In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and also available on EPADS v2.0 as well as Authority’s website at (www.ppra.gov.pk).
National Investment Trust Limited (National Investment Trust Limited (NITL)), Manager
6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-335-320-7636
tufail.saeed@nit.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
BDS Clause Number
ITB Number
Amendments of, and Supplements to, Clauses in the Instruction to Bidders
BDS Clause Number 1
ITB Number 1.1
Name of Procuring Agency: National Investment Trust Limited (National Investment Trust Limited (NITL))
The subject of procurement is: SUPPLY, IMPLEMENTATION OF ENTERPRISE ASSET MANAGEMENT SYSTEM (AMS) AT NIT HEAD OFFICE KARACHI
Expected commencement date: Monday, November 30, 2026
BDS Clause Number 2
ITB Number 2.1
Financial year for the operations of the Procuring Agency: 2026-27
Name and identification number of the Contract: P142791
BDS Clause Number 3
ITB Number 4.6
JV/Consortium or Association Allowed: No
Number of JV/Consortium Members: Nil
BDS Clause Number 4
ITB Number 7.1
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, October 27, 2026
BDS Clause Number 5
ITB Number 8.1
Any addendum, in case issued, shall be published on National Investment Trust Limited (National Investment Trust Limited (NITL)) website and on EPADS v2.0.
BDS Clause Number 6
ITB Number9.1
List of documents required along with the bid:
BDS Clause Number 7
ITB Number 11.1
The qualification criteria to establish the supply / production capability of the bidder.
see Eligibility Criteria
BDS Clause Number 8
ITB Number 7.6
Services and Their related documents:
See section Required Services and Scope of Work
BDS Clause Number 9
ITB Number 13.1 & 13.2
Price schedule will be provided according to the format defined and acquired.
see section price schedule.
BDS Clause Number 10
ITB Number 7.6.2
Specifications:
see section of specifications.
BDS Clause Number 11
ITB Number 13.5
The price shall be Fixed.
BDS Clause Number 12
ITB Number 15.1
Currency of the Bids shall be : PKR
BDS Clause Number 13
ITB Number 16.1
The Bids/Bid Validity period shall be: 180 Days
BDS Clause Number 14
ITB Number 17.1
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6
Instrument of Bid Security Shall be in the Name of :
The Bid Security shall be in the form of:
BDS Clause Number 15
ITB Number 17.3
The Bids security shall be valid for twenty-eight (28) days beyond the expiry of the Bids validity period specified in the bidding documents, for example the bid validity is 180 days so the bid security shall be valid for 180+28 = 208 days.
BDS Clause Number 16
ITB Number 18.1
Alternative Bids to the requirements of the bidding documents will not be permitted.
BDS Clause Number 17
ITB Number 21.1
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following;
6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
Bids that are not submitted on EPADS v2.0 shall be disqualified.
The deadline for Bids submission is: Friday, October 30, 2026 03:00 PM
BDS Clause Number 18
ITB Number 26.1
The Bids opening shall take place on EPADS v2.0.
Day : Friday
Date: Friday, October 30, 2026
Time : 03:30 PM
BDS Clause Number 19
ITB Number 32.1
Selection technique adopted will be: Quality Based Selection (QBS)
see Evaluation Criteria
BDS Clause Number 20
ITB Number 49.1
The Performance guarantee shall: 0%.
The Performance Guarantee shall be acceptable in the form of: Nil
BDS Clause Number 21
ITB Number 51.1
Arbitrator shall be appointed by mutual consent of the both parties.
BDS Clause Number 22
ITB Number 53.1
Grievence against this procurement shall be submitted online on EPADS v2.0.
Eligible Bidders: Company (Private Limited)
| Required Registration |
|---|
|
FBR (NTN) FBR (GSTN) Punjab (PRA) SECP |
| Eligibility Criteria | Document |
|---|---|
| 1. Income Tax Certificate / GST Certificate (Copy to be provided). | Yes |
| 2. The Vendor Should Successful Implemented their AMS Software in leading three (03) to Five (05) AMC’s in Pakistan. (List to be Provided) | Yes |
| 3. The Vendor have minimum Ten years of relevant experience in implementation of Asset Management System (AMS). | Yes |
| 4. Experience of successful completion of at least 10 similar AMS projects*, among which 03 completed within last 2 years. | Yes |
| 6. The AMS project completed during last 2 years and in hand should have a combined worth of at least Rs 250 Million. | Yes |
| 7. Completely Filled Bill of Quantity (Annex IV) as per the requirement Annexure I and Annexure III of the Tender Document. | Yes |
| 8. Proof of Company being in operation for at least 10 years in Pakistan in relevant business. | Yes |
| 9. Technical Specification Annexure I completely filled and in compliance with the specifications. | Yes |
| 10. Availability of relevant skilled and experienced manpower. | Yes |
| 11. Signing of SLA as per the “ANNEXURE III: SALIENT FEATURES FOR DRAFT SERVICE LEVEL” | Yes |
| 12. List of technical support staff should include professional holding, certification (if any) along with appropriate length of service. | Yes |
| 13. Should provide written confirmation that the bidder is offering his services initially under this agreement for five (05) year, which will be extendable based on mutual consent. | Yes |
| 14. Company must have resident engineers in regions where support is to be provided. Documentary Evidence should be provided. | Yes |
Quality Based Selection (QBS)
Weightage (Without Financial Criteria)
| Technical Evaluation % |
|---|
| 100 |
| Technical Marks | 100 | |
|---|---|---|
| Passing Marks | 90 | |
| TECHNICAL EVALUATION CRITERIA FOR SUPPLY AND IMPLEMENTATION OF ENTERPRISE ASSET MANAGEMENT SYSTEM (AMS) AT NIT HEAD OFFICE KARACHI | ||
| Years of relevant experience in implementation of Asset Management System (AMS) (2 mark per year; max 10) (Require Relevant Evidence and documents) (Quantitative)(Doc Required) | 10 | |
| Number of successful implementations (currently in SLA) of AMS Projects completed by the bidder. (6 marks per project; max 30) (Require Relevant Evidence and documents) (Quantitative)(Doc Required) | 30 | |
| Product demonstration of the proposed Asset Management System. The purpose of the demonstration will be to validate the system capabilities and usability claimed in the technical proposal. (Require Relevant Evidence and documents) (Quantitative)(Doc Required) | 20 | |
| Average annual turnover of PKR 250 million or above over last 2 years (PKR 250 million or more = 10 marks, PKR 150 million to 249 million = 5 marks, less than PKR 150 million = 2 marks) (Require Relevant Evidence and documents) (Quantitative)(Doc Required) | 10 | |
