Standard Bidding Document

📑 Procurement Notice (NIT)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

REQUEST FOR BIDS

PROCUREMENT OF CIVIL WORKS

  1. The Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)) has reserved Funds for the procurement planned for FY 2026-27. The Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)) intends to apply part of the proceeds of this Fund to cover eligible payments under the contract for the "Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze" with the reference of "P92743".
  2. The Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)) invites electronic Bids from eligible Bidders for procurement of Works (Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze) described in the bidding documents on EPADS v2.0.
  3. Single Stage-Two Envelope will be used by adopting Least Cost Based Selection (LCBS) Technique for the subject procurement, in line with the Public Procurement Rules, 2026 and any Regulations, Regulatory Guides, Procurement Guidelines or Instructions issued by the Authority from time to time.
  4. All Bids must be accompanied by a Bid Security amounting described in Bid Security Section in Bidding Document in the form of  Pay Order, Call at Deposit, Bank Guarantee, Demand Draft. Or all bids must be accompanied by bid securing declaration in the format specified in the Bidding documents
  5. E-Bidding documents, containing detailed terms & conditions, specifications and requirements etc. are available on e-Pak Acquisition and Disposal System (EPADS) at https://epads.gov.pk/opportunities/federal/procurements/92743 for all the interested bidders registered on EPADS v2.0. Bidders are required to get themselves registered on EPADS v2.0 to participate in Bidding process.
  6. The e-bids, prepared in accordance with the instructions in the e-Bidding documents, must be submitted through EPADS v2.0 on or before Monday, September 7, 2026 11:00 AM. E-bids will be opened by using EPADS v2.0 on the same day at Monday, September 7, 2026 11:30 AM. Manual submission of Bids shall not be entertained. Those vendor who have not yet registered on the new version of EPADS v2.0, may register themselves on https://pa.epads.gov.pk/. A tutorial to explain the registeration process is available at https://www.youtube.com/watch?v=MNW6T38v7tc.

In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).

 

 

Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)), Assistant Manager
PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-333-995-5002
kamran.faraz@pidc.com.pk

📑 Instructions to Bidders (ITB)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

A. INTRODUCTION

  1. Scope of Bid
    1. The Procuring agency/Employer (PA), as indicated in the Bid Data Sheet (BDS) invites Bids for the execution of Works as specified in the BDS and Section VI- Works Requirements. The name, identification, and number of lots (contracts) of this National/ International Competitive Bidding process are specified in the BDS.
  2. Source of Funds
    1. Source of funds as referred in Clause 2 of Bid Data Sheet.
  3. Eligible Bidders 
    1. A bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture or consortium. In the case of a joint venture or consortium, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture or consortium shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture or consortium during the Bidding process, and in case of award of contract, during the execution of contract. Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
      Any bid submitted by the joint venture, shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
      (The limit on the number of members of JV or Consortium may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
    2. The invitation for bids is open to all prospective bidders subject to any provisions of incorporation or licensing by the respective national/ international incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidder keeping in view the requirement of that business.
    3. A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidders may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
      1. are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring agency/Employer to provide consulting services for the preparation of design or technical specifications of the works that are the subject of the bid; or
      2. have controlling shareholders in common; or 
      3. receive or have received any direct or indirect subsidy from any of them; or 
      4. have the same legal representative for purposes of this Bid; or
      5. have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the Procuring agency/Employer regarding this Bidding process; or
      6. Submit more than one bid in this bidding process.
    4. A Bidder may be ineligible if –
      1. he is declared bankrupt or, in the case of company or firm, insolvent;
      2. payments in favor of the bidder is suspended in accordance with the judgment of a court of law other than a judgment declaring bankruptcy and resulting (in accordance with the national laws) in the total or partial loss of the right to administer and dispose of its property;
      3. the bidder is convicted, by a final judgment of a Court of Law or relevant Professional Statuary Body, of any offence involving professional conduct;
      4. The bidder is debarred/ blacklisted by a national level Procuring agency/Employer and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration.
    5. As and when required, bidders shall provide to the Procuring agency/Employer evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
  4. Eligible Material and Equipment
    1. All the material and equipment to be mobilized under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such materials and equipment. For this purpose, ineligible countries are stated in the section-IV titled as “Eligible Countries”. 

B. BIDDING DOCUMENTS

  1. Contents of Bidding Documents 
    1. The scope of Works, bidding procedures, and terms and conditions of the contract are prescribed in the bidding documents.  In addition to the Invitation for Bids, the bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 7.1 include:
      1. Section I Instructions to Bidders (ITBs)
      2. Section II Bid Data Sheet (BDS)
      3. Section III Eligible Countries
      4. Section IV Evaluation and Qualification Criteria
      5. Section V Works Requirements Technical Specifications & Schedule of Requirements
      6. Section VI Standard Bidding Forms
      7. Section VII General Conditions of Contract (GCC)
      8. Section VIII Particular Conditions of Contract (PCC)
      9. Section IX Contract Forms
    2. The bidder is expected to examine all instructions, forms, specifications, terms and conditions prescribed in the bidding documents. Failure to furnish all the information required in the bidding documents will be at the bidder’s risk and may result in the rejection of his bid. 
  2. Clarification of Bidding Document, Pre-bid Meeting
    1. A prospective bidder requiring any clarification of the bidding document may notify the Procuring agency/Employer through EPADS v2.0. 
    2. The Procuring agency/Employer shall respond to the request for clarification in accordance with the Public Procurement Rules 2026, Rule No.38 i.e. Clarifications of bids. 
    3. Should the Procuring Agency deem it necessary to amend the BIDDING document as a result of a clarification, it shall do so following the procedure under ITB 7.
    4. If indicated in the BDS, the bidder’s designated representative is invited at the bidder’s cost to attend a pre-bid meeting at the place, date and time mentioned in the BDS. During this pre-bid meeting, prospective bidders may request clarification of the schedule of requirement, the evaluation criteria or any other aspects of the bidding documents.
    5. Minutes of the pre-bid meeting, if applicable, including the text of the questions asked by bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS v2.0. Any modification to the bidding documents that may become necessary as a result of the pre-bid meeting shall be made by the Procuring agency/Employer exclusively through the use of an Addendum pursuant to ITB 7. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
    6. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works.  The costs of visiting the Site shall be at the bidder’s own expense.
    7. The bidder and any of its authorized personnel will be granted permission by the Procuring agency/Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the bidder and its personnel will release and indemnify the Procuring agency/Employer  from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
  3. Amendment of Bidding Documents
    1. The procuring agency may issue notification of any change, addition, modification or deletion in accordance with the PP Rules 2026, rule no. 34 i.e. Bidding Documents.
    2. To give prospective bidders reasonable time in which to take an addendum/corrigendum into account in preparing their bids, the Procuring agency/Employer may, at its discretion, extend the deadline for the submission of bids:
      Provided that the Procuring agency/Employer shall extend the deadline for submission of bid in pursuance of PP Rules 2026, rule no. 39 i.e. Extension of time for submission of bids, if such an addendum is issued within last three (03) days of the bid submission deadline.

C. PREPARATION OF BIDS

  1. Language of Bid
    1. The bid prepared by the bidder, as well as all correspondence and documents relating to the bid exchanged by the bidder and the Procuring agency/Employer shall be written in the English language unless specified in the BDS. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless specified in the BDS, in which case, for purposes of interpretation of the bidder, the translation shall govern.
  2. Documents Comprising the Bids
    1. The Bid prepared by the Bidder shall constitute the following components
      1.  Documentary evidence established in accordance with ITB 9 that the material and equipment to be utilized by the Bidder for the executions of works are eligible material and equipment and conform to the Bidding Documents
      2.  Documentary evidence established in accordance with ITB 10 that the Bidder has been authorized to carry out the Construction works
      3.  Documentary evidence established in accordance with ITB 10 that the Bidder is eligible and/or qualified for the subject Bidding process
      4.  Letter of Bid and Schedules and Bid Prices completed in accordance with ITB 11 and 12
      5.  Completed schedules as required, including priced Bill of Quantities in accordance with ITB 11
      6.  Technical Proposal completed in all aspects in accordance with ITB 14
      7.  Bid security or Bid Securing Declaration furnished in accordance with ITB 16
      8.  Any other Document required in the BDS
    2.  In addition to the requirements, Bids submitted by a JV shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful Bid shall be signed by all members and submitted with the Bid, together with a copy of the proposed Agreement. Bids submitted by a joint venture of two (2) or more firms specified in Bidding Data, shall comply with the following requirements
      1.  The bid, and in case of a successful bid, the Form of Contract Agreement shall be signed by all members so as to be legally binding on all partners
      2.  One of the joint venture partners shall be nominated as being in-charge; and this authorization shall be evidenced by submitting a power of attorney signed by legally authorized signatories of all the joint venture partners
      3.  For the partner-in-charge shall always be duly authorized to deal with the Employer regarding all matters related with and/or incidental to the execution of Works as per the terms and Conditions of Contract and in this regard to incur any and all liabilities, receive instructions, give binding undertakings and receive payments on behalf of the joint venture
      4.  All partners of the joint venture shall at all times and under all circumstances be liable jointly and severally for the execution of the Contract in accordance with the Contract terms and a statement to this effect shall be included in the authorization mentioned under Sub-Para(b) above as well as in the Letter of Bid and in the Form of Contract Agreement (in case of a successful bid); and
      5.  A copy of the agreement entered into by the joint venture partners shall be submitted with the bid stating the conditions under which it will function, its period of duration, the persons authorized to represent and obligate it and which persons will be directly responsible for due performance of the  Contract and can give valid receipts on behalf of the joint venture, the proportionate participation and corresponding duties & responsibilities of the several firms forming the joint venture, and any other information necessary to permit a full appraisal of its functioning. No amendments/modifications whatsoever in the joint venture agreement shall be agreed to between the joint venture partners without prior written consent of the Employer
    3. The Bidder shall furnish, as part of its Bid, all those documents establishing the eligibility in conformity to the terms and conditions specified in the Bidding Documents for all material, equipment and works which the Bidder proposes to execute
    4. The documentary evidence of conformity of the material, equipment and works to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of
      1. A detailed description of the work methodology, approach, schedule and resources to be mobilized at site
      2.  any other procurement specific documentation requirement as stated in the BDS
    5. The Bidder shall furnish in the Letter of Bid name(s) of the potential DAAB member(s) and attach their curriculum vitae. The list of potential DAAB member(s) proposed by the Employer (Contract Data 21.1) and by the Bidder (Letter of Bid) shall be subject to mutual review and agreement of the Parties in accordance with Sub-Clause 21.1 of the Conditions of Contract, and shall form the basis for the constitution of the DAAB in the event of Contract award.
  3. Documents Establishing Eligibility and Qualification of the Bidder
    1.  The bidder shall furnish, as part of its bid, all those documents establishing the bidder’s eligibility to participate in the bidding process and/or its qualification to perform the contract if its bid is accepted
    2.  The documentary evidence of the bidder’s eligibility to bid shall establish to the satisfaction of the Procuring agency/Employer that the bidder, at the time of submission of its bid, is from an eligible country as defined in Section-V titled as “Eligible Countries”.
    3. The documentary evidence of the bidder’s qualification to perform the contract if its bid is accepted shall establish to the satisfaction of Procuring agency/Employer that
      1. The bidder has the financial and technical capability necessary to perform the Contract, meets the qualification criteria specified in Section- III, Evaluation and Qualification Criteria
      2. In the case of a bidder not doing business within Pakistan, the bidder is or will be (if awarded the contract) represented by a local bidder (Joint Venture) in accordance with the PEC works bylaws, and in case of award of works such foreign firm is required to participate in the execution of works to carry out its obligations as prescribed in the Conditions of Contract and /or Technical Specifications.
      3. That the bidder meets the qualification criteria listed in Section-III, Evaluation and Qualification Criteria and BDS.
  4. Letter of Bid and Schedules
    1. The Bidder shall fill the Form of Bids furnished in the bidding documents. The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
  5. Bid Prices
    1. The bid prices quoted by the bidder in the  Bidding Forms, Bill of Quantities and in the Schedules to bid shall conform to the requirements specified below or exclusively mentioned hereafter in the bidding documents.
    2. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. If a Price Schedule shows items listed but not priced, their prices shall be construed to be included in the prices of other items in the Bill of Quantities and will not be paid for separately by the Procuring agency/Employer. 
    3. The Bid price to be quoted in the Form of Bid in accordance with ITB 11 shall be the total price of the bid
    4. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract.
    5. If so specified in ITB 1.1, bids may be invited for individual lots (contracts) or for any combination of lots (packages).
    6. Prices quoted by the Bidder shall either be fixed or adjustable during the Bidder’s performance of the contract if specified in the BDS.
    7. All duties, taxes, and other levies payable by the Contractor under the Contract, or for any other cause, as of the date twenty-eight (28) days prior to the deadline for submission of bids, shall be included in the rates and prices and the total bid price submitted by the bidder.
  6. Currencies of Bid and Payment
    1. The unit rates and the prices shall be quoted by the Bidder entirely Pakistani Rupees. A Bidder expecting to incur expenditures in other currencies for inputs to the Works supplied from outside the Employer’s country (referred to as the “Foreign Currency Requirements”) shall indicate in Table III of Schedule-A to Bid the proportion of the Bid Price (excluding Provisional Sums) needed by him for the payment of such Foreign Currency Requirements; in such case the unit rates and the prices shall be quoted by the Bidder in Equivalent Pakistani Rupees. Comparison of Bids and tie of Bid shall be treated in accordance with the PP rules 2026, rule no. 42.
  7. Documents Comprising the Technical Proposal
    1. The bidder shall furnish a Technical Proposal including a statement of work methods, equipment, personnel, schedule and any other information as stipulated in Section IV – Bidding Forms, in sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the work requirements and the completion time.
  8. Bid Validity Period
    1. Bids shall remain valid for the period specified in the BDS after the bid submission deadline prescribed by the Procuring agency/Employer. A bid valid for a shorter period shall be rejected by the Procuring agency/Employer as non-responsive. The period of bid validity will be determined from the complementary bid securing instrument i.e. the expiry period of bid security or bid securing declaration as the case may be. 
    2. Under exceptional circumstances, prior to the expiration of the initial Bids/Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids/Bid. Such request for extension of the period of bid validity shall be carried out in accordance with the PP rules 2026, rule no. 37 i.e. Bid Validity.
  9. Bid Security or Bid Securing Declaration
    1. Pursuant to ITB 10.1 unless otherwise specified in the BDS, the bidder shall furnish as part of its bid, a Bid Security in accordance with the PP Rules 2026, rule no. 36 in the amount and currency specified in the BDS or Bid Securing Declaration as specified in the BDS in the format provided in Section IV (Standard Bidding Forms). 
      In case Procuring agency/Employer is inviting bids in lots / packages, the bidder shall be required to submit his bid security against the respective lot/ package for which he is submitting his bid.
      Until the development of functionality of auto verification of financial instrument in EPADS v2.0, the scanned copy of bid security or bid securing declaration, as the case may be, shall be uploaded on EPADS v2.0 whereas the original instrument to be submitted to the procuring agency before closing of bid submission deadline, failing which shall result in rejection of Bid as non-responsive.
    2. The Bid Security shall be denominated in the local currency or in another freely convertible currency, and it shall be in the form specified in the BDS which shall be in any of the following:
      1. A bank guarantee, an irrevocable letter of credit issued by a Scheduled bank in the form provided in the Bidding Documents or another form acceptable to the Procuring agency/Employer and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bid Validity is extended. In either case, the form must include the complete name of the bidder; 
      2. A cashier’s or certified cheque; or
      3. Another security as indicated in the BDS.
    3. The Bid Security or Bid Securing Declaration shall be in accordance with the Form of the Bid Security or Bid Securing Declaration included in Schedule to Bid or another form approved by the Procuring agency/Employer prior to the bid submission.
    4. The Bid Security shall be payable promptly upon written demand by the Procuring agency/Employer in case any of the conditions listed in ITB 16.9 are invoked.
    5. Any bid not accompanied by a Bid Security or Bid Securing Declaration in accordance with ITB 16.1 or 16.3 shall be rejected by the Procuring agency/Employer and shall be declared as non-responsive bid, pursuant to ITB 25.
    6. Unsuccessful bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Procuring agency/Employer pursuant to ITB 15. The Procuring agency/Employer shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
      1. The expiry of the Bid Security;
      2. The entry into force of a procurement contract and the provision of a performance security (or guarantee), for the performance of the contract if such a security (or guarantee), is required by the Biding documents;
      3. The rejection by the Procuring agency/Employer of all Bids;
      4. The withdrawal of the bid prior to the deadline for the submission of bids, unless the biding documents stipulate that no such withdrawal is permitted.
    7. The successful bidder’s Bid Security will be discharged upon the bidder signing the contract pursuant to ITB 38, or furnishing the performance security (or guarantee), pursuant to ITB 39.
    8. The Bid Security may be forfeited or the Bid Securing Declaration executed:
      if a Bidder:
      1. Withdraws its Bid during the period of Bid Validity as specified by the Procuring agency/Employer, and referred by the bidder on the Form of Bid except as provided for in ITB 15.2; or 
      2. In the case of a successful bidder, if the bidder fails:
        1. to sign the contract in accordance with ITB 38; or
        2. to furnish performance security (or guarantee) in accordance with ITB 39.
    9. In case of Bid Security issued by the foreign bank is allowed by the Procuring agency/Employer, the same should be counter guaranteed by a corresponding bank in Pakistan. Furthermore, in case of joint venture, it should be in the name of Joint venture to ensure joint responsibility. In case the JV is not legally constituted at the time of bid submission, the bid security or bid securing declaration shall be in the names of Joint Venture or Lead/either Firm of the JV or in ratio of shares of the individual JV partners, submitting the bid.
  10. Withdrawal of Bids
    1. Before bid submission deadline, any bidder may withdraw, substitute, or modify its bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and the corresponding must accompany the respective written notice. 
  11. Format and Signing of Bid
    1. The Bidder shall prepare and submit Bids through EPADS with due diligence after carefully reading all the terms and condition before bid submission deadline.

D. SUBMISSION OF BIDS

  1. Submission of Bids
    1. All bids shall be submitted through EPADS v2.0.
  2. Deadline for Submission of Bids
    1. All bids shall be received through EPADS v2.0 not later than bid submission deadline as specified in the BDS.
    2. The Procuring agency/Employer may, under exceptional circumstances and at its discretion, extend the deadline for the submission of bids, pursuant to PP Rules 2026, rule no.39 Extension of Time for submission of bid, by amending the Bidding Documents in accordance with ITB 7, in which case all rights and obligations of the Procuring agency/Employer and bidders previously subject to the deadline will thereafter be subject to the new deadline.
  3. Withdrawal, Substitution and Modification of bids
    1. A bidder may substitute or modify his bid after it has been submitted, provided that written notice of the substitution or modification of the bid, is received by the Procuring agency/Employer prior to the deadline for submission of bids.
    2. Revised bid may be submitted after the substitution or modification made in the original bid in accordance with ITB 20.1. 

