In terms of Rules 65 of Public Procurement Rules, 2026 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
National Bank of Pakistan (Engineering Division), SVP/ Wing Head Office
Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi
+92-213-890-3028
qadir.khan@nbp.com.pk
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency: National Bank of Pakistan (Engineering Division) The subject of procurement is: Major Renovation of 5th Floor (Right Side) - ITG Block, NBP H.O Karachi Expected commencement date: Thursday, December 31, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency: 2026-27 Name and identification number of the Contract: P163569 |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Tuesday, November 17, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on National Bank of Pakistan (Engineering Division) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2 |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 360 Days |
| 14. |
17.1 |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Pay Order, Bank Guarantee |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Friday, November 20, 2026 11:00 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Friday Date: November 20, 2026 Time : 11:30 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 5.00%. The Performance Guarantee shall be acceptable in the form of: Bank Guarantee |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
All Active Taxpayers shall be eligible to participate in the procurement process, unless expressly excluded or otherwise restricted under the Eligibility Criteria specified by the Procuring Agency.
| Required Registration |
|---|
| NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| The bidder should have an active status on FBR Active Taxpayer List and with Provincial Revenue Board. | Yes |
| Valid registration in Pakistan Engineering Council in financial category C-5 or above with Specialization Code CE-10 & EE-04 on bidding date. | Yes |
| An Undertaking/Affidavit by the bidder that he has not been blacklisted and hence debarred due to involvement in corrupt and fraudulent practices, or performance failure or due to breach of bid securing declaration by any Organization/ Department / Institution in the past, on E Stamp Paper.of Rs. 500/- | Yes |
| Sindh Revenue Board (SRB) Tax (or relevant province/federal Board registration Certificate) | Yes |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| ITB for renovation 5th floor NBP HO Karachi | Address: NBP Head Office Building, 5TH Floor (Right Side), ITG BlockI.I Chundrigar Road Karachi Schedule: 365 Days Quantity: 01/job |
1/job | 1735020 PKR |
Yes
| Job | Related Services |
|---|---|
| ITB for renovation 5th floor NBP HO Karachi | delivery & transportation at site |
Jobs Without Lots :
Job: ITB for renovation 5th floor NBP HO Karachi
Specifications / Requirements:
| Sr. No | Ref | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|---|
| 1 | CIVIL WORKS | |||||
| 2 | 1 | DISMANTLING / DISPOSAL AND SHIFTING | ||||
| 3 | a) Dismantling / removing of existing constructed structures with all necessary precautionary measures, including but not limited to block masonry, RCC slab, dado/ floor tiles, wooden/ glass door, furniture, wooden/aluminum windows and doors, work stations, wooden cabinets, wooden partition, door / tiles, Gypsum / wooden/ dampa false ceiling, AC / Electrical / Plumbing fittings /fixtures or any other items which are required to be demolished / dismantled /removed but not mentioned in BOQ; complete in all respects; including labor, tools, equipment etc. b) Shifting and stacking of all necessary dismantled / demolished / removed material / fixtures / fittings, Work stations etc. or official documents as per Serial (a) above; to designated location within or outside the existing premises of work in Karachi as per the discretion of the Project Manager/ Bank Engineer with all necessary precautionary measures, including transportation, labor, equipment and loading / unloading, complete in all respects. c) Disposal of surplus unused/unwanted/broken stuff, material, garbage, debris etc. from the site, complete in all respects; and throwing the same outside the Municipal Limits as per the discretion and instructions of the Project Manager/ Bank Engineer including transportation, labor, equipment and loading / unloading, complete in all respects. | Job | 1 | 300000 | 300000 | |
| 4 | 2 | BLOCK MASONRY | ||||
| 5 | a | Providing and laying 4",6" thick block masonry wall set in (1:3) cement sand mortar including lifting, scaffolding, curing etc…. | Cft | 300 | 300 | 90000 |
| 6 | 3 | SURFACE RENDERING. | ||||
| 7 | a. | P/L 1/2" thick cement sand plaster 1:4 to walls making edges and corners, preparation of surface before plastering, finishing scaffolding, curing etc., complete in all respect and as directed by the Consultant. | Sft | 2000 | 100 | 200000 |
| 8 | b | providing and applying water proofing comprising of 2 cost of expan brush (Acrylic polymer modified protect and decorative coating for concrete and masonry) on existing cleaned, wall & slab and then applying new cement sand plaster 1:4 mixed with Expaplast WP 100 @ 1 Kg of Expaplast WP 100 per Bag of cement, including cost of hacking of existing plaster complete in all respects. | Sft | 2000 | 100 | 200000 |
| 9 | c | PCC FLOORING | ||||
| 10 | P/L Plain Cement Concrete under floors in 2" to 3" th in required penels 1:3:6 retio including leveling compecting,curing etc. (also includes trowel finish under carpet/under Wooden Floor). | Sft | 3000 | 100 | 300000 | |
| 11 | 4 | REINFORCMENT CEMENT CONCRETE | ||||
| 12 | a. | P/L 3" thick 1:2:4 cement concrete 1/2" Dia Deform steel bar c/c spacing 6" both way, alternate double steel.Area including form work, curing hacking chipping of existing surface for bonding where …. | ||||
| 13 | i) | Walls,Vanity Slab | Rft | 60 | 650 | 39000 |
| 14 | 5 | PORCELAIN TILE. | ||||
| 15 | a. | P/L Floor tiles 1200mm x 600mm White Horse/ Malaysian approved imported porcelain tile flooring of desired color and shade over existing flooring using dry bond mortar, including joint filling with approved matching color chemical, cutting tiles where required etc., complete in all respect. | Sft | 5700 | 750 | 4275000 |
| 16 | c | P/L Oxidized Floor tiles 600mm x 300mm approved imported porcelain tile flooring of desired color and shade over existing flooring using dry bond mortar, including joint filling with approved matching color chemical, cutting tiles where required etc., complete in all respect. | Sft. | 1950 | 750 | 1462500 |
| 17 | 6 | SKITRING: | ||||
| 18 | a. | Fixing of imported porcelain tile skirting White Horse/ Malaysian including labour, transportation, equipments complete in all respect | Rft | 400 | 350 | 140000 |
| 19 | b | Providing and Fixing Oxidized imported tile skirting 600mm x 600mm White Horse/ Malaysian approved color and shade using dry bond mortar, including joint filling with approved matching color chemical, cutting tiles where required etc., complete in all respect. | Rft | 350 | 350 | 122500 |
| 20 | 7 | CERAMICS TILES: | ||||
| 21 | a. | Only Fixing Ceramics / porcelain tile malaysian made glazed of size 600mm x 300mm straight and curved, approved quality on 1:2 cement sand base plaster, joint, filling with matching color grout, cutting tiles where required making holes for openings, keep joints true to plumb & line with spacers, complete in all respect as shown on drawings & as directed by the Consultant. (Toilet & Kitchen floor). | sft | 1300 | 650 | 845000 |
| 22 | 8 | GRANITE | ||||
