In terms of Rules 48 of Public Procurement Rules, 2004 Grievance Redressal Committee (GRC) is notified for the subject procurement and notification copy is available on the procuring agency’s website and on Authority’s website at (www.ppra.org.pk).
Â
Â
Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist
MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
+92-333-245-6254
wsrsukkur@gmail.com
The following specific data for the procurement of Goods to be procured shall complement, supplement, or amend the provisions in the Instructions to Bidders (ITB). Whenever there is a conflict, the provisions herein shall prevail over those in ITB.
|
BDS Clause Number |
ITB Number |
Amendments of, and Supplements to, Clauses in the Instruction to Bidders |
A. Introduction |
||
|
1 |
1.1 |
Name of Procuring Agency:Â Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department) The subject of procurement is:Â Construction of New Hostel Accomodation at Met. Office, Sukkur Airport. Expected commencement date: Saturday, May 30, 2026 |
|
2. |
2.1 |
Financial year for the operations of the Procuring Agency:Â 2025-26 Name and identification number of the Contract: P16085Â |
| 3. | 3.1 | JV/Consortium or Association Allowed: No Number of JV/Consortium Members: Nil |
B. Bidding Documents |
||
|
4. |
6.2 & 6.4 |
The Bidders may seek clarifications through EPADS v2.0: Clarification Date: Thursday, April 30, 2026 |
| 5. | 7.2 |
Any addendum, in case issued, shall be published on Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department) website and on EPADS v2.0. |
C. Preparation of Bids |
||
| 6. |
8.1 |
List of documents required along with the bid: No |
| 7. | 9.1 |
The qualification criteria to establish the supply / production capability of the bidder. see Eligibility Criteria |
| 8. | 11.2Â |
|
| 9. | 11.1 | Price schedule will be provided according to the format defined and acquired. see section price schedule. |
| 10. | 11.4 |
 Specifications: see section of specifications. |
|
11. |
11.5 & 13.5 |
The price shall be Fixed. |
| 12. |
14.1 |
Currency of the Bids shall be : PKR |
| 13. |
16.1 |
The Bids/Bid Validity period shall be: 87 Days |
| 14. |
17.1Â |
The amount of Bid Security shall be as defined in Bid Security Section for items and lots given in BDS 6 |
| 15. | 17.2 |
The Bid Security shall be in the form of: Call at Deposit  |
| 16. | 15.1 |
Alternative Bids to the requirements of the bidding documents will not be permitted. |
D. Submission of Bids |
||
|
17. |
18.1 & 21.1 |
Bid shall be submitted online on EPADS v2.0 whereas hard copy of the bid security should be submitted to the following; MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province). Bids that are not submitted on EPADS v2.0 shall be disqualified. The deadline for Bids submission is: Wednesday, May 6, 2026 10:30 AM |
E. Opening and Evaluation of Bids |
||
|
18. |
24.1 |
The Bids opening shall take place on EPADS v2.0. Day : Wednesday Date:Â May 06, 2026 Time : 11:00 AM |
|
19. |
30.2 |
Selection technique adopted will be: Least Cost Based Selection (LCBS) |
F. Award of Contract |
||
|
20. |
41.1 & 41.2 |
The Performance guarantee shall: 0%. The Performance Guarantee shall be acceptable in the form of:Â Nil |
| 21. | 45.1 |
Arbitrator shall be appointed by mutual consent of the both parties. |
G. Review of Procurement Decisions |
||
|
22. |
37 |
Grievance against this procurement shall be submitted online on EPADS v2.0. |
| Bidder's Type | Required Registration |
|---|---|
| Any | NADRA CITIZENSHIP (CNIC/NICOP) FBR (NTN) FBR (GSTN) PEC |
| Eligibility Criteria | Document |
|---|---|
| As per requirement of C5 or above (PEC) | Yes |
Least Cost Based Selection (LCBS)
Jobs Without Lots :
| Job | Delivery Schedule | Quantity | Bid Security |
|---|---|---|---|
| Hostel Building Civil Work | Address: Met. Office Sukkur Airport Schedule: 364Days Quantity: 1 | 1 | 593101 |
| WS and SI | Address: MET Office Sukkur Airport Schedule: 364 Days Quantity: 1 | 1 | 39591.16 |
| Electrification | Address: Met Office, Sukkur Airport Schedule: 364 Days Quantity: 1 | 1 | 52390 |
| Boundary Wall | Address: MET Office Sukkur Airport Schedule: 364 Days Quantity: 1 | 1 | 41749 |
| Road and Paths | Address: MET Office Sukkur Airport Schedule: 364Days Quantity: 1 | 1 | 11854 |
| Hostel Building Civil Work (Non -Schedule) | Address: MET Office Sukkur Airport Schedule: 364Days Quantity: 1 | 1 | 3500 |
| Electrification Internal (Non-Schedule) | Address: MET Office Sukkur Airport Schedule: 364Days Quantity: 1 | 1 | 8278 |
No
Jobs Without Lots :
Job: Hostel Building Civil Work
Specifications / Requirements:
| Sr. No | Ref. No. | Description | Unit | Qty | Rate | In Words | Amount |
|---|---|---|---|---|---|---|---|
| 1 | 1 | Excavation for raft foundations, underground tanks and septic tanks (rectangular or square) in all kinds of soil (except gravelly and murum soil wet silt, clay or mud, conglomeration of gravel and boulders, soft, sandy or disintegrated and hard rock) and back filling the excavated material all round the trenches including breaking clods, watering, consolidation by ramming in layers not exceeding 9 inches in depth to full compaction, dressing and disposal of surplus excavated stuff as directed, lead up to one chain and lift upto 5 feet.(a):- 0' to 5' | %Cft | 11968 | 1624.63 | ( Rupees One Thousand, Six Hundred, Twenty-four and Paisa Sixty-three Only) | 194436 |
| 2 | 2 | (b):- 5' to 8'. | %Cft | 2344 | 1862.13 | ( Rupees One Thousand, Eight Hundred, Sixty-two and Paisa Thirteen Only) | 43648 |
| 3 | 3 | Providing and laying 1:4:8 (1 cement 4 sand and 8 coarse aggregate) cement concrete using Crush graded boulders 1 inches and down gauge in foundation including levelling, compacting and curing etc. complete. | %Cft | 1123 | 21744.25 | ( Rupees Twenty-one Thousand, Seven Hundred, Forty-four and Paisa Twenty-five Only) | 244188 |
| 4 | 4 | Providing and layaing out Termite proofing in foundations, under floors and wood work surface with a soloution using of confront TC with water and spraying the solution of the area to be treated as completed as per direction of Enmgineer Incharge. | P-Sft | 6103 | 13.13 | ( Rupees Thirteen and Paisa Thirteen Only) | 80132 |
