In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED), CHIEF ENGINEER O&M DISTRIBUTION
22-A Queens Road Lahore
+92-499-0416
dm.osmdist@lesco.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED) The subject of procurement is: TENDER NO.3.5 MAINTENANCE OF DISTRIBUTION SYSTEM (2026-27) INVOLVING REPLACEMENT OF H.T/L.T JUMPERS OF LINES AND DISTRIBUTION TRANSFORMERS, BUS BARS, BROKEN DISC / PIN INSULATORS AND TREE TRIMMING FOR SOUTHERN CIRCLE LESCO Expected commencement date: Tuesday, September 15, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P58148 |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 2 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, July 13, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
|
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 120 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; 22-A Queens Road Lahore Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Wednesday, July 29, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Wednesday Date: July 29, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Eligibility Criteria: Duly licensed and renewed by the Pakistan Engineering Council (PEC) for FY 2026-27 or renewed for the year 2025-26 with deposit slip for the year 2026-2027 in the financial category of C6 & above and Technical category of EE-04 or EE-05, in case of Joint Venture both partners should be registered & renewed in PEC and said categories will be checked collectively otherwise will be declared ineligible / non responsive | Yes |
| Active Taxpayer NTN (for both FBR and PRA) should be attached, in case of Joint Venture both firms should be active taxpayer NTN (for both FBR and PRA) otherwise bidder will be declared ineligible/non-responsive | Yes |
| Affidavit about Firm/Company or the Joint venture company (if any) Non-Blacklisting, not been involved in any corrupt or fraudulent practices on Non- Judicial stamp paper as specimen mentioned in User Defined Annexure-4 that the bidder or joint venture has not been black listed. (Upload relevant Documents, Otherwise Bidder may be disqualified) | Yes |
| Bidder shall submit a bid security in favor of CEO LESCO, at their option, in the form of CDR, Pay Order or Bank Guarantee issued by the schedule Bank valid for (28) days beyond the end of the validity of the Bid (Bid guarantee can also be furnished on non-judicial stamp paper of value Rs.500/-) and must provide in original before the Tender submission deadline on PPRA EPADS | No |
| For Bid Security & Performance Guarantee, in case of Sole Proprietor, only Contractors account's issued (except Al Baraka & Summit Bank) will be entertained and in case of Joint venture only Joint Venture account or leading firm account bid security/performance guarantee (Upload relevant Documents, Otherwise Bidder may be Ineligible/disqualified | Yes |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| TENDER NO.3.5 MAINTENANCE OF DISTRIBUTION SYSTEM (2026-27) INVOLVING REPLACEMENT OF H.T/L.T JUMPERS OF LINES AND DISTRIBUTION TRANSFORMERS, BUS BARS, BROKEN DISC / PIN INSULATORS AND TREE TRIMMING FOR SOUTHERN CIRCLE LESCO | Address: SOUTHERN CIRCLE LESCO Schedule: Days 120 Quantity: 1/Qty |
1/Qty | 106159 PKR |
No
Jobs Without Lots :
Job: TENDER NO.3.5 MAINTENANCE OF DISTRIBUTION SYSTEM (2026-27) INVOLVING REPLACEMENT OF H.T/L.T JUMPERS OF LINES AND DISTRIBUTION TRANSFORMERS, BUS BARS, BROKEN DISC / PIN INSULATORS AND TREE TRIMMING FOR SOUTHERN CIRCLE LESCO
Specifications / Requirements:
| Sr. No | Description | Quantity | Units | Rate (Rs.) | Amount (Rs.) |
|---|---|---|---|---|---|
| 1 | Replacement of LT Bus Bar (All Conductor Sizes) per Phase | 927 | No. | 600 | 556200 |
| 2 | Replacement of 11 kV Droppers on Transformer HT Side (All Conductor Sizes) Per Phase | 830 | No. | 600 | 498000 |
| 3 | Replacement of Cross Arm (steel/wooden) (1 No.) | 719 | No. | 2400 | 1725600 |
| 4 | Disc Insulator Replacement (All Conductor Sizes) Per Disc | 102 | No. | 1440 | 146880 |
| 5 | Pin Insulator Replacement (All Conductor Sizes) Per Pin Insulator | 707 | No. | 480 | 339360 |
| 6 | Set Right Tilted LT Structure | 54 | No. | 4800 | 259200 |
| 7 | Set Right Tilted HT Structure | 141 | No. | 6000 | 846000 |
| 8 | Set Right Tilted LT Spun Pole | 3 | No. | 4800 | 14400 |