E. OPENING AND EVALUATION OF BIDS

  1. Opening of Bids
    1. The Procuring Agency will open bids in accordance with the PP rules 2026, rule no 40 and as specified in the BDS.
  2. Confidentiality
    1. Information relating to the examination, clarification, evaluation and comparison of bids and recommendation of contract award shall not be disclosed to bidders or any other persons not officially concerned with such process until the time of the announcement of the respective evaluation report.
  3. Clarification of Bids
    1. Clarification of Bidding Documents shall be carried out in accordance with the PP Rules 2026, rule no 38 i.e. Clarifications.
    2. The alteration or modification in the bid which in any case affect the following parameters will be considered as a change in the substance of a bid:
      1. evaluation & qualification criteria;
      2. required scope of work;
      3. contract price;
      4. all securities requirements;
      5. tax requirements;
      6. terms and conditions of bidding documents.
      7. change in the ranking of the bidder
  4. Preliminary Examination of Bids
    1. Prior to the detailed evaluation of bids, the Procuring agency/Employer will determine whether each bid:
      1. meets the eligibility criteria defined in ITB 3 and ITB 4;
      2. has been prepared as per the format and contents defined by the Procuring agency/Employer in the bidding documents;
      3. has been properly signed; 
      4. is accompanied by the required securities; and 
      5. is substantially responsive to the requirements of the bidding documents. 
        The Procuring agency/Employer's determination of a bid's substantial responsiveness will be based on the contents of the bid itself.
    2. A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding Documents, without material deviation or reservation. A material deviation or reservation is one that: - 
      1. affects in any substantial way the scope, quality, or performance of the Works; 
      2. limits in any substantial way, inconsistent with the bidding documents, the Procuring agency/Employer's rights or the bidders’ obligations under the Contract; or 
      3. if rectified, would affect unfairly the competitive position of other bidders presenting substantially responsive bids.
    3. The Procuring agency/Employer will confirm that the documents and information specified under ITB 9, 10 and 11 have been provided in the bid. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Bidders, the bid shall be rejected.
    4. The Procuring agency/Employer may waive-off any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
      Explanation: A minor informality, non-conformity or irregularity is one that is merely a matter of form and not of substance. It also pertains to some of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the works. The Procuring agency/Employer either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is advantageous to the Procuring agency/Employer. Examples of minor informalities or irregularities include failure of a bidder to –
      1. Submit the number of copies of signed bids required by the invitation;
      2. Furnish required information concerning the number of its employees;
      3. the firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature.
    5. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer may request the bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Technical Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any such aspect of the technical Proposal linked with the ranking of the bidders. Failure of the bidder to comply with the request may result in the rejection of its bid.
    6. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer shall rectify quantifiable nonmaterial nonconformities or omissions related to the Financial Proposal. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of the missing or nonconforming item or component.
    7. If a bid is not substantially responsive, it will be rejected by the Procuring agency/Employer and may not subsequently be evaluated for complete technical responsiveness.
  5. Examination of Terms and Conditions; Technical Evaluation
    1. The Procuring agency/Employer shall examine the bid to confirm that all terms and conditions specified in the GCC and the PCC have been accepted by the bidder without any material deviation or reservation.
      For this purpose:
      “Deviation” means departure from the requirements specified in the Bidding Document.
      “Reservation” means setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding Document.
    2. The Procuring agency/Employer shall evaluate the technical aspects of the bid submitted in accordance with ITB 28, to confirm that all requirements specified in Section VI – Works Requirement, Technical Specifications of the Bidding Documents have been met without material deviation or reservation.
    3. If after the examination of the terms and conditions and the technical evaluation, the Procuring agency/Employer determines that the bid is not substantially responsive in accordance with ITB 25, it shall reject the bid.
  6. Correction of Arithmetic Errors
    1. Bids determined to be substantially responsive will be checked for any arithmetic errors.  Errors will be corrected as follows: -
      1. if there is a discrepancy between unit prices and the sub-total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the sub-total price shall be corrected, unless in the opinion of the Procuring agency/Employer there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected;
      2. Subtraction of sub-totals, the sub-totals shall prevail, and the total shall be corrected; and 
      3. where there is a discrepancy between the amounts in figures and in words, the amount in words will govern.
      4. Where there is discrepancy between grand total of price schedule and amount mentioned on the Form of Bid, the amount referred in Price Schedule shall be treated as correct subject to elimination of other errors. 
    2. The amount stated in the Bid will, be rectified by the Procuring agency/Employer in accordance with the above procedure for the correction of errors and, with, the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount, its bid shall be rejected after forfeiture of Bid Security or execution of the Bid Securing Declaration, as the case may be, in accordance with ITB 39.3.
  7. Conversion to Single Currency
    1. Comparison of bids quoted in different currencies and conversion of bids into a single currency shall be carried out in accordance with the PP Rule 2026, rule no. 42(2) as specified in the BDS  
  8. Evaluation of Bids
    1. The Procuring agency/Employer shall evaluate and compare only the bids determined to be substantially responsive, pursuant to ITB 25.
    2. In evaluating the Technical Proposal of each Bid, the Procuring agency/Employer shall use the criteria and methodologies listed in the BDS and in terms of works requirement. No other evaluation criteria or methodologies shall be permitted.
    3. The Procuring agency/Employer’s evaluation of a bid will take into account:
      1. the bid price, excluding provisional sums and the provision, if any, for contingencies in the summary bill of quantities, but including day work items, where priced competitively;
      2. converting the amount resulting from applying above, if relevant, to a single currency in accordance with ITB 27;
    4. The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in bid evaluation.
    5. If these bidding documents allow bidders to quote separate prices for different lots, and the award to a single bidder of multiple lots, the methodology of evaluation to determine the lowest evaluated lot combinations in the Form of Bid, is specified in the BDS.
    6. If the bid, which results in the Evaluated Bid Price (Successful Bid), is seriously unbalanced or front loaded in the opinion of the Employer, the Employer may require the Bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated Contract payments, the Employer may require that the amount of the performance security be increased at the expense of the Bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under the Contract.
      Explanation:
      “Unbalanced” or “front-loaded” bids consist of deliberately submitting bids with artificially high prices or unit rates for the early stages of a construction project, offset by artificially low prices or unit rates for the later stages of the project, to improve the contractor’s cash flow.
  9. Domestic Preference
    1. If the BDS so specifies, the Procuring agency/Employer will grant a margin of preference to the domestic contractor in line with the rules, regulations, regulatory guides or instructions issued by the Authority from time to time. 
  10. Determination of Successful Bid
    1. The Procuring agency/Employer shall compare the evaluated bids in accordance with the predefined bidding procedure, of all substantially responsive bids to determine the Successful bidder.
  11. Qualification of Bidder
    1. The Procuring agency/Employer shall determine to its satisfaction whether the bidder is substantially responsive and whose bid is declared as Successful bid either continues to meet (if prequalification applies) or meets (if post-qualification applies) the qualifying criteria specified in Evaluation and Qualification Criteria.
      Note: In case of international bidding, the parameters for incorporation or licensing within Pakistan may be fulfilled as part of post qualification.
    2. The determination shall be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 10.
    3. Prior to contract award, the Procuring agency/Employer will verify that the successful bidder (including each member of a JV) is not blacklisted/debarred. The Procuring agency/Employer will conduct the same verification for each sub-contractor proposed by the successful bidder.
  12. Sub-Contractors
    1. The bidder shall provide details regarding any specialized sub-contractor to the Procuring agency/Employer. In case change of sub-contractors, the bidder shall promptly notify the Procuring agency/Employer and obtain approval for replacement of sub-contractors.
    2. Bidders may propose sub-contracting up to the percentage of total value of contracts or the volume of works as specified in the BDS.
  13. Abnormally Low Financial Bid
    1. A procuring Agency may reject abnormally low bids in accordance with the PP Rules 2026 rule no. 43. The decision of the Procuring agency/Employer to reject a bid and reasons for the decision shall be recorded in the procurement proceedings and promptly communicated to the bidder concerned. Moreover, the Procuring agency/Employer shall not incur any liability solely by rejecting abnormally bid 
      An abnormally low Bid means, a Bid containing Bid price that is less or lesser than twenty five percent (25%) of the Procuring agency/Employer’s estimate
    2. The Procuring agency/Employer will determine to its satisfaction whether the bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily, in accordance with the criteria listed in ITB 10.
    3. The determination will take into account the bidder’s financial and technical capabilities.  It will be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    4. documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 10, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    5. Procuring agency/Employer may seek “Certificate for Independent Price Determination” from the bidder and the results of reference checks may be used in determining award of contract.
      Explanation: The Certificate shall be furnished by the bidder. The bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc. 
    6. An affirmative determination will be a prerequisite for award of the contract to the bidder. A negative determination will result in rejection of the bidder’s bid, in which event the Procuring agency/Employer will proceed to the next ranked bidder to make a similar determination of that bidder’s capabilities to perform satisfactorily.

F. AWARD OF CONTRACT

  1. Criteria of Award
    1. Subject to ITB 34 and 35, the Procuring agency/Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has been declared as Successful Bidder, provided that such bidder has been determined to be:
      1. eligible in accordance with the provisions of ITB 3;
      2. is determined to be qualified to perform the Contract satisfactorily; and 
      3. Successful negotiations have been concluded, if any.
  2. Negotiations
    1. The Committee of the Procuring agency/Employer may negotiate with the Successful Bidder in accordance with PP Rules 2026 rule no. 26(3).
  3. Procuring agency/Employer’s Right to reject All Bids
    1. The procuring agency has the right to reject all bids in accordance with the PP Rules 2026 rule no. 45. However, the Authority (i.e. PPRA) may call from the Procuring agency/Employer the justification of those grounds.
  4. Notification of Award
    1. The procuring agency shall announce and publish the evaluation result in accordance with the PP Rules 2026, rule no. 48.
    2. Where no complaints have been lodged, the bidder whose bid has been accepted will be notified of the award by the Procuring agency/Employer prior to expiration of the bid validity period through EPADS. However, the Procuring agency/Employer shall not award any procurement contract at least for five (05) days after the announcement of final evaluation report. The notification letter (herein after and in the condition of the contract and contract form called “Letter of Acceptance” successful bidder in consideration for the execution and completion of the works as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price).
    3. The notification of award will constitute the formation of the Contract, subject to the bidder furnishing the Performance Security (or guarantee) in accordance with ITB 39 and signing of the contract in accordance with ITB 38. 
    4. Upon the successful bidder’s furnishing of the performance security (or guarantee) pursuant to ITB 39, the Procuring agency/Employer will promptly notify each unsuccessful bidder, the name of the successful bidder and the Contract amount and will discharge the Bid Security or Bid Securing Declaration of the bidder(s) pursuant to ITB 16. 
  5. Signing of Contract
    1. Promptly after notification of award, Procuring agency/Employer shall send the successful bidder the draft agreement, incorporating all terms and conditions as agreed by the parties to the contract.
    2. Immediately after the Redressal of grievance by the GRC, and after fulfillment of all conditions precedent of the Contract Form, the successful bidder and the Procuring agency/Employer shall sign the contract.
    3. Where no formal signing of a contract is required, work order issued to the bidder shall be construed to be the contract.
  6. Performance Security (or Guarantee)
    1. After the receipt of the Letter of Acceptance, the successful bidder, within the specified time, shall deliver to the Procuring agency/Employer a Performance Guarantee in the amount and in the form stipulated in the BDS and PCC, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract.
    2. If the Performance Guarantee is provided by the successful bidder and it shall be in the form specified in the BDS which shall be in any of the following:
      1. certified cheque, cashier’s or manager’s cheque, or bank draft;
      2. irrevocable letter of credit issued by a scheduled bank of Pakistan or in the case of an irrevocable letter of credit issued by a foreign bank, the letter shall be confirmed or authenticated by a scheduled bank of Pakistan;
      3. bank guarantee confirmed by a reputable local bank or, in the case of a successful foreign bidder, bonded by a foreign bank; or
      4. surety bond callable upon demand issued by any reputable surety or insurance company.
        Any Performance Guarantee submitted shall be enforceable in Pakistan.
    3. Failure of the Most Advantageous Bidder to comply with the requirement of ITB 40 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security or declare blacklisted (in case bid securing declaration is submitted) in which event the Procuring agency/Employer may make the award to the next most advantageous bidder or reinitiate the procurement process afresh (as a case may be).
  7. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted
  8. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted.
  9. Corrupt & Fraudulent Practices
    1. Procuring agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.

G. GRIEVANCE REDRESSAL & COMPLAINT REVIEW MECHANISM

  1. Grievance Redressal
    1. Grievance Redressal shall be carried out in accordance with the PP Rules 2026, rule no. 65 i.e. Redressal of grievances by the procuring agency and “Redressal of Grievances Regulations 2021”.

H. MECHANISM OF BLACKLISTING

  1. Mechanism of Blacklisting
    1. The Procuring agency/Employer shall proceed Blacklisting of Bidders/Contractors in accordance with PP Rules 2026, rule no.25 i.e. Blacklisting and “Blacklisting and Debarment of Bidders or Contractors Regulations 2024. 

📑 Bid Data Sheet (BDS)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

Bid Data Sheet (BDS)

The following specific data for the procurement of works shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITBs).  Whenever there is a conflict, the provisions herein shall prevail over those in ITBs.

A. Introduction

ITB Number   
Amendments of, and Supplements to, Clauses in the Instruction to Bidders

ITB Number 1.1

Name of Procuring agency/Employer: Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC))

The subject of procurement is: Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Period for completion of the works 8 Months

Commencement date execution of the works: 15 Days

Type of Procurement: Local

ITB Number 2.1

Financial year for the operations of the Procuring agency/Employer: 2026-27Name of Project [insert: name and summary description of the Project if any] 

Name of financing institution: [insert: name if any]

Name and identification number of the Contract: P92743 

ITB Number 3.1

JV/Consortium or Association Allowed: Yes

Maximum number of members in the joint venture shall be: 2.

B. Bidding Documents

ITB Number 6.4

The Bidders may seek clarifications through EPADS v2.0: Last Clarification Date: Thursday, August 27, 2026
Pre-Bid Meeting: Thursday, August 27, 2026 12:05 PM

C. Preparation of Bids

ITB Number 8.1

The Language of all correspondences and documents related to the Bid is: English

ITB Number 5.1 & 9.1 

The following documents must be included to constitute the Bid

 

  1. All Supporting Documents as requested in eligibility/mandatory and evaluation criteria.

ITB Number 9.4 (b)

Other procurement specific documentation requirements are: 

Sign and stamp bidding documents

Power of atorney

Aggrement (in case of JV)

 

 

ITB Number 12.4

The Bid price will be/will not be subject to the price adjustment Yes
Price Adjustment Annexure is attached in the Annexure Section with the name of Adjustment Data
.

ITB Number 12.6

The Bid price shall be adjusted in accordance with Schedule-A to Bid – “Schedule of Adjustment Data” if available. 

ITB Number 13.1

Bidders to quote entirely in Pak rupees (PKR)

Schedule of Adjustment Data for Local Currency (LC)

Index Code Index Description Source of Index Weighting
1 Non-adjustable --- 0.3
2 Local Labour PBS Monthly Statistical Bulletin 0.15
3 Bitumen PBS Monthly Statistical Bulletin 0.10
4 Cement PBS Monthly Statistical Bulletin 0.15
5 Steel PBS Monthly Statistical Bulletin 0.15
6 High Speed Diesel (HSD) Pakistan State Oil 0.15
Total Pak Rupees 1.00

ITB Number 15.1

The Bid Validity period shall be 120 Days days.

ITB Number 16.1

The amount of Bid Security shall be (insert amount)  

The currency of the Bid Security shall be: PKR.

ITB Number 16.2

The Bid Security shall be in the form of: Pay Order, Call at Deposit, Bank Guarantee, Demand Draft

D. Submission of Bids

ITB Number 19.1

The deadline for Bid submission is: Monday, September 7, 2026 11:00 AM
Address for submission of Original Bid Security: PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

ITB Number  21.1
The Bid opening shall take place at: EPADS v2.0
Day : Monday
Date: September 07, 2026
Time : 11:30 AM

ITB Number 27.1
The currency that shall be used for Bid evaluation and comparison purposes to convert all Bid prices expressed in various currencies is: PKR Only
The source of exchange rate shall be: Nil
The date of exchange rate shall be: Nil

ITB Number 28.2 & 28.5
Least Cost Based Selection (LCBS)

see Evaluation Criteria

ITB Number 29.1
Domestic preference to apply.
Domestic preference: Yes
The Percentage of Domestic Preference is 100%
 
Preference to domestic or national suppliers or contractors shall be provided in accordance with policies of the Federal Government and/or in accordance with the regulations issued by the Authority.
If Yes, The percentage for the domestic preference alongwith calculation formula is provided in the evaluation and qualification criteria.

ITB Number 32.2
Sub-contracting is allowed? : Yes

30 % of the total value of the contract.

39.1    The Performance Security (or guarantee) shall be 10.00%
39.2    The Performance Security (or guarantee) shall be in the form of: Pay Order,Banker's Cheque,Bank Guarantee

Eligibility Criteria

All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.

Required Registration
NADRA CITIZENSHIP (CNIC/NICOP)
FBR (NTN)
PEC
Eligibility CriteriaDocument
MANDATORY REQUIREMENTS PEC Registration in C-2 Category or above. Completed 1 similar nature civil infrastructure work with a minimum project value of PKR 600 million with in the last 10 years. Blacklisting Affidavit on non-judicial stamp paper. Active Federal and provincial tax Certificate. Valid Bid Security • Above mandatory is not attended by firms, then they will not be considered for evaluation. • If Joint Venture, each partner must individually meet all the above mandatory critYes

Evaluation Criteria

Least Cost Based Selection (LCBS)

Weightage

Technical Evaluation %
100
Technical Marks100
Passing Marks70
General Experience (Note: • *(The building, dam, irrigation canals and telecom projects will not be considered as similar nature projects. • No marks will be given in the absence of documentary proof.)
Firms’ registration with PEC since last 10 years. 0.5 marks for each year’s registration. (Qualitative)(Doc Required)5
Completion / Taking Over Certificate from client must be provided. A Projects of similar nature civil Infrastructure works of minimum project value of PKR 600 million completed within last 10 years in an industrial zone. (Qualitative)(Doc Required)

  2 Numbers of projects or more   (20)

  1 Number of Project   (10)

20
Completion / Taking Over Certificate from client must be provided. A Projects of similar nature civil Infrastructure works of minimum project value of PKR 600 million completed within last 10 years. 1 Project = 15 Marks (Quantitative)(Doc Required)15
Performance Certificate or any documentary proof showing the project / work is in progress must be provided. Ongoing similar nature civil infrastructure work of minimum value of PKR 500 million, awarded not later than 2025. (Qualitative)(Doc Required)

  2 Numbers of Project or more   (15)

  1 Number of Project   (8)

15
B. Personnel Capabilities (Marks will be awarded based on the qualification, experience, and current employment status of key technical personnel. Only individuals currently registered with Pakistan Engineering council (PEC) or holding valid diplom
Graduate Engineers registered with PEC. PEC detail must be provided. • Registered Engineers  10 years or above experience (Qualitative)(Doc Required)

  1 Civil & 1 Electrical Engineer   (12)

  1 Civil or 1 Electrical   (6)

12
Site Supervisors – Degree details must be provided (2 Nos)  Minimum DAE with 12 years’ experience / BE or BS with minimum 7 years’ experience. (Qualitative)(Doc Required)

  1 Civil and 1 Electrical   (4)

  1 Civil or 1 Electrical   (2)

4
Other Personnel  Minimum DAE Civil with 12 years’ experience / BE or BS with 7 years’ experience. (Qualitative)(Doc Required)

  Quantity Surveyor and Land Surveyor   (4)

  Quantity Surveyor or Land Surveyor   (2)

4
C. Equipment Capability: Marks will be awarded based on the availability, ownership status and condition of equipment required for the execution of the project. Bidders must provide the details as per Schedule-E along with documentary evidence such a
Tandem Roller - 1 Nos (Quantitative)(Doc Required)2
Grader - 1 Nos (Quantitative)(Doc Required)2
Excavator - 1 Nos (Quantitative)(Doc Required)2
Loader - 1 Nos (Quantitative)(Doc Required)1
Dumpers - 1 Nos (Quantitative)(Doc Required)2
Water Browser - 1 Nos (Quantitative)(Doc Required)1
D. Financial Soundness Audit Accounts Report of last 3 years should be submitted
Average Annual turnover in last 3 years (as per last 3 years audited accounts)  Full marks for average turnover of PKR 600 million or above.  For value below 600 million, marks will be awarded as: (Average Turnover / 600) x 5 (Qualitative)(Doc Required)5
Net Worth (as per latest audited balance sheet)  Full Marks for positive net worth of PKR 500 million or above  For value below PKR 500 million, marks will be awarded as: (Net Worth / 500) x 5 (Qualitative)(Doc Required)5
E. Construction Schedule
Complete Work Schedule item wise starting from 1st October 2026 should be submitted. (Schedule develop on MS Project or Primavera project Planner P-6 with detailed milestones, start date end date. A comprehensive and clear schedule with well-defined milestones will be awarded full marks. Partial marks may be given for incomplete or unclear schedule (Qualitative)(Doc Required)5

Jobs/Lots

Jobs Without Lots :

JobDelivery ScheduleQuantityBid Security
Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze
Address: Naushahro Feroze Industrial parkSchedule: 8 months from commencement dateQuantity: 1/job
1/job 5000000 PKR

Work Specifications and Market Rates

Jobs Without Lots :

Job: Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Specifications / Requirements:

Sr. NoSr. Nr.DescriptionUnitQtyRate Amount
1Bill # 1 Road Network      
2MES 1-27Clearing & Grubbing Clearing and Grubbing, all as specifiedCu.m3200131.91Rupees Thirty One and Ninety One Paisa Only1021151.91
4MES 1-28NGC Compaction of Natural Ground upto 95% Modified AASHTO density all as specified.Sq.m3569.6930.91Rupees Thirty and Ninety One Paisa Only110339.1179
6MES 1-31Embankment Making Embankment, with the specified/approved soil obtained from barrow excavation included loading within 5KM, compaction in 95% Modified AASHTO density, and dressing to required profile shape as specified.Cum26695995.54Rupees Nine Hundred Ninety Five and Fifty Four Paisa Only26575940.3
8MES 2-34Sand Layer Providing Sand Cushion in layer as specified, under concrete road, hard standings and Runways etc.Cu.m18612863.77Rupees Two Thousand Eight Hundred Sixty Three and Seventy Seven Paisa Only5329475.97
10MES 2-12Sub Base Bottoming /sub base of any thickness as specified using Soil Aggregate of CBR 30%, laid and compacted to 98% Modified AASHTO density by appropriate compaction equipment and roller.Cu.m17604034.94Rupees Four Thousand Hundred Thirty Four and Ninety Four Paisa Only7101494.4
12MES 2-17Aggregate Base Course Aggregate Base Course, of any thickness as specified, laid and compacted to 100% Modified AASHTO density, by appropriate compaction equipment and roller.Cu.m2299.3425065.06Rupees Five Thousand Hundred Sixty Five and Six Paisa Only11646305.19052
14MES 2-27Asphalt Base Course Providing and laying, Asphaltic Base Course of any thickness, as specified, with asphalt cement 60/70 or 80/100 using JMF (except prime coat).Ton379216243.5Rupees Sixteen Thousand Two Hundred Forty Three and Fifty Paisa Only61595352
16MES 2-29Prime Coat Prime Coat, on Base Course surfaceSq.m20691277.55Rupees Two Hundred Seventy Seven and Fifty Five Paisa Only5742787.05
17MES 12-17Paver 60mm Providing and laying, PCC Paving stone, 60 mm thick in natural colour, as in floors, streets, public parking etc., any pattern and shape, (Hydraulically compressed), laid and jointed in sand, including 50 mm thick sand bed as laying course, all as specifiedSq.m1763.21610.7Rupees One Thousand Six Hundred Ten and Seventy Paisa Only2839986.24
19MES 12-19Paver 80mm Providing and laying Tuff Pavers, having 7000 PSI, crushing strength of approved manufacturer, over 2" to 3" sand cushion i/c grouting with sand in joints i/c finishing to require slope . complete in all respect. (50% Grey / 50% Coloured)80-mm thickSq.m626.23052004.73Rupees Two Thousand Hundred Four and Seventy Three Paisa Only1255423.070265
21MES 15-75Road Marking paint on any new or old surface by using mechanical means, 1st coat.Ru.m1788495.95Rupees Four Hundred Ninety Five and Ninety Five Paisa Only886758.6
23MES 2-47Reflectorized Plastic Pavement Stud (10cm x 7.5 cm x 2 cm), Raised type.Each49555.1Rupees Five Hundred Fifty Five and Paisa Only27199.9
25MES 2-48Reflectorized Plastic Pavement Stud (10cm x 7.5 cm x 2 cm), Flush type.Each85985.53Rupees Nine Hundred Eighty Five and Fifty Three Paisa Only83770.05
27MES 3-52Kerb Stone (350x300x150)mm Providing and laying Precast PCC Kerb-stone, size 350 x 300 x 150 mm including setting, jointing and pointing in CM 1:4 all as specified.Ru.m83731085.63Rupees One Thousand Hundred Eighty Five and Sixty Three Paisa Only9089979.99
29MES 3-5Providing and laying of PCC with 3000 psi compressive cylindrical strength in all non- structural elements including formwork.Cu.m19023925.72Rupees Twenty Three Thousand Nine Hundred Twenty Five and Seventy Two Paisa Only4545886.8
31MES 3-2Providing and laying of CC 1:4:8 using Crushed or Broken Stone as specified, in FoundationCu.m50215617.42Rupees Fifteen Thousand Six Hundred Seventeen and Forty Two Paisa Only7839944.84
33MarketTraffic road signs catagory -1, including fixing in cement concrete 1:2:4 complete as per directions of Engineer-in-ChargeEach1016945.37Rupees Sixteen Thousand Nine Hundred Forty Five and Thirty Seven Paisa Only169453.7
35MarketTraffic road signs catagory -2, including fixing in cement concrete 1:2:4 complete as per directions of Engineer-in-ChargeEach521668.06Rupees Twenty One Thousand Six Hundred Sixty Eight and Six Paisa Only108340.3
37MarketTraffic road signs catagory -3(a), including fixing in cement concrete 1:2:4 complete as per directions of Engineer-in-ChargeEach335638.48Rupees Thirty Five Thousand Six Hundred Thirty Eight and Forty Eight Paisa Only106915.44
39 REHANDLING, REUSE AND RECONDITIONING OF EXISTING ROAD PAVEMENT     
40MarketRemoval/rehandling of the existing road pavement sub-base and aggregate base materials already available at site, including loosening, scarifying, excavation/removal to the required depth, loading, transportation and stacking/stockpiling at an approved location within the site as directed by the Engineer-in-Charge, without damage to the underlying formation. After completion of the required earth filling and raising of road level, the existing sub-base and aggregate base materials shall be brought back/rehandled and reused, including spreading, grading, reshaping to the required lines, levels, grades and cross-fall, breaking of lumps, removal of unsuitable material, addition of approved material if required, watering to achieve Optimum Moisture Content (OMC), thorough mixing and compaction to 98–100% Modified AASHTO Maximum Dry Density (MDD) using approved compaction equipment, complete in all respects as directed by the Engineer-in-Charge.Cum56451900Rupees One Thousand Nine Hundred Only10725500
41Bill No. 2 BOX CULVERT      
42 Excavation     
43 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
44MES 1-7upto 1.5 meter liftCu.m104375Rupees Three Hundred Seventy Five Only39000
45MES 1-8Same as above but 1.5 M to 3 M depth.Cu.m124735Rupees Seven Hundred Thirty Five Only91140
46MES 1-9Same as above but 3 M and upto 6 M depthCu.m136814Rupees Eight Hundred Fourteen Only110704
47MES 1-10Same as above but 6 M and upto 9 M depthCu.m59866Rupees Eight Hundred Sixty Six Only51094
49 Concrete Work in Foundation P.C.C (1:4:8)     
50MES 3-2Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.Cu.m11.0117162Rupees Seventeen Thousand One Hundred Sixty Two Only188953.62
52 R.C.C. Concrete in Foundation (3000 Psi)     
53MES 3-7Providing and laying of RCC with 3000 psi compressive cylindrical strength in different structural elements (foundation etc.) including form work all as specified. Reinforcement measured and paid separately.Cu.m0.8824684Rupees Twenty Four Thousand Six Hundred Eighty Four Only21721.92
54 R.C.C. Concrete in Foundation, column, footing (3500 Psi)     
55MES 3-17Providing and laying of RCC with 3500 psi compressive cylindrical strength all as specified in foundations, independent column footings, and rigid floors etc. including form work as specified. Reinforcement measured and paid separately.Cu.m58.331680Rupees Thirty One Thousand Six Hundred Eighty Only1846944
57 R.C.C. Wall, Roof Slab, Plinth Beam (3000 Psi)     
58MES 3-9Providing and laying of RCC with 3000 psi compressive cylindrical strength in different structural elements in roof slabs, landings, walls, plinth beams and bands etc. all as specified including form work (reinforcement measured and paid separately).Cu.m40.7131581Rupees Thirty One Thousand Five Hundred Eighty One Only1285662.51
60 RCC Slab (3500 Psi)     
61MES 3-15Providing and laying of RCC with 3500 psi compressive cylindrical strength all as specified in roof slabs, landings, walls, plinth beams and bands, etc., including form work. Reinforcement measured and paid separately.Cu.m24.5438056Rupees Thirty Eight Thousand Hundred Fifty Six Only933894.24
63 Reinforcement Grade 60     
64MES 9-56Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . a) Ground floor Kg20157.7354Rupees Three Hundred Fifty Four Only7135825.8
66MES 3-28Providing and fixing of PVC water stopper 250mm wide and 10 mm thick.Ru.m1122777Rupees Two Thousand Seven Hundred Seventy Seven Only311024
67MES 3-55Form expansion joint 13mm thick in RCC roof or floor slabs etc., and fill in with bitumen grade 10-20.Ru.m207576Rupees Seven Thousand Five Hundred Seventy Six Only151520
68Bill No. 3 Water Course      
69 Excavation     
70 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
71MES 1-7upto 1.5 meter liftCu.m62375Rupees Three Hundred Seventy Five Only23250
72 Backfilling     
73MES 1-16Earth filling as in Ordinary or hard soil, filling in foundation, pipe trenches, shafts, wells, independent holes, under floors or around plinths etc., 1.5 M below or above Ground Level (GL), with spoil obtained from excavation in trenches/over areas within 50M including watering and compaction in 150 mm layer and dressing to required profile and shape.Cu.m377.79400Rupees Four Hundred Only151116
74 Lean Concrete (1:4:8)     
75MES 3-2Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.Cu.m25.8717162Rupees Seventeen Thousand One Hundred Sixty Two Only443981
77MES 4-2Burnt brick work, in walls 115 mm thick, laid and jointed in CM 1:4, straight or to curve with inner radius of 6m and over, upto G.F roof level.     
78a)in bedPer Cum5.512524271Rupees Twenty Four Thousand Two Hundred Seventy One Only133794
79b)on slopePer Cum16.699224271Rupees Twenty Four Thousand Two Hundred Seventy One Only405306
80Bill No. 4 Water Supply System      
81 Excavation     
82 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
83MES 1-7upto 1.5 meter liftCu.m2217401.25Rupees Four Hundred One and Twenty Five Paisa Only889571.25
84 Backfilling     
85MES 1-16Earth filling as in Ordinary or hard soil, filling in foundation, pipe trenches, shafts, wells, independent holes, under floors or around plinths etc., 1.5 M below or above Ground Level (GL), with spoil obtained from excavation in trenches/over areas within 50M including watering and compaction in 150 mm layer and dressing to required profile and shape.Cu.m1095428Rupees Four Hundred Twenty Eight Only468660
86 Sand Bedding     
87MES 12-34Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidationby ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction and lift upto 5 feet (1 .52 m).Cu.m3333693.64Rupees Three Thousand Six Hundred Ninety Three and Sixty Four Paisa Only1229982.12
88 Lean Concrete (1:4:8)     
89MES 3-2Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.Cu.m83.2718363.34Rupees Eighteen Thousand Three Hundred Sixty Three and Thirty Four Paisa Only1529115.3218
91 Sluice Valve     
92 Sluice Valve, according to BSS-3464 class 150,(Table 18-1-6) flanged and drilled to BS, Table 18-1-10, complete with rubber packing, 80 mm dia, supply and fixing.     
93MES 18-3614 inches ( for 110 mm) diaEach244142.85Rupees Forty Four Thousand One Hundred Forty Two and Eighty Five Paisa Only88285.7
94MES 18-3626 inches (150 mm) diaEach849442.56Rupees Forty Nine Thousand Four Hundred Forty Two and Fifty Six Paisa Only395540.48
95 Fire Hyderants     
96MES 18-440Fire Hydrant flanged and drilled to BS Table 18-1-10, complete with rubber packing, 80 mm dia, supply and fixing.Each364227.82Rupees Sixty Four Thousand Two Hundred Twenty Seven and Eighty Two Paisa Only192683.46
97 Total PWD Scheduled Items 2022=     
98 HDPE Pipe     
99 High Density Polyethylene Pipe (HDPE-100), Class PN-10 / SDR-17 (excluding cost of excavation), supply and fixing. Complete with fusion Joint     
100MES 18-555a) 110 mmRu.m17332461Rupees Two Thousand Four Hundred Sixty One Only4264913
101MES 18-557b) 160 mmRu.m13684346.34Rupees Four Thousand Three Hundred Forty Six and Thirty Four Paisa Only5945793.12
102MES 18-559c) 200 mmRu.m5736667.17Rupees Six Thousand Six Hundred Sixty Seven and Seven Paisa Only3820288.41
103MES 18-560d) 265 mmRu.m2210434.64Rupees Ten Thousand Four Hundred Thirty Four and Sixty Four Paisa Only229562.08
105 Sluice Valve     
106 Providing and fixing cast iron sluice valves with' flanged ends and two tail pieces to each valve complete with bolts and nuts, including the cost of insertion rubber washers (valves to stand test pressure head of 400 feet (122 m).      
107MES 18-3638" i/d (200 mmEach297897.51Rupees Ninety Seven Thousand Eight Hundred Ninety Seven and Fifty One Paisa Only195795.02
109 Air Release Valve     
110MES 18-436Providing and fixing, air valve 2½ (65mm) dia of B.S.S. quality and weight (complete with jointing material).b) doubleEach229277.34Rupees Twenty Nine Thousand Two Hundred Seventy Seven and Thirty Four Paisa Only58554.68
112 Valve Chamber     
113MarketProviding, & construction of valve Chamber block masonary complete in all respects as per Drawings & Specification & Instruction of the Engineer Incharge. But Excluding the cost of Valve. Ineternal size of valve chamber 1.2m x 1.2m x 1.2mEach16150000Rupees One Lakh Fifty Thousand Hundred Only2400000
115 Wash out valve     
116 Providing and fixing Wash out valve of B.S.S. quality and weight, Class `B', for cast iron pipe line, and Asbestos cement pipe line (including cost of jointing material):-     
117Market4" i/d (100 mm)Each123126Rupees Twenty Three Thousand One Hundred Twenty Six Only23126
118Market6" i/d (150 mm)Each139283Rupees Thirty Nine Thousand Two Hundred Eighty Three Only39283
119Bill No. 5 O.H.R 100,000 Gallons      
120 Excavation     
121 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
122MES 1-7upto 1.5 meter liftCu.m86.23375Rupees Three Hundred Seventy Five Only32336
123MES 1-8Same as above but 1.5 M to 3 M depth.Cu.m569.1735Rupees Seven Hundred Thirty Five Only418289
124MES 1-9Same as above but 3 M and upto 6 M depthCu.m331.97814Rupees Eight Hundred Fourteen Only270224
126 Concrete Work in Foundation P.C.C (1:4:8)     
127MES 3-2Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.Cu.m157.4617162Rupees Seventeen Thousand One Hundred Sixty Two Only2702329
129 Floors Concrete 2 inch Thickness (1:2:4)     
130MES 3-5Providing and laying of PCC with 3000 psi compressive cylindrical strength in all non- structural elements including formworkCu.m54.6226292Rupees Twenty Six Thousand Two Hundred Ninety Two Only1436069
131 Sand Bedding     
132MES 12-34Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidationby ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction and lift upto 5 feet (1 .52 m).Cu.m1.023452Rupees Three Thousand Four Hundred Fifty Two Only3521
134 Sub-Base     
135MES 2-12Bottoming /sub base of any thickness as specified using Soil Aggregate of CBR 30%, laid and compacted to 98% Modified AASHTO density by appropriate compaction equipment and roller.Cu.m204434Rupees Four Thousand Four Hundred Thirty Four Only88680
137 Brick Work In Foundation     
138MES 4-6Burnt brick work, in wall over 225 mm thick, laid and jointed in CM 1:6, straight or to curve with inner radius of 6m and over, upto G.F roof level.Cu.m26.3620751Rupees Twenty Thousand Seven Hundred Fifty One Only546996
140 R.C.C. Concrete in Foundation, column, footing (3500 Psi)     
141MES 3-17Providing and laying of RCC with 3500 psi compressive cylindrical strength all as specified in foundations, independent column footings, and rigid floors etc. including form work as specified. Reinforcement measured and paid separately.Cu.m485.2531680Rupees Thirty One Thousand Six Hundred Eighty Only15372720
143 RCC Slab (3500 Psi)     
144MES 3-15Providing and laying of RCC with 3500 psi compressive cylindrical strength all as specified in roof slabs, landings, walls, plinth beams and bands, etc., including form work. Reinforcement measured and paid separately.Cu.m28.8338056Rupees Thirty Eight Thousand Hundred Fifty Six Only1097154
146 R.C.C. In Superstructure     
147MES 3-18Providing and laying of RCC with 4000 psi compressive cylindrical strength all as specified in roof slabs, landings, walls, plinth beams and bands, etc., including form work. Reinforcement measured and paid separately.Cu.m38.638497Rupees Thirty Eight Thousand Four Hundred Ninety Seven Only1485984
148 b) At Level 15'-0" to 25'-0"Cu.m38.639651.91Rupees Thirty Nine Thousand Six Hundred Fifty One and Ninety One Paisa Only1530564
149 c) At Level 25'-0" to 35'-0"Cu.m38.640036.88Rupees Forty Thousand Hundred Thirty Six and Eighty Eight Paisa Only1545424
150 d) At Level 35'-0" to 45'-0"Cu.m38.640421.85Rupees Forty Thousand Four Hundred Twenty One and Eighty Five Paisa Only1560283
151 d) At Level 45'-3" to 55'-0"Cu.m38.640806.82Rupees Forty Thousand Eight Hundred Six and Eighty Two Paisa Only1575143
152 d) At Level 55'-0" to 65'-0"Cu.m90.0441191.79Rupees Forty One Thousand One Hundred Ninety One and Seventy Nine Paisa Only3708909
153 d) At Level 65'-0" to 76'-5"Cu.m80.8741576.76Rupees Forty One Thousand Five Hundred Seventy Six and Seventy Six Paisa Only3362313
155 RCC Stairs     
156MES 3-19Providing and laying of RCC with 4000 psi compressive cylindrical strength all as specified in beams, columns, stair, posts, struts, piers, lintels etc., including form work. Reinforcement measured and paid separately. (At Level 5'-0" to 15'-0")Cu.m1.4139246Rupees Thirty Nine Thousand Two Hundred Forty Six Only55337
157 b) At Level 15'-0" to 25'-0"Cu.m1.4140423.38Rupees Forty Thousand Four Hundred Twenty Three and Thirty Eight Paisa Only56997
158 c) At Level 25'-0" to 35'-0"Cu.m1.4140815.84Rupees Forty Thousand Eight Hundred Fifteen and Eighty Four Paisa Only57550
159 d) At Level 35'-0" to 45'-0"Cu.m1.4141208.3Rupees Forty One Thousand Two Hundred Eight and Thirty Paisa Only58104
160 d) At Level 45'-0" to 55'-0"Cu.m1.4141600.76Rupees Forty One Thousand Six Hundred and Seventy Six Paisa Only58657
162MES 28-47Providing and using sulphate resisting cement in place of ordinary portland cment in O.H.W.T, U.G.W.T & Spetic Tank RCCKg192250410.8Rupees Ten and Eighty Paisa Only20763043
164 Reinforcement Grade 60     
165MES 9-56Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . a) Ground floor (Foundation to 5')Kg83281354Rupees Three Hundred Fifty Four Only29481474
166a)b) At Level 5'-0" to 15'-0"Kg3037.5364.62Rupees Three Hundred Sixty Four and Sixty Two Paisa Only1107533
167b)b) At Level 15'-0" to 25'-0"Kg3037.5368.16Rupees Three Hundred Sixty Eight and Six Paisa Only1118286
168c)c) At Level 25'-0" to 35'-0"Kg3037.5371.7Rupees Three Hundred Seventy One and Seventy Paisa Only1129039
169d)d) At Level 35'-0" to 45'-0"Kg3037.5375.24Rupees Three Hundred Seventy Five and Twenty Four Paisa Only1139792
170e)d) At Level 45'-0" to 55'-0"Kg3037.5378.78Rupees Three Hundred Seventy Eight and Seventy Eight Paisa Only1150544
171f)b) At Level 55'-0" to 65'-0"Kg18030.6382.32Rupees Three Hundred Eighty Two and Thirty Two Paisa Only6893459
172g)c) At Level 65'-0" to 76'-5"Kg13100.9385.86Rupees Three Hundred Eighty Five and Eighty Six Paisa Only5055113
174 G.I Railing     
175MarketProviding and fixing G.I. Pipe railing of 1-1/2" (38 mm) diameter comprising, vertical posts and horizontal bracing of G.I- pipe of the same dia, as per design including cost of specials, bends, threading, cutting and making good the floor or wall of any kind in cement concrete 1:2:4 etc. complete in any floor.. Ru.m102.762745Rupees Two Thousand Seven Hundred Forty Five Only282076
177 Tuff Pavers     
178MES 12-17Providing and laying, PCC Paving stone, 60 mm thick in natural colour, as in floors, streets, public parking etc., any pattern and shape, (Hydraulically compressed), laid and jointed in sand, including 50 mm thick sand bed as laying course, all as specifiedSq.m199.121776Rupees One Thousand Seven Hundred Seventy Six Only353637
180MES 3-28Providing and fixing of PVC water stopper 250mm wide and 10 mm thick.Ru.m202777Rupees Two Thousand Seven Hundred Seventy Seven Only55540
182 M.S Door     
183MarketProviding and fixing single leaf steel doors made to crittal or equivalent standard and of approved sections fully panelled with M. S. Sheet of 16 gauge painted with two coats of red oxide paint including using approved brass section oxidized fitting iron lugs, cutting holes and making good damages to walls etc. complete as required in any floor.Sq.m1.6311559.53Rupees Eleven Thousand Five Hundred Fifty Nine and Fifty Three Paisa Only18842
184 Gate valve     
185MarketProviding and fixing heavy duty Gate valve of specified diameter and material for pressure rating PN-16 mde of Crane (USA), Hatersly (UK), Scon (Pakistan) or approved equivalent manufacturer, i/c the cost of all accessories flanges, nut/ bolt and gaskit where required complete in all respect as approved and directed by the Engineer Incharge. Flange Ended Ductile Iron Valve     
186 200 mm diaEach5170000Rupees One Lakh Seventy Thousand Hundred Only850000
187 Disinfecting flanged     
188MarketSupplying, laying, cutting, jointing, testing and disinfecting flanged/socketed MS pipe, water quality (heavy), with all fittings i.e. sockets, bends, tees, bell mouth, end cap etc. where required, in accordance with API-5L (Grade-B)/ ASTM A53 Sch 40 including applying two coats of bitumen paint complete in all respect.     
189 200 mm diaRu.m9834000Rupees Thirty Four Thousand Hundred Only3332000
191MarketSupplying and fixing in position 2.75' x 2.75' MS sheet, 1/8" thick at the top of reservoir as per drawings, complete in all respects.Each125000Rupees Twenty Five Thousand Hundred Only25000
192MarketCleaning, testing & disinfecting over head reservoir complete in all respects upto the satisfaction of the Project ManagerJob1150000Rupees One Lakh Fifty Thousand Hundred Only150000
194MarketProviding and fixing C.I 4" dia air vent of approved quality and design on the top of tank as per details provided in the drawings. Complete in all respects.Each23500Rupees Three Thousand Five Hundred Only7000
