In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Â
Â
Collectorate of Custom Enforcement, Gadani (Pakistan Customs), Deputy Collector
Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province).
+92-311-127-1136
muhammad.hadi@fbr.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Collectorate of Custom Enforcement, Gadani (Pakistan Customs) The subject of procurement is:Â Repair and Renovation of Main Buildings, Warehouses, Guard Room, Boundary Wall and Allied Works at Custom House Gadani Expected commencement date: Saturday, May 2, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2025-26 Name and identification number of the Contract: P15401Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, April 14, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Collectorate of Custom Enforcement, Gadani (Pakistan Customs) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
 |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 90 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Demand Draft  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Friday, April 17, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Friday Date:Â April 17, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Partnership Firm Company (Private Limited) | FBR (NTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Valid PEC registration in Category C4 or above with relevant codes | Yes |
| Firm must be active taxpayer on FBR ATL | Yes |
| Valid GST/SRB registration required | Yes |
| Firm must not be blacklisted by any government department | Yes |
| Firm must provide affidavit of no litigation. | Yes |
| Firm must submit signed and stamped bidding documents | Yes |
| CNIC of authorized signatory required. | Yes |
| Affidavit of no non-performance | Yes |
Least Cost Based Selection (LCBS)
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Technical Qualification Criteria | ||
| Valid PEC C4 with required codes (Quantitative)(Doc Required) | 20 | |
| Two completed similar works of equal/higher value (Quantitative)(Doc Required) | 15 | |
| Two ongoing similar works (Quantitative)(Doc Required) | 10 | |
| At least 1 project in restricted/security area (Quantitative)(Doc Required) | 10 | |
| Bank balance ≥ 60 million + turnover ≥ 100 million (Quantitative)(Doc Required) | 15 | |
| ISO 9001 & ISO 45001 (Quantitative)(Doc Required) | 10 | |
| Minimum 5 engineers (3 civil, 1 electrical, 1 mechanical) (Quantitative)(Doc Required) | 10 | |
| Affidavits (no blacklist, litigation, non-performance (Quantitative)(Doc Required) | 10 | |
Lot Title : Repair and Renovation of Main Buildings and Completion of Boundary Wall at Custom House Gadani
Bid Security : 980611
| Job | Delivery Schedule | Quantity |
|---|---|---|
| Boundary Wall & Civil Works |
Address: Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province).
Schedule: 120
Quantity: 1
|
1 |
| Building Repair, Finishing & Electrical |
Address: Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province).
Schedule: 120
Quantity: 1
|
1 |
No
Lot Title: Repair and Renovation of Main Buildings and Completion of Boundary Wall at Custom House Gadani
Specifications / Requirements:
| Sr. No | Ref. No. | Description | UNIT | QUANTITY | RATE | Amount |
|---|---|---|---|---|---|---|
| 1 | 45/123 | Taking out door and window frames with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m). | Nos | 4.00 | 584.38 | 2,338 |
| 2 | 46/123 | Taking out clerestory window frame with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m) . | Nos | 3.00 | 489.38 | 1,468 |
| 3 | 40/123 | Dismantling cement tiled floor, dado or skirting in basement, plinth and ground floor including base mortar and stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m).... | %Sft | 24.00 | 1,503.13 | 361 |
| 4 | 42/123 | Dismantling brick or brick tiles flooring upto 4-1/2" (114 mm) thick without concrete bed including stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m) . | %Sft | 144.00 | 1,206.25 | 1,737 |
| 5 | 17/125 | Scraping, rubbing and cleaning oil bound distemper, plastic paint and snowcem including removal of rubbish etc. from the site as per direction of the Engineer-in-Charge in all floors. | %Sft | 1296.00 | 743.75 | 9,639 |
| 6 | 161/125 | Repainting two coats with enamel paint of approved make and shade to wood work including scraping and sand papering the surface as directed by Engineer-in-Charge in any floor. | %Sft | 672.00 | 2,189.38 | 14,713 |
| 7 | 151/122 | Distempering with vinyle distemper (ICI) Dulux Paintex of approved make and shade in two coats over and including the cost of one priming coat of lime wash including sand papering, dusting, and filling the holes, cracks and inequalities, if any, at any height in any floor.on ceilling | %Sft | 1296.00 | 3401.25 | 44,080 |
| 8 | 162/122 | Painting with ICI dulux plastic emulsion paint VIP of approved shade two coats over and including the cost of wall putti/priming coat complete over plastred surface at any height in any floor | %Sft | 1296.00 | 6737.38 | 87,316 |
| 9 | 213/120 | Providing & Fixing PVC Sheet wall Panelling or lining(Plain) on walls, Jambs, skirting etc., on wooden backing but excluding the cost of backing etc., as required | Sft | 132.00 | 322.32 | 42,546 |
| 10 | 38/117+76/117 | Providing and laying floor of 3/4 inch (19 mm) thick white marble tiles more then 1sftup to 3sftsize fine dressed on the surface without windings in ground fioor and laid over 1 inch (25 mm) thick 1:4 cement mortar setting the tiles with grey cement slurry over lime mortar, jointing & washing the tiles with white cement slurry including curing, rubbing and polishing etc. complete, including the cost of mortar. | %Sft | 144.00 | 42,071.50 | 60,583 |
| 11 | 16/118 | Providing and fixing 3/8 inch (9.5 mm) thick white marble tiles above 144 Sq. inches size fine dressed on the surface without windings in dado and skirting and facing etc. in ground floor over 1/2 inch (13 mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joints and washing the tiles with white cement slurry curing, finishing, cleaning and polishing etc. in internal work complete... | %Sft | 24.00 | 30,137.00 | 7,233 |
| 12 | 45/119 | Providing and fixing M.S. moulded steel door frames of 10" x 2-1/2" manufactured from mild steel sheet of 18 gauge (1.41 mm) conforming to B.S.S. 1245 having a double rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3 Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6 inch long welded with frame at not less than 10 points and 1 Nos. 12 inch long welded with frame at not less than 20 points), with holes and threads for fixing steel hings, fitted with one locking box of same sheet (point welded inside the frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated with special red oxide primer coat all around including cutting holes and filling the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer-in-Charge | %Rft | 21.00 | 69386.00 | 14,571 |
| 13 | 64/120 | Providing and fixing solid core 1st class deodar wood veneered flushe door shutters,1-1/2 inches (38 mm) thick with and including the cost of commercial veneer facing 3 mm. thick (3 ply) on both faces, fixed over best quality deodar wood frame 2 inches wide alround 6 inches wide lock rail and 2nd class deodar wood solid core, i/c., 1/4 inch thick best quality deodar wood lipping on al! sides as per approved drawing, manufactured under power driven hydraulic press, including the cost of approved iron fittings but excluding the cost of handles and locking arrangement. | %Sft | 21.00 | 144856.00 | 30,420 |
| 14 | 52/121 | Providing and fixing with C.P. brass screws main door handle type yale lock (Italy make) of approved design,cutting wood etc., to required size, with two operating keys, as per direction of the engineer-in-Charge. | Nos | 2.00 | 15899.38 | 31,799 |
| 15 | 124/121 | Providing and fixing approved brass sliding bolts or aldrop bolts 10" x 5/8" (254 mm x 16 mm) size with necessary brass screws and iron bolts and nuts | Nos | 10.00 | 2606.80 | 26,068 |
