Standard Bidding Document

📑 Procurement Notice (NIT)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

REQUEST FOR BIDS

PROCUREMENT OF CIVIL WORKS

  1. The SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)) has reserved Funds for the procurement planned for FY 2026-27. The SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)) intends to apply part of the proceeds of this Fund to cover eligible payments under the contract for the "315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi" with the reference of "P88684".
  2. The SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)) invites sealed Bids from eligible Bidders for procurement of Works (315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi) described in the bidding documents on EPADS v2.0.
  3. Single Stage-Two Envelope will be used by adopting Least Cost Based Selection (LCBS) Technique for the subject procurement, in line with the Public Procurement Rules, 2004 and any Regulations, Regulatory Guides, Procurement Guidelines or Instructions issued by the Authority from time to time.
  4. All Bids must be accompanied by a Bid Security amount described in Bid Security Section in Bidding Document in the form of  Pay Order, Banker's Cheque, Demand Draft. Or all bids must be accompanied by bid securing declaration in the format specified in the Bidding documents
  5. E-Bidding documents, containing detailed terms & conditions, specifications and requirements etc. are available on e-Pak Acquisition and Disposal System (EPADS) at https://epads.gov.pk/opportunities/federal/procurements/88684 for all the interested bidders registered on EPADS v2.0. Bidders are required to get themselves registered on EPADS v2.0 to participate in Bidding process.
  6. The e-bids, prepared in accordance with the instructions in the e-Bidding documents, must be submitted through EPADS v2.0 on or before Thursday, September 24, 2026 12:00 PM. E-bids will be opened by using EPADS v2.0 on the same day at Thursday, September 24, 2026 12:30 PM. Manual submission of Bids shall not be entertained. Those vendor who have not yet registered on the new version of EPADS v2.0, may register themselves on https://vendors.epads.gov.pk/. A tutorial to explain the registeration process is available at https://www.youtube.com/watch?v=MNW6T38v7tc.

In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).

 

 

SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)), Executive Engineer
Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-213-450-4122
shehzad.memon@sbp.org.pk

📑 Instructions to Bidders (ITB)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

A. INTRODUCTION

  1. Scope of Bid
    1. The Procuring agency/Employer (PA), as indicated in the Bid Data Sheet (BDS) invites Bids for the execution of Works as specified in the BDS and Section V- Works Requirements. The name, identification, and number of lots (contracts) of this National/ International Competitive Bidding process are specified in the BDS.
  2. Source of Funds
    1. Source of funds as referred in Clause 2 of Bid Data Sheet.
  3. Eligible Bidders
    1. A bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture or consortium. In the case of a joint venture or consortium, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture or consortium shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture or consortium during the Bidding process, and in case of award of contract, during the execution of contract. Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
      Any bid submitted by the joint venture, consortium or association shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
      (The limit on the number of members of JV or Consortium may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
    2. The invitation for bids is open to all prospective bidders subject to any provisions of incorporation or licensing by the respective national/ international incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidder keeping in view the requirement of that business.
    3. A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidders may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
      1. are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring agency/Employer to provide consulting services for the preparation of design or technical specifications of the works that are the subject of the bid; or
      2. have controlling shareholders in common; or
      3. receive or have received any direct or indirect subsidy from any of them; or
      4. have the same legal representative for purposes of this Bid; or
      5. have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the Procuring agency/Employer regarding this Bidding process; or
      6. Submit more than one bid in this bidding process.
    4. A Bidder may be ineligible if –
      1. he is declared bankrupt or, in the case of company or firm, insolvent;
      2. payments in favor of the bidder is suspended in accordance with the judgment of a court of law other than a judgment declaring bankruptcy and resulting (in accordance with the national laws) in the total or partial loss of the right to administer and dispose of its property;
      3. the bidder is convicted, by a final judgment of a Court of Law or relevant Professional Statuary Body, of any offence involving professional conduct;
      4. The bidder is debarred/ blacklisted by a national level Procuring agency/Employer and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration.
    5. As and when required, bidders shall provide to the Procuring agency/Employer evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
    6. Bidders shall submit proposal relating to the nature, conditions and modalities of sub-contracting wherever the sub-contracting of any elements of the contract is envisaged.
  4. Eligible Material and Equipment
    1. All the material and equipment to be mobilized under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such materials and equipment. For this purpose, ineligible countries are stated in the section-IV titled as “Eligible Countries”.

B. BIDDING DOCUMENTS

  1. Contents of Bidding Documents
    1. The scope of Works, bidding procedures, and terms and conditions of the contract are prescribed in the bidding documents.  In addition to the Invitation for Bids, the bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 7.1 include:
      Section I -Invitation for Bids 
      Section II Instructions to Bidders (ITBs)
      Section III Bid Data Sheet (BDS)
      Section IV Eligible Countries
      Section V Evaluation and Qualification Criteria
      Section VI Works Requirements Technical Specifications & Schedule of Requirements
      Section VII Standard Bidding Forms
      Section VIII General Conditions of Contract (GCC)
      Section IX Particular Conditions of Contract (PCC)
      Section X Contract Forms
    2. The bidder is expected to examine all instructions, forms, specifications, terms and conditions prescribed in the bidding documents. Failure to furnish all the information required in the bidding documents will be at the bidder’s risk and may result in the rejection of his bid. 
  2. Clarification of Bidding Document, Pre-bid Meeting
    1. A prospective bidder requiring any clarification of the bidding document may notify the Procuring agency/Employer through EPADS. 
    2. The Procuring agency/Employer shall respond to the request for clarification in accordance with Rule 31 of the Public Procurement Rules 2004.
    3. Should the Procuring Agency deem it necessary to amend the BIDDING document as a result of a clarification, it shall do so following the procedure under ITB 7.
    4. If indicated in the BDS, the bidder’s designated representative is invited at the bidder’s cost to attend a pre-bid meeting at the place, date and time mentioned in the BDS. During this pre-bid meeting, prospective bidders may request clarification of the schedule of requirement, the evaluation criteria or any other aspects of the bidding documents.
    5. Minutes of the pre-bid meeting, if applicable, including the text of the questions asked by bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS. Any modification to the bidding documents that may become necessary as a result of the pre-bid meeting shall be made by the Procuring agency/Employer exclusively through the use of an Addendum pursuant to ITB 7. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
    6. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works.  The costs of visiting the Site shall be at the bidder’s own expense.
    7. The bidder and any of its authorized personnel will be granted permission by the Procuring agency/Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the bidder and its personnel will release and indemnify the Procuring agency/Employer  from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
  3. Amendment of Bidding Documents
    1. The procuring agency may issue notification of any change, addition, modification or deletion in accordance with Rule 23 of the Public Procurement Rules 2004 i.e. Bidding Documents.
    2. To give prospective bidders reasonable time in which to take an addendum/corrigendum into account in preparing their bids, the Procuring agency/Employer may, at its discretion, extend the deadline for the submission of bids:
      Provided that the Procuring agency/Employer shall extend the deadline for submission of bid in pursuance of Rule 27 of the  Public Procurement Rules 2004, i.e. Extension of time for submission of bids, if such an addendum is issued within last three (03) days of the bid submission deadline.

C. PREPARATION OF BIDS

  1. Language of Bid
    1. The bid prepared by the bidder, as well as all correspondence and documents relating to the bid exchanged by the bidder and the Procuring agency/Employer shall be written in the English language unless specified in the BDS. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless specified in the BDS, in which case, for purposes of interpretation of the bidder, the translation shall govern.
  2. Documents Constituting the Bids   
    1. The Bids prepared by the Bidder shall constitute of all the documents required in the BDS.
  3. Documents Establishing Eligibility of Material, Equipment and Works, their Conformity to Bidding Documents
    1. The bid prepared by the bidder shall constitute the following components: -
      1. Documentary evidence established in accordance with ITB 10 that the material and equipment to be utilized by the Bidder for the executions of works are eligible material and equipment and conform to the Bidding Documents;
      2. Documentary evidence established in accordance with ITB 11 that the bidder has been authorized to carry out the Construction works;
      3. Documentary evidence established in accordance with ITB 11 that the bidder is eligible and/or qualified for the subject bidding process;
      4. Form of Bid and Bid Prices completed in accordance with ITB 12 and 13; 
      5. Completed schedules as required, including priced Bill of Quantities in accordance with ITB 13.
      6. Technical Proposal completed in all aspects in accordance with ITB-15. 
      7. Bid security or Bid Securing Declaration furnished in accordance with ITB 17;
      8. Any other document required in the BDS.
    2. In addition to the requirements, bids submitted by a JV shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful bid shall be signed by all members and submitted with the bid, together with a copy of the proposed Agreement.
    3. The bidder shall furnish, as part of its bid, all those documents establishing the eligibility in conformity to the terms and conditions specified in the bidding documents for all material, equipment and works which the bidder proposes to execute.
    4. The documentary evidence of conformity of the material, equipment and works to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of:
      1. a detailed description of the work methodology, approach, schedule and resources to be mobilized at site;
      2. an item-by-item commentary on the Procuring agency/Employer’s Technical Specifications demonstrating substantial responsiveness of the material, equipment and works to those specifications, or a statement of deviations and exceptions to the provisions of the Technical Specifications;
      3. any other procurement specific documentation requirement as stated in the BDS.
    5. The required documents and other accompanying documents must be in English. In case any other language than English is used the pertinent translation into English shall be attached to the original version.
  4. Documents Establishing Eligibility and Qualification of the Bidder   
    1. The bidder shall furnish, as part of its bid, all those documents establishing the bidder’s eligibility to participate in the bidding process and/or its qualification to perform the contract if its bid is accepted.
    2. The documentary evidence of the bidder’s eligibility to bid shall establish to the satisfaction of the Procuring agency/Employer that the bidder, at the time of submission of its bid, is from an eligible country as defined in Section-IV titled as “Eligible Countries”.
    3. The documentary evidence of the bidder’s qualification to perform the contract if its bid is accepted shall establish to the satisfaction of Procuring agency/Employer that:
      1. The bidder has the financial and technical capability necessary to perform the Contract, meets the qualification criteria specified in Section-V, Evaluation and Qualification Criteria and BDS.
      2. In the case of a bidder not doing business within Pakistan, the bidder is or will be (if awarded the contract) represented by a local bidder (Joint Venture) in accordance with the PEC works bylaws, and in case of award of works such foreign firm is required to participate in the execution of works to carry out its obligations as prescribed in the Conditions of Contract and /or Technical Specifications.
      3. That the bidder meets the qualification criteria listed in Section-V, Evaluation and Qualification Criteria and BDS. 
  5. Forms of Bid
    1. The Bidder shall fill the Form of Bids furnished in the bidding documents. The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
  6. Bid Prices
    1. The bid prices quoted by the bidder in the Standard bid Forms, Bill of Quantities and in the Price Schedules shall conform to the requirements specified below or exclusively mentioned hereafter in the bidding documents. 
    2. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. If a Price Schedule shows items listed but not priced, their prices shall be construed to be included in the prices of other items in the Bill of Quantities and will not be paid for separately by the Procuring agency/Employer. 
    3. Items not listed in the Price Schedule shall be assumed not to be included in the bid, and provided that the bid is still substantially responsive in their absence or due to their nominal nature, the corresponding average price of the respective item(s) of the remaining substantially responsive bidder(s) shall be construed to be the price of those missing item(s):
      Provided that:
      1. where there is only one (substantially) responsive bidder, or
      2. where there is provision for alternate proposals and the respective items are not listed in the other bids, 
        The Procuring agency/Employer may fix the price of missing items in accordance with market survey, and the same shall be considered as final price.
    4. The Bid price to be quoted in the Form of Bid in accordance with ITB 12 shall be the total price of the bid.
    5. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract. 
    6. If so specified in ITB 1.1, bids may be invited for individual lots (contracts) or for any combination of lots (packages). 
    7. Prices quoted by the Bidder shall be fixed during the bidder’s performance of the contract and not subject to variation on any account. A bid submitted with an adjustable price will be treated as non-responsive and shall be rejected, pursuant to ITB 27, unless otherwise price adjustment is permissible under Conditions of the Contract. 
    8. All duties, taxes, and other levies payable by the Contractor under the Contract, or for any other cause, as of the date twenty-eight (28) days prior to the deadline for submission of bids, shall be included in the rates and prices and the total bid price submitted by the bidder.
  7. Currencies of Bid and Payment
    1. Prices shall be quoted in Pakistani Rupees unless otherwise specified in the BDS. Comparison of bids and tie of bid shall be treated in accordance with the Rule 30(2) of Public Procurement Rules, 2004.
  8. Documents Comprising the Technical Proposal
    1. The bidder shall furnish a Technical Proposal including a statement of work methods, equipment, personnel, schedule and any other information as stipulated in Section VII – Standard Bid Forms, in sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the work requirements and the completion time.
  9. Bid Validity Period
    1. Bids shall remain valid for the period specified in the BDS after the bid submission deadline prescribed by the Procuring agency/Employer. A bid valid for a shorter period shall be rejected by the Procuring agency/Employer as non-responsive. The period of bid validity will be determined from the complementary bid securing instrument i.e. the expiry period of bid security or bid securing declaration as the case may be. 
    2. Under exceptional circumstances, prior to the expiration of the initial Bids/Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids/Bid. Such request for extension of the period of bid validity shall be carried out in accordance with Rule 26 of the Public Procurement Rules, 2004.
  10. Bid Security or Bid Securing Declaration
    1. Pursuant to ITB 11.1 unless otherwise specified in the BDS, the bidder shall furnish as part of its bid, a Bid Security in accordance with Rule 25 of the Public Procurement Rules, 2004 in the amount and currency specified in the BDS or Bid Securing Declaration as specified in the BDS in the format provided in Section VII (Standard Bidding Forms). 
      In case Procuring agency/Employer is inviting bids in lots / packages, the bidder shall be required to submit his bid security against the respective lot/ package for which he is submitting his bid.
      Until the development of functionality of auto verification of financial instrument in EPADS, the scanned copy of bid security or bid securing declaration, as the case may be, shall be uploaded on E-PADS whereas the original instrument to be submitted to the procuring agency before closing of bid submission deadline,
    2. The Bid Security shall be denominated in the local currency or in another freely convertible currency, and it shall be in the form specified in the BDS which shall be in any of the following:
      1. A bank guarantee, an irrevocable letter of credit issued by a Scheduled bank in the form provided in the Bidding Documents or another form acceptable to the Procuring agency/Employer and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bid Validity is extended. In either case, the form must include the complete name of the bidder; 
      2. A cashier’s or certified cheque; or
      3. Another security as indicated in the BDS.
    3. The Bid Security or Bid Securing Declaration shall be in accordance with the Form of the Bid Security or Bid Securing Declaration included in Section VII (Standard Bidding Forms) or another form approved by the Procuring agency/Employer prior to the bid submission.
    4. The Bid Security shall be payable promptly upon written demand by the Procuring agency/Employer in case any of the conditions listed in ITB 17.9 are invoked.
    5. Any bid not accompanied by a Bid Security or Bid Securing Declaration in accordance with ITB 17.1 or 17.3 shall be rejected by the Procuring agency/Employer and shall be declared as non-responsive bid, pursuant to ITB 27.
    6. Unsuccessful bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Procuring agency/Employer pursuant to ITB 16. The Procuring agency/Employer shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
      1. The expiry of the Bid Security;
      2. The entry into force of a procurement contract and the provision of a performance security (or guarantee), for the performance of the contract if such a security (or guarantee), is required by the Biding documents;
      3. The rejection by the Procuring agency/Employer of all Bids;
      4. The withdrawal of the bid prior to the deadline for the submission of bids, unless the biding documents stipulate that no such withdrawal is permitted.
    7. The successful bidder’s Bid Security will be discharged upon the bidder signing the contract pursuant to ITB 40, or furnishing the performance security (or guarantee), pursuant to ITB 41.
    8. The Bid Security may be forfeited or the Bid Securing Declaration executed:
      1. if a Bidder: 
        1. Withdraws its Bid during the period of Bid Validity as specified by the Procuring agency/Employer, and referred by the bidder on the Form of Bid except as provided for in ITB 16.2; or 
      2. In the case of a successful bidder, if the bidder fails:
        1. to sign the contract in accordance with ITB 40; or
        2. to furnish performance security (or guarantee) in accordance with ITB 41.
    9. In case of Bid Security issued by the foreign bank is allowed by the Procuring agency/Employer, the same should be counter guaranteed by a corresponding bank in Pakistan. Furthermore, in case of joint venture, it should be in the name of Joint venture to ensure joint responsibility. In case the JV is not legally constituted at the time of bid submission, the bid security or bid securing declaration shall be in the names of all future members as named in the letter of bid.
  11. Withdrawal of Bids   
    1. Before bid submission deadline, any bidder may withdraw, substitute, or modify its bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and the corresponding must accompany the respective written notice. 
  12. Format and Signing of Bid
    1. The Bidder shall prepare and submit Bids through EPADS with due diligence after carefully reading all the terms and condition before bid submission deadline.