| 5 | 5 | Providing and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in raft or strip foundation with columns and pillars, of any shape including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth | %Cft | 3531 | 33203.65 | ( Rupees Thirty-three Thousand, Two Hundred, Three and Paisa Sixty-five Only) | 1172421 |
| 6 | 6 | roviding and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in columns of square or rectangular shape of regular section including form work and its removal, compacting and curing etc. but excluding the cost of reinforcement, in foundation basement and plinth . | %Cft | 186 | 43741.87 | ( Rupees Forty-three Thousands, Seven Hundred, Forty-one and Paisa Eighty-Seven Only) | 81360 |
| 7 | 7 | Providing a coat of bitumen emulsion at 10 Lbs. per % sft. on walls and floor in ground floor. | %Sft | 455 | 1010.75 | ( Rupees One Thousand, ten and Paisa Seventy-five Only) | 4599 |
| 8 | 8 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls 9 to 13-1/2 inches thick including scaffolding, raking, out joints and curing etc. complete in foundation, basement and plinth (foundation and basement masonry upto 5-feet depth and plinth upto 4-feet height from ground level. | %-Cft | 1675 | 38582.85 | ( Rupees Thirty-eight Thousands, Five Hundred, Eighty-two and Paisa Eighty-five Only) | 646263 |
| 9 | 9 | Supplying earth from approved outside sources within a radius of 5 miles including digging, loading and unloading and filling in foundation trenches, plinth or under floor, etc. including breaking clods, dressing, watering and consolidation by ramming in layers not exceeding 9 inches in depth to full compaction complete. | %-Cft | 5277 | 3254.05 | ( Rupees Three Thousand, Two Hundred, Fifty-four and Paisa five Only) | 171716 |
| 10 | 10 | Providing and laying reinforced cement concrete using Lawrancepure sand and crushed grade boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in plinth beams of required shape and design including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in foundation basement and plinth. | %Cft | 636 | 40365.27 | ( Rupees Forty Thousand, Three Hundred, Sixty-five and Paisa Twenty-Seven Only) | 256723 |
| 11 | 11 | Providing and laying reinforced cement concrete using crushed grade boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3750 Ibs. per sq inch at 28 days with a mix not leaner than 1:1-1/2:3 in columns of square or rectangular shape of regular section, using lawrenecepur sand including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the.(a):- Ground Floor. | %-Cft | 531 | 58279.31 | ( Rupees Fifty-Eight Thousand, Two Hundred, Seventy-nine and Paisa Thirty-one Only) | 309463 |
| 12 | 12 | (b):- First Floor. | %-Cft | 500 | 61090.77 | ( Rupees Sixty-one Thousand, Ninty and Paisa Seventy-seven Only) | 305454 |
| 13 | 13 | (c):- Second Floor. | %-Cft | 225 | 63301.36 | ( Rupees Sixty-three Thousand, Three Hundred, One and Paisa Thirty-six Only) | 142428 |
| 14 | 14 | Providing and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in straight beams, lintels, cantilever beams of required shape or section including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 858 | 47322.89 | ( Rupees Forty-Seven Thousand, Three Hundred, Twenty-two and Paisa Eighty-nine Only) | 406030 |
| 15 | 15 | (b):- First Floor. | %-Cft | 834 | 50134.35 | ( Rupees Fifty Thousand, One Hundred, Thirty-four and Paisa Thirty-five Only) | 418120 |
| 16 | 16 | (c):- Second Floor. | %-Cft | 275 | 52344.94 | ( Rupees Fifty-two Thousand, Three Hundred, Forty-four and Paisa Ninty-four Only) | 143949 |
| 17 | 17 | Providing and laying reinforced cement concrete using Lawrancepur sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in straight stairs and landing of required section including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 94 | 57830.03 | ( Rupees Fifty-seven Thousand, Eight Hundred, Thirty and Paisa Three Only) | 54360 |
| 18 | 18 | (b):- First Floor. | %-Cft | 94 | 60641.49 | (Rupees Sixty Thousand, Six Hundred, Forty-one and Paisa Forty-nine Only) | 57003 |
| 19 | 19 | Providing and laying reinforced cement concrete using sand and crushed graded boluders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in ordinary slab 5 inches to 6 inches thick including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 1035 | 45587.16 | ( Rupees Forty-five Thousand, Five Hundred, Eighty-seven and Paisa Sixteen Only) | 471827 |
| 20 | 20 | (b):- First Floor. | %-Cft | 897 | 48398.62 | ( Rupees Forty-eight Thousand, Three Hundred, Ninty-eight and Paisa sixty-two Only) | 434136 |
| 21 | 21 | (c):- Second Floor. | %-Cft | 311 | 50609.21 | ( Rupees Fifty Thousand, Six Hundred, Nine and Paisa Twenty-one Only) | 157395 |
| 22 | 22 | Providing and laying reinforced cement concrete using sand and crushed graded boluders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in ordinary cantilevered horizantal sunshede or chajja tapered or straight average 3 inches to less then 5 inches thick including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 29 | 52656.75 | ( Rupees Fifty-two Thousand, Six Hundred, Fifty-six and Paisa Seventy-five Only) | 15270 |
| 23 | 23 | (b):- First Floor. | %-Cft | 29 | 55468.21 | ( Rupees Fifty-five Thousand, Four Hundred, Sixty-eight and Paisa Twenty-one Only) | 16086 |
| 24 | 24 | (c):- Second Floor. | %-Cft | 42 | 57678.80 | ( Rupees Fifty-seven Thousand, Six Hundred, Seventy-eight and Paisa Eighty Only) | 24225 |
| 25 | 25 | Providing and laying reinforced cement concrete using sand and crushed graded boulders 3/4 inch and down gauge having a minimum works cube crushing strength of 3000 Ibs. per sq inch at 28 days with a mix not leaner than 1:2:4 in precast shelves 1-1/2 inches to 2 inches thick including form work and its removal, compacting, leveling and curing etc. complete but excluding the cost of reinforcement, in the...(a):- Ground Floor. | %-Cft | 38 | 69803.62 | ( Rupees Sixty-nine Thousand, Eight Hundred, Three and Paisa Sixty-two Only) | 26525 |
| 26 | 26 | (b):- First Floor. | %-Cft | 38 | 72615.08 | ( Rupees Seventy-two Thousand, Six Hundred, Fifteen and Paisa Eight Only) | 27594 |