| 16 | 142/121 | Providing and fixing approved heavy type iron sliding or aldrop bolts 6" x 1/2" (152 mm x 13 mm) size with necessary iron screws, iron bolts and nuts . Tower bolt | Nos | 10.00 | 587.63 | 5,876 |
| 17 | 165/121 | Providing and fixing approved chromium plated brass handles 7" (178 mm) size heavy type with necessary brass screws . | Nos | 2.00 | 608.31 | 1,217 |
| 18 | 95/119+121/119 | Providing and fixing fully glazed Champagne anodized or powder coated aluminium Sliding windows as per British standard manufactured by Lucky, prime ,chawala, Krudson, Pakistan Cables . (fixing through their approved fabricators), prime model box section 101mm x 30mm and 1.6 mm thick including the cost of aluminium netting ,fitting, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but including the cost of 5mm tined glass panes etc | %Sft | 60.0 | 161401.00 | 96,841 |
| 19 | 32/119 | Providing and fixing iron grills with required section of angle iron grill with required section of angle iron and MS square bars as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws painting two coats of red oxide paint etc , complete as required in any floor in masonry or concerete work | kg | 180.00 | 290.89 | 52,360 |
| 20 | 207/124 | Providing and fixing ward robe 24" deep consisting 19mm thick laminated sheet on bottom , top sides parttion , shelves & shutter etc and 4 mm thick pressed on back side 2-1/2"x1-1/4"best quality deodar wood frame and all open edges filled 3/4" molding PVC gola complete i/c cost of glue iron nails screws heavy type piano hinges 1/2" handle catcher , looks etc , complete the as per direction of the engineer incharge etc | Sft | 75.00 | 1289.74 | 96,731 |
| 21 | 15/123 | Dismantling R.C.C. including separating reinforcement from concrete in foundation, basement, plinth and ground floor including stacking at site and disposing of unserviceable material within three chains (91.5 m) | %Cft | 468.72 | 8,456.25 | 39,636 |
| 22 | 166/114 | Providing and laying hard grade ribbed deform (minimum yield point 60000 psi) reinforcement bars with and including the cost of strengthaning cutting bending binding wastage and such over laps as are not shown in the drawings, placing in position in cement concrete 1:2:4 precast or m.s chair tying with binding wire cost of chairs and wires etc in all kind of RCC works in foundation basement, plinth and ground floor of building including septic tank and under ground tank and in projections for further extension | TON | 3.16570 | 282450.00 | 894,152 |
| 23 | 55/144 | Providing and laying 1:2:4 cement concrate . Extra for using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 (the crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (23.24 N/mm2 at 28 days) in slab 5" to 6" thickness including form work and its removal compacting and curing in basement and ground floor but excluding the cost of reinforcement . | %cft | 710.8361 | 45586.77 | 324,047 |
| 24 | 2/122 | 1/4" (6.5 mm) thick cement plaster 1:4 on Ceiling and columns etc. including making edges, corners, and curing etc., complete . | %sft | 1421.67 | 3852.59 | 54,771 |
| 25 | 162/122 | Painting with ICI dulux plastic emulsion paint VIP of approved shade two coats over and including the cost of wall putti/priming coat complete over plastred surface at any height in any floor | %Sft | 1421.67 | 6737.38 | 95,783 |
| 26 | 45/123 | Taking out door and window frames with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m). | Nos | 13.00 | 584.38 | 7,597 |
| 27 | 46/123 | Taking out clerestory window frame with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m) . | Nos | 8.00 | 489.38 | 3,915 |
| 28 | 40/123 | Dismantling cement tiled floor, dado or skirting in basement, plinth and ground floor including base mortar and stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m).... | %Sft | 130.00 | 1,503.13 | 1,954 |
| 29 | 42/123 | Dismantling brick or brick tiles flooring upto 4-1/2" (114 mm) thick without concrete bed including stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m) . | %Sft | 80.00 | 1,206.25 | 965 |
| 30 | 38/117+76/117 | Providing and laying floor of 3/4 inch (19 mm) thick white marble tiles more then 1sftup to 3sftsize fine dressed on the surface without windings in ground fioor and laid over 1 inch (25 mm) thick 1:4 cement mortar setting the tiles with grey cement slurry over lime mortar, jointing & washing the tiles with white cement slurry including curing, rubbing and polishing etc. complete, including the cost of mortar. | %Sft | 998.00 | 42071.50 | 419,874 |
| 31 | 16/118 | Providing and fixing 3/8 inch (9.5 mm) thick white marble tiles above 144 Sq. inches size fine dressed on the surface without windings in dado and skirting and facing etc. in ground floor over 1/2 inch (13 mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joints and washing the tiles with white cement slurry curing, finishing, cleaning and polishing etc. in internal work complete... | %Sft | 130.00 | 30137.00 | 39,178 |
| 32 | 83/117 | Providing and laying floor of 6mm (approx: 1/4") thick coloured glazed tiles more then 1sftupto 2sftof master make (Pakistani) first grade in ground floor laid over 1" (25mm) thick cement mortar 1:2 (1 cement and 2 sand) including jointing and washing the tiles with white cement slurry a matching colour (by using pigment in white cement) and curing etc. complete. | %Sft | 80.00 | 42,108.61 | 33,687 |
| 33 | 41/118 | Providing and fixing 1/4"(6mm approx.) thick of approved Pakistani make white / coloured glazed tiles from 1.5sftto 3sft size in dado and skirting in ground floor over 1/2" (13mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joint with white cement slurry to matching the colour and washing the tile, curing and cleaning etc. complete | %Sft | 252.00 | 31,498.72 | 79,377 |
| 34 | 17/125 | Scraping, rubbing and cleaning oil bound distemper, plastic paint and snowcem including removal of rubbish etc. from the site as per direction of the Engineer-in-Charge in all floors. | %Sft | 5526.00 | 743.75 | 41,100 |
| 35 | 161/125 | Repainting two coats with enamel paint of approved make and shade to wood work including scraping and sand papering the surface as directed by Engineer-in-Charge in any floor. | %Sft | 4078.00 | 2,189.38 | 89,283 |
| 36 | 162/122 | Painting with ICI dulux plastic emulsion paint VIP of approved shade two coats over and including the cost of wall putti/priming coat complete over plastred surface at any height in any floor | %Sft | 5526.00 | 6737.38 | 372,308 |
| 37 | 213/120 | Providing & Fixing PVC Sheet wall Panelling or lining(Plain) on walls, Jambs, skirting etc., on wooden backing but excluding the cost of backing etc., as required | Sft | 1870.00 | 322.32 | 602,738 |
| 38 | 45/119 | Providing and fixing M.S. moulded steel door frames of 10" x 2-1/2" manufactured from mild steel sheet of 18 gauge (1.41 mm) conforming to B.S.S. 1245 having a double rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3 Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6 inch long welded with frame at not less than 10 points and 1 Nos. 12 inch long welded with frame at not less than 20 points), with holes and threads for fixing steel hings, fitted with one locking box of same sheet (point welded inside the frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated with special red oxide primer coat all around including cutting holes and filling the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer-in-Charge | %Rft | 105.00 | 69386.00 | 72,855 |
| 39 | 64/120 | Providing and fixing solid core 1st class deodar wood veneered flushe door shutters,1-1/2 inches (38 mm) thick with and including the cost of commercial veneer facing 3 mm. thick (3 ply) on both faces, fixed over best quality deodar wood frame 2 inches wide alround 6 inches wide lock rail and 2nd class deodar wood solid core, i/c., 1/4 inch thick best quality deodar wood lipping on al! sides as per approved drawing, manufactured under power driven hydraulic press, including the cost of approved iron fittings but excluding the cost of handles and locking arrangement. | %Sft | 105.00 | 144856.00 | 152,099 |
