In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Allama Iqbal International Airport (Pakistan Airports Authority (PAA)), Divisional Engineer
Office of Divisional Engineer E&M, Level-IV, Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
+92-341-577-5777
imran.n@paa.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: Allama Iqbal International Airport (Pakistan Airports Authority (PAA)) The subject of procurement is: Provisioning / Installation and Replacement of outlived cooling towers with allied works at Allama Iqbal International Airport (AIIAP) Lahore Expected commencement date: Wednesday, September 30, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P37508 |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 03 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, June 22, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Allama Iqbal International Airport (Pakistan Airports Authority (PAA)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 180 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Demand Draft |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Office of Divisional Engineer E&M, Level-IV, Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Tuesday, July 7, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Tuesday Date: July 07, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 5.00%. The Performance Guarantee shall be acceptable in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Original Bid Security furnished in accordance with general instructions, invitation to bids and instructions to bidders Note: The physical financial instrument shall reach the office of the Divisional Engineer ES E&M AIIAP Lahore in envelope before opening of bids | Yes |
| Certificate of incorporation/Article & memorandum of association/Partnership deed/Affidavit for sole proprietorship Note: Duly attested by Notary Public/oath commissioner | Yes |
| Joint Venture Agreement (if applicable). In case of foreign firm/company, joint venture with Pakistani firm and registration with SECP | Yes |
| Affidavit on non-judicial e-stamp paper (worth Rs. 500/-) to the effect that company has not been blacklisted by any Govt./Semi-Govt./Autonomous body Note: Duly attested by Notary Public/oath commissioner | Yes |
| Active Taxpayer status (ATL)/NTN/GST and Professional Tax Certificate Note: Duly attested by Notary Public/oath commissioner | Yes |
| Valid Certification/License by the Pakistan Engineering Council (PEC) in relevant Category i.e. C-2 or above having specialization code ME-01 Note: Duly attested by Notary Public/oath commissioner | Yes |
| Power of attorney in accordance with Additional Instruction to Bidders. Note: Duly attested by Notary Public/oath commissioner | Yes |
Least Cost Based Selection (LCBS)
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Bidder must be a Cooling Tower Manufacturer (OEM) or OEM’s authorized agent / partner of the manufacturer for Pakistan (Minimum Passing Marks: 08) | ||
| Valid authorization certificate of OEM in case of Agent/Dealer/Partner partnership certificate for Pakistan as evidence of being an authorized partner. (Qualitative)(Doc Required) OEM/authorized agent/partner for 20 years (15) OEM/authorized agent/partner for 10 years Note: Additional 0.5 mark per past year if authorized dealer for Pakistan. (10) OEM/authorized agent/partner Note: Additional 0.5 mark per past year if authorized dealer for Pakistan. (5) Not OEM/authorized agent/partner (0) | 15 | |
| Applicant Firm / Contractor profiles resources and project planning (Minimum Passing Marks: 10) | ||
| Please submit a complete proposal/plan for Work methodology, PAA officials training program of delivered Cooling Tower. (Qualitative)(Doc Required) 06 Marks: if the step-by-step breakup of activities linked with manpower is provided with job responsibility and personal qualification/profile of the deployed staff. Additional 05 Marks: if the detailed breakup project is given with deployed tools/plant, testing equipment, machinery and equipment resources. Additional 04 Marks: if complete operation and maintenance training plan with contents and schedule for PAA Officials is prepared and submitted (15) 0 marks if none of the required three (03) documents are submitted. (0) | 15 | |
| General Experience of Bidder. (Minimum Passing Marks: 05) | ||
