The following specific data for the procurement of works shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITBs). Whenever there is a conflict, the provisions herein shall prevail over those in ITBs.
ITB Number 1.1
Name of Procuring agency/Employer: Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA)
The subject of procurement is: LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.
Period for completion of the works 728 Days
Commencement date execution of the works: 14 Days
Type of Procurement: Local
ITB Number 2.1
Financial year for the operations of the Procuring agency/Employer: 2026-27
Name of Project :
Name of financing institution:
Name and identification number of the Contract: P200199
ITB Number 3.1
JV/Consortium or Association Allowed: No
Maximum number of members in the joint venture shall be: Nil.
ITB Number 6.4
The Bidders may seek clarifications through EPADS v2.0: Last Clarification Date: Sunday, December 13, 2026
Pre-Bid Meeting: Tuesday, December 8, 2026 11:00 AM
ITB Number 8.1
The Language of all correspondences and documents related to the Bid is: English
ITB Number 5.1 & 9.1
The following documents must be included to constitute the Bid
ITB Number 9.4 (b)
Other procurement specific documentation requirements are:
ITB Number 12.4
The Bid price will be/will not be subject to the price adjustment Yes
Price Adjustment Annexure is attached in the Annexure Section with the name of Adjustment Data.
ITB Number 12.6
The Bid price shall be adjusted in accordance with Schedule-A to Bid – “Schedule of Adjustment Data” if available.
ITB Number 13.1
Bidders to quote entirely in Pak rupees (PKR)
Schedule of Adjustment Data for Local Currency (LC)
| Index Code | Index Description | Source of Index | Weighting |
|---|---|---|---|
| 1 | Non-adjustable | --- | 0.45 |
| 2 | Labour (Labourer (un-skilled) per day, shall be taken as representative of all types of Labour (skilled/unskilled) deployed at site) | Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. | 0.24 |
| 3 | Cement (OPC cement per bag shall be taken as representative of all types of cement used at the site) | Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. | 0.06 |
| 4 | Reinforcing Steel (½” Ø round M.S. Bars per tonne shall be taken as representative of all types and diameters of Steel Reinforcement) | Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. | 0.04 |
| 5 | Crush/Bajri (rata) (per truck) (100 CFT) (Bajri(rata) shall be taken as representative of all types of coarse aggregates, base course and sub base course) | Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. | 0.06 |
| 6 | High Speed Diesel (HSD) ( HSD shall be taken as representative of all kind of fuels used in connection with the Contract) | Government of Pakistan (GP) Federal Bureau of Statistics (FBS) Monthly Statistical Bulletin. | 0.15 |
| Total | Pakistan | 1.00 |
ITB Number 15.1
The Bid Validity period shall be 120 Days days.
ITB Number 16.1
The amount of Bid Security shall be ... see section itemd and bid security
The currency of the Bid Security shall be: PKR.
ITB Number 16.2
The Bid Security shall be in the form of: Call at Deposit
ITB Number 19.1
The deadline for Bid submission is: Wednesday, December 16, 2026 12:00 PM
Address for submission of Original Bid Security: 10, Mauve Area, G-10/4, Islamabad Capital Territory
ITB Number 21.1
The Bid opening shall take place at: EPADS v2.0
Day : Wednesday
Date: December 16, 2026
Time : 12:30 PM
ITB Number 27.1
The currency that shall be used for Bid evaluation and comparison purposes to convert all Bid prices expressed in various currencies is: PKR Only
The source of exchange rate shall be: Nil
The date of exchange rate shall be: Nil
ITB Number 28.2 & 28.5
Least Cost Based Selection (LCBS)
see Evaluation Criteria
ITB Number 29.1
Domestic preference to apply.
Domestic preference: No
Preference to domestic or national suppliers or contractors shall be provided in accordance with policies of the Federal Government and/or in accordance with the regulations issued by the Authority.
If Yes, The percentage for the domestic preference alongwith calculation formula is provided in the evaluation and qualification criteria.
ITB Number 32.2
Sub-contracting is allowed? : Yes
30 % of the total value of the contract.
39.1 The Performance Security (or guarantee) shall be 10.00%
39.2 The Performance Security (or guarantee) shall be in the form of: Bank Guarantee
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
| NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| i. Valid registration with PEC in category C-1 and above having CE-09, CE-10, CE-11(i), CE-11(vii), CE-11(ix), EE-04, EE-11(vi), EE-11(vv), EE-11(xvii) and EE-11(xxv) as codes of specialization. | Yes |
| ii. Affidavit of no blacklisting prepared within the current month of submission of bid-ding document. | Yes |
| iii. Information on any litigation or arbitration resulting from contracts completed or un-der execution by the Bidder. In case, the firm has never been involved in litigation, an affidavit to such effect should be provided | Yes |
| iv. Registration with income tax department (Valid NTN). | Yes |
| v. Registration with Sales Tax Department (GST/PST). | Yes |
| vi. On Active Tax Payer’s List at the time of submission of Bid. | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 75 | |
| Experience Record | ||
| Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Roads, Earthworks, Area Development/ Area Grading, bridges etc. completed during the last five (05) years or currently in-hand. Completed Projects • 02 marks will be awarded for each completed project having cost > Rs. 1.0 billion maximum up to 04 marks. • 02 marks will be awarded for each completed project having cost from Rs. 700 million to 1.0 billion max-imum up to 04 marks. • No marks will be given for projects having cost less than 700 million. (Qualitative)(Doc Required) | 8 | |
| Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Roads, Earthworks, Area Development/ Area Grading, bridges etc. completed during the last five (05) years or currently in-hand. In-hand Projects • 01 mark will be awarded for each in-hand project having cost > Rs. 1.0 billion maximum up to 02 marks. • 01 mark will be awarded for each in-hand project having cost from Rs. 700 million to Rs. 1.0 billion maximum up to 02 marks. • No marks will be given for projects having cost less than 700 million (Qualitative)(Doc Required) | 4 | |
| Specialized Horticulture and Landscaping Experience Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Parks, Green Belts, beautification, Green Up-gradation, etc. completed during the last five (05) years or currently in-hand. Completed Projects • 04 marks will be awarded for each completed project having cost > Rs. 1.0 billion maximum up to 08 marks • 04 marks will be awarded for each completed project having cost from Rs. 700 million to Rs. 1.0 billion maximum up to 08 marks • No marks will be given for projects having cost less than 700 million. (Qualitative)(Doc Required) | 16 | |
| Specialized Horticulture and Landscaping Experience Experience as a Prime Contractor in the execution of projects of similar nature and complexity, such as Parks, Green Belts, beautification, Green Up-gradation, etc. completed during the last five (05) years or currently in-hand. In-hand Projects • 03 marks will be awarded for each in-hand project having cost > Rs. 1.0 billion maximum up to 06 marks • 03 marks will be awarded for each in-hand project having cost from Rs. 700 million to Rs. 1.0 billion maximum up to 06 marks. • No marks will be given for projects having cost less than 700 million. (Qualitative)(Doc Required) | 12 | |
| Personnel Capabilities: | ||
| Project Manager/ Horticulturist (1) PHD or M.Sc. (Hons) Horticulture with minimum 10 years of relevant Experience to horticulture and landscaping works (Qualitative)(Doc Required) | 2 | |
| Horticulturist (1) B.Sc. (Hons) Horticulture (Landscaping) with minimum 08 years of relevant Experience to horticulture and landscaping works (Qualitative)(Doc Required) | 1 | |
| Civil Engineer 1 B.Sc. Civil Engineering registered with Pakistan Engineering Council (PEC) with minimum 06 years of relevant Experience to infrastructure works. (Qualitative)(Doc Required) | 2 | |
| Electrical Engineer 1 B.Sc. Electrical Engineering registered with Pakistan Engineering Council (PEC) with minimum 06 years of relevant Experience to infrastructure works. (Qualitative)(Doc Required) | 1 | |
| Quantity Surveyor 1 DAE (Civil) with 05 years hands on experience of beautification/up-gradation of horticulture and landscaping works/ infrastructure works (Qualitative)(Doc Required) | 1 | |
| Site Supervisor (Civil) 2 01 Personnel – 01 Mark DAE (Civil) with 05 years hands on experience of beautification/up-gradation of horticulture and landscaping works/ infrastructure works (Qualitative)(Doc Required) | 2 | |
| Site Supervisor (Horticulture & Landscaping) 2 01 Personnel – 01 Mark Diploma/ B.Sc. (Horticulture/ Landscaping) with 03 years hands on experience of beautification/up-gradation of horticulture and landscaping works including gardening and preparation of soft landscaping/green areas. (Qualitative)(Doc Required) | 2 | |
| Surveyor 1 DAE (Civil) with 05 years hands on experience of beautification/up-gradation of horticulture and landscaping works/ infrastructure works (Qualitative)(Doc Required) | 1 | |
| Gardner/Mali 20 01 Personnel – 0.15 Mark Preferably Literate with 05 years’ experience of gardening, horticulture and landscaping works. (Qualitative)(Doc Required) | 3 | |
| Equipment Capabilities | ||
| Excavators 02 Nos. (Qualitative)(Doc Required) | 1 | |
| Bull dozer and Wheel/ Crawler Loader 02 Nos. (Qualitative)(Doc Required) | 1 | |
| Dump trucks & Compactor 03 Nos. & Plain 01 No. (Qualitative)(Doc Required) | 1 | |
| Survey Equipment’s Total Station & Auto Level and Concrete mixer Machine , Min.(capacity 2 bag cement) 01 Each (Qualitative)(Doc Required) | 1 | |
| Tractor and trollies & Post Hole Digger 04 Nos. & 04 Nos. (Qualitative)(Doc Required) | 1 | |
| Water bowsers 04 Nos. (Qualitative)(Doc Required) | 1 | |
| Large Capacity Lawn Movers with collector and sweeping attachments 08 Nos (Qualitative)(Doc Required) | 1 | |
| Electrical shrub cutters 04 Nos (Qualitative)(Doc Required) | 1 | |
| Edging shear 04 Nos (Qualitative)(Doc Required) | 1 | |
| Battery powered cordless hedge cutter 02 Nos (Qualitative)(Doc Required) | 1 | |
| Battery operated brush cutter 08 Nos (Qualitative)(Doc Required) | 1 | |
| Grass trimmer & Tree branch cutter 10 Nos & 08 Nos (Qualitative)(Doc Required) | 1 | |
| Water pipe, 0.75” dia & Movable sprinkler with stand (or rain guns) 200 meters &10 Nos (Qualitative)(Doc Required) | 1 | |
| Sprayer, separate for spraying insecticides and anti-termite & Large bins to pile garden debris before garden 04 Nos & 08 Nos (Qualitative)(Doc Required) | 1 | |
| Wheel barrows 40 Nos (Qualitative)(Doc Required) | 1 | |
| Financial Capabilities | ||
| Average Annual Turn Over dur-ing the last (03) years. • Max Ten (10) marks shall be awarded if the average annual turnover for last three (03) years ≥ Rs. 01 billion. • Proportional Marks shall be awarded if the average annual turnover during the last three (03) years ≥ Rs. 700 million but ˂ Rs. 01 billion, calculated as: Marks = (Actual Turnover/ Max. Cap) x Max. Marks • For limit less than Rs. 700 million no marks shall be awarded. (Qualitative)(Doc Required) | 10 | |
| Working Capitals • Ten (10) Marks shall be awarded if the working capital for the last year ≥ Rs. 200 million. • Proportional Marks shall be awarded if the working capital for the last year is ≥ Rs. 100 million but ˂ Rs. 200 million, calcu-lated as: Marks = (Actual Working Capital/ Max. Cap) x Max. Marks • For limit less than Rs. 100 million no marks shall be awarded. (Qualitative)(Doc Required) | 10 | |
| Bank Credit Line (The bidder must provide an un-conditional, project specific credit line commitment letter from a scheduled bank in Pakistan on its official letterhead) • Ten (10) marks shall be awarded if the Bank Credit Line ≥ Rs. 250 million. • Proportional Marks shall be awarded if the Bank Credit Line ≥ Rs. 200 million but ˂ Rs. 250 million, calculated as: Marks = (Actual Bank Credit Line/ Max. Cap) x Max. Marks • Zero marks shall be given in case Bank Credit Line is less than Rs. 200 million (Qualitative)(Doc Required) | 10 | |
Lot Title : LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.
Bid Security : 28568283 PKR
| Job | Delivery Schedule | Quantity |
|---|---|---|
| Civil Works |
Address: 10, Mauve Area, G-10/4, Islamabad Capital Territory
Schedule: 728 Days
Quantity: 1/job
|
1/job |
| E/M Works |
Address: 10, Mauve Area, G-10/4, Islamabad Capital Territory
Schedule: 728 Days
Quantity: 1/job
|
1/job |
| Horticuture Works |
Address: 10, Mauve Area, G-10/4, Islamabad Capital Territory
Schedule: 728 Days
Quantity: 1/job
|
1/job |
Lot Title: LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | Amount | |
|---|---|---|---|---|---|---|---|
| 1 | Ch. 3 / Item 53 | Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof] | 1000 Sft | 2262000 | 5292.2 | One Crore Nineteen Lakh Seventy Thousand Nine Hundred Fifty Six Rupees Only | 11970956 |
| 2 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels] | 1000 Cft | 1537000 | 8385.7 | One Crore Twenty Eight Lakh Eighty Eight Thousand Eight Hundred Twenty One Rupees Only | 12888821 |
| 3 | Ch. 3 / Item 5(ii) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing] | 1000 Cft | 1537000 | 10856.75 | One Crore Sixty Six Lakh Eighty Six Thousand Eight Hundred Twenty Five Rupees Only | 16686825 |
| 4 | NSI / EW-BF | Filling to formation level with approved select material borrowed from outside, in layers, watered and compacted. | 1000 Cft | 700950 | 15386.45 | One Crore Seven Lakh Eighty Five Thousand One Hundred Thirty Two Rupees Only | 10785132 |
| 5 | Ch. 3 / Item 17(a) | Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead] | 1000 Cft | 7190.5 | Zero Rupees Only | ||
| 6 | Ch. 3 / Item 54 | Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works] | 1000 Sft | 2262000 | 3479.6 | Seventy Eight Lakh Seventy Thousand Eight Hundred Fifty Five Rupees Only | 7870855 |
| 7 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing] | 1000 Cft | 5589.4980694981 | 11147.4 | Sixty Two Thousand Three Hundred Eight Rupees Only | 62308 |
| 8 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing] | 100 Cft | 621.05534105534 | 36029.5 | Two Lakh Twenty Three Thousand Seven Hundred Sixty Three Rupees Only | 223763 |
| 9 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing] | Cft | 1048.0308880309 | 697.5 | Seven Lakh Thirty One Thousand Two Rupees Only | 731002 |
| 10 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding] | 100 Kg | 2305.667953668 | 30827.85 | Seven Lakh Ten Thousand Seven Hundred Eighty Eight Rupees Only | 710788 |
| 11 | Ch. 8 / Item 2(d)(iii) | Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall] | 100 Cft | 873.35907335907 | 35682.6 | Three Lakh Eleven Thousand Six Hundred Thirty Seven Rupees Only | 311637 |
| 12 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing] | 100 Cft | 1921.38996139 | 38677.7 | Seven Lakh Forty Three Thousand One Hundred Forty Nine Rupees Only | 743149 |
| 13 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall] | 100 Cft | 58.223938223938 | 49085.5 | Twenty Eight Thousand Five Hundred Eighty Rupees Only | 28580 |
| 14 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall] | 100 Sft | 5123.7065637066 | 7231.25 | Three Lakh Seventy Thousand Five Hundred Eight Rupees Only | 370508 |
| 15 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted] | 1000 Cft | 3047.0527670528 | 11261.3 | Thirty Four Thousand Three Hundred Fourteen Rupees Only | 34314 |
| 16 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall] | Rft | 465.79150579151 | 1587.5 | Seven Lakh Thirty Nine Thousand Four Hundred Forty Four Rupees Only | 739444 |
| 17 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil] | 1000 Cft | 34800 | 11147.4 | Three Lakh Eighty Seven Thousand Nine Hundred Thirty Rupees Only | 387930 |
| 18 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway] | 100 Cft | 11600 | 10874.25 | Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only | 1261413 |
| 19 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers] | 100 Cft | 23200 | 3556.7 | Eight Lakh Twenty Five Thousand One Hundred Fifty Four Rupees Only | 825154 |
| 20 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand] | Sft | 69600 | 231.35 | One Crore Sixty One Lakh One Thousand Nine Hundred Sixty Rupees Only | 16101960 |
| 21 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3] | Rft | 23200 | 573.35 | One Crore Thirty Three Lakh One Thousand Seven Hundred Twenty Rupees Only | 13301720 |
| 22 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of cycle-track sub-grade to designed level, in ordinary soil] | 1000 Cft | 7733.3333333333 | 11147.4 | Eighty Six Thousand Two Hundred Seven Rupees Only | 86207 |
| 23 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular base course, 1 in thick, under the cycle track] | 100 Cft | 3866.6666666667 | 10874.25 | Four Lakh Twenty Thousand Four Hundred Seventy One Rupees Only | 420471 |
| 24 | Ch. 18 / Item 6 | Providing and laying bituminous priming coat, using 10 lbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg kerosene and 0.5 Kg binder per square metre. [Ch. 18, Item 6: Providing and laying bituminous priming coat over the granular base of the cycle track] | 100 Sft | 46400 | 2582.55 | Eleven Lakh Ninety Eight Thousand Three Hundred Three Rupees Only | 1198303 |
| 25 | Ch. 18 / Item 10(a) | Providing and laying plant premixed bituminous carpet, including compaction and finishing to required camber, grade and density - wearing course, at the bitumen content of the approved Job Mix Formula (rate per inch thickness per 100 Sft, converted to Cft). [Ch. 18, Item 10(a): Providing and laying plant-premixed bituminous carpet wearing course, 1 in thick, to the cycle track, compacted and finished to camber and grade] | Cft | 3866.6666666667 | 931.93 | Thirty Six Lakh Three Thousand Four Hundred Sixty Three Rupees Only | 3603463 |
| 26 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the cycle track] | Rft | 11600 | 573.35 | Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only | 6650860 |
| 27 | NSI / EW-DL | Preparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller. | 100 Sft | 46400 | 1650 | Seven Lakh Sixty Five Thousand Six Hundred Rupees Only | 765600 |
| 28 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade] | 100 Cft | 11600 | 10874.25 | Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only | 1261413 |
| 29 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track] | Rft | 11600 | 573.35 | Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only | 6650860 |
| 30 | COMP / CA-17 | Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete. | Each | 20 | 363141.15 | Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only | 7262823 |
| 31 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as bedding under the performance-deck stage] | 100 Cft | 418.87902047864 | 3556.7 | Fourteen Thousand Eight Hundred Ninety Eight Rupees Only | 14898 |
| 32 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 4 in thick, as base slab under the stage] | 100 Cft | 418.87902047864 | 49085.5 | Two Lakh Five Thousand Six Hundred Nine Rupees Only | 205609 |
| 33 | Ch. 10 / Item 22(a)(i) | Providing and laying mosaic flooring consisting of one part of cement and marble powder in the ratio of 3:1 and two parts of marble chips, laid over 1" (25 mm) thick flooring of 1:2:4 cement concrete, including rubbing and polishing complete with finishing: 1-3/8" (35 mm) thick mosaic flooring, consisting of 3/8" (10 mm) mosaic topping, using grey cement. [Ch. 10, Item 22(a)(i): Providing and laying 35 mm mosaic / terrazzo flooring with marble chips, including rubbing and polishing, to the stage] | 100 Sft | 1256.6370614359 | 31412.9 | Three Lakh Ninety Four Thousand Seven Hundred Forty Six Rupees Only | 394746 |
| 34 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry in cement-sand mortar 1:6 in the concentric seating steps, 2 ft thick x 5 ft high, including dressing of stones and curing] | 100 Cft | 9738.9372261284 | 38677.7 | Thirty Seven Lakh Sixty Six Thousand Seven Hundred Ninety Seven Rupees Only | 3766797 |
| 35 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as cap on the masonry seating steps] | 100 Cft | 324.63124087095 | 49085.5 | One Lakh Fifty Nine Thousand Three Hundred Forty Seven Rupees Only | 159347 |
| 36 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing in cement mortar 1:3 to exposed stone-masonry faces of the seating steps] | 100 Sft | 4869.4686130642 | 7231.25 | Three Lakh Fifty Two Thousand One Hundred Twenty Three Rupees Only | 352123 |
| 37 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm precast concrete interlocking tuff pavers to the plaza apron around the seating circle] | Sft | 5419.2473274424 | 231.35 | Twelve Lakh Fifty Three Thousand Seven Hundred Forty Three Rupees Only | 1253743 |
| 38 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the plaza pavers] | 100 Cft | 1806.4157758141 | 3556.7 | Sixty Four Thousand Two Hundred Forty Nine Rupees Only | 64249 |
| 39 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Desilting of the bed of the existing natural pond in Zone-3] | 1000 Cft | 243000 | 8385.7 | Twenty Lakh Thirty Seven Thousand Seven Hundred Twenty Five Rupees Only | 2037725 |
| 40 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Excavation of the pond to the enlarged section, 200 ft wide and 8.5 ft deep with 2:1 banks, dressed to the designed section] | 1000 Cft | 1367700 | 8385.7 | One Crore Fourteen Lakh Sixty Nine Thousand One Hundred Twenty Two Rupees Only | 11469122 |
| 41 | Ch. 3 / Item 17(a) | Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of the silt and the surplus excavated material of the pond to approved dumping ground] | 1000 Cft | 1610700 | 7190.5 | One Crore Fifteen Lakh Eighty One Thousand Seven Hundred Thirty Eight Rupees Only | 11581738 |
| 42 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Clean screened sand, 3 in thick, as filter bedding under the stone pitching of the pond banks] | 100 Cft | 15205.262246999 | 3556.7 | Five Lakh Forty Thousand Eight Hundred Six Rupees Only | 540806 |
| 43 | Ch. 16 / Item 28 | Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Stone pitching, 1 ft thick, on the pitched banks of the pond] | 100 Cft | 60821.048987994 | 15198.5 | Ninety Two Lakh Forty Three Thousand Eight Hundred Eighty Seven Rupees Only | 9243887 |
| 44 | Ch. 16 / Item 28 | Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Stone pitching, 6 in thick, to the 4 ft wide toe apron at the bottom of the banks] | 100 Cft | 6400 | 15198.5 | Nine Lakh Seventy Two Thousand Seven Hundred Four Rupees Only | 972704 |
| 45 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4 in the toe beam, 1 ft 6 in x 1 ft 6 in] | 100 Cft | 7200 | 49085.5 | Thirty Five Lakh Thirty Four Thousand One Hundred Fifty Six Rupees Only | 3534156 |
| 46 | Ch. 16 / Item 34 | Grouting stone filling or pitching, with bajri. [Ch. 16, Item 34: Grouting of the pitching and the toe apron with bajri] | 100 Cft | 67221.048987994 | 3905.7 | Twenty Six Lakh Twenty Five Thousand Four Hundred Fifty Three Rupees Only | 2625453 |
| 47 | Ch. 1 / Item 1 | Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead from the approved source to site (composite of the chain and kilometre rates of the item). [Ch. 1, Item 1: Carriage of stone, aggregate and sand for the pond banks and walkway] | 100 Cft | 106692.97790166 | 4590 | Forty Eight Lakh Ninety Seven Thousand Two Hundred Eight Rupees Only | 4897208 |
| 48 | NSI / EW-DL | Dressing and levelling of the walkway sub-grade to designed section, with compaction. | 100 Sft | 25600 | 1650 | Four Lakh Twenty Two Thousand Four Hundred Rupees Only | 422400 |
| 49 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Sand bedding, 4 in thick, under the walkway] | 100 Cft | 8533.3333333333 | 3556.7 | Three Lakh Three Thousand Five Hundred Five Rupees Only | 303505 |
| 50 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4, 4 in thick, as the walkway slab] | 100 Cft | 8533.3333333333 | 49085.5 | Forty One Lakh Eighty Eight Thousand Six Hundred Twenty Nine Rupees Only | 4188629 |
| 51 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Tuff-paver wearing surface of the walkway] | Sft | 25600 | 231.35 | Fifty Nine Lakh Twenty Two Thousand Five Hundred Sixty Rupees Only | 5922560 |
| 52 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Precast edge kerb stone to both edges of the walkway] | Rft | 6400 | 573.35 | Thirty Six Lakh Sixty Nine Thousand Four Hundred Forty Rupees Only | 3669440 |
| 53 | Ch. 3 / Item 21, 2(a)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth from 5.1 ft. (1.5 m) to 15 ft. (4.5 m), in ordinary soil. [Ch. 3, Item 21, 2(a)(ii): Excavation in foundation of the weir, its aprons and the stilling basin, 5.1 ft to 15 ft deep] | 1000 Cft | 19936 | 13528.2 | Two Lakh Sixty Nine Thousand Six Hundred Ninety Eight Rupees Only | 269698 |
| 54 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Well-compacted granular fill of stone product, 3 ft thick, under the aprons and the weir base] | 100 Cft | 10050 | 10874.25 | Ten Lakh Ninety Two Thousand Eight Hundred Sixty Two Rupees Only | 1092862 |
| 55 | Ch. 6 / Item 6(a)(3) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - Type C (nominal mix 1:2:4). [Ch. 6, Item 6(a)(3): Reinforced cement concrete 1:2:4 in the upstream apron and the weir base slab, 8 in thick] | Cft | 1400 | 773.55 | Ten Lakh Eighty Two Thousand Nine Hundred Seventy Rupees Only | 1082970 |
| 56 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Reinforcement, deformed bars Grade-60, in the apron and base slab] | 100 Kg | 3080 | 30827.85 | Nine Lakh Forty Nine Thousand Four Hundred Ninety Eight Rupees Only | 949498 |
| 57 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4 in the downstream apron, 8 in thick] | 100 Cft | 833.33333333333 | 49085.5 | Four Lakh Nine Thousand Forty Six Rupees Only | 409046 |
| 58 | Ch. 16 / Item 28 | Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Hand-placed angular hard stone laid in mortar forming the body of the weir (crest 8 ft, base 27 ft, height 10 ft)] | 100 Cft | 8750 | 15198.5 | Thirteen Lakh Twenty Nine Thousand Eight Hundred Sixty Nine Rupees Only | 1329869 |
| 59 | COMP / CA-20 | Shotcrete facing 6 in thick (1:2:2) to both faces and the crest of the weir. | Sft | 1779.3114224134 | 1531.2 | Twenty Seven Lakh Twenty Four Thousand Four Hundred Eighty Two Rupees Only | 2724482 |
| 60 | Ch. 16 / Item 27 | Providing and laying stone pitching / filling, dry hand packed, as filling behind retaining walls or in pitching and aprons. [Ch. 16, Item 27: Dry hand-packed stone fill, 3 ft thick, in the stilling basin, with friction blocks] | 100 Cft | 3300 | 8234.15 | Two Lakh Seventy One Thousand Seven Hundred Twenty Seven Rupees Only | 271727 |
| 61 | Ch. 1 / Item 1 | Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the shorter lead adopted for the nullah and lake works. [Ch. 1, Item 1: Carriage of stone, aggregate and sand for the weir and its aprons] | 100 Cft | 24333.333333333 | 3881.75 | Nine Lakh Forty Four Thousand Five Hundred Fifty Nine Rupees Only | 944559 |
| 62 | NSI / EW-DL | Ground preparation for the plant nursery (244 ft x 200 ft) - clearing, levelling, dressing and compaction. | 100 Sft | 48800 | 1650 | Eight Lakh Five Thousand Two Hundred Rupees Only | 805200 |
| 63 | NSI / EW-DL | Ground preparation for the fruit nursery (150 ft square) - clearing, levelling, dressing and compaction. | 100 Sft | 22500 | 1650 | Three Lakh Seventy One Thousand Two Hundred Fifty Rupees Only | 371250 |
| 64 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation for the footings of the shed posts, in ordinary soil, including refilling and ramming] | 1000 Cft | 2199.375 | 11147.4 | Twenty Four Thousand Five Hundred Seventeen Rupees Only | 24517 |
| 65 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4 in the footings of the shed posts, 1.5 ft x 1.5 ft x 2.5 ft] | 100 Cft | 2199.375 | 49085.5 | Ten Lakh Seventy Nine Thousand Five Hundred Seventy Four Rupees Only | 1079574 |
| 66 | Ch. 25 / Item 10 | Fabrication of heavy steel / iron work, with angle, tees, flat iron, round iron and sheet iron for making trusses, girders, tanks, etc., including cutting, drilling, rivetting, handling, assembling and fixing, but excluding erection in position. [Ch. 25, Item 10: Fabrication of the shed structure of G.I. pipes - 2 in posts and 1-1/2 in top runners on both grid lines - cut, welded / clamped, with base and cap fittings] | 100 Kg | 20327.1 | 36401.6 | Seventy Three Lakh Ninety Nine Thousand Three Hundred Ninety Rupees Only | 7399390 |
| 67 | Ch. 25 / Item 11 | Erection and fitting in position iron trusses, staging of water tanks, etc. [Ch. 25, Item 11: Erection and fitting in position of the shed structure] | 100 Kg | 20327.1 | 1535.9 | Three Lakh Twelve Thousand Two Hundred Four Rupees Only | 312204 |
| 68 | MKT / NS-1 | Green HDPE shade net over the roof and the four sides of both sheds, stretched and tied to the runners. | Sft | 86180 | 30 | Twenty Five Lakh Eighty Five Thousand Four Hundred Rupees Only | 2585400 |
