In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
SSGC (PROCUREMENT DEPARTMENT), DCM
ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi
+92-322-821-4899
mmte@ssgc.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: SSGC (PROCUREMENT DEPARTMENT) The subject of procurement is: SSGC/SC/PT/EPADS2/14388 (HIRING OF SERVICE FOR HORIZONTAL DIRECTIONAL DRILLING HDD OF 24 DIA & 12 DIA QUETTA PIPELINE AT BIBI NANI BALOCHISTAN) Expected commencement date: Friday, January 8, 2027 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P58169 |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 5 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, July 27, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on SSGC (PROCUREMENT DEPARTMENT) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 120 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Call at Deposit, Bank Guarantee |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Thursday, July 30, 2026 10:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Thursday Date: July 30, 2026 Time : 10:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of: Pay Order, Call at Deposit, Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Valid PEC License in Category C-2 & field of specialization CE-08 (Oil and Gas pipeline) & CE10 (General Civil Engineering Works) | Yes |
| Undertaking on stamp paper of that the firm has not been black-listed by any Government Organization, State-Owned Corporation, Autonomous Body and/or International Financial Institution like the World Bank, Asian Development Bank etc. | Yes |
| The firm has an experience of Horizontal Directional Drilling of transmission gas pipeline for 12” Dia. and above pipeline. | Yes |
| Valid HSE & Quality Management Systems (ISO 9001, OHSAS 18001/45001 and ISO 14001) Certifications or Equivalent | Yes |
| Bid-Bond | Yes |
| If the firm come with Joint Venture / Association then must to confirm and mention that Lead partner and having the capability to execute the project. | Yes |
| Copy of Joint Venture Agreement on judicial paper in case of joint venture / association between the parties as per PEC Bye-laws 1987. The foreign firm must also attach the Joint venture agreement( with original signed) along with bid as per PEC 1987 Bylaws if J/V with a Pakistani Constructor/Operator specifying Leading party role, Financial shares, Liabilities and responsibilities of each party. | Yes |
| All Tender documents duly sign and stamp. | Yes |
Least Cost Based Selection (LCBS)
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Quality & Expertise of Key Professional Staff (Form-B1 of Application) | ||
| Staff having relevant experience for the assignment a) Project Manager (01 No.) (Total Marks: 04) Education: BE/ ME/ MSc – Mechanical/ Civil/ Industrial/ Chemical or any other Engineering Certifications: Valid PEC, PMP Experience: Atleast10 Years in Pipeline Construction, Welding, Testing and Commissioning Works. • Having more than 10 yr. experience & PMP certified. (Total Marks: 04) • Having 10 yr. experience but not PMP certified.(Total Marks: 02) • Having less than 10 yr. experience. (Total Marks: 0) b) Project/Site Co-ordinator (01 No.) (Total Marks: 03) Education: BE – Mechanical/ Civil/ Industrial/ Chemical Experience: Atleast10 Years in Pipeline Construction, Welding, Testing and Commissioning Works • Having more than 10 yr. experience. (Total Marks: 03) • Having 5-10 yr. experience (Total Marks: 1.5) • Having less than 05 yr. experience (Total Marks: 0) (Qualitative)(Doc Required) | 7 | |
| c) Site Engineer (01 Nos.) (Total Marks: 03) Education: BE/ ME/ MSc – Mechanical/ Civil/ Industrial/ Chemical Certifications: Valid PEC Experience: 07 Years in Pipeline Construction, Welding, Testing and Commissioning Works • Having more than 07 yr. experience .(Total Marks: 03) • Having 04-07 yr. experience .(Total Marks: 1.5) • Having less than 04 yr. experience .(Total Marks: 0) d) HSE Engineer (01 Nos.) (Total Marks: 03) Education: BE/ ME/ MSc – Mechanical/ Civil/ Industrial/ Chemical Certifications: Valid PEC, NEBOSH/IOSH Experience: 07 Years in Pipeline Construction, Welding, Testing and Commissioning Works • Having more than 07 yr. experience, NEBOSH/IOSH certified. (Total Marks: 03) • Having 07 yr. experience , but not NEBOSH/IOSH certified.(Total Marks: 1.5) • Having less than 04 yr. experience (Total Marks: 0) (Qualitative)(Doc Required) | 6 | |