| Product delivery timelines: after issuance of PO delivery and installation less than 15 days =30 marks else consider 5 marks (Require Relevant Evidence and documents) (Quantitative)(Doc Required) | 30 | |
Positions Without Lots :
| Position | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| SUPPLY, IMPLEMENTATION OF ENTERPRISE ASSET MANAGEMENT SYSTEM (AMS) AT NIT HEAD OFFICE KARACHI | Address: 6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province). Schedule: 10 Days Quantity: 1/job |
1/job | 0 PKR |
No
Positions Without Lots :
Position: SUPPLY, IMPLEMENTATION OF ENTERPRISE ASSET MANAGEMENT SYSTEM (AMS) AT NIT HEAD OFFICE KARACHI
Specifications / Requirements:
| Annexure I: Enterprise Level Asset Management System (AMS) Features and Functions Required | |
|---|---|
| 1. High-level Functions and Features of the Backoffice Module | Description |
| 1.1 | 1.1.1 |
| Coverage | Provision to create Shariah and Non-Shariah Compliant instruments |
| 1.1.2 | |
| AMC can use both types separately | |
| 1.1.3 | |
| System is fully compliant for all investment products available in Pakistan Market. | |
| 1.2 | 1.2.1 |
| Asset Classes | Asset Classes should includes the |
| a. Funds | |
| b. Equity (Quoted/Unquoted) | |
| c. Fixed Income (TFC, PIB, Bonds, Sukuk, T-Bills, Commercial Papers, ICP) | |
| d. Money Market (TDR, Murabaha, Musharaka) | |
| e. Bai Muajjal | |
| f. Commodities | |
| g. IPO Investments can be defined either Shariah compliant or non-shariah compliant. | |
| 1.3 | 1.3.1 |
| Fund Management | provides all the core features and functions to create and manage multiple types of funds. |
| 1.3.2 | |
| Fund Copy function that enables users to create a fund using standard attributes including a chart of account, fee structure including variable fees, fixed | |
| expenses and performance fee etc. | |
| 1.3.3 | |
| Multi units type management with different with different behaviours including Monthly Income Plans. Initial subscription and subsequent subscription amounts | |
| can be defined against each unit type. | |
| 1.4.1 | |
| 1.4 | The System should support the management of multiple portfolio and following type of security transaction should be manage: |
| Portfolio Management | a. Equity |
| b. Fixed Income (Shariah compliant and non-shariah compliant) includes, Bonds, GoP, Ijara Sukuk, corporate Sukuks, TFC, PIBs, following are high-level handling: | |
| I. System generates term-structure for coupon | |
| II. Term-structure is amendable for interest/profit rate and principal redemption for future coupons. | |
| III. System automatically redeemed the principal once coupon is matured. | |
| IV. System booked new interest based on new interest rate and new principal after redemption. | |
| V. System booked new buy/sell transactions based on amended face value through principal redemption | |
| VI. System auto calculates accrued income/profit based on number of days accrued for both buy and sell transactions. | |
| VII. System auto-calculate premium or discount based on price input. | |
| c. T-Bills, Commercial Papers, Islamic Commercial Papers, etc… | |
| d. Money Market Placements | |
| e. Commodities Trades | |
| f. Bai Muajjal Transactions against ICP or Sukuks | |
| g. MTS | |
| h. Subscription in Right Shares | |
| i. Investment in IPO | |
| j. Equity Trades Bulk Upload | |
| k. System auto generates the position of portfolio once Close of Business (CoB) is executed for fund or portfolio | |
| l. System auto booked G/L for realized gain/loss once securities are sold. | |
| m. System auto booked G/L for unrealized gain/loss based on average cost and last close available at AMS. | |
| n. System auto calculates the accruals of fixed income instruments on daily basis, partial redemption of principal as per defined against any coupon and full redemption on maturity of given instrument. | |
| 1.5 | 1.5.1 |
| ETF Management operation | a. Creation of Units against securities basket. |
| b. Redemption of Units against securities basket. | |
| c. Cash component calculation. | |
| d. Auto trigger of data to regulator. | |
| 1.6 | 1.6.1 |
| Fixed Income on Bank Balances | Pool Management |
| 1.6.2 | |
| Slab definition for defined pools | |
| 1.6.3 | |
| Closing balances input | |
| 1.6.4 | |
| Income/Interest Accruals | |
| 1.7 | 1.7.1 |
| Voluntary Pension Schemes (VPS) management | Provision to Define Sub-Funds under Main Pension Fund as follows: |
| a. Defining Sub-Funds under Main Pension Fund | |
| b. Pension and Retirement Plans definition (percentages in defined sub-funds) | |
| c. Participation management | |
| d. Redemptions with average tax rates | |
| e. Change of Pension Plan (auto & manual) | |
| f. Rebalancing of Customer’s Portfolios | |
| g. Retirement Option | |
| h. Change of Retirement Option | |
| i. Term-Structure for retirement | |
| j. VPS MIP Payments Management | |
| k. Related Reports | |
| 1.8 | 1.8.1 |
| Dynamic Fee Structure | Provides an inherently complex yet easy to manage fee structure that can cover a wide spectrum of fee types including: |
| a. Management fee | |
| b. Subscription/Front Load | |
| c. Redemption fee | |
| d. Contingent Load | |
| e. Price Adjustment Charges | |
| f. SECP Fee | |
| g. Trustee Fee | |
| h. Selling & Marketing | |
| i. Allocated Expenses | |
| j. Admin Expenses | |
| k. Broker Commission | |
| 1.9 | 1.9.1 |
| Tax calculations as per defined tax slab | System should calculate the Taxes as per defined Tax Slabs: |
| a. Capital Gain Tax (CGT) | |
| b. Withholding Tax (WHT) | |
| c. Sindh Sales Tax (SST) | |
| d. Zakat | |
| 1.10 | 1.10.1 |
| Amortizations calculations as per defined parameters | System should calculate the Amortizations as per defined parameters |
| a. Shariah Advisor Fee | |
| b. Board Members Fee | |
| c. Audit Fee | |
| d. Half Yearly Review Fee | |
| e. Rating Fee | |
| f. Listing Fee | |
| g. Other amortizations | |
| 1.11 | 1.11.1 |
| Purification Management | To purify the Dividend income advised by Shariah board, it should be fully automated in AMS through file upload. |
| 1.11.2 | |
| Should Generate auto credit/debit in defined accounts with given percentage of purification in each fund/portfolio where the given cash dividends received. | |
| 1.12 | 1.12.1 |
| Integrated Accounting system for Funds and Portfolios. | key features of Integrated accounting System: |
| a. Dynamic Chart of Account (Global) | |
| b. Financial Years definition | |
| c. Bank Accounts | |
| d. Sub-ledger definition | |
| e. G/L Books | |
| f. Financial report designer | |
| g. Reconciliations of Bank Statement (manual) | |
