Security.

15.2    Termination for Contractor’s Default

15.2.1    Notice
Following text is added at the end of sub-paragraph (h) of this Sub-Clause:
“For the purposes of this Contract, corrupt and fraudulent practices have been defined in Public Procurement Rules 2026.”
15.2.3    After Termination
The word “and” at the end of sub-paragraph (ii) of paragraph (b) is deleted the following paragraph is added after sub-paragraph (iii):
“(iv)    all Employer-Supplied Materials and/or Employer's Equipment madeavailable to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer's Equipment], and”

15.4    Payment after Termination

The following text is added at the end of this Sub-Clause:
“The Employer shall be entitled to sell any of the Contractor’s Equipment, Temporary Works and unused materials and apply the proceeds of sale towards payment of any debt due from the Contractor to the Employer under this Clause including any outstanding payments to the Subcontractors.

16.2    Termination by Contractor

16.2.1    Notice
The sub-paragraph (j) is deleted in its entirety.
At the end of sub-paragraph (i) “; or” is replaced with “.” and at the end of sub-paragraph (h) “;” is replaced with “; or”.
In sub-paragraph (f) “84 days” are replaced with “180 days” and text “for reasons not attributable to the Contractor” is added at the end.

16.3    Contractor’s Obligations After Termination

Sub-paragraph (c) is deleted and replaced with:
"(c)    deliver to the Engineer all Employer-Supplied Materials and/orEmployer's Equipment made available to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer’s Equipment]; and
(d)    remove all other Goods from the Site, except as necessary for safety,and leave the Site."

17.1    Responsibility for Care of the Works

After the two instances of “Goods” in the last paragraph, the words “Employer-Supplied Materials and/orEmployer's Equipment” are added.
The following Sub-Clause 17.7 is added after Sub-Clause 17.6:

17.7    Use of Employer’s Accommodation/Facilities

The Contractor shall take full responsibility for the care of the items of the Employer’s facilities and/or accommodation, if any, as detailed in the Specification, from the date of use and/or occupation by the Contractor until the date on which such use and/or occupation is re-vested in the Employer.
If any loss or damage happens to any of the above items during a time while the Contractor is responsible for its care, arising from any cause other than a cause for which the Employer is responsible or liable, the Contractor shall promptly rectify the loss or damage at the Contractor’s risk and cost.

18.1    Exceptional Events

The words “or disorder” are replaced with “disorder or sabotage” in sub-paragraph (c) of the Clause.

18.4    Consequences of an Exceptional Event

The following is added at the end of sub-paragraph (b) after deleting the “.”: 
“, including the costs of rectifying or replacing the Works and/or Goods damaged or destroyed by Exceptional Events, to the extent they are not indemnified through the insurance policy referred to in Sub-Clause 19.2 [Insurance to be provided by the Contractor].”

18.5    Optional Termination

In sub-paragraph (c), the words “and necessarily” areadded after the words “was reasonably”.

19.1    General Requirements

Following text is added at the end of first paragraph:
“The Contractor shall immediately after the date of the Letter of Acceptance submit the draft of insurance policies for the Employer’s consent.”
Following text is added at the end of third paragraph:
“The Contractor shall, within the respective periods stated in the Contract Data submit to the Engineer and the Employer a) evidence that the insurances described in this Clause have been effected, and b) copies of policies of the insurances described in Sub-Clauses 19.2.1, 19.2.4 and 19.2.5.”

19.2    Insurance to be provided by the Contractor   

19.2.5    Injury to employees
The words “sickness, disease” are deleted in the third line of first paragraph.

The following Sub-Clause is added after Sub-Clause 19.2.6:
19.2.7    Insurance Company
“The Contractor shall be obliged to place all insurances described in this Clause with insurers listed in the Contract Data and rated byPACRA/VISofrating as provided in Table below:

Accepted Contract Amount (In Eq. million PKR)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA

21.6    Arbitration

    The word “international” is deleted in the sixth line of first paragraph. The text of sub-paragraph (a) is substituted with the following:
“the Dispute shall be finally settled under the Rules of Arbitration, specified in the Contract Data;”
The following Clauses are added after Clause 21

22    Custom Duty   

[Employer may incorporate provisions where applicable. However, in order to make the bid more balanced, the payment of Customs Duties should be the responsibility of the Employer.]