196MarketProviding, installing, testing and commissioning Hydrostatic Level Submersible Transmitter/ Indicator for direct mounting in Over Head Reservoirs make of USA/Europe or equivalent, along with Level Display unit, Shielded wire of 3m complete in all respect as per instructions of the Engineer Incharge and including the following features.Each1270000Rupees Two Lakh Seventy Thousand Hundred Only270000
198MarketProviding and fixing MS ladder by using stringers of size 2.5"x0.50", 15" apart and steps @ 12" c/c for use inside the water including painting with one coat of primer (Red Oxide) and two coats of enamel of approved brand complete in all respects as per drawings.Ru.m138200Rupees Eight Thousand Two Hundred Only106600
200MarketProviding and fixing steel windows with openable glazed panels, using beam section for frame 1½"x1"x5/8"x1/8" (40x25x16x3 mm), Z-section for leaves ¾"x1"x¾"x1/8" 20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3mm), glass panes, wooden screed for glazing embedded over a thin layer of putty duly screwed with leaves, brass fittings, holdfast, duly painted, complete in all respects, including all cost of material and labour, etc. as per approved design and as directed by the Engineer-in-charge:- fixed with wire gauze, 22 SWG glass pane 5 mm thickRu.m7.4314954.05Rupees Fourteen Thousand Nine Hundred Fifty Four and Five Paisa Only111109
202MarketSupplying, installation, testing and commissioning of complete lightening arrestor system consisting of 5 point air terminal, copper strip, D.C tape clamp, test clamp, earth connecting clamp, earth rod etc complete in all respects as per drawings, specifications and instructions of the Engineer.Each11656000Rupees Sixteen Lakh Fifty Six Thousand Hundred Only1656000
204MarketComplete Geotechnical Investigations' for the site of overhead reservoir to determine its bearing capacity along with other relevant tests to be decided by the Engineer. Name of the geotechnical investigation firm will require prior approval.Each1200000Rupees Two Lakh Thousand Hundred Only200000
205Bill No. 6 Tubewell Chamber      
206 Excavation     
207 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
208MES 1-7upto 1.5 meter liftCu.m.25.37375Rupees Three Hundred Seventy Five Only9513.75
209 Backfilling     
210MES 1-16Earth filling as in Ordinary or hard soil, filling in foundation, pipe trenches, shafts, wells, independent holes, under floors or around plinths etc., 1.5 M below or above Ground Level (GL), with spoil obtained from excavation in trenches/over areas within 50M including watering and compaction in 150 mm layer and dressing to required profile and shape.Cu.m.16.21400Rupees Four Hundred Only6484
212 Termite Proofing     
213MES 11-1Providing and layaing out Termite proofing in foundations, under floors and wood work surface with a soloution using of confront TC with water and spraying the solution of the area to be treated as completed as per direction of Enmgineer Incharge.Sqm87.51248Rupees Two Hundred Forty Eight Only21702.48
215 Horizontal DPC     
216MES 4-71Providing and laying 2 inches (51 mm) thick damp proof course with cement concrete 1:2:4 cast in situ using graded screened bajri of 3/4 inch (19 mm) and down gauge including compacting, curing, form work and its removal etc. complete with applying a coat of hot bitumen (maxphalt 80/100 or equivalent) using 35 Lbs. per hundred square feet (1.71 Kg/sm) on damp proof course after complete drying and cleaning the surface .Sq.m.24.74872Rupees Eight Hundred Seventy Two Only21573.28
218 Vertical DPC     
219MES 4-70Providing damp proof course on vertical surface with 3/4 inch (19 mm) thick cement plaster 1:4 mixed with any approved water proofing agent including curing etc. complete, but excluding the cost of water proofing agent .Sq.m.18.51624Rupees Six Hundred Twenty Four Only11550.24
221  P.C.C (1:2:4)     
222MES 3-5Providing and laying of PCC with 3000 psi compressive cylindrical strength in all non- structural elements including formworkCu.m.0.4526292Rupees Twenty Six Thousand Two Hundred Ninety Two Only11831.4
224 Concrete Work in Foundation P.C.C (1:4:8)     
225MES 3-2Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.Cu.m.7.2617162Rupees Seventeen Thousand One Hundred Sixty Two Only124596.12
227 Sand Bedding     
228MES 12-34Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidationby ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction and lift upto 5 feet (1 .52 m).Cu.m.2.813452Rupees Three Thousand Four Hundred Fifty Two Only9700.12
230 Brick Work In Foundation     
231MES 4-6Burnt brick work, in wall over 225 mm thick, laid and jointed in CM 1:6, straight or to curve with inner radius of 6m and over, upto G.F roof level.Cu.m.37.12520751Rupees Twenty Thousand Seven Hundred Fifty One Only770380.875
233MES 4-12Burnt brick work, in wall over 225 mm thick, laid and jointed in CM 1:6, straight or to curve with inner radius of 6m and over, upto First Floor roof level.Cu.m.22.520976Rupees Twenty Thousand Nine Hundred Seventy Six Only471960
235 Reinforced Cement Concrete Work     
236 R.C.C. Concrete in Foundation, column, footing (3500 Psi)     
237MES 3-17Providing and laying of RCC with 3500 psi compressive cylindrical strength all as specified in foundations, independent column footings, and rigid floors etc. including form work as specified. Reinforcement measured and paid separately.Cu.m.3.8431680Rupees Thirty One Thousand Six Hundred Eighty Only121651.2
239 R.C.C. Plinth Beam     
240MES 3-15Providing and laying of RCC with 3500 psi compressive cylindrical strength all as specified in roof slabs, landings, walls, plinth beams and bands, etc., including form work. Reinforcement measured and paid separately.Cu.m.1.7538056Rupees Thirty Eight Thousand Hundred Fifty Six Only66598
242 R.C.C. In Superstructure     
243MES 3-18Providing and laying of RCC with 4000 psi compressive cylindrical strength all as specified in roof slabs, landings, walls, plinth beams and bands, etc., including form work. Reinforcement measured and paid separately.Cu.m.5.3738497Rupees Thirty Eight Thousand Four Hundred Ninety Seven Only206728.89
245 Reinforcement Grade 60     
246MES 9-56Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . a) Ground floor Kg963.9354Rupees Three Hundred Fifty Four Only341220.6
247 Stone Ballast P.C.C Under Floor     
248MES 3-2Providing and laying floors of 2 inches (51 mm) thick 1:2:4 cement concrete using graded screened bajri 3/4 inch (19 mm) and down gauge in ground floor laid in panels including form work, consolidation, finishing, and curing etc. complete. a) Basement & Ground floor Cu.m.1.72117162Rupees Seventeen Thousand One Hundred Sixty Two Only29535.802
250 Iron, Steel and Aluminium Works     
251 Aluminium Sliding Windows     
252MES 7-112Supply of Aluminium Fixed window, Deluxe Quality, of Anodized Aluminium extruded section in any size, colour and texture as specified, including fixing on concrete, wood or steel frames, complete with all necessary fittings except glass.Sq.m.5.9518216Rupees Eighteen Thousand Two Hundred Sixteen Only108385.2
254 5mm Glass Panes     
255MES 16-8Providing and fixing plain glass panes 5mm thick to M.S. Box pipe / Aluminium doors, windows and ventilators etc including the cost of labour but excluding the cost of M.S. square pipe beading, rubber packing and screw in any floor at any height.Sq.m.5.954876Rupees Four Thousand Eight Hundred Seventy Six Only29012.2
257 M.S Steel Door Frame     
258MES 7-84Providing and fixing MS moulded steel door frames of 4” X 2 ½” manufactured from steel sheet of 18 gauge conforming to BS 1245 having a single rebate size 1 ½” X ½” with provision of 3 nos. MS plate section 1 ½” X ¼” ( 2 nos. 6” long welded with frame at not less than 10 points and 1 no. 12” long welded with frame at not less than 20 points) with holes and threads for fixing steel hinges fitted with 1 locking box of same sheet ( point welded inside the frame) 6 nos. 6” long flat iron fixing lugs of 1 ¼” X 3/16” section treated with special red oxide primer coat all around including cutting holes and fixing the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer incharge. Ru.m.1.631735Rupees One Thousand Seven Hundred Thirty Five Only2828.05
260MES 28-130Providing and fixing with brass screws or specially supplied screws hydraulic door closer of approved design No. 5002, Japan make, cutting wood etc., to required shape and size as per direction of the engineer-in-charge.Each34875Rupees Four Thousand Eight Hundred Seventy Five Only14625
262MES 28-240Providing & fixing approved brass sliding bolt or L-drop bolts 12" x 3/4" size with necessary brass iron bolts and nuts.Each31508.75Rupees One Thousand Five Hundred Eight and Seventy Five Paisa Only4526.25
264 1/4" Th. Ceiling Plaster     
265MES 13-9¼” thick cement plaster 1:3 on soffits of ceiling, cantilever slabs, sides and soffits of beams etc. in basement, mezzanine and ground floor including making edges, corners and curing etc. complete. a) Ground floorSq.m.13.4817Rupees Eight Hundred Seventeen Only10947.8
266 1/2" Th. Internal Plaster     
267MES 13-4½” thick cement plaster 1:4 on walls and columns etc. in basement, plinth, mezzanine and ground floor including making edges, corners and curing etc. complete. a) Ground floorSq.m.40.29795Rupees Seven Hundred Ninety Five Only32030.55
268 3/4" Th. External Plaster     
269MES 13-73/4" inch (19 mm) thick cement, plaster 1:4 on walls and columns etc. in basement, plinth, mezzanine and ground floor including making edges, corners and curing etc., complete.Sq.m.48.348984Rupees Nine Hundred Eighty Four Only47574.432
270 Painting on Iron Work     
271MES 15-28-29Painting iron work with synthetic enamel paint of approved make and shade two coats over and including the cost of one priming coat complete at any height in any floor .Sq.m.6.26221Rupees Two Hundred Twenty One Only1383.46
272 Emulsion Paint     
273MES 15-52-53-54Painting with (ICI) Dulux Plastic emulsion paint VIP of approved shade two coats over and including the cost of one priming coat complete over plastered surface at any height in any floor .Sq.m.40.29494Rupees Four Hundred Ninety Four Only19903.26
274 Weather Shield Paint     
275MES 15-58-59Painting three coats with weather shield paint deluxe (ICI) make of approved shade on plaster surface (External) and including the cost of cleaning the surface, sand papering etc. complete at any height in any floor.Sq.m.48.348438Rupees Four Hundred Thirty Eight Only21176.424
276 Porcelain Tile Flooring     
277MES 13-36Providing and laying light colour, glazed/non skid vitrified porcelean tiles (Polished) exceeding 1600 sqcm and upto 3600 Sqcm each, (Pak made) on walls and floors, in any floor, laid with dry bond (stile bond) over a base of 1" thick cement mortar (1:3) including jointing to tiles with joint filler of approved quality as per direction of the Engineer incharge.Sqm18.173975Rupees Three Thousand Nine Hundred Seventy Five Only72225.75
278 Electrical Work     
279 POINT WIRING IN RECESSED PVC CONDUIT.     
280MES 24-9Wiring for light or fan point with 1.5mm² single core, PVC insulated wire copper conductor wire in 20mm (3/4") dia, uPVC conduit rececessed in wall or column, roof etc. including 1mm² single core PVC insulated wire as ECC as required. Point108349Rupees Eight Thousand Three Hundred Forty Nine Only83490
281MES 25-331Supply & drawing of 16 mm², single core, PVC insulated wire in all kinds of existing or given conduit/cable duct as required.P/Meter.751568Rupees One Thousand Five Hundred Sixty Eight Only117600
283MES 25-332Supply & drawing of 25 mm², single core, PVC insulated wire in all kinds of existing or given conduit/cable duct as required.P/Meter.1301723Rupees One Thousand Seven Hundred Twenty Three Only223990
285MES 24-420Supply & fixing 25mm (1") dia uPVC conduit with all especial such as bends, sockets, Junction etc fitted on surface as required. P/Meter.111106Rupees One Thousand One Hundred Six Only12166
287MES 24-422Supply & fixing 50mm (2") dia PVC conduit with all especial such as bends, sockets, Junction etc fitted on surface as required. P/Meter.1301967Rupees One Thousand Nine Hundred Sixty Seven Only255710
288 FANS     
289 Wall Brackt Fans.     
290MES 24-478Providing & installing 40 Cm (18") sweep wall bracket fan complete with blades, regulator & pulling cord switch, fitted on wall or column with GI clip including connection as required. Millat/Pak/Asia/ Younas/Climax/ Royal.Each114129Rupees Fourteen Thousand One Hundred Twenty Nine Only14129
291 Plastic Body Exhaust Fans     
292MES 24-708Providing & installing 35 Cm (14") sweep Plastic body Louvre wall bracket fan complete with blades, regulator & moving grill with motor, fitted on wall or column with GI clip including connection with 14.0076" flexible wire complete as required. Pak, Raval, GFC,Younas,Miltat. Each16844Rupees Six Thousand Eight Hundred Forty Four Only6844
294 4 CORE LT UN ARMOURED CABLE IN      
295 EXISTING CONDUIT OR CABLE DUCT     
296 Length of cables are tenetative. Actual length of cables to be installed shall be practically measured at site by the Contractor, duly authenticated by the employers electrical engineer before placing the order with the manufacturer, however, approximate length of cables are shown herewith. Payments shall be made as per actual length installed.     
297MES 25-268Providing & laying 4 core, 16 mm², PVC insulated & PVC sheathed, 600/1000 volts grade with stranded copper conductor , un armored, L.T cable in existing all kind of conduit or cable duct as per Pak. P.W.D specification as required. P/Meter. 752458Rupees Two Thousand Four Hundred Fifty Eight Only184350
299MES 25-269Providing & laying 4 core, 25 mm², PVC insulated & PVC sheathed, 600/1000 volts grade with stranded copper conductor , un armoured, L.T cable in existing all kind of conduit or cable duct as per Pak. P.W.D specification as required. P/Meter. 1303819Rupees Three Thousand Eight Hundred Nineteen Only496470
301 Termination & Joint of L.T Cable     
302MES 25-521Making Termination of 3 or 4 core armoured / un-armoured copper conductor, PVC x PVC L.T Cable including providing & fixing proper lugs, etc. complete in all respect as required.      
303 16mm2 to 25mm2P/Job211244Rupees Eleven Thousand Two Hundred Forty Four Only22488
305 Steel Door     
306MarketProviding and fixing double leaf steel doors made to crittal or equivalent standard and of approved sections fully panelled with M. S, Sheet of 16 gauge painted with coats of red oxide paint including using approved brass section oxidized fittings, iron lugs, including cutting holes and making good damages to walls etc. complete as required in any floor.Sq.m3.1312242.02Rupees Twelve Thousand Two Hundred Forty Two and Two Paisa Only38317.5226
308 Fitting and Fixtures     
309MarketProviding and fixing with C.P. brass screws main door handle type yale lock (Italy make) of approved design, cutting wood etc., to required size, with two operating keys, as per direction of the engineer-in-Charge.Each318284.28Rupees Eighteen Thousand Two Hundred Eighty Four and Twenty Eight Paisa Only54852.84
311 Miscellaneous     
312 Khurras     
313MarketProviding and laying 1:2:4 cement concrete khuras 2" (51 mm) thick 2 ft. x 2 ft. (610 mm x 610 mm) size on roof including finishing with cement plaster 1:4, curing etc. complete.Each386.23Rupees Eighty Six and Twenty Three Paisa Only258.69
315 Length of cables are tenetative. Actual length of cables to be installed shall be practically measured at site by the Contractor, duly authenticated by the employers electrical engineer before placing the order with the manufacturer, however, approximate length of cables are shown herewith. Payments shall be made as per actual length installed.     
316MarketWiring for sub main with 2 x 2.5mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20mm (3/4")dia, uPVC conduit recessed in the wall, column and roof etc. including 1.5mm² PVC insulated wire single core wire as ECC as required. P/Meter.34516.35Rupees Five Hundred Sixteen and Thirty Five Paisa Only17555.9
318MarketWiring for sub main with 2 x 4mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20mm (3/4")dia, uPVC conduit recessed in the wall, column and roof etc. including 1.5mm² PVC insulated wire single core wire as ECC as required. P/Meter.38736Rupees Seven Hundred Thirty Six Only27968
320 Single PVC Insulated Wire and PVC, PVC Cable     
321 in Existing Conduit / Duct.     
322 Length of cables are tenetative. Actual length of cables to be installed shall be practically measured at site by the Contractor, duly authenticated by the employers electrical engineer before placing the order with the manufacturer, however, approximate length of cables are shown herewith. Payments shall be made as per actual length installed.     
324MarketProviding & fixing 10 Amps Polycarbonate flame retardant S.P switch with fancy required gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.(Schneider/Philips )No.6541.65Rupees Five Hundred Forty One and Sixty Five Paisa Only3249.9
326MarketProviding & fixing 15 Amps Polycarbonate flame retardant 3-Pin switch socket with fancy required gang plate fixed on die fabricated, powder coated metal board recessed in wall or column including connection as required.(Schneider/Philips )No.21483.5Rupees One Thousand Four Hundred Eighty Three and Fifty Paisa Only2967
328MarketProviding, Installation, Testing and Commissinoing of water proof LED batten lights including driver, having warm /neutral white / cool white color 100-110 lm/W efficiency, 0.9 or above power factor, 40000 - 50000 hours life cycle, including connection, complete in all respect as approved by the engineer incharge.      
329 18-20 WattsNo. 223742Rupees Twenty Three Thousand Seven Hundred Forty Two Only47484
331 Roof Treatment     
332MarketSingle layer of tiles 9"x4½"x1½" (225x113x40 mm) laid over 4"(100 mm) earth and 1" (25 mm) mud plaster without Bhoosa, grouted with cement sand 1:3 on top of RCC roof slab, provided with 34 lbs. per %Sft. or 1.72 Kg/Sq.m bitumen coating sand blinded.Sq.m.14.0491418.15Rupees One Thousand Four Hundred Eighteen and Five Paisa Only19923.58935
334 Electrical Work     
335 P.V.C. Conduit and Accessories     
336MarketSupply at site Installation ,Laying of PVC conduit heavy duty make polo, Popular, Beta to be installed in walls, floor, columns above false ceiling or as required asper site conditions including cost of all PVC conduit accessories, steel pull wires, complete in all respects.     
337 c) 3" dia. PVC pipeP/Meter1001310Rupees One Thousand Three Hundred Ten Only131000
339 Earthing System     
340MarketSupply, installation, testing and commissioning of earthing system for LT panel including earth spike, one each job includes 4" dia bore70' to 80' deeper near water level along with 70 mm2 stranded copper conductor in 2" dia heavy gauge G.I. pipe upto earth connection point including cost of copper spike 12" long connected with G.I pipe, filling of bore with a mixture of charcoal and lime packed 300 mm all around the vertically bore, construction of inspection chamber with RCC cover plate, to achieve the specified earthing results shall be less than 1ohm as required for completion of the item as per requirements, specifications and drawings. Complete in all respects and to the approval of the Engineer.No.2160000Rupees One Lakh Sixty Thousand Hundred Only320000
341 LT Panel     
343 LT Panel Installed in Pump Room     
344MarketFabrication, supply at site, installation and commissioning of Distribution Board(DB) indoor type made of sheet steel 14 SWG , with flexible earthing straps, degreased and de-rusted, zinc phosphated, finished with electro-static powder coating of 100 micron thickness in approved colour, panel housing to comply with protection class IP-67, with hinged door, lockable handle, all auxiliaries, internal wiring, designation labels on termination lugs, brass cable glands for incoming & outgoing cables, wiring from breakers, indication lamps, instruments and control all accessories complete in all respect. All incoming and outgoing breakers shall be accessible by opening the front door having additional M.S. sheet cover. Incoming from existing source: 1 : 100 Amps 3 pole MCCB RC 10 KA 3 Indication lamp of colour Red Yellow Blue 01 Digital Voltmeter of scale 0-410 Volt with selector switch 3 Sets of "Brass Cable Glands" suitable for incoming cable. Outgoing: 1 x 25 ADP MCB RC 6KA 2 x 80 ATP MCCB RC 10KA 1x provision of spaces for future.Nos1310000Rupees Three Lakh Ten Thousand Hundred Only310000
346 Distribution Boards     
347MarketSupply of Common distribution board at site, fabrication, installation, testing, commissioning and connections of wires / cables of Distribution Boards “Light / Power” concealed type to be installed as and where shown on drawing, made of MS sheet 16 SWG degreased and degusted, zinc phosphated, finished with electro-static powder coating of 15 micron thickness in approved colour with hinged door, flexible earthing strap lockable handle, catcher, earthing strip neutral strip, internal wiring from MCBs terminating on cable terminal blocks, including cost of all necessary materials complete in all respects. Incoming 1 : 25 Amp 2 Pole MCB, RC: 10 KA Outgoing 04 x 10/16 ASP MCB RC 6KA for Light, Power 2x provision of spaces for future.Nos171000Rupees Seventy One Thousand Hundred Only71000
349MarketSupply installation of MCC panel Comsprising of ASDS starter to be installed in Pump Room to automatically opearte 70 HP submersible pump complete in all respects.Nos165640Rupees Sixty Five Thousand Six Hundred Forty Only65640
