In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
NDMA (National Disaster Management Authority (NDMA)), Director
Near ITP Office, Main Murree Road, Islamabad Capital Territory
+92-300-500-1238
latifndma@gmail.com
The following specific data for the procurement of works shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITBs). Whenever there is a conflict, the provisions herein shall prevail over those in ITBs.
ITB Number 1.1
Name of Procuring agency/Employer: NDMA (National Disaster Management Authority (NDMA))
The subject of procurement is: EXTENSION OF NEOC - ESTABLISHMENT OF NEXT GENERATION TECHNOLOGIES (NGT)
Period for completion of the works 90 Days
Commencement date execution of the works: 5 Days
Type of Procurement: Local
ITB Number 2.1
Financial year for the operations of the Procuring agency/Employer: 2026-27Name of Project [insert: name and summary description of the Project if any]
Name of financing institution: [insert: name if any]
Name and identification number of the Contract: P66746
ITB Number 3.1
JV/Consortium or Association Allowed: No
Maximum number of members in the joint venture shall be: Nil.
ITB Number 6.4
The Bidders may seek clarifications through EPADS v2.0: Last Clarification Date: Monday, July 27, 2026
ITB Number 8.1
The Language of all correspondences and documents related to the Bid is: English
ITB Number 5.1 & 9.1
The following documents must be included to constitute the Bid
No
ITB Number 9.4 (b)
Other procurement specific documentation requirements are:
Supporting Documents
ITB Number 12.4
The Bid price will be/will not be subject to the price adjustment Nil.
ITB Number 12.6
The Bid price shall be adjusted in accordance with Schedule-A to Bid – “Schedule of Adjustment Data” if available.
ITB Number 13.1
Bidders to quote entirely in Pak rupees (PKR)
ITB Number 15.1
The Bid Validity period shall be 90 Days days.
ITB Number 16.1
The amount of Bid Security shall be (insert amount)
The currency of the Bid Security shall be: PKR.
ITB Number 16.2
The Bid Security shall be in the form of: Pay Order, Call at Deposit, Bank Guarantee, Demand Draft
ITB Number 19.1
The deadline for Bid submission is: Thursday, August 6, 2026 11:00 AM
Address for submission of Original Bid Security: Near ITP Office, Main Murree Road, Islamabad Capital Territory
ITB Number 21.1
The Bid opening shall take place at: EPADS v2.0
Day : Thursday
Date: August 06, 2026
Time : 11:30 AM
ITB Number 27.1
The currency that shall be used for Bid evaluation and comparison purposes to convert all Bid prices expressed in various currencies is: PKR Only
The source of exchange rate shall be: Nil
The date of exchange rate shall be: Nil
ITB Number 28.2 & 28.5
Quality and Cost Based Selection (QCBS)
see Evaluation Criteria
ITB Number 29.1
Domestic preference to apply.
Domestic preference: Yes
The Percentage of Domestic Preference is 100%
Preference to domestic or national suppliers or contractors shall be provided in accordance with policies of the Federal Government and/or in accordance with the regulations issued by the Authority.
If Yes, The percentage for the domestic preference alongwith calculation formula is provided in the evaluation and qualification criteria.
ITB Number 32.2
Sub-contracting is allowed? : No
No % of the total value of the contract.
39.1 The Performance Security (or guarantee) shall be 10.00%
39.2 The Performance Security (or guarantee) shall be in the form of: Pay Order,Call at Deposit,Bank Guarantee,Demand Draft
| Bidder's Type | Required Registration |
|---|---|
| Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) | FBR (NTN) FBR (GSTN) SECP PEC |
| Eligibility Criteria | Document |
|---|---|
| Annual Average Turnover Certificate Last 3 years (Rs. 2000 million & above) | Yes |
| Audited Financial Statement of last 3 years showing Annual Average Turnover of Rs. 2000 million & above. | Yes |
| Income Tax Returns for the last 3 years | Yes |
| PEC Registration Certificate of Category C-1 or Above | Yes |
| Minimum 8 years of experience in civil construction works | Yes |
| An Affidavit on Rs. 100/- stamp paper duly attested by Notary Public, that the firm is not blacklisted by the government/ semi government department as per specimen attached. | Yes |
| An Affidavit on Rs. 100/- stamp paper duly attested by Notary Public, that the firm is not involved in any active legal disputes, corruption cases or blacklisting proceedings with government entities. | Yes |
Quality and Cost Based Selection (QCBS)
| Technical Marks | 70 | |
|---|---|---|
| Passing Marks | 49 | |
| Technical Evaluation Criteria | ||
| Firm Experience of civil work (Quantitative)(Doc Required) More than 15 Years (10) 10 years (6) 5 years (4) | 10 | |
| Similar Nature project Experience having worth of Rs. 2000 million or above (Quantitative)(Doc Required) Three or more similar projects Completed (10) Two Project (6) One Project (3) | 10 | |
| Key Personnel (Quantitative)(Doc Required) Key Personnel (10) Project Manager (4) Structural Engineer (3) Electrical / IT Engineer (2) Mechanical Engineer (1) | 10 | |
| Construction Equipment (Quantitative)(Doc Required) Construction Equipment (All Type of Construction Equipment) (10) Batching Plant (4) Excavator (3) Cranes (2) Survey Equipment (1) | 10 | |
| Financial Capabilities (Quantitative)(Doc Required) Average Annual Turnover >= Rs. 2500 Million (10) Average Annual Turnover >= Rs2200 Million (6) Average Annual Turnover >= Rs 2000 Million (4) | 10 | |
| Work Plan & Methodology (Quantitative)(Doc Required) Work Plan & Methodology (10) Project Schedule (CPM / PERT) (6) Construction Methodology (4) | 10 | |
| Steel Structure Fabrication Facility (Quantitative)(Doc Required) Owned (10) | 10 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| EXTENSION OF NEOC - ESTABLISHMENT OF NEXT GENERATION TECHNOLOGIES (NGT) | Address: Near ITP Office, Main Murree Road, Islamabad Capital TerritorySchedule: 90 Days after award of contractQuantity: 1/Qty |
1/Qty | 22000000 PKR |
Jobs Without Lots :
Job: EXTENSION OF NEOC - ESTABLISHMENT OF NEXT GENERATION TECHNOLOGIES (NGT)
Specifications / Requirements:
| Sr. No | Sr.No | Description | Unit | Quantity | Rate | Amount in Words | Amount (Rs) |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Design, Manufacturing and Supply of Pre engineered Steel Shed having including, primary structural steel rafters, columns, Connection plates, Base plates, Roof Purlins, Pre-painted roof sheet, Trims, gutters, Down take Pipes and cross wire bracing, anchor bolts for anchorage and Other Necessary hardware fixing screws complete in all respects. | %Sft | 14058 | |||
| 2 | 2 | Supply & Installation Mazzanine floor steel structure | %Sft | 6015 | |||
| 3 | 3 | Supply & Installation of Roof area only Glass Wool Insulation 100mm Thick with Mesh Density (10 – 12) Kg/m3. | %Sft | 13350 | |||
| 4 | 4 | Providing and fixing roof liner sheet made of precoated galvanized steel / aluminium-zinc alloy coated steel sheet, 0.5 mm thick , of approved make, colour, and shade, fixed to the underside of purlins using self-drilling/self-tapping screws with EPDM washers, complete with all accessories such as ridge fillers, trims, and sealants, as per the manufacturer’s specifications and drawings | %Sft | 13350 | |||
| 5 | 5 | Supply and Installation of Steel structure stair including railing with 12mm thk glass complete in all respects | %Job | 1 | |||
| 6 | 6 | Supply, fabrication and installation of MS/GI structural framework for façade shade comprising MS square/rectangular pipes and/or GI C-Channels of approved size and thickness, including all necessary brackets, cleats, gusset plates, anchor bolts, chemical anchors, nuts, washers and welding accessories. The structure shall be adequately braced and securely connected to the existing RCC columns and anchored with the brick masonry wall using suitable fastening arrangements. The scope includes cutting, fabrication, erection, alignment, welding, grinding, anti-rust primer and paint finish, complete in all respects as per approved drawings and site requirements. | %Ton | 4 | |||
| 7 | 7 | Dismantling of existing concrete Floor including the removal of surplus debris, unused material and by products as directed by the Engineer complete. | %Job | 1 | |||
| 8 | 8 | Excavation for foundation of columns, walls, etc. upto any depth and lead including back filling of excavated earth in foundation trenches and spreading the surplus earth in plinth area and/or depressions where required including making provision for shoring of loose soil if required and removal of excavated earth upto 5'-0" from edge of excavation complete as per drawing and as directed by the Consultants. | %Cft | 31268 | |||
| 9 | 9 | Providing Earth filling with off site material (brought from out side source)including compaction upto 95% in plinth, depression and where ever required laid in 12" layer well watered, consolidated and compacted with mechanical means complete as per drawing and as directed by the Consultants. | %Cft | 52476.125 | |||
| 10 | 10 | Providing C.C. 1:4:8 bed concrete using graded screened bajri 3/8" and down gauge as fine aggregate and stone ballast 1" to 2" size as coarse aggregate in foundation over well compacted earth including levelling and curing etc. complete as per drawing and as directed by the Consultants | %Cft | 5278.625 | |||
| 11 | 11 | Providing Reinforced cement concrete 1:2:4 (mix design) using graded screened bajri 3/8" and down gauge as fine aggregate and crushed stone 3/4" and down gauge as coarse aggregate with machine mixing including the cost of form work and its removal, vibrating using mechanical vibrator, curing and cube testing etc. having min. works cube crushing strength of 3,000 psi after 28 days curing but excluding the cost of reinforcement bars complete as per drawing and as directed by the Consultants. | %Cft | 12470.47625 | |||
| 12 | 12 | Providing brick masonry using 9" x 4 1/2" x3" best approved quality burnt bricks the bricks used should be well-burnt without being vitrified and shall be uniform in colour, regular in shape and size with sharp and square corners and parallel faces, free from flaws and crackes, to be laid in mortar 1:4 with curing, scaffolding, racking out the joints, courses shall be kept in time plumb as per drawing, standard specificaiton and as directed by the Consultants Up To 12ft Height. | %Cft | 16712.03125 | |||
| 13 | 13 | Providing fabrication and instllation in position 12mm of gypsum board sheet (gypsum board approved company) including cuttong of opening for lights ifixture/ diffusers with making of light pelmet fiber tape on joints icluding 3 coats of mat enamel paint fininsh pemerr coat filing if required with all other hardwares, wastage scaffolding, making access panel (where required)etc as per design & drawing complete. | %Sft | 17581.55 | |||
| 14 | 14 | Providing and fixing powder coated or anodized aluminum, glazed door of aluminum sections, tinted glass, rubber gaskets, double action floor mounted concealed type pivot hinge mechanism, hydraulic door closer, handles & locking arrangement, screws/expansion bolts and other aluminum accessories etc. complete in all respects as approved by the Engineer. | %Sft | 1160 | |||
| 15 | 15 | Providing and fixing powder coated or anodized aluminum, glazed-window of aluminum sections, tinted glass, rubber gaskets latch lock arrangement, screws/expansion bolts and other aluminum accessories etc. complete in all respects as approved by the Engineer. | %Sft | 55 | |||
| 16 | 16 | Providing and laying 1/2" thick cement sand plaster (1:4) to Internal Ceiling, Walls, Stairs, Columns, & etc making edges and corners, preparation of surface plaster with mesh, including finishing, scaffolding, curing and etc. Complete in all as per drawing & instruction of the Consultant. | %Sft | 25326.5 | |||
| 17 | 17 | Providing and applying 2 coats of Plastic Emulsion paint (Mat finish) of approved quality, color and shade (approved company) over 2 coats of Primer of approved manafacturer and quality on Ceiling, Columns, Walls, & etc including surface preparation, Wall putty filling, cutting, surfacing, scaffolding, scraping, sanding, & etc. Complete in all as per drawing & instruction of the Consultant. | %Sft | 56459.8 | |||
