In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
PIAHCL (Real Estate), Manager RE
4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad
+92-303-503-1198
mgr.realestate@piahcl.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: PIAHCL (Real Estate) The subject of procurement is: ESTABLISHMENT OF PIAHCL CORPORATE OFFICE AT ZTBL H.O, 7TH FLOOR, ANNEX BUILDING, ISLAMABAD Expected commencement date: Monday, August 24, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P69692 |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, July 28, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on PIAHCL (Real Estate) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
|
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 90 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; 4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Monday, August 10, 2026 03:00 PM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Monday Date: August 10, 2026 Time : 03:30 PM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 0%. The Performance Guarantee shall be acceptable in the form of: Nil |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Sole Proprietorship Partnership Firm Company (Private Limited) | FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Company Profile. | Yes |
| National Tax Number/ (NTN) Certificate. | Yes |
| Sales Tax Registration Certificate. | Yes |
| Active Taxpayer List (ATL) Status. | Yes |
| Valid Pakistan Engineering Council (PEC) Registration (C-6 or above Category) | Yes |
| Bid Security of PKR 216,564/- (Pay Order) | Yes |
| Tender Fee PKR 15,000/- | Yes |
| Authority Letter / Power of Attorney (if applicable) | Yes |
| Documentary evidence of similar completed works executed during the last five (05) years, comprising at least three (03) Work Orders and Completion Certificates, or Performance Certificates in case of works in progress, each having a value of PKR 7.0 Million or above. | Yes |
| Financial Statements / Bank Certificate | Yes |
| Affidavit on stamp paper confirming that the bidder has not been blacklisted by any Government, Semi-Government, Autonomous or Private Organization. | Yes |
| Certificate/Undertaking confirming that the bidder has fully read, understood and accepted the Eligibility Requirements and Important Conditions of the bidding documents. | Yes |
| Submission of all mandatory documents is compulsory. Failure to submit any required document shall result in disqualification of the bid. | Yes |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| ESTABLISHMENT OF PIAHCL CORPORATE OFFICE AT ZTBL H.O, 7TH FLOOR, ANNEX BUILDING, ISLAMABAD | Address: 4th Floor, PIA Building, 49-AKM, Fazal-e-Haq Road, Blue Area., Islamabad Capital Territory Schedule: 27 Days Quantity: 1/job |
1/job | 216564 PKR |
No
Jobs Without Lots :
Job: ESTABLISHMENT OF PIAHCL CORPORATE OFFICE AT ZTBL H.O, 7TH FLOOR, ANNEX BUILDING, ISLAMABAD
Specifications / Requirements:
| Sr. No | Sr.NO | Description of Item | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|---|
| 1 | 1 | Description of Items to be read with Technical Specifications, Drawings & Condition of Contract. | ||||
| 2 | 2 | The quantities, dimensions and specifications stated in this Bill of Quantities are based on the available drawings, preliminary site information and current project requirements. All quantities shall be verified by the bidder/contractor through detailed examination of the drawings, specifications and actual site conditions before submission of the bid and commencement of work. | ||||
| 3 | 3 | The bidder shall be deemed to have inspected the site and fully understood the nature, scope, access limitations, working conditions and requirements of the works. No claim arising from failure to inspect the site, verify dimensions or properly assess the work shall be entertained. | ||||
| 4 | 4 | The mentioned brand names are provided to establish the required minimum standard of quality and performance. Equivalent products may only be used subject to prior written approval of the Engineer-in-Charge/Employer. All materials, samples, finishes, colours, equipment and shop drawings shall be submitted for approval before procurement, fabrication or installation. | ||||
| 5 | 5 | Quoted rates shall be inclusive of all materials, labour, tools, plant, equipment, transportation, loading and unloading, wastage, scaffolding, cutting, fixing, testing, commissioning, protection of existing works, making good, disposal of debris, overheads, profit, taxes, duties and all incidental works necessary for proper completion of each item, unless specifically stated otherwise. | ||||
| 6 | 6 | The quantities indicated in the BOQ are provisional and may be increased, decreased, omitted or substituted according to actual site requirements and approved drawings. Payment shall be made against actual measured and verified quantities of satisfactorily completed work at the accepted unit rates. No additional payment shall be admissible for work that is reasonably implied by the drawings, specifications or item descriptions and is necessary for complete execution. | ||||
| 7 | 7 | In the event of any discrepancy between the BOQ, drawings, specifications or site conditions, the matter shall be referred to the Engineer-in-Charge before execution. The decision of the Employer/Engineer-in-Charge shall be final, subject to the applicable contract conditions. | ||||
| 8 | 8 | The Employer reserves the right to revise the scope, quantities, specifications and execution sequence, and to accept or reject any item, material or workmanship that does not comply with the approved drawings, specifications, applicable standards or contractual requirements. | ||||
