In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Divisional Engineer
Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province).
+92-333-753-1881
civil.cati@paa.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)) The subject of procurement is:Â ESTABLISHMENT OF ARCHIVE HALL IN MULTIPURPOSE HALL AT CATI HYDERABAD Expected commencement date: Monday, August 17, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P48503Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, June 30, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 180 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Call at Deposit, Demand Draft  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Tuesday, July 7, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Tuesday Date:Â July 07, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 5.00%. The Performance Guarantee shall be acceptable in the form of:Â Pay Order, Call at Deposit, Demand Draft |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Licensed Constructors registered with PEC in Category C-5 | Yes |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Civil Works | Address: Civil Aviation Training Institute (CATI), Hyderabad Airport, Hyderabad Schedule: 120 Days Quantity: 01/job |
1/job | 1600000 PKR |
No
Jobs Without Lots :
Job: Civil Works
Specifications / Requirements:
| Sr. No | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING R.C.C. INCLUDING SEPARATING REINFORCEMENT FROM CONCRETE IN FOUNDATION, BASEMENT, PLINTH AND GROUND FLOOR INCLUDING STACKING AT SITE AND DISPOSING OF UNSERVICEABLE MATERIAL WITHIN THREE CHAINS (91.5M) | %Cft | 2,646 | 11,838.750 | 313,253 |
| 2 | DISMANTLING BURNT BRICK MASONRY IN LIME OR CEMENT MORTAR FOUNDATION, BASEMENT, PLINTH AND GROUND FLOOR INCLUDING STACKING SALVAGED MATERIAL (SERVICEABLE) AND DISPOSING OF SURPLUS MATERIAL AS DIRECTED WITHIN THREE CHAINS (91.5 M). | %Cft | 941 | 4,208.750 | 39,604 |
| 3 | DISMANTLING C.C. FLOOR UPTO 2 INCHES (51 MM) THICK IN BASEMENT, PLINTH AND GROUND FLOOR INCLUDING DISPOSING OFF THE MATERIAL AS DIRECTED WITHIN THREE CHAINS (91.5 M). | %Sft | 1,103 | 2,104.382 | 23,211 |
| 4 | EXCAVATION FOR FOUNDATION TRENCHES AND DRAINS IN ALL KINDS OF MURUM SOIL AND BACK FILLING THE EXCAVATED MATERIAL IN FOUNDATION TRENCHES PLINTH OR UNDER FLOOR INCLUDING BREAKING CLODS, WATERING, CONSOLIDATION BY RAMMING IN LAYERS NOT EXCEEDING 9 INCHES (229 MM) IN DEPTH TO FULL COMPACTION, DRESSING AND DISPOSAL OF SURPLUS EXCAVATED STUFF AS DIRECTED LEAD UPTO ONE CHAIN (23.5 R.M) AND LIFT 5 FEET (1.52 M). | %Cft | 13,739 | 2,814.784 | 386,723 |