| 23 | Providing and laying 3/4" thick factory polished approved color Black Granite/ cherry pink including special works as bull nosing, straight or curved as per single piece as shown on the drawings complete with all respect | Sft | 70 | 1800 | 126000 | |
| 24 | 9 | CARPET TILE | ||||
| 25 | Providing and laying carpet tiles of approved quality and color detailed below. | |||||
| 26 | i | Carpet Tiles. | Sft | 250 | 600 | 150000 |
| 27 | 10 | WOODEN FLOORING | ||||
| 28 | Provide and install in line & level Pre-finished Wooden Laminated Flooring, including approved quality Under layer, wood edge & groove as per drawing & detail, wastage, lifting etc., complete in all respect as per manufacturer's specifications and instructions. | Sft | 550 | 550 | 302500 | |
| 29 | 11 | WOODEN FLOORING SKIRTING: | ||||
| 30 | providing and laying wooden laminated skirting complete in all respect. | Rft | 150 | 350 | 52500 | |
| 31 | 12 | WOOD WORK. | ||||
| 32 | Note: All wood work will be applied with anti termite treatment. | |||||
| 33 | a. | Wooden Skirting | ||||
| 34 | Providing and installation 1/2" thick & 3 1/2" high first class Beech Wood lacquer polished skirling fixed with 2" long steel screws as per approved design, complete in all respect. | Rft | 500 | 250 | 125000 | |
| 35 | b | Column Cladding | ||||
| 36 | Providing & installation of wooden cladding using 1/2'' thick lassni with laying oak wood ply, making niches with laying polish etc. (as per work done at IT 4th floor Right Side) complete in all respect. | sft | 750 | 950 | 712500 | |
| 37 | c | Kitchen Cabinets | ||||
| 38 | providing and fabrication in position 2' deep counter type cabinet in kitchen laminated carcase and oak polish finish on shutters, Wood work will be lacquer polished and all fittings i.e. screws, bolts, imported Italian hinges, catchers, locks, handles and other all accessories are the part of job, anti termite treatment etc, complete in all respect. | |||||
| 39 | i | on floor (18" deep) | sft | 40 | 1800 | 72000 |
| 40 | ii | on walls (14" deep ) | sft | 40 | 1800 | 72000 |
| 41 | iii | Black Granite / cherry pink. | sft | 50 | 1800 | 90000 |
| 42 | 13 | FULL HEIGHT WOODEN PARTITION. | ||||
| 43 | a. | Providing, fabricating and fixing in position 4" thick MDF wooden partition covered with Oak ply approved design and lacqure polish best quality imported, partition consisting of partal wood frame of size 2" x 2 1/2" @ 2'C/C both ways and 1/2" thick imported MDF board including the cost of all screws, rowel bolts, nails, glue etc. All wood should be termite proof complete in all respect. ( same as per work done at IT 4th floor) | Sft | 600 | 1200 | 720000 |
| 44 | b. | Providing, fabricating and fixing in position oak ply /veneered partition to front side of wall 2-1/2" thick approved design and shade of polish over 3" thick partitions including the cost of all screws, rowel bolts, nails, glue etc. All wood should be termite proof complete in all respect (same as per work done at IT 4th floor ) | Sft | 600 | 600 | 360000 |
| 45 | c. | Providing, fabricating and fixing in position oak ply /veneered partition to both side 3" thick approved design and shade of polish over 3" thick partitions including the cost of all screws, rowel bolts, nails, glue etc. All wood should be termite proof complete in all respect (same as per work done at IT 4th floor) | Sft | 400 | 1200 | 480000 |
| 46 | d. | Wooden cabinet Full / Low Hight | ||||
| 47 | P/fixing of 16" deep wooden cabinets low and full height at any height made up of 3/4" x3/4" aok wood frame, 3/4" lasani sheet with approved colour farmica pressed shelves, leaves,sides and back including beach wood lipping as specified complete with matt finish lacquered polish and hard ware brass hing , locks etc as per entire satisfaction of Engineer. | Sft | 850 | 1500 | 1275000 | |
| 48 | 14 | GLASS WORK | ||||
| 49 | Note: All glass panels will be edges polished & installed after polish of wooden H-Section | |||||
| 50 | a. | GLASS GLAZING / PARTITION FULL HEIGHT | ||||
| 51 | I | Removing and re-fixing of existing full height glass partition and glass door along with cleaning of glass rubber packing gas kit slicone and All Fittings etc.complete in all respect | Sft | 2400 | 550 | 1320000 |
| 52 | II | Providing and fixing 12mm thick imported frosted glass partitions with 1 3/4" x 3 3/4" thick OAK wood top and bottom H Section with middle rail of oak over MDF lassani 6"x6" in lacquer polish properly fixed with wooden beam including all necessary fitting etc. complete with all respect (same as per work done at IT 4th floor) | Sft | 400 | 1800 | 720000 |
| 53 | III | Providing and fixing 12mm thick imported frosted glass partitions with 3 3/4" thick OAK wood partion made of partal wooden frame covered MDF lassani with oak ply as per design approved by Executive Engineer and middle rail of oak over MDF lassani 6"x6" in lacquer polish properly fixed with wooden beam including all necessary fitting etc. complete with all respect (same as per work done at IT 4th floor ) | Sft | 300 | 1100 | 330000 |
| 54 | b | GLASS GLAZING DOOR | ||||
| 55 | Providing and fixing 12mm thick imported clear glass door using 1 3/4" x 3 3/4" OAK wood H section with lacquer polished top and bottom frame lock SS handle and imported Floor machine, frosted paper etc. complete with all respect. | Sft | 180 | 1200 | 216000 | |
| 56 | c | GLASS DOOR | ||||
| 57 | Providing and fixing frameless door 12mm tempered glass with S.S finish door handle,D-Lock, frosted paper and floor mounted with patch fitting (Japan) as approved. Completed in all respects. | sft | 220 | 2200 | 484000 | |
| 58 | 15 | PAINT WORKS | ||||
| 59 | a) | Providing and applying Three coats of ICI deluxe/ Gobis or equivalent matt paint after scraping, sand papering, plain surface at any height, complete with all material labour, equipment scaffolding etc. as per entire satisfaction of Engineer Incharge. | Sft | 7000 | 65 | 455000 |
| 60 | b) | Providing and applying Three coats of ICI deluxe/Gobis or equivalent Distemper paint for ceiling / after scraping, sand papering, plain surface at any height, complete with all material labour, equipment scaffolding etc. As per entire satisfaction of Engineer / Engineer Incharge. | Sft | 8600 | 55 | 473000 |
| 61 | 16 | FALSE CEILING | ||||
| 62 | a | CONCEALED GYPSUM BOARD CEILING. | ||||
| 63 | Providing and fixing plain 1/2" thick Gypsum board false ceiling (same as per work done at IT 4th floor Right Side) with suspension system as per manufacturer's specifications including three coats of matt finish paint cost of tapes, filling of joints as per drawings and instruction of the Consultant complete in all respects. | Sft | 3800 | 650 | 2470000 | |
| 64 | b | GYPSUM CEILING (2'-00X2'-00) | ||||
| 65 | Providing and fixing plain 1/2" thick Gypsum board false ceiling size (2'-00x2'-00) with aluminum refter highing system with black groove including cost of labor, material as per drawings and instruction of the Executive Engineer complete in all respects. . | Sft | 800 | 250 | 200000 | |
| 66 | c | WOODEN STRIPS CEILING | ||||
| 67 | Providing & fixing partal wood strips wooden ceiling using 2'' x 4'' solid partal wood with laying polish finish with Gypsum sheet use in base finish with paint etc. complete in all respect. In Entrance lobby | Sft | 1100 | 700 | 770000 | |
| 68 | d | WOODEN RAFTER CEILING | ||||
| 69 | Providing & fixing wooden rafter in 1/2'' thick lassani & laying oak wood ply 4'' x 6'' with laying polish finish etc. complete in all respect. In Entrance lobby | Sft | 600 | 700 | 420000 | |
| 70 | e | WOODEN CEILING | ||||