| 69 | Ch. 3 / Item 21, 1(a)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft (1.5 m): 1) depth upto 5 ft (1.5 m) - a) by manual - ii) ordinary soil. [Ch. 3, Item 21, 1(a)(ii): Excavation in foundation of the room, by manual means, in ordinary soil, including refilling, watering and ramming] | 1000 Cft | 1880 | 17088.2 | Thirty Two Thousand One Hundred Twenty Six Rupees Only | 32126 |
| 70 | Ch. 6 / Item 3(b) | Cement concrete brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge, in foundation and plinth: (b) ratio 1:4:8. [Ch. 6, Item 3(b): Cement concrete brick / stone ballast 1:4:8 in foundation] | 100 Cft | 35 | 36435.6 | Twelve Thousand Seven Hundred Fifty Two Rupees Only | 12752 |
| 71 | Ch. 7 / Item 4(i) | Pacca brick work in foundation and plinth in: i) cement, sand mortar - ratio 1:3. [Ch. 7, Item 4(i): Pacca brick work in foundation and plinth in cement-sand mortar 1:3] | 100 Cft | 164 | 44342.85 | Seventy Two Thousand Seven Hundred Twenty Two Rupees Only | 72722 |
| 72 | Ch. 6 / Item 37(b)(ii) | Providing and laying damp proof course of cement concrete 1:2:4 (using cement, sand and shingle), including bitumen coating: (b) with 2 coats of bitumen - ii) 2" thick (50 mm). [Ch. 6, Item 37(b)(ii): Damp proof course of cement concrete 1:2:4, 2" thick, with 2 coats of bitumen] | 100 Sft | 62 | 14064.3 | Eight Thousand Seven Hundred Twenty Rupees Only | 8720 |
| 73 | Ch. 6 / Item 39(b)(2)(b) | Providing and laying vertical damp proof course with cement sand plaster and bitumen coating: (b) with 2 coats of bitumen - 2) ratio 1:3 - b) 3/4" thick (20 mm). [Ch. 6, Item 39(b)(2)(b): Vertical damp proof course of cement-sand plaster 1:3, 3/4" thick, with 2 coats of bitumen] | 100 Sft | 86 | 9434.5 | Eight Thousand One Hundred Fourteen Rupees Only | 8114 |
| 74 | Ch. 7 / Item 5(i) | Pacca brick work in ground floor: i) cement, sand mortar - ratio 1:4. [Ch. 7, Item 5(i): Pacca brick work in the superstructure (ground floor) in cement-sand mortar 1:4] | 100 Cft | 384 | 43384.35 | One Lakh Sixty Six Thousand Five Hundred Ninety Six Rupees Only | 166596 |
| 75 | Ch. 3 / Item 15(i) | Filling, watering and ramming earth under floors: i) with surplus earth from foundation, etc. [Ch. 3, Item 15(i): Filling, watering and ramming earth under the floor with surplus earth from the foundation] | 1000 Cft | 1190 | 8155.5 | Nine Thousand Seven Hundred Five Rupees Only | 9705 |
| 76 | Ch. 3 / Item 15(ii) | Filling, watering and ramming earth under floors: ii) with new earth excavated from outside, lead upto one chain (30 m). [Ch. 3, Item 15(ii): Filling, watering and ramming earth under the floor with new earth from outside, lead upto one chain] | 1000 Cft | 390 | 17545.5 | Six Thousand Eight Hundred Forty Three Rupees Only | 6843 |
| 77 | Ch. 3 / Item 16(i) | Extra for every 50 ft (15 m) additional lead or part thereof: i) for earthwork soft, ordinary, hard and very hard. [Ch. 3, Item 16(i): Extra for additional lead of the new earth - two increments of 50 ft, as priced in the source estimate] | 1000 Cft | 780 | 74.25 | Fifty Eight Rupees Only | 58 |
| 78 | Ch. 6 / Item 2 | Dry rammed brick or stone ballast, 1-1/2" to 2" (40 mm to 50 mm) gauge. [Ch. 6, Item 2: Dry rammed brick / stone ballast 1-1/2" to 2" gauge under the floor] | 100 Cft | 50 | 14076.5 | Seven Thousand Thirty Eight Rupees Only | 7038 |
| 79 | Ch. 6 / Item 5(f) | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4] | 100 Cft | 1 | 49085.5 | Four Hundred Ninety One Rupees Only | 491 |
| 80 | Ch. 6 / Item 5(i) | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (i) ratio 1:4:8. [Ch. 6, Item 5(i): Plain cement concrete 1:4:8 under the floor] | 100 Cft | 25 | 36029.5 | Nine Thousand Seven Rupees Only | 9007 |
| 81 | Ch. 10 / Item 16(c) | Providing and laying topping of cement concrete 1:2:4, including surface finishing and dividing in panels: (c) 1-1/2" (40 mm) thick. [Ch. 10, Item 16(c): Cement concrete 1:2:4 floor topping, 1-1/2" thick, finished and divided in panels] | 100 Sft | 99 | 10169.6 | Ten Thousand Sixty Eight Rupees Only | 10068 |
| 82 | Ch. 6 / Item 6(a)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (a) reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(a)(2): Reinforced cement concrete Type B (1:1.5:3) in roof slab, beams, columns and lintels] | Cft | 126.07 | 853.15 | One Lakh Seven Thousand Five Hundred Fifty Seven Rupees Only | 107557 |
| 83 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (c) reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6(a-d) above not requiring form work (i.e. horizontal shuttering) complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Reinforced cement concrete Type B (1:1.5:3) in the raft / strip foundation and plinth beams] | Cft | 90.4 | 697.5 | Sixty Three Thousand Fifty Four Rupees Only | 63054 |
| 84 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): (b) deformed bars - (ii) Grade-60. [Ch. 6, Item 12(b)(ii): Fabrication of deformed bar reinforcement Grade-60, cut, bent, placed and bound] | 100 Kg | 540 | 30827.85 | One Lakh Sixty Six Thousand Four Hundred Seventy Rupees Only | 166470 |
| 85 | Ch. 11 / Item 9(c) | Cement plaster 1:4 upto 20 ft (6.00 m) height: c) 3/4" (20 mm) thick. [Ch. 11, Item 9(c): Cement plaster 1:4, 3/4" thick, to the walls] | 100 Sft | 514 | 6641.3 | Thirty Four Thousand One Hundred Thirty Six Rupees Only | 34136 |
| 86 | Ch. 11 / Item 18(a) | Cement pointing struck joints, on walls, upto 20 ft (6.00 m) height: a) ratio 1:2. [Ch. 11, Item 18(a): Cement pointing struck joints 1:2 to the external brick faces] | 100 Sft | 558 | 5418.05 | Thirty Thousand Two Hundred Thirty Three Rupees Only | 30233 |
| 87 | Ch. 11 / Item 12(c) | Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slabs only, upto 20 ft height: c) 1:4. [Ch. 11, Item 12(c): Cement plaster 1:4, 3/8" thick, under the soffit of the roof slab] | 100 Sft | 216 | 5537.2 | Eleven Thousand Nine Hundred Sixty Rupees Only | 11960 |
| 88 | Ch. 9 / Item 5 | Single layer of tiles 9" x 4-1/2" x 1-1/2" (225 x 113 x 40 mm) laid over 4" (100 mm) earth and 1" (25 mm) mud plaster without bhoosa, grouted with cement sand 1:3 on top of RCC roof slab, provided with 34 lbs per 100 Sft or 1.72 kg/sq.m bitumen coating sand blinded. [Ch. 9, Item 5: Single layer of roof tiles over 4" earth and 1" mud plaster with bitumen coating] | 100 Sft | 201 | 14518.05 | Twenty Nine Thousand One Hundred Eighty One Rupees Only | 29181 |
| 89 | Ch. 9 / Item 14 | Khassi parnalas in cement, sand mortar 1:2, 12" (300 mm) outside width finished smooth with a floating coat of neat cement. [Ch. 9, Item 14: Khassi parnalas 12" wide in cement-sand mortar 1:2] | Rft | 12.5 | 279.45 | Three Thousand Four Hundred Ninety Three Rupees Only | 3493 |
| 90 | Ch. 9 / Item 15 | Khuras on roof 2' x 2' x 6" (600 x 600 x 150 mm). [Ch. 9, Item 15: Khuras on roof 2 ft x 2 ft x 6 in] | Each | 1 | 1240.85 | One Thousand Two Hundred Forty One Rupees Only | 1241 |
| 91 | Ch. 9 / Item 16 | Bottom khuras of brick masonry in cement mortar 1:6, 4' x 2' x 4-1/2" (1200 x 600 x 113 mm) over 3" (75 mm) cement concrete 1:4:8. [Ch. 9, Item 16: Bottom khuras of brick masonry 4 ft x 2 ft x 4-1/2 in] | Each | 1 | 2399.3 | Two Thousand Three Hundred Ninety Nine Rupees Only | 2399 |
| 92 | Ch. 11 / Item 26(a)(iii) | White washing: a) new surface - iii) three coats. [Ch. 11, Item 26(a)(iii): White washing three coats on new surfaces] | 100 Sft | 495 | 971.55 | Four Thousand Eight Hundred Nine Rupees Only | 4809 |
| 93 | Ch. 25 / Item 61(ii) | P/F iron door comprising of specified leaves made of 1-1/4" x 1-1/4" x 3/16" MS angle iron for leaf frame, diagonal and horizontal braces duly welded with MS sheet 18-SWG i/c the cost of sliding bolt, tower bolt and painting 3-coats but excluding the cost of chowkat, complete in all respect as approved and directed by the Engineer Incharge: (ii) double leaf. [Ch. 25, Item 61(ii): Iron door, double leaf, of M.S. angle frame and 18 SWG sheet, painted, excluding chowkat] | Sft | 28 | 1481.9 | Forty One Thousand Four Hundred Ninety Three Rupees Only | 41493 |
| 94 | Ch. 12 / Item 17(ii) | Providing and fixing 2" wide MS / GI chowkat single / double rebate made of 16 SWG MS sheet pressed / welded / supported with M.S. flat 1-1/4" x 1/8" i/c 6" long M.S. flat 1" x 1/8" hold fasts (6 Nos) welded / screwed, punching of lock hole covered with MS box, coating with antirust paint including filling with cement sand mortar (1:8) and embedding hold fast in cement concrete (1:2:4), complete in all respect as approved and directed by the Engineer Incharge: (ii) 10.5" wide. [Ch. 12, Item 17(ii): M.S. / G.I. pressed-steel chowkat 10.5" wide for the door] | Sft | 28 | 733.4 | Twenty Thousand Five Hundred Thirty Five Rupees Only | 20535 |
| 95 | Ch. 25 / Item 45(a) | Providing and fixing steel windows using M.S. sheet (16 SWG) moulded tubular pipe 1-1/2" x 1-1/2" (40 x 40 mm) for frame and 1-1/4" x 1-1/4" (30 x 30 mm) for leaves including M.S. square bars 1/4" x 1/4" (6 x 6 mm) welded around each panel of frame, 5 mm thick glass panes fixed with double M.S. square tubular pipe 3/8" x 3/8" (10 x 10 mm) (22 SWG) beading with U-shaped rubber lining, brass fitting, holdfast, including painting three coats complete in all respects: a) for openable panels fixed with wire gauze 24 SWG, 12 x 12 mesh and glass panes 1/4" (6 mm) thick. [Ch. 25, Item 45(a): Steel windows of moulded tubular M.S. sections with wire gauze and glass panes, painted] | Sft | 18 | 1345.65 | Twenty Four Thousand Two Hundred Twenty Two Rupees Only | 24222 |
| 96 | Ch. 1 / Item 1 | Carriage of 100 Cft (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead P_TWLEAD from the approved quarry (sum of the kilometre rates of the item: 1st to 10th km, then 69.30 per km). [Ch. 1, Item 1: Carriage of crushed stone aggregate and bajri for the concrete, from the approved quarry] | 100 Cft | 206 | 3425.2 | Seven Thousand Fifty Six Rupees Only | 7056 |
| 97 | NSI / NB-3 | Supply and erection of a green shade structure for the nursery - frame with green shade cover, anchored to the ground, complete. | Job | 1 | 200000 | Two Lakh Rupees Only | 200000 |
| 98 | NSI / NB-4 | Supply and fixing of green jali (shade net) in rolls for the nursery beds and the shade structure. | Roll | 5 | 15000 | Seventy Five Thousand Rupees Only | 75000 |
| 99 | NSI / NB-5 | Fencing of the nursery area with posts, wire mesh and an entrance gate, complete. | Job | 1 | 300000 | Three Lakh Rupees Only | 300000 |
| 100 | NSI / NB-6 | Construction of a room / store for the nursery, complete with door, window, flooring and finishes. | No. | 2 | 800000 | Sixteen Lakh Rupees Only | 1600000 |
| 101 | NSI / NB-19 | Water bore for the nursery with pump, pipework and electrical connection, complete. | Job | 1 | 600000 | Six Lakh Rupees Only | 600000 |
| 102 | NSI / EW-DL | Preparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling. | 100 Sft | 321692.43242855 | 1650 | Fifty Three Lakh Seven Thousand Nine Hundred Twenty Five Rupees Only | 5307925 |
| 103 | Ch. 3 / Item 53 | Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof] | 1000 Sft | 2262000 | 5292.2 | One Crore Nineteen Lakh Seventy Thousand Nine Hundred Fifty Six Rupees Only | 11970956 |
| 104 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels] | 1000 Cft | 1537000 | 8385.7 | One Crore Twenty Eight Lakh Eighty Eight Thousand Eight Hundred Twenty One Rupees Only | 12888821 |
| 105 | Ch. 3 / Item 5(ii) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing] | 1000 Cft | 1537000 | 10856.75 | One Crore Sixty Six Lakh Eighty Six Thousand Eight Hundred Twenty Five Rupees Only | 16686825 |
| 106 | NSI / EW-BF | Filling to formation level with approved select material borrowed from outside, in layers, watered and compacted. | 1000 Cft | 700950 | 15386.45 | One Crore Seven Lakh Eighty Five Thousand One Hundred Thirty Two Rupees Only | 10785132 |
| 107 | Ch. 3 / Item 17(a) | Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead] | 1000 Cft | 7190.5 | Zero Rupees Only | ||
| 108 | Ch. 3 / Item 54 | Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works] | 1000 Sft | 2262000 | 3479.6 | Seventy Eight Lakh Seventy Thousand Eight Hundred Fifty Five Rupees Only | 7870855 |
| 109 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing] | 1000 Cft | 5589.4980694981 | 11147.4 | Sixty Two Thousand Three Hundred Eight Rupees Only | 62308 |
| 110 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing] | 100 Cft | 621.05534105534 | 36029.5 | Two Lakh Twenty Three Thousand Seven Hundred Sixty Three Rupees Only | 223763 |
| 111 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing] | Cft | 1048.0308880309 | 697.5 | Seven Lakh Thirty One Thousand Two Rupees Only | 731002 |
| 112 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding] | 100 Kg | 2305.667953668 | 30827.85 | Seven Lakh Ten Thousand Seven Hundred Eighty Eight Rupees Only | 710788 |
| 113 | Ch. 8 / Item 2(d)(iii) | Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall] | 100 Cft | 873.35907335907 | 35682.6 | Three Lakh Eleven Thousand Six Hundred Thirty Seven Rupees Only | 311637 |
| 114 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing] | 100 Cft | 1921.38996139 | 38677.7 | Seven Lakh Forty Three Thousand One Hundred Forty Nine Rupees Only | 743149 |
| 115 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall] | 100 Cft | 58.223938223938 | 49085.5 | Twenty Eight Thousand Five Hundred Eighty Rupees Only | 28580 |
| 116 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall] | 100 Sft | 5123.7065637066 | 7231.25 | Three Lakh Seventy Thousand Five Hundred Eight Rupees Only | 370508 |
| 117 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted] | 1000 Cft | 3047.0527670528 | 11261.3 | Thirty Four Thousand Three Hundred Fourteen Rupees Only | 34314 |
| 118 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall] | Rft | 465.79150579151 | 1587.5 | Seven Lakh Thirty Nine Thousand Four Hundred Forty Four Rupees Only | 739444 |
| 119 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil] | 1000 Cft | 34800 | 11147.4 | Three Lakh Eighty Seven Thousand Nine Hundred Thirty Rupees Only | 387930 |
| 120 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway] | 100 Cft | 11600 | 10874.25 | Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only | 1261413 |
| 121 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers] | 100 Cft | 23200 | 3556.7 | Eight Lakh Twenty Five Thousand One Hundred Fifty Four Rupees Only | 825154 |
| 122 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand] | Sft | 69600 | 231.35 | One Crore Sixty One Lakh One Thousand Nine Hundred Sixty Rupees Only | 16101960 |
| 123 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3] | Rft | 23200 | 573.35 | One Crore Thirty Three Lakh One Thousand Seven Hundred Twenty Rupees Only | 13301720 |
| 124 | NSI / EW-DL | Preparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller. | 100 Sft | 46400 | 1650 | Seven Lakh Sixty Five Thousand Six Hundred Rupees Only | 765600 |
| 125 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade] | 100 Cft | 11600 | 10874.25 | Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only | 1261413 |
| 126 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track] | Rft | 11600 | 573.35 | Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only | 6650860 |
| 127 | COMP / CA-17 | Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete. | Each | 20 | 363141.15 | Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only | 7262823 |
| 128 | NSI / EW-DL | Preparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling. | 100 Sft | 422234.16679537 | 1650 | Sixty Nine Lakh Sixty Six Thousand Eight Hundred Sixty Four Rupees Only | 6966864 |
| 129 | Ch. 3 / Item 53 | Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof] | 1000 Sft | 1131000 | 5292.2 | Fifty Nine Lakh Eighty Five Thousand Four Hundred Seventy Eight Rupees Only | 5985478 |
| 130 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels] | 1000 Cft | 768500 | 8385.7 | Sixty Four Lakh Forty Four Thousand Four Hundred Ten Rupees Only | 6444410 |
| 131 | Ch. 3 / Item 5(ii) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing] | 1000 Cft | 768500 | 10856.75 | Eighty Three Lakh Forty Three Thousand Four Hundred Twelve Rupees Only | 8343412 |
| 132 | NSI / EW-BF | Filling to formation level with approved select material borrowed from outside, in layers, watered and compacted. | 1000 Cft | 350475 | 15386.45 | Fifty Three Lakh Ninety Two Thousand Five Hundred Sixty Six Rupees Only | 5392566 |
| 133 | Ch. 3 / Item 17(a) | Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead] | 1000 Cft | 7190.5 | Zero Rupees Only | ||
| 134 | Ch. 3 / Item 54 | Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works] | 1000 Sft | 1131000 | 3479.6 | Thirty Nine Lakh Thirty Five Thousand Four Hundred Twenty Eight Rupees Only | 3935428 |
| 135 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing] | 1000 Cft | 5589.4980694981 | 11147.4 | Sixty Two Thousand Three Hundred Eight Rupees Only | 62308 |
| 136 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing] | 100 Cft | 621.05534105534 | 36029.5 | Two Lakh Twenty Three Thousand Seven Hundred Sixty Three Rupees Only | 223763 |
| 137 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing] | Cft | 1048.0308880309 | 697.5 | Seven Lakh Thirty One Thousand Two Rupees Only | 731002 |
| 138 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding] | 100 Kg | 2305.667953668 | 30827.85 | Seven Lakh Ten Thousand Seven Hundred Eighty Eight Rupees Only | 710788 |
| 139 | Ch. 8 / Item 2(d)(iii) | Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall] | 100 Cft | 873.35907335907 | 35682.6 | Three Lakh Eleven Thousand Six Hundred Thirty Seven Rupees Only | 311637 |
| 140 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing] | 100 Cft | 1921.38996139 | 38677.7 | Seven Lakh Forty Three Thousand One Hundred Forty Nine Rupees Only | 743149 |
| 141 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall] | 100 Cft | 58.223938223938 | 49085.5 | Twenty Eight Thousand Five Hundred Eighty Rupees Only | 28580 |
| 142 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall] | 100 Sft | 5123.7065637066 | 7231.25 | Three Lakh Seventy Thousand Five Hundred Eight Rupees Only | 370508 |
| 143 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted] | 1000 Cft | 3047.0527670528 | 11261.3 | Thirty Four Thousand Three Hundred Fourteen Rupees Only | 34314 |
| 144 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall] | Rft | 465.79150579151 | 1587.5 | Seven Lakh Thirty Nine Thousand Four Hundred Forty Four Rupees Only | 739444 |
| 145 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil] | 1000 Cft | 34800 | 11147.4 | Three Lakh Eighty Seven Thousand Nine Hundred Thirty Rupees Only | 387930 |
| 146 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway] | 100 Cft | 11600 | 10874.25 | Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only | 1261413 |
| 147 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers] | 100 Cft | 23200 | 3556.7 | Eight Lakh Twenty Five Thousand One Hundred Fifty Four Rupees Only | 825154 |
| 148 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand] | Sft | 69600 | 231.35 | One Crore Sixty One Lakh One Thousand Nine Hundred Sixty Rupees Only | 16101960 |
| 149 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3] | Rft | 23200 | 573.35 | One Crore Thirty Three Lakh One Thousand Seven Hundred Twenty Rupees Only | 13301720 |
| 150 | NSI / EW-DL | Preparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller. | 100 Sft | 46400 | 1650 | Seven Lakh Sixty Five Thousand Six Hundred Rupees Only | 765600 |
| 151 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade] | 100 Cft | 11600 | 10874.25 | Twelve Lakh Sixty One Thousand Four Hundred Thirteen Rupees Only | 1261413 |
| 152 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track] | Rft | 11600 | 573.35 | Sixty Six Lakh Fifty Thousand Eight Hundred Sixty Rupees Only | 6650860 |
| 153 | COMP / CA-17 | Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete. | Each | 20 | 363141.15 | Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only | 7262823 |
| 154 | NSI / EW-DL | Preparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling. | 100 Sft | 196034.16679537 | 1650 | Thirty Two Lakh Thirty Four Thousand Five Hundred Sixty Four Rupees Only | 3234564 |
| 155 | Ch. 3 / Item 53 | Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof] | 1000 Sft | 273000 | 5292.2 | Fourteen Lakh Forty Four Thousand Seven Hundred Seventy One Rupees Only | 1444771 |
| 156 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels] | 1000 Cft | 185500 | 8385.7 | Fifteen Lakh Fifty Five Thousand Five Hundred Forty Seven Rupees Only | 1555547 |
| 157 | Ch. 3 / Item 5(ii) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing] | 1000 Cft | 185500 | 10856.75 | Twenty Lakh Thirteen Thousand Nine Hundred Twenty Seven Rupees Only | 2013927 |
| 158 | NSI / EW-BF | Filling to formation level with approved select material borrowed from outside, in layers, watered and compacted. | 1000 Cft | 84597.413793103 | 15386.45 | Thirteen Lakh One Thousand Six Hundred Fifty Four Rupees Only | 1301654 |
| 159 | Ch. 3 / Item 17(a) | Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead] | 1000 Cft | 7190.5 | Zero Rupees Only | ||
| 160 | Ch. 3 / Item 54 | Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works] | 1000 Sft | 273000 | 3479.6 | Nine Lakh Forty Nine Thousand Nine Hundred Thirty One Rupees Only | 949931 |
| 161 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing] | 1000 Cft | 674.59459459459 | 11147.4 | Seven Thousand Five Hundred Twenty Rupees Only | 7520 |
| 162 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing] | 100 Cft | 74.954954954955 | 36029.5 | Twenty Seven Thousand Six Rupees Only | 27006 |
| 163 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing] | Cft | 126.48648648649 | 697.5 | Eighty Eight Thousand Two Hundred Twenty Four Rupees Only | 88224 |
| 164 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding] | 100 Kg | 278.27027027027 | 30827.85 | Eighty Five Thousand Seven Hundred Eighty Five Rupees Only | 85785 |
| 165 | Ch. 8 / Item 2(d)(iii) | Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall] | 100 Cft | 105.40540540541 | 35682.6 | Thirty Seven Thousand Six Hundred Eleven Rupees Only | 37611 |
| 166 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing] | 100 Cft | 231.89189189189 | 38677.7 | Eighty Nine Thousand Six Hundred Ninety Rupees Only | 89690 |
| 167 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall] | 100 Cft | 7.027027027027 | 49085.5 | Three Thousand Four Hundred Forty Nine Rupees Only | 3449 |
| 168 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall] | 100 Sft | 618.37837837838 | 7231.25 | Forty Four Thousand Seven Hundred Sixteen Rupees Only | 44716 |
| 169 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted] | 1000 Cft | 367.74774774775 | 11261.3 | Four Thousand One Hundred Forty One Rupees Only | 4141 |
| 170 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall] | Rft | 56.216216216216 | 1587.5 | Eighty Nine Thousand Two Hundred Forty Three Rupees Only | 89243 |
| 171 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil] | 1000 Cft | 4200 | 11147.4 | Forty Six Thousand Eight Hundred Nineteen Rupees Only | 46819 |
| 172 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway] | 100 Cft | 1400 | 10874.25 | One Lakh Fifty Two Thousand Two Hundred Forty Rupees Only | 152240 |
| 173 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers] | 100 Cft | 2800 | 3556.7 | Ninety Nine Thousand Five Hundred Eighty Eight Rupees Only | 99588 |
| 174 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand] | Sft | 8400 | 231.35 | Nineteen Lakh Forty Three Thousand Three Hundred Forty Rupees Only | 1943340 |
| 175 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3] | Rft | 2800 | 573.35 | Sixteen Lakh Five Thousand Three Hundred Eighty Rupees Only | 1605380 |
| 176 | NSI / EW-DL | Preparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller. | 100 Sft | 5600 | 1650 | Ninety Two Thousand Four Hundred Rupees Only | 92400 |
| 177 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade] | 100 Cft | 1400 | 10874.25 | One Lakh Fifty Two Thousand Two Hundred Forty Rupees Only | 152240 |
| 178 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track] | Rft | 1400 | 573.35 | Eight Lakh Two Thousand Six Hundred Ninety Rupees Only | 802690 |
| 179 | COMP / CA-17 | Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete. | Each | 20 | 363141.15 | Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only | 7262823 |
| 180 | NSI / EW-DL | Preparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling. | 100 Sft | 51412.827027027 | 1650 | Eight Lakh Forty Eight Thousand Three Hundred Twelve Rupees Only | 848312 |
| 181 | Ch. 3 / Item 53 | Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the site over the whole belt, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof] | 1000 Sft | 1170000 | 5292.2 | Sixty One Lakh Ninety One Thousand Eight Hundred Seventy Four Rupees Only | 6191874 |
| 182 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Regular excavation (cutting) of the belt to formation level, dressed to designed section and levels] | 1000 Cft | 795000 | 8385.7 | Sixty Six Lakh Sixty Six Thousand Six Hundred Thirty Two Rupees Only | 6666632 |
| 183 | Ch. 3 / Item 5(ii) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 90% maximum modified AASHTO dry density. [Ch. 3, Item 5(ii): Earthwork in embankment / filling to formation level with suitable material from the belt cut, including ploughing, mixing, moisture conditioning, compaction to 90% modified AASHTO and dressing] | 1000 Cft | 795000 | 10856.75 | Eighty Six Lakh Thirty One Thousand One Hundred Sixteen Rupees Only | 8631116 |
| 184 | NSI / EW-BF | Filling to formation level with approved select material borrowed from outside, in layers, watered and compacted. | 1000 Cft | 362560.34482759 | 15386.45 | Fifty Five Lakh Seventy Eight Thousand Five Hundred Seventeen Rupees Only | 5578517 |
| 185 | Ch. 3 / Item 17(a) | Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of surplus cut material to approved dumping ground, upto 5 km lead] | 1000 Cft | 7190.5 | Zero Rupees Only | ||
| 186 | Ch. 3 / Item 54 | Compaction of natural ground. [Ch. 3, Item 54: Compaction of natural ground over the belt prior to formation of landscape works] | 1000 Sft | 1170000 | 3479.6 | Forty Lakh Seventy One Thousand One Hundred Thirty Two Rupees Only | 4071132 |
| 187 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the boundary wall, 4 ft wide x 3 ft deep, by excavator in ordinary soil, including dagbelling and dressing] | 1000 Cft | 7516.9111969112 | 11147.4 | Eighty Three Thousand Seven Hundred Ninety Four Rupees Only | 83794 |
| 188 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick x 4 ft wide, as lean course under the wall footing] | 100 Cft | 835.21235521236 | 36029.5 | Three Lakh Nine Hundred Twenty Three Rupees Only | 300923 |
| 189 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 3 ft wide x 9 in thick, including formwork, compacting and curing] | Cft | 1409.4208494208 | 697.5 | Nine Lakh Eighty Three Thousand Seventy One Rupees Only | 983071 |
| 190 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing, including cutting, bending, laying and binding] | 100 Kg | 3100.7258687259 | 30827.85 | Nine Lakh Fifty Five Thousand Eight Hundred Eighty Seven Rupees Only | 955887 |
| 191 | Ch. 8 / Item 2(d)(iii) | Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in foundation and upto plinth of the boundary wall] | 100 Cft | 1174.5173745174 | 35682.6 | Four Lakh Nineteen Thousand Ninety Eight Rupees Only | 419098 |
| 192 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 9 in thick, in cement-sand mortar 1:6, in the boundary wall above plinth, including scaffolding and curing] | 100 Cft | 2583.9382239382 | 38677.7 | Nine Lakh Ninety Nine Thousand Four Hundred Eight Rupees Only | 999408 |
| 193 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on top of the boundary wall] | 100 Cft | 78.301158301158 | 49085.5 | Thirty Eight Thousand Four Hundred Thirty Five Rupees Only | 38435 |
| 194 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the stone-masonry boundary wall] | 100 Sft | 6890.5019305019 | 7231.25 | Four Lakh Ninety Eight Thousand Two Hundred Sixty Nine Rupees Only | 498269 |
| 195 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, in layers, watered and compacted] | 1000 Cft | 4097.7606177606 | 11261.3 | Forty Six Thousand One Hundred Forty Six Rupees Only | 46146 |
| 196 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. railing 3 ft high, 76x76x3 mm hollow box main member, on top of the boundary wall] | Rft | 626.40926640927 | 1587.5 | Nine Lakh Ninety Four Thousand Four Hundred Twenty Five Rupees Only | 994425 |
| 197 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of walkway sub-grade to designed level, in ordinary soil] | 1000 Cft | 46800 | 11147.4 | Five Lakh Twenty One Thousand Six Hundred Ninety Eight Rupees Only | 521698 |
| 198 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the walkway] | 100 Cft | 15600 | 10874.25 | Sixteen Lakh Ninety Six Thousand Three Hundred Eighty Three Rupees Only | 1696383 |