| Attach list of purchaser or delivery orders or contracts or project completion or sign-off certificate with contact details. (Qualitative)(Doc Required) Full Marks will be given in case of 100 Cooling Towers for HVAC System have been completed in the last 10 years. (10) 08 Marks will be given, if the bidder has commissioned 50 Cooling Towers for HVAC System in Pakistan during the last 10 years. Note: If less than 50 Cooling Towers for HVAC System in Pakistan during the last 10 years, 0.16 mark shall be awarded for each tower. If more than 50 Cooling Towers for HVAC System in Pakistan during the last 10 years, 0.04 mark shall be awarded for each additional tower. (8) 0 mark for more than 10-year-old cooling towers work. (0) | 10 | |
| Particular Experience of Bidder. (Minimum Passing Marks: 05) | ||
| Attach list of purchaser or delivery orders or contracts or project completion or sign-off certificate with contact details for induced draft, cross flow, hot water distribution type Cooling Tower. (Qualitative)(Doc Required) Full Marks will be given in case of 100 Cooling Towers i.e. induced draft, cross flow, hot water distribution type at least 600 TR capacity during the last 10 years. (10) 08 Marks will be given, if the bidder/ OEM has Provided/ Installed/ erected, commissioned 50 Cooling Towers i.e. induced draft, cross flow, hot water distribution type at least 600 TR capacity locally or Globally during the last 10 years. Note: If less than 50 Cooling Towers (above specified type) during the last 10 years, 0.16 mark shall be awarded for each tower. If more than 50 Cooling Towers (above specified type) during the last 10 years, 0.04 mark shall be awarded for each additional tower (8) 0 mark for more than 10-year-old cooling towers work. (0) | 10 | |
| Technical Compliance to Tender Specifications. (Minimum Passing Marks: 10) | ||
| Prepare and attach a detailed technical compliance sheet to PAA Technical Specifications Appendix III-b covering clause wise features of offered Cooling Tower Note: 0 marks in case sheet is not prepared or incomplete compliance sheet is attached. Full marks for submitting completely filled (and complied) compliance sheet with required documents mentioned therein are attached. (Quantitative)(Doc Required) | 10 | |
| Bidders Technical Capacity. (Minimum Passing Marks: 07) | ||
| Please attach copy of PEC valid registration certificate with specific category. Note: 0 mark for non submission of valid PEC certificate or PEC certificate below C-2 category or non-availability of ME-01 Code. 07 marks for C-2 category or above with ME-01 field of specialization. (Quantitative)(Doc Required) | 7 | |
| Bidder must have Technical Strength of at least one (01) OEM Certified / Trained Engineer for after sales services and support. (Minimum Passing Marks: 08) | ||
| Please attach copies of OEM certificate with Engineer’s profile/s. Note: 0 mark if OEM certificate for trained engineer is not Submitted Full marks if OEM certificate for one or more trained engineer is Submitted (Quantitative)(Doc Required) | 8 | |
| Financial Capacity of the bidder. (Minimum Passing Marks: 10) | ||
| Copies of Audited Financial Statement for last three financial years shall be provided i.e. 2022-23, 2023-24, 2024-25. (Qualitative)(Doc Required) 15 Marks are given if the average annual turnover of last 3 years is equal to Rs 850 Million or above. (15) 10 Marks are given if the average annual turnover of last 3 years is equal to Rs 600 Million. Note: 01 additional mark is given for every PKR 50 million (average annual turnover of last 3 years) surplus of PKR 600 Million. (10) 05 Marks are given if the average annual turnover of last 3 years is below Rs 600 Million. (5) 0 mark if audited financial statement for all mentioned last three years are not attached. (0) | 15 | |
| Time schedule to design, manufacture, transport, hardware installation with software deployment at site, debugging testing commissioning, provision of training and handing over of the System to PAA. (Minimum Passing Marks: 05) | ||
| Gantt chart with complete time schedule and milestones to be provided. (Qualitative)(Doc Required) 5 Marks are given if the complete Gantt chart showing complete work schedules with milestones within completion time is submitted with technical bid. Additional 5 Marks are given if the contractor has shown to complete the project in 300 days or earlier in his Gantt chart. (10) 5 Marks are given if the complete Gantt chart showing complete work schedules with milestones within completion time is submitted with technical bid. Note: For more than 300 days of project completion time 1 mark each shall be deducted for every additional 13 days. (5) 0 mark if the Gantt chart showing complete work schedules with milestones is not submitted with technical bid. (0) | 10 | |
