In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)), Unit Head
Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory
+92-344-544-4455
head.gpu@ztbl.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)) The subject of procurement is:Â Hiring of Contractor for Uplifting of Exterior of ZTBL, Head Office Main Building, Islamabad. Expected commencement date: Wednesday, October 7, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P48071Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, July 27, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
 |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 150 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Demand Draft  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Thursday, July 30, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Thursday Date:Â July 30, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Pay Order, Banker's Cheque, Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| The firm must be registered with the Pakistan Engineering Council (PEC) in Category C-5 or above. A valid PEC Registration Certificate must be uploaded. In case the PEC registration has expired or category upgradation, the firm must upload documentary evidence issued by the Pakistan Engineering Council (PEC) confirming that renewal or category upgradation is in process. | Yes |
| The Firm must possess PEC Codes: BC-04, CE-10, CE-11(i), and CE-11(vii). | Yes |
| The Firm must have valid NTN. | Yes |
| The firm should have existence in Pakistan for the last five years (Attach firm's incorporation certificate) | Yes |
| Affidavit for not being blacklisted (Attach scanned copy) original shall be submitted with bid security to ZTBL Procurement department before the bid submission deadline. | Yes |
| The bidding firm shall have Two (2) Site Engineer and one (1) Safety Officer, each with at least five (5) years of relevant experience. The Site Engineer shall hold a Bachelor's degree in Civil Engineering and a valid PEC registration. The Safety officer shall hold a NEBOSH /IOSH certifications. Documentary proof of qualifications, certifications, and employment with the bidding firm shall be submitted. | Yes |
Least Cost Based Selection (LCBS)
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Technical Evaluation Criteria [Please ensure to select the appropriate catagory and attached the relevant docuemnt, otherwise the system will mark zero (0)]. | ||
| Experience & Past Performance Similar Maintenance Project (Highrise- above 7 stories) Completed in last 10 years minimum of 40 Million PKR each project. (Provide Verifiable Completion Certificates) (Quantitative)(Doc Required) 04 Projects (40) 03 Projects (30) 02 Projects (20) 01 Project (10) | 40 | |
| Similar in hand Maintenance/construction Projects (High rise buildings - above 7 stories) in last 5 years minimum of 40 Million PKR each project. (Provide Verifiable Performance Certificates) (Quantitative)(Doc Required) 03 Projects (15) 02 Projects (10) 01 Projects (5) | 15 | |
| Compliance Soundness - Work Program / Schedule (MS Project / Bar Chart) (Completeness, logical sequence, realistic duration, resource planning, critical path, Planned manpower deployment and resource allocation.) (Quantitative)(Doc Required) | 10 | |
| Equipment capabilities - Gondolas/BMU (owned or rented) Rental agreement must be attached incase of rented Gondolas. (Quantitative)(Doc Required) | 3 | |
| Equipment capabilities - Scaffolding owned/rented (Rented Agreement must be attached) (Quantitative)(Doc Required) | 3 | |
| Equipment capabilities - Safety Equipments (full body safety harness ( Minimum 5) (Quantitative)(Doc Required) | 5 | |
| Financial Soundness - Audit Reports of Last 3 Year. Incase of sole proprietorship, bank statements for the last three years. (Quantitative)(Doc Required) | 10 | |
| Financial Soundness - Available Bank Credit Line/bank statement (Quantitative)(Doc Required) Available Bank Credit Line/bank statement greater then 30 Million PKR (10) Available Bank Credit Line/bank statement greater then 20 Million PKR (8) Available Bank Credit Line/statement greater then 10 Million PKR (5) | 10 | |
| Compliance Soundness - ISO 9001 (Certification must be attached) (Quantitative)(Doc Required) | 2 | |
