In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist
MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
+92-333-245-6254
wsrsukkur@gmail.com
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department) The subject of procurement is: Construction of Hostel Accomodation Expected commencement date: Monday, August 31, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P69032 |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, August 17, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
|
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 109 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Thursday, August 20, 2026 10:30 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Thursday Date: August 20, 2026 Time : 11:00 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 0%. The Performance Guarantee shall be acceptable in the form of: Nil |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Ciivil work | Address: Met Office Sukkur Airport Schedule: 365Days Quantity: 1/Qty |
1/Qty | 593101 PKR |
| WS & SI | Address: Met Office Sukkur Airport Schedule: 364days Quantity: 1/Qty |
1/Qty | 39591 PKR |
| Electrification (Internal) | Address: Met Office Sukkur Airport Schedule: 364days Quantity: 1/Qty |
1/Qty | 52390 PKR |
| Boundary Wall | Address: Met Office Sukkur Airport Schedule: 364Days Quantity: 1/Qty |
1/Qty | 41749 PKR |
| Road and Paths | Address: Met Office Sukkur Airport Schedule: 364 Days Quantity: 1/Qty |
1/Qty | 11854 PKR |
| Hostel Building Civil work(Non Schedule) | Address: Met Office Sukkur Airpor Schedule: 364Days Quantity: 1/Qty |
1/Qty | 3500 PKR |
| Electrification(Non Schedule) | Address: Met Office Sukkur Airpor Schedule: 364Days Quantity: 1/Qty |
1/Qty | 8278 PKR |
No
Jobs Without Lots :
Job: Ciivil work
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Excavation for raft foundations, underground tanks and septic tanks (rectangular or square) in all kinds of soil (except gravelly and murum soil wet silt, clay or mud, conglomeration of gravel and boulders, soft, sandy or disintegrated and hard rock) and back filling the excavated material all round the trenches including breaking clods, watering, consolidation by ramming in layers not exceeding 9 inches in depth to full compaction, dressing and disposal of surplus excavated stuff as directed, lead up to one chain and lift upto 5 feet.(a):- 0' to 5' | %Cft | 11968 | 1624.63 | ( Rupees One Thousand, Six Hundred, Twenty-four and Paisa Sixty-three Only) | 194435.7184 |
| 2 | 2 | (b):- 5' to 8'. | %Cft | 2344 | 1862.13 | ( Rupees One Thousand, Eight Hundred, Sixty-two and Paisa Thirteen Only) | 43648.3272 |
| 3 | 3 | Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using Crush graded boulders 1 inches and down gauge in foundation including levelling, compacting and curing etc. complete. | %Cft | 1123 | 21744.25 | ( Rupees Twenty-one Thousand, Seven Hundred, Forty-four and Paisa Twenty-five Only) | 244187.9275 |
| 4 | 4 | Providing and layaing out Termite proofing in foundations, under floors and wood work surface with a soloution using of confront TC with water and spraying the solution of the area to be treated as completed as per direction of Enmgineer Incharge. | P-Sft | 6103 | 13.13 | ( Rupees Thirteen and Paisa Thirteen Only) | 80132.39 |
| 5 | 5 | Providing and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in raft or strip foundation with columns and pillars, of any shape including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 3531 | 33203.65 | ( Rupees Thirty-three Thousand, Two Hundred, Three and Paisa Sixty-five Only) | 1172420.8815 |
| 6 | 6 | roviding and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth . | %Cft | 186 | 43741.87 | ( Rupees Forty-three Thousands, Seven Hundred, Forty-one and Paisa Eighty-Seven Only) | 81359.8782 |
| 7 | 7 | Providing a coat of bitumen emulsion at 10 Lbs. per % sft. on walls and floor in ground floor. | %Sft | 455 | 1010.75 | ( Rupees One Thousand, ten and Paisa Seventy-five Only) | 4598.9125 |
| 8 | 8 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls 9 to 13-1/2 inches thick including scaffolding, raking, out joints and curing etc. complete in foundation, basement and plinth (foundation and basement masonry upto 5-feet depth and plinth upto 4-feet height from ground level. | %-Cft | 1675 | 38582.85 | ( Rupees Thirty-eight Thousands, Five Hundred, Eighty-two and Paisa Eighty-five Only) | 646262.7375 |
| 9 | 9 | Supplying earth from approved outside sources within a radius of 5 miles including digging, loading and unloading and filling in foundation trenches, plinth or under floor, etc. including breaking clods, dressing, watering and consolidation by ramming in layers not exceeding 9 inches in depth to full compaction complete. | %-Cft | 5277 | 3254.05 | ( Rupees Three Thousand, Two Hundred, Fifty-four and Paisa five Only) | 171716.2185 |
| 10 | 10 | Providing and laying reinforced cement concrete using Lawrancepure sand and crushed grade boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in plinth beams of required shape and design including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth. | %Cft | 636 | 40365.27 | ( Rupees Forty Thousand, Three Hundred, Sixty-five and Paisa Twenty-Seven Only) | 256723.1172 |
| 11 | 11 | Providing and laying reinforced cement concrete using crushed grade boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3750 Ibs. per sq inch at 28 days with a mix not leaner than 1:1-1/2:3 in columns of square or rectangular shape of regular section, using lawrenecepur sand including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the.(a):- Ground Floor. | %-Cft | 531 | 58279.31 | ( Rupees Fifty-Eight Thousand, Two Hundred, Seventy-nine and Paisa Thirty-one Only) | 309463.1361 |
| 12 | 12 | (b):- First Floor. | %-Cft | 500 | 61090.77 | ( Rupees Sixty-one Thousand, Ninty and Paisa Seventy-seven Only) | 305453.85 |
| 13 | 13 | (c):- Second Floor. | %-Cft | 225 | 63301.36 | ( Rupees Sixty-three Thousand, Three Hundred, One and Paisa Thirty-six Only) | 142428.06 |
| 14 | 14 | Providing and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in straight beams, lintels, cantilever beams of required shape or section including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 858 | 47322.89 | ( Rupees Forty-Seven Thousand, Three Hundred, Twenty-two and Paisa Eighty-nine Only) | 406030.3962 |
| 15 | 15 | (b):- First Floor. | %-Cft | 834 | 50134.35 | ( Rupees Fifty Thousand, One Hundred, Thirty-four and Paisa Thirty-five Only) | 418120.479 |
| 16 | 16 | (c):- Second Floor. | %-Cft | 275 | 52344.94 | ( Rupees Fifty-two Thousand, Three Hundred, Forty-four and Paisa Ninty-four Only) | 143948.585 |
| 17 | 17 | Providing and laying reinforced cement concrete using Lawrancepur sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in straight stairs and landing of required section including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 94 | 57830.03 | ( Rupees Fifty-seven Thousand, Eight Hundred, Thirty and Paisa Three Only) | 54360.2282 |
| 18 | 18 | (b):- First Floor. | %-Cft | 94 | 60641.49 | (Rupees Sixty Thousand, Six Hundred, Forty-one and Paisa Forty-nine Only) | 57003.0006 |
| 19 | 19 | Providing and laying reinforced cement concrete using sand and crushed graded boluders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in ordinary slab 5 inches to 6 inches thick including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 1035 | 45587.16 | ( Rupees Forty-five Thousand, Five Hundred, Eighty-seven and Paisa Sixteen Only) | 471827.106 |