| 9 | Set Right Tilted HT Spun Pole | 12 | No. | 4200 | 50400 |
| 10 | Replacement of HT jumpers (All conductor sizes) Per Jumper | 483 | No. | 840 | 405720 |
| 11 | Tree Trimming Per Tree | 2200 | No. | 1800 | 3960000 |
| 12 | Replacement of D-Fuse Fittings (1 No.) | 912 | No. | 1080 | 984960 |
| 13 | Set Right of LT Sagging (All conductor sizes, All Phases & neutral) Per Span | 65 | No. | 1680 | 109200 |
| 14 | Set Right of HT Sagging (All conductor sizes) per dead per circuit | 200 | No. | 3600 | 720000 |
| GRAND TOTAL: | Rs 10,615,920.00 |
MAINTENANCE OF DISTRIBUTION SYSTEM (2025-26) INVOLVING REPLACEMENT OF DETERIORATED CONDUCTORS, H.T/L.T JUMPERS OF LINES AND DISTRIBUTION TRANSFORMERS, BUS BARS, BROKEN DISC / PIN INSULATORS AND X-ARMS, MID-SPANNING, SET RIGHT OF H.T/L.T TILTED POLES/ STRUCTURES, INSTALLATION OF INSULATED CONDUCTORS, REPLACEMENT OF D-SETS AND TREE TRIMMING FOR CONCERNED OPERATION CIRCLE LESCO INTRODUCTION LESCO is one of the biggest electricity distribution companies in Pakistan with more than 6.5 million customers. LESCO serves / distributes electricity in Civil Districts of Lahore, Kasur, Okara, Nankana and Sheikhupura. LESCO comprises of eight distribution Operation Circles. LESCO is committed to deliver safe & secure Electric Power Supply to all its valuable customers by employing technological approach dependable human and organizational resource, focusing on delivery of targets and quality services. Our mission is “To distribute electricity in a reliable, secure, safe, environmentally responsible & cost-effective manner.” Objectives LESCO requires technical and financial proposals against supply of services for maintenance of distribution system involving replacement of deteriorated conductors, H.T/L.T jumpers of lines and distribution transformers, Bus Bars, broken Disc / Pin insulators and X-Arms, mid-spanning, set right of H.T/L.T tilted poles/ structures, installation of insulated conductors, replacement of D-sets and tree trimming. In an endeavor to improve quality of supply, uninterrupted and reliable as well as safety to line staff, public, animals and protection to LESCO equipment to enhance the operational and financial efficiency of the distribution system and quality of service to its consumers, LESCO seeks to outsource the works for maintenance of non technical/technical works/ maintenance of 11 KV Feeder through skilled / unskilled labor through a competitive bidding process, LESCO intends to secure Services Contract with reputable and financially sound private sector investor(s)/companies to undertake the work for maintenance of non technical/technical works of 11 KV Feeders. LESCO’s objectives for awarding a Services Contract, inter alia, include: I. ii. Maintenance of non-technical /technical works of 11 KV Feeder through skilled/unskilled labor as per approved WAPDA/LESCO standardization of design instruction under the jurisdiction of LESCO Concerned Operation Circle. To ensure continuity of supply through maintenance. iii. To replace deteriorated conductors, H.T/L.T jumpers of lines and distribution transformers, Bus Bars, broken Disc / Pin insulators and X-Arms. iv. v. vi. vii. To set right of H.T/L.T tilted poles/ structures Installation of insulated conductors Replacement of D-sets Tree trimming. The selection of services Contractor shall be through a transparent bidding process and within the provisions of license issued by NEPRA and as per Electric Power Act 1997. SCOPE OF WORK LESCO intends to improve safety environment for public, employees and operational performance by reducing the electricity theft by awarding Services Contract against supply of services for Maintenance of distribution system involves replacement of deteriorated conductors where hot spot are identified, HT / LT jumpers of lines and distribution transformers, Bus Bars, Broken Disc / Pin insulators and damaged X Arms, mid-spanning/replacement of damaged structures set right of HT / LT tilted poles / structures, installation of insulated conductors to avoid frequent tripping during rainy season where tree trimming is impossible, replacement of broken / non-specified dropout cutouts (D-sets) and tree trimming to private contractors under