In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
University of Baltistan, Skardu (University of Baltistan, Skardu), Procurement Officer
Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
+92-341-460-0067
assistant.treasurer.procurement@uobs.edu.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â University of Baltistan, Skardu (University of Baltistan, Skardu) The subject of procurement is:Â External Electrical works for Package-IV Expected commencement date: Thursday, July 23, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P49097Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, June 30, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on University of Baltistan, Skardu (University of Baltistan, Skardu) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 90 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Call at Deposit  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Tuesday, July 7, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Tuesday Date:Â July 07, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Call at Deposit, Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) | NADRA CITIZENSHIP (CNIC/NICOP) PEC |
Least Cost Based Selection (LCBS)
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 65 | |
| Technical Evaluation Criteria | ||
| Bank Credit Line – up to 20 million or above (Original & Verified from Regional Office) (Qualitative)(Doc Required) Bank Credit Line – up to 20 million or above (Original & Verified from Regional Office) (15) | 15 | |
| Bank Statement showing available balance up to 10 million as on publishing date of advertisement. (Qualitative)(Doc Required) Bank Statement showing available balance up to 10 million as on publishing date of advertisement. (15) | 15 | |
| Project of similar Nature and complexity (10 million or above) completed in last 5 Years.
1 Project x 5 Nos (Qualitative)(Doc Required) Project of similar Nature and complexity (10 million or above) completed in last 5 Years. 1 Project x 5 Nos (15) | 15 | |
| Project of similar Nature and complexity (10 million or above) in hand (75% completed).
1 Project x 5 Nos (Qualitative)(Doc Required) Project of similar Nature and complexity (10 million or above) in hand (75% completed). 1 Project x 5 Nos (10) | 10 | |
| Project of General Nature (Public Sector) completed in last 5 year or in Hand (20 million or above).
1 Project x 5 No’s (Qualitative)(Doc Required) Project of General Nature (Public Sector) completed in last 5 year or in Hand (20 million or above). 1 Project x 5 No’s (15) | 15 | |
| Engineers Registered with PEC
b) BSc Engr. (Electrical) equal to 5 years’ Experience or above. (4 marks for Professional Engineer PE, 03 Marks for Registered Engineer RE)
Engineers with identical/same technology will only be consider once.
Proof of Registration with the firm in PEC must be provided. (Qualitative)(Doc Required) Engineers Registered with PEC b) BSc Engr. (Electrical) equal to 5 years’ Experience or above. (4 marks for Professional Engineer PE, 03 Marks for Registered Engineer RE) Engineers with identical/same technology will only be consider once. Proof of Registration with the firm in PEC must be provided. (10) | 10 | |
| Diploma Engineers in Employment of the Firm
a) Site Supervisors ( DAE) with 5 years’ Experience &
Above (Electrical) 02 mark each. (Qualitative)(Doc Required) Diploma Engineers in Employment of the Firm a) Site Supervisors ( DAE) with 5 years’ Experience & Above (Electrical) 02 mark each. (5) | 5 | |
| Earth Moving Machinery Excavator (Qualitative)(Doc Required) Earth Moving Machinery Excavator (5) | 5 | |
| Richard/Chain pully. (Qualitative)(Doc Required) Richard/Chain pully. (3) | 3 | |
| Dumper truck/Tractor (Qualitative)(Doc Required) Dumper truck/Tractor (2) | 2 | |
| Proposed program of work/construction schedule of works (Bar chart to be attached at SCHEDULE – C TO BID) (Qualitative)(Doc Required) Proposed program of work/construction schedule of works (Bar chart to be attached at SCHEDULE – C TO BID) (5) | 5 | |
Lot Title : External Electrical works for Package-IV
Bid Security : 678720 PKR
| Job | Delivery Schedule | Quantity |
|---|---|---|
| Supply and fixing of galvanized lattice steel structure, HT Pole 34'-8 |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 2/Qty
|
2/Qty |
| S/F and test running of 400KVA step down transformer 3 phase, Delta/ star connection, 11/0.400 KV, 50HZ oil immersed up to standard level, breather and all accessories i/c transportation from down country upto site of work, Trnasformor Pad and a |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| S/F of ACSR (Rabbit) conductor 6-1/0.132 i/c un-rolling, straightening, sagging jointing and TPT charges from Ex-factory to site of work etc complete as per WAPDA Approved specification & standard complete in all aspect as per engineers direction |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 500/m
|
500/m |