352MarketSupply at site & installation of PVC back boxes compatible with switch & socket plates to be installed.     
353 a) Back Box: 3" x 3"Each4421Rupees Four Hundred Twenty One Only1684
354 b) Back Box: 3" x 6""Each2610Rupees Six Hundred Ten Only1220
355 c) Junction Box 9"x7" for general useEach1790Rupees Seven Hundred Ninety Only790
356Bill No. 7 Tubewell      
357 Excavation     
358 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
359MES 1-7upto 1.5 meter liftCu.m.13.5375Rupees Three Hundred Seventy Five Only5062.5
361MES 4-21Burnt brick work, in wall 115 mm thick, laid and jointed in CM 1:6, straight or to curve with inner radius of 6m and over, upto 4.25 m depth.Cu.m.1813694Rupees Thirteen Thousand Six Hundred Ninety Four Only246492
363MES 18-364Providing and fixing cast iron sluice valves according to BSS-3464 class 150 with 'flanged end sand two tail pieces to each valve complete with bolts and nuts, including the cost of insertion rubber washers (valves to stand test pressure head of 400 feet (122 m). 250 mm i/d.Each1116252Rupees One Lakh Sixteen Thousand Two Hundred Fifty Two Only116252
365MES 19-33In any soil, drilling bore hole, 600 mm dia, employing Reverse Rotary, Hydraulic Percussion method, bore upto 50 M depth, complete.Ru.m5014900Rupees Fourteen Thousand Nine Hundred Only745000
367MES 19-36In any soil, drilling bore hole, 600 mm dia, employing Reverse Rotary, Hydraulic Percussion method, bore more than 50 M but upto 100 M depth, complete.Ru.m2516868Rupees Sixteen Thousand Eight Hundred Sixty Eight Only421700
369MES 19-60Supply and Pouring of Shrouding Gravel of requisite grade, in annular space between blind pipe/strainer and bore hole according to specifications for 250 mm dia blind pipe/strainer.Cu.m.25.74712Rupees Seven Hundred Twelve Only18327
371MES 19-63Provision of Sanitary Seal of approved design and specification for 250 mm dia blind pipe.Ru.m903916Rupees Three Thousand Nine Hundred Sixteen Only352440
373MES 18-436Air valve automatic, 50 mm size, double acting, supply and fixing.Each127362Rupees Twenty Seven Thousand Three Hundred Sixty Two Only27362
375MES 19-57Providing and installing, Fiber Glass Bail plug in tubewell bore hole. . 250 mm i/d 6mm thick 3 m long.Each126808Rupees Twenty Six Thousand Eight Hundred Eight Only26808
376MES 27-67Pipe line pressure gauge, supply and fixing.Job124982Rupees Twenty Four Thousand Nine Hundred Eighty Two Only24982
378MarketProviding and installing M.S blind pipe socketed/welded joint, M.S. reducer in tubewells bore hole including jointing/welding with strainer, etc. 18" i/d 1/4" (450 mm i/d 6 mm) thick.Ru.m3045000Rupees Forty Five Thousand Hundred Only1350000
380MarketProviding and installing, Fiber Glass strainer in tubewell bore hole including sockets,special socket etc. including jointing complete in all respect.250 mm i/d 6mm thick with 10% open area.Ru.m6011700Rupees Eleven Thousand Seven Hundred Only702000
382MarketProviding and installing, Fiber Glass blank pipe in blank pipe in the tubewell borehole including jointing with the Fiber Glass blank pipe / strainer pipe. 250 mm i/d 6mm thick.Ru.m309435Rupees Nine Thousand Four Hundred Thirty Five Only283050
384MarketProviding/fixing M.S centerlizersEach131069Rupees One Thousand Hundred Sixty Nine Only13897
386MarketTaking sample one number at every 5 ft. or from each stratum as per direction of Engineer including submission construction charts etc. and results of strata analysis. Each90166Rupees One Hundred Sixty Six Only14940
388MarketProviding and sealing with puddle clay between shrouding and grouting etc.Job14801Rupees Four Thousand Eight Hundred One Only4801
390MarketDevelopment testing and disinfecting of complete well in accordance with the tendered specifications including disposal arrangement of water as pumped. Job1157102Rupees One Lakh Fifty Seven Thousand One Hundred Two Only157102
391MarketProviding and fixing M.S. cap to cover the pump house casing upto 600 mm dia 6mm thick including welding.Each12113Rupees Two Thousand One Hundred Thirteen Only2113
392MarketProviding/laying cement concrete block size as per drawing with RCC ratio 1:2:4 to house casing complete i/c screening of aggregate shuttering M.S Bars size 1/2" i/d & 2 Nos. clamps at right angle 1/2" thick 6" wide 5 ft long for holding down bolts with nuts complete.Job154805Rupees Fifty Four Thousand Eight Hundred Five Only54805
394MarketInstallation of supply wellJob1259708Rupees Two Lakh Fifty Nine Thousand Seven Hundred Eight Only259708
396MarketGeophysical bore hole loggingJob160000Rupees Sixty Thousand Hundred Only60000
398MarketProviding/fixing Carrugated Sheet (8'x4') i/c Joints etc around Working Area of the site for Safety Arrangments CompleteRu.m76.22511.68Rupees Five Hundred Eleven and Sixty Eight Paisa Only39000
400MarketProviding, installing, testing and lowering vertical shaft water lubricated deep well turbine pump of Europe/USA or equivelent of 250m3/hr capcaity against pumping head of 45 m feet including lowering of bowl assembly about 30m column pipe setting along with vertical solid shaft electrcial motor totally enclosed fann cooled, tropically insulated, 3-Phase, 75 HP / 4P Siemens Vertical Solid Shaft Motor + Motor Control UnitJob17020000Rupees Seventy Lakh Twenty Thousand Hundred Only7020000
402MarketP/fixing D.I non return valve in accordance with BS 3464 PN16 epoxy cotted internally and externally stainless Steel Wedge, stamp and seatas per specifications 250 mm dia with integral flanges i/c rubber rings, complete in all respect.Each1203788Rupees Two Lakh Three Thousand Seven Hundred Eighty Eight Only203788
404MarketProviding cement concrete/brick blocks to support bends with ratio 1:2:4 i/c of screening washing of stone aggregate shuttering and curing etc. complete as per drawing, complete job.Each1700Rupees Seven Hundred Only700
406MarketConstruction of brick support for tubewell delivery pipe as per drawing complete in all respects.Job11500Rupees One Thousand Five Hundred Only1500
408MarketConstruction of RCC support for tubewell delivery pipe and bend as per drawing complete in all respects.Job13822.7Rupees Three Thousand Eight Hundred Twenty Two and Seventy Paisa Only3823
409Bill No. 8 Sewerage System      
410 Excavation     
411 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
412MES 1-7upto 1.5 meter liftCu.m4894341.25Rupees Three Hundred Forty One and Twenty Five Paisa Only1670078
413MES 1-8Same as above but 1.5 M to 3 M depth.Cu.m4894668.85Rupees Six Hundred Sixty Eight and Eighty Five Paisa Only3273352
414MES 1-9Same as above but 3 M and upto 6 M depthCu.m1813740.74Rupees Seven Hundred Forty and Seventy Four Paisa Only1342962
415 Backfilling     
416MES 1-16Earth filling as in Ordinary or hard soil, filling in foundation, pipe trenches, shafts, wells, independent holes, under floors or around plinths etc., 1.5 M below or above Ground Level (GL), with spoil obtained from excavation in trenches/over areas within 50M including watering and compaction in 150 mm layer and dressing to required profile and shape.Cu.m5500364Rupees Three Hundred Sixty Four Only2002000
417 Sand Bedding     
418MES 12-34Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidationby ramming in layers not exceeding 9 inches (229 mm) in depth to full compaction and lift upto 5 feet (1 .52 m).Cu.m6003141.32Rupees Three Thousand One Hundred Forty One and Thirty Two Paisa Only1884792
420 RCC Pipes     
421 Providing RCC pipes and collars of class 'A' and fixing in trench including cutting, fitting and jointing with maxphalt composition and cement mortar (1:1) and testing with water to a head of 4 feet (1.22 m) above the top of the highest pipe including cartage within 10 miles (16.09 km.)     
422MES 21-712 inches (305 mm) dia. pipe.Ru.m21752457Rupees Two Thousand Four Hundred Fifty Seven Only5343975
423MES 21-815 inches (380 mm) dia. pipeRu.m5403373.37Rupees Three Thousand Three Hundred Seventy Three and Thirty Seven Paisa Only1821620
424MES 21-918 inches (460 mm) dia. pipe…Ru.m4423869.32Rupees Three Thousand Eight Hundred Sixty Nine and Thirty Two Paisa Only1710239
426 UPVC Pipes     
427 Providing and fixing un platisized polyvinyl chloride pipe (P.V.C) "D" class and specials etc. including cutting and fitting complete with and including the cost of cutting trench upto 1-1/2 feet deep refilling, watering, ramming, and disposal of surplus earth within one chain and after cleaning the pipe and cartage within 10 miles (16.09 km.) (working pressure 12 kg/cm2 ) 1-1/4 inches (32 mm) dia.     
428MES 20-4 6 inches (150 mm) diaRu.m4003757.39Rupees Three Thousand Seven Hundred Fifty Seven and Thirty Nine Paisa Only1502956
429 Cunette & RCC Chamber     
430 Concrete Work P.C.C (1:3:6)     
431MES 3-3Providing and laying 1:3:6 (1 cement 3 sand and 6 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.100 Cft3.9117253.6Rupees Seventeen Thousand Two Hundred Fifty Three and Sixty Paisa Only67462
433 Concrete Work P.C.C (1:4:8)     
434MES 3-2Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.100 Cft0.415617.42Rupees Fifteen Thousand Six Hundred Seventeen and Forty Two Paisa Only6247
435 R.C.C. Concrete in Foundation (3000 Psi)     
436MES 3-7Providing and laying of RCC with 3000 psi compressive cylindrical strength in different structural elements (foundation etc.) including form work all as specified. Reinforcement measured and paid separately.Cu.m7.52122462.44Rupees Twenty Two Thousand Four Hundred Sixty Two and Forty Four Paisa Only168940
438 R.C.C. Wall, Roof Slab, Plinth Beam (3000 Psi)     
439MES 3-9Providing and laying of RCC with 3000 psi compressive cylindrical strength in different structural elements in roof slabs, landings, walls, plinth beams and bands etc. all as specified including form work (reinforcement measured and paid separately).Cu.m57.1228738.71Rupees Twenty Eight Thousand Seven Hundred Thirty Eight and Seventy One Paisa Only1641555
441 Reinforcement Grade 60     
442MES 9-56Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or m.s. chairs, tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension . a) Ground floor Kg6000322.14Rupees Three Hundred Twenty Two and Four Paisa Only1932840
444 Crushed Stone Bedding     
445MarketSupplying, stacking, spreading soil aggregate (Ghara/Pit pan gravel) and sand (a mixture of natured and crushed stone ) as approved by Engineer Incharge i/c watering, consolidation, compaction to required density with power robber i/c all lead and lift ( actual compacted depth shall be cibsudered for payment.Cu.m2852025.74Rupees Two Thousand Hundred Twenty Five and Seventy Four Paisa Only577336
446 Manholes     
447MarketConstruction of manholes, complete in all respects as per drawings, specifications & instructions of the Engineer. The unit rate includes but not limited to excavation, backfilling of earth, required compaction, crushed stone, PCC (1:4:8), PCC (1:3:6), (1:2:4) benching, R.C.C 4000 Psi, including reinforcement bitumen coating, top ring, manhole cover with frame, making holes for RCC pipes, etc complete in all respects as per Drawings.     
448 4' i/d, 10.01-14 ft Height, Type IEach60172835Rupees One Lakh Seventy Two Thousand Eight Hundred Thirty Five Only10370100
449 4' i/d, 14.01-18 ft Height, Type IIEach18218389Rupees Two Lakh Eighteen Thousand Three Hundred Eighty Nine Only3931002
450 5' i/d, upto 18 ft Height, Type IIIEach16287897Rupees Two Lakh Eighty Seven Thousand Eight Hundred Ninety Seven Only4606352
452MarketProviding and fixing D.I Grating with frame 1.5'x1.5' hinged & bolted anti theft complete in all respect as approval and entire satisfaction of the Engineer.Each8081075Rupees Eighty One Thousand Hundred Seventy Five Only6486000
453Bill No. 9 Electrical Sleeves      
454 Excavation     
455 Excavation over areas as in Ordinary/Hard Soil upto 1.5 M depth, in foundation / excavations, throw earth clear of edges of excavation within 50 M.     
456MES 1-7upto 1.5 meter liftCu.m410375Rupees Three Hundred Seventy Five Only153750
457 Backfilling     
458MES 1-16Earth filling as in Ordinary or hard soil, filling in foundation, pipe trenches, shafts, wells, independent holes, under floors or around plinths etc., 1.5 M below or above Ground Level (GL), with spoil obtained from excavation in trenches/over areas within 50M including watering and compaction in 150 mm layer and dressing to required profile and shape.Cu.m111400Rupees Four Hundred Only44400
459 Concrete Work P.C.C (1:4:8)     
460MES 3-2Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using graded stone ballast 2 inches (51 mm) and down gauge in foundation including levelling, compacting and curing etc. complete.Cu.m23017162Rupees Seventeen Thousand One Hundred Sixty Two Only3947260
462 UPVC Pipes     
463 Providing and fixing un platisized polyvinyl chloride pipe (P.V.C) "D" class and specials etc. including cutting and fitting complete with and including the cost of cutting trench upto 1-1/2 feet deep refilling, watering, ramming, and disposal of surplus earth within one chain and after cleaning the pipe and cartage within 10 miles (16.09 km.) (working pressure 12 kg/cm2 ) 1-1/4 inches (32 mm) dia.     
464MES 20-4 6 inches (150 mm) diaRu.m28774129Rupees Four Thousand One Hundred Twenty Nine Only11879133
465MES 20-34 inches (100 mm) diaRu.m9002759Rupees Two Thousand Seven Hundred Fifty Nine Only2483100
466 HDPE Pipe     
467 High Density Polyethylene Pipe (HDPE-100), Class PN-10 / SDR-17 (excluding cost of excavation), supply and fixing. Complete with fusion Joint     
468MES 18-562315 mmRu.m15015609Rupees Fifteen Thousand Six Hundred Nine Only2341350
469Bill No. 10 EXTERNAL LIGHTING WORKS      
470 Length of cables are tenetative. Actual length of cables to be installed shall be practically measured at site by the Contractor, duly authenticated by the employers electrical engineer before placing the order with the manufacturer, however, approximate length of cables are shown herewith. Payments shall be made as per actual length installed.     
471MES 25-257Providing & laying 4-core, PVC insulated & PVC sheathed, 600/1000 Volts grade with stranded copper conductor, armoured underground, LT cable buried in the ground dully covered with sand and warning cable tiles as per Pak. P.W.D specification as required.      
472 16mmsq P/Meter. 20803411.52Rupees Three Thousand Four Hundred Eleven and Fifty Two Paisa Only7095961.6
474MES 25-331Supply & drawing of 16 mm², single core, PVC insulated wire in all kinds of existing or given conduit/cable duct as required. (From Transformer to SLCP) P/Meter.20801756.16Rupees One Thousand Seven Hundred Fifty Six and Six Paisa Only3652813
476MarketMaking Termination of 3 or 4 core armoured / un-armoured copper conductor, PVC X PVC L.T Cable including providing & fixing proper lugs etc complete in all respect as required.      
477 a) 16mmsq to 25mmsqP/Job42954.56Rupees Two Thousand Nine Hundred Fifty Four and Fifty Six Paisa Only11818.24
479MES 25-592Providing and fixing indoor/outdoor, Single core, 11KV, XLPE, heat shrink termination ends kit complete in all respect as required      
480 a) 16mmsq to 25mmsqP/Job43794.56Rupees Three Thousand Seven Hundred Ninety Four and Fifty Six Paisa Only15178.24
482MES 25-492Making Straight through joint of 3 or 4 core armoured, copper conductor L.T cable, complete with heat shrink tubes, ferules, GI flexible Earth net, joint box and compound solution including excavation & back filling as required.      
483 a) 16mmsq P/Job714605.92Rupees Fourteen Thousand Six Hundred Five and Ninety Two Paisa Only102241.44
485 Providing, Installation, Testing and Commissinoing of Street / Road Lights (IP 65) including driver, having warm / neutral white / cool white colour 110-120 lm/ watts efficiency 0.9 or above power factor 40000-50000 hours life cycle, including connection, complete in all respect as approved by the engineer incharge.      
486MES 25-101090-100 Watts No. 8449035.84Rupees Forty Nine Thousand Hundred Thirty Five and Eighty Four Paisa Only4119010.56
488 Supply and installation of hot-dipped galvanized inside and outside with 4mm wall thickness Octagonal Steel poles. Including base plate, galvanized J bolt, nuts and washer, self locking inspection weather proof type door with rubber gasket, earthing lugs strip in side pole, special key, as per specification and details shown on the drawings. The product complying with the specification shall be used or approved by the Engineer.     
491MES 25-259 meter high Hot-dipped galvanized, Octagonal Steel pole with single arm.Each46106243.2Rupees One Lakh Six Thousand Two Hundred Forty Three and Twenty Paisa Only4887187.2
492 9 meter high Hot-dipped galvanized, Octagonal Steel pole with Double armEach19104220.48Rupees One Lakh Four Thousand Two Hundred Twenty and Forty Eight Paisa Only1980189.12
494 Supply, installation testing and comissioning of uPVC conduit/ pipe Class D including cost of all fittings i.e., Elbows, Tee, Sockets, Reducer etc jointing with accessories. complete in all respect as shown in drawings and as per specifications.     
496MES 24-42250 mm Dia uPVC ConduitMtr20802203.04Rupees Two Thousand Two Hundred Three and Four Paisa Only4582323.2
498MarketWiring for sub main with 2 x 2.5mm², PVC insulated wire 300/500 volts grade, single core, stranded copper conductor wire in 20mm (3/4")dia, uPVC conduit recessed in the wall, column and roof etc. including 1.5mm² PVC insulated wire single core wire as ECC as required. P/Meter.1176516.35Rupees Five Hundred Sixteen and Thirty Five Paisa Only607227.6
500 Supply, installation, testing and commissioning of following cable terminal box comprising with 2Amp Miniature circuit breaker (MCB) including 415 volt high voltage resistance Copper terminal, Complete in all respect as per specification and drawing.     
501MarketCable Terminal Box with 1x2 Amp miniature circuit breaker.Each461792Rupees One Thousand Seven Hundred Ninety Two Only82432
502MarketCable Terminal Box with 2x2 Amp miniature circuit breaker.Each192689Rupees Two Thousand Six Hundred Eighty Nine Only51091
504MarketSupply, installation , testing & commissioning of following out door type Street Light Control Panel (IP-67) rated, as per single line schematic diagram including provision of Pad Mounted foundation , complete in all respect as per drawing and specification:-     
505 SLCP-1 :     
506 INCOMING:     
507 1 No: 40A TP MCCB (Isc: 10KA)     
508 1 No: 40A TP Contactor On/Off Push Button     
509 1 No. : 3 Phase Kwh Energy Meter      
510 1 No. : Surge Protector (15-20 kA)     
511 1 No. : Photo Sensor with manual bypaas timer contactor arrangement .     
512 OUTGOING:     
513Market09 Nos: 15A TP MCCB (Isc:10 KA)Each1368000Rupees Three Lakh Sixty Eight Thousand Hundred Only368000
514 Earthing System     
515MarketSupply , installation , testing and commissioning of earthing system with 3 meter long 20 mm dia earth Copper rod at both end of each circuit of street light, directly driven to ground to obtain earth resistance Not less than 3 ohm including 16 sq mm bare conductor wire from earth rod to lighting pole, Marconite concrete, drilling in ground etc, complete in all repect as per specification and drawing or as directed by Engineer.Each264381Rupees Sixty Four Thousand Three Hundred Eighty One Only128762
517MarketSupply , installation , testing and commissioning of earthing system for protecting Earthing of SLCP with 3 meter long Copper rod with 20 mm dia size with bare Copper Earth conductor 2 x 70 sq. mm, up to Earth connecting point, inspection chamber, marconite concrete, drilling etc, to achieve less than 1 ohms specified Earthing results. Complete in all respect as per drawing and specification or as directed by Engineer.Each280220Rupees Eighty Thousand Two Hundred Twenty Only160440
519MarketSupply, installation, testing and commissioning of earthing system with 3 meter long 20 mm dia earth copper rod at both end of each circuit of street light, directly driven to ground to obtain earth resistance not less than 3 ohm including 16 sq mm bare conductor wire from earth rod to lighting pole, marconite concrete, drilling in ground etc. Complete in all repect as per specification and drawing or as directed by Engineer.Each264000Rupees Sixty Four Thousand Hundred Only128000
521MarketSupply, installation, testing and commissioning of earthing system for protecting earthing of SLCP with 3 meter long copper rod with 20 mm dia size with bare copper earth conductor 2 x 70 sq. mm, up to earth connecting point, inspection chamber, marconite concrete, drilling etc, to achieve less than 1 ohms specified earthing results. Complete in all respect as per drawing and specification or as directed by the Engineer.Each281726Rupees Eighty One Thousand Seven Hundred Twenty Six Only163452
523MarketExcavation and backfilling of every type of trench in any type of soil with in the project area for laying of street light cables, including and cushion, protective bricks, warning tape and excvated compaction in layers not exceeding 9 inch thick, site cleaning etc. as per drawing and specification or as directed by the Engineer.     
524 Excavation, back filling and compactionCu.m683351.3Rupees Three Hundred Fifty One and Thirty Paisa Only239937.9
525 River Sand (Bed and cover)Cu.m230750Rupees Seven Hundred Fifty Only172500
526 Bricks Cu.m459516.5Rupees Nine Thousand Five Hundred Sixteen and Fifty Paisa Only428242.5
527 Warning Tape with 300 mm width and 0.5 mm thickness Rm208260Rupees Sixty Only124920
GRAND TOTAL:Rs 421,744,734.28