| 199 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the tough pavers] | 100 Cft | 31200 | 3556.7 | Eleven Lakh Nine Thousand Six Hundred Ninety Rupees Only | 1109690 |
| 200 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi, 50% grey and 50% coloured, including grouting joints with sand] | Sft | 93600 | 231.35 | Two Crore Sixteen Lakh Fifty Four Thousand Three Hundred Sixty Rupees Only | 21654360 |
| 201 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone of 3500 psi to both edges of the walkway, laid in cement-sand mortar 1:3] | Rft | 31200 | 573.35 | One Crore Seventy Eight Lakh Eighty Eight Thousand Five Hundred Twenty Rupees Only | 17888520 |
| 202 | NSI / EW-DL | Preparation and compaction of the jogging-track formation to designed section - ploughing, moistening to optimum moisture content, levelling and compaction with power road roller. | 100 Sft | 62400 | 1650 | Ten Lakh Twenty Nine Thousand Six Hundred Rupees Only | 1029600 |
| 203 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying pan crush (crushed stone product of approved quality and grade), 3 in thick, on the compacted earth formation of the jogging track, including spreading, moistening and compaction to required camber and grade] | 100 Cft | 15600 | 10874.25 | Sixteen Lakh Ninety Six Thousand Three Hundred Eighty Three Rupees Only | 1696383 |
| 204 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the jogging track] | Rft | 15600 | 573.35 | Eighty Nine Lakh Forty Four Thousand Two Hundred Sixty Rupees Only | 8944260 |
| 205 | COMP / CA-17 | Construction of rain-water harvesting pit 12 ft x 12 ft x 6 ft deep, including excavation, stone-masonry stepped lining, filter media, geotextile, uPVC pipework, P.C.C. base and heavy-duty cover - complete. | Each | 20 | 363141.15 | Seventy Two Lakh Sixty Two Thousand Eight Hundred Twenty Three Rupees Only | 7262823 |
| 206 | NSI / EW-DL | Preparation of shrub / ground-cover beds over 20% of the net soft-landscape area, including forking, weeding, manuring and levelling. | 100 Sft | 193751.27258687 | 1650 | Thirty One Lakh Ninety Six Thousand Eight Hundred Ninety Six Rupees Only | 3196896 |
| 207 | Ch. 3 / Item 53 | Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the park site, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof] | 1000 Sft | 228690 | 5292.2 | Twelve Lakh Ten Thousand Two Hundred Seventy Three Rupees Only | 1210273 |
| 208 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Cutting down mounds and ridges inside the park to balance the filling areas, regular excavation dressed to designed section and levels, including haulage within the park] | 1000 Cft | 686070 | 8385.7 | Fifty Seven Lakh Fifty Three Thousand One Hundred Seventy Seven Rupees Only | 5753177 |
| 209 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Earth filling to raise the park, average 3 ft depth over the whole park area, with the material obtained from the park cut, laid in layers, watered and compacted] | 1000 Cft | 686070 | 11261.3 | Seventy Seven Lakh Twenty Six Thousand Forty Rupees Only | 7726040 |
| 210 | NSI / EW-BF | Earth filling with approved select material borrowed from outside - only the shortfall that the site cut cannot balance. | 1000 Cft | 15386.45 | Zero Rupees Only | ||
| 211 | NSI / EW-DL | Dressing and levelling of the finished fill surface to designed section, including compaction with power road roller. | 100 Sft | 228690 | 1650 | Thirty Seven Lakh Seventy Three Thousand Three Hundred Eighty Five Rupees Only | 3773385 |
| 212 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the park boundary wall, 3 ft wide x 2 ft 6 in deep, by excavator in ordinary soil] | 1000 Cft | 14550.689045936 | 11147.4 | One Lakh Sixty Two Thousand Two Hundred Two Rupees Only | 162202 |
| 213 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick, as lean course under the wall footing] | 100 Cft | 1940.0918727915 | 36029.5 | Six Lakh Ninety Nine Thousand Five Rupees Only | 699005 |
| 214 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 2 ft 6 in wide x 9 in thick, including formwork and curing] | Cft | 3637.6722614841 | 697.5 | Twenty Five Lakh Thirty Seven Thousand Two Hundred Seventy Six Rupees Only | 2537276 |
| 215 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing] | 100 Kg | 8002.878975265 | 30827.85 | Twenty Four Lakh Sixty Seven Thousand One Hundred Sixteen Rupees Only | 2467116 |
| 216 | Ch. 8 / Item 2(d)(iii) | Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in foundation and upto plinth] | 100 Cft | 4365.2067137809 | 35682.6 | Fifteen Lakh Fifty Seven Thousand Six Hundred Nineteen Rupees Only | 1557619 |
| 217 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in the wall above plinth, 4 ft high] | 100 Cft | 11640.551236749 | 38677.7 | Forty Five Lakh Two Thousand Two Hundred Ninety Seven Rupees Only | 4502297 |
| 218 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on the boundary wall] | 100 Cft | 485.02296819788 | 49085.5 | Two Lakh Thirty Eight Thousand Seventy Six Rupees Only | 238076 |
| 219 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the boundary wall] | 100 Sft | 15520.734982332 | 7231.25 | Eleven Lakh Twenty Two Thousand Three Hundred Forty Three Rupees Only | 1122343 |
| 220 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, watered and compacted] | 1000 Cft | 4607.7181978799 | 11261.3 | Fifty One Thousand Eight Hundred Eighty Nine Rupees Only | 51889 |
| 221 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of the perimeter walkway sub-grade to designed level] | 1000 Cft | 5820.2756183746 | 11147.4 | Sixty Four Thousand Eight Hundred Eighty One Rupees Only | 64881 |
| 222 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the perimeter walkway] | 100 Cft | 1940.0918727915 | 10874.25 | Two Lakh Ten Thousand Nine Hundred Seventy Rupees Only | 210970 |
| 223 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the walkway pavers] | 100 Cft | 3880.183745583 | 3556.7 | One Lakh Thirty Eight Thousand Six Rupees Only | 138006 |
| 224 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm precast concrete interlocking tuff pavers, 7000 psi, to the perimeter walkway 6 ft wide, including grouting joints] | Sft | 11640.551236749 | 231.35 | Twenty Six Lakh Ninety Three Thousand Forty Two Rupees Only | 2693042 |
| 225 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the perimeter walkway] | Rft | 3880.183745583 | 573.35 | Twenty Two Lakh Twenty Four Thousand Seven Hundred Three Rupees Only | 2224703 |
| 226 | Ch. 10 / Item 4 | Providing, laying, watering and ramming brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge mixed with 25% sand, for foundation, complete in all respects. [Ch. 10, Item 4: Providing, laying, watering and ramming compacted granular fill 4 in thick to the internal footpath, 4 ft wide] | 100 Cft | 5523.9130434783 | 14479.4 | Seven Lakh Ninety Nine Thousand Eight Hundred Twenty Nine Rupees Only | 799829 |
| 227 | COMP / CA-16 | Providing and laying hand-packed rock-stone fill sub-walkway, 1 ft size stone, 3 ft wide, over compacted sub-grade. | Sft | 7457.2826086957 | 153.68 | Eleven Lakh Forty Six Thousand Thirty Five Rupees Only | 1146035 |
| 228 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Excavation / trimming of the compacted park fill to the stair profile, dressed to designed section] | 1000 Cft | 205.05594679072 | 8385.7 | One Thousand Seven Hundred Twenty Rupees Only | 1720 |
| 229 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 3 in thick, as blinding under the stair slab, landings and cheek walls] | 100 Cft | 42.348510750258 | 36029.5 | Fifteen Thousand Two Hundred Fifty Eight Rupees Only | 15258 |
| 230 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair waist slab and top / bottom landings, 6 in thick, including formwork and curing] | 100 Cft | 71.323807579381 | 49085.5 | Thirty Five Thousand Ten Rupees Only | 35010 |
| 231 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair steps (6 in risers x 12 in treads, 8 ft long), broom-finished treads and rounded nosings] | 100 Cft | 12 | 49085.5 | Five Thousand Eight Hundred Ninety Rupees Only | 5890 |
| 232 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair cheek walls, 9 in thick, both sides, including formwork and curing] | 100 Cft | 53.492855684536 | 49085.5 | Twenty Six Thousand Two Hundred Fifty Seven Rupees Only | 26257 |
| 233 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing M.S. stair handrail (box section 1-1/2 in x 3 in with square-bar balusters), both sides, grouted into the cheek walls] | Rft | 15.661903789691 | 1587.5 | Twenty Four Thousand Eight Hundred Sixty Three Rupees Only | 24863 |
| 234 | Ch. 3 / Item 7, 1(A)(i) | Earthwork excavation in open cutting for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead: upto 5 ft. (1.5 m) depth, by manual, ordinary soil. [Ch. 3, Item 7, 1(A)(i): Earthwork excavation in open cutting upto 5 ft depth for the storm-water pipe trench, including shoring, dressing to designed level and grade and removal of surface water] | 1000 Cft | 9700.4593639576 | 14409.7 | One Lakh Thirty Nine Thousand Seven Hundred Eighty One Rupees Only | 139781 |
| 235 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand as bedding and surround to the storm-water pipe] | 100 Cft | 2425.1148409894 | 3556.7 | Eighty Six Thousand Two Hundred Fifty Four Rupees Only | 86254 |
| 236 | Ch. 21 / Item 3(a)(i) | Providing and laying R.C.C. pipe sewers, moulded with cement concrete 4000 psi conforming to ASTM Specification C-76-20, specific class, Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing, etc., complete: Class-II, 310 mm (12") i/d. [Ch. 21, Item 3(a)(i): Providing and laying R.C.C. pipe sewer, 310 mm (12 in) internal diameter, Class-II to ASTM C-76, including carriage, lowering in trench to correct alignment and grade, jointing with rubber ring and testing] | Rft | 970.04593639576 | 909.2 | Eight Lakh Eighty One Thousand Nine Hundred Sixty Six Rupees Only | 881966 |
| 237 | COMP / CA-19 | Constructing storm-water manhole 3 ft x 3 ft internal, average 5 ft deep, including excavation, P.C.C. base, brick-masonry chamber rendered inside, R.C.C. cover slab with 6 in R.C.C. cover and frame, steps and benching - complete. | Each | 6 | 60761.75 | Three Lakh Sixty Four Thousand Five Hundred Seventy One Rupees Only | 364571 |
| 238 | Ch. 21 / Item 6 | Constructing standard gully grating chamber, 3' x 2-1/2' (900 x 750 mm), with chinaware trap as per PHED Drawing STD/PD No. 3 of 1977, complete in all respects. [Ch. 21, Item 6: Constructing standard gully grating chamber 3 ft x 2 ft 6 in with chinaware trap as per PHED standard drawing, complete in all respects] | Each | 7 | 21861.6 | One Lakh Fifty Three Thousand Thirty One Rupees Only | 153031 |
| 239 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling of the pipe trench with approved excavated material in layers not exceeding 6 in, watered and compacted] | 1000 Cft | 7275.3445229682 | 11261.3 | Eighty One Thousand Nine Hundred Thirty Rupees Only | 81930 |
| 240 | NSI / EW-BF | Earth filling with approved select material borrowed from outside - only the shortfall that the site cut cannot balance. | 1000 Cft | 1002000 | 15386.45 | One Crore Fifty Four Lakh Seventeen Thousand Two Hundred Twenty Three Rupees Only | 15417223 |
| 241 | NSI / EW-DL | Dressing and levelling of the finished fill surface to designed section, including compaction with power road roller. | 100 Sft | 334000 | 1650 | Fifty Five Lakh Eleven Thousand Rupees Only | 5511000 |
| 242 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation in foundation of the park boundary wall, 3 ft wide x 2 ft 6 in deep, by excavator in ordinary soil] | 1000 Cft | 17520 | 11147.4 | One Lakh Ninety Five Thousand Three Hundred Two Rupees Only | 195302 |
| 243 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 4 in thick, as lean course under the wall footing] | 100 Cft | 2336 | 36029.5 | Eight Lakh Forty One Thousand Six Hundred Forty Nine Rupees Only | 841649 |
| 244 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete 1:1.5:3 in the wall strip footing, 2 ft 6 in wide x 9 in thick, including formwork and curing] | Cft | 4380 | 697.5 | Thirty Lakh Fifty Five Thousand Fifty Rupees Only | 3055050 |
| 245 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the wall footing] | 100 Kg | 9636 | 30827.85 | Twenty Nine Lakh Seventy Thousand Five Hundred Seventy Two Rupees Only | 2970572 |
| 246 | Ch. 8 / Item 2(d)(iii) | Coursed rubble masonry hammer dressed, in foundation and plinth, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 2(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in foundation and upto plinth] | 100 Cft | 5256 | 35682.6 | Eighteen Lakh Seventy Five Thousand Four Hundred Seventy Seven Rupees Only | 1875477 |
| 247 | Ch. 8 / Item 4(d)(iii) | Coursed rubble masonry hammer dressed, in ground floor or 20 ft. (6 m) height, building / other than building, in cement, sand mortar: ratio 1:6. (Rates for all finished work include the removal of surplus debris, unused material and byproducts.) [Ch. 8, Item 4(d)(iii): Stone masonry (random rubble / coursed), 18 in thick, in cement-sand mortar 1:6, in the wall above plinth, 4 ft high] | 100 Cft | 14016 | 38677.7 | Fifty Four Lakh Twenty One Thousand Sixty Six Rupees Only | 5421066 |
| 248 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4, 2 in thick, as copping on the boundary wall] | 100 Cft | 584 | 49085.5 | Two Lakh Eighty Six Thousand Six Hundred Fifty Nine Rupees Only | 286659 |
| 249 | Ch. 11 / Item 20(c)(ii) | Pointing on stone work upto 20 ft. (6.00 m) height, raised, in cement mortar 1:3. [Ch. 11, Item 20(c)(ii): Cement pointing, raised, in cement mortar 1:3 to both exposed faces of the boundary wall] | 100 Sft | 18688 | 7231.25 | Thirteen Lakh Fifty One Thousand Three Hundred Seventy Six Rupees Only | 1351376 |
| 250 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling around the wall foundation with approved excavated material, watered and compacted] | 1000 Cft | 5548 | 11261.3 | Sixty Two Thousand Four Hundred Seventy Eight Rupees Only | 62478 |
| 251 | Ch. 3 / Item 21, 1(b)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth upto 5 ft. (1.5 m), by excavator, in ordinary soil. [Ch. 3, Item 21, 1(b)(ii): Excavation and dressing of the perimeter walkway sub-grade to designed level] | 1000 Cft | 7008 | 11147.4 | Seventy Eight Thousand One Hundred Twenty One Rupees Only | 78121 |
| 252 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying compacted granular fill, 2 in thick, under the perimeter walkway] | 100 Cft | 2336 | 10874.25 | Two Lakh Fifty Four Thousand Twenty Two Rupees Only | 254022 |
| 253 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4 in thick, as cushion under the walkway pavers] | 100 Cft | 4672 | 3556.7 | One Lakh Sixty Six Thousand One Hundred Sixty Nine Rupees Only | 166169 |
| 254 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm precast concrete interlocking tuff pavers, 7000 psi, to the perimeter walkway 6 ft wide, including grouting joints] | Sft | 14016 | 231.35 | Thirty Two Lakh Forty Two Thousand Six Hundred Two Rupees Only | 3242602 |
| 255 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone to both edges of the perimeter walkway] | Rft | 4672 | 573.35 | Twenty Six Lakh Seventy Eight Thousand Six Hundred Ninety One Rupees Only | 2678691 |
| 256 | Ch. 10 / Item 4 | Providing, laying, watering and ramming brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge mixed with 25% sand, for foundation, complete in all respects. [Ch. 10, Item 4: Providing, laying, watering and ramming compacted granular fill 4 in thick to the internal footpath, 4 ft wide] | 100 Cft | 8067.6328502415 | 14479.4 | Eleven Lakh Sixty Eight Thousand One Hundred Forty Five Rupees Only | 1168145 |
| 257 | COMP / CA-16 | Providing and laying hand-packed rock-stone fill sub-walkway, 1 ft size stone, 3 ft wide, over compacted sub-grade. | Sft | 10891.304347826 | 153.68 | Sixteen Lakh Seventy Three Thousand Seven Hundred Seventy Six Rupees Only | 1673776 |
| 258 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Excavation / trimming of the compacted park fill to the stair profile, dressed to designed section] | 1000 Cft | 205.05594679072 | 8385.7 | One Thousand Seven Hundred Twenty Rupees Only | 1720 |
| 259 | Ch. 6 / Item 5(i) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:4:8. [Ch. 6, Item 5(i): Providing and laying plain cement concrete 1:4:8, 3 in thick, as blinding under the stair slab, landings and cheek walls] | 100 Cft | 42.348510750258 | 36029.5 | Fifteen Thousand Two Hundred Fifty Eight Rupees Only | 15258 |
| 260 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair waist slab and top / bottom landings, 6 in thick, including formwork and curing] | 100 Cft | 71.323807579381 | 49085.5 | Thirty Five Thousand Ten Rupees Only | 35010 |
| 261 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair steps (6 in risers x 12 in treads, 8 ft long), broom-finished treads and rounded nosings] | 100 Cft | 12 | 49085.5 | Five Thousand Eight Hundred Ninety Rupees Only | 5890 |
| 262 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete 1:2:4 in the stair cheek walls, 9 in thick, both sides, including formwork and curing] | 100 Cft | 53.492855684536 | 49085.5 | Twenty Six Thousand Two Hundred Fifty Seven Rupees Only | 26257 |
| 263 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing M.S. stair handrail (box section 1-1/2 in x 3 in with square-bar balusters), both sides, grouted into the cheek walls] | Rft | 15.661903789691 | 1587.5 | Twenty Four Thousand Eight Hundred Sixty Three Rupees Only | 24863 |
| 264 | Ch. 3 / Item 7, 1(A)(i) | Earthwork excavation in open cutting for storm water channels, drains, sullage drains in open areas, roads, streets, lanes, including under pinning of walls and shoring to protect existing works, shuttering and timbering the trenches, dressed to designed level and dimensions, trimming, removal of surface water from trenches, back filling and surplus excavated material disposed of and dressed within 50 ft. (15 m) lead: upto 5 ft. (1.5 m) depth, by manual, ordinary soil. [Ch. 3, Item 7, 1(A)(i): Earthwork excavation in open cutting upto 5 ft depth for the storm-water pipe trench, including shoring, dressing to designed level and grade and removal of surface water] | 1000 Cft | 11680 | 14409.7 | One Lakh Sixty Eight Thousand Three Hundred Five Rupees Only | 168305 |
| 265 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand as bedding and surround to the storm-water pipe] | 100 Cft | 2920 | 3556.7 | One Lakh Three Thousand Eight Hundred Fifty Six Rupees Only | 103856 |
| 266 | Ch. 21 / Item 3(a)(i) | Providing and laying R.C.C. pipe sewers, moulded with cement concrete 4000 psi conforming to ASTM Specification C-76-20, specific class, Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing, etc., complete: Class-II, 310 mm (12") i/d. [Ch. 21, Item 3(a)(i): Providing and laying R.C.C. pipe sewer, 310 mm (12 in) internal diameter, Class-II to ASTM C-76, including carriage, lowering in trench to correct alignment and grade, jointing with rubber ring and testing] | Rft | 1168 | 909.2 | Ten Lakh Sixty One Thousand Nine Hundred Forty Six Rupees Only | 1061946 |
| 267 | COMP / CA-19 | Constructing storm-water manhole 3 ft x 3 ft internal, average 5 ft deep, including excavation, P.C.C. base, brick-masonry chamber rendered inside, R.C.C. cover slab with 6 in R.C.C. cover and frame, steps and benching - complete. | Each | 7 | 60761.75 | Four Lakh Twenty Five Thousand Three Hundred Thirty Two Rupees Only | 425332 |
| 268 | Ch. 21 / Item 6 | Constructing standard gully grating chamber, 3' x 2-1/2' (900 x 750 mm), with chinaware trap as per PHED Drawing STD/PD No. 3 of 1977, complete in all respects. [Ch. 21, Item 6: Constructing standard gully grating chamber 3 ft x 2 ft 6 in with chinaware trap as per PHED standard drawing, complete in all respects] | Each | 8 | 21861.6 | One Lakh Seventy Four Thousand Eight Hundred Ninety Three Rupees Only | 174893 |
| 269 | Ch. 3 / Item 5(i) | Earthwork in ordinary soil for embankments, lead upto 100 ft. (30 m), including ploughing, mixing and compaction by mechanical means at optimum moisture content and dressing to designed section, complete in all respects: 95% to 100% maximum modified AASHTO dry density. [Ch. 3, Item 5(i): Backfilling of the pipe trench with approved excavated material in layers not exceeding 6 in, watered and compacted] | 1000 Cft | 8760 | 11261.3 | Ninety Eight Thousand Six Hundred Forty Nine Rupees Only | 98649 |
| 270 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt] | Sft | 10800 | 231.35 | Twenty Four Lakh Ninety Eight Thousand Five Hundred Eighty Rupees Only | 2498580 |
| 271 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers] | 100 Cft | 3600 | 3556.7 | One Lakh Twenty Eight Thousand Forty One Rupees Only | 128041 |
| 272 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt] | Sft | 10800 | 231.35 | Twenty Four Lakh Ninety Eight Thousand Five Hundred Eighty Rupees Only | 2498580 |
| 273 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers] | 100 Cft | 3600 | 3556.7 | One Lakh Twenty Eight Thousand Forty One Rupees Only | 128041 |
| 274 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt] | Sft | 10800 | 231.35 | Twenty Four Lakh Ninety Eight Thousand Five Hundred Eighty Rupees Only | 2498580 |
| 275 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers] | 100 Cft | 3600 | 3556.7 | One Lakh Twenty Eight Thousand Forty One Rupees Only | 128041 |
| 276 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt] | Sft | 1350 | 231.35 | Three Lakh Twelve Thousand Three Hundred Twenty Three Rupees Only | 312323 |
| 277 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers] | 100 Cft | 450 | 3556.7 | Sixteen Thousand Five Rupees Only | 16005 |
| 278 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the vehicle entrance apron at each entrance position of the belt] | Sft | 14850 | 231.35 | Thirty Four Lakh Thirty Five Thousand Five Hundred Forty Eight Rupees Only | 3435548 |
| 279 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the apron pavers] | 100 Cft | 4950 | 3556.7 | One Lakh Seventy Six Thousand Fifty Seven Rupees Only | 176057 |
| 280 | COMP / CA-21 | Supply, fabrication and erection of wicket gate 12'-0" x 7'-0" in the park boundary wall, wide enough for a vehicle - double-leaf wrought-iron grill gate with a pedestrian door in one leaf, hot-dip galvanised and powder-coated, on 100x100x5 mm hollow-box posts in R.C.C. foundations, with lock set, hinges, drop bolts and stoppers - complete. | Each | 1 | 160229.98 | One Lakh Sixty Thousand Two Hundred Thirty Rupees Only | 160230 |
| 281 | COMP / CA-22 | Supply, installation, testing and commissioning of revolving pedestrian entrance gate (full-height three-arm turnstile), hot-dip galvanised and powder-coated steel, on P.C.C. foundation with guide railings to the approach - complete and operational. | Each | 1 | 596619.03 | Five Lakh Ninety Six Thousand Six Hundred Nineteen Rupees Only | 596619 |
| 282 | COMP / CA-23 | Forming vehicle crossing at the wicket gate, 12'-0" wide - mountable kerb and heavy-duty tuff-paver crossing on a granular base with edge beams, so that a fire tender or an ambulance can drive in through the wicket gate. | Each | 1 | 89251.6 | Eighty Nine Thousand Two Hundred Fifty Two Rupees Only | 89252 |
| 283 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the entrance apron at each gate position] | Sft | 800 | 231.35 | One Lakh Eighty Five Thousand Eighty Rupees Only | 185080 |
| 284 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the gate-apron pavers] | 100 Cft | 266.66666666667 | 3556.7 | Nine Thousand Four Hundred Eighty Five Rupees Only | 9485 |
| 285 | COMP / CA-21 | Supply, fabrication and erection of wicket gate 12'-0" x 7'-0" in the park boundary wall, wide enough for a vehicle - double-leaf wrought-iron grill gate with a pedestrian door in one leaf, hot-dip galvanised and powder-coated, on 100x100x5 mm hollow-box posts in R.C.C. foundations, with lock set, hinges, drop bolts and stoppers - complete. | Each | 1 | 160229.98 | One Lakh Sixty Thousand Two Hundred Thirty Rupees Only | 160230 |
| 286 | COMP / CA-22 | Supply, installation, testing and commissioning of revolving pedestrian entrance gate (full-height three-arm turnstile), hot-dip galvanised and powder-coated steel, on P.C.C. foundation with guide railings to the approach - complete and operational. | Each | 1 | 596619.03 | Five Lakh Ninety Six Thousand Six Hundred Nineteen Rupees Only | 596619 |
| 287 | COMP / CA-23 | Forming vehicle crossing at the wicket gate, 12'-0" wide - mountable kerb and heavy-duty tuff-paver crossing on a granular base with edge beams, so that a fire tender or an ambulance can drive in through the wicket gate. | Each | 1 | 89251.6 | Eighty Nine Thousand Two Hundred Fifty Two Rupees Only | 89252 |
| 288 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers to the entrance apron at each gate position] | Sft | 800 | 231.35 | One Lakh Eighty Five Thousand Eighty Rupees Only | 185080 |
| 289 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as cushion under the gate-apron pavers] | 100 Cft | 266.66666666667 | 3556.7 | Nine Thousand Four Hundred Eighty Five Rupees Only | 9485 |
| 290 | NSI / EW-DL | Dressing and levelling of the footpath sub-grade to designed section, including compaction and moistening to optimum moisture content. | 100 Sft | 36000 | 1650 | Five Lakh Ninety Four Thousand Rupees Only | 594000 |
| 291 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as bedding under the footpath] | 100 Cft | 12000 | 3556.7 | Four Lakh Twenty Six Thousand Eight Hundred Four Rupees Only | 426804 |
| 292 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 4" thick, as the footpath slab, including placing, compacting, finishing and curing] | 100 Cft | 12000 | 49085.5 | Fifty Eight Lakh Ninety Thousand Two Hundred Sixty Rupees Only | 5890260 |
| 293 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi crushing strength, in approved pattern with 50% grey and 50% coloured, over sand cushion, including grouting of joints] | Sft | 36000 | 231.35 | Eighty Three Lakh Twenty Eight Thousand Six Hundred Rupees Only | 8328600 |
| 294 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone (4" to 6" thick) of 3500 psi compressive strength to both edges of both footpaths, laid in cement-sand mortar 1:3, complete] | Rft | 18000 | 573.35 | One Crore Three Lakh Twenty Thousand Three Hundred Rupees Only | 10320300 |
| 295 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. safety railing 3'-0" high, main member 76x76x3 mm hollow box section, welded with intermediate members, ON THE TOP SECTION of both banks of the channel, complete in all respects] | Rft | 9000 | 1587.5 | One Crore Forty Two Lakh Eighty Seven Thousand Five Hundred Rupees Only | 14287500 |
| 296 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete ratio 1:1.5:3 in public access steps from footpath level down to the channel (80 Cft per flight), including formwork and finishing] | Cft | 800 | 697.5 | Five Lakh Fifty Eight Thousand Rupees Only | 558000 |
| 297 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the access steps] | 100 Kg | 1760 | 30827.85 | Five Lakh Forty Two Thousand Five Hundred Seventy Rupees Only | 542570 |
| 298 | NSI / EW-DL | Dressing and levelling of the footpath sub-grade to designed section, including compaction and moistening to optimum moisture content. | 100 Sft | 32000 | 1650 | Five Lakh Twenty Eight Thousand Rupees Only | 528000 |
| 299 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as bedding under the footpath] | 100 Cft | 10666.666666667 | 3556.7 | Three Lakh Seventy Nine Thousand Three Hundred Eighty One Rupees Only | 379381 |
| 300 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 4" thick, as the footpath slab, including placing, compacting, finishing and curing] | 100 Cft | 10666.666666667 | 49085.5 | Fifty Two Lakh Thirty Five Thousand Seven Hundred Eighty Seven Rupees Only | 5235787 |
| 301 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi crushing strength, in approved pattern with 50% grey and 50% coloured, over sand cushion, including grouting of joints] | Sft | 32000 | 231.35 | Seventy Four Lakh Three Thousand Two Hundred Rupees Only | 7403200 |
| 302 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone (4" to 6" thick) of 3500 psi compressive strength to both edges of both footpaths, laid in cement-sand mortar 1:3, complete] | Rft | 16000 | 573.35 | Ninety One Lakh Seventy Three Thousand Six Hundred Rupees Only | 9173600 |
| 303 | Ch. 25 / Item 34 | Providing / fixing stair railing consisting of M.S. Box section size 1-1/2" x 3" of 16 SWG welded with M.S. flat 1" x 1/8" continuously and welded over M.S. square bars 5/8" x 5/8" punched in M.S. flat 2-3/4' high @ 5-1/2" c/c fixed in steps of stair i/c painting 3 coats complete. [Ch. 25, Item 34: Providing and fixing hot-dip galvanised M.S. safety railing 3'-0" high, main member 76x76x3 mm hollow box section, welded with intermediate members, ON THE TOP SECTION of both banks of the channel, complete in all respects] | Rft | 8000 | 1587.5 | One Crore Twenty Seven Lakh Rupees Only | 12700000 |