D. SUBMISSION OF BIDS

  1. Submission of Bids through EPADS v2.0
    1. All bids shall be submitted through EPADS v2.0.
  2. Deadline for Submission of Bids
    1. All bids shall be received through EPADS v2.0 not later than bid submission deadline as specified in the BDS.
    2. The Procuring agency/Employer may, under exceptional circumstances and at its discretion, extend the deadline for the submission of bids, pursuant to Rule 27 of the Public Procurement Rules, 2004. Extension of Time for submission of bid, by amending the Bidding Documents in accordance with ITB 7, in which case all rights and obligations of the Procuring agency/Employer and bidders previously subject to the deadline will thereafter be subject to the new deadline.
  3. Substitution and Modification of bids
    1. A bidder may substitute or modify his bid after it has been submitted, provided that written notice of the substitution or modification of the bid, is received by the Procuring agency/Employer prior to the deadline for submission of bids.
    2. Revised bid may be submitted after the substitution or modification made in the original bid in accordance with the provisions referred in ITB 18

E. OPENING AND EVALUATION OF BIDS

  1. Opening of Bids
    1. The Procuring Agency will open bids in accordance with Rule 28 of the Public Procurement Rules, 2004 and as specified in the BDS.
  2. Confidentiality
    1. Information relating to the examination, clarification, evaluation and comparison of bids and recommendation of contract award shall not be disclosed to bidders or any other persons not officially concerned with such process until the time of the announcement of the respective evaluation report.
  3. Clarification of Bids
    1. Clarification of Bidding Documents shall be carried out in accordance with Rule 31 of the Public Procurement Rules, 2004.
    2. The alteration or modification in the bid which in any case affect the following parameters will be considered as a change in the substance of a bid:
      1. evaluation & qualification criteria;
      2. required scope of work;
      3. contract price;
      4. all securities requirements;
      5. tax requirements;
      6. terms and conditions of bidding documents.
      7. change in the ranking of the bidder
  4. Preliminary Examination of Bids 
    1. Prior to the detailed evaluation of bids, the Procuring agency/Employer will determine whether each bid:
      1. meets the eligibility criteria defined in ITB 3 and ITB 4
      2. has been prepared as per the format and contents defined by the Procuring agency/Employer in the bidding documents;
      3. has been properly signed; 
      4. is accompanied by the required securities; and 
      5. is substantially responsive to the requirements of the bidding documents. 
        The Procuring agency/Employer's determination of a bid's substantial responsiveness will be based on the contents of the bid itself.
    2. A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding Documents, without material deviation or reservation. A material deviation or reservation is one that: - 
      1. affects in any substantial way the scope, quality, or performance of the Works; 
      2. limits in any substantial way, inconsistent with the bidding documents, the Procuring agency/Employer's rights or the bidders’ obligations under the Contract; or 
      3. if rectified, would affect unfairly the competitive position of other bidders presenting substantially responsive bids.
    3. The Procuring agency/Employer will confirm that the documents and information specified under ITB 9, 10 and 11 have been provided in the bid. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Bidders, the bid shall be rejected.
    4. The Procuring agency/Employer may waive-off any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
      Explanation: A minor informality, non-conformity or irregularity is one that is merely a matter of form and not of substance. It also pertains to some immaterial defect in a Bid or variation of a bid from the exact requirements of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the works. The Procuring agency/Employer either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is advantageous to the Procuring agency/Employer. Examples of minor informalities or irregularities include failure of a bidder to –
      1. Submit the number of copies of signed bids required by the invitation;
      2. Furnish required information concerning the number of its employees;
      3. the firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature.
    5. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer may request the bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Technical Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any such aspect of the technical Proposal linked with the ranking of the bidders. Failure of the bidder to comply with the request may result in the rejection of its bid.
    6. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer shall rectify quantifiable nonmaterial nonconformities or omissions related to the Financial Proposal. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of the missing or nonconforming item or component. 
    7. If a bid is not substantially responsive, it will be rejected by the Procuring agency/Employer and may not subsequently be evaluated for complete technical responsiveness. 
  5. Examination of Terms and Conditions; Technical Evaluation
    1. The Procuring agency/Employer shall examine the bid to confirm that all terms and conditions specified in the GCC and the PCC have been accepted by the bidder without any material deviation or reservation.
      For this purpose:
      “Deviation” means departure from the requirements specified in the Bidding Document.
      “Reservation” means setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding Document.
    2. The Procuring agency/Employer shall evaluate the technical aspects of the bid submitted in accordance with ITB 30, to confirm that all requirements specified in Section VI – Works Requirement, Technical Specifications of the Bidding Documents have been met without material deviation or reservation.
    3. If after the examination of the terms and conditions and the technical evaluation, the Procuring agency/Employer determines that the bid is not substantially responsive in accordance with ITB 27, it shall reject the bid.
  6. Correction of Arithmetic Errors
    1. Bids determined to be substantially responsive will be checked for any arithmetic errors.  Errors will be corrected as follows: -
      1. if there is a discrepancy between unit prices and the sub-total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the sub-total price shall be corrected, unless in the opinion of the Procuring agency/Employer there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected;
      2. if there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail, and the total shall be corrected; and 
      3. where there is a discrepancy between the amounts in figures and in words, the amount in words will govern.
      4. Where there is discrepancy between grand total of price schedule and amount mentioned on the Form of Bid, the amount referred in Price Schedule shall be treated as correct subject to elimination of other errors. 
    2. The amount stated in the Bid will, be rectified by the Procuring agency/Employer in accordance with the above procedure for the correction of errors and, with, the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount, its bid shall be rejected after forfeiture of Bid Security or execution of the Bid Securing Declaration, as the case may be, in accordance with ITB 41.3.
  7. Conversion to Single Currency
    1. The unit rates and the prices shall be quoted by the bidder entirely in Pak rupees. A bidder expecting to incur expenditures in other currencies for inputs to the Works from outside the Procuring agency/Employer’s country (referred to as the “Foreign Currency Requirements”) shall indicate the same in the letter of bid-financial proposal. The proportion of the Bid Price (excluding Provisional Sums) needed by him for the payment of such Foreign Currency Requirements either (i) entirely in the currency of the Bidder’s home country or, (ii) at the bidder’s option, entirely in Pak rupees provided always that a bidder expecting to incur expenditures in a currency or currencies other than those stated in (i) and (ii) above for a portion of the foreign currency requirements, and wishing to be paid accordingly, shall indicate the respective portions in his bid. Comparison of bids quoted in different currencies and conversion of bids into a single currency shall be carried out in accordance with Rule 30(2) of the Public Procurement Rules, 2004.
  8. Evaluation of Bids
    1. The Procuring agency/Employer shall evaluate and compare only the bids determined to be substantially responsive, pursuant to ITB 27.
    2. In evaluating the Technical Proposal of each Bid, the Procuring agency/Employer shall use the criteria and methodologies listed in the BDS and in terms of works requirement. No other evaluation criteria or methodologies shall be permitted.
    3. The Procuring agency/Employer’s evaluation of a bid will take into account:
      1. the bid price, excluding provisional sums and the provision, if any, for contingencies in the summary bill of quantities, but including day work items, where priced competitively;
      2. converting the amount resulting from applying above, if relevant, to a single currency in accordance with ITB 29;
    4. The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in bid evaluation.
    5. If these bidding documents allow bidders to quote separate prices for different lots, and the award to a single bidder of multiple lots, the methodology of evaluation to determine the lowest evaluated lot combinations in the Form of Bid, is specified in the BDS.
    6. If the bid, which results in the Evaluated Bid Price (Successful Bid), is seriously unbalanced or front loaded in the opinion of the Employer, the Employer may require the Bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated Contract payments, the Employer may require that the amount of the performance security be increased at the expense of the Bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under the Contract.
      Explanation:
      “Unbalanced” or “front-loaded” bids consist of deliberately submitting bids with artificially high prices or unit rates for the early stages of a construction project, offset by artificially low prices or unit rates for the later stages of the project, to improve the contractor’s cash flow.
  9. Domestic Preference
    1. If the BDS so specifies, the Procuring agency/Employer will grant a margin of preference to the domestic contractor in line with the rules, regulations, regulatory guides or instructions issued by the Authority from time to time. 
  10. Determination of Successful Bid
    1. The Procuring agency/Employer shall compare the evaluated bids in accordance with the predefined bidding procedure, of all substantially responsive bids to determine the Successful bidder. 
  11. Qualification of Bidder 
    1. The Procuring agency/Employer shall determine to its satisfaction whether the bidder is substantially responsive and whose bid is declared as Successful bid either continues to meet (if prequalification applies) or meets (if post-qualification applies) the qualifying criteria specified in Evaluation and Qualification Criteria.
      Note: In case of international bidding, the parameters for incorporation or licensing within Pakistan may be fulfilled as part of post qualification.
    2. The determination shall be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11.
    3. Prior to contract award, the Procuring agency/Employer will verify that the successful bidder (including each member of a JV) is not blacklisted/debarred. The Procuring agency/Employer will conduct the same verification for each sub-contractor proposed by the successful bidder. 
  12. Sub-Contractors
    1. The bidder shall provide details regarding any specialized sub-contractor to the Procuring agency/Employer. In case change of sub-contractors, the bidder shall promptly notify the Procuring agency/Employer and obtain approval for replacement of sub-contractors.
    2. Bidders may propose sub-contracting up to the percentage of total value of contracts or the volume of works as specified in the BDS.
  13. Abnormally Low Financial Bid
    1. A procuring Agency may reject abnormally low bids. The decision of the Procuring agency/Employer to reject a bid and reasons for the decision shall be recorded in the procurement proceedings and promptly communicated to the bidder concerned. Moreover, the Procuring agency/Employer shall not incur any liability solely by rejecting abnormally bid
      Guidance for Procuring agency/Employer:
      An abnormally low bid means, in the light of the Procuring agency/Employer’s estimate and of all the bids submitted, the bid appears to be abnormally low by not providing a margin for normal levels of profit. In order to identify the Abnormally Low Bid (ALB) following approaches can be considered to minimize the scope of subjectivity:
      1. Comparing the bid price with the cost estimate; 
      2. Comparing the bid price with the bids offered by other bidders submitting substantially responsive bids; and 
      3. Comparing the bid price with prices paid in similar contracts in the recent past either government- or development partner-funded.
    2. The Procuring agency/Employer will determine to its satisfaction whether the bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily, in accordance with the criteria listed in ITB 11
    3. The determination will take into account the bidder’s financial and technical capabilities.  It will be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    4. Procuring agency/Employer may seek “Certificate for Independent Price Determination” from the bidder and the results of reference checks may be used in determining award of contract.
      Explanation: The Certificate shall be furnished by the bidder. The bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc. 
    5. An affirmative determination will be a prerequisite for award of the contract to the bidder. A negative determination will result in rejection of the bidder’s bid, in which event the Procuring agency/Employer will proceed to the next ranked bidder to make a similar determination of that bidder’s capabilities to perform satisfactorily.

F. AWARD OF CONTRACT

  1. Criteria of Award
    1. Subject to ITB 36 and 37, the Procuring agency/Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has been declared as Successful Bidder, provided that such bidder has been determined to be:
      1. eligible in accordance with the provisions of ITB 3
      2. is determined to be qualified to perform the Contract satisfactorily; and 
      3. Successful negotiations have been concluded, if any.
  2. Negotiations
    1. The Committee of the Procuring agency/Employer may negotiate with the Most Advantageous Bidder relating to the following areas:
      1. a minor alteration to the technical (drawings, design technical specifications) details of the statement of works;
      2. Methodology, work plan, staffing in view to streamline the work;
      3. a minor amendment to the Particular conditions of Contract;
      4. finalizing payment arrangements;
      5. clarifying details that were not apparent or could not be finalized at the time of Bidding; 
    2. Where negotiation fails to result into an agreement, the Procuring agency/Employer may invite the next ranked bidder for negotiations. Where negotiations are commenced with the next ranked bidder, the Procuring agency/Employer shall not reopen earlier negotiations.
  3. Procuring agency's Right to reject All Bids
    1. The procuring agency has the right to reject all bids in accordance with Rule 33 of the Public Procurement Rules, 2004. However, the Authority (i.e. PPRA) may call from the Procuring agency/Employer the justification of those grounds. 
  4. Notification of Award
    1. The procuring agency shall announce and publish the evaluation result in accordance with Rule 35 of the Public Procurement Rules, 2004.
    2. Where no complaints have been lodged, the bidder whose bid has been accepted will be notified of the award by the Procuring agency/Employer prior to expiration of the bid validity period through EPADS. However, the Procuring agency/Employer shall not award any procurement contract at least for five (05) days after the announcement of final evaluation report. The notification letter (herein after and in the condition of the contract and contract form called “Letter of Acceptance” will specify the sum that the Procuring agency/Employer will pay the successful bidder in consideration for the execution and completion of the works as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price). 
    3. The notification of award will constitute the formation of the Contract, subject to the bidder furnishing the Performance Security (or guarantee) in accordance with ITB 41 and signing of the contract in accordance with ITB 40
    4. Upon the successful bidder’s furnishing of the performance security (or guarantee) pursuant to ITB 41, the Procuring agency/Employer will promptly notify each unsuccessful bidder, the name of the successful bidder and the Contract amount and will discharge the Bid Security or Bid Securing Declaration of the bidder(s) pursuant to ITB 17.
  5. Signing of Contract
    1. Promptly after notification of award, Procuring agency/Employer shall send the successful bidder the draft agreement, incorporating all terms and conditions as agreed by the parties to the contract. 
    2. Immediately after the Redressal of grievance by the GRC, and after fulfillment of all conditions precedent of the Contract Form, the successful bidder and the Procuring agency/Employer shall sign the contract.
    3. Where no formal signing of a contract is required, work order issued to the bidder shall be construed to be the contract. 
  6. Performance Security (or Guarantee)
    1. After the receipt of the Letter of Acceptance, the successful bidder, within the specified time, shall deliver to the Procuring agency/Employer a Performance Guarantee in the amount and in the form stipulated in the BDS and PCC, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract.
    2. If the Performance Guarantee is provided by the successful bidder and it shall be in the form specified in the BDS which shall be in any of the following:
      1. certified cheque, cashier’s or manager’s cheque, or bank draft; 
      2. irrevocable letter of credit issued by a scheduled bank of Pakistan or in the case of an irrevocable letter of credit issued by a foreign bank, the letter shall be confirmed or authenticated by a scheduled bank of Pakistan; 
      3. bank guarantee confirmed by a reputable local bank or, in the case of a successful foreign bidder, bonded by a foreign bank; or
      4. surety bond callable upon demand issued by any reputable surety or insurance company.
        Any Performance Guarantee submitted shall be enforceable in Pakistan.
    3. Failure of the Most Advantageous Bidder to comply with the requirement of ITB 40 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security or declare blacklisted (in case bid securing declaration is submitted) in which event the Procuring agency/Employer may make the award to the next most advantageous bidder or reinitiate the procurement process afresh (as a case may be).
  7. Advance Payment
    1. Advance payment will be provided to the bidder in percentage and in the manner as agreed by the both parties in terms of Conditions of the Contract. 
    2. The Procuring agency/Employer will provide an advance payment as stipulated in the Conditions of Contract, subject to a maximum amount, as stated and/or Conditions of the Contract.  The advance payment request shall be accompanied by an advance payment security (guarantee) in the form provided in Section X. For the purpose of receiving the advance payment, the bidder shall make and estimate of, and include in its bid, the expenses that will relate to the purchase of equipment, machinery, materials, and on the engagement of labor during the first month beginning with the date of the Procuring agency/Employer’s “Notice to Commence” as specified in the PCC.
  8. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted.
  9. Corrupt & Fraudulent Practices
    1. Procuring agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.  

G. GRIEVANCE REDRESSAL & COMPLAINT REVIEW MECHANISM

  1. Grievance Redressal
    1. Grievance Redressal shall be carried out in accordance with Rule 48 of the Public Procurement Rules, 2004 i.e. Redressal of grievances by the procuring agency and “Redressal of Grievances Regulations 2021”.

H. MECHANISM OF BLACKLISTING

  1. Mechanism of Blacklisting
    1. The Procuring agency/Employer shall proceed Blacklisting of Bidders/Contractors in accordance with Rule 19 of the Public Procurement Rules, 2004 i.e. Blacklisting and “Blacklisting and Debarment of Bidders or Contractors Regulations 2024. 