Lot Title : Replacement of cooling towers
Bid Security : 5000000
| Job | Delivery Schedule | Quantity |
|---|---|---|
| E&M Works |
Address: Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Schedule: 365 Days
Quantity: 01
|
1 |
| Civil Works |
Address: Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Schedule: 365 Days
Quantity: 01
|
1 |
| Item | UNSPSC | Delivery Schedule | Quantity | Bid Security | Related to Job/Lot |
|---|---|---|---|---|---|
| Calculator Large | Desktop calculator |
Address: Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
Schedule: 30 Days
Quantity: 01
|
1 | 0 | Replacement of cooling towers (Lot) |
Yes
Replacement of cooling towers
| Job | Related Services |
|---|---|
| E&M Works | Dismantled materials to be shifted to PAA Stores |
| Civil Works | Clear site as per instructions of Engineer Incharge |
Lot Title: Replacement of cooling towers
Specifications / Requirements:
| Sr. No | Ref No. | Description | Unit | Qty | Rate | Amount | |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Dismatling of old/ outlived Marley Make cross flow, induced draft, twin-cell cooling tower using specialized tools/ equipment, and PPEs without damaging the surrounding areas including the existing foundations and pipeline network. (Please refer Appendix-VIII (item-1) for complete description of this item.) | P/Job | 4 | 848,563.00 | (Rupees eight hundred forty eight thousand five hundred sixty three only) | 3,394,252.00 |
| 2 | 2 | Providing, installation/ erection, testing, commissioning and water balancing of induced draft, cross flow, vertical discharge, twin-cell, CTI/ JCI/JIS/EUROVENT/ASHRAE standards certified Cooling Tower. Complete in all respects as per site requirements. The selection of Cooling Tower be based on following parameters and attached technical specifications: Heat Rejection Capacity (Minimum): 2200 kW Water Flow Rate Per Cooling Tower: 105 liters/Sec Hot Water In Temperature: 38 degrees Celsius Cold Water Out Temperature: 33 degrees Celsius Web Bulb Temperature: 29 degrees Celsius (Please refer Appendix-VIII (item-2) for complete description of this item.) | P/Job | 5 | 101,705,000.00 | (Rupees one hundred and one million, seven hundred five thousand only) | 508,525,000.00 |
| 3 | 3 | Dismantling of existing deteriorated in-line centrifugal pump with motor installed on the condenser supply piping and all allied accessories with specialized tools/ equipment without damaging the surrounding piping and foundation and careful placement of the dismantled pump motor set at a designated place on wooden pallets and making good the damages as per site requirement, complete job in all respects as required and as per the instructions of the Engineer In-Charge. | P/Job | 4 | 324,861.00 | (Rupees Three hundred twenty four thousand eight hundred sixty one only) | 1,299,444.00 |
| 4 | 4 | Providing, installation, testing and commissioning of inline centrifugal pump ISO 9906 compliant coupled with motor on condenser water supply/ Cooling Tower discharge piping. The selection be based on the following parameters: - Location : Outdoor - Flow rate (m³/hr): 378 - Service: Cooling Tower (open cycle) water - Type: Centrifugal, in line, direct driven - Head (kPa): 315 - Water type: Chenically dosed for chiller condensor / open loop - Water Working Temperature Range: 01 to 50°C - Existing Motor Power: 55kW - Volts-Phase-Hz: 400-3ϕ-50 - RPM: 1450 - Protection class: IP65 (Please refer Appendix-VIII (item-4) for complete description of this item.) | P/Job | 5 | 11,929,820.00 | (Rupees eleven million, nine hundred twenty nine thousand eight hundred twenty only) | 59,649,100.00 |
| 5 | 5 | Supply, installation, testing & comissioning of M.S schedule 40 seamless pipeline of diameter 250 mm for condenser water return main pipe to cooling tower and condenser water supply pipeline including all accessories (elbows, tees, reducers, test points, blind flange size DN 550 mm qty. 02 having suitable provision for welding of 250MM Dia pipe etc) as per actual of the existing cooling towers as required as per site requirement and instructions of the Engineer In-Charge. | P/RM | 45 | 122,524.00 | (Rupees one hundred twenty two thousand five hundred twenty four only) | 5,513,580.00 |
