Standard Bidding Document

📑 Procurement Notice (NIT)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

REQUEST FOR BIDS

PROCUREMENT OF CIVIL WORKS

  1. The SBP-BSC North (SBP Banking Services Corporation (BSC)) has reserved Funds for the procurement planned for FY 2026-27. The SBP-BSC North (SBP Banking Services Corporation (BSC)) intends to apply part of the proceeds of this Fund to cover eligible payments under the contract for the "UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD" with the reference of "P103714".
  2. The SBP-BSC North (SBP Banking Services Corporation (BSC)) invites sealed Bids from eligible Bidders for procurement of Works (UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD) described in the bidding documents on EPADS v2.0.
  3. Single Stage-Two Envelope will be used by adopting Least Cost Based Selection (LCBS) Technique for the subject procurement, in line with the Public Procurement Rules, 2004 and any Regulations, Regulatory Guides, Procurement Guidelines or Instructions issued by the Authority from time to time.
  4. All Bids must be accompanied by a Bid Security amount described in Bid Security Section in Bidding Document in the form of  Pay Order, Banker's Cheque, Call at Deposit, Demand Draft. Or all bids must be accompanied by bid securing declaration in the format specified in the Bidding documents
  5. E-Bidding documents, containing detailed terms & conditions, specifications and requirements etc. are available on e-Pak Acquisition and Disposal System (EPADS) at https://epads.gov.pk/opportunities/federal/procurements/103714 for all the interested bidders registered on EPADS v2.0. Bidders are required to get themselves registered on EPADS v2.0 to participate in Bidding process.
  6. The e-bids, prepared in accordance with the instructions in the e-Bidding documents, must be submitted through EPADS v2.0 on or before Wednesday, November 4, 2026 03:00 PM. E-bids will be opened by using EPADS v2.0 on the same day at Wednesday, November 4, 2026 03:30 PM. Manual submission of Bids shall not be entertained. Those vendor who have not yet registered on the new version of EPADS v2.0, may register themselves on https://vendors.epads.gov.pk/. A tutorial to explain the registeration process is available at https://www.youtube.com/watch?v=MNW6T38v7tc.

In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).

 

 

SBP-BSC North (SBP Banking Services Corporation (BSC)), Senior Officer
SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).
+92-315-720-2000
akhtar.munir@sbp.org.pk

📑 Instructions to Bidders (ITB)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

A. INTRODUCTION

  1. Scope of Bid
    1. The Procuring agency/Employer (PA), as indicated in the Bid Data Sheet (BDS) invites Bids for the execution of Works as specified in the BDS and Section V- Works Requirements. The name, identification, and number of lots (contracts) of this National/ International Competitive Bidding process are specified in the BDS.
  2. Source of Funds
    1. Source of funds as referred in Clause 2 of Bid Data Sheet.
  3. Eligible Bidders
    1. A bidder may be natural person, company or firm or public or semi-public agency of Pakistan or any foreign country, or any combination of them with a formal existing agreement (on Judicial Papers) in the form of a joint venture or consortium. In the case of a joint venture or consortium, all members shall be jointly and severally liable for the execution of the Contract in accordance with the terms and conditions of the Contract. The joint venture or consortium shall nominate a Lead Member as nominated in the BDS, who shall have the authority to conduct all business for and on behalf of any and all the members of the joint venture or consortium during the Bidding process, and in case of award of contract, during the execution of contract. Verifiable copy of the agreement that forms a joint venture, consortium or association shall be required to be submitted as part of the Bid.
      Any bid submitted by the joint venture, consortium or association shall indicate the part of proposed contract to be performed by each party and each party shall be evaluated (or post qualified if required) with respect to its contribution only, and the responsibilities of each party shall not be substantially altered without prior written approval of the Procuring Agency and in line with any instructions issued by the Authority.
      (The limit on the number of members of JV or Consortium may be prescribed in BDS, in accordance with the guidelines issued by the PPRA).
    2. The invitation for bids is open to all prospective bidders subject to any provisions of incorporation or licensing by the respective national/ international incorporating agency or statutory body established for that particular trade or business. Procuring agencies shall specify the registration/licensing requirements for the foreign bidder keeping in view the requirement of that business.
    3. A Bidder shall not have a conflict of interest. All Bidders found to have a conflict of interest shall be disqualified. A Bidders may be considered to have a conflict of interest with one or more parties in this Bidding process, if they:
      1. are associated or have been associated in the past, directly or indirectly with a firm or any of its affiliates which have been engaged by the Procuring agency/Employer to provide consulting services for the preparation of design or technical specifications of the works that are the subject of the bid; or
      2. have controlling shareholders in common; or
      3. receive or have received any direct or indirect subsidy from any of them; or
      4. have the same legal representative for purposes of this Bid; or
      5. have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the bid of another bidder, or influence the decisions of the Procuring agency/Employer regarding this Bidding process; or
      6. Submit more than one bid in this bidding process.
    4. A Bidder may be ineligible if –
      1. he is declared bankrupt or, in the case of company or firm, insolvent;
      2. payments in favor of the bidder is suspended in accordance with the judgment of a court of law other than a judgment declaring bankruptcy and resulting (in accordance with the national laws) in the total or partial loss of the right to administer and dispose of its property;
      3. the bidder is convicted, by a final judgment of a Court of Law or relevant Professional Statuary Body, of any offence involving professional conduct;
      4. The bidder is debarred/ blacklisted by a national level Procuring agency/Employer and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration.
    5. As and when required, bidders shall provide to the Procuring agency/Employer evidence of their eligibility, proof of compliance with the necessary legal requirements to carry out the contract effectively.
    6. Bidders shall submit proposal relating to the nature, conditions and modalities of sub-contracting wherever the sub-contracting of any elements of the contract is envisaged.
  4. Eligible Material and Equipment
    1. All the material and equipment to be mobilized under the contract shall have their origin in eligible source countries, and all expenditures made under the contract will be limited to such materials and equipment. For this purpose, ineligible countries are stated in the section-IV titled as “Eligible Countries”.

B. BIDDING DOCUMENTS

  1. Contents of Bidding Documents
    1. The scope of Works, bidding procedures, and terms and conditions of the contract are prescribed in the bidding documents.  In addition to the Invitation for Bids, the bidding documents which should be read in conjunction with any addenda issued in accordance with ITB 7.1 include:
      Section I -Invitation for Bids 
      Section II Instructions to Bidders (ITBs)
      Section III Bid Data Sheet (BDS)
      Section IV Eligible Countries
      Section V Evaluation and Qualification Criteria
      Section VI Works Requirements Technical Specifications & Schedule of Requirements
      Section VII Standard Bidding Forms
      Section VIII General Conditions of Contract (GCC)
      Section IX Particular Conditions of Contract (PCC)
      Section X Contract Forms
    2. The bidder is expected to examine all instructions, forms, specifications, terms and conditions prescribed in the bidding documents. Failure to furnish all the information required in the bidding documents will be at the bidder’s risk and may result in the rejection of his bid. 
  2. Clarification of Bidding Document, Pre-bid Meeting
    1. A prospective bidder requiring any clarification of the bidding document may notify the Procuring agency/Employer through EPADS. 
    2. The Procuring agency/Employer shall respond to the request for clarification in accordance with Rule 31 of the Public Procurement Rules 2004.
    3. Should the Procuring Agency deem it necessary to amend the BIDDING document as a result of a clarification, it shall do so following the procedure under ITB 7.
    4. If indicated in the BDS, the bidder’s designated representative is invited at the bidder’s cost to attend a pre-bid meeting at the place, date and time mentioned in the BDS. During this pre-bid meeting, prospective bidders may request clarification of the schedule of requirement, the evaluation criteria or any other aspects of the bidding documents.
    5. Minutes of the pre-bid meeting, if applicable, including the text of the questions asked by bidders, including those during the meeting (without identifying the source) and the responses given, together with any responses prepared after the meeting will be uploaded on EPADS. Any modification to the bidding documents that may become necessary as a result of the pre-bid meeting shall be made by the Procuring agency/Employer exclusively through the use of an Addendum pursuant to ITB 7. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
    6. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own responsibility all information that may be necessary for preparing the bid and entering into a contract for construction of the Works.  The costs of visiting the Site shall be at the bidder’s own expense.
    7. The bidder and any of its authorized personnel will be granted permission by the Procuring agency/Employer to enter upon its premises and lands for the purpose of such visit, but only upon the express condition that the bidder and its personnel will release and indemnify the Procuring agency/Employer  from and against all liability in respect thereof, and will be responsible for death or personal injury, loss of or damage to property, and any other loss, damage, costs, and expenses incurred as a result of the inspection.
  3. Amendment of Bidding Documents
    1. The procuring agency may issue notification of any change, addition, modification or deletion in accordance with Rule 23 of the Public Procurement Rules 2004 i.e. Bidding Documents.
    2. To give prospective bidders reasonable time in which to take an addendum/corrigendum into account in preparing their bids, the Procuring agency/Employer may, at its discretion, extend the deadline for the submission of bids:
      Provided that the Procuring agency/Employer shall extend the deadline for submission of bid in pursuance of Rule 27 of the  Public Procurement Rules 2004, i.e. Extension of time for submission of bids, if such an addendum is issued within last three (03) days of the bid submission deadline.

C. PREPARATION OF BIDS

  1. Language of Bid
    1. The bid prepared by the bidder, as well as all correspondence and documents relating to the bid exchanged by the bidder and the Procuring agency/Employer shall be written in the English language unless specified in the BDS. Supporting documents and printed literature furnished by the bidder may be in another language provided they are accompanied by an accurate translation of the relevant pages in the English language unless specified in the BDS, in which case, for purposes of interpretation of the bidder, the translation shall govern.
  2. Documents Constituting the Bids   
    1. The Bids prepared by the Bidder shall constitute of all the documents required in the BDS.
  3. Documents Establishing Eligibility of Material, Equipment and Works, their Conformity to Bidding Documents
    1. The bid prepared by the bidder shall constitute the following components: -
      1. Documentary evidence established in accordance with ITB 10 that the material and equipment to be utilized by the Bidder for the executions of works are eligible material and equipment and conform to the Bidding Documents;
      2. Documentary evidence established in accordance with ITB 11 that the bidder has been authorized to carry out the Construction works;
      3. Documentary evidence established in accordance with ITB 11 that the bidder is eligible and/or qualified for the subject bidding process;
      4. Form of Bid and Bid Prices completed in accordance with ITB 12 and 13; 
      5. Completed schedules as required, including priced Bill of Quantities in accordance with ITB 13.
      6. Technical Proposal completed in all aspects in accordance with ITB-15. 
      7. Bid security or Bid Securing Declaration furnished in accordance with ITB 17;
      8. Any other document required in the BDS.
    2. In addition to the requirements, bids submitted by a JV shall include a copy of the Joint Venture Agreement entered into by all members. Alternatively, a letter of intent to execute a Joint Venture Agreement in the event of a successful bid shall be signed by all members and submitted with the bid, together with a copy of the proposed Agreement.
    3. The bidder shall furnish, as part of its bid, all those documents establishing the eligibility in conformity to the terms and conditions specified in the bidding documents for all material, equipment and works which the bidder proposes to execute.
    4. The documentary evidence of conformity of the material, equipment and works to the Bidding Documents may be in the form of literature, drawings, and data, and shall consist of:
      1. a detailed description of the work methodology, approach, schedule and resources to be mobilized at site;
      2. an item-by-item commentary on the Procuring agency/Employer’s Technical Specifications demonstrating substantial responsiveness of the material, equipment and works to those specifications, or a statement of deviations and exceptions to the provisions of the Technical Specifications;
      3. any other procurement specific documentation requirement as stated in the BDS.
    5. The required documents and other accompanying documents must be in English. In case any other language than English is used the pertinent translation into English shall be attached to the original version.
  4. Documents Establishing Eligibility and Qualification of the Bidder   
    1. The bidder shall furnish, as part of its bid, all those documents establishing the bidder’s eligibility to participate in the bidding process and/or its qualification to perform the contract if its bid is accepted.
    2. The documentary evidence of the bidder’s eligibility to bid shall establish to the satisfaction of the Procuring agency/Employer that the bidder, at the time of submission of its bid, is from an eligible country as defined in Section-IV titled as “Eligible Countries”.
    3. The documentary evidence of the bidder’s qualification to perform the contract if its bid is accepted shall establish to the satisfaction of Procuring agency/Employer that:
      1. The bidder has the financial and technical capability necessary to perform the Contract, meets the qualification criteria specified in Section-V, Evaluation and Qualification Criteria and BDS.
      2. In the case of a bidder not doing business within Pakistan, the bidder is or will be (if awarded the contract) represented by a local bidder (Joint Venture) in accordance with the PEC works bylaws, and in case of award of works such foreign firm is required to participate in the execution of works to carry out its obligations as prescribed in the Conditions of Contract and /or Technical Specifications.
      3. That the bidder meets the qualification criteria listed in Section-V, Evaluation and Qualification Criteria and BDS. 
  5. Forms of Bid
    1. The Bidder shall fill the Form of Bids furnished in the bidding documents. The Bids Form must be completed without any alterations to its format and no substitute shall be accepted.
  6. Bid Prices
    1. The bid prices quoted by the bidder in the Standard bid Forms, Bill of Quantities and in the Price Schedules shall conform to the requirements specified below or exclusively mentioned hereafter in the bidding documents. 
    2. The bidder shall fill in rates and prices for all items of the Works described in the Bill of Quantities. If a Price Schedule shows items listed but not priced, their prices shall be construed to be included in the prices of other items in the Bill of Quantities and will not be paid for separately by the Procuring agency/Employer. 
    3. Items not listed in the Price Schedule shall be assumed not to be included in the bid, and provided that the bid is still substantially responsive in their absence or due to their nominal nature, the corresponding average price of the respective item(s) of the remaining substantially responsive bidder(s) shall be construed to be the price of those missing item(s):
      Provided that:
      1. where there is only one (substantially) responsive bidder, or
      2. where there is provision for alternate proposals and the respective items are not listed in the other bids, 
        The Procuring agency/Employer may fix the price of missing items in accordance with market survey, and the same shall be considered as final price.
    4. The Bid price to be quoted in the Form of Bid in accordance with ITB 12 shall be the total price of the bid.
    5. Unless otherwise specified in the BDS and the Contract, the rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of the Conditions of Contract. 
    6. If so specified in ITB 1.1, bids may be invited for individual lots (contracts) or for any combination of lots (packages). 
    7. Prices quoted by the Bidder shall be fixed during the bidder’s performance of the contract and not subject to variation on any account. A bid submitted with an adjustable price will be treated as non-responsive and shall be rejected, pursuant to ITB 27, unless otherwise price adjustment is permissible under Conditions of the Contract. 
    8. All duties, taxes, and other levies payable by the Contractor under the Contract, or for any other cause, as of the date twenty-eight (28) days prior to the deadline for submission of bids, shall be included in the rates and prices and the total bid price submitted by the bidder.
  7. Currencies of Bid and Payment
    1. Prices shall be quoted in Pakistani Rupees unless otherwise specified in the BDS. Comparison of bids and tie of bid shall be treated in accordance with the Rule 30(2) of Public Procurement Rules, 2004.
  8. Documents Comprising the Technical Proposal
    1. The bidder shall furnish a Technical Proposal including a statement of work methods, equipment, personnel, schedule and any other information as stipulated in Section VII – Standard Bid Forms, in sufficient detail to demonstrate the adequacy of the bidder’s proposal to meet the work requirements and the completion time.
  9. Bid Validity Period
    1. Bids shall remain valid for the period specified in the BDS after the bid submission deadline prescribed by the Procuring agency/Employer. A bid valid for a shorter period shall be rejected by the Procuring agency/Employer as non-responsive. The period of bid validity will be determined from the complementary bid securing instrument i.e. the expiry period of bid security or bid securing declaration as the case may be. 
    2. Under exceptional circumstances, prior to the expiration of the initial Bids/Bid validity period, the Procuring Agency may request the Bidders’ consent to an extension of the period of validity of their Bids/Bid. Such request for extension of the period of bid validity shall be carried out in accordance with Rule 26 of the Public Procurement Rules, 2004.
  10. Bid Security or Bid Securing Declaration
    1. Pursuant to ITB 11.1 unless otherwise specified in the BDS, the bidder shall furnish as part of its bid, a Bid Security in accordance with Rule 25 of the Public Procurement Rules, 2004 in the amount and currency specified in the BDS or Bid Securing Declaration as specified in the BDS in the format provided in Section VII (Standard Bidding Forms). 
      In case Procuring agency/Employer is inviting bids in lots / packages, the bidder shall be required to submit his bid security against the respective lot/ package for which he is submitting his bid.
      Until the development of functionality of auto verification of financial instrument in EPADS, the scanned copy of bid security or bid securing declaration, as the case may be, shall be uploaded on E-PADS whereas the original instrument to be submitted to the procuring agency before closing of bid submission deadline,
    2. The Bid Security shall be denominated in the local currency or in another freely convertible currency, and it shall be in the form specified in the BDS which shall be in any of the following:
      1. A bank guarantee, an irrevocable letter of credit issued by a Scheduled bank in the form provided in the Bidding Documents or another form acceptable to the Procuring agency/Employer and valid for twenty-eight (28) days beyond the end of the validity of the Bid. This shall also apply if the period for Bid Validity is extended. In either case, the form must include the complete name of the bidder; 
      2. A cashier’s or certified cheque; or
      3. Another security as indicated in the BDS.
    3. The Bid Security or Bid Securing Declaration shall be in accordance with the Form of the Bid Security or Bid Securing Declaration included in Section VII (Standard Bidding Forms) or another form approved by the Procuring agency/Employer prior to the bid submission.
    4. The Bid Security shall be payable promptly upon written demand by the Procuring agency/Employer in case any of the conditions listed in ITB 17.9 are invoked.
    5. Any bid not accompanied by a Bid Security or Bid Securing Declaration in accordance with ITB 17.1 or 17.3 shall be rejected by the Procuring agency/Employer and shall be declared as non-responsive bid, pursuant to ITB 27.
    6. Unsuccessful bidders’ Bid Security will be discharged or returned as promptly as possible, however in no case later than thirty (30) days after the expiration of the period of Bid Validity prescribed by the Procuring agency/Employer pursuant to ITB 16. The Procuring agency/Employer shall make no claim to the amount of the Bid Security, and shall promptly return the Bid Security document, after whichever of the following that occurs earliest:
      1. The expiry of the Bid Security;
      2. The entry into force of a procurement contract and the provision of a performance security (or guarantee), for the performance of the contract if such a security (or guarantee), is required by the Biding documents;
      3. The rejection by the Procuring agency/Employer of all Bids;
      4. The withdrawal of the bid prior to the deadline for the submission of bids, unless the biding documents stipulate that no such withdrawal is permitted.
    7. The successful bidder’s Bid Security will be discharged upon the bidder signing the contract pursuant to ITB 40, or furnishing the performance security (or guarantee), pursuant to ITB 41.
    8. The Bid Security may be forfeited or the Bid Securing Declaration executed:
      1. if a Bidder: 
        1. Withdraws its Bid during the period of Bid Validity as specified by the Procuring agency/Employer, and referred by the bidder on the Form of Bid except as provided for in ITB 16.2; or 
      2. In the case of a successful bidder, if the bidder fails:
        1. to sign the contract in accordance with ITB 40; or
        2. to furnish performance security (or guarantee) in accordance with ITB 41.
    9. In case of Bid Security issued by the foreign bank is allowed by the Procuring agency/Employer, the same should be counter guaranteed by a corresponding bank in Pakistan. Furthermore, in case of joint venture, it should be in the name of Joint venture to ensure joint responsibility. In case the JV is not legally constituted at the time of bid submission, the bid security or bid securing declaration shall be in the names of all future members as named in the letter of bid.
  11. Withdrawal of Bids   
    1. Before bid submission deadline, any bidder may withdraw, substitute, or modify its bid after it has been submitted by sending a written notice, duly signed by an authorized representative, and the corresponding must accompany the respective written notice. 
  12. Format and Signing of Bid
    1. The Bidder shall prepare and submit Bids through EPADS with due diligence after carefully reading all the terms and condition before bid submission deadline.