| 304 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6 (a-d) above not requiring form work (i.e. horizontal shuttering), complete in all respects - Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Providing and laying reinforced cement concrete ratio 1:1.5:3 in public access steps from footpath level down to the channel (80 Cft per flight), including formwork and finishing] | Cft | 640 | 697.5 | Four Lakh Forty Six Thousand Four Hundred Rupees Only | 446400 |
| 305 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-60 in the access steps] | 100 Kg | 1408 | 30827.85 | Four Lakh Thirty Four Thousand Fifty Six Rupees Only | 434056 |
| 306 | Ch. 3 / Item 53 | Clearing and grubbing. [Ch. 3, Item 53: Clearing and grubbing of the lake margin and of the corridor of the perimeter walkway, including removal of vegetation, shrubs, roots, rubbish and debris and disposal thereof] | 1000 Sft | 17955 | 5292.2 | Ninety Five Thousand Twenty One Rupees Only | 95021 |
| 307 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Desilting and re-profiling of the bed of the existing lake, average 2'-0" deep, including dressing to the designed profile and disposal of the silt within the measured lead] | 1000 Cft | 141570 | 8385.7 | Eleven Lakh Eighty Seven Thousand One Hundred Sixty Four Rupees Only | 1187164 |
| 308 | Ch. 3 / Item 6 | Regular excavation dressed. [Ch. 3, Item 6: Excavation and trimming of the lake bank to the designed 1:2 batter, 12'-0" high, dressed to section and levels] | 1000 Cft | 34020 | 8385.7 | Two Lakh Eighty Five Thousand Two Hundred Eighty Two Rupees Only | 285282 |
| 309 | Ch. 3 / Item 17(a) | Transportation of earth of all types when the total distance, including the lead covered in the item of work, is more than 1000 ft. (300 m): upto 1/4 mile (400 m). [Ch. 3, Item 17(a): Transportation of silt and surplus excavated material of all types to approved dumping ground, total distance upto 5 km lead] | 1000 Cft | 175590 | 7190.5 | Twelve Lakh Sixty Two Thousand Five Hundred Eighty Rupees Only | 1262580 |
| 310 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 3" thick, as filter bedding under the stone pitching of the lake bank] | 100 Cft | 3169.626358106 | 3556.7 | One Lakh Twelve Thousand Seven Hundred Thirty Four Rupees Only | 112734 |
| 311 | Ch. 16 / Item 28 | Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Providing and laying stone pitching, 1'-0" thick, with hammer-dressed stones laid in courses on the prepared 1:2 slope of the lake bank, complete in all respects] | 100 Cft | 12678.505432424 | 15198.5 | Nineteen Lakh Twenty Six Thousand Nine Hundred Forty Three Rupees Only | 1926943 |
| 312 | Ch. 16 / Item 28 | Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Providing and laying stone pitching, 6" thick, to the 4'-0" wide toe apron at the bottom of the pitched slope] | 100 Cft | 1890 | 15198.5 | Two Lakh Eighty Seven Thousand Two Hundred Fifty Two Rupees Only | 287252 |
| 313 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4 in the toe beam under the apron, 1'-6" x 1'-6", including formwork, compacting, finishing and curing] | 100 Cft | 2126.25 | 49085.5 | Ten Lakh Forty Three Thousand Six Hundred Eighty Rupees Only | 1043680 |
| 314 | Ch. 16 / Item 34 | Grouting stone filling or pitching, with bajri. [Ch. 16, Item 34: Grouting of the stone pitching and the toe apron with bajri] | 100 Cft | 14568.505432424 | 3905.7 | Five Lakh Sixty Nine Thousand Two Rupees Only | 569002 |
| 315 | Ch. 1 / Item 1 | Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead from the approved source to site (composite of the chain and kilometre rates of the item). [Ch. 1, Item 1: Carriage of stone, aggregate, sand and other materials for the lake pitching, toe and walkway] | 100 Cft | 24904.38179053 | 4590 | Eleven Lakh Forty Three Thousand One Hundred Eleven Rupees Only | 1143111 |
| 316 | NSI / EW-DL | Dressing and levelling of the walkway sub-grade to designed section, including compaction and moistening to optimum moisture content. | 100 Sft | 7560 | 1650 | One Lakh Twenty Four Thousand Seven Hundred Forty Rupees Only | 124740 |
| 317 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling clean screened sand, 4" thick, as bedding under the walkway] | 100 Cft | 2520 | 3556.7 | Eighty Nine Thousand Six Hundred Twenty Nine Rupees Only | 89629 |
| 318 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 4" thick, as the walkway slab, including placing, compacting, finishing and curing] | 100 Cft | 2520 | 49085.5 | Twelve Lakh Thirty Six Thousand Nine Hundred Fifty Five Rupees Only | 1236955 |
| 319 | Ch. 10 / Item 44 | Providing and laying Polygon Pavers, having 7000 PSI crushing strength of approved manufacturer, 60 mm thick, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope, in pattern as approved by Engineer Incharge. Complete in all respect. (50% Grey & 50% Coloured) [Ch. 10, Item 44: Providing and laying 60 mm thick precast concrete interlocking tuff pavers, 7000 psi crushing strength, in approved pattern, over sand cushion, including grouting of joints] | Sft | 7560 | 231.35 | Seventeen Lakh Forty Nine Thousand Six Rupees Only | 1749006 |
| 320 | Ch. 10 / Item 45 | Providing and fixing precast (K-2 type) Edge Kerb Stone (3-1/2" x 6-1/2" x 7-1/2"), of 3500 PSI compressive strength, embedded in PCC (1:2:4) over lean concrete (1:4:8) i/c excavation and grouting with cement etc. complete in all respect as approved and directed by the Engineer Incharge. [Ch. 10, Item 45: Providing and fixing precast edge kerb stone (4" to 6" thick) of 3500 psi compressive strength to both edges of the walkway, laid in cement-sand mortar 1:3, complete] | Rft | 1890 | 573.35 | Ten Lakh Eighty Three Thousand Six Hundred Thirty Two Rupees Only | 1083632 |
| 321 | Ch. 3 / Item 21, 2(a)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft. (1.5 m): depth from 5.1 ft. (1.5 m) to 15 ft. (4.5 m), in ordinary soil. [Ch. 3, Item 21, 2(a)(ii): Excavation in foundation of the weir, its aprons and the stilling basin, from 5.1 ft to 15 ft depth, by excavator, in ordinary soil, including dagbelling, dressing and refilling around the structure] | 1000 Cft | 9256 | 13528.2 | One Lakh Twenty Five Thousand Two Hundred Seventeen Rupees Only | 125217 |
| 322 | Ch. 18 / Item 3(a)(ii) | Providing and laying sub-base course of stone product of approved quality and grade, including placing, mixing, spreading and compaction of sub-base material to required depth, camber, grade to achieve 100% maximum modified AASHO dry density, including carriage of all material to site of work except gravel and aggregate: crushed stone aggregate. (The rates include the provision and maintenance of field test laboratory.) [Ch. 18, Item 3(a)(ii): Providing and laying well-compacted granular fill of stone product of approved quality, 3'-0" thick, under the aprons and the weir base, including placing, spreading and compaction to specified density] | 100 Cft | 4020 | 10874.25 | Four Lakh Thirty Seven Thousand One Hundred Forty Five Rupees Only | 437145 |
| 323 | Ch. 6 / Item 6(a)(3) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate Resisting cement / Slag cement as may be required, coarse sand and graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - Type C (nominal mix 1:2:4). [Ch. 6, Item 6(a)(3): Providing and laying reinforced cement concrete ratio 1:2:4, 8" thick, in the upstream apron and the weir base slab, including formwork, compacting, finishing and curing] | Cft | 560 | 773.55 | Four Lakh Thirty Three Thousand One Hundred Eighty Eight Rupees Only | 433188 |
| 324 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): deformed bars (Grade-60). [Ch. 6, Item 12(b)(ii): Fabrication of mild steel deformed bar reinforcement Grade-40 in the apron and base slab, including cutting, bending, laying in position and binding] | 100 Kg | 1232 | 30827.85 | Three Lakh Seventy Nine Thousand Seven Hundred Ninety Nine Rupees Only | 379799 |
| 325 | Ch. 6 / Item 5(f) | Cement concrete plain, including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): ratio 1:2:4. [Ch. 6, Item 5(f): Providing and laying plain cement concrete ratio 1:2:4, 8" thick, in the downstream apron, including compacting, finishing and curing] | 100 Cft | 333.33333333333 | 49085.5 | One Lakh Sixty Three Thousand Six Hundred Eighteen Rupees Only | 163618 |
| 326 | Ch. 16 / Item 28 | Providing and laying stone pitching with hammer dressed stones on surface, laid in courses. [Ch. 16, Item 28: Providing and laying hand-placed angular hard stone of toughness more than 1,500 psi, set in mortar, forming the body of the stone-fill weir (crest 8'-0", base 27'-0", height 10'-0"), complete in all respects] | 100 Cft | 3500 | 15198.5 | Five Lakh Thirty One Thousand Nine Hundred Forty Eight Rupees Only | 531948 |
| 327 | COMP / CA-20 | Providing and applying 6" thick shotcrete (1:2:2) to both faces and the crest of the weir, including #1 stainless steel re-bars at 6" centres both ways, surface preparation, nozzle work, rebound allowance and curing, complete. | Sft | 711.72456896535 | 1531.2 | Ten Lakh Eighty Nine Thousand Seven Hundred Ninety Three Rupees Only | 1089793 |
| 328 | Ch. 16 / Item 27 | Providing and laying stone pitching / filling, dry hand packed, as filling behind retaining walls or in pitching and aprons. [Ch. 16, Item 27: Providing and laying dry hand-packed stone fill, 3'-0" thick, in the stilling basin downstream of the apron, including 12" friction blocks at 5'-0" centres, complete] | 100 Cft | 1320 | 8234.15 | One Lakh Eight Thousand Six Hundred Ninety One Rupees Only | 108691 |
| 329 | Ch. 1 / Item 1 | Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the shorter lead adopted for the nullah and lake works. [Ch. 1, Item 1: Carriage of stone, aggregate, sand and other materials for the weir, its aprons and the stilling basin] | 100 Cft | 9733.3333333333 | 3881.75 | Three Lakh Seventy Seven Thousand Eight Hundred Twenty Four Rupees Only | 377824 |
| 330 | Ch. 3 / Item 2 | Earthwork excavation in ashes, sand and soft soil or silt clearance, undressed lead upto 50 ft (15 metre) through mechanical means. [Ch. 3, Item 2: Earthwork excavation for the water storage pit 35 ft x 25 ft x 5 ft at each well, undressed, lead upto 50 ft] | 1000 Cft | 21875 | 8932.7 | One Lakh Ninety Five Thousand Four Hundred Three Rupees Only | 195403 |
| 331 | Ch. 23 / Item 2(a)(i) | Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (a) from ground level to 250 ft (75 m) below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(a)(i): Direct / reverse rotary drilling of the bore, 15" to 18" i/d, from ground level to 250 ft] | Rft | 1250 | 956.3 | Eleven Lakh Ninety Five Thousand Three Hundred Seventy Five Rupees Only | 1195375 |
| 332 | Ch. 23 / Item 2(b)(i) | Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (b) exceeding 250 ft (75 m) depth below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(b)(i): Direct / reverse rotary drilling of the bore, 15" to 18" i/d, below 250 ft to the full depth] | Rft | 1750 | 1050.55 | Eighteen Lakh Thirty Eight Thousand Four Hundred Sixty Three Rupees Only | 1838463 |
| 333 | Ch. 23 / Item 12(g) | Providing and installing M.S. blind pipe socketed / welded joint, M.S. reducer (where necessary), in tubewell bore hole, including jointing / welding with strainer, etc. complete: (g) 8" i/d, 3/16" (200 mm i/d, 5 mm) thick. [Ch. 23, Item 12(g): M.S. blind pipe 8" i/d, 3/16" thick, socketed / welded, in the bore hole (replaces the FRP blank pipe of the source)] | Rft | 2700 | 3537.8 | Ninety Five Lakh Fifty Two Thousand Sixty Rupees Only | 9552060 |
| 334 | Ch. 23 / Item 9(v) | Providing and installing Fiberglass Reinforced Polypropelene (FRP) strainer of specified wall thickness having slot size of 0.9 mm to 1.10 mm in tubewell borehole i/c the cost of male / female coupling with nylone strip, studs complete in all respect as approved and directed by the Engineer Incharge: (v) 8" dia (5 mm thickness). [Ch. 23, Item 9(v): FRP strainer 8" dia, 5 mm wall, slot 0.9 - 1.10 mm, in the bore hole] | Rft | 250 | 2650.4 | Six Lakh Sixty Two Thousand Six Hundred Rupees Only | 662600 |
| 335 | Ch. 23 / Item 10(v) | Providing and installing Fiber glass Reinforced Polypropelene (FRP) bail plug of specified wall thickness in tubewell bore hole i/c the cost of male / female coupling with nylone strip, studs complete in all respect as approved and directed by the Engineer Incharge: (v) 8" dia (5 mm thickness). [Ch. 23, Item 10(v): FRP bail plug 8" dia, 5 mm wall, at the bottom of the assembly] | Rft | 50 | 2495.4 | One Lakh Twenty Four Thousand Seven Hundred Seventy Rupees Only | 124770 |
| 336 | Ch. 23 / Item 17 | Shrouding with graded pea gravel 3/8" to 1/8" (10 to 3 mm), around tubewell in bore hole (including wastage etc.). [Ch. 23, Item 17: Shrouding with graded pea gravel 3/8" to 1/8" around the well assembly] | Cft | 4140 | 189.3 | Seven Lakh Eighty Three Thousand Seven Hundred Two Rupees Only | 783702 |
| 337 | Ch. 23 / Item 31 | Providing & mixing bentonite clay / powder having swelling factor of 1200% for lining / seal and plug earthen bore holes / ponds in the specified ratio conforming to IS:6186 for stabilization of soil as specified by the designer etc. complete in all respect. [Ch. 23, Item 31: Bentonite clay / powder for the seal and plug of the bore hole] | Pound | 5280 | 13.2 | Sixty Nine Thousand Six Hundred Ninety Six Rupees Only | 69696 |
| 338 | Ch. 23 / Item 13(a)(i) | Providing and installing P.V.C. blind pipe, B.S.S., in tubewell bore hole, including sockets and solvents and jointing with strainer (PS-3051 = BS-3505), etc. complete: (a) Class-B (6 bar) - (i) 3" i/d (75 mm). [Ch. 23, Item 13(a)(i): P.V.C. blind pipe Class-B 3" i/d for gravel feeding] | Rft | 150 | 401.5 | Sixty Thousand Two Hundred Twenty Five Rupees Only | 60225 |
| 339 | Ch. 23 / Item 16(i) | Testing and developing of tubewell of size 6" (150 mm) i/d and above continuously: (i) upto 1.5 cs discharge. [Ch. 23, Item 16(i): Testing and developing of the tube well continuously (discharge upto 1.5 cusec), including the long-duration pumping test] | Hour | 100 | 3195.35 | Three Lakh Nineteen Thousand Five Hundred Thirty Five Rupees Only | 319535 |
| 340 | NSI / TW-N1 | Taking samples of the strata at every 5 ft, with construction charts and analysis. | Each | 600 | 202 | One Lakh Twenty One Thousand Two Hundred Rupees Only | 121200 |
| 341 | NSI / TW-N2 | Geophysical logging of the bore. | Job | 5 | 63180 | Three Lakh Fifteen Thousand Nine Hundred Rupees Only | 315900 |
| 342 | NSI / TW-N3 | M.S. centralizers. | Each | 75 | 2906 | Two Lakh Seventeen Thousand Nine Hundred Fifty Rupees Only | 217950 |
| 343 | NSI / TW-N4 | Chemical and physical analysis of water samples after every 24 hours of pumping. | Job | 10 | 17021 | One Lakh Seventy Thousand Two Hundred Ten Rupees Only | 170210 |
| 344 | NSI / TW-N5 | M.S. cap 8" dia, 1/4" thick. | Each | 5 | 2249 | Eleven Thousand Two Hundred Forty Five Rupees Only | 11245 |
| 345 | NSI / TW-N6 | Submersible pump set 0.25 cfs, head 250 ft, with motor, cable and motor control unit, installed, tested and commissioned. | Each | 5 | 2039040 | One Crore One Lakh Ninety Five Thousand Two Hundred Rupees Only | 10195200 |
| 346 | NSI / TW-N7 | Hypo-chlorinator with dosing pump and controller. | Job | 5 | 150841.2 | Seven Lakh Fifty Four Thousand Two Hundred Six Rupees Only | 754206 |
| 347 | Ch. 3 / Item 2 | Earthwork excavation in ashes, sand and soft soil or silt clearance, undressed lead upto 50 ft (15 metre) through mechanical means. [Ch. 3, Item 2: Earthwork excavation for the water pit 35 ft x 25 ft x 5 ft at each trial bore, undressed, lead upto 50 ft] | 1000 Cft | 43750 | 8932.7 | Three Lakh Ninety Thousand Eight Hundred Six Rupees Only | 390806 |
| 348 | Ch. 23 / Item 2(a)(i) | Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (a) from ground level to 250 ft (75 m) below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(a)(i): Direct / reverse rotary drilling of the trial bore, 15" to 18" i/d, from ground level to 250 ft] | Rft | 2500 | 956.3 | Twenty Three Lakh Ninety Thousand Seven Hundred Fifty Rupees Only | 2390750 |
| 349 | Ch. 23 / Item 2(b)(i) | Direct Rotary / Reverse Rotary drilling of bore for tubewells, in all types of soil except shingle, gravel and rock: (b) exceeding 250 ft (75 m) depth below ground level - (i) 15" to 18" (375 to 450 mm) i/d. [Ch. 23, Item 2(b)(i): Direct / reverse rotary drilling of the trial bore, 15" to 18" i/d, below 250 ft to the full depth] | Rft | 3500 | 1050.55 | Thirty Six Lakh Seventy Six Thousand Nine Hundred Twenty Five Rupees Only | 3676925 |
| 350 | Ch. 10 / Item 3 | Supplying and filling sand under floor, or plugging in wells. [Ch. 10, Item 3: Supplying and filling sand for plugging the trial bore after logging and sampling] | 100 Cft | 10620 | 3556.7 | Three Lakh Seventy Seven Thousand Seven Hundred Twenty Two Rupees Only | 377722 |
| 351 | NSI / TW-N1 | Taking samples of the strata at every 5 ft, with construction charts and analysis. | Each | 1200 | 202 | Two Lakh Forty Two Thousand Four Hundred Rupees Only | 242400 |
| 352 | NSI / TW-N2 | Geophysical logging of the trial bore. | Job | 10 | 63180 | Six Lakh Thirty One Thousand Eight Hundred Rupees Only | 631800 |
| 353 | NSI / TW-N4 | Chemical and physical analysis of the water sample. | Job | 10 | 17021 | One Lakh Seventy Thousand Two Hundred Ten Rupees Only | 170210 |
| 354 | Ch. 3 / Item 21, 1(a)(ii) | Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling in layers around structure with excavated earth, watering and ramming, lead upto one chain (30 m) and lift upto 5 ft (1.5 m): 1) depth upto 5 ft (1.5 m) - a) by manual - ii) ordinary soil. [Ch. 3, Item 21, 1(a)(ii): Excavation in foundation of the room, by manual means, in ordinary soil, including refilling, watering and ramming] | 1000 Cft | 9400 | 17088.2 | One Lakh Sixty Thousand Six Hundred Twenty Nine Rupees Only | 160629 |
| 355 | Ch. 6 / Item 3(b) | Cement concrete brick or stone ballast 1-1/2" to 2" (40 mm to 50 mm) gauge, in foundation and plinth: (b) ratio 1:4:8. [Ch. 6, Item 3(b): Cement concrete brick / stone ballast 1:4:8 in foundation] | 100 Cft | 175 | 36435.6 | Sixty Three Thousand Seven Hundred Sixty Two Rupees Only | 63762 |
| 356 | Ch. 7 / Item 4(i) | Pacca brick work in foundation and plinth in: i) cement, sand mortar - ratio 1:3. [Ch. 7, Item 4(i): Pacca brick work in foundation and plinth in cement-sand mortar 1:3] | 100 Cft | 820 | 44342.85 | Three Lakh Sixty Three Thousand Six Hundred Eleven Rupees Only | 363611 |
| 357 | Ch. 6 / Item 37(b)(ii) | Providing and laying damp proof course of cement concrete 1:2:4 (using cement, sand and shingle), including bitumen coating: (b) with 2 coats of bitumen - ii) 2" thick (50 mm). [Ch. 6, Item 37(b)(ii): Damp proof course of cement concrete 1:2:4, 2" thick, with 2 coats of bitumen] | 100 Sft | 310 | 14064.3 | Forty Three Thousand Five Hundred Ninety Nine Rupees Only | 43599 |
| 358 | Ch. 6 / Item 39(b)(2)(b) | Providing and laying vertical damp proof course with cement sand plaster and bitumen coating: (b) with 2 coats of bitumen - 2) ratio 1:3 - b) 3/4" thick (20 mm). [Ch. 6, Item 39(b)(2)(b): Vertical damp proof course of cement-sand plaster 1:3, 3/4" thick, with 2 coats of bitumen] | 100 Sft | 430 | 9434.5 | Forty Thousand Five Hundred Sixty Eight Rupees Only | 40568 |
| 359 | Ch. 7 / Item 5(i) | Pacca brick work in ground floor: i) cement, sand mortar - ratio 1:4. [Ch. 7, Item 5(i): Pacca brick work in the superstructure (ground floor) in cement-sand mortar 1:4] | 100 Cft | 1920 | 43384.35 | Eight Lakh Thirty Two Thousand Nine Hundred Eighty Rupees Only | 832980 |
| 360 | Ch. 3 / Item 15(i) | Filling, watering and ramming earth under floors: i) with surplus earth from foundation, etc. [Ch. 3, Item 15(i): Filling, watering and ramming earth under the floor with surplus earth from the foundation] | 1000 Cft | 5950 | 8155.5 | Forty Eight Thousand Five Hundred Twenty Five Rupees Only | 48525 |
| 361 | Ch. 3 / Item 15(ii) | Filling, watering and ramming earth under floors: ii) with new earth excavated from outside, lead upto one chain (30 m). [Ch. 3, Item 15(ii): Filling, watering and ramming earth under the floor with new earth from outside, lead upto one chain] | 1000 Cft | 1950 | 17545.5 | Thirty Four Thousand Two Hundred Fourteen Rupees Only | 34214 |
| 362 | Ch. 3 / Item 16(i) | Extra for every 50 ft (15 m) additional lead or part thereof: i) for earthwork soft, ordinary, hard and very hard. [Ch. 3, Item 16(i): Extra for additional lead of the new earth - two increments of 50 ft, as priced in the source estimate] | 1000 Cft | 3900 | 74.25 | Two Hundred Ninety Rupees Only | 290 |
| 363 | Ch. 6 / Item 2 | Dry rammed brick or stone ballast, 1-1/2" to 2" (40 mm to 50 mm) gauge. [Ch. 6, Item 2: Dry rammed brick / stone ballast 1-1/2" to 2" gauge under the floor] | 100 Cft | 250 | 14076.5 | Thirty Five Thousand One Hundred Ninety One Rupees Only | 35191 |
| 364 | Ch. 6 / Item 5(f) | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) ratio 1:2:4. [Ch. 6, Item 5(f): Plain cement concrete 1:2:4] | 100 Cft | 5 | 49085.5 | Two Thousand Four Hundred Fifty Four Rupees Only | 2454 |
| 365 | Ch. 6 / Item 5(i) | Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (i) ratio 1:4:8. [Ch. 6, Item 5(i): Plain cement concrete 1:4:8 under the floor] | 100 Cft | 125 | 36029.5 | Forty Five Thousand Thirty Seven Rupees Only | 45037 |
| 366 | Ch. 10 / Item 16(c) | Providing and laying topping of cement concrete 1:2:4, including surface finishing and dividing in panels: (c) 1-1/2" (40 mm) thick. [Ch. 10, Item 16(c): Cement concrete 1:2:4 floor topping, 1-1/2" thick, finished and divided in panels] | 100 Sft | 495 | 10169.6 | Fifty Thousand Three Hundred Forty Rupees Only | 50340 |
| 367 | Ch. 6 / Item 6(a)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (a) reinforced cement concrete in roof slab, beams, columns, lintels, girders and other structural members laid in situ or precast laid in position, or prestressed members cast in situ, complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(a)(2): Reinforced cement concrete Type B (1:1.5:3) in roof slab, beams, columns and lintels] | Cft | 630.35 | 853.15 | Five Lakh Thirty Seven Thousand Seven Hundred Eighty Three Rupees Only | 537783 |
| 368 | Ch. 6 / Item 6(c)(2) | Providing and laying reinforced cement concrete (including prestressed concrete), using Ordinary Portland Cement / Sulphate resisting cement / Slag cement as may be required; coarse sand and screened graded and washed aggregate, in required shape and design, including forms, moulds, shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.): (c) reinforced cement concrete in pile cap, slab of rafts / strip foundation, base slab of column and retaining walls, etc. and footing beams, other structural members other than those mentioned in 6(a-d) above not requiring form work (i.e. horizontal shuttering) complete in all respects - (2) Type B (nominal mix 1:1-1/2:3). [Ch. 6, Item 6(c)(2): Reinforced cement concrete Type B (1:1.5:3) in the raft / strip foundation and plinth beams] | Cft | 452 | 697.5 | Three Lakh Fifteen Thousand Two Hundred Seventy Rupees Only | 315270 |
| 369 | Ch. 6 / Item 12(b)(ii) | Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars): (b) deformed bars - (ii) Grade-60. [Ch. 6, Item 12(b)(ii): Fabrication of deformed bar reinforcement Grade-60, cut, bent, placed and bound] | 100 Kg | 2700 | 30827.85 | Eight Lakh Thirty Two Thousand Three Hundred Fifty Two Rupees Only | 832352 |
| 370 | Ch. 11 / Item 9(c) | Cement plaster 1:4 upto 20 ft (6.00 m) height: c) 3/4" (20 mm) thick. [Ch. 11, Item 9(c): Cement plaster 1:4, 3/4" thick, to the walls] | 100 Sft | 2570 | 6641.3 | One Lakh Seventy Thousand Six Hundred Eighty One Rupees Only | 170681 |
| 371 | Ch. 11 / Item 18(a) | Cement pointing struck joints, on walls, upto 20 ft (6.00 m) height: a) ratio 1:2. [Ch. 11, Item 18(a): Cement pointing struck joints 1:2 to the external brick faces] | 100 Sft | 2790 | 5418.05 | One Lakh Fifty One Thousand One Hundred Sixty Four Rupees Only | 151164 |
| 372 | Ch. 11 / Item 12(c) | Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slabs only, upto 20 ft height: c) 1:4. [Ch. 11, Item 12(c): Cement plaster 1:4, 3/8" thick, under the soffit of the roof slab] | 100 Sft | 1080 | 5537.2 | Fifty Nine Thousand Eight Hundred Two Rupees Only | 59802 |
| 373 | Ch. 9 / Item 5 | Single layer of tiles 9" x 4-1/2" x 1-1/2" (225 x 113 x 40 mm) laid over 4" (100 mm) earth and 1" (25 mm) mud plaster without bhoosa, grouted with cement sand 1:3 on top of RCC roof slab, provided with 34 lbs per 100 Sft or 1.72 kg/sq.m bitumen coating sand blinded. [Ch. 9, Item 5: Single layer of roof tiles over 4" earth and 1" mud plaster with bitumen coating] | 100 Sft | 1005 | 14518.05 | One Lakh Forty Five Thousand Nine Hundred Six Rupees Only | 145906 |
| 374 | Ch. 9 / Item 14 | Khassi parnalas in cement, sand mortar 1:2, 12" (300 mm) outside width finished smooth with a floating coat of neat cement. [Ch. 9, Item 14: Khassi parnalas 12" wide in cement-sand mortar 1:2] | Rft | 62.5 | 279.45 | Seventeen Thousand Four Hundred Sixty Six Rupees Only | 17466 |
| 375 | Ch. 9 / Item 15 | Khuras on roof 2' x 2' x 6" (600 x 600 x 150 mm). [Ch. 9, Item 15: Khuras on roof 2 ft x 2 ft x 6 in] | Each | 5 | 1240.85 | Six Thousand Two Hundred Four Rupees Only | 6204 |
| 376 | Ch. 9 / Item 16 | Bottom khuras of brick masonry in cement mortar 1:6, 4' x 2' x 4-1/2" (1200 x 600 x 113 mm) over 3" (75 mm) cement concrete 1:4:8. [Ch. 9, Item 16: Bottom khuras of brick masonry 4 ft x 2 ft x 4-1/2 in] | Each | 5 | 2399.3 | Eleven Thousand Nine Hundred Ninety Seven Rupees Only | 11997 |
| 377 | Ch. 11 / Item 26(a)(iii) | White washing: a) new surface - iii) three coats. [Ch. 11, Item 26(a)(iii): White washing three coats on new surfaces] | 100 Sft | 2475 | 971.55 | Twenty Four Thousand Forty Six Rupees Only | 24046 |
| 378 | Ch. 25 / Item 61(ii) | P/F iron door comprising of specified leaves made of 1-1/4" x 1-1/4" x 3/16" MS angle iron for leaf frame, diagonal and horizontal braces duly welded with MS sheet 18-SWG i/c the cost of sliding bolt, tower bolt and painting 3-coats but excluding the cost of chowkat, complete in all respect as approved and directed by the Engineer Incharge: (ii) double leaf. [Ch. 25, Item 61(ii): Iron door, double leaf, of M.S. angle frame and 18 SWG sheet, painted, excluding chowkat] | Sft | 140 | 1481.9 | Two Lakh Seven Thousand Four Hundred Sixty Six Rupees Only | 207466 |
| 379 | Ch. 12 / Item 17(ii) | Providing and fixing 2" wide MS / GI chowkat single / double rebate made of 16 SWG MS sheet pressed / welded / supported with M.S. flat 1-1/4" x 1/8" i/c 6" long M.S. flat 1" x 1/8" hold fasts (6 Nos) welded / screwed, punching of lock hole covered with MS box, coating with antirust paint including filling with cement sand mortar (1:8) and embedding hold fast in cement concrete (1:2:4), complete in all respect as approved and directed by the Engineer Incharge: (ii) 10.5" wide. [Ch. 12, Item 17(ii): M.S. / G.I. pressed-steel chowkat 10.5" wide for the door] | Sft | 140 | 733.4 | One Lakh Two Thousand Six Hundred Seventy Six Rupees Only | 102676 |
| 380 | Ch. 25 / Item 45(a) | Providing and fixing steel windows using M.S. sheet (16 SWG) moulded tubular pipe 1-1/2" x 1-1/2" (40 x 40 mm) for frame and 1-1/4" x 1-1/4" (30 x 30 mm) for leaves including M.S. square bars 1/4" x 1/4" (6 x 6 mm) welded around each panel of frame, 5 mm thick glass panes fixed with double M.S. square tubular pipe 3/8" x 3/8" (10 x 10 mm) (22 SWG) beading with U-shaped rubber lining, brass fitting, holdfast, including painting three coats complete in all respects: a) for openable panels fixed with wire gauze 24 SWG, 12 x 12 mesh and glass panes 1/4" (6 mm) thick. [Ch. 25, Item 45(a): Steel windows of moulded tubular M.S. sections with wire gauze and glass panes, painted] | Sft | 90 | 1345.65 | One Lakh Twenty One Thousand One Hundred Nine Rupees Only | 121109 |
| 381 | Ch. 25 / Item 10 | Fabrication of heavy steel / iron work, with angle, tees, flat iron, round iron and sheet iron for making trusses, girders, tanks, etc., including cutting, drilling, revitting, handling, assembling and fixing, but excluding erection in position. [Ch. 25, Item 10: Fabrication of heavy steel work for the well top cover, base plate and lifting girder] | 100 Kg | 1660 | 36401.6 | Six Lakh Four Thousand Two Hundred Sixty Seven Rupees Only | 604267 |
| 382 | Ch. 25 / Item 11 | Erection and fitting in position iron trusses, staging of water tanks, etc. [Ch. 25, Item 11: Erection and fitting in position of the steel work above] | 100 Kg | 1660 | 1535.9 | Twenty Five Thousand Four Hundred Ninety Six Rupees Only | 25496 |
| 383 | Ch. 23 / Item 52 | Providing and fixing chain pulley block of 5 ton capacity with 5 metre length of chain, as per required specifications complete in all respect and as approved by the Engineer Incharge. [Ch. 23, Item 52: Chain pulley block of 5 ton capacity with 5 m chain] | Each | 5 | 53030 | Two Lakh Sixty Five Thousand One Hundred Fifty Rupees Only | 265150 |
| 384 | Ch. 1 / Item 1 | Carriage of 100 Cft (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 Cft (4.25 cu.m) of timber, by truck or by any other means owned by the contractor - for the lead P_TWLEAD from the approved quarry (sum of the kilometre rates of the item: 1st to 10th km, then 69.30 per km). [Ch. 1, Item 1: Carriage of crushed stone aggregate and bajri for the concrete, from the approved quarry] | 100 Cft | 1030 | 3425.2 | Thirty Five Thousand Two Hundred Eighty Rupees Only | 35280 |