| 18 | 18 | Providing Reinforced steel bars using minimum Yield Strength of 60 KSI confirming to ASTM A-615, as per design including cutting, bending, binding and placing in position on c.c precast spacers and steel chairs, tying with binding wire 20 SWG complete with the cost of chairs, binding wire etc. complete as per drawing and as directed by the Consultants.(Rate should include the cost of westage of steel, also note that All Reinforcing steel shall be adequately protected from rust and corrosion before and during concreting) | %Ton | 41.5 | |||
| 19 | 19 | Providing and installation of locally produced Porcelain tiles on floor, Wall & skirting with cement motar 1:4 and complete with screening, grouting, filling, finishing and etc. complete in all respects, as per drawing & instruction of the consultant or Engineer. | %Sft | 26202.5625 | |||
| 20 | 20 | Providing and fixing of Pre Polished Granite Sills / Thresholds under windows and doors respectively , of approved origin, color/shade / thickness fix with cement sand mortar | %Sft | 768 | |||
| 21 | 21 | Provide and install Aluminum Composite Panel overall 4mm thick with 0.5mm skin thickness with mineral-filled core of approved sample & metallic/solid colour of approved shades including making grooves, champhered edges, joint details, sealant, backing rod, fixing & framing system, protection of panels, etc. all as per manufacturer's specifications and instructions, fixing arrangement, etc. complete in all respect as per drawings & specifications. | %Sft | 20501.072 | |||
| 22 | 22 | Matel Framing With Gypsum Board Cladding on both side and Rock Wool Insulation | %Sft | 16626 | |||
| 23 | 23 | Providing and fixing cleared toughened glass partition,10mm thick, fixed with LGS Stud framing including harware complete in all respects. | %Sft | 6720 | |||
| 24 | 24 | Providing and making at site Plinth Protection around the building area 3'-0'' wide comprising of brick masonry, back filling, compaction, pcc 1:2:4 complete in all respects. | %CFT | 4300 | |||
| 25 | 25 | Providing and making at site Plinth Protection around the building area 3'-0'' wide comprising of brick masonry, back filling, compaction, pcc 1:2:4 complete in all respects. | %CFT | 4300 | |||
| 26 | 26 | Supply and fix raised floor in Data Room / IT Area | %Sft | 4600 | |||
| 27 | 27 | Providing and Fixing of Cementious Tile/chemical tile of Different sizes at plinth protection Comprising cement Sand Mortor complete in all respects. | %SFT | 1852 | |||
| 28 | 28 | Plumbing Works (1 nos of washroom with all accessories.Pipe for inlet/outlet and connection with service water tank included; conclealed service water tank included; suigas submeter, | %Nos | 32 | |||
| 29 | 29 | Supply and installation of MDF (Medium Density Fiberboard) false ceiling of approved quality and specified thickness, fixed over G.I./wooden framework with necessary hangers, supports, screws, fasteners and accessories. The work shall include cutting, joint treatment, edge finishing, sanding, and application of paint/laminate finish (where required), complete in all respects as per approved drawings and site requirements. | %Sft | 1503.45 | |||
| 30 | 30 | Installation of Blind Curtain Providing placing and installation of Blind curtain including preparation of all required arrangments and access work to be complete as per quality & interior finishes aspects in accordance with the specification complete in all respect | %Sft | 1895 | |||
| 31 | 31 | Supply and installation of premium-grade uPVC toilet/washroom door, comprising a rigid uPVC frame. Door to include solid uPVC panels for high durability in wet areas Complete in all aspects | %Sft | 640 | |||
| 32 | 32 | Providing and laying 6" Gravel Fill Material of approved quality and size in foundation including Compaction, complete in all respects. | %CFT | 3716 | |||
| 33 | 33 | Supply of Aluminium Fixed Curtain Wall, Premium Quality, of Anodized Aluminium extruded section size, colour and texture as specified, including fixing on concrete, wood or steel frames, complete with all necessary fittings incl 6mm double glazed glass all as specified. | %Sft | 4399 | |||
| 34 | 34 | Providing and installation of 8" dia bore l 120 ft deep along with 1.5hp submersible pump | %Job | 1 | |||
| 35 | 35 | Providing, installation, testing, commissioning of Water pressure booster pumps for water supply (One operation and one standby). Pumps shall be complete with electric drive motor, operate at 230 volts, single phase 50 hertz including electric power supply wiring conduiting, earthing etc. complete in all respects as per specification | %Job | 1 | |||
| 36 | 36 | Providing and Installation of pipe PVC Dia 6'' with calmps and all other nessary hardware | %RFT | 150 | |||
| 37 | 37 | Providing and Installation of pipe PVC Dia 6'' with calmps and all other nessary hardware | %RFT | 708 | |||
| 38 | 38 | Providing and Installation of pipe PVC Dia 6'' with calmps and all other nessary hardware | %RFT | 742 | |||
| 39 | 39 | Providing and Installation of pipe PVC Dia 6'' with calmps and all other nessary hardware | %RFT | 160 | |||
| 40 | 40 | Providing and Installation of pipe PVC Dia 6'' with calmps and all other nessary hardware | %RFT | 80 | |||
| 41 | 41 | Providing and Installation of pipe PVC Dia 6'' with calmps and all other nessary hardware | %RFT | 441 | |||
| 42 | 42 | Supply, installation, testing and commissioning of electric geyser,(25L) complete with all accessories, inlet/outlet connections, safety valve, thermostat, pressure release system, and necessary fittings, including all civil and electrical works to make the unit fully operational. | %Nos | 4 | |||
| 43 | 43 | Providing, supplying, installing of 40 ft high moveable Hydraulic Ladder of approved make, complete with hydraulic lifting mechanism, heavy-duty steel/aluminium structure, anti-slip platform/steps, safety guardrails, locking system, stabilizers/outriggers, control unit, power system and all necessary accessories, anchors and fittings, complete in all respects as per manufacturer's specifications and to the approval of the Engineer. | %Nos | 1 | |||
| 44 | 44 | Supply and installation of Hand dryer complete in all aspect | %Nos | 12 | |||
| 45 | 45 | Office Table | %Nos | 28 | |||
| 46 | 46 | Table 20x2 | %Nos | 8 | |||
| 47 | 47 | Table 14x2 | %Nos | 8 | |||
| 48 | 48 | Table 35x2 | %Nos | 4 | |||
| 49 | 49 | Table 25x2 | %Nos | 4 | |||
| 50 | 50 | Octagonal Table 45x2.5 | %Nos | 2 | |||
| 51 | 51 | Computer Chairs | %Nos | 120 | |||
| 52 | 52 | Office Chair Executive | %Nos | 56 | |||
| 53 | 53 | Visitor Chair | %Nos | 140 | |||
| 54 | 54 | Sofa 3 Seater | %Nos | 10 | |||
| 55 | 55 | Centre Table | %Nos | 10 | |||
| 56 | 56 | Mobile Units | %Nos | 140 | |||
| 57 | 57 | Podium | %Nos | 6 | |||
| 58 | 58 | 4 Seater Sofa | %Nos | 30 | |||
| 59 | 59 | Wooden Visitor Chairs | %Nos | 20 | |||
| 60 | 60 | Centre Table Set | %Nos | 2 | |||
| 61 | 61 | File Rack (10x6 Feet) | %Nos | 2 | |||
| 62 | 62 | Supply, installation, testing & commissioning of following items including all material, tools, labor & accessories required for completion of work as per description & drawings. Complete in all respects. | %Nos | 1 | |||
| 63 | 63 | Circuit wiring from DB to switch board including any wiring from switch board to switch board with 2x2.5 Sq.mm + ECC 1x2.5 Sqmm, 1-core PVC wires in 25mm dia of pvc conduit exposed / concealed as shown on drawings. Complete in all respects. | %Nos | 45 | |||
| 64 | 64 | Circuit wiring from switch board to switch board with 2x2.5 Sq.mm + ECC 1x2.5 Sqmm, 1-core PVC wires in 25mm dia of pvc conduit exposed / concealed as shown on drawings. Complete in all respects. | %Nos | 80 | |||
| 65 | 65 | Wiring for light point from switch board/ Dimmer board to first light point with 2.5 Sq.mm common neutral of 2.5 Sq.mm and common ECC of 2.5 Sq.mm + wires in 25mm dia of exposed / concealed PVC conduit as shown on drawings. | %Nos | 260 | |||
| 66 | 66 | Same as above item but wiring from light point to point. | %Nos | 350 | |||
| 67 | 67 | Wiring for Group Control Emergency & Exit Light fixtures from DB to first light point with 2x1.5 Sq.mm + ECC 1x1.5 Sq.mm in 25mm dia PVC Conduit as exposed / concealed shown on drawings. Complete in all respects. | %Nos | 3 | |||
| 68 | 68 | Same as above item but wiring from light point to point. | %Nos | 16 | |||
| 69 | 69 | Wiring of 13A/15A Switch Socket unit from DB to first outlet with following size of wires in 25mm dia PVC conduit of exposed / concealed as shown on drawings. Complete in all respects. | %Nos | 1 | |||
| 70 | 70 | 2x4 Sq.mm Cu/PVC + ECC 1x4Sq.mm Cu/PVC | %Mtr | 48 | |||
| 71 | 71 | Same as item above but wiring from outlet to outlet | %Mtr | 102 | |||
| 72 | 72 | Emergency Wiring of 13A/15A Switch Socket unit from DB to first outlet with following size of wires in 25mm dia PVC conduit of exposed / concealed as shown on drawings. Complete in all respects. | %Nos | 1 | |||
| 73 | 73 | 2x4 Sq.mm Cu/PVC + ECC 1x4Sq.mm Cu/PVC | %Mtr | 48 | |||
| 74 | 74 | Same as item above but wiring from outlet to outlet | %Mtr | 102 | |||
| 75 | 75 | Wiring of 20A DP Switch unit for split AC from DB to first outlet with following size of wires in 25mm dia size PVC conduit of exposed / concealed as shown on drawings. Complete in all respects. | %Nos | 1 | |||
| 76 | 76 | 2C-4 Sq.mm Cu/PVC + ECC 1x4 Sq.mm Cu/PVC | %Mtr | 32 | |||
| 77 | 77 | Supply and installation of following size of PVC / UPVC conduit including all accessories such as junction box, bend, socket etc. Complete in all respect. | %Nos | 1 | |||
| 78 | 78 | 25mm dia PVC Conduit | %Mtr | 3765 | |||
| 79 | 79 | 32mm dia PVC Conduit | %Mtr | 337 | |||
| 80 | 80 | 100mm dia UPVC Conduit (Class-D) | %Mtr | 650 | |||
| 81 | 81 | Supply & Installation of following sizes of 16 SWG Perforated Cable Tray with 18 SWG Solid Cover (4 feet covers) including all installation accessories such as rawal bolts, supporting hangers, brackets, elbows, tee & mounting accessories etc. | %Mtr | 650 | |||
| 82 | 82 | 300mm x 100mm Horizontal | %Mtr | 305 | |||
| 83 | 83 | Supply and Installation of following 10 Amps, gang type switches & switch socket outlets Legrand/Clipsal/Pakistan Cables make including back boxes, recessed on wall or column as per design drawings. | %Nos | 1 | |||
| 84 | 84 | 10A, 220V One Gang Switch Unit | %Nos | 7 | |||
| 85 | 85 | 10A, 220V Two Gang Switch Unit | %Nos | 15 | |||
| 86 | 86 | 10A, 220V Three Gang Switch Unit | %Nos | 25 | |||
| 87 | 87 | 10A, 220V Four Gang Switch Unit | %Nos | 35 | |||
| 88 | 88 | 13A, International Switch Socket Unit | %Nos | 435 | |||
| 89 | 89 | 13A, Flat Pin simplez Switch Socket Unit | %Nos | 200 | |||
| 90 | 90 | 15A, Round Switch Socket Unit | %Nos | 150 | |||
| 91 | 91 | 20A DP switch Unit for AC | %Nos | 33 | |||
| 92 | 92 | Floor Boxes | %Nos | 49 | |||
| 93 | 93 | Supply, installation, testing, commissioning and termination of following size of CU/PVC/PVC Cables for Distribution Board in already installed PVC conduit / Cable tray, including all accessories, Complete in all respect as shown on drawing. | %Nos | 1 | |||
| 94 | 94 | From MDB to DBLP-M 4C-70 Sq.mm Cu/PVC/PVC + ECC 1Cx35 Sq.mm Cu/ PVC | %Mtr | 350 | |||
| 95 | 95 | 4C-95 Sq.mm Cu/PVC/PVC | %Mtr | 422 | |||
| 96 | 96 | 4C-6 Sq.mm Cu/PVC/PVC | %Mtr | 333 | |||
| 97 | 97 | Supply, installation, testing and commissioning of following LV Panels and Distribution Boards made with 14/16 SWG sheet steel housing (14 SWG for floor standing & 16 SWG for wall mounted) with approved color and having specified circuit breakers as shown on drawing. (Refer Single Line Diagram) Note: | %Nos | 1 | |||
| 98 | 98 | UDB- DATA+W/S | %Nos | 1 | |||
| 99 | 99 | LPDB | %Nos | 1 | |||
| 100 | 100 | LPDB Ground | %Nos | 1 | |||
| 101 | 101 | UDB Video Wall | %Nos | 1 | |||
| 102 | 102 | UDB FF | %Nos | 1 | |||
| 103 | 103 | UDB GF | %Nos | 1 | |||
| 104 | 104 | DB HVAC | %Nos | 1 | |||
| 105 | 105 | MAIN LV | %Nos | 1 | |||
| 106 | 106 | ATS With MOR (T/F) | %Nos | 2 | |||
| 107 | 107 | Supply and installation of following lighting fixtures complete with ballast, starter p.f.i capacitor and specified lamps. (Subject to approval of Architect / Consultant) Note: Color temperature will be as per Architect. | %Nos | 1 | |||
| 108 | 108 | SURFACE/ RECESSED MOUNTED 15W LED DOWN LIGHT | %Nos | 495 | |||
| 109 | 109 | SURFACE/ RECESSED MOUNTED 15W LED LASER BLADE LIGHT | %Nos | 157 | |||
| 110 | 110 | LED ROPE LIGHT | %Mtr | 1523 | |||
| 111 | 111 | Wall MOUNTED 10W Decorative LIGHT | %Nos | 5 | |||
| 112 | 112 | Wall Mounted Emergency Exit Sign in Green Color with 8W LED, including Battery Backup | %Nos | 5 | |||