| 71 | P/F of wooden false ceiling made of partal wooden frame 2"x1-1/2" with MDF lassani sheet covered with oak ply best quality approved design including best quality lacquare polish etc. Complete in all respect. | Sft | 851 | 900 | 765900 | |
| 72 | f | BULK HEAD | ||||
| 73 | Providing and making bulkhead using 2" x 2" partal wooden frame @ 2' c/c horizontal and vertical with 3/4" thick imported MDF complete in all respect. | Sft | 700 | 600 | 420000 | |
| 74 | 17 | WOODEN DOORS. | ||||
| 75 | a | VENEER FINISH FLUSH DOORS WITH GLASS SLIT: | ||||
| 76 | P/F 1-1/2" thick solid core lacquered polish Teak veneer finish flush doors with first class solid Beech wood door frames lipping on all sides of the door shutters, approved design architrave all-around the frame, heavy duty SS fittings, high quality hinges, Door Locks holdfasts, door stopper etc, complete in all respects as per drawing. | Sft | 200 | 1800 | 360000 | |
| 77 | b | FORMICA FINISH FLUSH DOORS | ||||
| 78 | providing and fixing 1 1/2" thick wooden flush door with Door Frame (Red Merandi) solid core face High quality hinges, Toilet Door Locks, holdfast door stopper etc, complete in all respect as per drawings & as approved by the consultant. | Sft | 200 | 900 | 180000 | |
| 79 | 18 | WOODEN WORK STATIONS | ||||
| 80 | i | STAFF / OFFICERS LINEAR WORK STATIONS WITH DRAWER UNIT: SIZE 4'-0"X2'-0"x2'-6"H: laminated Tactile sheet # 4024 (alnoor) pressed over partical MDF / Best quality chipboard finished colour same as use in Staff College FTC Building or as per approved color & design, extruded powder coated aluminum partition frame or wooden frame of same material having glass or top finished material partition of Tactile Sheet #4024 (alnoor) pressed over MDF, slide out keyboard extruded alongwith CPU & key board tray and equipped with cable / power management complete in all respect as per approved design, | nos | 79 | 50000 | 3950000 |
| 81 | 19 | MISC. WORK | ||||
| 82 | a | Granite. | ||||
| 83 | Providing and laying best quality pre-polished granite, including nosing / beveling / chamfering with fine edges 1:6 cement and sand bed or approved adhesive to required levels, layout and details. Include for grouting with laticrete. | Sft | 70 | 1700 | 119000 | |
| 84 | 20 | FROSTED FILM | ||||
| 85 | 3M Film (NV 25): : Provide and past approved frosted safety film over fixed glass panels including all fixing accessories and arrangements, wastage, etc. Complete in all respects and as per drawings and directions of the Consultant. | Sft | 2500 | 180 | 450000 | |
| 86 | 21 | ROLLER BLINDS. | ||||
| 87 | Providing and fixing of Roller fabric blinds of approved shade and color with aluminum rail complete in all respect. | Sft | 800 | 550 | 440000 | |
| 88 | 22 | ALUMINUM WINDOWS | ||||
| 89 | Reparing of existing aluminum windows Including all material, rubber gasket, locking system, replacing new broken glass where required, handles etc. complete in all respects and as directed by Engineer Incharge | Sft | 800 | 2600 | 2080000 | |
| 90 | 23 | DOOR LOCKS | ||||
| 91 | Providing and installation of imported best quality door locks as approved by Inchare Engineer | Each | 10 | 6500 | 65000 | |
| 92 | 24 | DOOR CLOSER. | ||||
| 93 | Providing and fixing imported best quality door closer as approved by Consultant Base | Each | 10 | 8000 | 80000 | |
| 94 | 25 | TERMITE PROOFING | ||||
| 95 | Providing, mixing, carrying out and spraying of Termite proof chemicals of approved vendor (preferably BIFLEX or approved) as per instruction / specifications / advise of the manufacturer / principals. The work shall be carried out by an approved sub-contractor who will provide 10-years warranty stating that in case of infestation during the period of warranty, he will carry out the remedial work without extra charges to the Employer complete in all respects and as directed by the consultant / Engineer Incharge. | Sft | 8000 | 12 | 96000 | |
| 96 | 26 | BEACH WOOD CORNICE | ||||
| 97 | a. | P/F of wooden cornice 3" high 1/2" thick best quality imported including lacqure polish etc. Complete in all respect. | Rft | 600 | 300 | 180000 |
| 98 | b. | Providing, making and fixing of suspended pentagon-shaped wooden frame for decorative lighting, fabricated from good-quality wooden/MDF material and finished with approved laminated tactile sheet, including provision for concealed LED light fittings along the inner perimeter, necessary suspension rods/wires, brackets, supports, joints, cutting, edge finishing, fixing, alignment, and complete installation with all required materials, labour, tools and accessories, as directed by the Engineer/In-Charge. Reference: The design, shape, finish and lighting arrangement shall be as per the existing newly renovated 1st Floor. Contractor shall visit the site for proper measurement and reference before execution. | Nos | 80 | 20000 | 1600000 |
| 99 | c. | Providing, making and fixing of suspended linear wooden frame for decorative lighting, fabricated from good-quality MDF/wooden board and finished with approved laminated tactile sheet, including provision for concealed LED light/profile along the frame, complete with internal supports, suspension rods/wires, brackets, joints, cutting, edge finishing, fixing, alignment, and all necessary materials, labour, tools and equipment, complete in all respects as directed by the Engineer/In-Charge. Reference: Design, dimensions, laminate/tactile sheet finish and lighting arrangement shall be as per the existing installation at the newly renovated 1st Floor. Contractor shall visit the site for proper measurement and reference before execution. | Nos | 90 | 10000 | 900000 |
| 100 | d. | Providing and fixing of 1 1/2" x 2'-4" thcik decorative stone, complete in all respect.(same as per work done at 4th floor IT Right Side) | Sft | 200 | 250 | 50000 |
| 101 | PLUMBING WORKS | |||||
| 102 | 1 | SOIL WASTE AND WATER SUPPLY | ||||
| 103 | Providing , fixing, jointing and testing AGM pipe of approved equivalent pressure pipe, for floor and wall sewerage and water supply arrangement including valve fitting, vertical pipes and connection to vertical line, waste jali, floor trap etc. excluding fittings and fixtures, complete pipe work as approved by the Incharge Engineer. | |||||
| 104 | a) | Toilet | Job | 9 | 35000 | 315000 |
| 105 | b) | Kitchen | Job | 1 | 30000 | 30000 |
| 106 | 2 | TOILET FITTINGS & FIXTURES | ||||
| 107 | a) | Water Closet | ||||
| 108 | P/f European type water closet (Porta HD-9A B-D-N) or equivalent with seat cover/Flush tank of approved color with integral trap in vitreous imported quality. complete in all respect | Nos. | 4 | 45000 | 180000 | |
| 109 | b) | Orissa Pattern WC | ||||
| 110 | Providing and fixing White Orissa pattern glazed earthen ware W.C painted MS wall brackets flush tank and fittings and with nuts and bolts etc. Complete in all respect. | Nos. | 5 | 18000 | 90000 | |
| 111 | c) | Wash Basin | ||||
| 112 | P/F wash hand basin vanity Porta or equivalent approved granit eshade and design 22' x 16" white / light color including pillar cock and all fittings etc., Complete in all respect. | Nos. | 4 | 25000 | 100000 | |
| 113 | d) | Fittings | ||||
| 114 | P/F of best quality imported fittings of Master/Faisal or equivalent approved quality including installation etc. Complete in all respect. | |||||
| 115 | i) | Single bib cock | Nos. | 12 | 8000 | 96000 |
| 116 | ii) | Double bib cock | Nos. | 12 | 12000 | 144000 |
| 117 | iii) | T- Stop Cock | Nos. | 25 | 5500 | 137500 |
| 118 | 3 | TOILET ACCESSORIES | ||||
| 119 | a) | Water Mixer | ||||
| 120 | P/F 15 mm dia C.P. fitting single lever of water mixer make "Master" C.P. pipe 15mm dia | |||||
| 121 | i) | For wash basin / Vanity. | Nos. | 4 | 30000 | 120000 |