D. SUBMISSION OF BIDS

  1. Submission of Bids through EPADS v2.0
    1. All bids shall be submitted through EPADS v2.0.
  2. Deadline for Submission of Bids
    1. All bids shall be received through EPADS v2.0 not later than bid submission deadline as specified in the BDS.
    2. The Procuring agency/Employer may, under exceptional circumstances and at its discretion, extend the deadline for the submission of bids, pursuant to Rule 27 of the Public Procurement Rules, 2004. Extension of Time for submission of bid, by amending the Bidding Documents in accordance with ITB 7, in which case all rights and obligations of the Procuring agency/Employer and bidders previously subject to the deadline will thereafter be subject to the new deadline.
  3. Substitution and Modification of bids
    1. A bidder may substitute or modify his bid after it has been submitted, provided that written notice of the substitution or modification of the bid, is received by the Procuring agency/Employer prior to the deadline for submission of bids.
    2. Revised bid may be submitted after the substitution or modification made in the original bid in accordance with the provisions referred in ITB 18. 

E. OPENING AND EVALUATION OF BIDS

  1. Opening of Bids
    1. The Procuring Agency will open bids in accordance with Rule 28 of the Public Procurement Rules, 2004 and as specified in the BDS.
  2. Confidentiality
    1. Information relating to the examination, clarification, evaluation and comparison of bids and recommendation of contract award shall not be disclosed to bidders or any other persons not officially concerned with such process until the time of the announcement of the respective evaluation report.
  3. Clarification of Bids
    1. Clarification of Bidding Documents shall be carried out in accordance with Rule 31 of the Public Procurement Rules, 2004.
    2. The alteration or modification in the bid which in any case affect the following parameters will be considered as a change in the substance of a bid:
      1. evaluation & qualification criteria;
      2. required scope of work;
      3. contract price;
      4. all securities requirements;
      5. tax requirements;
      6. terms and conditions of bidding documents.
      7. change in the ranking of the bidder
  4. Preliminary Examination of Bids 
    1. Prior to the detailed evaluation of bids, the Procuring agency/Employer will determine whether each bid:
      1. meets the eligibility criteria defined in ITB 3 and ITB 4; 
      2. has been prepared as per the format and contents defined by the Procuring agency/Employer in the bidding documents;
      3. has been properly signed; 
      4. is accompanied by the required securities; and 
      5. is substantially responsive to the requirements of the bidding documents. 
        The Procuring agency/Employer's determination of a bid's substantial responsiveness will be based on the contents of the bid itself.
    2. A substantially responsive Bid is one which conforms to all the terms, conditions, and specifications of the Bidding Documents, without material deviation or reservation. A material deviation or reservation is one that: - 
      1. affects in any substantial way the scope, quality, or performance of the Works; 
      2. limits in any substantial way, inconsistent with the bidding documents, the Procuring agency/Employer's rights or the bidders’ obligations under the Contract; or 
      3. if rectified, would affect unfairly the competitive position of other bidders presenting substantially responsive bids.
    3. The Procuring agency/Employer will confirm that the documents and information specified under ITB 9, 10 and 11 have been provided in the bid. If any of these documents or information is missing, or is not provided in accordance with the Instructions to Bidders, the bid shall be rejected.
    4. The Procuring agency/Employer may waive-off any minor informality, nonconformity, or irregularity in a bid which does not constitute a material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
      Explanation: A minor informality, non-conformity or irregularity is one that is merely a matter of form and not of substance. It also pertains to some immaterial defect in a Bid or variation of a bid from the exact requirements of the invitation that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on quantity, quality, or delivery is negligible when contrasted with the total cost or scope of the works. The Procuring agency/Employer either shall give the bidder an opportunity to cure any deficiency resulting from a minor informality or irregularity in a bid or waive the deficiency, whichever is advantageous to the Procuring agency/Employer. Examples of minor informalities or irregularities include failure of a bidder to –
      1. Submit the number of copies of signed bids required by the invitation;
      2. Furnish required information concerning the number of its employees;
      3. the firm submitting a bid has formally adopted or authorized, before the date set for opening of bids, the execution of documents by typewritten, printed, or stamped signature and submits evidence of such authorization and the bid carries such a signature.
    5. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer may request the bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Technical Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any such aspect of the technical Proposal linked with the ranking of the bidders. Failure of the bidder to comply with the request may result in the rejection of its bid.
    6. Provided that a Technical Bid is substantially responsive, the Procuring agency/Employer shall rectify quantifiable nonmaterial nonconformities or omissions related to the Financial Proposal. To this effect, the Bid Price shall be adjusted, for comparison purposes only, to reflect the price of the missing or nonconforming item or component. 
    7. If a bid is not substantially responsive, it will be rejected by the Procuring agency/Employer and may not subsequently be evaluated for complete technical responsiveness. 
  5. Examination of Terms and Conditions; Technical Evaluation
    1. The Procuring agency/Employer shall examine the bid to confirm that all terms and conditions specified in the GCC and the PCC have been accepted by the bidder without any material deviation or reservation.
      For this purpose:
      “Deviation” means departure from the requirements specified in the Bidding Document.
      “Reservation” means setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Bidding Document.
    2. The Procuring agency/Employer shall evaluate the technical aspects of the bid submitted in accordance with ITB 30, to confirm that all requirements specified in Section VI – Works Requirement, Technical Specifications of the Bidding Documents have been met without material deviation or reservation.
    3. If after the examination of the terms and conditions and the technical evaluation, the Procuring agency/Employer determines that the bid is not substantially responsive in accordance with ITB 27, it shall reject the bid.
  6. Correction of Arithmetic Errors
    1. Bids determined to be substantially responsive will be checked for any arithmetic errors.  Errors will be corrected as follows: -
      1. if there is a discrepancy between unit prices and the sub-total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail, and the sub-total price shall be corrected, unless in the opinion of the Procuring agency/Employer there is an obvious misplacement of the decimal point in the unit price, in which the total price as quoted shall govern and the unit price shall be corrected;
      2. if there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail, and the total shall be corrected; and 
      3. where there is a discrepancy between the amounts in figures and in words, the amount in words will govern.
      4. Where there is discrepancy between grand total of price schedule and amount mentioned on the Form of Bid, the amount referred in Price Schedule shall be treated as correct subject to elimination of other errors. 
    2. The amount stated in the Bid will, be rectified by the Procuring agency/Employer in accordance with the above procedure for the correction of errors and, with, the concurrence of the bidder, shall be considered as binding upon the bidder. If the bidder does not accept the corrected amount, its bid shall be rejected after forfeiture of Bid Security or execution of the Bid Securing Declaration, as the case may be, in accordance with ITB 41.3.
  7. Conversion to Single Currency
    1. The unit rates and the prices shall be quoted by the bidder entirely in Pak rupees. A bidder expecting to incur expenditures in other currencies for inputs to the Works from outside the Procuring agency/Employer’s country (referred to as the “Foreign Currency Requirements”) shall indicate the same in the letter of bid-financial proposal. The proportion of the Bid Price (excluding Provisional Sums) needed by him for the payment of such Foreign Currency Requirements either (i) entirely in the currency of the Bidder’s home country or, (ii) at the bidder’s option, entirely in Pak rupees provided always that a bidder expecting to incur expenditures in a currency or currencies other than those stated in (i) and (ii) above for a portion of the foreign currency requirements, and wishing to be paid accordingly, shall indicate the respective portions in his bid. Comparison of bids quoted in different currencies and conversion of bids into a single currency shall be carried out in accordance with Rule 30(2) of the Public Procurement Rules, 2004.
  8. Evaluation of Bids
    1. The Procuring agency/Employer shall evaluate and compare only the bids determined to be substantially responsive, pursuant to ITB 27.
    2. In evaluating the Technical Proposal of each Bid, the Procuring agency/Employer shall use the criteria and methodologies listed in the BDS and in terms of works requirement. No other evaluation criteria or methodologies shall be permitted.
    3. The Procuring agency/Employer’s evaluation of a bid will take into account:
      1. the bid price, excluding provisional sums and the provision, if any, for contingencies in the summary bill of quantities, but including day work items, where priced competitively;
      2. converting the amount resulting from applying above, if relevant, to a single currency in accordance with ITB 29;
    4. The estimated effect of the price adjustment provisions of the Conditions of Contract, applied over the period of execution of the Contract, shall not be taken into account in bid evaluation.
    5. If these bidding documents allow bidders to quote separate prices for different lots, and the award to a single bidder of multiple lots, the methodology of evaluation to determine the lowest evaluated lot combinations in the Form of Bid, is specified in the BDS.
    6. If the bid, which results in the Evaluated Bid Price (Successful Bid), is seriously unbalanced or front loaded in the opinion of the Employer, the Employer may require the Bidder to produce detailed price analyses for any or all items of the Bill of Quantities, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. After evaluation of the price analyses, taking into consideration the schedule of estimated Contract payments, the Employer may require that the amount of the performance security be increased at the expense of the Bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under the Contract.
      Explanation:
      “Unbalanced” or “front-loaded” bids consist of deliberately submitting bids with artificially high prices or unit rates for the early stages of a construction project, offset by artificially low prices or unit rates for the later stages of the project, to improve the contractor’s cash flow.
  9. Domestic Preference
    1. If the BDS so specifies, the Procuring agency/Employer will grant a margin of preference to the domestic contractor in line with the rules, regulations, regulatory guides or instructions issued by the Authority from time to time. 
  10. Determination of Successful Bid
    1. The Procuring agency/Employer shall compare the evaluated bids in accordance with the predefined bidding procedure, of all substantially responsive bids to determine the Successful bidder. 
  11. Qualification of Bidder 
    1. The Procuring agency/Employer shall determine to its satisfaction whether the bidder is substantially responsive and whose bid is declared as Successful bid either continues to meet (if prequalification applies) or meets (if post-qualification applies) the qualifying criteria specified in Evaluation and Qualification Criteria.
      Note: In case of international bidding, the parameters for incorporation or licensing within Pakistan may be fulfilled as part of post qualification.
    2. The determination shall be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11.
    3. Prior to contract award, the Procuring agency/Employer will verify that the successful bidder (including each member of a JV) is not blacklisted/debarred. The Procuring agency/Employer will conduct the same verification for each sub-contractor proposed by the successful bidder. 
  12. Sub-Contractors
    1. The bidder shall provide details regarding any specialized sub-contractor to the Procuring agency/Employer. In case change of sub-contractors, the bidder shall promptly notify the Procuring agency/Employer and obtain approval for replacement of sub-contractors.
    2. Bidders may propose sub-contracting up to the percentage of total value of contracts or the volume of works as specified in the BDS.
  13. Abnormally Low Financial Bid
    1. A procuring Agency may reject abnormally low bids. The decision of the Procuring agency/Employer to reject a bid and reasons for the decision shall be recorded in the procurement proceedings and promptly communicated to the bidder concerned. Moreover, the Procuring agency/Employer shall not incur any liability solely by rejecting abnormally bid
      Guidance for Procuring agency/Employer:
      An abnormally low bid means, in the light of the Procuring agency/Employer’s estimate and of all the bids submitted, the bid appears to be abnormally low by not providing a margin for normal levels of profit. In order to identify the Abnormally Low Bid (ALB) following approaches can be considered to minimize the scope of subjectivity:
      1. Comparing the bid price with the cost estimate; 
      2. Comparing the bid price with the bids offered by other bidders submitting substantially responsive bids; and 
      3. Comparing the bid price with prices paid in similar contracts in the recent past either government- or development partner-funded.
    2. The Procuring agency/Employer will determine to its satisfaction whether the bidder that is selected as having submitted the successful bid is qualified to perform the contract satisfactorily, in accordance with the criteria listed in ITB 11
    3. The determination will take into account the bidder’s financial and technical capabilities.  It will be based upon an examination of the documentary evidence of the bidder’s qualifications submitted by the bidder, pursuant to ITB 11, as well as such other information as the Procuring agency/Employer deems necessary and appropriate. Factors not included in these bidding documents shall not be used in the evaluation of the bidders’ qualifications.
    4. Procuring agency/Employer may seek “Certificate for Independent Price Determination” from the bidder and the results of reference checks may be used in determining award of contract.
      Explanation: The Certificate shall be furnished by the bidder. The bidder shall certify that the price is determined keeping in view of all the essential aspects such as raw material, its processing, value addition, optimization of resources due to economy of scale, transportation, insurance and margin of profit etc. 
    5. An affirmative determination will be a prerequisite for award of the contract to the bidder. A negative determination will result in rejection of the bidder’s bid, in which event the Procuring agency/Employer will proceed to the next ranked bidder to make a similar determination of that bidder’s capabilities to perform satisfactorily.