| h. Year-End Voucher Setting | |
| i. Journal Vouchers (JVs) | |
| j. Integrated vouchers | |
| k. Auto Revaluations | |
| l. Account Transfer (from one bank account to other under the same fund) | |
| m. Year-End Process | |
| n. Ledger Reports | |
| o. Sub-Ledger Reports | |
| p. Trial Balance | |
| q. Balance sheet | |
| r. Income statement | |
| 1.13 | 1.13.1 |
| Corporate Actions | Fully automatic process to create entitlements and settlements as per defined dates and other data system and cover the following type of securities corporate actions. |
| a. Bonus shares | |
| b. Cash dividend | |
| c. Splits | |
| d. Rights | |
| 1.14 | 1.14.1 |
| Fund Corporate Actions | Includes cash dividend and bonus units’ distributions to unitholders, system should generate entitlements with following actions: |
| a. Gross dividend | |
| b. Withholding Tax on Dividend | |
| c. Net Dividend | |
| d. Refund of Capital | |
| e. Reinvestment of Refund of Capital | |
| f. Reinvestment of Net Dividend (if customer opted-in for Reinvestment) | |
| 1.15 | 1.15.1 |
| Pricing and Benchmarks | System should link with real time market feed and price engine to ensure up-to-date market evaluation and mark to market. |
| 1.15.2 | |
| System capable to receive price upload in case no integration available for price | |
| Feed. | |
| 1.15.3 | |
| System creates unrealized gain/loss automatically based on given prices for | |
| Securities. | |
| 1.15.4 | |
| Benchmarks rates to show comparisons. | |
| 1.16 | 1.16.1 |
| Trade Reconciliation & Settlement | Provides for daily consolidated positions of all trade’s exchange/custodian-wise. |
| 1.17 | 1.17.1 |
| Cash Management | Provides the facility for all kind of cash Transaction (Injection / withdrawal |
| / Expense / Interest / Due Transaction / Incentive Fee/ Bank transfers / Fees/ Commission) | |
| 1.18 | 1.18.1 |
| Unit Management | Provides the facility to manage unitholders’ transactions in funds |
| including: | |
| a. Subscriptions/Purchases with subscription fee and SST, system also cater the discount/rebate. System book Capital contribution and element of capital automatically based on given prices for transaction and start of fiscal year or inception. | |
| b. Redemptions transaction with deduction of CGT in both full or partial cases. System also calculates the redemption amount from capital contribution, element of capital and revenue element. | |
| c. Fund to Fund Conversion transactions in one shot, system automatically create both redemption side and purchase side transaction with impact of fees and taxes including CGT, PAC and defined fee or taxes. | |
| d. FoF to FoF Conversion transactions in one shot handle separately. | |
| e. Unit Type Change, a separate process to change the unit type in the same fund for the customer. | |
| f. Transfers of Units, customer to customer transfer of units is fully automated. | |
| g. Investment Rollovers feature allows to redeemed units then reinvest (purchase) in the same fund, it is created for corporate clients. | |
| h. Reversals can be booked for any kind of transaction, where system will only revert the most recent transaction. | |
| i. Pledge of units; pledging of units against a specific third party, issuing physical certificates against specific holding positions, pledge against CSD. | |
| j. Adjustments against purchase or redemption side transactions including: | |
| I. Front Load adjustment | |
| II. CGT Refund | |
| III. Zakat Adjustment | |
| k. MIP execution, creates redemption orders automatically using customer’s earning in given funds. | |
| l. System also allowed following features for unit management: | |
| I. Order receiving from different channels including online and physical. | |
| II. Order received from online channels booked at AMS in approved status and once NAV is confirmed, the given orders are allocated with NAV and system automatically update the statement of account, able to trigger email or SMS for order confirmation. | |
| III. System handle realization-based fund and form-based funds. | |
| IV. System automatically allocate/authorize NAV to realization-based funds, once payment is confirmed either through for orders received from online channels or input through physical form. | |
| V. System capable to allocate/authorize NAV rate for form-based funds and keep pending until payment is realized, system auto issue units once payment is realized by user or received through online channels. | |
| m. Bulk upload of: | |
| I. Purchase Orders | |
| II. Redemption Orders | |
| III. CGT Refund | |
| IV. Load Adjustment | |
| 1.19 | 1.19.1 |
| NAV Calendar | Allows to run business of funds accordingly; system not disseminates NAV for non-NAV days but calculate for internal use and report to CDC/MUFAP. |
| 1.20 | |
| Pre-NAV Approval | 1.20.1 |
| System should allows to see NAV and changes from previous NAV and have an approval before generating NAV. | |
| a. NAV will be confirmed from given screen | |
| b. If any fund corporate action (Cash Dividend) is booked for given fund, then popup appear to confirm gross dividend. | |
| c. Once Gross dividend is confirmed, system record liability and show Post-NAV Rate. | |
| d. The behaviour of Funds marked as daily dividend is that the different of NAV auto calculate the gross amount of dividend to distribute on daily basis. | |
| e. System allowed to confirm given daily dividend and accordingly the NAV/Unit return back to original. | |
| 1.21 | 1.21.1 |
| Daily Dividend funds | Daily Dividend funds should marked from the Fund definition. Following specially managed functions should be performed: |
| a. System generates gross entitlements for unitholders as per their holding position on given date. | |
| b. System auto calculate WHT based on tax slab for filer and non-filer | |
| c. System do not calculate WHT for tax exempted customers. | |
| d. System booked WHT payable liability once user confirmed. | |
| e. System auto reinvests the net cash dividends on the given fund. | |
| f. System auto updates the statement of account after reinvestment of cash dividends. | |
| 1.22 | 1.22.1 |
| Periodic Cash Dividend | Should managed through fund corporate actions. Following specially managed functions should be performed: |
| a. System generates gross entitlements for unitholders as per their holding position on given date once given cash dividend is confirmed through NAV/Confirmation for the given date. | |
| b. System auto calculate WHT based on tax slab for filer and non-filer from the given screen. | |
| c. System do not calculate WHT for tax exempted customers. | |