| 6 | 6 | Supply, installation, testing & comissioning of M.S schedule 40 seamless pipeline of diameter 200 mm for condenser water return riser branch pipe towards the hot water basin of the cooling tower including all accessories (elbows, tees, reducers etc) as per actual of the existing cooling towers as required as per site requirement and instructions of the Engineer In-Charge. | P/RM | 10 | 98,769.00 | (Rupees ninety eight thousand seven hundred sixty nine only) | 987,690.00 |
| 7 | 7 | Supply, installation, testing & comissioning of M.S schedule 40 seamless pipeline of diameter 150 mm for condenser water return branch pipe inlet in the hot water basins of both cells of the cooling tower and extension of the existing equalizer line upto the installation site of the new cooling tower including all accessories (elbows, tees, reducers etc) as per actual of the existing cooling towers as required as per site requirement and instructions of the Engineer In-Charge. | P/RM | 20 | 42,225.00 | (Rupees forty two thousand two hundred twenty five only) | 844,500.00 |
| 8 | 8 | Supply, installation, testing & comissioning of M.S schedule 40 seamless pipeline of diameter 100 mm for drainage line and interconnection of the tower equalizer line with the main equalizer line including all accessories (elbows, tees, reducers etc) as per actual of the existing cooling towers as required as per site requirement and instructions of the Engineer In-Charge. | P/RM | 10 | 36,960.00 | (Rupees thirty six thousand nine hundred sixty only) | 369,600.00 |
| 9 | 9 | Supply, installation, testing & comissioning of M.S schedule 40 seamless pipeline of diameter 80 mm for overflow drain pipe and interconnection of the drain line with overflow drain pipe including all accessories (elbows, tees, reducers, flanges etc) as per actual of the existing cooling towers as required as per site requirement and instructions of the Engineer In-Charge. | P/RM | 10 | 20,019.00 | (Rupees twenty thousand nineteen only) | 200,190.00 |
| 10 | 10 | Supply, installation, testing & comissioning of M.S schedule 40 seamless pipeline of diameter 32 mm for tower makeup water line including all accessories (elbows, tees, reducers etc) as per actual of the existing cooling towers as required as per site requirement and instructions of the Engineer In-Charge. | P/RM | 8 | 7,877.00 | (Rupees seven thousand eight hundred seventy seven only) | 63,016.00 |
| 11 | 11 | Supply and installation of butterfly valve flanged type compliant with relevant ASME/ANSI/JIS standard having dia 250 mm, design pressure 16 bars (Qty. 02 valves shall be compatible for installation with motorized actuator) on condenser water supply and return line, including hydraulic testing of mentioned valve against leakage as per recommendations of manufacturer, also including p/f of gasket, high strength HDGI nuts/bolts and other necessary accessories, cutting, welding as required and commissioning of valve complete job in all respect as per site requirement and instructions of Engineer In-charge. | Each | 5 | 124,139.00 | (Rupees one hundred twenty four thousand one hundred thirty nine only) | 620,695.00 |
| 12 | 12 | Supply and installation of balancing valve flanged type compliant with relevant ASME/ANSI/JIS standard having dia. 250 mm, design pressure 16 bars on condenser water supply and return line, including hydraulic testing of mentioned valve against leakage as per recommendations of manufacturer, also including p/f of gasket, high strength HDGI nuts/bolts and complete necessary accessories such as ports, nozzels, locking mechanism etc of required size, cutting, welding as required and commissioning of valve complete job in all respect as per site requirement and instructions of Engineer In-charge. | Each | 2 | 607,311.00 | (Rupees six hundred seven thousand three hundred eleven only) | 1,214,622.00 |
