In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments), Director CIMLA
Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi
+92-519-274050
cimlagov@gmail.com
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments) The subject of procurement is:Â Macro - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems at 6 x Cantonment Boards (Rawalpindi, Peshawar, Karachi, Chaklala, Lahore, Multan) Expected commencement date: Wednesday, September 30, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2026-27 Name and identification number of the Contract: P99661Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: Yes Number of JV/Consortium Members: 2 |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Monday, August 31, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 180 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Call at Deposit  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Wednesday, September 16, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Wednesday Date:Â September 16, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Quality and Cost Based Selection (QCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 10.00%. The Performance Guarantee shall be acceptable in the form of:Â Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Individual / Individual Consultant Sole Proprietorship Partnership Firm Company (Private Limited) Company (Public Limited) Company (Holding Company) Company (Limited by Guarantee) State Owned Enterprise (Private Limited) State Owned Enterprise (Public Limited) | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| Participation in this bidding process shall be limited to firms incorporated or registered in the Islamic Republic of Pakistan and duly registered with the Pakistan Engineering Council (PEC) as mentioned in ITB.3. | No |
| Joint Ventures (JVs) between eligible Pakistani firms are permitted, provided that all constituent members are registered with the Pakistan Engineering Council (PEC) and comply with the eligibility and qualification requirements specified in this Bidding Document. | No |
Quality and Cost Based Selection (QCBS)
Weightage
| Technical Evaluation % | Financial Evaluation % |
|---|---|
| 70 | 30 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 70 | |
| Relevant Experience and Past Performance (25 Marks) | ||
| Successful completion of similar nature projects (Hybrid projects) in last five years: • 10 marks for 5 or more projects • 2 marks for 1 project Note: No marks if performance certificate of respective projects is not attached. (Qualitative)(Doc Required) | 10 | |
| In hand projects of similar nature (Hybrid projects): • 5 marks for 2 or more projects • 2.5 marks for 1 project Note: No marks if acceptance letter / Award letter of respective project is not attached. (Qualitative)(Doc Required) | 5 | |
| Financial outlay of projects at Sr. No. (i) (at least two projects having cost more than Rs. 150 M: • 5 marks for cost more than Rs. 150M • No mark for cost less than Rs. 150M Note: No marks if Taking Over Certificate from concerned authority is not attached (Qualitative)(Doc Required) | 5 | |
| Satisfactory report from executing agency/organization for works already performed and listed at Sr. No. (i) above: • 2 marks for each project performed as "good" and 1 mark for each project performed as "satisfactory (upto a max. of 5 marks) Note: No marks if Taking Over Certificate from concerned authority is not attached (Qualitative)(Doc Required) | 5 | |
| Personnel Capabilities (12 Marks) Note: All Engineers must be registered with PEC. Bidder must provide educational certificates, PEC Reg, certificates & pay slips at last six months. | ||
| 1 x Project Manager BSc /MSc Electrical Experience (MSc – 10 Years or BSc - 15 Years) (Qualitative)(Doc Required) | 3 | |
| 1 x Design Engineer 07 Years Experience (Qualitative)(Doc Required) | 3 | |
