Standard Bidding Document

📑 Procurement Notice (NIT)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

REQUEST FOR BIDS

PROCUREMENT OF CIVIL WORKS

  1. The Quetta Airport (Pakistan Airports Authority (PAA)) has reserved Funds for the procurement planned for FY 2026-27. The Quetta Airport (Pakistan Airports Authority (PAA)) intends to apply part of the proceeds of this Fund to cover eligible payments under the contract for the "Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)" with the reference of "P202140"
  2. The Quetta Airport (Pakistan Airports Authority (PAA)) invites electronic Bids from eligible Bidders for procurement of Works (Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)) described in the bidding documents on EPADS v2.0.
  3. Single Stage-One Envelope will be used by adopting Least Cost Based Selection (LCBS) Technique for the subject procurement, in line with the Public Procurement Rules, 2026 and any Regulations, Regulatory Guides, Procurement Guidelines or Instructions issued by the Authority from time to time.
  4. All Bids must be accompanied by a Bid Security amounting described in Bid Security Section in Bidding Document in the form of  . Or all bids must be accompanied by bid securing declaration in the format specified in the Bidding documents
  5. E-Bidding documents, containing detailed terms & conditions, specifications and requirements etc. are available on e-Pak Acquisition and Disposal System (EPADS) at https://epads.gov.pk/opportunities/federal/procurements/202140 for all the interested bidders registered on EPADS v2.0. Bidders are required to get themselves registered on EPADS v2.0 to participate in Bidding process.
  6. The e-bids, prepared in accordance with the instructions in the e-Bidding documents, must be submitted through EPADS v2.0 on or before Wednesday, November 25, 2026 02:00 PM. E-bids will be opened by using EPADS v2.0 on the same day at Wednesday, November 25, 2026 02:30 PM. Manual submission of Bids shall not be entertained. Those vendor who have not yet registered on the new version of EPADS v2.0, may register themselves on https://vendors.epads.gov.pk/. A tutorial to explain the registration process is available at https://www.youtube.com/watch?v=MNW6T38v7tc.

In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.gov.pk).

 

 

Quetta Airport (Pakistan Airports Authority (PAA)), Secretary
Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
+92-322-826-8402
rasheedbizenjo35@gmail.com

📑 Instructions to Bidders (ITB)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

A. INTRODUCTION

  1. Scope of Bid
    1. The Procuring agency/Employer (PA), as indicated in the Bid Data Sheet (BDS) invites Bids for the execution of Works as specified in the BDS and Section VI- Works Requirements. The name, identification, and number of lots (contracts) of this National/ International Competitive Bidding process are specified in the BDS.
  2. Source of Funds
    1. Source of funds as referred in Clause 2 of Bid Data Sheet.
  3. Eligible Bidders 
    1. A bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture or consortium. In the case of a joint venture or consortium, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture or consortium shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture or consortium during the Bidding process, and in case of award of contract, during the execution of contract. Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
      Any bid submitted by the joint venture shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
      (The limit on the number of members of JV or Consortium may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
    2. The invitation for bids is open to all prospective bidders subject to any provisions of incorporation or licensing by the respective national/ international incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidder keeping in view the requirement of that business.
    3. A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidders may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
      1. are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring agency/Employer to provide consulting services for the preparation of design or technical specifications of the works that are the subject of the bid; or
      2. have controlling shareholders in common; or 
      3. receive or have received any direct or indirect subsidy from any of them; or 
      4. have the same legal representative for purposes of this Bid; or
      5. have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the Procuring agency/Employer regarding this Bidding process; or
      6. Submit more than one bid in this bidding process.
    4. A Bidder may be ineligible if –
      1. he is declared bankrupt or, in the case of company or firm, insolvent;
      2. payments in favor of the bidder is suspended in accordance with the judgment of a court of law other than a judgment declaring bankruptcy and resulting (in accordance with the national laws) in the total or partial loss of the right to administer and dispose of its property;
      3. the bidder is convicted, by a final judgment of a Court of Law or relevant Professional Statuary Body, of any offence involving professional conduct;
      4. The bidder is debarred/ blacklisted by a national level Procuring agency/Employer and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration.
    5. As and when required, bidders shall provide to the Procuring agency/Employer evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
  4. Eligible Material and Equipment
    1. All the material and equipment to be mobilized under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such materials and equipment. For this purpose, ineligible countries are stated in the section-IV titled as “Eligible Countries”. 

B. BIDDING DOCUMENTS

  1. Contents of Bidding Documents 
    1. The scope of Works, bidding procedures, and terms and conditions of the contract are prescribed in the bidding documents.  In addition to the Invitation for Bids, the bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 7.1 include:
      1. Section I Instructions to Bidders (ITBs)
      2. Section II Bid Data Sheet (BDS)
      3. Section III Evaluation and Qualification Criteria
      4. Section IV Bidding Forms 
      5. Section V Eligible Countries
      6. Section VI Works Requirements
      7. Section VII General Conditions of Contract (GC)
      8. Section VIII Particular Conditions of Contract (PC
      9.  Section IX Contract Forms
    2. The bidder is expected to examine all instructions, forms, specifications, terms and conditions prescribed in the bidding documents. Failure to furnish all the information required in the bidding documents will be at the bidder’s risk and may result in the rejection of his bid. 
  2. Clarification of Bidding Document, Pre-bid Meeting
    1. A prospective bidder requiring any clarification of the bidding document may notify the Procuring agency/Employer through EPADS v2.0. 
    2. The Procuring agency/Employer shall respond to the request for clarification in accordance with the Public Procurement Rules 2026, Rule No.38 i.e. Clarifications of bids. 
    3. Should the Procuring Agency deem it necessary to amend the BIDDING document as a result of a clarification, it shall do so following the procedure under ITB 7.
    4. If indicated in the BDS, the bidder’s designated representative is invited at the bidder’s cost to attend a pre-bid meeting at the place, date and time mentioned in the BDS. During this pre-bid meeting, prospective bidders may request clarification of the schedule of requirement, the evaluation criteria or any other aspects of the bidding documents.
    5. Minutes of the pre-bid meeting, if applicable, including the text of the questions asked by bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS v2.0. Any modification to the bidding documents that may become necessary as a result of the pre-bid meeting shall be made by the Procuring agency/Employer exclusively through the use of an Addendum pursuant to ITB 7. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
    6. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works.  The costs of visiting the Site shall be at the bidder’s own expense.
    7. The bidder and any of its authorized personnel will be granted permission by the Procuring agency/Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the bidder and its personnel will release and indemnify the Procuring agency/Employer  from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
  3. Amendment of Bidding Documents
    1. The procuring agency may issue notification of any change, addition, modification or deletion in accordance with the Public Procurement Rules 2026, rule no. 34 i.e. Bidding Documents.
    2. To give prospective bidders reasonable time in which to take an addendum/corrigendum into account in preparing their bids, the Procuring agency/Employer may, at its discretion, extend the deadline for the submission of bids:
      Provided that the Procuring agency/Employer shall extend the deadline for submission of bid in pursuance of Public Procuement Rules 2026, rule no. 39  i.e. Extension of time for submission of bids, if such an addendum is issued within last three (03) days of the bid submission deadline.

C. PREPARATION OF BIDS

  1. Language of Bid
    1. The bid prepared by the bidder, as well as all correspondence and documents relating to the bid exchanged by the bidder and the Procuring agency/Employer shall be written in the English language unless specified in the BDS. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless specified in the BDS, in which case, for purposes of interpretation of the bidder, the translation shall govern.
  2. Documents Comprising the Bids
    1. The Bid prepared by the Bidder shall constitute the following components: -
      1. Documentary evidence established in accordance with ITB 9 that the material and equipment to be utilized by the Bidder for the executions of works are eligible material and equipment and conform to the Bidding Documents;
      2. Documentary evidence established in accordance with ITB 10 that the Bidder has been authorized to carry out the Construction works;
      3. Documentary evidence established in accordance with ITB 10 that the Bidder is eligible and/or qualified for the subject Bidding process;
      4. Letter of Bid and Schedules and Bid Prices completed in accordance with ITB 11 and 12;
      5. Completed schedules as required, including priced Bill of Quantities in accordance with ITB 11.
      6. Technical Proposal completed in all aspects in accordance with ITB 14.
      7. Bid security or Bid Securing Declaration furnished in accordance with ITB 16;
      8. Any other Document required in the BDS.
    2. In addition to the requirements, Bids submitted by a JV shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful Bid shall be signed by all members and submitted with the Bid, together with a copy of the proposed Agreement. Bids submitted by a joint venture of two (2) or more firms specified in Bidding Data, shall comply with the following requirements:
      1. The bid, and in case of a successful bid, the Form of Contract Agreement shall be signed by all members so as to be legally binding on all partners;
      2. One of the joint venture partners shall be nominated as being in-charge; and this authorization shall be evidenced by submitting a power of attorney signed by legally authorized signatories of all the joint venture partners;
      3. For the partner-in-charge shall always be duly authorized to deal with the Employer regarding all matters related with and/or incidental to the execution of Works as per the terms and Conditions of Contract and in this regard to incur any and all liabilities, receive instructions, give binding undertakings and receive payments on behalf of the joint venture;
      4. All partners of the joint venture shall at all times and under all circumstances be liable jointly and severally for the execution of the Contract in accordance with the Contract terms and a statement to this effect shall be included in the authorization mentioned under Sub-Para(b) above as well as in the Letter of Bid and in the Form of Contract Agreement (in case of a successful bid); and
      5. A copy of the agreement entered into by the joint venture partners shall be submitted with the bid stating the conditions under which it will function, its period of duration, the persons authorized to represent and obligate it and which persons will be directly responsible for due performance of the  Contract and can give valid receipts on behalf of the joint venture, the proportionate participation and corresponding duties & responsibilities of the several firms forming the joint venture, and any other information necessary to permit a full appraisal of its functioning. No amendments/modifications whatsoever in the joint venture agreement shall be agreed to between the joint venture partners without prior written consent of the Employer.
    3. The Bidder shall furnish, as part of its Bid, all those documents establishing the eligibility in conformity to the terms and conditions specified in the Bidding Documents for all material, equipment and works which the Bidder proposes to execute.
    4. The documentary evidence of conformity of the material, equipment and works to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of:
      1. a detailed description of the work methodology, approach, schedule and resources to be mobilized at site;
      2. any other procurement specific documentation requirement as stated in the BDS.
    5. The Bidder shall furnish in the Letter of Bid name(s) of the potential DAAB member(s) and attach their curriculum vitae. The list of potential DAAB member(s) proposed by the Employer (Contract Data 21.1) and by the Bidder (Letter of Bid) shall be subject to mutual review and agreement of the Parties in accordance with Sub-Clause 21.1 of the Conditions of Contract, and shall form the basis for the constitution of the DAAB in the event of Contract award.
  3. Documents Establishing Eligibility and Qualification of the Bidder
    1. The bidder shall furnish, as part of its bid, all those documents establishing the bidder’s eligibility to participate in the bidding process and/or its qualification to perform the contract if its bid is accepted.
    2. The documentary evidence of the bidder’s eligibility to bid shall establish to the satisfaction of the Procuring agency/Employer that the bidder, at the time of submission of its bid, is from an eligible country as defined in Section-V titled as “Eligible Countries”.
    3. The documentary evidence of the bidder’s qualification to perform the contract if its bid is accepted shall establish to the satisfaction of Procuring agency/Employer that:
      1. The bidder has the financial and technical capability necessary to perform the Contract, meets the qualification criteria specified in Section-III, Evaluation and Qualification Criteria and BDS.
      2. In the case of a bidder not doing business within Pakistan, the bidder is or will be (if awarded the contract) represented by a local bidder (Joint Venture) in accordance with the PEC works bylaws, and in case of award of works such foreign firm is required to participate in the execution of works to carry out its obligations as prescribed in the Conditions of Contract and /or Technical Specifications.
      3. That the bidder meets the qualification criteria listed in Section-III, Evaluation and Qualification Criteria and BDS. 
  4. Letter of Bid and Schedules
    1. The Bidder shall fill the Form of Bids furnished in the bidding documents. The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
  5. Bid Prices
    1. The bid prices quoted by the bidder in the Bidding Forms, Bill of Quantities and in the Price Schedule to Bid shall conform to the requirements specified below or exclusively mentioned hereafter in the bidding documents.
    2. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. If a Price Schedule shows items listed but not priced, their prices shall be construed to be included in the prices of other items in the Bill of Quantities and will not be paid for separately by the Procuring agency/Employer. 
    3. The Bid price to be quoted in the Form of Bid in accordance with ITB 11 shall be the total price of the bid
    4. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract.
    5. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract.
    6. If so specified in ITB 1.1, bids may be invited for individual lots (contracts) or for any combination of lots (packages).
    7. Prices quoted by the Bidder shall either be fixed or adjustable during the Bidder’s performance of the contract if specified in the BDS.
    8. All duties, taxes, and other levies payable by the Contractor under the Contract, or for any other cause, as of the date twenty-eight (28) days prior to the deadline for submission of bids, shall be included in the rates and prices and the total bid price submitted by the bidder.
  6. Currencies of Bid and Payment
    1. The unit rates and the prices shall be quoted by the Bidder entirely Pakistani Rupees. A Bidder expecting to incur expenditures in other currencies for inputs to the Works supplied from outside the Employer’s country (referred to as the “Foreign Currency Requirements”) shall indicate in Table III of Schedule-A to Bid the proportion of the Bid Price (excluding Provisional Sums) needed by him for the payment of such Foreign Currency Requirements; in such case the unit rates and the prices shall be quoted by the Bidder in Equivalent Pakistani Rupees.Comparison of Bids and tie of Bid shall be treated in accordance with the Public Procurement rules 2026, rule no. 42.
  7. Documents Comprising the Technical Proposal
    1. The bidder shall furnish a Technical Proposal including a statement of work methods, equipment, personnel, schedule and any other information as stipulated in Section IV– Bidding Forms, in sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the work requirements and the completion time.
  8. Bid Validity Period
    1. Bids shall remain valid for the period specified in the BDS after the bid submission deadline prescribed by the Procuring agency/Employer. A bid valid for a shorter period shall be rejected by the Procuring agency/Employer as non-responsive. The period of bid validity will be determined from the complementary bid securing instrument i.e. the expiry period of bid security or bid securing declaration as the case may be. 
    2. Under exceptional circumstances, prior to the expiration of the initial Bids/Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids/Bid. Such request for extension of the period of bid validity shall be carried out in accordance with the Public Procurement rules 2026, rule no. 37 i.e. Bid Validity.
  9. Bid Security or Bid Securing Declaration
    1. Pursuant to ITB 10.1 unless otherwise specified in the BDS, the bidder shall furnish as part of its bid, a Bid Security in accordance with the Public Procurement Rules 2026, rule no. 36 in the amount and currency specified in the BDS or Bid Securing Declaration as specified in the BDS in the format provided in Section IV (Bidding Forms). 
      In case Procuring agency/Employer is inviting bids in lots / packages, the bidder shall be required to submit his bid security against the respective lot/ package for which he is submitting his bid.
      Until the development of functionality of auto verification of financial instrument in EPADS v2.0, the scanned copy of bid security or bid securing declaration, as the case may be, shall be uploaded on EPADS v2.0 whereas the original instrument to be submitted to the procuring agency before closing of bid submission deadline, failing which shall result in rejection of Bid as non-responsive.
    2. The Bid Security shall be denominated in the local currency or in another freely convertible currency, and it shall be in the form specified in the BDS which shall be in any of the following:
      1. A bank guarantee, an irrevocable letter of credit issued by a Scheduled bank in the form provided in the Bidding Documents or another form acceptable to the Procuring agency/Employer and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bid Validity is extended. In either case, the form must include the complete name of the bidder; 
      2. A cashier’s or certified cheque; or
      3. Another security as indicated in the BDS.
    3. The Bid Security or Bid Securing Declaration shall be in accordance with the Form of the Bid Security or Bid Securing Declaration included in Schedule to Bid or another form approved by the Procuring agency/Employer prior to the bid submission.
    4. The Bid Security shall be payable promptly upon written demand by the Procuring agency/Employer in case any of the conditions listed in ITB 16.9 are invoked.
    5. Any bid not accompanied by a Bid Security or Bid Securing Declaration in accordance with ITB 16.1 or 16.3 shall be rejected by the Procuring agency/Employer and shall be declared as non-responsive bid, pursuant to ITB 25.
    6. Unsuccessful bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Procuring agency/Employer pursuant to ITB 15. The Procuring agency/Employer shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
      1. The expiry of the Bid Security;
      2. The entry into force of a procurement contract and the provision of a performance security (or guarantee), for the performance of the contract if such a security (or guarantee), is required by the Biding documents;
      3. The rejection by the Procuring agency/Employer of all Bids;
      4. The withdrawal of the bid prior to the deadline for the submission of bids, unless the biding documents stipulate that no such withdrawal is permitted.
    7. The successful bidder’s Bid Security will be discharged upon the bidder signing the contract pursuant to ITB 38, or furnishing the performance security (or guarantee), pursuant to ITB 39.
    8. The Bid Security may be forfeited or the Bid Securing Declaration executed:
      if a Bidder:
      1. Withdraws its Bid during the period of Bid Validity as specified by the Procuring agency/Employer, and referred by the bidder on the Form of Bid except as provided for in ITB 15.2; or 
      2. In the case of a successful bidder, if the bidder fails:
        1. to sign the contract in accordance with ITB 38; or
        2. to furnish performance security (or guarantee) in accordance with ITB 39.
    9. In case of Bid Security issued by the foreign bank is allowed by the Procuring agency/Employer, the same should be counter guaranteed by a corresponding bank in Pakistan. Furthermore, in case of joint venture, it should be in the name of Joint venture to ensure joint responsibility. In case the JV is not legally constituted at the time of bid submission, the bid security or bid securing declaration shall be in the names of Joint Venture or Lead/either Firm of the JV or in ratio of shares of the individual JV partners, submitting the bid.
  10. Withdrawal of Bids
    1. The Bidder shall prepare and submit Bids through EPADS with due diligence after carefully reading all the terms and condition before Bid submission deadline.

D. SUBMISSION OF BIDS

  1. Submission of Bids
    1. All bids shall be submitted through EPADS v2.0.
  2. Deadline for Submission of Bids
    1. All bids shall be received through EPADS v2.0 not later than bid submission deadline as specified in the BDS.
    2. The Procuring agency/Employer may, under exceptional circumstances and at its discretion, extend the deadline for the submission of bids, pursuant to Public Procurement Rules 2026, rule no. 39  Extension of Time for submission of bid, by amending the Bidding Documents in accordance with ITB 7, in which case all rights and obligations of the Procuring agency/Employer and bidders previously subject to the deadline will thereafter be subject to the new deadline.
  3. Withdrawal, Substitution and Modification of Bids
    1. A bidder may substitute or modify his bid after it has been submitted, provided that written notice of the substitution or modification of the bid, is received by the Procuring agency/Employer prior to the deadline for submission of bids.
    2. Revised bid may be submitted after the substitution or modification made in the original bid in accordance with ITB 20.1. 

E. OPENING AND EVALUATION OF BIDS

  1. Opening of Bids
    1. The Procuring Agency will open bids in accordance with the Public Procurement rules 2026, rule no.40 as specified in the BDS.
  2. Confidentiality
    1. Information relating to the examination, clarification, evaluation and comparison of bids and recommendation of contract award shall not be disclosed to bidders or any other persons not officially concerned with such process until the time of the announcement of the respective evaluation report.
  3. Clarification of Bids
    1. Clarification of Bidding Documents shall be carried out in accordance with the Public Procurement Rules 2026, rule no. 38 i.e. Clarifications.
    2. The alteration or modification in the bid which in any case affect the following parameters will be considered as a change in the substance of a bid:
      1. evaluation & qualification criteria;
      2. required scope of work;
      3. contract price;
      4. all securities requirements;
      5. tax requirements;
      6. terms and conditions of bidding documents.
      7. change in the ranking of the bidder
  4. Preliminary Examination of Bids
    1. Prior to the detailed evaluation of bids, the Procuring agency/Employer will determine whether each bid:
      1. has been prepared as per the format and contents defined by the Procuring agency/Employer in the bidding documents;
      2. has been properly signed; 
      3. is accompanied by the required securities; and 
      4. is substantially responsive to the requirements of the bidding documents. 
        The Procuring agency/Employer's determination of a bid's substantial responsiveness will be based on the contents of the bid itself.
    2. A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding Documents, without material deviation or reservation. A material deviation or reservation is one that: - 
      1. affects in any substantial way the scope, quality, or performance of the Works; 
      2. limits in any substantial way, inconsistent with the bidding documents, the Procuring agency/Employer's rights or the bidders’ obligations under the Contract; or 
      3. if rectified, would affect unfairly the competitive position of other bidders presenting substantially responsive bids.
    3. The Procuring agency/Employer will confirm that the documents and information specified under ITB 9, 10 and 11 have been provided in the bid. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Bidders, the bid shall be rejected.
    4. The Procuring agency/Employer may waive-off any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
      Explanation: A minor informality, non-conformity or irregularity is one that is merely a matter of form and not of substance. It also pertains to some of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the works. The Procuring agency/Employer either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is advantageous to the Procuring agency/Employer. Examples of minor informalities or irregularities include failure of a bidder to –
      1. Submit the number of copies of signed bids required by the invitation;
      2. Furnish required information concerning the number of its employees;
      3. the firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature.
    5. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer may request the bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Technical Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any such aspect of the technical Proposal linked with the ranking of the bidders. Failure of the bidder to comply with the request may result in the rejection of its bid.
    6. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer shall rectify quantifiable nonmaterial nonconformities or omissions related to the Financial Proposal. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of the missing or nonconforming item or component.
    7. If a bid is not substantially responsive, it will be rejected by the Procuring agency/Employer and may not subsequently be evaluated for complete technical responsiveness.
  5. Examination of Terms and Conditions; Technical Evaluation
    1. The Procuring agency/Employer shall examine the bid to confirm that all terms and conditions specified in the GC and the PC have been accepted by the bidder without any material deviation or reservation.
      For this purpose:
      “Deviation” means departure from the requirements specified in the Bidding Document.
      “Reservation” means setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding Document.
    2. The Procuring agency/Employer shall evaluate the technical aspects of the bid submitted in accordance with ITB 28, to confirm that all requirements specified in Section VI – Works Requirement, Technical Specifications of the Bidding Documents have been met without material deviation or reservation.
    3. If after the examination of the terms and conditions and the technical evaluation, the Procuring agency/Employer determines that the bid is not substantially responsive in accordance with ITB 25, it shall reject the bid.
  6. Correction of Arithmetic Errors
    1. Bids determined to be substantially responsive will be checked for any arithmetic errors.  Errors will be corrected as follows: -
      1. if there is a discrepancy between unit prices and the sub-total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the sub-total price shall be corrected, unless in the opinion of the Procuring agency/Employer there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected;
      2. if there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail, and the total shall be corrected; and 
      3. where there is a discrepancy between the amounts in figures and in words, the amount in words will govern.
      4. Where there is discrepancy between grand total of price schedule and amount mentioned on the Form of Bid, the amount referred in Price Schedule shall be treated as correct subject to elimination of other errors. 
    2. The amount stated in the Bid will, be rectified by the Procuring agency/Employer in accordance with the above procedure for the correction of errors and, with, the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount, its bid shall be rejected after forfeiture of Bid Security or execution of the Bid Securing Declaration, as the case may be, in accordance with ITB 39.3.
  7. Conversion to Single Currency
    1. Comparison of bids quoted in different currencies and conversion of bids into a single currency shall be carried out in accordance with the Public Procurement Rule 2026, rule no. 42(2) as specified in the BDS.
  8. Evaluation of Bids
    1. The Procuring agency/Employer shall evaluate and compare only the bids determined to be substantially responsive, pursuant to ITB 25.
    2. In evaluating the Technical Proposal of each Bid, the Procuring agency/Employer shall use the criteria and methodologies listed in the BDS and in terms of works requirement. No other evaluation criteria or methodologies shall be permitted.
    3. The Procuring agency/Employer’s evaluation of a bid will take into account:
      1. the bid price, excluding provisional sums and the provision, if any, for contingencies in the summary bill of quantities, but including day work items, where priced competitively;
      2. converting the amount resulting from applying above, if relevant, to a single currency in accordance with ITB 27;
    4. The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in bid evaluation.
    5. If these bidding documents allow bidders to quote separate prices for different lots, and the award to a single bidder of multiple lots, the methodology of evaluation to determine the lowest evaluated lot combinations in the Form of Bid, is specified in the BDS.
    6. If the bid, which results in the Evaluated Bid Price (Successful Bid), is seriously unbalanced or front loaded in the opinion of the Employer, the Employer may require the Bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated Contract payments, the Employer may require that the amount of the performance security be increased at the expense of the Bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under the Contract.
      Explanation:
      “Unbalanced” or “front-loaded” bids consist of deliberately submitting bids with artificially high prices or unit rates for the early stages of a construction project, offset by artificially low prices or unit rates for the later stages of the project, to improve the contractor’s cash flow.
  9. Domestic Preference
    1. If the BDS so specifies, the Procuring agency/Employer will grant a margin of preference to the domestic contractor in line with the rules, regulations, regulatory guides or instructions issued by the Authority from time to time. 
  10. Determination of Successful Bid
    1. The Procuring agency/Employer shall compare the evaluated bids in accordance with the predefined bidding procedure, of all substantially responsive bids to determine the Successful bidder.
  11. Qualification of Bidder
    1. The Procuring agency/Employer shall determine to its satisfaction whether the bidder is substantially responsive and whose bid is declared as Successful bid either continues to meet (if prequalification applies) or meets (if post-qualification applies) the qualifying criteria specified in Evaluation and Qualification Criteria.
      Note: In case of international bidding, the parameters for incorporation or licensing within Pakistan may be fulfilled as part of post qualification.
    2. The determination shall be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 10.
    3. Prior to contract award, the Procuring agency/Employer will verify that the successful bidder (including each member of a JV) is not blacklisted/debarred. The Procuring agency/Employer will conduct the same verification for each sub-contractor proposed by the successful bidder.
  12. Sub-Contractors
    1. The bidder shall provide details regarding any specialized sub-contractor to the Procuring agency/Employer. In case change of sub-contractors, the bidder shall promptly notify the Procuring agency/Employer and obtain approval for replacement of sub-contractors.
    2. Bidders may propose sub-contracting up to the percentage of total value of contracts or the volume of works as specified in the BDS.
  13. Abnormally Low Financial Bid
    1. A procuring Agency may reject abnormally low bids in accordance with the Public Procurement Rules 2026, rule no. 43. The decision of the Procuring agency/Employer to reject a bid and reasons for the decision shall be recorded in the procurement proceedings and promptly communicated to the bidder concerned. Moreover, the Procuring agency/Employer shall not incur any liability solely by rejecting abnormally bid 
      Guidance for Procuring agency/Employer:
      An abnormally low Bid means, a Bid containing Bid price that is less or lesser than twenty five percent (25%) of the Procuring agency/Employer’s estimate.
    2. The Procuring agency/Employer will determine to its satisfaction whether the bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily, in accordance with the criteria listed in ITB 10.
    3. The determination will take into account the bidder’s financial and technical capabilities.  It will be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 10, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    4. Procuring agency/Employer may seek “Certificate for Independent Price Determination” from the bidder and the results of reference checks may be used in determining award of contract.
      Explanation: The Certificate shall be furnished by the bidder. The bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc. 
    5. An affirmative determination will be a prerequisite for award of the contract to the bidder. A negative determination will result in rejection of the bidder’s bid, in which event the Procuring agency/Employer will proceed to the next ranked bidder to make a similar determination of that bidder’s capabilities to perform satisfactorily.

F. AWARD OF CONTRACT

  1. Criteria of Award
    1. Subject to ITB 34 and 35, the Procuring agency/Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has been declared as Successful Bidder, provided that such bidder has been determined to be:
      1. eligible in accordance with the provisions of ITB 3;
      2. is determined to be qualified to perform the Contract satisfactorily; and 
      3. Successful negotiations have been concluded, if any.
  2. Negotiations
    1. The Committee of the Procuring agency/Employer may negotiate with the Successful Bidder in accordance with Public Procurement Rules 2026 rule no. 26(3).
  3. Procuring agency/Employer’s Right to reject All Bids
    1. The procuring agency has the right to reject all bids in accordance with the Public Procurement Rules 2026, rule no. 45 However, the Authority (i.e. PPRA) may call from the Procuring agency/Employer the justification of those grounds.
  4. Notification of Award
    1. The procuring agency shall announce and publish the evaluation result in accordance with the Public Procurement Rules 2026, rule no 48.
    2. Where no complaints have been lodged, the bidder whose bid has been accepted will be notified of the award by the Procuring agency/Employer prior to expiration of the bid validity period through EPADS. However, the Procuring agency/Employer shall not award any procurement contract at least for five (05) days after the announcement of final evaluation report. The notification letter (herein after and in the condition of the contract and contract form called “Letter of Acceptance” will specify the sum that the Procuring agency/Employer will pay the successful bidder in consideration for the execution and completion of the works as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price).
    3. The notification of award will constitute the formation of the Contract, subject to the bidder furnishing the Performance Security (or guarantee) in accordance with ITB 39 and signing of the contract in accordance with ITB 38. 
    4. Upon the successful bidder’s furnishing of the performance security (or guarantee) pursuant to ITB 39, the Procuring agency/Employer will promptly notify each unsuccessful bidder, the name of the successful bidder and the Contract amount and will discharge the Bid Security or Bid Securing Declaration of the bidder(s) pursuant to ITB 16. 
  5. Signing of Contract
    1. Promptly after notification of award, Procuring agency/Employer shall send the successful bidder the draft agreement, incorporating all terms and conditions as agreed by the parties to the contract.
    2. Immediately after the Redressal of grievance by the GRC, and after fulfillment of all conditions precedent of the Contract Form, the successful bidder and the Procuring agency/Employer shall sign the contract.
    3. Where no formal signing of a contract is required, work order issued to the bidder shall be construed to be the contract.
  6. Performance Security (or Guarantee)
    1. After the receipt of the Letter of Acceptance, the successful bidder, within the specified time, shall deliver to the Procuring agency/Employer a Performance Guarantee in the amount and in the form stipulated in the BDS and PC, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract.
    2. If the Performance Guarantee is provided by the successful bidder and it shall be in the form specified in the BDS which shall be in any of the following:
      1. certified cheque, cashier’s or manager’s cheque, or bank draft;
      2. irrevocable letter of credit issued by a scheduled bank of Pakistan or in the case of an irrevocable letter of credit issued by a foreign bank, the letter shall be confirmed or authenticated by a scheduled bank of Pakistan;
      3. bank guarantee confirmed by a reputable local bank or, in the case of a successful foreign bidder, bonded by a foreign bank; or
      4. surety bond callable upon demand issued by any reputable surety or insurance company.
        Any Performance Guarantee submitted shall be enforceable in Pakistan.
    3. Failure of the Most Advantageous Bidder to comply with the requirement of ITB 40 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security or declare blacklisted (in case bid securing declaration is submitted) in which event the Procuring agency/Employer may make the award to the next most advantageous bidder or reinitiate the procurement process afresh (as a case may be).
  7. Advance Payment
    1. Advance payment will be provided to the bidder in percentage and in the manner as agreed by the both parties in terms of Conditions of the Contract.
    2. The Procuring agency/Employer will provide an advance payment as stipulated in the Conditions of Contract, subject to a maximum amount, as stated and/or Conditions of the Contract.  The advance payment request shall be accompanied by an advance payment security (guarantee) in the form provided in Section X. For the purpose of receiving the advance payment, the bidder shall make and estimate of, and include in its bid, the expenses that will relate to the purchase of equipment, machinery, materials, and on the engagement of labor during the first month beginning with the date of the Procuring agency/Employer’s “Notice to Commence” as specified in the PCC.
  8. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted.
  9. Corrupt & Fraudulent Practices
    1. Procuring agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.

G. GRIEVANCE REDRESSAL & COMPLAINT REVIEW MECHANISM

  1. Grievance Redressal
    1. Grievance Redressal shall be carried out in accordance with the PPRA, rules i.e. Redressal of grievances by the procuring agency and “Redressal of Grievances Regulations”.

H. MECHANISM OF BLACKLISTING

  1. Mechanism of Blacklisting
    1. The Procuring agency/Employer shall proceed Blacklisting of Bidders/Contractors in accordance with Public Procurement Rules 2026, rule no. 65 rule i.e. Blacklisting and “Blacklisting and Debarment of Bidders or Contractors. 

📑 Bid Data Sheet (BDS)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

Bid Data Sheet (BDS)

The following specific data for the procurement of works shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITBs).  Whenever there is a conflict, the provisions herein shall prevail over those in ITBs.

A. Introduction

ITB Number   
Amendments of, and Supplements to, Clauses in the Instruction to Bidders

ITB Number 1.1

Name of Procuring agency/Employer: Quetta Airport (Pakistan Airports Authority (PAA))

The subject of procurement is: Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Period for completion of the works 24 Months

Commencement date execution of the works: 15 Days

Type of Procurement: Local

ITB Number 2.1

Financial year for the operations of the Procuring agency/Employer: 2026-27
Name of Project : 

Name of financing institution: 

Name and identification number of the Contract: P202140 

ITB Number 3.1

JV/Consortium or Association Allowed: No

Maximum number of members in the joint venture shall be: Nil.

B. Bidding Documents

ITB Number 6.4

The Bidders may seek clarifications through EPADS v2.0: Last Clarification Date: Sunday, November 22, 2026

C. Preparation of Bids

ITB Number 8.1

The Language of all correspondences and documents related to the Bid is: English

ITB Number 5.1 & 9.1 

The following documents must be included to constitute the Bid

 

  1. Attach filled, signed and stamped BoQ

ITB Number 9.4 (b)

Other procurement specific documentation requirements are: 

Signed / Stamped Bidding Document

 

ITB Number 12.4

The Bid price will be/will not be subject to the price adjustment Yes
Price Adjustment Annexure is attached in the Annexure Section with the name of Adjustment Data
.