📑 Bid Data Sheet (BDS)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

Bids Data Sheet (BDS)

The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB).  Whenever there is a conflict, the provisions herein shall prevail over those in ITB.

BDS Clause Number

ITB Number

Amendments of, and Supplements to, Clauses in the Instruction to Bidders

A. Introduction

1

1.1

Name of Procuring Agency: SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC))

The subject of procurement is: 315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Expected commencement date: Thursday, October 15, 2026

2.

2.1

Financial year for the operations of the Procuring Agency: 2026-27

Name and identification number of the Contract: P88684 

3. 3.1 JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil

B. Bidding Documents

4.

6.2 & 6.4

The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Friday, September 11, 2026
Pre-Bid Meeting: Thursday, September 10, 2026 11:00 AM
Venue: Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road

5. 7.2

Any addendum, in case issued, shall be published on SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)) website  and on EPADS v2.0.

C. Preparation of Bids

6.

8.1

List of documents required along with the bid: No
 

7. 9.1

The qualification criteria to establish the supply / production capability of the bidder.

see Eligibility Criteria
8. 11.2 


Works and Their related documents:
See section Required Scope of Work
 

9. 11.1 Price schedule will be provided according to the format defined and acquired.
see section price schedule.
10. 11.4

 Specifications:

see section of specifications.

11.

11.5 & 13.5

The price shall be Fixed.
The bid price shall be adjusted in accordance with Appendix provided – Formula for Price Adjustment.

12.

14.1

Currency of the Bids shall be : PKR

13.

16.1

The Bids/Bid Validity period shall be: 180 Days

14.

17.1 

The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6

15. 17.2

The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Demand Draft  

16. 15.1

Alternative Bids to the requirements of the bidding documents will not be permitted.

D. Submission of Bids

17.

18.1 & 21.1

Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;

Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

Bids that are not submitted on EPADS v2.0 shall be disqualified.

The deadline for Bids submission is: Thursday, September 24, 2026 12:00 PM

E. Opening and Evaluation of Bids

18.

24.1

The Bids opening shall take place on EPADS v2.0.

Day : Thursday

Date: September 24, 2026

Time : 12:30 PM

19.

30.2

Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria

F. Award of Contract

20.

41.1 & 41.2

The Performance guarantee shall: 10.00%.

The Performance Guarantee shall be acceptable in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft

21. 45.1

Arbitrator shall be appointed by mutual consent of the both parties.

G. Review of Procurement Decisions

22.

37

Grievance against this procurement shall be submitted online on EPADS v2.0.

Eligibility Criteria

Bidder's TypeRequired Registration
Individual / Individual Consultant
Sole Proprietorship
Partnership Firm
Company (Private Limited)
Company (Public Limited)
Company (Holding Company)
Company (Limited by Guarantee)
State Owned Enterprise (Private Limited)
State Owned Enterprise (Public Limited)
FBR (NTN)
PEC
Eligibility CriteriaDocument
Revenue Authority Registration: The Bidder should be registered with relevant / concerned Provincial Revenue Authority. If not registered, the 100% tax shall be deducted at source as per applicable law and credited to relevant account.No
PEC Valid Registration: The bidder should have valid registration with Pakistan Engineering Council at least in Category of C-3 or above with specialization in CE-10, ME-01, ME-03, EE-04.Yes
Undertaking/Letter of Bid (As per Format attached): The bidder is required to submit an undertaking/letter of bid as per format attached.Yes

Evaluation Criteria

Least Cost Based Selection (LCBS)

Weightage

Technical Evaluation %
100
Technical Marks100
Passing Marks100
Technical Evaluation Criteria
Experience: The bidder has completed/ awarded/ in-hand at least 02 projects pertaining to construction of buildings each of min. cost Rs. 250 M, during last seven (07) years. (Copies of work orders/ completion certificates/ contract agreements or equivalent documents). (Quantitative)(Doc Required)30
Annual Sales volume or Gross Turnover: Available of at least Rs.300 M in any of the last five years. Attach Copy(s) of Audited Financial Statements or Income Tax return filed in FBR. --OR-- Availability of Bank Credit Line facility amounting to Rs.75 M or above during last one year or availability of Liquid Assets of equivalent amount) --OR-- Financial Capability Available of Rs.75 M or above. (Submit Bank statement as evidence showing required balance at any one instance in the statement of last three months before date of publication of tender notice) (Quantitative)(Doc Required)30
The Bidder should provide support letter from the Original Equipment Manufacturer (OEM) of the lifts or its Authorized Distributor. The OEM or authorized distributor should have valid credentials (OEM and dealership) for the quoted lifts brand for last three (03) consecutive years including current year. (Quantitative)(Doc Required)20
The Bidder should provide support letter from the Original Equipment Manufacturer (OEM) of the sound system or its Authorized Distributor. The OEM or authorized distributor should have valid credentials (OEM and dealership) for the quoted sound system brand for last three (03) consecutive years including current year. (Quantitative)(Doc Required)20

Jobs/Lots

Jobs Without Lots :

JobDelivery ScheduleQuantityBid Security
Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi
Address: SBP Complex, I.I. Chundrigar road Karachi
Schedule: 450 Days
Quantity: 1/job
1/job 5000000 PKR
Items Without Lots :
Item UNSPSC Delivery Schedule Quantity Bid Security Related to Job/Lot
Nil Building construction management
Address: SBP Complex, I.I. Chundrigar road Karachi Schedule: 450 Days Quantity: 1/job
1/job PKR

Related Services :

No

Work Specifications and Market Rates

Jobs Without Lots :

Job: Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Specifications / Requirements:

Sr. NoRef. No.DescriptionUnitQtyRateAmount
1 SECTION-1: CONSTRUCTION OF MOSQUE    
2 SUB-SECTION-1-A: CIVIL WORKS    
3 Civil Works Providing, fabricating and applying at any elevation / height except where otherwise stated in the specific item of the Bill of Quantities including all material, labour, scaffolding & plant for the following items complete in all respects as per drawings, approved shop drawings, technical specifications, miscellaneous details and instructions by the Engineer In-Charge.    
4 PROTECTION WORKS    
51Cordoning off the entire project site along with the materials dumping area using 8ft high corrugate sheets fixed with the help of angle irons/ channels/ MS pipes etc. to the entire satisfaction of the Engineer In-Charge. The fencing will have to be provided around an area of about 17000 Sft and duration for this fencing will be the entire construction periof of the project. The contractor can use the MS pipes and other useable sections removed from the existing parking shed at site but the contractor will have to handover all employer's materils to the employer when these are no more needed. Any new material brought by the cpntractor for this item of work will be the contractor's property and he will take it away when these are no more required at site. Job130000003000000
6 DEMOLITION WORKS    
72Dismantling of existing fiber shed structure completely including MS pipe supports stacking of serviceable material at designated place in the bank premises including disposal of unserviceable material and debris outside the muncipal limits at any lead complete in all respects as per site requirements and as directed by Engineer In-Charge.Job1300000300000
8 DEMOLITION OF EXISTING MOSQUE & ADJOINING PRAYER HALL    
93Demolition of existing Buildings/Structures including Plumbing (sewer lines, fixtures, manholes etc), Electrical & Mechanical Works, PCC (driveway), clearing the site to any level as per site (including paved areas, ablusion areas), roof of any type, beam, column, wall, floor, foundation from its base (RCC/ load bearing/any type etc.), excavation and dewatering (if required). Demolition will be carried out from top to bottom with precautionary measures to ensure safety for people, adjacent structures/building/services etc. Any damage inspiring or death will be sole responsibility of the Contractor. The Contractor will remove the suitable/ un-suitable demolished material/ debris from Site to outside of the municipal limits and complete cleaning, leveling and dressing of Site up to required level complete in all respects as per site requirements and as directed by Engineer In-Charge.Job112500001250000
104Dismantling of existing PCC flooring and stone soling including disposal of debris away from site, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Cft73921801330560
115Dismantling of existing RCC flooring/ walls including disposal of debris away from site, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Cft20035070000
126Dismantling of existing block masonry walls including disposal of debris away from site, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Cft50015075000
13 EARTH WORKS    
147Excavation for Raft Foundation, underground Tanks, Septic Tanks (rectangular square or any other shape in all kinds of soil including disposal or stacking of surplus/rejected excavated materials to designated places at any lead & lift complete in all respects as per site requirements and as directed by Engineer In-Charge.Cft62712402508480
158Backfilling filling in foundation, under floors or around plinths etc with soil obtained from excavation including watering and compaction in 150 mm layer and dressing to required profile and shape complete in all respects as per site requirements and as directed by Engineer In-Charge.Cft62712352194920
169Providing, laying and compacting in layers of 150 mm borrow earth upto plinth level complete in all respects as per site requirements and as directed by the Engineer In-Charge.Cft1100050550000
1710Filling Granular, stone soling or selected material obtained from outside sources including compaction complete in all respects as per site requirements and as directed by Engineer In-Charge.Cft3746200749200
1811Same as above item but using stone & concrete debris available at the site.Cft5007537500
19 DEWATERING    
2012Pumping out and disposal of water from excavation etc, including all labour, use of pumps, plants etc. Payment will be made on the basis of double quantity of soil excavated below the ground water table.Cu.M1774220390280
21 TERMITE CONTROL TREATMENT    
2213Provide and spray approved pesticide solution as per manufacturer's recommendation in excavated earth, consolidated layer or earth under floor, walls etc., complete as per specifications by approved agency of Termite Control for building (Basement area will be measured for payment). Warranty period to be mentioned and warranty Certificate to be provided by the Contractor for Ten years. complete in all respects as per site requirements and as directed by Engineer In-Charge..Sft1784245802890
23 STEEL REINFORCEMENT    
2414Providing & laying reinforcement bars using hot rolled deformed billet steel bars "Grade 60" conforming to ASTM A-615 including the cost of straightening, cutting, bending, binding, wastage and such overlaps as are not shown on drawings, placing in position on chairs, tying with binding wire etc, in all kinds of RCC work complete in all respects as per site requirements and as directed by Engineer In-Charge.Kgs16955145076297950
25 PLAIN AND REINFORCED CONCRETE    
26 Providing, laying, vibrating/ consolidating and curing, ready-mix concrete brought from approved batching plant (Lucky Paragon or other approved by the Employer), including the cost of providing and fixing & removal of fair face steel plates/ ply wood shuttering, complete in all respects as per drawings, specifications and as directed by the Engineer In-charge. (Contractor shall have to submit Mix. Design prepared by NED University or other similar approved institute before start of concreting).    
27 (A) SUB-STRUCTURE    
2815PCC (1:4:8) concrete using Ordinary Portland cement complete in all respects as shown on the drawings.Cft59466003567600
2916PCC with 3000 psi compressive cylindrical strength concrete using modified portland cement in C.C pad rooms/external prayer areaCft24947451858030
3017RCC reinforced concrete with 3000 psi compressive cylindrical strength using weigh batch concrete including pump etc. and transportation as per site requirements in following sub-structures as per design shown on the drawings    
31(a)Foundations concrete Cft1610491014654640
32(b)Column up to plinth beam from raft with concrete strength 4000PsiCft100010501050000
33(c)Plinth Beams Cft156610101581660
34 (B) SUPER-STRUCTURE    
3518RCC reinforced concrete with 4000 psi compressive cylindrical strength using weigh batch concrete including pump etc. and transportation as per site requirements in following structures as per design shown on the drawings    
36(a)Columns & WallsCft9512120011414400
3719RCC reinforced concrete with 3000 psi compressive cylindrical strength using weigh batch concrete including pump etc. and transportation as per site requirements in following structures as per design shown on the drawings    
38(a)Beams & LintelsCft773410508120700
39(b)SlabsCft12326101012449260
40(c)Staircase (Waist slab, beam, landing, stets)Cft9251010934250
41(d)Parapet WallCft4771200572400
42(e)Dome i/c minaret top domeCft3121500468000
43 BLOCK MASONRY    
4420Providing and laying masonry walls using approved quality machine made solid concrete blocks of approved size, with minimum compressive strength of 1000PSI, of Envicrete, IZHAR or other approved equivalent make, laid in 1:4 cement-sand mortar upto Basement/GF roof level including thorough filling of mortar in joints and raking out joints, curing etc. cost of required scaffolding, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Cft57416753875175
4521Same as Sr. # 44 above, but upto 1st floor roof level.Cft1170685801450
4622Same as Sr. # 44 above, but upto 2nd floor roof level.Cft25866951797270
47 CARPENTRY & JOINERY WORK    
4823Providing and fixing in position single-leaf / double-leaf Semi Glazed wooden panelled doors as per drawing, comprising 2" (50 mm) thick door shutters manufactured from approved 1st Class Hardwood (Burma Teak), sound, well-seasoned, and free from knots, fissures, sapwood, warping and other defects and 6 mm thick plain glass of Ghani or other approved make, including 2" (50 mm) thick Burma Teak door frames of width equal to the wall thickness. The item shall further include 4" (100 mm) wide plain Burma Teak beading with beveled edges on inner and outer sides, providing & applying approved anti-termite treatment to infill and all wooden components, best quality brass tower bolts minimum 18" long at top and bottom for all door panels, one approved quality brass door lock of European or Italian origin, and minimum 05 Nos. 6" long stainless steel hinges with brass bushes per shutter, 04 Nos 2' long stainless steel handles made from 1.5"x1.5"x16SWG tubes as per approved design complete with all necessary hardware, screws, fittings and fixing arrangements. The rate shall also include lacquer polishing of the complete door assembly in approved shade/colour, complete in all respects as per site requirements and as directed by Engineer In-Charge.Sft659100006590000
4924Providing and fixing in position Burma Teak Windows as per approved design with 2" thick Burma Teak frame wide as per wall width and same wood beading 4" wide all around the inner side of the mosque and 6mm thick plain glassof Ghani or approved make, having lipping of same wood around the glass complete with all necessary hardware, screws, fittings and fixing arrangements. The rate shall also include lacquer polishing of the complete window assembly in approved shade/colour, complete in all respects as per site requirements and as directed by Engineer In-Charge.Sft3214730023462200
5025Providing and fixing Burma Teak Beading on wall of Size 3/4" thick and 2" width, including polishing complete in all respects as per site requirements and as directed by the Engineer In-Charge.Rft676700473200
5126Proviing and Fixing 3' high stair railing comprising of 2" dia 16 SWG SS Pipe hand rail at top and two 1"x1"x16SWG SS pipes laid horizontally with 1-1/2" wide 3/8" thick SS pipe vertical supports at every alternate step including base plates/cups etc., top rail/ pipe fixed to the vertical supports with the help of 3/4" wide 3/8" thick 2" long strips provided over all vertical supports, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Rft1504500675000
5227Proviing and Fixing SS hand rail comprising of pipe of size 2 " dia 16 SWG fixed to walll with the help[ of SS supports/ brackets made from 3/4" wide 3/8" thick strips fixed to wall with plate/cup at wall after every 3' complete in all respects as per site requirements and as directed by the Engineer In-Charge.Rft1501200180000
53 WOODEN CABENITS    
5428Providing, fabricating and fixing in position floor standing/wall mounted cabinets 15" deep for placing quran sharif, with back boxes made from 10mm thick laminated HDF board of approved quality & make, and front side and doors etc. made from approved quality scratch resistant laminated MDF board 18mm thick of approved colour and design, matt finish SS edge banding at exposed surfaces, cost of approved quality SS hydraulic hinges, SS handles, magnetic catchers, and all adhesives & hardware required for fabrication and fixing of the cabinets, complete in all respects as per site requirements and as directed by the Engineer In-Charge (Measurement for payment hall be made on the surface area of the front side of the cabinets only)Sft40030001200000
5529Providing and fixing in position 6ft high shoe racks of 12 inches depth, fabricated from 16 SWG stainless steel sheet for shelves supported over framing with stainless steel angle sections of size 1"×1"×1/8" size. The item also includes all necessary accessories, fittings, fixing arrangements, hardware, and installation, complete in all respects, as per approved drawings, site requirements, and as directed by theEngineer In-Charge.Sft2003500700000
5630WATER PROOFING & BUILT-UP ROOFING Providing and torch-applying 4 mm thick modified bitumen, non-woven polyester fibre–reinforced based PE/HDPE finish type waterproofing membrane of Roofgrip or other approved equivalent make, strictly in accordance with the manufacturer’s instructions. The work includes application of approved primer at a coverage rate of approximately 4 m² per litre, ensuring all required overlaps of minimum 3" width, cost of providing and applying about 200micron thick layer of approved quality polyethylene sheet, complete in all respects as per site requirements and as directed by the Engineer In-Charge. Measurement for payment shall be based on the top surface area only. (Note: The contractor shall submit material samples along with technical data sheets for approval by the Engineer In-Charge prior to application at site.)Sft54253201736000
5731Providing, mixing, and laying an average 3" thick PCC screed (1:2:4) laid in alternate panels. The surface shall be finished smooth with a trowel and cured using damp jute cloth. The rate shall include all materials, labour, tools and plant, and incidental works necessary to complete the job complete in all respects as per site requirements and as directed by the Engineer In-Charge.Sft54252631426775
5832Making PCC edge fillet (gola) of triangular shape, (4" × 4") in size, along the outer walls using cement–sand concrete in (1:2:4) ratio. The work includes the use of a latex-based concrete bonding agent from Sika, Fospak, or other approved manufacturer at the rate of 3 litres per bag of cement or as per manufacturer’s instructions. The fillet shall be finished with a smooth trowel surface and cured properly, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Rft55017093500
5933Providing and fixing 3/4" thick Ziarat white marble tiles of size 12" × 24", laid in approved pattern, including all materials such as cement mortar, bonding agent, cutting, finishing, and fixing arrangements, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Sft46927503519000
60 UPVC DOORS, VENTILATORS     
61 VENTILATORS    
6234Providing & fixing of approved quality partially openable uPVC ventilators in white or other pproved color made from minimum 2mm thick uPVC sections duly strengthened with 1.5mm thick MS sheet sections reinforcement, frame made from minimum 70mm wide section, with 5mm thick clear plain glass panels, best quality rubbers, brushes, gaskets/EPDM, tapes, stoppers, hinges, stainless steel screws and other hardware required, including sealing with approved quality silicone, removal of stickers and cleaning, complete in all respects as per site requirements and as directed by the Engineer In-ChargeSft32250080000
63 UPVC DOORS FOR WASHROOMS    
6435Providing & fixing of approved quality PVC-Polyurathene sandwitch panel doors of Ploy Doors or other approved equivalent make in approved colour and design, minimum 40mm thick door panels along with door frames made from 16SWG GI sheet, cost of holdfasts, along with cost of approved quality brass hinges, handle locks, stainless steel screws, 3 stainless steel coat hangers behind each door along with all hardware required for proper fixing of doors, complete in all respects as per site requirements, specifications, instructions of the manufacturer and as directed by the Engineer In-Charge. Door panel size= 2.5ft x 7ftJobs952500472500
6536Doors same as above but with door panel 3ft x 7ft size.Jobs363000189000
66 STAINLESS STEEL MOON (CRESCENT)    
6737Providing, fabricating and fixing decorative mosque moon (crescent) of 2’-6” diameter, manufactured from approved quality SS sheet (minimum 18 SWG) (as approved), accurately cut and shaped to true curvature, including welding, grinding and finishing. The crescent shall be finished with high-quality gold colour PVD coating or other approved protective coating to achieve smooth and uniform appearance. The crescent shall be fixed over approved supporting arrangements, including SS base plate, about 4ft high SS spindle/spire, anchor bolts, clamps, lifting arrangements, scaffolding, alignment, erection at required height, and all necessary accessories. The rate shall include the cost of material, labour, tools & plants, transportation, installation, electrical works, testing, finishing, safety measures and all incidentals, complete in all respects as per drawings/specifications, site requirements and as directed by theEngineer In-Charge.    
68(a)Over main dome Jobs1400000400000
69(b)Over minaret dome Jobs1450000450000
70 QURANIC AYAT / ISLAMIC CALLIGRAPHY    
7138Providing and fixing Quranic Ayats/ Islamic caligraphy sculptures made from 20SWG black or golden colour stainless steel sheets, all words minimum 1-1/2" thick, welded/ jointed together to make the required ayat/ kalima, fixed to the walls using approved quality screws etc. complete in all respects as per site requirements and as directed by the Engineer In-Charge. (Measurement for payment shall be made on the basis of out to out height and length of the sculpture)Sft508500425000
72 FINISHES (INTERNAL)    
73 CEMENT PLASTER    
7440Providing and laying plaster with cement sand mortar with G.I. expanded metal and approved corner bead at the interfaces of structures of different materials including staging and curing complete in all respects as per site requirements and as directed by Engineer In-Charge.    
75(a)1/2" thick plaster with 1:4 cement sand mortar on ceilings & internal wallsSft31684601901040
76(b)1/2" thick plaster with 1:4 cement sand mortar mixed with puddlo @ 5lbs per bag of cement on projections and parapetsSft2000100200000
7741Providing and fixing Architectural Resin Jali (Rasin, Sea Soil, Cement and marble powder) as per approved design and drawings at any height including all materials, scaffolding tools and plants complete in all respects as per site requirements and as directed by Engineer In-Charge.Sft5002250012505000
78 FLOOR & WALL FINISHES    
7942Providing & fixing in position A-grade Supreme quality/finish full body polished/Semi polished porcelain scratch resistant tiles of Master, Shabbir, Orient or approved equivalent in 60cm x 120 cm or other approved size on floor using tile bond of Stile or other approved equivalent including the cost of cutting of tiles where required, grouting with matching color pigment including the cost of base leveling mortar/plaster as per site requirement, disposal of debris from the Bank premises, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Sft1829180014632800
8043Providing and laying Premium quality Prepolished Granite slabs over cement sand base mortar, setting in cement slurry, filling the joint with white cement, washing, cleaning and curing etc. complete in all respects as per drawings, specifications and/or as directed by the Engineer. (at any elevation)     
81(a)Floor (3/4" Thick) (Vietnamese White)Sft161638006140800
82(b)Entrance/Exit Steps, Entrance Lobby, Ramp, Treads (3/4" Thick) (Sado white or other approved) with three grooves with rubber filling to make the steps anti-slip Sft116820002336000
83(c)Riser Stair Case 1/2" thick pre perolished Granite (1/2" Thick) (Sado White or other approved)Sft4031100443300
84(d)Landing (3/4" Thick) (Sado White or other approved)Sft4801500720000
85(e)Window Sills (3/4" Thick) with half round and polished exposed edges Sado White or other approvedSft3041650501600
86(f)Ablution Seats with half round polished exposed edges (Sado White or other approvedSft1681750294000
8744Providing and laying granite skirting/ dado/ threshold of approved quality over rough base plaster, exposed to wall with approved adhesive color / type / finish to match floor, setting in cement slurry, complete in all respect as per drawings specifications and/ or as directed by the Engineer (at any elevation) Sado white or approved equivalent    
88 a) 4" high skirting on Stairs / Steps and vanity counter sides (1/2")Sft300900270000
8945Providing and Laying Vanity Top 3/4" thick granite slabs Sado white or other approved, making holes s per fixture size and shape with rounded & polished nosing/ edges all around exposed edges including the octs of resuired cement paste/ base morot etc. complete in all respects as per site requirements and as directed by the Engineer In-Charge.Sft42190079800
9046Providing and applying washed Terrazo using approved colour and size stone granuels on outerside walls etc. at any height including cost of surface preparation and 1:4 cement-sand base plaster at any height complete in all respects as per site requirements and as directed by Engineer In-Charge.Sft2970745013368150
9147Providing and applying 3 coats of plastic Emulsion emulsion paint of ICI Dulux, Berger, Kansai or other approved make, of approved shade over a coat of primer of the approved manufacturer to all internal surfaces including smooth filling complete in all respects as per site requirements and as directed by Engineer In-Charge.Sft31684802534720
9248Providing, fabricating, and fixing motorized tensile fabric shed comprising of approved quality tensile fabric laid/supported/ running on SS wire strands, anchored to the RCC beams wih the help of approved quality MS assemblies, minimum weight fabric is 725 gsm (Gram per Sq. meter) tensile fabris sheet, inlcuding approved quality pull wires and pulley assemblies, required motors of approved quality and rating, as per drawings and specifications. The work includes the provision of all necessary materials, labor, equipment, and tools required for the successful completion of the project as per site conditions and as directed by the Engineer In-Charge.Sft161620003232000
93 PLUMBING & DRAINAGE WORKS    
94 Vanity Counter Works    
9549Providing, mixing, laying, vibrating and curing of 3" thick Reinforced Cement Concrete for vanities 1:2:4 ratio, including the cost providing, cutting, bending and binding 3/8" dia steel bars @ 6"c/c bothways of Grade-40 deformed steel and making cut/grooves & drilling the bars in the existing masonry wall for proper fixing of slab, including cost of providing, fixing & removal of required water tight form work, making of holes for under counter type vanity basins, smooth trowel finished, complete in all respects as per site requirements and as directed by the Engineer In-Charge. (Measurements for payment shall be taken after deduction of all openings/holes etc.)Sft8940035600
96 Tile Works    
9750Providing & fixing in position A-Grade porcelain Tiles of Master/Shabbir/ Orient or other equivalent make, of 60cmx60cm or other approved size,quality, colour & shade (as per the sample approved by the Bank) on walls and floors having minimum thickness of 10mm and required size, including fixing with tile bond of M/s Shabbir or approved equivalent including the cost of filling with best quality grout with application of base plaster as per site requirement to make surface plumb/square, complete in allrespect as per site conditions and as directed by the Engineer In-Charge. Gloss finish for walls and matt finish for floor, after sample approval.Sft34887002441600
98 Water Supply & Sewerage Works    
9951Providing, jointing and laying hot type PPRC pipe of FIRAT/Popular or approved equivalent make including cutting, heat jointing, testing etc. and the cost of required specials, hooks, etc. complete in all respects as per site requirements and as directed by the Engineer In-Charge.    
100 a) 25 mmRft300350105000
101 b) 40mmRft20045090000
102 c) 60mmRft300550165000
10352Providing and fixing ball valve of Kitz/Popular or approved equivalent for 125 psi together with all additional material required for complete installation, complete in all respects as per site requirements and as directed by the Engineer In-Charge.    
104 a) 40mmEach41500060000
105 b) 25 mmEach4800032000
106 c) 60 mmEach42000080000
10753Providing & laying Sch.40 uPVC pipe of Popular or approved make & quality for waste water, including the cost of all required specials like bends,tees etc, sockets, elbows & solutions, cutting/making hole in walls, complete hanging arrangements for all pipes with slab with stainless steel U-clips/clamps etc. complete in all respects as per site requirements and as directed by the Engineer In-Charge. (Note: Vent pipes must go above the building parapet )    
108(a) 4” dia.Rft7001100770000
109(b) 6” dia.Rft2001400280000
11054Providing & laying Sch.40 uPVC pipe of Steelex or approved make & quality for Rain water, including the cost of all required specials like bends,tees etc, sockets, elbows & solutions, cutting/making hole in walls, complete hanging arrangements for all pipes with walls with stainless steel U-clips/clamps etc. complete in all respects as per site requirements and as directed by the Engineer In-Charge.    
111(a) 4” dia.Rft3501100385000
11255Providing & fixing in position, uPVC floor trap for floor drains of Popular or approved equivalent make, with 6” x 6” size heavy duty full stainless steel jali set of Alpine or other approved equivalent, complete in all respects as per site requirements and as directed by the Engineer In-Charge.    
113 4” sizeEach14600084000
114 Sanitary Fittings    
11556Providing & fixing W.C, HD-43 of Porta or other approved equivalent make, including the cost of uPVC P-trap, providing & fixing of concealed type flush tank of Porta (G3004A) or other approved equivalent make, including the cost approved quality T-stop cock of Master/Sonex or approved equivalent, CP connection pipe, MS frame and other accessories required for proper fixing of the flush tank, connection with the WC, connection pipe, flushing pipe, providing and applying sealant Max Track of Sika, CHEMAFLEX of ICPL or other approved equivalent make around flush pipe at joint with WC & around WC neck before placing the WC in position, etc. complete in all respects as per site requirements and as directed by the Engineer In-Charge.Each682000492000
11657Providing & fixing under counter type wash basin of Porta (HDLU-008) or approved equivalent make, including the cost of basin waste of approved quality, stainless steel screws, fixing with the help of approved quality epoxy adhesive, bottle trap of Master or other approved equivalent make, connection pipes, waste pipes etc. complete in all respects as per site requirements and as directed by the Engineer In-Charge. Each630000180000