| 5 | PROVIDING AND LAYING 1:4:8 (1 CEMENT 4 SAND AND 8 COARSE AGGREGATE) CEMENT CONCRETE USING CRUSHED GRADED BOULDERS (MACHINE BROKEN) 1 INCH (25.4 MM) AND DOWN GAUGE IN FOUNDATION INCLUDING LEVELLING, COMPACTING AND CURING ETC. COMPLETE. | %Cft | 828 | 34,306.426 | 284,057 |
| 6 | PROVIDING AND LAYING REINFORCED CEMENT CONCRETE USING CRUSHED GRADED BOULDERS 3/4 INCH (19 MM) AND DOWN GAUGE HAVING A MINIMUM WORKS CUBE CRUSHING STRENGTH OF 3750 LBS. PER SQ INCH (23.24 N/MM2) AT 28 DAYS WITH A MIX NOT LEANER THAN 1:1-1/2:3 IN COLUMN FOOTING OF REQUIRED SHAPE INCLUDING FORM WORK AND ITS REMOVAL, COMPACTING AND CURING ETC. COMPLETE BUT EXCLUDING THE COST OF REINFORCEMENT, IN FOUNDATION BASEMENT AND PLINTH. | %Cft | 2,649 | 58,557.674 | 1,551,193 |
| 7 | PROVIDING AND LAYING REINFORCED CEMENT CONCRETE USING CRUSHED GRADED BOULDERS 3/4 INCH (19 MM) AND DOWN GAUGE HAVING A MINIMUM WORKS CUBE CRUSHING STRENGTH OF 3750 LBS. PER SQ INCH (23.24 N/MM2) AT 28 DAYS WITH A MIX NOT LEANER THAN 1:1-1/2:3 IN COLUMNS OF SQUARE OR RECTANGULAR SHAPE OF REGULAR SECTION INCLUDING FORM WORK AND ITS REMOVAL, COMPACTING AND CURING ETC. BUT EXCLUDING THE COST OF REINFORCEMENT, IN FOUNDATION BASEMENT AND PLINTH. | %Cft | 124 | 63,908.264 | 79,246 |
| 8 | PROVIDING AND LAYING REINFORCED CEMENT CONCRETE USING CRUSHED GRADED BOULDERS 3/4 INCH (19 MM) AND DOWN GAUGE HAVING A MINIMUM WORKS CUBE CRUSHING STRENGTH OF 3750 LBS. PER SQ INCH (23.24 N/MM2) AT 28 DAYS WITH A MIX NOT LEANER THAN 1:1-1/2:3 IN PLINTH BEAMS OF REQUIRED SHAPE AND DESIGN INCLUDING FORM WORK AND ITS REMOVAL, COMPACTING AND CURING ETC. BUT EXCLUDING THE COST OF REINFORCEMENT, IN FOUNDATION BASEMENT AND PLINTH. | %Cft | 623 | 61,730.774 | 384,583 |
| 9 | PROVIDING AND LAYING REINFORCED CEMENT CONCRETE USING CRUSHED GRADED BOULDERS 3/4 INCH (19 MM) AND DOWN GAUGE HAVING A MINIMUM WORKS CUBE CRUSHING STRENGTH OF 3750 LBS. PER SQ INCH (23.24 N/MM2) AT 28 DAYS WITH A MIX NOT LEANER THAN 1:1-1/2:3 IN STRAIGHT WALLS, VERTICAL FINS ETC. MORE THAN 6 INCHES (152 MM) THICK INCLUDING FORM WORK AND ITS REMOVAL, COMPACTING AND CURING ETC. COMPLETE BUT EXCLUDING THE COST OF REINFORCEMENT, IN GROUND FLOOR. | %Cft | 894 | 71,695.288 | 640,956 |
| 10 | PROVIDING AND LAYING REINFORCED CEMENT CONCRETE USING CRUSHED GRADED BOULDERS 3/4 INCH (19 MM) AND DOWN GAUGE HAVING A MINIMUM WORKS CUBE CRUSHING STRENGTH OF 3750 LBS. PER SQ INCH (23.24 N/MM2) AT 28 DAYS WITH A MIX NOT LEANER THAN 1:1-1/2:3 IN COLUMNS OF SQUARE OR RECTANGULAR SHAPE OF REGULAR INCLUDING INCLUDING FORM WORK AND ITS REMOVAL, COMPACTING AND CURING ETC. BUT EXCLUDING THE COST OF REINFORCEMENT, IN THE GROUND FLOOR | %Cft | 653 | 78,997.534 | 515,854 |