ITB Number 12.6

The Bid price shall be adjusted in accordance with Schedule-A to Bid – “Schedule of Adjustment Data” if available. 

ITB Number 13.1

Bidders to quote entirely in Pak rupees (PKR)

Schedule of Adjustment Data for Local Currency (LC)

Index Code Index Description Source of Index Weighting
1 Non-adjustable --- 0.30
2 Labour PBS Statistical Bulletin 0.16
3 Steel PBS Statistical Bulletin 0.05
4 Cement PBS Statistical Bulletin 0.11
5 Bitumen PARCO / Attock Notification 0.05
6 Aggregate PBS Statistical Bulletin 0.20
7 HSD OGRA / PSO 0.13
Total PKR 1.00

ITB Number 15.1

The Bid Validity period shall be 90 Days days.

ITB Number 16.1

The amount of Bid Security shall be ... see section itemd and bid security

The currency of the Bid Security shall be: PKR.

ITB Number 16.2

The Bid Security shall be in the form of: 

D. Submission of Bids

ITB Number 19.1

The deadline for Bid submission is: Wednesday, November 25, 2026 02:00 PM
Address for submission of Original Bid Security: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).

ITB Number  21.1
The Bid opening shall take place at: EPADS v2.0
Day : Wednesday
Date: November 25, 2026
Time : 02:30 PM

ITB Number 27.1
The currency that shall be used for Bid evaluation and comparison purposes to convert all Bid prices expressed in various currencies is: PKR Only
The source of exchange rate shall be: Nil
The date of exchange rate shall be: Nil

ITB Number 28.2 & 28.5
Least Cost Based Selection (LCBS)

see Evaluation Criteria

ITB Number 29.1
Domestic preference to apply.
Domestic preference: Yes
The Percentage of Domestic Preference is 90%
 
Preference to domestic or national suppliers or contractors shall be provided in accordance with policies of the Federal Government and/or in accordance with the regulations issued by the Authority.
If Yes, The percentage for the domestic preference alongwith calculation formula is provided in the evaluation and qualification criteria.

ITB Number 32.2
Sub-contracting is allowed? : Yes

30 % of the total value of the contract.

39.1    The Performance Security (or guarantee) shall be 0%
39.2    The Performance Security (or guarantee) shall be in the form of: Nil

Eligibility Criteria

All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.

Required Registration
NADRA CITIZENSHIP (CNIC/NICOP)
FBR (NTN)
PEC

Evaluation Criteria

Least Cost Based Selection (LCBS)

Jobs/Lots

Lot Title : Rehabilitation of Dalbandin Project

Bid Security : 0 PKR

Job Delivery Schedule Quantity
Rehabilitation of Airside Pavements
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
Access Road
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
Ancillary Civil Infrastructure
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
Renovation of PTB
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
Public Health Engineering
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
Security Infrastructure
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
External Electrical Infrastructure
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
Building Electrification & Life Safety
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365 Days Quantity: 1/job
1/job
Mechanical Works
Address: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). Schedule: 365Days Quantity: 1/job
1/job

Work Specifications and Market Rates

Lot Title: Rehabilitation of Dalbandin Project

Specifications / Requirements:

Sr. NoREFDESCRIPTIONUNITQUANTITYRATEAMOUNT
1SH1DEMOLITION OF PREMIX CARPET / BITUMINOUS PAVEMENTS, LOAD MATERIAL FOR DISPOSE OFF AND LEAD UPTO 5 KM OUTSIDE AIRPORT PREMISESCUM120999  
2SH1CUTTING OF ORDINARY / HARD SOIL OF ROADWAY / RUNWAY / HARD STANDING STRIPPING ETC AND DISPOSE OFF / COLLECT SPOIL WITHIN 5 KM COMPLETECUM101  
3SH1COMPACTION OF NATURAL GROUND UP TO 95% MODIFIED AASHTO DENSITY ALL AS SPECIFIEDSQM100750  
4SH1EXCAVATION AS IN ORDINARY / HARD SOIL UPTO 1.50 MTR DEPTH IN FOUNDATIONS OR TRENCHES, THROW EARTH CLEAR OF EDGES OF EXCAVATION INCL LOADING AND UNLOADING AND UP TO 10 KM LEADCUM6971  
5SH1PROVIDING AND LAYING IMPROVED SUBGRADE USING 80% EXISTING EXCAVATED MATERIAL TO ACHIEVE 95% MODIFIED AASHTO DENSITY COMPLETECUM27670  
6SH1PROVIDING AND LAYING IMPROVED SUBGRADE USING 20% GRANULAR MATERIAL TO ACHIEVE 95% MODIFIED AASHTO DENSITY COMPLETECUM6917  
7SH1BOTTOMING / SUB BASE OF ANY THICKNESS AS SPECIFIED USING GRANULAR MATERIAL OF CBR 30% LAID AND COMPACTED TO 100% MODIFIED AASHTO DENSITY BY APPROPRIATE COMPACTION COMPLETECUM34588  
8SH1PROVISION AND INSTALLING OF HDPE GEOGRID BIAXIAL IN PAVEMENT STRUCTURAL LAYERS AS PER OEM RECOMMENDATIONS AND DIRECTIONS OF ENGINEER IN CHARGE.SQM70000  
9SH1PROVISION AND INSTALLING OF HDPE GEOCELLS (CELL DEPTH 150MM, CELL SIZE 440 MM, SHEET THICK 1.5 MM) IN PAVEMENT STRUCTURAL LAYERS AS PER OEM RECOMMENDATIONS AND DIRECTIONS OF ENGINEER IN CHARGE.SQM70000  
10SH1AGGREGATE BASE COURSE OF ANY THICKNESS AS SPECIFIED LAID AND COMPACTED TO 100% MODIFIED AASHTO DENSITY BY APPROPRIATE COMPACTION EQUIPMENT AND ROLLERCUM43189  
11SH1PRIME COAT ON BASE COURSE SURFACE COMPLETESQM113400  
12SH1PROVIDING AND LAYING (BATCHING-PLANT-MIXED) ASPHALT BASE COURSE OF ANY THICKNESS IN LAYERS AS SPECIFIED WITH ASPHALT CONCRETE IN 60/70 OR 80/100 GRADES USING APPROVED JMF COMPLETE (EXCEPT PRIME COAT)TON27784  
13SH1TACK COAT ON ASPHALTIC SURFACE COMPLETESQM113400  
14SH1PROVIDING AND LAYING (BATCHING-PLANT-MIXED) ASPHALT WEARING COURSE OF ANY THICKNESS IN LAYERS AS SPECIFIED WITH AASPHALT CONCRETE IN 60/70 OR 80/100 GRADES USING APPROVED JMF COMPLETE (EXCEPT TACK COAT)TON13892  
15SH1BLEND ADDITIVE(S) SBS/SBR/PEVA IN BITUMEN BINDER TO MAKE IT PMB PG 76-22 COMPATIBLE FOR USE IN ASPHALT CONCRETE AS SPECIFIED.TON137  
16SH1LABOUR AND NECESSARY MATERIAL FOR FORMING OF EXPANSION JOINT 13 MM WIDE AND LEAVING THE JOINT CLEAR FOR FILLING (LENGTH OF JOINT MULTIPLIED BY THICKNESS OF JOINT)SQM15  
17SH1PROVIDING AND FILLING OF RIGID PAVEMENT JOINTS 3/4 INCH X 5/8 INCH (AVERAGE) WITH JET FUEL RESISTANT SEALANT (CRAFCO USA OR EQUIVALENT IMPORTED) CONFORMING TO ASTM D6690 INCL REMOVAL/CLEANING OF EXISTING SEALANT, CLEANING INTERFACES BY SAWING OR MECHANICAL ABRASION, BLOWING DRY WITH COMPRESSOR, DISPOSAL OF RUBBISH AND P/L BACKER ROD/RUBBER STRIPMETRE2561  
18SH1FILLING OF JOINT WITH AEROLASTIC MATERIAL INCL FOAM ROPE (BACKER ROD), CUTTING WITH SAWMETRE110  
19SH1P/L OF LEAN CONCRETE USING CRUSHED OR BROKEN STONE GRADED 1:4:8 ALL AS SPDCUM431  
20SH1PROVIDING AND LAYING PCC 1:2:4 CONCRETE USING CRUSHED OR BROKEN STONE GRADED ALL AS SPDCUM1394  
21SH1PROVIDING AND LAYING PCC 1:2:4 AS IN FLOOR SLABS SURFACE FINISHED SMOOTH WITH NEAT CEMENT AND STEEL TROWEL USING CRUSHED OR BROKEN STONE FOR BASEMENT / GROUND FLOORCUM183  
22SH1PROVIDING AND LAYING PQC FLEXURAL STRENGTH OF 600 PSI FOR RUNWAY TAXIWAY LINKS LEAD-INS AND TARMAC OF ANY THICKNESS USING CONCRETE MIX DESIGN LAID MANUALLY ALL AS SPECIFIEDCUM67  
23SH1PROVIDING AND LAYING RCC 4000 PSI CONCRETE USING CRUSHED OR BROKEN STONE AS IN WALLS ROOF SLAB LANDING PLINTH BEAMS AND BAND ETC INCL FORM WORK REINFORCEMENT MEASURED AND PAID SEPARATELYCUM1165  
24SH1SUPPLY AND FIX STEEL REINFORCEMENT USING DEFORMED BAR GRADE-60 INCL CUTTING BINDING AND PLACINGKG8722  
25SH1SUPPLY AND FIX BARS ROUND SQUARE OR FLAT INCLUDING CUTTING BENDING BINDING AND PLACING REINFORCEMENT IN POSITIONKG633  
26SH1PROVIDING AND LAYING RCC PIPE 230MM BORE LAID AND JOINTED WITH SPIGOT SOCKET OR COLLAR COMPLETEMETRE2525  
27SH1PROVIDING AND LAYING POLYETHYLENE PIPE (PE-100) 160MM DIA CLASS PN-10 / SDR-17 COMPLETEMETRE1001  
28SH1PROVIDING AND LAYING UPVC 150MM BORE COMPLETEMETRE480  
29SH1PROVIDING SAND CUSHION IN LAYER AS SPD UNDER CONCRETE ROAD, HARD STANDING AND RUNWAY ETC COMPLETECUM2958  
30SH1PROVIDING AND LAYING BOND BREAKING MATERIALS USING 0.102 MM THICK POLYTHENE FILM OVER NORMAL THICKNESS OF CONCRETE FLOORSQM335  
31SH1BURNT BRICK WORK IN WALL OVER 115MM THICK WALL LAID AND JOINTED IN CM 1:3 STRAIGHT OR CURVE WITH INNER RADIUS LESS THAN 6 MTR UPTO 4.25 MTR DEPTH COMPLETECUM777  
32SH1PLASTER 1:4 13MM THICK FINISHED AS SPD (BASEMENT, GF, 1ST AND 2ND FLOOR)SQM3397  
33SH1PROVIDING AND APPLYING ONE COAT OF UNDILUTED WATER BASED ROAD / AIRFIELD MARKINGS PAINT (BERGER, STAR BRITE OR EQUIVALENT) WITH GLASS BEADS CONFORMING TO FEDERAL SPEC TT-B-1325C TYPE 1 GRADE A APPLIED AT 1 KG PER LITRE OF PAINT (FAA P-602) USING AIRLESS PNEUMATIC SPRAY MACHINE CAPABLE OF PAINTING UP TO 3 FEET WIDE STRIP WITH SYNCHRONIZED GLASS BEAD DISPENSING ATTACHMENTSQM10011  
34SH2CLEARING AND GRUBBING THE SITE INCLUDING REMOVAL OF GRASS, SHRUBS, BRUSHWOOD, UNDERGROWTH, ROOTS AND SMALL TREES NOT EXCEEDING 225 MM GIRTH, AND DISPOSING OF CLEARED MATERIAL OFF-SITE, COMPLETE AS SPECIFIED.SQM7352  
35SH2COMPACTION OF NATURAL GROUND UP TO 95% MODIFIED AASHTO DENSITY, INCLUDING SCARIFYING, WATERING AND ROLLING, COMPLETE AS SPECIFIED.SQM7352  
36SH2EXCAVATION IN ORDINARY SOIL UP TO 1.5 M DEPTH, IN FOUNDATIONS AND PIPE TRENCHES UP TO 1.5 M WIDE, IN SHAFTS, WELLS AND INDEPENDENT HOLES UP TO 30 SQM EACH, THROWING EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10 M; TIMBERING TO BE PAID EXTRA.CUM2290  
37SH2MAKING EMBANKMENT WITH SPECIFIED/APPROVED SOIL OBTAINED FROM BORROW EXCAVATION, INCLUDING LOADING WITHIN 5 KM, COMPACTION IN 150 MM LAYERS UP TO 95% MODIFIED AASHTO DENSITY, AND DRESSING TO REQUIRED PROFILE AND SHAPE.CUM11028  
38SH2GRANULAR FILLING UNDER FOOTING/FOUNDATION USING SPECIFIED/APPROVED GRANULAR MATERIAL, INCLUDING LOADING AND TRANSPORTATION WITHIN 5 KM, COMPACTION IN 150 MM LAYERS UP TO 95% MODIFIED AASHTO DENSITY, AND DRESSING TO REQUIRED PROFILE AND SHAPE.CUM1103  
39SH2PROVIDING AND LAYING AGGREGATE BASE COURSE OF ANY THICKNESS, LAID AND COMPACTED TO 100% MODIFIED AASHTO DENSITY USING APPROPRIATE COMPACTION EQUIPMENT AND ROLLER, COMPLETE AS SPECIFIED.CUM1103  
40SH2PROVIDING AND APPLYING PRIME COAT ON PREPARED AGGREGATE BASE COURSE SURFACE USING APPROVED BITUMINOUS MATERIAL AT THE SPECIFIED RATE, COMPLETE AS SPECIFIED.SQM7352  
41SH2PROVIDING AND LAYING PLANT-MIXED ASPHALTIC WEARING COURSE OF ANY THICKNESS USING ASPHALT CEMENT GRADE 60/70 OR 80/100 AND APPROVED JOB MIX FORMULA (JMF), INCLUDING HAULING, PLACING AND COMPACTION, EXCLUDING TACK COAT.TON368  
42SH2PROVIDING AND LAYING LEAN CONCRETE (PCC 1:4:8) USING CRUSHED OR BROKEN STONE GRADED AS SPECIFIED, FOR DRAIN WORKS, COMPLETE.CUM76  
43SH2PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN DIFFERENT STRUCTURAL ELEMENTS (FOUNDATION ETC.) INCLUDING FORMWORK, FOR DRAIN WORKS; REINFORCEMENT MEASURED AND PAID SEPARATELY.CUM762  
44SH2PROVIDING AND LAYING LEAN CONCRETE (PCC 1:4:8) USING CRUSHED OR BROKEN STONE GRADED AS SPECIFIED, FOR CULVERT WORKS, COMPLETE.CUM5  
45SH2PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN DIFFERENT STRUCTURAL ELEMENTS (FOUNDATION ETC.) INCLUDING FORMWORK, FOR CULVERT WORKS; REINFORCEMENT MEASURED AND PAID SEPARATELY.CUM14  
46SH2SUPPLY AND FIXING RCC PIPES 600 MM BORE, LAID AND JOINTED WITH SPIGOT-SOCKET OR TONGUE-AND-GROOVE JOINT INCLUDING RUBBER RING, COMPLETE AS SPECIFIED.MTR4  
47SH2APPLYING THREE COATS OF APPROVED ROAD MARKING PAINT ON NEW OR OLD SURFACE USING MECHANICAL MEANS, COMPLETE AS SPECIFIED.SQM666  
48SH2PROVIDING AND LAYING ROAD MARKING WITH REFLECTIVE THERMOPLASTIC (TP) PAINT FOR LINES OF 12.50 CM WIDTH (YELLOW). RATE BUILT FROM SOR COMPONENTS: 15-75 (PRIMER/PREP), 15-76 (TP APPLICATION), 15-77 (GLASS BEADS).SQM822  
49SH2PROVIDING AND LAYING ROAD MARKING WITH REFLECTIVE THERMOPLASTIC (TP) PAINT FOR LINES OF 12.50 CM WIDTH (WHITE). RATE BUILT FROM SOR COMPONENTS: 15-75 (PRIMER/PREP), 15-76 (TP APPLICATION), 15-77 (GLASS BEADS).SQM11605  
50SH2PROVIDING AND LAYING ROAD MARKING WITH REFLECTIVE THERMOPLASTIC (TP) PAINT FOR 4-METRE ARROWS. RATE BUILT FROM SOR COMPONENTS: 15-75 (PRIMER/PREP), 15-76 (TP APPLICATION), 15-77 (GLASS BEADS).SQM881  
51SH2PROVIDING AND FIXING ROAD SIGN BOARDS (E.G., CAUTION SIGNS) WITH REFLECTIVE PAINT, HAVING SUPERFICIAL AREA OF 1.125 SQM, INCLUDING COST OF POST, FOUNDATION, FIXING AND ALL ACCESSORIES, AS APPROVED BY THE ENGINEER, COMPLETE AS SPECIFIED.NOS20  
52SH3EXCAVATION IN ORDINARY SOIL UP TO 1.5 M DEPTH, IN FOUNDATION AND PIPE TRENCHES UP TO 1.5 M WIDE, IN SHAFTS, WELLS AND INDEPENDENT HOLES UP TO 30 SQM EACH, THROWING EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10 M; TIMBERING TO BE PAID EXTRA, COMPLETE AS SPECIFIED.CUM1774  
53SH3EXCAVATION IN HARD SOIL UP TO 1.5 M DEPTH, IN FOUNDATION AND PIPE TRENCHES UP TO 1.5 M WIDE, IN SHAFTS, WELLS AND INDEPENDENT HOLES UP TO 30 SQM EACH, THROWING EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10 M, INCLUDING BACKFILLING, COMPLETE AS SPECIFIED.CUM612  
54SH3EXCAVATION OVER AREAS IN ORDINARY/HARD SOIL FROM 1.5 M TO 3 M DEPTH, IN FOUNDATION/EXCAVATIONS, THROWING EARTH CLEAR WITHIN 50 M, COMPLETE AS SPECIFIED.CUM157  
55SH3EXCAVATION OVER AREAS IN ORDINARY/HARD SOIL UP TO 1.5 M DEPTH, IN FOUNDATION/EXCAVATIONS, THROWING EARTH CLEAR WITHIN 50 M, COMPLETE AS SPECIFIED.CUM1787  
56SH3BOTTOMING/SUB-BASE OF ANY THICKNESS USING GRANULAR SUB-BASE MATERIAL/SOIL AGGREGATES CBR 30%, LAID AND COMPACTED TO 100% MODIFIED AASHTO DENSITY, COMPLETE AS SPECIFIED.CUM910  
57SH3EARTH FILLING IN ORDINARY OR HARD SOIL, IN FOUNDATION, PIPE TRENCHES, SHAFTS, WELLS, INDEPENDENT HOLES, UNDER FLOORS OR AROUND PLINTH ETC., 1.5 M BELOW OR ABOVE GROUND LEVEL, WITH SPOIL OBTAINED FROM EXCAVATION, INCLUDING WATERING AND COMPACTION IN 150 MM LAYERS, COMPLETE AS SPECIFIED.CUM894  
58SH3PROVIDING AND LAYING LEAN CONCRETE (PCC 1:4:8) USING CRUSHED OR BROKEN STONE GRADED AS SPECIFIED, UNDER FOOTINGS/FOUNDATIONS, COMPLETE.CUM310  
59SH3PROVIDING AND LAYING SAND CUSHION UNDER FLOOR (100 MM THICK), COMPLETE AS SPECIFIED.CUM1655  
60SH3PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN DIFFERENT STRUCTURAL ELEMENTS (FOUNDATION ETC.) INCLUDING FORMWORK; REINFORCEMENT MEASURED AND PAID SEPARATELY, COMPLETE AS SPECIFIED.CUM483  
61SH3PROVIDING AND LAYING RCC WITH 4000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN FOUNDATIONS ETC., INCLUDING FORMWORK; REINFORCEMENT PAID SEPARATELY, COMPLETE AS SPECIFIED.CUM188  
62SH3PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN COLUMNS, BEAMS, STAIRS, POSTS, STRUTS, PIERS, LINTELS AND THE LIKE, INCLUDING FORMWORK; REINFORCEMENT PAID SEPARATELY, COMPLETE AS SPECIFIED.CUM306  
63SH3PROVIDING AND LAYING RCC WITH 4000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN COLUMNS, BEAMS, STAIRS, POSTS, STRUTS, PIERS, LINTELS, INCLUDING FORMWORK; REINFORCEMENT PAID SEPARATELY, COMPLETE AS SPECIFIED.CUM105  
64SH3PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN ROOF SLABS, LANDINGS, WALLS, PLINTH BEAMS AND BANDS ETC., INCLUDING FORMWORK; REINFORCEMENT PAID SEPARATELY, COMPLETE AS SPECIFIED.CUM618  
65SH3PROVIDING AND LAYING RCC WITH 4000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN ROOF SLABS, LANDINGS, WALLS, PLINTH BEAMS AND BANDS, INCLUDING FORMWORK; REINFORCEMENT PAID SEPARATELY, COMPLETE AS SPECIFIED.CUM430  
66SH3PROVIDING AND LAYING PCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN ALL NON-STRUCTURAL ELEMENTS, INCLUDING FORMWORK AND FAIR FACES TO EXPOSED SURFACES, COMPLETE AS SPECIFIED.CUM12  
67SH3PROVIDING AND LAYING PCC 1:2:4 IN FLOOR SLABS AS UNDERLAYER FOR TERRAZZO/TILES TOP FINISH, USING CRUSHED OR BROKEN STONE, COMPLETE AS SPECIFIED.CUM194  
68SH3PROVIDING AND LAYING PCC 1:3:6 IN FLOOR SLABS AS UNDERLAYER FOR TERRAZZO/TILES TOP FINISH, COMPLETE AS SPECIFIED.CUM95  
69SH3PROVIDING AND LAYING PCC 1:6:12 UNDER FLOORS USING CRUSHED OR BROKEN STONES, COMPLETE AS SPECIFIED.CUM319  
70SH3PROVIDING AND LAYING PCC 1:4:8 UNDER FLOOR USING CRUSHED OR BROKEN STONES, COMPLETE AS SPECIFIED.CUM77  
71SH3PROVIDING AND LAYING 50 MM THICK PCC 1:2:4 USING 3 MM AGGREGATE, FINISHED SMOOTH WITH STEEL FLOAT, COVERED WITH TWO COATS OF HOT BITUMEN AT 0.75 KG PER SQM EACH, AND BLINDED WITH 0.012 CUM OF SAND PER SQM.SQM47  
72SH3ADDITIONAL LABOUR FOR HOISTING/LOWERING CONCRETE FOR EACH STOREY BEYOND 12 M ABOVE/BELOW GL.CUM222  
73SH3PROVIDING, CUTTING, BENDING, PLACING AND BINDING HIGH TENSILE (GRADE-60) DEFORMED STEEL BAR REINFORCEMENT, COMPLETE.KG290478  
74SH3BURNT BRICK WORK IN WALL OVER 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:6, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO 4.25 M DEPTH, COMPLETE AS SPECIFIED.CUM118  
75SH3BURNT BRICK WORK IN WALLS 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:4, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO GROUND FLOOR ROOF LEVEL, COMPLETE AS SPECIFIED.CUM78  
76SH3BURNT BRICK WORK IN WALL OVER 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:6, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO GROUND FLOOR ROOF LEVEL, COMPLETE AS SPECIFIED.CUM151  
77SH3BURNT BRICK WORK IN WALL OVER 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:6, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO FIRST FLOOR ROOF LEVEL, COMPLETE AS SPECIFIED.CUM4  
78SH3BURNT BRICK WORK IN WALL 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:4, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO FIRST FLOOR ROOF LEVEL, COMPLETE AS SPECIFIED.CUM312  
79SH3EXTRA TO BRICK FOR FORMING CAVITY, 57 MM WIDE, LAID AND JOINTED IN CEMENT MORTAR 1:3, ONE FACE MEASURED (CAVITY WALL), COMPLETE AS SPECIFIED.SQM224  
80SH3SUPPLY AND FIXING STEEL CHOWKAT, PRESS-MOULDED 18 SWG, FOR 115 MM WALLS, SINGLE LEAF, INCLUDING HOLDFAST, TIES FOR LATERAL MOVEMENT, PCC 1:2:4 CAVITY FILLING, ONE COAT ANTI-CREOSOTE PAINT (INTERNAL) AND RED OXIDE PAINT (EXTERNAL), COMPLETE AS SPECIFIED.MTR1591  
81SH3SUPPLY AND FIXING STEEL CHOWKAT, PRESS-MOULDED 18 SWG, FOR 230 MM WALLS, SINGLE/DOUBLE LEAF, INCLUDING HOLDFAST, TIES FOR LATERAL MOVEMENT, PCC 1:2:4 CAVITY FILLING, ONE COAT ANTI-CREOSOTE PAINT (INTERNAL) AND RED OXIDE PAINT (EXTERNAL), COMPLETE AS SPECIFIED.MTR1075  
82SH3SUPPLY AND FIXING WATERPROOF BUILDING/INSULATING PAPER WEIGHING 3.92 KG PER 10 SQM, FIXED ANY POSITION WITH 50 MM SIDE AND 150 MM END LAPS, COMPLETE AS SPECIFIED.SQM1238  
83SH3PROVIDING AND LAYING BOND-BREAKING SLIP MEMBRANE USING 0.102 MM THICK POLYETHYLENE FILM OVER NORMAL THICKNESS OF CONCRETE FLOOR, COMPLETE AS SPECIFIED.SQM18  
84SH3PROVIDING AND APPLYING TWO COATS OF HOT BITUMEN AT 0.75 KG PER SQM PER COAT, BLINDED WITH SAND AT 0.012 CUM PER SQM, COMPLETE AS SPECIFIED.SQM130  
85SH3SUPPLY AND FIXING SYNTHETIC VINYL (PVC) FLEXIBLE MEMBRANE 0.50 MM THICK WITH 75-100 MM SIDE/END LAPS, SEAMED/WELDED THERMALLY/CHEMICALLY (SUNK PORTION), COMPLETE AS SPECIFIED.SQM137  
86SH3SUPPLY AND FIXING DOUBLE LAYER OF WATERPROOFING BUILDING/INSULATING PAPER 3.92 KG PER 10 SQM FIXED ANY POSITION WITH 50 MM SIDE AND 150 MM END LAPS AND NAILING, COMPLETE AS SPECIFIED.SQM7  
87SH3SUPPLY AND FIXING DOUBLE LAYER OF WATERPROOFING BUILDING/INSULATING PAPER WITHOUT NAILING, INCLUDING 13 MM THICK CEMENT PLASTER CM 1:4, COMPLETE AS SPECIFIED.SQM36  
88SH3SUPPLY AND APPLYING ROOF INSULATION/WATERPROOFING USING DOUBLE LAYER OF BITUMEN FELT MEMBRANE (16-18 KG PER 10 SQM) WITH 50 MM SIDE AND 150 MM END LAPS, INCLUDING PRIMER AND STICKING COAT, COMPLETE AS SPECIFIED.SQM1408  
89SH3SUPPLY AND FIXING POLY EXTRUDED BOARD 50 MM THICK, DENSITY 32-35 KG/CUM, AS ROOF INSULATION WITH SHIP-LAP EDGES, ANY SIZE OF SHEET, ALL AS SPECIFIED.SQM188  
90SH3PROVIDING AND LAYING 50 MM THICK SCREED BED ON BOND-BREAKING MATERIAL, INCLUDING TWO COATS OF ELASTOMERIC CEMENTITIOUS WATERPROOFING COATING, COMPLETE AS SPECIFIED.SQM111  
91SH3PROVIDING AND LAYING SINGLE LAYER OF POLYESTER-BASED ROOFING BITUMEN FELT, INCLUDING PRIMER AND STICKING COAT, FOLLOWED BY A DOUBLE-LAYER FELT MEMBRANE, COMPLETE AS SPECIFIED.SQM365  
92SH3PROVIDING AND LAYING 50 MM THICK SCREED BED, 20 MM THICK TERRAZZO FLOOR USING MARBLE CHIPS (1:2), INCLUDING CUTTING, RUBBING AND CHEMICAL POLISHING, COMPLETE AS SPECIFIED.SQM367  
93SH3PROVIDING AND APPLYING 13 MM THICK CEMENT-SAND PLASTER (1:3 MIX) ON WALL SURFACES, FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM3930  
94SH3PROVIDING AND APPLYING 19 MM THICK CEMENT-SAND PLASTER (1:3 MIX) ON WALL SURFACES, FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM88  
95SH3PROVIDING AND APPLYING 13 MM THICK CEMENT-SAND PLASTER (1:4 MIX) ON WALL SURFACES, FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM5740  
96SH3PROVIDING AND APPLYING 13 MM THICK CEMENT-SAND PLASTER (1:6 MIX) ON WALL SURFACES, FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM6264  
97SH3APPLYING THREE COATS OF PLASTIC EMULSION PAINT ON WALLS AND CEILING, COMPLETE AS SPECIFIED.SQM3437  
98SH3APPLYING THREE COATS OF WEATHER-SHIELD PAINT ON EXTERIOR SURFACES (NEW), COMPLETE AS SPECIFIED.SQM1351  
99SH3APPLYING THREE COATS OF WHITE WASH ON CEILING, COMPLETE AS SPECIFIED.SQM1945  
100SH3APPLYING THREE COATS OF DISTEMPER ON WALLS, COMPLETE AS SPECIFIED.SQM5844  
101SH3PROVIDING AND APPLYING TWO COATS OF WATERPROOFING COMPOUND USING BITUMEN 10/20 APPLIED HOT AT 4.90 KG PER 10 SQM, COMPLETE AS SPECIFIED.SQM129  
102SH3PROVIDING AND APPLYING 13 MM THICK CEMENT PLASTER 1:4 INCLUDING DECORATIVE PLASTER (EXTERNAL) FINISH, COMPLETE AS SPECIFIED.SQM479  
103SH3PROVIDING AND APPLYING 13 MM THICK CEMENT PLASTER 1:4 WITH PUDLO OR OTHER SIMILAR APPROVED WATERPROOFING MATERIAL MIXED WITH CEMENT AT 3% BY WEIGHT, COMPLETE AS SPECIFIED.SQM26  
104SH3PROVIDING AND APPLYING 13 MM THICK CEMENT PLASTER 1:4, INCLUDING ONE COAT OF HOT BITUMEN AT 0.75 KG PER SQM AND BLINDING WITH SAND AT 0.012 CUM PER SQM (BELOW GROUND LEVEL), COMPLETE AS SPECIFIED.SQM208  
105SH3PROVIDING AND APPLYING 13 MM THICK CEMENT PLASTER 1:4, INCLUDING THREE COATS OF CEMENT SLURRY WASH ON NEW/OLD SURFACE, COMPLETE AS SPECIFIED.SQM19  
106SH3FORMING V-GROOVES 13 MM WIDE AND 10 MM DEEP IN NEW PLASTER, COMPLETE AS SPECIFIED.MTR139  
107SH3FORMING V-GROOVES 25 MM WIDE AND 10 MM DEEP IN NEW PLASTER, COMPLETE AS SPECIFIED.MTR427  
108SH3FORMING V-GROOVES 25 MM WIDE AND 10 MM DEEP IN NEW PLASTER, INCLUDING SUPPLY AND FIXING ALUMINIUM COVER STRIP 60 MM WIDE X 2 MM THICK WITH ALL FITTINGS FOR ALL JOINTS, COMPLETE AS SPECIFIED.MTR149  
109SH3PROVIDING AND LAYING PLINTH PROTECTION 3 FEET WIDE, 3 INCH THICK PCC 1:2:4, INCLUDING EDGE WALL, PCC BLOCK, AND MARBLE PATTY, USING SULPHATE-RESISTANT CEMENT (SRC), COMPLETE AS SPECIFIED.SQM1460  
110SH3PROVIDING AND LAYING 50 MM THICK SCREED BED ON BOND-BREAKING MATERIAL, COMPLETE AS SPECIFIED.SQM139  
111SH3PROVIDING AND LAYING STANDARD QUALITY TILES OF ANY MAKE EXCEEDING 1600 SQ CM ON WALLS AND FLOORS, INCLUDING SETTING, JOINTING AND BONDING, COMPLETE AS SPECIFIED.SQM243  
112SH3PROVIDING AND LAYING STANDARD QUALITY MARBLE TILES (VARIOUS COLOURS) OF ANY SIZE, 20 MM THICK, INCLUDING SETTING, JOINTING, BONDING AND CHEMICAL POLISHING, COMPLETE AS SPECIFIED.SQM233  
113SH3PROVIDING AND LAYING STANDARD QUALITY MARBLE TILES (VARIOUS COLOURS) OF ANY SIZE, 13 MM THICK, INCLUDING SETTING, JOINTING, BONDING AND CHEMICAL POLISHING (SKIRTING), COMPLETE AS SPECIFIED.SQM41  
114SH3PROVIDING AND LAYING 13 MM THICK TERRAZZO IN DADO/SKIRTING USING MARBLE CHIPS (1:2), INCLUDING 10 MM CEMENT PLASTER 1:3, CUTTING, RUBBING AND CHEMICAL POLISHING, COMPLETE AS SPECIFIED.SQM460  
115SH3PROVIDING AND LAYING 20 MM THICK TERRAZZO FLOOR USING MARBLE CHIPS (1:2), INCLUDING CUTTING, RUBBING, CLEANING AND CHEMICAL POLISHING, COMPLETE AS SPECIFIED.SQM2811  
116SH3PROVIDING AND LAYING 13 MM THICK STONOLITHIC 150 MM DADO/SKIRTING, INCLUDING 10 MM CEMENT PLASTER CM 1:4 AND TUCKING IN TOP EDGE, COMPLETE AS SPECIFIED.SQM25  
117SH3PROVIDING AND LAYING 20 MM THICK STONOLITHIC LAYER SPREAD OVER ORDINARY CONCRETE FLOORS, INCLUDING MARBLE PATTY AND RUBBING, COMPLETE AS SPECIFIED.SQM213  
118SH3PROVIDING AND LAYING 19 MM THICK TERRAZZO FLOOR, MARBLE CHIPS 1:2 MIXED WITH ORDINARY CEMENT, EXCLUDING CUTTING, RUBBING AND CHEMICAL POLISHING, COMPLETE AS SPECIFIED.SQM518  
119SH3SUPPLY AND FIXING 8-10 MM THICK AND 40 MM WIDE MARBLE PATTY AS DIVIDING STRIPS IN FLOORS, COMPLETE AS SPECIFIED.MTR3284  
120SH3SUPPLY AND FIXING 25 MM THICK MARBLE SLAB AROUND VANITY BOWL WITH BRACKETS, INCLUDING CUTTING, RUBBING, POLISHING AND WATERTIGHT JOINTS, COMPLETE AS SPECIFIED.SQM15  
121SH3SUPPLY AND FIXING GYPSUM CEILING TILES 600 MM X 600 MM X 7.5 MM THICK, INCLUDING ALUMINIUM TEE/ANGLE FRAMING, HANGER CLIPS, JOINTING CLIPS AND GI WIRE, COMPLETE AS SPECIFIED.SQM69  
122SH3SUPPLY AND FIXING 13 MM THICK SOFT BOARD SHEET IN CAVITIES, COMPLETE AS SPECIFIED.SQM7  
123SH3APPLYING PRIMER COAT ON NEW WOOD WORK SUCH AS TIMBER WORK IN CEILING AND TIMBER BOARDING, COMPLETE AS SPECIFIED.SQM33  
124SH3SUPPLY AND FIXING 1ST CLASS SOFT WOOD (DEODAR) FRAMED AND PANELLED DOORS, PANELS FILLED WITH MDF 16 MM SHEET (EXCEPT CHOWKATS), INCLUDING HOLDFAST, MONGERY AND THREE COATS SYNTHETIC ENAMEL PAINT, 38 MM THICK, COMPLETE AS SPECIFIED.SQM206  
125SH3SUPPLY AND FIXING 1ST CLASS SOFT WOOD (DEODAR) GLAZED DOORS WITH MOULDED/CHAMFERED BARS, PANELS FILLED WITH GLASS, HOLDFASTS, HINGES/PIVOTS, MONGERY AND THREE COATS SYNTHETIC ENAMEL PAINT (EXCEPT CHOWKATS), 38 MM THICK, COMPLETE AS SPECIFIED.SQM47  
126SH3SUPPLY AND FIXING 38 MM FIRST CLASS SOFT WOOD (DEODAR) GLAZED DOOR, 9X9 MESH 24 GAUGE, EXCLUDING CHOWKATS, HOLDFASTS, HINGES/PIVOTS, MONGERY, WITH THREE COATS SYNTHETIC ENAMEL PAINT, COMPLETE AS SPECIFIED.SQM6  
127SH3SUPPLY AND FIXING 38 MM THICK FIRST CLASS SOFT WOOD HOLLOW FLUSH DOOR, INCLUDING 3 MM THICK TEAK PLY BOTH SIDES AND BRASS CP MONGERY, EXCEPT CHOWKAT, KICK PLATES AND BOW HANDLES, COMPLETE AS SPECIFIED.SQM43  
128SH3SUPPLY AND FIXING 38 MM THICK 1ST CLASS SOFT WOOD (DEODAR) FRAMED AND PANELLED DOORS, PANELS FILLED WITH MDF 16 MM SHEET, INCLUDING 2X2 ARCHITRAVE WITH ALL FITTINGS, CHOWKAT AND THREE COATS SYNTHETIC ENAMEL PAINT (LOCKERS), COMPLETE AS SPECIFIED.SQM77  
129SH3SUPPLY AND FIXING 1ST CLASS SOFT WOOD (DEODAR) GAUZED DOORS, 9X9 MESH 24 GAUGE, 38 MM THICK, WITHOUT CHOWKATS, INCLUDING THREE COATS SYNTHETIC ENAMEL PAINT, COMPLETE AS SPECIFIED.SQM22  
130SH3SUPPLY AND FIXING 38 MM THICK 1ST CLASS SOFT WOOD GAUZE DOORS, GATES ETC., EXCEPT CHOWKATS, INCLUDING CP IRON MONGERY AND THREE COATS SYNTHETIC ENAMEL PAINT, COMPLETE AS SPECIFIED.SQM3  
131SH3SUPPLY AND FIXING TUBULAR PARTICLE BOARD ENGINEERED DOOR 38 MM THICK, INCLUDING MONGERY, DOLLY FRAME CHOWKATS 2X2 ALL AROUND, AND TWO COATS SYNTHETIC ENAMEL PAINT, COMPLETE AS SPECIFIED.SQM60  
132SH3SUPPLY AND FIXING BOX-PIPE TYPE OPENABLE AND FIXED SIDE-HUNG WINDOW OR CSW USING 16 GAUGE FRAME 50X25 MM, PANEL Z 38X31X38 MM, 10X10 MM SQUARE GOLA, NOT EXCEEDING 1.48 SQM EACH, WITH FITTINGS/MONGERY, HOLDFAST, TWO COATS SYNTHETIC ENAMEL PLUS PRIMER, INCLUDING 5 MM PLAIN SHEET GLASS, COMPLETE AS SPECIFIED.SQM254  
133SH3SUPPLY AND FIXING UPVC SLIDING WINDOW, 37 MM THICK SHUTTER WITH FRAME 80X50 MM, EXCEEDING 2.23 SQM EACH, WHITE, WITH FITTINGS, MONGERY, FLY-PROOF NETTING, INCLUDING 5 MM TINTED SHEET GLASS, COMPLETE AS SPECIFIED.SQM175  
134SH3SUPPLY AND FIXING UPVC SLIDING WINDOW, DOUBLE GLAZED 5 MM TINTED GLASS, 37 MM THICK SHUTTER WITH FRAME 80X50 MM, EXCEEDING 2.23 SQM EACH, COMPLETE AS SPECIFIED.SQM29  
135SH3SUPPLY AND FIXING UPVC OPENABLE WINDOW, 60 MM THICK SHUTTER WITH FRAME, DOUBLE GLAZING 5 MM TINTED GLASS, EXCEEDING 2.23 SQM EACH, COMPLETE AS SPECIFIED.SQM6  
136SH3SUPPLY AND FIXING 1.6 MM ALUMINIUM SLIDING WINDOW, DELUXE QUALITY, WOOD-LOOK COLOUR EXTRUDED SECTION, INCLUDING 5 MM THICK GLASS, COMPLETE AS SPECIFIED.SQM45  
137SH3SUPPLY AND FIXING BOX TYPE STEEL SLIDING/FIXED WINDOW OR CSW, 16 GAUGE FRAME 75X30 MM, PANEL 25X50 MM GOLA, INCLUDING FITTINGS, MONGERY, HOLDFAST, SYNTHETIC ENAMEL PAINT, PRIMER, GLASS PANES, GRILL AND WIRE GAUZE, COMPLETE AS SPECIFIED.SQM26  
138SH3SUPPLY AND FIXING ALUMINIUM TINNED WIRE GAUZE, 16X16 MESH, 26 GAUGE, FIXED WITH FLAT IRON 13X3 MM TO STEEL WINDOW FRAMES WITH SCREWS 75 MM OLC, COMPLETE AS SPECIFIED.SQM134  
139SH3SUPPLY AND FIXING ALUMINIUM FLY/INSECT SCREENING WITH MESH (PREMIUM MODEL), ANODIZED EXTRUDED SECTION, INCLUDING FIXING ON CONCRETE/WOOD/STEEL FRAMES, COMPLETE AS SPECIFIED.SQM25  
140SH3SUPPLY AND FIXING UPVC DOOR, 60 MM THICK SHUTTER, GROOVE PANEL 20 MM THICK, FILLED AS PER FIG 07-2 SKETCH 7-2.4 INSTEAD OF GLASS, COMPLETE, EXCEEDING 1.9 SQM EACH, WHITE, WITH FITTINGS, MONGERY AND FLY-PROOF NETTING, COMPLETE AS SPECIFIED.SQM170  
141SH3SUPPLY AND FIXING UPVC OPENABLE DOOR, 60 MM THICK SHUTTER WITH FRAME, EXCEEDING 2.23 SQM EACH, WHITE, WITH FITTINGS, MONGERY, AND PLASTIC WIRE GAUZE MOSQUITO PROOF 18X18 MESH 28 GAUGE (FOR GAUZE DOOR), COMPLETE AS SPECIFIED.SQM18  
142SH3SUPPLY AND FIXING GUARD BARS, GRILLS, RAILINGS, LADDERS, BRACKETS, HOOKS, HOLDFASTS AND FRAMES ETC., CUT TO DEAD LENGTH, REDUCED TO SIZE/SHAPE, FIGURE ETC. INCLUDING PUNCHING / DRILLING HOLES IF NECESSARY AND FIXING, ASSEMBLING BY WELDING OR BOLTS/NUTS/RIVETS/WASHERS ETC. AND ERECTION / FIXING IN POSITION INCLUDING MAKING GOOD DISTURBED SURFACES, COMPLETE AS SPECIFIED.SQM35260  
143SH3SUPPLY AND FIXING CP LOCK OR LATCH, 150 MM DELUXE, TWO BOLTS, TWO LEVERS, COMPLETE.EACH10  
144SH3SUPPLY AND FIXING RIM LOCK/LATCH CP BEST QUALITY, TWO KEYS, TWO LEVERS, COMPLETE.EACH19  
145SH3SUPPLY AND FIXING DOOR CLOSER (DELUXE), ANODIZED BRONZE, COMPLETE.NO14  
146SH3SUPPLY AND FIXING ALUMINIUM DOOR CLOSER (PREMIUM), ANODIZED BRONZE, COMPLETE.EACH10  
147SH3SUPPLY AND FIXING UPVC DOOR LOCK, COMPLETE.NO19  
148SH3SUPPLY AND FIXING UPVC DOOR HANDLE, COMPLETE.NO47  
149SH3SUPPLY AND FIXING 300 MM CP SLIDING/LOCKING BOLTS WITH STAPLE, COMPLETE.EACH111  
150SH3SUPPLY AND FIXING 150 MM HELICAL STEEL SPRING FOR DOORS, CP, COMPLETE.EACH127  
151SH3SUPPLY AND FIXING BRASS PEGS 125 MM OR OVER, COMPLETE.EACH15  
152SH3SUPPLY AND FIXING STAINLESS STEEL KICK PLATE (16-18G), COMPLETE.SQM1  
153SH3SUPPLY AND FIXING FILLETS (UP TO 12.90 SQ CM) 1ST CLASS SOFT WOOD, WROUGHT AND SCREWED, COMPLETE.MTR101  
154SH3SUPPLY AND FIXING 5 MM TINTED GLASS TO TIMBER/STEEL SASHES WITH BEADS OR RUBBER LINING, COMPLETE.SQM48  
155SH3SUPPLY AND FIXING GENERAL STEEL WORK (HOLDFASTS, FLAT IRON, WALL TIES) CUT TO LENGTH, DRILLED AND ERECTED, COMPLETE.KG291  
156SH3SUPPLY AND FIXING STAINLESS STEEL GRADE 304 HAND RAILING (3/4 INCH TO 2 INCH DIA, 16-18G PIPE), COMPLETE.MTR108  
157SH3SUPPLY AND FIXING 2 INCH X 2 INCH MS HOLLOW PIPE (16G), INCL WELDING AND PAINTING, COMPLETE.MTR48  
158SH3SUPPLY AND FIXING XPM (EXPANDED METAL) BRC WELD-MESH, INCL BINDING WIRE, COMPLETE.SQM91  
159SH3SUPPLY AND FIXING UPVC DUCT COVERS USING UPVC FILLETS 45 MM X 20 MM, COMPLETE.SQM6  
160SH3APPLYING TWO COATS WEATHER-RESISTANT PAINT ON EXTERIOR WALL (OLD), COMPLETE.SQM857  
161SH3APPLYING TWO COATS SYNTHETIC ENAMEL PAINT, COMPLETE.SQM53  
162SH3SUPPLY AND FIXING 5 MM SILVERED GLASS MIRROR, GROUND EDGES, COMPLETE.SQM41  
163SH3SUPPLY AND FIXING PLASTIC SHELF WITH PLUGS AND SCREWS, COMPLETE.EACH31  
164SH3SUPPLY AND FIXING CP TOWEL RAIL (SINGLE ROD), COMPLETE.EACH53  
165SH3SUPPLY AND FIXING SOAP/SPONGE TRAY WITH PLUGS AND SCREWS, COMPLETE.EACH43  
166SH3SUPPLY AND FIXING TOILET PAPER HOLDER, PAK MADE, COMPLETE.EACH1  
167SH3SUPPLY AND FIXING 6-PIECE BATH SET (PLASTIC), COMPLETE.EACH2  
168SH3SUPPLY AND FIXING 7-PIECE BATH SET (DELUXE, CP/YC), COMPLETE.EACH12  
169SH3SUPPLY AND FIXING VANITY BOWL (GLAZED), INCL BOTTLE TRAP, WASTE COUPLING, CP MIXER, COMPLETE.EACH44  
170SH3SUPPLY AND FIXING WHB (660X560 MM), INCL WASTE, COUPLING, PLUG, CP MIXER, COMPLETE.EACH15  
171SH3SUPPLY AND FIXING WHB WITH PEDESTAL (660X560 MM), INCL WASTE, CHAIN, PLUG, COMPLETE.EACH2  
172SH3SUPPLY AND FIXING WC (EUROPEAN COUPLED), DELUXE, COMPLETE.EACH16  
173SH3SUPPLY AND FIXING WC (ASIATIC, >550 MM) WITH FLUSHING SYSTEM, COMPLETE.EACH55  
174SH3SUPPLY AND FIXING URINAL BASIN (STALL PATTERN), INCL FLUSHING PIPE, COMPLETE.EACH1  
175SH3SUPPLY AND FIXING CP SHOWER ROSE (FIXED/ADJUSTABLE), COMPLETE.EACH2  
176SH3SUPPLY AND FIXING TOILET SHOWER, 100 MM DIA, COMPLETE.EACH4  
177SH3SUPPLY AND FIXING SINK MIXER, STANDARD, COMPLETE.EACH4  
178SH3SUPPLY AND FIXING STAINLESS STEEL SINK SCULLERY (SINGLE/DOUBLE BOWL), INCL CP MIXER, COMPLETE.EACH3  
179SH3SUPPLY AND FIXING KITCHEN FLOOR/SINK CABINET (600X862 MM), INCL MONGERY, MARBLE SLAB, COMPLETE.SQM37  
180SH3SUPPLY AND FIXING KITCHEN WALL CABINET (381X610 MM), INCL CP MONGERY, COMPLETE.MTR33  
181SH3SUPPLY AND FIXING KITCHEN EXHAUST HOOD (TEAK VENEER + PGI SHEET), COMPLETE.MTR1  
182SH3SUPPLY AND FIXING WARDROBE (BUILT-IN CABINET), INCL FRAME, SHUTTERS, MONGERY, COMPLETE.SQM86  
183SH3SUPPLY AND FIXING 50 MM PRECAST RCC JALI, INCL SETTING AND JOINTING, COMPLETE.SQM5  
184SH3CONSTRUCTION OF KHURRA (TOP ROOF OR GROUND), INCL PCC BASE AND BRICKWORK, COMPLETE.NO7  
185SH3CONSTRUCTION OF CHIMNEY STACK, INCL BRICKWORK, PLASTER, GI FLASHING, COMPLETE.EACH6  
186SH3PROVIDING EXPANSION JOINT (13 MM WIDE) WITH BITUMEN FILLER, COMPLETE.JOB1  
187SH3CONSTRUCTION OF GREASE TRAP (NOT EXCEEDING 600 MM DEEP), COMPLETE.EACH11  
188SH3PROVISION OF HEATER RECESS, INCL BRICKWORK, PLASTER, PCC, COMPLETE.EACH6  