| 20 | 20 | (b):- First Floor. | %-Cft | 897 | 48398.62 | ( Rupees Forty-eight Thousand, Three Hundred, Ninty-eight and Paisa sixty-two Only) | 434135.6214 |
| 21 | 21 | (c):- Second Floor. | %-Cft | 311 | 50609.21 | ( Rupees Fifty Thousand, Six Hundred, Nine and Paisa Twenty-one Only) | 157394.6431 |
| 22 | 22 | Providing and laying reinforced cement concrete using sand and crushed graded boluders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in ordinary cantilevered horizantal sunshede or chajja tapered or straight average 3 inches to less then 5 inches thick including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 29 | 52656.75 | ( Rupees Fifty-two Thousand, Six Hundred, Fifty-six and Paisa Seventy-five Only) | 15270.4575 |
| 23 | 23 | (b):- First Floor. | %-Cft | 29 | 55468.21 | ( Rupees Fifty-five Thousand, Four Hundred, Sixty-eight and Paisa Twenty-one Only) | 16085.7809 |
| 24 | 24 | (c):- Second Floor. | %-Cft | 42 | 57678.8 | ( Rupees Fifty-seven Thousand, Six Hundred, Seventy-eight and Paisa Eighty Only) | 24225.096 |
| 25 | 25 | Providing and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in precast shelves 1-1/2 inches to 2 inches thick including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 38 | 69803.62 | ( Rupees Sixty-nine Thousand, Eight Hundred, Three and Paisa Sixty-two Only) | 26525.3756 |
| 26 | 26 | (b):- First Floor. | %-Cft | 38 | 72615.08 | ( Rupees Seventy-two Thousand, Six Hundred, Fifteen and Paisa Eight Only) | 27593.7304 |
| 27 | 27 | (c):- Second Floor. | %-Cft | 13 | 74825.67 | ( Rupees Seventy-four Thousand, Eight Hundred, Twenty-five0 and Paisa Sixty-seven Only) | 9727.3371 |
| 28 | 28 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or M.S. Chairs, Tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension .(a):- Ground Floor. | P.Kg | 23679 | 282.45 | ( Rupees Two Hundred, Eighty-two and Paisa Forty-five Only) | 6688133.55 |
| 29 | 29 | (b):- First Floor. | P.Kg | 9472 | 286.89 | ( Rupees Two Hundred, Eighty-six and Paisa Eighty-nine Only) | 2717422.08 |
| 30 | 30 | (c):- Second Floor. | P.Kg | 3564 | 291.33 | ( Rupees Two Hundred, Ninty-one and Paisa Thirty-three Only) | 1038300.12 |
| 31 | 31 | Providing and laying 2 inches thick damp proof course with cement concrete 1:2:4 cast in situ using graded screened bajri of 3/4 inch and down gauge including compacting, curing, form work and its removal etc. complete with applying a coat of hot bitumen (maxphalt 80/100 or equivalent) using 35 Lbs. per hundred square feet on damp proof course after complete drying and cleaning the surface . | %-Sft | 112 | 8526.8 | ( Rupees Eight Thousand, Five Hundred, Twenty-six and Paisa Eighty Only) | 9550.016 |
| 32 | 32 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls 9 to 13-1/2 inches thick including scaffolding, raking, out joints and curing etc. complete in superstructure... (a):- Ground Floor. | %-Cft | 2587 | 41260.97 | ( Rupees Forty-one Thousand, Two Hundred, Sixty and Paisa Ninty-seven Only) | 1067421.2939 |
| 33 | 33 | (b):- First Floor. | %-Cft | 2587 | 43602.06 | ( Rupees Forty-three Thousand, Six Hundred, Two and Paisa Six Only) | 1127985.2922 |
| 34 | 34 | (c):- Second Floor. | %-Cft | 1028 | 45455.56 | ( Rupees Forty-five Thousand, Four Hundred, Fifty-five and Paisa Fifty-six Only) | 467283.1568 |
| 35 | 35 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:4 in straight or curved walls 4-1/2 inches and less in thick including scaffolding, raking, out joints and curing etc. complete in superstructure... (a):- Ground Floor. | %-Cft | 49 | 44318.47 | ( Rupees Forty-four Thousand, Three Hundred, Eighteen and Paisa Forty-seven Only) | 21716.0503 |
| 36 | 36 | (b):- First Floor. | %-Cft | 49 | 46659.56 | ( Rupees Forty-six Thousand, Six Hundred, Fifty-nine and Paisa Fifty-six Only) | 22863.1844 |
| 37 | 37 | (c):- Second Floor. | %-Cft | 150 | 48513.06 | ( Rupees Forty-eight Thousand, Five Hundred, Thirteen and Paisa Six Only) | 72769.59 |
| 38 | 38 | 1/4" thick cement plaster 1:3 on soffits of ceiling, cantilever slabs, sides and soffits of beams etc., in basement, mezzanine and ground floor including making edges, corners and curing etc., complete . (a):- Basement & Ground Floor. | %-Sft | 1975 | 4014.7 | ( Rupees Four Thousand, Fourteen and Paisa Seventy Only) | 79290.325 |
| 39 | 39 | (b):- First Floor. | %-Sft | 1758 | 4322.2 | ( Rupees Four Thousand, Three Hundred, Twenty-two and Paisa Twenty Only) | 75984.276 |
| 40 | 40 | (c):- Second Floor. | %-Sft | 566 | 4558.45 | ( Rupees Four Thousand, Five Hundred, Fifty-eight and Paisa Forty-five Only) | 25800.827 |
| 41 | 41 | 1/2" thick cement plaster 1:4 on walls and columns etc. in cement, plinth, mezzanine and ground floor including making sides, corners, and curing etc complete....(a):- Basement & Ground Floor. | %-Sft | 6602 | 4381.84 | ( Rupees Four Thousand, Three Hundred, Eighty-one and Paisa Eighty-four Only) | 289289.0768 |
| 42 | 42 | (b):- First Floor. | %-Sft | 6362 | 4689.34 | ( Rupees Four Thousand, Six Hundred, Eighty-nine and Paisa Thirty-four Only) | 298335.8108 |
| 43 | 43 | (c):- Second Floor. | %-Sft | 4132 | 4925.59 | ( Rupees Four Thousand, Nine Hundred, Twenty-five and Paisa Fifty-nine Only) | 203525.3788 |
| 44 | 44 | 3/4" thick cement plaster 1:4 on walls and columns etc. in cement, plinth, mezzanine and ground floor including making sides, corners, and curing etc complete....(a):- Basement & Ground Floor. | %-Sft | 144 | 5335.06 | ( Rupees Five Thousand, Three Hundred, Thirty-five and Paisa Six Only) | 7682.4864 |
| 45 | 45 | (b):- First Floor. | %-Sft | 144 | 5745.06 | ( Rupees Five Thousand, Seven Hundred, Forty-five and Paisa Six Only) | 8272.8864 |
| 46 | 46 | Extra if deep cut grooves of approved sizes and design are made on plastered surface of any description in any floor | %-Sft | 288 | 2287.5 | ( Rupees Two Thousand, Two Hundred, Eighty-seven and Paisa Fifty Only) | 6588 |
| 47 | 47 | Water proofing of roof slab using Bituflex @ 10 Kg per % sft in three coats, i/c cleaning /scraping the extra mortar etc. from the roof surface,and washing the surface with water and filling the depressions using Bituflex: sand mortar .Applyingone one primer coal, over moist surface using a mix of 50 %Bituflex and 50 % water blirded the surface with saul any floor in any light. | %-Sft | 2037 | 1243.06 | ( Rupees One Thousand, Two Hundred, Forty-three and Paisa Six Only) | 25321.1322 |
| 48 | 48 | Provding and fixing of diamond jumbolon insulation board 2" thick and polyphonesheet over diamond jumblolon insulation board for roof insulation as per direction of the Engineer Inchage in any floor in any height. | P-Sft | 1880 | 171.91 | ( Rupees One Hundred, Seventy-one and Paisa Ninty-one Only) | 323190.8 |
| 49 | 49 | Providing and laying 1:9 cement concrete using screened graded bajri 3/4 inch and down gauge In terracing 3 inches average thickness to required slope in panels including form work, consolidation, finishing, curing etc. and painting the surface with plastic bitumen No. 4 at the rate of 15 Ibs per hundred square feet blinded with sand at the rate of 2 cubic feet per hundred square feet complete" on ground floor roof. | %-Sft | 2073 | 8229.59 | ( Rupees Eight Thousand, Two Hundred, Twenty-nine and Paisa Fifty-nine Only) | 170599.4007 |
| 50 | 50 | Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidation by ramming in layers not exceeding 9 inches in depth to full compaction and lift upto 5 feet. | %-Cft | 1590 | 4869.94 | ( Rupees Four Thousand, Eight Hundred, Sixty-nine and Paisa Ninty-four Only) | 77432.046 |