| 13 | 13 | Supply and installation of Butterfly valve flanged type compliant with relevant ASME/ANSI/JIS standard having dia 100 mm, design pressure 16 bars on the connection of tower equalizer line to the main equalizer line, including hydraulic testing of mentioned valve against leakage as per recommendations of manufacturer, also including p/f of gasket, high strength HDGI nuts/bolts and complete necessary accessories of required size, cutting, welding as required and commissioning of valve complete job in all respect as per site requirement and instructions of Engineer In-charge. | Each | 1 | 41,364.00 | (Rupees forty one thousand three hundred sixty four only) | 41,364.00 |
| 14 | 14 | Supply and installation of Gate Valve flanged type compliant with relevant ASME/ANSI/JIS standard having dia 32 mm, design pressure 16 bars on make up water line of cooling tower, including hydraulic testing of mentioned valve against leakage as per recommendations of manufacturer, also including p/f of gasket, HDGI and high strength nuts/bolts and complete necessary accessories of required size, cutting, welding as required and commissioning of valve complete job in all respect as per site requirement and instructions of Engineer In-charge. | Each | 1 | 18,264.00 | (Rupees eighteen thousand two hundred sixty four only) | 18,264.00 |
| 15 | 15 | Supply and installation of Gate Valve flanged type compliant with relevant ASME/ANSI/JIS standard having dia 100 mm, design pressure 16 bars for the drain line of cooling tower and equalizer line, including hydraulic testing of mentioned valve against leakage as per recommendations of manufacturer, also including p/f of gasket, high strength HDGI nuts/bolts and complete necessary accessories of required size, cutting, welding as required and commissioning of valve complete job in all respect as per site requirement and instructions of Engineer In-charge. | Each | 3 | 66,601.00 | (Rupees sixty six thousand six hundred one only) | 199,803.00 |
| 16 | 16 | Supply, installation, testing and comissioning of Y-Type strainer flanged type relevant ASME/ANSI/JIS standard compliant dia 250 mm, Mesh Size 0.75 mm, design pressure 16 bars, including hydraulic testing against leakage as per recommendations of manufacturer, also including p/f of gasket, high strength HDGI nuts/bolts and complete necessary accessories of required size, cutting, welding as required in the condenser water supply line before the pump including all fittings and accessories as per site requirement and Instructions of the Engineer In-Charge. | Each | 1 | 305,589.00 | (Rupees three hundred five thousand five hundred eighty nine only) | 305,589.00 |
| 17 | 17 | Supply and installation of Non Return Valve flanged end swing type compliant with relevant ASME/ANSI/JIS standard having dia 250 mm, design pressure 16 bars on condenser water supply line, including hydraulic testing of mentioned valve against leakage as per recommendations of manufacturer, also including p/f of gasket, nuts/bolts and other necessary accessories and foundations of required size, cutting, welding as required and commissioning of valve complete job in all respect as per site requirement and instructions of Engineer In-charge. | Each | 1 | 401,081.00 | (Rupees four hundred one thousand eighty one only) | 401,081.00 |
| 18 | 18 | Preparation of all existing and newly erected non HDGI surfaces to near white finish SA 2 1/2 with the help of sand blasting with provisioning of suitable abbrasive media, air compressor, nozzles, hoses, blasting machine complete material, consumable and skilled labour. Remove weld spatter and smoothen weld seams, corners and sharp edges as applicable. Job also include isolation of other operational equipment during blasting activity, cleaning and disposal of waste material complete in all respect as per instructions of Incharge. | P/SFT | 3326 | 1,389.00 | (Rupees one thousand three hundred eighty nine only) | 4,619,814.00 |
| 19 | 19 | Cleaning and painting of all existing and newly erected prepared surface including valves and allied fittings etc for C4 Corrosive , Medium life coating system by one coat of zinc rich primer and then two coat of epoxy paint (Nippon, Kansai, Jotun or equivalent) to the required thickness as per instruction of manufacturer and engineer in-charge including air spray machine complete in all respect. | P/Sq. M | 294.015 | 6,328.00 | (Rupees six thousand three hundred twenty eight only) | 1,860,526.92 |
| 20 | 20 | Providing and fixing PVC pipe spouts of 3" (80 mm) dia and required length including fixing in cement mortar 1:4 etc. complete | P/RM. | 10 | 2,196.18 | (Rupees two thousand one hundred ninety six paisa eighteen only) | 21,961.80 |