189SH3SUPPLY AND FIXING CHULLAH HOOD, INCL MS FRAME, GI SHEET, PLASTER, COMPLETE.EACH1  
190SH3SUPPLY AND FIXING OF PROPRIETARY CLAY TANDOOR COMPLETE, INCLUDING ALL LABOR, MATERIALS, PLANT, SCAFFOLDING, AND TESTING, COMPRISING SUPPLY AND INSTALLATION OF THE PROPRIETARY CLAY TANDOOR UNIT WITH ITS INSULATED CLAY BODY AND LINING, MILD STEEL OR CAST IRON GRILL AND FRAME, ASH COLLECTION TRAY, CHIMNEY/FLUE CONNECTION, AND ALL NECESSARY ACCESSORIES, COMPLETE WITH FIXING IN POSITION, SEALING, AND FINISHING TO MAKE THE INSTALLATION FULLY FUNCTIONAL, STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, THE APPROVED DRAWING, AND ALL APPLICABLE LOCAL CODES AND STANDARDS, WITH THE CONTRACTOR RESPONSIBLE FOR ENSURING PROPER ALIGNMENT, LEVELING, AND SAFE TERMINATION OF THE FLUE, AND FOR DEMONSTRATING SATISFACTORY WORKING PERFORMANCE (INCLUDING PROPER DRAFT AND COMBUSTION) UPON COMPLETION, ALL TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE.EACH1  
191SH3SEWERAGE HANG ARRANGEMENT, COMPLETE WITH U-TRAPEZE HANGER, EPOXY FILLING, CEMENTITIOUS GROUT, CORE CUT, COMPLETE.JOB1  
192SH3EXCAVATE, DISPOSE SPOIL, SUPPLY SURFACE GULLIES (230X230X100 MM) WITH 100 MM PCC SURROUND AND CI GRATING, COMPLETE.EACH62  
193SH3CONSTRUCTION OF MANHOLES, COMPLETE, NOT EXCEEDING 600 MM DEEP, BRICK WALLS, EXCEPT COVER, COMPLETE.CUM78  
194SH3CONSTRUCTION OF MANHOLES, COMPLETE, 600-1800 MM DEEP, WITH IRON STEPS, BRICK WALLS, EXCEPT COVER, COMPLETE.CUM12  
195SH3PROVIDING AND LAYING PRECAST RCC MANHOLE COVER WITH ANGLE IRON FRAME, COMPLETE.EACH192  
196SH3SUPPLY AND FIXING RCC PIPES 150 MM BORE, LAID AND JOINTED, COMPLETE.MTR234  
197SH3SUPPLY AND FIXING UPVC SOIL AND WASTE PIPE 50 MM DIA, WITH SOLVENT CEMENT JOINT, COMPLETE.MTR155  
198SH3SUPPLY AND FIXING UPVC SOIL AND WASTE PIPE 75 MM DIA, WITH SOLVENT CEMENT JOINT, COMPLETE.MTR478  
199SH3SUPPLY AND FIXING UPVC SOIL AND WASTE PIPE 110 MM DIA, WITH SOLVENT CEMENT JOINT, COMPLETE.MTR530  
200SH3SUPPLY AND FIXING UPVC SOIL AND WASTE PIPE 160 MM BORE, WITH SOLVENT CEMENT JOINT, COMPLETE.MTR293  
201SH3SUPPLY AND FIXING UPVC ELBOW/BEND 90 DEG 75 MM DIA, COMPLETE.EACH71  
202SH3SUPPLY AND FIXING UPVC ELBOW/BEND 90 DEG 110 MM DIA, COMPLETE.EACH198  
203SH3SUPPLY AND FIXING 75 MM DIA UPVC ELBOW/BENDS 90 DEG, COMPLETE.EACH2  
204SH3SUPPLY AND FIXING 110 MM DIA UPVC ELBOW/BENDS 90 DEG, COMPLETE.EACH2  
205SH3SUPPLY AND FIXING ECCENTRIC REDUCER 50 MM X 110 MM DIA, COMPLETE.EACH69  
206SH3SUPPLY AND FIXING UPVC EQUAL TEE 110 MM DIA, COMPLETE.EACH82  
207SH3SUPPLY AND FIXING UPVC ACCESS/DOOR TEE 110 MM DIA, COMPLETE.EACH13  
208SH3SUPPLY AND FIXING UPVC ACCESS/DOOR TEE 75 MM DIA, COMPLETE.EACH4  
209SH3SUPPLY AND FIXING UPVC REDUCER Y-TEE 75 MM X 110 MM DIA, COMPLETE.EACH5  
210SH3SUPPLY AND FIXING UPVC VENT COWL 50 MM DIA, COMPLETE.EACH61  
211SH3SUPPLY AND FIXING 100 MM DIA FLOOR TRAP WITH GRATING, COMPLETE.EACH110  
212SH3SUPPLY AND FIXING 150 MM DIA (MEDIUM) GI WATER PIPE WITH FITTINGS, COMPLETE.MTR410  
213SH3SUPPLY AND FIXING 200 MM DIA (4.8 MM THICK) GI WATER PIPE WITH FITTINGS, COMPLETE.MTR57  
214SH3SUPPLY AND FIXING 150 MM DIA SLUICE VALVE (BSS-3464), COMPLETE.EACH2  
215SH3SUPPLY AND FIXING 150 MM DIA MS/GI FLANGES, COMPLETE.EACH4  
216SH3SUPPLY AND INSTALLATION OF WATER GAUGE WITH FLOAT AND ACCESSORIES, COMPLETE.EACH1  
217SH3DESIGN, SUPPLY, FABRICATION, AND CONSTRUCTION OF A COMPLETE REINFORCED CEMENT CONCRETE (RCC) OVERHEAD WATER TANK ON BUILDING ROOF, INCLUDING ALL LABOR, MATERIALS, PLANT, SCAFFOLDING, AND TESTING, COMPRISING SURFACE PREPARATION OF THE EXISTING ROOF SLAB, RCC PEDESTALS AND COLUMNS WITH BRACING, RCC TANK BODY COMPRISING WALLS AND BED SLAB, RCC ROOF SLAB WITH MANHOLE COVER, COMPLETE MS ACCESS LADDER WITH ANCHOR CONNECTIONS, ALL INTERNAL PLUMBING (INLET, OUTLET, OVERFLOW, WASHOUT PIPES WITH VALVES, AND WATER LEVEL INDICATOR), COMPLETE MS RAILING, AND LIGHTNING ARRESTER WITH GROUNDING, STRICTLY ADHERING TO GRADE-60 DEFORMED STEEL, SPECIFIED CONCRETE MIXES, AND LOCAL SEISMIC AND WIND PARAMETERS, WITH PERFORMANCE PARAMETERS INCLUDING A STORAGE CAPACITY [>20,000 US GALLONS], FREEBOARD, ZERO-LEAKAGE WATERPROOFING, AND COMPLIANCE WITH ALL STRUCTURAL SAFETY AND SERVICEABILITY REQUIREMENTS AS PER BCP.EACH15  
218SH3ELECTRIC WELDING WORKS, COMPLETE AS PER SPECIFICATION.MTR60  
219SH4TAKING UP OR DOWN TILES/MARBLE/GRANITE WORK OF ANY TYPE LAID IN FLOORS/WALLS ETC., INCLUDING STACKING SERVICEABLE MATERIAL AND DISPOSING OF UN-SERVICEABLE MATERIAL, COMPLETE AS SPECIFIED.SQM112  
220SH4DISMANTLING SINGLE TILING OF BRICK OR PCC IN ROOF OR FLOOR, LAID IN CEMENT MORTAR, INCLUDING HALF BRICKS OR BLOCKS ON EDGE, IN ANY POSITION, INCLUDING DISPOSAL OF DEBRIS, COMPLETE AS SPECIFIED.SQM139  
221SH4DEMOLITION OF PLAIN CEMENT CONCRETE OF ANY THICKNESS, INCLUDING BREAKING, STACKING AND DISPOSAL OF DEBRIS, COMPLETE AS SPECIFIED.CUM27  
222SH4TAKING DOWN DOOR OR GATE LEAVES ONLY (SINGLE OR FOLDING) OF ANY PATTERN OR THICKNESS NOT EXCEEDING 2.60 M EACH, INCLUDING REMOVAL OF FITTINGS AND STACKING SERVICEABLE MATERIAL, COMPLETE AS SPECIFIED.EACH18  
223SH4REMOVING WHITE/COLOUR WASH, DISTEMPER, PLASTIC EMULSION PAINT AND WEATHER RESISTANT PAINT FROM PLASTERED/UN-PLASTERED SURFACES BY SCRAPING, SANDING OR CHEMICAL MEANS, INCLUDING CLEANING THE SURFACE, COMPLETE AS SPECIFIED.SQM934  
224SH4EXCAVATION IN ORDINARY SOIL UP TO 1.5 M DEPTH, IN FOUNDATIONS AND PIPE TRENCHES UP TO 1.5 M WIDE, IN SHAFTS, WELLS AND INDEPENDENT HOLES UP TO 30 SQM EACH, THROWING EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10 M; TIMBERING TO BE PAID EXTRA.CUM15  
225SH4SUPPLY AND FIXING RCC PIPES 230 MM BORE, LAID AND JOINTED WITH SPIGOT-SOCKET OR COLLARS, INCLUDING RUBBER RING, COMPLETE AS SPECIFIED.MTR64  
226SH4CONSTRUCTION OF BRICK MASONRY MANHOLE, RECTANGULAR OR CIRCULAR, EXCEEDING 600 MM DEEP BUT NOT EXCEEDING 1800 MM DEEP, WITH IRON STEPS AT 380 MM CENTRES, 230 MM THICK BRICK WALLS, EXCLUDING COVER, COMPLETE AS SPECIFIED.CUM17  
227SH4SUPPLY AND FIXING UPVC SOIL AND WASTE PIPE 110 MM DIAMETER, COMPLETE WITH Z-JOINT AND RUBBER RING, COMPLETE AS SPECIFIED.MTR46  
228SH4SUPPLY AND FIXING STEEL CHOWKAT, PRESS-MOULDED 18 SWG, FOR 115 MM WALLS, SINGLE LEAF, INCLUDING HOLDFAST, TIES FOR LATERAL MOVEMENT, PCC 1:2:4 CAVITY FILLING, ONE COAT ANTI-CREOSOTE PAINT (INTERNAL) AND RED OXIDE PAINT (EXTERNAL), COMPLETE AS SPECIFIED.MTR26  
229SH4PROVIDING AND APPLYING 19 MM THICK CEMENT-SAND PLASTER (1:4 MIX) ON INTERNAL WALL SURFACES (BASEMENT, GROUND, FIRST AND SECOND FLOORS), FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM139  
230SH4PROVIDING AND LAYING 50 MM THICK SCREED BED ON BOND-BREAKING MATERIAL, COMPLETE AS SPECIFIED.SQM139  
231SH4PROVIDING AND LAYING STANDARD QUALITY TILES OF ANY MAKE NOT EXCEEDING 1600 SQ CM (16 INCH X 16 INCH), INCLUDING SETTING, JOINTING AND BONDING, COMPLETE AS SPECIFIED.SQM185  
232SH4SUPPLY AND FIXING GYPSUM CEILING TILES 600 MM X 600 MM X 7.5 MM THICK, INCLUDING ALUMINIUM TEE/ANGLE FRAMING, HANGER CLIPS, JOINTING CLIPS AND GI WIRE, COMPLETE AS SPECIFIED.SQM142  
233SH4APPLYING PRIMER COAT ON NEW WOOD WORK SUCH AS TIMBER WORK IN CEILING AND TIMBER BOARDING, INCLUDING SURFACE PREPARATION, COMPLETE AS SPECIFIED.SQM33  
234SH4SUPPLY AND FIXING 38 MM THICK 1ST CLASS SOFT WOOD (DEODAR) FRAMED AND PANELLED DOORS, INCLUDING CHOWKATS, HOLDFASTS, MONGERY AND TWO COATS OF SYNTHETIC ENAMEL PAINT, COMPLETE AS SPECIFIED.SQM10  
235SH4RE-SECURING WITHOUT TAKING DOWN DOOR CHOWKATS EXCEEDING 2.60 M EACH, INCLUDING ARCHITRAVES IF ANY, HARD/SOFT WOOD, INCLUDING ADJUSTMENT AND PLUGGING, COMPLETE AS SPECIFIED.EACH18  
236SH4SUPPLY AND FIXING ALUMINIUM SWING DOOR, SINGLE SHUTTER, DELUXE QUALITY, ANODIZED ALUMINIUM EXTRUDED SECTION, ANY SIZE/COLOUR/TEXTURE, FIXED ON CONCRETE/WOOD/STEEL FRAMES, COMPLETE EXCEPT GLASS, LOCK AND HANDLE.SQM24  
237SH4SUPPLY AND FIXING ALUMINIUM SLIDING WINDOW, PREMIUM QUALITY, ANODIZED ALUMINIUM EXTRUDED SECTION, ANY SIZE/COLOUR/TEXTURE, FIXED ON CONCRETE/WOOD/STEEL FRAMES, WITH ALL NECESSARY FITTINGS EXCEPT GLASS.SQM25  
238SH4SUPPLY AND FIXING 5 MM THICK TINTED GLASS, FIXED TO TIMBER OR STEEL SASHES WITH HARD/SOFTWOOD BEADS AND SCREWS OR RUBBER LINING, COMPLETE AS SPECIFIED.SQM48  
239SH4SUPPLY AND FIXING CP LOCK OR LATCH, 150 MM DELUXE QUALITY, WITH TWO BOLTS AND TWO LEVERS, IN ANY PATTERN/SHAPE, COMPLETE AS SPECIFIED.EACH10  
240SH4SUPPLY AND FIXING ALUMINIUM DOOR CLOSER, PREMIUM MODEL, ANODIZED BRONZE, COMPLETE AS SPECIFIED.EACH10  
241SH4APPLYING TWO COATS OF APPROVED WEATHER-RESISTANT EXTERIOR PAINT ON OLD PLASTERED EXTERIOR WALL SURFACES, INCLUDING SURFACE PREPARATION, COMPLETE AS SPECIFIED.SQM857  
242SH4SUPPLY AND FIXING WALL SHOWER SET SINGLE LEVER CP (STANDARD), CONSISTING OF WALL SHOWER, DOUBLE BIB COCK, TEE STOP COCK, BASIN MIXER AND TOILET SHOWER, COMPLETE AS SPECIFIED.EACH1  
243SH4SUPPLY AND FIXING TOILET SHOWER, 15 MM DIAMETER, COMPLETE AS SPECIFIED.EACH2  
244SH4SUPPLY AND FIXING VANITY BOWL, GLAZED WARE, ONE HOLE, WITH BOTTLE TRAP AND WASTE COUPLING, COMPLETE AS SPECIFIED (EXCLUDING MIXER).EACH2  
245SH4SUPPLY AND FIXING WATER CLOSET (WC) OF DELUXE QUALITY, EUROPEAN PATTERN, COMPLETE (COUPLED), COMPLETE AS SPECIFIED.EACH2  
246SH4SUPPLY AND FIXING BATH ACCESSORIES SET (PLASTIC) CONSISTING OF SHELF, TOWEL RAIL, RING, BRUSH HOLDER, TOILET PAPER HOLDER, SOAP DISH AND MIRROR, COMPLETE AS SPECIFIED.EACH2  
247SH4PROVIDING AND LAYING PRECAST RCC 1:2:4 MANHOLE COVER WITH EMBEDDED ANGLE-IRON FRAME, AS PER INFORMATION SHEET SVCS-341, COMPLETE AS SPECIFIED.NOS15  
248SH4SUPPLY AND FIXING STAINLESS STEEL HANDRAIL FOR STAIRS/RAMPS/ACCESSIBILITY, USING 3/4 INCH TO 2 INCH DIA 16-18 GAUGE PIPE INCLUDING BALUSTERS AND ALL FITTINGS, HEIGHT UP TO 900 MM, COMPLETE AS SPECIFIED.MTR25  
249SH4PROVIDING AND LAYING 75 MM THICK PCC 1:2:4 PLINTH PROTECTION/USE FOR WHEELCHAIR RAMP BASE, USING CRUSHED STONES, SURFACE FINISHED AND SMOOTHED WITH CEMENT AND STEEL TROWEL, INCLUDING FORMWORK, COMPLETE AS SPECIFIED.SQM18  
250SH4PROVIDING AND LAYING STANDARD QUALITY NON-SLIP FLOOR TILES FOR WHEELCHAIR RAMPS/ACCESSIBLE AREAS, INCLUDING SETTING, JOINTING AND BONDING, COMPLETE AS SPECIFIED.SQM18  
251SH4SUPPLY AND FIXING STEEL BUTT HINGES, 50 MM LONG, COMPLETE WITH SCREWS AND FIXING, FOR DOORS AND WINDOWS, COMPLETE AS SPECIFIED.EACH150  
252SH4SUPPLY AND FIXING CP TOWER BOLTS, 100 MM LONG, WITH BRIGHT SHOOTS, FIXED WITH SOCKETS OR LET INTO ANY MATERIAL, COMPLETE AS SPECIFIED.EACH50  
253SH4SUPPLY AND FIXING STEEL HANDLE BOW, 150 MM OVERALL, COMPLETE WITH SCREWS, COMPLETE AS SPECIFIED.EACH60  
254SH4SUPPLY AND FIXING STEEL KNOB 30 MM FOR CUPBOARD, HAVING SCREWED END, COMPLETE AS SPECIFIED.EACH40  
255SH4SUPPLY AND FIXING BRASS OR COPPER KICK PLATE (16-18 GAUGE), COMPLETE AS SPECIFIED.SQM8  
256SH4SUPPLY AND FIXING 13 MM THICK SOFT BOARD SHEET, FIXED IN CEILING AND PARTITIONS WITH 1ST CLASS SOFT WOOD (DEODAR) BEVELED EDGE COVER FILLETS 50 MM X 13 MM SCREWED ON, COMPLETE AS SPECIFIED.SQM45  
257SH4SUPPLY AND FIXING FIBRE GLASS CEILING PANELS (1200 MM X 600 MM), SINGLE PLY (NOT LESS THAN 1 MM THICK), IN ANY COLOUR/TEXTURE, INCLUDING ALUMINIUM TEE AND ANGLE 25X25X1 MM, HANGER CLIPS, JOINTING CLIPS AND GI 14 SWG WIRE, INCLUDING OPENINGS FOR LIGHTS, COMPLETE AS SPECIFIED.SQM65  
258SH4SUPPLY AND FIXING PLASTER OF PARIS (POP) CEILING TILES (600 MM X 600 MM X 20 MM), FIXED IN CEILING IN ANY DESIGN, PARTITIONS AND DADOS, COMPLETE AS SPECIFIED.SQM35  
259SH4SUPPLY AND FIXING 10 MM THICK MDF SHEETS CEILING, ALONG WITH HANGING ARRANGEMENTS, ALUMINIUM TEE AND ANGLE 25X25X1 MM, INCLUDING HANGER CLIPS, JOINTING CLIPS, COMPLETE AS SPECIFIED.SQM30  
260SH5IN ANY SOIL DRILLING BORE HOLE 450 MM DIA EMPLOYING REVERSE ROTARY HYDRAULIC PERCUSSION METHOD BORE UPTO 50 M DEPTH COMPLETE.METRE260  
261SH5IN ANY SOIL DRILLING BORE HOLE 450 MM DIA EMPLOYING REVERSE ROTARY HYDRAULIC / PERCUSSION METHOD BORE MORE THAN 50M BUT UPTO 100 M DEPTH COMPLETE.METRE230  
262SH5SUPPLY AND INSTALLATION MS BLIND PIPE 5 MM THICK 250MM DIA WITH WELDING JOINTS COMPLETE.METRE280  
263SH5SUPPLY AND LOWERING IN PREDRILLED BORE HOLE 250 MM DIA V-WIRE V-WEDGE CONTINUOUS SLOT STAINLESS STEEL WATER WELL SCREEN PROPER WELDED WITH MS PIPE COMPLETE.METRE140  
264SH5SUPPLY AND INSTALLATION OF BAIL PLUG 250 MM DIA OF APPROVED SPECIFICATIONS.EACH1  
265SH5SUPPLY AND POURING OF SHROUDING GRAVEL OF REQUISITE GRADE IN ANNULAR SPACE BETWEEN BLIND PIPE/STRAINER AND BORE HOLE ACCORDING TO SPECIFICATIONS FOR 250 MM DIA BLIND PIPE/STRAINER.METRE360  
266SH5PROVISION OF SANITARY SEAL OF APPROVED DESIGN AND SPECIFICATION FOR 250 MM DIA BLIND PIPE.METRE14  
267SH5DEVELOP TEST AND STERILIZE TUBE WELL IN ACCORDANCE WITH APPROVED PROCEDURE 250 MM DIA.EACH1  
268SH5EXCAVATE AS IN ORDINARY SOIL UPTO 1.5 M DEPTH IN FOUNDATION AND PIPE TRENCHES UPTO 1.5M WIDE IN SHAFTS WELLS AND INDEPENDENT HOLES UPTO 30 SQM EACH AND THROW EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10M. TIMBERING TO BE PAID EXTRA.CUM2083  
269SH5EXCAVATE AS IN ORDINARY SOIL EXCEEDING 1.5 MTR BUT NOT EXCEEDING 3 MTR DEPTH.CUM340  
270SH5EXCAVATE AS IN ORDINARY SOIL EXCEEDING 3 MTR BUT NOT EXCEEDING 4.50 MTR DEPTH.CUM42  
271SH5EXCAVATE AS IN ORDINARY SOIL EXCEEDING 4.5 MTR BUT NOT EXCEEDING 6.00 MTR DEPTH.CUM42  
272SH5EXCAVATE AS IN ORDINARY SOIL EXCEEDING 6 MTR BUT NOT EXCEEDING 7.50 MTR DEPTH.CUM42  
273SH5EXCAVATE AS IN ORDINARY SOIL EXCEEDING 7.50 MTR BUT NOT EXCEEDING 9.0 MTR DEPTH.CUM42  
274SH5EXCAVATE AS IN ORDINARY SOIL EXCEEDING 9 MTR BUT NOT EXCEEDING 10.50 MTR DEPTH.CUM42  
275SH5EXCAVATE AS IN ORDINARY SOIL EXCEEDING 10.5 MTR BUT NOT EXCEEDING 12.0 MTR DEPTH.CUM42  
276SH5EXCAVATION AS IN HARD SOIL UPTO 1.5 M DEPTH IN FOUNDATION AND PIPE TRENCHES UPTO 1.5 M WIDE IN SHAFTS WELLS AND INDEPENDENT HOLES UPTO 30 SQM EACH AND THROW EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10M.CUM357  
277SH5EARTH FILLING AS IN ORDINARY OR HARD SOIL FILLING IN FOUNDATION PIPE TRENCHES SHAFTS WELLS INDEPENDENT HOLES UNDER FLOORS OR AROUND PLINTH ETC 1.5 M BELOW OR ABOVE GROUND LEVEL (GL) WITH SPOIL OBTAINED FROM EXCAVATION IN TRENCHES/OVER AREAS WITHIN 10M INCLUDING WATERING AND COMPACTION IN 150MM LAYER AND DRESSING TO REQUIRED PROFILE AND SHAPE.CUM802  
278SH5PROVIDING AND LAYING OF LEAN CONCRETE USING CRUSHED OR BROKEN STONE GRADED 1:4:8 ALL AS SPECIFIED.CUM21  
279SH5PROVIDING AND LAYING OF CC TYPE C USING CRUSHED OR BROKEN STONE GRADED AS SPECIFIED.CUM58  
280SH5PROVIDING AND LAYING OF RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH USING WEIGH BATCH CONCRETE INCLUDING PUMP ETC AND TRANSPORTATION UPTO 5 KM BY TRANSIT MIXER AS SPECIFIED IN ROOF SLABS LANDINGS WALLS PLINTH BEAMS AND BANDS ETC INCLUDING FORM WORK (REINFORCEMENT MEASURED AND PAID SEPARATELY).CUM11  
281SH5SUPPLY AND FIX BARS ROUND USING DEFORMED BARS GRADE - 40 INCLUDING CUTTING BENDING BINDING AND PLACING REINFORCEMENT IN POSITION.KG921  
282SH5BURNT BRICK WORK IN WALL OVER 115 MM THICK LAID AND JOINTED IN CEMENT MORTAR 1:4 STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER UPTO 4.25 M DEPTH.CUM65  
283SH5BRICK BATS OR OTHER APPROVED FILLING IN SOKAGE PITS ETC.CUM291  
284SH5PROVIDING AND LAYING 13MM TH CEMENT PLASTER AS IN CM 1:4 WITH PUDLO OR OTHER SIMILAR APPROVED MATERIAL MIXED WITH CEMENT AT THE RATE OF 3% BY WEIGHT COMPLETE ALL AS SPD.SQM1367  
285SH5TUBE WATER QUALITY (GI) WITH ALL FITTINGS (I.E. SOCKETS BENDS TEES ELBOWS WHERE REQUIRED) AND LAID COMPLETE IN TRENCHES (EXCLUDING EXCAVATION) OR FIXED TO WALL FLOOR (SURFACE OR CONCEALED) AND CEILING ETC. INCLUDING CAPS AND PLUGS AS REQUIRED 100 MM DIA (MEDIUM) SUPPLY AND FIXING.METRE1293  
286SH5POLYETHYLENE PIPE (PE-100) 63 MM DIA CLASS PN-10/SDR-17 LAID IN TRENCHES (EXCLUDING EXCAVATION) SUPPLY AND FIXING.MTR92  
287SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 20 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR192  
288SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 25 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR1299  
289SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 32 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR697  
290SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 40 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR350  
291SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 50 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR207  
292SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 63 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR23  
293SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 75 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR705  
294SH5PPR PIPE WITH ALL FITTINGS I.E. SOCKET BEND TEE ELBOW WHERE REQUIRED 110 MM DIA CLASS PN-20 (EXCL EXCAVATION) SUPPLY AND FIXING.MTR5  
295SH5POLYETHYLENE PIPE (PE-100) 160 MM DIA CLASS PN-16 / SDR-11 (EXCLUDING COST OF EXCAVATION) SUPPLY AND FIXING.METRE1900  
296SH5SUPPLY AND FIX RCC PIPES 300 MM BORE LAID AND JOINTED WITH SPIGOT SOCKET OR TONGUE AND GROOVE JOINT INCLUDE RUBBER RING AS SPECIFIED.MTR1866  
297SH5SUPPLY AND FIX UPVC SOIL AND WASTE PIPE 160MM BORE (OUTSIDE DIA) COMPLETE WITH PLAIN END AND SOLVENT CEMENT JOINT AS SPECIFIED.MTR58  
298SH5PPR COUPLER / SOCKET 40 MM DIA SUPPLY AND FIXING.EACH5  
299SH5SUPPLY AND FIX UPVC EQUAL TEE 160MM DIA COMPLETE WITH SOLVENT CEMENT JOINT ALL AS SPECIFIED.NO6  
300SH5BALL TAP WITH HANDLE 20 MM DIA FOR PPR PIPE.EACH16  
301SH5BALL TAP WITH HANDLE 25 MM DIA FOR PPR PIPE SUPPLY AND FIXING.EACH108  
302SH5BALL TAP WITH HANDLE 32 MM DIA FOR PPR PIPE SUPPLY AND FIXING.EACH16  
303SH5BALL TAP WITH HANDLE 40 MM DIA FOR PPR PIPE SUPPLY AND FIXING.EACH20  
304SH5BALL TAP WITH HANDLE 50 OR 60 MM DIA FOR PPR PIPE.EACH2  
305SH5BALL TAP WITH HANDLE 63 MM DIA FOR PPR PIPE.EACH9  
306SH5SCREW TAP WITH HANDLE 32 MM DIA FOR PPR PIPE SUPPLY AND FIXING.EACH4  
307SH5SCREW TAP WITH HANDLE 40 MM DIA FOR PPR PIPE SUPPLY AND FIXING.EACH6  
308SH5SCREW TAP WITH HANDLE 50 MM DIA FOR PPR PIPE SUPPLY AND FIXING.EACH3  
309SH5SCREW TAP WITH HANDLE 63 MM DIA FOR PPR PIPE SUPPLY AND FIXING.EACH1  
310SH5BIB COCK BRASS CP FANCY TYPE SCREWED DOWN BSP 15 MM DIA.EACH27  
311SH5STOP COCK BRASS CP SCREW DOWN HIGH PRESSURE FANCY TYPE 15MM DIA. BUT CONCEALED TYPE.EACH54  
312SH5STOP COCK BRASS CP SCREW DOWN HIGH PRESSURE FANCY TYPE 15MM DIA. BUT TEE STOP COCK.EACH114  
313SH5FLOAT VALVES BRASS (CORYDON) OR OTHER APPROVED PATTERN WITH PLASTIC BALL SCREWED FOR IRON (BRASS FERRULE) WITH COPPER BALL 40MM DIA.EACH4  
314SH5FLOAT VALVES BRASS (CORYDON) OR OTHER APPROVED PATTERN WITH PLASTIC BALL SCREWED FOR IRON (BRASS FERRULE) WITH COPPER BALL 50MM DIA.EACH1  
315SH5GLOBE VALVES GUNMETAL SCREWED BOTH ENDS COMPLETE WITH STEEL HANDLE CLASS-150 40 MM DIA SUPPLY AND FIXING.EACH10  
316SH5GLOBE VALVES GUNMETAL SCREWED BOTH ENDS COMPLETE WITH STEEL HANDLE CLASS-150 50 MM DIA SUPPLY AND FIXING.EACH10  
317SH5GLOBE VALVES GUNMETAL FLANGED AND DRILLED TO BS TABLE 18-1-10 COMPLETE WITH STEEL HANDLE CLASS-150 80MM DIA SUPPLY AND FIXING.EACH12  
318SH5SLUICE VALVE ACCORDING TO BSS-3464 CLASS 150 (TABLE 18-1-6) FLANGED AND DRILLED TO BS TABLE 18-1-10 COMPLETE WITH RUBBER PACKING 100 MM DIA SUPPLY AND FIXING.EACH1  
319SH5SLUICE VALVE ACCORDING TO BSS-5150/5163 PN-16 (TABLE 18-1-8) FLANGED AND DRILLED TO BS TABLE 18-1-10 COMPLETE WITH RUBBER PACKING 150 MM DIA SUPPLY AND FIXING.EACH18  
320SH5SUPPLY AND FIXING OF NON RETURN VALVE OR REFLUX VALVE SCREWED 15 MM DIA.EACH2  
321SH5SUPPLY AND FIXING OF NON RETURN VALVE OR REFLUX VALVE SCREWED 20 MM DIA.EACH4  
322SH5SUPPLY AND FIXING OF NON RETURN VALVE OR REFLUX VALVE SCREWED 150 MM DIAEACH2  
323SH5SOCKET GI 150 MM DIA SUPPLY AND FIXING.EACH12  
324SH5BEND GI 45 DEG / 90 DEG 150 MM DIA SUPPLY AND FIXING.EACH8  
325SH5SUPPLY AND FIX GUARD BARS GRILLS RAILING LADDERS BRACKETS HOOKS HOLD FASTS AND FRAMES ETC CUT TO DEAD LENGTH REDUCED TO SIZE SHAPE FIGURE ETC INCLUDING PUNCHING / DRILLING HOLES IF NECESSARY AND FIXING ASSEMBLING BY WELDING OR WITH THE USE OF BOLTS NUTS RIVETS WASHERS ETC AND ERECTION/FIXING IN POSITION INCLUDING MAKING GOOD THE DISTURBED SURFACES.KG41  
326SH5SUPPLY AND FIX XPM EXPENDED METAL 25MM X 25MM MASH 18 GAGUE BRC FABRIC WELD MESH MAXWELD ETC IN REINFORCEMENT OR IN OTHER POSITIONS LIKE DOORS PARTITION AND LATHING FOR PLASTER TO SHAPE SIZE AS REQUIRED INCLUDING BINDING WITH 14 SWG WIRE NAILS STAPLES ETC AND PLACING IN POSITION MEASURED NET.SQM3  
327SH5MANHOLES COMPLETE RECTANGULAR OR CIRCULAR AS DESCRIBED EXCEEDING 600 MM DEEP BUT NOT EXCEEDING 1800 MM DEEP WITH IRON STEPS (IN ANGLES 380 MM CENTRES) 230MM THICK BRICK WALLS (EXCEPT MANHOLE COVER).CUM269  
328SH5PROVIDING AND LAYING RCC TYPE B MANHOLE COVER (PRECAST COMPLETE WITH ANGLE IRON FRAME EMBEDDED IN CONCRETE ALL AS PER INFORMATION SHEET NO. SVCS-341 DATED 10-11-99.NO141  
329SH5EXCAVATE DISPOSE SPOIL SUPPLY SURFACE GULLIES (230X230X100 MM) WITH 100 MM PCC SURROUND AND CI GRATING COMPLETE.EACH6  
330SH5DEMOLITION OF PLAIN CEMENT CONCRETE.CUM23.986318315808  
331SH5SUPPLY AND FIX WALL SHOWER SET SINGLE LEVER CP (PREMIUM) CONSISTING OF A WALL SHOWER, DOUBLE BIB COCK, TEE STOP COCK, BASIN MIXER AND TOILET SHOWER COMPLETE ALL AS SPECIFIEDEACH8  
332SH5SUPPLY AND FIXING BASIN MIXER SINGLE LEVER CP, 15MM DIA INCLUDING PIPE CONNECTION COMPLETE AS SPECIFIED.EACH8  
333SH5SUPPLY AND FIXING SINK MIXER CP SINGLE LEVER HIGH NECK FANCY, 15 MM DIA, INCLUDING PIPE CONNECTION COMPLETE ALL AS SPECIFIEDEACH8  
334SH5SUPPLY AND FIXING OF WHITE GLAZED EARTHENWARE ASIATIC-PATTERN WATER CLOSET (WC) NOT LESS THAN 550 MM LONG COMPLETE WITH FLUSHING CISTERN FLUSH PIPE AND CONNECTIONS COMPLETE AS SPECIFIED.NO6  
335SH5SUPPLY AND FIXING OF GLAZED-WARE WASH BASIN/VANITY BOWL WITH SINGLE FAUCET HOLE INCLUDING BOTTLE TRAP WASTE COUPLING CP BASIN MIXER AND ALL CONNECTIONS COMPLETE AS SPECIFIED.NO6  
336SH5SUPPLY AND FIXING OF 5 MM THICK SILVERED GLASS MIRROR (ANY SHAPE: RECTANGULAR CIRCULAR OR OVAL) WITH GROUND AND POLISHED EDGES FIXED TO WALL WITH SCREWS AND PLUGS COMPLETE AS SPECIFIED.SQM6  
337SH5SUPPLY AND FIXING OF PLASTIC SHELF (ANY SIZE AND SHAPE) WITH SCREWS AND WALL PLUGS COMPLETE AS SPECIFIED.EACH6  
338SH5SUPPLY AND FIXING OF CHROME-PLATED (CP) SINGLE-ROD TOWEL RAIL ANY PATTERN AND SIZE WITH SCREWS AND WALL PLUGS COMPLETE AS SPECIFIED.EACH6  
339SH5ELECTRIC GEYSER 45 LIT CAPACITY COMPLETE WITH THERMOSTAT SAFETY VALVE SUPPLY AND FIXING.EACH2  
340SH5ELECTRIC WATER COOLER SP 220/240V COOLING CAPACITY 60 LIT/HR COMPLETE SUPPLY AND FIXING.EACH6  
341SH5HYPO-CHLORINATOR SOLENOID TYPE HAVING LIQUID CHLORINE FEEDING CAPACITY 20 GPD AT 150 PSI FITTED WITH FLOW RATE CONTROL KNOB MANUALLY ADJUSTABLE 0-100% OPERATED AT 220/240V 50 HZ DIAPHRAGM TYPE OF NON-CORROSIVE MATERIAL WITH STANDARD SUCTION/DISCHARGE TUBING INJECTOR PRESSURE AUTO RELIEF VALVE ANTI-SIPHON VALVE SOLUTION STORAGE TANK OF 50 GAL CAPACITY PE/PVC WITH STAND DULY PAINTED AS SPECIFIED SUPPLY AND FIXING.EACH2  
342SH5PUMPING SET SUBMERSIBLE WITH AC ELECTRIC MOTOR DRIVEN 400 V 3 PHASE 50 CYCLES COMPLETE WITH PUMP MOTOR CABLE COLUMN PIPES MOTOR CONTROL UNIT PUMP CAPACITY 0.5 CUSEC UPTO 97 M HEAD PUMP SETTING 60 M WITH 82-91 HP MOTOR 2900 RPM MOTOR EFFICIENCY IE2 INSULATION CLASS F ENCLOSURE CHARACTERISTICS IP-68 SUPPLY AND FIXING.EACH2  
343SH6CLEARING AND GRUBBING THE SITE INCLUDING REMOVAL OF GRASS, SHRUBS, BRUSHWOOD, UNDERGROWTH, ROOTS, AND SMALL TREES NOT EXCEEDING 225 MM GIRTH, DISPOSING OF CLEARED MATERIAL OFF-SITE, COMPLETE AS SPECIFIED.SQM92  
344SH6EXCAVATION IN ORDINARY SOIL UP TO 1.5 M DEPTH, IN FOUNDATION AND PIPE TRENCHES UP TO 1.5 M WIDE, IN SHAFTS, WELLS AND INDEPENDENT HOLES UP TO 30 SQM EACH, THROWING EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10 M; TIMBERING TO BE PAID EXTRA, COMPLETE AS SPECIFIED.CUM11324  
345SH6EXCAVATION IN HARD SOIL UP TO 1.5 M DEPTH, IN FOUNDATION AND PIPE TRENCHES UP TO 1.5 M WIDE, IN SHAFTS, WELLS AND INDEPENDENT HOLES UP TO 30 SQM EACH, THROWING EARTH CLEAR OF EDGES OF EXCAVATION WITHIN 10 M; TIMBERING TO BE PAID EXTRA, COMPLETE AS SPECIFIED.CUM903  
346SH6EXCAVATION OVER AREAS IN ORDINARY/HARD SOIL FROM 1.5 M TO 3 M DEPTH, IN FOUNDATION/EXCAVATIONS, THROWING EARTH CLEAR WITHIN 50 M; FOR DEEP EXCAVATION OF SEMI-UNDERGROUND UAV BUNKER STRUCTURES.CUM400  
347SH6EARTH FILLING IN ORDINARY OR HARD SOIL, IN FOUNDATION, PIPE TRENCHES, SHAFTS, WELLS, INDEPENDENT HOLES, UNDER FLOORS OR AROUND PLINTH ETC., 1.5 M BELOW OR ABOVE GROUND LEVEL, WITH SPOIL OBTAINED FROM EXCAVATION IN TRENCHES/OVER AREAS WITHIN 50 M, INCLUDING WATERING AND COMPACTION IN 150 MM LAYERS AND DRESSING TO REQUIRED PROFILE AND SHAPE.CUM468  
348SH6MAKING EMBANKMENT WITH SPECIFIED/APPROVED SOIL OBTAINED FROM BORROW EXCAVATION, INCLUDING LOADING WITHIN 5 KM, COMPACTION IN 150 MM LAYERS UP TO 95% MODIFIED AASHTO DENSITY, AND DRESSING TO REQUIRED PROFILE AND SHAPE.CUM200  
349SH6CUT OR FILL IN GRANULAR SOIL NOT EXCEEDING 150 MM, COMPACTING THE FORMATION SURFACE BY COMPACTION EQUIPMENT AND ROLLER UP TO 100% MODIFIED AASHTO DENSITY, INCLUDING FILLING DEPRESSIONS WITH HARD SOIL.SQM92  
350SH6LOADING OF EXCAVATED SOIL, ROCK, DEMOLISHED BRICK BATS, BRICKS, SAND AND BITUMEN ETC. BY ANY MEANS UP TO 1000 M, UNLOADING AND STACKING OR SPREADING, PLUS CARRIAGE FOR EACH SUBSEQUENT 5 KM OR PART THEREOF.CUM130  
351SH6MAKING EMBANKMENT WITH SPECIFIED/APPROVED SOIL OBTAINED FROM BORROW EXCAVATION FOR EARTH COVERING OVER UAV BUNKER ROOFS FOR CAMOUFLAGE AND THERMAL INSULATION, INCLUDING LOADING, PLACING IN LAYERS, AND COMPACTION, COMPLETE AS SPECIFIED.CUM250  
352SH6GRANULAR BACKFILLING USING APPROVED GRANULAR SUB-BASE MATERIAL, LAID AND COMPACTED IN LAYERS TO 100% MODIFIED AASHTO DENSITY, COMPLETE AS SPECIFIED.CUM534  
353SH6PROVIDING SAND CUSHION IN LAYERS AS SPECIFIED, UNDER CONCRETE SLABS, HARD STANDINGS AND RUNWAYS ETC., COMPLETE.CUM250  
354SH6PROVIDING AND LAYING LEAN CONCRETE (PCC 1:4:8) USING CRUSHED OR BROKEN STONE GRADED AS SPECIFIED, COMPLETE.CUM721  
355SH6PROVIDING AND LAYING LEAN CONCRETE (PCC 1:3:6) USING CRUSHED OR BROKEN STONE GRADED AS SPECIFIED, COMPLETE.CUM104  
356SH6PROVIDING AND LAYING PCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN ALL STRUCTURAL/NON-STRUCTURAL ELEMENTS (E.G., STEPS), INCLUDING FORMWORK AND FAIR FACES TO EXPOSED SURFACES.CUM125  
357SH6PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN DIFFERENT STRUCTURAL ELEMENTS (FOUNDATION ETC.) INCLUDING FORMWORK, COMPLETE; REINFORCEMENT MEASURED AND PAID SEPARATELY.CUM2382  
358SH6PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN ROOF SLABS, LANDINGS, WALLS, PLINTH BEAMS AND BANDS ETC., INCLUDING FORMWORK; REINFORCEMENT MEASURED AND PAID SEPARATELY.CUM337  
359SH6PROVIDING AND LAYING RCC WITH 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN COLUMNS, BEAMS, STAIRS, POSTS, STRUTS, PIERS, LINTELS AND THE LIKE, INCLUDING FORMWORK; REINFORCEMENT MEASURED AND PAID SEPARATELY.CUM1751  
360SH6PROVIDING AND LAYING RCC WITH 4000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN ROOF SLABS, LANDINGS, WALLS, PLINTH BEAMS AND BANDS, INCLUDING FORMWORK; REINFORCEMENT PAID SEPARATELY; FOR UAV BUNKER ROOF SLAB WITH WATERPROOFING MEMBRANE.CUM90  
361SH6PROVIDING AND LAYING RCC WITH 4000 PSI COMPRESSIVE CYLINDRICAL STRENGTH IN ROOF SLABS, LANDINGS, WALLS, PLINTH BEAMS AND BANDS, INCLUDING FORMWORK; REINFORCEMENT PAID SEPARATELY; FOR UAV BUNKER ROOF SLAB WITH WATERPROOFING MEMBRANE.CUM55  
362SH6SUPPLY AND FIXING DEFORMED STEEL BARS GRADE-60 REINFORCEMENT, INCLUDING CUTTING, BENDING, BINDING WITH 16 SWG WIRE, AND PLACING IN POSITION AT ANY HEIGHT/LEVEL, COMPLETE AS SPECIFIED.KG3212598.9501584  
363SH6BURNT BRICK WORK IN WALLS OVER 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:4, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO GROUND FLOOR ROOF LEVEL, COMPLETE.CUM211  
364SH6BURNT BRICK WORK IN WALLS OVER 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:6, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO GROUND FLOOR ROOF LEVEL, COMPLETE.CUM128  
365SH6BURNT BRICK WORK IN WALLS OVER 115 MM THICK, LAID AND JOINTED IN CEMENT MORTAR 1:6, STRAIGHT OR TO CURVE WITH INNER RADIUS OF 6 M AND OVER, UP TO FIRST FLOOR ROOF LEVEL, COMPLETE.CUM141  
366SH6PROVIDING AND LAYING PCC SOLID BLOCKS FOR NON-LOAD-BEARING WALLS, INCLUDING SETTING AND JOINTING IN CEMENT MORTAR 1:6, UP TO GROUND FLOOR ROOF LEVEL, COMPLETE AS SPECIFIED.CUM5215  
367SH6PROVIDING AND LAYING PCC HOLLOW BLOCKS FOR NON-LOAD-BEARING WALLS, INCLUDING SETTING AND JOINTING IN CEMENT MORTAR 1:6, UP TO BASEMENT/GROUND FLOOR ROOF LEVEL, COMPLETE AS SPECIFIED.CUM6  
368SH6PROVIDING AND LAYING 50 MM THICK PCC 1:2:4 USING 3 MM AGGREGATE, FINISHED SMOOTH WITH STEEL FLOAT, COVERED WITH TWO COATS OF HOT BITUMEN AT 0.75 KG PER SQM EACH, AND BLINDED WITH 0.012 CUM OF SAND PER SQM.SQM1398  
369SH6PROVIDING AND LAYING A BOND-BREAKING SLIP MEMBRANE BENEATH FLOOR SLABS, CONSISTING OF 0.102 MM THICK POLYETHYLENE FILM LAID OVER THE PREPARED SUB-BASE, COMPLETE AS SPECIFIED.SQM29  
370SH6PROVIDING AND APPLYING TWO COATS OF HOT-APPLIED BITUMEN (10/20 GRADE) ON ROOF SURFACE AT 0.75 KG PER SQM PER COAT, EACH COAT BLINDED WITH SAND AT 0.012 CUM PER SQM, INCLUDING CLEANING AND PREPARATION OF THE SURFACE, COMPLETE.SQM269  
371SH6TERMITE PROOFING OF NEW BUILDINGS/FOUNDATIONS WITH APPROVED CHEMICALS (EXCEPT JOINERY), APPLIED TO BEDS AND SIDES OF EXCAVATED TRENCHES, BACKFILLS, FILLED-UP EARTH, AND SURROUNDING AREAS WITHIN 5 M OF THE BUILDING, COMPLETE WITH 5-YEAR WARRANTY.SQM51  
372SH6PROVIDING AND APPLYING 13 MM THICK CEMENT-SAND PLASTER (1:4 MIX) ON INTERNAL WALL SURFACES (BASEMENT, GROUND, FIRST AND SECOND FLOORS), FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM1061  