23    Taxes   

The Contractor, Subcontractors and their employees shall be liable to pay income tax, withholding tax, super tax and other taxes on income arising out of the Contract. The rates and prices as stated in the contract shall be deemed to cover all such taxes.

24    Integrity Part

If it is found and established at any stage that the Contractor or any of his Subcontractors, agents or servants have violated or involved in violation of the Integrity Pact signed by the Contractor then the Employer shall be entitled to :
(a)    recover from the Contractor an amount equivalent to ten times the sum of any commission, gratification, bribe, finder’s fee or kickback given by the Contractor or any of his Subcontractors, agent or servants;
(b)    terminate the Contract; and
(c)    recover from the Contractor any loss or damage to the Employer as a result of such termination or of any other corrupt business practices of the Contractor or any of his Subcontractors, agent or servants. 
The termination under sub-paragraph(b) of this Sub-Clause shall proceed in the manner prescribed under Sub-Clause 15.1 to 15.4 and the payment under Sub-Clause 15.4 shall be made after having deducted the amounts due to the Employer under sub-paragraph(a) and (c) of this Sub-Clause.


Appendix     General Conditions of Dispute Avoidance/Adjudication Agreement

12    Disputes Under DAAB Agreement

In the first paragraph, third, fourth and fifth line, the text “under the Rules of Arbitration of the International Chamber of Commerce 2017……………shall apply” is substituted with “under the Arbitration Act 1940 by sole arbitrator appointed by the Managing Director Public Procurement Regulatory Authority or Chairman Pakistan Engineering Council.”

 

 

 

 

📑 Bid Securing Declaration (BSD)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

FORM OF BID SECURING DECLARATION

Date: 
No.: 
Alternative No.: P200199

To: Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory

We, the undersigned, declare that:

We understand that, according to your conditions, Bids must be supported by a Bid-Securing Declaration.

We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:

(a)     have withdrawn our Bid during the period of Bid validity specified in the Letter of Bid; or
(b)     having been notified of the acceptance of our Bid by the Procuring agency/Employer during the period of Bid validity, (i) fail or refuse to sign the Contract; or (ii) fail or refuse to furnish the Performance Security (or guarantee), if required, in accordance with the ITB.

We understand this Bid Securing Declaration shall expire if we are not the successful Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight days after the expiration of our Bid.

 

Name of the Bidder*    
Name of the person duly authorized to sign the Bid on behalf of the Bidder**    _______
Title of the person signing the Bid    ______________________
Signature of the person named above    ______________________
Date signed ________________________________ day of ___________________, _____
*: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder
**: Person signing the Bid shall have the power of attorney given by the Bidder attached to the Bid

[Note: In case of a Joint Venture, the Bid-Securing Declaration must be in the name of all members to the Joint Venture that submits the Bid.]

📑 Contract Form (CNF)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

FORM OF CONTRACT AGREEMENT

THIS CONTRACT AGREEMENT (hereinafter called the “Agreement”) made on the _________ day of __________ (month) 20_____ between Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory (hereinafter called the “Employer”) of the one part and __________________________________________________ (hereinafter called the “Contractor”) of the other part.
WHEREAS the Employer is desirous that certain Works, viz., LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD. (P200199) should be executed by the Contractor and has accepted a Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein.
NOW this Agreement witnessed as follows:
1.    In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2.    The following documents, in the order of priority, after incorporating addenda, if any, except those parts relating to Instructions to Bidders shall be deemed to form and be read and construed as part of this Agreement:
a)    This Contract Agreement;
b)    The Letter of Acceptance;
c)    The Letter of Bid;
d)    The Particular Conditions Part A - Contract Data;
e)    The Particular Conditions Part B - SpecialProvisions;
f)    The General Conditions;
g)    The Specifications Part A - SpecificProvisions;
h)    The Specifications Part B- Technical Provisions;
i)    The Drawings;
j)    The Completed Schedules to Bid including Schedule of Prices;
k)    the JV Undertaking (if the Contractor is a JV); and
l)    [Employer to insert any other documents forming part of the Contract]

The addenda/corrigenda,if any, (Excluding part relating to Instructions to Bidders alongwith Bidding Data) shall be deemed to have been incorporated at the appropriate places in the “Documents forming the Contract”.
3.    In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy defects therein in conformity and in all respects with the provisions of the Contract.
4.    The Employer hereby covenants to pay the Contractor, in consideration of the execution and completion of the Works as per provisions of the Contract, the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.


IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on the day, month and year first before written in accordance with their respective laws.

 

Signature of the Contactor        Signature of Employer
        
(Seal)        (Seal)
Signed, Sealed and Delivered in the presence of:

Witness        Witness
        
        
(Name, Title and Address)        (Name, Title and Address)

 

DAAB Agreement

[All italicised text and any text within square brackets (except sub-clause headings) in this form of agreement is for use in preparing the form and should be deleted from the final product].

Name and details of the Contract LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.
______________________________________________________________________________

This Agreement made the ______day of ______ [month], _____ [year], between

Name and contact details of the Employer  Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director    
   10, Mauve Area, G-10/4, Islamabad Capital Territory
   +92-321-538-5944
   director.technical@fgeha.gov.pk


Name and contact details of the Contractor     _____________________________________ (name)
    ____________________________________ (address)
    __________________________________ (telephone)
    ___________________(email / other contact details);

Name and contact details of the DAAB Member    _____________________________________ (name)
    ____________________________________ (address)
    __________________________________ (telephone)
    ___________________(email / other contact details);


(“DAAB Agreement”)

Whereas:
A.    the Employer and the Contractor have entered (or intend to enter) into the Contract;
B.    under the Contract, the “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole member or three members (as stated in the Contract Data of the Contract) so named in the Contract, or appointed under Sub-Clause 21.1 [Constitution of the DAAB] or Sub-Clause 21.2 [Failure to Appoint DAAB Members] of the Conditions of Contract;
C.    the Employer and the Contractor desire jointly to appoint the above-named DAAB Member to act on the DAAB as:
a.    the sole member of the DAAB, and where this is the case, all references to the “Other Members” do not apply; or
b.    one of three members / chairman [delete the one which is not applicable] of the DAAB and, where this is the case, the other two persons are:

 

____________________________ (name)    _________________________ (name)
___________________________ (address)    _______________________ (address)
_____________________________(telephone)    ______________________(telephone)
______________(email/ other contact details)    _______ (email/other contact details)

the “Other Members”; and
D.    the DAAB Member accepts this appointment.

The Employer, Contractor and DAAB Member jointly agree as follows:

1.    The conditions of this DAAB Agreement comprise:
(a)    Clause 21 [Disputes and Arbitration] of the Conditions of Contract, and any other provisions of the Contract that are applicable to the DAAB’s Activities; and
(b)    the “General Conditions of Dispute Avoidance/Adjudication Agreement”, which is appended to the General Conditions of the “Conditions of Contract for Construction” Second Edition 2017 published by FIDIC (“GCs”), as amended and/or added to by the following provisions.
2.    [Details of amendments to the GCs, if any. For example:
In the procedural rules annexed to the GCs, Rule _ is deleted and replaced by: “ … “]
3.    The DAAB Member shall be paid in accordance with Clause 9 of the GCs. The currency of payment shall be ________.
In respect of Sub-Clauses 9.1 and 9.2 of the GCs, the amounts of the DAAB Member’s monthly fee and daily fee shall be:
monthly fee___________________ per month, and
daily fee of____________________ per day
(or as otherwise set under Sub-Clause 9.3 of the GCs).
4.    In consideration of the above fees, and other payments to be made to the DAAB Member in accordance with the GCs, the DAAB Member undertakes to act as DAAB Member in accordance with the terms of this DAAB Agreement.
5.    The Employer and the Contractor shall be jointly and severally liable for the DAAB Member’s fees and other payments to be made to the DAAB Member in accordance with the GCs.
6.    This DAAB Agreement shall be governed by the law of _____________ (if not stated, the law that governs the Contract under Sub-Clause 1.4 of the Conditions of Contract).