| 21 | 21 | Providing & fixing cubical type metal sheet vermin protected LT pannel board as per drawing with locking arragement duly powder coated I/c all fastening devices and electrical wire/ leads for internal connection complete as required. | P/SFT | 15 | 15,058.40 | (Rupees fiftteen thousand fifty eight paisa forth only) | 225,876.00 |
| 22 | 22 | Providing & fixing 400 Amps, 4 pole, three phase bus bar strip set (Standred size) fitted in suitable size metallic sheet steel box with hinged type front door duly painted and fixed on existing board I/c connection as required. | Each | 1 | 25,768.40 | (Rupees twenty five thousand seven hundred sixty eight paisa forty only) | 25,768.40 |
| 23 | 23 | Providing & fixing pilot lamp set fitted on existing board I/c connection as required. | P/Set | 1 | 1,220.80 | (Rupees one thousand two hundred twenty paisa eighty only) | 1,220.80 |
| 24 | 24 | Providing and laying 4 core, 35mm² PVC insulated & PVC sheathed, 600/1000 volts grade with stranded copper conductor, armoured underground, L.T cable buried in the ground dully covered with sand and warning cable tiles as per Pak. P. W.D specification as required | P/RM | 15 | 11,226.60 | (Rupees eleven thousand two hundred twenty six paisa sixty only) | 168,399.00 |
| 25 | 25 | Providing and laying 4 core, 25mm² PVC insulated & PVC sheathed, 600/1000 volts grade with stranded copper conductor, unarmoured, L.T cable in existing all kind of conduit or cable duct as per Pak. P. W.D specification as required. | P/RM | 100 | 5,618.20 | (Rupees five thousand six hundred eighteen paisa twenty only) | 561,820.00 |
| 26 | 26 | Supply and drawing of 16mm² single core PVC insulated wire in all kinds of existing or given conduit/ cable duct as required. Note: ECC for pump | P/RM | 50 | 960.40 | (Rupees nine hundred sixty paisa forty only) | 48,020.00 |
| 27 | 27 | Providing and laying 4 core, 10mm², stranded copper conductor, PVC insulated & PVC sheathed cable including 2.5mm² single core PVC insulated wire as ECC in all kind of existing or given conduit/ duct as required. Note: Job also include proper termination of Cables as per site requirement. | P/RM | 250 | 2,745.40 | (Rupees two thousand seven hundred forty five paisa forty only) | 686,350.00 |
| 28 | 28 | Making termination of 3 or 4 core 35mm² to 50mm² armoured/ unaroured copper conductor, PVC x PVC L.T cable including providing & fixing proper lugs, etc complete in all respect as required | P/Job | 2 | 3,491.60 | (Rupees three thousand four hundred ninety one paisa sixty only) | 6,983.20 |
| 29 | 29 | Making termination of 3 or 4 core 16mm² to 25mm² armoured/ unaroured copper conductor, PVC x PVC L.T cable including providing & fixing proper lugs, etc complete in all respect as required | P/Job | 4 | 3,211.60 | (Rupees three thousand two hundred eleven paisa sixty only) | 12,846.40 |
| 30 | 30 | Providing and fixing 250 to 400 Amps, (High Breaking Capacity) T.P circuit breaker fixed on existing board, i/c inter connection as required. | Each | 1 | 59,904.60 | (Rupees fifty nine thousand nine hundred four paisa sixty only) | 59,904.60 |
| 31 | 31 | Providing / Fabricating & fixing of cable tray (from existing tray network to new cooling tower and pump) made of 16 SWG Perforated bottom HDGI Cable Tray with 16 SWG HDGI Cover With Joint Plates, Nuts & Bolts. of size 6”x3’’, with complete necessary supports, complete job as per the instructions of the Engineer In-charge. | P/Rft | 20 | 1,849.00 | (Rupees one thousand eight hundred forty nine only) | 36,980.00 |
| 32 | 32 | Providing & fixing of 4" dia dial water pressure gauge ASME/EN/JIS Compliant range (0 to 60 PSi), filled and outdoor type at suction and discharge of the condenser water pump with syphon type, isolating valves and suitable fittings etc complete as per site requirement. | Each | 10 | 34,189.00 | (Rupees thirty four thousand one hundred eighty nine only) | 341,890.00 |
| 33 | 33 | Providing & fixing of 6'' dia water temperature gauge/ thermometer ASME/EN/JIS Compliant range (0 to 60 Degree Centigrade), filled and outdoor type at cooling tower supply and return main headers with thermowells and suitable lenght stems including mounting stands and suitable fittings etc complete as per site requirement. | Each | 2 | 31,378.00 | (Rupees thirty one thousand three hundred seventy eight only) | 62,756.00 |