373SH6PROVIDING AND APPLYING 13 MM THICK CEMENT-SAND PLASTER (1:6 MIX) ON WALL SURFACES, FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM110  
374SH6PROVIDING AND APPLYING 13 MM THICK CEMENT-SAND PLASTER (1:3 MIX) ON WALL SURFACES (BASEMENT, GROUND, FIRST AND SECOND FLOORS), FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM3854  
375SH6PROVIDING AND LAYING 13 MM THICK TERRAZZO DADO/SKIRTING (MARBLE CHIPS MIXED WITH ORDINARY CEMENT IN 1:2 RATIO) ON A 1:3 CEMENT PLASTER BASE, INCLUDING CUTTING AND RUBBING, COMPLETE.SQM16  
376SH6PROVIDING AND LAYING 80 MM THICK HYDRAULICALLY-COMPRESSED PCC PAVING STONES IN NATURAL COLOUR, IN ANY PATTERN OR SHAPE, LAID AND JOINTED IN SAND ON A 50 MM THICK SAND BEDDING COURSE, FOR FLOORS, LOADING DECKS AND HEAVY-DUTY AREAS, COMPLETE AS SPECIFIED.SQM75139  
377SH6PROVIDING AND LAYING 80 MM THICK HYDRAULICALLY-COMPRESSED PCC PAVING STONES IN ANY COLOUR OTHER THAN NATURAL, IN ANY PATTERN OR SHAPE, LAID AND JOINTED IN SAND ON A 50 MM THICK SAND BEDDING COURSE, COMPLETE AS SPECIFIED.SQM322  
378SH6PROVIDING AND LAYING 20 MM THICK TERRAZZO FLOOR USING MARBLE CHIPS (1:2) WITH ORDINARY CEMENT, INCLUDING CUTTING, RUBBING, CLEANING AND CHEMICAL POLISHING, COMPLETE AS SPECIFIED.SQM11  
379SH6SUPPLY AND FIXING 8-10 MM THICK AND 40 MM WIDE MARBLE PATTY AS DIVIDING STRIPS IN FLOORS, COMPLETE AS SPECIFIED.MTR12  
380SH6PROVIDING AND LAYING PCC 1:4:8 UNDER FLOOR USING CRUSHED OR BROKEN STONES, COMPLETE AS SPECIFIED.CUM64  
381SH6PROVIDING AND LAYING PCC 1:2:4 IN FLOOR SLABS, SURFACE FINISHED SMOOTH WITH NEAT CEMENT AND STEEL TROWEL, USING CRUSHED OR BROKEN STONE, FOR BASEMENT/GROUND FLOOR, COMPLETE AS SPECIFIED.CUM2  
382SH6PROVIDING AND LAYING 50 MM THICK FLOOR TOPPING WITH PCC OF 3000 PSI COMPRESSIVE CYLINDRICAL STRENGTH, COMPLETE AS SPECIFIED.SQM389  
383SH6PROVIDING AND LAYING PAVEMENT QUALITY CONCRETE (PQC) OF 600 PSI FLEXURAL STRENGTH FOR RUNWAY, TAXIWAY LINKS, LEAD-INS AND TARMAC, OF ANY THICKNESS, USING AN APPROVED CONCRETE MIX DESIGN, LAID MANUALLY, COMPLETE AS SPECIFIED.CUM73  
384SH6PROVIDING AND LAYING 75 MM THICK PCC 1:2:4 PLINTH PROTECTION USING CRUSHED STONES, SURFACE FINISHED AND SMOOTHED WITH CEMENT AND STEEL TROWEL, INCLUDING FORMWORK, COMPLETE AS SPECIFIED.SQM79  
385SH6PROVIDING AND LAYING PCC 1:3:6 IN FLOOR SLABS, SURFACE FINISHED SMOOTH WITH CEMENT AND STEEL TROWEL USING CRUSHED OR BROKEN STONES, FOR BASEMENT/GROUND FLOOR, COMPLETE AS SPECIFIED.CUM4  
386SH6PROVIDING AND FIXING 22 BG CORRUGATED GALVANIZED IRON (CGI) ROOFING SHEETS ON THE VEHICLE SHED ROOF, FIXED TO TIMBER/STEEL PURLINS WITH ONE-AND-A-HALF CORRUGATION SIDE LAPS AND 150 MM END LAPS, USING GALVANIZED SCREWS, FIBRE WASHERS, AND CURVED/LIMPET WASHERS AT CENTRES NOT EXCEEDING 380 MM, COMPLETE AS SPECIFIED.SQM558  
387SH6SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF A MOTORIZED SLIDING/OPENING MECHANISM WITH REMOTE CONTROL FOR THE HEAVY-DUTY STEEL GATE, INCLUDING MOTOR, DRIVE, CONTROLS, SAFETY SENSORS, AND ALL ACCESSORIES, COMPLETE AS SPECIFIED.JOB1  
388SH6SUPPLY OF HIGH-STRENGTH WOVEN POLYPROPYLENE HESCO/DEFENCE BARRIER BAGS, 4 FT X 4 FT X 8 FT (L X W X H), WITH UV-STABILIZED COATING AND INTEGRAL FILLING SPOUTS, COMPLETE AS SPECIFIED.NOS15000  
389SH6PROVIDING AND PLACING APPROVED IMPORTED SAND/EARTH FILLING MATERIAL INTO HESCO BARRIER BAGS, INCLUDING LOADING, TRANSPORTATION TO SITE, UNLOADING AND FILLING, COMPLETE AS SPECIFIED.CUM1258.5  
390SH6PROVIDING AND FIXING TWO STRANDS OF GALVANIZED 12 SWG BARBED WIRE (4-POINT BARBS AT 75 MM CENTRES) ON ANGLED STEEL BRACKETS ALONG THE TOP OF THE HESCO WALL, FIXED WITH GI STAPLES AND TENSIONED, COMPLETE AS SPECIFIED.MTR3900  
391SH6SUPPLY AND FIXING OF GUARD BARS, GRILLS, RAILINGS, LADDERS, BRACKETS, HOOKS, HOLDFASTS AND FRAMES ETC., CUT TO DEAD LENGTH, REDUCED TO SIZE AND SHAPE, PUNCHED/DRILLED AS NECESSARY, ASSEMBLED BY WELDING OR WITH BOLTS/NUTS/RIVETS/WASHERS, AND ERECTED/FIXED IN POSITION, INCLUDING MAKING GOOD DISTURBED SURFACES, COMPLETE AS SPECIFIED.KG33828  
392SH6SUPPLY AND FIXING OF ROUND, SQUARE OR FLAT STEEL BARS INCLUDING CUTTING, BENDING, BINDING AND PLACING REINFORCEMENT IN POSITION, COMPLETE AS SPECIFIED.KG714  
393SH6SUPPLY AND FIXING OF BOLTS EXCEEDING 10 MM BUT NOT EXCEEDING 18 MM DIAMETER, LENGTH EXCEEDING 75 MM AND NOT EXCEEDING 150 MM, WITH HEXAGON/SQUARE/CUP/CHEESE HEADS, SCREWED ONE OR BOTH ENDS, EACH WITH ONE WASHER AND ONE HEXAGON OR SQUARE NUT, COMPLETE AS SPECIFIED.EACH2762  
394SH6SUPPLY AND FIXING OF 2 INCH X 2 INCH SQUARE MS HOLLOW PIPE SECTION, 16 GAUGE, INCLUDING CUTTING, WELDING, JOINTING AND ERECTION IN POSITION, COMPLETE AS SPECIFIED.MTR396  
395SH6SUPPLY AND FIXING OF GALVANIZED IRON WIRE NETTING, 50 MM X 50 MM MESH, 10 SWG, FIXED WITH TINNED TACKS AND GI STAPLES, COMPLETE AS SPECIFIED.SQM2928  
396SH6PROVIDING AND FIXING TWO STRANDS OF GALVANIZED 12 SWG BARBED WIRE (4-POINT BARBS AT 75 MM CENTRES) ON POSTS/BRACKETS, FIXED WITH GI STAPLES/NAILS, INCLUDING CONNECTING UP ENDS AND TENSIONING, MEASURED PER LINEAR METRE, COMPLETE AS SPECIFIED.MTR57009  
397SH6SUPPLY AND FIXING OF CONCERTINA/RAZOR WIRE, SINGLE COIL, 10/12 GAUGE GALVANIZED WIRE, LOOP DIAMETER 0.452 TO 0.990 M, COMPLETE WITH ALL ACCESSORIES, ALL AS SPECIFIED.MTR8701  
398SH6SUPPLY AND FIXING OF MS DT-TYPE CLAMP BRACKET, FABRICATED AS PER APPROVED DRAWING, INCLUDING BOLTS, NUTS AND WASHERS, COMPLETE AS SPECIFIED.EACH789.23  
399SH6SUPPLY AND FIXING OF UPVC DOOR, 60 MM THICK SHUTTER WITH 20 MM THICK GROOVE PANEL FILLED INSTEAD OF GLASS, WITH FRAME, EXCEEDING 1.9 SQM EACH, IN WHITE COLOUR, INCLUDING ALL NECESSARY FITTINGS AND MONGERY, COMPLETE AS SPECIFIED.SQM79  
400SH6SUPPLY AND FIXING OF BOX-PIPE TYPE OPENABLE/FIXED SIDE-HUNG STEEL WINDOW (OR CSW), FABRICATED FROM 16 GAUGE MS FRAME SECTION 50 MM X 25 MM AND Z-SHAPED PANEL 38 X 31 X 38 MM WITH 10 X 10 MM SQUARE GOLA, NOT EXCEEDING 1.48 SQM EACH, INCLUDING ALL FITTINGS, MONGERY, HOLDFASTS, TWO COATS OF SYNTHETIC ENAMEL PAINT OVER ONE COAT OF PRIMER, AND 5 MM THICK PLAIN SHEET GLASS, COMPLETE AS SPECIFIED.SQM36  
401SH6SUPPLY AND FIXING OF HEAVY-DUTY REINFORCED STEEL GATE FOR UAV TAXIWAY ACCESS (30 FT WIDE &12 FT HIGH), APPROX. 20 KG/SQM, INCLUDING CUTTING, WELDING, ERECTION, HINGES, GUIDES, LOCKING MECHANISM, AND TWO COATS OF ENAMEL PAINT OVER PRIMER, COMPLETE AS SPECIFIED.NOS1  
402SH6SUPPLY AND FIXING OF STEEL DOOR AS PER APPROVED DRAWING, FABRICATED FROM MS SHEET/SECTIONS WITH NECESSARY STIFFENERS, HINGES, LOCKS, HANDLES, AND TWO COATS OF ENAMEL PAINT OVER PRIMER, APPROX. 25 KG/SQM, COMPLETE AS SPECIFIED.SQM3  
403SH6SUPPLY AND INSTALLATION OF BLAST-RESISTANT STEEL DOOR FOR UAV BUNKER, HEAVY-DUTY CONSTRUCTION WITH AIRTIGHT NEOPRENE GASKET SEALING, MULTI-POINT LOCKING SYSTEM, AND BLAST-RATED HINGES, COMPLETE WITH ALL HARDWARE AND FACTORY FINISH AS SPECIFIED.NOS2  
404SH6PROVIDING AND APPLYING 13 MM THICK CEMENT-SAND PLASTER (1:4 MIX) ON INTERNAL WALL SURFACES, FINISHED SMOOTH, COMPLETE AS SPECIFIED.SQM131  
405SH6APPLYING ONE COAT OF APPROVED WEATHER-RESISTANT EXTERIOR EMULSION PAINT ON NEW PLASTERED EXTERIOR WALL SURFACES, INCLUDING SURFACE PREPARATION, COMPLETE AS SPECIFIED.SQM613  
406SH6APPLYING SECOND AND SUBSEQUENT COATS OF APPROVED WEATHER-RESISTANT EXTERIOR EMULSION PAINT ON PREVIOUSLY PRIMED/COATED EXTERIOR WALL SURFACES, COMPLETE AS SPECIFIED.SQM613  
407SH6APPLYING A THREE-COAT SYSTEM OF APPROVED WEATHER-RESISTANT EXTERIOR EMULSION PAINT (ONE PRIMER COAT PLUS TWO FINISH COATS) ON NEW PLASTERED EXTERIOR WALL SURFACES, INCLUDING SURFACE PREPARATION, COMPLETE AS SPECIFIED.SQM2678  
408SH6APPLYING ONE COAT OF LIME WHITEWASH (FAT LIME SLAKED AND STRAINED) ON NEW OR OLD WALL/CEILING SURFACES, INCLUDING SURFACE PREPARATION, COMPLETE AS SPECIFIED.SQM66  
409SH6APPLYING SECOND AND SUBSEQUENT COATS OF LIME WHITEWASH ON PREVIOUSLY WHITEWASHED WALL/CEILING SURFACES, COMPLETE AS SPECIFIED.SQM66  
410SH6APPLYING A THREE-COAT LIME WHITEWASH FINISH ON NEW OR OLD WALL/CEILING SURFACES, INCLUDING SURFACE PREPARATION AND CLEANING, COMPLETE AS SPECIFIED.SQM59398  
411SH6APPLYING A THREE-COAT OIL-BOUND DISTEMPER (OR POLYVINYL DISTEMPER) FINISH ON NEW OR OLD PLASTERED WALL SURFACES, INCLUDING SURFACE PREPARATION, COMPLETE AS SPECIFIED.SQM1483  
412SH6APPLYING TWO COATS OF SYNTHETIC ENAMEL PAINT ON NEW OR OLD STEEL DOORS, WINDOWS AND CSWS, INCLUDING SURFACE PREPARATION (CLEANING, SANDING, PRIMING WHERE REQUIRED), COMPLETE AS SPECIFIED.SQM72  
413SH6APPLYING THREE COATS OF SYNTHETIC ENAMEL PAINT ON MS GRILLS/RAILINGS, INCLUDING SURFACE PREPARATION (REMOVAL OF RUST, SCALE AND OLD PAINT), COMPLETE AS SPECIFIED.SQM75  
414SH7EXCAVATION OF CABLE TRENCH UP TO 3 FEET DEEP AND 1.5 FEET WIDE FOR LAYING OF AIRFIELD LIGHTING PRIMARY CABLE OF ANY DESCRIPTION 6MM2 ON DESIRED LOCATION INCLUDING BACKFILLING IN LAYERS WITH COVERING LAYER OF SAND AROUND THE CABLE WARNING TAPE AND TILES/BRICKS COMPACTION AND MAKING GOOD AS PER PAK PWD SPECIFICATIONS.MTR2000  
415SH7EXCAVATION OF CABLE TRENCH UP TO 3 FEET DEEP AND 3 FEET WIDE FOR LAYING OF AIRFIELD LIGHTING PRIMARY CABLE OF ANY DESCRIPTION 6MM2 ON DESIRED LOCATION INCLUDING BACKFILLING IN LAYERS WITH COVERING LAYER OF SAND AROUND THE CABLE WARNING TAPE AND TILES/BRICKS COMPACTION AND MAKING GOOD AS PER PAK PWD SPECIFICATIONS.MTR6500  
416SH7PROVIDING AND LAYING OF 4 CORE 25MM2 PVC INSULATED AND PVC SHEATHED 1900/3300 VOLTS GRADE CIRCULAR STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE IN A PROPER CABLE TRENCH BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING TILES AS PER PAK PWD SPECIFICATION.MTR1500  
417SH7PROVIDING AND LAYING OF 4 CORE 50MM2 PVC INSULATED AND PVC SHEATHED 1900/3300 VOLTS GRADE CIRCULAR STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE IN A PROPER CABLE TRENCH BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING TILES AS PER PAK PWD SPECIFICATION.MTR4000  
418SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 10MM2.MTR200  
419SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 16MM2.MTR11180  
420SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 25MM2.MTR210  
421SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 35MM2.MTR150  
422SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 50MM2.MTR110  
423SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 70MM2.MTR110  
424SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 95MM2.MTR100  
425SH7PROVIDING AND LAYING 4 CORE PVC INSULATED AND PVC SHEATHED 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR ARMORED UNDERGROUND LT CABLE BURIED IN THE GROUND DULY COVERED WITH SAND AND WARNING CABLE TILES AS PER PAK PWD SPECIFICATION - 120MM2.MTR100  
426SH7PROVIDING AND LAYING HT 11 KV 3 CORE STRANDED COPPER CONDUCTOR XLPE INSULATED CU TAPE SCREENED PVC BEDDED AND PVC SHEATHED ARMORED CABLE LAID IN EXISTING ALL KIND OF PIPES CABLE DUCT CHANNELS ETC AS PER PAK PWD SPECIFICATION - 50MM2.MTR150  
427SH7PROVIDING AND LAYING HT 11 KV 3 CORE STRANDED COPPER CONDUCTOR XLPE INSULATED CU TAPE SCREENED PVC BEDDED AND PVC SHEATHED ARMORED CABLE LAID IN EXISTING ALL KIND OF PIPES CABLE DUCT CHANNELS ETC AS PER PAK PWD SPECIFICATION - 95MM2.MTR150  
428SH7PROVIDING AND FIXING INDOOR/OUTDOOR 3 CORE 11KV XLPE HEAT SHRINK TERMINATION ENDS KIT COMPLETE IN ALL RESPECT AS REQUIRED - 50MM2 TO 95MM2.JOBS6  
429SH7PROVIDING INSTALLATION AND COMMISSIONING OF OUTDOOR WATER TIGHT TYPE 30KVA 2000/415VOLTS 50HZ TRANSFORMER INCLUDING MAKING CONNECTIONS AND TESTING ON LOAD COMPLETE.NOS5  
430SH7PROVIDING INSTALLATION AND COMMISSIONING OF OUTDOOR WATER TIGHT TYPE 200 KVA 415/2000 VOLTS 50HZ TRANSFORMER INCLUDING MAKING CONNECTIONS AND TESTING ON LOAD COMPLETE.NOS1  
431SH7PROVIDING INSTALLATION AND COMMISSIONING OF OUTDOOR WATER TIGHT TYPE 150 KVA 415/2000 VOLTS 50HZ TRANSFORMER INCLUDING MAKING CONNECTIONS AND TESTING ON LOAD COMPLETE.NOS1  
432SH7PROVIDING FIXING AND COMMISSIONING INDOOR/POLE MOUNTED STEPDOWN 11000/400 VOLTS THREE PHASE 50HZ TRANSFORMER AS PER ELECTRICITY CODE COMPLETE IN ALL RESPECT - 400 KVA.NOS1  
433SH7PROVIDING FIXING AND COMMISSIONING INDOOR/POLE MOUNTED STEPDOWN 11000/400 VOLTS THREE PHASE 50HZ TRANSFORMER AS PER ELECTRICITY CODE COMPLETE IN ALL RESPECT - 630 KVA.NOS2  
434SH7PROVIDING AND FIXING HT 11 KV INDOOR/OUTDOOR TYPE FUSE D LINK/CUT OFF FUSE ASSEMBLY SET OF THREE PIECES COMPLETE WITH FUSE FITTED ON ANGLE IRON BASE FRAME AS REQUIRED.JOBS3  
435SH7PROVIDING AND ERECTING LT MS TUBULAR POLE 30 FEET LONG IN THE GROUND 5FT DEEP AND MAKING PCC FOUNDATION 1:3:6 RATIO 2FT HEIGHT FROM GROUND LEVEL DULY PLASTERED INCLUDING ACCESSORIES AND INTERCONNECTION.JOBS370  
436SH7SUPPLY AND INSTALLATION OF 2 FEET 2MM THICK GI SINGLE ARM MOUNTING BRACKET.NOS10  
437SH7SUPPLY AND INSTALLATION OF 2 FEET 2MM THICK GI DOUBLE ARM MOUNTING BRACKET.NOS350  
438SH7SUPPLY AND INSTALLATION OF 2 FEET 2MM THICK GI FOUR ARM MOUNTING BRACKET.NOS10  
439SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF FLOOD LIGHTS IP66 INCLUDING DRIVER HAVING NEUTRAL WHITE/COOL WHITE COLOUR 90-110 LM/WATTS EFFICIENCY 0.9 OR ABOVE POWER FACTOR 20000-25000 HOURS LIFE CYCLE INCLUDING CONNECTION - 90-100 WATTS.NOS100  
440SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF FLOOD LIGHTS IP66 INCLUDING DRIVER HAVING NEUTRAL WHITE/COOL WHITE COLOUR 90-110 LM/WATTS EFFICIENCY 0.9 OR ABOVE POWER FACTOR 20000-25000 HOURS LIFE CYCLE INCLUDING CONNECTION - 140-160 WATTS.NOS550  
441SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF STREET/ROAD LIGHTS IP65 INCLUDING DRIVER HAVING NEUTRAL WHITE/COOL WHITE COLOUR 90-110 LM/WATTS EFFICIENCY 0.9 OR ABOVE POWER FACTOR 20000-25000 HOURS LIFE CYCLE INCLUDING CONNECTION - 90-100 WATTS.NOS50  
442SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF STREET/ROAD LIGHTS IP65 INCLUDING DRIVER HAVING NEUTRAL WHITE/COOL WHITE COLOUR 90-110 LM/WATTS EFFICIENCY 0.9 OR ABOVE POWER FACTOR 20000-25000 HOURS LIFE CYCLE INCLUDING CONNECTION - 140-160 WATTS.NOS140  
443SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF FLOODLIGHTS IP66 INCLUDING DRIVER HAVING NEUTRAL WHITE/COOL WHITE COLOUR 110-120 LM/WATTS EFFICIENCY 0.9 OR ABOVE POWER FACTOR 40000-50000 HOURS LIFE CYCLE INCLUDING CONNECTION - 300 WATTS.NOS24  
444SH7PROVIDING FABRICATION AND INSTALLATION OF HOT DIPPED GALVANIZED POLYGONAL MAST UP TO 25 METERS HEIGHT INCLUDING MID PLATFORM HEAD PLATFORM CLIMBING LADDERS SAFETY LOOPS BASE PLATE ANCHOR BOLTS AND STIFFENERS AS PER DRAWING AND SPECIFICATION.JOBS2  
445SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED UNIDIRECTIONAL INSET APPROACH LIGHT COMPLETE WITH PRISM GASKET CABLE TERMINATION CALIBRATION AND ALL ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOBS5  
446SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED UNIDIRECTIONAL ELEVATED APPROACH LIGHT COMPLETE WITH FRANGIBLE COUPLING POLE/BASE ASSEMBLY CABLE TERMINATION CALIBRATION AND ALL ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOBS19  
447SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED UNIDIRECTIONAL INSET THRESHOLD LIGHT COMPLETE WITH PRISM GASKET CABLE TERMINATION CALIBRATION AND ALL ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOBS12  
448SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED BIDIRECTIONAL INSET THRESHOLD/RUNWAY END LIGHT COMPLETE WITH GREEN/RED FILTERS PRISM GASKET CABLE TERMINATION CALIBRATION AND ALL ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOBS12  
449SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED BIDIRECTIONAL INSET RUNWAY EDGE LIGHT COMPLETE WITH PRISM GASKET CABLE TERMINATION CALIBRATION AND ALL ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOBS6  
450SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED BI-DIRECTIONAL ELEVATED RUNWAY EDGE LIGHT COMPLETE WITH FRANGIBLE COUPLING OPTICAL SYSTEM CABLE TERMINATION CALIBRATION AND ALL ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOBS134  
451SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED OMNIDIRECTIONAL ELEVATED TAXIWAY EDGE LIGHT COMPLETE WITH FRANGIBLE COUPLING OPTICAL SYSTEM CABLE TERMINATION CALIBRATION AND ALL ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOBS50  
452SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF 45 W ISOLATING TRANSFORMER RATED 6.6A/6.6A 50/60 HZ COMPLETE WITH PRIMARY AND SECONDARY CONNECTIONS EARTHING MOUNTING AND ALL ACCESSORIES SUITABLE FOR SERIES AIRFIELD LIGHTING CIRCUITS.JOBS62  
453SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF 65 W ISOLATING TRANSFORMER RATED 6.6A/6.6A 50/60 HZ COMPLETE WITH PRIMARY AND SECONDARY CONNECTIONS EARTHING MOUNTING AND ALL ACCESSORIES SUITABLE FOR SERIES AIRFIELD LIGHTING CIRCUITS.JOBS188  
454SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF ISOLATION TRANSFORMER RATED 200 W PRIMARY CURRENT 6.6 A SECONDARY CURRENT 6.6 A FREQUENCY 50/60 HZ COMPLETE WITH AL CORE CONSTRUCTION AND ALL NECESSARY ACCESSORIES SUITABLE FOR OPERATION WITH ICAO COMPLIANT AIRFIELD LIGHTING SYSTEMS.JOBS8  
455SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF LED PRECISION APPROACH PATH INDICATOR PAPI LIGHT 04 COMPLETE UNIT COMPLETE WITH OPTICAL ASSEMBLY FRANGIBLE MOUNTING AIMING AND CALIBRATION MECHANISM AND ALL NECESSARY ACCESSORIES CONFORMING TO ICAO ANNEX 14 AND FAA STANDARDS.JOB1  
456SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF 8 INCH ALUMINUM SHALLOW BASE FOR INSET AIRFIELD LIGHTING FIXTURES 135 MM HEIGHT WITH 100 MM CENTRE HOLE COMPLETE WITH O-RING GASKET MOUNTING SCREWS GROUNDING SCREW AND ALL NECESSARY ACCESSORIES.JOBS11  
457SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF 12 INCH ALUMINUM SHALLOW BASE FOR INSET AIRFIELD LIGHTING FIXTURES 150 MM HEIGHT WITH 100 MM CENTRE HOLE COMPLETE WITH O-RING GASKET MOUNTING STUDS GROUNDING SCREW AND ALL NECESSARY ACCESSORIES.JOBS24  
458SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF 5 KVA CONSTANT CURRENT REGULATOR CCR AIR-COOLED MICROPROCESSOR-CONTROLLED MODULAR TYPE INCORPORATING FIVE BRIGHTNESS STEPS LOCAL AND REMOTE CONTROL FACILITIES AND ALL NECESSARY PROTECTIONS CONFORMING TO FAA AND ICAO STANDARDS.JOBS4  
459SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF 7.5 KVA CONSTANT CURRENT REGULATOR CCR AIR-COOLED MICROPROCESSOR-CONTROLLED MODULAR TYPE INCORPORATING FIVE BRIGHTNESS STEPS LOCAL AND REMOTE CONTROL FACILITIES AND ALL NECESSARY PROTECTIONS CONFORMING TO FAA AND ICAO STANDARDS.JOBS6  
460SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF 15 KVA CONSTANT CURRENT REGULATOR CCR AIR-COOLED MICROPROCESSOR-CONTROLLED MODULAR TYPE INCORPORATING FIVE BRIGHTNESS STEPS LOCAL AND REMOTE CONTROL FACILITIES AND ALL NECESSARY PROTECTIONS CONFORMING TO FAA AND ICAO STANDARDS.JOBS2  
461SH7PROVIDING SUPPLYING LAYING TESTING AND COMMISSIONING OF 6 MM2 SINGLE-CORE AIRFIELD LIGHTING AFL PRIMARY CABLE 5 KV GRADE XLPE INSULATED STRANDED COPPER CONDUCTOR SCREENED AND PVC/PE SHEATHED SUITABLE FOR 6.6 A SERIES LIGHTING CIRCUITS CONFORMING TO ICAO AND FAA STANDARDS.MTR35000  
462SH7PROVIDING SUPPLYING LAYING TESTING AND COMMISSIONING OF 4 MM2 2-CORE AIRFIELD LIGHTING AFL SECONDARY CABLE COPPER CONDUCTOR WITH POLYCHLOROPRENE PCP INSULATION/SHEATH SUITABLE FOR CONNECTION BETWEEN ISOLATION TRANSFORMER AND AIRFIELD LIGHTING FIXTURES CONFORMING TO ICAO AND FAA STANDARDS.MTR2100  
463SH7SUPPLYING AND DRAWING OF 6MMSQ SINGLE CORE PVC INSULATED WIRE IN ALL KINDS OF EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED.MTR6000  
464SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF PRIMARY CONNECTOR KIT KD500 SUITABLE FOR 5 KV 6.6 A AIRFIELD LIGHTING AFL SERIES PRIMARY CABLE COMPRISING MOLDED PLUG AND RECEPTACLE ASSEMBLY WATERTIGHT INSULATED CONNECTORS AND ALL NECESSARY HARDWARE.JOBS242  
465SH7PROVIDING SUPPLYING AND INSTALLATION OF L-867 HOT-DIP GALVANIZED DEEP BASE ISOLATION TRANSFORMER HOUSING FABRICATED FROM HEAVY-DUTY GALVANIZED STEEL 12-INCH DIAMETER AND 18-INCH DEPTH COMPLETE WITH COVER PLATE MOUNTING STUDS UPVC CONDUIT EXCAVATION CONCRETE FOUNDATION EARTHING AND ALL ASSOCIATED ACCESSORIES CONFORMING TO FAA STANDARDS.JOBS242  
466SH7PROVIDING SUPPLYING INSTALLATION TESTING AND COMMISSIONING OF SECONDARY CONNECTOR KIT MALE AND FEMALE KD501 AND KD502 SUITABLE FOR AIRFIELD LIGHTING AFL SECONDARY CABLE CONNECTION BETWEEN THE ISOLATION TRANSFORMER AND LIGHTING FIXTURE COMPLETE WITH MOLDED WATERTIGHT CONNECTORS AND ALL NECESSARY HARDWARE CONFORMING TO FAA AND ICAO STANDARDS.JOBS254  
467SH7PROVIDING CORE CUTTING FIXING INSTALLATION TESTING AND COMMISSIONING OF 8-INCH INSET AIRFIELD LIGHTING SHALLOW BASE INCLUDING CORE DRILLING OF EXISTING PAVEMENT POSITIONING AND ALIGNMENT GROUTING WITH APPROVED NON-SHRINK EPOXY/CEMENTITIOUS GROUT REINSTATEMENT OF SURROUNDING PAVEMENT CONFORMING TO ICAO AND FAA STANDARDS.JOBS31  
468SH7PROVIDING CORE CUTTING FIXING INSTALLATION TESTING AND COMMISSIONING OF 12-INCH INSET AIRFIELD LIGHTING SHALLOW BASE INCLUDING CORE DRILLING OF EXISTING PAVEMENT POSITIONING AND ALIGNMENT GROUTING WITH APPROVED NON-SHRINK EPOXY/CEMENTITIOUS GROUT RESTORATION OF PAVEMENT CONFORMING TO ICAO AND FAA STANDARDS.JOBS165  
469SH7PROVIDING SLOT CUTTING 25 MM WIDE AND UP TO 100 MM DEEP IN EXISTING PAVEMENT INCLUDING CUTTING CLEANING LAYING OF AIRFIELD LIGHTING AFL CABLE INSTALLATION OF BACKER ROD FILLING WITH APPROVED NON-SHRINK GROUT/SEALANT SURFACE FINISHING RESTORATION OF PAVEMENT CONFORMING TO ICAO AND FAA STANDARDS.MTR200  
470SH7PROVIDING SUPPLYING AND INSTALLATION OF AIRFIELD LIGHTING AFL CABLE ROUTE MARKERS MANUFACTURED FROM REINFORCED PRECAST CONCRETE COMPLETE WITH ENGRAVED AFL CABLE IDENTIFICATION EXCAVATION CONCRETE FOUNDATION ALIGNMENT FIXING BACKFILLING AND ALL NECESSARY HARDWARE INSTALLED AT REQUIRED INTERVALS CONFORMING TO ICAO AND FAA STANDARDS.JOBS446  
471SH7PROVIDING AND INSTALLATION OF RUNWAY/TAXIWAY GUIDANCE SIGN BOARD FACE SIZE 2100 MM X 600 MM X 210 MM LOCALLY FABRICATED 14 SWG ALUMINUM SHEET FRAME MADE WITH 1-1/4IN ALUMINUM ANGLE FRAME DULY POWDER COATED SINGLE FACED WITH 5 MM THICK ACRYLIC SHEET WITH 3M VINYL PASTING INTERNALLY ILLUMINATED BY LED TYPE LIGHTS TO BE RUN ON 6.6A CCR CIRCUIT.JOBS2  
472SH7PROVIDING AND INSTALLATION OF RUNWAY/TAXIWAY GUIDANCE SIGN BOARD FACE SIZE 1200 MM X 600 MM X 210 MM LOCALLY FABRICATED 14 SWG ALUMINUM SHEET FRAME MADE WITH 1-1/4IN ALUMINUM ANGLE FRAME DULY POWDER COATED SINGLE FACED WITH 5 MM THICK ACRYLIC SHEET WITH 3M VINYL PASTING INTERNALLY ILLUMINATED BY LED TYPE LIGHTS TO BE RUN ON 6.6A CCR CIRCUIT.JOBS3  
473SH7PROVIDING AND INSTALLATION OF RUNWAY/TAXIWAY GUIDANCE SIGN BOARD FACE SIZE 2700 MM X 800 MM X 210 MM LOCALLY FABRICATED 14 SWG ALUMINUM SHEET FRAME MADE WITH 1-1/4IN ALUMINUM ANGLE FRAME DULY POWDER COATED DOUBLE FACED WITH 5 MM THICK ACRYLIC SHEET WITH 3M VINYL PASTING INTERNALLY ILLUMINATED BY LED TYPE LIGHTS TO BE RUN ON 6.6A CCR CIRCUIT.JOBS2  
474SH7FABRICATING/MAKING 1.5FT X 1.5FT X 4FT RCC FOUNDATION PADS FOR INSTALLATION OF GUIDANCE SIGN BOARDS INCLUDING NECESSARY GROUND WORK COMPLETE AS PER SITE REQUIREMENT.JOBS8  
475SH7PROVIDING AND LAYING D CLASS 50MM UPVC CONDUIT 2INCH DIA WITH ALL SPECIALS FITTING INCLUDING MAKING GOOD THE DAMAGES AS PER ORIGINAL COMPLETE.MTR444  
476SH7PROVIDING AND INSTALLATION OF 3 METERS X 19 MM DIA COPPER EARTH ROD ELECTRODE BURIED UNDER GROUND ALONG WITH SUITABLE COPPER CLAMPS NUTS/BOLTS AND MAKING CONNECTIONS INCLUDING TESTING COMPLETE.JOBS40  
477SH7PROVIDING AND LAYING OF 10MM2 STRANDED BARE COPPER CONDUCTOR FOR COUNTERPOISE IN THE EXISTING CABLE TRENCH ENSURING PROPER SPACING AS PER ICAO/FAA SPECIFICATIONS COMPLETE AS REQUIRED.MTR8000  
478SH7PROVIDING AND FIXING 4IN DIA UPVC PIPE D CLASS AND SPECIALS ETC OF APPROVED MAKE AND QUALITY WITH SPECIALS AND CLAMPS ETC.RFT4081  
479SH7EXCAVATION FOR FOUNDATION TRENCHES AND DRAINS IN STRATA OF CONGLOMERATIONS OF GRAVEL AND BOULDERS BY HAMMERING CHISELING AND JUMPER WORK INCLUDING STACKING OF SERVICEABLE AND UNSERVICEABLE MATERIALS SEPARATELY LEAD UP TO ONE CHAIN AND LIFT UP TO 5 FEET.100CFT3855  
480SH7PROVIDING AND LAYING 1:3:6 CEMENT CONCRETE SOLID BLOCK MASONRY MACHINE MADE MORE THAN 6 INCHES THICK USING GRADED SCREENED BAJRI 3/4 INCH AND DOWN GAUGE SET IN CEMENT MORTAR 1:5 IN FOUNDATION BASEMENT AND PLINTH INCLUDING SCAFFOLDING RAKING OUT JOINTS AND CURING COMPLETE.100CFT132  
481SH71/4IN THICK CEMENT PLASTER 1:4 ON SOFFITS OF CEILING CANTILEVER SLABS SIDES AND SOFFITS OF BEAMS ETC IN FIRST FLOOR INCLUDING MAKING EDGES CORNERS AND CURING COMPLETE.100SFT180  
482SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF MONOCRYSTALLINE A GRADE TIER I HIGH EFFICIENCY IEC CERTIFIED SOLAR PANEL INCLUDING CABLING MAKING CONNECTIONS COMPLETE.WATTS500000  
483SH7PROVIDING AND FIXING OF GALVANIZED RUST FREE 14 GAUGE SOLID DESIGN FRAME FOR SOLAR PANEL COMPLETE.NOS800  
484SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF HYBRID ONGRID INVERTER INCLUDING NECESSARY CABLES MAKING CONNECTIONS WITH LOCKING ARRANGEMENTS COMPLETE - 50 KVA.NOS10  
485SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 10 AMP TO 20 AMP.NOS25  
486SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 25 AMP.NOS25  
487SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 40 AMP.NOS25  
488SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 50 AMP.NOS25  
489SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 10 AMP TO 20 AMP.NOS25  
490SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 32 AMP.NOS25  
491SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 40 AMP TO 50 AMP.NOS25  
492SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF SINGLE POLE DC CIRCUIT BREAKER FIXED ON EXISTING BOARD INCLUDING INTERCONNECTIONS - 63 AMP.NOS25  
493SH7PROVIDING LAYING FIXING TESTING AND COMMISSIONING SINGLE-CORE 6 MM2 DC SOLAR CABLE RATED UP TO 1500V DC MANUFACTURED WITH TINNED COPPER CONDUCTOR DOUBLE INSULATED LSZH FLAME RETARDANT AND UV WEATHER RESISTANT CABLE LAID IN SURFACE OR CONCEALED PVC CONDUITS INCLUDING CABLE TIES LUGS MC4 CONNECTORS GLANDING CRIMPING TERMINATION COMPLETE.MTR4200  
494SH7SUPPLY AND FIXING 12IN X 4IN MS CABLE TRAY PERFORATED 18 SWG COMPLETE WITH COVER OF 20 SWG INCLUDING PAINTING AND SUPPORTING SYSTEM.MTR250  
495SH7SUPPLY AND FIXING OF 6IN X 4IN MS CABLE TRAY PERFORATED 18 SWG COMPLETE WITH COVER OF 20 SWG INCLUDING PAINTING AND SUPPORTING SYSTEM.MTR150  
496SH7PROVIDING INSTALLATION TESTING AND COMMISSIONING OF RECESSED SPOT LIGHTS INCLUDING DRIVER HAVING WARM/NEUTRAL WHITE/COOL WHITE COLOUR 80 LM/WATT EFFICIENCY 0.9 OR ABOVE POWER FACTOR 15000-20000 HOURS LIFE CYCLE INCLUDING CONNECTION - 3 WATTS.NOS8  
497SH7WIRING FOR LIGHT POINT WITH 1.5 MM2 SINGLE CORE PVC INSULATED WIRE COPPER CONDUCTOR IN 20 MM DIA UPVC CONDUIT RECESSED IN THE WALL OR COLUMN ROOF ETC INCLUDING 1 MM2 SINGLE CORE PVC INSULATED WIRE AS ECC AS REQUIRED.POINT5  
498SH7PROVIDING AND FIXING 6/10 AMPS FLUSH TYPE SP PIANO SWITCH FITTED ON GIVEN SHEET OR ALL KIND OF BOARD INCLUDING CONNECTION AS REQUIRED.EACH5  
499SH7PROVIDING AND FIXING FLAME PROOF FITTING 20 MM ET TAPPED ENTRY CI BODY GREY PAINTED WITH HEAVY GLASS CEMENTED TO FIXED RING STRONG WIRE GUARD AND LAMP HOLDER WITH TERMINAL CHAMBER SUITABLE FOR 60/100 W LAMP.EACH5  
500SH7PROVIDING AND FIXING DISTRIBUTION BOARD STEEL SHEET FLAME PROOF OF REQUIRED SIZE WITH HINGED COVER HARD DRAWN COPPER BUS BARS MOUNTED ON INSULATED FRAMES COMPLETE WITH MAIN AND BRANCH CABLES SOCKETS AND TERMINALS ENAMEL PAINT INSIDE AND BLACK OUTSIDE 500 V 200 A 4 BARS 400 MM HEIGHT.EACH5  
501SH7PROVIDING AND FIXING 6 TO 32 AMPS SP MCCB FIXED ON EXISTING BOARD INCLUDING INTER-CONNECTION AS REQUIRED.EACH5  
502SH7PROVIDING AND FIXING 6 TO 63 AMPS DP MCCB FIXED ON EXISTING BOARD INCLUDING INTER-CONNECTION AS REQUIRED.EACH5  
503SH7PROVIDING AND FIXING EARTHING SET COMPLETE WITH 8 SWG COPPER CONDUCTOR SUPPLY AND FIXING.EACH2  
504SH8WIRING FOR LIGHT OR FAN POINT WITH 1.5 mm2 SINGLE CORE, PVC INSULATED WIRE COPPER CONDUCTOR WIRE IN 20 mm (3/4in) DIA UPVC CONDUIT RECESSED IN THE WALL OR COLUMN, ROOF ETC. INCLUDING 1mm2 SINGLE CORE PVC INSULATED WIRE AS ECC AS REQUIRED.POINTS1600  
505SH8EXTENSION/ADDITIONAL WIRING FOR LIGHT, FAN OR CALL BELL POINT CONTROLLED WITH SAME SWITCH WITH 1.5mm2 PVC INSULATED WIRE IN 20 mm (3/4in) DIA UPVC CONDUIT RECESSED IN THE WALL OR COLUMN, INCLUDING 1mm2 PVC INSULATED WIRE AS ECC AS REQUIRED.POINTS1500  
506SH8SUPPLY & DRAWING OF 2 x 2.5mm2, SINGLE CORE, PVC INSULATED WIRE INCLUDING 1mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ALL KINDS OF EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED (P+N+E)METERS16000  
507SH8SUPPLY & DRAWING OF 2 x 4mm2, SINGLE CORE, PVC INSULATED WIRE INCLUDING 1.5mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ALL KINDS OF EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS11000  
508SH8SUPPLY & DRAWING OF 2 x 6mm2, SINGLE CORE, PVC INSULATED WIRE INCLUDING 2.5mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ALL KINDS OF EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS200  
509SH8WIRING FOR SUB-MAIN WITH 4 x 4mm2, PVC INSULATED WIRE 300/500VOLTS GRADE, SINGLE CORE, STRANDED COPPER CONDUCTOR WIRE INCLUDING 1.5mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ALL KINDS OF EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS310  
510SH8WIRING FOR SUB-MAIN WITH 4 x 6mm2, PVC INSULATED WIRE 300/500VOLTS GRADE, SINGLE CORE, STRANDED COPPER CONDUCTOR WIRE INCLUDING 2.5mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ALL KINDS OF EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS3360  