the provisions of the power Distribution license issued by NEPRA for efficient and safe network management and operations. METHODOLOGY 1. The work Maintenance of distribution system involves replacement of deteriorated conductors where hot spot are identified, HT / LT jumpers of lines and distribution transformers, Bus Bars, Broken Disc / Pin insulators and damaged X-Arms, mid-spanning/replacement of damaged structures set right of HT / LT tilted poles / structures, installation of insulated conductors to avoid frequent tripping during rainy season where tree trimming is impossible, replacement of broken / non-specified dropout cutouts (D-sets) and tree trimming at the various locations in Concerned Operation LESCO. 2. There are 1418 No. 11 KV mixed feeders and 753 No. 11 KV Independent feeders in LESCO. 3. After mapping/patrolling of feeders, 823 No. 11 KV feeders (Mixed feeders 672 No. & 151 No. Independent feeders) have been identified and selected where dire need of maintenance work is required. 4. Material required for carrying out above said maintenance works through outsource will be arranged by Material Management Directorate LESCO 5. Superintendent Engineer of each operation circle will supervise/monitor all maintenance activities regarding timely release of material through ERP, preparation of shutdowns schedule as per quantum of work and workmanship of contractor in line with WAPDA SDI. 6. Each shut down will be allowed for 08 Hours duration. 7. Each shut down for execution of maintenance work will be availed daily on one feeder per sub division. 200 Nos. of feeders to be maintained gradually on daily basis. 8. Concerned LS/Feeder in-charge of each sub division will get PTW against shutdown approved by LESCO competent authority. 9. SDO and LS of concerned sub division will be responsible for supervision of maintenance work and provision of material and PTWs. 10. LS/Feeder in-charge of concerned sub division will draw the material and handover to contractor. 11. Daily progress of maintenance work to be carried out by contractor will be prepared by concerned SDO/LS/ Feeder in-charge of each sub division on prescribed format along with before and after snaps of sites assigned to contractor and the same will be submitted to XEN office with the signature of contractor as well as themselves. 12. Chief Engineer O&M (Dist.) LESCO is the overall in-charge of maintenance work and his office will act as Project Management Unit (PMU) for conducting Annual Maintenance work which is a continuous process for the safety of distribution system ensuring continuity of power supply. Sequence of Work 1. The contract of maintenance work of each division will be assigned to one contractor to execute work on five feeders on daily basis as per priority given by concerned XEN. 2. Length of area for completion of maintenance work of 11-KV feeders in four months: a. AVG length= 16 KM for urban area b. AVG length= 40 KM for rural area 3. Four teams of skilled line staff will be arranged by the respective contractor for completion of maintenance work of each 11-KV feeder on daily basis: a. Each team = 01 lineman and 01 ALM i. Completion of work in urban area = 0.25 KM line per team and total 01 KM will be completed in a day. ii. Completion of work in rural area = 0.625 KM line per team and total 2.5 KM will be completed in a day. 4. Line staff required for completion of work of a Division within given time frame on daily basis: a. Line staff =08 Nos. on each feeder. b. Total line staff =40 Nos. of 05 No. feeders 5. The completion of maintenance work on each feeder will be divided into four parts. a. Each part of urban area of a feeder =04 KM in one month b. Each part of rural area of a feeder =10 KM. in one month 6. The maintenance work of an 11 KV feeder will be completed by availing 16 shutdowns. a. In a month =04 shutdowns b. In each week = 01 shutdown. c. Completion of work in a month =25 % 7. While starting work, the contractor will be bound to work in the presence of respective LS who will avail PTW through concerned Sub Divisional officer to avoid any mishap. 8. Each contractor will complete maintenance work on 11-KV feeders of _____ Nos. Operation divisions a. In four months = 20 Nos. 11 KV feeder by a contractor in a division b. In four months= total _____ Nos. feeders in a Circle of LESCO 09. Total ________ Nos. skilled line staff is required for completion of maintenance work of _______ Nos. feeders in four months in a circle. 10. Time for completion of maintenance work is four months.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED), CHIEF ENGINEER O&M DISTRIBUTION 22-A Queens Road Lahore