| 9 | 9 | All items described under title "Description" unless specifically indicated otherwise, shall be deemed to be read in terms of supply, storing, protecting, making, assembling, installing, applying, laying, fixing, testing, commissioning, clearing, wastage etc. including all materials, labor, tools, plants, equipments, appliances etc. as required for the completion and maintenance as per drawings, specifications, manufacturer's instructions and/or as directed by the Engineer In charge. Water Supply for construction purpose shall be sole responsibility of the Contractor and shall be as per Standard free from impurities. | ||||
| 10 | 10 | Site Offices, Store and Labor Camps and their Space would be sole responsibility of Contractor. | ||||
| 11 | 11 | The Contractor shall arrange permission of Local Authorities/Landlord for dumping/staking of Construction Materials and Disposal of dismantled materials outside Bank's Premises. | ||||
| 12 | 12 | The Contractor shall arrange permission of Local Authorities/Landlord for dumping/staking of Construction Materials and Disposal of dismantled materials outside Bank's Premises to some suitable place. | ||||
| 13 | 13 | CIVIL & FINISHING WORKS | ||||
| 14 | 14 | Carefully dismantling and removing of inclusive of all existing wooden partition walls, brick masonry walls, concrete walls, floor finishes, wall finishes, ceramic/porcelain tiles, and other associated building elements as required for renovation, flooring, plumbing, sewerage, and related construction works. The item shall include cutting, breaking, dismantling, loading, transportation, and disposal of all surplus and debris material from the site to an approved dumping location, complete in all respects, in accordance with the drawings, specifications, and the instructions of the Engineer. Disposal shall be carried out at a location approved by the Engineer or as directed by the Landlord. The contractor shall ensure protection of adjacent structures, services, and finishes during execution of the works. | Job | 1 | 85,000 | 85,000 |
| 15 | 15 | Providing/Fixing burnt brick masonry 4-1/2” thick wall by using 1st class approved good quality bricks laid in cement sand mortar (1:4) using medium coarse sand, specifications and satisfaction of the Engineer. | Sft | 200 | 187 | 37,400 |
| 16 | 16 | Providing/Fixing burnt brick masonry 9” thick wall by using 1st class approved good quality bricks laid in cement sand mortar (1:4) using medium coarse sand, specifications and satisfaction of the Engineer. | Cft | 113 | 378 | 42,553 |
| 17 | 17 | P/L 1:4:8 PCC 4" average thick floor on the plinths i/c Chipping, cleaning of the floor, leveling, curing, grading, compacting etc complete as per direction of the site Engineer. | Cft | 89 | 362 | 32,263 |
| 18 | 18 | Providing & Applying 3/4" thick Cement Sand Plaster (1:4 mix) over new/ old surfaces, bricks walls, concrete columns, soffits of slabs and beams etc. i/c making edges, corners, grooves, and fixing of wire mesh using nails at junction of concrete & bricks, chipping/ roughening, cleaning, preparation of surface, curing, scaffolding and subsequent its removal in any floor at any height complete in all respects conforming to specification as per instruction of site Engineer. | Sft | 1,550 | 38 | 59,288 |
| 19 | 19 | Providing and fixing Drywall Partition (4" thick) comprising gypsum board sheets screwed to G.I. Track U Channel (72mm × 32mm × 32mm × 0.50mm thick) fixed at top and bottom, and G.I. Studs (C-Channel) (70mm × 34mm × 36mm × 0.50mm thick) installed at 2'-0" centre-to-centre vertical spacing within the channel framework to form the partition. The work shall include providing and fixing 12mm thick gypsum board conforming to ASTM 1396 on both sides of the framework, complete with Rockwool insulation infill, jointing compound, self-adhesive fibreglass joint tape, corner angle beads, drywall screws (3.5mm × 25mm), flexible metal corner tape, surface preparation, sanding/grinding of joints with abrasive paper, and all associated accessories required to achieve a smooth, uniform and finished surface. The item shall be completed in all respects, strictly in accordance with the drawings, specifications, and as approved by the Engineer In-Charge. | Sft | 2,000 | 383 | 765,000 |
| 20 | 20 | Providing and fixing aluminum glazed partition fabricated from anodized/powder-coated aluminum sections of Al-Cop, Chawla, Prime, or approved equivalent manufacturer, comprising 2mm thick aluminum frame sections (D48-A profile), complete with 12mm thick tempered glass, including sandblasting and edge polishing. The rate shall include the cost of tear-resistant film & frosting, rubber gaskets, all necessary hardware and accessories, fixing materials, installation, alignment, adjustment, and all associated works required for complete execution of the partition system. The work shall be completed in all respects, strictly in accordance with the drawings, specifications, and as approved and directed by the Engineer In-Charge. | Sft | 800 | 1,360 | 1,088,000 |