11758Providing and fixing powder coated pillar cock (as per approved sample) of Master, Sonex or other approved equivalent make, complete in all respects as per site requirements and as directed by the Engineer In-Charge. Each61200072000
11859Providing and fixing powder coated Mixer Long Neck with for ablution (as per approved sample) of Master, Sonex or other approved equivalent make, complete in all respects as per site requirements and as directed by the Engineer In-Charge. Each3612000432000
11960Providing & fixing in position, powder coated double bib cock (as per approved sample) of Master, Sonex or approved equivalent make, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Each6550033000
12061Providing & fixing in position approved quality Muslim Shower (as per approved sample) of Master, Sonex or approved equivalent make including the cost of approved quality connection pipe of same brand, complete in all respects as per site requirements and as directed by the Engineer In-Charge. Each6600036000
12162Providing and fixing powder coated Regal type T-Stop Cocks (as per approved sample) of Master, Sonex or approved equivalent make, complete in all respects as per site requirements and as directed by the Engineer In-Charge. Each12350042000
12263Providing & fixing in position, plastic body liquid soap dispensers of Zilver or approved equivalent, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Each42000080000
12364Providing & fixing in position, 5mm thick imported approved quality looking mirror of 2ft x 4ft size with 12mm thick 1.5” wide Corian dupont edging all around of Cocao Brown or other approved colour, including fixing approximately 4” away from the wall with the help of stainless steel studs, etc. required for fixing of the mirror, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Each660000360000
12465Providing & fixing in position, stainless steel Tissue Paper Holder (as per approved sample) of Master, Sonex or other approved make, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Each6220013200
125 SUB-SECTION-1-B: HVAC Works    
12666Supply of Air-Cooled Modular VRF Outdoor Unit, inverter driven scroll T3 compressor, heat pump type, R410A/R35 refrigerant, microprocessor control, low noise condenser fan, Black anti-corrosion coated condenser coil, suitable for 415V/3Ph/50Hz complete in all respects (Minimum 35 TR each) including vibration isolators and MS mounting frame with anti-rust paint and concrete pedestal supports.Nos2550000011000000
12767Supply of Ceiling Concealed / Cassette Type Indoor Unit – 4 TR capacity, complete with cooling coil, EEV, drain pump, washable filter, wired remote controller, suitable for 220V/1Ph/50Hz Nos182500004500000
12868Supply of Centralized Controller for complete VRF system with monitoring and scheduling facilitySet1230000230000
12969Suply of Additional Refrigerant Charge as required beyond factory chargeKg506000300000
13070Providing, supplying, installing, testing and commissioning of seamless ACR grade soft drawn copper refrigerant piping, phosphorous deoxidized and dehydrated, suitable for R410A /R35 refrigerant and high-pressure VRF applications, complete with Imported nitrile rubber insulation (Class O),Vapor barrier wrapping, Refnet joints / Y branch joints, Brazing, Pipe clamps and supports, GI saddles and hangers, Wall/floor sleeves, Pressure testing with dry nitrogen, Vacuuming and dehydration, Refrigerant charging, Leak testing complete in all respects as per manufacturer recommendations. The copper pipes shall conform to ASTM B280 / JIS H3300 / EN 12735-1 standards and must be suitable for operating pressure of inverter-based VRF systems.    
131aCopper Pipe – 1/4" dia - 22 SWG (for liquid refrigerant line connection of small indoor units) or size as per manufacturer vrf design software recommendationRft450700315000
132bCopper Pipe – 3/8" dia - 22 SWG (for liquid line / branch connection in VRF system) or size as per manufacturer vrf design software recommendationRft5501050577500
133cCopper Pipe – 1/2" dia - 20 to 22 SWG (for liquid line and branch interconnection between indoor and outdoor units) or size as per manufacturer vrf design software recommendationRft6501450942500
134dCopper Pipe – 5/8" dia - 20 SWG (for Refrigerant suction/gas line) or size as per manufacturer vrf design software recommendationRft3502100735000
135eCopper Pipe – 3/4" dia - 18 to 20 SWG (for medium capacity gas line connection) or size as per manufacturer vrf design software recommendationRft4002250900000
136fCopper Pipe – 7/8" dia - 18 SWG (High-pressure refrigerant gas line pipe suitable for VRF main branch piping) or size as per manufacturer vrf design software recommendationRft35030001050000
137gCopper Pipe – 1-1/8" dia - 16 to 18 SWG (Main refrigerant header copper pipe between outdoor units and main distribution network) or size as per manufacturer vrf design software recommendationRft2503500875000
13869Supply and installation of UPVC Drain Pipe with insulation – 25 mmRft600300180000
13970Supply and installation of UPVC Drain Pipe with insulation – 32 mmRft550350192500
14071Supply and installation of UPVC Drain Pipe with insulation– 40 mmRft550500275000
14172Supply, installation, testing and commissioning of Electric Distribution Panel, Wall mounted finished with 16/14 SWG MS sheet, front and back doors, drawing pocket, transparent sheet, powder coated paint of RAL 7032 approved color, moveable & lockable handles of suitable brand, flush type hinged door with Earthling braid consisting of danger plate with handle, complete internal power and control wiring, MCCB Safety Plates as per DB Gauge, fixing material nut bolts, Lugs, glands and with following components:- Main Incoming Side • 01 Nos. 250 Amp Four Pole MCCB (Icu=25kA Ics=100% of Icu) adjustable type • 03 Nos. Indication Lights • 03 Nos. 2 Amp SP MCB • 1 No. Multimeter with required CT's Current Measurement on common busbar Outgoing For Outdoor Units • 02 Nos. 125 Amp Four Pole MCCB (Icu=25kA Ics=100% of Icu) adjustable type • 03 Nos. Indication Lights • 03 Nos. 2 Amp SP MCB • 1 No. Multimeter with required CT's Current Measurement on common busbar Outgoing For Indoor Units • 18 Nos. 10A TP MCB 10kA Protection Devices • Surge Protection Device, Type-II, 3 Phase (1 No.) • RCCB for outdoor unit # 1 & 2 (2 Nos.) (4P, 125 A, 300mA) • Phase Failure Relay (01 No.) • Under/Over Voltage Relay (Adjustable) All cable links/bus bar links must be as per outgoing load. All Circuit Breakers (Make: Schneider/ABB or approved equivalent) must be compact size, as per specifications and complying with standards, complete in all respect as directed by Engineer In-charge The vendor must submit shop drawings for approval of the Engineer before the manufacturing of the DB. Job115000001500000
14273Supply, Laying, Termination, Testing & Commissioning of Cables along with PVC pipe of appropriate diameter complete installation and termination accessories to be laid in already installed Cable trench / Cable ladder / Cable tray / Duct Bank including all accessories including cutting/chasing in walls, floors, and required civil restoration works. Complete in all respects. -Imported Lugs and Connectors shall be used in LV Cables. -Manual crimping of lugs is not allowed. Proper lug presser for smaller lugs and hydraulic lug presser for large size lugs should be used.    
143a4C × 25 sqmm Cu Meter757500562500
144b3C × 10 sqmm Cu Outdoor to Indoor UnitsMeter1503500525000
145c3C × 2.5 sqmm Cu (Drop to Indoor Units)Meter3001000300000
146d2C × 1.5 sqmm Cu Shielded (Control Cable)Meter260480124800
147e1C x 16 sqmm Cu (Earthing Cable Outdoor Units)Meter1501500225000
148f1C x 2.5 sqmm Cu (Earthing Cable Indoor Units)Meter320330105600
14974Installation of Outdoor Units including lifting, alignment and fixing, Installation of Indoor Units including suspension arrangement and supports, Pressure Testing with Nitrogen, Vacuuming and Dehydration of Refrigerant Circuit, Refrigerant Charging & Oil Balancing, Testing, Balancing and Commissioning of Complete VRF System, Training of Client Staff for operation & maintenance Job1250000250000
15075Providing Yearly Comprehensive Warranty for complete VRF air conditioning system including all outdoor units, indoor units, refrigerant piping, control wiring, and accessories. The scope includes complete preventive and corrective maintenance services to ensure uninterrupted and efficient system operation. Scope shall include: -Comprehensive warranty for all VRF system components including compressors, PCB cards, fan motors, sensors, expansion valves, controllers, and all associated parts including the electrical accessories. -Free-of-cost repair and/or replacement of any defective component during warranty period. -Free refrigerant gas charging , including leak detection, rectification, vacuuming, and recharging. -Monthly preventive maintenance visits (total 60 visits over 5 years) including cleaning, inspection, testing, and system performance checks of indoor and outdoor units. - Breakdown and emergency service support with prompt response and rectification. - All labor, tools, testing instruments, consumables, and transportation included. - Submission of service reports after each visit and maintenance log records. - The system shall be maintained in fully operational condition throughout the warranty period in accordance with manufacturer recommendations and the best industry practices. Job58000004000000
15176Supply of O&M Manuals + As-Built DrawingsSet345000135000
152 SUB-SECTION-1-C: Electrical Works    
15377Supply, installation, testing and commissioning of recessed/surface mounted LED panel light of size 600 mm × 1200 mm (2 ft × 4 ft) with high efficiency LED technology, suitable for commercial and institutional lighting applications. The luminaire shall provide uniform glare-controlled illumination with low power consumption and long operational life. The fitting shall meet or exceed the following minimum specifications: Type: LED Panel Light Size: 2 ft × 4 ft (600 × 1200 mm) Power Consumption: 38–45 Watts Correlated Color Temperature (CCT): 4000K (Neutral White) or approved as per site requirement Luminous Flux: minimum 5400 lumens Color Rendering Index (CRI): ≥ 80 Power Factor: ≥ 0.90 Operating Voltage: 220–240V AC, 50/60Hz Protection Class: minimum IP20 Housing: powder coated metal body Life Span: minimum 50,000 operating hours Warranty: minimum 2 years replacement warrranty Compliance: IEC 60598 or equivalent international standards The rate shall include driver, mounting accessories, connectors, suspension/fixing hardware, wiring connections, testing and commissioning, and all associated works required for complete installation and satisfactory operation, complete in all respects as directed by the Engineer In-Charge.Nos1620000320000
15478Supply, installation, testing and commissioning of flexible COB LED strip/cove lighting complete with driver, V-profile aluminium channel and diffuser, suitable for decorative and architectural lighting applications. The LED strip shall provide continuous dot-free illumination with high color consistency and uniform light distribution. The fitting shall meet or exceed the following minimum specifications: Type: Flexible COB LED Strip Light Color Temperature (CCT): 3000K (Warm White) or approved as per site requirement Power Consumption: minimum 10–14 W/m Luminous Flux: minimum 700–1250 lm/m Color Rendering Index (CRI): ≥ 80 Protection Rating: IP20 or above LED Type: COB continuous light technology for uniform illumination Life Span: minimum 50,000 operating hours Driver: suitable electronic driver/power supply compatible with strip load Compliance: IEC/Equivalent international standards Warranty: minimum 2 years replacement warrranty The scope includes supply of LED strip, driver, aluminium V-profile, diffuser, mounting clips, connectors, soldering, wiring, fixing, testing and commissioning, along with all accessories, consumables and labour required for complete installation and satisfactory operation, complete in all respects as directed by the Engineer In-Charge.Mtr2003750750000
15579Supply, installation, testing and commissioning of recessed/surface mounted LED panel light of size 1 ft × 4 ft (300 mm × 1200 mm) suitable for office, commercial and institutional lighting applications. The luminaire shall provide uniform, glare-controlled and flicker-free illumination with high energy efficiency and long operational life. The fitting shall meet or exceed the following minimum specifications: Type: LED Panel Light Size: 1 ft × 4 ft (300 × 1200 mm) Power Consumption: 30–40 Watts Correlated Color Temperature (CCT): 4000K (Neutral White) or approved as per site requirement Luminous Flux: minimum 3600–4000 lumens Color Rendering Index (CRI): ≥ 80 Power Factor: ≥ 0.90 Operating Voltage: 220–240V AC, 50/60HzProtection Class: minimum IP20 Mounting: recessed/surface/suspended compatible Life Span: minimum 50,000 operating hours Compliance: IEC 60598 or equivalent international standards Warranty: minimum 2 years replacement warrranty The rate shall include LED driver, mounting accessories, connectors, suspension/fixing hardware, wiring connections, testing and commissioning, and all associated works required for complete installation and satisfactory operation, complete in all respects as directed by the Engineer In-ChargeNos2315000345000
15680Supply, installation, testing and commissioning of high efficiency surface mounted LED downlight suitable for commercial and institutional lighting applications. The luminaire shall provide uniform glare-controlled illumination with high energy efficiency and long operational life. The fitting shall meet or exceed the following minimum specifications: Type: Surface Mounted LED Downlight Power Consumption: at least 60 Watts Correlated Color Temperature (CCT): 4000K (Neutral White) or approved as per site requirement Luminous Flux: minimum 6600 lumens Luminous Efficacy: minimum 100 lm/W Color Rendering Index (CRI): ≥ 80 Power Factor: ≥ 0.90 Input Voltage: 220–240V AC, 50/60Hz Housing Material: die-cast aluminium body Protection Rating: minimum IP65 Mounting: surface mounted type Driver: integral electronic driver/power supply unit Life Span: minimum 50,000 operating hours (L70B50) Operating Temperature: -20°C to +40°C Compliance: IEC 60598 or equivalent international standards Warranty: minimum 2 years replacement warrranty The rate shall include supply of luminaire, driver, mounting accessories, fixing hardware, connectors, wiring connections, testing and commissioning, and all associated labour, consumables and accessories required for complete installation and satisfactory operation, complete in all respects as directed by the Engineer In-ChargeNos350000150000
15781Supply, installation, testing and commissioning of surface mounted LED downlight suitable for commercial and institutional lighting applications. The luminaire shall provide uniform, glare-controlled and flicker-free illumination with high energy efficiency and long operational life. The fitting shall meet or exceed the following minimum specifications: Type: Surface Mounted LED Downlight Power Rating: 12–15 Watts Correlated Color Temperature (CCT): 3000K / 4000K / 6500K Luminous Flux: minimum 1200 lumens Color Rendering Index (CRI): ≥ 80 Power Factor: ≥ 0.80 Operating Voltage: 220–240V AC, 50/60Hz Protection Rating: minimum IP20 Mounting Type: surface mounted Life Span: minimum 25,000 operating hours Compliance: IEC 60598 or equivalent international standards Warranty: minimum 2 years replacement warrranty The rate shall include LED driver/power supply unit, mounting accessories, connectors, fixing hardware, wiring connections, testing and commissioning, and all associated labour, consumables and accessories required for complete installation and satisfactory operation, complete in all respects as directed by the Engineer In-Charge.Nos.245500132000
15882Supply and installation of 56-inch DC inverter ceiling fans of high-efficiency, compatible with 200–250V AC, 50Hz supply. Each fan shall have a sweep of 56 inches, a power consumption not exceeding 40W. The body shall be made of die-cast or aluminum alloy with rust-resistant finish and aerodynamic blades. Fans shall be supplied with remote controls, offering soft-start. Each fan shall be supplied complete with downrod, mounting accessories, and instruction manuals, and shall carry a minimum one-year warranty.Jobs140150002100000
15983Supply and installation of long rods (downrods) for ceiling fans, fabricated from high-strength mild steel or aluminum alloy with rust-resistant finish. Each rod shall have a standard length of 24 inches (or as required by site conditions) to ensure safe clearance and optimal air circulation. The rods shall be compatible with 56-inch DC inverter ceiling fans, designed to securely support aerodynamic blades and die-cast/aluminum alloy fan bodies. Each rod shall be supplied complete with coupling, screws, safety pin, and mounting accessories, along with installation instructions, and shall carry a minimum one-year warranty.Jobs60150090000
16084Supply and installation of window fitted round/square shaped plastic body exhasut fans of size 12", speed not less than 1350RPM, 99.9% copper winding of Make Voldam, GFC, Pak Fan or approved equivalent Jobs81200096000
16185Supply, installation, testing and commissioing of Electric Distribution Panel (Name: P&LDB-1) , Wall mounted finished with 16/14 SWG MS sheet, front and back doors, drawing pocket, transparent sheet, powder coated paint of RAL 7032 approved color, moveable & lockable handles of suitable brand, flush type hinged door with Earthling braid consisting of danger plate with handle, complete internal power and control wiring, MCCB Safety Plates as per DB Gauge, fixing material nut bolts, Lugs, glands and with following components:- Incoming Side 1 • 01 Nos. 100 Amp Three Pole MCCB (Icu=25kA Ics=100% of Icu) adjustable type • 03 Nos. Indication Lights • 03 Nos. 2 Amp SP MCB • 1 No. Multimeter with required CT's Current Measurement on commmon busbar Incoming Side 2 • 01 Nos. 80 Amp Three Pole MCCB (Icu=25kA Ics=100% of Icu) adjustable type • 03 Nos. Indication Lights • 03 Nos. 2 Amp SP MCB • 1 No. Multimeter with required CT's Current Measurement on commmon busbar Outgoing Side 1 • 20 Nos. 20A TP MCB 10kA • 16 Nos. 16A DP MCB 10kA Outgoing Side 2 • 20 Nos. 10A TP MCB 10kA • 15 Nos. 16A DP MCB 10kA All cable links/bus bar links must be as per outgoing load. All Circuit Breakers must be compact size, as per specifications and complying with standards, complete in all respect as directed by Engineer In-charge The vendor must submit shop drawings for approval of the Engineer before the manufacturing of the DB. Jobs1300000300000
16286Supply, installation, testing and commissioingof Electric Distribution Panel (Name: MDB-1) , Wall mounted finished with 16/14 SWG MS sheet, front and back doors, drawing pocket, transparent sheet, powder coated paint of RAL 7032 approved color, moveable & lockable handles of suitable brand, flush type hinged door with Earthling braid consisting of danger plate with handle, complete internal power and control wiring, MCCB Safety Plates as per DB Gauge, fixing material nut bolts, Lugs, glands and with following components:- Incoming Side • 01 Nos. 400 Amp Three Pole MCCB (Icu=25kA Ics=100% of Icu) adjustable type • 03 Nos. Indication Lights • 03 Nos. 2 Amp SP MCB • 1 No. Multimeter with required CT's Current Measurement on commmon busbar Outgoing Side • 02 Nos. 250A TP MCCB 25kA • 02 Nos. 100A TP MCCB 25kA • 02 Nos. 80A TP MCCB 25kA • 01 Nos. 60A TP MCCB 25kA All cable links/bus bar links must be as per outgoing load. All Circuit Breakers must be compact size, as per specifications and complying with standards, complete in all respect as directed by Engineer In-charge The vendor must submit shop drawings for approval of the Engineer before the manufacturing of the DB. Jobs1350000350000
16387Supply and installation of Power switch socket/ Multi sheet 13 Amps with metallic powder coated back box with fixing material by observing beauty and proper level on wall from floor level with necessary fitting, fixing material, drilling, chipping, wall cutting, paint work and repairing as per original  , connections complete in all respects as directed by engineer-in-charge. Jobs30250075000
16488Supply, installation, testing and commissioning of automatic electric hand dryer suitable for washroom applications, designed for high-speed and energy-efficient hand drying operation. The unit shall be wall mounted type with durable construction and shall meet or exceed the following minimum specifications: Type: Automatic sensor-based hand dryer Operating Voltage: 220–240V AC, 50 Hz Power Rating: 1500–2000 Watts Activation: Infrared automatic sensing Air Speed: high-speed drying performance Body Material: ABS/metallic corrosion-resistant housing Noise Level: low noise operation Safety Features: overheating and overload protection Mounting: wall mounted complete with fixing accessories The scope includes fixing, wiring connection from nearby power source, testing, commissioning and all associated accessories, consumables, labour and hardware required for complete installation and satisfactory operation, complete in all respects as directed by the Engineer In-Charge.Jobs465000260000
16589Supply, installation, testing, and commissioning of following LED Lights wiring, Electrical wiring must be compliant with IEC 60364 or BS 7671 and type tested certification from KEMA/RAWAT/PQSIR) and PVC pipe of 25 mm dia of class C (Electrical PVC pipe must be in compliant with BS 6099-1 or PS 1905-87 or equivalent standards) The cost includes supply, laying, and installation of wires in concealed/recessed as per site PVC conduit pipe with all necessary installation material and redressing as per original condition, complete in all respects as per standard industry practice to the satisfaction of the Engineer In-charge .    
166aCircuit Wiring from DB to Gang Switches using 2 x 2.5mm sqr. & 1.5mmsqr. as ECC copper/PVC wireMtr700880616000
167bPoint to Point Wiring from Gang Switches to LED lights and looping using 2 x 1.5mm sqr. & 1.5mmsqr. as ECC copper/PVC wireMtr1300650845000
16890Supply and installation of following Gang switch sheets/face plates for LED lights of with metallic powder coated back box/PVC back box 3"x3" concealed/recessed as per site with fixing material by observing beauty and proper level on wall from floor level. Complete in all respects as directed by engineer-in-charge.    
169a6 Gang SheetsJobs8245019600
170b4 Gang SheetsJobs13240031200
17191Supply, installation, testing, and commissioning of power circuits for switch sockets from DB to power point/point to point using: 2 x 2.5mm sqr. & 1.5mmsqr. as ECC copper/PVC wire (Electrical wiring must be compliant with IEC 60364 or BS 7671 and type tested certification from KEMA/RAWAT/PQSIR) and PVC pipe of 25 mm dia of class C (Electrical PVC pipe must be in compliant with BS 6099-1 or PS 1905-87 or equivalent standards) The cost includes supply, laying, and installation of wires in concealed/recessed as per site PVC conduit pipe with all necessary installation material and redressing as per original condition, complete in all respects as per standard industry practice to the satisfaction of the Engineer In-chargeMtr.500920460000
17292Supply, Laying, Termination, Testing & Commissioning of 4 No. 1C-240 Sqmm AL/XLPE/PVC + ECC 1C-120 Sq.mm Cu/PVC LV Cable along with complete installation and termination accessories to be laid in already installed Cable trench / Cable ladder / Cable tray / Duct Bank including all accessories. Complete in all respects. -Imported Lugs and Connectors shall be used in LV Cables. -Bi-Mettalic Lugs to be used with Aluminum Cables. -Manual crimping of lugs is not allowed. Proper lug presser for smaller lugs and hydraulic lug presser for large size lugs should be used. Mtr.1404800672000
17393Supply & Laying of following sizes of 120mm dia UPVC Conduits including all accessories such as bends, sockets, j-boxes, flexible conduits, metal saddles e.t.c for Main / Sub Main Power, Telephone & Data Cables, concealed / surface on wall as per design drawings. Provide Pull boxes where ever required. Note: The below mentioned conduits will be used for items where description of the item clearly states that the conduit is not inclusive or already installed. This section will also cover empty conduit runs, sleeves, conduit risers etc.Mtr.1404800672000
17494Supply, Laying, Termination, Testing & Commissioning of 4C-25 Sqmm Al/PVC + ECC 1C-6 Sq.mm Al/PVC LV Cable along with PVC pipe of appropriate diameter complete installation and termination accessories to be laid in already installed Cable trench / Cable ladder / Cable tray / Duct Bank including all accessories. Complete in all respects. -Imported Lugs and Connectors shall be used in LV Cables. -Manual crimping of lugs is not allowed. Proper lug presser for smaller lugs and hydraulic lug presser for large size lugs should be used. Mtr.45120054000
17595Supply, installation & testing of earthing set comprising of Bore earthing up to water level (minimum 50ft), lime, salt & charcoal mixture, packed hard including excavation & perfect back filling. 50 mm dia uPVC pipe and copper wires up to test terminal and also providing, fixing & connection of 300mm x 50mm x 5mm Earth test terminal with brass nuts bolts & washer along with construction of RCC inspection chamber with heavy duty CI cover Lid and lock protection, The Contractor shall perform the earth resistance test as per relevant IEEE/IEC standards, the earthing resistance should be less than 4 ohms. complete in all respect as directed by engineer incharge.Jobs2200000400000
17696Supply, installation, testing and commissioning of at least 400A MCCB Circuit Breaker Adjustable 36kA-40kA atleast in substation panel with complete modification of bus bar per site requirement complete in all respects directed by engineer in-charge in complaince with BS 387 1 - Miniature & Molded Case Circuit Breakers or equivalent standardJobs1300000300000
17797Supply, installation, testing, and commissioning of 5 core control wire Make Cu 1.5mm2, Electrical wiring must be compliant with IEC 60364 or BS 7671 and type tested certification from KEMA/RAWAT/PQSIR) and PVC pipe of 25 mm dia of class C (Electrical PVC pipe must be in compliant with BS 6099-1 or PS 1905-87 or equivalent standards) The cost includes supply, laying, and installation of wires in PVC conduit pipe with all necessary installation material and redressing as per original condition, complete in all respects as per standard industry practice to the satisfaction of the Engineer In-charge .Mtr45120054000
