In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Federal Government Employees Housing Authority (Ministry of Housing and Works), Deputy Director (Maintenance)
Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad.
+92-320-090-5755
dd-maintenance@fgeha.gov.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Federal Government Employees Housing Authority (Ministry of Housing and Works) The subject of procurement is:Â Replacement of Centrifugal Pumps at Pump Station Located at St No 24, G-13/2, Islamabad Expected commencement date: Thursday, October 15, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P89965Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, August 31, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Federal Government Employees Housing Authority (Ministry of Housing and Works) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid:
 |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 180 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad. Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Tuesday, September 8, 2026 12:00 PM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Tuesday Date:Â September 08, 2026 Time : 12:30 PM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Individual / Individual Consultant Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Pakistan Engineering Council Registration: The bidder must be a valid PEC registered Firm/Contractor in Category C-5 or above, with a valid license on the date of submission of the bid. The bidders shall have the authorization of relevant PEC code(s) of specialization applicable to the scope of work, including EE11 and CE09(ii). | Yes |
| Tax Registration: The bidder shall have the NTN / Sales Tax Registration and be appearing on the Active Taxpayer List (ATL) at the time of submission of the bid. | Yes |
| Non-Blacklisting: The bidder shall submit an affidavit, issued/notarized, declaring that the firm: i. has not been blacklisted/debarred by any Federal or Provincial Government department, autonomous body or public-sector organization; ii. is not currently debarred from participation in public procurement; and iii. has not submitted false, forged or misleading information/documents. | Yes |
| Bid Security: The bidder shall submit bid security in the amount and form specified in the bidding documents. | Yes |
| Similar Works Experience: must have successfully completed similar works during the last five (05) years, involving one or more of the following: i. Supply and installation of tubewell/submersible pumps ii. Supply and installation/replacement of electric motors iii. Replacement of pump and motor assemblies iv. Electrical installation of pump/motor systems v. Testing and commissioning of pump/motor installations vi. Combined electrical/mechanical rehabilitation of pumping stations/tubewells | Yes |
| Minimum Similar Experience: The bidder shall have successfully completed at least two (02) similar completed contracts, each having a value of not less than Rs. 20 million. Documentary evidence shall include work order/contract agreement and satisfactory completion certificate. | Yes |
| Average Annual Turnover: The bidder shall have an average annual turnover of not less than Rs. 25.00 million during the each last three (03) financial years. The bidder shall submit audited financial statements or other acceptable documentary evidence for the required period. | Yes |
| Proposed Technical Staff: Bidders must submit CVs, qualifications, and experience for key technical staff: Project/Resident Engineer (Electrical): B.Sc./B.E. Electrical (PEC registered where applicable), min 5 yrs exp. Electrical Supervisor/Technician: DAE Electrical or equiv., min 5 yrs exp. Pump/Mechanical Technician: DAE Mechanical or equiv., min 5 yrs exp. Electricians/Skilled Workers: Relevant trade qualification/exp., min 3 yrs exp. | Yes |
| Certificate Warranty on Stamp Paper: The bidder shall provide affidavit that during the warranty period, the contractor shall rectify manufacturing/workmanship defects at no additional cost to the FGEHA. | Yes |
| Site Visit: A site visit certificate is mandatory for the bidders from Maintenance Directorate, FGEHA, certifying that the bidder/firm has inspected the site before submission of the bid and satisfy itself regarding: i. Existing tubewell condition ii. Existing pump/motor arrangement iii. Electrical supply; iv. Existing control panel v. Cable route/Cable condition vi. Pump setting/depth vii. Lifting and handling requirements viii. Access to site ix. Any other condition affecting executio | Yes |