| 21 | 21 | Providing, fabricating and fixing full-height glazed wooden partition of approved design and pattern, comprising 2'-0" × 2'-0" or 3'-0" × 3'-0" glass panels, or other approved panel sizes to suit the site dimensions and architectural drawings. The main framework shall be made of first-class, seasoned solid Kail wood (3"×3" or 3"x2"), free from knots, warping, cracks and other defects, with vertical and horizontal members of adequate section and strength. The partition shall be glazed with 8 mm thick clear/tinted toughened glass, securely fixed within the wooden framework using matching Kail wood glazing beads, approved rubber gaskets, clear silicone sealant and all necessary accessories. The item shall include approved wood stain and matt or semi-gloss lacquer/polish finish, including surface preparation, sanding, wood filler, sealer and the required number of finishing coats to achieve a smooth and uniform appearance. The work shall also include cutting, jointing, framing, fixing to floors, walls and ceilings, levelling, alignment, necessary timber supports, anchors, screws, fasteners, sealants, making good adjoining surfaces and all labor, materials, tools, transportation and accessories required to complete the partition in all respects, in accordance with the approved shop drawings, samples and directions of the Engineer-in-Charge. | Sft | 200 | 1,700 | 340,000 |
| 22 | 22 | Providing and fixing 12 mm Tempered Glass Door frameless comprising of aluminum H-section (D48) at bottom, H-type S.S frameless handles both side (approved), top pivot hinges, bottom concealed floor machine hinges, s.s patch fitting, D glass door lock (approved), frosting and all the cost of using approved standard fittings, accessories etc., and hardware any required, as shown on drawings, complete in all respect as per Specifications, as approved by the Engineer. | Sft | 25 | 1,870 | 45,815 |
| 23 | 23 | Providing & Fixing 2' x 2' Vinyl quoted exposed gypsum ceiling of Elephan, Arish or approved equivalent of approved shade/design suspended by means of G.I. wire 12 gauge fixed in slab/beam with pvc rawal plugs and powder coated of matching color 1" x 1" aluminum Tee, 1" x 1" angle at junction of the ceiling and wall and at off set complete with leveling etc. i/c the cost of removal/re-fixing of fans with pipes/rods, light fittings etc. as per instruction of the Engineer In-charge at any height in any floor. The net area shall be considered for payment). | Sft | 850 | 187 | 158,950 |
| 24 | 24 | Providing, laying and jointing Premium Quality Imported HDF Laminated Wooden Flooring 12 mm thick (sustainable certification compliance) of approved color, shade, size and surface finish, having properties of water resistance, UV resistance, stain resistance, scratch resistance and abrasion resistance, conforming to EN 438 standards. The rate shall include the cost of edging, underlayment (minimum 2mm thick Polyethylene/EVA), cutting, fitting, jointing, skirting, finishing and all accessories required for complete installation, in accordance with the approved specifications and as approved by the Engineer In-Charge. | SFt | 850 | 723 | 614,125 |
| 25 | 25 | Providing and fixing wooden vertical decorative batten screen/louvers, comprising seasoned wooden battens of approved size and finish, fixed vertically at equal spacing on a concealed wooden framework, complete with screws, brackets, nails, adhesive, polishing/PU finish, cutting, fitting, all accessories, labour and everything required to complete the work as per drawings and the Engineer's approval. | Sft | 300 | 935 | 280,500 |
| 26 | 26 | Providing and fixing built-in wooden planter box made of moisture-resistant MDF/plywood with approved natural wood veneer/laminate finish, complete with internal waterproof lining, concealed framing, all necessary hardware and fixing accessories, including the supply, planting and establishment of approved natural indoor plants suitable for interior conditions, complete with appropriate growing medium, drainage arrangement, decorative pebbles and all associated works, as per drawings and Engineer’s approval. | Rft | 70 | 1,870 | 130,900 |
| 27 | 27 | Providing and fixing of rolling blinds made of fabric i/c Roller blind Bead Chain, clutch, 28mm/38mm Bracket Set Plastic/Metal Chain complete in all respect in any floor at any height. | Sft | 960 | 404 | 387,600 |
| 28 | 28 | Providing and laying superb quality Porcelain glazed tiles Floor/wall of Master/ Stile brand or approved equivalent manufacturer, skirting/dado of specified size 600mmx 1200 mm (24"x48") or 600mm x 600 mm (24"x24"), Color and Shade with adhesive/ bond over 1/2"thick (1:2) cement plaster i/c the cost of matching sealer for finishing the joints, laser cutting grinding complete in all respect as approved and directed by the Engineer In charge. | Sft | 1,380 | 383 | 527,850 |
| 29 | 29 | Providing and fixing first-class Deodar wood solid flush/panel door 1-1/2" (38 mm) thick, of approved design, size and pattern, fixed at any floor for office rooms, washrooms or wherever required, i/c glass panel. The glass panel shall be of approved size and configuration, comprising 6 mm thick clear/tinted toughened safety glass, securely fixed with Deodar wood glazing beads, approved sealant and necessary accessories. The item shall include an approved hardwood door frame, wooden architraves/beading on both sides, stainless-steel hinges, mortise door lock with cylinder and keys, lever handles, tower bolt, rubber or magnetic door stopper, GI holdfasts/clamps, screws, fasteners and all necessary ironmongery. It shall also include fitting, glazing, hanging, alignment, easing, cutting, fixing, lacquer matt polish or enamel paint, as approved, and all labour, materials, tools, transportation and accessories required to complete the work in all respects, in accordance with the drawings and to the satisfaction of the Engineer-in-Charge. | Sft | 172 | 1,870 | 320,705 |
| 30 | 30 | Providing & Applying distempering at least 3-coats with distemper of ICI, Berger, Nippon of approved shade/ color scheme over new/ old surfaces of Walls, Ceiling or where required including cost of ready made putty filling (ICI, Burger, Nippon) for preparation of smooth surfaces in any floor at any height, complete in all respects as per Instruction of Engineer In-charge. | Sft | 8,000 | 34 | 272,000 |