| 122 | ii) | For Kitchen Sink. | Nos. | 1 | 16000 | 16000 |
| 123 | b) | Muslim Shower | ||||
| 124 | S.S. double bibcock with original Master Muslim shower. | Nos. | 5 | 9000 | 45000 | |
| 125 | c) | Soap Dish | ||||
| 126 | Providing and fixing soap dish heavy duty S.S finish master or equivalent complete in all respect. | Nos. | 3 | 4500 | 13500 | |
| 127 | d) | Toilet Paper Holder | ||||
| 128 | Providing and fixing toilet paper holder best quality Master make or as approved by the Incharge Engineer | Nos. | 3 | 5000 | 15000 | |
| 129 | e) | Towel Rail | ||||
| 130 | Providing and fixing 5mm looking glass with beveled edges of first quality Belgium made or equivalent approved make fixed with SS clips etc.complete in all respect | Nos. | 3 | 5500 | 16500 | |
| 131 | f) | Hand Dryer | ||||
| 132 | Providing and Fixing of best quality Hand Dryer Siemens make or equivalent. | Nos. | 2 | 20000 | 40000 | |
| 133 | g) | Mirror | ||||
| 134 | Providing and fixing 5mm looking glass with beveled edges of first quality Belgium made or equivalent approved. | Sft | 60 | 800 | 48000 | |
| 135 | 4 | KITCHEN SINK | ||||
| 136 | P/F stainless steel kitchen sink of specified size best quality Porta ( HDSC8728) or equivalent as approved by the Engineer incharge | Nos. | 2 | 20000 | 40000 | |
| 137 | 5 | A/C DRAIN LINE | ||||
| 138 | a) | Providing and fixing UPVC drain pipe 1.5" dia for A.c drain including all necessary fitting in wall complete in all respect. | Rft | 500 | 350 | 175000 |
| 139 | b) | Providing and fixing upvc drain pipe 1.0" dia for A.c drain including all necessary fitting in wall complete in all respect. | Rft | 500 | 300 | 150000 |
| 140 | HVAC INFRASTUCTURE WORKS | |||||
| 141 | 1 | Copper Piping of Floor Standing units of 4ton Capacity with all relevant accessories i.e. Electrical Control wire 110/76 3 core (Pakistan Cable, Pioneer cable or equivalent), Aero flax Insulation, Pipe size 22 Gauge (Muller USA or equilent) Pipe dia 3/8 x 5/8 and after verification of engineer etc. Payment will be made on actual measurement of piping and accessories | Rft | 280 | 1800 | 504000 |
| 142 | 2 | Copper Piping of Split AC units of 1, 1.5, 2 ton Capacity with all relevant accessories i.e. Electrical Control wire 110/76 3 core (Pakistan Cable, Pioneer cable or equivalent), Aero flax Insulation, Pipe size 22 Gauge (Muller USA or equivalent) Pipe dia 1/2 X 1/4 and after verification of engineer, etc. Payment will be made on actual measurement of piping and accessories | Rft | 138 | 1500 | 207000 |
| 143 | 3 | Providing and Fixing of Angle iron Bracket for Outdoor units with all accessories in all respect. | Sets | 18 | 1550 | 27900 |
| 144 | ELECTRICAL WORKS | |||||
| 145 | 1 | ELECTRICAL WIRING | ||||
| 146 | Supply, laying, connection and testing of following wiring types; in heavy duty PVC Conduit recessed in walls, columns, slabs, floors or fixed at Ceiling above false ceiling or in Dura duct if exposed on walls or in tray, with all necessary fixing accessories, conduit/duct accessories, pull boxes, steel pull wires complete in all respects, required as per site conditions. with make/brand of material being specified in Annexure A. (PVC insulated Copper - 300/500 Volt Grade Wires to be used) | |||||
| 147 | a) | Circuit Wiring (For Switchboard/Light Plug etc.) | ||||
| 148 | From DB to Switch Board or 2/3 pin Light Plug (5/10/13A) to be wired with 2x2.5 sq.mm S/C wires and 1 X 2.5 sq.mm S/C wire of Green/Yellow Colour as Circuit Protective Conductor (CPC) in 25 mm dia. heavy duty PVC conduit Each circuit shall have independent CPC. Maximum wiring of 3 light circuits can be pulled through 25 mm dia. PVC conduit. | Nos. | 20 | 9000 | 180000 | |
| 149 | b) | Switch Board to Switch Board OR Switch Board to Light plug etc. Circuit Wiring | ||||
| 150 | Same as above item No. 1(a) but from point to point i.e. Switchboard to Switchboard/Light Plug or Light Plug to Light Plug. (Side by Side or Back to Back Wiring points will not be payable and will be considered to be included in item No. 1(a). | Nos. | 35 | 4500 | 157500 | |
| 151 | c) | Point Wiring (Light/Fan etc.) | ||||
| 152 | From Switchboard to 1st Point (Light/Fan) with 1 x 1.5 sq.mm S/C wire from Piano Switch and 1 x 2.5 sq.mm wire common neutral including i/c P/F 10A Piano Switch in 20 mm dia. heavy duty PVC conduit/flexible pipe, recessed in walls, columns, slabs, floors or fixed at Ceiling above false ceiling with all necessary fixing accessories, conduit accessories, ceiling roses, 75 mm high PVC junction boxes, pull boxes, steel pull wires, connectors, M.S. sheet steel switch box 16 SWG with earth terminal with 2 coats of powder coating of orange colour, M.S. box shall be of the same size as that of 1, 2 or 3 upto 6 gangs flush type plate switches complete in all respects, required as per site conditions. (In case of point wiring at Ceiling, 2 X 1.5 sq.mm wires in Flexible Conduit from junction box equipped with PVC gland to light/fan fixture, will also have to be provided). Maximum wiring of 6 points (light/fan) can be pulled through 20 mm dia. PVC conduit. (The rates should be inclusive of wiring to be connected to Hanging Pendant Lights or any other Hanging Lights with interconnection between the Lights on same Wooden Frame). All PVC Conduits/Flexible Pipes etc. must be properly colored as per industrial ceiling color. | Nos. | 75 | 3500 | 262500 | |
| 153 | d) | Point to Point Wiring (Light/Fan etc.) | ||||
| 154 | Same as item No. 1(c) above but from Point to Point and without including cost of Switch and M.S. sheet steel switch box 16 SWG. | Nos. | 235 | 1500 | 352500 | |
| 155 | e) | Wiring Circuit for 1 x 10/13 A Simplex/Duplex - Switch Socket Outlet (SSO) installed at Wall/Workstation/Floor Box etc. or any other purpose. | ||||
| 156 | i) | From DB to 1st SSO (fixed on walls/tables/workstations etc.) with 2 x 2.5 sq.mm S/C wire + 1 x 2.5 sq.mm S/C wire of Green/Yellow Colour as Circuit Protective Conductor (CPC) in 25 mm dia. heavy duty PVC conduit, recessed in walls, columns, slabs, floors or fixed at Ceiling above false ceiling with all necessary fixing accessories, conduit accessories, pull boxes, steel pull wires complete in all respects, required as per site conditions. Each circuit shall have independent CPC. | Nos. | 50 | 9000 | 450000 |
| 157 | ii) | Same as item No. 1(e) (i) above, but from Point to Point I.e. 1st SSO to 2nd SSO and onwards. (Side by Side or Back to Back Wiring points will not be payable and will be considered to be included in item No. 1(e) (i) (Maximum of 07 SSO - Simplex/Duplex, can be connected with 1st SSO). | Nos. | 150 | 1600 | 240000 |
| 158 | f) | Wiring Circuit for 1 x 20 A Switch Socket Outlet (SSO) for AC connection or any other purpose | ||||
| 159 | From DB to SSO with 2 x 4.0 sq.mm S/C wire + 1 x 2.5 sq.mm S/C wire of Green/Yellow Colour as Circuit Protective Conductor (CPC) in 25 mm dia. heavy duty PVC conduit, recessed in walls, columns, slabs, floors or fixed at Ceiling above false ceiling with all necessary fixing accessories, conduit accessories, pull boxes, steel pull wires complete in all respects, required as per site conditions. Each circuit shall have independent CPC. (Maximum wiring of 2 circuits can be pulled through 25 mm dia. PVC conduit). | Nos. | 28 | 15000 | 420000 | |
| 160 | g) | Wiring Circuit for 03 Phase - 04 Ton AC connection or any other purpose | ||||