Least Cost Based Selection (LCBS)
Weightage
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 50 | |
|---|---|---|
| Passing Marks | 50 | |
| Technical Evaluation Criteria | ||
| Pakistan Engineering Council Registration: The bidder must be a valid PEC registered Firm/Contractor in Category C-5 or above, with a valid license on the date of submission of the bid. The bidders shall have the authorization of relevant PEC code(s) of specialization applicable to the scope of work, including EE11 and CE09(ii). (Quantitative)(Doc Required) | 10 | |
| Similar Works Experience: The bidder must have successfully completed similar works during the last five (05) years, "similar works" shall mean works involving one or more of the following: i. Supply and installation of tubewell/submersible pumps ii. Supply and installation/replacement of electric motors iii. Replacement of pump and motor assemblies iv. Electrical installation of pump/motor systems v. Testing and commissioning of pump/motor installations vi. Combined electrical/mechanical rehabilitation of pumping stations/tubewells (Quantitative)(Doc Required) | 10 | |
| Minimum Similar Experience: The bidder shall have successfully completed at least two (02) similar completed contracts, each having a value of not less than Rs. 20 million. Documentary evidence shall include work order/contract agreement and satisfactory completion certificate. (Quantitative)(Doc Required) | 10 | |
| Average Annual Turnover: The bidder shall have an average annual turnover of not less than Rs. 25.00 million during the each last three (03) financial years. The bidder shall submit audited financial statements or other acceptable documentary evidence for the required period. (Quantitative)(Doc Required) | 10 | |
| Proposed Technical Staff: Bidders must submit CVs, qualifications, and experience for key technical staff: Project/Resident Engineer (Electrical): B.Sc./B.E. Electrical (PEC registered where applicable), min 5 yrs exp. Electrical Supervisor/Technician: DAE Electrical or equiv., min 5 yrs exp. Pump/Mechanical Technician: DAE Mechanical or equiv., min 5 yrs exp. Electricians/Skilled Workers: Relevant trade qualification/exp., min 3 yrs exp. (Quantitative)(Doc Required) | 10 | |
Lot Title : Replacement of Centrifugal Pumps at Pump Station Located at St No 24, G-13/2, Islamabad
Bid Security : 896780 PKR
| Job | Delivery Schedule | Quantity |
|---|---|---|
| 4 Nos Centrifugal Pumps |
Address: Pump Station St 24 G-13/2
Schedule: 90 days
Quantity: 1/job
|
1/job |
| Main Distribution Box |
Address: Pump Station St 24 G-13/2
Schedule: 90 Days
Quantity: 1/job
|
1/job |
| Earthing System |
Address: Pump Station St 24 G-13/2
Schedule: 90 Days
Quantity: 1/job
|
1/job |
Yes
Replacement of Centrifugal Pumps at Pump Station Located at St No 24, G-13/2, Islamabad
| Job | Related Services |
|---|---|
| 4 Nos Centrifugal Pumps | Complete supply, installation, testing, and commissioning of pumps, including a comprehensive 1-year post-completion warranty. Mandatory Factory Acceptance Testing (FAT): Pre-installation factory testing at the manufacturer’s site is mandatory. The bidder shall bear all costs and logistical arrangements for witnessing FGEHA officials. |
| Main Distribution Box | Complete supply, installation, testing, and commissioning including a comprehensive 1- year post-completion warranty. |
| Earthing System | Complete supply, installation, testing, and commissioning including a comprehensive 1- year post-completion warranty. |
Lot Title: Replacement of Centrifugal Pumps at Pump Station Located at St No 24, G-13/2, Islamabad
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | NS-01 | Providing, Installing and Commissionig of 4 Nos Centrifugal Pumps Sets each having the following specs: 1) Flow Rate of 4 Cusec. 