| 113 | 113 | Supply and Fixing Flood Light 200W | %Nos | 23 | |||
| 114 | 114 | Supply and Fixing Name Plate With Led Complete in all Aspect | %Nos | 30 | |||
| 115 | 115 | Decorative Mirror Light | %Nos | 6 | |||
| 116 | 116 | Supply, installation, testing and commissioning of following items for Conventional Fire Alarm System comprising of following equipments including all accessories required for the completion of the system in all respects. | %Nos | 1 | |||
| 117 | 117 | Conventional Fire Alarm Control Panel of 2-Zone The FACP shall be self powered with built in 12V batteries for 24 Hrs backup with charging unit. Complete in all respect. | %Nos | 3 | |||
| 118 | 118 | Conventional Smoke Detectors | %Nos | 54 | |||
| 119 | 119 | Conventional Multi Detectors | %Nos | 3 | |||
| 120 | 120 | Conventional Break Glass Type Manual Call Point | %Nos | 5 | |||
| 121 | 121 | Conventional Type Indoor Loop Powered electronic sounder | %Nos | 5 | |||
| 122 | 122 | Supply and wiring for complete Fire Alarm System using 2C, 1.5 sqmm fire resistance cable in 25mm dia PVC conduit from Fire Alarm Control Panel to all sensors & devices including all installation accessories, complete in all respect. | %Mtr | 804 | |||
| 123 | 123 | Programming, testing and commissioning of the complete system as per client's requirements permissible for the FACP. | %JOB | 1 | |||
| 124 | 124 | Fire Extinguisher Balls | %Nos | 202 | |||
| 125 | 125 | Fire Extinguisher Cylinder ( 1x powder and 1 x Co2 ) | %Nos | 9 | |||
| 126 | 126 | Supply, installation, testing and commissioning of following items for CCTV System (IP Based) including but not limited to the description given here under including all power and communication accessories, housings, mounting brackets, suspension rods etc. required for completion of the system. | %Nos | 1 | |||
| 127 | 127 | Surface/Recessed Ceiling mounted Dome fixed type PoE I.P camera with day and night feature with 720p resolution 1280 x 1024 @ 25/30fps pixels with live and recording quality of minimum 15 fps, along with all mounting accessories complete in all respect. | %Nos | 27 | |||
| 128 | 128 | Wall bracket box Camera, type PoE I.P camera with day and night feature having 720p Resolution 1280 x 720 @ 25/30fps pixels with live/recording quality of min 15 fps, along with all mounting accessories complete in all respect. | %Nos | 18 | |||
| 129 | 129 | CAT-6, UTP Cable for Voice Communication System from Communication Rack to each workstation / outlet in 25 mm PVC conduit / channel as per drawings including termination and tagging at both ends. Complete in all respects. | %Mtr | 50 | |||
| 130 | 130 | Network Video Recorder (NVR) with 32 channel Video input. The NVR shall be equipped with LAN / WAN facility. NVR should have 10 Tb HDD, RW CD Drive. Complete with all connecting cords, accessories, software for Integration with | %Nos | 3 | |||
| 131 | 131 | 24-Port Patch Panel | %Nos | 3 | |||
| 132 | 132 | 42" LED Color Monitors to be installed with all connecting cords and mounting stands. | %Nos | 3 | |||
| 133 | 133 | Mouse | %Nos | 150 | |||
| 134 | 134 | Programming, testing and commissioning of the complete system as per the Client requirement. | %JOB | 1 | |||
| 135 | 135 | 24-Port Giga Bit POE Ethernet Switch with 4 SFP ( S5735-L24P4XP-A-V2). | %Nos | 3 | |||
| 136 | 136 | CAT-6, UTP Cable for Voice Communication System from Communication Rack to each CCTV Point / outlet in 25 mm PVC conduit / channel as per drawings including termination and tagging at both ends. Complete in all respects. | %Mtr | 52 | |||
| 137 | 137 | 4MP IP PTZ Camera 200 Meter IR Range with day and night feature having 720p Resolution 1280 x 720 @ 25/30fps pixels with live/recording quality of min 15 fps, along with all mounting accessories complete in all respect. DS-2DE7A425IWG1-E | %Nos | 7 | |||
| 138 | 138 | Front Cable Organizer for Voice & Data patch panels / wiring blocks with complete labeling and dressing for incoming cable management. | %Nos | 3 | |||
| 139 | 139 | 1 Meter Long Patch Cord. | %Nos | 56 | |||
| 140 | 140 | Cameras Pole 5 Feet to 7 Feet | %Nos | 16 | |||
| 141 | 141 | Supply, installation, testing and commissioning of following items for Earthing / Grounding System for lightning protection and grounding of other systems including all material, boring, labor, tools, transportation, accessories etc. Complete in all respects with detailed test reports. | %Nos | 1 | |||
| 142 | 142 | Chemical Enhanced Earth using 38 mm dia copper pipe filled with soil conditioning material including 6" dia, 11' deep boring and back filled chemical to enhance conductivity. Complete with termination clamps, 12" dia heavy duty tin plated round cover as per details given in drawings. | %Nos | 9 | |||
| 143 | 143 | Earth Connecting Point (ECP) or Equipotential bar made with 200mm wide, 75mm high and 5mm thick tin plated Copper, as shown in drawings. Bar shall be provided with holes suitable for installation of 4 No. 70 sqmm bare copper conductor. ECP shall be enclosed in appropriate size of powder coated metal enclosure with front accessible cover. | %Nos | 9 | |||
| 144 | 144 | Stranded bare copper conductors of following sizes in appropriate size of UPVC conduit laid in floor/raft from Earth Station to ECP to as shown in drawings. Complete in all respects including termination at ECP. | %Nos | 1 | |||
| 145 | 145 | 70 Sq.mm Bare Copper Conductor | %Mtr | 165 | |||
| 146 | 146 | 25mm x 3mm copper tape | %Mtr | 85 | |||
| 147 | 147 | Supply, installation, testing & commissioning of following size of single core PVC cables in appropriate size of exposed / concelled PVC conduit from ECP to several equipments as per details given below, including all material, labor, tools, transportation, accessories etc. Complete in all respects with detailed test reports. | %Nos | 1 | |||
| 148 | 148 | 1C, 35 Sq.mm PVC (Green) | %Mtr | 90 | |||
| 149 | 149 | 1C, 16 Sq.mm PVC (Green) | %Mtr | 90 | |||
| 150 | 150 | 1C-70 Sq.mm Cu/PVC/PVC | %Mtr | 90 | |||
| 151 | 151 | Lightining Erester | %Nos | 9 | |||
| 152 | 152 | Construction of earthing pit complete with excavation, brick work, plastering, and concrete cover, including all materials and labour as per standard specifications. | %Nos | 9 | |||
| 153 | 153 | Supply of All DC Inverter Controlled Variable Refrigerant Flow (VRF) Heat Pump Type Multi Split A/c System complete with built-in auto control system & Central Controller with display (Table) including, unloading, Lifting, placing and Fixing at foundation at locations shown on drawing | %Nos | 1 | |||
| 154 | 154 | Outdoor Condensing Units | %Nos | 1 | |||
| 155 | 155 | AVWT-232HKFSE | %Nos | 3 | |||
| 156 | 156 | AVWT-232HKFSE | %Nos | 2 | |||
| 157 | 157 | AVWT-96HKFSE | %Nos | 1 | |||
| 158 | 158 | AVWT-154HKFSE | %Nos | 2 | |||
| 159 | 159 | Indoor Units | %Nos | 1 | |||
| 160 | 160 | Mini 4-Way Cassette | %Nos | 1 | |||
| 161 | 161 | AVC-19HJFA | %Nos | 2 | |||
| 162 | 162 | 4-Way Cassette | %Nos | 1 | |||
| 163 | 163 | AVBC-24HJFKA | %Nos | 2 | |||
| 164 | 164 | AVBC-27HJFKA | %Nos | 5 | |||
| 165 | 165 | AVBC-30HJFKA | %Nos | 5 | |||
| 166 | 166 | AVBC-38HJFKA | %Nos | 5 | |||
| 167 | 167 | AVBC-48HJFKA | %Nos | 6 | |||
| 168 | 168 | Wall Mounted | %Nos | 1 | |||
| 169 | 169 | AVS-24HJFTDD | %Nos | 6 | |||
| 170 | 170 | Ducted HSP Type | %Nos | 1 | |||
| 171 | 171 | AVD-48HCFCH | %Nos | 1 | |||
| 172 | 172 | AVD-76HJFH | %Nos | 5 | |||
| 173 | 173 | Branch Pipe | %Nos | 1 | |||
| 174 | 174 | Y-Joints | %Nos | 3 | |||
| 175 | 175 | Receiver Kit | %Nos | 1 | |||
| 176 | 176 | HYRE-T03H | %Nos | 22 | |||
| 177 | 177 | HYRE-Z01H | %Nos | 3 | |||
| 178 | 178 | Wireless Controller HYXE-VD01 | %Nos | 25 | |||
| 179 | 179 | Wired Controller HYXE-VC01 | %Nos | 6 | |||
| 180 | 180 | Central Controller HYJM-RA10D | %Nos | 4 | |||
| 181 | 181 | Supply, Fabrication and Installation of G.I. ducting & Sheet Metal work complete with hangers, bracings, splitter dampers etc | %Nos | 1 | |||
| 182 | 182 | US Gauge 22 | %Mtr | 337 | |||
| 183 | 183 | US Gauge 24 | %Mtr | 1944 | |||
| 184 | 184 | US Gauge 26 | %Mtr | 505 | |||
| 185 | 185 | Supply & Installation of Aluminum air devices as specified and scheduled | %Nos | 1 | |||
| 186 | 186 | Fresh / Exhaust Air Louvers | %Nos | 45 | |||
| 187 | 187 | 4D Diffuser | %Nos | 63 | |||
| 188 | 188 | Supply & Installation of Mild Steel Sheet welded Type for kitchen/ washroom 14 guage exhaust ductwork complete with hangers, dampers, clean-out access panels etc. | %Sqm | 303 | |||
| 189 | 189 | Supply & Installation of 3" thick rock wool insulation for Kitchen Grease Exhaust Ducts & HWG Flue duct | %Sqm | 303 | |||
| 190 | 190 | Supply & Installation of Built-in Microban Elastomeric/Epdm Closed Cell FM Approved with Green Guard certificate, anti fungus, anti microbial Foam Type insulation of density 65 Kg/m3 and thermal conductivity 0.035 W/M at 24 deg C of fire performance conforming to UK building regulation of Class-0 rating protected with fire retardent type high density closely woven fiberglass cloth as specified manufactured by Armacell, Durkflex or Aeroflex complete with adhesives and sealers | %Nos | 1 | |||
| 191 | 191 | 1/2" (13mm) thick for indoor installed ducts | %Sqm | 4050 | |||
| 192 | 192 | Supply & Installation of 16 guage MS Perforated type Cable tray of below mentioned size with solid cover of 14 guage or as mentioned in drawings ( Only use for out side of Building Area for copper piping) | %Nos | 1 | |||
| 193 | 193 | 300mm x 100mm with cover | %Mtr | 168 | |||
| 194 | 194 | Supply & installation of Ventilation fans as specified and scheduled including unloading, lifting, placing and fixing at locations as shown on the drawings. | %Nos | 1 | |||
| 195 | 195 | EF-1 | %Nos | 5 | |||
| 196 | 196 | Supply and Installation of Gas & Liquid Copper Piping for indoor & outdoor units Complete with insulation (9mm for indoor & 19mm for outdoor) Built-in Microban Elastomeric/Epdm Closed Cell FM Approved with Green Guard certificate, anti fungus, anti microbial Foam Type insulation of density 65 Kg/m3 and thermal conductivity 0.035 W/M at 24 deg C of fire performance conforming to UK building regulation of Class-0 rating protected with fire retardent type high density closely woven fiberglass cloth as specified manufactured by Armacell or Durkflex complete with adhesives and sealers, gas charging, accessories, clamping and other related material for installation purpose, complete in all respect. | %JOB | 1 | |||
| 197 | 197 | Supply, fabrication and installation of PVC. piping & fittings, including hangers, anchor bolts, rubber vibration mounts etc. | %JOB | 1 | |||
| 198 | 198 | Supply & installation of 1/4" thick polyethylene insulation (Jumbolon) covered with PVC taping for condensate drain piping | %JOB | 1 | |||
| 199 | 199 | Recessed in false ceiling 8 inch dia exhaust fan with pure copper windings, (Voldam/Air Guard Model AFWS6) including 6 inch dia PVC Pipe as exhaust duct , and exhaust air grill as shown in the drawings | %Nos | 1 | |||
| 200 | 200 | Conduiting and communication wiring of all HVAC equipment(indoor &outdoor) complete with cables/wires, cables glands, cable ties, G.I./PVC conduits etc. control wiring from units to central controller and all other items to complete the Job. | %JOB | 1 | |||
| 201 | 201 | Painting of metal hangers and metal structures where installed as specified | %JOB | 1 | |||
| 202 | 202 | Shop drawings and As-built drawings | %JOB | 1 | |||
| 203 | 203 | Inspection, testing, Gas Charging, Commissioning and Air Balancing of of Complete system | %JOB | 1 | |||
| 204 | 204 | WIRING/WIRING ACCESSORIES | %Nos | 1 | |||
| 205 | 205 | From DB-HVAC to VRF outdoor 4C-16 Sq.mm Cu/PVC/PVC + ECC 1Cx16 Sq.mm Cu/ PVC | %Mtr | 85 | |||
| 206 | 206 | Supply, installation, testing and commissioning of following LV Panels and Distribution Boards made with 14/16 SWG sheet steel housing (14 SWG for floor standing & 16 SWG for wall mounted) with approved color and having specified circuit breakers as shown on drawing. (Refer Single Line Diagram) | %Nos | 1 | |||
| 207 | 207 | 18" x 18" Access Panel | %Nos | 30 | |||
| 208 | 208 | AC INV H&C 1 ton | %Nos | 4 | |||
| 209 | 209 | AC INV H&C 1.5 ton | %Nos | 4 | |||
| 210 | 210 | DSP5011 6.5 inch Frameless Ceiling Speaker | %Nos | 33 | |||
| 211 | 211 | DMA120U 120W Digital Mixer Amplifier | %Nos | 3 | |||
| 212 | 212 | DM30 Dynamic Desktop Microphone | %Nos | 3 | |||