| 27 | 27 | (c):- Second Floor. | %-Cft | 13 | 74825.67 | ( Rupees Seventy-four Thousand, Eight Hundred, Twenty-five0 and Paisa Sixty-seven Only) | 9727 |
| 28 | 28 | Providing and laying hard grade ribbed deformed (minimum yield point 60,000 psi) reinforcement bars with & including the cost of straightening, cutting, bending, binding, wastage, and such overlaps as are not shown in the drawings, placing in position on cement concrete 1:2:4 precast or M.S. Chairs, Tying with binding wire, cost of chairs and wires etc. in all kinds of RCC work in foundation, basement, plinth and ground floor of building including septic tanks and under ground tanks and in projections for future extension .(a):- Ground Floor. | P.Kg | 23679 | 282.45 | ( Rupees Two Hundred, Eighty-two and Paisa Forty-five Only) | 6688134 |
| 29 | 29 | (b):- First Floor. | P.Kg | 9472 | 286.89 | ( Rupees Two Hundred, Eighty-six and Paisa Eighty-nine Only) | 2717422 |
| 30 | 30 | (c):- Second Floor. | P.Kg | 3564 | 291.33 | ( Rupees Two Hundred, Ninty-one and Paisa Thirty-three Only) | 1038300 |
| 31 | 31 | Providing and laying 2 inches thick damp proof course with cement concrete 1:2:4 cast in situ using graded screened bajri of 3/4 inch and down gauge including compacting, curing, form work and its removal etc. complete with applying a coat of hot bitumen (maxphalt 80/100 or equivalent) using 35 Lbs. per hundred square feet on damp proof course after complete drying and cleaning the surface . | %-Sft | 112 | 8526.80 | ( Rupees Eight Thousand, Five Hundred, Twenty-six and Paisa Eighty Only) | 9550 |
| 32 | 32 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:6 in straight or curved walls 9 to 13-1/2 inches thick including scaffolding, raking, out joints and curing etc. complete in superstructure... (a):- Ground Floor. | %-Cft | 2587 | 41260.97 | ( Rupees Forty-one Thousand, Two Hundred, Sixty and Paisa Ninty-seven Only) | 1067421 |
| 33 | 33 | (b):- First Floor. | %-Cft | 2587 | 43602.06 | ( Rupees Forty-three Thousand, Six Hundred, Two and Paisa Six Only) | 1127985 |
| 34 | 34 | (c):- Second Floor. | %-Cft | 1028 | 45455.56 | ( Rupees Forty-five Thousand, Four Hundred, Fifty-five and Paisa Fifty-six Only) | 467283 |
| 35 | 35 | Providing and laying first class solid burnt brick masonry set in cement mortar 1:4 in straight or curved walls 4-1/2 inches and less in thick including scaffolding, raking, out joints and curing etc. complete in superstructure... (a):- Ground Floor. | %-Cft | 49 | 44318.47 | ( Rupees Forty-four Thousand, Three Hundred, Eighteen and Paisa Forty-seven Only) | 21716 |
| 36 | 36 | (b):- First Floor. | %-Cft | 49 | 46659.56 | ( Rupees Forty-six Thousand, Six Hundred, Fifty-nine and Paisa Fifty-six Only) | 22863 |
| 37 | 37 | (c):- Second Floor. | %-Cft | 150 | 48513.06 | ( Rupees Forty-eight Thousand, Five Hundred, Thirteen and Paisa Six Only) | 72770 |
| 38 | 38 | 1/4" thick cement plaster 1:3 on soffits of ceiling, cantilever slabs, sides and soffits of beams etc., in basement, mezzanine and ground floor including making edges, corners and curing etc., complete . (a):- Basement & Ground Floor. | %-Sft | 1975 | 4014.70 | ( Rupees Four Thousand, Fourteen and Paisa Seventy Only) | 79290 |
| 39 | 39 | (b):- First Floor. | %-Sft | 1758 | 4322.20 | ( Rupees Four Thousand, Three Hundred, Twenty-two and Paisa Twenty Only) | 75984 |
| 40 | 40 | (c):- Second Floor. | %-Sft | 566 | 4558.45 | ( Rupees Four Thousand, Five Hundred, Fifty-eight and Paisa Forty-five Only) | 25801 |
| 41 | 41 | 1/2" thick cement plaster 1:4 on walls and columns etc. in cement, plinth, mezzanine and ground floor including making sides, corners, and curing etc complete....(a):- Basement & Ground Floor. | %-Sft | 6602 | 4381.84 | ( Rupees Four Thousand, Three Hundred, Eighty-one and Paisa Eighty-four Only) | 289289 |
| 42 | 42 | (b):- First Floor. | %-Sft | 6362 | 4689.34 | ( Rupees Four Thousand, Six Hundred, Eighty-nine and Paisa Thirty-four Only) | 298336 |
| 43 | 43 | (c):- Second Floor. | %-Sft | 4132 | 4925.59 | ( Rupees Four Thousand, Nine Hundred, Twenty-five and Paisa Fifty-nine Only) | 203525 |
| 44 | 44 | 3/4" thick cement plaster 1:4 on walls and columns etc. in cement, plinth, mezzanine and ground floor including making sides, corners, and curing etc complete....(a):- Basement & Ground Floor. | %-Sft | 144 | 5335.06 | ( Rupees Five Thousand, Three Hundred, Thirty-five and Paisa Six Only) | 7682 |
| 45 | 45 | (b):- First Floor. | %-Sft | 144 | 5745.06 | ( Rupees Five Thousand, Seven Hundred, Forty-five and Paisa Six Only) | 8273 |
| 46 | 46 | Extra if deep cut grooves of approved sizes and design are made on plastered surface of any description in any floor | %-Sft | 288 | 2287.50 | ( Rupees Two Thousand, Two Hundred, Eighty-seven and Paisa Fifty Only) | 6588 |
| 47 | 47 | Water proofing of roof slab using Bituflex @ 10 Kg per % sft in three coats, i/c cleaning /scraping the extra mortar etc. from the roof surface,and washing the surface with water and filling the depressions using Bituflex: sand mortar .Applyingone one primer coal, over moist surface using a mix of 50 %Bituflex and 50 % water blirded the surface with saul any floor in any light. | %-Sft | 2037 | 1243.06 | ( Rupees One Thousand, Two Hundred, Forty-three and Paisa Six Only) | 25321 |
| 48 | 48 | Provding and fixing of diamond jumbolon insulation board 2" thick and polyphonesheet over diamond jumblolon insulation board for roof insulation as per direction of the Engineer Inchage in any floor in any height. | P-Sft | 1880 | 171.91 | ( Rupees One Hundred, Seventy-one and Paisa Ninty-one Only) | 323191 |
| 49 | 49 | Providing and laying 1:9 cement concrete using screened graded bajri 3/4 inch and down gauge In terracing 3 inches average thickness to required slope in panels including form work, consolidation, finishing, curing etc. and painting the surface with plastic bitumen No. 4 at the rate of 15 Ibs per hundred square feet blinded with sand at the rate of 2 cubic feet per hundred square feet complete" on ground floor roof. | %-Sft | 2073 | 8229.59 | ( Rupees Eight Thousand, Two Hundred, Twenty-nine and Paisa Fifty-nine Only) | 170599 |