| 34 | 34 | Rehabilitation and redesigning (as required) of existing electrical cum control panel of cooling towers including dismatling of existing control panel accessories including dismantling of main incoming breaker and star delta panel accessories (MCCBs, magnetic contactors, relays, voltmeters, current transformers, associated wiring housed inside the panel etc.) for cooling tower fans (8 Nos.) and condenser water pumps (4 Nos.). Job includes safely handing over and placing the dismantled accessories at a designated place as per the instructions of the Engineer In-Charge. (Please refer Appendix-VIII (item-34) for complete description of this item.) | P/Job | 1 | 9,704,465.00 | (Rupees nine million seven hundred four thousand four hundred sixty five only) | 9,704,465.00 |
| 35 | 35 | Dismantling R.C.C. including separating reinforcement from concrete in foundation, basement, plinth and ground floor including stacking at site and disposing of unserviceable material within three chains (91.5 m) | P/100 Cft | 266 | 11,838.75 | (Rupees eleven thousand eight hundred thirty eight paisa seventy five only) | 31,438.98 |
| 36 | 36 | Providing and laying reinforced cement concrete using lawrancepur sand and crushed graded boulders 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3750 Ibs. per sq inch (23.24 N/mm2 ) at 28 days with a mix not leaner than 1:1.5:3 in straight walls more than 6" (152 mm) thick including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth | P/100 Cft | 663 | 66,328.77 | (Rupees sixty six thousand three hundred twenty eight paisa seventy seven only) | 439,452.48 |
| 37 | 37 | Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidation by ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction and lift up to 5 feet (1 .52 m). | P/100 Cft | 1,527 | 6,817.92 | (Rupees six thousand eight hundred seventeen Paisa ninety two only) | 104,109.58 |
| 38 | 38 | Providing and laying reinforced cement concrete using lawrencepur sand and crushed graded boulders 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch (20.69 N/mm2 ) at 28 days with a mix not leaner than 1:2:4 in raft or strip foundation with columns and pillars, of any shape including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | P/100 Cft | 1,332 | 49,211.61 | (Rupees forty nine thousand two hundred eleven paisa sixty one only) | 655,498.64 |
| 39 | 39 | Providing and laying reinforced cement concrete using lawrencepur sand and crushed graded boulders 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch (20.69 N/mm2 ) at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth | P/100 Cft | 35 | 61,415.37 | (Rupees sixty one thousand four hundred fifteen paisa thirty seven only) | 21,482.95 |
| 40 | 40 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension. | P/Kg | 6446 | 395.43 | (Rupees three hundred ninety five paisa forty three only) | 2,548,941.78 |
| 41 | 41 | Providing and fixing R. S. Joists and channels including welding all the side of the sections at the junction, gusset plates, bolts, nuts etc. complete with hoisting and erecting in position in steel trusses, frames, towers etc of any design in ground floor. | P/Kg | 1,000 | 482.24 | (Rupees four hundred eightty two paisa twenty four only) | 482,244.00 |
| 42 | 42 | Providiing & Filling cavity / joint having size 15mm x 15mm with Poly Sulphide Conflex PS (or equivalent) including the cost of 19mm dia backer rod, Conflex primer on both edges of cavity / joint, cleaning the surface before application, cartage, wastage etc. complete in all respect as directed by the Engineer In Charge. | P/Kg | 145 | 1,068.00 | (Rupees one thousand sixty eight only) | 154,817.28 |
| 43 | 43 | Providing and laying reinforced cement concrete using lawrancepur sand and crushed graded boulders 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3750 Ibs. per sq inch (23.24 N/mm2 ) at 28 days with a mix not leaner than 1:1.5:3 in straight walls 5" (127 mm) to 6" (152 mm) thick including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth | P/100 Cft | 553 | 79,688.27 | (Rupees seventy nine thousand six hundred eighty eight paisa twenty seven only) | 440,676.11 |
| 44 | 44 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension. | P/Kg | 2008 | 395.43 | (Rupees three hundred ninety five paisa forty three only) | 794,023.44 |