| 213 | 213 | Supply and Wiring of 2C, 40/0.0076.mm flexible Speaker Cable for Public Address System in 1" Dia PVC Conduite or Cable Try from Speaker to Speaker as per zoning layout shown in drawings . Complete in all respects. | %Mtr | 33 | |||
| 214 | 214 | Installation, Testing & Commisioning of Public Address System with all Respact. | %JOB | 1 | |||
| 215 | 215 | SMD for NGT Hall | %Sq ft | 5560 | |||
| 216 | 216 | H15 Controller with 12x 4 port HDMI IN Card and 9 x 20 port RJ45 Cards, 1x 4 Port Output Card (Hall) | %Nos | 2 | |||
| 217 | 217 | SMD For Board Room | %Sq ft | 120 | |||
| 218 | 218 | H2 Controller with 1x4 HDMI IN Card and 1x 16 Port RJ45 Card | %Nos | 1 | |||
| 219 | 219 | HDMI Cables (Diff Lengths) | %Job | 180 | |||
| 220 | 220 | 85" LED | %Nos | 7 | |||
| 221 | 221 | 65" LED | %Nos | 15 | |||
| 222 | 222 | 55" LED | %Nos | 13 | |||
| 223 | 223 | Standees LED 55 Inch | %Nos | 3 | |||
| 224 | 224 | Desktop PC (Core i7, 16 GB RAM, 1TB SSD NVMe, 21 Inch Led, Mouse, Keyboard) with Graphic Card (8GB or advance) | %Nos | 45 | |||
| 225 | 225 | Intel Core Ultra 7 265K (20 Cores, up to 5.5 GHz) or AMD Ryzen 9 9900X or equivalent , 32 GB DDR5, 1 TB NVMe Gen4 SSD, NVIDIA RTX 4060 (8 GB VRAM),1 Gbps Ethernet, 27-inch QHD Display with Windows 11 Pro, Mouse and Keyboard | %Nos | 60 | |||
| 226 | 226 | Intel Core Ultra 9 285K (24 Cores, up to 5.7 GHz) or AMD Ryzen 9 9950X or equivalent , 64 GB DDR5 (Expandable to 128 GB), 2 TB NVMe Gen4/Gen5 SSD, NVIDIA RTX 5070 (12 GB VRAM) or higher, 2.5 Gbps Ethernet, 27-inch IPS QHD or 4K Display, with Windows 11 Pro, Mouse and Keyboard | %Nos | 21 | |||
| 227 | 227 | AMD Ryzen Threadripper PRO 7995WX (96 Cores, 192 Threads), 256 GB DDR5 ECC, 6 TB NVMe Gen4/Gen5 SSD, NVIDIA RTX 6000 Ada Generation (44 GB VRAM), 2.5 Gbps Ethernet, 27-inch IPS QHD Display, with Windows 11 Pro, Mouse and Keyboard | %Nos | 3 | |||
| 228 | 228 | HP Probook 12th Gen Ci7 16GB RAM 1TB SSD HD 15.6" display | %Nos | 10 | |||
| 229 | 229 | Server (Power Edge R760, RAM 1TB, CPU 16 Core, SSD 20 TB) | %Nos | 2 | |||
| 230 | 230 | AI/GPU Server Dell PowerEdge R760xa, 1TB RAM, GPUs (NVIDIA A-series / L - Series or equivalent) | %Nos | 2 | |||
| 231 | 231 | USB Ext cables Diff Length and types | %Nos | 20 | |||
| 232 | 232 | HDMI Splitters | %Nos | 10 | |||
| 233 | 233 | USBs | %Nos | 40 | |||
| 234 | 234 | LaserJet Printers | %Nos | 5 | |||
| 235 | 235 | Scanner | %Nos | 3 | |||
| 236 | 236 | 48-Port Managed POE Ethernet Switch S5735-L48P4XE-A-V2 | %Nos | 10 | |||
| 237 | 237 | SFPs (LC) 1 km, Single Mode, dual 10G Gigabit Industrial grade | %Pairs | 12 | |||
| 238 | 238 | 48 Port Patch Panel | %Nos | 10 | |||
| 239 | 239 | Cable Organizer | %Nos | 10 | |||
| 240 | 240 | WIFI Access Points Indoor Tplink EAP 660 | %Nos | 6 | |||
| 241 | 241 | WIFI Access Points Outdoor Tplink EAP 772 | %Nos | 2 | |||
| 242 | 242 | Fiber Optic Cable 4-core Single mode with Digging an laying (End to End Connectivity) | %Mtr | 150 | |||
| 243 | 243 | 12-Port ODF for Patching of Fiber Optic with Splicing | %Nos | 2 | |||
| 244 | 244 | Fiber Patch Cords 3m Single mode(LC-LC) | %Nos | 20 | |||
| 245 | 245 | Ethernet Patch Cords 1m | %Nos | 480 | |||
| 246 | 246 | Ethernet Patch Cords 3m | %Nos | 250 | |||
| 247 | 247 | Ethernet I/O (Faceplate with Box) | %Nos | 200 | |||
| 248 | 248 | 20 Port Rack mounted PDUs with loop cables | %Nos | 2 | |||
| 249 | 249 | UTP CAT6 (305 Meter) Roll | %Roll | 40 | |||
| 250 | 250 | RJ-45 Connector | %Box | 5 | |||
| 251 | 251 | End to End PTCL OFC Link | %Job | 1 | |||
| 252 | 252 | 300 MB CIR Internet Bandwidth | %Months | 12 | |||
| 253 | 253 | Technology Boxes | %Nos | 100 | |||
| 254 | 254 | Zoom License | %Nos | 2 | |||
| 255 | 255 | IP-Phone | %Nos | 25 | |||
| 256 | 256 | 8 MP Fixed Bullet Camera | %Nos | 21 | |||
| 257 | 257 | 32 Channel NVR with 2x10 TB HDD | %Nos | 1 | |||
| 258 | 258 | Biometric Device Access Control | %Nos | 5 | |||
| 259 | 259 | Biometric Device Attendance | %Nos | 2 | |||
| 260 | 260 | Video Conference solution | %Nos | 2 | |||
| 261 | 261 | Sound System | %Nos | 2 | |||
| 262 | 262 | Sound Mixer | %Nos | 2 | |||
| 263 | 263 | Mic Sets ( Diff types) | %Nos | 1 | |||
| 264 | 264 | Pimax Reality VR | %Nos | 2 | |||
| 265 | 265 | Samsung Galaxy XR | %Nos | 2 | |||
| 266 | 266 | Meta Quest 3 | %Nos | 4 | |||
| 267 | 267 | Virtuix Omni One | %Nos | 1 | |||
| 268 | 268 | Kat C2 Plus Enhanced | %Nos | 1 | |||
| 269 | 269 | Samsung 55 inch Screens for Visual Setup | %Nos | 2 | |||
| 270 | 270 | INTELLIGENT ADDRESSABLE FIRE ALARM SYSTEM (BRAND-ZETA/BOSCH/Equvalent) Supply at site, installation, testing & commissioning of following complete Intelligent Addressable Fire Alarm System including mounting bracket, all fixing and mounting accessories, with open architecture communication interface, including all accessories as required, complete in all respect. | %Nos | 1 | |||
| 271 | 271 | Two Loop Intelligent Addressable Fire Alarm Control Panel (FACP) with capacity to connect Repeater Panels / Annunciator / Mimic panels, Wall Mounted, Microprocessor Based, Led Display, Multifunction Status Leds, 127 Devices / Elements Per Loop, Graphical User Interface Support, Remotely Programmable, Free Of Cost Programming Software, Modular Components, > 5000 Log Capacity, Input/output Interfacing, Multi Configuration Level, 24 Hours Back Up Time & 30 Minutes Alarm Time, with open architecture communication interface, including all accessories as required, complete in all respect. | %Job | 1 | |||
| 272 | 272 | Addressable fire alarm Repeater panel MTD,1.8m AFF with alarn manager software. | %Nos | 1 | |||
| 273 | 273 | Intelligent addressable optical smoke sensor with base and dual ray technology, built in smoke patterns, built in short circuit isolator including all installation accessories. | %Nos | 42 | |||
| 274 | 274 | Addressable heat detector with base, Fixed Temperature with built in short circuit isolator including all installation accessories. | %Nos | 5 | |||
| 275 | 275 | Multi Detector with integrated smoke detector, heat detector and gas sensor (CO). An alarm is generated at carbon monoxide (CO) gas levels that are threatening for human life. It should have built-in Short Circuit Isolator. | %Nos | 1 | |||
| 276 | 276 | Addressable Beam detector with base, Fixed Temperature with built in short circuit isolator including all installation accessories. | %Nos | 2 | |||
| 277 | 277 | Addressable Manual Call Point, Indoor, Red, Addressable, Resettable type, surface mount, single action, direct trigger, reset key included and IP-54 rated. CE, MOE, CPD, VDS Certified. | %Nos | 5 | |||
| 278 | 278 | Addressable MIDI red sounder/LED flasher sound output >92db @ 1.0 m IP-43 mounting height at 2.0M. Above F.F.L., mounting base included. | %Job | 5 | |||
| 279 | 279 | Wiring of Fire Alarm Points with 2 core 1.5 mm2 LSZH , CWZ cable complying BS5839 and EN50200 laid in already installed conduit or tray or trunking etc., including all accessories, complete in all respect.(500-Coil) | %Coil | 2 | |||
| 280 | 280 | Programming, testing and commissioning of complete system including on site demonstration and training of client's representative upto the entire satisfaction of consultant/client | %Job | 1 | |||
| 281 | 281 | FIRE SUPPRESSION SYSTEM DCP Fire Extinguishers - 8 Kg | %Nos | 6 | |||
| 282 | 282 | FM - 200 (IT, ARV/VR Room/ Electrical Room) | %Nos | 1 | |||
| 283 | 283 | * Factory Filled Per KG (HFC-227ea - UL/FM) - 260KG Model PEMALL 227 * (1 No.) PEMALL 227™-(360 PSI)-LP SERIES ENGINEERED 75 LB. - S.S. RED COLOR CYL. ASSEMBLY (FILLING RANGE 14.1(31) TO 32.2(71) KG(LB))- W/ 1" S.S .VALVE ASSEMBLY C/W TOP CAP ADAPTER, PRESSURE GAUGE W/GUARD & CYL. MOUNTING BRACKET - MODEL # H3-SS-0075-1.0 -UL/FM * Latching Solenoid with Supervision and Local Manual Control Head * Low Pressure Supervisory Switch (N/C) 360 PSI * 1/2" - 1" NOZZLE (BLANK) (1 No.) * Caution Label - "DO NOT ENTER…" for HFC-227EA * Caution Label - "OPERATION OF MANUAL…" for HFC-227EA * Caution Label -ROOM PROTECTED WITH HFC-227EA Make: PEMALL - USA | %Set | 1 | |||
| 284 | 284 | Combined Fire & Extinguishing Control Panel with Battery Backup (Make: ZETA-UK) | %Nos | 1 | |||
| 285 | 285 | Conventional Smoke Detector with Base (Make: ZETA-UK) | %Nos | 2 | |||
| 286 | 286 | Abort Switch | %Nos | 1 | |||
| 287 | 287 | Conventional Fire Alarm Sounder with Flasher (Make: ZETA-UK) | %Nos | 1 | |||
| 288 | 288 | Conventional Fire Alarm Sounder (Make: ZETA-UK) | %Nos | 1 | |||
| 289 | 289 | Installation, Testing & Commissioning Wiring, Piping, Cabling & Conduiting are not included | %Job | 1 | |||
| 290 | 290 | Piping and cabling | %Job | 1 | |||
| 291 | 291 | SERVICE AREA | %Nos | 1 | |||
| 292 | 292 | * Factory Filled Per KG (HFC-227ea - UL/FM) - 380KG Model PEMALL 227 * (1 No.) PEMALL 227™-(500 PSI)-HP SERIES ENGINEERED 105 LB. - S.S. RED COLOR CYL. ASSEMBLY (FILLING RANGE 20(44) TO 42.6(94) KG(LB))- W/ 1" S.S .VALVE ASSEMBLY C/W TOP CAP ADAPTER, PRESSURE GAUGE W/GUARD, PRESSURE SWITCH GUARD & CYL. MOUNTING BRACKET - MODEL # H5-SS-0105-1.0 -UL/FM * Latching Solenoid with Supervision and Local Manual Control Head * Low Pressure Supervisory Switch (N/C) 500 PSI with Guard * 1/2" - 1" NOZZLE (BLANK) (1 No.) * Caution Label - "DO NOT ENTER…" for HFC-227EA * Caution Label - "OPERATION OF MANUAL…" for HFC-227EA * Caution Label -ROOM PROTECTED WITH HFC-227EA Make: PEMALL - USA | %Set | 1 | |||
| 293 | 293 | Combined Fire & Extinguishing Control Panel with Battery Backup (Make: ZETA-UK) | %Nos | 1 | |||
| 294 | 294 | Conventional Smoke Detector with Base (Make: ZETA-UK) | %Nos | 4 | |||
| 295 | 295 | Abort Switch | %Nos | 1 | |||
| 296 | 296 | Conventional Fire Alarm Sounder with Flasher (Make: ZETA-UK) | %Nos | 1 | |||
| 297 | 297 | Conventional Fire Alarm Sounder (Make: ZETA-UK) | %Nos | 1 | |||
| 298 | 298 | Installation, Testing & Commissioning Wiring, Piping, Cabling & Conduiting are not included | %Job | 1 | |||
| 299 | 299 | Piping and cabling | %Job | 1 | |||
| 300 | 300 | HALL | %Nos | 1 | |||
| 301 | 301 | * Factory Filled Per KG (HFC-227ea - UL/FM) - 275 KG Model PEMALL 227 * (7 Nos.) PEMALL 227™-(500 PSI)-HP SERIES ENGINEERED 1250 LB. - S.S. RED COLOR CYL. ASSEMBLY (FILLING RANGE 235.5(519) TO515.7(1137) KG(LB))- W/ 4" S.S .VALVE ASSEMBLY C/W TOP CAP ADAPTER, PRESSURE GAUGE W/GUARD, PRESSURE SWITCHGUARD & CYL. MOUNTING BRACKET - MODEL # H5-SS-1250-4.0 -UL/FM * Latching Solenoid with Supervision and Local Manual Control Head * 1/2" - 1" NOZZLE (BLANK) (14 Nos.) * 1-1/4" to 2" NOZZLE (BLANK) (14 Nos.) * Caution Label - "DO NOT ENTER…" for FK-5-1-12 * Caution Label - "OPERATION OF MANUAL…" for FK-5-1-12 * Caution Label -ROOM PROTECTED WITH FK-5-1-12 Make: PEMALL - USA | %Set | 1 | |||
| 302 | 302 | Combined Fire & Extinguishing Control Panel with Battery Backup (Make: ZETA-UK) | %Nos | 1 | |||
| 303 | 303 | Conventional Smoke Detector with Base (Make: ZETA-UK) | %Nos | 16 | |||
| 304 | 304 | Abort Switch | %Nos | 1 | |||
| 305 | 305 | Conventional Fire Alarm Sounder with Flasher (Make: ZETA-UK) | %Nos | 2 | |||
| 306 | 306 | Conventional Fire Alarm Sounder (Make: ZETA-UK) | %Nos | 2 | |||
| 307 | 307 | Installation, Testing & Commissioning Wiring, Piping, Cabling & Conduiting are not included | %Job | 1 | |||
| 308 | 308 | Piping and cabling | %Job | 1 | |||
| 309 | 309 | UPS U-060M33H Modular UPS - Rack Mount IEC Type 400V3P 60kVA Maximum capacity, power efficiency >95.5%, 8U height rack mount with 6 x 400V3P 10kVA power module for modular UPS,Output PF 1.0, hot-swap module with 32 x 12V65AH Batteries (15 mins battery backup). Battery bank and SNMP card is included. | %Nos | 1 | |||
| 310 | 310 | UPS U-030R33H - UPS rack mount, 30kVA Online UPS, output PF 1.0, 380V/380V, 4U height with 15 mins battery backup. Third Party battery bank price is also included. SNMP Card is included | %Nos | 2 | |||
| 311 | 311 | Supply at site, installation, testing & commissioning of following complete Access Control System including mounting bracket, all fixing and mounting accessories, with open architecture communication interface, including all accessories as required, complete in all respect. | %UNIT | 1 | |||
| 312 | 312 | 4-DOOR MODULAR CONTROLLER Supply, installation, testing & Commissioning of 4- Door / 4 Reader Controller, Networkable, 4x Wiegand Host Interface, RS-485, 4x Relay Outputs, 4x Monitored Analog Inputs, Tamper Switch, Compact Flash, Including Cost of Regulated Power Supply, Maintenance Free Dry Battery & MS Enclosure with Din Rail, Complete in All Respect. | %Nos | 1 | |||