| 40 | 52/121 | Providing and fixing with C.P. brass screws main door handle type yale lock (Italy make) of approved design,cutting wood etc., to required size, with two operating keys, as per direction of the engineer-in-Charge. | Nos | 10.00 | 15899.38 | 158,994 |
| 41 | 124/121 | Providing and fixing approved brass sliding bolts or aldrop bolts 10" x 5/8" (254 mm x 16 mm) size with necessary brass screws and iron bolts and nuts | Nos | 10.00 | 2606.80 | 26,068 |
| 42 | 142/121 | Providing and fixing approved heavy type iron sliding or aldrop bolts 6" x 1/2" (152 mm x 13 mm) size with necessary iron screws, iron bolts and nuts . Tower bolt | Nos | 5.00 | 587.63 | 2,938 |
| 43 | 165/121 | Providing and fixing approved chromium plated brass handles 7" (178 mm) size heavy type with necessary brass screws . | Nos | 5.00 | 608.31 | 3,042 |
| 44 | 95/119+121/119 | Providing and fixing fully glazed Champagne anodized or powder coated aluminium Sliding windows as per British standard manufactured by Lucky, prime ,chawala, Krudson, Pakistan Cables . (fixing through their approved fabricators), prime model box section 101mm x 30mm and 1.6 mm thick including the cost of aluminium netting ,fitting, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but including the cost of 5mm tined glass panes etc | %Sft | 196.0 | 161401.00 | 316,346 |
| 45 | 32/119 | Providing and fixing iron grills with required section of angle iron grill with required section of angle iron and MS square bars as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws painting two coats of red oxide paint etc , complete as required in any floor in masonry or concerete work | kg | 588.00 | 290.89 | 171,043 |
| 46 | 207/124 | Providing and fixing ward robe 24" deep consisting 19mm thick laminated sheet on bottom , top sides parttion , shelves & shutter etc and 4 mm thick pressed on back side 2-1/2"x1-1/4"best quality deodar wood frame and all open edges filled 3/4" molding PVC gola complete i/c cost of glue iron nails screws heavy type piano hinges 1/2" handle catcher , looks etc , complete the as per direction of the engineer incharge etc | Sft | 195.00 | 1289.74 | 251,499 |
| 47 | 45/123 | Taking out door and window frames with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m). | Nos | 14.00 | 584.38 | 8,181 |
| 48 | 46/123 | Taking out clerestory window frame with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m) . | Nos | 8.00 | 489.38 | 3,915 |
| 49 | 40/123 | Dismantling cement tiled floor, dado or skirting in basement, plinth and ground floor including base mortar and stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m).... | %Sft | 94.00 | 1,503.13 | 1,413 |
| 50 | 42/123 | Dismantling brick or brick tiles flooring upto 4-1/2" (114 mm) thick without concrete bed including stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m) . | %Sft | 600.00 | 1,206.25 | 7,238 |
| 51 | 38/117+76/117 | Providing and laying floor of 3/4 inch (19 mm) thick white marble tiles more then 1sftup to 3sftsize fine dressed on the surface without windings in ground fioor and laid over 1 inch (25 mm) thick 1:4 cement mortar setting the tiles with grey cement slurry over lime mortar, jointing & washing the tiles with white cement slurry including curing, rubbing and polishing etc. complete, including the cost of mortar. | %Sft | 697.27 | 42,071.50 | 293,352 |
| 52 | 16/118 | Providing and fixing 3/8 inch (9.5 mm) thick white marble tiles above 144 Sq. inches size fine dressed on the surface without windings in dado and skirting and facing etc. in ground floor over 1/2 inch (13 mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joints and washing the tiles with white cement slurry curing, finishing, cleaning and polishing etc. in internal work complete... | %Sft | 94.00 | 30,137.00 | 28,329 |
| 53 | 83/117 | Providing and laying floor of 6mm (approx: 1/4") thick coloured glazed tiles more then 1sftupto 2sftof master make (Pakistani) first grade in ground floor laid over 1" (25mm) thick cement mortar 1:2 (1 cement and 2 sand) including jointing and washing the tiles with white cement slurry a matching colour (by using pigment in white cement) and curing etc. complete. | %Sft | 72.00 | 42,108.61 | 30,318 |
| 54 | 41/118 | Providing and fixing 1/4"(6mm approx.) thick of approved Pakistani make white / coloured glazed tiles from 1.5sftto 3sft size in dado and skirting in ground floor over 1/2" (13mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joint with white cement slurry to matching the colour and washing the tile, curing and cleaning etc. complete | %Sft | 238.00 | 31,498.72 | 74,967 |
| 55 | 17/125 | Scraping, rubbing and cleaning oil bound distemper, plastic paint and snowcem including removal of rubbish etc. from the site as per direction of the Engineer-in-Charge in all floors. | %Sft | 3784.95 | 743.75 | 28,151 |
| 56 | 161/125 | Repainting two coats with enamel paint of approved make and shade to wood work including scraping and sand papering the surface as directed by Engineer-in-Charge in any floor. | %Sft | 3469.00 | 2,189.38 | 75,950 |
| 57 | 162/122 | Painting with ICI dulux plastic emulsion paint VIP of approved shade two coats over and including the cost of wall putti/priming coat complete over plastred surface at any height in any floor | %Sft | 3794.95 | 6737.38 | 255,680 |
| 58 | 213/120 | Providing & Fixing PVC Sheet wall Panelling or lining(Plain) on walls, Jambs, skirting etc., on wooden backing but excluding the cost of backing etc., as required | Sft | 1221.00 | 322.32 | 393,553 |
| 59 | 45/119 | Providing and fixing M.S. moulded steel door frames of 10" x 2-1/2" manufactured from mild steel sheet of 18 gauge (1.41 mm) conforming to B.S.S. 1245 having a double rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3 Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6 inch long welded with frame at not less than 10 points and 1 Nos. 12 inch long welded with frame at not less than 20 points), with holes and threads for fixing steel hings, fitted with one locking box of same sheet (point welded inside the frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated with special red oxide primer coat all around including cutting holes and filling the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer-in-Charge | %Rft | 126.00 | 69386.00 | 87,426 |
| 60 | 64/120 | Providing and fixing solid core 1st class deodar wood veneered flushe door shutters,1-1/2 inches (38 mm) thick with and including the cost of commercial veneer facing 3 mm. thick (3 ply) on both faces, fixed over best quality deodar wood frame 2 inches wide alround 6 inches wide lock rail and 2nd class deodar wood solid core, i/c., 1/4 inch thick best quality deodar wood lipping on al! sides as per approved drawing, manufactured under power driven hydraulic press, including the cost of approved iron fittings but excluding the cost of handles and locking arrangement. | %Sft | 315.00 | 144856.00 | 456,296 |
| 61 | 52/121 | Providing and fixing with C.P. brass screws main door handle type yale lock (Italy make) of approved design,cutting wood etc., to required size, with two operating keys, as per direction of the engineer-in-Charge. | Nos | 10.00 | 15899.38 | 158,994 |
| 62 | 124/121 | Providing and fixing approved brass sliding bolts or aldrop bolts 10" x 5/8" (254 mm x 16 mm) size with necessary brass screws and iron bolts and nuts | Nos | 10.00 | 2606.80 | 26,068 |
| 63 | 142/121 | Providing and fixing approved heavy type iron sliding or aldrop bolts 6" x 1/2" (152 mm x 13 mm) size with necessary iron screws, iron bolts and nuts . Tower bolt | Nos | 10.00 | 587.63 | 5,876 |
| 64 | 165/121 | Providing and fixing approved chromium plated brass handles 7" (178 mm) size heavy type with necessary brass screws . | Nos | 6.00 | 608.31 | 3,650 |
| 65 | 95/119+121/119 | Providing and fixing fully glazed Champagne anodized or powder coated aluminium Sliding windows as per British standard manufactured by Lucky, prime ,chawala, Krudson, Pakistan Cables . (fixing through their approved fabricators), prime model box section 101mm x 30mm and 1.6 mm thick including the cost of aluminium netting ,fitting, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but including the cost of 5mm tined glass panes etc | %Sft | 184.0 | 161401.00 | 296,978 |