| 31 | 31 | Providing, supplying and fixing approved quality decorative wallpaper of selected colour, texture, pattern and design on internal walls, including preparation of the existing surface by scraping, cleaning, sanding, filling cracks, holes and uneven areas with approved wall putty, application of primer/sealer where required, and fixing the wallpaper with approved adhesive. The wallpaper shall be properly aligned, matched at joints, neatly cut around corners, doors, windows, switches and other fixtures, and finished without bubbles, wrinkles, visible joints or loose edges. The item shall include all necessary labour, materials, adhesives, tools, wastage and accessories required to complete the work in all respects, in accordance with the approved sample and to the satisfaction of the Engineer-in-Charge. | Sft | 500 | 145 | 72,250 |
| 32 | 32 | Providing and fixing high-quality decorative PVC/WPC wall panels of approved colour, texture and pattern, fixed with approved adhesive and necessary framework/backing where required, including corner trims, edge trims, cutting, fitting, all necessary accessories, labour and materials, complete in all respects as per approved drawings and the instructions of the Engineer-in-Charge. | Job | 3 | 110,500 | 331,500 |
| 33 | 33 | Providing/Fixing filing cupboards 16” deep (openable door OR sliding door) consisting of Lamination board ¾” thick Patex, ZRK or Equivalent for partitions, shelves and laminated board ¾” thick for shutters along with back lasani ¼” and wooden edging/gola 1" soft wood frame 2"x1" kail wood i/c the cost long hinges, iron fittings, locking arrangement, polishing in wood colour over golas, wooden frame or where required i/c making grooves as per drawing/design etc. complete in any floor at any height. | Sft | 504 | 850 | 428,400 |
| 34 | 34 | Providing and laying 2'-0" wide and 1" thick pre-polished Granite Marble slab on kitchen and vanity counters, laid over ¾" thick cement sand mortar (1:3), including 2" to 4" deep matching granite nosing/drop on exposed edges, edge moulding, rubbing, chemical polishing, cutting, fitting and finishing. The item shall also include complete arrangement of concealed Mild Steel (MS) supporting/hanging frame of approved size and section, properly welded, fixed with anchor fasteners, treated with anti-rust primer and two coats of enamel paint, together with all necessary brackets, supports, hardware, labour, materials and accessories, complete in all respects as per approved drawings and to the satisfaction of the Engineer-in-Charge.. | Sft | 60 | 1,020 | 61,200 |
| 35 | 35 | Providing and fixing modular kitchen cabinets comprising moisture-resistant MDF/laminated board carcass with high gloss laminate finish on shutters and exposed surfaces, including base cabinets, overhead (wall-mounted) cabinets and tall units wherever shown on the drawings, complete with adjustable shelves, drawers, soft-close hinges, telescopic drawer channels, stainless steel handles, PVC edge banding, kick plate/plinth for base cabinets, all necessary hardware, screws, adhesives, cutting, fitting and all accessories required for complete installation. The work shall be completed in all respects as per approved drawings and to the satisfaction of the Engineer-in-Charge. | Sft | 100 | 935 | 93,500 |
| 36 | 36 | Floor Grinding/Chemical polishing over existing marble/mosaic floors by using the grinding vatties of all the numbers (0,1,2 &3) for grinding/cutting the surfaces of floors and then use the chemical polishing vatties of all the numbers ( ¾, 600, 800, Yellow & Buff) for polishing/making the surface of floors smooth and shined properly i/c filling with cement slurry of matching colour in joints or where required in any floor at any height i/c disposal of waste material where desired. Complete the job in all respect as desired/ entire satisfaction of Engineer Incharge. | Sft | 4,500 | 30 | 133,875 |
| 37 | 37 | Providing, supplying and fixing decorative PIAHCL signage/logo in approved design, size, colour and finish, fabricated from acrylic, stainless steel, aluminium composite panel or other approved material, complete with lettering, logo, backing, concealed supports, fixing accessories and illumination where required, installed at the designated location as per approved sample and instructions of the Engineer-in-Charge. | Job | 1 | 12,750 | 12,750 |
| 38 | 38 | Providing, supplying and fixing a decorative cable drop enclosure/vertical cable management arrangement for neatly concealing and routing electrical, data, telephone and other wires from ceiling level to workstations, counters or designated points. The enclosure shall be fabricated from approved-quality powder-coated metal, aluminium, MDF/plywood with laminate finish, or other approved decorative material, complete with internal cable segregation, removable access cover, supporting framework, brackets, clamps, sleeves, cable ties, fixing accessories and all necessary openings for safe entry and exit of cables. The item shall include cutting, drilling, making good disturbed surfaces, proper alignment, secure fixing and finishing in an approved colour, texture and design to match the surrounding interior. All cables shall be arranged neatly without exposed loose wiring, sharp bends or interference between electrical and data cables, complete in all respects as per drawings, approved sample and instructions of the Engineer-in-Charge. | No. | 6 | 10,200 | 61,200 |
| 39 | 39 | PLUMBING & SANITARY WORKS | ||||