| 50 | 50 | Supplying stacking and filling sand of approved quality from outside sources in foundation, trenches, plinth or under floor, etc. including dressing, watering and consolidation by ramming in layers not exceeding 9 inches in depth to full compaction and lift upto 5 feet. | %-Cft | 1590 | 4869.94 | ( Rupees Four Thousand, Eight Hundred, Sixty-nine and Paisa Ninty-four Only) | 77432 |
| 51 | 51 | Providing and laying 1:4:8 cement concrete bed under floors using graded stone ballast 2 inches and down gauge with levelling and ramming, watering and curing etc. complete.. | %-Cft | 1125 | 22036.75 | ( Rupees Twenty-two Thousand, Thirty-six and Paisa Seventy-five Only) | 247913 |
| 52 | 52 | Providing and laying in situ 1:2:4 (1 cement 2 sand and 4 coarse aggregate) cement concrete using crushed graded boulders 3/4 inch (19 mm) and down gauge in foundation, basement and plinth including form work, compacting, curing and removal of form work etc. complete, foundation and basement up to 5 feet (1.52 m) depth and plinth up to 4 feet (1.2 m) height from ground level .(a):- Ground Floor. | %-Cft | 385 | 39059.08 | ( Rupees Thirty-nine Thousand, Fifty-nine and Paisa Eight Only) | 150377 |
| 53 | 53 | (b):- First Floor. | %-Cft | 385 | 39795.33 | ( Rupees Thirty-nine Thousand, Seven Hundred, Ninty-five and Paisa Thirty-three Only) | 153212 |
| 54 | 54 | (c):- Second Floor. | %-Cft | 67 | 40389.08 | ( Rupees Forty Thousand, Three Hundred, Eighty-nine and Paisa Eight Only) | 27061 |
| 55 | 55 | Providing and laying light colour, glazed/non skid vitrified porcelean tiles (Polished) exceeding 3600 Sqcm each, (Pak made) on walls and floors, in any floor, laid with dry bond (stile bond) over a base of 1" thick cement mortar (1:3) including jointing to tiles with joint filler of approved quality as per direction of the Engineer incharge. | %-Sft | 3827 | 49798.24 | ( Rupees Forty-nine Thousand, Seven Hundred, Ninty-eight and Paisa Twenty-four Only) | 1905779 |
| 56 | 55 | Providing and laying floor of 3/4 inches thick Granite stone Pakistani Original more than 3 sq. ft. upto 5 Sq. ft. size fine dressed on the surface without winding in ground floor over 1 inch lime mortar 1:2 setting the marble tiles with grey cement slurry including curing rubbing and polishing etc. complete, including the cost of mortar.(a):- Ground Floor. | %-Sft | 256 | 81539.13 | ( Rupees Eighty-one Thousand, Five Hundred, Thirty-nine and Paisa Thirteen Only) | 208740 |
| 57 | 56 | (b):- First Floor. | %-Sft | 205 | 82132.88 | ( Rupees Eighty-two Thousand, One Hundred, Thirty-two and Paisa Eighty-eight Only) | 168372 |
| 58 | 57 | Extra for making nosing of treads as per design and instructions of the Engineer-in-Charge .. | P-Rft | 192 | 131.25 | ( Rupees One Hundred, Thirty-one and Paisa Twenty-five Only) | 25200 |
| 59 | 58 | Providing and laying floor of 6mm (approx: 1/4") thick coloured glazed tiles More than 1 sq.ft upto 2 sq.ft. of master make (Pakistani) first grade in ground floor laid over 1" (25mm) thick cement mortar 1:2 (1 cement and 2 sand) including jointing and washing the tiles with white cement slurry a matching colour (by using pigment in white cement) and curing etc. complete. | %-Sft | 665 | 42108.61 | ( Rupees Forty-two Thousand, One Hundred, Eight and Paisa Sixty-one Only) | 280022 |
| 60 | 59 | (b):- First Floor. | %-Sft | 665 | 42702.36 | ( Rupees Forty-two Thousand, Seven Hundred, two and Paisa Thirty-six Only) | 283971 |
| 61 | 60 | Providing and fixing 1/4 inches or 6.4 mm (approx.) thick approved Pakistani make white glazed tiles upto 1.50sq feet to 3. sq. ft size in dado and skirting in ground floor, over 1/2 inch (13 mm) thick base of cement mortar 1:3 setting of tiles in slurry of grey cement over mortar base including filling the joints and washing the tile with white cement slurry curing and cleaning etc. complete . | %-Sft | 160 | 31498.72 | ( Rupees Thirty-one Thousand, Four Hundred, Ninty-eight and Paisa Seventy-two Only) | 50398 |
| 62 | 61 | (b):- First Floor. | %-Sft | 160 | 32261.22 | ( Rupees Thirty-two Thousand, Two Hundred, Sixty-one and Paisa Twenty-two Only) | 51618 |
| 63 | 62 | (c):- Second Floor. | %-Sft | 54 | 32833.72 | ( Rupees Thirty-two Thousand, Eight Hundred, Thirty-three and Paisa Seventy-two Only) | 17730 |
| 64 | 63 | Providing and fixing M.S. moulded steel door frames of 10" x 2-1/2" manufactured from mild steel sheet of 18 gauge conforming to B.S.S. 1245 having a double rebate size 1-1/2" x 1/2" provision of 3 Nos. M.S. plate, section 1-1/2" x 1/4" (2 Nos. 6 inch long welded with frame at not less than 10 points and 1 Nos. 12 inch long welded with frame at not less than 20 points), with holes and threads for fixing steel hings, fitted with one locking box of same sheet (point welded inside the frame), 6 Nos. 6 inches long flat iron fixing lugs of 1-1/4" x 3/16" section, treated with special red oxide primer coat all around including cutting holes and filling the cavity with cement concrete 1:2:4 etc. in any floor at any height complete as directed by the Engineer-in-Charge | P-Rft | 316 | 693.86 | ( Rupees Six Hundred, Ninty-three and Paisa Eighty-six Only) | 219260 |
| 65 | 64 | Providing and fixing ward robe 24" deep consisting 19mm thick laminated sheet on bottom ,top sides partition shelves & shutters etc. and 4mm thick pressed on back side , 2-1/2" x 1-1/4" best quality deodar wood frame and allopen edges filled 3/4" molding PVCgols completei/c the cost of glue ironnails screws,heavy type piano hings,1/2" handles catcher locks etccomplete theas perdirection ofthe engineer incharge. | P-Sft | 572 | 1289.74 | ( Rupees One Thousand, Two Hundred, Eighty-nine and Paisa Seventy-four Only) | 737731 |
| 66 | 65 | Providing and fixing 1-1/2 inches (38 mm) thick solid core deodar wood flushed veneered door shutters, with and including the cost of commercial plywood facing 3 mm. thick (3 ply) on both faces, fixed over best quality deodar wood frame 2 inches wide alround 6 inches wide lock rail and 2nd class deodar wood solid core, i/c., 1/4 inch thick best quality deodar wood lipping on al! sides as per approved drawing, manufactured under power driven hydraulic press, including the cost of approved iron fittings but excluding the cost of handles and locking arrangement. | P-Sft | 280 | 1448.56 | ( Rupees One Thousand, Four Hundred, Forty-eight and Paisa Fifty-six Only) | 405597 |