511SH8WIRING FOR SUB-MAIN WITH 4x10mm2, PVC INSULATED WIRE 300/500VOLTS GRADE, SINGLE CORE, STRANDED COPPER CONDUCTOR WIRE INCLUDING 2.5mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ALL KINDS OF EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS423  
512SH8WIRING FOR SUB-MAIN WITH 4x16 mm2, PVC INSULATED WIRE 450/750VOLTS GRADE, SINGLE CORE, STRANDED COPPER CONDUCTOR WIRE INCLUDING 4mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ANY EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS200  
513SH8WIRING FOR SUB-MAIN WITH 4x25mm2, PVC INSULATED WIRE 450/750VOLTS GRADE, SINGLE CORE, STRANDED COPPER CONDUCTOR WIRE INCLUDING 4mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ANY EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS170  
514SH8WIRING FOR SUB-MAIN WITH 4x35mm2, PVC INSULATED WIRE 450/750 VOLTS GRADE, SINGLE CORE, STRANDED COPPER CONDUCTOR WIRE INCLUDING 6mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ANY EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS150  
515SH8WIRING FOR SUB-MAIN WITH 4x50mm2, PVC INSULATED WIRE 450/750 VOLTS GRADE, SINGLE CORE, STRANDED COPPER CONDUCTOR WIRE INCLUDING 6mm2 PVC INSULATED WIRE SINGLE CORE WIRE AS ECC IN ANY EXISTING OR GIVEN CONDUIT/CABLE DUCT AS REQUIRED. (P+N+E)METERS100  
516SH8SUPPLY & FIXING 25mm (1in) DIA UPVC CONDUIT WITH ALL ESPECIAL SUCH AS BENDS, SOCKETS, JUNCTION ETC FITTED ON SURFACE AS REQUIRED.METERS1200  
517SH8SUPPLY & FIXING 40mm (1 1/2in) DIA UPVC CONDUIT WITH ALL ESPECIAL SUCH AS BENDS, SOCKETS, JUNCTION ETC FITTED ON SURFACE AS REQUIRED.METERS1000  
518SH8SUPPLY & FIXING 50mm (2in) DIA UPVC CONDUIT WITH ALL ESPECIAL SUCH AS BENDS, SOCKETS, JUNCTION ETC FITTED ON SURFACE AS REQUIRED.METERS1000  
519SH8SUPPLY & FIXING 25mm (1in) DIA UPVC CONDUIT WITH ALL ESPECIAL SUCH AS BENDS, SOCKETS, JUNCTION ETC RECESSED IN THE WALL OR COLUMN AS REQUIRED.METERS5800  
520SH8SUPPLY & FIXING 40mm (1 1/2in) DIA UPVC CONDUIT WITH ALL ESPECIAL SUCH AS BENDS, SOCKETS, JUNCTION ETC RECESSED IN THE WALL OR COLUMN AS REQUIRED.METERS9000  
521SH8SUPPLY & FIXING 50mm (2in) DIA UPVC CONDUIT WITH ALL ESPECIAL SUCH AS BENDS, SOCKETS, JUNCTION ETC RECESSED IN THE IN THE WALL OR FLOOR AS REQUIRED.METERS9000  
522SH8PROVIDING & FIXING OF 50X50mm UPVC DUCT FITTED ON SURFACE AS REQUIRED BY SITE INCHARGE.METERS200  
523SH8PROVIDING & FIXING OF 100X100mm UPVC DUCT FITTED ON SURFACE AS REQUIRED BY SITE INCHARGE.METERS200  
524SH8PROVIDING & FIXING OF 150X150mm UPVC DUCT FITTED ON SURFACE AS REQUIRED BY SITE INCHARGE.METERS200  
525SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF RECESSED / SURFACE MOUNTED PROJECT / PROFESSIONAL SERIES CEILING LIGHTS / DOWNLIGHTS INCLUDING DRIVER HAVING WARM/NEUTRAL WHITE/COOL WHITE COLOUR, 100-110 LM/WATTS EFFICIENCY, 0.9 OR ABOVE POWER FACTOR, 40000-50000 HOURS LIFECYCLE, INCLUDING CONNECTION, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 11-13 WATTSNOS600  
526SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF RECESSED / SURFACE MOUNTED PROJECT / PROFESSIONAL SERIES CEILING LIGHTS / DOWNLIGHTS INCLUDING DRIVER HAVING WARM/NEUTRAL WHITE/COOL WHITE COLOUR, 100-110 LM/WATTS EFFICIENCY, 0.9 OR ABOVE POWER FACTOR, 40000-50000 HOURS LIFECYCLE, INCLUDING CONNECTION, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 16-18 WATTSNOS1500  
527SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF RECESSED / SURFACE MOUNTED PROJECT / PROFESSIONAL SERIES CEILING LIGHTS / DOWNLIGHTS INCLUDING DRIVER HAVING WARM/NEUTRAL WHITE/COOL WHITE COLOUR, 100-110 LM/WATTS EFFICIENCY, 0.9 OR ABOVE POWER FACTOR, 40000-50000 HOURS LIFECYCLE, INCLUDING CONNECTION, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 22-24 WATTSNOS150  
528SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF RECESSED / SURFACE MOUNTED PROJECT / PROFESSIONAL SERIES CEILING LIGHTS / DOWNLIGHTS INCLUDING DRIVER HAVING WARM/NEUTRAL WHITE/COOL WHITE COLOUR, 100-110 LM/WATTS EFFICIENCY, 0.9 OR ABOVE POWER FACTOR, 40000-50000 HOURS LIFECYCLE, INCLUDING CONNECTION, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 30-34 WATTSNOS100  
529SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF RECESSED/ SURFACE MOUNTED LED PANEL LIGHT INCLUDING DRIVER, HAVING WARM/ NEUTRALWHITE /COOL WHITE COLOUR, 80-100LM/WATTS EFFICIENCY, 0.9 OR ABOVE POWERFACTOR, 20000-25000 HOURS LIFE CYCLE, INCLUDING CONNECTION, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 38-40 WATTS (2 x 2)NOS250  
530SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF LED BATTEN LIGHTS INCLUDING DRIVER, HAVING WARM / NEUTRAL WHITE /COOL WHITE COLOUR, 90-100 LM/WATTS EFFICIENCY, 0.9 OR ABOVE POWER FACTOR, 20000-25000 HOURS LIFE CYCLE, INCLUDING CONNECTION, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 18-20 WATTSNOS250  
531SH8PROVIDING & INSTALLING 140 Cm (56in) SWEEP CEILING FAN WITH BLADES, CANOPY, STANDARD LENGTH OF DOWN ROD INCLUDING CONNECTION WITH 14.0076in FLEXIBLE WIRE COMPLETE AS REQUIRED. (WITHOUT REGULATOR) PAK, ROYAL, GFC, YOUNAS, MILLAT.NOS250  
532SH8PROVIDING & INSTALLING FALSE CEILING FAN (BOX FAN) WITH REMOTE, 24in (2 x 2) SIZE INCLUDING CONNECTIONS, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE (VOLDAM / PAK / ROYAL)NOS250  
533SH8PROVIDING & INSTALLING 45 Cm (18in) SWEEP WALL BRACKET FAN COMPLETE WITH BLADES, REGULATOR & PULLING CORD SWITCH, FITTED ON WALL OR COLUMN WITH GI CLIP INCLUDING CONNECTION AS REQUIRED. PAK, ROYAL, GFC, YOUNAS, MILLATNOS50  
534SH8PROVIDING & INSTALLING 30 Cm (12in) SWEEP, METALLIC BODY EXHAUST FAN COMPLETE WITH BLADES, MOTOR, ETC FITTED IN EXISTING HOLE INCLUDING CONNECTION WITH 14/.0076in FLEXIBLE WIRE COMPLETE AS REQUIRED PAK, ROYAL, GFC, YOUNAS, MILLAT.NOS20  
535SH8PROVIDING & INSTALLING 60 Cm (24in) SWEEP, METALLIC BODY EXHAUST FAN COMPLETE WITH BLADES, MOTOR, ETC FIXED IN EXISTING HOLE INCLUDING CONNECTION WITH 14/.0076in FLEXIBLE WIRE COMPLETE AS REQUIRED PAK, ROYAL, GFC, YOUNAS, MILLAT.NOS12  
536SH8PROVIDING & INSTALLING 25 Cm (10in) SWEEP, PLASTIC BODY EXHAUST FAN COMPLETE WITH BLADES, MOTOR, ETC FIXED IN EXISTING HOLE INCLUDING CONNECTION WITH 14/.0076in FLEXIBLE WIRE COMPLETE AS REQUIRED PAK, ROYAL, GFC, YOUNAS, MILLAT.NOS66  
537SH8PROVIDING & INSTALLING 30 Cm (12in) SWEEP, PLASTIC BODY EXHAUST FAN COMPLETE WITH BLADES, MOTOR, ETC FIXED IN EXISTING HOLE INCLUDING CONNECTION WITH 14/.0076in FLEXIBLE WIRE COMPLETE AS REQUIRED PAK, ROYAL, GFC, YOUNAS, MILLAT.NOS60  
538SH8PROVIDING & FIXING 10 AMPS POLYCARBONATE FLAME RETARDANT S.P SWITCH WITH FANCY REQUIRED GANG PLATE FIXED ON DIE FABRICATED, POWDER COATED METAL BOARD RECESSED IN WALL OR COLUMN INCLUDING CONNECTION AS REQUIRED. (SCHNEIDER / PHILIPS)NOS1900  
539SH8PROVIDING & FIXING 10 AMPS POLYCARBONATE FLAME RETARDANT 2-PIN SWITCH SOCKET UNIT ( UNIVERSAL) WITH FANCY GANG PLATE FIXED ON DIE FABRICATED, POWDER COATED METAL BOARD RECESSED IN WALL OR COLUMN INCLUDING CONNECTION AS REQUIRED. (SCHNEIDER / PHILIPS)NOS1000  
540SH8PROVIDING & FIXING 15 AMPS POLYCARBONATE FLAME RETARDANT 3-PIN SWITCH SOCKET UNIT WITH FANCY GANG PLATE FIXED ON DIE FABRICATED, POWDER COATED METAL BOARD RECESSED IN WALL OR COLUMN INCLUDING CONNECTION AS REQUIRED. (SCHNEIDER / PHILIPS)NOS400  
541SH8PROVIDING & FIXING 10/15 AMPS POLYCARBONATE FLAME RETARDANT 2-PIN SCHUKO SOCKET UNIT(GR-EARTH PIN) WITH FANCY GANG PLATE FIXED ON DIE FABRICATED, POWDER COATED METAL BOARD RECESSED IN WALL OR COLUMN INCLUDING CONNECTION AS REQUIRED. (SCHNEIDER / PHILIPS)NOS40  
542SH8PROVIDING & FIXING LIGHT DIMMER POLYCARBONATE FLAME RETARDANT WITH FANCY GANG PLATE FIXED ON DIE FABRICATED, POWDER COATED METAL BOARD RECESSED IN WALL OR COLUMN INCLUDING CONNECTION AS REQUIRED. (SCHNEIDER / PHILIPS)NOS355  
543SH8PROVIDING & FIXING POLYCARBONATE FLAME RETARDANT DATA SOCKET UNIT 8 CONTACT CAT-5 WITH FANCY GANG PLATE FIXED ON DIE FABRICATED, POWDER COATED METAL BOARD RECESSED IN WALL OR COLUMN INCLUDING CONNECTION AS REQUIRED. (SCHNEIDER / PHILIPS)NOS250  
544SH8PROVIDING & FIXING POLYCARBONATE FLAME RETARDANT TELEPHONE SOCKET 4 CONTACT SINGLE 2 LINE WITH FANCY GANG PLATE FIXED ON DIE FABRICATED, POWDER COATED METAL BOARD RECESSED IN WALL OR COLUMN INCLUDING CONNECTION AS REQUIRED. (SCHNEIDER / PHILIPS)NOS250  
545SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF ONLINE UPS, WITH STANDARD BACKUP OF 15-20 MINUTES, SUITABLE FOR OPERATION AT 220/240 VOLTS, 50HZ, SINGLE PHASE AC SUPPLY, INCLUDING CONNECTIONS, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 1 KVANOS3  
546SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF ONLINE UPS, WITH STANDARD BACKUP OF 15-20 MINUTES, SUITABLE FOR OPERATION AT 220/240 VOLTS, 50HZ, SINGLE PHASE AC SUPPLY, INCLUDING CONNECTIONS, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 2 KVANOS3  
547SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF ONLINE UPS, WITH STANDARD BACKUP OF 15-20 MINUTES, SUITABLE FOR OPERATION AT 220/240 VOLTS, 50HZ, SINGLE PHASE AC SUPPLY, INCLUDING CONNECTIONS, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 3 KVANOS6  
548SH8PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF ONLINE UPS, 10KVA CAPACITY, WITH STANDARD BACKUP OF 15-20 MINUTES, 3 PHASE IN AND 3 PHASE OUT, SUITABLE FOR OPERATION AT 380/400VOLTS, 50HZ, AC SUPPLY, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE.NOS5  
549SH8PROVIDING & FIXING CUBICAL TYPE METAL SHEET VERMIN PROTECTED LT PANEL BOARD AS PER DRAWING WITH LOCKING ARRANGEMENT DULY POWDER COATED I/C ALL FASTENING DEVICES AND ELECTRICAL WIRE/ LEADS FOR INTERNAL CONNECTION COMPLETE AS REQUIRED.SFT650  
550SH8PROVIDING & FIXING 6 TO 32 AMPS, S.P MCCB FIXED ON EXISTING BOARD, I/C INTER-CONNECTION AS REQUIRED.NOS950  
551SH86-32 AMPS DP MCCB.NOS250  
552SH8PROVIDING & FIXING 10 TO 60 AMPS,( HIGH BREAKING CAPACITY) T.P MCCB FIXED ON EXISTING BOARD, I/C INTER-CONNECTION AS REQUIRED.NOS70  
553SH8PROVIDING & FIXING 75 TO 100 AMPS,( LOW BREAKING CAPACITY) T.P MCCB FIXED ON EXISTING BOARD, I/C INTER-CONNECTION AS REQUIRED.NOS30  
554SH8PROVIDING & FIXING 250 TO 400 AMPS,( HIGH BREAKING CAPACITY) T.P CIRCUIT BREAKER FIXED ON EXISTING BOARD, I/C INTER-CONNECTION AS REQUIRED.NOS20  
555SH8PROVIDING & FIXING 400 TO 630 AMPS,( HIGH BREAKING CAPACITY) T.P CIRCUIT BREAKER FIXED ON EXISTING BOARD, I/C INTER-CONNECTION AS REQUIRED.NOS20  
556SH8PROVIDING & FIXING 400 TO 630 AMPS,(ADJUSTABLE- HIGH BREAKING CAPACITY) 4 POLE CIRCUIT BREAKER FIXED ON EXISTING BOARD, I/C INTERCONNECTION AS REQUIRED.NOS4  
557SH8PROVIDING & FIXING 630 TO 1200 AMPS, (ADJUSTABLE- HIGH BREAKING CAPACITY) 4 POLE CIRCUIT BREAKER FIXED ON EXISTING BOARD, I/C INTER CONNECTION AS REQUIRED.NOS4  
558SH8PROVIDING & FIXING 10 TO 60 AMPS, 4 POLE, THREE PHASE BUS BAR STRIP FITTED IN GIVEN DISTRIBUTION BOARD COMPLETE WITH BUS BAR INSULATOR, SCREWS, BOLTS ETC AS REQUIRED.NOS55  
559SH8PROVIDING & FIXING 70 TO 100 AMPS, 4 POLE, THREE PHASE BUS BAR STRIP FITTED IN GIVEN DISTRIBUTION BOARD COMPLETE WITH BUS BAR INSULATOR, SCREWS, BOLTS ETC AS REQUIRED.NOS60  
560SH8PROVIDING & FIXING 160 TO 200 AMPS, 4 POLE, THREE PHASE BUS BAR STRIP FITTED IN GIVEN DISTRIBUTION BOARD COMPLETE WITH BUS BAR INSULATOR, SCREWS, BOLTS ETC AS REQUIRED.NOS20  
561SH8PROVIDING & FIXING 400 AMPS, 4 POLE, THREE PHASE BUS BAR STRIP SET (STANDARD SIZE) FITTED IN SUITABLE SIZE METALLIC SHEET STEEL BOX WITH HINGED TYPE FRONT DOOR DULY PAINTED AND FIXED ON EXISTING BOARD I/C CONNECTION AS REQUIRED.NOS20  
562SH8PROVIDING & FIXING PILOT LAMP SET FITTED ON EXISTING BOARD I/C CONNECTION AS REQUIRED.SETS60  
563SH8VOLT METER 96 mm x 96 mmNOS60  
564SH8AMPERE METER 96 mm x 96 mm CT OPERATED 150 TO 1000 AMPNOS60  
565SH8CURRENT TRANSFORMER 200/5ANOS180  
566SH8PROVIDING AND FIXING EARTHING SET WITH 2ftx2ftx1/4in COPPER PLATE BURIED IN THE GROUND AT A DEPTH OF 12 FEET OR LESS IF WATER COMES OUT FROM THE GROUND LEVEL (WITH SALT AND CHARCOAL, OR EARTHING CHEMICAL POWDER) ETC MAKING THE PIT 12 FEET DEEP BY EXCAVATION OF ALL TYPE OF SOIL (EXCEPT SOFT OR HARD ROCK) I/C FIXING OF 8SWG COPPER WIRE IN 1/2in G.I CONDUIT COMPLETE IN ALL RESPECT AS REQUIRED.JOBS60  
567SH8PROVIDING AND FIXING 1in DIAMETER 3FT LONG LIGHTING COPPER ROD WITH FIVE SPIKES AND BALLS ON ITS HEAD AS REQUIRED.JOBS100  
568SH8PROVIDING AND FIXING 1-1/2in x 1/3in THICK COPPER STRIP WITH SUITABLE SADDLE AT 12in INTERVALS COMPLETE AS REQUIRED.METERS2000  
569SH8WIRING OF CCTV CAMERA WITH UTP CAT-6 IN EXISTING PVC CONDUIT/DUCT I/C CONNECTORS COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE (VOICE + DATA)METERS15000  
570SH8PROVIDING, FIXING AND INSTALLING POE GIGA BIT SWITCHES, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED. - 8 PORT POE SWITCHJOBS32  
571SH8PROVIDING, FIXING AND INSTALLING POE GIGA BIT SWITCHES, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED. - 16 PORT POE SWITCHJOBS32  
572SH8PROVIDING, SUPPLYING, INSTALLATION, FITTING, FIXING AND COMMISSIONING OF 4 CORE SINGLE MODE FIBER OPTICS CABLE IN GIVEN EXISTING PVC CONDUIT, BOX CONDUIT, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE.METERS500  
573SH8PROVIDING, SUPPLYING, INSTALLATION, FITTING, FIXING AND COMMISSIONING OF 8 CORE SINGLE MODE FIBER OPTICS CABLE IN GIVEN EXISTING PVC CONDUIT, BOX CONDUIT, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGEMETERS500  
574SH8PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF MEDIA CONVERTER, USED FOR DATA CONVERSION FROM FIBER OPTIC TO CAT-6 ETHERNET CABLE, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE.NOS64  
575SH8PROVIDING, SUPPLYING, INSTALLATION, FITTING, FIXING AND COMMISSIONING OF ODF WITH UP & DOWN FIBER CONNECTIVITY WITH REQUIRED PROGRAMMING AS NEEDED, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 8 PORT POE SWITCHNOS40  
576SH8PROVIDING AND INSTALLATION OF ILLUMINATED SIGNBOARDS FOR LOUNGES IN BOTH URDU AND ENGLISH WORDS BEST MATERIAL (MS SHEET 18 SWG), LASER/FIBRE CUTTING OF LETTERS & SIGNS, ACRYLIC SHEET 4 mm YELLOW, POWDER COATING, COMPLETE 3D BENDING SCREWLESS SIGN, LED /SMD INJECTED MODULES, WATER PROOF POWER SUPPLY, 3D LIGHTING LATEST TYPE APPROVED COLOUR AND PATTERN, SINGLE AND DOUBLE FACED SIGNS COMPLETE IN ALL RESPECT AS PER INSTRUCTIONS OF ENGINEER INCHARGE.SFT250  
577SH8PROVIDING AND INSTALLATION OF MS 3D ILLUMINATED SIGNBOARDS FABRICATED WITH MS CHANNEL 3/4in x 1in (18-20SWG) STRUCTURE INCLUDING MS LETTER HAVING 4in THICKNESS OF 18-20 SWG POWDER COATED APPROVED COLOR, PLASTIC / ACRYLIC LETTER SHEET 3mm PURE YELLOW ILLUMINATED WITH 400 WATTS, SMD / LED INJECTED MODULES 5730 / 5050 COOL WHITE COLOR WITH SUITABLE WATER PROOF WIRING / POWER SUPPLY. JOB ALSO INCLUDES INVISIBLE ANGLE IRON STRUCTURE 2inx2in OF 6mm WITH WELDED SUPPORT FITTED ON HEAVY GAUGE IRON STRUCTURE AS PER SITE REQUIREMENT COMPLETE IN ALL RESPECTS WITH TESTING AND AS PER INSTRUCTIONS OF ENGINEER IN-CHARGESFT480  
578SH8PROVIDING & FIXING OF UNIVERSAL MOUNTED LED BASED EXIT SIGN IMPORTED MAKE WITH DOUBLE / SINGLE FACE CONFIGURATION, 220VAC, 02 WATTS, COMPLETE WITH RECHARGEABLE NI-CAD BATTERY I/C MAKING CONNECTION ETC. COMPLETE IN ALL RESPECTS AS PER SATISFACTION OF ENGINEER IN-CHARGENOS31  
579SH8PROVIDING & INSTALLATION OF 45 LITRES / HOUR CAPACITY WATER COOLER WITH BRAND NEW COMPRESSOR AND CONDENSOR, PRIME COPPER WRAPPED STEEL TANK AND ELECTRIC FAN MOTOR, PRIME GRADE INSULATION, STAINLESS STEEL FULLY DIE MADE BODY WITH BLACK COLOR ETC. COMPLETE IN ALL RESPECTS AS PER SATISFACTION OF ENGINEER IN-CHARGENOS5  
580SH8PROVIDING & FIXING 12in x 4in MS CABLE TRAY PERFORATED 18 SWG COMPLETE WITH COVER OF 20 SWG INCLUDING PAINTING AND SUPPORTING SYSTEMMETERS250  
581SH8PROVIDING & FIXING OF 6in x 4in MS CABLE TRAY PERFORATED 18 SWG COMPLETE WITH COVER OF 20 SWG INCLUDING PAINTING AND SUPPORTING SYSTEMMETERS150  
582SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF CONVENTIONAL 02 ZONE FIRE ALARM CONTROL PANEL SURFACE /RECESSED MOUNTING TYPE WITH FULL SWITCHING PROGRAMMING CAPABILITIES, SYSTEM SUITABLE OPERATION OF 230 VOLTS 50HZ WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER WITH BATTERY BACKUP COMPLIES WITH ALLIED COMPONENTS APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIREDJOBS3  
583SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF CONVENTIONAL 04 ZONE FIRE ALARM CONTROL PANEL SURFACE /RECESSED MOUNTING TYPE WITH FULL SWITCHING PROGRAMMING CAPABILITIES, SYSTEM SUITABLE OPERATION OF 230 VOLTS 50HZ WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER WITH BATTERY BACKUP COMPLIES WITH ALLIED COMPONENTS APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIRED.JOBS2  
584SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF CONVENTIONAL 08 ZONE FIRE ALARM CONTROL PANEL SURFACE /RECESSED MOUNTING TYPE WITH FULL SWITCHING PROGRAMMING CAPABILITIES, SYSTEM SUITABLE OPERATION OF 230 VOLTS 50HZ WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER WITH BATTERY BACKUP COMPLIES WITH ALLIED COMPONENTS APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIREDJOB1  
585SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF CONVENTIONAL SMOKE DETECTOR, WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER/ DRAWING WITH ALLIED COMPONENTS APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIRED.JOBS180  
586SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF CONVENTIONAL HEAT DETECTOR, WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER/ DRAWING WITH ALLIED COMPONENTS APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIRED.JOBS25  
587SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF MANUAL CALL POINT BREAK GLASS TYPE WITH SPARE GLASS WITH ALLIED COMPONENTS WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER/ DRAWING ETC APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIRED.JOBS50  
588SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF CONVENTIONAL WALL SOUNDER WITH ALLIED COMPONENTS WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER/ DRAWING ETC APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIRED.JOBS50  
589SH8PROVIDING, FIXING, TESTING AND COMMISSIONING OF CONVENTIONAL 6in BELL WITH ALLIED COMPONENTS WITH FULL FUNCTIONALITY AS PER SPECIFICATION OF MANUFACTURER/ DRAWING ETC APPROVED MAKE OR AS APPROVED BY THE ENGINEER IN-CHARGE AS REQUIRED.JOBS50  
590SH8PROVIDING, FIXING, TWO CORE, 1.5mm, FIRE RESISTANT CABLE, MINIMUM FIRE RATING OF 2 HOUR, LAID IN CONDUIT (25mm DIA), COMPLETE IN ALL RESPECT, AS APPROVED BY THE ENGINEER IN-CHARGE.METERS3500  
591SH9CONDUCTING ELECTRIC RESISTIVITY SURVEY AT DIFFERENT LOCATIONS TO CONFIGURE THE SUBSURFACE LITHOLOGIES/POSSIBILITY OF GROUND WATER SUITABLE FOR DRILLING TUBE WELL.JOBS4  
592SH9DRILLING OF TRIAL BORE IN SHINGLE GRAVEL AND ROCK INCLUDING SINKING AND WITH DRAWING OF CASING PIPES 6in - 10in DIA GROUND LEVEL TO 250 RftRFT250  
593SH9EXCEEDING 250 RftRFT170  
594SH9CONVERSION OF TRIAL BORE IN SHINGLE GRAVEL AND ROCK INCLUDING SINKING AND WITH DRAWING OF CASING PIPES 15in - 18in DIA GROUND LEVEL TO 250 RftRFT250  
595SH9EXCEEDING 250 RftRFT170  
596SH9FURNISHING SAMPLES OF WATER FROM BORE HOLE.SETS2  
597SH9PROVIDING AND INSTALLING PVC BAIL/END PLUG IN TUBE WELL BORE HOLE 2 ft LONG & 10in DIA CLASS E COMPLETE AS REQUIRED.NOS2  
598SH9PROVIDING AND INSTALLING 10in DIA U PVC BLIND PIPE BSS CLASS E IN TUBE WELL BORE HOLE INCLUDING SOCKETS AND SALVENT ETC COMPLETE AS REQUIRED AS APPROVED BY THE ENGINEER INCHARGE AS REQUIREDRFT200  
599SH9PROVIDING AND INSTALLING 10in DIA U PVC STRAINER BSS CLASS E IN TUBE WELL BORE HOLE INCLUDING SOCKETS AND SALVENT ETC COMPLETE AS REQUIRED AS APPROVED BY THE ENGINEER INCHARGE AS REQUIREDRFT640  
600SH9SHROUDING WITH GRADED PEA GRAVEL INTO THE SPACE BETWEEN BORE HOLE AND BLIND PIPE/STRAINER.CFT1105  
601SH9ELECTRIC/VIDEO LOGGING OF SUCCESSFUL BORE HOLE FOR PROPER PLACEMENT OF STRAINER/BLIND PIPE ETC COMPLETE AS REQUIRED.JOBS2  
602SH9TESTING DEVELOP AND STERILIZE OF TUBE WELL THROUGH COMPRESSOR UPTO 1.5 CUSECS DISCHARGE IN ACCORDANCE WITH APPROVED PROCEDURE UPTO DURATION OF 72 HOURS AS REQUIRED BY THE ENGINEER.JOBS2  
603SH9PROVIDING & LAYING IN SITU 1:2:4 CEMENT CONCRETE USING SCREEN GRADED BAJRI IN FOUNDATION AND PLINTH I/C FORM WORK, RODDING, COMPACTING, CURING ETC.CFT144  
604SH9PROVIDING & FIXING CENTRIFUGAL PUMPING SET COMPLETE WITH AC 5 HP 2850/2900 RPM 380/400V 50 CYCLE 3 PHASE AC MOTOR WITH CENTRIFUGAL PUMP HAVING SUCTION & DISCHARGE 2 x 1 1/2in COUPLED ON A COMMON BASE PLATE AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED.NO1  
605SH9PROVIDING & FIXING CENTRIFUGAL PUMPING SET COMPLETE WITH AC 10 HP 2850/2900 RPM 380/400V 50 CYCLE 3 PHASE AC MOTOR WITH CENTRIFUGAL PUMP HAVING SUCTION & DISCHARGE 4in x 3in COUPLED ON A COMMON BASE PLATE AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED.NO1  
606SH9PROVIDING & FIXING CENTRIFUGAL PUMPING SET COMPLETE WITH AC 15 HP 2850/2900 RPM 380/400V 50 CYCLE 3 PHASE AC MOTOR WITH CENTRIFUGAL PUMP HAVING SUCTION & DISCHARGE 4in x 3in COUPLED ON A COMMON BASE PLATE AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED.NO1  
607SH9PROVIDING & FIXING SUBMERSIBLE PUMPING SET COMPRISING OF SUBMERSIBLE PUMP WITH 5 HP 2850/2900 RPM, 3 PHASE, 400 V, 50 HZ, AC ELECTRIC MOTOR CAPABLE TO DISCHARGE 1800-2500 US GPH (GALLONS PER HOUR) OF CLEAR WATER AT HEAD OF 250 TO 300 ft, INCLUDING ERRECTION CLAMP, CABLE CLAMP, NON RETURN VALVE, MOTOR CONTROL UNIT, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED.NO1  
608SH9PROVIDING & FIXING SUBMERSIBLE PUMPING SET COMPRISING OF SUBMERSIBLE PUMP WITH 10 HP 2850/2900 RPM, 3 PHASE, 400 V, 50 HZ, AC ELECTRIC MOTOR CAPABLE TO DISCHARGE 1800-2500 US GPH (GALLONS PER HOUR) OF CLEAR WATER AT HEAD OF 250 TO 300 ft, INCLUDING ERRECTION CLAMP, CABLE CLAMP, NON RETURN VALVE, MOTOR CONTROL UNIT, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED.NO1  
609SH9PROVIDING & FIXING SUBMERSIBLE PUMPING SET COMPRISING OF SUBMERSIBLE PUMP WITH 15 HP 2850/2900 RPM, 3 PHASE, 400 V, 50 HZ, AC ELECTRIC MOTOR CAPABLE TO DISCHARGE 1800-2500 US GPH (GALLONS PER HOUR) OF CLEAR WATER AT HEAD OF 250 TO 300 ft, INCLUDING ERRECTION CLAMP, CABLE CLAMP, NON RETURN VALVE, MOTOR CONTROL UNIT, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED.NO1  
610SH9PROVIDING & FIXING SUBMERSIBLE PUMPING SET (KSB/GRUNDFOS/HMA) COMPRISING OF SUBMERSIBLE PUMP WITH 3 HP 2850/2900 RPM, 3 PHASE, 400 V, 50 HZ, AC ELECTRIC MOTOR CAPABLE TO DISCHARGE 800-900 US GPH (GALLONS PER HOUR) OF CLEAR WATER AT HEAD OF 250 TO 320 ft, INCLUDING ERRECTION CLAMP, CABLE CLAMP, NON RETURN VALVE, MOTOR CONTROL UNIT, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE AS REQUIRED.NO1  
611SH9PROVIDING & FIXING MANUAL OPERATED STAR DELTA STARTER SUITABLE FOR 3-10 HP AC.3 PHASE 50 CYCLE SUPPLY UP TO 12/25 AMPS TRIP RATING ON A PREPARED BOARD.NOS6  
612SH9WIRING FOR SUB-MAIN WITH 3 CORE, 6 mm2, STRANDED COPPER CONDUCTOR, PVC INSULATED & PVC SHEATHED CIRCULAR / FLAT CABLE IN EXISTING CONDUIT FITTED ON SURFACE / UNDERGROUND AS REQUIRED.METERS250  
613SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF SPLIT TYPE WALL MOUNTED AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 0.9 TON - 1.0 TON (10800 BTU - 12000 BTU)JOBS50  
614SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF SPLIT TYPE WALL MOUNTED AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 1.5 TON - 1.6 TON (18000 BTU - 19500 BTU)JOBS150  
615SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF SPLIT TYPE WALL MOUNTED AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 1.9 TON - 2 TON (22800 BTU - 24000 BTU)JOBS25  
616SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF SPLIT TYPE WALL MOUNTED AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 2.2 TON - 2.5 TON (26000 BTU - 30000 BTU)JOBS25  
617SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF CASSETTE TYPE AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 1.9 TON - 2 TON (22800 BTU - 24000 BTU)JOBS30  
618SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF CASSETTE TYPE AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 3.8 TON - 4.0 TON (45600 BTU - 48000 BTU)JOBS25  
619SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF FLOOR STANDING AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 2 TON - 2.3 TON (24000 BTU - 28000 BTU)JOBS10  
620SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF FLOOR STANDING AIR CONDITIONER, HEAT & COOL, IN THE SPECIFIED PLACE. THE JOB INCLUDES CONNECTION OF COPPER PIPING OF OUT DOOR UNIT FITTED ON ROOF OR ANGLE IRON FRAME, MAKING INTER CONNECTION OF THE UNIT WITH SUITABLE SIZES OF WIRE ALSO PIPING FOR CONDENSED WATER ETC AS REQUIRED APPROVED MAKE (IMPORTED). - 3.8 TON - 4.0 TON (45600 BTU - 48000 BTU)JOBS20  
621SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF REFRIGERANT COPPER PIPE, 22 GAUGE WITH ALL TYPE OF FITTINGS LIKE, ELBOW, CLAMPING, AERO FLEX INSULATION, WRAPPING TAPE, ETC COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 1/4inFTS2000  
622SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF REFRIGERANT COPPER PIPE, 22 GAUGE WITH ALL TYPE OF FITTINGS LIKE, ELBOW, CLAMPING, AERO FLEX INSULATION, WRAPPING TAPE, ETC COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 1/2inFTS2000  
623SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF REFRIGERANT COPPER PIPE, 22 GAUGE WITH ALL TYPE OF FITTINGS LIKE, ELBOW, CLAMPING, AERO FLEX INSULATION, WRAPPING TAPE, ETC COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 3/8inFTS2000  
624SH9PROVIDING, INSTALLATION, TESTING AND COMMISSIONING OF REFRIGERANT COPPER PIPE, 22 GAUGE WITH ALL TYPE OF FITTINGS LIKE, ELBOW, CLAMPING, AERO FLEX INSULATION, WRAPPING TAPE, ETC COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 5/8inFTS2000  
625SH9PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF STANDBY 1500 RPM, DIESEL GENERATING SET, SUITABLE FOR 400/415 VOLTS, 3-PHASE, 50HZ, AC SUPPLY, WITH CANOPY, INCLUDING CONTROL WIRING, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 440 KVA (400 KVA PRIME RATINGS)JOB1  
626SH9PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF STANDBY 1500 RPM, DIESEL GENERATING SET, SUITABLE FOR 400/415 VOLTS, 3-PHASE, 50HZ, AC SUPPLY, WITH CANOPY, INCLUDING CONTROL WIRING, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 700 KVA (640 KVA PRIME RATINGS)JOBS2  
627SH9PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF 400 VOLTS, 3-PHASE, 3 POLE, ATS PANEL, WITH MOR, DULY POWDER COATED, PAINTED, HAVING MAGNETIC CONTACTOR, MECHANICAL INTERLOCKING, EMERGENCY STOP SYSTEM, ATS MODULE, BATTERY CHARGER, AUXILIARY RELAYS, VOLTMETER, AMPERE METER, FREQUENCY METER, SELECTOR SWITCH, INDICATION LIGHTS, COPPER BUS BAR, TIMERS, INCLUDING WIRING, LOCKING ARRANGEMENTS, ETC, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 400 KVAJOB1  
628SH9PROVIDING, INSTALLATION, TESTING & COMMISSIONING OF 400 VOLTS, 3-PHASE, 3 POLE, ATS PANEL, WITH MOR, DULY POWDER COATED, PAINTED, HAVING MAGNETIC CONTACTOR, MECHANICAL INTERLOCKING, EMERGENCY STOP SYSTEM, ATS MODULE, BATTERY CHARGER, AUXILIARY RELAYS, VOLTMETER, AMPERE METER, FREQUENCY METER, SELECTOR SWITCH, INDICATION LIGHTS, COPPER BUS BAR, TIMERS, INCLUDING WIRING, LOCKING ARRANGEMENTS, ETC, COMPLETE IN ALL RESPECT AS APPROVED BY THE ENGINEER INCHARGE. - 600 KVAJOBS2  
629SH9PROVIDING & FIXING 4 CORE, PVC INSULATED & PVC SHEATHED, 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR, UNARMOURED, L.T CABLE FIXED ON SURFACE WITH HEAVY GAUGE GI FLAT STRIP SADDLE AT SUITABLE DISTANCE AS PER PAK. P.W.D SPECIFICATION AS REQUIRED. - 185 mm2METERS310  
630SH9PROVIDING & FIXING 4 CORE, PVC INSULATED & PVC SHEATHED, 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR, UNARMOURED, L.T CABLE FIXED ON SURFACE WITH HEAVY GAUGE GI FLAT STRIP SADDLE AT SUITABLE DISTANCE AS PER PAK. P.W.D SPECIFICATION AS REQUIRED. - 240 mm2METERS200  
631SH9PROVIDING & FIXING 4 CORE, PVC INSULATED & PVC SHEATHED, 600/1000 VOLTS GRADE WITH STRANDED COPPER CONDUCTOR, UNARMOURED, L.T CABLE FIXED ON SURFACE WITH HEAVY GAUGE GI FLAT STRIP SADDLE AT SUITABLE DISTANCE AS PER PAK. P.W.D SPECIFICATION AS REQUIRED. - 300 mm2METERS180  
632SH9MAKING TERMINATION OF 3 OR 4 CORE ARMOURED / UN-ARMOURED COPPER CONDUCTOR, PVC X PVC L.T CABLE INCLUDING PROVIDING & FIXING PROPER LUGS, ETC COMPLETE IN ALL RESPECT AS REQUIRED. - 16 mm2 TO 25 mm2NOS750  
633SH9MAKING TERMINATION OF 3 OR 4 CORE ARMOURED / UN-ARMOURED COPPER CONDUCTOR, PVC X PVC L.T CABLE INCLUDING PROVIDING & FIXING PROPER LUGS, ETC COMPLETE IN ALL RESPECT AS REQUIRED. - 35 mm2 TO 50 mm2NOS30  
634SH9MAKING TERMINATION OF 3 OR 4 CORE ARMOURED / UN-ARMOURED COPPER CONDUCTOR, PVC X PVC L.T CABLE INCLUDING PROVIDING & FIXING PROPER LUGS, ETC COMPLETE IN ALL RESPECT AS REQUIRED. - 70 mm2 TO 95 mm2NOS30  
635SH9MAKING TERMINATION OF 3 OR 4 CORE ARMOURED / UN-ARMOURED COPPER CONDUCTOR, PVC X PVC L.T CABLE INCLUDING PROVIDING & FIXING PROPER LUGS, ETC COMPLETE IN ALL RESPECT AS REQUIRED. - 120 mm2 TO 150 mm2NOS20  
636SH9MAKING TERMINATION OF 3 OR 4 CORE ARMOURED / UN-ARMOURED COPPER CONDUCTOR, PVC X PVC L.T CABLE INCLUDING PROVIDING & FIXING PROPER LUGS, ETC COMPLETE IN ALL RESPECT AS REQUIRED. - 185 mm2 TO 240 mm2NOS20  
637SH9MAKING TERMINATION OF 3 OR 4 CORE ARMOURED / UN-ARMOURED COPPER CONDUCTOR, PVC X PVC L.T CABLE INCLUDING PROVIDING & FIXING PROPER LUGS, ETC COMPLETE IN ALL RESPECT AS REQUIRED. - 300 mm2NOS14  
638SH9VENTILATION SYSTEM: EXPLOSION-PROOF EXHAUST FANS AND AIR VENTS (UAV BUNKERS) COMPLETE AS PER SPECIFICATIONS AND DIRECTIONS OF THE ENGINEER.NOS4  
639SH9DEHUMIDIFIER: TO MAINTAIN LOW HUMIDITY INSIDE BUNKER (UAV BUNKERS) COMPLETE AS PER SPECIFICATIONS AND DIRECTIONS OF THE ENGINEER.NOS2  
640SH9FIRE SUPPRESSION: FIRE EXTINGUISHERS (DCP) AS PER SAFETY CODES (UAV BUNKERS)NOS4  
641 TOTAL ESTIMATED COSTJOB1 7343223931
GRAND TOTAL:Rs 7,343,223,931.00