| 2 x Electrical / Site Engineer 05 Years Experience (Qualitative)(Doc Required) | 2 | |
| 2 x Solar Installation Supervisor/ Foreman 05 Years Experience (Qualitative)(Doc Required) | 2 | |
| 4 x Electricians/ Technicians 03 Years Experience (Qualitative)(Doc Required) | 2 | |
| Equipment and Plants (8 Marks) | ||
| Installation Tools - Complete set of insulated electrician tools, hydraulic cable crimping tools, cable cutters, MC4 crimping tools, torque wrenches and hand tools Note: Documentary evidence required. (Qualitative)(Doc Required) | 4 | |
| Testing & Commissioning Equipment Digital Multimeter, Clamp Meter, Insulation Resistance Tester (Megger), Tester and Infrared Thermal Camera Earth Resistance Tester and Phase Sequence Meter Note: Calibration certificates (where applicable) shall be submitted. Documentary evidence required. (Qualitative)(Doc Required) | 4 | |
| Financial Capability (25 Marks) | ||
| Average Working Capital a. Full Marks if the average working capital during the last three (03) financial years is more than Rs. 150 Million. b. For the average working capital more than Rs. 75 Million but less than Rs. 150 Million, use the following weightage: Marks = 6 + (A/150) × 6.5 A = Average Working Capital during the last three (03) financial years. Note: Audited Financial Statements for the last three (03) financial years shall be submitted. No marks shall be awarded if the required documentary evidence is not provided. (Qualitative)(Doc Required) | 13 | |
| Bid Capacity a. Full Marks if the Net Bid Capacity is more than Rs. 150 Million. b. For Net Bid Capacity more than Rs. 75 Million but less than Rs. 150 Million, use the following weightage: Marks = 6 + (A/150) × 6.5 A = Bid Capacity Note: Net Bid Capacity = Available Capital − 20% of the cost of all balance works in hand. Available Capital = Average Working Capital of the last three (03) years. (Qualitative)(Doc Required) | 12 | |
| Managerial Capability (10 Marks) | ||
| Organization Structure Organization chart showing key management personnel and reporting hierarchy for execution of the project. Note: Organization chart shall be submitted. (Qualitative)(Doc Required) | 2 | |
| Project Execution & Monitoring Plan Submission of project execution methodology including work schedule, resource allocation, implementation strategy, and monitoring mechanism (Gantt Chart/MS Project or equivalent). Note: Documentary evidence shall be provided. (Qualitative)(Doc Required) | 3 | |
| Net Billing / Utility Coordination Experience Documentary evidence of successful coordination with DISCOs/NEPRA for Net Metering/Net Billing approvals, including submission of approval letters, commissioning certificates, or completion certificates for similar projects (Hybrid Projects). Note: Documentary evidence shall be submitted. (Qualitative)(Doc Required) | 5 | |
| Engineering Design & Methodology (20 Marks) | ||
| System Design & Load Analysis Adequacy of load assessment, PV array sizing, inverter sizing, battery sizing (where applicable), cable sizing, voltage drop analysis and annual energy yield calculations. Note: Documentary evidence shall be submitted. (Qualitative)(Doc Required) | 7 | |
| Simulation & Design Software Submission of simulation results generated through PVsyst, Helioscope, ETAP, DIgSILENT, Homer Pro or equivalent software demonstrating system performance, annual energy generation, Performance Ratio (PR), system losses and payback calculation based on Net billing Note: Documentary evidence shall be submitted. (Qualitative)(Doc Required) | 7 | |
| Electrical Design & Protection Philosophy Single Line Diagram (SLD), DC/AC protection coordination, ACDB/DCDB design, earthing calculations, lightning protection system, surge protection devices and compliance with IEC/IEEE/NEC standards. Note: Documentary evidence shall be submitted. (Qualitative)(Doc Required) | 6 | |