| Compliance Soundness - ISO 45001 (Certification must be attached) (Quantitative)(Doc Required) | 2 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Uplifting of Exterior of Main building of ZTBL, Head Office Main Building, Islamabad | Address: Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory Schedule: The project shall commence within thirty (30) days. The completion of work should be with in 12 months from date of issuance of work order. Quantity: 1/job |
1/job | 1000000 PKR |
No
Jobs Without Lots :
Job: Uplifting of Exterior of Main building of ZTBL, Head Office Main Building, Islamabad
Specifications / Requirements:
| Sr. No | Sr.No | Â | Description | Scope of Work | Unit | Quantity | Rate | Total Amount |
|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Paint Work | Removal of Debris and Site Cleaning Works | Clearing, collecting, loading, and removing all construction debris, waste materials, dust, and unwanted rubbish from the site area, including sweeping, scraping, and cleaning of floors and surrounding surfaces, and disposing of all waste to an approved dumping site as directed by the Engineer, complete in all respects. | LS | 1 | 100000 | 100,000 |
| 2 | 2 | Paint Work | Grain Textured Plaster Finish to Walls" (Pane Chips) | Providing and applying exterior decorative grain textured finish to external walls of high-rise building at all heights i.e 170;, where required including surface preparation, primer, texture coat, scaffolding/gondola arrangements, labor, materials, transportation, safety,Warning Signage & Night-time Safety measures,Safety Lifeline & Anchorage Systems and also removal of existing grains , dump materials all ancillary works complete in all respects. | SFt | 20000 | 310 | 6,200,000 |
| 3 | 3 | Paint Work | Stucco Paint (Margalla & Pindi Sides) | Surface cleaning using high-pressure water jet, Removal of loose/peeling paint and weak plaster, i.e 170 height Crack repair with polymer-modified mortar (cement/sand), Surface leveling & patchwork, Primer coat, stucco texture, top coat (2+ coats),Protection of adjacent surfaces,Curing & finishing as brand/Quality and also cleaning, removal of loose/peeling paint around ZTBL logo, apply Enamel paint on Logo and scaffolding/gondola arrangements, labor, materials, transportation, safety measures, Safety Lifeline & Anchorage Systems,Warning Signage & Night-time Safety and also removal of existing paint etc, dump materials all ancillary works complete in all respects.need full be done as approved Engineer- In-charge only | Sft | 41580 | 310 | 12,889,800 |
| 4 | 4 | Paint Work | Weather Shield Paint (Front & Back Elevations) | Surface cleaning (manual + mechanical), Removal of dust, fungus, algae, old coatings,Crack filling & surface correction, i.e 170 height Primer & 2–3 coats weather shield paint, Uniform color finish, Protection of windows/adjacent elements, Deduction of windows as per BOQ, Waterproofing & UV protection and scaffolding/gondola arrangements, labor, materials, transportation, safety measures, Safety Lifeline & Anchorage Systems,Warning Signage & Night-time Safety and all ancillary works complete in all respects.need full be done as approved Engineer- In-charge. | Sft | 42000 | 190 | 7,980,000 |
| 5 | 5 | Paint Work | Emergency Staircase Weather Shield Paint | Surface cleaning & preparation, Minor repair of cracks & defects, Primer coat & 2+ coats weather shield paint, Anti-fungal & moisture-resistant finish, i.e 170 height Painting in confined spaces and scaffolding/gondola arrangements, labor, materials, transportation, safety measures,Safety Lifeline & Anchorage Systems,Warning Signage & Night-time Safety (Emergency Stairs) and all ancillary works complete in all respects.need full be done as approved Engineer- In-charge only. | Sft | 13860 | 200 | 2,772,000 |
| 6 | 6 | Aluminium Work (Repair and Replacement of Aluminum Window Components Including Glass, Hardware, Gaskets, and Safety Film) | Alignment and adjustment of existing aluminum window frames, | Checking, realigning, adjusting, and securing existing aluminum window frames to restore proper operation, including tightening of fixings, adjustment of shutters/sashes, correction of minor distortions, lubrication of moving parts where required, and all associated works complete in all respects. | No.s | 770 | 2000 | 1,540,000 |