| e) QA/QC Engineer (01 Nos.) (Total Marks: 03) Education: BE/ ME/ MSc – Mechanical/ Civil/ Industrial/ Metallurgical Certifications: Valid PEC, CSWIP 3.1, ASNT NDT Level (II/III) (RT/UT) Experience: 07 Years in Pipeline Construction, Welding, Testing and Commissioning Works • Having more than 7 yr. experience .(Total Marks: 03) • Having 5-7 yr. experience .(Total Marks: 1.5) • Having less than 05 yr. experience. (Total Marks: 0) (Qualitative)(Doc Required) | 3 | |
| Past Performance (Form-B3 of Application) | ||
| Relevant Experience related to Horizontal Directional Drilling of High Pressure Gas Pipeline Projects (12” dia or above) in the past ten (10) years (Completion Certificate Required) 05 Nos. project of 12” dia or above (8 marks each project) (Total Marks: 40) Note: Following details are required on form B-3 for pipeline construction projects undertaken in the past: a. Project Value b. Planned duration and cost c. Actual Performance- Duration and Cost d. Length of pipeline laid e. Resource (manpower and equipment) deployment (Qualitative)(Doc Required) | 40 | |
| Construction Equipment & Machinery | ||
| Following minimum equipment and machinery must be provided by the bidder along with third party fitness/ calibration certifications: i. HDD Rig Machine, pulling capacity 200 Tons & above (01 No.) ii. Wire line Guidance Tracking system /Digi track device (01 No.) iii. Mud Mixing unit along with Mud pump Recycling Unit (01 Set.) iv. Pipe Layer, 50 Tons (01 Nos.) v. Welding Plants (2 Nos.) vi. Dozer, D-7 & D-8 only (1 Nos.) vii. Backhoe Excavator (2 Nos.) viii. Rock Cutter/ Jack Hammer (01 Nos.) ix. Crane, 35-40 tons (01 Nos.) x. Low bed trailer (01 Nos.) xi. High bed trailer (01 Nos.) xii. Dump truck (01 Nos.) 01 marks for each machinery owned 0.5 marks for machinery rented The bidder has to provide undertaking that the aforementioned equipment will be made available at project site within the mobilization period. For leased equipment owned, the bidder must provide evidence of availability at least in the country of its origin. The bidder will provide an agreement from equipment owner that the equipment will be available within mobilization period (Owner will have right to verify) The bidder should submit third party fitness certification conducted by globally recognized firms i.e. Lloyd’s Register / Bureau Vitas / SGS / TUV. (Qualitative)(Doc Required) | 14 | |
| Project Implementation Plan with Methodology and Schedule | ||
| a) Project Implementation Plan & Methodology (Total Marks: 2.5) • Provide comprehensive implementation plan and methodology of all activities (Total Marks: 2.5) • Provide partial implementation plan and methodology of all activities (Total Marks: 1) • Implementation plan and methodology of all activities not provided (Total Marks: 0) b) Project Execution Schedule (Total Marks: 2.5) • Provided Level 4 Project Execution Schedule (Total Marks: 2.5) • Provided Level 3 Project Execution Schedule (Total Marks: 2) • Provided Level 2 Project Execution Schedule (Total Marks: 1) • Project Execution Schedule not provided (Total Marks: 0) (Qualitative)(Doc Required) | 5 | |
| QA/QC system and HSE Policy | ||
| a) QA/QC Management System (i.e. Project Quality Plan, QIP, Method Statements, QA/Qc Forms) (Total Marks: 2.5) • Complete details of QA/QC Management System is provided (Total Marks: 2.5) • Partial details of QA/QC Management System is provided (Total Marks:1) • No details of QA/QC Management System is provided (Total Marks: 0) b) HSE Policy Document (including HSE Protocol, Emergency plan, HSE Plan/Risk Assessment) (Total Marks: 2.5) • Complete details of HSE policy is provided (Total Marks: 2.5) • Partial details of HSE policy is provided (Total Marks: 1) • No details of HSE policy is provided (Total Marks: 0) (Qualitative)(Doc Required) | 5 | |
| Financial Status | ||