| 67 | 66 | Providing and fixing 1-1/2 inches (38 mm) thick best quality deodar wood wire gauze shutters fully wire gauzed with galvanized iron wire gauze of 24 gauge and 12 mesh to an inch (25 mm) with approved iron butt hinges, spring hinges, tower bolts etc., as required . | P-Sft | 280 | 1438.93 | ( Rupees One Thousand, Four Hundred, Thirty-eight and Paisa Ninty-three Only) | 402900 |
| 68 | 67 | Providing and fixing fully glazed Champagne anodized aluminium Sliding windows as per British standard manufactured by Lucky,Alcop, Krudson, Pakistan cable and A.C.P (fixing through their approved fabricators), Prime model box section 101mm x 30mm and 2mm thick including the cost of aluminium netting ,fittings, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but excluding the cost of glass pans. | P-Sft | 320 | 1367.19 | ( Rupees One Thousand, Three Hundred, Sixty-seven and Paisa Ninteen Only) | 437501 |
| 69 | 68 | Providing and fixing fully glazed Champagne anodized aluminium Fixed windows Partition as per British standard manufactured by Lucky, Alcop, Krudson, Pakistan Cables and A.C.P. (fixing through their approved fabricators), Economy model box section 76.2mm x 38.1mm and 1.6mm thick including the cost of aluminium fittings, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but excluding the cost of glass pans. | P-Sft | 48 | 859.72 | ( Rupees Eight Hundred, Fifty-nine and Paisa Seventy-two Only) | 41267 |
| 70 | 69 | Providing and fixing fully glazed Champagne anodized aluminium Hinged door with frame as per British standard manufactured by Lucky, Alcop, Krudson, Pakistan Cables and A.C.P. (Deluxe model section, 101.6mm x 30mm and 2mm thick including the aluminium fittings, with all accessories cutting hole etc. and making good damages to walls etc. complete as required in any floor as per direction of engineer-in-charge, but excluding the cost of glass pans. | P-Sft | 102 | 1840.63 | ( Rupees One Thousand , Eight Hundred, Forty and Paisa Sixty-three Only) | 187744 |
| 71 | 70 | Providing and fixing Tinted glass panes 5mm thick to M.S. Box pipe / Aluminium doors, windows and ventilators etc including the cost of labour but excluding the cost of M.S. square pipe beading, rubber packing and screw in any floor at any height. | P-Sft | 470 | 371.82 | ( Rupees Three Hundred, Seventy-one and Paisa Eighty-two Only) | 174755 |
| 72 | 71 | Providing and fixing iron grills with required section of flat iron as per approved design including welding all sides of the section at the junction and fixing with sunk iron screws, painting two coats of red oxide paint etc. complete as required in any floor in wooden frame . | P-Kg | 1199 | 290.95 | ( Rupees Two Hundred, Ninty and Paisa Eighty-nine Only) | 348850 |
| 73 | 72 | Providing and fixing 2" dia stainles steel pipe (18gauge) railling alongwith 4 Nos 3/4" dia parallel pipe having s/s pipe vertical post 2"dia at 3 ft c/c average spacing and 4" dia vertical post at start turning and end point including cost of labour, weilding charges fitting & fixing in marble floor and wall etc complete as per direction of the Engineer Incharge. | P-Rft | 112 | 2234.38 | ( Rupees Two Thousand, Two Hundred, Thirty-four and Paisa Thirty-eight Only) | 250251 |
| 74 | 73 | Providing and fixing with brass screw or specially supplied screws hydraulic door closer of approved design No. 707, Japan make, cutting wood etc., to required shape and size as per direction of the engineer-in-Charge | Each | 10 | 8706.25 | ( Rupees Eight Thousand, Seven Hundred, Six and Paisa Twenty-five Only) | 87063 |
| 75 | 74 | Providing and fixing with brass screws door lock handle type of approved design ( Hungry Make) cutting wood etc.to required shape and size with two operating keys as per direction of the Engineer in Charge. | Each | 18 | 4024.38 | ( Rupees Four Thousand, Twenty-four and Paisa Thirty-eight Only) | 72439 |
| 76 | 75 | Providing and fixing approved brass handles 5" (127 mm) size heavy type with becessary brass screws . | Each | 18 | 357.74 | ( Rupees Three Hundred, Fifty-seven and Paisa Seventy-four Only) | 6439 |
| 77 | 76 | Providing and laying 3/8" thick marble patties (Pannel strips) upto 1"depth in floor and dado of any description in all floor. | Each | 187 | 17.38 | ( Rupees Seventeen and Paisa Thirty-eight Only) | 3250 |
| 78 | 77 | Providing and fixing 4" dia polyvinyle chloride rain water (PVC) down pipe with mild steel clamps,bolts andnuts fixed in cement concrete 1:2:4etc. complete. | %Rft | 123 | 718.67 | ( Rupees Seven Hundred, Eighteen and Paisa Sixty-seven Only) | 88396 |
| 79 | 78 | Providing and fixing 4" dia polyvinyle chloride (PVC) bend of any degree for rain water down pipe with clamps,bolts and nuts in cement concrete 1:2:4 etc. complete. | Each | 14 | 1748.13 | ( Rupees One Thousand, Seven Hundred, Forty-eight and Paisa Thirteen Only) | 24474 |
| 80 | 79 | Providing and laying gola 3" x 3" (76 mm x 76 mm) concrete 1:2:4 using graded screened bajri at junction of roof slab and walls and finished with cement plaster 1:4 including curing etc. complete. | %Rft | 318 | 3202.36 | ( Rupees Three Thousand, Two Hundred, Two and Paisa Thirty-six Only) | 10184 |
| 81 | 80 | Tuck or weather struck pointing on brick work with cement mortar 1:3 (one cement and three sand) in plinth and ground floor including raking out joints, curing etc., complete..(a):- Ground Floor. | %-Sft | 384 | 3449.57 | ( Rupees Three Thousand, Four Hundred, Forty-nine and Paisa Fifty-seven Only) | 13246 |
| 82 | 81 | (b):- First Floor. | %-Sft | 384 | 3888.95 | ( Rupees Three Thousand, Eight Hundred, Eighty-eight and Paisa Ninty-five Only) | 14934 |
| 83 | 82 | Painting with (ICI) Dulux plastic emulsion paint VIP of approved shade two coats over and including the cost of one priming coat complete over plastered surface at any height in any floor . | %-Sft | 13746 | 6737.38 | ( Rupees Six Thousand, Seven Hundred, Thirty-seven and Paisa Thirty-eight Only) | 926120 |
| 84 | 83 | Painting three coats with weather shield paint deluxe (ICI) make of approved shade on plaster surface (External) and including the cost of cleaning the surface, sand papering etc. complete at any height in any floor. | %-Sft | 6329 | 4408.75 | ( Rupees Four Thousand, Four Hundred, Eight and Paisa Seventy-five Only) | 279030 |