| 161 | From DB to AC etc. with 1 X 4 sq.mm 4/C PVC/PVC insulated Cable + 1 x 2.5 sq.mm S/C wire of Green/Yellow Colour as Circuit Protective Conductor (CPC) in 25 mm dia. heavy duty PVC conduit, recessed in walls, columns, slabs, floors or fixed at Ceiling above false ceiling with all necessary fixing accessories, conduit accessories, pull boxes, steel pull wires complete in all respects, required as per site conditions. Each circuit shall have independent CPC. (Maximum wiring of 1 circuit can be pulled through 25 mm dia. PVC conduit). | Nos. | 8 | 30000 | 240000 | |
| 162 | 2 | DATA / VOICE / CCTV / BIOMETRIC / HDMI WIRING/CABLING | ||||
| 163 | Supply, laying, connection and testing of following wiring types; with make/brand of material being specified in Annexure A. | |||||
| 164 | a) | Lan/Data Cabling | ||||
| 165 | Wiring for each Data point from Communication Rack (Patch Panel) to each Data point on wall or in M.S floor outlet box with 4 pair Cat. 6E 23 AWG cable in 20 mm dia. heavy duty PVC conduit recessed in walls, columns, slabs, floors or above false ceiling with all necessary fixing accessories and flute testing report as required as per site condition, complete in all respects. | Nos. | 140 | 9000 | 1260000 | |
| 166 | b) | Telephone/Voice Cabling | ||||
| 167 | Wiring for each Voice point from Telephone Junction Box to each telephone point on wall or in M.S floor outlet box or in Data Cabinet/Communication (Wall mounted or Floor Standing) with 4 pair Cat. 6E 23 AWG cable in 20 mm dia. heavy duty PVC conduit recessed in walls, columns, slabs, floors or above false ceiling with all necessary fixing accessories as required as per site condition, complete in all respects | Nos. | 140 | 9000 | 1260000 | |
| 168 | c) | CCTV Cabling | ||||
| 169 | Wiring for CCTV points from CCTV Switch to each CCTV point on wall or on Ceiling with 4 Pair Cat 6E cable in PVC Conduit 25mm dia. recessed in walls, columns, slabs, floors or above false ceiling with all condition, complete in all respects as per site requirement | Nos. | 20 | 7000 | 140000 | |
| 170 | d) | Biometric Cabling | ||||
| 171 | Wiring for each Voice point from Telephone Junction Box to each telephone point on wall or in M.S floor outlet box or in Data Cabinet/Communication (Wall mounted or Floor Standing) with 4 pair Cat. 6E 23 AWG cable in 20 mm dia. heavy duty PVC conduit recessed in walls, columns, slabs, floors or above false ceiling with all necessary fixing accessories as required as per site condition, complete in all respects | Nos. | 4 | 6000 | 24000 | |
| 172 | e) | HDMI Cabling | ||||
| 173 | Wiring for Projector/TV wired with HDMI Cable - 4K complete with connectors (both ends) in 1.5" dia. Heavy duty PVC conduit, recessed in walls, floors, column or as required as per site conditions, all PVC Conduit accessories, pull boxes, steel wires etc. complete in all respects of following lengths. | |||||
| 174 | i) | 15 Mr | Nos. | 5 | 32000 | 160000 |
| 175 | ii) | 20 Mtr | Nos. | 10 | 40000 | 400000 |
| 176 | 3 | MAIN / SUB MAIN CABLES | ||||
| 177 | P/L, connection, testing and commissioning of PVC insulated PVC sheathed non armored copper conductor power cable 600 / 1000 Volt grade manufactured by any one of the manufacturers as mentioned in Annexure A. The cable would be recessed in walls, columns, slabs, floors or fixed at Ceiling above false ceiling with all necessary fixing accessories either in already laid PVC Conduit/Dura duct or otherwise openly laid complete in all respects, required as per site conditions. and approval of Engineer Incharge including cost of all necessary materials, connections of cables and identification tags at both ends, cables lugs properly crimped at both ends for the following sizes. Actual length of cables to be laid shall be practically measured at site by the Contractor, duly authenticated by the Electrical Engineer / Engineer Incharge / Supervisor before placing the order with the manufacturer, however, approximate length of cables are shown herewith. Payments shall be made as per actual length laid. | |||||
| 178 | a) | 4 Core 6 sq.mm | Rft. | 100 | 1100 | 110000 |
| 179 | b) | 4 Core 10 sq.mm | Rft. | 50 | 1600 | 80000 |
| 180 | c) | 4 Core 16 sq.mm | Rft. | 50 | 2000 | 100000 |
| 181 | d) | 4 Core 25 sq.mm | Rft. | 50 | 3500 | 175000 |
| 182 | e) | 4 Core 35 sq.mm | Rft. | 50 | 4500 | 225000 |
| 183 | f) | 1 Core 6 sq.mm Green/Yellow Color as CPC | Rft. | 200 | 200 | 40000 |
| 184 | g) | 1 Core 10 sq.mm Green/Yellow Color as CPC | Rft. | 100 | 350 | 35000 |
| 185 | 4 | ELECTRICAL FITTINGS, FIXTURES & ACCESSORIES | ||||
| 186 | Supply, Installation, testing and commissioning of following fittings/fixtures as per specified brand/make given in Annexure "A" recessed in or on wall / ceiling / column / Workstation / wooden Frame etc. complete in all respects, duly approved by Engineer Incharge prior to installation. | |||||
| 187 | a) | Light Fixtures | ||||
| 188 | (The temperature / Colour Index to be got confirmed from Site Engineer before installation | |||||
| 189 | i) | T5 LED Light - 4FT (18/20W) | Nos. | 75 | 2000 | 150000 |
| 190 | ii) | T5 LED Light - 2FT (12/14W) | Nos. | 175 | 1600 | 280000 |
| 191 | iii) | Down Light COB 3" /7W | Nos. | 500 | 1200 | 600000 |
| 192 | iv) | Down Light COB 4" /12W | Nos. | 100 | 1500 | 150000 |
| 193 | v) | Surface Mounted Panel Light 8"/20W | Nos. | 15 | 1200 | 18000 |
| 194 | vi) | Rope Light | Rft. | 200 | 185 | 37000 |
| 195 | vii) | Niche COB Light 1"/3W | Nos. | 15 | 500 | 7500 |
| 196 | b) | Fans | ||||
| 197 | i) | Ceiling Mounted Exhaust Fan 8" sweep, Plastic body, louvre type. | Nos. | 5 | 7000 | 35000 |
| 198 | ii) | Wall Mounted Exhaust Fan 10" sweep, Metalc body, louvre type. | Nos. | 3 | 8500 | 25500 |
| 199 | c) | Switch Socket Outlets / Industrial Sockets | ||||
| 200 | Following SSO complete with back box i.e. M.S. box, made of 16 SWG sheet steel with earth terminal having 2 coats of powder coating of orange colour, M.S. box shall be of the same size as that of SSO. | |||||
| 201 | i) | 10/13 A - 3 Pin Multi type SSO (for General Use) | Nos. | 20 | 1700 | 34000 |
| 202 | ii) | Same as above item (i) but 20A Power Plug SSO (for ACs) | Nos. | 26 | 2500 | 65000 |
| 203 | iii) | 13A Duplex SSO - 3 Pin Flat type / Universal type (for UPS Power) | Nos. | 120 | 2800 | 336000 |
| 204 | iv) | Same as above item (iii) but Simplex SSO (for Normal Power) | Nos. | 120 | 1600 | 192000 |
| 205 | V) | Supply, fixing and connection of 3P - 32 A Industrial Plug Sockets (IEC-60309(309) complete in all respects | Nos. | 4 | 8000 | 32000 |
| 206 | d) | Circuit Breakers | ||||
| 207 | Providing, installation, testing and commissioning of following Circuit Breakers as per brands/makes specified in Annexure "A" in already installed or to be installed DBs with rail mountings, proper connections and tagging, complete in all respects, as per Site requirements and prior approval of Bank's Engineer Incharge. | |||||
| 208 | i) | Miniature Circuit Breakers (MCBs) Rail Type, C Type | ||||
| 209 | i.1 | 6/10/16/20/32 A - SP (RC- 6KA) | Nos. | 72 | 1600 | 115200 |
| 210 | i.2 | 16/32 A - DP (RC-10 KA) | Nos. | 8 | 3200 | 25600 |
| 211 | i.3 | 20/32 A - TP (RC-10 KA) | Nos. | 9 | 12000 | 108000 |
| 212 | ii) | Moulded Case Circuit Breakers (MCCBs)TP, C Type, RC - 10 to 18 KA | ||||
| 213 | ii.1 | 75/100 A - 3P | Nos. | 6 | 21500 | 129000 |
| 214 | e) | Automatic Transfer Switch | ||||
| 215 | Providing, installation, testing and commissioning of 63 A - 2P ATS - Rail Type as per brands/makes specified in Annexure "A" in already installed or to be installed DB, proper connections and tagging, complete in all respects, as per Site requirements and prior approval of Bank's Engineer Incharge. | Nos. | 1 | 20000 | 20000 | |
| 216 | 5 | IT/TELEPHONE FITTINGS, FIXTURES & ACCESSORIES | ||||
| 217 | a) | Face Plates with I/Os | ||||