17898Supply, Installation, fixing, testing and commissioning of main decorative chandelier for mosque prayer hall, including suspension arrangement, ceiling mounting supports, anchoring system, alignment, electrical wiring connections, load balancing and complete integration with existing lighting circuit. The scope includes provision of all necessary hardware, clamps, chains/rods, connectors, fasteners, scaffolding/lifting arrangement, safety measures, testing and adjustment required for safe and stable installation of chandelier at designated height. The item shall be completed in all respects as per site requirements and instructions of the Engineer In-Charge.Jobs13000030000
17999Supply, Installation, fixing, testing and commissioning of small decorative chandelier for mosque area, including mounting arrangement, suspension supports, electrical connections, alignment and integration with existing lighting system. The scope includes all accessories, fixing hardware, connectors, consumables, scaffolding/lifting arrangement, testing and necessary safety measures required for complete and secure installation. The item shall be executed in all respects as per site conditions and instructions of the Engineer In-Charge.Jobs21800036000
180100Supply, installation, testing and commissioning of at least 60A MCCB Circuit Breaker for lighting as per site requirement complete in all respects directed by engineer in-charge in complaince with BS 387 1 - Miniature & Molded Case Circuit Breakers or equivalent standard complete in all respects as directed by Engineer In-chargeJobs22500050000
181 SUB-SECTION-1-D: LIFT WORKS    
182101Supply of Machine Room Less (MRL) passenger lift of 3 stops (Ground + 2) minimum capacity 630Kg, as per EN-81 safety standards, operational on 380-415 Volts, 3-phase, 50 Hz, 3 stops, with following features: • Permanent magnet gearless hoisting motor capable of serving Ground + 2 Floors with microprocessor control panel, Car Operating Panels (COP) • Floor operating panels (FOP) One (01) on each lift lobby equipped with up/down stainless steel call buttons with braille and buzzer, door tracks, sills, door drive mechanism and its complete control system • Reservation services system inside each car • Indicator flicker and chime before car arrival (Audible alert system in the car announcing the floor that the car has arrived at) • Automatic control of the door’s operating closing time according to the kind of floor and call. • Automatic rescue device (ARD)/Emergency Landing Device, • Full length light curtain, with door closing force limiting device • Weight overload buzzer • All safety devices as per safety standards of EN-81 • Telephone intercom system • Alarm bell • Voice Prompt System for blind persons indicating each floor reached • Further equipped with lights, fan, call bell, emergency backup for lights, fan, alarm and intercom • Operation manual, maintenance manual and circuit diagrams (English Version). Two Hard Copies & One Soft copy in USB. • In accordance with manufacturer’s standard design/drawings and confirming to Technical Specifications and Data. Submission of Shop Drawings after work order and As-Built Drawings after completion Job11500000015000000
183102Installation, testing and commissioning of MRL type passenger elevator(s), including complete system along with car assembly, guide rails, hoisting machine and ropes, control panel, speed governor, safety devices, landing and car doors, and all associated components required for a fully functional installation. The system shall be installed in accordance with approved specifications as mentioned in Volume 1 Technical Specifications and lift stop schedule. The scope also includes all civil works with provision and installation of M.S. scaffolding within the shaft for safe execution of works, complete erection.The rate shall include all materials, equipment, labour, tools, accessories, testing, commissioning and statutory compliance, ensuring safe, reliable and complete operation of the elevator system in all respects as directed by the Engineer In-Charge.Job116000001600000
184103Provision of comprehensive operation and maintenance services for elevator system(s) for a period of one (01) year, including deployment of one (01) qualified operators/technicians at site, each having minimum three (03) years’ relevant experience in operation and maintenance of elevators. The scope includes routine operation, preventive and breakdown maintenance, periodic inspection, minor adjustments, lubrication, cleaning, attending faults, ensuring safe and smooth functioning, and maintaining operational records/logs. The service shall ensure maximum uptime, safety compliance and reliable performance of the elevator system. The rate shall include all labour, supervision, tools, consumables and associated services required for complete operation and maintenance, carried out in all respects as per site requirements and instructions of the Engineer In-Charge.Month121000001200000
185 SUB-SECTION-1-E: SOUND SYSTEM    
186104Supply of professional 2-way surface mount speaker system suitable for auditorium, public address and background music applications, complete with mounting bracket and all associated accessories. The speaker shall be designed for wall/ceiling mounting and shall provide clear voice intelligibility and high-quality music reproduction. The speaker system shall meet or exceed the following minimum specifications: Type: 2-way surface mount speaker system Speaker Size: low frequency driver with high frequency dome tweeter Continuous Program Power: minimum 150W Rated Noise Power: minimum 90W Sensitivity: minimum 91 dB (1W/1m) Frequency Response: 50 Hz – 20 kHz or better Dispersion: minimum 100° × 100° coverage or better Mounting: wall/ceiling mountable with adjustable steel bracket Construction: heavy-duty enclosure Operating Temperature: -10°C to +50°C Certification: EN54-24 certified outdoor/weatherproof version where specifiedNos.111200001320000
187105Supply of compact two-way wall mount speaker system suitable for auditorium, conference and public address applications, designed for wide dispersion, high speech intelligibility and high-quality music reproduction. The speaker shall be complete with mounting bracket and all associated accessories and shall meet or exceed the following minimum specifications: Type: Two-way bass reflex wall mount speaker Rated Input: minimum 30 Watts Power Handling Capacity: minimum 140W continuous program Rated Impedance: 8 Ohms with 70V/100V line transformer tapping Sensitivity: minimum 90 dB (1W/1m) Frequency Response: 80 Hz – 20 kHz (-10 dB) Input Terminal: push-in terminal type Enclosure Material: HIPS resin or equivalent high durability enclosure Mounting: wall/ceiling mountable with adjustable bracket Nos.685000510000
188106Supply of two-way weatherproof music horn speaker suitable for outdoor public address and background music applications, designed for high intelligibility, high efficiency and wide area sound coverage. The speaker system shall be suitable for continuous outdoor operation and shall meet or exceed the following minimum specifications: Type: Two-way weatherproof music horn speaker Rated Input Power: 60 Watts minimum Line Voltage Operation: 70V/100V line transformer type Sensitivity: minimum 100 dB (1W/1m) Maximum Sound Pressure Level: minimum 117 dB at rated power Frequency Response: 100 Hz – 20 kHz or better Dispersion Angle: minimum 90° horizontal × 80° vertical Speaker Components: Low Frequency: minimum 6-inch cone type High Frequency: dome tweeter type Dust & Water Protection: minimum IP66 rated Enclosure Material: weatherproof ABS resin or equivalent Finish: UV resistant outdoor coating Suitable for outdoor installations including stadiums, parking areas, corridors and public spacesNos.2150000300000
189107Supply of weatherproof high-intelligibility driver unit suitable for public address and outdoor announcement applications, designed for use with compatible horn flare assembly. The driver unit shall be suitable for continuous outdoor operation and shall meet or exceed the following minimum specifications: Type: High impedance driver unit for horn speaker Rated Input Power: 50 Watts minimum Line Voltage Operation: 70V/100V line system Sensitivity: minimum 110 dB (1W/1m) Frequency Response: 150 Hz – 6 kHz or better Dust & Water Protection: minimum IP65 rated (with compatible horn assembly) Impedance Selector: external tap selector arrangement Construction: corrosion resistant housing with powder coated finish Horn Coupling: standard threaded coupling suitable for compatible horn flare Suitable for outdoor public address and announcement systemsNos.624000144000
190108Supply of weatherproof long horn speaker suitable for outdoor public address, emergency announcement and mass notification applications, designed for high intelligibility and long-distance sound projection. The speaker shall be suitable for continuous outdoor operation and shall meet or exceed the following minimum specifications: Type: Long horn / reflex horn speaker Rated Input Power: minimum 30–50 Watts Line Voltage Operation: 70V/100V line system or equivalent High sensitivity suitable for long-range coverage Frequency Response: suitable for speech intelligibility and announcement applications Weatherproof construction suitable for outdoor installation Corrosion resistant housing and mounting hardware Adjustable mounting bracket arrangement Suitable for continuous duty operation in outdoor environmentsNos.61400084000
191109Supply of professional multichannel digital power amplifier suitable for auditorium, public address and professional sound reinforcement applications. The amplifier shall be rack mountable and capable of delivering high power output with low distortion and reliable continuous operation. The unit shall meet or exceed the following minimum specifications: Type: Class-D multichannel digital power amplifier Channels: 4 independent output channels Output Power: Minimum 1000W × 4 channels at 4Ω Minimum 650W × 4 channels at 8Ω Bridge Mode: minimum 2000W × 2 channels at 8Ω Frequency Response: 20 Hz – 20 kHz (±3 dB) Total Harmonic Distortion (THD): ≤ 0.1% Signal to Noise Ratio: ≥ 100 dB Input Impedance: 20kΩ balanced / 10kΩ unbalanced Input Connectors: XLR-F balanced input Output Connectors: NL4 Speakon speaker connectors LED Indicators: Protect, Clip, Signal, Power and level indicators Cooling System: forced air cooling front-to-rear airflow Power Supply: 100–240V AC, 50/60 Hz Power Consumption: maximum 2000W Mounting: standard 19-inch rack mount type Construction: heavy-duty metal chassis suitable for professional applicationsNos.2450000900000
192110Supply of professional mixer power amplifier suitable for public address, auditorium, mosque and background music applications, capable of high-quality speech and music reproduction with multi-input mixing and zone selection facility. The amplifier shall be rack/table mount type and shall meet or exceed the following minimum specifications: Type: Mixer Power Amplifier Rated Output Power: 240 Watts minimum Microphone Inputs: minimum 6 balanced MIC/LINE inputs AUX Inputs: minimum 5 AUX inputs Simultaneous Mixing Capability: minimum 9 input sources Recording Input/Output facility Speaker Zones: minimum 2 selectable speaker zones Speaker Output: 100V line and 4–16Ω low impedance output Frequency Response: 50 Hz – 20 kHz (±3 dB) Distortion: ≤ 2% at rated output Signal Processing: provision for equalizer/processor connection Tone Controls: independent bass and treble controls Indicators: power, output level and zone selection LED indicators Input Connectors: XLR/phone jack and RCA type combinations Cooling: convection/forced air suitable for continuous operation Power Supply: 220–240V AC, 50/60 Hz Mounting: rack/table mountable heavy-duty chassis constructionNos.2300000600000
193111Supply of professional compact digital/analog audio mixing console suitable for auditorium, conference, studio and live sound reinforcement applications. The mixer shall provide high-quality audio processing, multi-channel mixing capability, integrated digital effects and USB audio interfacing for recording and playback applications. The unit shall meet or exceed the following minimum specifications: Type: Professional compact mixing console Input Channels: minimum 16 channels comprising: 12 Mic/Line input channels 4 Mic/Stereo-Line input channels Microphone Preamplifiers: low-noise professional grade preamps Auxiliary Buses: minimum 6 AUX buses Effects Processors: dual integrated digital stereo effects processors Effects Presets: minimum 100 factory presets and 20 user programmable presets Equalizer: 11-band stereo graphic equalizer USB Audio Interface: professional 4-in/4-out USB interface Audio Resolution: minimum 24-bit / 96 kHz MIDI Interface: integrated MIDI input/output support Frequency Response: 15 Hz – 70 kHz or better THD: ≤ 0.01% Phantom Power: +48V selectable phantom power Display: OLED/LCD display for effects and system settings Outputs: balanced XLR master outputs and monitor outputs Controls: independent channel EQ, AUX, FX and gain controls Construction: heavy-duty compact chassis suitable for portable and fixed installations Power Supply: 100–240V AC, 50/60 Hz universal power supplNos.1500000500000
194112Supply of professional dynamic headset microphone suitable for speech reinforcement, auditorium, presentation and live sound applications. The microphone shall provide clear voice reproduction, high gain-before-feedback and reliable hands-free operation. The unit shall meet or exceed the following minimum specifications: Type: Dynamic close-talk headset microphone Polar Pattern: Cardioid (unidirectional) Frequency Response: 50 Hz – 15 kHz Output Connector: 3-pin XLR male balanced output Output Impedance: 150Ω rated or better Sensitivity: suitable for professional speech applications Construction: lightweight adjustable wireframe headset with flexible boom arm Cable: attached shielded microphone cable minimum 1.2 m length Accessories: foam windscreen and cable clip Finish: black or approved equivalent Operation: no phantom power required Suitable for indoor speech, stage and presentation applicationsNos.1117000117000
195113Supply and installation of microphone outlet plate complete with phono/audio jack and socket assembly suitable for professional audio signal connections, including mounting box, connectors, termination and labeling. The outlet shall be suitable for balanced audio applications and shall include all accessories required for complete installation, testing and satisfactory operation, complete in all respects as directed by the Engineer In-Charge.Nos.2840016800
196114Supply and installation of professional audio interconnection patch cable suitable for connection between amplifier and mixer, comprising shielded low-noise cable with heavy-duty audio jack connectors. The cable shall be suitable for professional sound applications and shall include all standard terminations, complete in all respects as directed by the Engineer In-Charge.Nos.6840050400
197115Supply and installation of professional speaker connectors suitable for audio amplifier and loudspeaker interconnections, comprising heavy-duty locking type connectors with high current carrying capacity and durable insulated housing, complete with all standard accessories and fittings, complete in all respects as directed by the Engineer In-Charge.Nos.11150011500
198116Supply and installation of 27U floor standing PA equipment rack fabricated from heavy-duty steel sheet with powder coated finish and front glass door, suitable for housing professional audio and communication equipment. The rack shall be complete with ventilation arrangement, cable management provision, mounting hardware and power distribution unit (PDU). The rack shall meet or exceed the following minimum specifications: Rack Size: 27U standard 19-inch rack Construction: heavy-duty MS/CRCA steel sheet Finish: powder coated anti-corrosive finish Front Door: lockable toughened glass door Mounting Rails: adjustable equipment mounting rails Ventilation: fan mounting/ventilation provision Accessories: cable manager, shelves and mounting hardware PDU: rack mountable power distribution unit Base: floor standing type with levelling arrangement/castersNos.18500085000
199117Supply of professional handheld wired dynamic microphone suitable for public address, speech and vocal applications, complete with microphone holder, cable and standard accessories. The microphone shall provide clear voice reproduction and reliable performance and shall meet or exceed the following minimum specifications: Type: Dynamic handheld wired microphone Polar Pattern: unidirectional/cardioid Frequency Response: suitable for speech and vocal applications Output Connector: standard professional audio connector Construction: rugged metal body suitable for continuous use Switch: built-in ON/OFF switch Cable: shielded low-noise microphone cable Accessories: microphone holder/clip and carrying accessoriesNos.12700027000
200118Supply of professional imported microphone stand suitable for auditorium, conference, public address and recording applications, designed for stable support and flexible positioning of microphones. The stand shall be heavy-duty construction and shall meet or exceed the following minimum specifications: Type: adjustable floor/table microphone stand Construction: heavy-duty steel/metal body Height Adjustment: adjustable Base: stable tripod or heavy round base type Finish: black powder coated/mat finish Thread Compatibility: standard 5/8-inch or equivalent microphone mounting thread Compatible with standard dynamic and condenser microphonesNos.11300013000
201119Supply, laying, termination, testing and commissioning of 2-core 1.5 sq.mm flexible speaker cable suitable for professional audio and speaker system applications, installed through 1” dia PVC conduit pipe concealed/recessed as per site with all required accessories in surface mounted configuration. The cable shall comprise high conductivity copper conductors with durable insulation suitable for low-loss audio signal transmission. The scope includes supply and installation of PVC conduit pipe, bends, couplers, saddles, junction accessories, cable pulling, dressing, termination, fixing, labeling and testing for continuity and proper operation. The rate shall include all consumables, labour, tools and associated works required for complete installation, fully operational in all respects as directed by the Engineer In-Charge.Mtr510900459000
202120Supply, laying, termination, testing and commissioning of 2-core shielded microphone cable suitable for professional audio and microphone system applications, comprising high conductivity copper conductors with braided/foil shielding for noise and interference-free signal transmission, installed through 1” dia PVC conduit pipe concealed/recessed as per site with all required accessories in surface mounted configuration. The scope includes supply and installation of PVC conduit pipe, bends, couplers, saddles, junction accessories, cable pulling, dressing, termination, fixing, labeling and testing for continuity and signal integrity. The rate shall include all consumables, labour, tools and associated works required for complete installation and satisfactory operation, complete in all respects as directed by the Engineer In-Charge.Mtr50100050000
203121Installation, fixing, alignment, testing and commissioning of speakers from Sr#186 to 190 at designated locations, including mounting arrangement, suspension/fixing hardware, electrical/audio connections, cable dressing and integration with existing sound system. The scope includes all labour, tools, consumables, clamps, brackets, fasteners and accessories required for safe and proper installation of speakers, complete with testing for satisfactory audio performance and operation, in all respects as directed by the Engineer In-Charge.Jobs25300075000
204122Installation, testing, commissioning and sound tuning (including equalization and zoning setup) of the complete PA system by OEM authorized/certified engineer for Sr#191 to 194 and 199 to 200, ensuring proper operational performance and system integration.Jobs1120000120000
205 SECTION-2: UGWT    
206 Sub-Section 2-A: Dismantling & Excavation Works    
207123Dismantling of existing PCC flooring and stone soling including disposal of unwanted/ surplus debris away from site, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Cft.1135180204300
208124Excavation for Raft Foundation, underground Tanks, Septic Tanks (rectangular square or any other shape in all kinds of soil including disposal or stacking of surplus/rejected excavated materials to designated places at any lead & lift complete in all respects as per site requirements and as directed by Engineer In-Charge.Cft.29810401192400
209 Sub-Section 2-B: Stone Soling/Pitching and Concrete Works    
210125Providing and laying stone soling about 8” thick (stone obtained from Hub source), under foundation/raft slab, complete in all respects as per site requirements and as directed by the Engineer In-charge.Sft2270140317800
211126Providing & laying ready mix PCC (1:4:8) concrete using Ordinary Portland cement complete in all respects as shown on the drawings.Cft.1140600684000
212127Providing, cleaning/straightening, cutting, bending, binding and fixing in position steel reinforcing deformed bars of Grade 60 (Min. yield strength 60,000 Psi, from Amreli Steel or other make approved by the Employer) conforming to ASTM A-615 including the cost of testing from approved laboratory, concrete spacers, binding wire, complete in all respects as per drawings and as directed by the Engineer In-charge (Payment shall be made according to the approved Bar Bending Schedule, contractor shall have to submit test reports for at least three samples of each size from each consignment).Kg.2316545010424250
213128Providing, laying, vibrating/ consolidating and curing, ready-mix concrete brought from approved batching plant (Lucky Paragon or other approved by the Employer), with minimum 3000 psi compressive cylinder strength at 28 days, with sulphate resistant cement, including the cost of providing and fixing & removal of fair face steel plates shuttering, complete in all respects as per drawings, specifications and as directed by the Engineer In-charge. (Contractor shall have to submit Mix. Design prepared by NED University or other similar approved institute before start of concreting).    
214aRaft FoundationCft.21509101956500
215bWallsCft.219012002628000
216cRoof SlabCft.150010101515000
217dRoof BeamsCft.1001050105000
218 Sub-Section 2-C: Water Proofing Works    
219129Providing and fixing in position 10” wide transparent PVC water stopper of DECORA or approved equivalent make, (with 03 bulbs), of approved quality, complete in all respects as per drawings and as directed by the Engineer In-charge.Rft.210810170100
220130Providing, mixing, applying and curing ½” thick puddlo plaster on internal & external surfaces in 1:3 ratio using 5 lbs of puddlo per bag of sulphate resistant cement, complete in all respects as per site requirements and as directed by the Engineer In-charge.Sft.8680102885360
221131Providing & applying two flood coats of rubberized bitumen on all reinforced concrete surfaces likely to come in contact with the soil, complete in all respects as per site requirements and as directed by the Engineer In-charge. Sft443035155050
222 Sub-Section 2-D: Backfilling & Flooring Works    
223132Backfilling filling in foundation, under floors or around plinths etc with soil obtained from excavation including watering and compaction in 150 mm layer and dressing to required profile and shape complete in all respects as per site requirements and as directed by Engineer In-Charge.Cft.631035220850
224 Sub-Section 2-E: Manholes & Piping Works    
225133Providing and fixing in position Cast Iron manhole cover 2ft x 2ft size with frame, weighing at least 135 KG each including the cost of grouting the frame in RCC walls/ slab, Alpine, Tipu or approved equivalent make, complete in all respects as per site requirements and as directed by the Engineer In-charge.Nos.450000200000
226134Providing & fixing 2ft high air vents made from 4” dia. Schedul-80 cPVC pipes & elbows with fly mesh/ steel grating set provided at outer end using cPVC sockets etc. complete in all respects as per drawings, specifications and as directed by the Engineer In-charge. Nos.4500020000
227135Providing and fixing in position, 2” dia. Schedule-80 uPVC pipe of AGM or approved equivalent make including the cost of required specials, complete in all respects with required accessories, as directed by the Engineer In-charge.Rft6545029250
228136Providing and fixing in position, 4” dia. Schedule-40 uPVC pipe of AGM or approved equivalent make including the cost of required specials, complete in all respects with required accessories, as directed by the Engineer In-charge.Rft1001100110000
229137Providing and fixing in position, rungs each made from 20mm dia. 4 ft long stainless steel bar, including the cost of cutting, bending, fixing as per drawings, and as directed by the Engineer In-charge. Nos.206000120000
230138Providing & fixing of 2" dia. uPVC handle valve complete in all respects as per site requirements and as directed by the Engineer in Charge.Nos235007000
231139Providing, installation, testing, commissioning etc. of brand new 2HP electric operated single phase mono block water pump of Javed or other approved equivalent brand, with 2” dia. suction & 2” dia. delivery pipes, including cost of 24” x 24” x 18” concrete foundation, required specials, no-return valve of 2” size of Kitz (England) or approved equivalent make, etc. complete in all respects as per site requirements and as directed by the Engineer In-charge. Job1100000100000
232 SECTION-3: LANDSCAPING    
233140Providing and laying pre-cast concrete pavers, city style or other approved shape, 80 mm thick of Envicrete/ Izhaar or other approved Equivalent in red colour, minium compressive strength will be 7000PSI, lalid as per approved pattern including the cost of about 50mm thick stone dust bed and grouting with same stone dust, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Sft100003503500000
234141Same as above but removal & refixing of pavers from the site.Sft4000150600000
235142Providing and fixing Kerb Stones og size 1ftx3ftx6inch at bottom and about 3" at top, incluidng the cost of PCC 1:2:4 required for benching/ haunching etc. and cement-sand mortar for grouting, painting with chlorinated rubber paint of approved colour and make, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Rft400800320000
GRAND TOTAL:Rs 347,857,160.00