| 40 | 40 | Providing, Laying, Fixing & Testing UPVC soil, waste, vent and rain water pipe as per BSS 4514 & 5255 or equivalent BS specifications including necessary Upvc fittings with solvent cement jointing or rubber ring joints, Master A - Class, Dadex, Shavyl, Galco or equivalent make as approved by the Engineer In-charge including clamps, bends, tees, y-tees, cowls, reducers, clean out etc., embedded in floors and walls, clamped to walls, suspended from slab, making requisite no. of holes and making good the same complete in all respects. | ||||
| 41 | 41 | 3" dia. | Rft | 100 | 298 | 29,750 |
| 42 | 42 | 4" dia. | Rft | 100 | 404 | 40,375 |
| 43 | 43 | Providing, Fixing, Joining & Testing Polypropylene random (PPRc) pipes of make Master A - Class, Dadex, Beta, Minhas or approved equivalent pressure pipe for cold/hot water as per DIN 8077-8078, PN-20 for pipes and DIN 16962, PN-25 for fittings (polyfusion welded joints) including fittings and specials (sockets, tees, elbows, bends crosses, reducers, adaptor, plugs, clamps and union etc., supported on walls or suspended from roof slab or run in chases including pipe hangers, supports, cutting and making good the chases and holes, complete in all respects. | ||||
| 44 | 44 | 25 mm | Rft | 250 | 94 | 23,375 |
| 45 | 45 | 32 mm | Rft | 250 | 128 | 31,875 |
| 46 | 46 | Providing, Laying, Fixing & Testing floor drain P - Trap of required size, Ceramic/ Upvc/ C.I. heavy duty as required at site including extension grating and stainless steel cover grating best quality local make Dadex, Beta or equivalent as approved by the Engineer In-charge, complete in all respects to in any floor at any height to the entire satisfaction i/c the cost of removal/ dismantling of existing damaged trap of any type and making good the damages complete. | No. | 6 | 2,125 | 12,750 |
| 47 | 47 | Providing and fixing European type water closet (Porta, ICL-IFO or equivalent) of approved color/design with integral trap in vitreous China best quality as approved by the engineer incharge complete in all respects to their entire satisfaction with vitreous China coupled flushing cistern, including all accessories and fittings of Faisal, Master, Sonex or approved equivalent make, waste and trap, double seat and cover, Tee stop cock with wall cups, PVC flexible pipe connection, all joints to services and drains, plugging and screwing as necessary to the structure and making good the same complete in all respects. | No. | 3 | 27,200 | 81,600 |
| 48 | 48 | Providing and fixing Indian (Orissa) type water closet of approved color/design in vitreous China with S or P trap best quality Porta, ICL-IFO or equivalent as approved by the engineer incharge complete in all respect to their entire satisfaction with low level flushing cistern including all fittings and accessories of Faisal, Master, Sonex or approved equivalent make waste and trap PVC flexible pipe connection tee stop cock with wall cups, painted MS wall brackets with nut bolts, all joints to services and drains, plugging and screwing as necessary to the structure and making good the same Complete in all respects | No. | 2 | 10,200 | 20,400 |
| 49 | 49 | Providing and fixing white/coloured under or above/over counter vanity make, Porta, 03 star, Durr Eqv. including all accessories, mixture (hot & cold) and sanitary fittings of Faisal, Master, or approved equivalentincluding stop cockes, waster pipe and waste coupling plug with chain other ancillary material etc complete in all respect as specified by the Engineer. | No. | 5 | 15,300 | 76,500 |
| 50 | 50 | Providing & Fixing CP Double Bibcock of best quality of make Master, Faisal, or approved equivalent complete in all respects as per specification, drawings and satisfaction of the Engineer. | No. | 5 | 3,230 | 16,150 |
| 51 | 51 | Providing & Fixing CP Toilet/ Muslim shower with CP flexible pipe, of make Master, Faisal, Sonex, or approved equivalent, complete in all respect as per specification, drawings and satisfaction of the Engineer. | No. | 5 | 2,720 | 13,600 |
| 52 | 52 | Providing & Fixing 5mm beveled edge Mirror (appropiate Size) with all auxillary material as approved by the Engineer In-charge complete in all respect to entire satisfaction i/c SS clips, fixed to walls etc. Complete in all respect. | Sft | 76 | 281 | 21,318 |
| 53 | 53 | Providing, Fixing, Testing & Commissioning heavy duty Electric Geyser (80 Liter/min capacity) of Canon, Boss or approved equivalent best quality local make, including all necessary valves, controls and fittings and connect the same to the existing hot/cold line make it operational, complete in all respects as directed by the Engineer. | No. | 1 | 34,000 | 34,000 |
| 54 | 54 | Providing, Laying, Fixing & Testing Control Valves for gas/ water supply piping in walls or where required as per BSS 1387 medium quality, KITZ, IIL or equivalent as approved by the Engineer In-charge complete in all respects at their entire satisfaction, jointing with G.I./PPR Pipelines using Teflon tape, on walls complete in all respects. | ||||
| 55 | 55 | 1" dia | No. | 2 | 5,100 | 10,200 |
| 56 | 56 | 3/4" dia | No. | 2 | 3,400 | 6,800 |
| 57 | 57 | Providing & Fixing stainless steel kitchen Sink of size 24"x18" x 9" best quality local make Rashid, Asia, Atlas or equivalent as approved by the Engineer in-charge complete up to entire satisfaction including all accessories, mixture and fittings of Faisal, Master, Sonex or approved equivalent, including all connections, best quality trap, 1/2" dia CP tee, stop cock, waste water jointing assembly, all joints to services and drains, plugging and screwing as necessary to the structure complete in all respects. | No. | 1 | 12,750 | 12,750 |