| 66 | 32/119 | Providing and fixing iron grills with required section of angle iron grill with required section of angle iron and MS square bars as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws painting two coats of red oxide paint etc , complete as required in any floor in masonry or concerete work | kg | 552.0 | 290.89 | 160,571 |
| 67 | 207/124 | Providing and fixing ward robe 24" deep consisting 19mm thick laminated sheet on bottom , top sides parttion , shelves & shutter etc and 4 mm thick pressed on back side 2-1/2"x1-1/4"best quality deodar wood frame and all open edges filled 3/4" molding PVC gola complete i/c cost of glue iron nails screws heavy type piano hinges 1/2" handle catcher , looks etc , complete the as per direction of the engineer incharge etc | Sft | 195.00 | 1289.74 | 251,499 |
| 68 | 45/123 | Taking out door and window frames with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m). | Nos | 6.00 | 584.38 | 3,506 |
| 69 | 46/123 | Taking out clerestory window frame with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m) . | Nos | 8.00 | 489.38 | 3,915 |
| 70 | 40/123 | Dismantling cement tiled floor, dado or skirting in basement, plinth and ground floor including base mortar and stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m).... | %Sft | 65.00 | 1,503.13 | 977 |
| 71 | 42/123 | Dismantling brick or brick tiles flooring upto 4-1/2" (114 mm) thick without concrete bed including stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m) . | %Sft | 335.00 | 1,206.25 | 4,041 |
| 72 | 25/108+37/108+37/108 | Providing and laying 1:9 cement concrete using screened graded bajri 3/4 inch (19 mm) and down gauge In terracing 3 inches (76 mm) average thickness to required slope in panels including form work, consolidation, finishing, curing etc. and painting the surface with plastic bitumen No. 4 at the rate of 15 Ibs per hundred square feet (0.73 Kg per s.m) blinded with sand at the rate of 2 cubic feet per hundred square feet (0.06 Kg per s.m) complete" on ground floor roof. | %Sft | 552.00 | 9912.09 | 54,715 |
| 73 | 38/117+76/117 | Providing and laying floor of 3/4 inch (19 mm) thick white marble tiles more then 1sftup to 3sftsize fine dressed on the surface without windings in ground fioor and laid over 1 inch (25 mm) thick 1:4 cement mortar setting the tiles with grey cement slurry over lime mortar, jointing & washing the tiles with white cement slurry including curing, rubbing and polishing etc. complete, including the cost of mortar. | %Sft | 355.00 | 42,071.50 | 149,354 |
| 74 | 16/118 | Providing and fixing 3/8 inch (9.5 mm) thick white marble tiles above 144 Sq. inches size fine dressed on the surface without windings in dado and skirting and facing etc. in ground floor over 1/2 inch (13 mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joints and washing the tiles with white cement slurry curing, finishing, cleaning and polishing etc. in internal work complete... | %Sft | 65.50 | 30,137.00 | 19,740 |
| 75 | 17/125 | Scraping, rubbing and cleaning oil bound distemper, plastic paint and snowcem including removal of rubbish etc. from the site as per direction of the Engineer-in-Charge in all floors. | %Sft | 1804.00 | 743.75 | 13,417 |
| 76 | 162/122 | Painting with ICI dulux plastic emulsion paint VIP of approved shade two coats over and including the cost of wall putti/priming coat complete over plastred surface at any height in any floor | %Sft | 1804.00 | 6737.38 | 121,542 |
| 77 | 45/119 | Providing and fixing M.S. moulded steel door frames of 10" x 2-1/2" manufactured from mild steel sheet of 18 gauge (1.41 mm) conforming to B.S.S. 1245 having a double rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3 Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6 inch long welded with frame at not less than 10 points and 1 Nos. 12 inch long welded with frame at not less than 20 points), with holes and threads for fixing steel hings, fitted with one locking box of same sheet (point welded inside the frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated with special red oxide primer coat all around including cutting holes and filling the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer-in-Charge | %Rft | 42.00 | 69386.00 | 29,142 |
| 78 | 64/120 | Providing and fixing solid core 1st class deodar wood veneered flushe door shutters,1-1/2 inches (38 mm) thick with and including the cost of commercial veneer facing 3 mm. thick (3 ply) on both faces, fixed over best quality deodar wood frame 2 inches wide alround 6 inches wide lock rail and 2nd class deodar wood solid core, i/c., 1/4 inch thick best quality deodar wood lipping on al! sides as per approved drawing, manufactured under power driven hydraulic press, including the cost of approved iron fittings but excluding the cost of handles and locking arrangement. | %Sft | 42.00 | 144856.00 | 60,840 |
| 79 | 17/119 | Providing and fixing collapsible steel shutter or gate with vertical channels, flat iron diagonal, top and bottom rail with steel rollers of required size, T-iron bottom track riveting the junctions, including locking arrangement and handles, cutting holes, painting two coats of red oxide paint, fixing bottom track with cement concrete 1:2:4 and making good the damages to walls, fabrication as designed and erection as per instruction of the Engineer Incharge | %sft | 30.00 | 116423.00 | 34,927 |
| 80 | 52/121 | Providing and fixing with C.P. brass screws main door handle type yale lock (Italy make) of approved design,cutting wood etc., to required size, with two operating keys, as per direction of the engineer-in-Charge. | Nos | 5.00 | 15899.38 | 79,497 |
| 81 | 124/121 | Providing and fixing approved brass sliding bolts or aldrop bolts 10" x 5/8" (254 mm x 16 mm) size with necessary brass screws and iron bolts and nuts | Nos | 10.00 | 2606.80 | 26,068 |
| 82 | 142/121 | Providing and fixing approved heavy type iron sliding or aldrop bolts 6" x 1/2" (152 mm x 13 mm) size with necessary iron screws, iron bolts and nuts . Tower bolt | Nos | 10.00 | 587.63 | 5,876 |
| 83 | 165/121 | Providing and fixing approved chromium plated brass handles 7" (178 mm) size heavy type with necessary brass screws . | Nos | 10.00 | 608.31 | 6,083 |
| 84 | 95/119+121/119 | Providing and fixing fully glazed Champagne anodized or powder coated aluminium Sliding windows as per British standard manufactured by Lucky, prime ,chawala, Krudson, Pakistan Cables . (fixing through their approved fabricators), prime model box section 101mm x 30mm and 1.6 mm thick including the cost of aluminium netting ,fitting, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but including the cost of 5mm tined glass panes etc | %Sft | 76.0 | 161401.00 | 122,665 |
| 85 | 32/119 | Providing and fixing iron grills with required section of angle iron grill with required section of angle iron and MS square bars as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws painting two coats of red oxide paint etc , complete as required in any floor in masonry or concerete work | pkg | 228.00 | 290.89 | 66,323 |
| 86 | 24/125 | Removing cement or lime plaster of any thickness from walls and disposing of the rubbish etc. from site as directed | %Sft | 6168.00 | 843.75 | 52,043 |
| 87 | 45/123 | Taking out door and window frames with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m). | Nos | 16.00 | 584.38 | 9,350 |
| 88 | 46/123 | Taking out clerestory window frame with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m) . | Nos | 8.00 | 489.38 | 3,915 |
| 89 | 40/123 | Dismantling cement tiled floor, dado or skirting in basement, plinth and ground floor including base mortar and stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m).... | %Sft | 76.00 | 1,503.13 | 1,142 |
| 90 | 42/123 | Dismantling brick or brick tiles flooring upto 4-1/2" (114 mm) thick without concrete bed including stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m) . | %Sft | 1248.00 | 1,206.25 | 15,054 |