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Rawalpindi Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems | Address: Rawalpindi Cantt. Board. Opposite AWT Plaza, The Mall, Sadar, Rawalpindi Schedule: 90 Days Quantity: 1/job |
1/job | 1449945 PKR |
| Peshawar Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems | Address: Peshawar Cantonment Board office, 5 Jalil Road, Peshawar Cantt Schedule: 90 Days Quantity: 1/job |
1/job | 1997986 PKR |
| Karachi Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems | Address: 259, Sarwar Shaheed Road, Karachi Cantonment Schedule: 90 Days Quantity: 1/job |
1/job | 899876 PKR |
| Chaklala Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems | Address: Chaklala Cantonment Board office, Murree Road, Saddar, Rawalpindi Schedule: 90 Days Quantity: 1/job |
1/job | 999986 PKR |
| Lahore Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems | Address: Lahore Cantonment Board, 42, Sarwar Road, Lahore Cantt Schedule: 90 Days Quantity: 1/job |
1/job | 824971 PKR |
| Multan Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems | Address: 71, Sher Shah Road, Multan Cantt Schedule: 90 Days Quantity: 1/job |
1/job | 809988 PKR |
| Item | UNSPSC | Delivery Schedule | Quantity | Bid Security | Related to Job/Lot |
|---|---|---|---|---|---|
| Macro - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems at 6 x Cantonment Boards (Rawalpindi, Peshawar, Karachi, Chaklala, Lahore, Multan) | Solar power plants |
Address: Macro - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems at 6 x Cantonment Boards (Rawalpindi, Peshawar, Karachi, Chaklala, Lahore, Multan)
Schedule: 90 Days
Quantity: 1/job
|
1/job | 2246 PKR | Rawalpindi Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems (Job) |
No
Jobs Without Lots :
Job: Rawalpindi Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems
Specifications / Requirements:
| Sr. No | Ser | Description | Unit | QTY | Rate | Amount |
|---|---|---|---|---|---|---|
| 1 | 1 | 3 phase Hybrid 80 kW Sineng Inverter with Remotely Monitoring Devices | kW | 80 | 43000 | 3440000 |
| 2 | 2 | Tier 1 Manufacturer according to bloomberg latest issued rankings with IEC 61215 Compliance and not less than 600 W N-Type Half Cut PV module | kW | 80 | 43000 | 3440000 |
| 3 | 3 | Roof Top Galvanized Elevated Structure | kW | 80 | 18000 | 1440000 |
| 4 | 4 | Lithium-ion Battery for critical load installed with Hybrid system | kW. | 80 | 66000 | 5280000 |
| 5 | 5 | Genset Controller for Hybrid Inverter | Job | 1 | 1350000 | 1350000 |
| 6 | 6 | IP65 galvanized iron AC combiner Cabinet, 1 IN 1 Out The size of cabinet : H*L*D ft (4*2.5*2.5)/ DB as per layout Gauge : 16 AWG, Color : RAL 6021 Mounting type = ground mounted Details of breakers and SPD to be in housed in cabinet, Others specs:RYB Indicator, Digital Ammeter and Voltmeter =Yes, AC grounding bus bar =Yes(length =1 ft, to be placed at the left bottom of the DB),DC grounding Bus bar=Yes | Nos. | 4 | 182540 | 730160 |
| 7 | 7 | IP54 GI DB for each inverter for placing DC strings Wall mount, single door with lock and with complete fitting scheme/ railing for DC breakers | Nos. | 4 | 55480 | 221920 |
| 8 | 8 | AC Breakers 160A | Nos. | 6 | 48824 | 292944 |
| 9 | 9 | AC Breakers 250A | Nos. | 6 | 48824 | 292944 |
| 10 | 10 | DC Breakers with Fuses and all other safety equipment | Job | 5 | 85500 | 427500 |
| 11 | 11 | 06 mm Sq. DC flexible wire 1500V DC Copper conductor, Cu XLPO/XLPEO | Mtr. | 3000 | 440 | 1320000 |
| 12 | 12 | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 95 mm Sq. AC stranded | Mtr. | 211 | 16428 | 3466308 |
| 13 | Â | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 16 mm Sq. AC stranded | Mtr. | 135 | 3170 | 427950 |
| 14 | 13 | Earthing of Solar System | Nos. | 3 | 100000 | 300000 |