| 58 | 58 | ELECTRIC WORK | ||||
| 59 | 59 | Supply, installation, fixing, wiring, connecting, testing and commissioning of the following light fittings, including electrical wiring with suitable-size flexible copper wire of Pakistan Cables, Newage Cables, Fast cable or approved equivalent brand, conduits/ducts, connectors, accessories and all necessary terminations, complete and operational in all respects, as directed by the Engineer. | ||||
| 60 | 60 | Panel Light 2'x2', Osaka or eqv. 48W | No. | 45 | 6,375 | 286,875 |
| 61 | 61 | SMD Water Proof Light, Paklite or eqv. SMD, Model No. FCW098 1xTornado 50 W K O, Wall mounted external for boundary wall | No. | 8 | 2,550 | 20,400 |
| 62 | 62 | Wall light, LED Tube Light, Osaka or eqv., Wall mounted, | No. | 8 | 2,125 | 17,000 |
| 63 | 63 | Providing, wiring, fixing, testing and commissioning of modular switchboards of approved make Clipsal, Legrand, Schneider or equivalent approved, complete with modular switches, sockets, USB charging outlets where specified, fan regulators where required, matching cover plates, concealed 16 SWG G.I./M.S. powder-coated switch back boxes, and complete internal wiring from the nearest junction box/circuit point up to the switchboard. The wiring shall be carried out using PVC-insulated, stranded copper conductor wires of approved size and make, such as Pakistan Cables, Newage Cables, FAST Cables or equivalent approved, including earth continuity wire, connectors, sleeves, lugs, fixing screws, wiring terminations, testing and commissioning. The switchboard shall be recessed in brick masonry/RCC walls or gypsum-board partitions, complete in all respects as per approved drawings, relevant specifications and the instructions of the Engineer-in-Charge. | - | |||
| 64 | 64 | 1- 6 gang | No. | 10 | 2,550 | 25,500 |
| 65 | 65 | 1- 4 gang | No. | 15 | 2,125 | 31,875 |
| 66 | 66 | 1- 3 gang | No. | 15 | 1,870 | 28,050 |
| 67 | 67 | 1- 2 gang | No. | 15 | 1,615 | 24,225 |
| 68 | 68 | Providing, wiring, fixing, testing and commissioning of dedicated Split Air Conditioner Power Point, complete with 20A DP switch/isolator (or 32A DP switch/isolator where required as per AC load) of approved make (Clipsal, Legrand, Schneider, or equivalent approved), concealed 16 SWG G.I./M.S. powder-coated back box, complete wiring from the respective Distribution Board using PVC insulated copper conductor wires of approved size drawn in heavy gauge PVC conduit, including earth continuity conductor, conduit, connectors, sleeves, lugs, fixing screws, wiring terminations, testing and commissioning. The item shall also include necessary provision for complete Split AC installation, including insulated copper refrigerant piping (liquid and suction lines) of suitable diameter, UV-resistant insulation, PVC condensate drain pipe with all fittings and accessories, interconnecting control cable, communication cable where required, heavy-duty PVC conduit/trunking for refrigerant pipes and drain line, pipe supports, clamps, sleeves, sealing of wall penetrations, minor civil works, cutting and making good, and all ancillary materials required for a complete installation, excluding the indoor and outdoor AC units, complete in all respects as per approved drawings, manufacturer's recommendations and the instructions of the Engineer-in-Charge. | No. | 3 | 21,250 | 63,750 |
| 69 | 69 | Providing, wiring, fixing, testing and commissioning of 20A Single Switched Power Outlet of approved make Clipsal, Legrand, Schneider, MK or equivalent approved, complete with 20A switch and socket outlet, matching cover plate, concealed 16 SWG G.I./M.S. powder-coated switch back box, and complete wiring from the respective Distribution Board using PVC-insulated copper conductor wires of approved size and make, such as Pakistan Cables, Newage Cables, FAST Cables or equivalent approved, drawn in heavy-gauge PVC conduit. The item shall include earth continuity conductor, conduit, connectors, sleeves, lugs, fixing screws, wiring terminations, testing and commissioning, recessed in brick masonry/RCC wall or gypsum-board partition, complete in all respects as per approved drawings, relevant specifications and the instructions of the Engineer-in-Charge. | No. | 30 | 3,400 | 102,000 |
| 70 | 70 | Providing, wiring, fixing, testing and commissioning of 5A Switched Socket Outlet of approved make Clipsal, Legrand, Schneider or equivalent approved, complete with 5A switch and socket outlet, matching cover plate, concealed 16 SWG G.I./M.S. powder-coated switch back box, and complete wiring from the respective Distribution Board using 1.5 sq.mm PVC-insulated copper conductor wires of approved make, such as Pakistan Cables, Newage Cables, FAST Cables or equivalent approved, drawn in heavy-gauge PVC conduit. The item shall include earth continuity conductor, conduit, connectors, sleeves, lugs, fixing screws, wiring terminations, testing and commissioning. It shall also include all necessary arrangements for concealed and seamless power distribution to office furniture, executive desks, workstations and tables, including concealed PVC conduit/raceway, under-desk cable trays, flexible conduits, cable-management accessories, desk grommets, cable sleeves, furniture cut-outs, concealed floor/wall entry points, supports, clamps, fixing accessories, cutting, chasing, making good and all ancillary materials required to provide a neat, concealed and aesthetically finished installation with no exposed wiring, complete in all respects as per approved drawings and the instructions of the Engineer-in-Charge. | No. | 30 | 2,380 | 71,400 |