| 7 | 7 | Aluminium Work (Repair and Replacement of Aluminum Window Components Including Glass, Hardware, Gaskets, and Safety Film) | Windows allied Repair. | Repair / replacement of window rollers, hinges, locks, and latches including adjustment and smooth functioning complete in all respects,Cleaning of aluminum windows including frames, glass, tracks and removal of dust, debris and cement stains complete in all respects | LS | 1 | 300000 | 300,000 |
| 8 | 8 | Aluminium Work (Repair and Replacement of Aluminum Window Components Including Glass, Hardware, Gaskets, and Safety Film) | Gas Kit | Providing and fixing EPDM/Ethylene Propylene Diene Monomer rubber glazing gasket with speical Silicon to existing aluminum/uPVC windows, including removal of damaged gasket, cleaning of grooves, installation of new weatherproof gasket, sealing at joints and corners, and all necessary accessories, complete in all respects. | Rft | 16000 | 75 | 1,200,000 |
| 9 | 9 | Aluminium Work (Repair and Replacement of Aluminum Window Components Including Glass, Hardware, Gaskets, and Safety Film) | Glass work | Providing and fixing 6 mm thick clear float glass, free from bubbles, waves, scratches, and other defects, cut to required sizes and shapes, including edge finishing, handling, fitting, and all incidental works complete in accordance with the drawings and specifications | Sft | 5000 | 400 | 2,000,000 |
| 10 | 10 | Aluminium Work (Repair and Replacement of Aluminum Window Components Including Glass, Hardware, Gaskets, and Safety Film) | Anti Shutter- Work | Supply and apply clear anti-shatter safety film to glass, including surface preparation and installation, complete in all respects Film type: Clear safety/security film Thickness: 100–175 microns (4–7 mil) or as specified UV rejection: Minimum 95–99% Optical clarity: High transparency with minimal distortion Adhesive: Pressure-sensitive, permanent bonding Application: Interior face of glass | SFt | 5000 | 400 | 2,000,000 |
| 11 | 11 | Aluminium Work (Repair and Replacement of Aluminum Window Components Including Glass, Hardware, Gaskets, and Safety Film) | Handles | Providing and fixing aluminum window handles of approved quality and finish, complete with screws, fixing accessories, and all necessary hardware for proper operation of the window, complete in all respects. Material: Die-cast aluminum Finish: Powder-coated, anodized, or painted to match window frame Corrosion resistant Suitable for the window type (casement, sliding, top-hung, etc.) Including all fixing screws and accessories | No. | 800 | 550 | 440,000 |
| 12 | 12 | Aluminium Windows Work(new) | Aluminium Windows Work(new) | Supply, fabricate and install powder-coated aluminum framed window with 6 mm thick clear float glass, 1.6 mm Aluminium single Glazed glass , Fixing rubber beading , mesh jali & accessories, Airtight & watertight sealing, Rectification of rainwater leakage through windows by sealing perimeters with approved waterproof sealant, repairing joints and gaps, and ensuring no water ingress during heavy rain and wind conditions Cleaning & finishing brand/Quality approved Engineer only | Sft | 300 | 2000 | 600,000 |
| 13 | 13 | Aluminium Windows Work(new) | Aluminium Windows Work(new) | Supply, fabrication, double glazed glass (DGU) Sliding Windows 2mmx100mm with imported jali, 5mm Brown and plan glass both tempered glass,and installation of powder-coated/anodized aluminium works (doors, windows, partitions, etc.) using approved sections, including all necessary fittings such as handles, locks, hinges, rollers, rubber gaskets, glass/panels, sealants, and accessories, Adjustment of old windows, complete in all respects as per approved Engineer-incharge | Sft | 900 | 3200 | 2,880,000 |
| 14 | 14 | Aluminium Work (Water Stopper Patti) | Aluminium Work (Water Stopper Patti) | Supply & fabrication of aluminium patti (1.5''x1.5''), Cutting, shaping, installation, Fixing with screws/anchors, Sealant application for waterproofing, Alignment & finishing, Corrosion protection brand/Quality approved Engineer only | Rft | 1500 | 133 | 199,500 |
| GRAND TOTAL: | Rs 41,101,300.00 |
Â
SCOPE OF PROJECT
Zarai Taraqiati Bank Limited (ZTBL) is one of Pakistan’s leading specialized financial institutions, dedicated to promoting the agriculture sector and providing financial services to the farming community. The Bank operates through its extensive network of branches and offices across Pakistan to support agricultural development and rural economic growth.