Scope of Work

See Annexure-04 - Scope of Works & KPI

Price Schedule

For Individual Jobs

# Job Title Quantity Unit Price (PKR) Total Price (PKR) Delivery Location Delivery Period / Year Country of Origin
1
2
For Lots
# Lot Title Total Lot Price (PKR) Country of Origin
1[Lot 1 Title]

 

 

 

📑 General Conditions of Contract (GCC)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

A. General

  1. Definitions
    1. Unless the context otherwise requires, the following terms whenever used in this Contract shall have the same meaning and shall be interpreted as  indicated
      1. “Applicable Law” means the laws and any other instruments having the force of law in the Government’s Country, or in such other country as may be specified in the Special Conditions of the Contract (SC), as they may be issued and in force from time to time;
      2. “The Contract” means an agreement enforceable by law;
      3. “The Contract Price” means the price payable to the Contractor under the Contract for the full and proper performance of its contractual obligations;
      4. “The Services” means the work to be performed by the Contractor pursuant to this Contract and as prescribed in the Specifications and Schedule of Activities included in the Contractor’s Bid;
      5. “Ancillary Services” means those services ancillary to the provision of Services, such as transportation and insurance, and any other incidental services, such as installation, commissioning, provision of technical assistance, training, and other such obligations of the Contractor covered under the Contract;
      6. “GCC” means the General Conditions of Contract contained in this section;
      7. “SCC” means the Special Conditions of Contract by which the GCC may be amended or supplemented;
      8. Day” means calendar day unless indicated otherwise;
      9. “Effective Date” means the date on which this Contract comes into force and effect;
      10. “The  Contractor” means the individual or corporate body whose Bids to provide the Services has been accepted by the Procuring Agency;
      11. “The Project Site,” where applicable, means the place or places named in Bid Data Sheet and technical Specifications;
      12. “Government” means the Government of Pakistan;
      13. “Local Currency” means the currency of Pakistan;
      14.  “In Writing” means communicated in written form with proof of receipt;
      15. “Completion Date” means the date of completion of the Services by the Contractor  as certified by the Procuring Agency;
      16. “Foreign Currency” means any currency other than the currency of the country of the Procuring Agency;
      17. “Party” means the Procuring Agency or the Contractor, as the case may be, and “Parties” means both of them;
      18.  "Service" means any object of procurement other than goods or works;
      19. “Subcontractor” means any entity to which the Bidder subcontracts any part of the Services.
  2. Applicable Law
    1. The contract shall be governed and interpreted in accordance with the laws of Pakistan, unless otherwise specified in SCC.
  3. Language
    1. The Contract as well as all correspondence and documents relating to the Contract exchanged between the Contractorand the Procuring Agency, shall be written in the English language unless otherwise stated in the SCC.  Supporting documents and printed literature that are part of the Contract may be in another language provided these are accompanied by an accurate translation of the relevant passages in English, in which case, for purposes of interpretation of the Contract, this translation shall govern.
  4. Notices
    1. Any notice, request, or consent made pursuant to this Contract shall be in writing and shall be deemed to have been made when delivered in person to an authorized representative of the Party to whom the communication is addressed, or when sent by registered mail, telex, telegram, or facsimile to such Party at the address specified in the SCC.
  5. Location
    1. The Services shall be performed at such locations as the Procuring Agency may approve and as specified in SCC.
    2. A {DOCUMENTS}
  6. Authorized Representatives / Authority of Member in charge
    1. Any action required or permitted to be taken, and any document required or permitted to be executed, under this Contract by the Procuring Agency or the Contractor may be taken or executed by the officials specified in the SCC.

B. Commencement, Completion, Modification, and Termination of Contract

  1. Effectiveness of Contract
    1. This Contract shall come into effect on the date the Contract is signed by both parties and such other later date as may be stated in the SCC.
  2. Commencement of Services
    1. The Contractor shall confirm availability of Key Experts and begin carrying out the Services not later than the number of days after the Effective Date specified in the SCC.
  3. Program schedule
    1. Before commencement of the Services, the Contractor shall submit to the Procuring Agency for approval a Program showing the general methods, arrangements, order and timing for all activities. The Services shall be carried out in accordance with the approved Program as updated.
  4. Starting Date/Expiration Date
    1. The Contractor shall start carrying out the Services Five (05) days after the date the Contract becomes effective, or at such other date as may be specified in the SCC.
    2. Unless terminated earlier pursuant to Clause GCC 14 hereof, this Contract shall expire at the end of such time period after the Effective Date as specified in the SCC.
  5. Entire Agreement
    1. This Contract contains all covenants, stipulations and provisions agreed by the Parties.  No agent or representative of either Party has authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein.
  6. Modification
    1. Any modification or variation of the terms and conditions of this Contract, including any modification or variation of the scope of the Services, may only be made by written agreement between the Parties. However, each Party shall give due consideration to any modification(s) or variation(s) made by the other Party.
    2. In cases of any modification(s) or variation(s), the prior written consent of the Procuring Agency is required.
  7. Force Majeure
    1. Definition
      For the purposes of this Contract, “Force Majeure” means an event which is beyond the reasonable control of a Contractor and which makes a Contractor’s performance of its obligations under the Contract impossible or so impractical as to be considered impossible under the circumstances.
    2. No Breach of Contract
      The failure of a Party to fulfill any of its obligations under the contract shall not be considered to be a breach of, or default under, this Contract in so far as such inability arises from an event of Force Majeure, provided that the Party affected by such an event (a) has taken all reasonable precautions, due care and reasonable alternative measures in order to carry out the terms and conditions of this Contract, and (b) has informed the other Party as soon as possible about the occurrence of such an event.
    3. Extension of Time
      Any period within which a Contractor shall, pursuant to this Contract, complete any action or task, shall be extended for a period equal to the time during which such Party was unable to perform such action as a result of Force Majeure.
    4. Payments
      During the period of their inability to perform the Services as a result of an event of Force Majeure, the Contractor shall be entitled to continue to be paid under the terms of this Contract, as well as to be reimbursed for additional costs reasonably and necessarily incurred by them during such period for the purposes of the Services and in reactivating the Service after the end of such period.
  8. Termination
    1. By the Procuring Agency
      The Procuring Agency may terminate this Contract in case of the occurrence of any of the events specified in paragraphs (a) through (e) of this Clause. In such an occurrence the Procuring Agency shall give at least thirty (30) calendar days’ written notice of termination to the Contractor in case of the events referred to in (a) through (d); at least sixty (60) calendar days’ written notice in case of the event referred to in (e);
      1. If the Contractor fails to remedy a failure in the performance of its obligations hereunder, as specified in a notice of suspension;
      2. If the Contractor becomes (or, if the Contractor consists of more than one entity, if any of its members becomes) insolvent or bankrupt or enter into any agreements with their creditors for relief of debt or take advantage of any law for the benefit of debtors or go into liquidation or receivership whether compulsory or voluntary;
      3. If the Contractor fails to comply with any final decision reached as a result of arbitration proceedings;
      4. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      5. If the Procuring Agency, in its sole discretion and for any reason whatsoever, decides to terminate this Contract;
    2. By the Contractor
      The Contractor may terminate this Contract, by not less than thirty (30) calendar days’ written notice to the Procuring Agency, in case of the occurrence of any of the events specified in paragraphs (a) through (d) of this Clause.
      1. If the Procuring Agency fails to pay any money due to the Contractor pursuant to this Contract and not subject to dispute within forty-five (45) calendar days after receiving written notice from the Contractor that such payment is overdue;
      2. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      3. If the Procuring Agency fails to comply with any final decision reached as a result of arbitration;
      4. If the Procuring Agency is in material breach of its obligations pursuant to this Contract and has not remedied the same within forty-five (45) days (or such longer period as the Bidder may have subsequently approved in writing) following the receipt by the Procuring Agency of the Contractor’s notice specifying such breach.