| 385 | NSI / TE-C1 | Wiring of light / fan points from the switch, in concealed PVC pipe, with switches and boxes. | Each | 15 | 2720 | Forty Thousand Eight Hundred Rupees Only | 40800 |
| 386 | NSI / TE-C2 | Circuit wiring from the MCB board to the gang switch board, 3 x 2.5 sq.mm in PVC conduit. | Each | 5 | 8871 | Forty Four Thousand Three Hundred Fifty Five Rupees Only | 44355 |
| 387 | NSI / TE-C3 | Wiring from one light point to another light point. | Each | 10 | 2246 | Twenty Two Thousand Four Hundred Sixty Rupees Only | 22460 |
| 388 | NSI / TE-C4 | 5 A switch socket unit wired with 3 x 4 sq.mm cable in concealed conduit. | Each | 5 | 10838 | Fifty Four Thousand One Hundred Ninety Rupees Only | 54190 |
| 389 | NSI / TE-C5 | Wiring from one socket to another socket with 3 x 2.5 sq.mm cable. | Each | 5 | 5914 | Twenty Nine Thousand Five Hundred Seventy Rupees Only | 29570 |
| 390 | NSI / TE-C6 | 15/20 A switch socket unit wired with 3 x 6 sq.mm cable from the D.B. | Each | 5 | 13463 | Sixty Seven Thousand Three Hundred Fifteen Rupees Only | 67315 |
| 391 | Ch. 24 / Item 11(c)(vi) | Supply and erection of PVC insulated, PVC sheathed copper conductor cables for service connection, in prelaid pipe / G.I. wire / trenches, etc. (rate for cable only): c) four core, 600/1000 volt non armoured cable - vi) 10 mm (7/0.052"). [Ch. 24, Item 11(c)(vi): Four-core 10 sq.mm PVC/PVC copper cable 600/1000 V, non-armoured, for the service connection] | Rft | 250 | 621.9 | One Lakh Fifty Five Thousand Four Hundred Seventy Five Rupees Only | 155475 |
| 392 | Ch. 24 / Item 11(c)(viii) | Supply and erection of PVC insulated, PVC sheathed copper conductor cables for service connection, in prelaid pipe / G.I. wire / trenches, etc. (rate for cable only): c) four core, 600/1000 volt non armoured cable - viii) 25 mm (19/0.052"). [Ch. 24, Item 11(c)(viii): Four-core 25 sq.mm PVC/PVC copper cable 600/1000 V, non-armoured, for the service connection] | Rft | 1000 | 1465 | Fourteen Lakh Sixty Five Thousand Rupees Only | 1465000 |
| 393 | Ch. 24 / Item 8(c)(vi) | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe / M.S. conduit / G.I. pipe / wooden strip batten / wooden casing and capping / G.I. wire / trenches (rate for cables only): c) 450/750 volts, PVC insulated - vi) 10 mm sq (7/0.052"). [Ch. 24, Item 8(c)(vi): Single-core 10 sq.mm PVC insulated copper cable 450/750 V in prelaid pipe] | Rft | 500 | 182.3 | Ninety One Thousand One Hundred Fifty Rupees Only | 91150 |
| 394 | Ch. 24 / Item 8(c)(vii) | Supply and erection of single core PVC insulated copper conductor cables, in prelaid PVC pipe / M.S. conduit / G.I. pipe / wooden strip batten / wooden casing and capping / G.I. wire / trenches (rate for cables only): c) 450/750 volts, PVC insulated - vii) 16 mm sq (7/0.064"). [Ch. 24, Item 8(c)(vii): Single-core 16 sq.mm PVC insulated copper cable 450/750 V in prelaid pipe] | Rft | 1500 | 274.6 | Four Lakh Eleven Thousand Nine Hundred Rupees Only | 411900 |
| 395 | Ch. 24 / Item 99(i) | Providing and fixing 4" deep cable tray with straight flange fabricated with perforated G.I. sheet of specified gauge, size and depth duly supported on painted brackets of MS angle iron of 1-1/2" x 1-1/2" x 3/16" and MS patti of 1-1/2" x 3/16" size @ 3 ft c/c, hangers i/c the cost of hardwares as approved and directed by the Engineer Incharge: 14 SWG - (i) 12" x 4". [Ch. 24, Item 99(i): Perforated G.I. cable tray 12" x 4", 14 SWG, on M.S. angle brackets at 3 ft centres] | Rft | 250 | 1307.35 | Three Lakh Twenty Six Thousand Eight Hundred Thirty Eight Rupees Only | 326838 |
| 396 | Ch. 24 / Item 102(a)(ii) | Providing and fixing Pakistan Energy Label NEECA approved copper winded exhaust fan i/c the cost of necessary cable and hardware for connection from ceiling rose complete as approved and directed by Engineer Incharge: a) plastic body - (ii) 12" dia. [Ch. 24, Item 102(a)(ii): Exhaust fan 12" dia, plastic body, copper winding, with louver and shutter] | Each | 5 | 5685.5 | Twenty Eight Thousand Four Hundred Twenty Eight Rupees Only | 28428 |
| 397 | NSI / TE-N1 | Two-core 10 sq.mm PVC/PVC copper cable 600/1000 V with glands and lugs. | Rft | 250 | 360 | Ninety Thousand Rupees Only | 90000 |
| 398 | NSI / TE-N2 | LED batten light fixture 18 W. | Each | 10 | 3284 | Thirty Two Thousand Eight Hundred Forty Rupees Only | 32840 |
| 399 | NSI / TE-N3 | Wall bracket LED light fixture 12 W. | Each | 5 | 5065 | Twenty Five Thousand Three Hundred Twenty Five Rupees Only | 25325 |
| 400 | Ch. 24 / Item 103(i) | Providing and fixing Pakistan Energy Label NEECA approved copper winded wall bracket fan i/c the cost of necessary cable and hardware for connection as approved and directed by Engineer Incharge: i) 18" sweep dia. [Ch. 24, Item 103(i): Wall bracket fan 18" sweep, copper winding] | Each | 5 | 6861.15 | Thirty Four Thousand Three Hundred Six Rupees Only | 34306 |
| 401 | NSI / TE-N4 | uPVC conduit 100 mm dia, Class-B. | Rft | 400 | 876 | Three Lakh Fifty Thousand Four Hundred Rupees Only | 350400 |
| 402 | NSI / TE-N5 | uPVC conduit 100 mm dia, Class-D. | Rft | 250 | 1410 | Three Lakh Fifty Two Thousand Five Hundred Rupees Only | 352500 |
| 403 | NSI / TE-N6 | Distribution board for the tube-well room, complete as specified. | Each | 5 | 59789 | Two Lakh Ninety Eight Thousand Nine Hundred Forty Five Rupees Only | 298945 |
| 404 | NSI / TE-N7 | LV switchgear panel / main panel board, complete as specified. | Each | 5 | 397311 | Nineteen Lakh Eighty Six Thousand Five Hundred Fifty Five Rupees Only | 1986555 |
| 405 | Ch. 24 / Item 118 | Providing, making & testing / commissioning of rod type earth point comprising of 5/8" dia (16 mm dia) 10 ft long copper coated M.S. rod driven in ground duly fixed with clamp with tinned earth test link copper plate (300 x 50 x 10 mm), i/c the cost of brass nuts, spacers, bolts, washers, lugs etc. but excluding the cost of copper strand & manhole, as approved and directed by Engineer Incharge (rod type earthing). [Ch. 24, Item 118: Rod-type earth point, 10 ft x 5/8" copper-coated M.S. rod with test link] | Job | 25 | 21210.95 | Five Lakh Thirty Thousand Two Hundred Seventy Four Rupees Only | 530274 |
| 406 | NSI / TE-N8 | Power factor improvement panel 10 kVAR, complete as specified. | Each | 5 | 335073 | Sixteen Lakh Seventy Five Thousand Three Hundred Sixty Five Rupees Only | 1675365 |
| 407 | COMP / CA-29 | Design, supply, installation, testing and commissioning of a complete solar power system for the tube well and its pump room, comprising approximately 20 kWp capacity of Tier-1 N-type bifacial photovoltaic (PV) modules, terminated with MC4 connectors, complete with branded 6 mm² DC solar cables as required. The solar PV modules shall carry a minimum 15-year manufacturer's warranty. The system shall include a hot-dip galvanized/powder-coated 12 SWG solar panel mounting structure, including stainless-steel (SS) bolts, mid-clamps, end-clamps, accessories and 1-foot-long J-bolts as required; a 25 kW, three-phase hybrid inverter with pure sine-wave output, IP65 protection, suitable pump soft-start facility and compatibility with the proposed PV array and battery bank, carrying a minimum 10-year manufacturer's warranty; and a 100 kWh LiFePO₄ battery energy storage system carrying a minimum 10-year manufacturer's warranty. The system shall further include complete AC/DC cabling, combiner boxes, distribution/changeover panels, fuses, surge protection devices (SPDs), four-pole isolator, and all necessary connectors and accessories; separate DC and AC earthing systems for the PV array and inverter, each having earth resistance of less than 5 ohms; a lightning protection system comprising air terminals (lightning rods/arresters), down conductors and earthing arrangements; protective fencing, foundations, cable termination, interconnections, transportation, labour, installation, configuration, testing, commissioning and all ancillary works required to provide a complete, safe and operational system, in accordance with applicable standards, manufacturer recommendations and approved drawings. All warranties shall be supported by official manufacturer's warranty certificates and shall commence from the date of successful commissioning and acceptance of the system, subject to the applicable warranty terms. Rate analysis reference: CA-29. Complete in all respects. | Set | 5 | 9147312.07 | Four Crore Fifty Seven Lakh Thirty Six Thousand Five Hundred Sixty Rupees Only | 45736560 |
| 408 | NSI / NB-1 | Supply of indoor plants for the nursery stock - assorted species as approved by the Engineer, healthy and well rooted, in nursery bags, delivered to the nursery. | No. | 3500 | 300 | Ten Lakh Fifty Thousand Rupees Only | 1050000 |
| 409 | NSI / NB-2 | Supply of outdoor plants for the nursery stock - assorted ornamental and landscape species as approved by the Engineer, healthy and well rooted, in nursery bags, delivered to the nursery. | No. | 3000 | 300 | Nine Lakh Rupees Only | 900000 |
| 410 | NSI / NB-7 | Supply of grow bags for raising plants in the nursery. | No. | 4000 | 300 | Twelve Lakh Rupees Only | 1200000 |
| 411 | NSI / NB-8 | Supply of plant pots for the nursery. | No. | 1000 | 400 | Four Lakh Rupees Only | 400000 |
| 412 | NSI / NB-9 | Supply of polythene nursery bags, in bundles. | Bundle | 7 | 5500 | Thirty Eight Thousand Five Hundred Rupees Only | 38500 |
| 413 | NSI / NB-10 | Supply of bhall (fine river silt) for the potting mixture, delivered to the nursery by trolley. | Trolley | 10 | 12000 | One Lakh Twenty Thousand Rupees Only | 120000 |
| 414 | NSI / NB-11 | Labour for setting up the nursery - filling of bags and pots, bed preparation and shifting of plants. | Man-day | 5 | 1500 | Seven Thousand Five Hundred Rupees Only | 7500 |
| 415 | NSI / NB-12 | Supply of plant and flower seed packs. | Pack | 150 | 1200 | One Lakh Eighty Thousand Rupees Only | 180000 |
| 416 | NSI / NB-13 | Supply of plant cuttings for propagation in the nursery. | No. | 2000 | 50 | One Lakh Rupees Only | 100000 |
| 417 | NSI / NB-14 | Supply of polythene sheet roll for the nursery beds and propagation. | Roll | 1 | 10000 | Ten Thousand Rupees Only | 10000 |
| 418 | NSI / NB-15 | Supply of fertilizer for the nursery, in bags. | Bag | 5 | 5000 | Twenty Five Thousand Rupees Only | 25000 |
| 419 | NSI / NB-16 | Supply of well-rotted cow dung (farmyard manure) for the potting mixture, delivered by trolley. | Trolley | 3 | 3000 | Nine Thousand Rupees Only | 9000 |
| 420 | NSI / NB-17 | Supply of nursery hand tools - spades, khurpas, secateurs, rakes, watering cans and the like. | No. | 20 | 1500 | Thirty Thousand Rupees Only | 30000 |
| 421 | NSI / NB-18 | Supply of bamboo sticks for staking the plants. | No. | 300 | 100 | Thirty Thousand Rupees Only | 30000 |
| 422 | NSI / NB-20 | Supply of a hand cart (wheel barrow) for the nursery. | No. | 1 | 8000 | Eight Thousand Rupees Only | 8000 |
| 423 | NSI / NB-21 | Supply of a loader rickshaw for the nursery. | No. | 1 | 500000 | Five Lakh Rupees Only | 500000 |
| 424 | NSI / NB-22 | Supply of a lawn watering hose roll for the nursery. | Roll | 1 | 17000 | Seventeen Thousand Rupees Only | 17000 |
| 425 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt. | Sft | 1608462.1621427 | 7.5 | One Crore Twenty Lakh Sixty Three Thousand Four Hundred Sixty Six Rupees Only | 12063466 |
| 426 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing. | Rft | 7540 | 433.61 | Thirty Two Lakh Sixty Nine Thousand Four Hundred Nineteen Rupees Only | 3269419 |
| 427 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main. | Each | 40 | 22849.37 | Nine Lakh Thirteen Thousand Nine Hundred Seventy Five Rupees Only | 913975 |
| 428 | Plant / SP-01 | Supply and planting of Guava Mexican (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 220 | 4754.41 | Ten Lakh Forty Five Thousand Nine Hundred Seventy Rupees Only | 1045970 |
| 429 | Plant / SP-02 | Supply and planting of Fig (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 160 | 4754.41 | Seven Lakh Sixty Thousand Seven Hundred Six Rupees Only | 760706 |
| 430 | Plant / SP-03 | Supply and planting of Jamun (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 180 | 4754.41 | Eight Lakh Fifty Five Thousand Seven Hundred Ninety Four Rupees Only | 855794 |
| 431 | Plant / SP-04 | Supply and planting of Papaya (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 160 | 4754.41 | Seven Lakh Sixty Thousand Seven Hundred Six Rupees Only | 760706 |
| 432 | Plant / SP-05 | Supply and planting of Grapes (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 90 | 4754.41 | Four Lakh Twenty Seven Thousand Eight Hundred Ninety Seven Rupees Only | 427897 |
| 433 | Plant / SP-06 | Supply and planting of Spineless Ber (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 120 | 4754.41 | Five Lakh Seventy Thousand Five Hundred Twenty Nine Rupees Only | 570529 |
| 434 | Plant / SP-07 | Supply and planting of Shahtoot (Variety) (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 130 | 4754.41 | Six Lakh Eighteen Thousand Seventy Three Rupees Only | 618073 |
| 435 | Plant / SP-08 | Supply and planting of Imli (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 140 | 4229.41 | Five Lakh Ninety Two Thousand One Hundred Seventeen Rupees Only | 592117 |
| 436 | Plant / SP-09 | Supply and planting of Falsa (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 130 | 4754.41 | Six Lakh Eighteen Thousand Seventy Three Rupees Only | 618073 |
| 437 | Plant / SP-10 | Supply and planting of Lichi (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 130 | 5804.41 | Seven Lakh Fifty Four Thousand Five Hundred Seventy Three Rupees Only | 754573 |
| 438 | Plant / SP-11 | Supply and planting of Pear (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 120 | 4754.41 | Five Lakh Seventy Thousand Five Hundred Twenty Nine Rupees Only | 570529 |
| 439 | Plant / SP-12 | Supply and planting of Louqat (fruit tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 120 | 3704.41 | Four Lakh Forty Four Thousand Five Hundred Twenty Nine Rupees Only | 444529 |
| 440 | Plant / SP-13 | Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 180 | 3914.41 | Seven Lakh Four Thousand Five Hundred Ninety Four Rupees Only | 704594 |
| 441 | Plant / SP-14 | Supply and planting of Kachnar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 80 | 3809.41 | Three Lakh Four Thousand Seven Hundred Fifty Three Rupees Only | 304753 |
| 442 | Plant / SP-15 | Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 130 | 3809.41 | Four Lakh Ninety Five Thousand Two Hundred Twenty Three Rupees Only | 495223 |
| 443 | Plant / SP-16 | Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 180 | 3809.41 | Six Lakh Eighty Five Thousand Six Hundred Ninety Four Rupees Only | 685694 |
| 444 | Plant / SP-17 | Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 150 | 3914.41 | Five Lakh Eighty Seven Thousand One Hundred Sixty Two Rupees Only | 587162 |
| 445 | Plant / SP-18 | Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 155 | 3809.41 | Five Lakh Ninety Thousand Four Hundred Fifty Nine Rupees Only | 590459 |
| 446 | Plant / SP-19 | Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3809.41 | Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only | 761882 |
| 447 | Plant / SP-20 | Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3704.41 | Seven Lakh Forty Thousand Eight Hundred Eighty Two Rupees Only | 740882 |
| 448 | Plant / SP-21 | Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 185 | 3914.41 | Seven Lakh Twenty Four Thousand One Hundred Sixty Six Rupees Only | 724166 |
| 449 | Plant / SP-22 | Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 160 | 4754.41 | Seven Lakh Sixty Thousand Seven Hundred Six Rupees Only | 760706 |
| 450 | Plant / SP-34 | Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 160 | 1904.29 | Three Lakh Four Thousand Six Hundred Eighty Six Rupees Only | 304686 |
| 451 | Plant / SP-35 | Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 160 | 486.79 | Seventy Seven Thousand Eight Hundred Eighty Six Rupees Only | 77886 |
| 452 | Plant / SP-36 | Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 160 | 434.29 | Sixty Nine Thousand Four Hundred Eighty Six Rupees Only | 69486 |
| 453 | Plant / SP-37 | Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 160 | 413.29 | Sixty Six Thousand One Hundred Twenty Six Rupees Only | 66126 |
| 454 | Plant / SP-38 | Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 160 | 413.29 | Sixty Six Thousand One Hundred Twenty Six Rupees Only | 66126 |
| 455 | Plant / SP-39 | Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 160 | 465.79 | Seventy Four Thousand Five Hundred Twenty Six Rupees Only | 74526 |
| 456 | Plant / SP-40 | Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 160 | 413.29 | Sixty Six Thousand One Hundred Twenty Six Rupees Only | 66126 |
| 457 | Plant / SP-41 | Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 180 | 381.79 | Sixty Eight Thousand Seven Hundred Twenty Two Rupees Only | 68722 |
| 458 | Plant / SP-43 | Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 190 | 486.79 | Ninety Two Thousand Four Hundred Ninety Rupees Only | 92490 |
| 459 | Plant / SP-46 | Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 190 | 434.29 | Eighty Two Thousand Five Hundred Fifteen Rupees Only | 82515 |
| 460 | COMP / CA-27 | Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 14 | 9765.51 | One Lakh Thirty Six Thousand Seven Hundred Seventeen Rupees Only | 136717 |
| 461 | COMP / CA-28 | Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 14 | 9590.51 | One Lakh Thirty Four Thousand Two Hundred Sixty Seven Rupees Only | 134267 |
| 462 | COMP / CA-15 | Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 886.20504801252 | 51000 | Four Crore Fifty One Lakh Ninety Six Thousand Four Hundred Fifty Seven Rupees Only | 45196457 |
| 463 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt. | Sft | 2111170.8339768 | 7.5 | One Crore Fifty Eight Lakh Thirty Three Thousand Seven Hundred Eighty One Rupees Only | 15833781 |
| 464 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing. | Rft | 7540 | 433.61 | Thirty Two Lakh Sixty Nine Thousand Four Hundred Nineteen Rupees Only | 3269419 |
| 465 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main. | Each | 40 | 22849.37 | Nine Lakh Thirteen Thousand Nine Hundred Seventy Five Rupees Only | 913975 |
| 466 | Plant / SP-13 | Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3914.41 | Seven Lakh Eighty Two Thousand Eight Hundred Eighty Two Rupees Only | 782882 |
| 467 | Plant / SP-20 | Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3704.41 | Seven Lakh Forty Thousand Eight Hundred Eighty Two Rupees Only | 740882 |
| 468 | Plant / SP-15 | Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3809.41 | Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only | 761882 |
| 469 | Plant / SP-16 | Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3809.41 | Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only | 761882 |
| 470 | Plant / SP-17 | Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3914.41 | Seven Lakh Eighty Two Thousand Eight Hundred Eighty Two Rupees Only | 782882 |
| 471 | Plant / SP-18 | Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3809.41 | Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only | 761882 |
| 472 | Plant / SP-19 | Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3809.41 | Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only | 761882 |
| 473 | Plant / SP-22 | Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 150 | 4754.41 | Seven Lakh Thirteen Thousand One Hundred Sixty Two Rupees Only | 713162 |
| 474 | Plant / SP-21 | Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 150 | 3914.41 | Five Lakh Eighty Seven Thousand One Hundred Sixty Two Rupees Only | 587162 |
| 475 | Plant / SP-23 | Supply and planting of Kurrajong (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 4019.41 | Eight Lakh Three Thousand Eight Hundred Eighty Two Rupees Only | 803882 |
| 476 | Plant / SP-24 | Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3809.41 | Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only | 761882 |
| 477 | Plant / SP-25 | Supply and planting of Weeping Willow (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3809.41 | Seven Lakh Sixty One Thousand Eight Hundred Eighty Two Rupees Only | 761882 |
| 478 | Plant / SP-26 | Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 4019.41 | Eight Lakh Three Thousand Eight Hundred Eighty Two Rupees Only | 803882 |
| 479 | Plant / SP-27 | Supply and planting of Bottle Brush (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 200 | 3777.91 | Seven Lakh Fifty Five Thousand Five Hundred Eighty Two Rupees Only | 755582 |
| 480 | Plant / SP-34 | Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 200 | 1904.29 | Three Lakh Eighty Thousand Eight Hundred Fifty Eight Rupees Only | 380858 |
| 481 | Plant / SP-35 | Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 200 | 486.79 | Ninety Seven Thousand Three Hundred Fifty Eight Rupees Only | 97358 |
| 482 | Plant / SP-36 | Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 200 | 434.29 | Eighty Six Thousand Eight Hundred Fifty Eight Rupees Only | 86858 |
| 483 | Plant / SP-37 | Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 150 | 413.29 | Sixty One Thousand Nine Hundred Ninety Four Rupees Only | 61994 |
| 484 | Plant / SP-38 | Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 200 | 413.29 | Eighty Two Thousand Six Hundred Fifty Eight Rupees Only | 82658 |
| 485 | Plant / SP-39 | Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 150 | 465.79 | Sixty Nine Thousand Eight Hundred Sixty Nine Rupees Only | 69869 |
| 486 | Plant / SP-40 | Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 200 | 413.29 | Eighty Two Thousand Six Hundred Fifty Eight Rupees Only | 82658 |
| 487 | Plant / SP-41 | Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 200 | 381.79 | Seventy Six Thousand Three Hundred Fifty Eight Rupees Only | 76358 |
| 488 | Plant / SP-42 | Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 300 | 527.74 | One Lakh Fifty Eight Thousand Three Hundred Twenty Two Rupees Only | 158322 |
| 489 | Plant / SP-44 | Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 150 | 455.29 | Sixty Eight Thousand Two Hundred Ninety Four Rupees Only | 68294 |
| 490 | Plant / SP-43 | Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 150 | 486.79 | Seventy Three Thousand Nineteen Rupees Only | 73019 |
| 491 | Plant / SP-46 | Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 200 | 434.29 | Eighty Six Thousand Eight Hundred Fifty Eight Rupees Only | 86858 |
| 492 | COMP / CA-27 | Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 14 | 9765.51 | One Lakh Thirty Six Thousand Seven Hundred Seventeen Rupees Only | 136717 |
| 493 | COMP / CA-28 | Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 14 | 9590.51 | One Lakh Thirty Four Thousand Two Hundred Sixty Seven Rupees Only | 134267 |
| 494 | COMP / CA-15 | Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 1163.1795228523 | 51000 | Five Crore Ninety Three Lakh Twenty Two Thousand One Hundred Fifty Six Rupees Only | 59322156 |
| 495 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt. | Sft | 980170.83397683 | 7.5 | Seventy Three Lakh Fifty One Thousand Two Hundred Eighty One Rupees Only | 7351281 |
| 496 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing. | Rft | 7540 | 433.61 | Thirty Two Lakh Sixty Nine Thousand Four Hundred Nineteen Rupees Only | 3269419 |
| 497 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main. | Each | 40 | 22849.37 | Nine Lakh Thirteen Thousand Nine Hundred Seventy Five Rupees Only | 913975 |
| 498 | Plant / SP-13 | Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3914.41 | Three Lakh Ninety One Thousand Four Hundred Forty One Rupees Only | 391441 |
| 499 | Plant / SP-20 | Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3704.41 | Three Lakh Seventy Thousand Four Hundred Forty One Rupees Only | 370441 |
| 500 | Plant / SP-28 | Supply and planting of Putanjiva (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 4019.41 | Four Lakh One Thousand Nine Hundred Forty One Rupees Only | 401941 |
| 501 | Plant / SP-16 | Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3809.41 | Three Lakh Eighty Thousand Nine Hundred Forty One Rupees Only | 380941 |
| 502 | Plant / SP-17 | Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3914.41 | Three Lakh Ninety One Thousand Four Hundred Forty One Rupees Only | 391441 |
| 503 | Plant / SP-29 | Supply and planting of Chestnut Tree/Shah Baloot (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3977.41 | Three Lakh Ninety Seven Thousand Seven Hundred Forty One Rupees Only | 397741 |
| 504 | Plant / SP-19 | Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3809.41 | Three Lakh Eighty Thousand Nine Hundred Forty One Rupees Only | 380941 |
| 505 | Plant / SP-22 | Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 4754.41 | Four Lakh Seventy Five Thousand Four Hundred Forty One Rupees Only | 475441 |
| 506 | Plant / SP-21 | Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3914.41 | Three Lakh Ninety One Thousand Four Hundred Forty One Rupees Only | 391441 |
| 507 | Plant / SP-30 | Supply and planting of Sapium (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3284.41 | Three Lakh Twenty Eight Thousand Four Hundred Forty One Rupees Only | 328441 |
| 508 | Plant / SP-24 | Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 3809.41 | Three Lakh Eighty Thousand Nine Hundred Forty One Rupees Only | 380941 |
| 509 | Plant / SP-31 | Supply and planting of Katsagan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 4754.41 | Four Lakh Seventy Five Thousand Four Hundred Forty One Rupees Only | 475441 |
| 510 | Plant / SP-26 | Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 4019.41 | Four Lakh One Thousand Nine Hundred Forty One Rupees Only | 401941 |
| 511 | Plant / SP-32 | Supply and planting of Amla (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 100 | 4019.41 | Four Lakh One Thousand Nine Hundred Forty One Rupees Only | 401941 |
| 512 | Plant / SP-34 | Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 1904.29 | One Lakh Ninety Thousand Four Hundred Twenty Nine Rupees Only | 190429 |
| 513 | Plant / SP-35 | Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 486.79 | Forty Eight Thousand Six Hundred Seventy Nine Rupees Only | 48679 |
| 514 | Plant / SP-36 | Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 434.29 | Forty Three Thousand Four Hundred Twenty Nine Rupees Only | 43429 |
| 515 | Plant / SP-37 | Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 413.29 | Forty One Thousand Three Hundred Twenty Nine Rupees Only | 41329 |
| 516 | Plant / SP-38 | Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 413.29 | Forty One Thousand Three Hundred Twenty Nine Rupees Only | 41329 |
| 517 | Plant / SP-39 | Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 465.79 | Forty Six Thousand Five Hundred Seventy Nine Rupees Only | 46579 |
| 518 | Plant / SP-40 | Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 413.29 | Forty One Thousand Three Hundred Twenty Nine Rupees Only | 41329 |
| 519 | Plant / SP-41 | Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 381.79 | Thirty Eight Thousand One Hundred Seventy Nine Rupees Only | 38179 |
| 520 | Plant / SP-42 | Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 527.74 | Fifty Two Thousand Seven Hundred Seventy Four Rupees Only | 52774 |
| 521 | Plant / SP-44 | Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 455.29 | Forty Five Thousand Five Hundred Twenty Nine Rupees Only | 45529 |
| 522 | Plant / SP-43 | Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 486.79 | Forty Eight Thousand Six Hundred Seventy Nine Rupees Only | 48679 |
| 523 | Plant / SP-46 | Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 434.29 | Forty Three Thousand Four Hundred Twenty Nine Rupees Only | 43429 |
| 524 | Plant / SP-47 | Supply and planting of MorPunkh (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 100 | 434.29 | Forty Three Thousand Four Hundred Twenty Nine Rupees Only | 43429 |
| 525 | COMP / CA-27 | Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 14 | 9765.51 | One Lakh Thirty Six Thousand Seven Hundred Seventeen Rupees Only | 136717 |
| 526 | COMP / CA-28 | Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 14 | 9590.51 | One Lakh Thirty Four Thousand Two Hundred Sixty Seven Rupees Only | 134267 |
| 527 | COMP / CA-15 | Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 540.03902698448 | 51000 | Two Crore Seventy Five Lakh Forty One Thousand Nine Hundred Ninety Rupees Only | 27541990 |
| 528 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt. | Sft | 257064.13513514 | 7.5 | Nineteen Lakh Twenty Seven Thousand Nine Hundred Eighty One Rupees Only | 1927981 |
| 529 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing. | Rft | 910 | 433.61 | Three Lakh Ninety Four Thousand Five Hundred Eighty Five Rupees Only | 394585 |
| 530 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main. | Each | 6 | 22849.37 | One Lakh Thirty Seven Thousand Ninety Six Rupees Only | 137096 |