| 51 | 51 | Providing and laying 1:4:8 cement concrete bed under floors using graded stone ballast 2 inches and down gauge with levelling and ramming, watering and curing etc. complete.. | %-Cft | 1125 | 22036.75 | ( Rupees Twenty-two Thousand, Thirty-six and Paisa Seventy-five Only) | 247913.4375 |
| 52 | 52 | Providing and laying in situ 1:2:4 (1 cement 2 sand and 4 coarse aggregate) cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in foundation, basement and plinth including form work, compacting, curing and removal of form work etc. complete, foundation and basement up to 5 feet (1.52 m) depth and plinth up to 4 feet (1.2 m) height from ground level .(a):- Ground Floor. | %-Cft | 385 | 39059.08 | ( Rupees Thirty-nine Thousand, Fifty-nine and Paisa Eight Only) | 150377.458 |
| 53 | 53 | (b):- First Floor. | %-Cft | 385 | 39795.33 | ( Rupees Thirty-nine Thousand, Seven Hundred, Ninty-five and Paisa Thirty-three Only) | 153212.0205 |
| 54 | 54 | (c):- Second Floor. | %-Cft | 67 | 40389.08 | ( Rupees Forty Thousand, Three Hundred, Eighty-nine and Paisa Eight Only) | 27060.6836 |
| 55 | 55 | Providing and laying light colour, glazed/non skid vitrified porcelean tiles (Polished) exceeding 3600 Sqcm each, (Pak made) on walls and floors, in any floor, laid with dry bond (stile bond) over a base of 1" thick cement mortar (1:3) including jointing to tiles with joint filler of approved quality as per direction of the Engineer incharge. | %-Sft | 3827 | 49798.24 | ( Rupees Forty-nine Thousand, Seven Hundred, Ninty-eight and Paisa Twenty-four Only) | 1905778.6448 |
| 56 | 55 | Providing and laying floor of 3/4 inches thick Granite stone Pakistani Original more than 3 sq. ft. upto 5 Sq. ft. size fine dressed on the surface without winding in ground floor over 1 inch lime mortar 1:2 setting the marble tiles with grey cement slurry including curing rubbing and polishing etc. complete, including the cost of mortar.(a):- Ground Floor. | %-Sft | 256 | 81539.13 | ( Rupees Eighty-one Thousand, Five Hundred, Thirty-nine and Paisa Thirteen Only) | 208740.1728 |
| 57 | 56 | (b):- First Floor. | %-Sft | 205 | 82132.88 | ( Rupees Eighty-two Thousand, One Hundred, Thirty-two and Paisa Eighty-eight Only) | 168372.404 |
| 58 | 57 | Extra for making nosing of treads as per design and instructions of the Engineer-in-Charge .. | P-Rft | 192 | 131.25 | ( Rupees One Hundred, Thirty-one and Paisa Twenty-five Only) | 25200 |
| 59 | 58 | Providing and laying floor of 6mm (approx: 1/4") thick coloured glazed tiles More than 1 sq.ft upto 2 sq.ft. of master make (Pakistani) first grade in ground floor laid over 1" (25mm) thick cement mortar 1:2 (1 cement and 2 sand) including jointing and washing the tiles with white cement slurry a matching colour (by using pigment in white cement) and curing etc. complete. | %-Sft | 665 | 42108.61 | ( Rupees Forty-two Thousand, One Hundred, Eight and Paisa Sixty-one Only) | 280022.2565 |
| 60 | 59 | (b):- First Floor. | %-Sft | 665 | 42702.36 | ( Rupees Forty-two Thousand, Seven Hundred, two and Paisa Thirty-six Only) | 283970.694 |
| 61 | 60 | Providing and fixing 1/4 inches or 6.4 mm (approx.) thick approved Pakistani make white glazed tiles upto 1.50sq feet to 3. sq. ft size in dado and skirting in ground floor, over 1/2 inch (13 mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joints and washing the tile with white cement slurry curing and cleaning etc. complete . | %-Sft | 160 | 31498.72 | ( Rupees Thirty-one Thousand, Four Hundred, Ninty-eight and Paisa Seventy-two Only) | 50397.952 |
| 62 | 61 | (b):- First Floor. | %-Sft | 160 | 32261.22 | ( Rupees Thirty-two Thousand, Two Hundred, Sixty-one and Paisa Twenty-two Only) | 51617.952 |
| 63 | 62 | (c):- Second Floor. | %-Sft | 54 | 32833.72 | ( Rupees Thirty-two Thousand, Eight Hundred, Thirty-three and Paisa Seventy-two Only) | 17730.2088 |
| 64 | 63 | Providing and fixing M.S. moulded steel door frames of 10" x 2-1/2" manufactured from mild steel sheet of 18 gauge conforming to B.S.S. 1245 having a double rebate size 1-1/2" x 1/2" provision of 3 Nos. M.S. plate, section 1-1/2" x 1/4" (2 Nos. 6 inch long welded with frame at not less than 10 points and 1 Nos. 12 inch long welded with frame at not less than 20 points), with holes and threads for fixing steel hings, fitted with one locking box of same sheet (point welded inside the frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated with special red oxide primer coat all around including cutting holes and filling the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer-in-Charge | P-Rft | 316 | 693.86 | ( Rupees Six Hundred, Ninty-three and Paisa Eighty-six Only) | 219259.76 |
| 65 | 64 | Providing and fixing ward robe 24" deep consisting 19mm thick laminated sheet on bottom ,top sides partition shelves & shutters etc. and 4mm thick pressed on back side , 2-1/2" x 1-1/4" best quality deodar wood frame and allopen edges filled 3/4" molding PVCgols completei/c the cost of glue ironnails screws,heavy type piano hings,1/2" handles catcher locks etccomplete theas perdirection ofthe engineer incharge. | P-Sft | 572 | 1289.74 | ( Rupees One Thousand, Two Hundred, Eighty-nine and Paisa Seventy-four Only) | 737731.28 |
| 66 | 65 | Providing and fixing 1-1/2 inches (38 mm) thick solid core deodar wood flushed veneered door shutters, with and including the cost of commercial plywood facing 3 mm. thick (3 ply) on both faces, fixed over best quality deodar wood frame 2 inches wide alround 6 inches wide lock rail and 2nd class deodar wood solid core, i/c., 1/4 inch thick best quality deodar wood lipping on al! sides as per approved drawing, manufactured under power driven hydraulic press, including the cost of approved iron fittings but excluding the cost of handles and locking arrangement. | P-Sft | 280 | 1448.56 | ( Rupees One Thousand, Four Hundred, Forty-eight and Paisa Fifty-six Only) | 405596.8 |
| 67 | 66 | Providing and fixing 1-1/2 inches (38 mm) thick best quality deodar wood wire gauze shutters fully wire gauzed with galvanized iron wire gauze of 24 gauge and 12 mesh to an inch (25 mm) with approved iron butt hinges, spring hinges, tower bolts etc., as required . | P-Sft | 280 | 1438.93 | ( Rupees One Thousand, Four Hundred, Thirty-eight and Paisa Ninty-three Only) | 402900.4 |
| 68 | 67 | Providing and fixing fully glazed Champagne anodized aluminium Sliding windows as per British standard manufactured by Lucky,Alcop, Krudson, Pakistan cable and A.C.P (fixing through their approved fabricators), Prime model box section 101mm x 30mm and 2mm thick including the cost of aluminium netting ,fittings, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but excluding the cost of glass pans. | P-Sft | 320 | 1367.19 | ( Rupees One Thousand, Three Hundred, Sixty-seven and Paisa Ninteen Only) | 437500.8 |
| 69 | 68 | Providing and fixing fully glazed Champagne anodized aluminium Fixed windows Partition as per British standard manufactured by Lucky, Alcop, Krudson, Pakistan Cables and A.C.P. (fixing through their approved fabricators), Economy model box section 76.2mm x 38.1mm and 1.6mm thick including the cost of aluminium fittings, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but excluding the cost of glass pans. | P-Sft | 48 | 859.72 | ( Rupees Eight Hundred, Fifty-nine and Paisa Seventy-two Only) | 41266.56 |