Scope of Work

The contractor shall execute all procurement, installation, testing, and commissioning works across the following nine sub-heads:

1. Rehabilitation of Airside Pavements (SH 1)

Earthworks and Sub Base: Demolishing existing bituminous pavements, stripping topsoil, compacting natural subgrade, and laying granular sub base reinforced with biaxial HDPE geogrids and geocells.

Paving and Markings: Constructing polymer modified asphalt base and wearing courses, laying PQC for taxiway links and aprons, sealing rigid joints with jet fuel resistant sealant, installing airside drainage pipes, and applying FAA compliant reflective airfield markings.

2. Access Road (SH 2)

Roadway Construction: Clearing the alignment, constructing compacted borrow embankments, laying aggregate base courses, and paving with plant mixed asphaltic wearing course.

Drainage and Furniture: Building reinforced concrete roadside drains and pipe culverts, applying thermoplastic road markings, and installing reflective caution signboards.

3. Ancillary Civil Infrastructure (SH 3)

Structural and Architectural Works: Constructing Grade 60 steel reinforced concrete foundations, frames, roof slabs, and overhead water tanks, alongside brick masonry, plastering, terrazzo and marble flooring, gypsum ceilings, Deodar wood doors, uPVC or aluminium windows, and stainless steel railings.

Plumbing and Sewerage: Fitting washroom sanitary ware, kitchen cabinetry, grease traps, brick manholes, uPVC waste stacks, and galvanized iron water mains.

4. Renovation of Passenger Terminal Building (SH 4)

Refurbishment and Finishes: Stripping damaged tiles, plaster, and paint, re securing door frames, applying fresh plaster and non slip tiling, repainting exteriors, and installing gypsum, fiberglass, Plaster of Paris, and MDF false ceilings.

Glazing and Accessibility: Fitting anodized aluminium doors and tinted glass sliding windows, upgrading washrooms, and constructing a concrete wheelchair ramp with stainless steel handrails.

5. Public Health Engineering (SH 5)

Tube Wells and Pumping: Drilling deep boreholes using reverse rotary percussion methods, installing mild steel blind pipes and stainless steel V wire screens, gravel shrouding, sterilizing wells, and commissioning high head submersible pumps with chlorination units.

Water and Sewerage Networks: Trenching and laying PE 100, PPR, and galvanized iron water distribution lines with isolation valves, alongside constructing masonry manholes, soakage pits, and reinforced concrete sewer lines.

6. Security Infrastructure (SH 6)

UAV Bunkers and Hardening: Excavating and constructing reinforced concrete semi underground bunkers with bituminous waterproofing, camouflage earth cover, and blast resistant steel doors.

Perimeter Barriers and Access: Deploying and sand filling UV stabilized HESCO defense barriers, erecting galvanized wire mesh, barbed wire, and concertina razor wire fencing, installing a motorized heavy duty steel taxiway gate, and laying hydraulically compressed concrete pavers.

7. External Electrical Infrastructure (SH 7)

Power Distribution: Trenching and laying 11 kV XLPE armored cables and underground low tension copper cables, and commissioning step down transformers and switchgear.

Airfield Lighting and Solar Plant: Installing ICAO and FAA compliant LED inset and elevated approach, threshold, runway, and taxiway lights, a PAPI system, Constant Current Regulators, isolating transformers, illuminated guidance signs, street and high mast floodlighting, and a 500 kW solar PV plant with hybrid inverters.

8. Building Electrification and Life Safety (SH 8)

Internal Power and Lighting: Installing concealed uPVC conduits, copper wiring, flame retardant switches and sockets, vermin proof distribution boards, copper plate earthing, lightning protection, online UPS systems, LED lighting fixtures, fans, and illuminated lounge signage.

IT, CCTV, and Fire Safety: Deploying CAT 6 cabling, single mode fiber optic backbones, PoE switches, conventional multi zone fire alarm panels with fire resistant cabling, smoke and heat detectors, call points, sounders, and battery backed exit signs.

9. Mechanical Works (SH 9)

Groundwater and Pumping Systems: Conducting electric resistivity surveys, drilling and video logging production boreholes, installing uPVC casing and strainers, and commissioning centrifugal and submersible pump sets.

HVAC and Standby Generation: Installing wall mounted split, ceiling cassette, and floor standing air conditioners with insulated copper piping, equipping UAV bunkers with explosion proof exhaust fans, dehumidifiers, and fire extinguishers, and commissioning canopy type standby diesel generators with Automatic Transfer Switch panels.

Brief Description

The Rehabilitation of Dalbandin Airport, commissioned by the Pakistan Airports Authority (PAA) in Dalbandin, Balochistan, is a comprehensive infrastructure modernization and security upgrade initiative. Designed to restore full operational readiness, elevate aviation safety, and harden perimeter defenses, the project integrates nine civil, electrical, mechanical, and public health engineering packages.

Core airside works involve the demolition and full depth reconstruction of runways, taxiways, and aprons utilizing Asphalt Concrete, and Pavement Quality Concrete (PQC) compliant with ICAO and FAA standards. Landside improvements include constructing a paved access road with drainage culverts, renovating the Passenger Terminal Building (PTB) with accessibility upgrades, and erecting reinforced ancillary support buildings. A central focus of the project is tactical and perimeter security hardening, featuring HESCO defense barriers, concertina fencing, heavy duty concrete paving, and semi underground, blast resistant Unmanned Aerial Vehicle (UAV) bunkers.

Supporting utility and electromechanical packages cover deep tube well boring, potable water supply and sewerage networks, 11 kV high tension and low tension power distribution, an ICAO Annex 14 compliant LED Airfield Ground Lighting (AGL) system, a 500 kW grid tied solar power plant, standby diesel generators, HVAC installations, and conventional fire detection and life safety systems. Together, these upgrades will establish Dalbandin Airport as a resilient, modern, and secure regional aviation facility.

Price Schedule

For Individual Jobs

# Job Title Quantity Unit Price (PKR) Total Price (PKR) Delivery Location Delivery Period / Year Country of Origin
1
2
For Lots
# Lot Title Total Lot Price (PKR) Country of Origin
1[Lot 1 Title]

📑 General Conditions of Contract (GCC)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

Red Book:
© FIDIC 2017. All rights reserved.

The Conditions of Contract are the “General Conditions” which form part of the “Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC) and the following “Particular Conditions” which shall complement the General Conditions of the Contract.

The successful Bidder, upon contract award, shall be required to furnish two (02) copies of aforementioned “General Conditions” for incorporation in the Works Contract.

International Federation of Consulting Engineers (FIDIC) FIDIC
Bookshop – Box- 311 – CH – 1215 Geneva 15, Switzerland
Fax: +41 22 799 49 054
Telephone: +41 22 568 0500
E-mail: fidic@fidic.org
Website:
www.fidic.org
FIDIC code: ISBN13: 978-2-88432-084-9

📑 Special Conditions of Contract (SCC)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

PARTICULAR  CONDITIONS OF CONTRACT (PCC)

Particular Conditions
(Mandatory Provisions not to be amended/substituted) 

The Particular Conditions (PCC) complement the General Conditions (GCC) to specify dates, contractual requirements, and special circumstances related to the Works. The PCC consists of two parts, Part A - Contract Data and Part B - Special Provisions. The provisions to be found in the Special Provisions (Particular Conditions - Part B) take precedence over the equivalent provisions found under the same Sub-Clause number(s) in the General Conditions, and the provisions of the Contract Data (Particular Conditions - Part A) take precedence over the Special Provisions (Particular Conditions - Part B).

PART A - Contract Data

Sub-Clause 1.1.27
Defects Notification Period (DNP): 365 Days

Sub-Clause 1.1.31 
Employer's name & address: Quetta Airport (Pakistan Airports Authority (PAA)), Secretary Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).

Sub-Clause 1.1.35 
Engineer's name & address: Abdul Mohaymin Sahito, DDS Civil HQ 

HQ, Terminal I, JIAP, Karachi

Sub-Clause 1.1.84
Time for Completion: 730 days for whole of the works

Sub-Clause 1.3 (a)(ii)
Agreed method of electronic transmission: Agreed
The Electronic Transmission Methods are Email

Sub-Clause 1.3 (d)
Address of Empoyer for Communications: Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
Address of Engineer for Communications: 

HQ, Terminal I, JIAP, Karachi


Address of Contractor for Communications: -----------------------------

Sub-Clause 1.4
Contract shall be governed by the law of:    Islamic Republic of Pakistan
Ruling language: English
Language for communications: English

Sub-Clause 2.1
After receiving the Letter of Acceptance, the Contractor shall be given right of access to all or part of the Site within: 15 days after Commencement Date

Sub-Clause 2.4
Employer’s financial arrangements:

Funded by Provincial Government

Sub-Clause 3.2 (e)(ii)
Engineer’s Duties and Authority: Variation resulting in an increase of the Accepted Contract Amount in excess ofone percent (1%)subject to accumulative Variations not exceeding five percent (5%)of the Accepted Contract Amount 

Sub-Clause 4.2
Performance Security (as percentage of the Accepted Contract Amount in Currencies): 0%
Form of Performance Guarantee: Nil

Sub-Clause 4.2.1
List of Insurance Companies:

Insurance Company in Pakistan having at least “AA” rating from PACRA

Sub-Clause 4.7.2
period for notification of errors in the items of reference: Twenty Eight (28) days

Sub-Clause 4.19
Period of payment for temporary utilities: Each Month

Sub-Clause 5.1 (a)
Maximum allowable accumulated value of work subcontracted (as a percentage of the Accepted Contract Amount): 30 %

Sub-Clause 5.1 (b)
Parts of the Works for which subcontracting is not permitted: 40

None

Sub-Clause 6.5
Normal working hours on the Site: 09

Sub-Clause 8.3
Number of additional paper copies of programmes: 06

Sub-Clause 8.8 & 14.15(b)
Delay Damages payable for each day of delay 0.01% of the Accepted Contract Amountfor delay in completion of whole of the Works

Sub-Clause 8.8
Maximum amount of Delay Damages    10.00 % of the Accepted Contract Amount

Sub-Clause 8.14
Applicability of Incentives for Early Completion    No

Sub-Clause 12.3
Percentage profit (Not more than 10%):    Nil

Sub-Clause 13.4.(b)(ii)
Percentage rate to be applied to Provisional Sums for overhead charges and profit: Twenty Five percent (25%)

Sub-Clause 14.2
Total Advance Payment: Fifteen percent (15%) of the Accepted Contract Amount excluding Provisional Sums payable in the currencies and proportions in which the Accepted Contract Amount is payable

Sub-Clause 14.2.1
Advance Payment Insurance Allowed

Insurance Company in Pakistan having at least “AA” rating from PACRA

Sub-Clause 14.2.3
Percentage deductions for the repayment of the Advance Payment: Deduction shall be made at the amortization rate of 17.5 % of the value of the Works executed of each IPC as provided in paragraph (i) of Sub-Clause GCC 14.3, starting from 2nd IPC provided that the advance payment shall be completely repaid prior to the time when 90% of the Accepted Contract Amount less Provisional Sums has been certified for payment. It may be more than 17.5% in the last instalment to ensure full repayment.

Sub-Clause 14.3
Period of payment    One Month

Sub-Clause 14.3(b)
Number of additional paper copies of Statements: 06

Sub-Clause 14.3 (iii)
Percentage of retention: Seven percent (7%)

Sub-Clause 14.3 (iii)
Limit of Retention Money (as a percentage of the Accepted Contract Amount): Five percent (5%)

Sub-Clause 14.5(b)(i)
Plant and Materials for payment when shipped: Plant and Materials under Bill of “Imported Plant and Materials” 

Imported Plants and Materials

Deleted. Not Applicable.

Sub-Clause 14.5(c)(i)
Plant and Materials for payment when delivered to the Site: Plant and Non Perishable Materials 

Plants and Materials Onsite

Plant and Non-Perishable Materials for payment shall include: 1. Steel Reinforcement 2. Tile, Marble and Granite 3. Electric Cables

Sub-Clause 14.6.2
Minimum amount of Interim Payment Certificate (IPC): Yes
The Minimum Amount IPC is 150,000,000

[Employer to give value not exceeding one fifth of the average expected value of Interim Payment Certificate]

Sub-Clause 14.7(a)
Period of payment of Advance Payment to the Contractor: 14 days

Sub-Clause 14.7b(i)   
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.6:    28 days

Sub-Clause 14.7b(ii)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.13 (Final Payment): 56 days 

Sub-Clause 14.7(c)
Period for the Employer to make final payment to the Contractor: 56 days 

Sub-Clause 14.8
Financing charges for delayed payment Local Currency (PKR):
6-Month KIBOR (Offer) +3% per annum.
Foreign Currency: 
USD
6-Month SOFR (Secured Overnight Financing Rate for USD) +1% per annum.

EURO
6-Month EURIBOR (EURO Interbank Offered Rate for EURO) +1% per annum.

Others
Appropriate rates +1% (for other foreign currencies, Ref. Schedule-A, A-4 to Bid).

Sub-Clause 14.11.1(b)
Number of additional paper copies of draft Final Statements: 06
[insert number of copies say six (06)]

Sub-Clause 14.15
Currencies of payment of Contract Price: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(a)(i)
Proportions or amounts of Local and Foreign currencies: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(c)
Currencies and proportions for payment of Delay Damages: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(f)
rates of exchange: as stated in the Table IV of Schedule A (If Given)

Sub-Clause 17.2(d)
Forces of nature, the risks of which are allocated to the Contractor: Nil

Sub-Clause 19.1
Permitted deductible limits: 
i)    insurance required for the Works: Ten percent (10%) of loss amount on each & every loss
ii)    insurance required for Goods: Nil
iii)    insurance required for liability for breach of professional duty: Nil
iv)    insurance required against liability for fitness for purpose (if any is required): Nil
v)    insurance required for injury to persons and damage to property: Nil
vi)    insurance required for injury to employees: Nil
vii)    other insurances required by Laws and by local practice : Nil  

Periods for submission of insurance:
a)    evidence of insurance: Not later than the Commencement Date
b)    relevant policies: Within twenty eight (28) day from the Commencement Date

Sub-Clause 19.2.1(b)
Additional amount to be insured (as a percentage of the replacement value): 15% of the replacement value (Accepted Contract Amount)
Sub-Clause 19.2.2 
Extent of insurance required for Goods: From Ex-Works (i.e., works, factory, warehouse, etc) to delivery at the Site
Amount of insurance required for Goods: Full replacement value

Sub-Clause 19.2.3(a)
Amount of insurance required for liability for breach of professional duty: Full replacement value of the Works to be designed by the Contractor

Sub-Clause 19.2.3(b)
Insurance required against liability for fitness for purpose: Yes

Sub-Clause 19.2.3
Period of insurance required for liability for breach of professional duty: Until the date of issuance of Performance Certificate

Sub-Clause 19.2.4
Amount of insurance required for injury to persons and damage to property: Injury to person and Fatal case: 
in accordance with Workmen Compensation Act
Damage to Property: The Amount of Insurance Required for Person Injury is In accordance with Workmen Compensation Act
The Amount of Insurance Required for Damage to Property is In accordance with Contractor's All Risk Policy as per his assessment of the adjoining property(ies) other than the Works]
without limit to the number of incidents

Sub-Clause 19.2.6
Other insurances required by Laws and by local practice: All insurances as applicable, to the extent of execution of the project, under Federal and Provincial laws of Islamic Republic of Pakistan

Sub-Clause 21.1
Time for appointment of the DAAB: Within 28 days from the Commencement Date.
In case the Accepted Contract Amount is lesser than PKR one (01) billion, appointment of the DAAB shall be made when Dispute arises between the Parties.

Sub-Clause 21.1
The DAAB shall comprise  3
[insert either “a sole Member” or “Three Members”]
[For a Contract estimated to cost above PKR 2.5billion, the DAAB shall comprise of three members. For a Contract estimated to cost between PKR1billion and PKR2.5billion, the DAAB may comprise of three members or a sole member. For a Contract estimated to cost less than PKR1billion, a sole member is recommended.]

Sub-Clause 21.1
List of proposed members of DAAB
- proposed by Employer

Sole Member

-

-


- proposed by Contractor
[to be inserted at the time of signing of the Contract]
1.________________
2.________________
3.________________

Sub-Clause 21.2
Appointing entity (official) for DAAB members    Managing Director Public Procurement Regulatory Authority (PPRA) or Chairman Pakistan Engineering Council (PEC) from the list of PEC approved arbitrators published at its website

Sub-Clause 21.6
Rules of Arbitration: PEC Rules of Conciliation and Arbitration or Pakistan Arbitration Act of 1940, if the former is inactive.
The place of Arbitration shall be in the Employer’s country: Karachi
[Insert name of city]

 

Particular Conditions

PartB - Special Provisions

1.1    Definitions

1.1.76 “Specification”
Following is added at the end:
“and consists of two parts i.e.,
i)    “Part A - Specific Provisions”; and 
ii)    “Part B - Technical Provisions”.”

1.2    Interpretation

“and” is deleted from the end of sub-paragraph (i) and added at the end of sub-paragraph (j). 
Sub-paragraph (k) is added:
“(k)    The word “tender” is synonymous with “bid” the word tenderer with “bidder”, the words “tender documents” with “bidding documents” and “Schedule of Prices” with “Bill of Quantities”, as applicable.”


1.5    Priority of Documents   

The documents listed at (a) through (k) of this Sub-Clause are deleted and substituted with the following:
(a)    the Contract Agreement;
(b)    the Letter of Acceptance;
(c)    the Letter of Bid;
(d)    the Particular Conditions Part A - Contract Data;
(e)    the Particular Conditions Part B - SpecialProvisions;
(f)    the General Conditions;
(g)    the Specification Part A - SpecificProvisions;
(h)    the Specification Part B- Technical Provisions;
(i)    the Drawings;
(j)    the completed Schedules to Bid includingBillof Quantities;
(k)    the JV Undertaking (if the Contractor is a JV); and
(l)    any other documents forming part of the Contract.
The addenda/corrigenda, if any, shall be deemed to have been incorporated at the appropriate places in the documents forming the Contract.

1.6    Contract Agreement

In the last line of the 1st paragraph the text “shall be borne by the Employer” is substituted by“ shall be reimbursed by the Employer to the Contractor”.

3.1    The Engineer

In sub-paragraph (a) the text “as defined in the Pakistan Engineering Council Act, 1975 (Act No.V of 1976)” are added after the words “professional engineer”.

3.2    Engineer’s Duties and Authority

The Engineer shall obtain the consent in writing of the Employer before taking action under the following Sub-Clauses of these Conditions:
(a)    Consenting to the subcontracting of any part of the Works under Sub-Clause 5.1 [Subcontractors]
(b)    Any action under Sub-Clauses 8.9 [Employer’s Suspension] and 8.12 [Prolonged Suspension]
(c)    Issuance of “Taking Over Certificate” under Sub-Clause 10.1 [Taking Over the Works and Sections].
(d)    Issuing the “Performance Certificate” under Sub-Clause 11.9 [Performance Certificate].
(e)    Sub-Clause 13.1 [Right to Vary]: instructing a Variation, except;
(i)    in an emergency situation as determined by the Engineer, or
(ii)    if such a Variation would increase the Accepted Contract Amount by less than the percentage specified in the Contract Data.
(f)    Sub-Clause 13.3 [Variation Procedure]: approving a proposal for Variation submitted by the Contractor in accordance with Sub-Clause 13.3.2 [Variation by Request for Proposal] or 13.2 [Value Engineering].
(g)    Certifying release of second half of the Retention Money under Sub-Clause 14.9 [Release of Retention Money].
(h)    Issuing Final Payment Certificate under Sub-Clause 14.13 [Issue of FPC].
(i)    

Issue of FPC Sub Clauses

-


*[insert Sub-Clause number (not Sub-Clause 3.7 [Agreement or Determination]
Any such requirement shall not be applied to any action by the Engineer under Sub-Clause 3.7 [Agreement or Determination], as stated in Sub-Clause 3.2 [Engineer’s Duties and Authority] of the General Conditions.
Notwithstanding the obligation, as set out above, to obtain approval, if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of the Works or of adjoining property, he may, without relieving the Contractor of any of his duties and responsibility under the Contract, instruct the Contractor to execute all such work or to do all such things as may, in the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith comply, despite the absence of approval of the Employer, with any such instruction of the Engineer. The Engineer shall determine an addition to the Contract Price, in respect of such instruction, in accordance with Clause 13 and shall notify the Contractor accordingly, with a copy to the Employer.
Following is added after the words “the Employer’s consent is required” in 4th paragraph:
“stating that the Employer’s consent has been obtained for that specified authority”

4.2    Performance Security

4.2.1    Contractor’s Obligations
The entity issuing the Performance Security and its form shall be as under:
The Performance Security shall be, at the option of the Contractor,issuedin the prescribed form included in the Bidding Documents,by(a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistan or (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofratingas provided in Table below:
Accepted Contract Amount (In Eq. PKR million)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA
In case of Joint Venture, the Performance Security shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
Following paragraph is added at the end of this Sub-Clause:
“The amount of Performance Security shall be reducedto 50%following issue of the Taking-Over Certificate for the whole of the Works under Clause 10 of Conditions of Contract.”

4.3    Contractor’s Representative

In second paragraphthe text “professional engineer as defined in the Pakistan Engineering Council Act, 1975 (Act No. V of 1976) (having temporary licence in case of foreign engineer under Section 12 of the Pakistan Engineering Council Act, 1975 (Act No. V of 1976)” are added after the words “qualified, experienced”.
In the 3rd paragraph the words “28 days” are substituted by “14 days”. In 2nd line of 4thparagraph the text “or appoint a replacement” is substituted by “except appointment of a suitable temporary replacement is deployed at the Site”

4.4    Contractor’s Documents

4.4.2    As-Built Records
First paragraph is deleted and the text in the last paragraph is substituted with the following:
“The Contractor shall furnish to the Engineer 6 copies, one reproducible and one electronic copy(provided the Engineer has made available to the Contractor editable form of the Drawings)of all Drawings amended to conform to the Works as built.In case the Engineer does not make available to the Contractor editable form of the Drawings, the Contractor shall furnish to the Engineer as-built data for incorporation in the Drawings. Upon receipt of PDF versions of the as-built drawings prepared by the Engineer, the Contractor shall furnish to the Engineer 6copies and one reproducible of these Drawings.
The price of such Drawings shall be deemed to be included in the Contract Price.”
Following Sub-Clause is added:
4.4.4    ShopDrawings
The Contractor shall submit to the Engineer for review 3 copies of all shop and erection drawings applicable to this Contract as per provision of relevant Sub-Clause of the Contract.
Review and approval by the Engineer shall not exceed 21 days and be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory and the Engineer’s review or approval shall not relieve the Contractor of any of his responsibilities under the Contract.

4.8    Health and Safety Obligations

The following text is added at the end ofthis Sub-Clause:
In the event of work being carried out outside the normal working hours and in the event of work being carried out at night, the Contractor shall at his own cost, provide and maintain such good and sufficient light as will enable the work to proceed satisfactorily and without danger. The approaches to the Site and the Works where the night work is being carried out shall be sufficiently lighted. All arrangement adopted for such lighting shall be to the satisfaction of the Engineer.

4.20    Progress Reports

At the end of sub-paragraph (g) the word “and” is deleted and at the end of sub-paragraph (h) the full stop (.) is replaced with “;”, and the following new sub-paragraphs are added as:
(i)    planned programme for the execution of the Works for next 56 days to enable the Engineer to determine its programme of inspection and testing;
(j)    monthly summery of daily job record indicating weather conditions, deployment of Contractor’s Equipment, labour employment, local material procurement and material import, if any; and
(k)    salient contractual and project information.

5.1    Subcontractors

Add the following text at the end of paragraph (ii):
“underSchedule to Bid”
The following is added at the end of the last paragraph of Sub-Clause 5.1:
“All subcontracts relating to the Works shall include provisions which entitle the Employer to require the subcontract to be assigned to the Employer under sub-paragraph (a) of Sub-Clause 15.2.3 [After Termination].
The Contractor shall give reasonable opportunity to contractors from Islamic Republic of Pakistan for subcontracts for the Works, and endeavour to employ such contractors as Subcontractors.”

5.2    Nominated Subcontractors

5.2.2    Objection to Nomination
In sub-paragraph (c), “and” is deleted from the end of (i);
 “.” at the end of (ii) is replaced with: “, and”. 
The following is then added as (iii):  
“(iii)    be paid only if and when the Contractor has received from the Employer payments for sums due under the Subcontract referred to under Sub-Clause 5.2.3 [Payment to nominated Subcontractors].”