| Working Capital in last three (03) years as per audited accounts of the firm • Average annual turnover for last three year is more than PKR 500 Million (Total Marks: 20) • Average annual turnover for last three year is less than PKR 500 Million & greater than PKR 250 Million (Total Marks: 10) • Average annual turnover for last three year is less than PKR 250 Million (Total Marks: 0) (Qualitative)(Doc Required) | 20 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Hiring of Services Horizontal Directional Drilling(HDD) of 24 | Address: ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi Schedule: 120 Days Quantity: 1/job |
1/job | 4200000 PKR |
No
Jobs Without Lots :
Job: Hiring of Services Horizontal Directional Drilling(HDD) of 24
Specifications / Requirements:
| Sr. No | Heading | Item # | Description | Unit | Qty. | Rate |
|---|---|---|---|---|---|---|
| 1 | SECTION A – GEOTECHNICAL INVESTIGATION | A-1 | Site establishment, drilling spread setup, transportation of equipment, temporary facilities and final site clearance | L.S. | 1 | |
| 2 | SECTION A – GEOTECHNICAL INVESTIGATION | A-2 | Site reconnaissance, access arrangements and survey of borehole locations | L.S. | 1 | |
| 3 | SECTION A – GEOTECHNICAL INVESTIGATION | A-3 | Percussion Drilling of boreholes including casing, sampling and logging. (up to 30 meters depth depending on the availability pf hard strata) | Nos. | 3 | |
| 4 | SECTION A – GEOTECHNICAL INVESTIGATION | A-4 | Standard Penetration Tests (SPT) at 1.5 m intervals in accordance with ASTM D-1586 | No. | 60 | |
| 5 | SECTION A – GEOTECHNICAL INVESTIGATION | A-5 | Collection, preservation and transportation of soil samples obtained during SPT | No. | 60 | |
| 6 | SECTION A – GEOTECHNICAL INVESTIGATION | A-6 | Laboratory testing of soil samples including all specified tests | L.S. | 1 | |
| 7 | SECTION A – GEOTECHNICAL INVESTIGATION | A-7 | Groundwater sampling and laboratory testing | No. | 3 | |
| 8 | SECTION A – GEOTECHNICAL INVESTIGATION | A-8 | Geophysical investigations (ERT and/or Seismic Refraction Survey) (Optional) | L.S. | 1 | |
| 9 | SECTION A – GEOTECHNICAL INVESTIGATION | A-9 | Geotechnical Data Report (GDR) | L.S. | 1 | |
| 10 | SECTION A – GEOTECHNICAL INVESTIGATION | A-10 | Geotechnical Baseline Report (GBR) | L.S. | 1 | |
| 11 | SECTION A – GEOTECHNICAL INVESTIGATION | A-11 | Final Geotechnical Report with HDD recommendations | L.S. | 1 | |
| 12 | SECTION B – DETAILED ENGINEERING & DESIGN | B-1 | Topographical survey and route verification | L.S. | 1 | |
| 13 | SECTION B – DETAILED ENGINEERING & DESIGN | B-2 | HDD alignment selection and profile design | L.S. | 1 | |
| 14 | SECTION B – DETAILED ENGINEERING & DESIGN | B-3 | Engineering design for 12-inch QPL HDD crossing | L.S. | 1 | |
| 15 | SECTION B – DETAILED ENGINEERING & DESIGN | B-4 | Engineering design for 24-inch HDD crossing | L.S. | 1 | |
| 16 | SECTION B – DETAILED ENGINEERING & DESIGN | B-5 | Temporary works design and construction methodology | L.S. | 1 | |
| 17 | SECTION B – DETAILED ENGINEERING & DESIGN | B-6 | Tie-in engineering and shutdown planning | L.S. | 1 | |
| 18 | SECTION B – DETAILED ENGINEERING & DESIGN | B-7 | Preparation of AFC drawings and calculations | L.S. | 1 | |
| 19 | SECTION B – DETAILED ENGINEERING & DESIGN | B-8 | Preparation of as-built drawings and completion dossier | L.S. | 1 | |
| 20 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-1 | HDD spread setup including drilling rig, ancillary equipment, support machinery and subsequent removal upon completion | L.S. | 1 | |
| 21 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-2 | Mud recycling and solids control system setup and operation | L.S. | 1 | |
| 22 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-3 | Establishment of entry and exit work areas | L.S. | 1 | |
| 23 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-4 | Survey control network and alignment setup | L.S. | 1 | |
| 24 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-5 | Temporary power generation, lighting and utilities | L.S. | 1 | |
| 25 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-6 | Drilling fluid preparation, storage and containment facilities | L.S. | 1 | |