F. AWARD OF CONTRACT

  1. Criteria of Award
    1. Subject to ITB 36 and 37, the Procuring agency/Employer will award the Contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has been declared as Successful Bidder, provided that such bidder has been determined to be:
      1. eligible in accordance with the provisions of ITB 3; 
      2. is determined to be qualified to perform the Contract satisfactorily; and 
      3. Successful negotiations have been concluded, if any.
  2. Negotiations
    1. The Committee of the Procuring agency/Employer may negotiate with the Most Advantageous Bidder relating to the following areas:
      1. a minor alteration to the technical (drawings, design technical specifications) details of the statement of works;
      2. Methodology, work plan, staffing in view to streamline the work;
      3. a minor amendment to the Particular conditions of Contract;
      4. finalizing payment arrangements;
      5. clarifying details that were not apparent or could not be finalized at the time of Bidding; 
    2. Where negotiation fails to result into an agreement, the Procuring agency/Employer may invite the next ranked bidder for negotiations. Where negotiations are commenced with the next ranked bidder, the Procuring agency/Employer shall not reopen earlier negotiations.
  3. Procuring agency's Right to reject All Bids
    1. The procuring agency has the right to reject all bids in accordance with Rule 33 of the Public Procurement Rules, 2004. However, the Authority (i.e. PPRA) may call from the Procuring agency/Employer the justification of those grounds. 
  4. Notification of Award
    1. The procuring agency shall announce and publish the evaluation result in accordance with Rule 35 of the Public Procurement Rules, 2004.
    2. Where no complaints have been lodged, the bidder whose bid has been accepted will be notified of the award by the Procuring agency/Employer prior to expiration of the bid validity period through EPADS. However, the Procuring agency/Employer shall not award any procurement contract at least for five (05) days after the announcement of final evaluation report. The notification letter (herein after and in the condition of the contract and contract form called “Letter of Acceptance” will specify the sum that the Procuring agency/Employer will pay the successful bidder in consideration for the execution and completion of the works as prescribed by the Contract (hereinafter and in the Contract called the "Contract Price). 
    3. The notification of award will constitute the formation of the Contract, subject to the bidder furnishing the Performance Security (or guarantee) in accordance with ITB 41 and signing of the contract in accordance with ITB 40. 
    4. Upon the successful bidder’s furnishing of the performance security (or guarantee) pursuant to ITB 41, the Procuring agency/Employer will promptly notify each unsuccessful bidder, the name of the successful bidder and the Contract amount and will discharge the Bid Security or Bid Securing Declaration of the bidder(s) pursuant to ITB 17.
  5. Signing of Contract
    1. Promptly after notification of award, Procuring agency/Employer shall send the successful bidder the draft agreement, incorporating all terms and conditions as agreed by the parties to the contract. 
    2. Immediately after the Redressal of grievance by the GRC, and after fulfillment of all conditions precedent of the Contract Form, the successful bidder and the Procuring agency/Employer shall sign the contract.
    3. Where no formal signing of a contract is required, work order issued to the bidder shall be construed to be the contract. 
  6. Performance Security (or Guarantee)
    1. After the receipt of the Letter of Acceptance, the successful bidder, within the specified time, shall deliver to the Procuring agency/Employer a Performance Guarantee in the amount and in the form stipulated in the BDS and PCC, denominated in the type and proportions of currencies in the Letter of Acceptance and in accordance with the Conditions of Contract.
    2. If the Performance Guarantee is provided by the successful bidder and it shall be in the form specified in the BDS which shall be in any of the following:
      1. certified cheque, cashier’s or manager’s cheque, or bank draft; 
      2. irrevocable letter of credit issued by a scheduled bank of Pakistan or in the case of an irrevocable letter of credit issued by a foreign bank, the letter shall be confirmed or authenticated by a scheduled bank of Pakistan; 
      3. bank guarantee confirmed by a reputable local bank or, in the case of a successful foreign bidder, bonded by a foreign bank; or
      4. surety bond callable upon demand issued by any reputable surety or insurance company.
        Any Performance Guarantee submitted shall be enforceable in Pakistan.
    3. Failure of the Most Advantageous Bidder to comply with the requirement of ITB 40 shall constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security or declare blacklisted (in case bid securing declaration is submitted) in which event the Procuring agency/Employer may make the award to the next most advantageous bidder or reinitiate the procurement process afresh (as a case may be).
  7. Advance Payment
    1. Advance payment will be provided to the bidder in percentage and in the manner as agreed by the both parties in terms of Conditions of the Contract. 
    2. The Procuring agency/Employer will provide an advance payment as stipulated in the Conditions of Contract, subject to a maximum amount, as stated and/or Conditions of the Contract.  The advance payment request shall be accompanied by an advance payment security (guarantee) in the form provided in Section X. For the purpose of receiving the advance payment, the bidder shall make and estimate of, and include in its bid, the expenses that will relate to the purchase of equipment, machinery, materials, and on the engagement of labor during the first month beginning with the date of the Procuring agency/Employer’s “Notice to Commence” as specified in the PCC.
  8. General Performance of the Bidders
    1. The Procuring agency/Employer reserves the right to obtain information regarding performance of the bidders on their previously awarded contracts / works. The Procuring agency/Employer may seek information / report from the previous employer for consideration. However, the Procuring agency/Employer shall incorporate such parameters in the evaluation criteria and accordingly decide the fate of the bid submitted.
  9. Corrupt & Fraudulent Practices
    1. Procuring agencies (including beneficiaries of Government funded projects and procurement) as well as Bidders/Suppliers/Contractors under Government financed contracts, observe the highest standard of ethics during the procurement and execution of such contracts, and will avoid to engage in any corrupt and fraudulent practices.  

G. GRIEVANCE REDRESSAL & COMPLAINT REVIEW MECHANISM

  1. Grievance Redressal
    1. Grievance Redressal shall be carried out in accordance with Rule 48 of the Public Procurement Rules, 2004 i.e. Redressal of grievances by the procuring agency and “Redressal of Grievances Regulations 2021”.

H. MECHANISM OF BLACKLISTING

  1. Mechanism of Blacklisting
    1. The Procuring agency/Employer shall proceed Blacklisting of Bidders/Contractors in accordance with Rule 19 of the Public Procurement Rules, 2004 i.e. Blacklisting and “Blacklisting and Debarment of Bidders or Contractors Regulations 2024. 

📑 Bid Data Sheet (BDS)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

Bids Data Sheet (BDS)

The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB).  Whenever there is a conflict, the provisions herein shall prevail over those in ITB.

BDS Clause Number

ITB Number

Amendments of, and Supplements to, Clauses in the Instruction to Bidders

A. Introduction

1

1.1

Name of Procuring Agency: SBP-BSC North (SBP Banking Services Corporation (BSC))

The subject of procurement is: UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Expected commencement date: Wednesday, March 31, 2027

2.

2.1

Financial year for the operations of the Procuring Agency: 2026-27

Name and identification number of the Contract: P103714 

3. 3.1 JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil

B. Bidding Documents

4.

6.2 & 6.4

The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Sunday, November 1, 2026

5. 7.2

Any addendum, in case issued, shall be published on SBP-BSC North (SBP Banking Services Corporation (BSC)) website  and on EPADS v2.0.

C. Preparation of Bids

6.

8.1

List of documents required along with the bid: No
 

7. 9.1

The qualification criteria to establish the supply / production capability of the bidder.

see Eligibility Criteria
8. 11.2 


Works and Their related documents:
See section Required Scope of Work
 

9. 11.1 Price schedule will be provided according to the format defined and acquired.
see section price schedule.
10. 11.4

 Specifications:

see section of specifications.

11.

11.5 & 13.5

The price shall be Fixed.
The bid price shall be adjusted in accordance with Appendix provided – Formula for Price Adjustment.

12.

14.1

Currency of the Bids shall be : PKR

13.

16.1

The Bids/Bid Validity period shall be: 180 Days

14.

17.1 

The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6

15. 17.2

The Bid Security shall be in the form of: Pay Order, Banker's Cheque, Call at Deposit, Demand Draft  

16. 15.1

Alternative Bids to the requirements of the bidding documents will not be permitted.

D. Submission of Bids

17.

18.1 & 21.1

Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;

SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).

Bids that are not submitted on EPADS v2.0 shall be disqualified.

The deadline for Bids submission is: Wednesday, November 4, 2026 03:00 PM

E. Opening and Evaluation of Bids

18.

24.1

The Bids opening shall take place on EPADS v2.0.

Day : Wednesday

Date: November 04, 2026

Time : 03:30 PM

19.

30.2

Selection technique adopted will be: Least Cost Based Selection (LCBS)
see Evaluation Criteria

F. Award of Contract

20.

41.1 & 41.2

The Performance guarantee shall: 10.00%.

The Performance Guarantee shall be acceptable in the form of: Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft

21. 45.1

Arbitrator shall be appointed by mutual consent of the both parties.

G. Review of Procurement Decisions

22.

37

Grievance against this procurement shall be submitted online on EPADS v2.0.

Eligibility Criteria

Bidder's TypeRequired Registration
Individual / Individual Consultant
Sole Proprietorship
Partnership Firm
Company (Private Limited)
Company (Public Limited)
Company (Holding Company)
Company (Limited by Guarantee)
State Owned Enterprise (Private Limited)
State Owned Enterprise (Public Limited)
FBR (NTN)
PEC
Eligibility CriteriaDocument
Revenue Authority Registration: The Bidder should be registered with relevant / concerned Provincial Revenue Authority. If not registered, the 100% tax shall be deducted at source as per applicable law and credited to relevant account.No
Valid registration with Pakistan Engineering Council at least in Category C-03, or above with specialized category EE-04 and EE-05.Yes
Undertaking/Letter of Bid (As per Format attached): The bidder is required to submit an undertaking/letter of bid as per format attached.Yes

Evaluation Criteria

Least Cost Based Selection (LCBS)

Weightage

Technical Evaluation %
100
Technical Marks100
Passing Marks100
Technical Evaluation Criteria
Minimum experience of the company/ firm should not less than five (05) Years for performing works related to Electrical system (The bidder shall provide documentary evidence such as work order / acceptance letter / completion certificate / Contract documents or any other tractable evidence) (Quantitative)(Doc Required)20
The bidder should have executed minimum One (01) project of supply & installation of 1000KVA transformer or above, HT/LT Panels of cost Rs. 120 Million during last five (05) year. OR The bidder should have executed minimum Two (02) projects of electrical supply and installation works including 1000KVA transformer or above and MV/LV panels of cost 80.0M executed during last five (05) years (The bidder shall provide documentary evidence such as work order/ completion certificate / Contract documents showing scope of works) (Quantitative)(Doc Required)20
Available Financial Capability/Liquid Assets of Rs. 80M or above. (Bank statement be submitted as evidence showing required balance at any one instant in the statement of last three months before date of publication of tender notice or available Bank Credit Line facility during same period or Liquid Assets). OR Annual Sales volume/Gross Turnover of at least Rs. 150M in any of the last 03 (three) years Attach Copy(s) of Audited Financial Statements / Sales Tax/ Income Tax return filed in FBR/ purchase orders or work orders (Quantitative)(Doc Required)30
The bidder/contractor shall provide technical brochures of quoted equipment complying with specification mentioned in Bill of Quantities (BOQ) and Schedule of Specifications Appendix A to Bid (Quantitative)(Doc Required)10
The Bidder shall submit a valid support/authorization letter from the OEM of the proposed Synchronization Controller(s) or its Authorized Distributor, authorizing the Bidder for supply, installation, commissioning, and after-sales support. The OEM or Authorized Distributor shall: Hold valid OEM authorization/dealership credentials for the quoted controller brand for the last three (03) consecutive years, including the current year. Have a minimum of ten (10) years' experience in synchronization controllers, power management, generator synchronization, or related automation and control systems. Maintain a technical support office in Karachi, Pakistan. Provide technical support, warranty services, and spare parts for the proposed equipment. (Quantitative)(Doc Required)20

Jobs/Lots

Jobs Without Lots :

JobDelivery ScheduleQuantityBid Security
UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD
Address: SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).
Schedule: 540 Days
Quantity: 1/job
1/job 4000000 PKR

Related Services :

No

Work Specifications and Market Rates

Jobs Without Lots :

Job: UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Specifications / Requirements:

Sr. NoS.#DESCRIPTIONUNITQTYRATE AMOUNT IN WORDSAMOUNT
1 SECTION - A MEDIUM VOLTAGE SWITCHGEAR     
2 Minimum Two Year Warranty required, warranty period will start from the date of successful Testing & Commissioning. NOTE: - Shop drawings with complete technical details shall be submitted for approval before manufacturing. - The Contractor shall facilitate a comprehensive Factory Acceptance Test (FAT) at the manufacturer's facility for all LV/MV panels prior to dispatch. The testing shall be witnessed by the Client/Consultant.     
3A-1/1Supply of following 11KV Incoming MV Type Tested Switchgear (Cassette Type) comprising with motor mechanism, metering and all protection devices CTs, PTs, Over current Protection, IBMS Complied along with Energy Analyzer, earth Fault Relay including complete interlocking facility by adding blocking coils, UVT, coils etc. Panel shall have provision for Cable Entry/Exit from TOP along with cable chamber box termination of minimum 450mm x 1200mm including seperate trolly for VCB drawout, Complete with all respects having following specifications: The (80x10mm) Cu Bus Bars shall be Tin Plated using Electroplating Method and covered with Heat Shrink Color Coded Sleeves. Complete in all respect. Breaker type: VCB Rate Voltage: 12kV Rated Current : 630A TP Busbar: Pure Copper Tinned With Sleeves BIL: 75kV Supply Frequency: 50 Hz Rated Power Frequency Withstand Voltage: 28 kV Rated Short Circuit Breaking Current Rating : 20KA for 3 sec. MV Panel must be Type Tested with operator safety IAC qualification FLR All Controls of VCB shall be 220V AC AC supply should be provided by client DC power supply should be supplied by supplier if required Each Panel Shall have Sensor for humidity & temparature with de-humidifirer. Note: -All protection relays must be self-powered -To be Coupled with the below mentioned 2 No. Outgoing Switchgears Minimum Two Year Warranty required, warranty period will start from the date of successful Testing & Commissioning. - Shop drawings with complete technical details shall be submitted for approval before manufacturing. - The Contractor shall facilitate a comprehensive Factory Acceptance Test (FAT) at the manufacturer's facility for all LV/MV panels prior to dispatch. The testing shall be witnessed by the Client/Consultant.No.16989346Rupees Six Million Nine Hundred Eighty Nine Thousand Three Hundred Forty Six Only6989346
4A-1/2 Placement, Transportation, Loading/Unloading, Installation, Testing & Commissioning of above item at S.# A-1/1No.1123714Rupees One Hundred Twenty Three Thousand Seven Hundred Fourteen Only123714
5A-2/1Supply of 11KV Phase Reversal Correction Panel (Cassette Type) comprising with motor mechanism, metering and all protection devices CTs, PTs, Over current Protection, IBMS Complied along with Energy Analyzer, earth Fault Relay including complete interlocking facility by adding blocking coils, UVT, coils etc. Panel shall have provision for Cable Entry/Exit from TOP along with cable chamber box termination of minimum 450mm x 1200mm, Complete with all respects having following specifications: The (80x10mm) Cu Bus Bars shall be Tin Plated using Electroplating Method and covered with Heat Shrink Color Coded Sleeves. Complete in all respect. Breaker type: VCB Rate Voltage: 12kV Rated Current : 630A TP Busbar: Pure Copper Tinned With Sleeves BIL: 75kV Supply Frequency: 50 Hz Rated Power Frequency Withstand Voltage: 28 kV Rated Short Circuit Breaking Current Rating : 20KA for 3 sec. MV Panel must be Type Tested with operator safety IAC qualification AFLR All Controls of VCB shall be 220V AC AC supply should be provided by client DC power supply should be supplied by supplier if required Each Panel Shall have Sensor for humidity & temparature with de-humidifier. Note: -All protection relays must be self-powered -To be Coupled with the below mentioned 2 No. Outgoing SwitchgearsNo.16989346Rupees Six Million Nine Hundred Eighty Nine Thousand Three Hundred Forty Six Only6989346
6A-2/2Placement, Transportation, Loading/Unloading, Installation, Testing & Commissioning of above item at S.# A-2/1No.1123714Rupees One Hundred Twenty Three Thousand Seven Hundred Fourteen Only123714
7A-3/1Supply of 11KV Outgoing MV Switchgear (Cassette Type) comprising with motor mechanism and all protection devices CTs, PTs, Over current Protection, IBMS Complied along with Energy Analyzer, earth Fault Relay, earthing switch, including complete interlocking facility by adding blocking coils, UVT, coils etc. Panel shall have provision for Cable Entry/Exit from TOP along with cable chamber box termination of minimum 450mm x 1200mm, Complete with all respects having following specifications: The (80x10mm) Cu Bus Bars shall be Tin Plated using Electroplating Method and covered with Heat Shrink Color Coded Sleeves. Complete in all respect. Breaker type: VCB Rate Voltage: 12kV Rated Current : 630A TP Busbar: Pure Copper Tinned With Sleeves BIL: 75kV Supply Frequency: 50 Hz Rated Power Frequency Withstand Voltage: 28 kV Rated Short Circuit Breaking Current Rating : 20KA for 3 sec. MV Panel must be Type Tested with operator safety IAC qualification FLR All Controls of VCB shall be 220V AC AC supply should be provided by client DC power supply should be supplied by supplier if required Each Panel Shall have Sensor for humidity & temparature with de-humidifier. (To Be Coupled with the above mentioned Incoming / Phase Reversal Switchgear)No.26825751Rupees Thirteen Million Six Hundred Fifty One Thousand Five Hundred Two Only13651502
8A-3/2Placement, Transportation, Loading/Unloading, Installation, Testing & Commissioning of above item at S.# A-3/1No.2123714Rupees Two Hundred Forty Seven Thousand Four Hundred Twenty Eight Only247428
9A-4/1Supply of 600mm wide, 6 mm thick Rubber mat piece to be installed all along Switchgear in substation rooms as per requirements and specifications, complete in all respect.Rm.156786Rupees One Hundred One Thousand Seven Hundred Ninety Only101790
10A-4/2 Laying of above item at S.# A-4/1Rm.15124Rupees One Thousand Eight Hundred Sixty Only1860
11A-5/1Supply of Danger Boards, Emergency Signs etc. including all mounting accessories, complete in all respects.Job126100Rupees Twenty Six Thousand One Hundred Only26100
12A-5/2 Installation, Testing & Commissioning of above item at S.# A-5/1Job16186Rupees Six Thousand One Hundred Eighty Six Only6186
13A-6/1Supply and delivery of a loose, fully operational, truck-mounted Vacuum Circuit Breaker (VCB) trolley, completely compatible and interchangeable with the 11kV IAC AFLR switchgear panels specified above.No.155098Rupees Fifty Five Thousand Ninety Eight Only55098
14A-7Physical Factory Acceptance Test at the manufacturer's premises for 2 Persons (1 No. Client's Representative & 1 No. Consultant's Representative with supplier)Job161857Rupees Sixty One Thousand Eight Hundred Fifty Seven Only61857
15 Note: ● Vendor is advised to inform missing items (if any) in BOQ at time of submitting this tender. No escalation will be considered at time of execution of work. ● Vendor to check placement of MV switch gear on substation room and make necessary arrangement for it accordingly as per site condition.     
16 SECTION - B OIL FILLED TRANSFORMER     
17B-1/1Supply of Oil Filled Step Down Distribution Transformers including all protection devices CTs, PTs, PRD relay etc. Complete in all respects and having following specifications: Rated power: 1000kVA Phase: 3 Phase Rated frequency: 50 Hz Rated primary voltage: 11 kV Secondary voltage ( at no-load): 415 V Vector group: Dyn11 Basic Insulation Level: 95kV Dielectric liquid: Mineral oil Cooling mode: ONAN (oil natural air natural) Type of installation: Indoor Mounting mode: Ground / Pad Mounted Degree of protection: IP00 no enclosure IECNo.29487089Rupees Eighteen Million Nine Hundred Seventy Four Thousand One Hundred Seventy Eight Only18974178
18B-1/2 Placement, Transportation, Loading/Unloading, Installation, Testing & Commissioning of above item at S.# B-1/1No.2309285Rupees Six Hundred Eighteen Thousand Five Hundred Seventy Only618570
19B-2/1Supply of wiring for bucholz relay, alarm control etc. for above Transformers from transformers to MV Panels with 3x1C-2.5 Sqmm Cu/PVC cables in 25mm dia G.I conduit with all accessories, complete as per drawing and specification.Rm.501044Rupees Fifty Two Thousand Two Hundred Only52200
20B-2/2Installation, laying, tagging, termination, testing and commissioning of above item at S.# B-2/1Rm.50118Rupees Five Thousand Nine Hundred Only5900
21B-3Physical Factory Acceptance Test at the manufacturer's premises for 2 Persons (1 No. Client's Representative & 1 No. Consultant's Representative with supplier)Job1309285Rupees Three Hundred Nine Thousand Two Hundred Eighty Five Only309285
22 SECTION - C LV PANELS & DISTRIBUTION BOARDS     
23 Supply, Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of the following LV Panels/Distribution boards made with 14 SWG Sheet Steel Enclosure including all installation accessories such as Rawal bolt etc. Complete in all respects. Note: - Imported Bi-Mettalic Lugs and Connectors shall be used in existing LV Cables. - Manual crimping of lugs is not allowed. Proper hydraulic lug presser should be used. - All the DBs should be front accessible and maintainable. - The transportation & unloading of Panels is to be done by Panel Supplier. - Laser engraved tags required as mention in SLDs - Space for circuit tagging required with permanent installation on protective sheet via rivets - 20% space required in DB for future provision - Tin platted Imported Cu bus bar with heat shrink color coded sleeves to be used. - Hindged protective metallic door is required with knob/handle. - Braided Door earth required. - Lockable handle required for main door. - As-built drawing pocket. - Cable hanging arrangement. - Shop drawings with complete technical details shall be submitted for approval before manufacturing. - The Contractor shall facilitate a comprehensive Factory Acceptance Test (FAT) at the manufacturer's facility for all LV/MV panels prior to dispatch. The testing shall be witnessed by the Client/Consultant. Minimum Two Year Warranty Required from date of successful comissioning on site.     
24C-1/1Supply of Main L.V Panels with PFI and Synchronization system (Form3B - Type 2 minimum). The scope comprehensively includes all necessary control cabling, an automation system featuring a remote monitoring synchronization module, a dedicated Microgrid Controller for PV system control, and an integrated HMI display module for real-time synchronization management. (Sync. Module must be COMAP) Note: -Refer Technical Specification Section V-05 (Annexure A) for control philosophy. -All Rigid Connection (Busbar links between Busway Flange and Panel) of following Busways are in Panel Builder Scope a- 1600A Main Incoming 1 b- 1600A Main Incoming 2No.132707602Rupees Thirty Two Million Seven Hundred Seven Thousand Six Hundred Two Only32707602
25C-1/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-1/1No.1371142Rupees Three Hundred Seventy One Thousand One Hundred Forty Two Only371142
26C-2/1Supply of Genset LTO Panel with Synchronization system (Form3B - Type 2 minimum). The scope comprehensively includes all necessary control cabling, an automation system featuring a remote monitoring synchronization module, complete in all respects. (Sync. Module must be COMAP)No.117963754Rupees Seventeen Million Nine Hundred Sixty Three Thousand Seven Hundred Fifty Four Only17963754
27C-2/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-2/1No.1371142Rupees Three Hundred Seventy One Thousand One Hundred Forty Two Only371142
28C-3/1Supply of LT-5 PANEL (GF)No.12890810Rupees Two Million Eight Hundred Ninety Thousand Eight Hundred Ten Only2890810
29C-3/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-3/1No.1123714Rupees One Hundred Twenty Three Thousand Seven Hundred Fourteen Only123714
30C-4/1Supply of ELT-1 PANEL (GF)No.11979336Rupees One Million Nine Hundred Seventy Nine Thousand Three Hundred Thirty Six Only1979336
31C-4/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-4/1No.1123714Rupees One Hundred Twenty Three Thousand Seven Hundred Fourteen Only123714
32C-5/1Supply of EDB-1 (GF)No.1323458Rupees Three Hundred Twenty Three Thousand Four Hundred Fifty Eight Only323458
33C-5/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-5/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
34C-6/1Supply of DB-1 (GF)No.1414129Rupees Four Hundred Fourteen Thousand One Hundred Twenty Nine Only414129
35C-6/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-6/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
36C-7/1Supply of DB-AC (FF)No.1414745Rupees Four Hundred Fourteen Thousand Seven Hundred Forty Five Only414745
37C-7/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-7/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
38C-8/1Supply of EDB-4 (FF)No.1339734Rupees Three Hundred Thirty Nine Thousand Seven Hundred Thirty Four Only339734
39C-8/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-8/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
40C-9/1Supply of SLT-1 & DB-2 (FF)No.1646607Rupees Six Hundred Forty Six Thousand Six Hundred Seven Only646607
41C-9/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-9/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
42C-10/1Supply of SLT-2 & DB-5 (SF)No.1621186Rupees Six Hundred Twenty One Thousand One Hundred Eighty Six Only621186
43C-10/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-10/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
44C-11/1Supply of LPDB-SF (SF)No.1349495Rupees Three Hundred Forty Nine Thousand Four Hundred Ninety Five Only349495
45C-11/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-11/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
46C-12/1Supply of DB-HALL-1 (SF)No.1368872Rupees Three Hundred Sixty Eight Thousand Eight Hundred Seventy Two Only368872
47C-12/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-12/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
48C-13/1Supply of DB-HALL-2 (SF)No.1368872Rupees Three Hundred Sixty Eight Thousand Eight Hundred Seventy Two Only368872
49C-13/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-13/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
50C-14/1Supply of LPDB-SUBNo.1312767Rupees Three Hundred Twelve Thousand Seven Hundred Sixty Seven Only312767
51C-14/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-14/1No.137115Rupees Thirty Seven Thousand One Hundred Fifteen Only37115
52C-15/1Supply of MCC PanelNo.18497748Rupees Eight Million Four Hundred Ninety Seven Thousand Seven Hundred Forty Eight Only8497748
53C-15/2Placement, Installation, Transportation, Loading/Unloading, Testing & Commissioning of above item at S.# C-15/1No.1123714Rupees One Hundred Twenty Three Thousand Seven Hundred Fourteen Only123714
54C-16Physical Factory Acceptance Test at the manufacturer's premises for 2 Persons (1 No. Client's Representative & 1 No. Consultant's Representative with supplier)Job130929Rupees Thirty Thousand Nine Hundred Twenty Nine Only30929
55 Note: - The contractor shall provision and install temporary Distribution Board (DB) as required to minimize system downtime during the transition and swapping of existing units.     
56 SECTION - D CENTRALIZED ENERGY MONITORING SYSTEM     
57 Supply, Installation, Testing & Commissioning of complete Central Energy monitoring System, including with wiring, software, terminations, complete in all respect. Note: - Energy Analyzers with protocols like Modbus RTU/TCP, BACnet, and INCOM are already installed in the DBs. - Warranty period will start from the date of successful Testing & Commissioning     
58D-1/1IoT Gateway / Data Logger for transmission of energy analyzer data to server including housing (if required)Job1340971Rupees Three Hundred Forty Thousand Nine Hundred Seventy One Only340971
59D-1/2 Installation, Testing & Commissioning of above item at S.# D-1/1Job172781Rupees Seventy Two Thousand Seven Hundred Eighty One Only72781
60D-2/1Software Interface with Complete Dashboard for live remote monitoring of all electrical and energy parameters as well as data logging of complete data. including 1 year license for all nodes from the date of successful commissioning of system.Job1968665Rupees Nine Hundred Sixty Eight Thousand Six Hundred Sixty Five Only968665
61D-2/2 Installation, Testing & Commissioning of above item at S.# D-2/1Job127298Rupees Twenty Seven Thousand Two Hundred Ninety Eight Only27298
62D-3/1Workstation PC with complete accessories (if required for software installation / server set-up to be quoted by supplier as per their system requirement)No.1232484Rupees Two Hundred Thirty Two Thousand Four Hundred Eighty Four Only232484
63D-3/2 Installation, Testing & Commissioning of above item at S.# D-3/1No.17281Rupees Seven Thousand Two Hundred Eighty One Only7281
64D-4/1Supply and Wiring for interconnecting from Energy Analyzer to Energy Analyzer with CAT-6 UTP 23 AWG in 25mm dia PVC conduit including all accessories Complete in all respect as per drawings and technical Specifications.Rm150851Rupees One Hundred Twenty Seven Thousand Six Hundred Fifty Only127650
65D-4/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# D-4/1Rm150279Rupees Forty One Thousand Eight Hundred Fifty Only41850
66D-5Programming, testing and commissioning of complete system including on site demonstration and training of client's representative upto the entire satisfaction of consultant/clientJob1247428Rupees Two Hundred Forty Seven Thousand Four Hundred Twenty Eight Only247428
67 Note: - Contractor is advised to confirm the cable running lengths and termination as per site conditions before commencement of work.     
68 SECTION - E MEDIUM VOLTAGE CABLES & TERMINATION KITS     
69 Supply, Laying Termination, Testing and Commissioning of following 8.7/15kV, MV Cables in already installed Cable trench / Cable ladder / Cable tray / Duct Bank including all accessories. Complete in all respects as per drawing and specification.     
70E-1/1From MV Switch to 1000kVA Transformer # 1 3C-300 Sqmm 8.7/15kV AL/XLPE/PVC Rm2517378Rupees Four Hundred Thirty Four Thousand Four Hundred Fifty Only434450
71E-1/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# E-1/1Rm251807Rupees Forty Five Thousand One Hundred Seventy Five Only45175
72E-2/1From MV Switch to 1000kVA Transformer # 2 3C-300 Sqmm 8.7/15kV AL/XLPE/PVC Rm2517378Rupees Four Hundred Thirty Four Thousand Four Hundred Fifty Only434450
73E-2/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# E-2/1Rm251807Rupees Forty Five Thousand One Hundred Seventy Five Only45175
74E-3/1Supply, installation, testing and commissioning of 11KV, XLPE-AL, MV Cable Termination Kit at both ends with 3M, Raychem or equivalent approved brand termination kit etc. 3C-300 Sqmm Indoor Type MV Cable Termination kits with Boots including all termination accessories like HT tape etc.No763324Rupees Four Hundred Forty Three Thousand Two Hundred Sixty Eight Only443268
75E-3/2 Installation, Testing & Commissioning of above item at S.# E-3/1No724743Rupees One Hundred Seventy Three Thousand Two Hundred One Only173201
76E-4Physical Factory Acceptance Test at the manufacturer's premises for 2 Persons (1 No. Client's Representative & 1 No. Consultant's Representative with supplier)Job130929Rupees Thirty Thousand Nine Hundred Twenty Nine Only30929
77 Note: - Contractor is advised to confirm the cable running lengths and termination as per site conditions before commencement of work. - HIPOT Testing of MV Cables to be done by the Contractor.     
78 SECTION - F LOW VOLTAGE CABLES     
79 Supply, Laying, Termination, Testing & Commissioning of the following ratings of LV Cables along with complete installation and termination accessories to be laid in already installed Cable trench / Cable ladder / Cable tray / Duct Bank including all accessories. Complete in all respects. -Imported Bi-Mettalic Lugs and Connectors shall be used in LV Cables. -Manual crimping of lugs is not allowed. Proper lug presser for smaller lugs and hydraulic lug presser for large size lugs should be used.     
80F-1/1From 500kVA Generator to Generator Load Take-Off Panel 8 No. 1C-300 Sqmm Cu/PVC+ ECC 2 No. 1C-150 Sqmm Cu/PVCRm65212334Rupees Thirteen Million Eight Hundred One Thousand Seven Hundred Ten Only13801710
81F-1/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-1/1Rm6511209Rupees Seven Hundred Twenty Eight Thousand Five Hundred Eighty Five Only728585
82F-2/1From 600kVA Generator to Generator Load Take-Off Panel 12 No. 1C-240 Sqmm Cu/PVC+ ECC 3 No. 1C-120 Sqmm Cu/PVCRm55254658Rupees Fourteen Million Six Thousand One Hundred Ninety Only14006190
83F-2/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-2/1Rm5513442Rupees Seven Hundred Thirty Nine Thousand Three Hundred Ten Only739310
84F-3/1From 200kVA Generator to Generator Load Take-Off Panel 04 No. 1C-300 Sqmm Cu/PVC+ ECC 1 No. 1C-150 Sqmm Cu/PVCRm100106170Rupees Ten Million Six Hundred Seventeen Thousand Only10617000
85F-3/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-3/1Rm1005605Rupees Five Hundred Sixty Thousand Five Hundred Only560500
86F-4/1From Generator Load Take-off Panel O/G-1 to Main LV Panel 8 No. 1C-300 Sqmm Cu/PVC+ ECC 2 No. 1C-150 Sqmm Cu/PVCRm30212334Rupees Six Million Three Hundred Seventy Thousand Twenty Only6370020
87F-4/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-4/1Rm3011209Rupees Three Hundred Thirty Six Thousand Two Hundred Seventy Only336270