| 218 | Following Face Plates white/off white finish, complete with shuttered Click-ins, labels and all accessories including back box i.e. M.S. box, made of 16 SWG sheet steel having 2 coats of powder coating of orange colour. M.S. box shall be of the same size as that of Face Plate. | |||||
| 219 | i) | Simplex Face Plate with 1 x RJ45 I/O | Nos. | 120 | 1800 | 216000 |
| 220 | ii) | Simplex Face Plate with 1 x RJ11 I/O | Nos. | 120 | 1300 | 156000 |
| 221 | iii) | Duplex Face Plate with 2 X Rj45 I/Os | Nos. | 10 | 3000 | 30000 |
| 222 | iv) | Duplex Face Plate with 2 X Rj11 I/Os | Nos. | 10 | 1700 | 17000 |
| 223 | v) | Quadruplex Face Plate with 4 X Rj11 I/Os | Nos. | 5 | 2200 | 11000 |
| 224 | b) | Supply of Patch / Drop Cords | ||||
| 225 | Factory tested (imported) Cords of Cat6 - 23 AWG Cable of following sizes | |||||
| 226 | i) | 01 meter Patch Cord | Nos. | 140 | 1200 | 168000 |
| 227 | ii) | 03 meter Drop Cord | Nos. | 140 | 1800 | 252000 |
| 228 | c) | IT Communication Rack Components | ||||
| 229 | i) | Thermostatic type Exhaust/Cooling Fans | ||||
| 230 | Supply and Installation of Thermostatic type Exhaust/Cooling Fans in existing Communication Rack, with proper connections, complete in all respects | Nos. | 4 | 2500 | 10000 | |
| 231 | ii) | PDU | ||||
| 232 | Supply of PDU with 04 x 13 A Flat Pin or International Type Switch Sockets for existing Communication Rack | Nos. | 2 | 4050 | 8100 | |
| 233 | iii) | Front Cable Manager | ||||
| 234 | Supply and Installation of Front Cable Manager in existing Communication Rack with proper labeling / tagging / harnessing. | Nos. | 6 | 7500 | 45000 | |
| 235 | iv) | Patch Panel | ||||
| 236 | Supply and Installation of 24 Port - Patch Panel (loaded with 24 I/Os) in existing Communication Rack with proper labeling / tagging / harnessing. | Nos. | 6 | 27500 | 165000 | |
| 237 | d) | CCTV Data Rack & Components | ||||
| 238 | i) | Data Rack | ||||
| 239 | Supply and Installation of 19" - Communication Rack made of M.S Frame, Glass Door, Pull Handle, supported by perforated sides / M.S Cover of size: 9U - 600 mm x 600 mm | Nos. | 1 | 20000 | 20000 | |
| 240 | ii) | Thermostatic type Exhaust/Cooling Fans | ||||
| 241 | Supply and Installation of Thermostatic type Exhaust/Cooling Fans for CCCTV Rack, with proper connections, complete in all respects | Nos. | 2 | 2500 | 5000 | |
| 242 | iii) | PDU | ||||
| 243 | Supply of PDU with 04 x 13 A Flat Pin or International Type Switch SocketsCCCTV Rack, with proper connections, complete in all respects | Nos. | 1 | 4000 | 4000 | |
| 244 | iv) | Front Cable Manager | ||||
| 245 | Supply and Installation of Front Cable Manager CCCTV Rack, with proper connections, complete in all respects with proper labeling / tagging / harnessing. | Nos. | 2 | 7000 | 14000 | |
| 246 | v) | Patch Panel | ||||
| 247 | Supply and Installation of 24 Port - Patch Panel (loaded with 24 I/Os) CCCTV Rack, with proper connections, complete in all respects with proper labeling / tagging / harnessing. | Nos. | 2 | 27500 | 55000 | |
| 248 | e) | Telephone Krone Strips | ||||
| 249 | Supply, installation and commissioning of 10 pairs Telephone KRONE STRIPS (Copper), with mounting stand, tagging/marking arrangements including cost of all necessary material to connect incoming and outgoing telephone cables,Wiring Block complete in all respect in excisisting TJB (Telephone Juncation Box). | Nos. | 120 | 1200 | 144000 | |
| 250 | 6 | CABLE CONTAINMENT | ||||
| 251 | a) | Cable Tray | ||||
| 252 | Supply and fixing of perforated GI Tray with Cover made up of 18 Gauge, complete with allied accessories, hanging brackets / supports, reducers, joints, spacers etc. on ceiling or wall as per site requirement of size: | |||||
| 253 | i) | Width: 12” x Height: 4” | Rft. | 300 | 2000 | 600000 |
| 254 | ii) | Width: 6” x Height: 4” | Rft. | 152 | 1400 | 212800 |
| 255 | b) | Floor Box | ||||
| 256 | Fabrication, supply and installation of Five (05) Outlet Floor Box i.e. M.S Box made of mild steel 16 SWG duly painted initially with Red Oxide and finally with approved Colour of appropriate size but not less than 10" x 10" x 4-1/2" deep with openable hinged cover 2.5mm thick, all necessary materials / arrangements for fixation of sockets, holes for passage of outgoing cables, rubber, gourmet, earthing terminal, and partition made of backlit. Boxes shall be installed flush with floor and should be suitable for installation of following number of Simplex SSOs or Face Plates. (The cost of SSOs or Face Plates not to be included) | Nos. | 5 | 4000 | 20000 | |
| 257 | c) | Technological Box | ||||
| 258 | Fabrication, supply and installation of Technological Box i.e. M.S Box made of M.S 16 SWG duly painted initially with Red Oxide and finally with approved Colour of appropriate size suitable for fixation of following number of Switch Socket Outlets / Face Plates etc. having holes for passage of outgoing cables, rubber, gourmet, earthing terminal, and partition made of backlit. (The cost of SSOs or Face Plates not to be included) | |||||
| 259 | i) | Four Nos. Outlets | Nos. | 5 | 3200 | 16000 |
| 260 | ii) | Same as item No. 3 (d) (ii) but for Five Outlets | Nos. | 5 | 2700 | 13500 |
| 261 | d) | Pull Box | ||||
| 262 | Fabrication, supply and installation of Pull Box i.e. M.S Box made of 16 SWG sheet having heavy duty SS Top Cover of 16 SWG Sheet of following size, complete in all respects as per site requirements. | |||||
| 263 | 300 mm x 300 mm x 62 mm | Nos. | 8 | 5000 | 40000 | |
| 264 | 7 | WIRING FOR FIRE ALARM SYSTEM | ||||
| 265 | Providing, laying & connection of Wiring with existing Fire Alarm Control Panel and associated Detectors/Call Points/Sounders, wired in 20 mm dia PVC Conduit make Beta / Galco FIRE PROOF Clipped to surface or concealed in building fabric complete in all respect as per Site requirement with 2Core - 1.5 Sq.mm PVC insulated CI Fire Resistant Cable 300/500V Grade manufactured as per CI Standard: BS 6387 (CWZ) complete in all respects, as per site requirement. | Rft. | 800 | 325 | 260000 | |
| 266 | AIR-CONDITIONERS | |||||
| 267 | 1 | Providing Split AC units 2ton Capacity, (Inverter Type) having net cooling capacity of 24000 BTU with all accessories, safety valve, EER more than or equal to 2.4 ≥ etc, having warranty of Five Years Compressor and one Year for Parts, Refrigeret Gas R-410 or R-22, in all respect including transportation and all taxes. | Nos. | 3 | 280000 | 840000 |
| 268 | 2 | Providing Split AC units 1ton Capacity, (Inverter Type) having net cooling capacity of 12000 BTU with all accessories, safety valve, EER more than or equal to 2.4 ≥ etc, having warranty of Five Years Compressor and one Year for Parts, Refrigeret Gas R-410 or R-22, in all respect including transportation and all taxes. | Nos. | 10 | 165000 | 1650000 |
| 269 | 3 | Providing Split AC units 1.5ton Capacity, (Inverter Type) having net cooling capacity of 18000 BTU with all accessories, safety valve, EER more than or equal to 2.4 ≥ etc, having warranty of Five Years Compressor and one Year for Parts, Refrigeret Gas R-410 or R-22, in all respect including transportation and all taxes. | Nos. | 10 | 180000 | 1800000 |
| 270 | 4 | Providing Floor Standing unit 4ton Capacity (Conventional Type), having net cooling capacity 48000 BTU with all accessories, safety valve, EER Greater than 3.0 or Equilent, etc, in all respect including transportation and all taxes. | Nos. | 4 | 450000 | 1800000 |
| 271 | 5 | Installation charges of Floor Standing Units 4ton Capacity as pointed out by the Engineer with all accessories in all respect. | Nos. | 2 | 8250 | 16500 |
| 272 | 6 | Installation charges of Split AC units as pointed out by the Engineer with all accessories in all respect. | Nos. | 18 | 5000 | 90000 |