| 70 | 69 | Providing and fixing fully glazed Champagne anodized aluminium Hinged door with frame as per British standard manufactured by Lucky, Alcop, Krudson, Pakistan Cables and A.C.P. (Deluxe model section, 101.6mm x 30mm and 2mm thick including the aluminium fittings, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but excluding the cost of glass pans. | P-Sft | 102 | 1840.63 | ( Rupees One Thousand , Eight Hundred, Forty and Paisa Sixty-three Only) | 187744.26 |
| 71 | 70 | Providing and fixing Tinted glass panes 5mm thick to M.S. Box pipe / Aluminium doors, windows and ventilators etc including the cost of labour but excluding the cost of M.S. square pipe beading, rubber packing and screw in any floor at any height. | P-Sft | 470 | 371.82 | ( Rupees Three Hundred, Seventy-one and Paisa Eighty-two Only) | 174755.4 |
| 72 | 71 | Providing and fixing iron grills with required section of flat iron as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws, painting two coats of red oxide paint etc. complete as required in any floor in wooden frame . | P-Kg | 1199 | 290.95 | ( Rupees Two Hundred, Ninty and Paisa Eighty-nine Only) | 348850 |
| 73 | 72 | Providing and fixing 2" dia stainles steel pipe (18gauge) railling alongwith 4 Nos 3/4" dia parallel pipe having s/s pipe vertical post 2"dia at 3 ft c/c average spacing and 4" dia vertical post at start turning and end point including cost of labour, weilding charges fitting & fixing in marble floor and wall etc complete as per direction of the Engineer Incharge. | P-Rft | 112 | 2234.38 | ( Rupees Two Thousand, Two Hundred, Thirty-four and Paisa Thirty-eight Only) | 250250.56 |
| 74 | 73 | Providing and fixing with brass screw or specially supplied screws hydraulic door closer of approved design No. 707, Japan make, cutting wood etc., to required shape and size as per direction of the engineer-in-Charge | Each | 10 | 8706.25 | ( Rupees Eight Thousand, Seven Hundred, Six and Paisa Twenty-five Only) | 87062.5 |
| 75 | 74 | Providing and fixing with brass screws door lock handle type of approved design ( Hungry Make) cutting wood etc.to required shape and size with two operating keys as per direction of the Engineer in Charge. | Each | 18 | 4024.38 | ( Rupees Four Thousand, Twenty-four and Paisa Thirty-eight Only) | 72438.84 |
| 76 | 75 | Providing and fixing approved brass handles 5" (127 mm) size heavy type with becessary brass screws . | Each | 18 | 357.74 | ( Rupees Three Hundred, Fifty-seven and Paisa Seventy-four Only) | 6439.32 |
| 77 | 76 | Providing and laying 3/8" thick marble patties (Pannel strips) upto 1"depth in floor and dado of any description in all floor. | Each | 187 | 17.38 | ( Rupees Seventeen and Paisa Thirty-eight Only) | 3250.06 |
| 78 | 77 | Providing and fixing 4" dia polyvinyle chloride rain water (PVC) down pipe with mild steel clamps,bolts andnuts fixed in cement concrete 1:2:4etc. complete. | %Rft | 123 | 718.67 | ( Rupees Seven Hundred, Eighteen and Paisa Sixty-seven Only) | 88396.41 |
| 79 | 78 | Providing and fixing 4" dia polyvinyle chloride (PVC) bend of any degree for rain water down pipe with clamps,bolts and nuts in cement concrete 1:2:4 etc. complete. | Each | 14 | 1748.13 | ( Rupees One Thousand, Seven Hundred, Forty-eight and Paisa Thirteen Only) | 24473.82 |
| 80 | 79 | Providing and laying gola 3" x 3" (76 mm x 76 mm) concrete 1:2:4 using graded screened bajri at junction of roof slab and walls and finished with cement plaster 1:4 including curing etc. complete. | %Rft | 318 | 3202.36 | ( Rupees Three Thousand, Two Hundred, Two and Paisa Thirty-six Only) | 10183.5048 |
| 81 | 80 | Tuck or weather struck pointing on brick work with cement mortar 1:3 (one cement and three sand) in plinth and ground floor including raking out joints, curing etc., complete..(a):- Ground Floor. | %-Sft | 384 | 3449.57 | ( Rupees Three Thousand, Four Hundred, Forty-nine and Paisa Fifty-seven Only) | 13246.3488 |
| 82 | 81 | (b):- First Floor. | %-Sft | 384 | 3888.95 | ( Rupees Three Thousand, Eight Hundred, Eighty-eight and Paisa Ninty-five Only) | 14933.568 |
| 83 | 82 | Painting with (ICI) Dulux plastic emulsion paint VIP of approved shade two coats over and including the cost of one priming coat complete over plastered surface at any height in any floor . | %-Sft | 13746 | 6737.38 | ( Rupees Six Thousand, Seven Hundred, Thirty-seven and Paisa Thirty-eight Only) | 926120.2548 |
| 84 | 83 | Painting three coats with weather shield paint deluxe (ICI) make of approved shade on plaster surface (External) and including the cost of cleaning the surface, sand papering etc. complete at any height in any floor. | %-Sft | 6329 | 4408.75 | ( Rupees Four Thousand, Four Hundred, Eight and Paisa Seventy-five Only) | 279029.7875 |
| 85 | 84 | Painting wood work with synthetic enamel paint of approved make and shade two coats over and including the cost of one priming coat complete at any height in any floor . | %-Sft | 840 | 5954.86 | ( Rupees Five Thousand, Nine Hundred, Fifty-four and Paisa Eighty-six Only) | 50020.824 |
| 86 | 85 | Painting iron work with synthetic enamel paint of approved make and shade two coats over and including the cost of one priming coat complete at any height in any floor | %-Sft | 949 | 6071.25 | ( Rupees Six Thousand, Seventy-one and Paisa Twenty-five Only) | 57616.1625 |
| 87 | 86 | Providing and fixing plaster of Paris 19mm thick false ceilling including T & L angle clips jointing clips and GI wire etc complete as required in any floor. | P-Sft | 3238 | 120.23 | ( Rupees One Hundred, Twenty and Paisa Twenty-three Only) | 389304.74 |
| 88 | 87 | Proving & fixing kitchen floor cabinet making of shutter board box & 3/4" thick high glass lamination lasani shutter , PVC beading , deodar wooden frame 2.5"x1.25" size making tray drawer of approved design etc. fixed with rawal plugs,screws i/c the cost of glue iron nails hings, handles etcas per drawing. complet the as per direction of engineer incharge. | P-Sft | 75 | 1552.45 | ( Rupees One Thousand, Five Hundred, Fifty-two and Paisa Forty-five Only) | 116433 |
| GRAND TOTAL: | Rs 29,655,034.62 |
Job: WS & SI
Specifications / Requirements:
| Sr. No | Sr | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Providing and fixing best quality squatting type earthern ware W.C. pan (porta or equivalent) complete with and including the cost of 13.6 liter best quality low level plastic slushing cistern with internal fittings complete , PVC flushing pipe suitable for squatting type with extra bend and length with fittings, PVC trap 4 inches (100 mm) dia making requisite number of holes in walls, plinth & floor for pipe connection and making good in cemnent concrete 1:2:4 | Each | 6 | 19665 | ( Rupees Ninteen Thousand, Six Hundred, Sixty-five Only) | 117990 |
| 2 | 2 | Providing and fixing best quality white glazed earthenware Two piece toilet (commode) coupled with flush tank (Porta or equivalent) complete with and including cost of plastic seat with Buffers, with internal fittings complete. | Each | 2 | 25375 | ( Rupees Twenty-five Thousand, Three Hundred, Seventy-five Only) | 50750 |
| 3 | 3 | Providing & fixing best quality earthern ware vanity basin (porta or equivalent) standard size (white/light color) and including the cost of 1-1/4" rubber plug and chrome plated brass chain pvc waste pipe 1-1/4" dia of apporved pattern etc. complete | Each | 8 | 16420.63 | ( Rupees Sixteen Thousand, Four Hundred, Twenty and Paisa Sixty-three Only) | 131365.04 |