2) 60 Hp Motor (ABB/WEG) Minimum Class IE3 3) Pump (KSB/Groundfos) Cast Iron Body and Bronze Impeller 4) Soft Starter (ABB/WEG) Based MCU Scope: *Modification of existing suction and delivery manifolds to accommodate new flow parameters, including the provision and installation of Flexible Bellow, Gate Valves, Non-Return Valves, matching Reducers/Expanders, and Pressure Gauges, Dry Relay. (Any modification/part required included) *Supply and installation of a Main Distribution Board (MDB), including the laying of Main Incoming Copper Cables from the Transformer to the MDB and secondary cabling from the MDB to individual pump units (properly sized for 60 HP load). *Execution of a dedicated Chemical/Copper Plate Earthing System for the MDB and all four pumping units to ensure equipment safety and neutral stability. *Careful dismantling and removal of existing pumping sets and outdated piping. Reconstruction of foundations RCC (1:2:4 MS Bars#6 & 6'' c/c) including metal base plate tailored to the footprints of the new 4-cusec units. *The work includes all labor, materials, transportation, tools, and plant required for a complete operational installation, finished in all respects as per the technical specifications and to the entire satisfaction of the Engineer In-Charge. | Job | 1 | 29020375 | (Rupees Twenty Million Twenty Thousand Three Hundred Seventy Five only) | 29020375 |
| 2 | NS-02 | Providing , Installation, Testing, and Commissioning of a wall-mounted Main Distribution Board (MDB). The unit shall be equipped with one (1) Main Circuit Breaker and four (4) secondary circuit breakers per pump set, alongside appropriately rated busbars, ammeters, and voltmeters. The scope includes all necessary electrical terminations and the provision of appropriately sized power cabling from the MDB to each Motor Control Unit (MCU). The work shall be completed in all respects, strictly to the satisfaction and approval of the Engineer-in-Charge | Job | 1 | 445300 | (Rupees Four Hundred Forty Five Thousand Three Hundred only) | 445300 |
| 3 | NS-03 | Supply, Installation, Testing, and Commissioning of a comprehensive earthing system for one (1) Main Distribution Board (MDB), four (4) Motor Control Units (MCUs), and four (4) pump motor sets. The scope of work includes the provision of borehole, the installation of copper earth electrodes (rods or plates), and the routing and fixing of bare copper conductors, alongside all necessary fittings and associated works. The installation shall be complete in all respects, strictly to the satisfaction and as required by the Engineer-in-Charge. | Job | 1 | 427000 | (Rupees Four Hundred Twenty Seven Thousands only) | 427000 |
| GRAND TOTAL: | Rs 29,892,675.00 |
__________________________________________________________________________________________________________________________________________________________
Providing, Installing and Commissionig of 4 Nos Centrifugal Pumps Sets each having the following specs:
1) Flow Rate of 4 Cusec.
2) 60 Hp Motor (ABB/WEG) Minimum Class IE3Â
3) Pump (KSB/Groundfos) Cast Iron Body and Bronze ImpellerÂ
4) Soft Starter (ABB/WEG) Based MCU
Scope:Â
*Modification of existing suction and delivery manifolds to accommodate new flow parameters, including the provision and installation of Flexible Bellow, Gate Valves, Non-Return Valves, matching Reducers/Expanders, and  Pressure Gauges. (Any modification/part required included)Â
*Supply and installation of a Main Distribution Board (MDB), including the laying of Main Incoming Copper Cables from the Transformer to the MDB and secondary cabling from the MDB to individual pump units (properly sized for 60 HP load).
*Execution of a dedicated Chemical/Copper Plate Earthing System for the MDB and all four pumping units to ensure equipment safety and neutral stability.
*Careful dismantling and removal of existing pumping sets and outdated piping. Reconstruction of foundations RCC (1:2:4 MS Bars#6 & 6'' c/c) including metal base plate tailored to the footprints of the new 4-cusec units.
*The work includes all labor, materials, transportation, tools, and plant required for a complete operational installation, finished in all respects as per the technical specifications and to the entire satisfaction of the Engineer In-Charge.
__________________________________________________________________________________________________________________________________________________________
Providing , Installation, Testing, and Commissioning of a wall-mounted Main Distribution Board (MDB). The unit shall be equipped with one (1) Main Circuit Breaker and four (4) secondary circuit breakers per pump set, alongside appropriately rated busbars, ammeters, and voltmeters. The scope includes all necessary electrical terminations and the provision of appropriately sized power cabling from the MDB to each Motor Control Unit (MCU). The work shall be completed in all respects, strictly to the satisfaction and approval of the Engineer-in-Charge.