| 15 | 14 | 16 AWG Galvanized iron with flat cover, perforated, size (W*D)inch 4*2 for laying string wires | Mtr | 953 | 1633 | 1556249 |
| 16 | 15 | DB’s for Energy Source and Load for Back equipment, Racks for BESS, completed with all aspects | Nos. | 2 | 600000 | 1200000 |
| 17 | 16 | Net Billing Services complete in all aspects along with bidirectional meters and NEPRA license | Job. | 1 | 1000000 | 1000000 |
| 18 | 17 | Complete project installation and commissioning till handover of the project to client | Job. | 1 | 700000 | 700000 |
| 19 | 18 | 11% above MES Schedule | Job. | 1 | 2112928.95 | 2112928.95 |
| GRAND TOTAL: | Rs 28,998,903.95 |
Job: Peshawar Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems
Specifications / Requirements:
| Sr. No | Ser | Description | Unit | QTY | Rate | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | 3 phase Hybrid Sineng Inverter with Remotely Monitoring Devices | kW | 160 | 43000 | Forty Thousand Only | 6880000 |
| 2 | 2 | Tier 1 Manufacturer according to bloomberg latest issued rankings with IEC 61215 Compliance and not less than 600 W N-Type Half Cut PV module | kW | 160 | 43000 | Forty Thousand Only | 6880000 |
| 3 | 3 | Roof Top Galvanized Elevated Structure | kW | 160 | 18000 | Eighteen Thusand Only | 2880000 |
| 4 | 4 | Lithium-ion Battery for critical load installed with Hybrid system | kW. | 60 | 66000 | Sixty Six thousand only | 3960000 |
| 5 | 5 | Supply & fixing of Geset Gateway / Synch Controller, completed with all aspects | Job | 1 | 700000 | Seven lac | 700000 |
| 6 | 6 | IP65 galvanized iron AC combiner Cabinet, 1 IN 1 Out The size of cabinet : H*L*D ft (4*2.5*2.5)/ DB as per layout Gauge : 16 AWG, Color : RAL 6021 Mounting type = ground mounted Details of breakers and SPD to be in housed in cabinet, Others specs:RYB Indicator, Digital Ammeter and Voltmeter =Yes, AC grounding bus bar =Yes(length =1 ft, to be placed at the left bottom of the DB),DC grounding Bus bar=Yes | Nos. | 4 | 320000 | 3 lac and twenty Thousand | 1280000 |
| 7 | 7 | IP54 GI DB for each inverter for placing DC strings Wall mount, single door with lock and with complete fitting scheme/ railing for DC breakers | Nos. | 4 | 85000 | Eighty Thousand | 340000 |
| 8 | 8 | AC Breakers 160A | Nos. | 6 | 48824 | Forty eight Thousand eight hundred and twenty four | 292944 |
| 9 | Â | AC Breakers 250A | Nos. | 6 | 48824 | Forty eight Thousand eight hundred and twenty four | 292944 |
| 10 | 11 | 06 mm Sq. DC flexible wire 1500V DC Copper conductor, Cu XLPO/XLPEO | Mtr. | 7000 | 440 | Four hndred forty | 3080000 |
| 11 | 12 | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 95 mm Sq. AC stranded | Mtr. | 400 | 16428 | sixteen thousand four hundred and twnety eight | 6571200 |
| 12 | Â | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 16 mm Sq. AC stranded | Mtr | 210 | 3046 | three thousand and forty six | 639660 |
| 13 | 13 | Complete earthing of Solar System including lighting arresters with 15mm dia copper, 150 cm long with copper base, 75mm x 40 mm x 30 mm, fixed complete with brass, bolts, supply and fixing | Nos. | 3 | 98000 | ninty eigh thousand | 294000 |
| 14 | 14 | 16 AWG Galvanized iron with flat cover, perforated, size (W*D)inch 4*2 for laying string wires | Mtr | 300 | 2900 | two thousand and nine hundred | 870000 |
| 15 | 15 | DB’s for Energy Source and Load for Back equipment, Racks for BESS, completed with all aspects | Nos. | 1 | 300000 | three lac | 300000 |
| 16 | 16 | Net Billing Services complete in all aspects along with bidirectional meters and NEPRA license | Job. | 1 | 1000000 | one million | 1000000 |
| 17 | 17 | S/F of UPVC pipe including band, sockets and clips as per site req. | Job | 1 | 550000 | five lac and fifty thousand | 550000 |
| 18 | 18 | 10% above MES Schedule 2025 | Job | 1 | 3148980 | Â | 3148980 |
| GRAND TOTAL: | Rs 39,959,728.00 |