Scope of Work

As per BOQ

 

Price Schedule

For Individual Jobs

# Job Title Quantity Unit Price (PKR) Total Price (PKR) Delivery Location Delivery Period / Year Country of Origin
1
2
For Lots
# Lot Title Total Lot Price (PKR) Country of Origin
1[Lot 1 Title]

📑 General Conditions of Contract (GCC)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

Red Book:
© FIDIC 2017. All rights reserved.

The Conditions of Contract are the “General Conditions” which form part of the “Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (“Red book”) Second edition 2017” published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC) and the following “Particular Conditions” which shall complement the General Conditions of the Contract.

The successful Bidder, upon contract award, shall be required to furnish two (02) copies of aforementioned “General Conditions” for incorporation in the Works Contract.

International Federation of Consulting Engineers (FIDIC) FIDIC
Bookshop – Box- 311 – CH – 1215 Geneva 15, Switzerland
Fax: +41 22 799 49 054
Telephone: +41 22 568 0500
E-mail: fidic@fidic.org
Website:
www.fidic.org
FIDIC code: ISBN13: 978-2-88432-084-9

📑 Special Conditions of Contract (SCC)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

PARTICULAR  CONDITIONS OF CONTRACT (PCC)

Particular Conditions
(Mandatory Provisions not to be amended/substituted) 

The Particular Conditions (PCC) complement the General Conditions (GCC) to specify dates, contractual requirements, and special circumstances related to the Works. The PCC consists of two parts, Part A - Contract Data and Part B - Special Provisions. The provisions to be found in the Special Provisions (Particular Conditions - Part B) take precedence over the equivalent provisions found under the same Sub-Clause number(s) in the General Conditions, and the provisions of the Contract Data (Particular Conditions - Part A) take precedence over the Special Provisions (Particular Conditions - Part B).

PART A - Contract Data

Sub-Clause 1.1.27
Defects Notification Period (DNP): 180 Days

Sub-Clause 1.1.31 
Employer's name & address: Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)), Assistant Manager PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

Sub-Clause 1.1.35 
Engineer's name & address: Asian Consulting Engineers 

Lahore

Sub-Clause 1.1.84
Time for Completion: 240 days for whole of the works

Sub-Clause 1.3 (a)(ii)
Agreed method of electronic transmission: Not Agreed

Sub-Clause 1.3 (d)
Address of Empoyer for Communications: PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
Address of Engineer for Communications: 

Lahore


Address of Contractor for Communications: -----------------------------

Sub-Clause 1.4
Contract shall be governed by the law of:    Islamic Republic of Pakistan
Ruling language: English
Language for communications: English

Sub-Clause 2.1
After receiving the Letter of Acceptance, the Contractor shall be given right of access to all or part of the Site within: 15 days after Commencement Date

Sub-Clause 2.4
Employer’s financial arrangements:

PIDC Own Funds

Sub-Clause 3.2 (e)(ii)
Engineer’s Duties and Authority: Variation resulting in an increase of the Accepted Contract Amount in excess ofone percent (1%)subject to accumulative Variations not exceeding five percent (5%)of the Accepted Contract Amount 

Sub-Clause 4.2
Performance Security (as percentage of the Accepted Contract Amount in Currencies): 10.00%
Form of Performance Guarantee: Pay Order, Banker's Cheque, Bank Guarantee

Sub-Clause 4.2.1
List of Insurance Companies:

All AA rating insurance companies

Sub-Clause 4.7.2
period for notification of errors in the items of reference: Twenty Eight (28) days

Sub-Clause 4.19
Period of payment for temporary utilities: Each Month

Sub-Clause 5.1 (a)
Maximum allowable accumulated value of work subcontracted (as a percentage of the Accepted Contract Amount): Nil %

Sub-Clause 5.1 (b)
Parts of the Works for which subcontracting is not permitted: Nil

Sub-Clause 6.5
Normal working hours on the Site: 9

Sub-Clause 8.3
Number of additional paper copies of programmes: 3

Sub-Clause 8.8 & 14.15(b)
Delay Damages payable for each day of delay 0.01% of the Accepted Contract Amountfor delay in completion of whole of the Works

Sub-Clause 8.8
Maximum amount of Delay Damages    10.00 % of the Accepted Contract Amount

Sub-Clause 8.14
Applicability of Incentives for Early Completion    No

Sub-Clause 12.3
Percentage profit (Not more than 10%):    Nil

Sub-Clause 13.4.(b)(ii)
Percentage rate to be applied to Provisional Sums for overhead charges and profit: Twenty Five percent (25%)

Sub-Clause 14.2
Total Advance Payment: Fifteen percent (15%) of the Accepted Contract Amount excluding Provisional Sums payable in the currencies and proportions in which the Accepted Contract Amount is payable

Sub-Clause 14.2.1
Advance Payment Insurance Allowed

Only Bank Guarantee Applicable

Sub-Clause 14.2.3
Percentage deductions for the repayment of the Advance Payment: Deduction shall be made at the amortization rate of 17.5 % of the value of the Works executed of each IPC as provided in paragraph (i) of Sub-Clause GCC 14.3, starting from 2nd IPC provided that the advance payment shall be completely repaid prior to the time when 90% of the Accepted Contract Amount less Provisional Sums has been certified for payment. It may be more than 17.5% in the last instalment to ensure full repayment.

Sub-Clause 14.3
Period of payment    One Month

Sub-Clause 14.3(b)
Number of additional paper copies of Statements: 3

Sub-Clause 14.3 (iii)
Percentage of retention: Seven percent (7%)

Sub-Clause 14.3 (iii)
Limit of Retention Money (as a percentage of the Accepted Contract Amount): Five percent (5%)

Sub-Clause 14.5(b)(i)
Plant and Materials for payment when shipped: Plant and Materials under Bill of “Imported Plant and Materials” 

Imported Plants and Materials

Not Applicable

Sub-Clause 14.5(c)(i)
Plant and Materials for payment when delivered to the Site: Plant and Non Perishable Materials 

Plants and Materials Onsite

Not Applicable

Sub-Clause 14.6.2
Minimum amount of Interim Payment Certificate (IPC): Yes
The Minimum Amount IPC is 40000000

[Employer to give value not exceeding one fifth of the average expected value of Interim Payment Certificate]

Sub-Clause 14.7(a)
Period of payment of Advance Payment to the Contractor: 14 days

Sub-Clause 14.7b(i)   
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.6:    28 days

Sub-Clause 14.7b(ii)
Period for the Employer to make interim payments to the Contractor under Sub-Clause 14.13 (Final Payment): 56 days 

Sub-Clause 14.7(c)
Period for the Employer to make final payment to the Contractor: 56 days 

Sub-Clause 14.8
Financing charges for delayed payment Local Currency (PKR):
6-Month KIBOR (Offer) +3% per annum.
Foreign Currency: 
USD
6-Month SOFR (Secured Overnight Financing Rate for USD) +1% per annum.

EURO
6-Month EURIBOR (EURO Interbank Offered Rate for EURO) +1% per annum.

Others
Appropriate rates +1% (for other foreign currencies, Ref. Schedule-A, A-4 to Bid).

Sub-Clause 14.11.1(b)
Number of additional paper copies of draft Final Statements: 3
[insert number of copies say six (06)]

Sub-Clause 14.15
Currencies of payment of Contract Price: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(a)(i)
Proportions or amounts of Local and Foreign currencies: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(c)
Currencies and proportions for payment of Delay Damages: as stated in the Table Schedule of Adjustment Data of Schedule A (if Given)

Sub-Clause 14.15(f)
rates of exchange: as stated in the Table IV of Schedule A (If Given)

Sub-Clause 17.2(d)
Forces of nature, the risks of which are allocated to the Contractor: Nil

Sub-Clause 19.1
Permitted deductible limits: 
i)    insurance required for the Works: Ten percent (10%) of loss amount on each & every loss
ii)    insurance required for Goods: Nil
iii)    insurance required for liability for breach of professional duty: Nil
iv)    insurance required against liability for fitness for purpose (if any is required): Nil
v)    insurance required for injury to persons and damage to property: Nil
vi)    insurance required for injury to employees: Nil
vii)    other insurances required by Laws and by local practice : Nil  

Periods for submission of insurance:
a)    evidence of insurance: Not later than the Commencement Date
b)    relevant policies: Within twenty eight (28) day from the Commencement Date

Sub-Clause 19.2.1(b)
Additional amount to be insured (as a percentage of the replacement value): 15% of the replacement value (Accepted Contract Amount)
Sub-Clause 19.2.2 
Extent of insurance required for Goods: From Ex-Works (i.e., works, factory, warehouse, etc) to delivery at the Site
Amount of insurance required for Goods: Full replacement value

Sub-Clause 19.2.3(a)
Amount of insurance required for liability for breach of professional duty: Full replacement value of the Works to be designed by the Contractor

Sub-Clause 19.2.3(b)
Insurance required against liability for fitness for purpose: Yes

Sub-Clause 19.2.3
Period of insurance required for liability for breach of professional duty: Until the date of issuance of Performance Certificate

Sub-Clause 19.2.4
Amount of insurance required for injury to persons and damage to property: Injury to person and Fatal case: 
in accordance with Workmen Compensation Act
Damage to Property: The Amount of Insurance Required for Person Injury is 50000
The Amount of Insurance Required for Damage to Property is 50000 as per his assessment of the adjoining property(ies) other than the Works]
without limit to the number of incidents

Sub-Clause 19.2.6
Other insurances required by Laws and by local practice: All insurances as applicable, to the extent of execution of the project, under Federal and Provincial laws of Islamic Republic of Pakistan

Sub-Clause 21.1
Time for appointment of the DAAB: Within 28 days from the Commencement Date.
In case the Accepted Contract Amount is lesser than PKR one (01) billion, appointment of the DAAB shall be made when Dispute arises between the Parties.

Sub-Clause 21.1
The DAAB shall comprise  1
[insert either “a sole Member” or “Three Members”]
[For a Contract estimated to cost above PKR 2.5billion, the DAAB shall comprise of three members. For a Contract estimated to cost between PKR1billion and PKR2.5billion, the DAAB may comprise of three members or a sole member. For a Contract estimated to cost less than PKR1billion, a sole member is recommended.]

Sub-Clause 21.1
List of proposed members of DAAB
- proposed by Employer

Time for appointment of the DAAB: Within 56 days from the Commencement Date.


- proposed by Contractor
[to be inserted at the time of signing of the Contract]
1.________________
2.________________
3.________________

Sub-Clause 21.2
Appointing entity (official) for DAAB members    Managing Director Public Procurement Regulatory Authority (PPRA) or Chairman Pakistan Engineering Council (PEC) from the list of PEC approved arbitrators published at its website

Sub-Clause 21.6
Rules of Arbitration: PEC Rules of Conciliation and Arbitration or Pakistan Arbitration Act of 1940, if the former is inactive.
The place of Arbitration shall be in the Employer’s country: Karachi
[Insert name of city]

 

Particular Conditions

PartB - Special Provisions

1.1    Definitions

1.1.76 “Specification”
Following is added at the end:
“and consists of two parts i.e.,
i)    “Part A - Specific Provisions”; and 
ii)    “Part B - Technical Provisions”.”

1.2    Interpretation

“and” is deleted from the end of sub-paragraph (i) and added at the end of sub-paragraph (j). 
Sub-paragraph (k) is added:
“(k)    The word “tender” is synonymous with “bid” the word tenderer with “bidder”, the words “tender documents” with “bidding documents” and “Schedule of Prices” with “Bill of Quantities”, as applicable.”
1.5    Priority of Documents    The documents listed at (a) through (k) of this Sub-Clause are deleted and substituted with the following:
(a)    the Contract Agreement;
(b)    the Letter of Acceptance;
(c)    the Letter of Bid;
(d)    the Particular Conditions Part A - Contract Data;
(e)    the Particular Conditions Part B - SpecialProvisions;
(f)    the General Conditions;
(g)    the Specification Part A - SpecificProvisions;
(h)    the Specification Part B- Technical Provisions;
(i)    the Drawings;
(j)    the completed Schedules to Bid includingBillof Quantities;
(k)    the JV Undertaking (if the Contractor is a JV); and
(l)    any other documents forming part of the Contract.
The addenda/corrigenda, if any, shall be deemed to have been incorporated at the appropriate places in the documents forming the Contract.

1.6    Contract Agreement

In the last line of the 1st paragraph the text “shall be borne by the Employer” is substituted by “shall be reimbursed by the Employer to the Contractor”.

3.1    The Engineer

In sub-paragraph (a) the text “as defined in the Pakistan Engineering Council Act, 1975 (Act No.V of 1976)” are added after the words “professional engineer”.

3.2    Engineer’s Duties and Authority

The Engineer shall obtain the consent in writing of the Employer before taking action under the following Sub-Clauses of these Conditions:
(a)    Consenting to the subcontracting of any part of the Works under Sub-Clause 5.1 [Subcontractors]
(b)    Any action under Sub-Clauses 8.9 [Employer’s Suspension] and 8.12 [Prolonged Suspension]
(c)    Issuance of “Taking Over Certificate” under Sub-Clause 10.1 [Taking Over the Works and Sections].
(d)    Issuing the “Performance Certificate” under Sub-Clause 11.9 [Performance Certificate].
(e)    Sub-Clause 13.1 [Right to Vary]: instructing a Variation, except;
(i)    in an emergency situation as determined by the Engineer, or
(ii)    if such a Variation would increase the Accepted Contract Amount by less than the percentage specified in the Contract Data.
(f)    Sub-Clause 13.3 [Variation Procedure]: approving a proposal for Variation submitted by the Contractor in accordance with Sub-Clause 13.3.2 [Variation by Request for Proposal] or 13.2 [Value Engineering].
(g)    Certifying release of second half of the Retention Money under Sub-Clause 14.9 [Release of Retention Money].
(h)    Issuing Final Payment Certificate under Sub-Clause 14.13 [Issue of FPC].
(i)    

Issue of FPC Sub Clauses

Issuing Final Payment Certificate under Sub-Clause 14.13 [Issue of FPC].


*[insert Sub-Clause number (not Sub-Clause 3.7 [Agreement or Determination]
Any such requirement shall not be applied to any action by the Engineer under Sub-Clause 3.7 [Agreement or Determination], as stated in Sub-Clause 3.2 [Engineer’s Duties and Authority] of the General Conditions.
Notwithstanding the obligation, as set out above, to obtain approval, if, in the opinion of the Engineer, an emergency occurs affecting the safety of life or of the Works or of adjoining property, he may, without relieving the Contractor of any of his duties and responsibility under the Contract, instruct the Contractor to execute all such work or to do all such things as may, in the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall forthwith comply, despite the absence of approval of the Employer, with any such instruction of the Engineer. The Engineer shall determine an addition to the Contract Price, in respect of such instruction, in accordance with Clause 13 and shall notify the Contractor accordingly, with a copy to the Employer.
Following is added after the words “the Employer’s consent is required” in 4th paragraph:
“stating that the Employer’s consent has been obtained for that specified authority”

4.2    Performance Security

4.2.1    Contractor’s Obligations
The entity issuing the Performance Security and its form shall be as under:
The Performance Security shall be, at the option of the Contractor,issuedin the prescribed form included in the Bidding Documents,by(a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistan or (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofratingas provided in Table below:
Accepted Contract Amount (In Eq. PKR million)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA
In case of Joint Venture, the Performance Security shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.
Following paragraph is added at the end of this Sub-Clause:
“The amount of Performance Security shall be reducedto 50%following issue of the Taking-Over Certificate for the whole of the Works under Clause 10 of Conditions of Contract.”