| 531 | Plant / SP-13 | Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3914.41 | Forty Six Thousand Nine Hundred Seventy Three Rupees Only | 46973 |
| 532 | Plant / SP-20 | Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3704.41 | Forty Four Thousand Four Hundred Fifty Three Rupees Only | 44453 |
| 533 | Plant / SP-15 | Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3809.41 | Forty Five Thousand Seven Hundred Thirteen Rupees Only | 45713 |
| 534 | Plant / SP-16 | Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3809.41 | Forty Five Thousand Seven Hundred Thirteen Rupees Only | 45713 |
| 535 | Plant / SP-17 | Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3914.41 | Forty Six Thousand Nine Hundred Seventy Three Rupees Only | 46973 |
| 536 | Plant / SP-18 | Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3809.41 | Forty Five Thousand Seven Hundred Thirteen Rupees Only | 45713 |
| 537 | Plant / SP-19 | Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3809.41 | Forty Five Thousand Seven Hundred Thirteen Rupees Only | 45713 |
| 538 | Plant / SP-22 | Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 9 | 4754.41 | Forty Two Thousand Seven Hundred Ninety Rupees Only | 42790 |
| 539 | Plant / SP-21 | Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 9 | 3914.41 | Thirty Five Thousand Two Hundred Thirty Rupees Only | 35230 |
| 540 | Plant / SP-23 | Supply and planting of Kurrajong (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 4019.41 | Forty Eight Thousand Two Hundred Thirty Three Rupees Only | 48233 |
| 541 | Plant / SP-24 | Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3809.41 | Forty Five Thousand Seven Hundred Thirteen Rupees Only | 45713 |
| 542 | Plant / SP-25 | Supply and planting of Weeping Willow (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3809.41 | Forty Five Thousand Seven Hundred Thirteen Rupees Only | 45713 |
| 543 | Plant / SP-26 | Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 4019.41 | Forty Eight Thousand Two Hundred Thirty Three Rupees Only | 48233 |
| 544 | Plant / SP-27 | Supply and planting of Bottle Brush (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 12 | 3777.91 | Forty Five Thousand Three Hundred Thirty Five Rupees Only | 45335 |
| 545 | Plant / SP-34 | Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 12 | 1904.29 | Twenty Two Thousand Eight Hundred Fifty One Rupees Only | 22851 |
| 546 | Plant / SP-35 | Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 12 | 486.79 | Five Thousand Eight Hundred Forty One Rupees Only | 5841 |
| 547 | Plant / SP-36 | Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 12 | 434.29 | Five Thousand Two Hundred Eleven Rupees Only | 5211 |
| 548 | Plant / SP-37 | Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 9 | 413.29 | Three Thousand Seven Hundred Twenty Rupees Only | 3720 |
| 549 | Plant / SP-38 | Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 12 | 413.29 | Four Thousand Nine Hundred Fifty Nine Rupees Only | 4959 |
| 550 | Plant / SP-39 | Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 9 | 465.79 | Four Thousand One Hundred Ninety Two Rupees Only | 4192 |
| 551 | Plant / SP-40 | Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 12 | 413.29 | Four Thousand Nine Hundred Fifty Nine Rupees Only | 4959 |
| 552 | Plant / SP-41 | Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 12 | 381.79 | Four Thousand Five Hundred Eighty One Rupees Only | 4581 |
| 553 | Plant / SP-42 | Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 18 | 527.74 | Nine Thousand Four Hundred Ninety Nine Rupees Only | 9499 |
| 554 | Plant / SP-44 | Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 9 | 455.29 | Four Thousand Ninety Eight Rupees Only | 4098 |
| 555 | Plant / SP-43 | Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 9 | 486.79 | Four Thousand Three Hundred Eighty One Rupees Only | 4381 |
| 556 | Plant / SP-46 | Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 12 | 434.29 | Five Thousand Two Hundred Eleven Rupees Only | 5211 |
| 557 | COMP / CA-27 | Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 2 | 9765.51 | Nineteen Thousand Five Hundred Thirty One Rupees Only | 19531 |
| 558 | COMP / CA-28 | Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 2 | 9590.51 | Nineteen Thousand One Hundred Eighty One Rupees Only | 19181 |
| 559 | COMP / CA-15 | Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 141.63313230586 | 51000 | Seventy Two Lakh Twenty Three Thousand Two Hundred Ninety Rupees Only | 7223290 |
| 560 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the belt. | Sft | 968756.36293436 | 7.5 | Seventy Two Lakh Sixty Five Thousand Six Hundred Seventy Three Rupees Only | 7265673 |
| 561 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2 in dia, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing. | Rft | 10140 | 433.61 | Forty Three Lakh Ninety Six Thousand Eight Hundred Five Rupees Only | 4396805 |
| 562 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main. | Each | 52 | 22849.37 | Eleven Lakh Eighty Eight Thousand One Hundred Sixty Seven Rupees Only | 1188167 |
| 563 | Plant / SP-13 | Supply and planting of Amaltas (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3914.41 | Five Lakh Twenty Four Thousand Five Hundred Thirty One Rupees Only | 524531 |
| 564 | Plant / SP-20 | Supply and planting of Bakain (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3704.41 | Four Lakh Ninety Six Thousand Three Hundred Ninety One Rupees Only | 496391 |
| 565 | Plant / SP-15 | Supply and planting of Tabebuia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3809.41 | Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only | 510461 |
| 566 | Plant / SP-16 | Supply and planting of Alastonia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3809.41 | Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only | 510461 |
| 567 | Plant / SP-17 | Supply and planting of Chinar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3914.41 | Five Lakh Twenty Four Thousand Five Hundred Thirty One Rupees Only | 524531 |
| 568 | Plant / SP-18 | Supply and planting of Sukh Chyn (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3809.41 | Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only | 510461 |
| 569 | Plant / SP-19 | Supply and planting of Terminalia (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3809.41 | Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only | 510461 |
| 570 | Plant / SP-22 | Supply and planting of Neem (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 101 | 4754.41 | Four Lakh Eighty Thousand One Hundred Ninety Five Rupees Only | 480195 |
| 571 | Plant / SP-21 | Supply and planting of Pilkan (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 101 | 3914.41 | Three Lakh Ninety Five Thousand Three Hundred Fifty Five Rupees Only | 395355 |
| 572 | Plant / SP-23 | Supply and planting of Kurrajong (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 4019.41 | Five Lakh Thirty Eight Thousand Six Hundred One Rupees Only | 538601 |
| 573 | Plant / SP-24 | Supply and planting of Soap Berry/Reetha (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3809.41 | Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only | 510461 |
| 574 | Plant / SP-25 | Supply and planting of Weeping Willow (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3809.41 | Five Lakh Ten Thousand Four Hundred Sixty One Rupees Only | 510461 |
| 575 | Plant / SP-26 | Supply and planting of Gul-e-Nishtar (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 4019.41 | Five Lakh Thirty Eight Thousand Six Hundred One Rupees Only | 538601 |
| 576 | Plant / SP-27 | Supply and planting of Bottle Brush (tree), complete with pit, sweet-earth and manure backfill, stake and guard, watering and first-season care. | No. | 134 | 3777.91 | Five Lakh Six Thousand Two Hundred Forty Rupees Only | 506240 |
| 577 | Plant / SP-34 | Supply and planting of Osmanthus (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 134 | 1904.29 | Two Lakh Fifty Five Thousand One Hundred Seventy Five Rupees Only | 255175 |
| 578 | Plant / SP-35 | Supply and planting of Franciscia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 134 | 486.79 | Sixty Five Thousand Two Hundred Thirty Rupees Only | 65230 |
| 579 | Plant / SP-36 | Supply and planting of Marwi (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 134 | 434.29 | Fifty Eight Thousand One Hundred Ninety Five Rupees Only | 58195 |
| 580 | Plant / SP-37 | Supply and planting of Raat ki Rani (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 101 | 413.29 | Forty One Thousand Seven Hundred Forty Two Rupees Only | 41742 |
| 581 | Plant / SP-38 | Supply and planting of Din ka Raja (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 134 | 413.29 | Fifty Five Thousand Three Hundred Eighty One Rupees Only | 55381 |
| 582 | Plant / SP-39 | Supply and planting of HaarSinghar (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 101 | 465.79 | Forty Seven Thousand Forty Five Rupees Only | 47045 |
| 583 | Plant / SP-40 | Supply and planting of Lagerstroemia (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 134 | 413.29 | Fifty Five Thousand Three Hundred Eighty One Rupees Only | 55381 |
| 584 | Plant / SP-41 | Supply and planting of Motiya (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 134 | 381.79 | Fifty One Thousand One Hundred Sixty Rupees Only | 51160 |
| 585 | Plant / SP-42 | Supply and planting of Rose (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 202 | 527.74 | One Lakh Six Thousand Six Hundred Three Rupees Only | 106603 |
| 586 | Plant / SP-44 | Supply and planting of Tacoma Stance (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 101 | 455.29 | Forty Five Thousand Nine Hundred Eighty Four Rupees Only | 45984 |
| 587 | Plant / SP-43 | Supply and planting of Tacoma Grocha (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 101 | 486.79 | Forty Nine Thousand One Hundred Sixty Six Rupees Only | 49166 |
| 588 | Plant / SP-46 | Supply and planting of Dwarf Burning Bush (shrub), complete with pit, sweet-earth and manure backfill, watering and first-season care. | No. | 134 | 434.29 | Fifty Eight Thousand One Hundred Ninety Five Rupees Only | 58195 |
| 589 | COMP / CA-27 | Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 19 | 9765.51 | One Lakh Eighty Five Thousand Five Hundred Forty Five Rupees Only | 185545 |
| 590 | COMP / CA-28 | Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 19 | 9590.51 | One Lakh Eighty Two Thousand Two Hundred Twenty Rupees Only | 182220 |
| 591 | COMP / CA-15 | Landscape establishment and maintenance for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 533.75006222279 | 51000 | Two Crore Seventy Two Lakh Twenty One Thousand Two Hundred Fifty Three Rupees Only | 27221253 |
| 592 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the park. | Sft | 178887.78921493 | 7.5 | Thirteen Lakh Forty One Thousand Six Hundred Fifty Eight Rupees Only | 1341658 |
| 593 | COMP / CA-14 | Turfing with Dhaka grass over 70% of the net soft-landscape area of the park. | Sft | 125221.45245045 | 36 | Forty Five Lakh Seven Thousand Nine Hundred Seventy Two Rupees Only | 4507972 |
| 594 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2 in dia, around the park, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing. | Rft | 2328.1102473498 | 433.61 | Ten Lakh Nine Thousand Four Hundred Ninety Two Rupees Only | 1009492 |
| 595 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main. | Each | 7 | 22849.37 | One Lakh Fifty Nine Thousand Nine Hundred Forty Six Rupees Only | 159946 |
| 596 | Plant / PK-MIX-T | Supply and planting of trees - mix of the 15 tree species on the Client park list in equal numbers (perimeter row and lawn trees). | No. | 123 | 3922.81 | Four Lakh Eighty Two Thousand Five Hundred Six Rupees Only | 482506 |
| 597 | Plant / PK-MIX-S | Supply and planting of shrubs / bushes - mix of the 12 shrub species on the Client park list in equal numbers (borders). | No. | 1003 | 563.7 | Five Lakh Sixty Five Thousand Three Hundred Ninety One Rupees Only | 565391 |
| 598 | COMP / CA-27 | Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 6 | 9765.51 | Fifty Eight Thousand Five Hundred Ninety Three Rupees Only | 58593 |
| 599 | COMP / CA-28 | Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 6 | 9590.51 | Fifty Seven Thousand Five Hundred Forty Three Rupees Only | 57543 |
| 600 | COMP / CA-15 | Landscape establishment and maintenance of the park for three years - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 98.560765407677 | 51000 | Fifty Lakh Twenty Six Thousand Five Hundred Ninety Nine Rupees Only | 5026599 |
| 601 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1 ft thick, over the net soft-landscape area of the park. | Sft | 270163.29710145 | 7.5 | Twenty Lakh Twenty Six Thousand Two Hundred Twenty Five Rupees Only | 2026225 |
| 602 | COMP / CA-14 | Turfing with Dhaka grass over 70% of the net soft-landscape area of the park. | Sft | 189114.30797101 | 36 | Sixty Eight Lakh Eight Thousand One Hundred Fifteen Rupees Only | 6808115 |
| 603 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2 in dia, around the park, including trenching, sand bedding and surround, specials, thrust blocks, backfilling and testing. | Rft | 2803.2 | 433.61 | Twelve Lakh Fifteen Thousand Four Hundred Ninety Six Rupees Only | 1215496 |
| 604 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main. | Each | 8 | 22849.37 | One Lakh Eighty Two Thousand Seven Hundred Ninety Five Rupees Only | 182795 |
| 605 | Plant / PK-MIX-T | Supply and planting of trees - mix of the 15 tree species on the Client park list in equal numbers (perimeter row and lawn trees). | No. | 162 | 3922.81 | Six Lakh Thirty Five Thousand Four Hundred Ninety Five Rupees Only | 635495 |
| 606 | Plant / PK-MIX-S | Supply and planting of shrubs / bushes - mix of the 12 shrub species on the Client park list in equal numbers (borders). | No. | 1341 | 563.7 | Seven Lakh Fifty Five Thousand Nine Hundred Twenty Two Rupees Only | 755922 |
| 607 | COMP / CA-27 | Supply and planting of ornamental palms (Phoenix, Foxtail, Copernicia, Sagu / Kanghi, Bismarckia and Bottle palm in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 6 | 9765.51 | Fifty Eight Thousand Five Hundred Ninety Three Rupees Only | 58593 |
| 608 | COMP / CA-28 | Supply and planting of ornamental ficus (White, Panda 3 head, Multihead and Simple Panda Ficus in equal numbers), complete with pit, sweet-earth and manure backfill, stake, watering and first-season care. | Each | 6 | 9590.51 | Fifty Seven Thousand Five Hundred Forty Three Rupees Only | 57543 |
| 609 | COMP / CA-15 | Landscape establishment and maintenance of the park for three years - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 148.85030143331 | 51000 | Seventy Five Lakh Ninety One Thousand Three Hundred Sixty Five Rupees Only | 7591365 |
| 610 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1'-0" thick, over the prepared formation of all central medians and roadside green strips. | Sft | 1249978 | 7.5 | Ninety Three Lakh Seventy Four Thousand Eight Hundred Thirty Five Rupees Only | 9374835 |
| 611 | COMP / CA-14 | Turfing with Dhaka grass over 70% of the median and roadside soft area, including levelling, dressing, laying, rolling, first watering and maintenance until established. | Sft | 874984.6 | 36 | Three Crore Fourteen Lakh Ninety Nine Thousand Four Hundred Forty Six Rupees Only | 31499446 |
| 612 | COMP / CA-15 | Landscape establishment and maintenance of the road central medians and roadside green strips for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 688.69311294766 | 51000 | Three Crore Fifty One Lakh Twenty Three Thousand Three Hundred Forty Nine Rupees Only | 35123349 |
| 613 | Plant / Q-T32 | Supply and planting of AMALTAS (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 410 | 3914.41 | Sixteen Lakh Four Thousand Nine Hundred Eight Rupees Only | 1604908 |
| 614 | Plant / Q-S01 | Supply and planting of HAMELIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 324 | 434.29 | One Lakh Forty Thousand Seven Hundred Ten Rupees Only | 140710 |
| 615 | Plant / Q-S02 | Supply and planting of MARWA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1228 | 434.29 | Five Lakh Thirty Three Thousand Three Hundred Eight Rupees Only | 533308 |
| 616 | Plant / Q-S03 | Supply and planting of ICE BERG (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1228 | 486.79 | Five Lakh Ninety Seven Thousand Seven Hundred Seventy Eight Rupees Only | 597778 |
| 617 | Plant / Q-S04 | Supply and planting of HABISCUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 275 | 413.29 | One Lakh Thirteen Thousand Six Hundred Fifty Five Rupees Only | 113655 |
| 618 | Plant / Q-S05 | Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 275 | 413.29 | One Lakh Thirteen Thousand Six Hundred Fifty Five Rupees Only | 113655 |
| 619 | Plant / Q-S06 | Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 275 | 413.29 | One Lakh Thirteen Thousand Six Hundred Fifty Five Rupees Only | 113655 |
| 620 | Plant / Q-T33 | Supply and planting of KURRAJONG (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 269 | 4019.41 | Ten Lakh Eighty One Thousand Two Hundred Twenty One Rupees Only | 1081221 |
| 621 | Plant / Q-S07 | Supply and planting of POTATO TREE (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 215 | 591.79 | One Lakh Twenty Seven Thousand Two Hundred Thirty Five Rupees Only | 127235 |
| 622 | Plant / Q-S08 | Supply and planting of VINCA MINOR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1600 | 486.79 | Seven Lakh Seventy Eight Thousand Eight Hundred Sixty Four Rupees Only | 778864 |
| 623 | Plant / Q-S09 | Supply and planting of EUPHORBIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1600 | 402.79 | Six Lakh Forty Four Thousand Four Hundred Sixty Four Rupees Only | 644464 |
| 624 | Plant / Q-S10 | Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 90 | 413.29 | Thirty Seven Thousand One Hundred Ninety Six Rupees Only | 37196 |
| 625 | Plant / Q-S11 | Supply and planting of TECOMA GROCHA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 90 | 486.79 | Forty Three Thousand Eight Hundred Eleven Rupees Only | 43811 |
| 626 | Plant / Q-S13 | Supply and planting of BURNING BUSH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 90 | 434.29 | Thirty Nine Thousand Eighty Six Rupees Only | 39086 |
| 627 | Plant / Q-T34 | Supply and planting of Chinar (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 268 | 3914.41 | Ten Lakh Forty Nine Thousand Sixty Two Rupees Only | 1049062 |
| 628 | Plant / Q-S04 | Supply and planting of HABISCUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 90 | 413.29 | Thirty Seven Thousand One Hundred Ninety Six Rupees Only | 37196 |
| 629 | Plant / Q-S06 | Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 90 | 413.29 | Thirty Seven Thousand One Hundred Ninety Six Rupees Only | 37196 |
| 630 | Plant / Q-S14 | Supply and planting of CASSIA GALAUCA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 215 | 434.29 | Ninety Three Thousand Three Hundred Seventy Two Rupees Only | 93372 |
| 631 | Plant / Q-S15 | Supply and planting of DESI GULAB (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1200 | 392.29 | Four Lakh Seventy Thousand Seven Hundred Forty Eight Rupees Only | 470748 |
| 632 | Plant / Q-S16 | Supply and planting of MOTIYA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1200 | 381.79 | Four Lakh Fifty Eight Thousand One Hundred Forty Eight Rupees Only | 458148 |
| 633 | Plant / Q-S17 | Supply and planting of HARSINGHAR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 90 | 465.79 | Forty One Thousand Nine Hundred Twenty One Rupees Only | 41921 |
| 634 | Plant / Q-T35 | Supply and planting of Pine (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 125 | 4229.41 | Five Lakh Twenty Eight Thousand Six Hundred Seventy Six Rupees Only | 528676 |
| 635 | Plant / Q-S03 | Supply and planting of ICE BERG (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 200 | 486.79 | Ninety Seven Thousand Three Hundred Fifty Eight Rupees Only | 97358 |
| 636 | Plant / Q-S06 | Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 65 | 413.29 | Twenty Six Thousand Eight Hundred Sixty Four Rupees Only | 26864 |
| 637 | Plant / Q-S10 | Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 65 | 413.29 | Twenty Six Thousand Eight Hundred Sixty Four Rupees Only | 26864 |
| 638 | Plant / Q-S18 | Supply and planting of ARIZONA CYPRUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 125 | 539.29 | Sixty Seven Thousand Four Hundred Eleven Rupees Only | 67411 |
| 639 | Plant / Q-S19 | Supply and planting of DAY LILLY (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 200 | 434.29 | Eighty Six Thousand Eight Hundred Fifty Eight Rupees Only | 86858 |
| 640 | Plant / Q-T36 | Supply and planting of BRACHYCHITON FLAME TREE (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 288 | 4754.41 | Thirteen Lakh Sixty Nine Thousand Two Hundred Seventy Rupees Only | 1369270 |
| 641 | Plant / Q-S12 | Supply and planting of TECOMA STANS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 72 | 455.29 | Thirty Two Thousand Seven Hundred Eighty One Rupees Only | 32781 |
| 642 | Plant / Q-S17 | Supply and planting of HARSINGHAR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 144 | 465.79 | Sixty Seven Thousand Seventy Four Rupees Only | 67074 |
| 643 | Plant / Q-S20 | Supply and planting of JATROPHA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 72 | 434.29 | Thirty One Thousand Two Hundred Sixty Nine Rupees Only | 31269 |
| 644 | Plant / Q-S21 | Supply and planting of PLUMBAGO AURICULATA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 72 | 539.29 | Thirty Eight Thousand Eight Hundred Twenty Nine Rupees Only | 38829 |
| 645 | Plant / Q-T37 | Supply and planting of TERMINALIA (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 430 | 3809.41 | Sixteen Lakh Thirty Eight Thousand Forty Six Rupees Only | 1638046 |
| 646 | Plant / Q-S05 | Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 110 | 413.29 | Forty Five Thousand Four Hundred Sixty Two Rupees Only | 45462 |
| 647 | Plant / Q-S13 | Supply and planting of BURNING BUSH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 110 | 434.29 | Forty Seven Thousand Seven Hundred Seventy Two Rupees Only | 47772 |
| 648 | Plant / Q-S22 | Supply and planting of PITTOSPORUM (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 250 | 486.79 | One Lakh Twenty One Thousand Six Hundred Ninety Eight Rupees Only | 121698 |
| 649 | Plant / Q-S23 | Supply and planting of BRUNFELSIA Punsilora (Franciscia) (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 250 | 486.79 | One Lakh Twenty One Thousand Six Hundred Ninety Eight Rupees Only | 121698 |
| 650 | Plant / Q-T07 | Supply and planting of Erithrina Subrosa/Gul-e- Nishtar (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 184 | 4019.41 | Seven Lakh Thirty Nine Thousand Five Hundred Seventy One Rupees Only | 739571 |
| 651 | Plant / Q-S02 | Supply and planting of MARWA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 103 | 434.29 | Forty Four Thousand Seven Hundred Thirty Two Rupees Only | 44732 |
| 652 | Plant / Q-S05 | Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 50 | 413.29 | Twenty Thousand Six Hundred Sixty Five Rupees Only | 20665 |
| 653 | Plant / Q-S11 | Supply and planting of TECOMA GROCHA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 50 | 486.79 | Twenty Four Thousand Three Hundred Forty Rupees Only | 24340 |
| 654 | Plant / Q-S23 | Supply and planting of BRUNFELSIA Punsilora (Franciscia) (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 103 | 486.79 | Fifty Thousand One Hundred Thirty Nine Rupees Only | 50139 |
| 655 | Plant / Q-T38 | Supply and planting of KACHNAR (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 287 | 3809.41 | Ten Lakh Ninety Three Thousand Three Hundred One Rupees Only | 1093301 |
| 656 | Plant / Q-S02 | Supply and planting of MARWA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 96 | 434.29 | Forty One Thousand Six Hundred Ninety Two Rupees Only | 41692 |
| 657 | Plant / Q-S04 | Supply and planting of HABISCUS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 96 | 413.29 | Thirty Nine Thousand Six Hundred Seventy Six Rupees Only | 39676 |
| 658 | Plant / Q-S06 | Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 287 | 413.29 | One Lakh Eighteen Thousand Six Hundred Fourteen Rupees Only | 118614 |
| 659 | Plant / Q-S13 | Supply and planting of BURNING BUSH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 96 | 434.29 | Forty One Thousand Six Hundred Ninety Two Rupees Only | 41692 |
| 660 | Plant / Q-S15 | Supply and planting of DESI GULAB (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1200 | 392.29 | Four Lakh Seventy Thousand Seven Hundred Forty Eight Rupees Only | 470748 |
| 661 | Plant / Q-S24 | Supply and planting of MORPUNKH (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 1200 | 434.29 | Five Lakh Twenty One Thousand One Hundred Forty Eight Rupees Only | 521148 |
| 662 | Plant / Q-T39 | Supply and planting of ALSTONIA (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 120 | 3809.41 | Four Lakh Fifty Seven Thousand One Hundred Twenty Nine Rupees Only | 457129 |
| 663 | Plant / Q-T40 | Supply and planting of FIDDLEWOOD (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 96 | 4439.41 | Four Lakh Twenty Six Thousand One Hundred Eighty Three Rupees Only | 426183 |
| 664 | Plant / Q-S05 | Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 60 | 413.29 | Twenty Four Thousand Seven Hundred Ninety Seven Rupees Only | 24797 |
| 665 | Plant / Q-S06 | Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 60 | 413.29 | Twenty Four Thousand Seven Hundred Ninety Seven Rupees Only | 24797 |
| 666 | Plant / Q-S16 | Supply and planting of MOTIYA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 700 | 381.79 | Two Lakh Sixty Seven Thousand Two Hundred Fifty Three Rupees Only | 267253 |
| 667 | Plant / Q-S08 | Supply and planting of VINCA MINOR (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 700 | 486.79 | Three Lakh Forty Thousand Seven Hundred Fifty Three Rupees Only | 340753 |
| 668 | Plant / Q-S25 | Supply and planting of MELALEUCA (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 82 | 3305.41 | Two Lakh Seventy One Thousand Forty Four Rupees Only | 271044 |
| 669 | Plant / Q-T41 | Supply and planting of Bakain (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 102 | 3704.41 | Three Lakh Seventy Seven Thousand Eight Hundred Fifty Rupees Only | 377850 |
| 670 | Plant / Q-S10 | Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 52 | 413.29 | Twenty One Thousand Four Hundred Ninety One Rupees Only | 21491 |
| 671 | Plant / Q-S26 | Supply and planting of ROSE (MULTICOLOR) (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 916 | 527.74 | Four Lakh Eighty Three Thousand Four Hundred Ten Rupees Only | 483410 |
| 672 | Plant / Q-S27 | Supply and planting of VITEX (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 52 | 486.79 | Twenty Five Thousand Three Hundred Thirteen Rupees Only | 25313 |
| 673 | Plant / Q-S28 | Supply and planting of SAPIUM (tree) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, stake and guard, watering, first-season care and replacement allowance. | No. | 164 | 3284.41 | Five Lakh Thirty Eight Thousand Six Hundred Forty Three Rupees Only | 538643 |
| 674 | Plant / Q-S05 | Supply and planting of RAAT KI RANI (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 35 | 413.29 | Fourteen Thousand Four Hundred Sixty Five Rupees Only | 14465 |
| 675 | Plant / Q-S06 | Supply and planting of LAGERSTROEMIA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 42 | 413.29 | Seventeen Thousand Three Hundred Fifty Eight Rupees Only | 17358 |
| 676 | Plant / Q-S10 | Supply and planting of DIN KA RAJA (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 42 | 413.29 | Seventeen Thousand Three Hundred Fifty Eight Rupees Only | 17358 |
| 677 | Plant / Q-S12 | Supply and planting of TECOMA STANS (shrub) - adopted nursery quotation, complete with pit, sweet-earth and manure backfill, watering, first-season care and replacement allowance. | No. | 35 | 455.29 | Fifteen Thousand Nine Hundred Thirty Five Rupees Only | 15935 |
| 678 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1'-0" thick, over the prepared sub-grade of the channel-side green buffer strip. | Sft | 108000 | 7.5 | Eight Lakh Ten Thousand Rupees Only | 810000 |
| 679 | COMP / CA-14 | Turfing with Dhaka grass over the prepared bed of the channel-side green buffer, including levelling, dressing, laying, rolling and watering until established - 70% of the buffer area. | Sft | 75600 | 36 | Twenty Seven Lakh Twenty One Thousand Six Hundred Rupees Only | 2721600 |
| 680 | COMP / CA-26 | Supply and planting of shade trees along the buffer strip at 30 ft centres on each bank, complete with pit excavation, sweet-earth and manure backfill, stake and guard, initial watering and first-season care. | Each | 226 | 4603.01 | Ten Lakh Forty Thousand Two Hundred Eighty Rupees Only | 1040280 |
| 681 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2" dia, along each bank, including trenching, bedding, specials, thrust blocks, backfilling and testing, complete. | Rft | 9000 | 433.61 | Thirty Nine Lakh Two Thousand Four Hundred Ninety Rupees Only | 3902490 |