Job: Karachi Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems
Specifications / Requirements:
| Sr. No | Ser | Description | Unit | QTY | Rate | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | 3 phase Hybrid Sineng Inverter with Remotely Monitoring Devices | kW | 100 | 43000 | Forty Thousand Only | 4300000 |
| 2 | 2 | Tier 1 Manufacturer according to bloomberg latest issued rankings with IEC 61215 Compliance and not less than 600 W N-Type Half Cut PV module | kW | 100 | 43000 | Forty Thousand Only | 4300000 |
| 3 | 3 | Roof Top Galvanized Elevated Structure | kW | 100 | 18000 | Eighteen Thusand Only | 1800000 |
| 4 | 4 | Lithium-ion Battery for critical load installed with Hybrid system | kW. | 40 | 66000 | Sixty Six thousand only | 2640000 |
| 5 | 5 | Supply & fixing of Geset Gateway / Synch Controller, completed with all aspects | Job | 1 | 250000 | two lac and fifity thousand | 250000 |
| 6 | 6 | IP65 galvanized iron AC combiner Cabinet, 1 IN 1 Out The size of cabinet : H*L*D ft (4*2.5*2.5)/ DB as per layout Gauge : 16 AWG, Color : RAL 6021 Mounting type = ground mounted Details of breakers and SPD to be in housed in cabinet, Others specs:RYB Indicator, Digital Ammeter and Voltmeter =Yes, AC grounding bus bar =Yes(length =1 ft, to be placed at the left bottom of the DB),DC grounding Bus bar=Yes | Nos. | 2 | 182540 | One lac eighty two thousand five hundred forty | 365080 |
| 7 | 7 | IP54 GI DB for each inverter for placing DC strings Wall mount, single door with lock and with complete fitting scheme/ railing for DC breakers | Nos. | 2 | 55480 | fifty five thousand four hundred eighty | 110960 |
| 8 | 8 | AC Breakers 160A | Nos. | 2 | 48824 | Forty eight Thousand eight hundred and twenty four | 97648 |
| 9 | Â | AC Breakers 250A | Nos. | 2 | 48824 | Forty eight Thousand eight hundred and twenty four | 97648 |
| 10 | 11 | 06 mm Sq. DC flexible wire 1500V DC Copper conductor, Cu XLPO/XLPEO | Mtr. | 1450 | 440 | Four hundred forty | 638000 |
| 11 | 12 | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 95 mm Sq. AC stranded | Mtr. | Â | 16428 | sixteen thousand four hundred and twnety eight | Â |
| 12 | Â | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 16 mm Sq. AC stranded | Mtr | 150 | 3046 | three thousand and forty six | 456900 |
| 13 | 13 | Complete earthing of Solar System including lighting arresters with 15mm dia copper, 150 cm long with copper base, 75mm x 40 mm x 30 mm, fixed complete with brass, bolts, supply and fixing | Nos. | 2 | 98000 | Ninty eight thousand | 196000 |
| 14 | 14 | 16 AWG Galvanized iron with flat cover, perforated, size (W*D)inch 4*2 for laying string wires | Mtr | 270 | 1633 | one thousand six hundred thirty three | 440910 |
| 15 | 15 | DB’s for Energy Source and Load for Back equipment, Racks for BESS, completed with all aspects | Nos. | 1 | 200000 | two lac and fifity thousand | 200000 |
| 16 | 16 | Net Billing Services complete in all aspects along with bidirectional meters and NEPRA license | Job. | 1 | 400000 | four lac | 400000 |
| 17 | 17 | S/F of UPVC pipe including band, sockets and clips as per site req. | Job | 1 | 200000 | two lac and fifity thousand | 200000 |
| 18 | 18 | Change Over (300A) | Job | 2 | Â | Â | Â |
| 19 | 19 | 11% above on MES Schedule | Job | 1 | 1500790.06 | Â | 1504382.66 |
| GRAND TOTAL: | Rs 17,997,528.66 |
Job: Chaklala Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems
Specifications / Requirements:
| Sr. No | Ser | Description | Unit | QTY | Rate | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Supply, installation, testing and commissioning of PV panel Tier-1 for solar electric energy system, complete in all respect as specified | Watt | 120000 | 43 | Forty Three | 5160000 |
| 2 | 2 | Supply, installation, testing and commissioning of Lithium Iron Phosphate Battery for solar electric energy system, complete in all respect as specified | Watt | 30000 | 66 | Sixty Six | 1980000 |