| 11 | PROVIDING AND LAYING REINFORCED CEMENT CONCRETE USING CRUSHED GRADED BOULDERS 3/4 INCH (19 MM) AND DOWN GAUGE HAVING A MINIMUM WORKS CUBE CRUSHING STRENGTH OF 3750 LBS. PER SQ INCH (23.24 N/MM2) AT 28 DAYS WITH A MIX NOT LEANER THAN 1:1-1/2:3 IN STRAIGHT BEAMS, LINTELS CANTILEVER BEAMS OF REQUIRED SHAPE OR SECTION INCLUDING FORM WORK AND ITS REMOVAL, COMPACTING AND CURING ETC. COMPLETE BUT EXCLUDING THE COST OF REINFORCEMENT, IN BASEMENT AND GROUND FLOOR. | %Cft | 1,868 | 71,471.442 | 1,335,087 |
| 12 | PROVIDING AND LAYING REINFORCED CEMENT CONCRETE USING SCREENED GRADED BAJRI 3/4 INCH (19 MM) AND DOWN GAUGE HAVING A MINIMUM WORKS CUBE CRUSHING STRENGTH OF 3750 LBS. PER SQ INCH (23.24 N/MM2) AT 28 DAYS WITH A MIX NOT LEANER THAN 1:1-1/2:3 IN ORDINARY SLAB 5 INCHES (127 MM) TO 6 INCHES (152 MM) THICK INCLUDING FORM WORK AND ITS REMOVAL COMPACTING AND CURING ETC. COMPLETE BUT EXCLUDING THE COST OF REINFORCEMENT, IN BASEMENT PLINTH AND GROUND FLOOR | %Cft | 72 | 69,040.874 | 49,709 |
| 13 | PROVIDING AND LAYING HARD GRADE RIBBED DEFORMED (MINIMUM YIELD POINT 60,000 PSI) REINFORCEMENT BARS WITH & INCLUDING THE COST OF STRAIGHTENING, CUTTING, BENDING, BINDING, WASTAGE, AND SUCH OVERLAPS AS ARE NOT SHOWN IN THE DRAWINGS, PLACING IN POSITION ON CEMENT CONCRETE 1:2:4 PRECAST OR M.S. CHAIRS, TYING WITH BINDING WIRE, COST OF CHAIRS AND WIRES ETC. IN ALL KINDS OF RCC WORK IN FOUNDATION, BASEMENT, PLINTH AND GROUND FLOOR OF BUILDING INCLUDING SEPTIC TANKS AND UNDER GROUND TANKS AND IN PROJECTIONS FOR FUTURE EXTENSION | Per. Kg | 18,733 | 395.430 | 7,407,590 |
| 14 | PROVIDING AND LAYING GOLA 3" X 3" (76 MM X 76 MM) CONCRETE 1:2:4 USING GRADED SCREENED BAJRI AT JUNCTION OF ROOF SLAB AND WALLS AND FINISHED WITH CEMENT PLASTER 1:4 INCLUDING CURING ETC. COMPLETE. | %Cft | 435 | 4,483.304 | 19,502 |
| 15 | PROVIDING AND FIXING 4 INCHES (100 MM) DIA POLYVINYLE CHLORIDE RAIN WATER (PVC) DOWN PIPE WITH MILD STEEL CLAMPS, BOLTS AND NUTS FIXED IN CEMENT CONCRETE 1;2:4 ETC. COMPLETE. | Per. Rft | 150 | 1,006.138 | 150,921 |
| 16 | PROVIDING AND LAYING FIRST CLASS SOLID BURNT BRICK MASONRY SET IN CEMENT MORTAR 1:6 IN STRAIGHT OR CURVED WALLS 9 INCHES TO 13-/2 INCHES (228 MM TO 343 MM) THICK INCLUDING SCAFFOLDING, RAKING OUT JOINTS AND CURING ETC. COMPLETE IN FOUNDATION,BASEMENT AND PLINTH (FOUNDATION AND BASEMENT MASONRY UPTO 5 FEET (1.52 RU.M.) DEPTH AND PLINTH UPTO 4 LEET (1.2 RU.M.) HEIGHT FROM GROUND LEVEL). | %Cft | 383 | 54,015.990 | 206,881 |
| 17 | PROVIDING AND LAYING FIRST CLASS SOLID BURNT BRICK MASONRY SET IN CEMENT MORTAR 1:6 IN STRAIGHT OR CURVED WALLS 9 TO 13-1/2 INCHES (229 MM TO 343 MM) THICK INCLUDING SCAFFOLDING, RAKING, OUT JOINTS AND CURING ETC. COMPLETE IN GROUND FLOOR SUPERSTRUCTURE . | %Cft | 780 | 57,765.358 | 450,570 |