| 85 | 84 | Painting wood work with synthetic enamel paint of approved make and shade two coats over and including the cost of one priming coat complete at any height in any floor . | %-Sft | 840 | 5954.86 | ( Rupees Five Thousand, Nine Hundred, Fifty-four and Paisa Eighty-six Only) | 50021 |
| 86 | 85 | Painting iron work with synthetic enamel paint of approved make and shade two coats over and including the cost of one priming coat complete at any height in any floor | %-Sft | 949 | 6071.25 | ( Rupees Six Thousand, Seventy-one and Paisa Twenty-five Only) | 57616 |
| 87 | 86 | Providing and fixing plaster of Paris 19mm thick false ceilling including T & L angle clips jointing clips and GI wire etc complete as required in any floor. | P-Sft | 3238 | 120.23 | ( Rupees One Hundred, Twenty and Paisa Twenty-three Only) | 389305 |
| 88 | 87 | Proving & fixing kitchen floor cabinet making of shutter board box & 3/4" thick high glass lamination lasani shutter , PVC beading , deodar wooden frame 2.5"x1.25" size making tray drawer of approved design etc. fixed with rawal plugs,screws i/c the cost of glue iron nails hings, handles etcas per drawing. complet the as per direction of engineer incharge. | P-Sft | 75 | 1552.45 | ( Rupees One Thousand, Five Hundred, Fifty-two and Paisa Forty-five Only) | 116436 |
| GRAND TOTAL: | Rs 29,655,035.00 |
Job: WS and SI
Specifications / Requirements:
| Sr. No | ABSTRACT OF COST | Â |
|---|---|---|
| 1 | -: Name of Work:- INSTALLATIION OF WEATHER SURVEILLANCE RADAR AT SUKKUR IN ISLAMIC REPUBLIC OF PAKISTAN. ( Sub Head:- Construction of Hostel Accommodation at Sukkur Airport ) | Â |
| 2 | Sr | Amount |
| 3 | Sub Head:- Water Supply & Sanitary Fitting | Â |
| 4 | (A):- Schedule Items | Â |
| 5 | 1 | 117,990 |
| 6 | 2 | 50,750 |
| 7 | 3 | 131,365 |
| 8 | 4 | 94,498 |
| 9 | 5 | 16,495 |
| 10 | 6 | 23,086 |
| 11 | 7 | 24,366 |
| 12 | 8 | 19,804 |
| 13 | 9 | 27,054 |
| 14 | 10 | 5,652 |
| 15 | 11 | 49,216 |
| 16 | 12 | 86,000 |
| 17 | 13 | 8,699 |
| 18 | Â | 16,052 |
| 19 | Â | 16,143 |
| 20 | Â | 11,243 |
| 21 | 14 | 80,468 |
| 22 | 15 | 8,011 |
| 23 | 16 | 95,924 |
| 24 | 17 | 13,494 |
| 25 | 18 | 205,889 |
| 26 | 19 | 17,952 |
| 27 | Â | 78,146 |
| 28 | Â | 129,442 |
| 29 | Â | 86,731 |
| 30 | 20 | 23,175 |
| 31 | 21 | 25,838 |
| 32 | Â | 96,078 |
| 33 | Â | 151,781 |
| 34 | Â | 112,142 |
| 35 | 22 | 59,026 |
| 36 | 23 | 81,750 |
| 37 | 24 | 4,475 |
| 38 | 25 | 10,823 |
| 39 | Total:- | Â |
|  |  | Rs 1,979,558.00 |
Job: Electrification
Specifications / Requirements:
| Sr. No | NIT | Â |
|---|---|---|
| 1 | NAME OF WORK:- | Â |
| 2 | Â | Â |
| 3 | Â | Â |
| 4 | S.No | AMOUNT |
| 5 | Â | Â |
| 6 | Â | Â |
| 7 | 1 | 326140 |
| 8 | 2 | 13556 |
| 9 | 3 | 58710 |
| 10 | 4 | 47160 |
| 11 | 5 | 146250 |
| 12 | 6 | 179600 |
| 13 | 7 | 224000 |
| 14 | 8 | 201250 |
| 15 | Â | 372500 |
| 16 | Â | 109958 |
| 17 | Â | 9050 |
| 18 | Â | 23440 |
| 19 | 13 | 11520 |
| 20 | 14 | 33810 |
| 21 | 15 | 1392 |
| 22 | 16 | 6420 |
| 23 | 17 | 308 |
| 24 | 18 | 8268 |
| 25 | 19 | 4448 |
| 26 | 20 | 5560 |
| 27 | 21 | 38584 |
| 28 | 22 | 5130 |
| 29 | 23 | 2205 |
| 30 | 24 | 26970 |
| 31 | 25 | 20676 |
| 32 | 26 | 4820 |
| 33 | 27 | 54054 |
| 34 | 28 | 64536 |
| 35 | 29 | 2616 |
| 36 | Â | 213564 |
| 37 | Â | 132840 |
| 38 | Â | 15656 |
| 39 | Â | 69372 |
| 40 | 33 | 8369 |
| 41 | 34 | 84141 |
| 42 | 35 | 6263 |
| 43 | 36 | 37376 |
| 44 | Â | 7,530 |
| 45 | Â | 2,286 |
| 46 | Â | 39,185 |
| 47 | Â | Â |
| 48 | Â | Â |
|  |  | Rs 2,619,513.00 |
Job: Boundary Wall
Specifications / Requirements:
| Sr. No | ABSTRACT OF COST | Â |
|---|---|---|
| 1 | -: Name of Work:- INSTALLATIION OF WEATHER SURVEILLANCE RADAR AT SUKKUR IN ISLAMIC REPUBLIC OF PAKISTAN. ( Sub Head:- Construction of Hostel Accommodation at Sukkur Airport ) | Â |
| 2 | Sr. | AMOUNT |
| 3 | Sub Head:- Boundary Wall | Â |
| 4 | 1 | 32,314 |
| 5 | 2 | 72,191 |
| 6 | 3 | 165,022 |
| 7 | 4 | 20,559 |
| 8 | 5 | 162,584 |
| 9 | 6 | 67,006 |
| 10 | 7 | 50,064 |
| 11 | 8 | 35,492 |
| 12 | 9 | 703,043 |
| 13 | 10 | 356,495 |
| 14 | 11 | 133,296 |
| 15 | 12 | 134,114 |
| 16 | 13 | 141,867 |
| 17 | 14 | 13,416 |
| 18 | TOTAL | Â |
|  |  | Rs 2,087,463.00 |
Job: Road and Paths
Specifications / Requirements:
| Sr. No | ABSTRACT OF COST | Â |
|---|---|---|
| 1 | -: Name of Work:- INSTALLATIION OF WEATHER SURVEILLANCE RADAR AT SUKKUR IN ISLAMIC REPUBLIC OF PAKISTAN. ( Sub Head:- Construction of Hostel Accommodation at Sukkur Airport ) | Â |
| 2 | Sr. | AMOUNT |
| 3 | Sub Head:- Road & Path | Â |
| 4 | 1 | 15,694 |
| 5 | 2 | 43,829 |
| 6 | 3 | 250,895 |
| 7 | 4 | 39,059 |
| 8 | 5 | 243,235 |
| 9 | TOTAL | Â |
|  |  | Rs 592,712.00 |
Job: Hostel Building Civil Work (Non -Schedule)
Specifications / Requirements:
| Sr. No | ABSTRACT OF COST | Â |
|---|---|---|
| 1 | -: Name of Work:- INSTALLATIION OF WEATHER SURVEILLANCE RADAR AT SUKKUR IN ISLAMIC REPUBLIC OF PAKISTAN. ( Sub Head:- Construction of Hostel Accommodation at Sukkur Airport ) | Â |
| 2 | Sr | Amount |
| 3 | Sub Head:- Building Civil Work. | Â |
| 4 | (B):- Non-Schedule Items | Â |
| 5 | 1 | 175,000 |
| 6 | Total:- (B) | Â |
|  |  | Rs 175,000.00 |
Job: Electrification Internal (Non-Schedule)
Specifications / Requirements:
| Sr. No | NIT | Â |
|---|---|---|
| 1 | NAME OF WORK:- | Â |
| 2 | Â | Â |
| 3 | Â | Â |
| 4 | S.No | AMOUNT |
| 5 | Â | Â |
| 6 | Â | Â |
| 7 | 1 | 358000 |
| 8 | 2 | 31680 |
| 9 | 3 | Â |
| 10 | Â | 9,200 |
| 11 | Â | 15,000 |
| 12 | Â | Â |
|  |  | Rs 413,880.00 |
Construction of Hostel Accomodation at Met. Office Sukkur Airport, under the project "Installation of WS Radar at Sukkur"
For Individual Jobs
| # | Job Title | Quantity | Unit Price (PKR) | Total Price (PKR) | Delivery Location | Delivery Period / Year | Country of Origin |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 |
| # | Lot Title | Total Lot Price (PKR) | Country of Origin |
|---|---|---|---|
| 1 | [Lot 1 Title] |
Â
Â
Â
The following Special Conditions of Contract shall supplement the General Conditions of Contract. Whenever there is a conflict, the provisions herein shall prevail over those in the Conditions of Contract. The corresponding clause number of the GCC is indicated in parentheses.