| 3 | 3 | String Inverter 3 phase Hybrid Inverter Combination with Remote Monitoring Devices 100KW | Each | 1 | 4300000 | Forty Three Lakh | 4300000 |
| 4 | 4 | Communication Box | Each | 1 | 150000 | One Lakh Fifty Thousand | 150000 |
| 5 | 5 | Supply and Installation of GI/Aluminium frame structure (Roof Top Elevated Structure) including concrete work for solar electric energy system, complete in all respect as specified | Watt | 120000 | 18 | Eighteen | 2160000 |
| 6 | 6 | Air termination for Lightning Conductor, with 15 mm dia copper rod, 150 cm long, with gunmetal copper base, 75 mm x 40 mm x 30 mm, fixed complete, with brass bolts, supply and fixing. | Each | 2 | 8579 | Eight Thousand Five Hundred Seventy Nine | 17158 |
| 7 | 7 | 0.4KV LV Panel | Each | 1 | 55000 | Fifty Five Thousand | 55000 |
| 8 | 8 | Distribution Board, steel sheet (16 BG) with hinged cover, having locking arrangement, enamel painted, suitable for housing of different capacities of MCCBs etc (as required), supply and fixing | Each | 1 | 86893 | Eighty Six Thousand Eight Hundred Ninety Three | 86893 |
| 9 | 9 | DC Breakers | Each | 6 | 10000 | Ten Thousand | 60000 |
| 10 | 10 | Supply, installation, testing and commissioning of DC Cable 6mm² double XLPO insulated and tin coated for solar electric energy system, complete in all respect as specified | Mtr | 3000 | 440 | Four Hundred Forty | 1320000 |
| 11 | 11 | Cable electric LT PVC insulated, PVC sheathed, steel wire armoured, overall PVC 600/1000 V, with stranded copper conductor, 150 mm², 4 core, laid in trenches, complete with bricks, sand (excluding cost of excavation) supply and fixing | Mtr | 50 | 25290 | Twenty Five Thousand Two Hundred Ninety | 1264500 |
| 12 | 12 | Cable electric HT, 11 KV stranded Copper conductor XLPE insulated, extruded PVC bedded, steel wire armoured and PVC sheathed overall Single core, 70 mm² laid in trenches complete with bricks, sand (excluding cost of excavation) supply and fixing | Mtr | 50 | 5561 | Five Thousand Five Hundred Sixty One | 278050 |
| 13 | 13 | Cable electric HT, 11 KV stranded Copper conductor XLPE insulated, extruded PVC bedded, steel wire armoured and PVC sheathed overall Single core, 16 mm² laid in trenches complete with bricks, sand (excluding cost of excavation) supply and fixing | Mtr | 30 | 3068 | Three Thousand Sixty Eight | 92040 |
| 14 | 14 | Wiring in conduit surface, concealed, flame proof, with single core PVC insulated cable, installed and connected complete (excluding conduit) single core cable, 6 mm², supply and fixing | Mtr | 100 | 244 | Two Hundred Forty Four | 24400 |
| 15 | 15 | Wiring in conduit surface, concealed, flame proof, with single core PVC insulated cable, installed and connected complete (excluding conduit) single core cable, 16 mm², supply and fixing | Mtr | 50 | 614 | Six Hundred Fourteen | 30700 |
| 16 | 16 | Stringing, straining, tensioning and binding Copper conductor, bare solid or stranded 4 SWG, supply and fixing | Mtr | 40 | 717 | Seven Hundred Seventeen | 28680 |
| 17 | 17 | Cable tray out of 16 Guage, GI sheet, without cover, complete in jointing plates | Mtr | 100 | 5219 | Five Thousand Two Hundred Nineteen | 521900 |
| 18 | 18 | Conduit 50 mm dia, heavy gauge Class "B" screwed complete with all bends, tees, boxes, saddles etc, stove enamelled for Concealed wiring, supply and fixing | Mtr | 200 | 2521 | Two Thousand Five Hundred Twenty One | 504200 |
| 19 | 19 | Conduit 25 mm dia, heavy gauge Class "B" screwed complete with all bends, tees, boxes, saddles etc, stove enamelled for Concealed wiring, supply and fixing | Mtr | 200 | 1657 | One Thousand Six Hundred Fifty Seven | 331400 |
| 20 | 20 | Connectors, consisting of mould resin, padding tape, funnels and ferrules etc as specified for PVC unarmoured LT cable, Single core, 25 mm² to 35 mm², supply and fixing | Each | 50 | 3730 | Three Thousand Seven Hundred Thirty | 186500 |