| 313 | 313 | 2-DOOR MODULAR CONTROLLER Supply, installation, testing & Commissioning of 2- Door / 2 Reader Controller, Networkable, 2x Wiegand Host Interface, RS-485, 2x Relay Outputs, 2x Monitored Analog Inputs, Tamper Switch, Compact Flash, Including Cost of Regulated Power Supply, Maintenance Free Dry Battery & MS Enclosure with Din Rail, Complete in All Respect. | %Nos | 1 | |||
| 314 | 314 | ACCESS CONTROL TERMINAL - RFID & PIN Supply, installation, testing & Commissioning of Proximity Card Reader with Numeric Keypad, RS- 485, OSDP, 26 Bit Weigand Interface, MiFare Classic 13.56 MHz ISO 14443 Type-A, 5 r 6 cm Reading Range, IP65, Tamper Switch, Red / Green LED Light with Beep, Complete in All Respect. | %Nos | 5 | |||
| 315 | 315 | TERMINAL ACCESSORIES Supply, installation, testing & Commissioning of Request to Exit Push Button with Key Icon & Back box, Magnetic Contact for Status Monitoring, Resettable Type Green Emergency Break Glass with Transparent Flap Including B/B, Over Ride Key Switch, Complete in All Respects. | %Nos | 5 | |||
| 316 | 316 | ELECTROMAGNETIC LOCK - SINGLE DOOR Supply, installation, testing & Commissioning of Electromagnetic Lock, Single Door, 600 Lbs Holding Force, LED Indicator, Force Open Indication, 1 2 / 2 4 VDC, Including 220VAC - 12/24VDC Power Supply & 12"x12"x6" SWG:16 Powder Coated MS Enclosure, Complete in All Respect | %Nos | 1 | |||
| 317 | 317 | ELECTROMAGNETIC LOCK - DOUBLE DOOR Supply, installation, testing & Commissioning of Electromagnetic Lock, Double Door, 600 Lbs Holding Force, LED Indicator, Force Open Indication, 1 2 / 2 4 VDC, Including 220VAC - 12/24VDC Power Supply & 12"x12"x6" SWG:16 Powder Coated MS Enclosure, Complete in All Respect | %Nos | 2 | |||
| 318 | 318 | Access Control and Time Management Software along with Security Control system features a password protected user logon system suitable to interface with Fire Alarm. It provide cardholder management, full alarm and event processing, multi division supports, alarms alerting via SMS and calls on mobile and detailed audit rail records. | %Job | 1 | |||
| 319 | 319 | RFID CARDS Supply & Configuration of MiFare ID Cards, 13.56 MHz , ISO 14443 Type-A, 1 Kb Data Storage, 2 Application Area, 1 Customizable, Both Side Printable, Complete in All Respects | %Nos | 50 | |||
| 320 | 320 | CLIENT WORKSTATION / SERVER Supply Installation Testing & Commissioning of Management Workstation, 300W 90% Efficient Chassis, Intel Core i7-8700 (3.2 GHz, 12 MB cache, 2666 MT/s memory speed, 6- core CPU), 8 GB DDR4 2666 UDIMM NECC RAM; 500 GB 7200 RPM 3.5" SATA HDD, Std. Key Board & Mouse, MS Win10 Pre-Installed, NVIDIA Quadro P620 Graphic Adapter, 2GB GDDR5 Internal RAM, 40W, PCI Express 3.0 x16, 4x 1.4 Display Ports Graphic Adapter, including all accessories as required, complete in all respect. | %Nos | 1 | |||
| 321 | 321 | CLIENT MONITOR Supply Installation Testing & Commissioning of Full HD High Performance LED Monitor, 16:9, 1920 x 1080p60Hz, 250 cd/m2, 2x HDMI Inputs, 1x VGA Input, 178° x 178°, 1000:1 Contrast, HDMI Cable & Table Top Stand, Complete in All Respects | %Nos | 1 | |||
| 322 | 322 | CLIENT MEDIA KIT Supply Installation Testing & Commissioning of Access Management Media Kit, 1x Branded USB Power Desktop Enrollment Reader Compatible to Mifare 13.56 ISO 14443 Type-A RFID Cards, 1x USB Powered Desktop Camera & 1x USB Powered Signature PAD, Complete in All Respect | %Nos | 1 | |||
| 323 | 323 | ID CARD PRINTER & ACCESSORIES Supply Installation Testing & Commissioning of ID Card Printer, CR 80/79 Std., Single or Dual Side Color/Mono Printer with Laminator in Single Attempt, Dye-Sublimation Type, 300 dpi with Edgeto-Edge Prining, Auto Card Feeding, 164 Cards / Hr for One Side Color & One Side Mono, 32 Sec / Card Lamination Speed, ISO 7811 JIS II Encoding, ISO 7816, MiFARE, ISO 14443, Desfire, iCLASS, USB, RJ-45 Ethernet, MS Windows, Linux, MAC OS Supported, Including Cost of Basic Design Template Software, One Side 4 Color UV Print Ribbon, One Side Black, Lamination for 500 Cards Minimum, Complete in All Respects. | %Nos | 1 | |||
| 324 | 324 | AUTO DOOR CLOSERS Supply, installation, testing & Commissioning of Heavy Duty Auto Door Closer, Adjustable Hydraulic Type Imported, Complete in All Respects | %Nos | 5 | |||
| 325 | 325 | WIRING / CABLING - COMMUNICATION Supply & Wiring of Access Control Point, From Network Data Switch to Access Controller, With 4 Pair Cat6 F/UTP Low Smoke Zero Halogen IEC 60754-1 ISO IEC 11801 250 MHz 1G Data Cable Including Cost of Cat6 F/UTP I/O Jack with Cat6 Patch Cords & Relevant Accessories, In PVC Conduit 1"0 With Required Fixing Accessories Civil Work, Complet in All Respects(305-coil) | %Nos | 2 | |||
| 326 | 326 | Supply, Installation of wall mounted 15U data cabinet imported, double section, including lockable front glass door , 06 Way power distribution unit rack mounted. | %Nos | 1 | |||
| 327 | 327 | Supply and Installation of Rack Mounted UPS of rating 1KVA, single phase,230V,0.9p.f including Rack Mount Kit and internal batteries. The complete unit shall be designed, fabricated and commissioned as per technical specifications. | %Nos | 9 | |||
| 328 | 328 | Commissioning & Operational of the entire system By Traind Certified Personal for required security systems & System operational Training to the Client Personal . | %Job | 1 | |||
| 329 | Total Estimated Cost | 1100000000 | |||||
| GRAND TOTAL: | Rs 1,100,000,000.00 |
The project shall comprise the following major components:
a. Construction of a state-of-the-art steel-frame structured building to house the Next Generation Technologies (NGT) Hub, including:
1) AR/VR and immersive simulation facility.
2) Modern office spaces and collaborative work areas.
3) High-end IT infrastructure, including server rooms, networking, data processing, and communication systems.
4) Conference, training, and meeting facilities.
5) Essential building services, utilities, safety systems, and associated amenities.
b. Development of external works, including:
1) Solar system, Landscaping and horticulture works.
2) Drainage, utility connections, outdoor lighting, and other ancillary infrastructure necessary for the complete and functional operation of the facility.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Red Book:
© FIDIC 2017. All rights reserved.
The Conditions of Contract are the “General Conditions” which form part of the “Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC) and the following “Particular Conditions” which shall complement the General Conditions of the Contract.
The successful Bidder, upon contract award, shall be required to furnish two (02) copies of aforementioned “General Conditions” for incorporation in the Works Contract.
International Federation of Consulting Engineers (FIDIC) FIDIC
Bookshop – Box- 311 – CH – 1215 Geneva 15, Switzerland
Fax: +41 22 799 49 054
Telephone: +41 22 568 0500
E-mail: fidic@fidic.org
Website: www.fidic.org
FIDIC code: ISBN13: 978-2-88432-084-9
Particular Conditions
(Mandatory Provisions not to be amended/substituted)
The Particular Conditions (PCC) complement the General Conditions (GCC) to specify dates, contractual requirements, and special circumstances related to the Works. The PCC consists of two parts, Part A - Contract Data and Part B - Special Provisions. The provisions to be found in the Special Provisions (Particular Conditions - Part B) take precedence over the equivalent provisions found under the same Sub-Clause number(s) in the General Conditions, and the provisions of the Contract Data (Particular Conditions - Part A) take precedence over the Special Provisions (Particular Conditions - Part B).
Sub-Clause 1.1.27
Defects Notification Period (DNP): 365 Days
Sub-Clause 1.1.31
Employer's name & address: NDMA (National Disaster Management Authority (NDMA)), Director Near ITP Office, Main Murree Road, Islamabad Capital Territory
Sub-Clause 1.1.35
Engineer's name & address: Junaid Khalid
NDMA HQ, Islamabad
Sub-Clause 1.1.84
Time for Completion: 90 days for whole of the works
Sub-Clause 1.3 (a)(ii)
Agreed method of electronic transmission: Not Agreed
Sub-Clause 1.3 (d)
Address of Empoyer for Communications: Near ITP Office, Main Murree Road, Islamabad Capital Territory
Address of Engineer for Communications:
NDMA HQ, Islamabad
Sub-Clause 1.4
Contract shall be governed by the law of: Islamic Republic of Pakistan
Ruling language: English
Language for communications: English
Sub-Clause 2.1
After receiving the Letter of Acceptance, the Contractor shall be given right of access to all or part of the Site within: 5 days after Commencement Date
Sub-Clause 2.4
Employer’s financial arrangements:
NDMF
Sub-Clause 3.2 (e)(ii)
Engineer’s Duties and Authority: Variation resulting in an increase of the Accepted Contract Amount in excess ofone percent (1%)subject to accumulative Variations not exceeding five percent (5%)of the Accepted Contract Amount
Sub-Clause 4.2
Performance Security (as percentage of the Accepted Contract Amount in Currencies): 10.00%
Form of Performance Guarantee: Pay Order, Call at Deposit, Bank Guarantee, Demand Draft
Sub-Clause 4.2.1
List of Insurance Companies:
All AA rating insurance companies
Sub-Clause 4.7.2
period for notification of errors in the items of reference: Twenty Eight (28) days
Sub-Clause 4.19
Period of payment for temporary utilities: Each Month
Sub-Clause 5.1 (a)
Maximum allowable accumulated value of work subcontracted (as a percentage of the Accepted Contract Amount): Nil %
Sub-Clause 5.1 (b)
Parts of the Works for which subcontracting is not permitted: Nil
Sub-Clause 6.5
Normal working hours on the Site: 12
Sub-Clause 8.3
Number of additional paper copies of programmes: 2
Sub-Clause 8.8 & 14.15(b)
Delay Damages payable for each day of delay 0.20% of the Accepted Contract Amountfor delay in completion of whole of the Works
Sub-Clause 8.8
Maximum amount of Delay Damages 10.00 % of the Accepted Contract Amount
Sub-Clause 8.14
Applicability of Incentives for Early Completion No
Sub-Clause 12.3
Percentage profit (Not more than 10%): Nil
Sub-Clause 13.4.(b)(ii)
Percentage rate to be applied to Provisional Sums for overhead charges and profit: Twenty Five percent (25%)
Sub-Clause 14.2
Total Advance Payment: Fifteen percent (15%) of the Accepted Contract Amount excluding Provisional Sums payable in the currencies and proportions in which the Accepted Contract Amount is payable
Sub-Clause 14.2.1
Advance Payment Insurance Allowed
Sub-Clause 14.2.3
Percentage deductions for the repayment of the Advance Payment: Deduction shall be made at the amortization rate of 17.5 % of the value of the Works executed of each IPC as provided in paragraph (i) of Sub-Clause GCC 14.3, starting from 2nd IPC provided that the advance payment shall be completely repaid prior to the time when 90% of the Accepted Contract Amount less Provisional Sums has been certified for payment. It may be more than 17.5% in the last instalment to ensure full repayment.
Sub-Clause 14.3
Period of payment One Month
Sub-Clause 14.3(b)
Number of additional paper copies of Statements: 2
Sub-Clause 14.3 (iii)
Percentage of retention: Seven percent (7%)
Sub-Clause 14.3 (iii)
Limit of Retention Money (as a percentage of the Accepted Contract Amount): Five percent (5%)
Sub-Clause 14.5(b)(i)
Plant and Materials for payment when shipped: Plant and Materials under Bill of “Imported Plant and Materials”
Sub-Clause 14.5(c)(i)
Plant and Materials for payment when delivered to the Site: Plant and Non Perishable Materials
Sub-Clause 14.6.2
Minimum amount of Interim Payment Certificate (IPC): No
[Employer to give value not exceeding one fifth of the average expected value of Interim Payment Certificate]
Sub-Clause 14.7(a)
Period of payment of Advance Payment to the Contractor: 14 days
Sub-Clause 14.7b(i)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.6: Nil days
Sub-Clause 14.7b(ii)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.13 (Final Payment): Nil days
Sub-Clause 14.7(c)
Period for the Employer to make final payment to the Contractor: 30 days
Sub-Clause 14.8
Financing charges for delayed payment Local Currency (PKR):
6-Month KIBOR (Offer) +3% per annum.
Foreign Currency:
USD
6-Month SOFR (Secured Overnight Financing Rate for USD) +1% per annum.
EURO
6-Month EURIBOR (EURO Interbank Offered Rate for EURO) +1% per annum.
Others
Appropriate rates +1% (for other foreign currencies, Ref. Schedule-A, A-4 to Bid).