| 4 | 4 | Providing and fixing bath room accessories set of 6 pieces consist of one shelf, one towel rod with bracket, one towel ring, one soap dish, one tooth brush holder with glass, one tissue paper holder, one double hook etc. complete of approved quality as per direction of Engineer Inchrage. | Each | 8 | 11812.2 | ( Rupees Eleven Thousand, Eight Hundred, Twelve and Paisa Twenty Only) | 94497.6 |
| 5 | 5 | Providing and fixing approved quality stainless steel sink 33” x 18” Pak made (Atlas) complete with brass oxidized bolt kit/angle iron brackets built into walls ½” dia CP sink mixer 1-1/4” rubber plug and CP brass chain 1-1/4” CP brass waste 1-1/4” dia malleable iron or CP brass bottle trap with malleable iron or brass unions and making requisite number of holes in walls, plinth and floor for pipe connections and making good in cement concrete 1:2:4 | Each | 1 | 16495 | ( Rupees Sixteen Thousand, Four Hundred, Ninty-five Only) | 16495 |
| 6 | 6 | Providing 1/2 inch dia plastic connection complete with a 1/2 inch dia brass stop cock two brass outs and lining jointed to plastic pipe. | Each | 28 | 824.5 | ( Rupees Eight Hundred, Twenty-four Paisa Fifty Only) | 23086 |
| 7 | 7 | Providing and fixing 24 inch x 18 inch looking mirror of imported glass 5mm thick fixing with CP clamsp and screws. | Each | 8 | 3045.74 | ( Rupees Three Thousand, Forty-five,Paisa Seventy-four Only) | 24365.92 |
| 8 | 8 | Providing and fixing 24" x 3/4" dia approved quality of chrome plated brass towel rail complete with brackets fixed with 1" long CP brass screws and rawal plug. | Each | 8 | 2475.5 | ( Rupees Two Thousand, Four Hundred Seventy-five,Paisa Fifty Only) | 19804 |
| 9 | 9 | Providing and fixing chromium plated Muslim bib cock without Muslim Shower of approved quality including flexible pipe complete. | Each | 8 | 3381.75 | ( Rupees Three Thousand, Three Hundred Eighty-one,Paisa Seventy-five Only) | 27054 |
| 10 | 10 | Providing and fixing 1/2 inches dia. CP bib cocks. | Each | 5 | 1130.4 | ( Rupees One Thousand, One Hundred Thirty,Paisa Forty Only) | 5652 |
| 11 | 11 | Providing and fixing 1/2 inches dia.CP Stop cocks. | Each | 40 | 1230.4 | ( Rupees One Thousand, Two Hundred Thirty,Paisa Forty Only) | 49216 |
| 12 | 12 | Providing and fixing CP Mixer 1/2 inches (Faisal/Master or equivelent) lever type Paksitani complete in all respect. | Each | 8 | 10750 | ( Rupees Ten Thousand, Seven Hundred Fifty Only) | 86000 |
| 13 | 13 | Providing and fixing 1/2 inches dia full way gun metal valves with wheels theaded or flanged ends with rubber washers (standard pattern)…. (a):- 2" dia | Each | 1 | 8699.4 | ( Rupees Eight Thousand, Six Hundred Ninty-nine,Paisa Forty Only) | 8699.4 |
| 14 | (b):- 1" dia | Each | 4 | 4012.9 | ( Rupees Four Thousand Twelve,Paisa Ninty Only) | 16051.6 | |
| 15 | (c):- 3/4" dia | Each | 8 | 2017.9 | ( Rupees Two Thousand Seventeen,Paisa Ninty Only) | 16143.2 | |
| 16 | (d):- 1/2" dia | Each | 8 | 1405.4 | ( Rupees One Thousand, Four Hundred Five,Paisa Forty Only) | 11243.2 | |
| 17 | 14 | Providing manhole type 'A' size 2 feet x 1-1/2 feet or (inside dimensions) x 2 feet deep as per approved design and specifications complete for 4 inches to 12 inches dia pipes up to 3 feet-11 inches depth with cast iron cover and frame 16 inches dia, inside or 63.5 kg. fixed in 4 inches thick RCC 1:2:4 slab, 8 inches thick c.c. 1:3:6 block masonry walls set in 1:3 c.m; 6 inches thick 1:3:6 c.c. in foundation 1:2:4 c.c. in benching, 1/2 inches thick cement plaster in 1:3 C.M. to all inside wall surface, channels and benching etc. and to top including making requisite umber of main and branch channels but excluding the cost of excavation back filling and disposal of excavated stuff, manhole cover and frame. | Each | 6 | 13411.31 | ( Rupees Thirteen Thousand, Four Hundred Eleven,Paisa Thirty-one Only) | 80467.86 |
| 18 | 15 | Add for extra depth beyond 2 feet and up to 3 feet-11 inches for 'A' type manholes (for depth lesser than 2 feet or 610 mm deduct at the same rate).. | P-Inch | 24 | 333.79 | ( Rupees Three Hundred Thirty-three,Paisa Seventy-nine Only) | 8010.96 |
| 19 | 16 | Providing manhole type 'B' size 3 feet x 2-1/2 feet (inside dimensions) x 4 feet deep as per approved design and specifications complete 4 inches to 12 inches dia. pipes 4 feet to 7 feet-5 inches depth with cast iron cover and frame 18 inches dia. (inside) weight -1 Cwt. 3 Qtrs.in 6 inches thick RCC 1:2:4 slab, 8 inches thick c.c. 1:3:6 block masonry walls set in 1:3 c.m. 6 inches thick, 1:3:6, c.c in foundation 1:2:4 c.c in benching, 1/2 inch thick cement plaster in 1:4 c.m. to all inside wall surfaces, channels and benching etc. and to top including providing and fixing cast iron foot rest at every foot of depth and making requisite number of main and branch channels complete but excluding the cost of excavation, back filing, disposal of excavated stuff manhole cover and frame. | Each | 3 | 31974.81 | ( Rupees Thirty-one Thousand, Nine Hundred Seventy-four,Paisa Eight-one Only) | 95924.43 |
| 20 | 17 | Add for extra depth beyond 4 feet and upto 7 feet-5 inches for 'B' type manholes including cost of cast iron foot rest at every foot of depth (for depth lesser than 4 feet or 1.22 m deduct at the same rate)… | Per Inch | 24 | 562.26 | ( Rupees Five Hundred Sixty-two,Paisa Twenty-six Only) | 13494.24 |
| 21 | 18 | Providing & fixing C.I Cover & Frame 16" dia weight 1 cwt 1 Qtr. | Each | 9 | 22876.56 | (Rupees Twenty-two Thousand, Eight Hundred Seventy-six,Paisa Fifty-six Only) | 205889.04 |
| 22 | 19 | Providing and fixing Un Platisized Polyvinyl Chloride Pipe (u.P.V.C) "E" class with specials) and clamps etc., including cutting and fitting, complete with and including the cost of breaking through walls and roof and making good etc.; after cleaning the pipe and cartage within 10 miles. (a):- 2" dia | P-Rft | 40 | 448.8 | ( Rupees Four Hundred Forty-eight,Paisa Eighty Only) | 17952 |
| 23 | (b):- 3" dia | P-Rft | 150 | 520.97 | ( Rupees Five Hundred Twenty,Paisa Ninty-seven Only) | 78145.5 | |
| 24 | (c):- 4" dia | P-Rft | 180 | 719.12 | ( Rupees Seven Hundred Ninteen,Paisa Twelve Only) | 129441.6 | |
| 25 | (d):- 6" dia | P-Rft | 100 | 867.31 | ( Rupees Eight Hundred Sixty-seven,Paisa Thirty-one Only) | 86731 | |
| 26 | 20 | Providing R.C.C. pipes and collars of class 'B' and fixing in trench including cutting, fitting and jointing with maxphalt composition and cement mortar (1:1) and back filling the excavated material in trench including testing with water to a pressure head of 50 feet and cartage within 10 miles for. 9 inches dia. pipe.. | P-Rft | 50 | 463.49 | ( Rupees Four Hundred Sixty-three,Paisa Forty-nine Only) | 23174.5 |
| 27 | 21 | Providing and fixing PPRC Pipe PN-20 with specials and clamps erc. includingcutting and fitting complete with and including the cost of breaking through walls and roof and making good erc aftercleaning the pipe and caartage within 10 Mils. (a):- 25MM | P-Rft | 120 | 215.32 | ( Rupees Two Hundred Fifteen,Paisa Thirty-two Only) | 25838.4 |
| 28 | (b):- 32MM | P-Rft | 300 | 320.26 | ( Rupees Three Hundred Twenty, Paisa Twenty-six Only) | 96078 | |
| 29 | (c):- 40MM | P-Rft | 350 | 433.66 | ( Rupees Four Hundred Thirty-three, Paisa Sixty-six Only) | 151781 | |
| 30 | (d):-50MM | P-Rft | 150 | 747.61 | ( Rupees Seven Hundred Forty-seven, Paisa Sixty-one Only) | 112141.5 | |
| 31 | 22 | Providing and fixing Polyethylene Pipe (HDPE) (PN-16) with specials including cutting and fitting complete cartage within 10 miles (a):- 50 mm e/d | P-Rft | 200 | 295.13 | ( Rupees Two Hundred Ninty-five, Paisa Thirteen Only) | 59026 |