| 26 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-7 | Environmental protection and spill containment measures | L.S. | 1 | |
| 27 | SECTION C – HDD SITE ESTABLISHMENT & TEMPORARY WORKS | C-8 | Site restoration and reinstatement | L.S. | 1 | |
| 28 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-1 | Setting out and survey verification | L.S. | 1 | |
| 29 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-2 | Preparation of entry and exit pads | L.S. | 1 | |
| 30 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-3 | Entry and exit pit excavation and backfilling | No. | 2 | |
| 31 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-4 | Handling, stringing and alignment of employer-supplied pipe | m | 800 | |
| 32 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-5 | Welding of 12-inch pipe joints | No. | 75 | |
| 33 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-6 | Field joint coating and coating repairs | No. | 75 | |
| 34 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-7 | Holiday testing of coated pipe | m | 800 | |
| 35 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-8 | Fabrication and installation of HDD pull head | No. | 1 | |
| 36 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-9 | Pilot hole drilling | m | 350 | |
| 37 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-10 | First pre-reaming pass | m | 350 | |
| 38 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-11 | Second pre-reaming pass | m | 350 | |
| 39 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-12 | Additional reaming passes, if required | m | 350 | |
| 40 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-13 | Swab pass and bore conditioning | m | 350 | |
| 41 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-14 | Pullback installation of 12-inch pipeline | m | 350 | |
| 42 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-15 | Removal of pull head and pipe end preparation | No. | 1 | |
| 43 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-16 | Tie-in welding to existing pipeline | No. | 2 | |
| 44 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-17 | Field coating of tie-in joints | No. | 2 | |
| 45 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-18 | Hydrostatic testing of completed section | L.S. | 1 | |
| 46 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-19 | Dewatering, gauging, cleaning and drying | L.S. | 1 | |
| 47 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-20 | Pre-commissioning activities | L.S. | 1 | |
| 48 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-21 | Commissioning support | L.S. | 1 | |
| 49 | WORKSTREAM A – HDD CROSSING OF 12-INCH QPL PIPELINE | A1-22 | As-built survey and records | L.S. | 1 | |
| 50 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-1 | Setting out and survey verification | L.S. | 1 | |
| 51 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-2 | Preparation of entry and exit pads | L.S. | 1 | |
| 52 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-3 | Entry and exit pit excavation and backfilling | No. | 2 | |
| 53 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-4 | Handling, stringing and alignment of employer-supplied pipe | m | 800 | |
| 54 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-5 | Welding of 24-inch pipe joints | No. | 75 | |
| 55 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-6 | Field joint coating and coating repairs | No. | 75 | |
| 56 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-7 | Holiday testing of coated pipe | m | 800 | |
| 57 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-8 | Fabrication and installation of HDD pull head | No. | 1 | |
| 58 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-9 | Pilot hole drilling | m | 350 | |
| 59 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-10 | First pre-reaming pass | m | 350 | |
| 60 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-11 | Second pre-reaming pass | m | 350 | |
| 61 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-12 | Third pre-reaming pass | m | 350 | |
| 62 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-13 | Additional reaming passes, if required | m | 350 | |