To maintain a professional, safe, and aesthetically improved working environment, ZTBL intends to undertake the uplifting of the exterior of its Main Building through necessary maintenance and renovation works. The proposed works are aimed at improving the appearance, durability, and overall condition of the building façade while ensuring preservation of the existing infrastructure.
Project Summary
ZTBL intends to hire a qualified and experienced contractor for the exterior uplifting and maintenance works of its Main Building located at zero point, G-7/1 Islamabad.Â
The contractor shall execute the works in accordance with approved specifications, quality standards, safety requirements, and instructions of ZTBL’s authorized representatives, ensuring minimum disruption to the Bank’s routine operations.Â
1. CIVIL & FINISHING WORKS (DETAILED DESCRIPTION)
1.1      Item No. 1 – Stucco Paint (Margalla & Pindi Sides)
1.1.1 Â Â Â Description:
Providing and applying high-quality stucco paint system on external elevations (Margalla & Pindi sides) including complete surface preparation, material application, and finishing, in accordance with approved engineering standards and manufacturer specifications.
1.1.2. Â Â Scope of Work Includes:Â Stucco Paint (Margalla & Pindi Sides):
1.1.3. Â Â Mode of Measurement:
Measured in square feet (Sft) of treated surface area.
1.2      Item No. 2 – Weather Shield Paint (Front & Back Elevations)
1.2.1 Â Â Â Description:
1.2.2Â Â Â Special Note:
1.2.3Â Mode of Measurement:
1.3      Item No. 3 – Window Repair / Replacement Works
1.3.1 Â Â Â Description:
Carrying out repair, maintenance, and partial replacement of windows, including frames, glass, and sealing to restore functionality and weather resistance.
1.3.2 Â Â Â Scope of Work Includes:
1.3.3 Â Â Â Mode of Measurement:
Measured in square feet (Sft) of repaired/replaced window area.
1.4      Item No. 4 – Emergency Staircase Weather Shield Paint
1.4.1Â Â Â Â Description:
Providing and applying weather-resistant paint system to emergency staircases, ensuring durability, safety visibility, and protection against environmental exposure.
1.4.2Â Â Â Â Scope of Work Includes:
1.4.3Â Â Â Â Mode of Measurement:
Measured in square feet (Sft)
1.5      Item No. 5 – Aluminum Work (Water Stopper Patti)
1.5.1Â Â Â Â Description:
Providing, fabricating, and fixing aluminum patti (water stopper) at critical (corners, joints, façade edges) to prevent water seepage up to 13-floor height, as per approved drawings and engineer instructions.
1.5.2Â Â Â Â Scope of Work Includes:
1.5.3Â Â Â Â Mode of Measurement:
Measured in running feet (Rft) of installed aluminium patti.
1.6Â Â Â Â Â Â GENERAL NOTES FOR SECTION-1
2. PRE-POST WORK CONDITIONS/ INSTRUCTIONS
EXTERIOR STUCCO PAINT & WINDOW REPAIR WORK 170 FT HIGH-RISE OPERATIONAL BUILDING ZTBL ISLAMABAD"
2.1Â Â Â Â Â Â General Conditions
2.2Â Â SPECIAL CONDITIONS (OPERATIONAL HIGH-RISE)
2.3Â RISK ASSESSMENT & METHOD STATEMENT (RAMS)
2.3.1Â Â Â Â Major Risks:
2.3.2Â Â Â Â Control Measures:
2.3.3Â Â Â Â Work Method:
1.    Site mobilization and barricading.
2.    Installation & certification of cradle.
3.    Surface preparation phase-wise.
4.    Primer application.
5.    Finish paint coats.
6.    Window repairs from inside wherever possible.
7.    Final inspection and snag rectification.
2.4Â Â Â Â Â Â PROTECTION OF SOLAR PANELS & ROOFTOP EQUIPMENT
2.4.1.   Contractor Responsibility
2.4.2.   Pre-Work & Post-Work Inspection
1.    Joint inspection of rooftop solar system shall be conducted before commencement of work.
2.    Photographic record shall be prepared and signed by both parties.
3.    Post-completion inspection certificate shall be issued after satisfactory condition verification.
2.4.3Â Â Â Â Indemnity Clause
The Contractor shall indemnify and hold harmless the Employer against all losses, damages, claims, liabilities, penalties, and expenses arising out of damage to solar installations or rooftop equipment caused during execution of the works.
2.4.4Â Â Â Â Mandatory Protection Measures (To Be Included in Method Statement)
2.4.5Â Â Â Â Penalty Clause
In case of any damage occur due to negligence, cost of repair/replacement shall be deducted from contractor’s running bill or performance security in addition to imposition of penalty as determined by the Engineer.
3 Payments Terms:
Â
4. Mandatory Items of Scope of the Project: The bidder shall quote the price after taking into account the following mandatory requirements. No separate payment shall be made for these items.
|
Mandatory Items of Scope of the Project |
|
|
Suspended Gondola System Rental & Installation/Mobile Crane with Man Basket |
 Rental & installation for 12months,Maintenance & safety checks brand/Quality approved Engineer only |
|
Scaffolding Setup (Emergency Stairs) |
 Restricted/emergency areas |
|
Safety Lifeline & Anchorage Systems |
 Fall protection |
|
Barricading, Safety Nets, Public Protection |
Site safety measures |
|
Warning Signage & Night-time Safety |
Signs, barricades |
|
Fire Safety & First Aid Equipment |
Fire extinguishers, first aid kits |
|
Dedicated 01x Safety Officer |
12 months supervision |
|
Site Supervision - Engineer (1x) + Supervisor (1x) |
12 months |
|
Material Handling & Logistics |
 Transport and shifting |
|
Cleaning, Debris Disposal & Handover |
Final cleanup |
5. Bill of Quantity (BOQ): The Detailed BOQ is available in BOQ Section and Annexure Section. The quantities specified in the BOQ are indicative and are provided for bid evaluation purposes only. Payment shall be made only for the actual quantities of work executed, measured, and verified. The payable amount shall be calculated by applying the successful bidder's quoted unit rates to the actual quantities executed.
Â
Â
Â
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)), Unit Head Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory
The Supplier is:
The title of the subject procurement is: Hiring of Contractor for Uplifting of Exterior of ZTBL, Head Office Main Building, Islamabad.
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)), Unit Head
Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory
+92-344-544-4455
head.gpu@ztbl.com.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)), Unit Head
Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory
+92-344-544-4455
head.gpu@ztbl.com.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P48071
To: Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)), Unit Head Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)), Unit Head Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Hiring of Contractor for Uplifting of Exterior of ZTBL, Head Office Main Building, Islamabad. (P48071) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Zarai Taraqiati Bank Ltd (ZTBL) (Zarai Taraqiati Bank Ltd (ZTBL)), Unit Head Procurement Department, Room-205, 2nd Floor, Main Building, ZTBL Head Office, Zero Point. Islamabad., Islamabad Capital Territory
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Please include only such past Experience which are 7 stories buildings (Construction/Maintenance), Completed in last 10 years having value minimum of 40 Million PKR. (Provide Verifiable Performance Certificates) (Doc Required)
Please attach "NIL" statement, if there is no past non-performance or pending letigations. Â