| 71 | 71 | Providing, supplying, fixing, wiring, testing and commissioning of flush/surface mounted Distribution Board (DB) of approved make (Schneider Electric, Siemens, Legrand or equivalent approved), fabricated from minimum 16 SWG CRCA sheet steel, phosphated, powder-coated, dust and vermin proof, complete with hinged lockable door, gland plate, neutral bar, earth bar, adequately rated tinned copper busbars, colour identification, engraved circuit directory, danger labels, cable termination lugs, shrouding, interconnections, earthing terminals and all necessary hardware. The Distribution Board shall be complete with adequately rated TPN/Main Incomer MCCB or Isolator, outgoing SP/DP/TP MCBs of appropriate ratings, RCCB/RCBOs, Type-II Surge Protection Device (SPD), phase indication lamps, blanking plates, DIN rails and all necessary protective devices, breakers and accessories required for the safe and satisfactory operation of the complete electrical installation, in accordance with the approved load schedule and Single Line Diagram (SLD). The item shall also include complete internal wiring, termination of incoming and outgoing cables, cable glands, ferrules, sleeves, identification tags, balancing of loads, preparation of circuit schedules, insulation resistance testing, earth continuity testing, functional testing, commissioning and submission of test reports, complete in all respects as per IEC 61439, IEC 60898, Pakistan Electricity Rules/PEC standards, approved drawings and the instructions of the Engineer-in-Charge. | No. | 1 | 63,750 | 63,750 |
| 72 | 72 | Providing, supplying, installing, wiring, testing and commissioning of 2' × 2' False Ceiling Fan of approved make GFC, Pak Fan or equivalent approved, complete with energy-efficient motor, fan blades, mounting brackets/supports, regulator/speed controller where required, and complete electrical wiring from the nearest power point using PVC-insulated copper conductor wires of approved make, Pakistan Cables, Newage Cables, FAST Cables or equivalent approved, drawn in heavy-gauge PVC conduit. The item shall include fixing accessories, connectors, sleeves, lugs, earth continuity conductor, testing, commissioning and all necessary hardware, fittings and accessories, complete in all respects as per approved drawings, relevant specifications and the instructions of the Engineer-in-Charge. | No. | 10 | 11,900 | 119,000 |
| 73 | 73 | Providing, Supplying, installing, testing and commissioning of Face Recognition Access Control System of approved make (ZKTeco, Hikvision, Dahua or equivalent approved), complete with facial recognition terminal having minimum 7-inch colour touch screen, face recognition, RFID card reader, PIN authentication, anti-spoofing technology, minimum 10,000 face capacity and 100,000 transaction logs, TCP/IP and Wi-Fi communication, USB interface, door access management software, real-time monitoring, attendance and access reports, complete with electromagnetic (EM) lock (600 lbs holding force), door release push button, emergency break-glass unit, door magnetic contact sensor, power supply unit with battery backup, exit switch, all necessary control cables, Cat-6/data cable, power wiring, PVC conduit, raceway, junction boxes, fixing brackets, supports, connectors, accessories, programming, integration, testing, commissioning, user enrolment and operator training, complete in all respects as per approved drawings, manufacturer's recommendations and the instructions of the Engineer-in-Charge | job | 1 | 85,000 | 85,000 |
| 74 | 74 | Providing, Supplying, installing, testing and commissioning of Executive LED Display System of approved make (Samsung, LG, Sony, or equivalent approved), comprising 65-inch Smart 4K UHD LED Display (or approved equivalent size) with minimum 3840 × 2160 resolution, HDR support, built-in Wi-Fi, LAN connectivity, HDMI, USB and DisplayPort inputs, integrated speakers, screen sharing and wireless presentation capability. The item shall include heavy-duty wall mounting bracket, concealed power and HDMI/data cabling, PVC conduit/trunking, cable management accessories, power outlet, HDMI wall plate, testing, commissioning and all necessary hardware, fittings, accessories, labour and materials required for a complete and fully operational display system, complete in all respects as per approved drawings, manufacturer's recommendations and the instructions of the Engineer-in-Charge. | Job | 1 | 255,000 | 255,000 |
| 75 | 75 | IT & Network System | ||||
| 76 | 76 | Providing, supplying, installing, testing and commissioning of Complete Structured Cat-6 LAN Network System including Cat-6 UTP cable, RJ-45 I/O modules, face plates, patch panels, cable management, concealed PVC conduits/raceways, under-desk cable management, 48 Port Switch, 24 Port Switch, PDU, 27 U Network rack, Wifi Access point and controller complete testing, labeling, commissioning and one-year warranty/support, complete in all respects.(Testing, Configuration, Programming, Documentation, Labeling, Commissioning and One-Year Support for Complete Network System.) | ||||
| 77 | 77 | Face Plate complete with RJ-45 shutter, accessories, fixing screws, RJ-45 Cat-6 Information Outlet (I/O Jack)and Cat-6 UTP Cable complete with laying, termination including ducting and testing installation (Panduit, Schneider, 3M or equivalent approved) | No. | 66 | 3,400 | 224,400 |
| 78 | 78 | Floor Service Box complete with LAN, and Electrical Power outlets where required. | No. | 5 | 8,500 | 42,500 |
| 79 | 79 | 24-Port Loaded Patch Panel complete with cable manager and accessories (Panduit, Schneider, 3M or equivalent approved). | No. | 3 | 29,750 | 89,250 |