| 682 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main, complete. | Each | 30 | 22849.37 | Six Lakh Eighty Five Thousand Four Hundred Eighty One Rupees Only | 685481 |
| 683 | COMP / CA-15 | Landscape establishment and maintenance of the channel-side green buffer for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 59.504132231405 | 51000 | Thirty Lakh Thirty Four Thousand Seven Hundred Eleven Rupees Only | 3034711 |
| 684 | NSI / LS-6 | Supply and spreading of sweet earth (imported fertile topsoil), 1'-0" thick, over the prepared sub-grade of the channel-side green buffer strip. | Sft | 96000 | 7.5 | Seven Lakh Twenty Thousand Rupees Only | 720000 |
| 685 | COMP / CA-14 | Turfing with Dhaka grass over the prepared bed of the channel-side green buffer, including levelling, dressing, laying, rolling and watering until established - 70% of the buffer area. | Sft | 67200 | 36 | Twenty Four Lakh Nineteen Thousand Two Hundred Rupees Only | 2419200 |
| 686 | COMP / CA-26 | Supply and planting of shade trees along the buffer strip at 30 ft centres on each bank, complete with pit excavation, sweet-earth and manure backfill, stake and guard, initial watering and first-season care. | Each | 200 | 4603.01 | Nine Lakh Twenty Thousand Six Hundred Two Rupees Only | 920602 |
| 687 | COMP / CA-25 | Providing and laying buried HDPE watering main, 2" dia, along each bank, including trenching, bedding, specials, thrust blocks, backfilling and testing, complete. | Rft | 8000 | 433.61 | Thirty Four Lakh Sixty Eight Thousand Eight Hundred Eighty Rupees Only | 3468880 |
| 688 | COMP / CA-24 | Providing and fixing watering point - galvanised standpost with quick-coupling hose valve and lockable gate valve in a masonry chamber with cover, connected to the watering main, complete. | Each | 28 | 22849.37 | Six Lakh Thirty Nine Thousand Seven Hundred Eighty Two Rupees Only | 639782 |
| 689 | COMP / CA-15 | Landscape establishment and maintenance of the channel-side green buffer for three years from substantial completion - watering, mowing, weeding, pruning, fertilising, pest control and routine replacement. | Kanal | 52.892561983471 | 51000 | Twenty Six Lakh Ninety Seven Thousand Five Hundred Twenty One Rupees Only | 2697521 |
| 690 | COMP / CA-7 | Providing and laying 2 in EPDM / rubber safety tiles to ASTM F1292 over 4 in P.C.C. base with kerb edge restraint, to the children's play area (100 ft x 50 ft). | Sft | 5000 | 1134.27 | Fifty Six Lakh Seventy One Thousand Three Hundred Fifty Rupees Only | 5671350 |
| 691 | COMP / CA-7 | Providing and laying 2 in EPDM / rubber safety tiles over 4 in P.C.C. base to the open-air gym area (70 ft square). | Sft | 4900 | 1134.27 | Fifty Five Lakh Fifty Seven Thousand Nine Hundred Twenty Three Rupees Only | 5557923 |
| 692 | COMP / CA-11 | Supply and installation of children's multi-play structure (tower, slide, climbing net and swings), complete with foundations. | Set | 1 | 1330929.71 | Thirteen Lakh Thirty Thousand Nine Hundred Thirty Rupees Only | 1330930 |
| 693 | COMP / CA-12 | Supply and installation of outdoor open-air gym equipment station, galvanised / powder coated, complete with foundations. | Each | 6 | 198115.4 | Eleven Lakh Eighty Eight Thousand Six Hundred Ninety Two Rupees Only | 1188692 |
| 694 | COMP / CA-1 | Supply, fabrication and erection of gazebo 19 ft x 19 ft, 14 ft clear height, complete as specified for the green-belt gazebos. | Each | 1 | 1237233.88 | Twelve Lakh Thirty Seven Thousand Two Hundred Thirty Four Rupees Only | 1237234 |
| 695 | COMP / CA-4 | Supply and fixing of park bench with recycled plastic (HDPE) lumber slats on galvanised M.S. frame. | Each | 44 | 65340.4 | Twenty Eight Lakh Seventy Four Thousand Nine Hundred Seventy Eight Rupees Only | 2874978 |
| 696 | COMP / CA-5 | Supply and fixing of 60-litre waste bin. | Each | 22 | 17720.2 | Three Lakh Eighty Nine Thousand Eight Hundred Forty Four Rupees Only | 389844 |
| 697 | MKT / SL-2 | Solar flood light 2 x 60 W LED (two on each pole) on a hot-dip galvanized pole 4-6 m high, complete as specified - rest areas. | Each | 28 | 450000 | One Crore Twenty Six Lakh Rupees Only | 12600000 |
| 698 | MKT / SL-3 | Solar post-top light 30-40 W LED on a hot-dip galvanized pole 3-4 m high, complete as specified - walkways. | Each | 122 | 300000 | Three Crore Sixty Six Lakh Rupees Only | 36600000 |
| 699 | COMP / CA-7 | Providing and laying 2 in EPDM / rubber safety tiles to ASTM F1292 over 4 in P.C.C. base with kerb edge restraint, to the children's play area (100 ft x 50 ft). | Sft | 5000 | 1134.27 | Fifty Six Lakh Seventy One Thousand Three Hundred Fifty Rupees Only | 5671350 |
| 700 | COMP / CA-7 | Providing and laying 2 in EPDM / rubber safety tiles over 4 in P.C.C. base to the open-air gym area (70 ft square). | Sft | 4900 | 1134.27 | Fifty Five Lakh Fifty Seven Thousand Nine Hundred Twenty Three Rupees Only | 5557923 |
| 701 | COMP / CA-11 | Supply and installation of children's multi-play structure (tower, slide, climbing net and swings), complete with foundations. | Set | 1 | 1330929.71 | Thirteen Lakh Thirty Thousand Nine Hundred Thirty Rupees Only | 1330930 |
| 702 | COMP / CA-12 | Supply and installation of outdoor open-air gym equipment station, galvanised / powder coated, complete with foundations. | Each | 6 | 198115.4 | Eleven Lakh Eighty Eight Thousand Six Hundred Ninety Two Rupees Only | 1188692 |
| 703 | COMP / CA-1 | Supply, fabrication and erection of gazebo 19 ft x 19 ft, 14 ft clear height, complete as specified for the green-belt gazebos. | Each | 1 | 1237233.88 | Twelve Lakh Thirty Seven Thousand Two Hundred Thirty Four Rupees Only | 1237234 |
| 704 | COMP / CA-4 | Supply and fixing of park bench with recycled plastic (HDPE) lumber slats on galvanised M.S. frame. | Each | 65 | 65340.4 | Forty Two Lakh Forty Seven Thousand One Hundred Twenty Six Rupees Only | 4247126 |
| 705 | COMP / CA-5 | Supply and fixing of 60-litre waste bin. | Each | 32 | 17720.2 | Five Lakh Sixty Seven Thousand Forty Six Rupees Only | 567046 |
| 706 | MKT / SL-2 | Solar flood light 2 x 60 W LED (two on each pole) on a hot-dip galvanized pole 4-6 m high, complete as specified - rest areas. | Each | 42 | 450000 | One Crore Eighty Nine Lakh Rupees Only | 18900000 |
| 707 | MKT / SL-3 | Solar post-top light 30-40 W LED on a hot-dip galvanized pole 3-4 m high, complete as specified - walkways. | Each | 178 | 300000 | Five Crore Thirty Four Lakh Rupees Only | 53400000 |
| 708 | COMP / CA-4 | Supply and fixing of bench with UV-stabilised outdoor-grade recycled plastic (HDPE) lumber slats on hot-dip galvanised M.S. frame, anchored on P.C.C. base - complete. | Each | 7 | 65340.4 | Four Lakh Fifty Seven Thousand Three Hundred Eighty Three Rupees Only | 457383 |
| 709 | COMP / CA-5 | Supply and fixing of 60-litre waste bin, recycled plastic / HDPE body on galvanised M.S. frame, anchored on P.C.C. base - complete. | Each | 4 | 17720.2 | Seventy Thousand Eight Hundred Eighty One Rupees Only | 70881 |
| 710 | COMP / CA-6 | Supply, installation, testing and commissioning of decorative landscape lamp post / lantern 8'-0" high, hot-dip galvanised and black powder-coated M.S. with LED 3000 K lamp, on P.C.C. foundation with conduit and cabling - complete. | Each | 25 | 66652.36 | Sixteen Lakh Sixty Six Thousand Three Hundred Nine Rupees Only | 1666309 |
| GRAND TOTAL: | Rs 1,428,414,137.00 |
The scope of work includes but not limited to the following:
Landscaping and Horticulture Works in Sector F-14/15, Islamabad.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Red Book:
© FIDIC 2017. All rights reserved.
The Conditions of Contract are the “General Conditions” which form part of the “Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC) and the following “Particular Conditions” which shall complement the General Conditions of the Contract.
The successful Bidder, upon contract award, shall be required to furnish two (02) copies of aforementioned “General Conditions” for incorporation in the Works Contract.
International Federation of Consulting Engineers (FIDIC) FIDIC
Bookshop – Box- 311 – CH – 1215 Geneva 15, Switzerland
Fax: +41 22 799 49 054
Telephone: +41 22 568 0500
E-mail: fidic@fidic.org
Website: www.fidic.org
FIDIC code: ISBN13: 978-2-88432-084-9
Particular Conditions
(Mandatory Provisions not to be amended/substituted)
The Particular Conditions (PCC) complement the General Conditions (GCC) to specify dates, contractual requirements, and special circumstances related to the Works. The PCC consists of two parts, Part A - Contract Data and Part B - Special Provisions. The provisions to be found in the Special Provisions (Particular Conditions - Part B) take precedence over the equivalent provisions found under the same Sub-Clause number(s) in the General Conditions, and the provisions of the Contract Data (Particular Conditions - Part A) take precedence over the Special Provisions (Particular Conditions - Part B).
Sub-Clause 1.1.27
Defects Notification Period (DNP): 1092 Days
Sub-Clause 1.1.31
Employer's name & address: Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory
Sub-Clause 1.1.35
Engineer's name & address: M/s Osmani & Company (Pvt.) Ltd
Site Camp Office F-14/15, Opposite to sector G-14/4, Islamabad.
Sub-Clause 1.1.84
Time for Completion: 728 days for whole of the works
Sub-Clause 1.3 (a)(ii)
Agreed method of electronic transmission: Not Agreed
Sub-Clause 1.3 (d)
Address of Empoyer for Communications: 10, Mauve Area, G-10/4, Islamabad Capital Territory
Address of Engineer for Communications:
Site Camp Office F-14/15, Opposite to sector G-14/4, Islamabad.
Sub-Clause 1.4
Contract shall be governed by the law of: Islamic Republic of Pakistan
Ruling language: English
Language for communications: English
Sub-Clause 2.1
After receiving the Letter of Acceptance, the Contractor shall be given right of access to all or part of the Site within: 14 days after Commencement Date
Sub-Clause 2.4
Employer’s financial arrangements:
Self Finance
Sub-Clause 3.2 (e)(ii)
Engineer’s Duties and Authority: Variation resulting in an increase of the Accepted Contract Amount in excess ofone percent (1%)subject to accumulative Variations not exceeding five percent (5%)of the Accepted Contract Amount
Sub-Clause 4.2
Performance Security (as percentage of the Accepted Contract Amount in Currencies): 10.00%
Form of Performance Guarantee: Bank Guarantee
Sub-Clause 4.2.1
List of Insurance Companies:
N/A
Sub-Clause 4.7.2
period for notification of errors in the items of reference: Twenty Eight (28) days
Sub-Clause 4.19
Period of payment for temporary utilities: Each Month
Sub-Clause 5.1 (a)
Maximum allowable accumulated value of work subcontracted (as a percentage of the Accepted Contract Amount): 30 %
Sub-Clause 5.1 (b)
Parts of the Works for which subcontracting is not permitted: 70
Sub-Clause 6.5
Normal working hours on the Site: 8
Sub-Clause 8.3
Number of additional paper copies of programmes: 6
Sub-Clause 8.8 & 14.15(b)
Delay Damages payable for each day of delay 0.01% of the Accepted Contract Amountfor delay in completion of whole of the Works
Sub-Clause 8.8
Maximum amount of Delay Damages 10.00 % of the Accepted Contract Amount
Sub-Clause 8.14
Applicability of Incentives for Early Completion No
Sub-Clause 12.3
Percentage profit (Not more than 10%): Nil
Sub-Clause 13.4.(b)(ii)
Percentage rate to be applied to Provisional Sums for overhead charges and profit: Twenty Five percent (25%)
Sub-Clause 14.2
Total Advance Payment: Fifteen percent (15%) of the Accepted Contract Amount excluding Provisional Sums payable in the currencies and proportions in which the Accepted Contract Amount is payable
Sub-Clause 14.2.1
Advance Payment Insurance Allowed
The advance payment shall be released in two parts: the first installment after submission of the request letter and provision of unconditional and irrevocable Bank Guarantee within fifteen days of signing contract agreement and the remaining half after provision of facilities as prescribed in special provisions and achieving 04% of physical progress within 42 days of signing of contract agreement.
Sub-Clause 14.2.3
Percentage deductions for the repayment of the Advance Payment: Deduction shall be made at the amortization rate of 17.5 % of the value of the Works executed of each IPC as provided in paragraph (i) of Sub-Clause GCC 14.3, starting from 2nd IPC provided that the advance payment shall be completely repaid prior to the time when 90% of the Accepted Contract Amount less Provisional Sums has been certified for payment. It may be more than 17.5% in the last instalment to ensure full repayment.
Sub-Clause 14.3
Period of payment One Month
Sub-Clause 14.3(b)
Number of additional paper copies of Statements: 2
Sub-Clause 14.3 (iii)
Percentage of retention: Seven percent (7%)
Sub-Clause 14.3 (iii)
Limit of Retention Money (as a percentage of the Accepted Contract Amount): Five percent (5%)
Sub-Clause 14.5(b)(i)
Plant and Materials for payment when shipped: Plant and Materials under Bill of “Imported Plant and Materials”
Sub-Clause 14.5(c)(i)
Plant and Materials for payment when delivered to the Site: Plant and Non Perishable Materials
Sub-Clause 14.6.2
Minimum amount of Interim Payment Certificate (IPC): Yes
The Minimum Amount IPC is 60 Million
[Employer to give value not exceeding one fifth of the average expected value of Interim Payment Certificate]
Sub-Clause 14.7(a)
Period of payment of Advance Payment to the Contractor: 14 days
Sub-Clause 14.7b(i)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.6: 28 days
Sub-Clause 14.7b(ii)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.13 (Final Payment): 56 days
Sub-Clause 14.7(c)
Period for the Employer to make final payment to the Contractor: 56 days
Sub-Clause 14.8
Financing charges for delayed payment Local Currency (PKR):
6-Month KIBOR (Offer) +3% per annum.
Foreign Currency:
USD
6-Month SOFR (Secured Overnight Financing Rate for USD) +1% per annum.
EURO
6-Month EURIBOR (EURO Interbank Offered Rate for EURO) +1% per annum.
Others
Appropriate rates +1% (for other foreign currencies, Ref. Schedule-A, A-4 to Bid).
Sub-Clause 14.11.1(b)
Number of additional paper copies of draft Final Statements: 6
[insert number of copies say six (06)]
Sub-Clause 14.15
Currencies of payment of Contract Price: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(a)(i)
Proportions or amounts of Local and Foreign currencies: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(c)
Currencies and proportions for payment of Delay Damages: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(f)
rates of exchange: as stated in the Table IV of Schedule A (If Given)
Sub-Clause 17.2(d)
Forces of nature, the risks of which are allocated to the Contractor: Nil
Sub-Clause 19.1
Permitted deductible limits:
i) insurance required for the Works: Ten percent (10%) of loss amount on each & every loss
ii) insurance required for Goods: Nil
iii) insurance required for liability for breach of professional duty: Nil
iv) insurance required against liability for fitness for purpose (if any is required): Nil
v) insurance required for injury to persons and damage to property: Nil
vi) insurance required for injury to employees: Nil
vii) other insurances required by Laws and by local practice : Nil
Periods for submission of insurance:
a) evidence of insurance: Not later than the Commencement Date
b) relevant policies: Within twenty eight (28) day from the Commencement Date
Sub-Clause 19.2.1(b)
Additional amount to be insured (as a percentage of the replacement value): 15% of the replacement value (Accepted Contract Amount)
Sub-Clause 19.2.2
Extent of insurance required for Goods: From Ex-Works (i.e., works, factory, warehouse, etc) to delivery at the Site
Amount of insurance required for Goods: Full replacement value
Sub-Clause 19.2.3(a)
Amount of insurance required for liability for breach of professional duty: Full replacement value of the Works to be designed by the Contractor
Sub-Clause 19.2.3(b)
Insurance required against liability for fitness for purpose: Yes
Sub-Clause 19.2.3
Period of insurance required for liability for breach of professional duty: Until the date of issuance of Performance Certificate
Sub-Clause 19.2.4
Amount of insurance required for injury to persons and damage to property: Injury to person and Fatal case:
in accordance with Workmen Compensation Act
Damage to Property: The Amount of Insurance Required for Person Injury is 500000
The Amount of Insurance Required for Damage to Property is 1000000 as per his assessment of the adjoining property(ies) other than the Works]
without limit to the number of incidents
Sub-Clause 19.2.6
Other insurances required by Laws and by local practice: All insurances as applicable, to the extent of execution of the project, under Federal and Provincial laws of Islamic Republic of Pakistan
Sub-Clause 21.1
Time for appointment of the DAAB: Within 28 days from the Commencement Date.
In case the Accepted Contract Amount is lesser than PKR one (01) billion, appointment of the DAAB shall be made when Dispute arises between the Parties.
Sub-Clause 21.1
The DAAB shall comprise 3
[insert either “a sole Member” or “Three Members”]
[For a Contract estimated to cost above PKR 2.5billion, the DAAB shall comprise of three members. For a Contract estimated to cost between PKR1billion and PKR2.5billion, the DAAB may comprise of three members or a sole member. For a Contract estimated to cost less than PKR1billion, a sole member is recommended.]
Sub-Clause 21.1
List of proposed members of DAAB
- proposed by Employer
Chief Engineer
Director Law
Director Finance
Sub-Clause 21.2
Appointing entity (official) for DAAB members Managing Director Public Procurement Regulatory Authority (PPRA) or Chairman Pakistan Engineering Council (PEC) from the list of PEC approved arbitrators published at its website
Sub-Clause 21.6
Rules of Arbitration: PEC Rules of Conciliation and Arbitration or Pakistan Arbitration Act of 1940, if the former is inactive.
The place of Arbitration shall be in the Employer’s country: Islamabad
[Insert name of city]
PartB - Special Provisions
1.1 Definitions
1.1.76 “Specification”
Following is added at the end:
“and consists of two parts i.e.,
i) “Part A - Specific Provisions”; and
ii) “Part B - Technical Provisions”.”
1.2 Interpretation
“and” is deleted from the end of sub-paragraph (i) and added at the end of sub-paragraph (j).
Sub-paragraph (k) is added:
“(k) The word “tender” is synonymous with “bid” the word tenderer with “bidder”, the words “tender documents” with “bidding documents” and “Schedule of Prices” with “Bill of Quantities”, as applicable.”
1.5 Priority of Documents
The documents listed at (a) through (k) of this Sub-Clause are deleted and substituted with the following:
(a) the Contract Agreement;
(b) the Letter of Acceptance;
(c) the Letter of Bid;
(d) the Particular Conditions Part A - Contract Data;
(e) the Particular Conditions Part B - SpecialProvisions;
(f) the General Conditions;
(g) the Specification Part A - SpecificProvisions;
(h) the Specification Part B- Technical Provisions;
(i) the Drawings;
(j) the completed Schedules to Bid includingBillof Quantities;
(k) the JV Undertaking (if the Contractor is a JV); and
(l) any other documents forming part of the Contract.
The addenda/corrigenda, if any, shall be deemed to have been incorporated at the appropriate places in the documents forming the Contract.
1.6 Contract Agreement
In the last line of the 1st paragraph the text “shall be borne by the Employer” is substituted by“ shall be reimbursed by the Employer to the Contractor”.
3.1 The Engineer
In sub-paragraph (a) the text “as defined in the Pakistan Engineering Council Act, 1975 (Act No.V of 1976)” are added after the words “professional engineer”.
3.2 Engineer’s Duties and Authority
The Engineer shall obtain the consent in writing of the Employer before taking action under the following Sub-Clauses of these Conditions:
(a) Consenting to the subcontracting of any part of the Works under Sub-Clause 5.1 [Subcontractors]
(b) Any action under Sub-Clauses 8.9 [Employer’s Suspension] and 8.12 [Prolonged Suspension]
(c) Issuance of “Taking Over Certificate” under Sub-Clause 10.1 [Taking Over the Works and Sections].
(d) Issuing the “Performance Certificate” under Sub-Clause 11.9 [Performance Certificate].
(e) Sub-Clause 13.1 [Right to Vary]: instructing a Variation, except;
(i) in an emergency situation as determined by the Engineer, or
(ii) if such a Variation would increase the Accepted Contract Amount by less than the percentage specified in the Contract Data.
(f) Sub-Clause 13.3 [Variation Procedure]: approving a proposal for Variation submitted by the Contractor in accordance with Sub-Clause 13.3.2 [Variation by Request for Proposal] or 13.2 [Value Engineering].
(g) Certifying release of second half of the Retention Money under Sub-Clause 14.9 [Release of Retention Money].
(h) Issuing Final Payment Certificate under Sub-Clause 14.13 [Issue of FPC].
(i)
*[insert Sub-Clause number (not Sub-Clause 3.7 [Agreement or Determination]
Any such requirement shall not be applied to any action by the Engineer under Sub-Clause 3.7 [Agreement or Determination], as stated in Sub-Clause 3.2 [Engineer’s Duties and Authority] of the General Conditions.
Notwithstanding the obligation, as set out above, to obtain approval, if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of the Works or of adjoining property, he may, without relieving the Contractor of any of his duties and responsibility under the Contract, instruct the Contractor to execute all such work or to do all such things as may, in the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith comply, despite the absence of approval of the Employer, with any such instruction of the Engineer. The Engineer shall determine an addition to the Contract Price, in respect of such instruction, in accordance with Clause 13 and shall notify the Contractor accordingly, with a copy to the Employer.
Following is added after the words “the Employer’s consent is required” in 4th paragraph:
“stating that the Employer’s consent has been obtained for that specified authority”
4.2 Performance Security
4.2.1 Contractor’s Obligations
The entity issuing the Performance Security and its form shall be as under:
The Performance Security shall be, at the option of the Contractor,issuedin the prescribed form included in the Bidding Documents,by(a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistan or (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofratingas provided in Table below:
Accepted Contract Amount (In Eq. PKR million) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
In case of Joint Venture, the Performance Security shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
Following paragraph is added at the end of this Sub-Clause:
“The amount of Performance Security shall be reducedto 50%following issue of the Taking-Over Certificate for the whole of the Works under Clause 10 of Conditions of Contract.”
4.3 Contractor’s Representative
In second paragraphthe text “professional engineer as defined in the Pakistan Engineering Council Act, 1975 (Act No. V of 1976) (having temporary licence in case of foreign engineer under Section 12 of the Pakistan Engineering Council Act, 1975 (Act No. V of 1976)” are added after the words “qualified, experienced”.
In the 3rd paragraph the words “28 days” are substituted by “14 days”. In 2nd line of 4thparagraph the text “or appoint a replacement” is substituted by “except appointment of a suitable temporary replacement is deployed at the Site”
4.4 Contractor’s Documents
4.4.2 As-Built Records
First paragraph is deleted and the text in the last paragraph is substituted with the following:
“The Contractor shall furnish to the Engineer 6 copies, one reproducible and one electronic copy(provided the Engineer has made available to the Contractor editable form of the Drawings)of all Drawings amended to conform to the Works as built.In case the Engineer does not make available to the Contractor editable form of the Drawings, the Contractor shall furnish to the Engineer as-built data for incorporation in the Drawings. Upon receipt of PDF versions of the as-built drawings prepared by the Engineer, the Contractor shall furnish to the Engineer 6copies and one reproducible of these Drawings.
The price of such Drawings shall be deemed to be included in the Contract Price.”
Following Sub-Clause is added:
4.4.4 ShopDrawings
The Contractor shall submit to the Engineer for review 3 copies of all shop and erection drawings applicable to this Contract as per provision of relevant Sub-Clause of the Contract.
Review and approval by the Engineer shall not exceed 21 days and be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory and the Engineer’s review or approval shall not relieve the Contractor of any of his responsibilities under the Contract.
4.8 Health and Safety Obligations
The following text is added at the end ofthis Sub-Clause:
In the event of work being carried out outside the normal working hours and in the event of work being carried out at night, the Contractor shall at his own cost, provide and maintain such good and sufficient light as will enable the work to proceed satisfactorily and without danger. The approaches to the Site and the Works where the night work is being carried out shall be sufficiently lighted. All arrangement adopted for such lighting shall be to the satisfaction of the Engineer.
4.20 Progress Reports
At the end of sub-paragraph (g) the word “and” is deleted and at the end of sub-paragraph (h) the full stop (.) is replaced with “;”, and the following new sub-paragraphs are added as:
(i) planned programme for the execution of the Works for next 56 days to enable the Engineer to determine its programme of inspection and testing;
(j) monthly summery of daily job record indicating weather conditions, deployment of Contractor’s Equipment, labour employment, local material procurement and material import, if any; and
(k) salient contractual and project information.
5.1 Subcontractors
Add the following text at the end of paragraph (ii):
“underSchedule to Bid”
The following is added at the end of the last paragraph of Sub-Clause 5.1:
“All subcontracts relating to the Works shall include provisions which entitle the Employer to require the subcontract to be assigned to the Employer under sub-paragraph (a) of Sub-Clause 15.2.3 [After Termination].
The Contractor shall give reasonable opportunity to contractors from Islamic Republic of Pakistan for subcontracts for the Works, and endeavour to employ such contractors as Subcontractors.”
5.2 Nominated Subcontractors
5.2.2 Objection to Nomination
In sub-paragraph (c), “and” is deleted from the end of (i);
“.” at the end of (ii) is replaced with: “, and”.
The following is then added as (iii):
“(iii) be paid only if and when the Contractor has received from the Employer payments for sums due under the Subcontract referred to under Sub-Clause 5.2.3 [Payment to nominated Subcontractors].”
6.1 Engagement of Staff and Labour
The following paragraph is added at the end of the Sub-Clause:
“The Contractor shall, to the extent practicable and reasonable, employ staff (not less than 50%) and labour (not less than 85%) with appropriate qualifications and experience from sources within the Islamic Republic of Pakistan.”
6.7 Health and Safety of Personnel
The existing text is substituted with the following:
“In order to provide for the safety, health and welfare of persons, and for prevention of damage of any kind, all operations for the purposes of or in connection with the Contract shall be carried out in compliance with the Safety Requirements of the Government of Pakistan with such modifications thereto as the Engineer may authorize or direct and the Contractor shall take or cause to be taken such further measures and comply with such further requirements as the Engineer may determine to be reasonably necessary for such purpose. The Contractor shall also provide all other medical services and appoint a health and safety officer at Site if stated in the Specifications. In case of any fatality or serious accident, the Contractor shall, in addition, notify the Engineer immediately by the quickest available means.”
6.8 Contractor’s Superintendence
Insert at the end of sub-paragraph (a) of this Sub-Clause:
"or, if not, the Contractor shall make competent interpreters available during all working hours, in a number sufficient for those persons to properly perform their superintendence duties"
The following text is added at the end of this Sub-Clause:
“The Contractor’s authorized representative and his other engineers working at site shall possess valid registration with the Pakistan Engineering Council.
The Contractor’s authorized representative at Site shall be authorized to exercise adequate administrative and financial powers on behalf of the Contractor so as to achieve completion of the Works as per the Contract.”
6.12 Key Personnel
The following is inserted at the end of the last paragraph:
“If any of the Key Personnel are not fluent in this language, the Contractor shall make competent interpreters available during all working hours in a number deemed sufficient by the Engineer.”