| S/F of Low Voltage (LT) Service Box rated 500 Ampere, suitable for 3-phase, 4-wire, 400/230 V, 50 Hz system, complete with heavy-duty MS enclosure, electrolytic copper bus bars (phase, neutral & earth), 500 A main isolator/MCCB, neutral and earthing |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| S/F of Low Voltage (LT) Service Box rated 500 Ampere, suitable for 3-phase, 4-wire, 400/230 V, 50 Hz system, complete with heavy-duty MS enclosure, electrolytic copper bus bars (phase, neutral & earth), 500 A main isolator/MCCB, neutral and earthing |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| S/F of 11 KV grade pin insulator with threaded lead pin, nuts, bolts etc complete approved quality. |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 9/Qty
|
9/Qty |
| S/F of galvanized channel type steel cross arms of size 8'x3 |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 3/Qty
|
3/Qty |
| S/F of earthing set complete with 2'x2'x1/4 |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| S/F of 11KV grade lightening arrester (surge arrester ) on given cross arms complete with breaket, connections with HT and earthing as per WAPDA Approved specification &standard. |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| S/F of PVC insulated PVC and sheathed single core copper cables 240mmSq size 600 volts grade i/c laying cutting thembling etc as per instruction engineer incaharge (PAK/FAST/NEWAGE) |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 100/m
|
100/m |
| S/F of 11 KV grade drop out fuse (D-set) complete with breaket, fuse link carrier etc complete approved quality (Double insulator) |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 3/Qty
|
3/Qty |
| S/F of Cables for Buildings 95 Sqmm AL/PVC/SWA/PVC- 4C i/c cost of excavation in all kind of soil, cable laying and abackfilling with warning tape , termination thimbling, etc complete in all aspects |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 560/m
|
560/m |
| Supply and fixing of galvanized lattice steel structure, HT Pole 34'-8 |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 10/Qty
|
10/Qty |
| S/F and test running of 400KVA step down transformer 3 phase, Delta/ star connection, 11/0.400 KV, 50HZ oil immersed up to standard level, breather and all accessories i/c transportation from down country upto site of work ,all types of test (Lo |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| HT Wire (S/F of ACSR conductor 6-1/0.132 (Rabit) i/c un-rolling, straightening, sagging join ting and i/c of TPT charges from Ex factory to site of work etc complete as per directives of Engineer incharge ) |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 2000/m
|
2000/m |
| S/F of Low Voltage (LT) Service Box rated 150 Ampere, suitable for 3-phase, 4-wire, 400/230 V, 50 Hz system, complete with heavy-duty MS enclosure, electrolytic copper bus bars (phase, neutral & earth), 500 A main isolator/MCCB, neutral and earthing |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 3/Qty
|
3/Qty |
| S/F of 11 KV grade pin insulator with threaded lead pin, nuts, bolts etc complete approved quality. |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 33/Qty
|
33/Qty |
| S/F of galvanized channel type steel cross arms of size 8'x3 |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 15/Qty
|
15/Qty |
| S/F of earthing set complete with 2'x2'x1/4 |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| S/F of 11KV grade lightening arrester (surge arrester ) on given cross arms complete with breaket, connections with HT and earthing as per instruction of Engineer Incharge |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
| S/F of copper cables 240mm Sq pvc insulated lying cutting thimbling in all respect |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 100/m
|
100/m |
| S/F of 11 KV grade drop out fuse (D-set) complete with breaket, fuse link carrier etc complete approved quality (Double insulator) |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 3/Qty
|
3/Qty |
| S/F of Cables for Buildings 25 Sqmm AL/PVC/SWA/PVC- 4C i/c cost of excavation in all kind of soil, cable laying and abackfilling with warning tape , termination thimbling, etc complete in all aspects |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 500/m
|
500/m |
| S/F of Ant 7/0.122 i/c un-rolling, straightening, sagging jointing and TPT charges from Ex-factory to site of work etc complete as per WAPDA Approved specification & standard complete in all aspect as per engineers direction. |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1500/m
|
1500/m |
| S/F of Shackle insulators of approved quality |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 50/Qty
|
50/Qty |
| S/F of wooden cross arm i/c steel braces, Nut/bolts, square washer etc complete |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 5/Qty
|
5/Qty |
| S/F of 11 kV grade Disc insulator with goove/dead end clamps, nuts bolts etc completed approved quality |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 6/Qty
|
6/Qty |
| S/F of 11 KV grade pin insulator with threaded lead pin, nuts, bolts etc complete approved quality. |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 12/Qty