| 91 | 25/108+37/108+37/108 | Providing and laying 1:9 cement concrete using screened graded bajri 3/4 inch (19 mm) and down gauge In terracing 3 inches (76 mm) average thickness to required slope in panels including form work, consolidation, finishing, curing etc. and painting the surface with plastic bitumen No. 4 at the rate of 15 Ibs per hundred square feet (0.73 Kg per s.m) blinded with sand at the rate of 2 cubic feet per hundred square feet (0.06 Kg per s.m) complete" on ground floor roof. | %Sft | 1248.00 | 9912.09 | 123,703 |
| 92 | 2/122 | 1/4" (6.5 mm) thick cement plaster 1:4 on Ceiling and columns etc. including making edges, corners, and curing etc., complete . | %sft | 6168.00 | 3852.59 | 237,628 |
| 93 | 38/117+76/117 | Providing and laying floor of 3/4 inch (19 mm) thick white marble tiles more then 1sftup to 3sftsize fine dressed on the surface without windings in ground fioor and laid over 1 inch (25 mm) thick 1:4 cement mortar setting the tiles with grey cement slurry over lime mortar, jointing & washing the tiles with white cement slurry including curing, rubbing and polishing etc. complete, including the cost of mortar. | %Sft | 1248.00 | 42,071.50 | 525,052 |
| 94 | 16/118 | Providing and fixing 3/8 inch (9.5 mm) thick white marble tiles above 144 Sq. inches size fine dressed on the surface without windings in dado and skirting and facing etc. in ground floor over 1/2 inch (13 mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joints and washing the tiles with white cement slurry curing, finishing, cleaning and polishing etc. in internal work complete... | %Sft | 76.00 | 30,137.00 | 22,904 |
| 95 | 151/122 | Distempering with vinyle distemper (ICI) Dulux Paintex of approved make and shade in two coats over and including the cost of one priming coat of lime wash including sand papering, dusting, and filling the holes, cracks and inequalities, if any, at any height in any floor.on ceilling | %Sft | 6168.00 | 3401.25 | 209,789 |
| 96 | 17/119 | Providing and fixing collapsible steel shutter or gate with vertical channels, flat iron diagonal, top and bottom rail with steel rollers of required size, T-iron bottom track riveting the junctions, including locking arrangement and handles, cutting holes, painting two coats of red oxide paint, fixing bottom track with cement concrete 1:2:4 and making good the damages to walls, fabrication as designed and erection as per instruction of the Engineer Incharge | %sft | 42.00 | 116423.00 | 48,898 |
| 97 | 95/119+121/119 | Providing and fixing fully glazed Champagne anodized or powder coated aluminium Sliding windows as per British standard manufactured by Lucky, prime ,chawala, Krudson, Pakistan Cables . (fixing through their approved fabricators), prime model box section 101mm x 30mm and 1.6 mm thick including the cost of aluminium netting ,fitting, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but including the cost of 5mm tined glass panes etc | %Sft | 132.0 | 161401.00 | 213,049 |
| 98 | 32/119 | Providing and fixing iron grills with required section of angle iron grill with required section of angle iron and MS square bars as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws painting two coats of red oxide paint etc , complete as required in any floor in masonry or concerete work | kg | 414.00 | 290.89 | 120,428 |
| 99 | 45/123 | Taking out door and window frames with or without hold fasts in ground floor including cutting walls, stacking salvaged material (serviceable) and disposing of unserviceÂable material as directed within three chains (91.5 m). | Nos | 4.00 | 584.38 | 2,338 |
| 100 | 40/123 | Dismantling cement tiled floor, dado or skirting in basement, plinth and ground floor including base mortar and stacking salvaged material (serviceable) and disposing of surplus stuff as directed within three chains (91.5 m).... | %Sft | 756.00 | 1,503.13 | 11,364 |
| 101 | 15/123 | Dismantling R.C.C. including separating reinforcement from concrete in foundation, basement, plinth and ground floor including stacking at site and disposing of unserviceable material within three chains (91.5 m) | %Cft | 1520.00 | 8456.25 | 128,535 |
| 102 | 14/105+27/105 | Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using crush graded boulders (machine broken) 1inch and down gauge in foundation including leveling compacting and curing etc. | %Cft | 43.75 | 24504.590 | 10,721 |
| 103 | 2/114 +136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (20.69 N/mm2 at 28 days) . in raft or strip foundation with columns and pillars, of any shape, including form work and its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 175.00 | 33203.65 | 58,106 |
| 104 | 166/114 | Providing and laying hard grade ribbed deform (minimum yield point 60000 psi) reinforcement bars with and including the cost of strengthaning cutting bending binding wastage and such over laps as are not shown in the drawings, placing in position in cement concrete 1:2:4 precast or m.s chair tying with binding wire cost of chairs and wires etc in all kind of RCC works in foundation basement, plinth and ground floor of building including septic tank and under ground tank and in projections for further extension | TON | 1.84492 | 282450.00 | 521,098 |
| 105 | 2/114 +136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (20.69 N/mm2 at 28 days) . in raft or strip foundation with columns and pillars, of any shape, including form work and its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 350.00 | 33203.65 | 116,213 |
| 106 | 8/114 +136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (20.69 N/mm2 at 28 days) .in plinth beams of required shape and design including form work and its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 434.00 | 40365.27 | 175,185 |
| 107 | 8/114 +136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (20.69 N/mm2 at 28 days) .in plinth beams of required shape and design including form work and its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 102.50 | 40365.27 | 41,374 |
| 108 | 34/110+75/110+92/110 | Providing and laying 1:3:6 cement concrete solid block masonry more than 6 inches (152 mm) thick using graded screened bajri 3/4 inch (19 mm) and down gauge set in cement mortar 1:4 including scaffolding, raking out joints and curing etc. complete in superstructure..( block made by machine press) | %Cft | 525.28 | 32637.93 | 171,441 |
| 109 | 24/114+136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (20.69 N/mm2 at 28 days)in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in super structure | %Cft | 64.03 | 52698.67 | 33,743 |
| 110 | 38/114+136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (20.69 N/mm2 at 28 days) in straight beams, lintels cantilever beams of required shape or section including form work and its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 68.70 | 47322.89 | 32,511 |
| 111 | 56/167+136/114 | Providing and laying 1:2:4 cement concrate . Extra for using crushed graded boulders 3/4 inch (19 mm) and down gauge in place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 (the crushing strength of works cube in this case will be 3000 Ibs. per sq. inch (23.24 N/mm2 at 28 days) in slab 5" to 6" thickness including form work and its removal compacting and curing in basement and ground floor but excluding the cost of reinforcement . | %Cft | 214.13 | 45586.77 | 97,615 |
| 112 | 8/122 | 19mm (3/4") thick cement plaster 1:4 cement mortor ratio on wall and coloumns including making edges cornor and curing.on external side | %Sft | 1,956.00 | 5335.06 | 104,354 |
| 113 | 83/117 | Providing and laying floor of 6mm (approx: 1/4") thick coloured glazed tiles more then 1sftupto 2sftof master make (Pakistani) first grade in ground floor laid over 1" (25mm) thick cement mortar 1:2 (1 cement and 2 sand) including jointing and washing the tiles with white cement slurry a matching colour (by using pigment in white cement) and curing etc. complete. | %Sft | 260.00 | 42,108.61 | 109,482 |