| 18 | 1/2" (13 MM) THICK CEMENT PLASTER 1:4 ON WALLS AND COLUMNS ETC. IN BASEMENT, PLINTH, MEZZANINE AND GROUND FLOOR INCLUDING MAKING EDGES, CORNERS, AND CURING ETC., COMPLETE . | %Sft | 5,850 | 6,134.576 | 358,873 |
| 19 | 3/4'' (19 MM) THICK CEMENT PLASTER 1:4 ON WALLS AND COLUMNS ETC. INCLUDING MAKING EDGES, CORNERS, AND CURING ETC., COMPLETE. IN GROUND FLOOR. | %Sft | 2,080 | 7,469.084 | 155,357 |
| 20 | PLASTERING 3/4" (19 MM) THICK IN PATCHES IN CEMENT SAND MORTAR 1:4 INCLUDING CURING AND SCRAPING OLD DAMAGED PORTION IN REGULAR SHAPE AND REMOVAL OF RUBBISH FROM THE SITE ETC. COMPLETE AS PER DIRECTION OF ENGINEER-IN-CHARGE IN GROUND FLOOR | %Sft | 1,045 | 8,145.774 | 85,123 |
| 21 | PROVIDING AND LAYING IN GROUND FLOOR 30 B.W.G. EXPANDED METAL 1/2 INCH (13 MM) MESH AS REINFORCEMENT INCLUDING THE COST OF CONCRETE CHAIRS ETC. COMPLETE IN ALL TYPES OF FLOOR. | %Sft | 139 | 13,598.550 | 18,902 |
| 22 | PROVIDING AND FIXING WOODEN PARTITION FULLY FLUSHED WITH HARD BOARD (MASONITE) ON ONE FACE FIXED ON BEST QUALITY DEODAR WOOD FRAME 3" X 1-3/4" (76 MM X 44 MM) AT SPACING NOT EXCEEDING 24 INCHES (610 MM) HORIZONTAL X 18 INCHES (457 MM) VERTICAL INCLUDING NECESSRY WOODEN BEADING ETC, AS REQUIRED . | Per. Sft | 389 | 1,193.192 | 464,152 |
| 23 | PROVIDING AND FIXING 3/4" THICK LASANI BOARD PARTITION OF APPROVED PATTERN AND BEADING FOR JOINT ON THE EXISTING FRAME WORK AS PER DIRECTION OF THE ENGINEER INCHARGE. | Per. Sft | 4,978 | 276.234 | 1,375,093 |
| 24 | PROVIDING AND FIXING PVC HARD SHEET WALL PANELLING OR LINING (PLAIN) ON WALLS, JAMBS, SKIRTING ETC., ON WOODEN BACKING BUT EXCLUDING THE COST OF BACKING ETC., AS REQUIRED | Per. Sft | 3,733 | 451.248 | 1,684,509 |
| 25 | PROVIDING AND FIXING PVC HARD SHEET WALL PANELLING OR LINING (PRINTED) ON WALLS, JAMBS, SKIRTING ETC., ON WOODEN BACKING BUT EXCLUDING THE COST OF BACKING ETC., AS REQUIRED | Per. Sft | 1,244 | 497.182 | 618,494 |
| 26 | PROVIDING AND LAYING 1:4:8 CEMENT CONCRETE BED UNDER FLOORS USING GRADED STONE BALLAST 2 INCHES (51 MM) AND DOWN GAUGE WITH LEVELLING AND RAMMING, WATERING AND CURING ETC. COMPLETE. | %Cft | 2,721 | 30,851.450 | 839,468 |
| 27 | PROVIDING AND LAYING FLOORS OF 3 INCHES (76 MM) THICK 1:2:4 CEMENT CONCRETE USING GRADED SCREENED BAJRI 3/4 INCH (19 MM) AND DOWN GAUGE IN GROUND FLOOR LAID IN WITH OR WITHOUT PANELS INCLUDING FORM WORK, CONSOLIDATION, FINISHING AND CURING ETC COMPLETE. | %Sft | 1,150 | 13,387.556 | 153,957 |
| 28 | PROVIDING AND FIXING 2 INCH DIA STAINLESS STEEL PIPE (18 GAUGE) RAILING ALONGWITH 4 NOS 3/4" DIA PARALLEL PIPE HAVING S/S PIPE VERTICAL POST 2" DIA AT 3 FT C/C AVERAGE SPACING AND 4" DIA VERTICAL POST AT START TURNING AND END POINT INCLUDING COST OF LABOUR, WELDING CHARGES FITTING & FIXING IN MARBLE FLOOR AND WALL ETC COMPLETE AS PER DIRECTION OF THE ENGINEER INCHARGE. | Per. Rft | 150 | 3,128.132 | 469,220 |