88F-5/1From Generator Load Take-off Panel O/G-2 to Main LV Panel 12 No. 1C-240 Sqmm Cu/PVC+ ECC 3 No. 1C-120 Sqmm Cu/PVCRm30254658Rupees Seven Million Six Hundred Thirty Nine Thousand Seven Hundred Forty Only7639740
89F-5/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-5/1Rm3013442Rupees Four Hundred Three Thousand Two Hundred Sixty Only403260
90F-6/1From Main LV Panel to LT-5 Panel (GF) 8 No. 1C-240 Sqmm Al/XLPE/PVC+ ECC 2 No. 1C-120 Sqmm Cu/PVCRm14037250Rupees Five Million Two Hundred Fifteen Thousand Only5215000
91F-6/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-6/1Rm1401968Rupees Two Hundred Seventy Five Thousand Five Hundred Twenty Only275520
92F-7/1From Main LV Panel to ELT-1 Panel (GF) 8 No. 1C-240 Sqmm Al/XLPE/PVC+ ECC 2 No. 1C-120 Sqmm Cu/PVCRm14037250Rupees Five Million Two Hundred Fifteen Thousand Only5215000
93F-7/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-7/1Rm1401968Rupees Two Hundred Seventy Five Thousand Five Hundred Twenty Only275520
94F-8/1From Main LV Panel to MCC Panel (Basement) 16 No. 1C-240 Sqmm Al/XLPE/PVC+ ECC 3 No. 1C-150 Sqmm Cu/PVCRm17071608Rupees Twelve Million One Hundred Seventy Three Thousand Three Hundred Sixty Only12173360
95F-8/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-8/1Rm1703780Rupees Six Hundred Forty Two Thousand Six Hundred Only642600
96F-9/14C-35 Sqmm Cu/PVC/PVC + 1C-16 Sqmm Cu/PVCRm5011704Rupees Five Hundred Eighty Five Thousand Two Hundred Only585200
97F-9/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-9/1Rm501238Rupees Sixty One Thousand Nine Hundred Only61900
98F-10/14C-25 Sqmm Cu/PVC/PVC + 1C-16 Sqmm Cu/PVCRm508833Rupees Four Hundred Forty One Thousand Six Hundred Fifty Only441650
99F-10/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-10/1Rm50935Rupees Forty Six Thousand Seven Hundred Fifty Only46750
100F-11/14C-16 Sqmm Cu/PVC/PVC + 1C-16 Sqmm Cu/PVCRm506097Rupees Three Hundred Four Thousand Eight Hundred Fifty Only304850
101F-11/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-11/1Rm50644Rupees Thirty Two Thousand Two Hundred Only32200
102F-12/14C-10 Sqmm Cu/PVC/PVC + 1C-10 Sqmm Cu/PVCRm504124Rupees Two Hundred Six Thousand Two Hundred Only206200
103F-12/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-12/1Rm50440Rupees Twenty Two Thousand Only22000
104F-13/12.5 Sqmm Cu/PVC (Red & Black coil for temporary works)Rm50215Rupees Ten Thousand Seven Hundred Fifty Only10750
105F-13/2Laying, Tagging, Termination, Testing & Commissioning of above item at S.# F-13/1Rm5025Rupees One Thousand Two Hundred Fifty Only1250
106F-14Supply and installation of Heat Shrinkable Straight-Through Jointing Kits suitable for 0.6/1kV or 11kV (as per site requirement) XLPE/PVC insulated, armored/unarmored power cables. Includes high-conductivity tinned copper/aluminum ferrules (as per conductor material), stress control tubing, adhesive-lined outer sealing sleeve, and earth continuity braid with constant force springs. The kits must be designed to provide a complete moisture-proof seal and mechanical protection equivalent to the original cable sheath. Complete in all respects.     
107F-14/14C-300 sq.mmJob140962Rupees Forty Thousand Nine Hundred Sixty Two Only40962
108F-14/1A Installation, Testing & Commissioning of above item at S.# F-14/1Job16186Rupees Six Thousand One Hundred Eighty Six Only6186
109F-14/24C-240 sq.mmJob140962Rupees Forty Thousand Nine Hundred Sixty Two Only40962
110F-14/2A Installation, Testing & Commissioning of above item at S.# F-14/2Job16186Rupees Six Thousand One Hundred Eighty Six Only6186
111F-14/34C-35 sq.mmJob124524Rupees Twenty Four Thousand Five Hundred Twenty Four Only24524
112F-14/3A Installation, Testing & Commissioning of above item at S.# F-14/3Job13712Rupees Three Thousand Seven Hundred Twelve Only3712
113F-14/44C-25 sq.mmJob124524Rupees Twenty Four Thousand Five Hundred Twenty Four Only24524
114F-14/4A Installation, Testing & Commissioning of above item at S.# F-14/4Job13712Rupees Three Thousand Seven Hundred Twelve Only3712
115F-14/54C-16 sq.mmJob113797Rupees Thirteen Thousand Seven Hundred Ninety Seven Only13797
116F-14/5A Installation, Testing & Commissioning of above item at S.# F-14/5Job12475Rupees Two Thousand Four Hundred Seventy Five Only2475
117F-15Physical Factory Acceptance Test at the manufacturer's premises for 2 Persons (1 No. Client's Representative & 1 No. Consultant's Representative with supplier)Job130929Rupees Thirty Thousand Nine Hundred Twenty Nine Only30929
118 Note: - Contractor is instructed to confirm the cable running lengths and termination as per site conditions before commencement of work. - Imported Lugs and Connectors shall be used in LV Cables. - Megger Test of all LV Cables to be done by contractor.     
119 SECTION - G CABLE CONTAINMENT     
120G-1Supply & Laying of following sizes of UPVC pipe sleeves embedded under the floor/slab, including all necessary couplers, solvent cement, end bells, and termination accessories, to form smooth cable routing paths connecting various handholes/manholes; including necessary excavation, trenching, backfilling, compacting, and installation of a 2mm galvanized steel draw wire inside each sleeve for future cable pulling. Provide Handhole where ever required. Note: The below mentioned conduits will be used for items where description of the item clearly states that the conduit is not inclusive or already laid/installed. This section will also cover empty conduit runs, sleeves, conduit risers etc.     
121G-1/1150mm dia UPVC Conduit (Class-D)Rm.6007857Rupees Four Million Seven Hundred Fourteen Thousand Two Hundred Only4714200
122G-1/1aLaying, Installation, Testing & Commissioning of above item at S.# G-1/1Rm.600829Rupees Four Hundred Ninety Seven Thousand Four Hundred Only497400
123G-2Making of RCC Handhole 600mm x 600mm x 900mm internal size, made with 150 mm thick Fiber walls and 200mm thick bed & top slabs, including cost of heavy duty 450mm square cover & angle iron frame (made 2”x2”x1/4” size angle iron) complete in all respects as per site requirements, as per drawing & details and as directed by the consultant. No.1092786Rupees Nine Hundred Twenty Seven Thousand Eight Hundred Sixty Only927860
124G-3Supply and Installation of following sizes G.I Powder Coated Perforated Cable Tray with 4 feet covers duly Painted after degreesing, derusting, phosphating and antirust primer complete in all respect with supporting hangers, brackets, elbows, tee & mounting accessories etc. Note: - Color Printed Tags to be provided at every 3 Meter Length. - Threaded Rods & Base Plate to be used for hanging from ceiling. - Wall Hanger Supports to be provided moving with walls. - U-shaped fischer plates to be used for joints. - Earth bonding to be done with every joint using flexible braided copper. - Color to be decided with consent of client. - Imported mounting accessories to be used make mungo or fischer.     
125G-3/1450mm x 100mm (16 SWG Tray and 18 SWG Cover) With Accessories (Power Cables)Rm.4011657Rupees Four Hundred Sixty Six Thousand Two Hundred Eighty Only466280
126G-3/1a Installation, Testing & Commissioning of above item at S.# G-3/1Rm.401485Rupees Fifty Nine Thousand Four Hundred Only59400
127G-3/2300mm x 100mm (16 SWG Tray and 18 SWG Cover) With Accessories (Power Cables)Rm.1008707Rupees Eight Hundred Seventy Thousand Seven Hundred Only870700
128G-3/2a Installation, Testing & Commissioning of above item at S.# G-3/2Rm.1001485Rupees One Hundred Forty Eight Thousand Five Hundred Only148500
129 Note: Contractor is advised to confirm the sizes, running lengths and termination as per site conditions before commencement of work.     
130 SECTION - H ENCLOSED BUS ASSEMBLIES     
131 Supply, Installation, Testing and Commissioning must be included in quoted price of the following imported TP+N+E Compact Busway including imported accessories like elbows, flange ends, U Shape supporting hangers, mounting accessories, complete in all respects and having attached specifications. Material : Aluminium Type : Compact Note: - The contract will be on item rate basis, therefore amount for only items being used at site will be paid. - Separate earth bar on 100% (50% Housing + 50% Bar) is required for all busways. - Expansion joints for straight length feeders shall be added in cost as per manufacturer standard without any additional cost. - All Power Busway shall be Sandwich Type. - All Power Busway shall be IP-65 and IK-09 rated. - All type test certificates are required; site tests shall be carried out in accordance with the provided specifications. - Supplier is advised to confirm the busway running lengths as per site conditions before final ordering to the principal. - Bidder shall submit the shop drawings with isometric views in hard copy and soft copy as well. - All the mounting heights have been mentioned in drawings. - Installation will include hangers and other accessories like hanging rods,rawal bolts etc. - Client will not arrange the site security particularly for the material & equipment till its final erection. It will be vendor responsibility. - All Busway lengths will be measured from End to End excluding the Elbows, Flanges, Flexibles etc. '- Copper connection between Breaker and Flange shall be included as mentioned below. - Expansion joints for straight length feeders shall be added in cost as per manufacturer standard without any additional cost. - Flexible connections on straight lengths as per manufacturer's recommendation shall be provided as inclusive in the cost of busways. - Spring Hangers for Earth Quake sustainability on all vertical busways shall be included in the above mentioned cost.     
132H-1Busway-Main (IP-65 Rated, 1600A TP+N+E) for Main Incoming 1 Location: From Transformer 1 to LV Panel     
133H-1/1Straight Lengths 1600A TP+N+E (5 Bar)Rm.30133502Rupees Four Million Five Thousand Sixty Only4005060
134H-1/1a Installation, Testing & Commissioning of above item at S.# H-1/1Rm.307058Rupees Two Hundred Eleven Thousand Seven Hundred Forty Only211740
135H-1/2Elbow 1600ANo.396884Rupees Two Hundred Ninety Thousand Six Hundred Fifty Two Only290652
136H-1/2a Installation, Testing & Commissioning of above item at S.# H-1/2No.35122Rupees Fifteen Thousand Three Hundred Sixty Six Only15366
137H-1/3Flange for LV Panel ConnectionNo.187587Rupees Eighty Seven Thousand Five Hundred Eighty Seven Only87587
138H-1/3a Installation, Testing & Commissioning of above item at S.# H-1/3No.14634Rupees Four Thousand Six Hundred Thirty Four Only4634
139H-1/4Flange for Transformer ConnectionNo.187587Rupees Eighty Seven Thousand Five Hundred Eighty Seven Only87587
140H-1/4a Installation, Testing & Commissioning of above item at S.# H-1/4No.14634Rupees Four Thousand Six Hundred Thirty Four Only4634
141H-1/5Flexible Connection (Insulated Braided Copper) 1600A TP+N+E (Busbar links between Flange and Transformer)No.1464962Rupees Four Hundred Sixty Four Thousand Nine Hundred Sixty Two Only464962
142H-1/5a Installation, Testing & Commissioning of above item at S.# H-1/5No.124570Rupees Twenty Four Thousand Five Hundred Seventy Only24570
143H-1/6Imported Galvanized Fixing Bracket with threaded rods, bolts and all other required accessories.Job148964Rupees Forty Eight Thousand Nine Hundred Sixty Four Only48964
144H-1/6a Installation, Testing & Commissioning of above item at S.# H-1/6Job12592Rupees Two Thousand Five Hundred Ninety Two Only2592
145H-2Busway-Main (IP-65 Rated, 1600A TP+N+E) for Main Incoming 2 Location: From Transformer 2 to LV Panel     
146H-2/1Straight Lengths 1600A TP+N+E (5 Bar)Rm.30133502Rupees Four Million Five Thousand Sixty Only4005060
147H-2/1a Installation, Testing & Commissioning of above item at S.# H-2/1Rm.307058Rupees Two Hundred Eleven Thousand Seven Hundred Forty Only211740
148H-2/2Elbow 1600ANo.396884Rupees Two Hundred Ninety Thousand Six Hundred Fifty Two Only290652
149H-2/2a Installation, Testing & Commissioning of above item at S.# H-2/2No.35122Rupees Fifteen Thousand Three Hundred Sixty Six Only15366
150H-2/3Flange for LV Panel ConnectionNo.187587Rupees Eighty Seven Thousand Five Hundred Eighty Seven Only87587
151H-2/3a Installation, Testing & Commissioning of above item at S.# H-2/3No.14634Rupees Four Thousand Six Hundred Thirty Four Only4634
152H-2/4Flange for Transformer ConnectionNo.187587Rupees Eighty Seven Thousand Five Hundred Eighty Seven Only87587
153H-2/4a Installation, Testing & Commissioning of above item at S.# H-2/4No.14634Rupees Four Thousand Six Hundred Thirty Four Only4634
154H-2/5Flexible Connection (Insulated Braided Copper) 1600A TP+N+E (Busbar links between Flange and Transformer)No.1464962Rupees Four Hundred Sixty Four Thousand Nine Hundred Sixty Two Only464962
155H-2/5a Installation, Testing & Commissioning of above item at S.# H-2/5No.124570Rupees Twenty Four Thousand Five Hundred Seventy Only24570
156H-2/6Imported Galvanized Fixing Bracket with threaded rods, bolts and all other required accessories.Job148964Rupees Forty Eight Thousand Nine Hundred Sixty Four Only48964
157H-2/6a Installation, Testing & Commissioning of above item at S.# H-2/6Job12592Rupees Two Thousand Five Hundred Ninety Two Only2592
158H-3 Transportation, Loading & Unloading, Placement and Storing material at siteJob161857Rupees Sixty One Thousand Eight Hundred Fifty Seven Only61857
159 SECTION - I IMPORTED EARTHING / GROUNDING SYSTEM     
160 Supply, Installation, Testing & Commissioning of the following items required for Earthing, Lightning Protection and Grounding of other systems including all material, boring, labor, tools, transportation, installation accessories etc. Complete in all respects as per drawings and specifications. - The contractor will also submit detailed earth test reports for approval.      
161I-1/1Chemical Enhanced Earth using 20mm dia, 10ft long imported copper cladded steel Rod filled with soil conditioning material including 6" dia, 11' deep boring and back filled chemical to enhance conductivity. Complete with termination clamps, 12" dia heavy duty tin plated round cover as per details given in drawings.No.14104855Rupees One Million Four Hundred Sixty Seven Thousand Nine Hundred Seventy Only1467970
162I-1/2 Installation, Testing & Commissioning of above item at S.# I-1/1No.1424743Rupees Three Hundred Forty Six Thousand Four Hundred Two Only346402
163I-2/1Earth Connecting Point (ECP) or Equipotential bar made with 450 mm wide, 75 mm high and 5 mm thick tin plated Copper, as shown in drawings. Bar shall be provided with holes suitable for installation of 6 No. 95 sqmm bare copper conductor. ECP shall be enclosed in appropriate size of powder coated metal enclosure with front accessible cover.No.2049371Rupees Nine Hundred Eighty Seven Thousand Four Hundred Twenty Only987420
164I-2/2 Installation, Testing & Commissioning of above item at S.# I-2/1No.203712Rupees Seventy Four Thousand Two Hundred Forty Only74240
165I-3Stranded bare copper conductors of the following sizes in 38mm dia UPVC Class-D conduit to be laid in floor/raft from Earth Station to ECP as shown in drawings. Complete in all respects including termination at ECP.     
166I-3/195 Sqmm Bare Copper ConductorRm.4006599Rupees Two Million Six Hundred Thirty Nine Thousand Six Hundred Only2639600
167I-3/1a Laying, Tagging, Termination, Testing & Commissioning of above item at S.# I-3/1Rm.400693Rupees Two Hundred Seventy Seven Thousand Two Hundred Only277200
168I-4Supply, installation, testing & commissioning of following size of single core PVC cables in appropriate size of exposed / concelled conduit from ECP to several equipments as per details given below, including all material, labor, tools, transportation, accessories etc. Complete in all respects with detailed test reports.     
169I-4/11C-95 Sqmm Cu/PVCRm.506672Rupees Three Hundred Thirty Three Thousand Six Hundred Only333600
170I-4/1a Laying, Tagging, Termination, Testing & Commissioning of above item at S.# I-4/1Rm.50699Rupees Thirty Four Thousand Nine Hundred Fifty Only34950
171I-4/21C-70 Sqmm Cu/PVCRm.506014Rupees Three Hundred Thousand Seven Hundred Only300700
172I-4/2a Laying, Tagging, Termination, Testing & Commissioning of above item at S.# I-4/2Rm.50631Rupees Thirty One Thousand Five Hundred Fifty Only31550
173I-4/31C-35 Sqmm Cu/PVCRm.503080Rupees One Hundred Fifty Four Thousand Only154000
174I-4/3a Laying, Tagging, Termination, Testing & Commissioning of above item at S.# I-4/3Rm.50328Rupees Sixteen Thousand Four Hundred Only16400
175 Note: - Contractor is advised to confirm the cable running lengths and termination as per site conditions before commencement of work. - The bidder shall submit complete technical literature of the quoted system for approval before procurement.      
176 SECTION - J SUBSTATION ELECTRIFICATION     
177J-1Supply, Installation, Testing & Commissioning of the following wiring items including all material, labour & tools required for completion of work as per item description, specifications & drawings including cutting, chiseling, making good and all necessary accessories such as bends, junction boxes, conduit sockets, earth connecting point connectors, etc. as shown on drawings, specifications and approval by the Engineer. Complete in all respects. Note: 1) The cost of wiring items shall includes Imported Polycarbonate Connectors and High Quality flexible PVC conduit as per LOAM of appropriate size on each light point. 2) Insulation Resistance Test of each circuit to be done by the Contractor. 3) All General Wiring grade should be 450/750 copper. 4) Surface conduiting shall be done in decorative / aesthetic manner. 5) Wherever the circuits are running in cable tray, it will enter / leave tray using proper PVC glands / Junction boxes (IP44). The cost of all such accessories to be included in wiring cost. 6) All electrical circuits and power outlets shall be numbered (i.e. circuit number and distribution board number shall be printed). 7) Contractor is advised to confirm the cable running lengths and termination as per site conditions before commencement of work. 8) All the cables shall be colour coded according to phases / types of services.     
178J-1/1Circuit wiring from DB to Switchboard including any wiring from switch board to switch board with 2x2.5 Sq.mm + ECC 1x2.5 Sqmm, Cu/PVC wires in 25mm dia PVC conduit as shown in drawings.No214329Rupees Twenty Eight Thousand Six Hundred Fifty Eight Only28658
179J-1/1a Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/1No21485Rupees Two Thousand Nine Hundred Seventy Only2970
180J-1/1bWiring for light point from Switchboard to first light point with phase 2.5 Sq.mm, common neutral 2.5 Sq.mm and common ECC 2.5 Sq.mm, Cu/PVC wires in 25mm dia PVC conduit as shown on drawings. No157168Rupees One Hundred Seven Thousand Five Hundred Twenty Only107520
181J-1/1c Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/1bNo15743Rupees Eleven Thousand One Hundred Forty Five Only11145
182J-1/1dPoint to Point wiring with phase 1.5 Sq.mm, common neutral 2.5 Sq.mm and common ECC 2.5 Sq.mm Cu/PVC in 25mm dia PVC conduit as shown in drawings.No53169Rupees Fifteen Thousand Eight Hundred Forty Five Only15845
183J-1/1e Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/1dNo5335Rupees One Thousand Six Hundred Seventy Five Only1675
184J-1/2Wiring for Group Control light fixtures from DB to first light point with 2x1.5 Sq.mm + ECC 1x1.5 Sq.mm Cu/PVC wires in 25mm dia PVC conduit as shown on drawings.No17011Rupees Seven Thousand Eleven Only7011
185J-1/2a Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/2No1737Rupees Seven Hundred Thirty Seven Only737
186J-1/2bPoint to Point wiring using the same wires & conduit size as mentioned in the above item.No54672Rupees Twenty Three Thousand Three Hundred Sixty Only23360
187J-1/2c Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/2bNo5495Rupees Two Thousand Four Hundred Seventy Five Only2475
188J-1/3Circuit Wiring of 13A/15A Switch Socket units (RAW Power) from DB to first outlet including wiring within same technology box / adjacent power outlets in separate back boxes with following size of 1-core wires in 25mm dia of PVC conduits as shown in the drawings.     
189J-1/3a2 x 4 Sq.mm Cu/PVC + ECC 1 x 4 Sq.mm Cu/PVCNo415875Rupees Sixty Three Thousand Five Hundred Only63500
190J-1/3b Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/3aNo41640Rupees Six Thousand Five Hundred Sixty Only6560
191J-1/3cOutlet to Outlet wiring including adjacent outlet wiring using 3 x 2.5 Sqmm Cu/PVC wires & in 25mm dia PVC conduit as mentioned in the drawings.No225158Rupees One Hundred Thirteen Thousand Four Hundred Seventy Six Only113476
192J-1/3d Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/3cNo22526Rupees Eleven Thousand Five Hundred Seventy Two Only11572
193J-1/4Circuit Wiring of 4 TON Floor Standing Air Conditioner from DB to equipment with following size of wires in 25mm dia size of exposed / concealed PVC conduit as shown on drawings.     
194J-1/4a2 x 4 Sq.mm Cu/PVC + ECC 1 x 4 Sq.mm Cu/PVCNo121168Rupees Twenty One Thousand One Hundred Sixty Eight Only21168
195J-1/4b Laying, Tagging, Termination, Testing & Commissioning of above item at S.# J-1/4aNo12184Rupees Two Thousand One Hundred Eighty Four Only2184
196J-2Supply & Laying of the following sizes of PVC/UPVC/EMT Conduits including all accessories such as bends, sockets, j-boxes, flexible conduits, metal saddles e.t.c as per design drawings, complete in all respect.     
197J-2/125mm dia PVC ConduitRm100220Rupees Twenty Two Thousand Only22000