| 114 | 41/118 | Providing and fixing 1/4"(6mm approx.) thick of approved Pakistani make white / coloured glazed tiles from 1.5sftto 3sft size in dado and skirting in ground floor over 1/2" (13mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joint with white cement slurry to matching the colour and washing the tile, curing and cleaning etc. complete | %Sft | 756.00 | 31,498.72 | 238,130 |
| 115 | 151/122 | Distempering with vinyle distemper (ICI) Dulux Paintex of approved make and shade in two coats over and including the cost of one priming coat of lime wash including sand papering, dusting, and filling the holes, cracks and inequalities, if any, at any height in any floor.on ceilling | %Sft | 1956.00 | 3401.25 | 66,528 |
| 116 | 45/119 | Providing and fixing M.S. moulded steel door frames of 10" x 2-1/2" manufactured from mild steel sheet of 18 gauge (1.41 mm) conforming to B.S.S. 1245 having a double rebate size 1-1/2" x 1/2" (38 mm x 12 mm) provision of 3 Nos. M.S. plate, section 1-1/2" x 1/4" (38 mm x 6 mm) (2 Nos. 6 inch long welded with frame at not less than 10 points and 1 Nos. 12 inch long welded with frame at not less than 20 points), with holes and threads for fixing steel hings, fitted with one locking box of same sheet (point welded inside the frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated with special red oxide primer coat all around including cutting holes and filling the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer-in-Charge | %Rft | 84.00 | 69386.00 | 58,284 |
| 117 | Â | Providing and fixing solid core 1st class deodar wood veneered flushe door shutters,1-1/2 inches (38 mm) thick with and including the cost of commercial veneer facing 3 mm. thick (3 ply) on both faces, fixed over best quality deodar wood frame 2 inches wide alround 6 inches wide lock rail and 2nd class deodar wood solid core, i/c., 1/4 inch thick best quality deodar wood lipping on al! sides as per approved drawing, manufactured under power driven hydraulic press, including the cost of approved iron fittings but excluding the cost of handles and locking arrangement. | %Sft | 84.00 | 144856.00 | 121,679 |
| 118 | 52/121 | Providing and fixing with C.P. brass screws main door handle type yale lock (Italy make) of approved design,cutting wood etc., to required size, with two operating keys, as per direction of the engineer-in-Charge. | Nos | 10.00 | 15899.38 | 158,994 |
| 119 | 124/121 | Providing and fixing approved brass sliding bolts or aldrop bolts 10" x 5/8" (254 mm x 16 mm) size with necessary brass screws and iron bolts and nuts | Nos | 10.00 | 2606.80 | 26,068 |
| 120 | 142/121 | Providing and fixing approved heavy type iron sliding or aldrop bolts 6" x 1/2" (152 mm x 13 mm) size with necessary iron screws, iron bolts and nuts . Tower bolt | Nos | 10.00 | 587.63 | 5,876 |
| 121 | 165/121 | Providing and fixing approved chromium plated brass handles 7" (178 mm) size heavy type with necessary brass screws . | Nos | 10.00 | 608.31 | 6,083 |
| 122 | 95/119+121/119 | Providing and fixing fully glazed Champagne anodized or powder coated aluminium Sliding windows as per British standard manufactured by Lucky, prime ,chawala, Krudson, Pakistan Cables . (fixing through their approved fabricators), prime model box section 101mm x 30mm and 1.6 mm thick including the cost of aluminium netting ,fitting, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but including the cost of 5mm tined glass panes etc | %Sft | 8.0 | 161401.00 | 12,912 |
| 123 | 32/119 | Providing and fixing iron grills with required section of angle iron grill with required section of angle iron and MS square bars as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws painting two coats of red oxide paint etc , complete as required in any floor in masonry or concerete work | Sft | 24.00 | 290.89 | 6,981 |
| 124 | 127/3 | Excavation or cutting in gravelly soil to a required grade, camber and side slopes including dressing top and disposal of excavated stuff within a lift of 5 ft. (1.52 m) and lead upto 100 ft. (30.5 m) | %Cft | 23400.00 | 1573.94 | 368,302 |
| 125 | 2/117 | P/L 1:4:8 cement concrete bed under flooring using grade stone ballast 1 inches and down gauge with levelling and ramming, watering and curing etc complete | %Cft | 5850.00 | 22036.00 | 1,289,106 |
| 126 | 8/104 | Supplying earth from approved outside sources within a radius of 5 miles (8 km) including digging, loading and unloading and filling in foundation trenches, plinth or under floor, etc. including breaking clods, dressing, watering and consolidation by ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction complete within a lead of one chain (30.5 R.m) and lift of 5 feet. | %Cft | 23400.00 | 3254.05 | 761,448 |
| 127 | 177/117 | Providing and laying in floor C.C. 1:2:4: tuff paver 2-1/2" thick of approved design and colour pattren laid on sand cushion filling of joint with sand and warring etc. complete as per direction of Engineer Incharge. (the cost of sand cushion is included) | Sft | 23400.00 | 135.13 | 3,162,042 |
| 128 | 2-65-01 | Replacement of un-serviceable defective/broken & burnt out existing switch sheets with new one polycarbonate flame retardant switch required gang plate fixed on die fabricated power coated metal board recessed/PVC on surface in/on the wall or column i/c connection as required. (Hero/Matrix) | Nos | 60.00 | 294.00 | 17,640 |
| 129 | 2-35-02 | Wiring for sub-main with 2x2.5 mm2, PVC Insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20 mm (3/4") dia uPVC conduit recessed in the wall, column and roof etc including 1.5 mm2 PVC insulated wire single core wire as ECC as required (Pak,Newage,Fast,Tech GM cable) | MTR | 180.00 | 499.00 | 89,820 |
| 130 | 2-34-01 | Wiring for sub-main with 3x1.5 mm2, PVC Insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20 mm (3/4") dia uPVC conduit recessed in the wall, column and roof etc required. (Pak, Newage, Fast, Tech GM Cable) | MTR | 140.00 | 499.00 | 69,860 |
| 131 | 2-65-01 | Replacement of un-serviceable defective/broken & burnt out existing switch sheets with new one polycarbonate flame retardant switch required gang plate fixed on die fabricated power coated metal board recessed/PVC on surface in/on the wall or column i/c connection as required. (Hero/Matrix) | Nos | 50.00 | 294.00 | 14,700 |
| 132 | 2-35-03 | Wiring for sub-main with 2x4 mm2 PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20 mm (3/4") dia uPVC conduit recessed in the wall, column and roof etc including 1.5 mm2 PVC insulated wire single core wire as ECC as required. | MTR | 150.00 | 640.00 | 96,000 |
| 133 | 2-38-01 | Wiring for sub-main with 3x 1.5 mm2 & 1x1mm@, PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20 mm (3/4")dia uPVC conduit recessed in the wall, column and roof etc including 1mm2 PVC insulated wire including 1mm2 PVC insulated wire single core wire as ECC as required. | MTR | 100.00 | 469.00 | 46,900 |
| 134 | 2-80-03 | Providing & Installing 140 Cm ( 56") sweep ceiling fan with blades, cannopy, standard length of down rod including connection with 14.0077" flexible wire complete as required. (without regulator) Pak, Royal, GFC, Younas,Millat. | Nos | 20.00 | 9,349.00 | 186,980 |
| 135 | 30-116-a | Supply & drawing of 16 mm2, single core, PVC insulated wire in all kinds of existing or given conduit/cable duct as required. | MTR | 80 | 686.00 | 54,880 |
| 136 | 5/301+13/302 | Providing and fixing Pakistani best quality European style white glazed earthenware W.,C pan complete with and including the cost of plastic seat and buffers, 13.6 litres best quality low level plastic flushing cistern with internal fittings complete, P.V.C flushing pipe with fittings and making requisite number of holes in walls, plinth and floor for pipe connections and making good in cement concrete 1:2:4..& PVC Muslim shower with one meter flaxible pipe. | Nos | 5.00 | 14312.50 | 71,563 |
| 137 | 1/301 | Providing and fixing best quality squatting type white glazed earthenware W.C Pan, Pakistani (of not less than 18 Inches clear opening as measured between flushing rims) complete with and including the cost of 13.6 litre best quality low level plastic flushing cistern with internal fittings complete, P.V.C. flushing pipe suitable for squatting type with extra bends and length with fittings, C.I. trap 4 inches (100mm) dia and making requisite number of holes in walls, plinth & floor for pipe connection and making good in cement concrete 1:2:4.. | Nos | 5.00 | 12602.50 | 63,013 |