Sub-Clause 14.11.1(b)
Number of additional paper copies of draft Final Statements: 2
[insert number of copies say six (06)]
Sub-Clause 14.15
Currencies of payment of Contract Price: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(a)(i)
Proportions or amounts of Local and Foreign currencies: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(c)
Currencies and proportions for payment of Delay Damages: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)
Sub-Clause 14.15(f)
rates of exchange: as stated in the Table IV of Schedule A (If Given)
Sub-Clause 17.2(d)
Forces of nature, the risks of which are allocated to the Contractor: Nil
Sub-Clause 19.1
Permitted deductible limits:
i) insurance required for the Works: Ten percent (10%) of loss amount on each & every loss
ii) insurance required for Goods: Nil
iii) insurance required for liability for breach of professional duty: Nil
iv) insurance required against liability for fitness for purpose (if any is required): Nil
v) insurance required for injury to persons and damage to property: Nil
vi) insurance required for injury to employees: Nil
vii) other insurances required by Laws and by local practice : Nil
Periods for submission of insurance:
a) evidence of insurance: Not later than the Commencement Date
b) relevant policies: Within twenty eight (28) day from the Commencement Date
Sub-Clause 19.2.1(b)
Additional amount to be insured (as a percentage of the replacement value): 15% of the replacement value (Accepted Contract Amount)
Sub-Clause 19.2.2
Extent of insurance required for Goods: From Ex-Works (i.e., works, factory, warehouse, etc) to delivery at the Site
Amount of insurance required for Goods: Full replacement value
Sub-Clause 19.2.3(a)
Amount of insurance required for liability for breach of professional duty: Full replacement value of the Works to be designed by the Contractor
Sub-Clause 19.2.3(b)
Insurance required against liability for fitness for purpose: Yes
Sub-Clause 19.2.3
Period of insurance required for liability for breach of professional duty: Until the date of issuance of Performance Certificate
Sub-Clause 19.2.4
Amount of insurance required for injury to persons and damage to property: Injury to person and Fatal case:
in accordance with Workmen Compensation Act
Damage to Property: The Amount of Insurance Required for Person Injury is 30000
The Amount of Insurance Required for Damage to Property is 100000 as per his assessment of the adjoining property(ies) other than the Works]
without limit to the number of incidents
Sub-Clause 19.2.6
Other insurances required by Laws and by local practice: All insurances as applicable, to the extent of execution of the project, under Federal and Provincial laws of Islamic Republic of Pakistan
Sub-Clause 21.1
Time for appointment of the DAAB: Within 28 days from the Commencement Date.
In case the Accepted Contract Amount is lesser than PKR one (01) billion, appointment of the DAAB shall be made when Dispute arises between the Parties.
Sub-Clause 21.1
The DAAB shall comprise 3
[insert either “a sole Member” or “Three Members”]
[For a Contract estimated to cost above PKR 2.5billion, the DAAB shall comprise of three members. For a Contract estimated to cost between PKR1billion and PKR2.5billion, the DAAB may comprise of three members or a sole member. For a Contract estimated to cost less than PKR1billion, a sole member is recommended.]
Sub-Clause 21.1
List of proposed members of DAAB
- proposed by Employer
Shahid Ismail
Aziz Ali
Junaid Khalid
Sub-Clause 21.2
Appointing entity (official) for DAAB members Managing Director Public Procurement Regulatory Authority (PPRA) or Chairman Pakistan Engineering Council (PEC) from the list of PEC approved arbitrators published at its website
Sub-Clause 21.6
Rules of Arbitration: PEC Rules of Conciliation and Arbitration or Pakistan Arbitration Act of 1940, if the former is inactive.
The place of Arbitration shall be in the Employer’s country: Pakistan
[Insert name of city]
PartB - Special Provisions
1.1 Definitions
1.1.76 “Specification”
Following is added at the end:
“and consists of two parts i.e.,
i) “Part A - Specific Provisions”; and
ii) “Part B - Technical Provisions”.”
1.2 Interpretation
“and” is deleted from the end of sub-paragraph (i) and added at the end of sub-paragraph (j).
Sub-paragraph (k) is added:
“(k) The word “tender” is synonymous with “bid” the word tenderer with “bidder”, the words “tender documents” with “bidding documents” and “Schedule of Prices” with “Bill of Quantities”, as applicable.”
1.5 Priority of Documents The documents listed at (a) through (k) of this Sub-Clause are deleted and substituted with the following:
(a) the Contract Agreement;
(b) the Letter of Acceptance;
(c) the Letter of Bid;
(d) the Particular Conditions Part A - Contract Data;
(e) the Particular Conditions Part B - SpecialProvisions;
(f) the General Conditions;
(g) the Specification Part A - SpecificProvisions;
(h) the Specification Part B- Technical Provisions;
(i) the Drawings;
(j) the completed Schedules to Bid includingBillof Quantities;
(k) the JV Undertaking (if the Contractor is a JV); and
(l) any other documents forming part of the Contract.
The addenda/corrigenda, if any, shall be deemed to have been incorporated at the appropriate places in the documents forming the Contract.
1.6 Contract Agreement
In the last line of the 1st paragraph the text “shall be borne by the Employer” is substituted by “shall be reimbursed by the Employer to the Contractor”.
3.1 The Engineer
In sub-paragraph (a) the text “as defined in the Pakistan Engineering Council Act, 1975 (Act No.V of 1976)” are added after the words “professional engineer”.
3.2 Engineer’s Duties and Authority
The Engineer shall obtain the consent in writing of the Employer before taking action under the following Sub-Clauses of these Conditions:
(a) Consenting to the subcontracting of any part of the Works under Sub-Clause 5.1 [Subcontractors]
(b) Any action under Sub-Clauses 8.9 [Employer’s Suspension] and 8.12 [Prolonged Suspension]
(c) Issuance of “Taking Over Certificate” under Sub-Clause 10.1 [Taking Over the Works and Sections].
(d) Issuing the “Performance Certificate” under Sub-Clause 11.9 [Performance Certificate].
(e) Sub-Clause 13.1 [Right to Vary]: instructing a Variation, except;
(i) in an emergency situation as determined by the Engineer, or
(ii) if such a Variation would increase the Accepted Contract Amount by less than the percentage specified in the Contract Data.
(f) Sub-Clause 13.3 [Variation Procedure]: approving a proposal for Variation submitted by the Contractor in accordance with Sub-Clause 13.3.2 [Variation by Request for Proposal] or 13.2 [Value Engineering].
(g) Certifying release of second half of the Retention Money under Sub-Clause 14.9 [Release of Retention Money].
(h) Issuing Final Payment Certificate under Sub-Clause 14.13 [Issue of FPC].
(i)
*[insert Sub-Clause number (not Sub-Clause 3.7 [Agreement or Determination]
Any such requirement shall not be applied to any action by the Engineer under Sub-Clause 3.7 [Agreement or Determination], as stated in Sub-Clause 3.2 [Engineer’s Duties and Authority] of the General Conditions.
Notwithstanding the obligation, as set out above, to obtain approval, if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of the Works or of adjoining property, he may, without relieving the Contractor of any of his duties and responsibility under the Contract, instruct the Contractor to execute all such work or to do all such things as may, in the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith comply, despite the absence of approval of the Employer, with any such instruction of the Engineer. The Engineer shall determine an addition to the Contract Price, in respect of such instruction, in accordance with Clause 13 and shall notify the Contractor accordingly, with a copy to the Employer.
Following is added after the words “the Employer’s consent is required” in 4th paragraph:
“stating that the Employer’s consent has been obtained for that specified authority”
4.2 Performance Security
4.2.1 Contractor’s Obligations
The entity issuing the Performance Security and its form shall be as under:
The Performance Security shall be, at the option of the Contractor,issuedin the prescribed form included in the Bidding Documents,by(a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistan or (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofratingas provided in Table below:
Accepted Contract Amount (In Eq. PKR million) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
In case of Joint Venture, the Performance Security shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
Following paragraph is added at the end of this Sub-Clause:
“The amount of Performance Security shall be reducedto 50%following issue of the Taking-Over Certificate for the whole of the Works under Clause 10 of Conditions of Contract.”
4.3 Contractor’s Representative
In second paragraphthe text “professional engineer as defined in the Pakistan Engineering Council Act, 1975 (Act No. V of 1976) (having temporary licence in case of foreign engineer under Section 12 of the Pakistan Engineering Council Act, 1975 (Act No. V of 1976)” are added after the words “qualified, experienced”.
In the 3rd paragraph the words “28 days” are substituted by “14 days”. In 2nd line of 4thparagraph the text “or appoint a replacement” is substituted by “except appointment of a suitable temporary replacement is deployed at the Site”
4.4 Contractor’s Documents
4.4.2 As-Built Records
First paragraph is deleted and the text in the last paragraph is substituted with the following:
“The Contractor shall furnish to the Engineer 6 copies, one reproducible and one electronic copy(provided the Engineer has made available to the Contractor editable form of the Drawings)of all Drawings amended to conform to the Works as built.In case the Engineer does not make available to the Contractor editable form of the Drawings, the Contractor shall furnish to the Engineer as-built data for incorporation in the Drawings. Upon receipt of PDF versions of the as-built drawings prepared by the Engineer, the Contractor shall furnish to the Engineer 6copies and one reproducible of these Drawings.
The price of such Drawings shall be deemed to be included in the Contract Price.”
Following Sub-Clause is added:
4.4.4 ShopDrawings
The Contractor shall submit to the Engineer for review 3 copies of all shop and erection drawings applicable to this Contract as per provision of relevant Sub-Clause of the Contract.
Review and approval by the Engineer shall not exceed 21 days and be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory and the Engineer’s review or approval shall not relieve the Contractor of any of his responsibilities under the Contract.
4.8 Health and Safety Obligations
The following text is added at the end ofthis Sub-Clause:
In the event of work being carried out outside the normal working hours and in the event of work being carried out at night, the Contractor shall at his own cost, provide and maintain such good and sufficient light as will enable the work to proceed satisfactorily and without danger. The approaches to the Site and the Works where the night work is being carried out shall be sufficiently lighted. All arrangement adopted for such lighting shall be to the satisfaction of the Engineer.
4.20 Progress Reports
At the end of sub-paragraph (g) the word “and” is deleted and at the end of sub-paragraph (h) the full stop (.) is replaced with “;”, and the following new sub-paragraphs are added as:
(i) planned programme for the execution of the Works for next 56 days to enable the Engineer to determine its programme of inspection and testing;
(j) monthly summery of daily job record indicating weather conditions, deployment of Contractor’s Equipment, labour employment, local material procurement and material import, if any; and
(k) salient contractual and project information.
5.1 Subcontractors
Add the following text at the end of paragraph (ii):
“underSchedule to Bid”
The following is added at the end of the last paragraph of Sub-Clause 5.1:
“All subcontracts relating to the Works shall include provisions which entitle the Employer to require the subcontract to be assigned to the Employer under sub-paragraph (a) of Sub-Clause 15.2.3 [After Termination].
The Contractor shall give reasonable opportunity to contractors from Islamic Republic of Pakistan for subcontracts for the Works, and endeavour to employ such contractors as Subcontractors.”
5.2 Nominated Subcontractors
5.2.2 Objection to Nomination
In sub-paragraph (c), “and” is deleted from the end of (i);
“.” at the end of (ii) is replaced with: “, and”.
The following is then added as (iii):
“(iii) be paid only if and when the Contractor has received from the Employer payments for sums due under the Subcontract referred to under Sub-Clause 5.2.3 [Payment to nominated Subcontractors].”
6.1 Engagement of Staff and Labour
The following paragraph is added at the end of the Sub-Clause:
“The Contractor shall, to the extent practicable and reasonable, employ staff (not less than 50%) and labour (not less than 85%) with appropriate qualifications and experience from sources within the Islamic Republic of Pakistan.”
6.7 Health and Safety of Personnel
The existing text is substituted with the following:
“In order to provide for the safety, health and welfare of persons, and for prevention of damage of any kind, all operations for the purposes of or in connection with the Contract shall be carried out in compliance with the Safety Requirements of the Government of Pakistan with such modifications thereto as the Engineer may authorize or direct and the Contractor shall take or cause to be taken such further measures and comply with such further requirements as the Engineer may determine to be reasonably necessary for such purpose. The Contractor shall also provide all other medical services and appoint a health and safety officer at Site if stated in the Specifications. In case of any fatality or serious accident, the Contractor shall, in addition, notify the Engineer immediately by the quickest available means.”
6.8 Contractor’s Superintendence
Insert at the end of sub-paragraph (a) of this Sub-Clause:
"or, if not, the Contractor shall make competent interpreters available during all working hours, in a number sufficient for those persons to properly perform their superintendence duties"
The following text is added at the end of this Sub-Clause:
“The Contractor’s authorized representative and his other engineers working at site shall possess valid registration with the Pakistan Engineering Council.
The Contractor’s authorized representative at Site shall be authorized to exercise adequate administrative and financial powers on behalf of the Contractor so as to achieve completion of the Works as per the Contract.”
6.12 Key Personnel
The following is inserted at the end of the last paragraph:
“If any of the Key Personnel are not fluent in this language, the Contractor shall make competent interpreters available during all working hours in a number deemed sufficient by the Engineer.”
The following Sub-Clauses 6.13 to 6.26 are added at the end of Sub-Clause 6.12:
6.13 Foreign Personnel
The Contractor may bring in to the Country any foreign personnel who are necessary for the execution of the Works to the extent allowed by the applicable Laws. The Contractor shall ensure that these personnel are provided with the required residence visas and work permits. The Employer will, if requested by the Contractor, use all reasonable endeavours in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national, or government permission required for bringing in the Contractor’s personnel.
The Contractor shall be responsible for the return of these personnel to the place where they were recruited or to their domicile. In the event of the death in the Country of any of these personnel or members of their families, the Contractor shall similarly be responsible for making the appropriate arrangements for their return or burial.
6.14 Supply of Foodstuffs
The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Specification at reasonable prices for the Contractor’s Personnel for the purposes of or in connection with the Contract.
6.15 Supply of Water
The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor’s Personnel.
6.16 Measures against Insect and Pest Nuisance
The Contractor shall at all times take the necessary precautions to protect the Contractor’s Personnel employed on the Site from insect and pest nuisance, and to reduce the danger to their health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.
6.17 Alcoholic Liquor or Drugs
The Contractor shall not, otherwise than in accordance with the Laws of the Country, import, sell, give, barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift, barter or disposal thereto by Contractor’s Personnel.
6.18 Arms and Ammunition
The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor’s Personnel to do so.
6.19 Festivals and Religious Customs
The Contractor shall respect the Country’s recognized festivals, days of rest and religious or other customs.
6.20 Funeral Arrangements
The Contractor shall be responsible, to the extent required by local regulations, for making any funeral arrangements for any of its local employees who may die while engaged upon the Works.
6.21 Forced Labour
The Contractor, including its Subcontractors, shall not employ or engage forced labour which consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.
6.22 Child Labour
The Contractor, including its Subcontractors, shall not employ or engage child labour in accordance with relevant law(s) in force in Islamic Republic of Pakistan.
6.23 Employment Records of Workers
The Contractor shall keep complete and accurate records of the employment of labour at the Site. The records shall include the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis and submitted to the Engineer. These records shall be included in the details to be submitted by the Contractor under Sub-Clause 6.10 [Contractor’s Records].