|
Number of GC Clause |
Amendments of, and Supplements to, Clauses in the General Conditions of Contract |
|
 |
Definitions The Procuring Agency is: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province). The Supplier is: The title of the subject procurement is:Construction of New Hostel Accomodation at Met. Office, Sukkur Airport. |
|
GCC 2 |
Applicable/Governing Law: The Contract shall be interpreted in accordance with the laws of Islamic Republic of Pakistan |
|
GCC 3 |
Language: The language of the Contract, all correspondence and communications to be given, and all other documentation to be prepared and supplied under the Contract shall be in English. |
|
GCC 4 |
Notices: The addresses for the notices are: Procuring Agency: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist Contractor/ Bidder:  [Name, address and telephone number]. The Contractor/ Bidder’s Representative(s) [Name, address, telephone number and e-mail address]  |
|
GCC 6.1 |
The Authorized Representatives are:  For the Procuring Agency: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist For the Bidder: Name: ……………………… Designation: …………….. Address: ……………………………..  |
|
GCC 7 |
Effectiveness of the contract The Contractor/Bidder shall be effective within ….. days from the date of signature of the Contract by both parties |
|
GCC 8 |
Commencement of Contract: The Contractor/ Bidder shall provide Non-Consultancy Services from the effective date of contract. |
|
GCC 10.2 |
Expiration of Contract: The time period shall be …………………. |
|
GCC 14 |
Termination In the event of termination of the contract due to any reason as already defined in the General Conditions of Contract, the Bidder shall be responsible for providing to the Authority the Goods till the time of alternate arrangements. |
|
GCC 16 |
Conflict of Interest: The Procuring Agency reserves the right to determine on a case-by-case basis whether the Bidder should be disqualified from providing goods or services due to a conflict of a nature described in Clause GCC 17. |
|
GCC 20 |
Liquidated Damages If the Bidder fails to provide services as required under the contract or in case of any data loss/data breach or any incident compromising the data security or other such failures related to any services, the Bidder shall pay to the Procuring Agency as Liquidated Damages at a rate of 0.01% to 1.00%Â of the Contract value, in accordance with the extent of performance failure & the cost of investigating such incidents as judged by the Authority. |
|
GCC 21 |
Performance Guarantee: The amount of performance guarantee shall be 0%Â of the contract price in acceptable form of Nil |
|
GCC 27 |
Currency of Payment: All the payment to be released to the contractor/Bidder shall be in Pakistani Rupees. |
|
GCC 28 |
Payment terms: Payment will be made to the Bidder against the procured Goods and services according to the actual invoice or running bills submitted by the Bidder against the services provided within the time given in the conditions of the contract. |
| Â | Â |
|
GCC 29 |
Identifying Defects: The Authority reserves the right at any time to inspect the premises of the provider to inspect the goods and monitor the goods being provided. Inspections & Tests RequirementsFor being Brand New, bearing relevant reference numbers of the equipment (Certificate from supplier) For Physical Fitness having No Damages (Certificate from supplier) For the Country of Origin as quoted by the Supplier (Certificate from manufacturer) For conformance to specifications and performance parameters, through Prior to delivery inspection (Inspection Report by Procurement Committee / Inspection Team) For successful operation at site after complete installation, testing and commissioning of the equipment (Installation, Testing and Commissioning Report by Procurement Committee / Inspection Team) Delivery & DocumentsCopies of the Supplier’s invoice showing Goods’ description, quantity, unit price, and total amount; Original and two copies of the usual transport document (for example, a negotiable bill of lading, a non-negotiable sea waybill, an inland waterway document, an air waybill, a railway consignment note, a road consignment note, or a multimodal transport document) which the buyer may require to take the goods; Copies of the packing list identifying contents of each package; Insurance Certificate; Manufacturer’s or Supplier’s Valid Warranty Certificate; Inspection Certificate issued by the Nominated Inspection Agency (if any), and the Supplier’s Factory Inspection Report; Certificate of Origin. The above documents would be required even if the equipment has already been imported and is available with the supplier ex-stock |
|
GCC 31 Â |
Following is the guidance for Dispute Resolution
Notwithstanding any reference to the arbitration herein, the parties shall continue to perform their respective obligations under the Contract unless they otherwise agree that the Authority shall pay the Bidder any monies due to the Bidder. Arbitrator’s fee: The fee shall be specified in Pak Rupees, as determined by the Arbitrator, which shall be shared equally by both parties. Appointing Authority for Arbitrator: By the Mutual Consent or in accordance with the provisions of Arbitration Act, 1940, in case the parties fail to reach a consensus on the name of sole arbitrator, any party may submit an application to the Chief Justice Islamabad High Court for appointment of sole arbitrator. The Chief Justice IHC may appoint a former judge of any High Court or Supreme Court as the sole arbitrator to resolve the dispute between the parties. Rules of procedure for arbitration proceedings: Any dispute between the Authority and a Bidder who is a national of the Islamic Republic of Pakistan arising in connection with the present Contract shall be referred to adjudication or arbitration in accordance with the laws of the Islamic Republic of Pakistan including Arbitration Act 1940, however above provision shall prevail in referring the case to the Arbitrator. Place of Arbitration and Award: The arbitration shall be conducted in English language and place of arbitration shall be at Islamabad. The award of the arbitrator shall be final and shall be binding on the parties. |