| d. System booked WHT payable liability once user confirmed. | |
| e. System auto reinvests the net cash dividends on the given fund. | |
| f. System auto create the cash dividend payable where customers opted-in for encashment. | |
| g. System auto updates the statement of account after reinvestment of cash dividends. | |
| 1.23 | 1.23.1 |
| Shareholder Position | System should provides the facility to view Shareholder Certificate Movement and Balance by NAV Date |
| 1.23.2 | |
| User able to generate Statement of Account (SoA) for any customer for any given period. | |
| 1.23.3 | |
| System should provide the facility to generate report for processed units since inception, it reflects the overall summary of each type of transaction including, purchases, redemption, conversion, reinvestments. It shows segregated position for each unit type. | |
| 1.23.4 | |
| Detail report for any single day where it shows the executed transactions for the | |
| given date. | |
| 1.24 | 1.24.1 |
| Reporting Module | Reporting Module should contain a significantly large set of reports covering Portfolio position, performance, registry, accounting, custodian, regulator and other reports. The reports include: |
| a. Internal reports | |
| b. Unitholder related reports | |
| c. NCCPL Reports | |
| d. SECP Reports | |
| e. CDC FMS Uploads | |
| f. Other reports | |
| 1.25 | 1.25.1 |
| Bank Statements Reconciliation | Bank Statements Reconciliation with system generated G/L for specific bank accounts, system provide manual knocking-offs. |
| 1.26 | 1.26.1 |
| Notifications/Alerts | As per defined trigger points and recipients including NAV announcements, special offers, order confirmations etc. |
| 1.27 | 1.27.1 |
| Post-Trade Compliance Reports | As per defined parameters against different groups and single entities. |
| 1.28 | 1.28.1 |
| Credit Rating | Assignment to securities, counterparties, banks and funds managed under AMC |
| to manage different investments and compliances. Given credit rating used in compliance rules and reporting. | |
| 2. High-level Functions and Features of the Front office Module | Description |
| 2.1 | 2.1.1 |
| Trade Module | Trade Module should consist of three options. |
| a. DMA Orders | |
| b. File upload | |
| c. Manual Order entry | |
| 2.1.2 | |
| DMA Order management uses the standard FIX protocol and can manage n-number of executing partners. | |
| 2.1.3 | |
| Transaction uploading module supports to upload the executed Orders and update the portfolio positions accordingly. | |
| 2.2 | 2.2.1 |
| Model Portfolio Rebalancing | Allows Rebalance the portfolio/ Fund based on (Benchmark % / Target %). |
| 2.3 | 2.3.1 |
| Market Watch | Market Watch is there based on the market subscriptions. The market watch comes with standard features and functions including the Order placement and depending on the license Level 2 feed can also be provided. |
| 2.4 | 2.4.1 |
| Bulk Order Placement | Bulk Order Placement can be done using a feature which allows to increase/decrease portfolio positions using one window operation ensuring the fair-trade mechanism. |
| 2.5 | 2.5.1 |
| Performance Attribution | Performance Attribution both single and multiple periods is available with the provision to view the positive and negative contributors. |
| 2.6 | 2.6.1 |
| Portfolio Watch | Portfolio Watch window provides an interactive and real-time overview of the portfolio for both fund and DPMs. |
| 2.7 | 2.7.1 |
| Exemplary Portfolio | Exemplary Portfolio can be proposed based on the Risk Profile gathers at the client onboarding. System displayed 3 portfolios mix and user can select any one as the model portfolio. |
| 2.8 | 2.8.1 |
| Multiple Dashboards | Multiple Dashboards are available with wide range of information including the 3600 views, Risk Dashboard and the user defined layouts. |
| 2.9 | 2.9.1 |
| Compliance Engine | Compliance Engine is a dynamic tool which empowered users specifically the compliance and risk department to devise and implement any regulatory or internal compliance limit or rule using a mathematical base engine. |
| 2.1 | 2.10.1 |
| Investable Universe | Investable Universe; A universe of securities generally refers to a set of securities that share a common feature. It can be attached with portfolio(s), where it will restrict the trading only in defined set of securities. |
| 2.11 | 2.11.1 |
| Trading Limits | Trading Limits are price ranges established to curtail excessive volatility that can be detrimental to the orderly functioning of markets. |
| 2.12 | 2.12.1 |
| Trading Restrictions | Trading Restrictions can be defined and attached with portfolio or group of portfolios; system will automatically restrict as per defined rules. |
| 2.13 | 2.13.1 |
| Reconciliation | System generated trades should be reconcile with brokerage/custodian provide trade file. |
| 2.14 | 2.14.1 |
| Post Trade Allocation | List the trades which are executed or still in pending state. |
| 2.15 | 2.15.1 |
| Role-Based User Management | Should allows user to restrict for a specific function or feature and limit their access to assigned portfolios. |
| 2.16 | 2.16.1 |
| Brokers Management | Brokers Management provide to define and attached with certain portfolio, send order either through integration or email through a defined format. |
| 3. High-level Functions and Features of Customer Relationship Management (CRM) Module | Description |
| 3.1 | 3.1.1 |
| Work Flow | Starting with Leads/Prospects tracking till onboarding is part of the solution. Any interaction done with the lead or Prospect is recorded for future reference. |
| 3.2 | 3.2.2 |
| Customer Onboarding | Customer Onboarding screen is a comprehensive one covering all the mandatory information along with document upload, tasks management, risk profiling, tax status, exemptions, opt-in and opt-out from different services & feature etc. |
| 3.3 | 3.3.1 |
| Dynamic Form Designer | Should provide the tool as a built-in utility, which one can design any supporting forms for capturing either questionnaire, KYC, risk profiles or related information. |
| 3.3.2 | |
| The tool should equip with various controls required to build a simple or a complex form. | |
| 3.4 | 3.4.1 |
| Branch Structure | Branch Structure is maintained to provide segregation based on the location. Different RMs or other staff members are assigned to branches so they can manage respective customer base. |
| 3.5 | 3.5.1 |
| Task & Complaint Management | Task & Complaint Management should be done using the tracking process, which uses a work flow for recording, assigning and tracking a compliant. |
| 3.6 | 3.6.1 |