| 45 | 45 | Providing and fixing R. S. Joists and channels including welding all the side of the sections at the junction, gusset plates, bolts, nuts etc. complete with hoisting and erecting in position in steel trusses, frames, towers etc of any design in ground floor. | P/Kg | 3116 | 482.24 | (Rupees four hundred eighty two paisa twenty four only) | 1,502,672.30 |
| GRAND TOTAL: | Rs 609,268,729.66 |
Please refer Appendix-III
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
|
Number of GC Clause |
Amendments of, and Supplements to, Clauses in the General Conditions of Contract |
|
|
Definitions The Procuring Agency is: Allama Iqbal International Airport (Pakistan Airports Authority (PAA)), Divisional Engineer Office of Divisional Engineer E&M, Level-IV, Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province). The Supplier is: The title of the subject procurement is:Provisioning / Installation and Replacement of outlived cooling towers with allied works at Allama Iqbal International Airport (AIIAP) Lahore |
|
GCC 2 |
Applicable/Governing Law: The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan |
|
GCC 3 |
Language: The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English. |
|
GCC 4 |
Notices: The addresses for the notices are: Procuring Agency: Allama Iqbal International Airport (Pakistan Airports Authority (PAA)), Divisional Engineer Contractor/ Bidder: [Name, address and telephone number]. The Contractor/ Bidder’s Representative(s) [Name, address, telephone number and e-mail address]
|
|
GCC 6.1 |
The Authorized Representatives are:
For the Procuring Agency: Allama Iqbal International Airport (Pakistan Airports Authority (PAA)), Divisional Engineer For the Bidder: Name: ……………………… Designation: …………….. Address: ……………………………..
|
|
GCC 7 |
Effectiveness of the contract The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties |
|
GCC 8 |
Commencement of Contract: The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract. |
|
GCC 10.2 |
Expiration of Contract: The time period shall be …………………. |
|
GCC 14 |
Termination In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements. |
|
GCC 16 |
Conflict of Interest: The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17. |
|
GCC 20 |
Liquidated Damages If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.02% to 5.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority. |
|
GCC 21 |
Performance Guarantee: The amount of performance guarantee shall be 5.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft |
|
GCC 27 |
Currency of Payment: All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees. |
|
GCC 28 |
Payment terms: Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract. |
|
GCC 29 |
Identifying Defects: The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided. Delivery & DocumentsOriginal and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods; Copies of the packing list identifying contents of each package; Certificate of Origin. |
|
GCC 31
|
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder. Arbitrator’s fee: The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties. Appointing Authority for Arbitrator: By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties. Rules of procedure for arbitration proceedings: Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator. Place of Arbitration and Award: The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties. |
Date: [insert date (as day, month and year)]
Bid No.:P37508
To: Allama Iqbal International Airport (Pakistan Airports Authority (PAA)), Divisional Engineer Office of Divisional Engineer E&M, Level-IV, Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Allama Iqbal International Airport (Pakistan Airports Authority (PAA)), Divisional Engineer Office of Divisional Engineer E&M, Level-IV, Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Provisioning / Installation and Replacement of outlived cooling towers with allied works at Allama Iqbal International Airport (AIIAP) Lahore (P37508) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Allama Iqbal International Airport (Pakistan Airports Authority (PAA)), Divisional Engineer Office of Divisional Engineer E&M, Level-IV, Allama Iqbal International Airport., Lahore City, Lahore (District), Lahore Division (Division), Punjab (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
The bidder is required to fill and upload this document alongwith relevant literature/certificates