The following Sub-Clauses 6.13 to 6.26 are added at the end of Sub-Clause 6.12:
6.13 Foreign Personnel
The Contractor may bring in to the Country any foreign personnel who are necessary for the execution of the Works to the extent allowed by the applicable Laws. The Contractor shall ensure that these personnel are provided with the required residence visas and work permits. The Employer will, if requested by the Contractor, use all reasonable endeavours in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national, or government permission required for bringing in the Contractor’s personnel.
The Contractor shall be responsible for the return of these personnel to the place where they were recruited or to their domicile. In the event of the death in the Country of any of these personnel or members of their families, the Contractor shall similarly be responsible for making the appropriate arrangements for their return or burial.
6.14 Supply of Foodstuffs
The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Specification at reasonable prices for the Contractor’s Personnel for the purposes of or in connection with the Contract.
6.15 Supply of Water
The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor’s Personnel.
6.16 Measures against Insect and Pest Nuisance
The Contractor shall at all times take the necessary precautions to protect the Contractor’s Personnel employed on the Site from insect and pest nuisance, and to reduce the danger to their health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.
6.17 Alcoholic Liquor or Drugs
The Contractor shall not, otherwise than in accordance with the Laws of the Country, import, sell, give, barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift, barter or disposal thereto by Contractor’s Personnel.
6.18 Arms and Ammunition
The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor’s Personnel to do so.
6.19 Festivals and Religious Customs
The Contractor shall respect the Country’s recognized festivals, days of rest and religious or other customs.
6.20 Funeral Arrangements
The Contractor shall be responsible, to the extent required by local regulations, for making any funeral arrangements for any of its local employees who may die while engaged upon the Works.
6.21 Forced Labour
The Contractor, including its Subcontractors, shall not employ or engage forced labour which consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.
6.22 Child Labour
The Contractor, including its Subcontractors, shall not employ or engage child labour in accordance with relevant law(s) in force in Islamic Republic of Pakistan.
6.23 Employment Records of Workers
The Contractor shall keep complete and accurate records of the employment of labour at the Site. The records shall include the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis and submitted to the Engineer. These records shall be included in the details to be submitted by the Contractor under Sub-Clause 6.10 [Contractor’s Records].
6.24 Workers’ Organizations
The Contractor shall comply with the relevant labour laws of Pakistan which recognize workers’ rights to form and to join workers’ organizations/Trade Union of their choosing and to bargain collectively without interference.
6.25 Non-Discrimination and Equal Opportunity
The Contractor shall not make decisions relating to the employment or treatment of Contractor’s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor’s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices.
Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure nondiscrimination and equal opportunity, including for specific groups such as women, persons with disabilities, migrant workers and children (of working age in accordance with Sub-Clause 6.22).
6.26 Epidemics
In the event of any out-break of illness of epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government or the local medical or sanitary authorities for the purpose of overcoming the same.
7.7 Ownership of Plant and Materials
The following is added before the first paragraph:
“Except as otherwise provided in the Contract,”
The following is added at the end of the Sub-Clause:
"No Plant and/or Materials that is the property of the Employer shallbe removed from the Site. If it becomes necessary to:
(i) remove any item of such Plant from the Site for the purposesof repair, the Contractor shall give a Notice, with reasons, tothe Engineer requesting consent to remove the defective ordamaged item off the Site. This Notice shall clearly identifythe item of defective or damaged Plant, and shall give detailsof: the defect or damage to be repaired; the place to whichdefective or damaged item of Plant is to be taken for repair;the transportation to be used (and insurance cover for suchtransportation); the proposed inspections and testing off theSite; and the planned duration required before the repaireditem of Plant shall be returned to the Site. The Contractorshall also provide any further details that the Employer mayreasonably require; or
(ii) replace any item(s) of such Plant and/or Materials, theContractor shall give a Notice, with reasons, to the Engineerclearly identifying the item(s) of Plant and/or Materials to bereplaced, and giving details of the due date of delivery tothe Site of the replacement item(s).
Where any item of Plant and/or Materials has become the propertyof the Employer under this Sub-Clause before it has been deliveredto the Site, the Contractor shall ensure that such an item is notmoved except for its delivery to the Site.
The Contractor shall indemnify and hold the Employer harmlessagainst and from the consequences of any defect in title orencumbrance or charge (except any reasonable restrictionarising from the intellectual property rights of the manufacturer orproducer) on any item of Plant and/or Materials that has becomethe property of the Employer under this Sub-Clause."
The following Sub-Clause7.9 is added after Sub Clause 7.8:
7.9 Use of Pakistani Materials and Services
The Contractor shall, so far as may be consistent with the Contract, make the maximum use of materials, supplies, plant and equipment indigenous to or produced or fabricated in Pakistan and services available in Pakistan provided such materials, supplies, plant, equipment and services shall be of required standard.
8.1 Commencement of Works
The following is added before the first paragraph:
“After signing of the Contract Agreement by both Parties,” and thereafter the word “The” is replaced with the word “the”.
8.5 Extension of Time for Completion
The following is added after paragraph (c):
“for last five years”.
The following Sub-Clause 8.14 is added after Sub-Clause 8.13:
8.14 Incentives For Early Completion
If Contract Data does not state applicability of incentives for early completion, this Sub-Clause shall not apply.
The Contractor shall be entitled subject to Sub-Clause 20.2 [Claims for Payment and/or EOT] to bonus payment if the Works and/or each Section is completed earlier than the Time for Completion for the Works or Section (as the case may be). The amount of bonus for early completion of the Works and/or each Section shall be upto a limit and at a rate to 50% of the relevant limit and rate of delay damages prescribed in Contract Data and shall be paid for every day which shall elapse between the relevant Date of Completion of the Works or Section and the relevant Time for Completion.
For the purposes of calculating any bonus payment, the applicableTime for Completion stated in the Contract Data is fixed and noadjustments of this time by reason of granting an EOT will beallowed.
The following Sub-Clause 11.12 is added after Sub-Clause 11.11:
11.12 Supervisory Assistance During DNP
If provided under the Schedule of Prices, the Contractor shall provide supervisory assistance to the Employer during the DNP for the Works. Such supervisory assistance shall be as described in the Specification for the purpose of supporting the Employer's operation and maintenance of the Plant for the period specified in the Schedule of Prices after the Date of Completion.
12.2 Method of Measurement
The following paragraph is added at the end of the Sub-Clause:
“Summary of measured quantity for payment shall be delineated item-wise under four headsnamely; “Schedule of Prices Quantity”, “Quantity Executed To-date”, “Quantity Certified Previously” and “Net Quantity Executed under this Certificate”.
12.3 Valuation of the Works
The following text is added at the end of fifth paragraph of the Sub-Clause:
“Sum of overhead charges and profit for sub-paragraph (a) shall be Twenty Five percent (25%)”.
13.4 Provisional Sums
The following paragraph is inserted as the penultimate paragraph:
“The Provisional Sum shall be used to cover the Employer’s share of the DAAB members’ fees and expenses, in accordance with Clause 21. No prior instruction of the Engineer shall be required with respect to the work of the DAAB. The Contractor shall submit the DAAB members’ invoices and the satisfactory evidence of having paid 100% of such invoices as part of the substantiation of those Statements submitted under Sub-Clause 14.3.
13.6 Adjustments for Changes in Laws
The following paragraphsare added at the end of the Sub-Clause:
“Notwithstanding the foregoing, the Contractor shall not be entitled to an extension of time if the relevant delay has already been taken into account in the determination of a previous extension of time and such Cost shall not be separately paid if the same shall already have been taken into account in the indexing of any inputs to the Table of Adjustment Data in accordance with the provisions of Sub-Clause 13.7 [Adjustments for Changes in Cost].”
14.1 The Contract Price
The following is added at the end of the Sub-Clause:
“Notwithstanding the provisions of subparagraph (b), Contractor's Equipment, including essential spare parts, imported by the Contractor for the sole purpose of executing the Contract shall be temporarily exempt from the payment of import duties and taxes upon initial importation, provided the Contractor shall post with the customs authorities at the port of entry an approved re-export bond or bank guarantee, valid until the Time for Completion plus six months, in an amount equal to the full import duties and taxes which would be payable on the assessed imported value of such Contractor's Equipment and spare parts, and callable in the event the Contractor's Equipment is not re-exported from the Country on completion of the Contract. A copy of the bond or bank guarantee endorsed by the customs authorities shall be provided by the Contractor to the Employer upon the importation of individual items of Contractor's Equipment and spare parts. Upon re-export of individual items of Contractor's Equipment or spare parts, or upon the completion of the Contract, the Contractor shall prepare, for approval by the customs authorities, an assessment of the residual value of the Contractor's Equipment and spare part to be re-exported, based on the depreciation scale(s) and other criteria used by the customs authorities for such purposes under the provisions of the applicable Laws. Import duties and taxes shall be due and payable to the customs authorities by the Contractor on (a) the difference between the initial imported value and the residual value of the Contractor's Equipment and spare parts to re-exported; and (b) on the initial imported value of the Contractor's Equipment and spare parts remaining in the Country after completion of the Contract. Upon payment of such dues within 28 days of being invoiced, the bond or bank guarantee shall be reduced or released accordingly; otherwise the security shall be called in the full amount remaining.”
[The Employer may change or delete this Sub-Clause as per Project requirements]
14.2 Advance Payment
14.2.1 Advance Payment Guarantee
The entity issuing the Advance PaymentGuaranteeand its form shall be as under:
The Advance PaymentGuarantee shall be in the form of Guarantee issued by (a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistanor (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
In case of Joint Venture, the Advance PaymentGuarantee(s)shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
14.6 Issue of IPC
14.6.1 The IPC
In the first line of the 1st paragraph the words “28 days” are substituted by “14 days”.
14.7 Payment
The words “or through crossed cheque in favour of the Contractor or JV partners. The Payment to JV partners shall be made at the request of the Joint Ventures in the ratio of their shares specified by them” are added at the end of the Sub-Clause.
14.8 Delayed Payment
In the first paragraph, third line, the words “compounded monthly” are deleted.
The text of 2nd paragraph is deleted and substituted with the following:
“The Employer shall pay to the Contractor compensation at the rate stated in the Contract Data.”
14.9 Release of Retention Money
The following is added at the end of Sub-Clause 14.9:
“Unless otherwise stated in the Contract, when the Taking-Over Certificate has been issued for the Works and the first half of the Retention Money has been certified for payment by the Engineer, the Contractor shall be entitled to substitute a guarantee, in the form annexed to the Particular Conditions or in another form approved by the Employer and issued by a schedule bank selected by the Contractor, for the second half of the Retention Money. The Contractor shall ensure that the guarantee is in the amounts and currencies of the second half of the Retention Money and is valid and enforceable until the Contractor has executed and completed the Works and remedied any defects, as specified for the Performance Security. On receipt by the Employer of the required guarantee, the Engineer shall certify, and the Employer shall pay the second half of the Retention Money. The release of the second half of the Retention Money against a guarantee shall then be in lieu of the release after the latest of the expiry dates of the Defects Notification Periods. The Employer shall return the guarantee to the Contractor within 21 days after receiving a copy of the Performance Certificate.
If the Performance Security required under Sub-Clause 4.2 is in the form of a demand guarantee, and the amount guaranteed under them when the Taking-Over Certificate is issued is more than half of the Retention Money, then the Retention Money guarantee will not be required. If the amount guaranteed under the Performance Security when the Taking-Over Certificate is issued is less than half of the Retention Money, the Retention Money guarantee will only be required for the difference between half of the Retention Money and the amount guaranteed under the Performance Security.
15.2 Termination for Contractor’s Default
15.2.1 Notice
Following text is added at the end of sub-paragraph (h) of this Sub-Clause:
“For the purposes of this Contract, corrupt and fraudulent practices have been defined in Public Procurement Rules 2026.”
15.2.3 After Termination
The word “and” at the end of sub-paragraph (ii) of paragraph (b) is deleted the following paragraph is added after sub-paragraph (iii):
“(iv) all Employer-Supplied Materials and/or Employer's Equipment madeavailable to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer's Equipment], and”
15.4 Payment after Termination
The following text is added at the end of this Sub-Clause:
“The Employer shall be entitled to sell any of the Contractor’s Equipment, Temporary Works and unused materials and apply the proceeds of sale towards payment of any debt due from the Contractor to the Employer under this Clause including any outstanding payments to the Subcontractors.
16.2 Termination by Contractor
16.2.1 Notice
The sub-paragraph (j) is deleted in its entirety.
At the end of sub-paragraph (i) “; or” is replaced with “.” and at the end of sub-paragraph (h) “;” is replaced with “; or”.
In sub-paragraph (f) “84 days” are replaced with “180 days” and text “for reasons not attributable to the Contractor” is added at the end.
16.3 Contractor’s Obligations After Termination
Sub-paragraph (c) is deleted and replaced with:
"(c) deliver to the Engineer all Employer-Supplied Materials and/orEmployer's Equipment made available to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer’s Equipment]; and
(d) remove all other Goods from the Site, except as necessary for safety,and leave the Site."
17.1 Responsibility for Care of the Works
After the two instances of “Goods” in the last paragraph, the words “Employer-Supplied Materials and/orEmployer's Equipment” are added.
The following Sub-Clause 17.7 is added after Sub-Clause 17.6:
17.7 Use of Employer’s Accommodation/Facilities
The Contractor shall take full responsibility for the care of the items of the Employer’s facilities and/or accommodation, if any, as detailed in the Specification, from the date of use and/or occupation by the Contractor until the date on which such use and/or occupation is re-vested in the Employer.
If any loss or damage happens to any of the above items during a time while the Contractor is responsible for its care, arising from any cause other than a cause for which the Employer is responsible or liable, the Contractor shall promptly rectify the loss or damage at the Contractor’s risk and cost.
18.1 Exceptional Events
The words “or disorder” are replaced with “disorder or sabotage” in sub-paragraph (c) of the Clause.
18.4 Consequences of an Exceptional Event
The following is added at the end of sub-paragraph (b) after deleting the “.”:
“, including the costs of rectifying or replacing the Works and/or Goods damaged or destroyed by Exceptional Events, to the extent they are not indemnified through the insurance policy referred to in Sub-Clause 19.2 [Insurance to be provided by the Contractor].”
18.5 Optional Termination
In sub-paragraph (c), the words “and necessarily” areadded after the words “was reasonably”.
19.1 General Requirements
Following text is added at the end of first paragraph:
“The Contractor shall immediately after the date of the Letter of Acceptance submit the draft of insurance policies for the Employer’s consent.”
Following text is added at the end of third paragraph:
“The Contractor shall, within the respective periods stated in the Contract Data submit to the Engineer and the Employer a) evidence that the insurances described in this Clause have been effected, and b) copies of policies of the insurances described in Sub-Clauses 19.2.1, 19.2.4 and 19.2.5.”
19.2 Insurance to be provided by the Contractor
19.2.5 Injury to employees
The words “sickness, disease” are deleted in the third line of first paragraph.
The following Sub-Clause is added after Sub-Clause 19.2.6:
19.2.7 Insurance Company
“The Contractor shall be obliged to place all insurances described in this Clause with insurers listed in the Contract Data and rated byPACRA/VISofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
21.6 Arbitration
The word “international” is deleted in the sixth line of first paragraph. The text of sub-paragraph (a) is substituted with the following:
“the Dispute shall be finally settled under the Rules of Arbitration, specified in the Contract Data;”
The following Clauses are added after Clause 21
22 Custom Duty
[Employer may incorporate provisions where applicable. However, in order to make the bid more balanced, the payment of Customs Duties should be the responsibility of the Employer.]
23 Taxes
The Contractor, Subcontractors and their employees shall be liable to pay income tax, withholding tax, super tax and other taxes on income arising out of the Contract. The rates and prices as stated in the contract shall be deemed to cover all such taxes.
24 Integrity Part
If it is found and established at any stage that the Contractor or any of his Subcontractors, agents or servants have violated or involved in violation of the Integrity Pact signed by the Contractor then the Employer shall be entitled to :
(a) recover from the Contractor an amount equivalent to ten times the sum of any commission, gratification, bribe, finder’s fee or kickback given by the Contractor or any of his Subcontractors, agent or servants;
(b) terminate the Contract; and
(c) recover from the Contractor any loss or damage to the Employer as a result of such termination or of any other corrupt business practices of the Contractor or any of his Subcontractors, agent or servants.
The termination under sub-paragraph(b) of this Sub-Clause shall proceed in the manner prescribed under Sub-Clause 15.1 to 15.4 and the payment under Sub-Clause 15.4 shall be made after having deducted the amounts due to the Employer under sub-paragraph(a) and (c) of this Sub-Clause.
Appendix General Conditions of Dispute Avoidance/Adjudication Agreement
12 Disputes Under DAAB Agreement
In the first paragraph, third, fourth and fifth line, the text “under the Rules of Arbitration of the International Chamber of Commerce 2017……………shall apply” is substituted with “under the Arbitration Act 1940 by sole arbitrator appointed by the Managing Director Public Procurement Regulatory Authority or Chairman Pakistan Engineering Council.”
Date:
No.:
Alternative No.: P200199
To: Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid-Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
(a) have withdrawn our Bid during the period of Bid validity specified in the Letter of Bid; or
(b) having been notified of the acceptance of our Bid by the Procuring agency/Employer during the period of Bid validity, (i) fail or refuse to sign the Contract; or (ii) fail or refuse to furnish the Performance Security (or guarantee), if required, in accordance with the ITB.
We understand this Bid Securing Declaration shall expire if we are not the successful Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight days after the expiration of our Bid.
Name of the Bidder*
Name of the person duly authorized to sign the Bid on behalf of the Bidder** _______
Title of the person signing the Bid ______________________
Signature of the person named above ______________________
Date signed ________________________________ day of ___________________, _____
*: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder
**: Person signing the Bid shall have the power of attorney given by the Bidder attached to the Bid
[Note: In case of a Joint Venture, the Bid-Securing Declaration must be in the name of all members to the Joint Venture that submits the Bid.]
THIS CONTRACT AGREEMENT (hereinafter called the “Agreement”) made on the _________ day of __________ (month) 20_____ between Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory (hereinafter called the “Employer”) of the one part and __________________________________________________ (hereinafter called the “Contractor”) of the other part.
WHEREAS the Employer is desirous that certain Works, viz., LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD. (P200199) should be executed by the Contractor and has accepted a Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein.
NOW this Agreement witnessed as follows:
1. In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents, in the order of priority, after incorporating addenda, if any, except those parts relating to Instructions to Bidders shall be deemed to form and be read and construed as part of this Agreement:
a) This Contract Agreement;
b) The Letter of Acceptance;
c) The Letter of Bid;
d) The Particular Conditions Part A - Contract Data;
e) The Particular Conditions Part B - SpecialProvisions;
f) The General Conditions;
g) The Specifications Part A - SpecificProvisions;
h) The Specifications Part B- Technical Provisions;
i) The Drawings;
j) The Completed Schedules to Bid including Schedule of Prices;
k) the JV Undertaking (if the Contractor is a JV); and
l) [Employer to insert any other documents forming part of the Contract]
The addenda/corrigenda,if any, (Excluding part relating to Instructions to Bidders alongwith Bidding Data) shall be deemed to have been incorporated at the appropriate places in the “Documents forming the Contract”.
3. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy defects therein in conformity and in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor, in consideration of the execution and completion of the Works as per provisions of the Contract, the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.
IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on the day, month and year first before written in accordance with their respective laws.
Signature of the Contactor Signature of Employer
(Seal) (Seal)
Signed, Sealed and Delivered in the presence of:
Witness Witness
(Name, Title and Address) (Name, Title and Address)
[All italicised text and any text within square brackets (except sub-clause headings) in this form of agreement is for use in preparing the form and should be deleted from the final product].
Name and details of the Contract LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD.
______________________________________________________________________________
This Agreement made the ______day of ______ [month], _____ [year], between
Name and contact details of the Employer Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director
10, Mauve Area, G-10/4, Islamabad Capital Territory
+92-321-538-5944
director.technical@fgeha.gov.pk
Name and contact details of the Contractor _____________________________________ (name)
____________________________________ (address)
__________________________________ (telephone)
___________________(email / other contact details);
Name and contact details of the DAAB Member _____________________________________ (name)
____________________________________ (address)
__________________________________ (telephone)
___________________(email / other contact details);
Whereas:
A. the Employer and the Contractor have entered (or intend to enter) into the Contract;
B. under the Contract, the “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole member or three members (as stated in the Contract Data of the Contract) so named in the Contract, or appointed under Sub-Clause 21.1 [Constitution of the DAAB] or Sub-Clause 21.2 [Failure to Appoint DAAB Members] of the Conditions of Contract;
C. the Employer and the Contractor desire jointly to appoint the above-named DAAB Member to act on the DAAB as:
a. the sole member of the DAAB, and where this is the case, all references to the “Other Members” do not apply; or
b. one of three members / chairman [delete the one which is not applicable] of the DAAB and, where this is the case, the other two persons are:
____________________________ (name) _________________________ (name)
___________________________ (address) _______________________ (address)
_____________________________(telephone) ______________________(telephone)
______________(email/ other contact details) _______ (email/other contact details)
the “Other Members”; and
D. the DAAB Member accepts this appointment.
The Employer, Contractor and DAAB Member jointly agree as follows:
1. The conditions of this DAAB Agreement comprise:
(a) Clause 21 [Disputes and Arbitration] of the Conditions of Contract, and any other provisions of the Contract that are applicable to the DAAB’s Activities; and
(b) the “General Conditions of Dispute Avoidance/Adjudication Agreement”, which is appended to the General Conditions of the “Conditions of Contract for Construction” Second Edition 2017 published by FIDIC (“GCs”), as amended and/or added to by the following provisions.
2. [Details of amendments to the GCs, if any. For example:
In the procedural rules annexed to the GCs, Rule _ is deleted and replaced by: “ … “]
3. The DAAB Member shall be paid in accordance with Clause 9 of the GCs. The currency of payment shall be ________.
In respect of Sub-Clauses 9.1 and 9.2 of the GCs, the amounts of the DAAB Member’s monthly fee and daily fee shall be:
monthly fee___________________ per month, and
daily fee of____________________ per day
(or as otherwise set under Sub-Clause 9.3 of the GCs).
4. In consideration of the above fees, and other payments to be made to the DAAB Member in accordance with the GCs, the DAAB Member undertakes to act as DAAB Member in accordance with the terms of this DAAB Agreement.
5. The Employer and the Contractor shall be jointly and severally liable for the DAAB Member’s fees and other payments to be made to the DAAB Member in accordance with the GCs.
6. This DAAB Agreement shall be governed by the law of _____________ (if not stated, the law that governs the Contract under Sub-Clause 1.4 of the Conditions of Contract).
SIGNED by:_______________ SIGNED by:_______________ SIGNED by:_______________
Print name:_________________ Print name:_________________ DAAB Member
Title: _____________________ Title:______________________ Title:______________________
for and on behalf of the
Employer for and on behalf of the
Contractor
in the presence of in the presence of in the presence of
Witness:___________________ Witness:___________________ Witness:___________________
Name:_____________________ Name:_____________________ Name:_____________________
Address:___________________ Address:___________________ Address:___________________
__________________________ __________________________ __________________________
Date:______________________ Date:______________________ Date:______________________
Guarantee No._________________________________________ Date _________________
WHEREAS _____________________________________ (hereinafter called the 'Employer')
has entered into a Contract for __________________________________________________
(Particulars of Contract)
with ____________________________________________ (hereinafter called the "Contractor').
AND WHEREAS, the Employer has agreed to advance to the Contractor, at the Contractor's request, an amount of Pak Rupees ___________________________________ (PKR _________ ) which amount shall be advanced to the Contractor as per provisions of the Contract.
AND WHEREAS, the Employer has asked the Contractor to furnish Guarantee to secure the mobilization advance for the performance of his obligations under the said Contract.
AND WHEREAS, ____________________________________________________________
(hereinafter called the “Guarantor”) at the request of the Contractor and in consideration of theEmployer agreeing to make the above advance to the Contractor, has agreed to furnish the said Guarantee.
NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the advance for the purpose of above mentioned Contract and if he fails and commits default in fulfilment of any of his obligations for which the advance payment is made, the Guarantor shall be liable to the Employer for payment not exceeding the aforementioned amount.
Notice in writing of any default,on the part of the Contractor, of which the Employer at his discretion of making decision, shall be given by the Employer to the Guarantor, and on such first written demand, payment shall be made by the Guarantor of all sums then due under this Guarantee without any reference to the Contractor and without any objection.
This Guarantee shall remain in force until the advance is fully adjusted against payments from the Interim Payment Certificates of the Contractor or until _________________________whichever is earlier. (Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of
PKR ______________________ (PakRupees ________________________________________________).
This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the aforesaid date or earlier if the advance made to the Contractor is fully adjusted against paymentsfrom Interim Payment Certificates of the Contractor provided that the Guarantor
agrees that the aforesaid period of validity shall be deemed to be extended if on the above mentioned date the advance payment is not fully adjusted.
Guarantor
(Scheduled Bank/ Insurance Company)
Signature ________________________________________________
Name ________________________________________________
Title ________________________________________________
WITNESS:
1. ________________________________________________
________________________________________________
Corporate Secretary (Seal) Corporate Guarantor (Seal)
2. ________________________________________________
________________________________________________
Name, Title & Address
________________________________ [Guarantor letterhead or SWIFT identifier code]
Beneficiary: ___________________ [Insert name and Address of Employer]
Date: ________________[Insert date of issue]
RETENTION MONEY GUARANTEE No.: [Insert guarantee reference number]
Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]
We have been informed that ________________ [insert name of Contractor, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called "the Contractor") has entered into Contract No. _____________ [insert reference number of the contract] dated ____________ with the Employer, for the execution of _____________________ [insert name of contract and brief description of Works] (hereinafter called "the Contract").
Furthermore, we understand that, according to the conditions of the Contract, the Employer retains moneys up to the limit set forth in the Contract (“the Retention Money”), and that when the Taking-Over Certificate has been issued under the Contract and the first half of the Retention Money has been certified for payment, payment of [insert the second half of the Retention Money orifthe amount guaranteed under the Performance Guarantee when the Taking-Over Certificate is issued is less than half of the Retention Money, the difference between half of the Retention Money and the amount guaranteed under the Performance Security and, if required, the ES Performance Security] is to be made against a Retention Money guarantee.
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ [insert amount in figures] () [amount in words] upon receipt by us of the Employer’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating that the Applicant is in breach of its obligation(s) under the Contract, without your needing to prove or show grounds for your demand or the sum specified therein.
A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Employer’s bank stating that the second half of the Retention Money as referred to above has been credited to the contractor on its account number ___________ at _________________ [insert name and address of Contractor’s bank].
This guarantee shall expire no later than the …. day of ……, 2…, and any demand for payment under it must be received by us at the office indicated above on or before that date.
____________________
[signature(s)]
Note: All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Name of Employer: ……………… Name of Bidder/Contractor: ……………
Signature: …………………… Signature: …………………………….
[Seal] [Seal]
Guarantee No.___________________
Executed on ____________________
Expiry date _____________________
Name of Guarantor with address: _________________________________________________________________________________________________________________________________
Name of Principal (Contractor) with address:___________________________________________________________________________________________________________________________
Penal Sum of Security (express in words and figures) ____________________________________________________________________________________________________________________
Letter of Acceptance No. _____________________________________Dated __________________
KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bidding Documents and above said Letter of Acceptance (hereinafter called the Documents) and at the request of the said Principal we, the Guarantor above named, are held and firmly bound unto the Federal Government Employees Housing Authority (Federal Government Employees Housing Authority-FGEHA), Director 10, Mauve Area, G-10/4, Islamabad Capital Territory (hereinafter called the Employer) in the penal sum of the amount stated above for the payment of which sum well and truly to be made to the said Employer, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has accepted the Employer's above said Letter of Acceptance for _____________________________________ ________________________________
(Name of Contract) for the LANDSCAPING AND HORTICULTURE WORKS IN SECTOR F-14 & F-15, ISLAMABAD. (P200199)
______________________________________________ (Name of Project).
NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all the undertakings, covenants, terms and conditions of the said Documents during the original terms of the said Documents and any extensions thereof that may be granted by the Employer, with or without notice to the Guarantor, which notice is, hereby, waived and shall also well and truly perform and fulfill all the undertakings, covenants terms and conditions of the Contract and of any and all modifications of said Documents that may hereafter be made, notice of which modifications to the Guarantor being hereby waived, then, this obligation to be void; otherwise to remain in full force and virtue till all requirements of Clause11, Defects After Taking Over, of Conditions of Contract are fulfilled.
Our total liability under this Guarantee is limited to the sum stated above and it is a condition of any liability attaching to us under this Guarantee that the claim for payment in writing shall be received by us within the validity period of this Guarantee, failing which we shall be discharged of our liability, if any, under this Guarantee.
We, _________________________________________________ (the Guarantor), waiving all objections and defense under the Contract, do hereby irrevocably and independently guarantee to pay to the Employer without delay upon the Employer's first written demand without cavil or arguments and without requiring the Employer to prove or to show grounds or reasons for such demand any sum or sums up to the amount stated above, against the Employer's written declaration that the Principal has refused or failed to perform the obligations under the Contract which payment will be effected by the Guarantor to Employer’s designated Bank & Account Number.
PROVIDED ALSO THAT the Employer shall decide, whether the Principal (Contractor) has duly performed his obligations under the Contract or has defaulted in fulfilling said obligations and the Guarantor shall pay without objection any sum or sums up to the amount stated above upon first written demand from the Employer forthwith and without any reference to the Principal or any other person.
IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its seal on the date indicated above, the name and corporate seal of the Guarantor being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.
Guarantor
(Schedule Bank/ Insurance Company)
Signature: _________________________________________________
Name: _________________________________________________
Title: _________________________________________________
Corporate Guarantor (Seal)
WITNESS:
1.
_________________________________________________
_________________________________________________
2.
_________________________________________________
_________________________________________________
Name, Title & Address