| Integrations | Integrations with other API to verify customer Ids, mobile number and other data. |
| 3.6.2 | |
| Integrations with authorities to check blacklisted customers. | |
| 3.7 | 3.7.2 |
| RM Terminal | RM Terminal to manage and track communication with customers and to address queries/complaints. Also, to watch client investment activities including purchases & redemptions, interactions, complaints. It also used to book customer transactions including: |
| a. Subscription | |
| b. Redemption | |
| c. Conversion | |
| d. VPS participations | |
| e. VPS Redemptions | |
| 3.8 | 3.8.1 |
| Customer Advance Screen | Customer Advance Screen to filter customers’ profile data and their holding by using specific parameters and variables. |
| 3.9 | 3.9.2 |
| Authority Management | Authority Management to manage users and their roles. |
| 3.1 | 3.10.1 |
| Dispatch Management | Dispatch Management to manage physical delivery of letters to customers including auto generation of bar code on letters. |
| 3.11 | 3.11.1 |
| Reports | Require Reports for different and multiple aspects of CRM as part of the standard solution. |
| 3.12 | 3.12.1 |
| Certificates Printing | Certificates Printing and delivery to customer, certificates including Investment, Tax, Balance confirmation, Transaction Detail, Tax Rebate, VISA, Pledge and Pension certificate. |
| 3.13 | 3.13.1 |
| Communication | Communication through bulk email/SMS, auto notification on Id Expiry, KYC Expiry, greetings on special days etc. through predefined and customized templates. |
| 4. High-level Functions and Features of Integrations Module | Description |
| 4.1 | 4.1.1 |
| Provide and Integrate the B2B and System to System API’s. | PMD Services |
| 4.1.2 | |
| NADRA Services | |
| 4.1.3 | |
| Title Fetch Services (1-Link) | |
| 4.1.4 | |
| KPK Pension Fund APIs | |
| 4.1.5 | |
| Punjab Pension Fund APIs | |
| 4.1.6 | |
| Sindh Pension Fund APIs | |
| 4.1.7 | |
| Baluchistan Pension Fund APIs | |
| 4.1.8 | |
| Federal Services Contributory Services APIs | |
| 4.1.9 | |
| NCCPL Services | |
| 4.1.10 | |
| RAAST P2P Services | |
| 4.1.11 | |
| Kuickpay Services | |
| 4.1.12 | |
| API’s with Bank for Instant Redumption to transfer funds to customers bank account. | |
| 4.1.13 | |
| CDC (FMS) (DB to DB) | |
| 4.1.14 | |
| MUFAP | |
| 4.1.15 | |
| Email Exchange Server | |
| 4.1.16 | |
| SMS Gateway | |
| 4.1.17 | |
| Standard APIs | |
| a. Get Funds’ List (Standard API) | |
| b. Customer Onboarding (Standard APIs) | |
| c. Customer Transactions (Standard APIs) | |
| d. Portfolio Balance Inquiry (Standard API) | |
| e. Portfolio Historical Transactions (Standard API) | |
| f. Certificates | |
| 4.1.18 | |
| API’s with Emlaak Financial for account opening and Transactions handling. | |
| 4.1.19 | |
| WhatsApp Business APIs to response customer quires, balance inquires, Generation of CGT, WHT certificates, account statement as per industry standard | |
| 4.1.20 | |
| API’s for integration with Portal and Mobile Application. | |
| 4.1.21 | |
| Call Center API, | |
| 4.1.22 | |
| Ticket Management API’s, | |
| 4.1.23 | |
| API’s for Internal Document Archival system ( Easy) for customer documents archival. Require to store customer documents in the archival system not in the Data Base. | |
| 5.1.1 | |
| 5. Overall Functional Requirements of AMS | Description |
| 5.1 | The architecture should be flexible and based on widely accepted standards. This will make it easier to integrate/interface the mission critical applications and other internal and external /modules. The systems is able to interoperate with a number of modern technologies, such as: |
| Industry Standard Architecture | Document management systems |
| Powerful and flexible ad hoc reporting tools Web-based self-service functions for the system users Integration through API’s. | |
| 5.2 | 5.2.1 |
| Disaster Recovery Management | The Software architecture should support the robust Disaster Recovery (DR) capability to ensure business continuity in the event of system failure, data center outage, cyber incident, natural disaster, or any other disruptive event. |
| 5.2.2 | |
| AMS system have capability and support the production data is securely and regularly replicated to the DR site/environment and the DR environment remains synchronized and ready for activation. | |
| 5.2.3 | |
| Any additional infrastructure, licenses, or third-party services required exclusively for the DR solution (beyond the primary production environment) shall be clearly identified in the vendor’s proposal. | |
| 5.3 | 5.3.1 |
| Secure | The system also incorporate the elements of authentication, authorization, monitoring/detection that adhere to industry standards. |
| 5.4 | 5.4.1 |
| Web-Based Architecture | The systems should have the integrating capabilities of the web services architecture. This will provide many users the ability to interact with the applications via a Web browser. |
| 5.5 | 5.5.1 |
| Scalable | Scalability will be critical to support expansion and workload variability. |
| 5.6 | 5.6.1 |
| Integration | The core AMS must act as a single system, with required data flowing between modules or systems as required to act as a single system. Component systems must be integrated to the core system. The NIT requires that the core systems vendor and the component system vendors work together to ensure that this integration occurs and is maintained. Costs for establishing and maintaining this integration must be incorporated in your financial proposal. |
| 5.7 | |
| Workflow Functionality | Workflow enables the specification of business rules, roles, and routings that can be used to automatically route requests, to supervisors and management for notification, review, and approval. |
| 5.8 | 5.8.1 |
| Relational Database Management System | The AMS system should support relational database technology such as Oracle for High Availability & Fault Tolerance. |
| 5.9 | 5.9.1 |
| External Integration Flexibility | The system will adhere to the use of industry standards. This will make it easier to integrate the mission critical systems and to share data with external systems. |
| 5.1 | 5.10.1 |
| Standards, Policies, and Regulatory Compliance of the AMS System | The Vendor warrants that the offered Asset Management System (including all modules, components, interfaces, and related services) shall fully comply with all applicable national and international standards, policies, guidelines, and regulatory requirements relevant to Asset Management, capital markets, data protection, information security, and financial systems, as amended from time to time. |