C. Obligations of the Contractor

  1. General
    1. Standard of Performance
      1. The Contractor shall perform the Services and carry out the Services with all due diligence, efficiency and economy, in accordance with generally accepted professional standards and practices, and shall observe sound management practices, and employ appropriate technology and safe and effective equipment, machinery, materials and methods. The Contractor shall always act, in respect of any matter relating to this Contract or to the Services, as a faithful adviser to the Procuring Agency, and shall at all times support and safeguard the Procuring Agency’s legitimate interests in any dealings with the third parties;
      2. The Contractor shall employ and provide such qualified and experienced Experts and Sub-Contractors as are required to carry out the Services.
    2. Law Applicable to Services
      The Contractor shall perform the Services in accordance with the Contract and in accordance with the Law of Pakistan and shall take all practicable steps to ensure that any of its Experts and Sub-Bidders, comply with the Applicable Law. 
  2. Conflict of Interests
    1. Contractor Not to Benefit from Commissions and Discounts
      The remuneration of the Contractor shall constitute the Contractor’s sole remuneration in connection with this Contract or the Services, and the Contractor shall not accept for their own benefit any trade commission, discount, or similar payment in connection with activities pursuant to this Contract or to the Services or in the discharge of their obligations under the Contract, and the Contractor shall use their best efforts to ensure that the Personnel, any Subcontractors, and agents of either of them similarly shall not receive any such additional remuneration.
    2. Contractor and Affiliates Not to be Otherwise Interested in Project
      The Contractor agree that, during the term of this Contract and after its termination, the Contractor and its affiliates, as well as any Subcontractor and any of its affiliates, shall be disqualified from providing Services (other than the Services and any continuation thereof) for any project resulting from or closely related to the Services.
    3. Prohibition of Conflicting Activities
      Neither the Bidder nor its Subcontractors nor the Personnel shall engage, either directly or indirectly, in any of the following activities:
      1. during the term of this Contract, any business or professional activities in the Government’s country which would conflict with the activities assigned to them under this Contract;
      2. during the term of this Contract, neither the Contractor nor their Subcontractors shall hire public employees in active duty or on any type of leave, to perform any activity under this Contract;
      3. after the termination of this Contract, such other activities as may be specified in the SCC.
  3. Insurance to be Taken Out by the Contractor
    1. The Contractor(a) shall take out and maintain, and shall cause any Subcontractors to take out and maintain, at its (or the Sub-contractors’, as the case may be) own cost but on terms and conditions approved by the Procuring Agency, insurance against the risks, and for the coverage, as shall be specified in the SCC; and (b) at the Procuring Agency’s request, shall provide evidence to the Procuring Agency showing that such insurance has been taken out and maintained and that the current premiums have been paid.
  4. Contractors Actions Requiring Procuring Agency’s Prior Approval
    1. The Contractor shall obtain the Procuring Agency’s prior approval in writing before taking any of the following actions:
      1. appointing such members of the Personnel not provided by the Contractor;
      2. changing the Program of activities; and
      3. any other action that may be specified in the SCC.
  5. Reporting Obligations
    1. The Contractor shall submit to the Procuring Agency the reports and documents in the numbers, and within the periods as prescribed by the Procuring Agency.
  6. Liquidated Damages
    1. Payments of Liquidated Damages
      The Contractor shall pay liquidated damages to the Procuring Agency at the rate per day stated in the SCC for each day that the Completion Date is later than the Intended Completion Date.  The total amount of liquidated damages shall not exceed the amount defined in the SCC.  The Procuring Agency may deduct liquidated damages from payments due to the Contractor.  Payment of liquidated damages shall not affect the Contractor’s liabilities.
    2. Correction for Over-payment
      If the Intended Completion Date is extended after liquidated damages have been paid, the Procuring Agency shall correct any overpayment of liquidated damages by the Contractor by adjusting the next payment certificate.  The Contractor shall be paid interest on the overpayment, calculated from the date of payment to the date of repayment, at the rates specified in SCC.
    3. Lack of performance penalty
      If the Contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, a penalty for Lack of performance will be paid by the Contractor. The amount to be paid will be calculated as a percentage of the cost of having the Defect corrected, assessed as specified in the Contractor
  7. Performance Guarantee
    1. Within the time stipulated in the acceptance letter from the Procuring Agency, the successful Bidder shall furnish the Performance Guarantee in shape and amount specified in SCC.
    2. The proceeds of the Performance Guarantee shall be payable to the Procuring agency as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract.
    3. The Performance Guarantee shall be denominated in the currency of the Contract, or in a freely convertible currency acceptable to the Procuring agency and shall be in the acceptable form as specified in SCC.
    4. The Performance Guarantee will be discharged by the Procuring agency and returned to the Supplier not later than thirty (30) days following the date of completion of the Supplier’s performance obligations under the Contract, including any warranty obligations, unless otherwise specified in SCC.
  8. Sustainable Procurement
    1. The Contractor shall conform to the sustainable procurement contractual provisions, if and as specified in the SCC.

D. Contractor’s Personnel

  1. Description of Personnel
    1. The titles, agreed job descriptions, minimum qualifications, and estimated periods of engagement in the carrying out of the Services of the Contractor’s Key Personnel.  The Key Personnel listed by title as well as by name are hereby approved by the Procuring Agency.
  2. Removal and / or Replacement of Personnel
    1. Except as the Procuring Agency may otherwise agree, no changes shall be made in the Key Personnel.  If, for any reason beyond the reasonable control of the Contractor, it becomes necessary to replace any of the Key Personnel, the Contractor shall provide as a replacement a person of equivalent or better qualifications.
    2. If the Procuring Agency finds that any of the Personnel have (i) committed serious misconduct or have been charged with having committed a criminal action, or (ii) have reasonable cause to be dissatisfied with the performance of any of the Personnel, then the Contractor shall, at the Procuring Agency’s written request specifying the grounds thereof, provide as a replacement a person with qualifications and experience acceptable to the Procuring Agency.
    3. The Contractor shall have no claim for additional costs arising out of or incidental to any removal and/or replacement of Personnel.

E. Obligations of the Procuring Agency

  1. Change in the Applicable Law
    1. If, after the date of this Contract, there is any change in the Applicable Law with respect to taxes and duties which increases or decreases the cost of the Services rendered by the Contractor, then the remuneration and reimbursable expenses otherwise payable to the Contractor under this Contract shall be increased or decreased accordingly by agreement between the Parties, and corresponding adjustments shall be made to the amounts referred in the SCC.
  2. Services and Facilities
    1. The Procuring Agency shall make available to the Contractor and the Experts, for the purposes of the Services and free of any charge, the services, facilities and property described in the Terms of Reference, at the times and in the manner specified in the Terms of Reference.
    2. In case that such services, facilities and property shall not be made available to the Contractor, the Parties shall agree on (i) any time extension that it may be appropriate to grant to the Contractor for the performance of the Services, (ii) the manner in which the Contractor shall procure any such services, facilities and property from other sources, and (iii) the additional payments, if any, to be made to the Contractor as a result thereof.

F. Payments to the Contractor

  1. Contract Price
    1. The price payable shall be in Pakistani Rupees unless otherwise specified in the SCC.
  2. Terms and Conditions of Payment
    1. Payments will be made to the Contractor according to the payment schedule stated in the SCC and as per actual invoice submitted by the Contractor.
    2. Unless otherwise stated in the SCC, the advance payment shall be made against the provision by the Contractor of a bank guarantee for the same amount, and shall be valid for the period stated in the SCC.  Any other payment shall be made after the conditions listed in the SCC for such payment have been met, and the Contractor have submitted an invoice to the Procuring Agency specifying the amount due.
  3. Quality Control Identifying Defects
    1. The principle and modalities of Inspection of the Services by the Procuring Agency shall be as indicated in the SCC. The Procuring Agency shall check the Contractor’s performance and notify him of any Defects that are found.  Such checking shall not affect the Contractor’s responsibilities.  The Procuring Agency may instruct the Contractor to search for a Defect and to uncover and test any service that the Procuring Agency considers may have a Defect. Defect Liability Period is as defined in the SCC.
    2. A {INSPECTION}
  4. Correction of Defects, and Lack of Performance Penalty
    1. The Procuring Agency shall give notice to the contractor of any Defects before the end of the Contract.  The Defects liability period shall be extended for as long as Defects remain to be corrected.
    2. Every time notice a Defect is given; the contractor shall correct the notified Defect within the length of time specified by the Procuring Agency’s notice.
    3. If the contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, the Procuring Agency will assess the cost of having the Defect corrected, the contractor will pay this amount, and a Penalty for Lack of Performance.
  5. Settlement of Disputes Amicable Settlement
    1. The Parties shall use their best efforts to settle amicably all disputes arising out of or in connection with this Contract or its interpretation.
  6. Dispute Settlement
    1. Arbitration
      If any dispute of any kind whatsoever shall arise between the procuring agency and the contractor in connection with or arising out of the Contract, including without prejudice to the generality of the foregoing, any question regarding its existence, validity or termination, or the execution of the contract, the parties shall seek to resolve any such dispute or difference by mutual consultation. If the parties fail to resolve such a dispute or difference even after negotiations or mediation, then the dispute shall be referred within fourteen (14) days in writing by either party to the Arbitrator, with a copy to the other party.
      Any dispute in respect of which a notice of intention to commence arbitration has been given, in accordance with GCC sub-clause 32.1, shall be finally settled by arbitration. Arbitration may be commenced prior to or after completion of the Contract. Arbitration proceedings shall be conducted in accordance with Arbitration Act 1940.
      Notwithstanding any reference to arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless otherwise agreed. The Procuring Agency shall continue to pay the Contractor any undisputed amounts due under the Contract during the resolution of any dispute.

📑 Special Conditions of Contract (SCC)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

SECTION VIII. SPECIAL CONDITIONS OF CONTRACT

The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.

Number of GC Clause

Amendments of, and Supplements to, Clauses in the General Conditions of Contract

Number of GC Clause 1

Definitions

The Procuring Agency is: SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)), Executive Engineer Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

The Supplier is:

The title of the subject procurement is: 315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Number of GC Clause 2

Applicable/Governing Law:

The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan

Number of GC Clause 3

Language:

The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.

Number of GC Clause 4

Notices:

The addresses for the notices are:

Procuring Agency:

SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)), Executive Engineer
Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-213-450-4122
shehzad.memon@sbp.org.pk

Contractor/ Bidder:

[Name, address and telephone number]

The Contractor/ Bidder’s Representative(s)

[Name, address, telephone number and e-mail address]

Number of GC Clause 6.1

The Authorized Representatives are:

For the Procuring Agency:

SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)), Executive Engineer
Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-213-450-4122
shehzad.memon@sbp.org.pk

For the Bidder:

Name: ………………………………………

Designation: ……………………..

Address: …………………………………………..

Number of GC Clause 7

Effectiveness of the contract

The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties

Number of GC Clause 8

Commencement of Contract:

The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.

Number of GC Clause 10.2

Expiration of Contract:

The time period shall be ……………………………

Number of GC Clause 14

Termination

In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.

Number of GC Clause 16

Conflict of Interest:

The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.

Number of GC Clause 20

Liquidated Damages

If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.

Number of GC Clause 21

Performance Guarantee:

The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft

Number of GC Clause 27

Currency of Payment:

All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.

Number of GC Clause 28

Payment terms:

Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.

Number of GC Clause 29

Identifying Defects:

The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.

Number of GC Clause 31

Following is the guidance for Dispute Resolution

  1. If any dispute of any kind whatsoever shall arise between the Authority and the Bidder in connection with or arising out of the Contract... (full clause unchanged)
  2. At future of negotiation the dispute shall be resolved through mediation...
  3. At failure of mediation, arbitration under Arbitration Act 1940...
  4. Cost sharing equally...
  5. Proceedings may commence before/after completion...

Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.

Rules of procedure for arbitration proceedings:

Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.

Place of Arbitration and Award:

The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.

📑 Bid Securing Declaration (BSD)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

Form 9: Bid Securing Declaration

Date: [insert date (as day, month and year)]

Bid No.:P88684

To: SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)), Executive Engineer Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

 

 

We, the undersigned, declare that:

We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.

We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:

  1. have  withdrawn  or  modified  our  Bid  during  the  period  of  Bid  Validity specified in the Form of Bid;
  2. Disagreement to arithmetical correction made to the Bid price; or
  3. having been notified of the acceptance of our Bid by the Procuring Agency during the period of Bid Validity, (i) failure to sign the contract if required by Procuring Agency to do so or (ii) fail or refuse to furnish the Performance Security or to comply with any other condition precedent to signing the contract specified in the Bidding Documents.

We understand this Bid Securing Declaration shall expire if we are not the successful

Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.

 

📑 Contract Form (CNF)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

SECTION IX: CONTRACT FORMS

 

THIS AGREEMENT made the _____ day of __________ 20_____ between SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)), Executive Engineer Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:

 

WHEREAS the Procuring Agency invited Bids for provision of goods, viz., 315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi (P88684) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).

 

NOW THIS CONTRACT WITNESSETH AS FOLLOWS:

1.   In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.

2.   The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-

  1. This form of Contract;
  2. the Form of Bids and the Price Schedule submitted by the Bidder;
  3. the Schedule of Requirements;
  4. the Technical Specifications;
  5. the Special Conditions of Contract;
  6. the General Conditions of the Contract;
  7. the Procuring Agency’s Letter of Acceptance; and
  8. [add here: any other documents]

3.   In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.

4.   The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.

 

IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.

 

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Procuring Agency:

………………………………………………

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Bidder: …………………………………………………

 

 

📑 Integrity Pact (INP)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

Integrity Pact

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC. PAYABLE BYTHE SUPPLIERS OF GOODS, SERVICES & WORKS IN  CONTRACTS WORTH RS.10.00 MILLION OR MORE

 

Contract                           Number:  Contract                               Value:  Contract Title:

Dated:

 

[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.

Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.

[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

📑 Performance Guarantee Form (PGF)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

Performance Guarantee Form

 

To:     SBP Banking Services Corporation (BSC) (SBP Banking Services Corporation (BSC)), Executive Engineer Engineering Department, 1st Flor, SBP Boulton Market Building, M.A Jinnah Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

 

WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No.  [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).

 

AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.

 

AND WHEREAS we have agreed to give the Bidders guarantee:

 

THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guar­antee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.

 

This guarantee is valid until the: [insert date]

 

 

Signature and seal of the Guarantors

 

 

_____________________________________________________________________

[name of bank or financial institution]

 

 

_____________________________________________________________________

[address]

 

 

_____________________________________________________________________

[date}

📑 Annexure (ANX)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code

Annexure-01 - Bidding Data Sheet (BDS) – Part-B

Annexure-01 - Bidding Data Sheet (BDS) – Part-B

Unknown

Annexure-02 - Section VIII - SCC (Part-B)

Annexure-02 - Section VIII - SCC (Part-B)

Unknown

Annexure-03 - Formula for Price Adjustment

Annexure-03 - Formula for Price Adjustment

Unknown

Annexure-04 - Scope of Works & KPI

Annexure-04 - Scope of Works & KPI

Unknown

Annexure-05 - Technical Specifications

Annexure-05 - Technical Specifications

Unknown

Annexure-06 - Drawings

Annexure-06 - Drawings

Unknown

Annexure-07 - Undertaking

Annexure-07 - Undertaking

Unknown

Annexure-08 - Supplier Account details

Annexure-08 - Supplier Account details

Unknown

📑 Procurement Forms (PFD)

315-Construction of Mosque at SBP HOK with allied works along with Underground Water Tank and Landscaping, SBP Head Office Karachi

Published on: Tuesday, August 25, 2026 05:00 PM

Ref# : P88684
QR Code