|
12/Qty |
| S/F of ACSR (Rabbit) conductor 6-1/0.132 i/c un-rolling, straightening, sagging jointing and TPT charges from Ex-factory to site of work etc complete as per WAPDA Approved specification &standard. |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 550/m
|
550/m |
| S/F of Bulk Metering Panel at 11 kV (HT) side suitable for 3-phase, 50 Hz system, complete with approved accuracy class electronic/TOD smart energy meter, metering CTs (multi core 100/5, 50/5) and PTs of required ratio and accuracy, isolation arrang |
Address: Lamsa Road., Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
Schedule: 90 Days
Quantity: 1/Qty
|
1/Qty |
Yes
External Electrical works for Package-IV
| Job | Related Services |
|---|---|
| Supply and fixing of galvanized lattice steel structure, HT Pole 34'-8 | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F and test running of 400KVA step down transformer 3 phase, Delta/ star connection, 11/0.400 KV, 50HZ oil immersed up to standard level, breather and all accessories i/c transportation from down country upto site of work, Trnasformor Pad and a | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of ACSR (Rabbit) conductor 6-1/0.132 i/c un-rolling, straightening, sagging jointing and TPT charges from Ex-factory to site of work etc complete as per WAPDA Approved specification & standard complete in all aspect as per engineers direction | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Low Voltage (LT) Service Box rated 500 Ampere, suitable for 3-phase, 4-wire, 400/230 V, 50 Hz system, complete with heavy-duty MS enclosure, electrolytic copper bus bars (phase, neutral & earth), 500 A main isolator/MCCB, neutral and earthing | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Low Voltage (LT) Service Box rated 500 Ampere, suitable for 3-phase, 4-wire, 400/230 V, 50 Hz system, complete with heavy-duty MS enclosure, electrolytic copper bus bars (phase, neutral & earth), 500 A main isolator/MCCB, neutral and earthing | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11 KV grade pin insulator with threaded lead pin, nuts, bolts etc complete approved quality. | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of galvanized channel type steel cross arms of size 8'x3 | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of earthing set complete with 2'x2'x1/4 | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11KV grade lightening arrester (surge arrester ) on given cross arms complete with breaket, connections with HT and earthing as per WAPDA Approved specification &standard. | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of PVC insulated PVC and sheathed single core copper cables 240mmSq size 600 volts grade i/c laying cutting thembling etc as per instruction engineer incaharge (PAK/FAST/NEWAGE) | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11 KV grade drop out fuse (D-set) complete with breaket, fuse link carrier etc complete approved quality (Double insulator) | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Cables for Buildings 95 Sqmm AL/PVC/SWA/PVC- 4C i/c cost of excavation in all kind of soil, cable laying and abackfilling with warning tape , termination thimbling, etc complete in all aspects | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| Supply and fixing of galvanized lattice steel structure, HT Pole 34'-8 | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F and test running of 400KVA step down transformer 3 phase, Delta/ star connection, 11/0.400 KV, 50HZ oil immersed up to standard level, breather and all accessories i/c transportation from down country upto site of work ,all types of test (Lo | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| HT Wire (S/F of ACSR conductor 6-1/0.132 (Rabit) i/c un-rolling, straightening, sagging join ting and i/c of TPT charges from Ex factory to site of work etc complete as per directives of Engineer incharge ) | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Low Voltage (LT) Service Box rated 150 Ampere, suitable for 3-phase, 4-wire, 400/230 V, 50 Hz system, complete with heavy-duty MS enclosure, electrolytic copper bus bars (phase, neutral & earth), 500 A main isolator/MCCB, neutral and earthing | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11 KV grade pin insulator with threaded lead pin, nuts, bolts etc complete approved quality. | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of galvanized channel type steel cross arms of size 8'x3 | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of earthing set complete with 2'x2'x1/4 | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11KV grade lightening arrester (surge arrester ) on given cross arms complete with breaket, connections with HT and earthing as per instruction of Engineer Incharge | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of copper cables 240mm Sq pvc insulated lying cutting thimbling in all respect | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11 KV grade drop out fuse (D-set) complete with breaket, fuse