SIGNED by:_______________    SIGNED by:_______________    SIGNED by:_______________
Print name:_________________    Print name:_________________    DAAB Member
Title: _____________________    Title:______________________    Title:______________________
for and on behalf of the
Employer    for and on behalf of the
Contractor    
in the presence of    in the presence of    in the presence of
Witness:___________________    Witness:___________________    Witness:___________________
Name:_____________________    Name:_____________________    Name:_____________________
Address:___________________    Address:___________________    Address:___________________
__________________________    __________________________    __________________________
Date:______________________    Date:______________________    Date:______________________

 

FORM OF MOBILIZATION ADVANCE GUARANTEE/ BOND

Guarantee No._________________________________________ Date _________________


WHEREAS _____________________________________ (hereinafter called the 'Employer')
has entered into a Contract for __________________________________________________
(Particulars of Contract)
with ____________________________________________ (hereinafter called the "Contractor').
AND WHEREAS, the Employer has agreed to advance to the Contractor, at the Contractor's request, an amount of Pak Rupees ___________________________________ (PKR _________ ) which amount shall be advanced to the Contractor as per provisions of the Contract.
AND WHEREAS, the Employer has asked the Contractor to furnish Guarantee to secure the mobilization advance for the performance of his obligations under the said Contract.
AND WHEREAS, ____________________________________________________________

(hereinafter called the “Guarantor”) at the request of the Contractor and in consideration of theEmployer agreeing to make the above advance to the Contractor, has agreed to furnish the said Guarantee.
NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the advance for the purpose of above mentioned Contract and if he fails and commits default in fulfilment of any of his obligations for which the advance payment is made, the Guarantor shall be liable to the Employer for payment not exceeding the aforementioned amount.
Notice in writing of any default,on the part of the Contractor, of which the Employer at his discretion of making decision, shall be given by the Employer to the Guarantor, and on such first written demand, payment shall be made by the Guarantor of all sums then due under this Guarantee without any reference to the Contractor and without any objection.
This Guarantee shall remain in force until the advance is fully adjusted against payments from the Interim Payment Certificates of the Contractor or until _________________________whichever is earlier.                                    (Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of 
PKR ______________________ (PakRupees ________________________________________________).
This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the aforesaid date or earlier if the advance made to the Contractor is fully adjusted against paymentsfrom Interim Payment Certificates of the Contractor provided that the Guarantor

agrees that the aforesaid period of validity shall be deemed to be extended if on the above mentioned date the advance payment is not fully adjusted.

 

Guarantor
(Scheduled Bank/ Insurance Company)

Signature ________________________________________________
Name ________________________________________________
Title ________________________________________________ 

 

WITNESS:                        

           

1.     ________________________________________________
       ________________________________________________                             
       Corporate Secretary (Seal)     Corporate Guarantor (Seal)

2.    ________________________________________________
       ________________________________________________              
       Name, Title & Address

 

 

Retention Money Security
Demand Guarantee

________________________________ [Guarantor letterhead or SWIFT identifier code]
Beneficiary:    ___________________ [Insert name and Address of Employer]        
Date:    ________________[Insert date of issue]
RETENTION MONEY GUARANTEE No.:    [Insert guarantee reference number]
Guarantor:  [Insert name and address of place of issue, unless indicated in the letterhead]

We have been informed that ________________ [insert name of Contractor, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called "the Contractor") has entered into Contract No. _____________ [insert reference number of the contract] dated ____________ with the Employer, for the execution of _____________________ [insert name of contract and brief description of Works] (hereinafter called "the Contract"). 
Furthermore, we understand that, according to the conditions of the Contract, the Employer retains moneys up to the limit set forth in the Contract (“the Retention Money”), and that when the Taking-Over Certificate has been issued under the Contract and the first half of the Retention Money has been certified for payment, payment of [insert the second half of the Retention Money orifthe amount guaranteed under the Performance Guarantee when the Taking-Over Certificate is issued is less than half of the Retention Money, the difference between half of the Retention Money and the amount guaranteed under the Performance Security and, if required, the ES Performance Security] is to be made against a Retention Money guarantee.
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ [insert amount in figures] () [amount in words] upon receipt by us of the Employer’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand,  stating that the Applicant is in breach of its obligation(s) under the Contract, without your needing to prove or show grounds for your demand or the sum specified therein. 
A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Employer’s bank stating that the second half of the Retention Money as referred to above has been credited to the contractor on its account number ___________ at _________________ [insert name and address of Contractor’s bank].
This guarantee shall expire no later than the …. day of ……, 2…, and any demand for payment under it must be received by us at the office indicated above on or before that date.

____________________     
[signature(s)]

Note:  All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.