| 32 | 23 | Providing and fixing water tank made of food grade polyethylene material 400 gallon (Supper tuff) i/c cost of specials and cartage upto site as per direction of Engineer in charge. | Each | 4 | 20437.5 | ( Rupees Twenty Thousand, Four Hundred Thirty-seven, Paisa Fifty Only) | 81750 |
| 33 | 24 | Providing and fixing cast iron foot valve with flanged ends complete with a strainer suitable for fixing to 1 inch dia. suction pipe including 1/8 inches thick rubber washer… | Each | 4 | 1118.75 | ( Rupees One Thousand, One Hundred Eighteen, Paisa Seven-five Only) | 4475 |
| 34 | 25 | Excavation in all kinds of soil, murum, hard, average or soft including lift up to 5 feet and lead up to one chain.. | %Cft | 588 | 1840.9 | ( Rupees One Thousand, Eight Hundred Forty, Paisa Ninty Only) | 10824.492 |
| 35 | Total:- | ||||||
| GRAND TOTAL: | Rs 1,979,558.48 |
Job: Electrification (Internal)
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Wiring for light or fan point with (3/.029") PVC insulated wire in 20 mm, (3/4") dia uPVC conduit recessed in the wall, column, roof , i/c 1mm² s/c PVC insulated wire as ECC as required. | P.Pts | 115 | 2836 | ( Rupees Two Thousand , Eight Hundred Thirty-six Only) | 326140 |
| 2 | 2 | Wiring for two way light point with (3/.029") PVC insulated wire in 20 mm, (3/4")dia uPVC conduit recessed in the wall, column, roof , i/c 1mm², s/c PVC insulated wire as ECC as required. | P.Pts | 4 | 3389 | ( Rupees Three Thousand , Three Hundred Eighty-nine Only) | 13556 |
| 3 | 3 | Wiring for plug point with (3/.029") PVC insulated wire in 20mm (3/4") dia uPVC conduit recessed in the wall, column, roof, i/c 1mm², s/c PVC insulated wire as ECC as required. | P.Pts | 38 | 1545 | ( Rupees One Thousand , Five Hundred Forty-five Only) | 58710 |
| 4 | 4 | Extension/Additional wiring for light, fan, call bell or light plug point, controlled with same switch with (3/.029") PVC insulated wire in 20 mm (3/4") dia uPVC conduit recessed in wall, column or roof i/c 1mm² s/c, PVC insulated wire as ECC as required. | P.Pts | 40 | 1179 | ( Rupees One Thousand , One Hundred Seventy-nine Only) | 47160 |
| 5 | 5 | Wiring for sub-main with 2x 1.5 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20mm (3/4")dia uPVC conduit recessed in the wall, column & roof etc i/c 1mm² PVC insulated wire s/c wire as ECC as required. | P.Mtr | 450 | 325 | ( Rupees Three Hundred Twenty-five Only) | 146250 |
| 6 | 6 | Wiring for sub-main with 2x 2.5 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20mm (3/4")dia uPVC conduit recessed in the wall, column & roof etc i/c 1.5 mm² PVC insulated wire s/c wire as ECC as required. | P.Mtr | 400 | 449 | ( Rupees Four Hundred Forty-nine Only) | 179600 |
| 7 | 7 | Wiring for sub-main with 2x 4 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20mm (3/4")dia uPVC conduit recessed in the wall, column & roof etc i/c 1.5 mm² PVC insulated wire s/c wire as ECC as required. | P.Mtr | 350 | 640 | ( Rupees Six Hundred Forty Only) | 224000 |
| 8 | 8 | Wiring for sub-main with 2x 6 mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 25mm (1")dia uPVC conduit recessed in the wall, column and roof etc including 2.5 mm² PVC insulated wire single core wire as ECC as required. for AC Circut. | P.Mtrs | 250 | 805 | ( Rupees Eight Hundred Five Only) | 201250 |
| 9 | 9 | Providing & laying 4 core, PVC insulated & PVC sheathed, 600/1000 volts grade with stranded copper conductor , armoured underground, L.T cable buried in the ground dully covered with sand and warning cable tiles as per Pak. P.W.D specification as required at site | |||||
| 10 | 16 mm² | P.Rft | 250 | 1490 | ( Rupees One Thousand , Four Hundred Ninty Only) | 372500 | |
| 11 | 10 | Providing and fixing Earthing set with 2'x2'x1/8'' copper plate buried in the ground at a depth of 12 feet or less if water comes out from the ground level (with salt and charcoal, or Earthing chemical Powder) etc making the pit 12 feet deep by excavation of all type of soil (except soft or hard rock) i/c fixing of 8 SWG copper wire in 1/2 '' G.I conduit complete in all respect as required. | P.Job | 2 | 54979 | ( Rupees Fifty-four Thousand , Nine Hundred Seventy-nine Only) | 109958 |
| 12 | 11 | S/F 25mm (1") dia uPVC conduit with all especial such as bends, sockets, Junction etc recessed in wall or column as required for phone / Etc. | P/Mtr | 50 | 181 | ( Rupees One Hundred Eighty-one Only) | 9050 |
| 13 | 12 | S/F 40mm (1½")dia uPVC conduit with all especial such as bends, sockets, Junction etc recessed in wall or column as required. | P.Mtr | 80 | 293 | ( Rupees Two Hundred Ninty-three Only) | 23440 |
| 14 | 13 | S/F 50mm (2") dia uPVC conduit with all especial such as bends, sockets, Junction etc recessed in wall or floor as required. | P.Mtr | 30 | 384 | ( Rupees Three Hundred Eighty-four Only) | 11520 |
| 15 | 14 | Providing & fixing 10 Amps Polycarbonate flame retardant S.P switch with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 115 | 294 | ( Rupees Two Hundred Ninty-four Only) | 33810 |
| 16 | 15 | P/F 10 Amps Polycarbonate flame retardant two way switch with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 4 | 348 | ( Rupees Three Hundred Forty-eight Only) | 1392 |
| 17 | 16 | P/F 10 Amps Polycarbonate flame retardant 2-Pin socket with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 20 | 321 | ( Rupees Three Hundred Twenty-one Only) | 6420 |
| 18 | 17 | P/F 10 Amps Polycarbonate flame retardant Bell Push with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 1 | 308 | ( Rupees Three Hundred Eight Only) | 308 |
| 19 | 18 | P/F Polycarbonate flame retardant click type fan dimmer of all any sweep with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 12 | 689 | ( Rupees Six Hundred Eighty-nine Only) | 8268 |
| 20 | 19 | P/F Polycarbonate flame retardant TV socket with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 8 | 556 | ( Rupees Five Hundred Fifty-six Only) | 4448 |
| 21 | 20 | P/F Polycarbonate flame retardant Digital Telephone socket with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 10 | 556 | ( Rupees Five Hundred Fifty-six Only) | 5560 |
| 22 | 21 | P/F 10Amps Polycarbonate flame retardant universal/schuko socket with fancy "Ivory" gang plate fixed on die fabricated, powder coated, metal board recessed in wall or column i/c connection as required. (MATRIX / SOK / TJ Series / TRUST make) | Each | 56 | 689 | ( Rupees Six Hundred Eighty-nine Only) | 38584 |
| 23 | 22 | P/F 6 Amps plastic batten / Angle holder on PVC Round block / Round Cover fitted on surface i/c connection as required. | Each | 15 | 342 | ( Rupees Three Hundred Forty-two Only) | 5130 |
| 24 | 23 | P/F 6 Amps plastic ceiling rose on PVC Round block / Round Cover fitted on surface i/c connection as required. | Each | 9 | 245 | ( Rupees Two Hundred Forty-five Only) | 2205 |
| 25 | 24 | Providing & fixing 6 to 32Amps, S.P MCCB fixed on existing board, i/c inter-connection as required. | Each | 31 | 870 | ( Rupees Eight Hundred Seventy Only) | 26970 |
| 26 | 25 | Providing & fixing 10 to 60Amps, (High Breaking Capacity) T.P MCCB fixed on existing board, i/c inter-connection as required. | Each | 2 | 10338 | ( Rupees Ten Thousand , Three Hundred Thirty-eight Only) | 20676 |
| 27 | 26 | Providing & fixing 6 to 32Amps, DP MCCB fixed on existing board, i/c inter-connection as required. | Each | 2 | 2410 | ( Rupees Two Thousand , Four Hundred Ten Only) | 4820 |