The Supplier is:
The title of the subject procurement is: TENDER NO.3.5 MAINTENANCE OF DISTRIBUTION SYSTEM (2026-27) INVOLVING REPLACEMENT OF H.T/L.T JUMPERS OF LINES AND DISTRIBUTION TRANSFORMERS, BUS BARS, BROKEN DISC / PIN INSULATORS AND TREE TRIMMING FOR SOUTHERN CIRCLE LESCO
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED), CHIEF ENGINEER O&M DISTRIBUTION
22-A Queens Road Lahore
+92-499-0416
dm.osmdist@lesco.gov.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED), CHIEF ENGINEER O&M DISTRIBUTION
22-A Queens Road Lahore
+92-499-0416
dm.osmdist@lesco.gov.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Inspections & Tests Requirements DD (Technical) Operation Circle will be overall in-charge of maintenance work and XEN of concerned division will be in-charge of maintenance work of his division and both also responsible for execution, completion and inspection of maintenance work.
Final inspection regarding quality and scope of work of each feeder after complete maintenance will be carried out by the nominated inspector from TS Directorate, nominated inspector from HSE Directorate and Manager Operation.
All the interim and final payments will be made on executed work, strictly after verification of Concerned LS, AM (OP), DM (OP) & SE (OP). The % check is 100% for LS, 25% for AM, 10% for DM and 5% for SE. The payments will be made by concerned DM(Op) i.e DDO of Division after verification of works from SE office under Budget Head.
Inspection Certificate issued by nominated inspector from TS Directorate, nominated inspector from HSE Directorate and Manager Operation.... Circle LESCO. Professional Tax Paid Certificate by the firm
The contractor in its invoices shall also give an undertaking that in case of omission of any deduct-able amount, LESCO’s claim at any later stage (through pre-audit or post audit) shall be acceptable to you.
While raising bill of contract work, the firm shall vividly mention the account number as well as the name of the bank and branch enabling CFO office to release payment thereof accordingly.
As per directions of FBR dated.3.9.2015 conveyed vide C.E (Operation) PEPCO vide letter No. 1918-28 dt.17.09.2015, the payment to the registered persons may be linked with the active taxpayer status of the contractors as per FBR database. If any registered contractor is not in ATL his payment should be stopped till he files his mandatory returns and appears on ATL of FBR.
Handing over / Taken over of material certificate issued by concerned Assistant Manager Operation.
Dismantled material returned to store certificate issued by concerned Assistant Manager Operation.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P58148
To: O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED), CHIEF ENGINEER O&M DISTRIBUTION 22-A Queens Road Lahore
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED), CHIEF ENGINEER O&M DISTRIBUTION 22-A Queens Road Lahore
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., TENDER NO.3.5 MAINTENANCE OF DISTRIBUTION SYSTEM (2026-27) INVOLVING REPLACEMENT OF H.T/L.T JUMPERS OF LINES AND DISTRIBUTION TRANSFORMERS, BUS BARS, BROKEN DISC / PIN INSULATORS AND TREE TRIMMING FOR SOUTHERN CIRCLE LESCO (P58148) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: O&M DISTRIBUTION (LAHORE ELECTRIC SUPPLY COMPANY LIMITED), CHIEF ENGINEER O&M DISTRIBUTION 22-A Queens Road Lahore
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
Past Experience and Completed Contracts Bidders shall provide documentary evidence (Work Order/Contract) relevant experience of construction works of HT/LT Power Distribution Network. Work Order/contract from any DISCO’s / organizations/Private Housing Societies where they have executed similar works. (Upload relevant Documents 01 No. Work Order / Contract, Otherwise Bidder may be disqualified)