6.24 Workers’ Organizations
The Contractor shall comply with the relevant labour laws of Pakistan which recognize workers’ rights to form and to join workers’ organizations/Trade Union of their choosing and to bargain collectively without interference.
6.25 Non-Discrimination and Equal Opportunity
The Contractor shall not make decisions relating to the employment or treatment of Contractor’s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor’s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices.
Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure nondiscrimination and equal opportunity, including for specific groups such as women, persons with disabilities, migrant workers and children (of working age in accordance with Sub-Clause 6.22).
6.26 Epidemics
In the event of any out-break of illness of epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government or the local medical or sanitary authorities for the purpose of overcoming the same.
7.7 Ownership of Plant and Materials
The following is added before the first paragraph:
“Except as otherwise provided in the Contract,”
The following is added at the end of the Sub-Clause:
"No Plant and/or Materials that is the property of the Employer shallbe removed from the Site. If it becomes necessary to:
(i) remove any item of such Plant from the Site for the purposesof repair, the Contractor shall give a Notice, with reasons, tothe Engineer requesting consent to remove the defective ordamaged item off the Site. This Notice shall clearly identifythe item of defective or damaged Plant, and shall give detailsof: the defect or damage to be repaired; the place to whichdefective or damaged item of Plant is to be taken for repair;the transportation to be used (and insurance cover for suchtransportation); the proposed inspections and testing off theSite; and the planned duration required before the repaireditem of Plant shall be returned to the Site. The Contractorshall also provide any further details that the Employer mayreasonably require; or
(ii) replace any item(s) of such Plant and/or Materials, theContractor shall give a Notice, with reasons, to the Engineerclearly identifying the item(s) of Plant and/or Materials to bereplaced, and giving details of the due date of delivery tothe Site of the replacement item(s).
Where any item of Plant and/or Materials has become the propertyof the Employer under this Sub-Clause before it has been deliveredto the Site, the Contractor shall ensure that such an item is notmoved except for its delivery to the Site.
The Contractor shall indemnify and hold the Employer harmlessagainst and from the consequences of any defect in title orencumbrance or charge (except any reasonable restrictionarising from the intellectual property rights of the manufacturer orproducer) on any item of Plant and/or Materials that has becomethe property of the Employer under this Sub-Clause."
The following Sub-Clause7.9 is added after Sub Clause 7.8:
7.9 Use of Pakistani Materials and Services
The Contractor shall, so far as may be consistent with the Contract, make the maximum use of materials, supplies, plant and equipment indigenous to or produced or fabricated in Pakistan and services available in Pakistan provided such materials, supplies, plant, equipment and services shall be of required standard.
8.1 Commencement of Works
The following is added before the first paragraph:
“After signing of the Contract Agreement by both Parties,” and thereafter the word “The” is replaced with the word “the”.
8.5 Extension of Time for Completion
The following is added after paragraph (c):
“for last five years”.
The following Sub-Clause 8.14 is added after Sub-Clause 8.13:
8.14 Incentives For Early Completion
If Contract Data does not state applicability of incentives for early completion, this Sub-Clause shall not apply.
The Contractor shall be entitled subject to Sub-Clause 20.2 [Claims for Payment and/or EOT] to bonus payment if the Works and/or each Section is completed earlier than the Time for Completion for the Works or Section (as the case may be). The amount of bonus for early completion of the Works and/or each Section shall be upto a limit and at a rate to 50% of the relevant limit and rate of delay damages prescribed in Contract Data and shall be paid for every day which shall elapse between the relevant Date of Completion of the Works or Section and the relevant Time for Completion.
For the purposes of calculating any bonus payment, the applicableTime for Completion stated in the Contract Data is fixed and noadjustments of this time by reason of granting an EOT will beallowed.
The following Sub-Clause 11.12 is added after Sub-Clause 11.11:
11.12 Supervisory Assistance During DNP
If provided under the Schedule of Prices, the Contractor shall provide supervisory assistance to the Employer during the DNP for the Works. Such supervisory assistance shall be as described in the Specification for the purpose of supporting the Employer's operation and maintenance of the Plant for the period specified in the Schedule of Prices after the Date of Completion.
12.2 Method of Measurement
The following paragraph is added at the end of the Sub-Clause:
“Summary of measured quantity for payment shall be delineated item-wise under four headsnamely; “Schedule of Prices Quantity”, “Quantity Executed To-date”, “Quantity Certified Previously” and “Net Quantity Executed under this Certificate”.
12.3 Valuation of the Works
The following text is added at the end of fifth paragraph of the Sub-Clause:
“Sum of overhead charges and profit for sub-paragraph (a) shall be Twenty Five percent (25%)”.
13.4 Provisional Sums
The following paragraph is inserted as the penultimate paragraph:
“The Provisional Sum shall be used to cover the Employer’s share of the DAAB members’ fees and expenses, in accordance with Clause 21. No prior instruction of the Engineer shall be required with respect to the work of the DAAB. The Contractor shall submit the DAAB members’ invoices and the satisfactory evidence of having paid 100% of such invoices as part of the substantiation of those Statements submitted under Sub-Clause 14.3.
13.6 Adjustments for Changes in Laws
The following paragraphsare added at the end of the Sub-Clause:
“Notwithstanding the foregoing, the Contractor shall not be entitled to an extension of time if the relevant delay has already been taken into account in the determination of a previous extension of time and such Cost shall not be separately paid if the same shall already have been taken into account in the indexing of any inputs to the Table of Adjustment Data in accordance with the provisions of Sub-Clause 13.7 [Adjustments for Changes in Cost].”
14.1 The Contract Price
The following is added at the end of the Sub-Clause:
“Notwithstanding the provisions of subparagraph (b), Contractor's Equipment, including essential spare parts, imported by the Contractor for the sole purpose of executing the Contract shall be temporarily exempt from the payment of import duties and taxes upon initial importation, provided the Contractor shall post with the customs authorities at the port of entry an approved re-export bond or bank guarantee, valid until the Time for Completion plus six months, in an amount equal to the full import duties and taxes which would be payable on the assessed imported value of such Contractor's Equipment and spare parts, and callable in the event the Contractor's Equipment is not re-exported from the Country on completion of the Contract. A copy of the bond or bank guarantee endorsed by the customs authorities shall be provided by the Contractor to the Employer upon the importation of individual items of Contractor's Equipment and spare parts. Upon re-export of individual items of Contractor's Equipment or spare parts, or upon the completion of the Contract, the Contractor shall prepare, for approval by the customs authorities, an assessment of the residual value of the Contractor's Equipment and spare part to be re-exported, based on the depreciation scale(s) and other criteria used by the customs authorities for such purposes under the provisions of the applicable Laws. Import duties and taxes shall be due and payable to the customs authorities by the Contractor on (a) the difference between the initial imported value and the residual value of the Contractor's Equipment and spare parts to re-exported; and (b) on the initial imported value of the Contractor's Equipment and spare parts remaining in the Country after completion of the Contract. Upon payment of such dues within 28 days of being invoiced, the bond or bank guarantee shall be reduced or released accordingly; otherwise the security shall be called in the full amount remaining.”
[The Employer may change or delete this Sub-Clause as per Project requirements]
14.2 Advance Payment
14.2.1 Advance Payment Guarantee
The entity issuing the Advance PaymentGuaranteeand its form shall be as under:
The Advance PaymentGuarantee shall be in the form of Guarantee issued by (a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistanor (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
In case of Joint Venture, the Advance PaymentGuarantee(s)shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
14.6 Issue of IPC
14.6.1 The IPC
In the first line of the 1st paragraph the words “28 days” are substituted by “14 days”.
14.7 Payment
The words “or through crossed cheque in favour of the Contractor or JV partners. The Payment to JV partners shall be made at the request of the Joint Ventures in the ratio of their shares specified by them” are added at the end of the Sub-Clause.
14.8 Delayed Payment
In the first paragraph, third line, the words “compounded monthly” are deleted.
The text of 2nd paragraph is deleted and substituted with the following:
“The Employer shall pay to the Contractor compensation at the rate stated in the Contract Data.”
14.9 Release of Retention Money
The following is added at the end of Sub-Clause 14.9:
“Unless otherwise stated in the Contract, when the Taking-Over Certificate has been issued for the Works and the first half of the Retention Money has been certified for payment by the Engineer, the Contractor shall be entitled to substitute a guarantee, in the form annexed to the Particular Conditions or in another form approved by the Employer and issued by a schedule bank selected by the Contractor, for the second half of the Retention Money. The Contractor shall ensure that the guarantee is in the amounts and currencies of the second half of the Retention Money and is valid and enforceable until the Contractor has executed and completed the Works and remedied any defects, as specified for the Performance Security. On receipt by the Employer of the required guarantee, the Engineer shall certify, and the Employer shall pay the second half of the Retention Money. The release of the second half of the Retention Money against a guarantee shall then be in lieu of the release after the latest of the expiry dates of the Defects Notification Periods. The Employer shall return the guarantee to the Contractor within 21 days after receiving a copy of the Performance Certificate.
If the Performance Security required under Sub-Clause 4.2 is in the form of a demand guarantee, and the amount guaranteed under them when the Taking-Over Certificate is issued is more than half of the Retention Money, then the Retention Money guarantee will not be required. If the amount guaranteed under the Performance Security when the Taking-Over Certificate is issued is less than half of the Retention Money, the Retention Money guarantee will only be required for the difference between half of the Retention Money and the amount guaranteed under the Performance Security.
15.2 Termination for Contractor’s Default
15.2.1 Notice
Following text is added at the end of sub-paragraph (h) of this Sub-Clause:
“For the purposes of this Contract, corrupt and fraudulent practices have been defined in Public Procurement Rules 2004.”
15.2.3 After Termination
The word “and” at the end of sub-paragraph (ii) of paragraph (b) is deleted the following paragraph is added after sub-paragraph (iii):
“(iv) all Employer-Supplied Materials and/or Employer's Equipment madeavailable to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer's Equipment], and”
15.4 Payment after Termination
The following text is added at the end of this Sub-Clause:
“The Employer shall be entitled to sell any of the Contractor’s Equipment, Temporary Works and unused materials and apply the proceeds of sale towards payment of any debt due from the Contractor to the Employer under this Clause including any outstanding payments to the Subcontractors.
16.2 Termination by Contractor
16.2.1 Notice
The sub-paragraph (j) is deleted in its entirety.
At the end of sub-paragraph (i) “; or” is replaced with “.” and at the end of sub-paragraph (h) “;” is replaced with “; or”.
In sub-paragraph (f) “84 days” are replaced with “180 days” and text “for reasons not attributable to the Contractor” is added at the end.
16.3 Contractor’s Obligations After Termination
Sub-paragraph (c) is deleted and replaced with:
"(c) deliver to the Engineer all Employer-Supplied Materials and/orEmployer's Equipment made available to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer’s Equipment]; and
(d) remove all other Goods from the Site, except as necessary for safety,and leave the Site."
17.1 Responsibility for Care of the Works
After the two instances of “Goods” in the last paragraph, the words “Employer-Supplied Materials and/orEmployer's Equipment” are added.
The following Sub-Clause 17.7 is added after Sub-Clause 17.6:
17.7 Use of Employer’s Accommodation/Facilities
The Contractor shall take full responsibility for the care of the items of the Employer’s facilities and/or accommodation, if any, as detailed in the Specification, from the date of use and/or occupation by the Contractor until the date on which such use and/or occupation is re-vested in the Employer.
If any loss or damage happens to any of the above items during a time while the Contractor is responsible for its care, arising from any cause other than a cause for which the Employer is responsible or liable, the Contractor shall promptly rectify the loss or damage at the Contractor’s risk and cost.
18.1 Exceptional Events
The words “or disorder” are replaced with “disorder or sabotage” in sub-paragraph (c) of the Clause.
18.4 Consequences of an Exceptional Event
The following is added at the end of sub-paragraph (b) after deleting the “.”:
“, including the costs of rectifying or replacing the Works and/or Goods damaged or destroyed by Exceptional Events, to the extent they are not indemnified through the insurance policy referred to in Sub-Clause 19.2 [Insurance to be provided by the Contractor].”
18.5 Optional Termination
In sub-paragraph (c), the words “and necessarily” areadded after the words “was reasonably”.
19.1 General Requirements
Following text is added at the end of first paragraph:
“The Contractor shall immediately after the date of the Letter of Acceptance submit the draft of insurance policies for the Employer’s consent.”
Following text is added at the end of third paragraph:
“The Contractor shall, within the respective periods stated in the Contract Data submit to the Engineer and the Employer a) evidence that the insurances described in this Clause have been effected, and b) copies of policies of the insurances described in Sub-Clauses 19.2.1, 19.2.4 and 19.2.5.”
19.2 Insurance to be provided by the Contractor
19.2.5 Injury to employees
The words “sickness, disease” are deleted in the third line of first paragraph.
The following Sub-Clause is added after Sub-Clause 19.2.6:
19.2.7 Insurance Company
“The Contractor shall be obliged to place all insurances described in this Clause with insurers listed in the Contract Data and rated byPACRA/VISofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR) Minimum Rating of Insurance Companies
Up to 1000 A (+)
1001 to no limit AA
21.6 Arbitration
The word “international” is deleted in the sixth line of first paragraph. The text of sub-paragraph (a) is substituted with the following:
“the Dispute shall be finally settled under the Rules of Arbitration, specified in the Contract Data;”
The following Clauses are added after Clause 21
22 Custom Duty
[Employer may incorporate provisions where applicable. However, in order to make the bid more balanced, the payment of Customs Duties should be the responsibility of the Employer.]
23 Taxes
The Contractor, Subcontractors and their employees shall be liable to pay income tax, withholding tax, super tax and other taxes on income arising out of the Contract. The rates and prices as stated in the contract shall be deemed to cover all such taxes.
24 Integrity Part
If it is found and established at any stage that the Contractor or any of his Subcontractors, agents or servants have violated or involved in violation of the Integrity Pact signed by the Contractor then the Employer shall be entitled to :
(a) recover from the Contractor an amount equivalent to ten times the sum of any commission, gratification, bribe, finder’s fee or kickback given by the Contractor or any of his Subcontractors, agent or servants;
(b) terminate the Contract; and
(c) recover from the Contractor any loss or damage to the Employer as a result of such termination or of any other corrupt business practices of the Contractor or any of his Subcontractors, agent or servants.