| 29 | PROVIDING AND INSTALLING M.S SPIRAL STAIR CASE WITH CENTRAL POST, HAND RAIL AND BRACES AT REQUIRED INTERVALS ETC. COMPLETE BUT EXCLUDING THE COST OF CEMENT WORK IN BASE AND FOUNDATION 6 FT. (1.82 M) DIA . | Per. Kg | 270 | 436.296 | 117,800 |
| 30 | PAINTING WOOD WORK WITH SYNTHETIC ENAMEL PAINT OF APPROVED MAKE AND SHADE TWO COATS OVER AND INCLUDING THE COST OF ONE PRIMING COAT COMPLETE AT ANY HEIGHT IN ANY FLOOR . | %Sft | 49 | 8,336.804 | 4,085 |
| 31 | DISTEMPERING WITH VINYLE DISTEMPER (ICI) DULUX PAINTEX OF APPROVED MAKE AND SHADE IN TWO COATS OVER AND INCLUDING THE COST OF WALL PUTTI, SAND PAPERING, DUSTING, AND FILLING THE HOLES, CRACKS AND INEQUALITIES, IF ANY, AT ANY HEIGHT IN ANY FLOOR. | %Sft | 6,237 | 4,761.750 | 296,990 |
| 32 | PAINTING WITH (ICI) DULUX PLASTIC EMULSION PAINT VIP OF APPROVED SHADE TWO COATS OVER AND INCLUDING THE COST OF ONE PRIMING COAT COMPLETE OVER PLASTERED SURFACE AT ANY HEIGHT IN ANY FLOOR . | %Sft | 4,978 | 9,432.332 | 469,541 |
| 33 | PROVDING / FIXING OF ALUCOBOND USA ALUMINUM COMPOSITE PANELS (CLADDING) 4MM THICK WITH 0.3/0.3MM SKIN THICKNESS FINISHED PVDF COAT. CLASS B2 NON FR. FRAMING WILL BE ALUMINUM TUBE 2"X1" WITH RELEVANT FITTINGS ETC. COMPLETE THE IN ALL RESPECT AS DIRECTED BY THE ENGINEER IN CHARGE. | Per. Sft | 6,634 | 2,543.632 | 16,874,455 |
| 34 | PROVIDING AND LAYING 1:9 CEMENT CONCRETE USING SCREENED GRADED BAJRI 3/4-INCH (19 MM) AND DOWN GAUGE IN TERRACING 3 INCHES (76 MM) AVERAGE THICKNESS TO REQUIRED SLOPE IN PANELS INCLUDING FORM WORK, CONSOLIDATION, FINISHING, CURING ETC. AND PAINTING THE SUTIACE WITH PLASTIC BITUMEN NO. 4 AT THE RATE OF 15 LBS PER HUNDRED SQUARE FEET (0.73 KG PER S.M) BLINDED WITH SAND AT THE RATE OF 2 CUBIC FEET PER HUNDRED SQUARE FEET (0.06 KG PER S.M) COMPLETE ON GROUND FLOOR ROOF. | %Sft | 489 | 11,521.426 | 56,340 |
| 35 | PROVIDING AND LAYING FLOOR OF 3/4" INCH (19 MM) THICK GRANITE STONE TILES PAKISTANI ORIGIN MORE THAN 36 SQ. INCH UPTO 72 SQ. INCH (MORE THAN 232 SQ.CM AND UPTO 464 SQ.CM) SIZE FINE DRESSED ON THE SURFACE, WITHOUT WINDING IN GROUND FLOOR OVER 1 INCH (25 MM) LIME MORTAR 1:2 (ONE LIME,TWO SAND) SETTING THE MARBLE TILE WITH GREY CEMENT SLURRY OVER LIME MORTAR, JOINTING AND WASHING THE TILES WITH WHITE CEMENT SLURRY INCLUDING CURING, RUBBING AND POLISHING ETC. COMPLETE, INCLUDING THE COST OF MORTAR. | %Sft | 3,458 | 80,910.900 | 2,797,899 |