| 138 | 9/301+10/301+4/303 | P/F 22" x16" lavatory basin in white glazed earthernware (Pakistani) complete with and including the cost of Brass oxidized bolts kit built into walls 1/2" dia. Chrome plated moxer, 1.25" rubber plug and chrome plated brass chain 1.25 " dia brass waste of approved pattern 1.25 " dia chromium plated battal trap with union and making requisite number of holes in walls, plinth and floor for pipe connections and making good in cement concrete 1:2:4 and also complete with providing and fixing white glazed earthen ware padestal & C.P. brass chain and rubber plug for sinks and lavatory basins.… | Nos | 5.00 | 15436.65 | 77,183 |
| 139 | 1/307 | Providing and fixing 1/2 inches dia. (15 mm) brass bib cocks. | Nos | 60.00 | 755.40 | 45,324 |
| 140 | 20/301 | Providing and fixing standing wall shower of CP brass 3 knobs of approved quality mixer unit and moveable shower head complete.. | Nos | 8.00 | 6127.50 | 49,020 |
| 141 | 9/302 | Providing and fixing bath room accessories of set of 6 pieces consist of one shelf, one towel rod with bracket, one towel ring, one soap dish, one tooth Brush holder with glass, one tissue paper holder one double hook etc complete of approved quality as per direction of Engineer in-charge. | Nos | 8.00 | 11812.50 | 94,500 |
| 142 | 6/301 | Providing and fixing 20 inches x 16 inches (508 mm x 406 mm) Looking mirror of Belgium glass complete with Plastic frame and C.P. Brass screws. | Nos | 10.00 | 3045.74 | 30,457 |
| 143 | 11/123 | Dismantling cement concrete block masonry work in lime or cement mortar in foundation, basement, plinth and ground floor including stacking salvaged material (serviceable) and disposing of surplus material as directed with in three chains (91.5 m). | %cft | 29619.46 | 3006.25 | 890,435 |
| 144 | 105/13 | Providing and laying 1:4:8 (1cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51mm) and down gauge in foundation including levelling, compacting and curing etc. complete. | %Cft | 564 | 21744.25 | 122,638 |
| 145 | 2/114 +136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4inch (19mm) and down gauge in place of screened gradedbajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000Ibs. persq. inch (20.69N/mm2 at 28 days) with a mix not leaner than1:2:4 in raft or strip foundation with column sand pillars,of any shape including formwork and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 3924 | 33203.65 | 1,302,911 |
| 146 | 166/114 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . | P/TON | 9.5904557 | 282450.00 | 2,708,824 |
| 147 | 2/106+ 29/106 | Providing and laying in situ 1:3:6 50% crushed graded boulders 3/4 inch (19mm) anddown gauge and 50% graded screened bajri 3/4 inch (19mm) and down gauge in foundation, basementand plinth including formwork, compacting, curing and removal of form work, etc. complete, foundation and basement upto 5 feet (1.52R.m) depth and plinth upto 4feet (1.2R.m) height from ground level. | %Cft | 2442.92 | 17613.17 | 430,276 |
| 148 | 114/4+114/139 | Providing and laying reinforced cement concrete using screened graded bajri 3/4 inch(19mm) and down gauge having aminimum works cube crushing strength of 2250Ibs. per sq inch(15.52N/mm2) at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth . | %Cft | 365.625 | 41920.62 | 153,272 |
| 149 | 8/114 +136/114 | Providing and laying 1:2:4 cement concrate using crushedgraded boulders 3/4 inch (19mm) and down gauge in placeof screened graded bajri in any item of RCC of mix not leanerthan 1:2:4 crushing strengthof works cube in this case will be 3000 Ibs.persq. inch (20.69N/mm2 at 28 days in plinth beam of required shape or section including formwork and its removal compacting and curing in basement and ground floor but excluding the costof reinforcement . | %Cft | 957.6 | 40365.27 | 386,538 |
| 150 | 34/110+75/110+92/110 | Providing and laying 1:3:6 cement concrete solid block masonry more than 6 inches (152mm) thick using graded screened bajri 3/4inch (19mm)and down gauge set in lime cement mortar 1:1:6 including scaffolding, raking out jointsand curing etc. completeinground floor superstructure. | %Cft | 4608.90 | 32637.93 | 1,504,250 |
| 151 | 24/114+136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4inch (19mm) and down gaugein place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushingstrength of works cube in thiscase will be 3000 Ibs. persq.inch (20.69N/mm2 at 28 dayswith a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc.but excluding the cost of reinforcement, in the ground floor | %Cft | 987.1875 | 52698.67 | 520,235 |
| 152 | 4/122 | 1/2" (13mm) thick cement plaster 1:4 on walls and columns etc. in basement, plint,mezzanine and grounf floor including making edges, corners, and curing etc., complete | %sft | 60208.00 | 4381.84 | 2,638,218 |
| 153 | 124/3 | Providing and fixing angle ironfencing post sembeddedin concrete and painting exposed portion with aluminium paint 3 coats including necessary holes but excluding the cost of excavation and concrete, complete . | KG | 1365.00 | 303.69 | 414,537 |
| 154 | 124/16 | Providing and fixing galvanized iron barbed wire fencing(with two points) to the postsof any description completewith hook sand binding wire etc. if required (cost of posts not included). | KG | 7800.00 | 421.18 | 3,285,204 |
| 155 | 172/122 | Painting with Robbialac (VIP) or equivalent Weather Sheild coat paint In two or more coat sas per manufactur'sin structionor plasteres, renderdand concrates surface over and including the cost of priming coat, surface prepration dust in grubbing down smooth ,filling any cracks holes, removing blister sand other imperfections | %sft | 60208.00 | 4408.75 | 2,654,420 |
| 156 | 119/18 | Providing and fixing steel gate offlatiro complete as per direction of the Engineer-in-Charge | P/ KG | 1150 | 346.44 | 398,406 |
| 157 | 158/122 | Painting iron work with enemel paint of complete at any eight in any floor | %sft | 920.00 | 5819.1 | 53,536 |
| 158 | 82/114 +136/114 | Providing and laying re inforced cement concrete using crushed graded boulders 3/4 inch (19mm) and down gaugein place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in thiscase will be 3000 Ibs. persq. inch (20.69N/mm2 at 28 dayswith a mix not leaner than1:2:4 in coping and cornice of walls moulded to design including formwork sand its removal, compacting and curing etc. complete but excluding the cost of reinforcement, in ground floor | %Cft | 1462.5 | 57278.93 | 837,704 |
| 159 | 166/114 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . | P/TON | 2.0955558 | 282450.00 | 591,890 |
| 160 | 34/110+75/110+92/110 | Providing and laying 1:3:6 cement concrete solid block masonry more than 6 inches (152mm) thick using graded screened bajri 3/4inch (19mm) and down gauge set in lime cement mortar 1:1:6 including scaffolding, raking out joint sand curing etc. complete in ground floor superstructure. | %Cft | 3870.75 | 32637.93 | 1,263,333 |
| 161 | 24/114+136/114 | Providing and laying reinforced cement concrete using crushed graded boulders 3/4inch (19mm) and downgaugein place of screened graded bajri in any item of RCC of mix not leaner than 1:2:4 crushing strength of works cube in this case will be 3000 Ibs. persq. inch (20.69N/mm2 at 28 dayswith a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including formwork and its removal, compacting and curing etc. but excluding the cost of reinforcement, in the ground floor | %Cft | 467.4375 | 52698.67 | 246,333 |
| 162 | Â | Premium 25% | % | 1 | 25% | 9,806,112 |
| GRAND TOTAL: | Rs 49,030,559.00 |
The project comprises repair and renovation of main buildings at Custom House Gadani & Dam, along with completion of remaining works of incomplete boundary wall and repair/rehabilitation of the existing boundary wall at Custom House Gadani & Dam, strictly in accordance with the BOQ and technical specifications.