4.3    Contractor’s Representative

In second paragraphthe text “professional engineer as defined in the Pakistan Engineering Council Act, 1975 (Act No. V of 1976) (having temporary licence in case of foreign engineer under Section 12 of the Pakistan Engineering Council Act, 1975 (Act No. V of 1976)” are added after the words “qualified, experienced”.
In the 3rd paragraph the words “28 days” are substituted by “14 days”. In 2nd line of 4thparagraph the text “or appoint a replacement” is substituted by “except appointment of a suitable temporary replacement is deployed at the Site”

4.4    Contractor’s Documents

4.4.2    As-Built Records
First paragraph is deleted and the text in the last paragraph is substituted with the following:
“The Contractor shall furnish to the Engineer 6 copies, one reproducible and one electronic copy(provided the Engineer has made available to the Contractor editable form of the Drawings)of all Drawings amended to conform to the Works as built.In case the Engineer does not make available to the Contractor editable form of the Drawings, the Contractor shall furnish to the Engineer as-built data for incorporation in the Drawings. Upon receipt of PDF versions of the as-built drawings prepared by the Engineer, the Contractor shall furnish to the Engineer 6copies and one reproducible of these Drawings.
The price of such Drawings shall be deemed to be included in the Contract Price.”
Following Sub-Clause is added:
4.4.4    ShopDrawings
The Contractor shall submit to the Engineer for review 3 copies of all shop and erection drawings applicable to this Contract as per provision of relevant Sub-Clause of the Contract.
Review and approval by the Engineer shall not exceed 21 days and be construed as a complete check but will indicate only that the general method of construction and detailing is satisfactory and the Engineer’s review or approval shall not relieve the Contractor of any of his responsibilities under the Contract.

4.8    Health and Safety Obligations

The following text is added at the end ofthis Sub-Clause:
In the event of work being carried out outside the normal working hours and in the event of work being carried out at night, the Contractor shall at his own cost, provide and maintain such good and sufficient light as will enable the work to proceed satisfactorily and without danger. The approaches to the Site and the Works where the night work is being carried out shall be sufficiently lighted. All arrangement adopted for such lighting shall be to the satisfaction of the Engineer.

4.20    Progress Reports

At the end of sub-paragraph (g) the word “and” is deleted and at the end of sub-paragraph (h) the full stop (.) is replaced with “;”, and the following new sub-paragraphs are added as:
(i)    planned programme for the execution of the Works for next 56 days to enable the Engineer to determine its programme of inspection and testing;
(j)    monthly summery of daily job record indicating weather conditions, deployment of Contractor’s Equipment, labour employment, local material procurement and material import, if any; and
(k)    salient contractual and project information.

5.1    Subcontractors

Add the following text at the end of paragraph (ii):
“underSchedule to Bid”
The following is added at the end of the last paragraph of Sub-Clause 5.1:
“All subcontracts relating to the Works shall include provisions which entitle the Employer to require the subcontract to be assigned to the Employer under sub-paragraph (a) of Sub-Clause 15.2.3 [After Termination].
The Contractor shall give reasonable opportunity to contractors from Islamic Republic of Pakistan for subcontracts for the Works, and endeavour to employ such contractors as Subcontractors.”

5.2    Nominated Subcontractors

5.2.2    Objection to Nomination
In sub-paragraph (c), “and” is deleted from the end of (i);
 “.” at the end of (ii) is replaced with: “, and”. 
The following is then added as (iii):  
“(iii)    be paid only if and when the Contractor has received from the Employer payments for sums due under the Subcontract referred to under Sub-Clause 5.2.3 [Payment to nominated Subcontractors].”

6.1    Engagement of Staff and Labour

The following paragraph is added at the end of the Sub-Clause:
“The Contractor shall, to the extent practicable and reasonable, employ staff (not less than 50%) and labour (not less than 85%) with appropriate qualifications and experience from sources within the Islamic Republic of Pakistan.”

6.7    Health and Safety of Personnel

The existing text is substituted with the following:
“In order to provide for the safety, health and welfare of persons, and for prevention of damage of any kind, all operations for the purposes of or in connection with the Contract shall be carried out in compliance with the Safety Requirements of the Government of Pakistan with such modifications thereto as the Engineer may authorize or direct and the Contractor shall take or cause to be taken such further measures and comply with such further requirements as the Engineer may determine to be reasonably necessary for such purpose. The Contractor shall also provide all other medical services and appoint a health and safety officer at Site if stated in the Specifications. In case of any fatality or serious accident, the Contractor shall, in addition, notify the Engineer immediately by the quickest available means.”

6.8    Contractor’s Superintendence

Insert at the end of sub-paragraph (a) of this Sub-Clause:
"or, if not, the Contractor shall make competent interpreters available during all working hours, in a number sufficient for those persons to properly perform their superintendence duties"
The following text is added at the end of this Sub-Clause: 
“The Contractor’s authorized representative and his other engineers working at site shall possess valid registration with the Pakistan Engineering Council.
The Contractor’s authorized representative at Site shall be authorized to exercise adequate administrative and financial powers on behalf of the Contractor so as to achieve completion of the Works as per the Contract.”

6.12    Key Personnel

The following is inserted at the end of the last paragraph: 
“If any of the Key Personnel are not fluent in this language, the Contractor shall make competent interpreters available during all working hours in a number deemed sufficient by the Engineer.”
The following Sub-Clauses 6.13 to 6.26 are added at the end of Sub-Clause 6.12:

6.13    Foreign Personnel

The Contractor may bring in to the Country any foreign personnel who are necessary for the execution of the Works to the extent allowed by the applicable Laws. The Contractor shall ensure that these personnel are provided with the required residence visas and work permits. The Employer will, if requested by the Contractor, use all reasonable endeavours in a timely and expeditious manner to assist the Contractor in obtaining any local, state, national, or government permission required for bringing in the Contractor’s personnel.
The Contractor shall be responsible for the return of these personnel to the place where they were recruited or to their domicile. In the event of the death in the Country of any of these personnel or members of their families, the Contractor shall similarly be responsible for making the appropriate arrangements for their return or burial.

6.14    Supply of Foodstuffs

The Contractor shall arrange for the provision of a sufficient supply of suitable food as may be stated in the Specification at reasonable prices for the Contractor’s Personnel for the purposes of or in connection with the Contract.

6.15    Supply of Water

The Contractor shall, having regard to local conditions, provide on the Site an adequate supply of drinking and other water for the use of the Contractor’s Personnel.

6.16    Measures against Insect and Pest Nuisance

The Contractor shall at all times take the necessary precautions to protect the Contractor’s Personnel employed on the Site from insect and pest nuisance, and to reduce the danger to their health. The Contractor shall comply with all the regulations of the local health authorities, including use of appropriate insecticide.

6.17    Alcoholic Liquor or Drugs

The Contractor shall not, otherwise than in accordance with the Laws of the Country, import, sell, give, barter or otherwise dispose of any alcoholic liquor or drugs, or permit or allow importation, sale, gift, barter or disposal thereto by Contractor’s Personnel.

6.18    Arms and Ammunition

The Contractor shall not give, barter, or otherwise dispose of, to any person, any arms or ammunition of any kind, or allow Contractor’s Personnel to do so.

6.19    Festivals and Religious Customs

The Contractor shall respect the Country’s recognized festivals, days of rest and religious or other customs.

6.20    Funeral Arrangements

The Contractor shall be responsible, to the extent required by local regulations, for making any funeral arrangements for any of its local employees who may die while engaged upon the Works.

6.21    Forced Labour

The Contractor, including its Subcontractors, shall not employ or engage forced labour which consists of any work or service, not voluntarily performed, that is exacted from an individual under threat of force or penalty, and includes any kind of involuntary or compulsory labour, such as indentured labour, bonded labour or similar labour-contracting arrangements.

6.22    Child Labour

The Contractor, including its Subcontractors, shall not employ or engage child labour in accordance with relevant law(s) in force in Islamic Republic of Pakistan.

6.23    Employment Records of Workers

The Contractor shall keep complete and accurate records of the employment of labour at the Site. The records shall include the names, ages, genders, hours worked and wages paid to all workers. These records shall be summarized on a monthly basis and submitted to the Engineer. These records shall be included in the details to be submitted by the Contractor under Sub-Clause 6.10 [Contractor’s Records].

6.24    Workers’ Organizations

The Contractor shall comply with the relevant labour laws of Pakistan which recognize workers’ rights to form and to join workers’ organizations/Trade Union of their choosing and to bargain collectively without interference.

6.25    Non-Discrimination and Equal Opportunity

The Contractor shall not make decisions relating to the employment or treatment of Contractor’s Personnel on the basis of personal characteristics unrelated to inherent job requirements. The Contractor shall base the employment of Contractor’s Personnel on the principle of equal opportunity and fair treatment, and shall not discriminate with respect to any aspects of the employment relationship, including recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, promotion, termination of employment or retirement, and disciplinary practices. 
Special measures of protection or assistance to remedy past discrimination or selection for a particular job based on the inherent requirements of the job shall not be deemed discrimination. The Contractor shall provide protection and assistance as necessary to ensure nondiscrimination and equal opportunity, including for specific groups such as women, persons with disabilities, migrant workers and children (of working age in accordance with Sub-Clause 6.22).

6.26    Epidemics   

In the event of any out-break of illness of epidemic nature, the Contractor shall comply with and carry out such regulations, orders and requirements as may be made by the Government or the local medical or sanitary authorities for the purpose of overcoming the same.

7.7    Ownership of Plant and Materials

The following is added before the first paragraph:
“Except as otherwise provided in the Contract,” 
The following is added at the end of the Sub-Clause:
"No Plant and/or Materials that is the property of the Employer shallbe removed from the Site. If it becomes necessary to:
(i)    remove any item of such Plant from the Site for the purposesof repair, the Contractor shall give a Notice, with reasons, tothe Engineer requesting consent to remove the defective ordamaged item off the Site. This Notice shall clearly identifythe item of defective or damaged Plant, and shall give detailsof: the defect or damage to be repaired; the place to whichdefective or damaged item of Plant is to be taken for repair;the transportation to be used (and insurance cover for suchtransportation); the proposed inspections and testing off theSite; and the planned duration required before the repaireditem of Plant shall be returned to the Site. The Contractorshall also provide any further details that the Employer mayreasonably require; or
(ii)    replace any item(s) of such Plant and/or Materials, theContractor shall give a Notice, with reasons, to the Engineerclearly identifying the item(s) of Plant and/or Materials to bereplaced, and giving details of the due date of delivery tothe Site of the replacement item(s).
Where any item of Plant and/or Materials has become the propertyof the Employer under this Sub-Clause before it has been deliveredto the Site, the Contractor shall ensure that such an item is notmoved except for its delivery to the Site.
The Contractor shall indemnify and hold the Employer harmlessagainst and from the consequences of any defect in title orencumbrance or charge (except any reasonable restrictionarising from the intellectual property rights of the manufacturer orproducer) on any item of Plant and/or Materials that has becomethe property of the Employer under this Sub-Clause."
The following Sub-Clause7.9 is added after Sub Clause 7.8:

7.9    Use of Pakistani Materials and Services

The Contractor shall, so far as may be consistent with the Contract, make the maximum use of materials, supplies, plant and equipment indigenous to or produced or fabricated in Pakistan and services available in Pakistan provided such materials, supplies, plant, equipment and services shall be of required standard.

8.1    Commencement of Works

The following is added before the first paragraph:
“After signing of the Contract Agreement by both Parties,” and thereafter the word “The” is replaced with the word “the”.

8.5    Extension of Time for Completion

The following is added after paragraph (c):
“for last five years”.
The following Sub-Clause 8.14 is added after Sub-Clause 8.13:

8.14    Incentives For Early Completion

If Contract Data does not state applicability of incentives for early completion, this Sub-Clause shall not apply.
The Contractor shall be entitled subject to Sub-Clause 20.2 [Claims for Payment and/or EOT] to bonus payment if the Works and/or each Section is completed earlier than the Time for Completion for the Works or Section (as the case may be). The amount of bonus for early completion of the Works and/or each Section shall be upto a limit and at a rate to 50% of the relevant limit and rate of delay damages prescribed in Contract Data and shall be paid for every day which shall elapse between the relevant Date of Completion of the Works or Section and the relevant Time for Completion.
For the purposes of calculating any bonus payment, the applicableTime for Completion stated in the Contract Data is fixed and noadjustments of this time by reason of granting an EOT will beallowed.
The following Sub-Clause 11.12 is added after Sub-Clause 11.11:

11.12    Supervisory Assistance During DNP

If provided under the Schedule of Prices, the Contractor shall provide supervisory assistance to the Employer during the DNP for the Works. Such supervisory assistance shall be as described in the Specification for the purpose of supporting the Employer's operation and maintenance of the Plant for the period specified in the Schedule of Prices after the Date of Completion.

12.2    Method of Measurement

The following paragraph is added at the end of the Sub-Clause:
“Summary of measured quantity for payment shall be delineated item-wise under four headsnamely; “Schedule of Prices Quantity”, “Quantity Executed To-date”, “Quantity Certified Previously” and “Net Quantity Executed under this Certificate”.

12.3    Valuation of the Works

The following text is added at the end of fifth paragraph of the Sub-Clause:
“Sum of overhead charges and profit for sub-paragraph (a) shall be Twenty Five percent (25%)”.

13.4    Provisional Sums

The following paragraph is inserted as the penultimate paragraph:
“The Provisional Sum shall be used to cover the Employer’s share of the DAAB members’ fees and expenses, in accordance with Clause 21. No prior instruction of the Engineer shall be required with respect to the work of the DAAB. The Contractor shall submit the DAAB members’ invoices and the satisfactory evidence of having paid 100% of such invoices as part of the substantiation of those Statements submitted under Sub-Clause 14.3.

13.6    Adjustments for Changes in Laws

The following paragraphsare added at the end of the Sub-Clause:
“Notwithstanding the foregoing, the Contractor shall not be entitled to an extension of time if the relevant delay has already been taken into account in the determination of a previous extension of time and such Cost shall not be separately paid if the same shall already have been taken into account in the indexing of any inputs to the Table of Adjustment Data in accordance with the provisions of Sub-Clause 13.7 [Adjustments for Changes in Cost].”

14.1    The Contract Price

The following is added at the end of the Sub-Clause: 
“Notwithstanding the provisions of subparagraph (b), Contractor's Equipment, including essential spare parts, imported by the Contractor for the sole purpose of executing the Contract shall be temporarily exempt from the payment of import duties and taxes upon initial importation, provided the Contractor shall post with the customs authorities at the port of entry an approved re-export bond or bank guarantee, valid until the Time for Completion plus six months, in an amount equal to the full import duties and taxes which would be payable on the assessed imported value of such Contractor's Equipment and spare parts, and callable in the event the Contractor's Equipment is not re-exported from the Country on completion of the Contract. A copy of the bond or bank guarantee endorsed by the customs authorities shall be provided by the Contractor to the Employer upon the importation of individual items of Contractor's Equipment and spare parts. Upon re-export of individual items of Contractor's Equipment or spare parts, or upon the completion of the Contract, the Contractor shall prepare, for approval by the customs authorities, an assessment of the residual value of the Contractor's Equipment and spare part to be re-exported, based on the depreciation scale(s) and other criteria used by the customs authorities for such purposes under the provisions of the applicable Laws. Import duties and taxes shall be due and payable to the customs authorities by the Contractor on (a) the difference between the initial imported value and the residual value of the Contractor's Equipment and spare parts to re-exported; and (b) on the initial imported value of the Contractor's Equipment and spare parts remaining in the Country after completion of the Contract. Upon payment of such dues within 28 days of being invoiced, the bond or bank guarantee shall be reduced or released accordingly; otherwise the security shall be called in the full amount remaining.”
[The Employer may change or delete this Sub-Clause as per Project requirements]

14.2    Advance Payment

14.2.1    Advance Payment Guarantee
The entity issuing the Advance PaymentGuaranteeand its form shall be as under:
The Advance PaymentGuarantee shall be in the form of Guarantee issued by (a) a Scheduled Bank in Pakistan or (b) a foreign bank duly counter-guaranteed by a Scheduled Bank in Pakistanor (c)an Insurance Companylisted in the Contract Data and rated by PACRA/VIS ofrating as provided in Table below:
Accepted Contract Amount (In Eq. million PKR)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA
In case of Joint Venture, the Advance PaymentGuarantee(s)shall be in the name of the Joint Venture or in the name of Lead/either firm of the JV or in ratio of shares of the individual JV partners.

14.6    Issue of IPC

14.6.1    The IPC
In the first line of the 1st paragraph the words “28 days” are substituted by “14 days”.

14.7    Payment

The words “or through crossed cheque in favour of the Contractor or JV partners. The Payment to JV partners shall be made at the request of the Joint Ventures in the ratio of their shares specified by them” are added at the end of the Sub-Clause.

14.8    Delayed Payment

In the first paragraph, third line, the words “compounded monthly” are deleted.
The text of 2nd paragraph is deleted and substituted with the following:
“The Employer shall pay to the Contractor compensation at the rate stated in the Contract Data.”

14.9    Release of Retention Money

The following is added at the end of Sub-Clause 14.9:
“Unless otherwise stated in the Contract, when the Taking-Over Certificate has been issued for the Works and the first half of the Retention Money has been certified for payment by the Engineer, the Contractor shall be entitled to substitute a guarantee, in the form annexed to the Particular Conditions or in another form approved by the Employer and issued by a schedule bank selected by the Contractor, for the second half of the Retention Money. The Contractor shall ensure that the guarantee is in the amounts and currencies of the second half of the Retention Money and is valid and enforceable until the Contractor has executed and completed the Works and remedied any defects, as specified for the Performance Security. On receipt by the Employer of the required guarantee, the Engineer shall certify, and the Employer shall pay the second half of the Retention Money. The release of the second half of the Retention Money against a guarantee shall then be in lieu of the release after the latest of the expiry dates of the Defects Notification Periods. The Employer shall return the guarantee to the Contractor within 21 days after receiving a copy of the Performance Certificate.

If the Performance Security required under Sub-Clause 4.2 is in the form of a demand guarantee, and the amount guaranteed under them when the Taking-Over Certificate is issued is more than half of the Retention Money, then the Retention Money guarantee will not be required. If the amount guaranteed under the Performance Security when the Taking-Over Certificate is issued is less than half of the Retention Money, the Retention Money guarantee will only be required for the difference between half of the Retention Money and the amount guaranteed under the Performance Security.

15.2    Termination for Contractor’s Default

15.2.1    Notice
Following text is added at the end of sub-paragraph (h) of this Sub-Clause:
“For the purposes of this Contract, corrupt and fraudulent practices have been defined in Public Procurement Rules 2004.”
15.2.3    After Termination
The word “and” at the end of sub-paragraph (ii) of paragraph (b) is deleted the following paragraph is added after sub-paragraph (iii):
“(iv)    all Employer-Supplied Materials and/or Employer's Equipment madeavailable to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer's Equipment], and”

15.4    Payment after Termination

The following text is added at the end of this Sub-Clause:
“The Employer shall be entitled to sell any of the Contractor’s Equipment, Temporary Works and unused materials and apply the proceeds of sale towards payment of any debt due from the Contractor to the Employer under this Clause including any outstanding payments to the Subcontractors.

16.2    Termination by Contractor

16.2.1    Notice
The sub-paragraph (j) is deleted in its entirety.
At the end of sub-paragraph (i) “; or” is replaced with “.” and at the end of sub-paragraph (h) “;” is replaced with “; or”.
In sub-paragraph (f) “84 days” are replaced with “180 days” and text “for reasons not attributable to the Contractor” is added at the end.

16.3    Contractor’s Obligations After Termination

Sub-paragraph (c) is deleted and replaced with:
"(c)    deliver to the Engineer all Employer-Supplied Materials and/orEmployer's Equipment made available to the Contractor in accordance with Sub-Clause 2.6 [Employer-Supplied Materials and Employer’s Equipment]; and
(d)    remove all other Goods from the Site, except as necessary for safety,and leave the Site."