198J-2/1a Installation, Testing & Commissioning of above item at S.# J-2/1Rm10025Rupees Two Thousand Five Hundred Only2500
199J-2/238mm dia UPVC Conduit (Class-D)Rm100700Rupees Seventy Thousand Only70000
200J-2/2a Installation, Testing & Commissioning of above item at S.# J-2/2Rm10075Rupees Seven Thousand Five Hundred Only7500
201J-3/1Supply & Installation of 16 SWG MS Sheet Steel Back Boxes for installation of Switches, Sockets, Voice & Data Outlets, Isolators as per drawings and details including all accessories.Rm35449Rupees Fifteen Thousand Seven Hundred Fifteen Only15715
202J-3/2 Installation, Testing & Commissioning of above item at S.# J-3/1Rm3550Rupees One Thousand Seven Hundred Fifty Only1750
203J-4Supply and installation of following sizes 16 SWG Galvanized Cable Ladder with 16 SWG G.I Cover as per details given in the drawings and specifications with prime quality japanese standard JIS 3302 36-38 microns Galvanized iron steel in line with NEMA standards with min. 36 microns Zinc overlap coating. Complete with all supporting hangers, brackets, elbows, tee & mounting accessories etc. Note: - Color Printed Tags to be provided at every 3 Meter Length. - Threaded Rods & Base Plate to be used for hanging from ceiling & vertical accessories. - Wall Hanger Supports to be provided moving with walls. - U-shaped fischer plates to be used for joints. - Earth bonding to be done with every joint using flexible braided copper. - Imported mounting accessories to be used make mungo or fischer.     
204J-4/1300mm x 100mm (MV Cable)Rm.408504Rupees Three Hundred Forty Thousand One Hundred Sixty Only340160
205J-4/1a Installation, Testing & Commissioning of above item at S.# J-4/1Rm.401238Rupees Forty Nine Thousand Five Hundred Twenty Only49520
206J-5Supply & Installation of following Switches and socket outlets recessed / surface on wall or as per design drawings. Following makes and models are suggested in white color but the final recommendation and approval to be given by the Architect on physical samples. Switches: Schneider Vivace, Legrand Eloe, or approved equiv. Sockets : Schneider Vivace Legrand Eloe, or approved equiv. Isolators : Schneider, Gewiss, Walther Industrial Sockets : Schneider, Gewiss, Walther, PCE     
207J-5/1One Gang Light SwitchNo11097Rupees One Thousand Ninety Seven Only1097
208J-5/1a Installation, Testing & Commissioning of above item at S.# J-5/1No1433Rupees Four Hundred Thirty Three Only433
209J-5/2Two Gang Light SwitchNo11655Rupees One Thousand Six Hundred Fifty Five Only1655
210J-5/2a Installation, Testing & Commissioning of above item at S.# J-5/2No1433Rupees Four Hundred Thirty Three Only433
211J-5/3Three Gang Light SwitchNo42600Rupees Ten Thousand Four Hundred Only10400
212J-5/3a Installation, Testing & Commissioning of above item at S.# J-5/3No4433Rupees One Thousand Seven Hundred Thirty Two Only1732
213J-5/413A, International Switch Socket UnitNo132772Rupees Thirty Six Thousand Thirty Six Only36036
214J-5/4a Installation, Testing & Commissioning of above item at S.# J-5/4No13433Rupees Five Thousand Six Hundred Twenty Nine Only5629
215J-5/515A 3-Pin Round Switch Socket unitNo132772Rupees Thirty Six Thousand Thirty Six Only36036
216J-5/5a Installation, Testing & Commissioning of above item at S.# J-5/5No13433Rupees Five Thousand Six Hundred Twenty Nine Only5629
217J-5/632A DP IsolatorNo114194Rupees Fourteen Thousand One Hundred Ninety Four Only14194
218J-5/6a Installation, Testing & Commissioning of above item at S.# J-5/6No1743Rupees Seven Hundred Forty Three Only743
219J-5/716A 3-Pin (Single Phase) Industrial Socket with PlugNo13910Rupees Three Thousand Nine Hundred Ten Only3910
220J-5/7a Installation, Testing & Commissioning of above item at S.# J-5/7No11238Rupees One Thousand Two Hundred Thirty Eight Only1238
221J-5/832A 3-Pin (Single Phase) Industrial Socket with PlugNo16197Rupees Six Thousand One Hundred Ninety Seven Only6197
222J-5/8a Installation, Testing & Commissioning of above item at S.# J-5/8No11238Rupees One Thousand Two Hundred Thirty Eight Only1238
223J-6Supply, Installation, Testing & Commissioning of the following Light fixtures complete with the supply of all hanging accessories including clips, suspension rods / wires, ceiling frame etc.     
224J-6/1Wall/Surface Mounted 18W LED Batten Light Fixture, 4000K, L=1200mmNo.203952Rupees Seventy Nine Thousand Forty Only79040
225J-6/1a Installation, Testing & Commissioning of above item at S.# J-6/1No.20749Rupees Fourteen Thousand Nine Hundred Eighty Only14980
226J-6/2NON-MAINTAINED TYPE WALL MOUNT EMERGENCY LIGHT WITH 5W LED LAMP AND 1.5 HOUR BUILT-IN BATTERY BACK-UPNo.624101Rupees One Hundred Forty Four Thousand Six Hundred Six Only144606
227J-6/2a Installation, Testing & Commissioning of above item at S.# J-6/2No.6749Rupees Four Thousand Four Hundred Ninety Four Only4494
228 SECTION - K MISC. WORKS     
229K-1Preparation & Submission of As-Built drawings for all electrical and allied works after getting final approval from the Client/Consultant. Note: 2 sets of as-built drawings after work completion of each floor, and 3 sets with a soft copy of complete electrical works after final commissioning of project to be submitted. Approval of bills are subject to the completion of as built drawings upto the entire satisfaction ot site engineer. Job1110106Rupees One Hundred Ten Thousand One Hundred Six Only110106
230K-2Disconnection, professional rigging, craneage, and transportation of the existing 200kVA Diesel Generator from the substation to the new outdoor location. This item includes the construction of a reinforced concrete (RCC) foundation pad with vibration isolators and the provision of a 110% capacity fuel/oil spill containment bund. The scope covers all mechanical and electrical re-connections, cable containment, and full testing and commissioning, ensuring the system is complete in all respects.Job1556713Rupees Five Hundred Fifty Six Thousand Seven Hundred Thirteen Only556713
231K-3Supply and installation of an IP-rated acoustic weather-proof canopy for the existing 200kVA Diesel Generator. The item includes all necessary mounting, sealing, and integration with the generator unit to ensure protection against environmental factors and compliance with noise reduction requirements, complete in all respects.Job1618570Rupees Six Hundred Eighteen Thousand Five Hundred Seventy Only618570
232K-4Disconnection, professional rigging, craneage, and transportation of the existing 2,400-liter fuel storage tank to the designated new location. Item includes the construction of a heavy-duty reinforced concrete (RCC) foundation pad and a 110% capacity secondary fuel/oil spill containment bund (dyke wall) to comply with environmental safety standards. Scope covers the relocation, modification, and extension of all fuel supply, return, and vent piping, including the re-installation of all valves, strainers, and level sensing equipment. Work includes all mechanical/electrical integration, earth bonding, and comprehensive pressure and leak testing of the entire fuel delivery system. Complete in all respects as per job requirements or as directed by the Engineer.Job1742284Rupees Seven Hundred Forty Two Thousand Two Hundred Eighty Four Only742284
233K-5Dismantling/pulling/removal, loading, shifting, unloading and transportation to SBP Store of existing Consumer MV Switchgears including with all required materials, equipment, machines, removal of any debris etc. related to complete the job. Complete in all respects as per job requirements or as directed by the Engineer / as per Client instructions. Notes: 1) Contractor has been advised to make a detailed site visit for this job. 2) Contractor shall handover all dismantled items to SBP Store with signed inventory. 3) A clearly marked plan to be prepared for dismantling / disconnection work by the contractor for approval of consultant / client before commencement of work.Job1309285Rupees Three Hundred Nine Thousand Two Hundred Eighty Five Only309285
234K-6Dismantling/pulling/removal, loading, shifting, unloading and transportation to SBP Store of existing 02 Nos Transfomers including with all required materials, equipment, machines, removal of any debris etc. related to complete the job. Complete in all respects as per job requirements or as directed by the Engineer / as per Client instructions. Notes: 1) Contractor has been advised to make a detailed site visit for this job. 2) Contractor shall handover all dismantled items to SBP Store with signed inventory. 3) A clearly marked plan to be prepared for dismantling / disconnection work by the contractor for approval of consultant / client before commencement of work.Job1371142Rupees Three Hundred Seventy One Thousand One Hundred Forty Two Only371142
235K-7Dismantling/pulling/removal, loading, shifting, unloading and transportation to SBP Store of existing Main LV Panels and Distribution Boards (DBs) shall include a comprehensive technical execution plan where the contractor performs systematic tracing and tagging of all incoming and outgoing feeders using permanent, legible identifiers prior to any disconnection. This process must be supported by a detailed re-termination and interconnection schedule, including a clearly marked plan for cable re-routing to ensure seamless integration into the new LV panels. The scope further encompasses the safe disconnection and pulling of all power and control cables from existing ducts or trays, the physical removal of panel structures, and all associated logistics including loading, shifting, and transportation of dismantled components to the SBP Store, followed by the complete disposal of electrical debris and site clearance as directed by the Consultant and Client.Job1371142Rupees Three Hundred Seventy One Thousand One Hundred Forty Two Only371142
236K-8Arrangment of temporary cables and installation, connection to energize the system during dismantling and shifting of MV Switches to avoid shutdowns and to provide smooth power supply to building. Work also includes temporary site facilities, required materials & equipments to complete the job as per job requirements / directed by the Engineer / Client instructions. Complete in all respects to maintain zero downtime.Job1309285Rupees Three Hundred Nine Thousand Two Hundred Eighty Five Only309285
237K-9Arrangment of temporary cables and installation, connection to energize the system during dismantling and shifting of Transformers to avoid shutdowns and to provide smooth power supply to building. Work also includes temporary site facilities, required materials & equipments to complete the job as per job requirements / directed by the Engineer / Client instructions. Complete in all respects to maintain zero downtime.Job1309285Rupees Three Hundred Nine Thousand Two Hundred Eighty Five Only309285
238K-10Careful pulling out of existing cable from Main LV panel to LT-5, ELT-1 and MCC panel of 4C-240 sqmm Cu/XLPE/PVC power cable with associated ECC from existing indoor/outdoor cable trays, vertical risers, and under-floor UPVC sleeves/handholes; including safe disconnecting, sealing of cable ends using waterproof PVC insulation tape or heat-shrinkable end caps to prevent moisture ingress, coiling/drumming, transportation, and safe stacking/handing over at the client's designated storage location within the facility premises.Job1556713Rupees Five Hundred Fifty Six Thousand Seven Hundred Thirteen Only556713
239K-11Careful dismantling, relocation, and re-installation of the existing 60kVA Automatic Transfer Switch (ATS) DB from its current position to a new location designated by the client. The scope of work includes marking/tagging of existing wires, safe electrical disconnection, structural unmounting, safe transit within the facility premises, rigid wall or floor mounting at the new location, extending/rerouting existing power/control cables if necessary, proper dressing, re-termination using appropriate copper lugs and glands, testing, and final commissioning to ensure seamless functionality.Job1185571Rupees One Hundred Eighty Five Thousand Five Hundred Seventy One Only185571
240K-12Dismantling, relocation, reinstallation, testing and recommissioning of the existing 110 kWe Solar PV system equipment, including solar inverters, AC/DC combiner boxes, energy meters, associated accessories and cabling, from the existing location to the new inverter room as directed by the Consultant/Client. The work shall include tagging and disconnection of existing cables, dismantling, internal transportation, mounting at the new location, cable rerouting/extensions as required, termination with suitable lugs and glands, reconnection of earthing and control circuits, testing, commissioning, and handing over the complete system in fully functional condition.Job1247428Rupees Two Hundred Forty Seven Thousand Four Hundred Twenty Eight Only247428
241 SECTION - L CIVIL WORKS     
242 Dismantling Works     
243L-1Dismantling of the existing walls and floors using mechanical means and manual labour as per site requirements, including the cost of dismantling existing installations necessary to remove for dismantling and to complete the job, including the cost of disposal of debris away from premises, complete in all respects.Cft650178Rupees One Hundred Fifteen Thousand Seven Hundred Only115700
244L-2Dismantling of existing doors carefully without any damages, stacking them at a designated location carefully within Bank Premises, cost of all labour, tools required to complete the job successfully is included, complete in all respects.Job217775Rupees Thirty Five Thousand Five Hundred Fifty Only35550
245 Sub Flooring Works     
246L-3Providing, mixing, laying, vibrating & curing cement concrete 1:3:6 in floors, in trenches in required levels & slopes complete in all respects as per site requirements and as directed by the Engineer Incharge.Cft480948Rupees Four Hundred Fifty Five Thousand Forty Only455040
247L-4Backfilling & compaction of approved quality sand in under floors, trenches, etc. including breaking clods, dressing, watering, compaction etc, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Cft250237Rupees Fifty Nine Thousand Two Hundred Fifty Only59250
248L-5Providing, mixing, laying, vibrating & curing RCC 1:2:4 in foundation beam and columns for gate using SR cement, including the cost of required formwork, including the cost of using mechanical vibrator for concrete compaction as per site requirements. The contractor shall be responsible for providing fairface concrete after removing formwork, free from all defects e.g honey combing etc. Complete in all respects as per site requirements and as directed by the Engineer In-ChargeCft2101185Rupees Two Hundred Forty Eight Thousand Eight Hundred Fifty Only248850
249L-6Providing, straightening, cutting, bending and binding of grade-60 deformed steel bars in beams, columns, foundations etc. including the cost of required binding wire, spacers etc. complete in all respects as per site requirements and as directed by the Engineer In-ChargeKg400593Rupees Two Hundred Thirty Seven Thousand Two Hundred Only237200
250L-7Providing, mixing, laying, vibrating & curing cement concrete 1:2:4 cost of required formwork, in required levels & slopes, including the cost of concrete pouring in panels in flooring, including the cost of glass strips in floor panels, complete in all respects as per site requirements and as directed by the Engineer Incharge.Cft6001185Rupees Seven Hundred Eleven Thousand Only711000
251 Masonry & Plaster Works     
252L-8Providing & laying 6 inch thick block masonry having minimum compressive strength of 700 psi in walls with 1:4 cement-sand mortar including cost of precast lintel, curing etc. complete in all respects as per site requirements and as directed by the Engineer incharge.Cft1200948Rupees One Million One Hundred Thirty Seven Thousand Six Hundred Only1137600
253L-9Providing and fixing lintel of precast beam a minimum of 6 inch high above doors as per site requirements, covering full width of wall or as diercted by the engineer incharge.Rft181304Rupees Twenty Three Thousand Four Hundred Seventy Two Only23472
254L-10Providing & laying ½” to ¾” thick 1:4 cement-sand plaster including curing etc. working at any height, complete in all respects as per site requirements and as directed by the Engineer incharge.Sft2600237Rupees Six Hundred Sixteen Thousand Two Hundred Only616200
255L-11Providing and fixing door frames made of about 10 swg MS sheet as per existing design and pattern, including the cost of cutting, bending, grinding, fixing in position, including the cost of red oxide, including the cost of enamel paint, complete in all respects as per site requirements and as directed by the engineer incharge.Job293615Rupees One Hundred Eighty Seven Thousand Two Hundred Thirty Only187230
256L-12Refixing of doors at the designated location including cost of any repairs required, complete in all respects as per site requirements and as directed by the engineer incharge.Job223700Rupees Forty Seven Thousand Four Hundred Only47400
257L-13Dismantling of existing rain water pipe completely, including disposal of debris away from municipal limits, including stacking serviceable items at a designated location inside bank premises as per directions of the engineer incharge.Job45925Rupees Twenty Three Thousand Seven Hundred Only23700
258L-14Providing and fixing 4 inch dia pvc pipe schedule 40, inlcuding cost of any fittings, including cost of pvc strainer, inlcuding cost of clips, nails required to fix the pipe, including the cost of providing khurrah, complete in all respects as per site requirements and as directed by the engineer incharge.Rft651067Rupees Sixty Nine Thousand Three Hundred Fifty Five Only69355
259L-15Leveling/repairing of slab surface with about ¾” average thick layer of slurry comprising of Cement + Sand (in 1:3 ratio) using latex based concrete bonding agent from Sika, ICPL, Fospak or other approved manufacturer @ 3 liters per bag of cement or as per the directions of the manufacturer/ supplier, smooth trowel finished top surface, curing with damp jute cloth, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Sft2030104Rupees Two Hundred Eleven Thousand One Hundred Twenty Only211120
260L-16Making of PCC edge fillet (triangular/parabolic shape gola) of approximately 4” x 4” size along the outer walls with plain cement in 1:2:4 ratio using OP cement, clean sand and coarse aggregate of 10mm and down sizes mixed with latex based bonding agent SBR from Sika, ICPL, Fospak or other approved manufacturer @ 3 liters per bag of cement or as per the directions of the manufacturer/ supplier with smooth trowel finished top surface, curing, complete in all respects as per site requirements and as directed by the Engineer In-Charge.Rft110115Rupees Twelve Thousand Six Hundred Fifty Only12650
261L-17Providing and torch applying 4mm thick layer of modified bitumen & non-woven spun-bond polyester fibers reinforcement based water proofing membrane of Derma Bit (ECOGUM SP) or other approved equivalent KSA make, with slated type top surface finish, in accordance with the directions of the manufacturer/supplier including the cost of approved primer (DERMAPRIMER or other approved equivalent) applied @ about 4m2/liter or as recommended by the manufacturer, all required overlaps of minimum 3” width, complete in all respects as per site requirements and as directed by the Engineer In-Charge. Measurement for payment shall be made on the basis of top surface only without considering any overlaps. (The contractor shall have to submit samples along with technical data sheets of materials for approval by the Engineer In-Charge before application at site.)Sft2030415Rupees Eight Hundred Forty Two Thousand Four Hundred Fifty Only842450
262 Paint Works     
263L-18Providing & applying two coats of plastic emulsion paint of Burger Robbialac or other approved equivalent over walls & ceiling application of wall putty, sand papering, etc. complete in all respects as per site requirements and as directed by the Engineer In-charge. Sft6700107Rupees Seven Hundred Sixteen Thousand Nine Hundred Only716900
264L-19Providing & applying two coats of weather coat paint of Burger Robbialac or other approved equivalent over walls , application of wall putty, sand papering, etc. complete in all respects as per site requirements and as directed by the Engineer In-charge.Sft2800119Rupees Three Hundred Thirty Three Thousand Two Hundred Only333200
265L-20Providing and applying enamel paint of nippon or approved equivalent on doors, ventilators and anyother metal frame as directed by the engineer incharge.Sft1000143Rupees One Hundred Forty Three Thousand Only143000
266L-21Providing and fixing 100 x 100 x 10mm angle along the edge of the cable trench, including the cost of enamel paint on angle, complete in all respects as per site requirements and as directed by the engineer incharge.Rft1102489Rupees Two Hundred Seventy Three Thousand Seven Hundred Ninety Only273790
267L-22Providing and fixing precast RCC slabs over cable trench having varying widths of 2 ft, 2.5 ft and 4 ft. Each slab must have two hooks at top for ease of lifting, minimum width of slab be about 1 ft, minimum thickness of slab is about 4 inch, with about 2 bars at top and 2 bars at bottom of 3/8" steel, with distribution steel as well, complete in all respects. payment will be made on top surface area of slab.Sft1801422Rupees Two Hundred Fifty Five Thousand Nine Hundred Sixty Only255960
GRAND TOTAL:Rs 240,285,841.00