The scope includes civil, electrical and minor mechanical works such as structural repairs, plastering, flooring, roofing treatment, painting, replacement/repair of doors and windows, electrical wiring, fixtures, panels and associated services. It also includes construction of remaining portions of boundary wall, strengthening, repair and restoration of old/damaged sections, including masonry, concrete works, plastering, barbed wire/razor wire (if applicable), gates and allied works.
The contractor shall provide all labor, materials, equipment, tools and supervision required for execution, including site clearance, dismantling of damaged structures, debris disposal, surface preparation, and finishing works. All testing, commissioning and quality control measures shall be carried out as per specifications.
The contractor shall be responsible for proper site management, safety arrangements, protection of existing structures, and ensuring uninterrupted functioning of the premises where required. All temporary works, environmental protection measures, and compliance with site-specific security protocols of Collectorate of Customs Enforcement Gadani shall be included.
The contractor shall ensure compliance with PEC standards, PPRA rules, applicable building codes, and all health, safety and environmental regulations. Coordination with the Engineer/Procuring Agency for inspections, approvals and execution planning shall be mandatory.
All works shall be completed within the stipulated time frame to the satisfaction of the Engineer/Procuring Agency. Any defects observed during execution or within the defect liability period shall be rectified by the contractor at no additional cost.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
|
Number of GC Clause |
Amendments of, and Supplements to, Clauses in the General Conditions of Contract |
|
 |
Definitions The Procuring Agency is: Collectorate of Custom Enforcement, Gadani (Pakistan Customs), Deputy Collector Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province). The Supplier is: The title of the subject procurement is:Repair and Renovation of Main Buildings, Warehouses, Guard Room, Boundary Wall and Allied Works at Custom House Gadani |
|
GCC 2 |
Applicable/Governing Law: The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan |
|
GCC 3 |
Language: The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English. |
|
GCC 4 |
Notices: The addresses for the notices are: Procuring Agency: Collectorate of Custom Enforcement, Gadani (Pakistan Customs), Deputy Collector Contractor/ Bidder:  [Name, address and telephone number]. The Contractor/ Bidder’s Representative(s) [Name, address, telephone number and e-mail address]  |
|
GCC 6.1 |
The Authorized Representatives are:  For the Procuring Agency: Collectorate of Custom Enforcement, Gadani (Pakistan Customs), Deputy Collector For the Bidder: Name: ……………………… Designation: …………….. Address: ……………………………..  |
|
GCC 7 |
Effectiveness of the contract The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties |
|
GCC 8 |
Commencement of Contract: The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract. |
|
GCC 10.2 |
Expiration of Contract: The time period shall be …………………. |
|
GCC 14 |
Termination In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements. |
|
GCC 16 |
Conflict of Interest: The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17. |
|
GCC 20 |
Liquidated Damages If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00%Â of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority. |
|
GCC 21 |
Performance Guarantee: The amount of performance guarantee shall be 10.00%Â of the contract price in acceptable form of Bank Guarantee |
|
GCC 27 |
Currency of Payment: All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees. |
|
GCC 28 |
Payment terms: Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract. |
| Â | Â |
|
GCC 29 |
Identifying Defects: The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided. Inspections & Tests RequirementsMaterial testing as per approved standards (cement, steel, aggregates, etc.) Workmanship inspection at each stage by Engineer/Procuring Agency Concrete tests (slump test, cube test) where applicable Electrical testing and verification before commissioning Final inspection and completion certificate by Engineer Defect liability inspection during defect liability period All materials and works shall conform to approved specifications and standards. Any substandard work or material shall be rejected and replaced at contractor’s cost. Contractor shall provide test reports and inspection records as required by the Engineer/Procuring Agency. All materials and works shall conform to approved specifications and standards. Any substandard work or material shall be rejected and replaced at contractor’s cost. Contractor shall provide test reports and inspection records as required by the Engineer/Procuring Agency. Delivery & DocumentsCopies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount; The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock Contractor’s invoice (RA bill / final bill) Running bill certification by Engineer/Procuring Agency Material test reports (cement, steel, concrete, etc.) Work completion certificate Final completion certificate issued by Engineer Defect liability undertaking Performance guarantee (valid till completion/DLP) |
|
GCC 31 Â |
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder. Arbitrator’s fee: The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties. Appointing Authority for Arbitrator: By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties. Rules of procedure for arbitration proceedings: Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator. Place of Arbitration and Award: The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties. |
Date: [insert date (as day, month and year)]
Bid No.:P15401
To: Collectorate of Custom Enforcement, Gadani (Pakistan Customs), Deputy Collector Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province).
Â
Â
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
Â
THIS AGREEMENT made the _____ day of __________ 20_____ between Collectorate of Custom Enforcement, Gadani (Pakistan Customs), Deputy Collector Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province).
 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
Â
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Repair and Renovation of Main Buildings, Warehouses, Guard Room, Boundary Wall and Allied Works at Custom House Gadani (P15401) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
Â
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1.  In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2.  The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3.  In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4.  The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
Â
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Â
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Bidder: …………………………………………………
Â
Â
Â
Contract                          Number:  Contract                              Value:  Contract Title:
Dated:
Â
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Â
To:     Collectorate of Custom Enforcement, Gadani (Pakistan Customs), Deputy Collector Collectorate of Custom Enforcement, Gadani, Gadani, Hub (District), Kalat Division (Division), Balochistan (Province).
Â
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
Â
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
Â
AND WHEREAS we have agreed to give the Bidders guarantee:
Â
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarÂantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
Â
This guarantee is valid until the: [insert date]
Â
Â
Signature and seal of the Guarantors
Â
Â
_____________________________________________________________________
[name of bank or financial institution]
Â
Â
_____________________________________________________________________
[address]
Â
Â
_____________________________________________________________________
[date}
This annexure contains firm registration and tax-related documents including FBR/NTN certificate, active taxpayer status, SST (SRB) registration, company profile, and firm details as required under eligibility criteria
This annexure contains PEC registration, specialized codes, and valid licensing documents including electric inspector license in compliance with eligibility requirements
This annexure contains financial capacity documents including bank statement, audited financial statements of the last three years, and turnover evidence as required under eligibility criteria.
Â
This annexure contains details of completed and ongoing similar works, including mandatory experience in security restricted areas, along with supporting work orders and completion certificates
This annexure contains performance certificates from at least three government departments for similar nature works as required under eligibility criteria
This annexure contains declarations on Rs. 500 e-stamp paper regarding no blacklisting, no litigation, and no non-performance as required under eligibility criteria
This annexure contains technical compliance documents including BOQ compliance statement, technical proposal, delivery schedule compliance, and bid validity confirmation as required under eligibility criteria
This annexure contains details of qualified engineering staff including civil, electrical, and mechanical engineers along with their degrees and PEC registration documents as required under eligibility criteria.
This annexure contains ISO certifications including ISO 9001:2015 and ISO 45001:2018 as required under eligibility criteria
This annexure contains bid security in the form of 2% pay order along with confirmation of physical submission as required under eligibility criteria
This annexure contains complete bidding documents, bid forms, and price schedule duly signed and stamped as required under eligibility criteria
This annexure contains miscellaneous compliance documents including sample submission (if required) and undertaking for acceptance of general conditions of the tender.