 

 

 

📑 Integrity Pact (INP)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

Integrity Pact

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC. PAYABLE BYTHE SUPPLIERS OF GOODS, SERVICES & WORKS IN  CONTRACTS WORTH RS.10.00 MILLION OR MORE

 

Contract                           Number:  Contract                               Value:  Contract Title:

Dated:

 

[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.

Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.

[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

 

Name of Employer: ………………                                           Name of Bidder/Contractor: ……………
Signature: ……………………                                                   Signature: …………………………….
[Seal]                                                                                   [Seal]

📑 Performance Guarantee Form (PGF)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

FORM OF PERFORMANCE SECURITY

Guarantee No.___________________
Executed on ____________________
Expiry date _____________________


Name of Guarantor with address: _________________________________________________________________________________________________________________________________

Name of Principal (Contractor) with address:___________________________________________________________________________________________________________________________

Penal Sum of Security (express in words and figures) ____________________________________________________________________________________________________________________

Letter of Acceptance No. _____________________________________Dated __________________

KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bidding Documents and above said Letter of Acceptance (hereinafter called the Documents) and at the request of the said Principal we, the Guarantor above named, are held and firmly bound unto the Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory (hereinafter called the Employer) in the penal sum of the amount stated above for the payment of which sum well and truly to be made to the said Employer, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has accepted the Employer's above said Letter of Acceptance for _____________________________________ ________________________________

(Name of Contract) for the LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD. (P200199)
______________________________________________ (Name of Project).

NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all the undertakings, covenants, terms and conditions of the said Documents during the original terms of the said Documents and any extensions thereof that may be granted by the Employer, with or without notice to the Guarantor, which notice is, hereby, waived and shall also well and truly perform and fulfill all the undertakings, covenants terms and conditions of the Contract and of any and all modifications of said Documents that may hereafter be made, notice of which modifications to the Guarantor being hereby waived, then, this obligation to be void; otherwise to remain in full force and virtue till all requirements of Clause11, Defects After Taking Over, of Conditions of Contract are fulfilled.

Our total liability under this Guarantee is limited to the sum stated above and it is a condition of any liability attaching to us under this Guarantee that the claim for payment in writing shall be received by us within the validity period of this Guarantee, failing which we shall be discharged of our liability, if any, under this Guarantee.

We, _________________________________________________ (the Guarantor), waiving all objections and defense under the Contract, do hereby irrevocably and independently guarantee to pay to the Employer without delay upon the Employer's first written demand without cavil or arguments and without requiring the Employer to prove or to show grounds or reasons for such demand any sum or sums up to the amount stated above, against the  Employer's written declaration that the Principal has refused or failed to perform the obligations under the Contract which payment will be effected by the Guarantor to Employer’s designated Bank & Account Number.

PROVIDED ALSO THAT the Employer shall decide, whether the Principal (Contractor) has duly performed his obligations under the Contract or has defaulted in fulfilling said obligations and the Guarantor shall pay without objection any sum or sums up to the amount stated above upon first written demand from the Employer forthwith and without any reference to the Principal or any other person.

IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its seal on the date indicated above, the name and corporate seal of the Guarantor being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

 

Guarantor
(Schedule Bank/ Insurance Company)
Signature:  _________________________________________________
Name: _________________________________________________
Title: _________________________________________________ 

Corporate Guarantor (Seal)

 

    
WITNESS:                 

1.
_________________________________________________ 
_________________________________________________  

2.  

_________________________________________________ 
_________________________________________________ 
Name, Title & Address

📑 Annexure (ANX)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

Adjustment Data

Unknown

Bidding Documents Vol-I

Unknown

Special Provisions

Unknown

Specifications Volume-II

Unknown

BOQ Volume-III

Unknown

Tender Drawings Voulme-IV

Unknown

Technical Specs for Solar System and Solar Lights

Unknown

📑 Procurement Forms (PFD)

LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.

Published on: Wednesday, November 25, 2026 04:00 PM

Ref# : P200199
QR Code

Past Construction Experiences

Contractor's Key Personnel Representative and Their Schedules

Financial Resources

Past Experience and Completed Contracts

Historical Contract Non-Performance, and Pending Litigation and Litigation History

Current Contracts and Their Progress

Financial Capacity and Net Worth Evaluation Form

Average Annual Turnover