__________________________________________________________________________________________________________________________________________________________
Supply, installation, testing, and commissioning of a comprehensive earthing system for one (1) Main Distribution Board (MDB), four (4) Motor Control Units (MCUs), and four (4) pump motor sets. The scope of work includes the provision of borehole, the installation of copper earth electrodes (rods or plates), and the routing and fixing of bare copper conductors, alongside all necessary fittings and associated works. The installation shall be complete in all respects, strictly to the satisfaction and as required by the Engineer-in-Charge.
__________________________________________________________________________________________________________________________________________________________
Factory Acceptance Testing (FAT): Prior to site delivery and installation, comprehensive performance and quality testing of the pumps must be conducted at the manufacturer’s facility. Official Inspection Logistics:
The successful bidder shall be fully responsible for all arrangements and associated costs—including transportation, travel, and logistics—required for the Federal Government Employees Housing Authority (FGEHA) officials to attend and witness the factory acceptance testing.
Must Produce Manufacturing Documents for Pumps, Motor (Import Document) and Soft Starter (Import Document).
__________________________________________________________________________________________________________________________________________________________
SPECIAL PROVISIONS
EMPLOYER'S VEHICLE
1. The Contractor Shall provide POL upto 100 Liters /Month and make Available at all time for the exclusive use of the Employer/ employer's staff, for the project related activities The contractor shall provide the following new vehicle, as the specified below:
One Honda 70cc motorcycle -----Latest Model
3. If contractor fails to provide the vehicle within the time specified the cost incurred by the employer in renting plus a 20% (twenty percent) overhead charge shall be payable by the contractor.
4. The vehicle will be registered, taxed, comprehensively insured fueled, repaired, and serviced. Cleaned and maintained by the contractor for the duration of the contract and temporarily replaced if, in the employer's opinion, vehicle is not in a roadworthy condition.
5. The vehicle will become the property of the employer after the completion of the project and the contractor shall service and maintain the vehicle on site before handing over the employer. The contractor shall also transfer the vehicle in the name of FGEHA as would be directed and shall also bear all the expenses of transference.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Federal Government Employees Housing Authority (Ministry of Housing and Works), Deputy Director (Maintenance) Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad.
The Supplier is:
The title of the subject procurement is: Replacement of Centrifugal Pumps at Pump Station Located at St No 24, G-13/2, Islamabad
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Federal Government Employees Housing Authority (Ministry of Housing and Works), Deputy Director (Maintenance)
Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad.
+92-320-090-5755
dd-maintenance@fgeha.gov.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Federal Government Employees Housing Authority (Ministry of Housing and Works), Deputy Director (Maintenance)
Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad.
+92-320-090-5755
dd-maintenance@fgeha.gov.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 1.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Factory Acceptance Testing (FAT): Prior to site delivery and installation, comprehensive performance and quality testing of the pumps must be conducted at the manufacturer’s facility. Official Inspection Logistics: The successful bidder shall be fully responsible for all arrangements and associated costs—including transportation, travel, and logistics—required for the Federal Government Employees Housing Authority (FGEHA) officials to attend and witness the factory acceptance testing.
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Engineer Incharge)
Must Produce Manufacturing Documents for Pumps, Motor (Import Document) and Soft Starter (Import Document).
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P89965
To: Federal Government Employees Housing Authority (Ministry of Housing and Works), Deputy Director (Maintenance) Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad.
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Federal Government Employees Housing Authority (Ministry of Housing and Works), Deputy Director (Maintenance) Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad.
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Replacement of Centrifugal Pumps at Pump Station Located at St No 24, G-13/2, Islamabad (P89965) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Federal Government Employees Housing Authority (Ministry of Housing and Works), Deputy Director (Maintenance) Directorate of Maintenance, Bazar No.5, Street 13, G-13/3, Islamabad.
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}