| 5.10.2 | |
| System shall comply with relevant securities, capital market, and Asset Management regulations issued by the applicable regulatory authority (e.g., Securities and Exchange Commission / MUFAP /equivalent); | |
| 5.10.3 | |
| System shall comply with Anti-Money Laundering (AML), Counter-Terrorism Financing (CTF), and Know-Your-Customer (KYC) requirements. | |
| 5.10.4 | |
| System shall comply with Industry best practices for financial systems, including principles of data integrity, audit trails, access control, and segregation of duties. | |
| 5.11 | 5.11.1 |
| Hosting Environment | Purchase software and services from the Vendor to install on the NIT’s on-site servers after completion all of the prerequisite completed by the NIT.. |
| 5.12 | 5.12.1 |
| System Integration | Vendors shall identify the hardware specifications, software, databases, licensing, and connectivity required for the following environments: |
| a. Production | |
| b. Test | |
| 5.13 | 5.13.1 |
| Software Documentation | The proposal must include a list and description of the software. Once selected the vendor must provide documentation as part of the system configuration. Examples of these are: |
| a. Application System Reference. | |
| b. Application System Tutorial. | |
| 5.14 | 5.14.1 |
| System Implementation Documentation | Prior to commencing work, the Vendor must provide documentation to include. |
| Implementation Plan, System Test Plan and Procedures and Training Plan. The delivery of these and certain key documents provided by the Vendor as their first deliverable. | |
| 5.15 | 5.15.1 |
| Training and Operations Documentation | Several documents will be prepared that will be used in training personnel and/or in operating the system. The Vendor must describe these documents in its proposal and specify the number of each that will be delivered to the NIT. |
| 6. AMS System on site Delivery & Deployment | Description |
| 6.1 | 6.1.1 |
| Delivery and Installation Timeline | The Vendor shall deliver the complete AMS System (including all software licenses, media, documentation, configuration files, and supporting components) to the designated Site and complete full on-site installation, configuration, integration and deployment within fifteen (15) working days from the date of issuance of the Purchase Order (PO) / Notification of Award. |
| 6.2 | 6.2.1 |
| On Site Delivery and installation | The vendor shall submit a detailed Delivery & Deployment Plan (including logistics, site readiness checklist, resource allocation, and risk mitigation) within three (3) working days of PO issuance for Purchaser approval. |
| 6.2.2 | |
| The vendor will bear all costs associated with the preparation, delivery and on-site installation of the Items and the NIT will in no case be responsible or liable for those costs. | |
| 6.2.3 | |
| Installation of the AMS software on the NIT’s on-site designated servers / environment. | |
| 6.2.4 | |
| Providing all required installation scripts, configuration parameters, and on-site or remote technical support personnel. | |
| 6.2.5 | |
| Conducting basic system verification (start-up, login, core module functionality checks) to confirm readiness for Acceptance Testing. | |
| 6.2.6 | |
| Issue an Installation Certificate confirming that the software has been correctly delivered, installed, configured and is ready for Operational Acceptance Testing. | |
| 7. Data Migration & Parallel Run of the AMS System | Description |
| 7.1 | 7.1.1 |
| Business Process Review | The Vendor is required, utilizing the Business Process Review analysis to pre-configure the system prior to data migration and testing. Vendor provide the complete workflow configuration into the AMS system. The Vendor will work with the NIT’s team to assess current business processes, identify gaps, and recommend improvements to utilize the system to its highest capacity. In addition, the Vendor will take these recommendations to build and configure new business processes into the new AMS system. |
| 7.2 | 7.2.1 |
| Data Migration from the existing System | The vendor shall be fully responsible for the complete, accurate, and secure migration of all relevant data from the existing AssetConnect System to the new AMS (Asset Management System) . |
| 7.2.2 | |
| The vendor shall migrate the data in a manner that ensures data integrity, completeness, consistency, and usability in the target system without loss, corruption, or unauthorized alteration. | |
| 7.2.4 | |
| Prepare a comprehensive Data Migration Plan (including data mapping, cleansing strategy, extraction, transformation, loading (ETL), validation, and cut-over approach). | |
| 7.2.6 | |
| Reference data, static data, and configuration data required for the proper functioning of the offered AMS System; | |
| 7.2.7 | |
| Perform data extraction including cleanse, transform and map the Data with necessary support from the NIT’s team. Conduct thorough data validation and reconciliation; | |
| 7.2.8 | |
| The vendor should migrate the historical data ( from July 2008) and transactional data (trades, orders, corporate actions, cash movements, valuations, positions, holdings); including opening balances and closing balances of the customers from the existing Oracle based to the new AMS System. | |
| 7.2.9 | |
| Migration of the balances of physical certificates to the new system and also provide the utility to convert the physical certificates to the electronic units. | |
| 7.2.10 | |
| Merge the existing multiple registration to the single registration and associate the relevant customers’ accounts to migrate to the new AMS System. All the transactions would be mapped against with the relevant accounts. | |
| 7.2.10 | |
| Any other data categories identified during the data discovery / mapping phase. | |
| 7.2.11 | |
| Ensure all migration activities are performed by qualified personnel. | |
| 7.2.12 | |
| The vendor shall be solely responsible for the technical execution of the migration. Any errors, data loss, or inconsistencies arising from the Vendor’s migration process shall be rectified by the vendor at its own cost and within agreed timelines. | |
| 7.2.13 | |
| The vendor shall submit a detailed Data Migration Plan. | |
| 7.2.14 | |
| Data migration activities shall be completed in alignment with the overall project timeline so that the AMS System is fully populated and validated before Operational Acceptance / Go-Live. The final production data load shall be completed no later than 05 working days before the scheduled Go-Live date or as agreed in the Project Plan. | |
| 7.3 | 7.3.1 |