link carrier etc complete approved quality (Double insulator) | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Cables for Buildings 25 Sqmm AL/PVC/SWA/PVC- 4C i/c cost of excavation in all kind of soil, cable laying and abackfilling with warning tape , termination thimbling, etc complete in all aspects | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Ant 7/0.122 i/c un-rolling, straightening, sagging jointing and TPT charges from Ex-factory to site of work etc complete as per WAPDA Approved specification & standard complete in all aspect as per engineers direction. | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Shackle insulators of approved quality | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of wooden cross arm i/c steel braces, Nut/bolts, square washer etc complete | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11 kV grade Disc insulator with goove/dead end clamps, nuts bolts etc completed approved quality | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of 11 KV grade pin insulator with threaded lead pin, nuts, bolts etc complete approved quality. | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of ACSR (Rabbit) conductor 6-1/0.132 i/c un-rolling, straightening, sagging jointing and TPT charges from Ex-factory to site of work etc complete as per WAPDA Approved specification &standard. | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
| S/F of Bulk Metering Panel at 11 kV (HT) side suitable for 3-phase, 50 Hz system, complete with approved accuracy class electronic/TOD smart energy meter, metering CTs (multi core 100/5, 50/5) and PTs of required ratio and accuracy, isolation arrang | 1.Installation & commissioning 2. Technical support (e.g. minimum 1 year) 3. Warranty and after-sales service 4. Transportation |
Lot Title: External Electrical works for Package-IV
Specifications / Requirements:
| Sr. No | BOQ | Â |
|---|---|---|
| 1 | Ref. No. | Amount |
| 2 | A | Â |
| 3 | 1 | 220000 |
| 4 | 2 | 4000000 |
| 5 | 3 | 125000 |
| 6 | 4 | 400000 |
| 7 | 5 | 600000 |
| 8 | 6 | 36000 |
| 9 | 7 | 12000 |
| 10 | 8 | 300000 |
| 11 | 9 | 400000 |
| 12 | 10 | 1600000 |
| 13 | 11 | 120000 |
| 14 | 12 | 2800000 |
| 15 | B | 0 |
| 16 | 1 | 1100000 |
| 17 | 2 | 4000000 |
| 18 | 3 | 500000 |
| 19 | 4 | 1500000 |
| 20 | 5 | |
| 21 | 6 | 132000 |
| 22 | 7 | 60000 |
| 23 | 8 | 300000 |
| 24 | 9 | 400000 |
| 25 | 10 | 1600000 |
| 26 | 11 | 120000 |
| 27 | 12 | 750000 |
| 28 | 13 | 499800 |
| 29 | 14 | 60000 |
| 30 | C | |
| 31 | 1 | 17500 |
| 32 | 2 | 15000 |
| 33 | 3 | 19200 |
| 34 | 4 | 137500 |
| 35 | 5 | 800000 |
|  |  | Rs 22,624,000.00 |
The Bidder must enquire and satisfy himself as to the nature of the ground, the hydrological and climatic conditions, the form and nature of the Site, source of supply, the sufficiency and the means of obtaining and transporting all materials, labour, fuel, water, electrical current for light and power and other things required for or in connection with the Works and he must consider all other matters and possible contingencies affecting the execution, completion and maintenance of the Works e.g. local customs & cultural events affecting the Bid Price etc.
Â
It is mandatory for the bidders to get a comprehensive survey of project site done at their own expense, and accordingly quote the rates. No subsequent contestation by the bidders will be accepted by the Employer/Engineer and payment shall be made as per BOQ/Quoted Rate in the Bid Price.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: University of Baltistan, Skardu (University of Baltistan, Skardu), Procurement Officer Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
The Supplier is:
The title of the subject procurement is: External Electrical works for Package-IV
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
University of Baltistan, Skardu (University of Baltistan, Skardu), Procurement Officer
Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
+92-341-460-0067
assistant.treasurer.procurement@uobs.edu.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
University of Baltistan, Skardu (University of Baltistan, Skardu), Procurement Officer
Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
+92-341-460-0067
assistant.treasurer.procurement@uobs.edu.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Call at Deposit, Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P49097
To: University of Baltistan, Skardu (University of Baltistan, Skardu), Procurement Officer Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between University of Baltistan, Skardu (University of Baltistan, Skardu), Procurement Officer Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., External Electrical works for Package-IV (P49097) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: University of Baltistan, Skardu (University of Baltistan, Skardu), Procurement Officer Shiger Lamsa Road Skardu, Skardu Tehsil, Skardu District (District), Baltistan Division (Division), Gilgit-Baltistan (GB) (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}