| 273 | OFFICE FURNITURE | |||||
| 274 | 1 | SENIOR EXECUTIVE ROOM FURNITURE | ||||
| 275 | i) | Senior executive table size 6'x3'x2'-6" Supply of Executive table made with Oak veneered & Ash wood with oak wooden edges walnut smoke finish or equivalent approved design and also may option of worktop wrapped with leatherite and lipping lacquer polish with front paneling etc. complete in all respect as per approved & standard design TFPC or equivalent design | Each | 6 | 80000 | 480000 |
| 276 | ii) | Mobile drawer unit for Senior Executive table Mobile drawer unit of above same material & quality finish having 3 drawer unit best channel, lock, handles & lacquer polish unit etc. Complete in all respect as approved & standard design TFPC or equivalent approved design. | Each | 6 | 15000 | 90000 |
| 277 | iii) | Senior Executive Side Rack size 42"x28"x16" Supply of senior executive side rack made with Oak veneered & Ash wood with oak wooden edges walnut smoke finish and lipping or equivalent approved polish color having 2 upper shelfs / drawers on top and two openable shutter, CPU & key board tray and equipped with cable / power management with best quality channels, lock, handles, hinges and lacquer polish etc. complete in all respect as per approved & standard design of TFPC or equivalent approved design | Each | 6 | 30000 | 180000 |
| 278 | iv) | Senior Executive Credenza Supply of senior executive credenza size 6'-0"x16"x28" made with Oak veneered & Ash wood with oak wooden edges walnut smoke finish and lipping or equivalent approved polish color having four (04) openable shutter of equal size upto 3" thick base quality lock, hinges, handles and lacquer polish etc. complete in all respect as per approved & standard design of TFPC or equivalent approved design | Each | 6 | 45000 | 270000 |
| 279 | v) | Sofa Set single Seator . Supply of single seator sofa Chesterfield with arms made of upholstered with approved foam and leatherier with inner structure made of solid wood, commercial ply and legs etc. complete in all respect as per approved, standard design & size of TFPC or equivalent approved design | Each | 2 | 30000 | 60000 |
| 280 | vi) | Center Table Supply of center table made with Oak veneered & Ash wood with oak wooden edges walnut smoke finish & legs with lacquer polish or equivalent approved polish color etc. complete in all respect as per approved, standard design & size of TFPC or equivalent approved design | Each | 2 | 15000 | 30000 |
| 281 | vii) | Side Table Supply of side table made with Oak veneered & Ash wood with oak wooden edges walnut smoke finish & legs with lacquer polish etc or equivalent approved polish color complete in all respect as per approved ,standard design & size of TFPC or equivalent approved design | Each | 2 | 12000 | 24000 |
| 282 | viii) | Senior Executive High Back chairs Supply of senior Executive High Back Chair M-16 Master make / Interwood design or equivalent with arm rest, head rest, lumber & support, Fabric seat and Mesh back . Seat & back reclining with gas lift mechanism having Five spoke Nylon/steel base with Twin caster wheels as per approved design | Each | 6 | 75000 | 450000 |
| 283 | ix) | Senior executive visitor chairs Supply of senior executive visitor chairs with arm fixed with stainless steel pipe frame or wood frame, upholstered with best quality foam and leatherier polish etc.as per approved design of TFPC or equivalent approved design by DCE | Each | 10 | 20000 | 200000 |
| 284 | 2 | WAITING AREA | ||||
| 285 | i) | Sofa Set Two Seator Supply of two seator sofa Koto design or equivalent with arms made of upholstered with approved foam and leatherier with inner structure made of solid wood, commercial ply and legs etc. complete in all respect as per approved & standard design of TFPC or equivalent approved design by DCE | Each | 3 | 50000 | 150000 |
| 286 | ii) | Sofa Set Single Seator Supply of single seator sofa Koto design or equivalent with arms made of upholstered with approved foam and leatherier with inner structure made of solid wood, commercial ply and legs etc. complete in all respect as per approved & standard design of TFPC or equivalent approved design | Each | 5 | 25000 | 125000 |
| 287 | iii) | Center Table Supply of center table traditional design & size or equivalent made with Oak veneered & Ash wood with oak wooden edges walnut smoke finish or equivalent approved polish, color, design & legs with lacquer polish fine grains etc. complete in all respect as per approved & standard design of TFPC or equivalent approved design by DCE | Each | 3 | 15000 | 45000 |
| 288 | iv) | Side Table Supply of side table traditional design & size or equivalent made with Oak veneered & Ash wood with oak wooden edges walnut smoke finish or equivalent approved polish color & design legs with lacquer polish fine grains etc. complete in all respect as per approved & standard design of TFPC or equivalent approved design | Each | 2 | 12000 | 24000 |
| 289 | 6 | EXECUTIVE FURNITURE Laminated for VP | ||||
| 290 | i) | EXECUTIVE TABLE FOR VP the budget design Manger desk 5'-0"X2'-6"X2'-6" laminated formica pressed over partical MDF / Best quality chipboard Cherry finished color or equivalent approved color & design with worktop are, slide out keyboard, extruded powder coated aluminum vertical bars or wooden legs to support work top to increase durability, complete in all respect as per TFPC or equivalent approved design, | Each | 7 | 60000 | 420000 |
| 291 | ii) | Mobile drawer unit for Senior Executive table Mobile drawer unit of above same material & quality finish having 3 drawer unit best channel, lock, handles & lacquer polish unit etc. Complete in all respect as perapproved & standard design TFPC or equivalent approved design. | Each | 7 | 15000 | 105000 |
| 292 | III) | Executive Side Rack supply of side rack with same design of executive table laminated for AVP support attached with table top of same finish having CPU tray, key board tray and equipped with cable / power management with best quality channels lock handles, hinges and lacquer polish etc as per standard design of TFPC or equivalent approved design by DCE | Each | 7 | 25000 | 175000 |
| 293 | IV) | Supply of meeting table square shape or other design table made with 18+18mm thick sandwitch Chipboard with Oak wood veneer on both sides hyduralic machine press with 5mm thick Oak wooden edges finished with approved NC lacquar polish should be done with machine approved & standard design | Each | 1 | 150000 | 150000 |
| 294 | V) | Supply of High Back Chair make / Interwood design or equivalent with arm rest, head rest, lumber & support, Fabric seat and Mesh back . Seat & back reclining with gas lift mechanism having Five spoke Nylon/steel base with Twin caster wheels as per approved design | Each | 8 | 25000 | 200000 |
| 295 | VI) | EXECUTIVE /OFFICER / STAFF CHAIRS MEDIUM BACK Supply of medium back chair structure made of nylon or wood seat, & plywood back upholstered with best quality foam & fabric plus arms, revolving reclining, lift mechanism, that gives comfort with SS or nylon base & wheel castor. complete in all respect as per approved design | Each | 80 | 30000 | 2400000 |
| 296 | VII) | EXECUTIVE /OFFICER / STAFF CHAIRS HIGH BACKSupply of Officer High Back Chair Master Mesh or Equivalent with arm rest, head rest, lumber & support seat upholstered with best quality foam and Fabric having five spoke nylon base with twin caster wheel, adjustable height with hydraulic base. Complete in all respects as per specifications.as per approve design. | Each | 8 | 30000 | 240000 |