| 80 | 80 | Power Distribution Unit (PDU) for Network Rack complete with installation (APC, Schneider, Baylan or equivalent approved). | No. | 3 | 6,800 | 20,400 |
| 81 | 81 | 27U Floor Standing Network Rack complete with lockable door, fan tray, shelves, cable organizers, earthing kit and accessories. | No. | 1 | 106,250 | 106,250 |
| 82 | 82 | Layer-3 Managed Gigabit Network Switch (Minimum 48-Port with 10G Uplink Capability) complete with configuration (Cisco, TP-Link Omada, HP/HPE or equivalent approved). | No. | 1 | 229,500 | 229,500 |
| 83 | 83 | Layer-3 Managed Gigabit Network Switch (Minimum 24-Port with 10G Uplink Capability) complete with configuration (Cisco, TP-Link Omada, HP/HPE or equivalent approved). | No. | 1 | 76,500 | 76,500 |
| 84 | 84 | Enterprise Grade Wi-Fi 6 Wireless Access Point and controller (AX3000 or higher) complete with mounting accessories and configuration (TP-Link Omada, Cisco, Aruba, Huawei or equivalent approved). | No. | 4 | 29,750 | 119,000 |
| 85 | 85 | Smart UPS 5 kVA installing, configuration, commisioning, testing, UPS cabling and one year warranty and support. APC by Schneider Electric Eaton Vertiv (Liebert) or equivalent | No. | 1 | 425,000 | 425,000 |
| 86 | 86 | Providing, supplying, installing, testing and commissioning of Professional Laser Multimedia Projector (Minimum 5,000 ANSI Lumens, WUXGA 1920×1200) complete with mounting accessories, HDMI connectivity, power cabling and all required accessories. Panasonic, View Sonic, Acer or equivalent | No. | 1 | 595,000 | 595,000 |
| 87 | 87 | Professional Video Conferencing Camera complete with mounting accessories, Complete Cabling, Testing, Programming, Commissioning and One-Year Support (Poly, Logitech, Cisco or equivalent) | No. | 1 | 680,000 | 680,000 |
| 88 | 88 | Laptop for Conference Room (Core i7, 16GB RAM, SSD, Windows OS) (Dell, HP, Lenovo or equivalent). | No. | 1 | 212,500.00 | 212,500 |
| GRAND TOTAL: | Rs 10,828,192.00 |
The successful bidder shall be responsible for the complete execution of the project, including the supply of all materials, labor, tools, equipment, transportation, testing and commissioning required to complete the works in accordance with the approved drawings, technical specifications and BOQ. The scope of work shall include, but not be limited to, the following:
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: PIAHCL (Real Estate), Manager RE 4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad
The Supplier is:
The title of the subject procurement is: ESTABLISHMENT OF PIAHCL CORPORATE OFFICE AT ZTBL H.O, 7TH FLOOR, ANNEX BUILDING, ISLAMABAD
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
PIAHCL (Real Estate), Manager RE
4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad
+92-303-503-1198
mgr.realestate@piahcl.com.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
PIAHCL (Real Estate), Manager RE
4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad
+92-303-503-1198
mgr.realestate@piahcl.com.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 1.00% to 1.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Retention Money, An amount equivalent to five percent (5%) of the gross value of each Interim Payment Certificate (IPC), running bill or other payment due to the Contractor shall be deducted and retained by the Employer as Retention Money. The Retention Money shall be released after the successful expiry of the Defects Liability Period, subject to the Contractor having completed all contractual obligations and rectified, to the satisfaction of the Employer, all defects, deficiencies and outstand
Defects Liability Period, The Defects Liability Period shall be twelve (12) months commencing from the date of completion of the Works and formal handing over of the site to the Employer, as certified by the Employer or its authorised representative. During this period, the Contractor shall, at its own cost and within the time specified by the Employer, rectify all defects, deficiencies, faults or incomplete works arising from defective materials, poor workmanship or non-compliance with the Cont
Completion Period, Within (21) calendar days from the date of award of the work.
The contract shall be governed by the terms and conditions specified in the Bidding Documents and the Contract Agreement.
The successful bidder shall execute the works in accordance with the approved BOQ, drawings, technical specifications and instructions of the Engineer-in-Charge.
Payments shall be made against verified quantities of satisfactorily completed work in accordance with the Contract.
Any variation in the scope of work shall be carried out only with the prior written approval of PIAHCL.
The contractor shall comply with all applicable laws, regulations, safety requirements and quality standards throughout the execution of the project.
The contractor shall be responsible for rectifying any defects identified during the Defect Liability Period at no additional cost to PIAHCL.
PIAHCL reserves the right to amend, suspend or terminate the contract in accordance with the terms and conditions of the Contract Agreement and applicable PPRA Rules.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P69692
To: PIAHCL (Real Estate), Manager RE 4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between PIAHCL (Real Estate), Manager RE 4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., ESTABLISHMENT OF PIAHCL CORPORATE OFFICE AT ZTBL H.O, 7TH FLOOR, ANNEX BUILDING, ISLAMABAD (P69692) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: PIAHCL (Real Estate), Manager RE 4th Floor, PIA Building, 49-AKM Fazal-e-Haq Road, Blue Area, Islamabad
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}