| 36 | PROVIDING AND LAYING IN FLOOR C.C. 1:2:4: TUFF PAVER 2-1/2" THICK (AVERAGE STRENGTH 5000 PSI) OF APPROVED DESIGN AND COLOUR PATTREN LAID ON SAND CUSHION FILLING OF JOINT WITH SAND AND WARRING ETC. COMPLETE AS PER DIRECTION OF ENGINEER LNCHARGE. (THE COST OF SAND CUSHION IS INCLUDED) | Per. Sft | 11,250 | 160.300 | 1,803,375 |
| 37 | PROVIDING AND FIXING PLASTER OF PARIS 19MM THICK FALSE CEILING I/C ALUMINUM T AND L ANGLE 1" X 1" I.C HANGER CLIPS JOINTING CLIPS AND G.L. WIRE ETC. COMPLETE AS REQUIRED IN ANY FLOOR. | Per. Sft | 6,863 | 168.322 | 1,155,194 |
| 38 | PROVIDING AND LAYING 4 TO 5 MM THICK CARPET TILE FLOORING (NYLON MATERIAL) OF APPROVED MAKE AND SHADE LAID IN APPROVED DESIGN / PATTERN, WEIGHING ATLEAST 0.4 TO 0.7 KG/SQM INCLUDING FIXING WITH APPROVED ADHESIVE ETC. COMPLETE IN ANY FLOOR AS PER DIRECTION OF THE ENGINEER-IN-CHARGE | Per. Sft | 6,863 | 844.180 | 5,793,607 |
| GRAND TOTAL: | Rs 49,431,374.00 |
ESTABLISHMENT OF ARCHIVE HALL INTO MULTI-PURPOSE HALL AT CATI HYDERABAD
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Divisional Engineer Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province).
The Supplier is:
The title of the subject procurement is: ESTABLISHMENT OF ARCHIVE HALL IN MULTIPURPOSE HALL AT CATI HYDERABAD
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Divisional Engineer
Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province).
+92-333-753-1881
civil.cati@paa.gov.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Divisional Engineer
Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province).
+92-333-753-1881
civil.cati@paa.gov.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.05% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 5.00% of the contract price in acceptable form of Pay Order, Call at Deposit, Demand Draft
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
All materials used in the work shall be subjected to testing and inspection as directed by the Engineer-in-Charge, in accordance with the applicable standards and project requirements.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P48503
To: Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Divisional Engineer Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Divisional Engineer Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., ESTABLISHMENT OF ARCHIVE HALL IN MULTIPURPOSE HALL AT CATI HYDERABAD (P48503) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Civil Aviation Training Institute (CATI) - Pakistan Airports Authority (Pakistan Airports Authority (PAA)), Divisional Engineer Airport, Hyderabad, Hyderabad (District), Hyderabad (Division), Sindh (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Affidavit for No Blacklisting & Details of Pending Litigation, if any.