| 297 | VIII) | RECEPTION COUNTER laminated farmica pressed over partical MDF / Best quality chipboard Cherry finished colour or as per approved color with worktop area, i/c key board , extruded powder coated aluminum partition / channel frame in curved or straight shape or or farmica pressed over partical MDF / wood fixed with worktop area of stylish design as per approved design of TFPC or equivalent approved design. | Each | 1 | 50000 | 50000 |
| GRAND TOTAL: | Rs 57,834,000.00 |
Major renovation work for 5th floor NBP HO Karachi
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
Number of GC Clause
Amendments of, and Supplements to, Clauses in the General Conditions of Contract
Number of GC Clause 1
Definitions
The Procuring Agency is: National Bank of Pakistan (Engineering Division), SVP/ Wing Head Office Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi
The Supplier is:
The title of the subject procurement is: Major Renovation of 5th Floor (Right Side) - ITG Block, NBP H.O Karachi
Number of GC Clause 2
Applicable/Governing Law:
The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan
Number of GC Clause 3
Language:
The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English.
Number of GC Clause 4
Notices:
The addresses for the notices are:
Procuring Agency:
National Bank of Pakistan (Engineering Division), SVP/ Wing Head Office
Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi
+92-213-890-3028
qadir.khan@nbp.com.pk
Contractor/ Bidder:
[Name, address and telephone number]
The Contractor/ Bidder’s Representative(s)
[Name, address, telephone number and e-mail address]
Number of GC Clause 6.1
The Authorized Representatives are:
For the Procuring Agency:
National Bank of Pakistan (Engineering Division), SVP/ Wing Head Office
Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi
+92-213-890-3028
qadir.khan@nbp.com.pk
For the Bidder:
Name: ………………………………………
Designation: ……………………..
Address: …………………………………………..
Number of GC Clause 7
Effectiveness of the contract
The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties
Number of GC Clause 8
Commencement of Contract:
The Contractor/Bidder shall provide Non-Consultancy Services from the effective date of contract.
Number of GC Clause 10.2
Expiration of Contract:
The time period shall be ……………………………
Number of GC Clause 14
Termination
In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements.
Number of GC Clause 16
Conflict of Interest:
The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17.
Number of GC Clause 20
Liquidated Damages
If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.10% to 10.00% of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority.
Number of GC Clause 21
Performance Guarantee:
The amount of performance guarantee shall be 5.00% of the contract price in acceptable form of Bank Guarantee
Number of GC Clause 27
Currency of Payment:
All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees.
Number of GC Clause 28
Payment terms:
Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract.
Number of GC Clause 29
Identifying Defects:
The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided.
For being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier)
For the Country of Origin as quoted by the Supplier (Certificate from manufacturer)
For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team)
Copies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount;
Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods;
Insurance Certificate;
Manufacturer’s or Supplier’s Valid Warranty Certificate;
Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report;
Certificate of Origin.
The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock
Number of GC Clause 31
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract.
Rules of procedure for arbitration proceedings:
Any dispute between the Authority and a Bidder shall be referred to arbitration under the laws of Pakistan including Arbitration Act 1940.
Place of Arbitration and Award:
The arbitration shall be conducted in English language and place shall be Islamabad. The award shall be final and binding.
Date: [insert date (as day, month and year)]
Bid No.:P163569
To: National Bank of Pakistan (Engineering Division), SVP/ Wing Head Office Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
THIS AGREEMENT made the _____ day of __________ 20_____ between National Bank of Pakistan (Engineering Division), SVP/ Wing Head Office Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi
(hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Major Renovation of 5th Floor (Right Side) - ITG Block, NBP H.O Karachi (P163569) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1. In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2. The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3. In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4. The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Witness to the signatures of the Bidder: …………………………………………………
Contract Number: Contract Value: Contract Title:
Dated:
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
To: National Bank of Pakistan (Engineering Division), SVP/ Wing Head Office Departmental Head-Tender, Procurement Division-LCMG, 3rd floor, NBP Head Office Building, I.I Chundrigar Road Karachi
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
AND WHEREAS we have agreed to give the Bidders guarantee:
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
This guarantee is valid until the: [insert date]
Signature and seal of the Guarantors
_____________________________________________________________________
[name of bank or financial institution]
_____________________________________________________________________
[address]
_____________________________________________________________________
[date}
| Experience under construction contracts in the role of prime contractor for at least the last 03 years, starting from 1st May 2023 |
| As per PPRA Format |
| As per PPRA Format |
| Three ( 03) number of similar contracts that have been satisfactorily completed as a prime contractor during last 03 years of at least 2.5 (M) |
| Non-performance of a contract did not occur as a result of contractor default since [ 3 years]. Bidder’s financial position and prospective long term profitability sound according to criteria established in 3.1 below and assuming that all pending litigation will be resolved against the Bidder No consistent history of court/arbitral award decisions against the Bidder since 1st May [2023] |
| Bidder Must Provide copies of Work Orders & Agreement of ongoing projects & current status certificate from awarding authority. |
| (i) The Bidder shall demonstrate that it has access to, or has available, liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the construction cash flow requirements estimated as PKR 25.0 (M)for the subject contract(s) net of the Bidders other commitments | (ii) The Bidders shall also demonstrate, to the satisfaction of the Procuring agency/Employer, that it has adequate sources of finance to meet the cash flow requirements on works currently in progress and for future contract commitments. | (iii) The audited balance sheets or, if not required by the laws of the Bidder’s country, other financial statements acceptable to the Procuring agency/Employer for the last 03 years shall be submitted and must demonstrate the current soundness of the Bidder’s financial position and indicate its prospective long-term profitability. |
| Minimum average annual construction turnover of PKR 30 Million, calculated as total certified payments received for contracts in progress and/or completed within the last 03years, divided by 03 years, starting from1st May 2023 |