| 28 | 27 | Providing & fixing Cubical type metal sheet Distribution Board with locking arrangement as per drawing, vermin protected duly powder coated paint i/c all fastening material i/c wiring with suitable gauge PVC x PVC wire complete as required. | P/Sft | 9 | 6006 | ( Rupees Six Thousand Six Only) | 54054 |
| 29 | 28 | Providing & fixing cubical type metal sheet vermin protected LT panel board as per drawing with locking arrangement duly powder coated I/c all fastening devices and electrical wire/ leads for internal connection complete as required. | P/Sft | 6 | 10756 | ( Rupees Ten Thousand , Seven Hundred Fifty-six Only) | 64536 |
| 30 | 29 | Providing & fixing pilot lamp set fitted on existing board I/c connection as required. | P/Set | 3 | 872 | ( Rupees Eight Hundred Seventy-two Only) | 2616 |
| 31 | 30 | P/I, Testing & Commissioning of recessed/surface mounted ceiling lights/downlights i/c driver, having warm/neutral white/cool white colour, 80-90lm/watts efficiency, 0.9 or above P.F, 20000-25000hrs life cycle, i/c connection, complete in all respect as approved by the Engineer Incharge. | |||||
| 32 | 18 - 20 Watts | Each | 74 | 2886 | ( Rupees Two Thousand , Eight Hundred Eighty-six Only) | 213564 | |
| 33 | 31 | Providing, Installation, Testing & Commissioning of recessed / surface mounted LED Panel Light including driver, having warm / neutral white / cool white colour, 80-100 lm/watts efficiency, 0.9 or above power factor, 20000-25000 hours life cycle, including connection, complete in all respect as approved by the Engineer Incharge. | |||||
| 34 | 36 Watts (2 ft X 2 ft) | Each | 12 | 11070 | ( Rupees Eleven Thousand , Seventy Only) | 132840 | |
| 35 | 32 | P/I, Testing & Commissioning of LED Tube/Batten Lights i/c driver having warm/Neutral White/cool white colour, 80-90lm/w efficiency, 0.9 or above PF, 10000-15000hrs life cycle, i/c connection, complete in all respect as approved by the Engineer Incharge. | |||||
| 36 | 2 Feet 18-20 Watts | Each | 8 | 1957 | ( Rupees One Thousand , Nine Hundred Fifty-seven Only) | 15656 | |
| 37 | 4 Feet 36 Watts | Each | 18 | 3854 | ( Rupees Three Thousand , Eight Hundred Fifty-four Only) | 69372 | |
| 38 | 33 | P/I 120cm/48" sweep ceiling fan with blades,canopy,standard length of down rod i/c connection with 14.0076" flexible wire complete as required. (without regulator) Pak, Royal, GFC, Younas, Millat. | Each | 1 | 8369 | ( Rupees Eight Thousand , Three Hundred Sixty-nine Only) | 8369 |
| 39 | 34 | P/I 140cm/56" sweep ceiling fan with blades,canopy,standard length of down rod i/c connection with 14.0076" flexible wire complete as required. (without regulator) Pak, Royal, GFC,Younas,Millat. | Each | 9 | 9349 | ( Rupees Nine Thousand , Three Hundred Forty-nine Only) | 84141 |
| 40 | 35 | P/I 40cm/16" sweep,metallic body Exhaust fan complete with blades, motor, etc fitted in existing hole i/c connection with 14.0076" flexible wire complete as required Pak,Royal,GFC,Younas,Millat. | Each | 1 | 6263 | ( Rupees Six Thousand , Two Hundred Sixty-three Only) | 6263 |
| 41 | 36 | P/I 30cm/12" sweep, Plastic body Exhaust fan complete with blades, motor, etc fixed in existing hole i/c connection with 14/.0076" flexible wire complete as required Pak,Royal,GFC,Younas,Millat. | Each | 8 | 4672 | ( Rupees Four Thousand , Six Hundred Seventy-two Only) | 37376 |
| 42 | 37 | Providing & fixing low pressure gas PPRC pipe (medium) with special such as bend, Tee, union and socket etc as required. | |||||
| 43 | 20 mm (3/4'') dia | P.Rft | 30 | 251 | ( Rupees Two Hundred Fifty-one Only) | 7530 | |
| 44 | 38 | Providing and fixing brass valve ball type screw both ends complete with steel handle washer/ nut as required. | |||||
| 45 | 20 mm (3/4'') dia | Each | 2 | 1143 | ( Rupees One Thousand , One Hundred Forty-three Only) | 2286 | |
| 46 | 39 | P/F Cooking Range Superior Quality, manual ignition, complete with all accessories i/c connection with gas line as approved by Engineer Incharge. | |||||
| 47 | 5 Burner 34'' Size | Each | 1 | 39185 | ( Rupees Thirty-nine Thousand , One Hundred Eighty-five Only) | 39185 | |
| GRAND TOTAL: | Rs 2,619,513.00 |
Job: Boundary Wall
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Excavation for foundation trenches and drains in all kinds of soil (except gravelly and murum soil, wet silt, clay or mud conglomeration of gravel and boulders, soft, sandy or disintegrated sandy and hard rock) and back filling the excavated material in foundation, plinth or under floor including breaking clods, watering, consolidation by ramming in layers not exceeding 9 inches in depth to full compaction, dressing and disposal of surplus excavated stuff as directed, lead upto one chain and lift upto 5 feet . | %Cft | 1989 | 1624.63 | ( Rupees One Thousand, Six Hundred Twenty-four, Paisa Sixty-three Only) | 32313.8907 |
| 2 | 2 | Providing and laying 1:4:8 cement concrete using graded stone ballast 2 inches and down gauge in foundation including levelling, compacting and curing etc. complete. | %Cft | 332 | 21744.25 | ( Rupees Twenty-one Thousand, Seven Hundred Forty-four, Paisa Twenty-five Only) | 72190.91 |
| 3 | 3 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in raft and strip foundation with column and piller required shape or section including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the... | %Cft | 497 | 33203.65 | ( Rupees Thirty-three Thousand, Two Hundred Three, Paisa Sixty-five Only) | 165022.1405 |
| 4 | 4 | Providing and laying reinforced cement concrete using crush graded Boulder 3/4 inch (19 mm) and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch (20.69 N/mm2 ) at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth. | %Cft | 47 | 43741.87 | ( Rupees Forty-three Thousand, Seven Hundred Forty-one, Paisa Eighty-seven Only) | 20558.6789 |
| 5 | 5 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls Morethen 13-1/2 inches thick including scaffolding, raking, out joints and curing etc. complete in foundation, basement and plinth (foundation and basement masonry upto 5-feet depth and plinth upto 4-feet height from ground level. | %Cft | 450 | 36129.72 | ( Rupees Thirty-six Thousand, One Hundred Twenty-nine, Paisa Seventy-two Only) | 162583.74 |
| 6 | 6 | Providing and laying reinforced cement concrete using crush graded Boulder 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs.. per sq inch at 28 days with a mix not leaner than 1:2:4 in plinth beams of required shape and design including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, tn foundation basement and plinth | %Cft | 166 | 40365.27 | ( Rupees Forty Thousand, Three Hundred Sixty-five, Paisa Twenty-seven Only) | 67006.3482 |
| 7 | 7 | Providing and laying reinforced cement concrete using crush graded Boulder 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in Ground Floor Supersturcture. | %Cft | 95 | 52698.67 | ( Rupees Fifty-two Thousand, Six Hundred Ninty-eight, Paisa Sixty-seven Only) | 50063.7365 |
| 8 | 8 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in straight beams, lintels, cantilever beams of required shape or section including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the... (a):- Ground Floor. | %Cft | 75 | 47322.89 | ( Rupees Forty-seven Thousand, three Hundred twenty-two, Paisa Eighty-nine Only) | 35492.1675 |
| 9 | 9 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . | P-Kg | 2489.0868596882 | 282.45 | ( Rupees Two Hundred Eighty-two, Paisa Forty-five Only) | 703042.58351893 |