Scope of Work

  1. Major Items of Contract:

 

  1. Dismantling/pulling/removal, loading, shifting, unloading and transportation of existing 02x750kVA transformers, MV Switchgears, LV Panels, DBs, HT/LT cables etc. to designated location within premises
  2. Installation, testing and commissioning and Sifting of DG Set to designated location within the premises.
  3. Supply, installation, testing and commissioning of 2x1000kVA oil type transformers along with construction of oil pits. 
  4. Supply, Installation, testing and commissioning of MV and LV panels including ATS, PFI panels and distribution boards (DB’s)
  5. Supply, Installation, testing and commissioning of MV and LT cables in existing/proposed Cable trays/underground pvc pipes/underground cable trench as per site requirements
  6. Supply, installation, testing and commissioning of light fixtures & Fans including wiring etc.
  7. Civil Works i.e. extension of existing Electrical Room after dismantling of existing walls. Construction of oil pits, excavation for cable trench etc   
  8. Earthing works.
  9. Submission of drawings and schematics in hardcopy and softcopy form detailing operating procedure and showing system failure scenarios.
  10. The samples shall be submitted to the Engineer at his office in North Nazimabad as specified in Preamble to Conditions of Contract. The rejected sample(s) shall be recollected by the Contractor and fresh sample(s) shall be submitted. The Engineer shall formally intimate the Employer and the Contractor of the reasons of rejection of sample(s).
  11. The Contractor shall submit one set in form of softcopy and two sets in hard form of shop drawings to the Engineer, under intimation to the Employer. The Engineer shall retain one set of the commented/approved shop drawing for his record and return the other set to the Contractor.

Price Schedule

For Individual Jobs

# Job Title Quantity Unit Price (PKR) Total Price (PKR) Delivery Location Delivery Period / Year Country of Origin
1
2
For Lots
# Lot Title Total Lot Price (PKR) Country of Origin
1[Lot 1 Title]

 

 

 

📑 General Conditions of Contract (GCC)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

A. General

  1. Definitions
    1. Unless the context otherwise requires, the following terms whenever used in this Contract shall have the same meaning and shall be interpreted as  indicated
      1. “Applicable Law” means the laws and any other instruments having the force of law in the Government’s Country, or in such other country as may be specified in the Special Conditions of the Contract (SC), as they may be issued and in force from time to time;
      2. “The Contract” means an agreement enforceable by law;
      3. “The Contract Price” means the price payable to the Contractor under the Contract for the full and proper performance of its contractual obligations;
      4. “The Services” means the work to be performed by the Contractor pursuant to this Contract and as prescribed in the Specifications and Schedule of Activities included in the Contractor’s Bid;
      5. “Ancillary Services” means those services ancillary to the provision of Services, such as transportation and insurance, and any other incidental services, such as installation, commissioning, provision of technical assistance, training, and other such obligations of the Contractor covered under the Contract;
      6. “GCC” means the General Conditions of Contract contained in this section;
      7. “SCC” means the Special Conditions of Contract by which the GCC may be amended or supplemented;
      8. “Day” means calendar day unless indicated otherwise;
      9. “Effective Date” means the date on which this Contract comes into force and effect;
      10. “The  Contractor” means the individual or corporate body whose Bids to provide the Services has been accepted by the Procuring Agency;
      11. “The Project Site,” where applicable, means the place or places named in Bid Data Sheet and technical Specifications;
      12. “Government” means the Government of Pakistan;
      13. “Local Currency” means the currency of Pakistan;
      14.  “In Writing” means communicated in written form with proof of receipt;
      15. “Completion Date” means the date of completion of the Services by the Contractor  as certified by the Procuring Agency;
      16. “Foreign Currency” means any currency other than the currency of the country of the Procuring Agency;
      17. “Party” means the Procuring Agency or the Contractor, as the case may be, and “Parties” means both of them;
      18.  "Service" means any object of procurement other than goods or works;
      19. “Subcontractor” means any entity to which the Bidder subcontracts any part of the Services.
  2. Applicable Law
    1. The contract shall be governed and interpreted in accordance with the laws of Pakistan, unless otherwise specified in SCC.
  3. Language
    1. The Contract as well as all correspondence and documents relating to the Contract exchanged between the Contractorand the Procuring Agency, shall be written in the English language unless otherwise stated in the SCC.  Supporting documents and printed literature that are part of the Contract may be in another language provided these are accompanied by an accurate translation of the relevant passages in English, in which case, for purposes of interpretation of the Contract, this translation shall govern.
  4. Notices
    1. Any notice, request, or consent made pursuant to this Contract shall be in writing and shall be deemed to have been made when delivered in person to an authorized representative of the Party to whom the communication is addressed, or when sent by registered mail, telex, telegram, or facsimile to such Party at the address specified in the SCC.
  5. Location
    1. The Services shall be performed at such locations as the Procuring Agency may approve and as specified in SCC.
    2. A {DOCUMENTS}
  6. Authorized Representatives / Authority of Member in charge
    1. Any action required or permitted to be taken, and any document required or permitted to be executed, under this Contract by the Procuring Agency or the Contractor may be taken or executed by the officials specified in the SCC.

B. Commencement, Completion, Modification, and Termination of Contract

  1. Effectiveness of Contract
    1. This Contract shall come into effect on the date the Contract is signed by both parties and such other later date as may be stated in the SCC.
  2. Commencement of Services
    1. The Contractor shall confirm availability of Key Experts and begin carrying out the Services not later than the number of days after the Effective Date specified in the SCC.
  3. Program schedule
    1. Before commencement of the Services, the Contractor shall submit to the Procuring Agency for approval a Program showing the general methods, arrangements, order and timing for all activities. The Services shall be carried out in accordance with the approved Program as updated.
  4. Starting Date/Expiration Date
    1. The Contractor shall start carrying out the Services Five (05) days after the date the Contract becomes effective, or at such other date as may be specified in the SCC.
    2. Unless terminated earlier pursuant to Clause GCC 14 hereof, this Contract shall expire at the end of such time period after the Effective Date as specified in the SCC.
  5. Entire Agreement
    1. This Contract contains all covenants, stipulations and provisions agreed by the Parties.  No agent or representative of either Party has authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein.
  6. Modification
    1. Any modification or variation of the terms and conditions of this Contract, including any modification or variation of the scope of the Services, may only be made by written agreement between the Parties. However, each Party shall give due consideration to any modification(s) or variation(s) made by the other Party.
    2. In cases of any modification(s) or variation(s), the prior written consent of the Procuring Agency is required.
  7. Force Majeure
    1. Definition
      For the purposes of this Contract, “Force Majeure” means an event which is beyond the reasonable control of a Contractor and which makes a Contractor’s performance of its obligations under the Contract impossible or so impractical as to be considered impossible under the circumstances.
    2. No Breach of Contract
      The failure of a Party to fulfill any of its obligations under the contract shall not be considered to be a breach of, or default under, this Contract in so far as such inability arises from an event of Force Majeure, provided that the Party affected by such an event (a) has taken all reasonable precautions, due care and reasonable alternative measures in order to carry out the terms and conditions of this Contract, and (b) has informed the other Party as soon as possible about the occurrence of such an event.
    3. Extension of Time
      Any period within which a Contractor shall, pursuant to this Contract, complete any action or task, shall be extended for a period equal to the time during which such Party was unable to perform such action as a result of Force Majeure.
    4. Payments
      During the period of their inability to perform the Services as a result of an event of Force Majeure, the Contractor shall be entitled to continue to be paid under the terms of this Contract, as well as to be reimbursed for additional costs reasonably and necessarily incurred by them during such period for the purposes of the Services and in reactivating the Service after the end of such period.
  8. Termination
    1. By the Procuring Agency
      The Procuring Agency may terminate this Contract in case of the occurrence of any of the events specified in paragraphs (a) through (e) of this Clause. In such an occurrence the Procuring Agency shall give at least thirty (30) calendar days’ written notice of termination to the Contractor in case of the events referred to in (a) through (d); at least sixty (60) calendar days’ written notice in case of the event referred to in (e);
      1. If the Contractor fails to remedy a failure in the performance of its obligations hereunder, as specified in a notice of suspension;
      2. If the Contractor becomes (or, if the Contractor consists of more than one entity, if any of its members becomes) insolvent or bankrupt or enter into any agreements with their creditors for relief of debt or take advantage of any law for the benefit of debtors or go into liquidation or receivership whether compulsory or voluntary;
      3. If the Contractor fails to comply with any final decision reached as a result of arbitration proceedings;
      4. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      5. If the Procuring Agency, in its sole discretion and for any reason whatsoever, decides to terminate this Contract;
    2. By the Contractor
      The Contractor may terminate this Contract, by not less than thirty (30) calendar days’ written notice to the Procuring Agency, in case of the occurrence of any of the events specified in paragraphs (a) through (d) of this Clause.
      1. If the Procuring Agency fails to pay any money due to the Contractor pursuant to this Contract and not subject to dispute within forty-five (45) calendar days after receiving written notice from the Contractor that such payment is overdue;
      2. If, as the result of Force Majeure, the Contractor is unable to perform a material portion of the Services for a period of not less than sixty (60) calendar days;
      3. If the Procuring Agency fails to comply with any final decision reached as a result of arbitration;
      4. If the Procuring Agency is in material breach of its obligations pursuant to this Contract and has not remedied the same within forty-five (45) days (or such longer period as the Bidder may have subsequently approved in writing) following the receipt by the Procuring Agency of the Contractor’s notice specifying such breach.