| 63 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-14 | Swab pass and bore conditioning | m | 350 | |
| 64 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-15 | Pullback installation of 24-inch pipeline | No. | 1 | |
| 65 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-16 | Removal of pull head and pipe end preparation | No. | 2 | |
| 66 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-17 | Tie-in welding to existing pipeline | No. | 2 | |
| 67 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-18 | Field coating of tie-in joints | L.S. | 1 | |
| 68 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-19 | Hydrostatic testing of completed section | L.S. | 1 | |
| 69 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-20 | Dewatering, gauging, cleaning and drying | L.S. | 1 | |
| 70 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-21 | Pre-commissioning activities | L.S. | 1 | |
| 71 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-22 | Commissioning support | L.S. | 1 | |
| 72 | WORKSTREAM B – HDD CROSSING OF 24-INCH QPCEP PIPELINE | B1-23 | As-built survey and records | L.S. | 1 | |
| 73 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-1 | Project Quality Management Plan | L.S. | 1 | |
| 74 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-2 | Inspection and Test Plan (ITP) | L.S. | 1 | |
| 75 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-3 | Welding Procedure Qualification Records (PQR/WPS) | L.S. | 1 | |
| 76 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-4 | HSE Management Plan | L.S. | 1 | |
| 77 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-5 | Risk Assessments and Job Safety Analyses | L.S. | 1 | |
| 78 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-6 | Daily, weekly and monthly progress reporting | L.S. | 1 | |
| 79 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-7 | Environmental monitoring and compliance | L.S. | 1 | |
| 80 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-8 | Final completion report | L.S. | 1 | |
| 81 | SECTION D – QA/QC, HSE & PROJECT CONTROLS | D-9 | Final documentation dossier | L.S. | 1 | |
| 82 | SECTION E – SITE REINSTATEMENT | E-1 | Removal of temporary works | L.S. | 1 | |
| 83 | SECTION E – SITE REINSTATEMENT | E-2 | Removal of drilling fluids, slurry and waste materials | L.S. | 1 | |
| 84 | SECTION E – SITE REINSTATEMENT | E-3 | Disposal of waste at approved locations | L.S. | 1 | |
| 85 | SECTION E – SITE REINSTATEMENT | E-4 | Restoration of work areas to original condition | L.S. | 1 | |
| 86 | SECTION E – SITE REINSTATEMENT | E-5 | Final environmental close-out inspection | L.S. | 1 | |
| 87 | Total Estimate Cost | 866000000 | ||||
| GRAND TOTAL: | Rs 866,000,000.00 |
Scope of work attached in Annexture SSGC Tender docuemnts.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: SSGC (PROCUREMENT DEPARTMENT), DCM ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi
The Supplier is:
The title of the subject procurement is: SSGC/SC/PT/EPADS2/14388 (HIRING OF SERVICE FOR HORIZONTAL DIRECTIONAL DRILLING HDD OF 24 DIA & 12 DIA QUETTA PIPELINE AT BIBI NANI BALOCHISTAN)
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
SSGC (PROCUREMENT DEPARTMENT), DCM
ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi
+92-322-821-4899
mmte@ssgc.com.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
SSGC (PROCUREMENT DEPARTMENT), DCM
ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi
+92-322-821-4899
mmte@ssgc.com.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Call at Deposit, Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P58169
To: SSGC (PROCUREMENT DEPARTMENT), DCM ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between SSGC (PROCUREMENT DEPARTMENT), DCM ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., SSGC/SC/PT/EPADS2/14388 (HIRING OF SERVICE FOR HORIZONTAL DIRECTIONAL DRILLING HDD OF 24 DIA & 12 DIA QUETTA PIPELINE AT BIBI NANI BALOCHISTAN) (P58169) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: SSGC (PROCUREMENT DEPARTMENT), DCM ST-4/B, Block 14, Sir Shah Suleman Road, Gulshan-e-Iqbal, Karachi
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}