| 21 | 21 | Bi-directional Meter | Each | 1 | 275000 | Two Lakh Seventy Five Thousand | 275000 |
| 22 | 22 | DC Earth, complete as described in Para 24.16 of the Specifications, with 3/0 SWG copper conductor, supply and fixing. | Each | 1 | 24904 | Twenty Four Thousand Nine Hundred Four | 24904 |
| 23 | 23 | AC Earth, complete as described in Para 24.16 of the Specifications, with 3/0 SWG copper conductor, supply and fixing | Each | 1 | 24904 | Twenty Four Thousand Nine Hundred Four | 24904 |
| 24 | 24 | MISC ITEMS | Job | 1 | 650000 | Six Lakh Fifty Thousand | 650000 |
| 25 | 25 | Installation, Testing and Commissioning | Job | 1 | 40000 | Forty Thousand | 40000 |
| 26 | 26 | Net metering services | Job | 1 | 320000 | Three Lakh Twenty Thousand | 320000 |
| 27 | 27 | Operation and Maintenance Services | Job | 1 | 55000 | Fifty Five Thousand | 55000 |
| 28 | 28 | O&M Training | Job | 1 | 58500 | Sixty Thousand | 58500 |
| GRAND TOTAL: | Rs 19,999,729.00 |
Job: Lahore Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems
Specifications / Requirements:
| Sr. No | Ser | Description | UNIT | QTY | RATE | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Supply, installation, testing and commissioning of PV panel Tier-I for solar electric energy system, complete in all respect as specified | Watt | 100000 | 43 | Forty three | 4300000 |
| 2 | 2 | Supply, installation, testing and commissioning of PV panel Tier-I for Hybrid solar electric energy system, complete in all respect as specified | Watt | 100000 | 43 | Forty three | 4300000 |
| 3 | 3 | Supply and Installation of GI/ Aluminium frame structure (Roof Top Elevated Structure) including concrete work for solar electric energy system, complete in all respect as specified | Watt | 100000 | 18 | Eighteen | 1800000 |
| 4 | 4 | Supply, installation, testing and commissioning of DC Cable 6mm² double XLPO insulated and tin coated for solar electric energy system, complete in all respect as specified | Mtr | 3962 | 440 | four hundred forty | 1743456 |
| 5 | 5 | Change over switch, 300 A, TP with NL, wall mounted type, supply and fixing | Each | 1.00 | 41173 | forty one thousand one hundred seventy three | 41173 |
| 6 | 6 | Complete Documentation Process including DISCOM and Bi-Directional Energy meter charges. Proper Earthing Panel to Panel earthing with proper thimbles, nuts, bolts, Cable & Lighting arrester with all complete jobs | Watt | 100000 | 15 | fifteen | 1500000 |
| 7 | 7 | 16 mm Cable Supper Cable | Mtr | 216.5 | 3046 | Â | 659459 |
| 8 | 8 | 15% abiove MES Schedule 2025 | Job | 1 | 2155329 | Â | 2155329 |
| GRAND TOTAL: | Rs 16,499,417.00 |
Job: Multan Cantonment Board - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems
Specifications / Requirements:
| Sr. No | Ser | Description | Unit | QTY | Rate | Â | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | 3 phase Hybrid Sineng Inverter with Remotely Monitoring Devices | kW | 80 | 43000 | Forty three thousand | 3440000 |
| 2 | 2 | Tier 1 Manufacturer according to bloomberg latest issued rankings with IEC 61215 Compliance and not less than 600 W N-Type Half Cut PV module | kW | 80 | 43000 | Forty three thousand | 3440000 |
| 3 | 3 | Roof Top Galvanized Elevated Structure | kW | 80 | 18000 | Eighteen Tousand | 1440000 |
| 4 | 4 | Lithium-ion Battery for critical load installed with Hybrid system | kW. | 40 | 66000 | Sixty Six Thousand | 2640000 |
| 5 | 5 | Supply & fixing of Geset Gateway / Synch Controller, completed with all aspects | Job | 1 | 250000 | two thousand and fifty | 250000 |