| Mock-based Parallel Run of the AMS System | Conduct the Mock-based Parallel run to test the system's functionality with actual data, including closing positions, holding quantities, and average costs. Reconciling results with the actual system to ensure accuracy and user confidence before proceeding with UAT. |
| 7.3.2 | |
| The purpose of the Mock-based Parallel Run is to: | |
| a. Simulate live business operations in the new DirectFN AMS System using real or near-real data. | |
| b. Validate that the new system produces correct results, reports, and outputs when compared with the existing AssetConnect System. | |
| c. Test end-to-end business processes, workflows, integrations, and user activities in a controlled environment. | |
| d. Identify any functional, performance, or data-related issues before actual Go-Live. | |
| e. Build user confidence and readiness. | |
| 7.3.3 | |
| During the Mock-based Parallel Run, the vendor shall: | |
| a. Ensure the AMS System is fully configured and populated with the latest test-migrated data. | |
| b. Support the operational users in executing key business transactions and processes in the new system. | |
| c. Perform daily/periodic reconciliation of critical outputs (positions, valuations, cash balances, reports, etc.) between AssetConnect and DirectFN AMS. | |
| d. Log, priorities, and resolve all issues arising during the parallel run. | |
| e. Provide dedicated on-site or remote support resources throughout the parallel run period. | |
| 8. Cut-over and Go-Live | Description |
| 8.1 | 8.1.1 |
| Pre-Cut-over Conditions | Cut-over shall only proceed after successful completion and sign-off of Test Migrations and Mock-based Parallel Run, resolution of all critical/high issues, approval of the final Cut-over Plan, and readiness of the production environment (including a tested Rollback Plan). |
| 8.2 | 8.2.1 |
| Cut-over Plan | The vendor shall submit a detailed Cut-over Plan (activities, timelines, resources, verification points, Go/No-Go criteria, and Rollback procedures) at least 10 working days before the scheduled Cut-over. |
| 8.3 | 8.3.1 |
| Cut-over Execution | The vendor is fully responsible for the final production data migration from AssetConnect, system activation, post-load reconciliation, verification of interfaces and jobs, and deployment of adequate support resources during the Cut-over window. |
| 8.4 | 8.4.1 |
| Go-Live | Upon successful Cut-over and verification, the vendor shall notify the NIT team. The vendor will issue a formal Go-Live Certificate (or notify outstanding critical issues). The date of the Go-Live Certificate shall be the official Go-Live Date, from which the 6-month bug-fix grace period and warranty obligations commence. |
| 8.5 | 8.5.1 |
| Hypercare Support | The vendor shall provide intensive Hypercare support for a minimum of 15 to 30 days after Go-Live, with dedicated resources, accelerated response times, and daily reviews as required. |
| 8.6 | 8.6.1 |
| Rollback | In case of critical failure during or immediately after Cut-over, the NIT’s team may direct execution of the approved Rollback Plan. The vendor shall perform the Rollback at its own cost and restore the previous system without data loss. |
| 9. Warranty/ Support | |
| 9.1 | 9.1.1 |
| Six-Month Grace Period for Bug Fixes after Go-Live | During this six-month grace period, the vendor shall, at no additional cost to the NIT, promptly rectify all bugs, defects, errors, malfunctions, or non-conformities in the system. |
| 9.1.2 | |
| The three-month grace period runs in parallel with (and does not replace) any standard warranty or Annual Maintenance Contract (AMC) period. Upon expiry of the grace period, ongoing support and maintenance shall be governed by the warranty/AMC terms of the Contract. | |
| 9.2 | 9.2.1 |
| Service Level Agreement (SLA) | The SLA shall form an integral part of this Contract and shall set out in detail the service levels, performance standards, response and resolution times, responsibilities, and remedies relating to the delivery, installation, deployment, Go-Live, and post-Go-Live support of the Asset Management Software. |
National Investment Trust Ltd intends to procure, implement a comprehensive, configurable Enterprise Asset Management System (AMS) to manage the full investment lifecycle, including portfolio management, investment operations, Fund Accounting, client reporting, and related processes to automate the key business process, thereby reducing the manual intervention and enhancing Data accuracy and system controls. The implementation aims to establish standardized and auditable workflow across all relevant functions, strengthen compliance with applicable regulatory and statutory requirements and enable robust real-time analytics and reporting for informed decision-making. The successful bidder shall be responsible for the following:
Bidders may be asked to provide a live product demonstration of the proposed Asset Management System. The purpose of the demonstration will be to validate the system capabilities and usability claimed in the technical proposal.
National Investment Trust (NIT) is the oldest Mutual Fund Company of Pakistan, with its Head Office located in Karachi and countrywide operation through its 25 branches and a customer facilitation center in Karachi. E-Bids are invited through E-Pak Acquisition and Disposal System (EPADS) from reputed and well-established firms/companies registered with relevant Registration Authorities and Tax Departments/ Authorities (Income Tax, Sales Tax & Sindh Sales Tax etc.) and who are on Active Tax payers List of the Federal Board of Revenue for supply, implementation & customization of Enterprise Asset Management system (AMS) at Karachi Head office as per specification given in Annexures I, as mentioned in this Tener document. The E-bids shall be received as per single stage two envelope procedures.
For Individual Positions
| # | Position Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Definitions
The Procuring Agency is: National Investment Trust Limited (National Investment Trust Limited (NITL)), Manager 6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
Contractor is:
The title of the subject procurement is:SUPPLY, IMPLEMENTATION OF ENTERPRISE ASSET MANAGEMENT SYSTEM (AMS) AT NIT HEAD OFFICE KARACHI
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
National Investment Trust Limited (National Investment Trust Limited (NITL)), Manager
6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-335-320-7636
tufail.saeed@nit.com.pk
Contractor/ Bidder:
[Name, address and telephone number].