6.1    Engagement of Staff and Labour

The following paragraph is added at the end of the Sub-Clause:
“The Contractor shall, to the extent practicable and reasonable, employ staff (not less than 50%) and labour (not less than 85%) with appropriate qualifications and experience from sources within the Islamic Republic of Pakistan.”

6.7    Health and Safety of Personnel

The existing text is substituted with the following:
“In order to provide for the safety, health and welfare of persons, and for prevention of damage of any kind, all operations for the purposes of or in connection with the Contract shall be carried out in compliance with the Safety Requirements of the Government of Pakistan with such modifications thereto as the Engineer may authorize or direct and the Contractor shall take or cause to be taken such further measures and comply with such further requirements as the Engineer may determine to be reasonably necessary for such purpose. The Contractor shall also provide all other medical services and appoint a health and safety officer at Site if stated in the Specifications. In case of any fatality or serious accident, the Contractor shall, in addition, notify the Engineer immediately by the quickest available means.”

6.8    Contractor’s Superintendence

Insert at the end of sub-paragraph (a) of this Sub-Clause:
"or, if not, the Contractor shall make competent interpreters available during all working hours, in a number sufficient for those persons to properly perform their superintendence duties"
The following text is added at the end of this Sub-Clause: 
“The Contractor’s authorized representative and his other engineers working at site shall possess valid registration with the Pakistan Engineering Council.
The Contractor’s authorized representative at Site shall be authorized to exercise adequate administrative and financial powers on behalf of the Contractor so as to achieve completion of the Works as per the Contract.”

6.12    Key Personnel

The following is inserted at the end of the last paragraph: 
“If any of the Key Personnel are not fluent in this language, the Contractor shall make competent interpreters available during all working hours in a number deemed sufficient by the Engineer.”
The following Sub-Clauses 6.13 to 6.26 are added at the end of Sub-Clause 6.12:

6.13    Foreign Personnel

The Contractor may bring in to the Country any foreign personnel who are necessary for the execution of the Works to the extent allowed by the applicable Laws. The Contractor shall ensure that these personnel are provided with the required residence visas and work permits. The Employer will, if requested by the Contractor, use all reasonable endeavours in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national, or government permission required for bringing in the Contractor’s personnel.
The Contractor shall be responsible for the return of these personnel to the place where they were recruited or to their domicile. In the event of the death in the Country of any of these personnel or members of their families, the Contractor shall similarly be responsible for making the appropriate arrangements for their return or burial.

6.14    Supply of Foodstuffs

The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Specification at reasonable prices for the Contractor’s Personnel for the purposes of or in connection with the Contract.

6.15    Supply of Water

The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor’s Personnel.

6.16    Measures against Insect and Pest Nuisance

The Contractor shall at all times take the necessary precautions to protect the Contractor’s Personnel employed on the Site from insect and pest nuisance, and to reduce the danger to their health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.

6.17    Alcoholic Liquor or Drugs

The Contractor shall not, otherwise than in accordance with the Laws of the Country, import, sell, give, barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift, barter or disposal thereto by Contractor’s Personnel.

6.18    Arms and Ammunition

The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor’s Personnel to do so.

6.19    Festivals and Religious Customs

The Contractor shall respect the Country’s recognized festivals, days of rest and religious or other customs.

6.20    Funeral Arrangements

The Contractor shall be responsible, to the extent required by local regulations, for making any funeral arrangements for any of its local employees who may die while engaged upon the Works.

6.21    Forced Labour

The Contractor, including its Subcontractors, shall not employ or engage forced labour which consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.

6.22    Child Labour

The Contractor, including its Subcontractors, shall not employ or engage child labour in accordance with relevant law(s) in force in Islamic Republic of Pakistan.

6.23    Employment Records of Workers

The Contractor shall keep complete and accurate records of the employment of labour at the Site. The records shall include the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis and submitted to the Engineer. These records shall be included in the details to be submitted by the Contractor under Sub-Clause 6.10 [Contractor’s Records].

6.24    Workers’ Organizations

The Contractor shall comply with the relevant labour laws of Pakistan which recognize workers’ rights to form and to join workers’ organizations/Trade Union of their choosing and to bargain collectively without interference.

6.25    Non-Discrimination and Equal Opportunity

The Contractor shall not make decisions relating to the employment or treatment of Contractor’s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor’s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices. 
Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure nondiscrimination and equal opportunity, including for specific groups such as women, persons with disabilities, migrant workers and children (of working age in accordance with Sub-Clause 6.22).

6.26    Epidemics   

In the event of any out-break of illness of epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government or the local medical or sanitary authorities for the purpose of overcoming the same.

7.7    Ownership of Plant and Materials

The following is added before the first paragraph:
“Except as otherwise provided in the Contract,” 
The following is added at the end of the Sub-Clause:
"No Plant and/or Materials that is the property of the Employer shallbe removed from the Site. If it becomes necessary to:
(i)    remove any item of such Plant from the Site for the purposesof repair, the Contractor shall give a Notice, with reasons, tothe Engineer requesting consent to remove the defective ordamaged item off the Site. This Notice shall clearly identifythe item of defective or damaged Plant, and shall give detailsof: the defect or damage to be repaired; the place to whichdefective or damaged item of Plant is to be taken for repair;the transportation to be used (and insurance cover for suchtransportation); the proposed inspections and testing off theSite; and the planned duration required before the repaireditem of Plant shall be returned to the Site. The Contractorshall also provide any further details that the Employer mayreasonably require; or
(ii)    replace any item(s) of such Plant and/or Materials, theContractor shall give a Notice, with reasons, to the Engineerclearly identifying the item(s) of Plant and/or Materials to bereplaced, and giving details of the due date of delivery tothe Site of the replacement item(s).
Where any item of Plant and/or Materials has become the propertyof the Employer under this Sub-Clause before it has been deliveredto the Site, the Contractor shall ensure that such an item is notmoved except for its delivery to the Site.
The Contractor shall indemnify and hold the Employer harmlessagainst and from the consequences of any defect in title orencumbrance or charge (except any reasonable restrictionarising from the intellectual property rights of the manufacturer orproducer) on any item of Plant and/or Materials that has becomethe property of the Employer under this Sub-Clause."
The following Sub-Clause7.9 is added after Sub Clause 7.8:

7.9    Use of Pakistani Materials and Services

The Contractor shall, so far as may be consistent with the Contract, make the maximum use of materials, supplies, plant and equipment indigenous to or produced or fabricated in Pakistan and services available in Pakistan provided such materials, supplies, plant, equipment and services shall be of required standard.

8.1    Commencement of Works

The following is added before the first paragraph:
“After signing of the Contract Agreement by both Parties,” and thereafter the word “The” is replaced with the word “the”.

8.5    Extension of Time for Completion

The following is added after paragraph (c):
“for last five years”.
The following Sub-Clause 8.14 is added after Sub-Clause 8.13:

8.14    Incentives For Early Completion

If Contract Data does not state applicability of incentives for early completion, this Sub-Clause shall not apply.
The Contractor shall be entitled subject to Sub-Clause 20.2 [Claims for Payment and/or EOT] to bonus payment if the Works and/or each Section is completed earlier than the Time for Completion for the Works or Section (as the case may be). The amount of bonus for early completion of the Works and/or each Section shall be upto a limit and at a rate to 50% of the relevant limit and rate of delay damages prescribed in Contract Data and shall be paid for every day which shall elapse between the relevant Date of Completion of the Works or Section and the relevant Time for Completion.
For the purposes of calculating any bonus payment, the applicableTime for Completion stated in the Contract Data is fixed and noadjustments of this time by reason of granting an EOT will beallowed.
The following Sub-Clause 11.12 is added after Sub-Clause 11.11:

11.12    Supervisory Assistance During DNP

If provided under the Schedule of Prices, the Contractor shall provide supervisory assistance to the Employer during the DNP for the Works. Such supervisory assistance shall be as described in the Specification for the purpose of supporting the Employer's operation and maintenance of the Plant for the period specified in the Schedule of Prices after the Date of Completion.

12.2    Method of Measurement

The following paragraph is added at the end of the Sub-Clause:
“Summary of measured quantity for payment shall be delineated item-wise under four headsnamely; “Schedule of Prices Quantity”, “Quantity Executed To-date”, “Quantity Certified Previously” and “Net Quantity Executed under this Certificate”.

12.3    Valuation of the Works

The following text is added at the end of fifth paragraph of the Sub-Clause:
“Sum of overhead charges and profit for sub-paragraph (a) shall be Twenty Five percent (25%)”.

13.4    Provisional Sums

The following paragraph is inserted as the penultimate paragraph:
“The Provisional Sum shall be used to cover the Employer’s share of the DAAB members’ fees and expenses, in accordance with Clause 21. No prior instruction of the Engineer shall be required with respect to the work of the DAAB. The Contractor shall submit the DAAB members’ invoices and the satisfactory evidence of having paid 100% of such invoices as part of the substantiation of those Statements submitted under Sub-Clause 14.3.

13.6    Adjustments for Changes in Laws

The following paragraphsare added at the end of the Sub-Clause:
“Notwithstanding the foregoing, the Contractor shall not be entitled to an extension of time if the relevant delay has already been taken into account in the determination of a previous extension of time and such Cost shall not be separately paid if the same shall already have been taken into account in the indexing of any inputs to the Table of Adjustment Data in accordance with the provisions of Sub-Clause 13.7 [Adjustments for Changes in Cost].”

14.1    The Contract Price

The following is added at the end of the Sub-Clause: 
“Notwithstanding the provisions of subparagraph (b), Contractor's Equipment, including essential spare parts, imported by the Contractor for the sole purpose of executing the Contract shall be temporarily exempt from the payment of import duties and taxes upon initial importation, provided the Contractor shall post with the customs authorities at the port of entry an approved re-export bond or bank guarantee, valid until the Time for Completion plus six months, in an amount equal to the full import duties and taxes which would be payable on the assessed imported value of such Contractor's Equipment and spare parts, and callable in the event the Contractor's Equipment is not re-exported from the Country on completion of the Contract. A copy of the bond or bank guarantee endorsed by the customs authorities shall be provided by the Contractor to the Employer upon the importation of individual items of Contractor's Equipment and spare parts. Upon re-export of individual items of Contractor's Equipment or spare parts, or upon the completion of the Contract, the Contractor shall prepare, for approval by the customs authorities, an assessment of the residual value of the Contractor's Equipment and spare part to be re-exported, based on the depreciation scale(s) and other criteria used by the customs authorities for such purposes under the provisions of the applicable Laws. Import duties and taxes shall be due and payable to the customs authorities by the Contractor on (a) the difference between the initial imported value and the residual value of the Contractor's Equipment and spare parts to re-exported; and (b) on the initial imported value of the Contractor's Equipment and spare parts remaining in the Country after completion of the Contract. Upon payment of such dues within 28 days of being invoiced, the bond or bank guarantee shall be reduced or released accordingly; otherwise the security shall be called in the full amount remaining.”
[The Employer may change or delete this Sub-Clause as per Project requirements]

14.2    Advance Payment

14.2.1    Advance Payment Guarantee
The entity issuing the Advance PaymentGuaranteeand its form shall be as under:
The Advance PaymentGuarantee shall be in the form of Guarantee issued by (a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistanor (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA
In case of Joint Venture, the Advance PaymentGuarantee(s)shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.

14.6    Issue of IPC

14.6.1    The IPC
In the first line of the 1st paragraph the words “28 days” are substituted by “14 days”.

14.7    Payment

The words “or through crossed cheque in favour of the Contractor or JV partners. The Payment to JV partners shall be made at the request of the Joint Ventures in the ratio of their shares specified by them” are added at the end of the Sub-Clause.

14.8    Delayed Payment

In the first paragraph, third line, the words “compounded monthly” are deleted.
The text of 2nd paragraph is deleted and substituted with the following:
“The Employer shall pay to the Contractor compensation at the rate stated in the Contract Data.”

14.9    Release of Retention Money

The following is added at the end of Sub-Clause 14.9:
“Unless otherwise stated in the Contract, when the Taking-Over Certificate has been issued for the Works and the first half of the Retention Money has been certified for payment by the Engineer, the Contractor shall be entitled to substitute a guarantee, in the form annexed to the Particular Conditions or in another form approved by the Employer and issued by a schedule bank selected by the Contractor, for the second half of the Retention Money. The Contractor shall ensure that the guarantee is in the amounts and currencies of the second half of the Retention Money and is valid and enforceable until the Contractor has executed and completed the Works and remedied any defects, as specified for the Performance Security. On receipt by the Employer of the required guarantee, the Engineer shall certify, and the Employer shall pay the second half of the Retention Money. The release of the second half of the Retention Money against a guarantee shall then be in lieu of the release after the latest of the expiry dates of the Defects Notification Periods. The Employer shall return the guarantee to the Contractor within 21 days after receiving a copy of the Performance Certificate.

If the Performance Security required under Sub-Clause 4.2 is in the form of a demand guarantee, and the amount guaranteed under them when the Taking-Over Certificate is issued is more than half of the Retention Money, then the Retention Money guarantee will not be required. If the amount guaranteed under the Performance Security when the Taking-Over Certificate is issued is less than half of the Retention Money, the Retention Money guarantee will only be required for the difference between half of the Retention Money and the amount guaranteed under the Performance Security.

15.2    Termination for Contractor’s Default

15.2.1    Notice
Following text is added at the end of sub-paragraph (h) of this Sub-Clause:
“For the purposes of this Contract, corrupt and fraudulent practices have been defined in Public Procurement Rules 2026.”
15.2.3    After Termination
The word “and” at the end of sub-paragraph (ii) of paragraph (b) is deleted the following paragraph is added after sub-paragraph (iii):
“(iv)    all Employer-Supplied Materials and/or Employer's Equipment madeavailable to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer's Equipment], and”

15.4    Payment after Termination

The following text is added at the end of this Sub-Clause:
“The Employer shall be entitled to sell any of the Contractor’s Equipment, Temporary Works and unused materials and apply the proceeds of sale towards payment of any debt due from the Contractor to the Employer under this Clause including any outstanding payments to the Subcontractors.

16.2    Termination by Contractor

16.2.1    Notice
The sub-paragraph (j) is deleted in its entirety.
At the end of sub-paragraph (i) “; or” is replaced with “.” and at the end of sub-paragraph (h) “;” is replaced with “; or”.
In sub-paragraph (f) “84 days” are replaced with “180 days” and text “for reasons not attributable to the Contractor” is added at the end.

16.3    Contractor’s Obligations After Termination

Sub-paragraph (c) is deleted and replaced with:
"(c)    deliver to the Engineer all Employer-Supplied Materials and/orEmployer's Equipment made available to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer’s Equipment]; and
(d)    remove all other Goods from the Site, except as necessary for safety,and leave the Site."

17.1    Responsibility for Care of the Works

After the two instances of “Goods” in the last paragraph, the words “Employer-Supplied Materials and/orEmployer's Equipment” are added.
The following Sub-Clause 17.7 is added after Sub-Clause 17.6:

17.7    Use of Employer’s Accommodation/Facilities

The Contractor shall take full responsibility for the care of the items of the Employer’s facilities and/or accommodation, if any, as detailed in the Specification, from the date of use and/or occupation by the Contractor until the date on which such use and/or occupation is re-vested in the Employer.
If any loss or damage happens to any of the above items during a time while the Contractor is responsible for its care, arising from any cause other than a cause for which the Employer is responsible or liable, the Contractor shall promptly rectify the loss or damage at the Contractor’s risk and cost.

18.1    Exceptional Events

The words “or disorder” are replaced with “disorder or sabotage” in sub-paragraph (c) of the Clause.

18.4    Consequences of an Exceptional Event

The following is added at the end of sub-paragraph (b) after deleting the “.”: 
“, including the costs of rectifying or replacing the Works and/or Goods damaged or destroyed by Exceptional Events, to the extent they are not indemnified through the insurance policy referred to in Sub-Clause 19.2 [Insurance to be provided by the Contractor].”

18.5    Optional Termination

In sub-paragraph (c), the words “and necessarily” areadded after the words “was reasonably”.

19.1    General Requirements

Following text is added at the end of first paragraph:
“The Contractor shall immediately after the date of the Letter of Acceptance submit the draft of insurance policies for the Employer’s consent.”
Following text is added at the end of third paragraph:
“The Contractor shall, within the respective periods stated in the Contract Data submit to the Engineer and the Employer a) evidence that the insurances described in this Clause have been effected, and b) copies of policies of the insurances described in Sub-Clauses 19.2.1, 19.2.4 and 19.2.5.”

19.2    Insurance to be provided by the Contractor   

19.2.5    Injury to employees
The words “sickness, disease” are deleted in the third line of first paragraph.

The following Sub-Clause is added after Sub-Clause 19.2.6:
19.2.7    Insurance Company
“The Contractor shall be obliged to place all insurances described in this Clause with insurers listed in the Contract Data and rated byPACRA/VISofrating as provided in Table below:

Accepted Contract Amount (In Eq. million PKR)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA

21.6    Arbitration

    The word “international” is deleted in the sixth line of first paragraph. The text of sub-paragraph (a) is substituted with the following:
“the Dispute shall be finally settled under the Rules of Arbitration, specified in the Contract Data;”
The following Clauses are added after Clause 21

22    Custom Duty   

[Employer may incorporate provisions where applicable. However, in order to make the bid more balanced, the payment of Customs Duties should be the responsibility of the Employer.]

23    Taxes   

The Contractor, Subcontractors and their employees shall be liable to pay income tax, withholding tax, super tax and other taxes on income arising out of the Contract. The rates and prices as stated in the contract shall be deemed to cover all such taxes.

24    Integrity Part

If it is found and established at any stage that the Contractor or any of his Subcontractors, agents or servants have violated or involved in violation of the Integrity Pact signed by the Contractor then the Employer shall be entitled to :
(a)    recover from the Contractor an amount equivalent to ten times the sum of any commission, gratification, bribe, finder’s fee or kickback given by the Contractor or any of his Subcontractors, agent or servants;
(b)    terminate the Contract; and
(c)    recover from the Contractor any loss or damage to the Employer as a result of such termination or of any other corrupt business practices of the Contractor or any of his Subcontractors, agent or servants. 
The termination under sub-paragraph(b) of this Sub-Clause shall proceed in the manner prescribed under Sub-Clause 15.1 to 15.4 and the payment under Sub-Clause 15.4 shall be made after having deducted the amounts due to the Employer under sub-paragraph(a) and (c) of this Sub-Clause.


Appendix     General Conditions of Dispute Avoidance/Adjudication Agreement

12    Disputes Under DAAB Agreement

In the first paragraph, third, fourth and fifth line, the text “under the Rules of Arbitration of the International Chamber of Commerce 2017……………shall apply” is substituted with “under the Arbitration Act 1940 by sole arbitrator appointed by the Managing Director Public Procurement Regulatory Authority or Chairman Pakistan Engineering Council.”

 

 

 

 

📑 Bid Securing Declaration (BSD)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

FORM OF BID SECURING DECLARATION

Date: 
No.: 
Alternative No.: P202140

To: Quetta Airport (Pakistan Airports Authority (PAA)), Secretary Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).

We, the undersigned, declare that:

We understand that, according to your conditions, Bids must be supported by a Bid-Securing Declaration.

We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:

(a)     have withdrawn our Bid during the period of Bid validity specified in the Letter of Bid; or
(b)     having been notified of the acceptance of our Bid by the Procuring agency/Employer during the period of Bid validity, (i) fail or refuse to sign the Contract; or (ii) fail or refuse to furnish the Performance Security (or guarantee), if required, in accordance with the ITB.

We understand this Bid Securing Declaration shall expire if we are not the successful Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight days after the expiration of our Bid.

 

Name of the Bidder*    
Name of the person duly authorized to sign the Bid on behalf of the Bidder**    _______
Title of the person signing the Bid    ______________________
Signature of the person named above    ______________________
Date signed ________________________________ day of ___________________, _____
*: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder
**: Person signing the Bid shall have the power of attorney given by the Bidder attached to the Bid

[Note: In case of a Joint Venture, the Bid-Securing Declaration must be in the name of all members to the Joint Venture that submits the Bid.]

📑 Contract Form (CNF)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

FORM OF CONTRACT AGREEMENT

THIS CONTRACT AGREEMENT (hereinafter called the “Agreement”) made on the _________ day of __________ (month) 20_____ between Quetta Airport (Pakistan Airports Authority (PAA)), Secretary Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). (hereinafter called the “Employer”) of the one part and __________________________________________________ (hereinafter called the “Contractor”) of the other part.
WHEREAS the Employer is desirous that certain Works, viz., Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works) (P202140) should be executed by the Contractor and has accepted a Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein.
NOW this Agreement witnessed as follows:
1.    In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2.    The following documents, in the order of priority, after incorporating addenda, if any, except those parts relating to Instructions to Bidders shall be deemed to form and be read and construed as part of this Agreement:
a)    This Contract Agreement;
b)    The Letter of Acceptance;
c)    The Letter of Bid;
d)    The Particular Conditions Part A - Contract Data;
e)    The Particular Conditions Part B - SpecialProvisions;
f)    The General Conditions;
g)    The Specifications Part A - SpecificProvisions;
h)    The Specifications Part B- Technical Provisions;
i)    The Drawings;
j)    The Completed Schedules to Bid including Schedule of Prices;
k)    the JV Undertaking (if the Contractor is a JV); and
l)    [Employer to insert any other documents forming part of the Contract]

The addenda/corrigenda,if any, (Excluding part relating to Instructions to Bidders alongwith Bidding Data) shall be deemed to have been incorporated at the appropriate places in the “Documents forming the Contract”.
3.    In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy defects therein in conformity and in all respects with the provisions of the Contract.
4.    The Employer hereby covenants to pay the Contractor, in consideration of the execution and completion of the Works as per provisions of the Contract, the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.


IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on the day, month and year first before written in accordance with their respective laws.

 

Signature of the Contactor        Signature of Employer
        
(Seal)        (Seal)
Signed, Sealed and Delivered in the presence of:

Witness        Witness
        
        
(Name, Title and Address)        (Name, Title and Address)

 

DAAB Agreement

[All italicised text and any text within square brackets (except sub-clause headings) in this form of agreement is for use in preparing the form and should be deleted from the final product].

Name and details of the Contract Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)
______________________________________________________________________________

This Agreement made the ______day of ______ [month], _____ [year], between

Name and contact details of the Employer  Quetta Airport (Pakistan Airports Authority (PAA)), Secretary    
   Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province).
   +92-322-826-8402
   rasheedbizenjo35@gmail.com


Name and contact details of the Contractor     _____________________________________ (name)
    ____________________________________ (address)
    __________________________________ (telephone)
    ___________________(email / other contact details);

Name and contact details of the DAAB Member    _____________________________________ (name)
    ____________________________________ (address)
    __________________________________ (telephone)
    ___________________(email / other contact details);


(“DAAB Agreement”)

Whereas:
A.    the Employer and the Contractor have entered (or intend to enter) into the Contract;
B.    under the Contract, the “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole member or three members (as stated in the Contract Data of the Contract) so named in the Contract, or appointed under Sub-Clause 21.1 [Constitution of the DAAB] or Sub-Clause 21.2 [Failure to Appoint DAAB Members] of the Conditions of Contract;
C.    the Employer and the Contractor desire jointly to appoint the above-named DAAB Member to act on the DAAB as:
a.    the sole member of the DAAB, and where this is the case, all references to the “Other Members” do not apply; or
b.    one of three members / chairman [delete the one which is not applicable] of the DAAB and, where this is the case, the other two persons are:

 

____________________________ (name)    _________________________ (name)
___________________________ (address)    _______________________ (address)
_____________________________(telephone)    ______________________(telephone)
______________(email/ other contact details)    _______ (email/other contact details)

the “Other Members”; and
D.    the DAAB Member accepts this appointment.

The Employer, Contractor and DAAB Member jointly agree as follows:

1.    The conditions of this DAAB Agreement comprise:
(a)    Clause 21 [Disputes and Arbitration] of the Conditions of Contract, and any other provisions of the Contract that are applicable to the DAAB’s Activities; and
(b)    the “General Conditions of Dispute Avoidance/Adjudication Agreement”, which is appended to the General Conditions of the “Conditions of Contract for Construction” Second Edition 2017 published by FIDIC (“GCs”), as amended and/or added to by the following provisions.
2.    [Details of amendments to the GCs, if any. For example:
In the procedural rules annexed to the GCs, Rule _ is deleted and replaced by: “ … “]
3.    The DAAB Member shall be paid in accordance with Clause 9 of the GCs. The currency of payment shall be ________.
In respect of Sub-Clauses 9.1 and 9.2 of the GCs, the amounts of the DAAB Member’s monthly fee and daily fee shall be:
monthly fee___________________ per month, and
daily fee of____________________ per day
(or as otherwise set under Sub-Clause 9.3 of the GCs).
4.    In consideration of the above fees, and other payments to be made to the DAAB Member in accordance with the GCs, the DAAB Member undertakes to act as DAAB Member in accordance with the terms of this DAAB Agreement.
5.    The Employer and the Contractor shall be jointly and severally liable for the DAAB Member’s fees and other payments to be made to the DAAB Member in accordance with the GCs.
6.    This DAAB Agreement shall be governed by the law of _____________ (if not stated, the law that governs the Contract under Sub-Clause 1.4 of the Conditions of Contract).

SIGNED by:_______________    SIGNED by:_______________    SIGNED by:_______________
Print name:_________________    Print name:_________________    DAAB Member
Title: _____________________    Title:______________________    Title:______________________
for and on behalf of the
Employer    for and on behalf of the
Contractor    
in the presence of    in the presence of    in the presence of
Witness:___________________    Witness:___________________    Witness:___________________
Name:_____________________    Name:_____________________    Name:_____________________
Address:___________________    Address:___________________    Address:___________________
__________________________    __________________________    __________________________
Date:______________________    Date:______________________    Date:______________________

 

FORM OF MOBILIZATION ADVANCE GUARANTEE/ BOND

Guarantee No._________________________________________ Date _________________


WHEREAS _____________________________________ (hereinafter called the 'Employer')
has entered into a Contract for __________________________________________________
(Particulars of Contract)
with ____________________________________________ (hereinafter called the "Contractor').
AND WHEREAS, the Employer has agreed to advance to the Contractor, at the Contractor's request, an amount of Pak Rupees ___________________________________ (PKR _________ ) which amount shall be advanced to the Contractor as per provisions of the Contract.
AND WHEREAS, the Employer has asked the Contractor to furnish Guarantee to secure the mobilization advance for the performance of his obligations under the said Contract.
AND WHEREAS, ____________________________________________________________

(hereinafter called the “Guarantor”) at the request of the Contractor and in consideration of theEmployer agreeing to make the above advance to the Contractor, has agreed to furnish the said Guarantee.
NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the advance for the purpose of above mentioned Contract and if he fails and commits default in fulfilment of any of his obligations for which the advance payment is made, the Guarantor shall be liable to the Employer for payment not exceeding the aforementioned amount.
Notice in writing of any default,on the part of the Contractor, of which the Employer at his discretion of making decision, shall be given by the Employer to the Guarantor, and on such first written demand, payment shall be made by the Guarantor of all sums then due under this Guarantee without any reference to the Contractor and without any objection.
This Guarantee shall remain in force until the advance is fully adjusted against payments from the Interim Payment Certificates of the Contractor or until _________________________whichever is earlier.                                    (Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of 
PKR ______________________ (PakRupees ________________________________________________).
This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the aforesaid date or earlier if the advance made to the Contractor is fully adjusted against paymentsfrom Interim Payment Certificates of the Contractor provided that the Guarantor

agrees that the aforesaid period of validity shall be deemed to be extended if on the above mentioned date the advance payment is not fully adjusted.

 

Guarantor
(Scheduled Bank/ Insurance Company)

Signature ________________________________________________
Name ________________________________________________
Title ________________________________________________ 

 

WITNESS:                        

           

1.     ________________________________________________
       ________________________________________________                             
       Corporate Secretary (Seal)     Corporate Guarantor (Seal)

2.    ________________________________________________
       ________________________________________________              
       Name, Title & Address

 

 

Retention Money Security
Demand Guarantee

________________________________ [Guarantor letterhead or SWIFT identifier code]
Beneficiary:    ___________________ [Insert name and Address of Employer]        
Date:    ________________[Insert date of issue]
RETENTION MONEY GUARANTEE No.:    [Insert guarantee reference number]
Guarantor:  [Insert name and address of place of issue, unless indicated in the letterhead]

We have been informed that ________________ [insert name of Contractor, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called "the Contractor") has entered into Contract No. _____________ [insert reference number of the contract] dated ____________ with the Employer, for the execution of _____________________ [insert name of contract and brief description of Works] (hereinafter called "the Contract"). 
Furthermore, we understand that, according to the conditions of the Contract, the Employer retains moneys up to the limit set forth in the Contract (“the Retention Money”), and that when the Taking-Over Certificate has been issued under the Contract and the first half of the Retention Money has been certified for payment, payment of [insert the second half of the Retention Money orifthe amount guaranteed under the Performance Guarantee when the Taking-Over Certificate is issued is less than half of the Retention Money, the difference between half of the Retention Money and the amount guaranteed under the Performance Security and, if required, the ES Performance Security] is to be made against a Retention Money guarantee.
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ [insert amount in figures] () [amount in words] upon receipt by us of the Employer’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand,  stating that the Applicant is in breach of its obligation(s) under the Contract, without your needing to prove or show grounds for your demand or the sum specified therein. 
A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Employer’s bank stating that the second half of the Retention Money as referred to above has been credited to the contractor on its account number ___________ at _________________ [insert name and address of Contractor’s bank].
This guarantee shall expire no later than the …. day of ……, 2…, and any demand for payment under it must be received by us at the office indicated above on or before that date.

____________________     
[signature(s)]

Note:  All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.

 

 

 

📑 Integrity Pact (INP)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

Integrity Pact

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC. PAYABLE BYTHE SUPPLIERS OF GOODS, SERVICES & WORKS IN  CONTRACTS WORTH RS.10.00 MILLION OR MORE

 

Contract                           Number:  Contract                               Value:  Contract Title:

Dated:

 

[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.

Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.

[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

 

Name of Employer: ………………                                           Name of Bidder/Contractor: ……………
Signature: ……………………                                                   Signature: …………………………….
[Seal]                                                                                   [Seal]

📑 Performance Guarantee Form (PGF)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

FORM OF PERFORMANCE SECURITY

Guarantee No.___________________
Executed on ____________________
Expiry date _____________________


Name of Guarantor with address: _________________________________________________________________________________________________________________________________

Name of Principal (Contractor) with address:___________________________________________________________________________________________________________________________

Penal Sum of Security (express in words and figures) ____________________________________________________________________________________________________________________

Letter of Acceptance No. _____________________________________Dated __________________

KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bidding Documents and above said Letter of Acceptance (hereinafter called the Documents) and at the request of the said Principal we, the Guarantor above named, are held and firmly bound unto the Quetta Airport (Pakistan Airports Authority (PAA)), Secretary Quetta Airport., Sadar, Quetta (District), Quetta Division (Division), Balochistan (Province). (hereinafter called the Employer) in the penal sum of the amount stated above for the payment of which sum well and truly to be made to the said Employer, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has accepted the Employer's above said Letter of Acceptance for _____________________________________ ________________________________

(Name of Contract) for the Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works) (P202140)
______________________________________________ (Name of Project).

NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all the undertakings, covenants, terms and conditions of the said Documents during the original terms of the said Documents and any extensions thereof that may be granted by the Employer, with or without notice to the Guarantor, which notice is, hereby, waived and shall also well and truly perform and fulfill all the undertakings, covenants terms and conditions of the Contract and of any and all modifications of said Documents that may hereafter be made, notice of which modifications to the Guarantor being hereby waived, then, this obligation to be void; otherwise to remain in full force and virtue till all requirements of Clause11, Defects After Taking Over, of Conditions of Contract are fulfilled.

Our total liability under this Guarantee is limited to the sum stated above and it is a condition of any liability attaching to us under this Guarantee that the claim for payment in writing shall be received by us within the validity period of this Guarantee, failing which we shall be discharged of our liability, if any, under this Guarantee.

We, _________________________________________________ (the Guarantor), waiving all objections and defense under the Contract, do hereby irrevocably and independently guarantee to pay to the Employer without delay upon the Employer's first written demand without cavil or arguments and without requiring the Employer to prove or to show grounds or reasons for such demand any sum or sums up to the amount stated above, against the  Employer's written declaration that the Principal has refused or failed to perform the obligations under the Contract which payment will be effected by the Guarantor to Employer’s designated Bank & Account Number.

PROVIDED ALSO THAT the Employer shall decide, whether the Principal (Contractor) has duly performed his obligations under the Contract or has defaulted in fulfilling said obligations and the Guarantor shall pay without objection any sum or sums up to the amount stated above upon first written demand from the Employer forthwith and without any reference to the Principal or any other person.

IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its seal on the date indicated above, the name and corporate seal of the Guarantor being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

 

Guarantor
(Schedule Bank/ Insurance Company)
Signature:  _________________________________________________
Name: _________________________________________________
Title: _________________________________________________ 

Corporate Guarantor (Seal)

 

    
WITNESS:                 

1.
_________________________________________________ 
_________________________________________________  

2.  

_________________________________________________ 
_________________________________________________ 
Name, Title & Address

📑 Annexure (ANX)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

Adjustment Data

Unknown

Bid Securing Declaration

Unknown

Document Required

Contract Document

Mandatory Requirement. Please attach signed and stamped copy of the document.

Unknown

Document Required

Bill of Quantities

Mandatory Requirement: Please attached filled, signed and stamped BoQ

Unknown

Document Required

📑 Procurement Forms (PFD)

Operationalization of Dalbandin Airport (Rehabilitation of Airside Pavements, Security Fence, PTB and Allied Works)

Published on: Monday, November 23, 2026 02:00 PM

Ref# : P202140
QR Code

Historical Contract Non-Performance, and Pending Litigation and Litigation History