Date: [insert date (as day, month and year)]
Bid No.:P16085
To: Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
Â
Â
We, the undersigned, declare that:
We understand that, according to your conditions, Bids must be supported by a Bid Securing Declaration.
We accept that we will be blacklisted and henceforth cross debarred  for participating in respective category of public procurement proceedings for a period of (not more than) six months, if fail to abide with a bid securing declaration, however without indulging in corrupt and fraudulent practices, if we are in breach of our obligation(s) under the Bid conditions, because we:
We understand this Bid Securing Declaration shall expire if we are not the successful
Bidder, upon the earlier of (i) our receipt of your notification to us of the name of the successful Bidder; or (ii) twenty-eight (28) days after the expiration of our Bid.
Â
THIS AGREEMENT made the _____ day of __________ 20_____ between Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
 (hereinafter called “the Procuring Agency”) of the one part and [name of Bidder] of [city and country of Bidder] (hereinafter called “the Bidder”) of the other part:
Â
WHEREAS the Procuring Agency invited Bids for provision of goods, viz., Construction of New Hostel Accomodation at Met. Office, Sukkur Airport. (P16085) and has accepted a Bids by the Bidder for the provision of Goods in the sum of [contract price in words and figures] (hereinafter called “the Contract Price”).
Â
NOW THIS CONTRACT WITNESSETH AS FOLLOWS:
1.  In this Contract words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract referred to.
2.  The following documents shall be deemed to form and be read and construed as part of this Contract, In the event of any ambiguity or conflict between the Contract Documents listed below, the order of precedence shall be the order in which the Contract Documents are listed below:-
3.  In consideration of the payments to be made by the Procuring Agency to the Bidder as hereinafter mentioned, the Bidder hereby covenants with the Procuring Agency to provide the Goods related services and to remedy defects therein in conformity in all respects with the provisions of the Contract.
4.  The Procuring Agency hereby covenants to pay the Bidder in consideration of the provision of Goods and the remedying of defects therein, the Contract Price or such other sum as may become payable under the provisions of the contract at the times and in the manner prescribed by the contract.
Â
IN WITNESS whereof the parties hereto have caused this Contract to be executed in accordance with their respective laws the day and year first above written.
Â
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Procuring Agency:
………………………………………………
Signed, sealed, delivered by __________________the ________________ (for the Procuring Agency)
Â
Witness to the signatures of the Bidder: …………………………………………………
Â
Â
Â
Contract                          Number:  Contract                              Value:  Contract Title:
Dated:
Â
[Name of Supplier] hereby declares that it has not obtained or induced the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practice.
Without limiting the generality of the foregoing [Name of Supplier] represents and warrants that it has fully declared the brokerage, commission, fee etc. paid  or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder's fee or kickback, whether described as consultations fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.
[Name of Supplier] certifies that it has made and will make full disclosure of all agreements and arrangements with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representative or warranty.
[Name of Supplier] accepts full responsibility and strict liability for making and false declaration, not making full disclosure, misrepresenting fact or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other right and remedies available to GoP under any law, contract or other instrument, be voidable at the option of GoP.
Notwithstanding any rights and remedies exercised by GoP in this regard, [Name of Supplier] agrees to indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten time the sum of any commission, gratification, bribe, finder's fee or kickback given by [Name of Supplier] as aforesaid for the purpose of obtaining or inducing the procurement of any contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP.
Â
To:     Sub Project Management Unit WSR, Sukkur (Pakistan Meteorological Department), Chief Meteorologist MET Complex, Gulistan-e-Johar Block-5, University Road., Airport Sub-Division, Malir (District), Karachi (Division), Sindh (Province).
Â
WHEREAS [name of Bidder] (hereinafter called “the Bidder”) has undertaken, in pursuance of Contract No. [reference number of the contract] dated [insert date] for provision of Goods(hereinafter called “the Contract”).
Â
AND WHEREAS it has been stipulated by you in the said Contract that the Bidder shall furnish you with a Bank Guarantee by a reputable bank for the sum specified therein as security for compliance with the Bidder’s performance obligations in accordance with the Contract.
Â
AND WHEREAS we have agreed to give the Bidders guarantee:
Â
THEREFORE, WE hereby affirm that we are Guarantors and responsible to you, on behalf of the Bidder, up to a total of [amount of the guarantee in words and figures], and we undertake to pay you, upon your first written demand declaring the Bidder to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [amount of guarÂantee] as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein.
Â
This guarantee is valid until the: [insert date]
Â
Â
Signature and seal of the Guarantors
Â
Â
_____________________________________________________________________
[name of bank or financial institution]
Â
Â
_____________________________________________________________________
[address]
Â
Â
_____________________________________________________________________
[date}
Please attached filled form of past experience and completed contracts
Â