The termination under sub-paragraph(b) of this Sub-Clause shall proceed in the manner prescribed under Sub-Clause 15.1 to 15.4 and the payment under Sub-Clause 15.4 shall be made after having deducted the amounts due to the Employer under sub-paragraph(a) and (c) of this Sub-Clause.
Appendix General Conditions of Dispute Avoidance/Adjudication Agreement
12 Disputes Under DAAB Agreement
In the first paragraph, third, fourth and fifth line, the text “under the Rules of Arbitration of the International Chamber of Commerce 2017……………shall apply” is substituted with “under the Arbitration Act 1940 by sole arbitrator appointed by the Managing Director Public Procurement Regulatory Authority or Chairman Pakistan Engineering Council.”
Date:
No.:
Alternative No.: P66746
To: NDMA (National Disaster Management Authority (NDMA)), Director Near ITP Office, Main Murree Road, Islamabad Capital Territory
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid-Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
(a) have withdrawn our Bid during the period of Bid validity specified in the Letter of Bid; or
(b) having been notified of the acceptance of our Bid by the Procuring agency/Employer during the period of Bid validity, (i) fail or refuse to sign the Contract; or (ii) fail or refuse to furnish the Performance Security (or guarantee), if required, in accordance with the ITB.
We understand this Bid Securing Declaration shall expire if we are not the successful Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight days after the expiration of our Bid.
Name of the Bidder*
Name of the person duly authorized to sign the Bid on behalf of the Bidder** _______
Title of the person signing the Bid ______________________
Signature of the person named above ______________________
Date signed ________________________________ day of ___________________, _____
*: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder
**: Person signing the Bid shall have the power of attorney given by the Bidder attached to the Bid
[Note: In case of a Joint Venture, the Bid-Securing Declaration must be in the name of all members to the Joint Venture that submits the Bid.]
THIS CONTRACT AGREEMENT (hereinafter called the “Agreement”) made on the _________ day of __________ (month) 20_____ between NDMA (National Disaster Management Authority (NDMA)), Director Near ITP Office, Main Murree Road, Islamabad Capital Territory (hereinafter called the “Employer”) of the one part and __________________________________________________ (hereinafter called the “Contractor”) of the other part.
WHEREAS the Employer is desirous that certain Works, viz., EXTENSION OF NEOC - ESTABLISHMENT OF NEXT GENERATION TECHNOLOGIES (NGT) (P66746) should be executed by the Contractor and has accepted a Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein.
NOW this Agreement witnessed as follows:
1. In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents, in the order of priority, after incorporating addenda, if any, except those parts relating to Instructions to Bidders shall be deemed to form and be read and construed as part of this Agreement:
a) This Contract Agreement;
b) The Letter of Acceptance;
c) The Letter of Bid;
d) The Particular Conditions Part A - Contract Data;
e) The Particular Conditions Part B - SpecialProvisions;
f) The General Conditions;
g) The Specifications Part A - SpecificProvisions;
h) The Specifications Part B- Technical Provisions;
i) The Drawings;
j) The Completed Schedules to Bid including Schedule of Prices;
k) the JV Undertaking (if the Contractor is a JV); and
l) [Employer to insert any other documents forming part of the Contract]
The addenda/corrigenda,if any, (Excluding part relating to Instructions to Bidders alongwith Bidding Data) shall be deemed to have been incorporated at the appropriate places in the “Documents forming the Contract”.
3. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy defects therein in conformity and in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor, in consideration of the execution and completion of the Works as per provisions of the Contract, the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.
IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on the day, month and year first before written in accordance with their respective laws.
Signature of the Contactor Signature of Employer
(Seal) (Seal)
Signed, Sealed and Delivered in the presence of:
Witness Witness
(Name, Title and Address) (Name, Title and Address)
[All italicised text and any text within square brackets (except sub-clause headings) in this form of agreement is for use in preparing the form and should be deleted from the final product].
Name and details of the Contract EXTENSION OF NEOC - ESTABLISHMENT OF NEXT GENERATION TECHNOLOGIES (NGT)
______________________________________________________________________________
This Agreement made the ______day of ______ [month], _____ [year], between
Name and contact details of the Employer NDMA (National Disaster Management Authority (NDMA)), Director
Near ITP Office, Main Murree Road, Islamabad Capital Territory
+92-300-500-1238
latifndma@gmail.com
Name and contact details of the Contractor _____________________________________ (name)
____________________________________ (address)
__________________________________ (telephone)
___________________(email / other contact details);
Name and contact details of the DAAB Member _____________________________________ (name)
____________________________________ (address)
__________________________________ (telephone)
___________________(email / other contact details);
Whereas:
A. the Employer and the Contractor have entered (or intend to enter) into the Contract;
B. under the Contract, the “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole member or three members (as stated in the Contract Data of the Contract) so named in the Contract, or appointed under Sub-Clause 21.1 [Constitution of the DAAB] or Sub-Clause 21.2 [Failure to Appoint DAAB Members] of the Conditions of Contract;
C. the Employer and the Contractor desire jointly to appoint the above-named DAAB Member to act on the DAAB as:
a. the sole member of the DAAB, and where this is the case, all references to the “Other Members” do not apply; or
b. one of three members / chairman [delete the one which is not applicable] of the DAAB and, where this is the case, the other two persons are:
____________________________ (name) _________________________ (name)
___________________________ (address) _______________________ (address)
_____________________________(telephone) ______________________(telephone)
______________(email/ other contact details) _______ (email/other contact details)
the “Other Members”; and
D. the DAAB Member accepts this appointment.
The Employer, Contractor and DAAB Member jointly agree as follows:
1. The conditions of this DAAB Agreement comprise:
(a) Clause 21 [Disputes and Arbitration] of the Conditions of Contract, and any other provisions of the Contract that are applicable to the DAAB’s Activities; and
(b) the “General Conditions of Dispute Avoidance/Adjudication Agreement”, which is appended to the General Conditions of the “Conditions of Contract for Construction” Second Edition 2017 published by FIDIC (“GCs”), as amended and/or added to by the following provisions.
2. [Details of amendments to the GCs, if any. For example:
In the procedural rules annexed to the GCs, Rule _ is deleted and replaced by: “ … “]
3. The DAAB Member shall be paid in accordance with Clause 9 of the GCs. The currency of payment shall be ________.
In respect of Sub-Clauses 9.1 and 9.2 of the GCs, the amounts of the DAAB Member’s monthly fee and daily fee shall be:
monthly fee___________________ per month, and
daily fee of____________________ per day
(or as otherwise set under Sub-Clause 9.3 of the GCs).
4. In consideration of the above fees, and other payments to be made to the DAAB Member in accordance with the GCs, the DAAB Member undertakes to act as DAAB Member in accordance with the terms of this DAAB Agreement.
5. The Employer and the Contractor shall be jointly and severally liable for the DAAB Member’s fees and other payments to be made to the DAAB Member in accordance with the GCs.
6. This DAAB Agreement shall be governed by the law of _____________ (if not stated, the law that governs the Contract under Sub-Clause 1.4 of the Conditions of Contract).
SIGNED by:_______________ SIGNED by:_______________ SIGNED by:_______________
Print name:_________________ Print name:_________________ DAAB Member
Title: _____________________ Title:______________________ Title:______________________
for and on behalf of the
Employer for and on behalf of the
Contractor
in the presence of in the presence of in the presence of
Witness:___________________ Witness:___________________ Witness:___________________
Name:_____________________ Name:_____________________ Name:_____________________
Address:___________________ Address:___________________ Address:___________________
__________________________ __________________________ __________________________
Date:______________________ Date:______________________ Date:______________________
Guarantee No._________________________________________ Date _________________
WHEREAS _____________________________________ (hereinafter called the 'Employer')
has entered into a Contract for __________________________________________________
(Particulars of Contract)
with ____________________________________________ (hereinafter called the "Contractor').
AND WHEREAS, the Employer has agreed to advance to the Contractor, at the Contractor's request, an amount of Pak Rupees ___________________________________ (PKR _________ ) which amount shall be advanced to the Contractor as per provisions of the Contract.
AND WHEREAS, the Employer has asked the Contractor to furnish Guarantee to secure the mobilization advance for the performance of his obligations under the said Contract.
AND WHEREAS, ____________________________________________________________
(hereinafter called the “Guarantor”) at the request of the Contractor and in consideration of theEmployer agreeing to make the above advance to the Contractor, has agreed to furnish the said Guarantee.
NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the advance for the purpose of above mentioned Contract and if he fails and commits default in fulfilment of any of his obligations for which the advance payment is made, the Guarantor shall be liable to the Employer for payment not exceeding the aforementioned amount.
Notice in writing of any default,on the part of the Contractor, of which the Employer at his discretion of making decision, shall be given by the Employer to the Guarantor, and on such first written demand, payment shall be made by the Guarantor of all sums then due under this Guarantee without any reference to the Contractor and without any objection.
This Guarantee shall remain in force until the advance is fully adjusted against payments from the Interim Payment Certificates of the Contractor or until _________________________whichever is earlier. (Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of
PKR ______________________ (PakRupees ________________________________________________).
This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the aforesaid date or earlier if the advance made to the Contractor is fully adjusted against paymentsfrom Interim Payment Certificates of the Contractor provided that the Guarantor
agrees that the aforesaid period of validity shall be deemed to be extended if on the above mentioned date the advance payment is not fully adjusted.
Guarantor
(Scheduled Bank/ Insurance Company)
Signature ________________________________________________
Name ________________________________________________
Title ________________________________________________
WITNESS:
1. ________________________________________________
________________________________________________
Corporate Secretary (Seal) Corporate Guarantor (Seal)
2. ________________________________________________
________________________________________________
Name, Title & Address
________________________________ [Guarantor letterhead or SWIFT identifier code]
Beneficiary: ___________________ [Insert name and Address of Employer]
Date: ________________[Insert date of issue]
RETENTION MONEY GUARANTEE No.: [Insert guarantee reference number]
Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]
We have been informed that ________________ [insert name of Contractor, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called "the Contractor") has entered into Contract No. _____________ [insert reference number of the contract] dated ____________ with the Employer, for the execution of _____________________ [insert name of contract and brief description of Works] (hereinafter called "the Contract").
Furthermore, we understand that, according to the conditions of the Contract, the Employer retains moneys up to the limit set forth in the Contract (“the Retention Money”), and that when the Taking-Over Certificate has been issued under the Contract and the first half of the Retention Money has been certified for payment, payment of [insert the second half of the Retention Money orifthe amount guaranteed under the Performance Guarantee when the Taking-Over Certificate is issued is less than half of the Retention Money, the difference between half of the Retention Money and the amount guaranteed under the Performance Security and, if required, the ES Performance Security] is to be made against a Retention Money guarantee.
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ [insert amount in figures] () [amount in words] upon receipt by us of the Employer’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand, stating that the Applicant is in breach of its obligation(s) under the Contract, without your needing to prove or show grounds for your demand or the sum specified therein.
A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Employer’s bank stating that the second half of the Retention Money as referred to above has been credited to the contractor on its account number ___________ at _________________ [insert name and address of Contractor’s bank].
This guarantee shall expire no later than the …. day of ……, 2…, and any demand for payment under it must be received by us at the office indicated above on or before that date.
____________________
[signature(s)]
Note: All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Name of Employer: ……………… Name of Bidder/Contractor: ……………
Signature: …………………… Signature: …………………………….
[Seal] [Seal]
Guarantee No.___________________
Executed on ____________________
Expiry date _____________________
Name of Guarantor with address: _________________________________________________________________________________________________________________________________
Name of Principal (Contractor) with address:___________________________________________________________________________________________________________________________
Penal Sum of Security (express in words and figures) ____________________________________________________________________________________________________________________
Letter of Acceptance No. _____________________________________Dated __________________
KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bidding Documents and above said Letter of Acceptance (hereinafter called the Documents) and at the request of the said Principal we, the Guarantor above named, are held and firmly bound unto the NDMA (National Disaster Management Authority (NDMA)), Director Near ITP Office, Main Murree Road, Islamabad Capital Territory (hereinafter called the Employer) in the penal sum of the amount stated above for the payment of which sum well and truly to be made to the said Employer, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has accepted the Employer's above said Letter of Acceptance for _____________________________________ ________________________________
(Name of Contract) for the EXTENSION OF NEOC - ESTABLISHMENT OF NEXT GENERATION TECHNOLOGIES (NGT) (P66746)
______________________________________________ (Name of Project).
NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all the undertakings, covenants, terms and conditions of the said Documents during the original terms of the said Documents and any extensions thereof that may be granted by the Employer, with or without notice to the Guarantor, which notice is, hereby, waived and shall also well and truly perform and fulfill all the undertakings, covenants terms and conditions of the Contract and of any and all modifications of said Documents that may hereafter be made, notice of which modifications to the Guarantor being hereby waived, then, this obligation to be void; otherwise to remain in full force and virtue till all requirements of Clause11, Defects After Taking Over, of Conditions of Contract are fulfilled.
Our total liability under this Guarantee is limited to the sum stated above and it is a condition of any liability attaching to us under this Guarantee that the claim for payment in writing shall be received by us within the validity period of this Guarantee, failing which we shall be discharged of our liability, if any, under this Guarantee.
We, _________________________________________________ (the Guarantor), waiving all objections and defense under the Contract, do hereby irrevocably and independently guarantee to pay to the Employer without delay upon the Employer's first written demand without cavil or arguments and without requiring the Employer to prove or to show grounds or reasons for such demand any sum or sums up to the amount stated above, against the Employer's written declaration that the Principal has refused or failed to perform the obligations under the Contract which payment will be effected by the Guarantor to Employer’s designated Bank & Account Number.
PROVIDED ALSO THAT the Employer shall decide, whether the Principal (Contractor) has duly performed his obligations under the Contract or has defaulted in fulfilling said obligations and the Guarantor shall pay without objection any sum or sums up to the amount stated above upon first written demand from the Employer forthwith and without any reference to the Principal or any other person.
IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its seal on the date indicated above, the name and corporate seal of the Guarantor being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.
Guarantor
(Schedule Bank/ Insurance Company)
Signature: _________________________________________________
Name: _________________________________________________
Title: _________________________________________________
Corporate Guarantor (Seal)
WITNESS:
1.
_________________________________________________
_________________________________________________
2.
_________________________________________________
_________________________________________________
Name, Title & Address
Average Annual Turnover >= Rs. 1500 Million