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
National Investment Trust Limited (National Investment Trust Limited (NITL)), Manager
6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
+92-335-320-7636
tufail.saeed@nit.com.pk
For the Bidder:
Name: ………………………
Designation: ……………..
Address: ……………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ………………….
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 16.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.00% to 0.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
Instrument of Performance Guarantee shall be in the Name of : Nil
The amount of performance guarantee shall be 0% of the contract price in acceptable form of Nil
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
Bidders asked to provide a live product demonstration of the proposed Asset Management System to validate the system capabilities and usability claimed in the technical proposal.
The Vendor shall deliver the complete AMS System (including all software licenses, media, documentation, configuration files, and supporting components) to the designated Site and complete full on-site installation, configuration, integration and deployment within fifteen (15) working days from the date of issuance of the Purchase Order (PO) / Notification of Award.
The vendor shall submit a detailed Delivery & Deployment Plan within three (3) working days of PO issuance.
The vendor will bear all costs associated with the preparation, delivery and on-site installation of the Items and the NIT will in no case be responsible or liable for those costs.
Providing all required installation scripts, configuration parameters, and on-site or remote technical support personnel.
Conducting basic system verification (start-up, login, core module functionality checks) to confirm readiness for Acceptance Testing.
Issue an Installation Certificate confirming that the software has been correctly delivered, installed, configured and is ready for Operational Acceptance Testing.
The Vendor is required, utilizing the Business Process Review analysis to pre-configure the system prior to data migration and testing. Vendor provide the complete workflow configuration into the AMS system. The Vendor will work with the NIT’s team to assess current business processes, identify gaps, and recommend improvements to utilize the system to its highest capacity.
The vendor shall be fully responsible for the complete, accurate, and secure migration of all relevant data from the existing AssetConnect System to the new AMS (Asset Management System)
The vendor shall migrate the data in a manner that ensures data integrity, completeness, consistency, and usability in the target system without loss, corruption, or unauthorized alteration
Prepare a comprehensive Data Migration Plan (including data mapping, cleansing strategy, extraction, transformation, loading (ETL), validation, and cut-over approach).
Reference data, static data, and configuration data required for the proper functioning of the offered AMS System;
Perform data extraction including cleanse, transform and map the Data with necessary support from the NIT’s team. Conduct thorough data validation and reconciliation;
The vendor should migrate the historical data ( from July 2008) and transactional data (trades, orders, corporate actions, cash movements, valuations, positions, holdings); including opening balances and closing balances of the customers from the existing Oracle based to the new AMS System.
Migration of the balances of physical certificates to the new system and also provide the utility to convert the physical certificates to the electronic units.
Any other data categories identified during the data discovery / mapping phase.
Ensure all migration activities are performed by qualified personnel.
The vendor shall be solely responsible for the technical execution of the migration. Any errors, data loss, or inconsistencies arising from the Vendor’s migration process shall be rectified by the vendor at its own cost and within agreed timelines
The vendor shall submit a detailed Data Migration Plan.
Data migration activities shall be completed in alignment with the overall project timeline so that the AMS System is fully populated and validated before Operational Acceptance / Go-Live. The final production data load shall be completed no later than 05 working days before the scheduled Go-Live date or as agreed in the Project Plan.
Mock-based Parallel Run of the AMS System
Cut-over shall only proceed after successful completion and sign-off of Test Migrations and Mock-based Parallel Run, resolution of all critical/high issues, approval of the final Cut-over Plan, and readiness of the production environment (including a tested Rollback Plan).
The vendor shall submit a detailed Cut-over Plan (activities, timelines, resources, verification points, Go/No-Go criteria, and Rollback procedures) at least 10 working days before the scheduled Cut-over.
The vendor is fully responsible for the final production data migration from AssetConnect, system activation, post-load reconciliation, verification of interfaces and jobs, and deployment of adequate support resources during the Cut-over window.
Upon successful Cut-over and verification, the vendor shall notify the NIT team. The vendor will issue a formal Go-Live Certificate (or notify outstanding critical issues). The date of the Go-Live Certificate shall be the official Go-Live Date, from which the 6-month bug-fix grace period and warranty obligations commence.
Hypercare support for a minimum of 15 to 30 days after Go-Live, with dedicated resources, accelerated response times, and daily reviews as required.
In case of critical failure during or immediately after Cut-over, the NIT’s team may direct execution of the approved Rollback Plan. The vendor shall perform the Rollback at its own cost and restore the previous system without data loss.
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder.
Arbitrator’s fee:
The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties.
Appointing Authority for Arbitrator:
By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties.
Date: [insert date (as day, month and year)]
Bid No.:P142791
To: National Investment Trust Limited (National Investment Trust Limited (NITL)), Manager 6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between National Investment Trust Limited (National Investment Trust Limited (NITL)), Manager 6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., SUPPLY, IMPLEMENTATION OF ENTERPRISE ASSET MANAGEMENT SYSTEM (AMS) AT NIT HEAD OFFICE KARACHI (P142791) and has accepted a Bids by the Bidder for the provision of Services in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: National Investment Trust Limited (National Investment Trust Limited (NITL)), Manager 6th Floor, NBP Head Office Building, I.I. Chundrigar Road, Saddar Sub-Division, Karachi South (District), Karachi (Division), Sindh (Province).
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Non-Consultancy Services(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
ANNEXURE IV: BILL OF QUANTITY FOR ASSET MANAGEMENT SYSTEM SHOULD BE FILLED SIGNED AND STAMPED.
Biding Document Guidlines and Term and Conditions
Annexure I Technical Specification and Annexure VI Bid Securing Declaration document should be completely filled signed and stamped by the Bidder..
Bidder firm has not been blacklisted by any Government/Semi Government organization provide documentary proof.
The Bidder must submit the list of successfully implemented and ongoing projects of the AMS system.
The AMS project completed during last 2 years and in hand should have a combined worth of at least Rs 250 Million.