17.1    Responsibility for Care of the Works

After the two instances of “Goods” in the last paragraph, the words “Employer-Supplied Materials and/orEmployer's Equipment” are added.
The following Sub-Clause 17.7 is added after Sub-Clause 17.6:

17.7    Use of Employer’s Accommodation/Facilities

The Contractor shall take full responsibility for the care of the items of the Employer’s facilities and/or accommodation, if any, as detailed in the Specification, from the date of use and/or occupation by the Contractor until the date on which such use and/or occupation is re-vested in the Employer.
If any loss or damage happens to any of the above items during a time while the Contractor is responsible for its care, arising from any cause other than a cause for which the Employer is responsible or liable, the Contractor shall promptly rectify the loss or damage at the Contractor’s risk and cost.

18.1    Exceptional Events

The words “or disorder” are replaced with “disorder or sabotage” in sub-paragraph (c) of the Clause.

18.4    Consequences of an Exceptional Event

The following is added at the end of sub-paragraph (b) after deleting the “.”: 
“, including the costs of rectifying or replacing the Works and/or Goods damaged or destroyed by Exceptional Events, to the extent they are not indemnified through the insurance policy referred to in Sub-Clause 19.2 [Insurance to be provided by the Contractor].”

18.5    Optional Termination

In sub-paragraph (c), the words “and necessarily” areadded after the words “was reasonably”.

19.1    General Requirements

Following text is added at the end of first paragraph:
“The Contractor shall immediately after the date of the Letter of Acceptance submit the draft of insurance policies for the Employer’s consent.”
Following text is added at the end of third paragraph:
“The Contractor shall, within the respective periods stated in the Contract Data submit to the Engineer and the Employer a) evidence that the insurances described in this Clause have been effected, and b) copies of policies of the insurances described in Sub-Clauses 19.2.1, 19.2.4 and 19.2.5.”

19.2    Insurance to be provided by the Contractor   

19.2.5    Injury to employees
The words “sickness, disease” are deleted in the third line of first paragraph.

The following Sub-Clause is added after Sub-Clause 19.2.6:
19.2.7    Insurance Company
“The Contractor shall be obliged to place all insurances described in this Clause with insurers listed in the Contract Data and rated byPACRA/VISofrating as provided in Table below:

Accepted Contract Amount (In Eq. million PKR)    Minimum Rating of Insurance Companies
Up to 1000    A (+)
1001 to no limit    AA

21.6    Arbitration

    The word “international” is deleted in the sixth line of first paragraph. The text of sub-paragraph (a) is substituted with the following:
“the Dispute shall be finally settled under the Rules of Arbitration, specified in the Contract Data;”
The following Clauses are added after Clause 21

22    Custom Duty   

[Employer may incorporate provisions where applicable. However, in order to make the bid more balanced, the payment of Customs Duties should be the responsibility of the Employer.]

23    Taxes   

The Contractor, Subcontractors and their employees shall be liable to pay income tax, withholding tax, super tax and other taxes on income arising out of the Contract. The rates and prices as stated in the contract shall be deemed to cover all such taxes.

24    Integrity Part

If it is found and established at any stage that the Contractor or any of his Subcontractors, agents or servants have violated or involved in violation of the Integrity Pact signed by the Contractor then the Employer shall be entitled to :
(a)    recover from the Contractor an amount equivalent to ten times the sum of any commission, gratification, bribe, finder’s fee or kickback given by the Contractor or any of his Subcontractors, agent or servants;
(b)    terminate the Contract; and
(c)    recover from the Contractor any loss or damage to the Employer as a result of such termination or of any other corrupt business practices of the Contractor or any of his Subcontractors, agent or servants. 
The termination under sub-paragraph(b) of this Sub-Clause shall proceed in the manner prescribed under Sub-Clause 15.1 to 15.4 and the payment under Sub-Clause 15.4 shall be made after having deducted the amounts due to the Employer under sub-paragraph(a) and (c) of this Sub-Clause.
Appendix     General Conditions of Dispute Avoidance/Adjudication Agreement

12    Disputes Under DAAB Agreement

In the first paragraph, third, fourth and fifth line, the text “under the Rules of Arbitration of the International Chamber of Commerce 2017……………shall apply” is substituted with “under the Arbitration Act 1940 by sole arbitrator appointed by the Managing Director Public Procurement Regulatory Authority or Chairman Pakistan Engineering Council.”

 

 

 

 

📑 Bid Securing Declaration (BSD)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

FORM OF BID SECURING DECLARATION

Date: 
No.: 
Alternative No.: P92743

To: Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)), Assistant Manager PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).

We, the undersigned, declare that:

We understand that, according to your conditions, Bids must be supported by a Bid-Securing Declaration.

We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:

(a)     have withdrawn our Bid during the period of Bid validity specified in the Letter of Bid; or
(b)     having been notified of the acceptance of our Bid by the Procuring agency/Employer during the period of Bid validity, (i) fail or refuse to sign the Contract; or (ii) fail or refuse to furnish the Performance Security (or guarantee), if required, in accordance with the ITB.

We understand this Bid Securing Declaration shall expire if we are not the successful Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight days after the expiration of our Bid.

 

Name of the Bidder*    
Name of the person duly authorized to sign the Bid on behalf of the Bidder**    _______
Title of the person signing the Bid    ______________________
Signature of the person named above    ______________________
Date signed ________________________________ day of ___________________, _____
*: In the case of the Bid submitted by joint venture specify the name of the Joint Venture as Bidder
**: Person signing the Bid shall have the power of attorney given by the Bidder attached to the Bid

[Note: In case of a Joint Venture, the Bid-Securing Declaration must be in the name of all members to the Joint Venture that submits the Bid.]

📑 Contract Form (CNF)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

FORM OF CONTRACT AGREEMENT

THIS CONTRACT AGREEMENT (hereinafter called the “Agreement”) made on the _________ day of __________ (month) 20_____ between Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)), Assistant Manager PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province). (hereinafter called the “Employer”) of the one part and __________________________________________________ (hereinafter called the “Contractor”) of the other part.
WHEREAS the Employer is desirous that certain Works, viz., Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze (P92743) should be executed by the Contractor and has accepted a Bid by the Contractor for the execution and completion of such Works and the remedying of any defects therein.
NOW this Agreement witnessed as follows:
1.    In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2.    The following documents, in the order of priority, after incorporating addenda, if any, except those parts relating to Instructions to Bidders shall be deemed to form and be read and construed as part of this Agreement:
a)    This Contract Agreement;
b)    The Letter of Acceptance;
c)    The Letter of Bid;
d)    The Particular Conditions Part A - Contract Data;
e)    The Particular Conditions Part B - SpecialProvisions;
f)    The General Conditions;
g)    The Specifications Part A - SpecificProvisions;
h)    The Specifications Part B- Technical Provisions;
i)    The Drawings;
j)    The Completed Schedules to Bid including Schedule of Prices;
k)    the JV Undertaking (if the Contractor is a JV); and
l)    [Employer to insert any other documents forming part of the Contract]

The addenda/corrigenda,if any, (Excluding part relating to Instructions to Bidders alongwith Bidding Data) shall be deemed to have been incorporated at the appropriate places in the “Documents forming the Contract”.
3.    In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy defects therein in conformity and in all respects with the provisions of the Contract.
4.    The Employer hereby covenants to pay the Contractor, in consideration of the execution and completion of the Works as per provisions of the Contract, the Contract Price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.


IN WITNESS WHEREOF the parties hereto have caused this Agreement to be executed on the day, month and year first before written in accordance with their respective laws.

 

Signature of the Contactor        Signature of Employer
        
(Seal)        (Seal)
Signed, Sealed and Delivered in the presence of:

Witness        Witness
        
        
(Name, Title and Address)        (Name, Title and Address)

 

DAAB Agreement

[All italicised text and any text within square brackets (except sub-clause headings) in this form of agreement is for use in preparing the form and should be deleted from the final product].

Name and details of the Contract Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze
______________________________________________________________________________

This Agreement made the ______day of ______ [month], _____ [year], between

Name and contact details of the Employer  Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)), Assistant Manager    
   PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
   +92-333-995-5002
   kamran.faraz@pidc.com.pk


Name and contact details of the Contractor     _____________________________________ (name)
    ____________________________________ (address)
    __________________________________ (telephone)
    ___________________(email / other contact details);

Name and contact details of the DAAB Member    _____________________________________ (name)
    ____________________________________ (address)
    __________________________________ (telephone)
    ___________________(email / other contact details);


(“DAAB Agreement”)

Whereas:
A.    the Employer and the Contractor have entered (or intend to enter) into the Contract;
B.    under the Contract, the “DAAB” or “Dispute Avoidance/Adjudication Board” means the sole member or three members (as stated in the Contract Data of the Contract) so named in the Contract, or appointed under Sub-Clause 21.1 [Constitution of the DAAB] or Sub-Clause 21.2 [Failure to Appoint DAAB Members] of the Conditions of Contract;
C.    the Employer and the Contractor desire jointly to appoint the above-named DAAB Member to act on the DAAB as:
a.    the sole member of the DAAB, and where this is the case, all references to the “Other Members” do not apply; or
b.    one of three members / chairman [delete the one which is not applicable] of the DAAB and, where this is the case, the other two persons are:

 

____________________________ (name)    _________________________ (name)
___________________________ (address)    _______________________ (address)
_____________________________(telephone)    ______________________(telephone)
______________(email/ other contact details)    _______ (email/other contact details)

the “Other Members”; and
D.    the DAAB Member accepts this appointment.

The Employer, Contractor and DAAB Member jointly agree as follows:

1.    The conditions of this DAAB Agreement comprise:
(a)    Clause 21 [Disputes and Arbitration] of the Conditions of Contract, and any other provisions of the Contract that are applicable to the DAAB’s Activities; and
(b)    the “General Conditions of Dispute Avoidance/Adjudication Agreement”, which is appended to the General Conditions of the “Conditions of Contract for Construction” Second Edition 2017 published by FIDIC (“GCs”), as amended and/or added to by the following provisions.
2.    [Details of amendments to the GCs, if any. For example:
In the procedural rules annexed to the GCs, Rule _ is deleted and replaced by: “ … “]
3.    The DAAB Member shall be paid in accordance with Clause 9 of the GCs. The currency of payment shall be ________.
In respect of Sub-Clauses 9.1 and 9.2 of the GCs, the amounts of the DAAB Member’s monthly fee and daily fee shall be:
monthly fee___________________ per month, and
daily fee of____________________ per day
(or as otherwise set under Sub-Clause 9.3 of the GCs).
4.    In consideration of the above fees, and other payments to be made to the DAAB Member in accordance with the GCs, the DAAB Member undertakes to act as DAAB Member in accordance with the terms of this DAAB Agreement.
5.    The Employer and the Contractor shall be jointly and severally liable for the DAAB Member’s fees and other payments to be made to the DAAB Member in accordance with the GCs.
6.    This DAAB Agreement shall be governed by the law of _____________ (if not stated, the law that governs the Contract under Sub-Clause 1.4 of the Conditions of Contract).

SIGNED by:_______________    SIGNED by:_______________    SIGNED by:_______________
Print name:_________________    Print name:_________________    DAAB Member
Title: _____________________    Title:______________________    Title:______________________
for and on behalf of the
Employer    for and on behalf of the
Contractor    
in the presence of    in the presence of    in the presence of
Witness:___________________    Witness:___________________    Witness:___________________
Name:_____________________    Name:_____________________    Name:_____________________
Address:___________________    Address:___________________    Address:___________________
__________________________    __________________________    __________________________
Date:______________________    Date:______________________    Date:______________________

 

FORM OF MOBILIZATION ADVANCE GUARANTEE/ BOND

Guarantee No._________________________________________ Date _________________


WHEREAS _____________________________________ (hereinafter called the 'Employer')
has entered into a Contract for __________________________________________________
(Particulars of Contract)
with ____________________________________________ (hereinafter called the "Contractor').
AND WHEREAS, the Employer has agreed to advance to the Contractor, at the Contractor's request, an amount of Pak Rupees ___________________________________ (PKR _________ ) which amount shall be advanced to the Contractor as per provisions of the Contract.
AND WHEREAS, the Employer has asked the Contractor to furnish Guarantee to secure the mobilization advance for the performance of his obligations under the said Contract.
AND WHEREAS, ____________________________________________________________

(hereinafter called the “Guarantor”) at the request of the Contractor and in consideration of theEmployer agreeing to make the above advance to the Contractor, has agreed to furnish the said Guarantee.
NOW, THEREFORE, the Guarantor hereby guarantees that the Contractor shall use the advance for the purpose of above mentioned Contract and if he fails and commits default in fulfilment of any of his obligations for which the advance payment is made, the Guarantor shall be liable to the Employer for payment not exceeding the aforementioned amount.
Notice in writing of any default,on the part of the Contractor, of which the Employer at his discretion of making decision, shall be given by the Employer to the Guarantor, and on such first written demand, payment shall be made by the Guarantor of all sums then due under this Guarantee without any reference to the Contractor and without any objection.
This Guarantee shall remain in force until the advance is fully adjusted against payments from the Interim Payment Certificates of the Contractor or until _________________________whichever is earlier.                                    (Date)
The Guarantor's liability under this Guarantee shall not in any case exceed the sum of 
PKR ______________________ (PakRupees ________________________________________________).
This Guarantee shall remain valid up to the aforesaid date and shall be null and void after the aforesaid date or earlier if the advance made to the Contractor is fully adjusted against paymentsfrom Interim Payment Certificates of the Contractor provided that the Guarantor

agrees that the aforesaid period of validity shall be deemed to be extended if on the above mentioned date the advance payment is not fully adjusted.

 

Guarantor
(Scheduled Bank/ Insurance Company)

Signature ________________________________________________
Name ________________________________________________
Title ________________________________________________ 

 

WITNESS:                        

           

1.     ________________________________________________
       ________________________________________________                             
       Corporate Secretary (Seal)     Corporate Guarantor (Seal)

2.    ________________________________________________
       ________________________________________________              
       Name, Title & Address

 

 

Retention Money Security
Demand Guarantee

________________________________ [Guarantor letterhead or SWIFT identifier code]
Beneficiary:    ___________________ [Insert name and Address of Employer]        
Date:    ________________[Insert date of issue]
RETENTION MONEY GUARANTEE No.:    [Insert guarantee reference number]
Guarantor:  [Insert name and address of place of issue, unless indicated in the letterhead]

We have been informed that ________________ [insert name of Contractor, which in the case of a joint venture shall be the name of the joint venture] (hereinafter called "the Contractor") has entered into Contract No. _____________ [insert reference number of the contract] dated ____________ with the Employer, for the execution of _____________________ [insert name of contract and brief description of Works] (hereinafter called "the Contract"). 
Furthermore, we understand that, according to the conditions of the Contract, the Employer retains moneys up to the limit set forth in the Contract (“the Retention Money”), and that when the Taking-Over Certificate has been issued under the Contract and the first half of the Retention Money has been certified for payment, payment of [insert the second half of the Retention Money orifthe amount guaranteed under the Performance Guarantee when the Taking-Over Certificate is issued is less than half of the Retention Money, the difference between half of the Retention Money and the amount guaranteed under the Performance Security and, if required, the ES Performance Security] is to be made against a Retention Money guarantee.
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the Beneficiary any sum or sums not exceeding in total an amount of ___________ [insert amount in figures] () [amount in words] upon receipt by us of the Employer’s complying demand supported by the Beneficiary’s statement, whether in the demand itself or in a separate signed document accompanying or identifying the demand,  stating that the Applicant is in breach of its obligation(s) under the Contract, without your needing to prove or show grounds for your demand or the sum specified therein. 
A demand under this guarantee may be presented as from the presentation to the Guarantor of a certificate from the Employer’s bank stating that the second half of the Retention Money as referred to above has been credited to the contractor on its account number ___________ at _________________ [insert name and address of Contractor’s bank].
This guarantee shall expire no later than the …. day of ……, 2…, and any demand for payment under it must be received by us at the office indicated above on or before that date.

____________________     
[signature(s)]

Note:  All italicized text (including footnotes) is for use in preparing this form and shall be deleted from the final product.

 

 

 

📑 Integrity Pact (INP)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

Integrity Pact

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC. PAYABLE BYTHE SUPPLIERS OF GOODS, SERVICES & WORKS IN  CONTRACTS WORTH RS.10.00 MILLION OR MORE

 

Contract                           Number:  Contract                               Value:  Contract Title:

Dated:

 

[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.

Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.

[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

 

Name of Employer: ………………                                           Name of Bidder/Contractor: ……………
Signature: ……………………                                                   Signature: …………………………….
[Seal]                                                                                   [Seal]

📑 Performance Guarantee Form (PGF)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

FORM OF PERFORMANCE SECURITY

Guarantee No.___________________
Executed on ____________________
Expiry date _____________________


Name of Guarantor with address: _________________________________________________________________________________________________________________________________

Name of Principal (Contractor) with address:___________________________________________________________________________________________________________________________

Penal Sum of Security (express in words and figures) ____________________________________________________________________________________________________________________

Letter of Acceptance No. _____________________________________Dated __________________

KNOW ALL MEN BY THESE PRESENTS, that in pursuance of the terms of the Bidding Documents and above said Letter of Acceptance (hereinafter called the Documents) and at the request of the said Principal we, the Guarantor above named, are held and firmly bound unto the Pakistan Industrial Development Corporation (Pvt.) Ltd. (Pakistan Industrial Development Corporation (PIDC)), Assistant Manager PIDC House, 2nd Floor, Dr. Ziauddin Ahmed Road, Civil Line Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province). (hereinafter called the Employer) in the penal sum of the amount stated above for the payment of which sum well and truly to be made to the said Employer, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has accepted the Employer's above said Letter of Acceptance for _____________________________________ ________________________________

(Name of Contract) for the Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze (P92743)
______________________________________________ (Name of Project).

NOW THEREFORE, if the Principal (Contractor) shall well and truly perform and fulfill all the undertakings, covenants, terms and conditions of the said Documents during the original terms of the said Documents and any extensions thereof that may be granted by the Employer, with or without notice to the Guarantor, which notice is, hereby, waived and shall also well and truly perform and fulfill all the undertakings, covenants terms and conditions of the Contract and of any and all modifications of said Documents that may hereafter be made, notice of which modifications to the Guarantor being hereby waived, then, this obligation to be void; otherwise to remain in full force and virtue till all requirements of Clause11, Defects After Taking Over, of Conditions of Contract are fulfilled.

Our total liability under this Guarantee is limited to the sum stated above and it is a condition of any liability attaching to us under this Guarantee that the claim for payment in writing shall be received by us within the validity period of this Guarantee, failing which we shall be discharged of our liability, if any, under this Guarantee.

We, _________________________________________________ (the Guarantor), waiving all objections and defense under the Contract, do hereby irrevocably and independently guarantee to pay to the Employer without delay upon the Employer's first written demand without cavil or arguments and without requiring the Employer to prove or to show grounds or reasons for such demand any sum or sums up to the amount stated above, against the  Employer's written declaration that the Principal has refused or failed to perform the obligations under the Contract which payment will be effected by the Guarantor to Employer’s designated Bank & Account Number.

PROVIDED ALSO THAT the Employer shall decide, whether the Principal (Contractor) has duly performed his obligations under the Contract or has defaulted in fulfilling said obligations and the Guarantor shall pay without objection any sum or sums up to the amount stated above upon first written demand from the Employer forthwith and without any reference to the Principal or any other person.

IN WITNESS WHEREOF, the above-bounden Guarantor has executed this Instrument under its seal on the date indicated above, the name and corporate seal of the Guarantor being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

 

Guarantor
(Schedule Bank/ Insurance Company)
Signature:  _________________________________________________
Name: _________________________________________________
Title: _________________________________________________ 

Corporate Guarantor (Seal)

 

    
WITNESS:                 

1.
_________________________________________________ 
_________________________________________________  

2.  

_________________________________________________ 
_________________________________________________ 
Name, Title & Address

📑 Annexure (ANX)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

Adjustment Data

Price Adjustment annexured is attached

Unknown

Technical Specification

Unknown

Drawings 1

Unknown

Drawings 2

Unknown

Drawings 3

Unknown

📑 Procurement Forms (PFD)

Procurement Of Contractor Services for Infrastructure Development of Left-Over / New and Allied Work (Phase-I) at Naushahro Feroze Industrial Park (NFIP), Naushahro Feroze

Published on: Thursday, August 20, 2026 05:00 PM

Ref# : P92743
QR Code

Past Construction Experiences

Kindly fill the form

Contractor's Key Personnel Representative and Their Schedules

Kindly fill the form along with CVs

Past Experience and Completed Contracts

Kindly fill the form

Current Contracts and Their Progress

Kindly fill the form

Financial Capacity and Net Worth Evaluation Form

Kindly fill the form

Average Annual Turnover

Kindly fill the form