| 6 | 6 | IP65 galvanized iron AC combiner Cabinet, 1 IN 1 Out The size of cabinet : H*L*D ft (4*2.5*2.5)/ DB as per layout Gauge : 16 AWG, Color : RAL 6021 Mounting type = ground mounted Details of breakers and SPD to be in housed in cabinet, Others specs:RYB Indicator, Digital Ammeter and Voltmeter =Yes, AC grounding bus bar =Yes(length =1 ft, to be placed at the left bottom of the DB),DC grounding Bus bar=Yes | Nos. | 2 | 182540 | one lac eughty two thiusand five hundred forty | 365080 |
| 7 | 7 | IP54 GI DB for each inverter for placing DC strings Wall mount, single door with lock and with complete fitting scheme/ railing for DC breakers | Nos. | 2 | 55480 | fifty five thiusand four hundred eighty | 110960 |
| 8 | 8 | AC Breakers 160A | Nos. | 2 | 48824 | Forty eight Thousand eight hundred and twenty four | 97648 |
| 9 | Â | AC Breakers 250A | Nos. | 2 | 48824 | Forty eight Thousand eight hundred and twenty four | 97648 |
| 10 | 11 | 06 mm Sq. DC flexible wire 1500V DC Copper conductor, Cu XLPO/XLPEO | Mtr. | 1200 | 440 | Four hndred forty | 528000 |
| 11 | 12 | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 95 mm Sq. AC stranded | Mtr. | Â | 16428 | sixteen thousand four hundred and twnety eight | Â |
| 12 | Â | AC Cable 4-C Cu, PVC/PVC 0.6/1 kV, 16 mm Sq. AC stranded | Mtr | 90 | 3046 | three thousand and forty six | 274140 |
| 13 | 13 | Complete earthing of Solar System including lighting arresters with 15mm dia copper, 150 cm long with copper base, 75mm x 40 mm x 30 mm, fixed complete with brass, bolts, supply and fixing | Nos. | 3 | 98000 | Ninty eight thousand | 294000 |
| 14 | 14 | 16 AWG Galvanized iron with flat cover, perforated, size (W*D)inch 4*2 for laying string wires | Mtr | 650 | 1633 | one thousand six hundred thirty three | 1061450 |
| 15 | 15 | DB’s for Energy Source and Load for Back equipment, Racks for BESS, completed with all aspects | Nos. | 1 | 200000 | two lac and fifity thousand | 200000 |
| 16 | 16 | Net Billing Services complete in all aspects along with bidirectional meters and NEPRA license | Job. | 1 | 400000 | four lac | 400000 |
| 17 | 17 | S/F of UPVC pipe including band, sockets and clips as per site req. | Job | 1 | 217000 | two lac and fifity thousand | 217000 |
| 18 | 18 | 10% above MES Schedule 2025 (Rs) | Job | 1 | 1343842.06 | Â | 1343842.06 |
| GRAND TOTAL: | Rs 16,199,768.06 |
Warranty obligations, defect liability responsibilities and maintenance / after sale service obligations for 2 years.
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments), Director CIMLA Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi
The Supplier is:
The title of the subject procurement is: Macro - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems at 6 x Cantonment Boards (Rawalpindi, Peshawar, Karachi, Chaklala, Lahore, Multan)
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments), Director CIMLA
Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi
+92-519-274050
cimlagov@gmail.com
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments), Director CIMLA
Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi
+92-519-274050
cimlagov@gmail.com
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For Physical Fitness having No Damages (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Certificate of Origin.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P99661
To: Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments), Director CIMLA Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments), Director CIMLA Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Macro - Engineering, Procurement, Construction, Installation, Testing, Commissioning and successful completion of On-grid/Hybrid Solar PV Systems at 6 x Cantonment Boards (Rawalpindi, Peshawar, Karachi, Chaklala, Lahore, Multan) (P99661) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: Headquarters Military Lands & Cantonments (Headquarters Military Lands & Cantonments), Director CIMLA Headquarters Military Lands & Cantonments, Murree Road, Saddar, Rawalpindi
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}