| 10 | 10 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls 9 to 13-1/2 inches thick including scaffolding, raking, out joints and curing etc. complete in ground floor superstructure . | %Cft | 864 | 41260.97 | ( Rupees Forty-one Thousand, Two Hundred Sixty, Paisa Ninty-seven Only) | 356494.7808 |
| 11 | 11 | 1/2" thick cement plaster 1:4 using sand on walls and columns etc. in basement, plinth, mezzanine and ground floor including making edges, corners and curing etc., complete. | %-Sft | 3042 | 4381.84 | ( Rupees Four Thousand, Three Hundred Eighty-one, Paisa Eighty-four Only) | 133295.5728 |
| 12 | 12 | Painting three coats with weather shield paint deluxe (ICI) make of approved shade on plaster surface (External) and including the cost of cleaning the surface, sand papering etc. complete at any height in any floor. | %Sft | 3042 | 4408.75 | ( Rupees Four Thousand, Four Hundred Eight, Paisa Seventy-five Only) | 134114.175 |
| 13 | 13 | Providing and fixing steel gate of flat iron sections of approved design with or without M.S. sheet covering including hold fast, with or without rollers and track arrangement including providing wicket shutter of required size with all accessories and locking arrangement complete as per direction of the Engineer-in-Charge. | P-kg | 409.5 | 346.44 | ( Rupees Three Hundred Forty-six, Paisa Forty-four Only) | 141867.18 |
| 14 | 14 | Painting iron work with synthetic enamel paint of approved make and shade two coats over and including the cost of one priming coat complete at any height in any floor . | %Sft | 221 | 6071.25 | ( Rupees Six Thousand, Seventy-one, Paisa Twenty-five Only) | 13417.4625 |
| 15 | TOTAL | ||||||
| GRAND TOTAL: | Rs 2,087,463.37 |
Job: Road and Paths
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Preparation of sub-grade over top of embankment already compacted to at least 95% modified A.A.S.H.O. maximum dry density with required dressing including cutting to required grade, camber and side slopes and disposal of surplus earth within three chains lead complete. | %Sft | 1800 | 871.88 | ( Rupees Eight Hundred Seventy-one, Paisa Eighty-eight Only) | 15693.84 |
| 2 | 2 | Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidation by ramming in layers not exceeding 9 inches in depth to full compaction and lift upto 5 feet. | %Cft | 900 | 4869.94 | ( Rupees Four Thousand, Eight Hundred Sixty-nine, Paisa Ninty-four Only) | 43829.46 |
| 3 | 3 | Providing and laying 1:4:8 cement concrete in any thickness using 2" and down gauge stone ballast of approved grade and quality over prepared sub-grade or sand cushion in roads, paths, creteways laid to required gradient and camber including cost of necessary form work and its removal compacting with vibrators including curing etc. complete . | %Cft | 900 | 27877.27 | ( Rupees Twenty-seven Thousand, Eight Hundred Seventy-seven, Paisa Twenty-seven Only) | 250895.43 |
| 4 | 4 | Providing and laying in situ 1:2:4 cement concrete using crushed graded boulders 3/4 inch and down gauge in foundation, basement and plinth including form work, compacting, curing and removal of form work etc.complete, foundation and basement up to 5 feet depth and plinth up to 4 feet height from ground level. | %Cft | 100 | 39059.08 | ( Rupees Thirty-nine Thousand, Fifty-nine, Paisa Eight Only) | 39059.08 |
| 5 | 5 | Providing and laying in floor C.C. 1:2:4: tuff paver 2-1/2" thick of approved design and colour pattren (average strength 7000 psi) laid on sand cushion filling of joint with sand and warring etc. complete as per direction of Engineer Incharge. (the cost of sand cushion is not included) | P-Sft | 1800 | 135.13 | ( Rupees One Hundred, Thirty-five, Paisa Thirteen Only) | 243234 |
| 6 | TOTAL | ||||||
| GRAND TOTAL: | Rs 592,711.81 |
Job: Hostel Building Civil work(Non Schedule)
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Providing and fixing WPC ( wood plastic composite) bath doors with frame complete in all respect ( appvored Make) with 4mm to 6mm thickness wall as approved by Engineer-in-charge including iron fittings etc., complete but excluding the cost of handles and locking arrangement. | P-Sft | 140 | 1250 | ( Rupees One Thousand, Two Hundred, Fifty Only) | 175000 |
| 2 | Total:- (B) | ||||||
| GRAND TOTAL: | Rs 175,000.00 |
Job: Electrification(Non Schedule)
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | S/I & commissioning of LED Solar Street LED Lights, 180watt with Integrated Battery & Charge Controllar, 100-150lm/watt, Charge Controlar, Auto On/Off, Time Control, Radar Sensor, Brightness Control, 3000-6200K, Strong Pressure Support ABS meterial Alumnium body Corrosion Resistant with mono Crystalline Solar Plate, waterproof & thickened boom joint complete in all respect as required for standard work Light make SE,Factor,Forth Lighting or equvialent best quality as approved & directed by Engineer Incharge | Each | 10 | 35800 | ( Rupees Thirty-five Thousand, Eight Hundred Only) | 358000 |
| 2 | 2 | P/F 5 ft long, 1-1/4" dia GI pipe with 45O or as required angle bracket with MS flat strip clamp fitted on wal / pole with bolts i/c making connection as required & as approved by the Engineer incharge. | Each | 10 | 3168 | ( Rupees Three Thousand, One Hundred, Sixty-eight Only) | 31680 |
| 3 | 3 | Providing, Installation, Testing & Commissioning of wall bracket light (superior quality) wall bracket light with glass shade/ globe / cyristal / wooden type etc complete with 12-13 watts LED bulbs (Osaka / Pak Lite) i/c inter-connection or as approved by the Engineer in-charge as required. | |||||
| 4 | Single arm wall bracket light.(best quality) | Each | 2 | 4600 | ( Rupees Four Thousand, Six Hundred Only) | 9201 | |
| 5 | Double arms wall bracket light.(best quality) | Each | 2 | 7500 | ( Rupees Seven Thousand, Five Hundred Only) | 15000 | |
| 6 | Total of Non Schedule Items:- RS | ||||||
| GRAND TOTAL: | Rs 413,881.00 |
1) Hostel Building Civil Work (Ground plus two) 2) Water Supply and Sanitary Fitting 3) Electrification (Internal) 4) Boundary Wall 5) Road and Path 6) Hostel Building Civil Work (Non Schedule) 7) Electrification (internal) Non Schedule
8) Architectural/Structural Design and other necessary drawings will be managed by the contractor 9) Soil investigation will be done by the contractor.
Note: i) Rates for the work at S. No. 8 and S.No.9 may also be mentioned in the quotation.
ii) Building and Standard Codes developed by Pakistan Engineering Council (PEC) must be followed.
iii) Green Building Code of Pakistan GBCP2023, Rainwater Harvesting Porvision for Builiding Code of Pakistan RWH-BCP2023 AND Occupational Safety and Health Code of Practice for consturction sector of Pakistan OSH-CPCSP-2025 must be implemented.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
The Supplier is:
The title of the subject procurement is: Construction of Hostel Accomodation
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist
MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
+92-333-245-6254
wsrsukkur@gmail.com
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist
MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
+92-333-245-6254
wsrsukkur@gmail.com
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 1.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Copies of the packing list identifying contents of each package;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P69032
To: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Construction of Hostel Accomodation (P69032) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}