C. Obligations of the Contractor

  1. General
    1. Standard of Performance
      1. The Contractor shall perform the Services and carry out the Services with all due diligence, efficiency and economy, in accordance with generally accepted professional standards and practices, and shall observe sound management practices, and employ appropriate technology and safe and effective equipment, machinery, materials and methods. The Contractor shall always act, in respect of any matter relating to this Contract or to the Services, as a faithful adviser to the Procuring Agency, and shall at all times support and safeguard the Procuring Agency’s legitimate interests in any dealings with the third parties;
      2. The Contractor shall employ and provide such qualified and experienced Experts and Sub-Contractors as are required to carry out the Services.
    2. Law Applicable to Services
      The Contractor shall perform the Services in accordance with the Contract and in accordance with the Law of Pakistan and shall take all practicable steps to ensure that any of its Experts and Sub-Bidders, comply with the Applicable Law. 
  2. Conflict of Interests
    1. Contractor Not to Benefit from Commissions and Discounts
      The remuneration of the Contractor shall constitute the Contractor’s sole remuneration in connection with this Contract or the Services, and the Contractor shall not accept for their own benefit any trade commission, discount, or similar payment in connection with activities pursuant to this Contract or to the Services or in the discharge of their obligations under the Contract, and the Contractor shall use their best efforts to ensure that the Personnel, any Subcontractors, and agents of either of them similarly shall not receive any such additional remuneration.
    2. Contractor and Affiliates Not to be Otherwise Interested in Project
      The Contractor agree that, during the term of this Contract and after its termination, the Contractor and its affiliates, as well as any Subcontractor and any of its affiliates, shall be disqualified from providing Services (other than the Services and any continuation thereof) for any project resulting from or closely related to the Services.
    3. Prohibition of Conflicting Activities
      Neither the Bidder nor its Subcontractors nor the Personnel shall engage, either directly or indirectly, in any of the following activities:
      1. during the term of this Contract, any business or professional activities in the Government’s country which would conflict with the activities assigned to them under this Contract;
      2. during the term of this Contract, neither the Contractor nor their Subcontractors shall hire public employees in active duty or on any type of leave, to perform any activity under this Contract;
      3. after the termination of this Contract, such other activities as may be specified in the SCC.
  3. Insurance to be Taken Out by the Contractor
    1. The Contractor(a) shall take out and maintain, and shall cause any Subcontractors to take out and maintain, at its (or the Sub-contractors’, as the case may be) own cost but on terms and conditions approved by the Procuring Agency, insurance against the risks, and for the coverage, as shall be specified in the SCC; and (b) at the Procuring Agency’s request, shall provide evidence to the Procuring Agency showing that such insurance has been taken out and maintained and that the current premiums have been paid.
  4. Contractor’s Actions Requiring Procuring Agency’s Prior Approval
    1. The Contractor shall obtain the Procuring Agency’s prior approval in writing before taking any of the following actions:
      1. appointing such members of the Personnel not provided by the Contractor;
      2. changing the Program of activities; and
      3. any other action that may be specified in the SCC.
  5. Reporting Obligations
    1. The Contractor shall submit to the Procuring Agency the reports and documents in the numbers, and within the periods as prescribed by the Procuring Agency.
  6. Liquidated Damages
    1. Payments of Liquidated Damages
      The Contractor shall pay liquidated damages to the Procuring Agency at the rate per day stated in the SCC for each day that the Completion Date is later than the Intended Completion Date.  The total amount of liquidated damages shall not exceed the amount defined in the SCC.  The Procuring Agency may deduct liquidated damages from payments due to the Contractor.  Payment of liquidated damages shall not affect the Contractor’s liabilities.
    2. Correction for Over-payment
      If the Intended Completion Date is extended after liquidated damages have been paid, the Procuring Agency shall correct any overpayment of liquidated damages by the Contractor by adjusting the next payment certificate.  The Contractor shall be paid interest on the overpayment, calculated from the date of payment to the date of repayment, at the rates specified in SCC.
    3. Lack of performance penalty
      If the Contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, a penalty for Lack of performance will be paid by the Contractor. The amount to be paid will be calculated as a percentage of the cost of having the Defect corrected, assessed as specified in the Contractor
  7. Performance Guarantee
    1. Within the time stipulated in the acceptance letter from the Procuring Agency, the successful Bidder shall furnish the Performance Guarantee in shape and amount specified in SCC.
    2. The proceeds of the Performance Guarantee shall be payable to the Procuring agency as compensation for any loss resulting from the Supplier’s failure to complete its obligations under the Contract.
    3. The Performance Guarantee shall be denominated in the currency of the Contract, or in a freely convertible currency acceptable to the Procuring agency and shall be in the acceptable form as specified in SCC.
    4. The Performance Guarantee will be discharged by the Procuring agency and returned to the Supplier not later than thirty (30) days following the date of completion of the Supplier’s performance obligations under the Contract, including any warranty obligations, unless otherwise specified in SCC.
  8. Sustainable Procurement
    1. The Contractor shall conform to the sustainable procurement contractual provisions, if and as specified in the SCC.

D. Contractor’s Personnel

  1. Description of Personnel
    1. The titles, agreed job descriptions, minimum qualifications, and estimated periods of engagement in the carrying out of the Services of the Contractor’s Key Personnel.  The Key Personnel listed by title as well as by name are hereby approved by the Procuring Agency.
  2. Removal and / or Replacement of Personnel
    1. Except as the Procuring Agency may otherwise agree, no changes shall be made in the Key Personnel.  If, for any reason beyond the reasonable control of the Contractor, it becomes necessary to replace any of the Key Personnel, the Contractor shall provide as a replacement a person of equivalent or better qualifications.
    2. If the Procuring Agency finds that any of the Personnel have (i) committed serious misconduct or have been charged with having committed a criminal action, or (ii) have reasonable cause to be dissatisfied with the performance of any of the Personnel, then the Contractor shall, at the Procuring Agency’s written request specifying the grounds thereof, provide as a replacement a person with qualifications and experience acceptable to the Procuring Agency.
    3. The Contractor shall have no claim for additional costs arising out of or incidental to any removal and/or replacement of Personnel.

E. Obligations of the Procuring Agency

  1. Change in the Applicable Law
    1. If, after the date of this Contract, there is any change in the Applicable Law with respect to taxes and duties which increases or decreases the cost of the Services rendered by the Contractor, then the remuneration and reimbursable expenses otherwise payable to the Contractor under this Contract shall be increased or decreased accordingly by agreement between the Parties, and corresponding adjustments shall be made to the amounts referred in the SCC.
  2. Services and Facilities
    1. The Procuring Agency shall make available to the Contractor and the Experts, for the purposes of the Services and free of any charge, the services, facilities and property described in the Terms of Reference, at the times and in the manner specified in the Terms of Reference.
    2. In case that such services, facilities and property shall not be made available to the Contractor, the Parties shall agree on (i) any time extension that it may be appropriate to grant to the Contractor for the performance of the Services, (ii) the manner in which the Contractor shall procure any such services, facilities and property from other sources, and (iii) the additional payments, if any, to be made to the Contractor as a result thereof.

F. Payments to the Contractor

  1. Contract Price
    1. The price payable shall be in Pakistani Rupees unless otherwise specified in the SCC.
  2. Terms and Conditions of Payment
    1. Payments will be made to the Contractor according to the payment schedule stated in the SCC and as per actual invoice submitted by the Contractor.
    2. Unless otherwise stated in the SCC, the advance payment shall be made against the provision by the Contractor of a bank guarantee for the same amount, and shall be valid for the period stated in the SCC.  Any other payment shall be made after the conditions listed in the SCC for such payment have been met, and the Contractor have submitted an invoice to the Procuring Agency specifying the amount due.
  3. Quality Control Identifying Defects
    1. The principle and modalities of Inspection of the Services by the Procuring Agency shall be as indicated in the SCC. The Procuring Agency shall check the Contractor’s performance and notify him of any Defects that are found.  Such checking shall not affect the Contractor’s responsibilities.  The Procuring Agency may instruct the Contractor to search for a Defect and to uncover and test any service that the Procuring Agency considers may have a Defect. Defect Liability Period is as defined in the SCC.
    2. A {INSPECTION}
  4. Correction of Defects, and Lack of Performance Penalty
    1. The Procuring Agency shall give notice to the contractor of any Defects before the end of the Contract.  The Defects liability period shall be extended for as long as Defects remain to be corrected.
    2. Every time notice a Defect is given; the contractor shall correct the notified Defect within the length of time specified by the Procuring Agency’s notice.
    3. If the contractor has not corrected a Defect within the time specified in the Procuring Agency’s notice, the Procuring Agency will assess the cost of having the Defect corrected, the contractor will pay this amount, and a Penalty for Lack of Performance.
  5. Settlement of Disputes Amicable Settlement
    1. The Parties shall use their best efforts to settle amicably all disputes arising out of or in connection with this Contract or its interpretation.
  6. Dispute Settlement
    1. Arbitration
      If any dispute of any kind whatsoever shall arise between the procuring agency and the contractor in connection with or arising out of the Contract, including without prejudice to the generality of the foregoing, any question regarding its existence, validity or termination, or the execution of the contract, the parties shall seek to resolve any such dispute or difference by mutual consultation. If the parties fail to resolve such a dispute or difference even after negotiations or mediation, then the dispute shall be referred within fourteen (14) days in writing by either party to the Arbitrator, with a copy to the other party.
      Any dispute in respect of which a notice of intention to commence arbitration has been given, in accordance with GCC sub-clause 32.1, shall be finally settled by arbitration. Arbitration may be commenced prior to or after completion of the Contract. Arbitration proceedings shall be conducted in accordance with Arbitration Act 1940.
      Notwithstanding any reference to arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless otherwise agreed. The Procuring Agency shall continue to pay the Contractor any undisputed amounts due under the Contract during the resolution of any dispute.

📑 Special Conditions of Contract (SCC)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

SECTION VIII. SPECIAL CONDITIONS OF CONTRACT

The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.

Number of GC Clause

Amendments of, and Supplements to, Clauses in the General Conditions of Contract

Number of GC Clause 1

Definitions

The Procuring Agency is: SBP-BSC North (SBP Banking Services Corporation (BSC)), Senior Officer SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).

The Supplier is:

The title of the subject procurement is: UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Number of GC Clause 2

Applicable/Governing Law:

The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan

Number of GC Clause 3

Language:

The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.

Number of GC Clause 4

Notices:

The addresses for the notices are:

Procuring Agency:

SBP-BSC North (SBP Banking Services Corporation (BSC)), Senior Officer
SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).
+92-315-720-2000
akhtar.munir@sbp.org.pk

Contractor/ Bidder:

[Name, address and telephone number]

The Contractor/ Bidder’s Representative(s)

[Name, address, telephone number and e-mail address]

Number of GC Clause 6.1

The Authorized Representatives are:

For the Procuring Agency:

SBP-BSC North (SBP Banking Services Corporation (BSC)), Senior Officer
SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).
+92-315-720-2000
akhtar.munir@sbp.org.pk

For the Bidder:

Name: ………………………………………

Designation: ……………………..

Address: …………………………………………..

Number of GC Clause 7

Effectiveness of the contract

The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties

Number of GC Clause 8

Commencement of Contract:

The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.

Number of GC Clause 10.2

Expiration of Contract:

The time period shall be ……………………………

Number of GC Clause 14

Termination

In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.

Number of GC Clause 16

Conflict of Interest:

The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.

Number of GC Clause 20

Liquidated Damages

If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.

Number of GC Clause 21

Performance Guarantee:

The amount of performance guarantee shall be 10.00% of the contract price in acceptable form of Pay Order, Banker's Cheque, Call at Deposit, Bank Guarantee, Demand Draft

Number of GC Clause 27

Currency of Payment:

All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.

Number of GC Clause 28

Payment terms:

Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.

Number of GC Clause 29

Identifying Defects:

The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.

Inspections & Tests Requirements

For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)

For Physical Fitness having No Damages (Certificate from supplier)

For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)

For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team)

For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)

Delivery & Documents

Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;

Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;

Copies of the packing list identifying contents of each package;

Insurance Certificate;

Manufacturer’s or Supplier’s Valid Warranty Certificate;

Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;

Certificate of Origin.

The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock

Number of GC Clause 31

Following is the guidance for Dispute Resolution

  1. If any dispute of any kind whatsoever shall arise between the Authority and the Bidder in connection with or arising out of the Contract... (full clause unchanged)
  2. At future of negotiation the dispute shall be resolved through mediation...
  3. At failure of mediation, arbitration under Arbitration Act 1940...
  4. Cost sharing equally...
  5. Proceedings may commence before/after completion...

Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.

Rules of procedure for arbitration proceedings:

Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.

Place of Arbitration and Award:

The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.

📑 Bid Securing Declaration (BSD)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

Form 9: Bid Securing Declaration

Date: [insert date (as day, month and year)]

Bid No.:P103714

To: SBP-BSC North (SBP Banking Services Corporation (BSC)), Senior Officer SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).

 

 

We, the undersigned, declare that:

We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.

We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:

  1. have  withdrawn  or  modified  our  Bid  during  the  period  of  Bid  Validity specified in the Form of Bid;
  2. Disagreement to arithmetical correction made to the Bid price; or
  3. having been notified of the acceptance of our Bid by the Procuring Agency during the period of Bid Validity, (i) failure to sign the contract if required by Procuring Agency to do so or (ii) fail or refuse to furnish the Performance Security or to comply with any other condition precedent to signing the contract specified in the Bidding Documents.

We understand this Bid Securing Declaration shall expire if we are not the successful

Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.

 

📑 Contract Form (CNF)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

SECTION IX: CONTRACT FORMS

 

THIS AGREEMENT made the _____ day of __________ 20_____ between SBP-BSC North (SBP Banking Services Corporation (BSC)), Senior Officer SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).

 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:

 

WHEREAS the Procuring Agency invited Bids for provision of goods, viz., UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD (P103714) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).

 

NOW THIS CONTRACT WITNESSETH AS FOLLOWS:

1.   In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.

2.   The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-

  1. This form of Contract;
  2. the Form of Bids and the Price Schedule submitted by the Bidder;
  3. the Schedule of Requirements;
  4. the Technical Specifications;
  5. the Special Conditions of Contract;
  6. the General Conditions of the Contract;
  7. the Procuring Agency’s Letter of Acceptance; and
  8. [add here: any other documents]

3.   In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.

4.   The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.

 

IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.

 

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Procuring Agency:

………………………………………………

Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)

 

Witness to the signatures of the Bidder: …………………………………………………

 

 

📑 Integrity Pact (INP)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

Integrity Pact

DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC. PAYABLE BYTHE SUPPLIERS OF GOODS, SERVICES & WORKS IN  CONTRACTS WORTH RS.10.00 MILLION OR MORE

 

Contract                           Number:  Contract                               Value:  Contract Title:

Dated:

 

[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.

Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.

[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.

Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.

📑 Performance Guarantee Form (PGF)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

Performance Guarantee Form

 

To:     SBP-BSC North (SBP Banking Services Corporation (BSC)), Senior Officer SBP BSC (Bank) Building Shahrah-e-Noor Jahan North Nazimabad,, North Nazimabad Sub-Division, Karachi Central (District), Karachi (Division), Sindh (Province).

 

WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No.  [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).

 

AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.

 

AND WHEREAS we have agreed to give the Bidders guarantee:

 

THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guar­antee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.

 

This guarantee is valid until the: [insert date]

 

 

Signature and seal of the Guarantors

 

 

_____________________________________________________________________

[name of bank or financial institution]

 

 

_____________________________________________________________________

[address]

 

 

_____________________________________________________________________

[date}

📑 Annexure (ANX)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code

Annexure-01-Bidding Data Sheet (BDS) – Part-B

Unknown

Annexure-02-Section VIII - SCC (Part-B)

Annexure-02 - Section VIII - SCC (Part-B).pdf

Unknown

Annexure-03- Formula for Price Adjustment

Annexure-3-Formula for Price Adjustment.pdf

Unknown

Annexure-04-Scope of work & Appendix-A to Bid

Unknown

Annexure-05-Construction Schedule & KPIs

Unknown

Annexure-06-Supplier Account Details

Unknown

Annexure-09-Drawings

Unknown

Annexure-07-Undertaking

Unknown

Document Required

Annexure-08- Technical Specifications Appendix-B to Bid

Unknown

📑 Procurement Forms (PFD)

UPGRADATION AND IMPROVEMENT OF ELECTRICAL SYSTEM AT SBP BSC (BANK) NORTH NAZIMABAD

Published on: Monday, October 12, 2026 11:43 AM

Ref# : P103714
QR Code